Tiger Armed Reconnaissance Helicopter (ARH Tiger) of the Australian Army (photos: 1st Australian Regiment)
"The end of ARH Tiger flying operations is a significant moment for the 1st Aviation Regiment, but it also marks the beginning of an exciting new chapter as we continue our relocation to Townsville and further build Australia's attack helicopter capability around the AH-64E Apache," Major General Hafner said.
The Australian Army will shortly conclude Tiger Armed Reconnaissance Helicopter (ARH Tiger) flying operations in Darwin, marking a significant milestone in the transition to the new AH-64E Apache Attack Helicopter capability.
In recognition, the 1st Aviation Regiment will mark the occasion with an open day for members and their families, a formal dinner and a flyover of Darwin.
Commander Army Aviation, Major General David Hafner AM CSC, said the ARH Tiger had provided Army with an armed reconnaissance capability for two decades.
"Our soldiers, aircrew and maintainers have achieved an extraordinary transition from the ARH Tiger to the Apache, while continuing to deliver training and operational outputs.
“Their dedication has ensured Army remains ready for the future."
When introduced into Australian service, the ARH Tiger combined the capabilities of the unarmed Kiowa reconnaissance helicopter and the Bushranger armed version of the Iroquois utility helicopter, into a single platform that integrated intelligence, surveillance, reconnaissance, electronic warfare and strike effects.
The retirement of the ARH Tiger reflects its planned 20-year service life and Australia’s need to operate in an evolving threat environment, where advanced air defence systems, precision weapons and uncrewed platforms present challenges better suited to the capabilities of next generation battlefield helicopters such as the AH-64E Apache.
The Apache is replacing the ARH Tiger within the 1st Aviation Regiment and will deliver enhanced firepower, networking and interoperability capabilities to support future Army operations.
This successful transition was demonstrated in July 2026, when Australian Army AH-64E Apache crews conducted their first live-fire activities in Townsville.
Six Apaches have been delivered to Australia, with all 29 helicopters expected to be delivered by the end of 2029.
(Aus DoD)



FMP ARROWHEAD140
BalasHapusdi namakan BALAPUTRADEWA,
seorang Raja yang termasyur..dari kerajaan Maritim Sriwijaya hore haha!🤗👍😎
cocok deh,
Kapal Induk baruw kita di namai KRI Sriwijaya 100
Frigat 6600 ton 64 VLS baruw kita dinamai Sang Raja KRI Balaputradewa 322 haha!🦾😉🚀
✅️https://www.facebook.com/watch/?v=1353330149363545&vanity=budibersenyum
✅️https://www.facebook.com/watch/?v=1631543565352289&vanity=KementerianPertahananRI
Matra Laut Semakin JAYA..JAYA..JAYAAAAAA...haha!🦾🚀🏴☠️
Hapusyg macem2 di ambalat sudah waktunya diberi embege ama kopdes🚀 haha!✌️🥳😋
tinggal tunggu Kapal Induk/LHD Majapahit,
HapusFrigat & Destronya Sang Mahapatih Gajah Mada serta para Raja dari Raden Wijaya, Hayam Wuruk🔥...makin menyala haha!🦾🔥🚀
lah seblah makin gak dianggap..ehh uda kicep haha!😂🍌🤫
Farewell tiger....we"ll missed you 🤧
Hapushttps://www.facebook.com/share/r/1CNipbb2yi/
KASIHAN YANG TAK PUNYA HELI ATTACK MACAM MALAYDESH CUMA BISA WET DREAM FOROVER
BalasHapus🙈🙈🙈🙈🙈🙈🇲🇾🤡🤡🤡🤡🤡🤡🤡🇲🇾🐷🐷🐷🐷🐷🐷🐷🇲🇾💩💩💩💩💩💩💩💩🇲🇾
INDONESIA=
BalasHapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------------------
REALITA ALUTSISTA: BARANG MUSEUM & GHOST PROJECTS
• Ageing Equipment: Akibat budget minim selama 25 tahun, militer dipaksa menggunakan peralatan era 70-an dan 90-an yang membahayakan nyawa.
• Su-30MKM Failure: Kesulitan menjaga kesiapan tempur jet Rusia akibat sanksi Ukraina dan kelangkaan suku cadang.
• Prototype Gagal: Industri lokal hanya mampu membuat prototipe pistol dan senapan yang tidak pernah terealisasi ke produksi massal.
________________________________________
KEHANCURAN FISKAL: "HANYA BAYAR BUNGA"
PM Anwar Ibrahim mengakui kelumpuhan anggaran negara:
• Debt to GDP: Total liabilitas mencapai 82%, dengan utang federal resmi di angka 60,4%.
• Siklus Gali Lubang: Anggaran negara habis hanya untuk membayar Faedah (Bunga), bukan melunasi pokok utang tertunggak.
• Corruption: Intervensi politik dan korupsi sistemik terus merusak arsitektur pengadaan pertahanan.
INDONESIA=
BalasHapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------------------
1. KLASIFIKASI KINERJA BELANJA MILITER SIPRI DI KAWASAN ASEAN
• Kelompok Aktif (Realisasi Shopping Masif):
o Indonesia (1 Lembar Penuh Paket Kelas Berat): Menandatangani dan merealisasikan kontrak efektif untuk alutsista mutakhir seperti Rafale F-4, TP400-D6, Ship Engine, PPA-L-Plus, A400M Atlas, rudal taktis Bora dan Khan, drone taktis Anka-S, Air Refuel System, serta mesin LM-2500.
o Vietnam: Aktif melakukan modernisasi pertahanan matra laut dan udara untuk menjaga stabilitas kedaulatan laut internal.
o Myanmar: Melanjutkan akuisisi operasional alutsista taktis guna memenuhi kebutuhan operasional domestik.
o Thailand: Merealisasikan pengadaan paket persenjataan baru dan memperbarui armada tempur lini depan.
o Filipina: Memperkuat postur maritim melalui kontrak pengadaan kapal perang serta rudal jelajah pesisir.
o Singapura: Mengisi lembar belanja secara konsisten lewat akuisisi platform teknologi pertahanan generasi kelima.
• Kelompok Pasif (Salam Lembar Kosong 2024–2025):
o MALONYET, Timor Leste, Kamboja, Laos, dan Brunei mencatatkan status nihil dalam dinamika transfer senjata strategis global.
________________________________________
2. KONTRA-NARATIF DOKUMEN 1 LEMBAR: KUALITAS KONTRAK VS ABSENSI TOTAL
• Analisis Ruang Fiskal: Kepemilikan laporan 1 lembar milik Indonesia mencerminkan konversi nyata dari rencana pertahanan menjadi transaksi riil, didukung oleh rasio utang pemerintah yang aman di kisaran 40% dari PDB nominal sebesar US$ 1,69 Triliun.
• Fakta Finansial Kontra: Narasi ejekan mengenai dokumen "hanya sehelai lembar" berbanding terbalik dengan kondisi MALONYET yang mencatatkan lembar KOSONG akibat tidak adanya daya beli belanja militer baru.
• Alokasi Defisit Anggaran: Anggaran pertahanan MALONYET sebesar RM 5,8 Miliar habis terserap sepenuhnya untuk pemeliharaan rutin, bukan investasi armada operasional baru.
Australian Army Farewells ARH Tiger Helicopters
BalasHapus------------
wahh heli atak Osi uda jadi Rongsok aje haha!😱🤓😶🌫️
kalo kita Dikasi Gratis sama Osi mayan nich buat kapal induk haha!😉🤣👌
pasti diseblah sodara tirinya si tipe m pasti NGAMUK🔥 total gak trima haha!🤪😤🍌
warganyet negri🎰kasino semenanjung kuala lumpo pura2 Nolak, padahal maoo tuchh..haha!🤭🍌🤥
Saya lihat mesinnya unik sendiri. Tidak nemu commonality dengan heli lain. Enakan ambil Super Cobra pakai PT6T.
Hapushayo para warganyet kl yg anti Rongsokan dipersilakan ngemis tiger osi,
BalasHapusjangan sampe kayak nh90 & hornet klasik....uda hancur lebur baruw pengen...
ucap 2 kata ajah..bagi donk haha!🤣🍌😋
ato gak last last SEWA, jimat kos haha!😝🤪🤥
MALONSIA = OVERPRICE + DOWNGRADE
BalasHapus-
⚓ HARGA LCS MALAYSIA VS DESTROYER
• Type 052D Class: USD 500–600 Juta / unit.
• KDX III Class (Sejong): USD 900 Juta / unit.
• Type 055 Class: USD 920 Juta / unit.
• LCS Malaysia (Maharaja Lela): USD 948 Juta / unit (Total USD 4,74 Miliar / 5 unit). Status delayed (tertunda) & kosongan (FFBNW/belum termasuk amunisi), tanpa NSM, tanpa VL Mica, tanpa torpedo ringan, tanpa secondary guns,
--------------------------------
🚁 SEWA VS BELI AW149
• Sewa: USD 3,7 Miliar (RM 16,8 M) / 28 unit / 15 tahun.
• Beli: USD 868 Juta (RM 3,954 M) / 28 unit (USD 31 Juta/unit).
• Rasio: Sewa 4x lebih mahal (setara 119 unit baru).
--------------------------------
🚢 LMS B2 Korvet (Ada Class)
• Malaysia (Hisar/LMS B2): USD 176,7 Juta / unit (Total USD 530 Jt / 3 unit — downgrade).
• Pakistan (Ada Class): USD 250 Juta / unit (Total USD 1 Miliar / 4 unit).
• Ukraina (Ada Class): USD 250 Juta / unit (Total USD 1 Miliar / 2 unit + UCAV).
--------------------------------
🛩️ JET TEMPUR FA-50
• FA-50M (Malaysia): USD 51,1 Juta / unit (Total USD 920 Jt / 18 unit — varian termurah).
• FA-50PH B2 (Filipina): USD 58,33 Juta / unit (Total USD 700 Jt / 12 unit — AESA & refueling).
• FA-50 GF (Block II): USD 58,75 Juta / unit (Total USD 705 Jt / 12 unit).
• FA-50 PL (Polandia): USD 63,89 Juta / unit (Total USD 2,3 Miliar / 36 unit — standar NATO).
--------------------------------
SURAT UTANG LUAR NEGERI MALONYET (1998–2026):
-
1998: Fokus restrukturisasi internal; absen di pasar global akibat pembatasan modal.
-
1999: Menerbitkan Global Bond USD 1 miliar di AS dan Eropa untuk bukti pemulihan.
-
2002: Merilis Sovereign Sukuk Ijarah Global pertama dunia USD 600 juta di London & Timur Tengah.
-
2004: Mempromosikan surat utang luar negeri melalui Khazanah Nasional.
-
2006: Khazanah menerbitkan Exchangeable Sukuk USD 750 juta di Asia dan Eropa.
-
2011: Menerbitkan Wakala Global Sukuk USD 2 miliar; kebanjiran permintaan 4,5 kali lipat.
-
2015: Merilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur dan utang.
-
2016: Menerbitkan Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun) demi efisiensi biaya.
-
2019: Diversifikasi ke Samurai Bond JPY 200 miliar dengan jaminan JBIC di Jepang.
-
2021: Meluncurkan Sovereign Sustainability Sukuk USD 1,3 miliar pertama dunia permintaan melonjak 6,4 kali lipat.
-
2022–2024: Absen di valas; fokus mempromosikan obligasi domestik (MGS/MGII) untuk menarik modal asing.
-
2025: Bersiap kembali ke pasar valas dengan menunjuk bank sindikasi internasional.
-
2026: Mempromosikan rencana obligasi global USD 1 miliar
KORPS MARINIR TNI-AL akan memiliki Refurbished AAV7 M35 Made in USA ex-USMC dalam 3 Batch:
BalasHapusBatch 2026 = 35 unit
Batch 2027 = 35 unit
Batch 2028 = 35 unit
Total= 105 unit
Disebar merata untuk 3 Pasmar I, II,III
RUPIAH JATUH TERSUNGKUR lagi guys....HAHAHAHHAHA
BalasHapus1 MYR = 4,406.3497 IDR
SEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
-
🪙 Daftar Negara & Produk
• Peru: Mata uang (Soles).
• Malonsia: Mata uang (Ringgit) & Paspor.
• Nepal: Mata uang (Rupee), Pita Cukai, & Prangko.
• Bangladesh: Mata uang (Taka).
• Sri Lanka: Mata uang (Rupee) & Paspor.
• Somalia: Mata uang (Shilling).
• Argentina: Mata uang (Peso).
• Pakistan: Pita Cukai.
• Filipina: Prangko.
• Guinea: Paspor.
-------------------------------------------
🔎 Sumber Berita & Media Resmi
1. Situs Resmi Peruri (Rilis Pers Ringgit) – Kerja sama cetak Ringgit Malonsia sejak 2010.
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail proyek dokumen imigrasi Sri Lanka.
3. detikFinance – Wawancara cetak mata uang Nepal, Somalia, dan Argentina.
4. Kompas – Catatan cetak prangko Filipina dan pita cukai Pakistan.
5. CNN Indonesia – Laporan ekspansi cetak uang Nepal dan paspor Guinea.
-------------------------------------------
BEBAN UTANG PER KAPITA & POPULASI (2026–1998)
2026: RM 94,544 | POPULASI: 36,385,115 JIWA
2025: RM 81,998 | POPULASI: 35,977,838 JIWA
2024: RM 79,315 | POPULASI: 34,671,895 JIWA
2023: RM 74,587 | POPULASI: 35,126,298 JIWA
2022: RM 70,901 | POPULASI: 34,695,493 JIWA
2021: RM 67,667 | POPULASI: 34,282,399 JIWA
2020: RM 63,464 | POPULASI: 33,870,000 JIWA
2019: RM 60,179 | POPULASI: 33,450,000 JIWA
2018: RM 57,605 | POPULASI: 33,000,000 JIWA
2017: RM 54,910 | POPULASI: 32,540,000 JIWA
2016: RM 52,699 | POPULASI: 32,040,000 JIWA
2015: RM 51,253 | POPULASI: 31,520,000 JIWA
2014: RM 47,927 | POPULASI: 30,980,000 JIWA
2013: RM 44,992 | POPULASI: 30,420,000 JIWA
2012: RM 41,326 | POPULASI: 29,850,000 JIWA
2011: RM 37,904 | POPULASI: 29,260,000 JIWA
2010: RM 34,488 | POPULASI: 28,650,000 JIWA
2009: RM 31,326 | POPULASI: 28,040,000 JIWA
2008: RM 26,155 | POPULASI: 27,450,000 JIWA
2007: RM 25,316 | POPULASI: 26,860,000 JIWA
2006: RM 23,381 | POPULASI: 26,260,000 JIWA
2005: RM 21,940 | POPULASI: 25,660,000 JIWA
2004: RM 20,550 | POPULASI: 25,060,000 JIWA
2003: RM 18,560 | POPULASI: 24,460,000 JIWA
2002: RM 16,798 | POPULASI: 23,870,000 JIWA
2001: RM 15,162 | POPULASI: 23,280,000 JIWA
2000: RM 13,574 | POPULASI: 22,690,000 JIWA
1999: RM 12,210 | POPULASI: 22,110,000 JIWA
1998: RM 10,821 | POPULASI: 21,530,000 JIWA
--------------------------------------------
UTANG & LIABILITAS MALONYET (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
SURAT UTANG LUAR NEGERI MALONYET (1998–2026):
-
1998: Fokus restrukturisasi internal; absen di pasar global akibat pembatasan modal.
-
1999: Menerbitkan Global Bond USD 1 miliar di AS dan Eropa untuk bukti pemulihan.
-
2002: Merilis Sovereign Sukuk Ijarah Global pertama dunia USD 600 juta di London & Timur Tengah.
-
2004: Mempromosikan surat utang luar negeri melalui Khazanah Nasional.
-
2006: Khazanah menerbitkan Exchangeable Sukuk USD 750 juta di Asia dan Eropa.
-
2011: Menerbitkan Wakala Global Sukuk USD 2 miliar; kebanjiran permintaan 4,5 kali lipat.
-
2015: Merilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur dan utang.
-
2016: Menerbitkan Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun) demi efisiensi biaya.
-
2019: Diversifikasi ke Samurai Bond JPY 200 miliar dengan jaminan JBIC di Jepang.
-
2021: Meluncurkan Sovereign Sustainability Sukuk USD 1,3 miliar pertama dunia permintaan melonjak 6,4 kali lipat.
-
2022–2024: Absen di valas; fokus mempromosikan obligasi domestik (MGS/MGII) untuk menarik modal asing.
-
2025: Bersiap kembali ke pasar valas dengan menunjuk bank sindikasi internasional.
-
2026: Mempromosikan rencana obligasi global USD 1 miliar
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
SURAT UTANG LUAR NEGERI MALONYET (1998–2026):
-
1998: Fokus restrukturisasi internal; absen di pasar global akibat pembatasan modal.
-
1999: Menerbitkan Global Bond USD 1 miliar di AS dan Eropa untuk bukti pemulihan.
-
2002: Merilis Sovereign Sukuk Ijarah Global pertama dunia USD 600 juta di London & Timur Tengah.
-
2004: Mempromosikan surat utang luar negeri melalui Khazanah Nasional.
-
2006: Khazanah menerbitkan Exchangeable Sukuk USD 750 juta di Asia dan Eropa.
-
2011: Menerbitkan Wakala Global Sukuk USD 2 miliar; kebanjiran permintaan 4,5 kali lipat.
-
2015: Merilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur dan utang.
-
2016: Menerbitkan Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun) demi efisiensi biaya.
-
2019: Diversifikasi ke Samurai Bond JPY 200 miliar dengan jaminan JBIC di Jepang.
-
2021: Meluncurkan Sovereign Sustainability Sukuk USD 1,3 miliar pertama dunia permintaan melonjak 6,4 kali lipat.
-
2022–2024: Absen di valas; fokus mempromosikan obligasi domestik (MGS/MGII) untuk menarik modal asing.
-
2025: Bersiap kembali ke pasar valas dengan menunjuk bank sindikasi internasional.
-
2026: Mempromosikan rencana obligasi global USD 1 miliar
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Rasio Utang Pemerintah terhadap PDB
Indonesia (Pruden): ~40% — Berada dalam kategori sangat sehat, jauh di bawah batas aman undang-undang (60%).
MALAYSEWA (Zona Merah): ~69–70% — Sudah melewati limit plafon utang mereka (65%).
-
Rasio Utang Rumah Tangga
Indonesia (Aman): 16% — Rendah, memberikan ketahanan tinggi terhadap konsumsi domestik.
MALAYSEWA (Ekstrem): 84,3% — Sangat tinggi (mencekik), sebagian besar pendapatan rakyat habis untuk membayar cicilan.
-
Defisit Fiskal (Tahun Anggaran 2025)
Indonesia (Terkendali): Di bawah 3% — Menunjukkan disiplin fiskal yang ketat dan manajemen anggaran yang stabil.
MALAYSEWA (Tinggi): 3,8% — Masih cukup tinggi, menambah beban akumulasi utang baru setiap tahun.
-
Kapasitas Belanja Negara
Indonesia (Tinggi): Fokus pada modernisasi alutsista strategis (Rafale, Scorpène) dan pembangunan infrastruktur karena fiscal space yang luas.
MALAYSEWA (Rendah): Fokus pada pembayaran bunga utang yang membengkak, mengakibatkan pembekuan pengadaan militer.
RUPIAH JATUH TERSUNGKUR lagi guys....HAHAHAHHAHA
BalasHapus1 MYR = 4,406.3497 IDR
SEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
RINGGIT DAN PASPOR MALONYET
RINGGIT DAN PASPOR MALONYET
-
Daftar ringkas negara yang mata uang atau dokumen negaranya dicetak oleh Perum Peruri, lengkap dengan tautan sumber berita resminya:
🪙 Daftar Negara & Produk
• Peru – Mata Uang: Soles
• Malonyet – Mata Uang: Ringgit & Paspor
• Nepal – Mata Uang: Rupee, Pita Cukai, & Prangko
• Bangladesh – Mata Uang: Taka
• Sri Lanka – Mata Uang: Rupee & Paspor
• Somalia – Mata Uang: Shilling
• Argentina – Mata Uang: Peso
• Pakistan – Dokumen Negara: Pita Cukai
• Filipina – Dokumen Negara: Prangko
• Guinea – Dokumen Negara: Paspor
----------------------------------
Sumber Berita Resmi & Media Nasional
1. Situs Resmi Peruri (Rilis Pers) – Laporan sejak tahun 2010, di mana Bank Negara Malonsia memercayakan pemenuhan kebutuhan pencetakan lembaran kertas mata uang Ringgit kepada Peruri
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail kerja sama pencetakan dokumen imigrasi paspor Sri Lanka.
3. detikFinance – Wawancara resmi terkait pencetakan mata uang Nepal, Somalia, hingga Argentina di Indonesia.
4. Kompas Interaktif – Catatan detail mengenai pencetakan prangko Filipina dan pita cukai Pakistan.
5. CNN Indonesia – Laporan ekspansi Peruri mencetak uang kertas Nepal serta paspor negara Guinea.
----------------------------------
HUTANG & LIABILITAS MALONYET 1998–2026
-
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia dan dimulainya defisit anggaran berkepanjangan.
-
1999: RM 116,6 Miliar – Penerbitan instrumen obligasi domestik baru untuk stimulus ekonomi.
-
2000: RM 125,6 Miliar – Restrukturisasi sektor korporasi dan perbankan pasca-krisis selesai.
-
2001: RM 145,7 Miliar – Peningkatan belanja pembangunan guna menopang pertumbuhan domestik.
-
2002: RM 165,0 Miliar – Rasio utang terhadap PDB mulai merangkak naik secara perlahan.
-
2003: RM 188,8 Miliar – Batas plafon utang resmi pertama kali dinaikkan menjadi 40% dari PDB.
-
2004: RM 216,6 Miliar – Pengeluaran publik meluas demi mendukung proyek infrastruktur baru.
-
2005: RM 228,7 Miliar – Konsolidasi fiskal awal di bawah manajemen kepemimpinan baru.
-
2006: RM 242,2 Miliar – Pengendalian defisit secara ketat di tengah lonjakan harga komoditas global.
-
2007: RM 266,7 Miliar – Posisi keuangan masih stabil menjelang gejolak finansial global.
-
2008: RM 306,4 Miliar – Kenaikan plafon utang menjadi 45% akibat dampak awal krisis finansial global.
-
2009: RM 362,4 Miliar – Batas utang melonjak ke 55% demi mendanai paket stimulus ekonomi besar.
-
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis finansial global.
-
2011: RM 456,1 Miliar – Rasio utang mulai meningkat stabil.
-
2012: RM 501,6 Miliar – Melewati ambang batas RM 500 miliar.
-
2013: RM 547,7 Miliar – Ekspansi belanja infrastruktur nasional.
-
2014: RM 582,8 Miliar – Berdasarkan Laporan Keuangan Pemerintah Federal 2014.
-
2015: RM 630,5 Miliar – Penyesuaian ekonomi akibat fluktuasi harga minyak.
-
2016: RM 648,5 Miliar – Konsolidasi fiskal di bawah pemerintahan saat itu.
-
2017: RM 686,8 Miliar – Data tercatat dalam Laporan Tahunan Bank Negara MALONYET 2017.
-
2018: RM 1,19 Triliun – Transparansi Baru: Termasuk liabilitas 1MDB & proyek PPP. [
-
2019: RM 1,25 Triliun – Laporan pengungkapan utang menembus RM 1 triliun.
-
2020: RM 1,32 Triliun – Lonjakan akibat paket stimulus pandemi COVID-19.
-
2021: RM 1,38 Triliun – Akumulasi utang federal selama masa pemulihan ekonomi.
-
2022: RM 1,45 Triliun – Posisi utang sebelum pergantian pemerintahan.
-
2023: RM 1,53 Triliun – Dikonfirmasi oleh PM Anwar Ibrahim sebagai warisan utang & liabilitas.
-
2024: RM 1,63 Triliun – Berdasarkan Belanjawan (APBN) 2024.
-
2025: RM 1,71 Triliun – Proyeksi dalam Tinjauan Fiskal 2026 (Kementerian Kewangan).
-
2026: RM 1,79 Triliun – Target manajemen utang dalam Economic Outlook 2026
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
SURAT UTANG LUAR NEGERI MALONYET (1998–2026):
-
1998: Fokus restrukturisasi internal; absen di pasar global akibat pembatasan modal.
-
1999: Menerbitkan Global Bond USD 1 miliar di AS dan Eropa untuk bukti pemulihan.
-
2002: Merilis Sovereign Sukuk Ijarah Global pertama dunia USD 600 juta di London & Timur Tengah.
-
2004: Mempromosikan surat utang luar negeri melalui Khazanah Nasional.
-
2006: Khazanah menerbitkan Exchangeable Sukuk USD 750 juta di Asia dan Eropa.
-
2011: Menerbitkan Wakala Global Sukuk USD 2 miliar; kebanjiran permintaan 4,5 kali lipat.
-
2015: Merilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur dan utang.
-
2016: Menerbitkan Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun) demi efisiensi biaya.
-
2019: Diversifikasi ke Samurai Bond JPY 200 miliar dengan jaminan JBIC di Jepang.
-
2021: Meluncurkan Sovereign Sustainability Sukuk USD 1,3 miliar pertama dunia permintaan melonjak 6,4 kali lipat.
-
2022–2024: Absen di valas; fokus mempromosikan obligasi domestik (MGS/MGII) untuk menarik modal asing.
-
2025: Bersiap kembali ke pasar valas dengan menunjuk bank sindikasi internasional.
-
2026: Mempromosikan rencana obligasi global USD 1 miliar
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
KLAIM CASH = HUTANG ASET MILITER
-
1. 🇹🇷 Turki (LMS Batch 2)
Model: G2G (Antar Pemerintah) via SSB.
Bunga: 4% – 6% (Fixed/OECD CIRR).
Tenor: 10 – 15 Tahun.
-
2. 🇰🇷 Korea Selatan (Pesawat FA-50)
Model: Hybrid (Kredit KEXIM & Barter CPO 50%).
Biaya: Management Fee sangat rendah (0,10% - 0,50%).
-
3. 🇬🇧 Inggris (Standar UKEF - Pesawat Hawk)
Syarat: Wajib DP 15% (Standar OECD).
Bunga: Stabil, mengikuti National Loans Fund.
-
4. 🇨🇳 China (LMS Batch 1)
Model: 100% Kredit Ekspor (China Eximbank).
Bunga: Sangat murah (3,5% Fixed).
Tenor: 10 Tahun.
-
5. 🇵🇱 Polandia (Tank PT-91M)
Model: DP 15% + Barter CPO (30-40%).
Tenor: 10 Tahun cicilan.
-
6. 🇩🇪 Jerman (Kedah-Class)
Model: Kredit Komersial dijamin negara (Euler Hermes).
Pendana: Deutsche Bank & Konsorsium.
-
7. Kredit Sindikasi (Proyek LCS - 17 Kreditor/Hutang)
Model: Konsorsium Bank Domestik/Intl (Skala Masif).
Bunga: 6% (Saldo Menurun).
Tenor: 15 Tahun (Akibat penundaan proyek)..
DEBT TRAP BRI PROJECTS = MANGKRAK
HapusMALAYDESH has several Chinese Belt and Road Initiative projects under construction, including the East Coast Rail Line, Kuantan Port Expansion, Green TechNOLogy Park in Pahang, Forest City, Robotic Future City, and Samalaju Industrial Park Steel Complex
(Sumber: Laporan Analisis Ekonomi Makro & Investigasi Proyek BRI)
--------------------------------
US DEPARTEMENT OF JUSTICE =
1. ONE OF THE WORLD'S GREATEST FINANCIAL SCANDALS
2. LARGEST KLEPTOCRACY CASE TO DATE
Although it began in MALAYDESH , the scandal's global scope implicated institutions and individuals in politics, banking, and entertainment, and led to criminal investigations in a number of nations. The 1MDB scandal has been described as "one of the world's greatest financial scandals" and declared by the United States Department of Justice as the "largest kleptocracy case to date"
.(Sumber: Dokumen Resmi Investigasi Hukum US DOJ)
--------------------------------
SCANDALS = NOw and then, by exception, scandals spill out into the public domain, like Bumiputera MALAYDESH Finance 1982, Bank Negara’s FX losses in the 1980s and 1990s, the Scorpene submarines of 2002, the National Feedlot scandal – “cowgate” – of 2012, 1MDB, and the latest LCS naval procurement. But these are just the tip of the iceberg of systematic pilferage. It has become the institutional NOrm.
(Sumber: Laporan Tata Kelola Pemerintahan & Media Investigasi)
--------------------------------
SURAT UTANG LUAR NEGERI MALONYET (1998–2026):
-
1998: Fokus restrukturisasi internal; absen di pasar global akibat pembatasan modal.
-
1999: Menerbitkan Global Bond USD 1 miliar di AS dan Eropa untuk bukti pemulihan.
-
2002: Merilis Sovereign Sukuk Ijarah Global pertama dunia USD 600 juta di London & Timur Tengah.
-
2004: Mempromosikan surat utang luar negeri melalui Khazanah Nasional.
-
2006: Khazanah menerbitkan Exchangeable Sukuk USD 750 juta di Asia dan Eropa.
-
2011: Menerbitkan Wakala Global Sukuk USD 2 miliar; kebanjiran permintaan 4,5 kali lipat.
-
2015: Merilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur dan utang.
-
2016: Menerbitkan Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun) demi efisiensi biaya.
-
2019: Diversifikasi ke Samurai Bond JPY 200 miliar dengan jaminan JBIC di Jepang.
-
2021: Meluncurkan Sovereign Sustainability Sukuk USD 1,3 miliar pertama dunia permintaan melonjak 6,4 kali lipat.
-
2022–2024: Absen di valas; fokus mempromosikan obligasi domestik (MGS/MGII) untuk menarik modal asing.
-
2025: Bersiap kembali ke pasar valas dengan menunjuk bank sindikasi internasional.
-
2026: Mempromosikan rencana obligasi global USD 1 miliar
--------------------------------------------
OBLIGASI GLOBAL MALONYET (1998–2026)
1998: Fokus restrukturisasi internal. Absen pasar global.
1999: Rilis Global Bond USD 1 miliar (AS/Eropa). Bukti pemulihan.
2002: Rilis Sukuk Ijarah Global pertama dunia USD 600 juta (London/Timur Tengah).
2004: Promosi surat utang luar negeri via Khazanah Nasional.
2006: Khazanah rilis Exchangeable Sukuk USD 750 juta (Asia/Eropa).
2011: Rilis Wakala Global Sukuk USD 2 miliar. Permintaan oversubscribed 4,5 kali.
2015: Rilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur.
2016: Rilis Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun).
2019: Diversifikasi ke Samurai Bond JPY 200 miliar bergaransi JBIC (Jepang).
2021: Rilis Sovereign Sustainability Sukuk pertama dunia USD 1,3 miliar. Permintaan melonjak 6,4 kali.
2022–2024: Absen valas. Fokus optimasi obligasi domestik (MGS/MGII).
2025: Bersiap kembali ke pasar valas lewat bank sindikasi internasional.
2026: Promosi rencana obligasi global baru USD 1 miliar.
Matawang RUPIAH hari ini guys.....Matawang TAK LAKU.....HAHAHAHAHHA
BalasHapusRupiah Melemah 0,48%, Dolar AS Makin Dekati Level Rp18.000
https://www.cnbcindonesia.com/market/20260928144912-17-771487/rupiah-melemah-048-dolar-as-makin-dekati-level-rp18000
SEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
RINGGIT DAN PASPOR MALONYET
RINGGIT DAN PASPOR MALONYET
-
Daftar ringkas negara yang mata uang atau dokumen negaranya dicetak oleh Perum Peruri, lengkap dengan tautan sumber berita resminya:
🪙 Daftar Negara & Produk
• Peru – Mata Uang: Soles
• Malonyet – Mata Uang: Ringgit & Paspor
• Nepal – Mata Uang: Rupee, Pita Cukai, & Prangko
• Bangladesh – Mata Uang: Taka
• Sri Lanka – Mata Uang: Rupee & Paspor
• Somalia – Mata Uang: Shilling
• Argentina – Mata Uang: Peso
• Pakistan – Dokumen Negara: Pita Cukai
• Filipina – Dokumen Negara: Prangko
• Guinea – Dokumen Negara: Paspor
----------------------------------
Sumber Berita Resmi & Media Nasional
1. Situs Resmi Peruri (Rilis Pers) – Laporan sejak tahun 2010, di mana Bank Negara Malonsia memercayakan pemenuhan kebutuhan pencetakan lembaran kertas mata uang Ringgit kepada Peruri
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail kerja sama pencetakan dokumen imigrasi paspor Sri Lanka.
3. detikFinance – Wawancara resmi terkait pencetakan mata uang Nepal, Somalia, hingga Argentina di Indonesia.
4. Kompas Interaktif – Catatan detail mengenai pencetakan prangko Filipina dan pita cukai Pakistan.
----------------------------------
UTANG & LIABILITAS MALAYDESH (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
--------------------------------------------
OBLIGASI GLOBAL (1998–2026)
1998: Fokus restrukturisasi internal. Absen pasar global.
1999: Rilis Global Bond USD 1 miliar (AS/Eropa). Bukti pemulihan.
2002: Rilis Sukuk Ijarah Global pertama dunia USD 600 juta (London/Timur Tengah).
2004: Promosi surat utang luar negeri via Khazanah Nasional.
2006: Khazanah rilis Exchangeable Sukuk USD 750 juta (Asia/Eropa).
2011: Rilis Wakala Global Sukuk USD 2 miliar. Permintaan oversubscribed 4,5 kali.
2015: Rilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur.
2016: Rilis Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun).
2019: Diversifikasi ke Samurai Bond JPY 200 miliar bergaransi JBIC (Jepang).
2021: Rilis Sovereign Sustainability Sukuk pertama dunia USD 1,3 miliar. Permintaan melonjak 6,4 kali.
2022–2024: Absen valas. Fokus optimasi obligasi domestik (MGS/MGII).
2025: Bersiap kembali ke pasar valas lewat bank sindikasi internasional.
2026: Promosi rencana obligasi global baru USD 1 miliar.
-
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
KLAIM CASH = HUTANG ASET MILITER
-
1. 🇹🇷 Turki (LMS Batch 2)
Model: G2G (Antar Pemerintah) via SSB.
Bunga: 4% – 6% (Fixed/OECD CIRR).
Tenor: 10 – 15 Tahun.
-
2. 🇰🇷 Korea Selatan (Pesawat FA-50)
Model: Hybrid (Kredit KEXIM & Barter CPO 50%).
Biaya: Management Fee sangat rendah (0,10% - 0,50%).
-
3. 🇬🇧 Inggris (Standar UKEF - Pesawat Hawk)
Syarat: Wajib DP 15% (Standar OECD).
Bunga: Stabil, mengikuti National Loans Fund.
-
4. 🇨🇳 China (LMS Batch 1)
Model: 100% Kredit Ekspor (China Eximbank).
Bunga: Sangat murah (3,5% Fixed).
Tenor: 10 Tahun.
-
5. 🇵🇱 Polandia (Tank PT-91M)
Model: DP 15% + Barter CPO (30-40%).
Tenor: 10 Tahun cicilan.
-
6. 🇩🇪 Jerman (Kedah-Class)
Model: Kredit Komersial dijamin negara (Euler Hermes).
Pendana: Deutsche Bank & Konsorsium.
-
7. Kredit Sindikasi (Proyek LCS - 17 Kreditor/Hutang)
Model: Konsorsium Bank Domestik/Intl (Skala Masif).
Bunga: 6% (Saldo Menurun).
Tenor: 15 Tahun (Akibat penundaan proyek)..
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
PENDAPATAN NEGARA (HASIL KERAJAAN)
RM334,1 Miliar: Estimasi total pendapatan pemerintah MALONYET.
-
75,8% Sumber Pendapatan: Berasal dari sektor pajak (pajak penghasilan individu dan perusahaan).
-
24,2% Sektor Non-Pajak: Berasal dari royalti minyak (Petronas), investasi, dan pungutan lainnya.
-
RM343,1 Miliar: Target proyeksi pendapatan negara.
--------------------------------------------
TOTAL PENGELUARAN NEGARA (BELANJA NEGARA)
RM419,2 Miliar hingga RM470 Miliar: Total belanja negara yang dialokasikan pemerintah MALONYET.
-
RM338,2 Miliar (Belanja Mengurus): Dana habis pakai khusus untuk gaji pegawai negeri, pensiun, operasional kementerian, serta pembayaran subsidi dan bantuan sosial.
-
RM81 Miliar (Belanja Pembangunan): Dana infrastruktur publik seperti jalan tol, sekolah, dan fasilitas medis.
--------------------------------------------
MENGAPA ANGKA PENDAPATAN INI MEMAKSA MALONYET BERUTANG?
BELANJA OPERASIONAL MENYERAP SELURUH PENDAPATAN
Angka belanja operasional murni (Operating Expenditure) yang menyentuh RM338,2 miliar sudah menyedot hampir 100% dari total seluruh pendapatan negara yang masuk.
Hal ini membuat pemerintah MALONYET sama sekali tidak memilik sisa dana pendapatan bersih untuk membiayai pembangunan fasilitas publik ataupun membayar rekor subsidi (yang sempat menyentuh RM80 miliar).
-
Defisit Anggaran Kronis
Jurang perbedaan antara total pendapatan (~RM343 miliar) dan total belanja (~RM419–RM470 miliar) menciptakan defisit anggaran berkisar di angka 3,5% hingga 3,6% dari PDB negara.
Satu-satunya jalan bagi pemerintah MALONYET untuk menambal kekurangan uang puluhan miliar ringgit tersebut adalah dengan MENERBITKAN SURAT UTANG NEGARA BARU.
HUTANG BAYAR HUTANG (2026–1998):
Hapus-
PENDAPATAN : RM334,1 Miliar
PENGELUARAN : RM470 Miliar
BUDGET MINUS : RM470 – RM334,1 = - RM135,9
-------------------------------------------
SURAT UTANG MALONYET (1998–2026) 28 TAHUN DEFISIT
-
1998: Fokus restrukturisasi internal; absen di pasar global akibat pembatasan modal.
-
1999: Menerbitkan Global Bond USD 1 miliar di AS dan Eropa untuk bukti pemulihan.
-
2002: Merilis Sovereign Sukuk Ijarah Global pertama dunia USD 600 juta di London & Timur Tengah.
-
2004: Mempromosikan surat utang luar negeri melalui Khazanah Nasional.
-
2006: Khazanah menerbitkan Exchangeable Sukuk USD 750 juta di Asia dan Eropa.
-
2011: Menerbitkan Wakala Global Sukuk USD 2 miliar; kebanjiran permintaan 4,5 kali lipat.
-
2015: Merilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur dan utang.
-
2016: Menerbitkan Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun) demi efisiensi biaya.
-
2019: Diversifikasi ke Samurai Bond JPY 200 miliar dengan jaminan JBIC di Jepang.
-
2021: Meluncurkan Sovereign Sustainability Sukuk USD 1,3 miliar pertama dunia permintaan melonjak 6,4 kali lipat.
-
2022–2024: Absen di valas; fokus mempromosikan obligasi domestik (MGS/MGII) untuk menarik modal asing.
-
2025: Bersiap kembali ke pasar valas dengan menunjuk bank sindikasi internasional.
-
2026: Mempromosikan rencana obligasi global USD 1 miliar
--------------------------------------------
HUTANG & LIABILITAS MALAYDESH 1998–2026
-
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia dan dimulainya defisit anggaran berkepanjangan.
-
1999: RM 116,6 Miliar – Penerbitan instrumen obligasi domestik baru untuk stimulus ekonomi.
-
2000: RM 125,6 Miliar – Restrukturisasi sektor korporasi dan perbankan pasca-krisis selesai.
-
2001: RM 145,7 Miliar – Peningkatan belanja pembangunan guna menopang pertumbuhan domestik.
-
2002: RM 165,0 Miliar – Rasio utang terhadap PDB mulai merangkak naik secara perlahan.
-
2003: RM 188,8 Miliar – Batas plafon utang resmi pertama kali dinaikkan menjadi 40% dari PDB.
-
2004: RM 216,6 Miliar – Pengeluaran publik meluas demi mendukung proyek infrastruktur baru.
-
2005: RM 228,7 Miliar – Konsolidasi fiskal awal di bawah manajemen kepemimpinan baru.
-
2006: RM 242,2 Miliar – Pengendalian defisit secara ketat di tengah lonjakan harga komoditas global.
-
2007: RM 266,7 Miliar – Posisi keuangan masih stabil menjelang gejolak finansial global.
-
2008: RM 306,4 Miliar – Kenaikan plafon utang menjadi 45% akibat dampak awal krisis finansial global.
-
2009: RM 362,4 Miliar – Batas utang melonjak ke 55% demi mendanai paket stimulus ekonomi besar.
-
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis finansial global.
-
2011: RM 456,1 Miliar – Rasio utang mulai meningkat stabil.
-
2012: RM 501,6 Miliar – Melewati ambang batas RM 500 miliar.
-
2013: RM 547,7 Miliar – Ekspansi belanja infrastruktur nasional.
-
2014: RM 582,8 Miliar – Berdasarkan Laporan Keuangan Pemerintah Federal 2014.
-
2015: RM 630,5 Miliar – Penyesuaian ekonomi akibat fluktuasi harga minyak.
-
2016: RM 648,5 Miliar – Konsolidasi fiskal di bawah pemerintahan saat itu.
-
2017: RM 686,8 Miliar – Data tercatat dalam Laporan Tahunan Bank Negara Malaydesh 2017.
-
2018: RM 1,19 Triliun – Transparansi Baru: Termasuk liabilitas 1MDB & proyek PPP. [
-
2019: RM 1,25 Triliun – Laporan pengungkapan utang menembus RM 1 triliun.
-
2020: RM 1,32 Triliun – Lonjakan akibat paket stimulus pandemi COVID-19.
-
2021: RM 1,38 Triliun – Akumulasi utang federal selama masa pemulihan ekonomi.
-
2022: RM 1,45 Triliun – Posisi utang sebelum pergantian pemerintahan.
-
2023: RM 1,53 Triliun – Dikonfirmasi oleh PM Anwar Ibrahim sebagai warisan utang & liabilitas.
-
2024: RM 1,63 Triliun – Berdasarkan Belanjawan (APBN) 2024.
-
2025: RM 1,71 Triliun – Proyeksi dalam Tinjauan Fiskal 2026 (Kementerian Kewangan).
-
2026: RM 1,79 Triliun – Target manajemen utang dalam Economic Outlook 2026.
=============
=============
INDONESIA
Govt Debt-to-GDP : 40,46%
-
Household Debt-to-GDP : 15,70%
Matawang RUPIAH hari ini guys.....Matawang TAK LAKU.....HAHAHAHAHHA
BalasHapusRupiah Melemah 0,48%, Dolar AS Makin Dekati Level Rp18.000
https://www.cnbcindonesia.com/market/20260928144912-17-771487/rupiah-melemah-048-dolar-as-makin-dekati-level-rp18000
SEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
-
🪙 Daftar Negara & Produk
• Peru: Mata uang (Soles).
• Malonsia: Mata uang (Ringgit) & Paspor.
• Nepal: Mata uang (Rupee), Pita Cukai, & Prangko.
• Bangladesh: Mata uang (Taka).
• Sri Lanka: Mata uang (Rupee) & Paspor.
• Somalia: Mata uang (Shilling).
• Argentina: Mata uang (Peso).
• Pakistan: Pita Cukai.
• Filipina: Prangko.
• Guinea: Paspor.
-------------------------------------------
🔎 Sumber Berita & Media Resmi
4. Situs Resmi Peruri (Rilis Pers Ringgit) – Kerja sama cetak Ringgit Malonsia sejak 2010.
5. Situs Resmi Peruri (Paspor Sri Lanka) – Detail proyek dokumen imigrasi Sri Lanka.
6. detikFinance – Wawancara cetak mata uang Nepal, Somalia, dan Argentina.
7. Kompas – Catatan cetak prangko Filipina dan pita cukai Pakistan.
8. CNN Indonesia – Laporan ekspansi cetak uang Nepal dan paspor Guinea.
--------------------------------
HUTANG & LIABILITAS MALONDESH 1998–2026
1998 : RM 165,4 Miliar
1999 : RM 178,3 Miliar
2000 : RM 192,2 Miliar
2001 : RM 207,2 Miliar
2002 : RM 223,3 Miliar
2003 : RM 240,7 Miliar
2004 : RM 259,5 Miliar
2005 : RM 279,7 Miliar
2006 : RM 301,5 Miliar
2007 : RM 325,0 Miliar
2008 : RM 350,4 Miliar
2009 : RM 377,7 Miliar
2010 : RM 407,1 Miliar
2011 : RM 456,1 Miliar
2012 : RM 501,6 Miliar
2013 : RM 547,7 Miliar
2014 : RM 582,8 Miliar
2015 : RM 630,5 Miliar
2016 : RM 648,5 Miliar
2017 : RM 686,8 Miliar
2018 : RM 1,19 Triliun
2019 : RM 1,25 Triliun
2020 : RM 1,32 Triliun
2021 : RM 1,38 Triliun
2022 : RM 1,45 Triliun
2023 : RM 1,53 Triliun
2024 : RM 1,63 Triliun
2025 : RM 1,71 Triliun
2026 : RM 1,79 Triliun
-
SUMBER :
Bloomberg & Reuters | CNA & The Star | The Edge Malondesh | MOF & Bernama | Kementerian Kewangan
--------------------------------
TAHUN RASIO UTANG TERHADAP GDP (%) 1998–2025
1998 : 35,8%
1999 : 40,4%
2000 : 36,1%
2001 : 42,5%
2002 : 44,9%
2003 : 45,9%
2004 : 45,1%
2005 : 43,8%
2006 : 41,5%
2007 : 41,1%
2008 : 41,3%
2009 : 51,1%
2010 : 52.4%
2011 : 51.8
2012 : 53.3
2013 : 54.7
2014 : 55.0
2015 : 55.1
2016 : 52.7
2017 : 51.9
2018 : 52.5
2019 : 52.4
2020 : 62.0
2021 : 63.3
2022 : 60.2
2023 : 64.3
2024 : 70.4
2025 : 70.5
-
SUMBER : Macrotrends / World Bank / Statista / Trading Economics
--------------------------------
DEFISIT FISKAL MALONDESH PERIODE 1998–2025:
1998 : -1,8% (± USD 33,6 MILIAR)
1999 : -3,2% (± USD 34,3 MILIAR)
2000 : -5,8% (± USD 32,5 MILIAR)
2001 : -5,5% (± USD 38,0 MILIAR)
2002 : -5,6% (± USD 39,5 MILIAR)
2003 : -5,0% (± USD 41,3 MILIAR)
2004 : -4,1% (± USD 41,9 MILIAR)
2005 : -3,6% (± USD 40,7 MILIAR)
2006 : -3,3% (± USD 39,6 MILIAR)
2007 : -3,2% (± USD 39,3 MILIAR)
2008 : -4,8% (± USD 39,3 MILIAR)
2009 : -6,7% (± USD 50,4 MILIAR)
2010 : -5,4% (± USD 51,8 MILIAR)
2011 : -4,8% (± USD 53,7 MILIAR)
2012 : -4,5% (± USD 55,6 MILIAR)
2013 : -3,9% (± USD 55,3 MILIAR)
2014 : -3,4% (± USD 56,9 MILIAR)
2015 : -3,2% (± USD 55,7 MILIAR)
2016 : -3,1% (± USD 54,3 MILIAR)
2017 : -3,0% (± USD 55,6 MILIAR)
2018 : -3,7% (± USD 57,0 MILIAR)
2019 : -3,4% (± USD 67,6 MILIAR)
2020 : -6,2% (± USD 69,1 MILIAR)
2021 : -6,4% (± USD 65,5 MILIAR)
2022 : -5,6% (± USD 69,7 MILIAR)
2023 : -5,0% (± USD 68,3 MILIAR)
2024 : -4,1% (± USD 298,4 MILIAR) (Pemangkasan subsidi)
2025 : -3,8% (± USD 325,6 MILIAR) (Rasionalisasi RON95)
-
SUMBER:
IMF | World Economic Outlook | World Bank | Bank Negara Malondesh.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
PENDAPATAN VS PENGELUARAN MALONYET
PENDAPATAN : RM334,1 Miliar
PENGELUARAN : RM470 Miliar
BEBAN SUBSIDI 23,9%
PANTAS HUTANG BAYAR HUTANG : RM470 – RM334,1 = MINUS RM135,9 ......
--------------------------------------------
PENDAPATAN NEGARA:
Berkisar RM334,1 Miliar hingga RM343,1 Miliar (75,8% dari pajak dan 24,2% non-pajak/Petronas).
-
TOTAL PENGELUARAN:
Mencapai RM419,2 Miliar hingga RM470 Miliar.
-
ALOKASI BELANJA:
Sebesar RM338,2 Miliar habis untuk operasional (gaji, pensiun, subsidi) dan hanya RM81 Miliar untuk pembangunan infrastruktur.
-
ALASAN UTAMA HARUS BERUTANG
PENDAPATAN HABIS TOtal: Biaya operasional murni (RM338,2 Miliar) langsung menelan hampir 100% dari seluruh pendapatan negara yang masuk.
-
DEFISIT ANGGARAN KRONIS: Selisih besar antara pendapatan dan total belanja menciptakan lubang defisit 3,5% hingga 3,6% dari PDB.
-
PENERBITAN UTANG BARU: Pemerintah terpaksa menarik utang baru senilai puluhan miliar ringgit karena tidak ada sisa dana bersih untuk membiayai proyek pembangunan dan subsidi.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
BEBAN UTANG PER KAPITA & POPULASI (2026–1998)
2026: RM 94,544 | POPULASI: 36,385,115 JIWA
2025: RM 81,998 | POPULASI: 35,977,838 JIWA
2024: RM 79,315 | POPULASI: 34,671,895 JIWA
2023: RM 74,587 | POPULASI: 35,126,298 JIWA
2022: RM 70,901 | POPULASI: 34,695,493 JIWA
2021: RM 67,667 | POPULASI: 34,282,399 JIWA
2020: RM 63,464 | POPULASI: 33,870,000 JIWA
2019: RM 60,179 | POPULASI: 33,450,000 JIWA
2018: RM 57,605 | POPULASI: 33,000,000 JIWA
2017: RM 54,910 | POPULASI: 32,540,000 JIWA
2016: RM 52,699 | POPULASI: 32,040,000 JIWA
2015: RM 51,253 | POPULASI: 31,520,000 JIWA
2014: RM 47,927 | POPULASI: 30,980,000 JIWA
2013: RM 44,992 | POPULASI: 30,420,000 JIWA
2012: RM 41,326 | POPULASI: 29,850,000 JIWA
2011: RM 37,904 | POPULASI: 29,260,000 JIWA
2010: RM 34,488 | POPULASI: 28,650,000 JIWA
2009: RM 31,326 | POPULASI: 28,040,000 JIWA
2008: RM 26,155 | POPULASI: 27,450,000 JIWA
2007: RM 25,316 | POPULASI: 26,860,000 JIWA
2006: RM 23,381 | POPULASI: 26,260,000 JIWA
2005: RM 21,940 | POPULASI: 25,660,000 JIWA
2004: RM 20,550 | POPULASI: 25,060,000 JIWA
2003: RM 18,560 | POPULASI: 24,460,000 JIWA
2002: RM 16,798 | POPULASI: 23,870,000 JIWA
2001: RM 15,162 | POPULASI: 23,280,000 JIWA
2000: RM 13,574 | POPULASI: 22,690,000 JIWA
1999: RM 12,210 | POPULASI: 22,110,000 JIWA
1998: RM 10,821 | POPULASI: 21,530,000 JIWA
DEBT TRAP BRI PROJECTS:
HapusProyek East Coast Rail, Kuantan Port, Green Tech Pahang, Forest City, Robotic City, dan Samalaju Steel di Malaydesh mangkrak/tertahan.
(Sumber: Laporan Analisis Makro & Investigasi Proyek BRI)
-
US DEPARTEMENT OF JUSTICE =
1. ONE OF THE WORLD'S GREATEST FINANCIAL SCANDALS
2. LARGEST KLEPTOCRACY CASE TO DATE
Skandal global yang dicap US DOJ sebagai skandal finansial terbesar dunia dan kasus kleptokrasi terbesar dalam sejarah. (Sumber: Dokumen Resmi Hukum US DOJ)
-
SCANDALS:
Bumiputera '82, Valas Bank Negara '80-'90an, Scorpene '02, Cowgate '12, 1MDB, LCS) hanyalah puncak gunung es dari penjarahan yang menjadi norma. (Sumber: Laporan Tata Kelola & Media Investigasi Malonyet)
--------------------------------
UTANG & LIABILITAS MALONYET (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
--------------------------------------------
OBLIGASI GLOBAL MALONYET (1998–2026)
1998: Fokus restrukturisasi internal. Absen pasar global.
1999: Rilis Global Bond USD 1 miliar (AS/Eropa). Bukti pemulihan.
2002: Rilis Sukuk Ijarah Global pertama dunia USD 600 juta (London/Timur Tengah).
2004: Promosi surat utang luar negeri via Khazanah Nasional.
2006: Khazanah rilis Exchangeable Sukuk USD 750 juta (Asia/Eropa).
2011: Rilis Wakala Global Sukuk USD 2 miliar. Permintaan oversubscribed 4,5 kali.
2015: Rilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur.
2016: Rilis Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun).
2019: Diversifikasi ke Samurai Bond JPY 200 miliar bergaransi JBIC (Jepang).
2021: Rilis Sovereign Sustainability Sukuk pertama dunia USD 1,3 miliar. Permintaan melonjak 6,4 kali.
2022–2024: Absen valas. Fokus optimasi obligasi domestik (MGS/MGII).
2025: Bersiap kembali ke pasar valas lewat bank sindikasi internasional.
2026: Promosi rencana obligasi global baru USD 1 miliar.
Kenapa Australia TDK sumbang Tiger ke warganyet ya. Selama ini mereka sewa heli usang
BalasHapusINDIANESIA...mulai PANIK...PANIK....PANIK....HAHAHAHAHHA
BalasHapusRupiah Sudah Dekati Rp18.000/US$
https://www.bloombergtechnoz.com/detail-news/122919/rupiah-sudah-dekati-rp18-000-us
SEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
-
🪙 Daftar Negara & Produk
• Peru: Mata uang (Soles).
• Malonsia: Mata uang (Ringgit) & Paspor.
• Nepal: Mata uang (Rupee), Pita Cukai, & Prangko.
• Bangladesh: Mata uang (Taka).
• Sri Lanka: Mata uang (Rupee) & Paspor.
• Somalia: Mata uang (Shilling).
• Argentina: Mata uang (Peso).
• Pakistan: Pita Cukai.
• Filipina: Prangko.
• Guinea: Paspor.
-------------------------------------------
🔎 Sumber Berita & Media Resmi
4. Situs Resmi Peruri (Rilis Pers Ringgit) – Kerja sama cetak Ringgit Malonsia sejak 2010.
5. Situs Resmi Peruri (Paspor Sri Lanka) – Detail proyek dokumen imigrasi Sri Lanka.
6. detikFinance – Wawancara cetak mata uang Nepal, Somalia, dan Argentina.
7. Kompas – Catatan cetak prangko Filipina dan pita cukai Pakistan.
8. CNN Indonesia – Laporan ekspansi cetak uang Nepal dan paspor Guinea.
--------------------------------
HUTANG & LIABILITAS MALONDESH 1998–2026
1998 : RM 165,4 Miliar
1999 : RM 178,3 Miliar
2000 : RM 192,2 Miliar
2001 : RM 207,2 Miliar
2002 : RM 223,3 Miliar
2003 : RM 240,7 Miliar
2004 : RM 259,5 Miliar
2005 : RM 279,7 Miliar
2006 : RM 301,5 Miliar
2007 : RM 325,0 Miliar
2008 : RM 350,4 Miliar
2009 : RM 377,7 Miliar
2010 : RM 407,1 Miliar
2011 : RM 456,1 Miliar
2012 : RM 501,6 Miliar
2013 : RM 547,7 Miliar
2014 : RM 582,8 Miliar
2015 : RM 630,5 Miliar
2016 : RM 648,5 Miliar
2017 : RM 686,8 Miliar
2018 : RM 1,19 Triliun
2019 : RM 1,25 Triliun
2020 : RM 1,32 Triliun
2021 : RM 1,38 Triliun
2022 : RM 1,45 Triliun
2023 : RM 1,53 Triliun
2024 : RM 1,63 Triliun
2025 : RM 1,71 Triliun
2026 : RM 1,79 Triliun
-
SUMBER :
Bloomberg & Reuters | CNA & The Star | The Edge Malondesh | MOF & Bernama | Kementerian Kewangan
--------------------------------
TAHUN RASIO UTANG TERHADAP GDP (%) 1998–2025
1998 : 35,8%
1999 : 40,4%
2000 : 36,1%
2001 : 42,5%
2002 : 44,9%
2003 : 45,9%
2004 : 45,1%
2005 : 43,8%
2006 : 41,5%
2007 : 41,1%
2008 : 41,3%
2009 : 51,1%
2010 : 52.4%
2011 : 51.8
2012 : 53.3
2013 : 54.7
2014 : 55.0
2015 : 55.1
2016 : 52.7
2017 : 51.9
2018 : 52.5
2019 : 52.4
2020 : 62.0
2021 : 63.3
2022 : 60.2
2023 : 64.3
2024 : 70.4
2025 : 70.5
-
SUMBER : Macrotrends / World Bank / Statista / Trading Economics
--------------------------------
DEFISIT FISKAL MALONDESH PERIODE 1998–2025:
1998 : -1,8% (± USD 33,6 MILIAR)
1999 : -3,2% (± USD 34,3 MILIAR)
2000 : -5,8% (± USD 32,5 MILIAR)
2001 : -5,5% (± USD 38,0 MILIAR)
2002 : -5,6% (± USD 39,5 MILIAR)
2003 : -5,0% (± USD 41,3 MILIAR)
2004 : -4,1% (± USD 41,9 MILIAR)
2005 : -3,6% (± USD 40,7 MILIAR)
2006 : -3,3% (± USD 39,6 MILIAR)
2007 : -3,2% (± USD 39,3 MILIAR)
2008 : -4,8% (± USD 39,3 MILIAR)
2009 : -6,7% (± USD 50,4 MILIAR)
2010 : -5,4% (± USD 51,8 MILIAR)
2011 : -4,8% (± USD 53,7 MILIAR)
2012 : -4,5% (± USD 55,6 MILIAR)
2013 : -3,9% (± USD 55,3 MILIAR)
2014 : -3,4% (± USD 56,9 MILIAR)
2015 : -3,2% (± USD 55,7 MILIAR)
2016 : -3,1% (± USD 54,3 MILIAR)
2017 : -3,0% (± USD 55,6 MILIAR)
2018 : -3,7% (± USD 57,0 MILIAR)
2019 : -3,4% (± USD 67,6 MILIAR)
2020 : -6,2% (± USD 69,1 MILIAR)
2021 : -6,4% (± USD 65,5 MILIAR)
2022 : -5,6% (± USD 69,7 MILIAR)
2023 : -5,0% (± USD 68,3 MILIAR)
2024 : -4,1% (± USD 298,4 MILIAR) (Pemangkasan subsidi)
2025 : -3,8% (± USD 325,6 MILIAR) (Rasionalisasi RON95)
-
SUMBER:
IMF | World Economic Outlook | World Bank | Bank Negara Malondesh.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
SEWA = HUTANG 84.3% DARI GDP = NO SHOPPING
1. SEWA 28 HELI
2. SEWA L39 ITCC
3. SEWA EC120B
4. SEWA FLIGHT SIMULATION TRAINING DEVICE (FSTD)
5. SEWA 1 UNIT SISTEM SIMULATOR EC120B
6. SEWA HOVERCRAFT
7. SEWA AW139
8. SEWA FAST INTERCEPTOR BOAT (FIB)
9. SEWA UTILITY BOAT
10. SEWA RIGID HULL FENDER BOAT (RHFB)
11. SEWA ROVER FIBER GLASS (ROVER)
12. SEWA MV AISHAH AIM 4
13. SEWA BMW R1250RT
14. SEWA 4x4 VECHICLE
15. SEWA VSHORAD
16. SEWA TRUCK
17. SEWA HONDA CIVIC
18. SEWA PATROL BOATS
19. SEWA OUTBOARD MOTORS
20. SEWA TRAILERS
21. SEWA SUPERBIKES
22. SEWA SIMULATOR MKM
23. SEWA 12 AW149 TUDM
24. SEWA 4 AW139 TUDM
25. SEWA 5 EC120B TUDM
26. SEWA 2 AW159 TLDM
27. SEWA 4 UH-60A TDM
28. SEWA 12 AW149 TDM
29. SEWA 4 AW139 BOMBA
30. SEWA 2 AW159 MMEA
31. SEWA 7 BELL429 POLIS
32. SEWA MOTOR POLIS
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
SEWA = HUTANG 84.3% DARI GDP = NO SHOPPING
1. SEWA 28 HELI
2. SEWA L39 ITCC
3. SEWA EC120B
4. SEWA FLIGHT SIMULATION TRAINING DEVICE (FSTD)
5. SEWA 1 UNIT SISTEM SIMULATOR EC120B
6. SEWA HOVERCRAFT
7. SEWA AW139
8. SEWA FAST INTERCEPTOR BOAT (FIB)
9. SEWA UTILITY BOAT
10. SEWA RIGID HULL FENDER BOAT (RHFB)
11. SEWA ROVER FIBER GLASS (ROVER)
12. SEWA MV AISHAH AIM 4
13. SEWA BMW R1250RT
14. SEWA 4x4 VECHICLE
15. SEWA VSHORAD
16. SEWA TRUCK
17. SEWA HONDA CIVIC
18. SEWA PATROL BOATS
19. SEWA OUTBOARD MOTORS
20. SEWA TRAILERS
21. SEWA SUPERBIKES
22. SEWA SIMULATOR MKM
23. SEWA 12 AW149 TUDM
24. SEWA 4 AW139 TUDM
25. SEWA 5 EC120B TUDM
26. SEWA 2 AW159 TLDM
27. SEWA 4 UH-60A TDM
28. SEWA 12 AW149 TDM
29. SEWA 4 AW139 BOMBA
30. SEWA 2 AW159 MMEA
31. SEWA 7 BELL429 POLIS
32. SEWA MOTOR POLIS
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
-------------------------------
USD 20 MILLIAR/SHOPPING versus USD 4,5 MILLIAR/LEASING
-
1. INDONESIA 🇮🇩
Anggaran: Rp335,2 triliun (~USD 20 miliar) | Naik 37% dari 2025.
Sumber: CNBC Indonesia - Anggaran Pertahanan RI Loncat ke Rp335 T.
-
2. SINGAPURA 🇸🇬
Anggaran: SGD 24,9 miliar (~USD 19,5–20 miliar) | 3–4% dari PDB.
Sumber: Bloomberg - Singapore Projects Nearly $20 Billion Defense Spend.
-
3. VIETNAM 🇻🇳
Anggaran: USD 6–7 miliar (Estimasi) | Target USD 10,2 miliar (2029).
Sumber: Data indeks militer regional Lowy Institute Asia Power Index.
-
4. THAILAND 🇹🇭
Anggaran: 204.434 juta Baht (~USD 5,7 miliar).
Sumber: Laporan belanja sektor publik Lowy Institute - Military Expenditure.
-
5. FILIPINA 🇵🇭
Anggaran: PHP 295–299 miliar (~USD 5,2 miliar) | Naik 16% dari 2025.
Sumber: Dokumen resmi Department of Budget and Management (DBM) Philippines.
-
6. MALONSIA 🇲🇾
Anggaran: RM 21,74 miIiar (~USD 4,5–4,7 miliar).
Sumber: The Sun Malonsia - Budget: Over RM21 billion allocated to boost national security.
DEBT TRAP BRI PROJECTS = MANGKRAK
HapusMALAYDESH has several Chinese Belt and Road Initiative projects under construction, including the East Coast Rail Line, Kuantan Port Expansion, Green TechNOLogy Park in Pahang, Forest City, Robotic Future City, and Samalaju Industrial Park Steel Complex
(Sumber: Laporan Analisis Ekonomi Makro & Investigasi Proyek BRI)
--------------------------------
US DEPARTEMENT OF JUSTICE =
1. ONE OF THE WORLD'S GREATEST FINANCIAL SCANDALS
2. LARGEST KLEPTOCRACY CASE TO DATE
Although it began in MALAYDESH , the scandal's global scope implicated institutions and individuals in politics, banking, and entertainment, and led to criminal investigations in a number of nations. The 1MDB scandal has been described as "one of the world's greatest financial scandals" and declared by the United States Department of Justice as the "largest kleptocracy case to date"
.(Sumber: Dokumen Resmi Investigasi Hukum US DOJ)
--------------------------------
SCANDALS = NOw and then, by exception, scandals spill out into the public domain, like Bumiputera MALAYDESH Finance 1982, Bank Negara’s FX losses in the 1980s and 1990s, the Scorpene submarines of 2002, the National Feedlot scandal – “cowgate” – of 2012, 1MDB, and the latest LCS naval procurement. But these are just the tip of the iceberg of systematic pilferage. It has become the institutional NOrm.
(Sumber: Laporan Tata Kelola Pemerintahan & Media Investigasi)
--------------------------------
HUTANG & LIABILITAS MALAYDESH 1998–2026
-
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia dan dimulainya defisit anggaran berkepanjangan.
-
1999: RM 116,6 Miliar – Penerbitan instrumen obligasi domestik baru untuk stimulus ekonomi.
-
2000: RM 125,6 Miliar – Restrukturisasi sektor korporasi dan perbankan pasca-krisis selesai.
-
2001: RM 145,7 Miliar – Peningkatan belanja pembangunan guna menopang pertumbuhan domestik.
-
2002: RM 165,0 Miliar – Rasio utang terhadap PDB mulai merangkak naik secara perlahan.
-
2003: RM 188,8 Miliar – Batas plafon utang resmi pertama kali dinaikkan menjadi 40% dari PDB.
-
2004: RM 216,6 Miliar – Pengeluaran publik meluas demi mendukung proyek infrastruktur baru.
-
2005: RM 228,7 Miliar – Konsolidasi fiskal awal di bawah manajemen kepemimpinan baru.
-
2006: RM 242,2 Miliar – Pengendalian defisit secara ketat di tengah lonjakan harga komoditas global.
-
2007: RM 266,7 Miliar – Posisi keuangan masih stabil menjelang gejolak finansial global.
-
2008: RM 306,4 Miliar – Kenaikan plafon utang menjadi 45% akibat dampak awal krisis finansial global.
-
2009: RM 362,4 Miliar – Batas utang melonjak ke 55% demi mendanai paket stimulus ekonomi besar.
-
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis finansial global.
-
2011: RM 456,1 Miliar – Rasio utang mulai meningkat stabil.
-
2012: RM 501,6 Miliar – Melewati ambang batas RM 500 miliar.
-
2013: RM 547,7 Miliar – Ekspansi belanja infrastruktur nasional.
-
2014: RM 582,8 Miliar – Berdasarkan Laporan Keuangan Pemerintah Federal 2014.
-
2015: RM 630,5 Miliar – Penyesuaian ekonomi akibat fluktuasi harga minyak.
-
2016: RM 648,5 Miliar – Konsolidasi fiskal di bawah pemerintahan saat itu.
-
2017: RM 686,8 Miliar – Data tercatat dalam Laporan Tahunan Bank Negara Malaydesh 2017.
-
2018: RM 1,19 Triliun – Transparansi Baru: Termasuk liabilitas 1MDB & proyek PPP. [
-
2019: RM 1,25 Triliun – Laporan pengungkapan utang menembus RM 1 triliun.
-
2020: RM 1,32 Triliun – Lonjakan akibat paket stimulus pandemi COVID-19.
-
2021: RM 1,38 Triliun – Akumulasi utang federal selama masa pemulihan ekonomi.
-
2022: RM 1,45 Triliun – Posisi utang sebelum pergantian pemerintahan.
-
2023: RM 1,53 Triliun – Dikonfirmasi oleh PM Anwar Ibrahim sebagai warisan utang & liabilitas.
-
2024: RM 1,63 Triliun – Berdasarkan Belanjawan (APBN) 2024.
-
2025: RM 1,71 Triliun – Proyeksi dalam Tinjauan Fiskal 2026 (Kementerian Kewangan).
-
2026: RM 1,79 Triliun – Target manajemen utang dalam Economic Outlook 2026.
INDIANESIA...mulai PANIK...PANIK....PANIK....HAHAHAHAHHA
BalasHapusRupiah Sudah Dekati Rp18.000/US$
https://www.bloombergtechnoz.com/detail-news/122919/rupiah-sudah-dekati-rp18-000-us
SEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
-
🪙 Daftar Negara & Produk
• Peru: Mata uang (Soles).
• Malonsia: Mata uang (Ringgit) & Paspor.
• Nepal: Mata uang (Rupee), Pita Cukai, & Prangko.
• Bangladesh: Mata uang (Taka).
• Sri Lanka: Mata uang (Rupee) & Paspor.
• Somalia: Mata uang (Shilling).
• Argentina: Mata uang (Peso).
• Pakistan: Pita Cukai.
• Filipina: Prangko.
• Guinea: Paspor.
-------------------------------------------
🔎 Sumber Berita & Media Resmi
1. Situs Resmi Peruri (Rilis Pers Ringgit) – Kerja sama cetak Ringgit Malonsia sejak 2010.
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail proyek dokumen imigrasi Sri Lanka.
3. detikFinance – Wawancara cetak mata uang Nepal, Somalia, dan Argentina.
4. Kompas – Catatan cetak prangko Filipina dan pita cukai Pakistan.
5. CNN Indonesia – Laporan ekspansi cetak uang Nepal dan paspor Guinea.
--------------------------------
PENDAPATAN VS PENGELUARAN MALAYDESH
PENDAPATAN : RM334,1 Miliar
PENGELUARAN : RM470 Miliar
BEBAN SUBSIDI 23,9%
PANTAS HUTANG BAYAR HUTANG : RM470 – RM334,1 = MINUS RM135,9 ......
--------------------------------------------
BEBAN SUBSIDI
Pemerintah Malaydesh harus mengalokasikan sekitar 23,3% hingga 23,9% dari total seluruh pendapatan negaranya hanya untuk membayar rekor anggaran subsidi yang menyentuh RM80 miliar. Jika dihitung berdasarkan struktur pengeluaran, dana subsidi ini memakan porsi sekitar 17% hingga 19% dari total seluruh belanja negara, atau setara dengan 23,6% dari khusus anggaran operasional (Belanja Mengurus).
--------------------------------------------
PENDAPATAN NEGARA (HASIL KERAJAAN)
RM334,1 Miliar: Estimasi total pendapatan pemerintah Malaydesh.
-
75,8% Sumber Pendapatan: Berasal dari sektor pajak (pajak penghasilan individu dan perusahaan).
-
24,2% Sektor Non-Pajak: Berasal dari royalti minyak (Petronas), investasi, dan pungutan lainnya.
-
RM343,1 Miliar: Target proyeksi pendapatan negara.
--------------------------------------------
TOTAL PENGELUARAN NEGARA (BELANJA NEGARA)
RM419,2 Miliar hingga RM470 Miliar: Total belanja negara yang dialokasikan pemerintah Malaydesh.
-
RM338,2 Miliar (Belanja Mengurus): Dana habis pakai khusus untuk gaji pegawai negeri, pensiun, operasional kementerian, serta pembayaran subsidi dan bantuan sosial.
-
RM81 Miliar (Belanja Pembangunan): Dana infrastruktur publik seperti jalan tol, sekolah, dan fasilitas medis.
--------------------------------------------
MENGAPA ANGKA PENDAPATAN INI MEMAKSA MALAYDESH BERUTANG?
BELANJA OPERASIONAL MENYERAP SELURUH PENDAPATAN
Angka belanja operasional murni (Operating Expenditure) yang menyentuh RM338,2 miliar sudah menyedot hampir 100% dari total seluruh pendapatan negara yang masuk.
Hal ini membuat pemerintah Malaydesh sama sekali tidak memilik sisa dana pendapatan bersih untuk membiayai pembangunan fasilitas publik ataupun membayar rekor subsidi (yang sempat menyentuh RM80 miliar).
-
Defisit Anggaran Kronis
Jurang perbedaan antara total pendapatan (~RM343 miliar) dan total belanja (~RM419–RM470 miliar) menciptakan defisit anggaran berkisar di angka 3,5% hingga 3,6% dari PDB negara.
Satu-satunya jalan bagi pemerintah Malaydesh untuk menambal kekurangan uang puluhan miliar ringgit tersebut adalah dengan MENERBITKAN SURAT UTANG NEGARA BARU.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Analisis Geopolitik & Pertahanan (Stagnasi Total)
Vakum Alutsista (SIPRI 2024-2025): Status "Kosong" selama dua tahun berturut-turut menandakan tidak adanya transfer senjata berat yang masuk. Hal ini mengonfirmasi kegagalan proses modernisasi di saat negara tetangga (Indonesia/Singapura) melakukan pengadaan masif.
Kegagalan Proyek Strategis: Pembatalan F/A-18 Hornet Kuwait sebanyak 4 kali menunjukkan hilangnya kredibilitas finansial di mata penjual internasional.
Penurunan Daya Gentar: Peringkat Global Firepower (GFP) 42 (ke-7 di ASEAN) menempatkan militer MALAYSEWA di bawah Filipina, menunjukkan efek domino dari penundaan proyek LCS dan ketergantungan pada aset tua.
Analisis Fiskal & Ekonomi (Spiral Utang)
Debt-Servicing Cycle: Dengan proyeksi utang menyentuh RM 1,79 Triliun pada 2026, fenomena "Gali Lubang Tutup Lubang" (58% pinjaman baru hanya untuk membayar cicilan) telah mengunci anggaran negara.
Rasio Bahaya: Rasio utang terhadap GDP yang stabil di angka 68%-70% sejak 2024-2026 membatasi ruang gerak fiskal untuk subsidi domestik maupun belanja modal militer.
Hambatan Dagang AS: Sanksi Section 301 (tarif 10-25%) dan ancaman IEEPA oleh USTR Amerika Serikat akan memukul sektor manufaktur dan E&E, yang merupakan tulang punggung pendapatan negara untuk membayar utang tersebut.
Analisis Reputasi & Diplomasi (Sanksi Internasional)
Runtuhnya Prestasi Olahraga: Kekalahan di CAS dan sanksi AFC (Kalah WO 0-3) akibat penggunaan 7 pemain naturalisasi ilegal bukan sekadar masalah sepak bola, melainkan cerminan kegagalan administrasi sistemik di tingkat federasi.
Kehilangan Posisi Regional: Kegagalan lolos ke Piala Asia 2027 dan pemberian posisi tersebut kepada Vietnam mempertegas penurunan pengaruh dan daya saing negara di kawasan ASEAN.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Analisa Geopolitik & Pertahanan: "Stagnasi Total"
Vakum SIPRI (2024-2025): Laporan impor senjata KOSONG selama dua tahun berturut-turut. MALAYSEWA kini sejajar dengan negara ekonomi kecil seperti Laos dan Kamboja dalam hal transfer alutsista berat.
Kegagalan Proyek Strategis: Pembatalan F/A-18 Hornet Kuwait sebanyak 4 kali menunjukkan hilangnya kredibilitas finansial di pasar pertahanan internasional.
Penurunan Daya Gentar: Berada di Peringkat 42 GFP (Posisi ke-7 di ASEAN), kini resmi berada di bawah Filipina (Peringkat 41).
Perbandingan Kontras: Indonesia memimpin di Peringkat 13 dunia dengan daftar belanja "satu lembar penuh" (Rafale F4, A400M, KF-21 Boramae, Kapal PPA, dan Rudal Khan/Bora).
-
Analisa Ekonomi & Fiskal: "Spiral Utang Kronis"
Fenomena Gali Lubang Tutup Lubang: Proyeksi 58% pinjaman baru di tahun 2026 hanya digunakan untuk membayar cicilan pokok dan bunga utang lama (Debt-Servicing Cycle).
Beban Utang Nasional: Total utang dan liabilitas diproyeksikan menyentuh RM 1,79 Triliun, dengan rasio utang terhadap GDP melampaui ambang batas aman (>70%).
Hambatan Dagang Global: Tekanan dari Amerika Serikat melalui Section 301 (kenaikan tarif 10-25%) dan ancaman IEEPA (pemblokiran transaksi) oleh USTR yang memukul sektor manufaktur dan E&E.
DEBT TRAP BRI PROJECTS = MANGKRAK
HapusMALAYDESH has several Chinese Belt and Road Initiative projects under construction, including the East Coast Rail Line, Kuantan Port Expansion, Green TechNOLogy Park in Pahang, Forest City, Robotic Future City, and Samalaju Industrial Park Steel Complex
(Sumber: Laporan Analisis Ekonomi Makro & Investigasi Proyek BRI)
--------------------------------
US DEPARTEMENT OF JUSTICE =
1. ONE OF THE WORLD'S GREATEST FINANCIAL SCANDALS
2. LARGEST KLEPTOCRACY CASE TO DATE
Although it began in MALAYDESH , the scandal's global scope implicated institutions and individuals in politics, banking, and entertainment, and led to criminal investigations in a number of nations. The 1MDB scandal has been described as "one of the world's greatest financial scandals" and declared by the United States Department of Justice as the "largest kleptocracy case to date"
.(Sumber: Dokumen Resmi Investigasi Hukum US DOJ)
--------------------------------
SCANDALS = NOw and then, by exception, scandals spill out into the public domain, like Bumiputera MALAYDESH Finance 1982, Bank Negara’s FX losses in the 1980s and 1990s, the Scorpene submarines of 2002, the National Feedlot scandal – “cowgate” – of 2012, 1MDB, and the latest LCS naval procurement. But these are just the tip of the iceberg of systematic pilferage. It has become the institutional NOrm.
(Sumber: Laporan Tata Kelola Pemerintahan & Media Investigasi)
--------------------------------
PENDAPATAN VS PENGELUARAN MALAYDESH
PENDAPATAN : RM334,1 Miliar
PENGELUARAN : RM470 Miliar
BEBAN SUBSIDI 23,9%
PANTAS HUTANG BAYAR HUTANG : RM470 – RM334,1 = MINUS RM135,9 ......
--------------------------------------------
BEBAN SUBSIDI
Pemerintah Malaydesh harus mengalokasikan sekitar 23,3% hingga 23,9% dari total seluruh pendapatan negaranya hanya untuk membayar rekor anggaran subsidi yang menyentuh RM80 miliar. Jika dihitung berdasarkan struktur pengeluaran, dana subsidi ini memakan porsi sekitar 17% hingga 19% dari total seluruh belanja negara, atau setara dengan 23,6% dari khusus anggaran operasional (Belanja Mengurus).
--------------------------------------------
PENDAPATAN NEGARA (HASIL KERAJAAN)
RM334,1 Miliar: Estimasi total pendapatan pemerintah Malaydesh.
-
75,8% Sumber Pendapatan: Berasal dari sektor pajak (pajak penghasilan individu dan perusahaan).
-
24,2% Sektor Non-Pajak: Berasal dari royalti minyak (Petronas), investasi, dan pungutan lainnya.
-
RM343,1 Miliar: Target proyeksi pendapatan negara.
--------------------------------------------
TOTAL PENGELUARAN NEGARA (BELANJA NEGARA)
RM419,2 Miliar hingga RM470 Miliar: Total belanja negara yang dialokasikan pemerintah Malaydesh.
-
RM338,2 Miliar (Belanja Mengurus): Dana habis pakai khusus untuk gaji pegawai negeri, pensiun, operasional kementerian, serta pembayaran subsidi dan bantuan sosial.
-
RM81 Miliar (Belanja Pembangunan): Dana infrastruktur publik seperti jalan tol, sekolah, dan fasilitas medis.
--------------------------------------------
MENGAPA ANGKA PENDAPATAN INI MEMAKSA MALAYDESH BERUTANG?
BELANJA OPERASIONAL MENYERAP SELURUH PENDAPATAN
Angka belanja operasional murni (Operating Expenditure) yang menyentuh RM338,2 miliar sudah menyedot hampir 100% dari total seluruh pendapatan negara yang masuk.
Hal ini membuat pemerintah Malaydesh sama sekali tidak memilik sisa dana pendapatan bersih untuk membiayai pembangunan fasilitas publik ataupun membayar rekor subsidi (yang sempat menyentuh RM80 miliar).
-
Defisit Anggaran Kronis
Jurang perbedaan antara total pendapatan (~RM343 miliar) dan total belanja (~RM419–RM470 miliar) menciptakan defisit anggaran berkisar di angka 3,5% hingga 3,6% dari PDB negara.
Satu-satunya jalan bagi pemerintah Malaydesh untuk menambal kekurangan uang puluhan miliar ringgit tersebut adalah dengan MENERBITKAN SURAT UTANG NEGARA BARU.
Sesama foda kenapa tdk hibahkan saja heli Tiger ke malaydesh. Kesian aset mereka sudah usang semua. Warganyet pasti terima dg senang hati
BalasHapusSelama ini mereka masih bangga dg heli Nuri mereka yg tdk tertandingi baik di dunia, luar angkasa maupun akherat
BalasHapusRUPIAH HANCUR lagi guys....HAHAHAHAHA
BalasHapusSEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
-
🪙 Daftar Negara & Produk
• Peru: Mata uang (Soles).
• Malonsia: Mata uang (Ringgit) & Paspor.
• Nepal: Mata uang (Rupee), Pita Cukai, & Prangko.
• Bangladesh: Mata uang (Taka).
• Sri Lanka: Mata uang (Rupee) & Paspor.
• Somalia: Mata uang (Shilling).
• Argentina: Mata uang (Peso).
• Pakistan: Pita Cukai.
• Filipina: Prangko.
• Guinea: Paspor.
-------------------------------------------
🔎 Sumber Berita & Media Resmi
4. Situs Resmi Peruri (Rilis Pers Ringgit) – Kerja sama cetak Ringgit Malonsia sejak 2010.
5. Situs Resmi Peruri (Paspor Sri Lanka) – Detail proyek dokumen imigrasi Sri Lanka.
6. detikFinance – Wawancara cetak mata uang Nepal, Somalia, dan Argentina.
7. Kompas – Catatan cetak prangko Filipina dan pita cukai Pakistan.
8. CNN Indonesia – Laporan ekspansi cetak uang Nepal dan paspor Guinea.
--------------------------------
HUTANG & LIABILITAS MALONDESH 1998–2026
1998 : RM 165,4 Miliar
1999 : RM 178,3 Miliar
2000 : RM 192,2 Miliar
2001 : RM 207,2 Miliar
2002 : RM 223,3 Miliar
2003 : RM 240,7 Miliar
2004 : RM 259,5 Miliar
2005 : RM 279,7 Miliar
2006 : RM 301,5 Miliar
2007 : RM 325,0 Miliar
2008 : RM 350,4 Miliar
2009 : RM 377,7 Miliar
2010 : RM 407,1 Miliar
2011 : RM 456,1 Miliar
2012 : RM 501,6 Miliar
2013 : RM 547,7 Miliar
2014 : RM 582,8 Miliar
2015 : RM 630,5 Miliar
2016 : RM 648,5 Miliar
2017 : RM 686,8 Miliar
2018 : RM 1,19 Triliun
2019 : RM 1,25 Triliun
2020 : RM 1,32 Triliun
2021 : RM 1,38 Triliun
2022 : RM 1,45 Triliun
2023 : RM 1,53 Triliun
2024 : RM 1,63 Triliun
2025 : RM 1,71 Triliun
2026 : RM 1,79 Triliun
-
SUMBER :
Bloomberg & Reuters | CNA & The Star | The Edge Malondesh | MOF & Bernama | Kementerian Kewangan
--------------------------------
TAHUN RASIO UTANG TERHADAP GDP (%) 1998–2025
1998 : 35,8%
1999 : 40,4%
2000 : 36,1%
2001 : 42,5%
2002 : 44,9%
2003 : 45,9%
2004 : 45,1%
2005 : 43,8%
2006 : 41,5%
2007 : 41,1%
2008 : 41,3%
2009 : 51,1%
2010 : 52.4%
2011 : 51.8
2012 : 53.3
2013 : 54.7
2014 : 55.0
2015 : 55.1
2016 : 52.7
2017 : 51.9
2018 : 52.5
2019 : 52.4
2020 : 62.0
2021 : 63.3
2022 : 60.2
2023 : 64.3
2024 : 70.4
2025 : 70.5
-
SUMBER : Macrotrends / World Bank / Statista / Trading Economics
--------------------------------
DEFISIT FISKAL MALONDESH PERIODE 1998–2025:
1998 : -1,8% (± USD 33,6 MILIAR)
1999 : -3,2% (± USD 34,3 MILIAR)
2000 : -5,8% (± USD 32,5 MILIAR)
2001 : -5,5% (± USD 38,0 MILIAR)
2002 : -5,6% (± USD 39,5 MILIAR)
2003 : -5,0% (± USD 41,3 MILIAR)
2004 : -4,1% (± USD 41,9 MILIAR)
2005 : -3,6% (± USD 40,7 MILIAR)
2006 : -3,3% (± USD 39,6 MILIAR)
2007 : -3,2% (± USD 39,3 MILIAR)
2008 : -4,8% (± USD 39,3 MILIAR)
2009 : -6,7% (± USD 50,4 MILIAR)
2010 : -5,4% (± USD 51,8 MILIAR)
2011 : -4,8% (± USD 53,7 MILIAR)
2012 : -4,5% (± USD 55,6 MILIAR)
2013 : -3,9% (± USD 55,3 MILIAR)
2014 : -3,4% (± USD 56,9 MILIAR)
2015 : -3,2% (± USD 55,7 MILIAR)
2016 : -3,1% (± USD 54,3 MILIAR)
2017 : -3,0% (± USD 55,6 MILIAR)
2018 : -3,7% (± USD 57,0 MILIAR)
2019 : -3,4% (± USD 67,6 MILIAR)
2020 : -6,2% (± USD 69,1 MILIAR)
2021 : -6,4% (± USD 65,5 MILIAR)
2022 : -5,6% (± USD 69,7 MILIAR)
2023 : -5,0% (± USD 68,3 MILIAR)
2024 : -4,1% (± USD 298,4 MILIAR) (Pemangkasan subsidi)
2025 : -3,8% (± USD 325,6 MILIAR) (Rasionalisasi RON95)
-
SUMBER:
IMF | World Economic Outlook | World Bank | Bank Negara Malondesh.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Analisa Model Pengadaan: "Negara Penyewa" (Leasing)
Krisis Likuiditas: Ketiadaan dana tunai memaksa militer beralih ke skema Sewa (Leasing) untuk 32+ item strategis (Helikopter Blackhawk, AW139, simulator, hingga kendaraan taktis).
Barter Komoditas: Pengadaan yang tersisa terpaksa menggunakan skema Barter Kelapa Sawit (CPO) seperti pada kesepakatan FA-50 (Korea Selatan) dan PT-91M (Polandia).
Aset Karatan & Hilang: Proyek LCS mangkrak melibatkan 17 kreditor, diperparah dengan catatan buruk hilangnya 48 pesawat Skyhawk dan 2 mesin jet jet tempur.
-
Analisa Reputasi & Diplomasi Internasional
Runtuhnya Prestasi Olahraga: Kekalahan di CAS terkait 7 pemain naturalisasi ilegal dan sanksi AFC (Kalah WO 0-3) mencerminkan kegagalan administrasi sistemik.
Kehilangan Posisi Regional: Resmi gagal lolos ke Piala Asia 2027, di mana posisi tersebut kini diambil alih oleh Vietnam, mempertegas penurunan pengaruh MALAYSEWA di ASEAN.
Krisis Identitas: Kritik internal dari pemimpin nasional (Mahathir & Anwar Ibrahim) mengenai kemiskinan struktural dan korupsi proyek negara memperburuk citra di mata investor global.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Status Kelumpuhan Pertahanan (SIPRI & Alutsista)
Vakum SIPRI (2024–2025): Status KOSONG total selama dua tahun berturut-turut. Tidak ada transfer senjata berat yang tercatat, menempatkan MALAYSEWA setara dengan Laos dan Kamboja.
Tren Mundur: Penurunan konsisten dari fase Planned (2020), Selected Not Yet Ordered (2022), hingga nihil aktivitas (2024–2025).
Kegagalan Simbolik: Pembatalan resmi akuisisi F/A-18 Hornet Kuwait sebanyak 4 kali bukti hilangnya kredibilitas finansial di pasar global.
Procurement Freeze (2026): Instruksi PM Anwar Ibrahim untuk pembekuan total pengadaan guna menghentikan korupsi sistemik dan kebocoran anggaran.
-
Model "Negara Penyewa" (Military-for-Rent)
Ketiadaan uang tunai memaksa militer beralih dari kepemilikan aset menjadi skema Leasing (Sewa):
Aset Sewaan (32+ Item): Mencakup 31 Helikopter (Blackhawk, AW139, AW149, Bell 429), pesawat latihan L39 ITCC, simulator jet tempur MKM, hingga motor polisi.
Skema Barter: Pengadaan yang tersisa (FA-50, PT-91M, Scorpene) terpaksa menggunakan Barter Kelapa Sawit (CPO) karena krisis devisa.
Aset Mangkrak: Proyek LCS & OPV yang karatan di galangan melibatkan 17 kreditor dengan bunga yang terus membengkak.
-
Spiral Utang "Gali Lubang Tutup Lubang"
Debt-Servicing Cycle: 58% hingga 64,3% pinjaman baru hanya digunakan untuk membayar bunga dan cicilan pokok utang lama.
Ledakan Liabilitas: Utang nasional melonjak drastis dari RM 407 Miliar (2010) menjadi proyeksi RM 1,79 Triliun (2026).
Rasio Kritis: Utang pemerintah menyentuh 69% GDP (melewati limit 65%) dan utang rumah tangga ekstrem di angka 84,3% GDP.
Tabung Harapan (2018): Bukti historis keputusasaan fiskal melalui penggalangan dana rakyat untuk membayar utang negara.
1.FOREST CITY = USD 100 BILLION
Hapus2. ECRL= USD 20 BILLION
3.CHINA-MALONYET QINZHOU INDUSTRIAL PARK (CMQIP) = USD 4,2 BILLION
4. MALONYET -CHINA KUANTAN INDUSTRIAL PARK (MCKIP) = USD 3,77 BILLION
5.CHINA RAILWAY ROLLING STOCK CORP’S ROLLING STOCK CENTER = USD 131 MILLION
6. 1 MDB = USD 4,5 BILLION
--------------------------------------------
BEBAN SUBSIDI
Pemerintah Malaydesh harus mengalokasikan sekitar 23,3% hingga 23,9% dari total seluruh pendapatan negaranya hanya untuk membayar rekor anggaran subsidi yang menyentuh RM80 miliar. Jika dihitung berdasarkan struktur pengeluaran, dana subsidi ini memakan porsi sekitar 17% hingga 19% dari total seluruh belanja negara, atau setara dengan 23,6% dari khusus anggaran operasional (Belanja Mengurus).
--------------------------------------------
PENDAPATAN NEGARA (HASIL KERAJAAN)
RM334,1 Miliar: Estimasi total pendapatan pemerintah Malaydesh.
-
75,8% Sumber Pendapatan: Berasal dari sektor pajak (pajak penghasilan individu dan perusahaan).
-
24,2% Sektor Non-Pajak: Berasal dari royalti minyak (Petronas), investasi, dan pungutan lainnya.
-
RM343,1 Miliar: Target proyeksi pendapatan negara.
--------------------------------------------
TOTAL PENGELUARAN NEGARA (BELANJA NEGARA)
RM419,2 Miliar hingga RM470 Miliar: Total belanja negara yang dialokasikan pemerintah Malaydesh.
-
RM338,2 Miliar (Belanja Mengurus): Dana habis pakai khusus untuk gaji pegawai negeri, pensiun, operasional kementerian, serta pembayaran subsidi dan bantuan sosial.
-
RM81 Miliar (Belanja Pembangunan): Dana infrastruktur publik seperti jalan tol, sekolah, dan fasilitas medis.
--------------------------------------------
MENGAPA ANGKA PENDAPATAN INI MEMAKSA MALAYDESH BERUTANG?
BELANJA OPERASIONAL MENYERAP SELURUH PENDAPATAN
Angka belanja operasional murni (Operating Expenditure) yang menyentuh RM338,2 miliar sudah menyedot hampir 100% dari total seluruh pendapatan negara yang masuk.
Hal ini membuat pemerintah Malaydesh sama sekali tidak memilik sisa dana pendapatan bersih untuk membiayai pembangunan fasilitas publik ataupun membayar rekor subsidi (yang sempat menyentuh RM80 miliar).
-
Defisit Anggaran Kronis
Jurang perbedaan antara total pendapatan (~RM343 miliar) dan total belanja (~RM419–RM470 miliar) menciptakan defisit anggaran berkisar di angka 3,5% hingga 3,6% dari PDB negara.
Satu-satunya jalan bagi pemerintah Malaydesh untuk menambal kekurangan uang puluhan miliar ringgit tersebut adalah dengan MENERBITKAN SURAT UTANG NEGARA BARU.
--------------------------------------------
PENDAPATAN VS PENGELUARAN MALAYDESH
PENDAPATAN : RM334,1 Miliar
PENGELUARAN : RM470 Miliar
BEBAN SUBSIDI 23,9%
PANTAS HUTANG BAYAR HUTANG : RM470 – RM334,1 = MINUS RM135,9 ......
--------------------------------------------
DEFISIT 1998-2026 = TIDAK BAYAR HUTANG
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
-
Anwar Ibrahim menegaskan bahwa miliaran ringgit yang dibayarkan oleh pemerintah saat ini sebenarnya hanya digunakan untuk membayar khidmat utang (biaya layanan utang) atau membayar bunga/faedah saja, dan bukan untuk melunasi pokok atau jumlah utang tertunggak secara keseluruhan
RUPIAH HANCUR lagi guys....HAHAHAHAHA
BalasHapusSEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
-
🪙 Daftar Negara & Produk
• Peru: Mata uang (Soles).
• Malonsia: Mata uang (Ringgit) & Paspor.
• Nepal: Mata uang (Rupee), Pita Cukai, & Prangko.
• Bangladesh: Mata uang (Taka).
• Sri Lanka: Mata uang (Rupee) & Paspor.
• Somalia: Mata uang (Shilling).
• Argentina: Mata uang (Peso).
• Pakistan: Pita Cukai.
• Filipina: Prangko.
• Guinea: Paspor.
-------------------------------------------
🔎 Sumber Berita & Media Resmi
1. Situs Resmi Peruri (Rilis Pers Ringgit) – Kerja sama cetak Ringgit Malonsia sejak 2010.
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail proyek dokumen imigrasi Sri Lanka.
3. detikFinance – Wawancara cetak mata uang Nepal, Somalia, dan Argentina.
4. Kompas – Catatan cetak prangko Filipina dan pita cukai Pakistan.
5. CNN Indonesia – Laporan ekspansi cetak uang Nepal dan paspor Guinea.
-------------------------------------------
BEBAN UTANG PER KAPITA & POPULASI (2026–1998)
2026: RM 94,544 | POPULASI: 36,385,115 JIWA
2025: RM 81,998 | POPULASI: 35,977,838 JIWA
2024: RM 79,315 | POPULASI: 34,671,895 JIWA
2023: RM 74,587 | POPULASI: 35,126,298 JIWA
2022: RM 70,901 | POPULASI: 34,695,493 JIWA
2021: RM 67,667 | POPULASI: 34,282,399 JIWA
2020: RM 63,464 | POPULASI: 33,870,000 JIWA
2019: RM 60,179 | POPULASI: 33,450,000 JIWA
2018: RM 57,605 | POPULASI: 33,000,000 JIWA
2017: RM 54,910 | POPULASI: 32,540,000 JIWA
2016: RM 52,699 | POPULASI: 32,040,000 JIWA
2015: RM 51,253 | POPULASI: 31,520,000 JIWA
2014: RM 47,927 | POPULASI: 30,980,000 JIWA
2013: RM 44,992 | POPULASI: 30,420,000 JIWA
2012: RM 41,326 | POPULASI: 29,850,000 JIWA
2011: RM 37,904 | POPULASI: 29,260,000 JIWA
2010: RM 34,488 | POPULASI: 28,650,000 JIWA
2009: RM 31,326 | POPULASI: 28,040,000 JIWA
2008: RM 26,155 | POPULASI: 27,450,000 JIWA
2007: RM 25,316 | POPULASI: 26,860,000 JIWA
2006: RM 23,381 | POPULASI: 26,260,000 JIWA
2005: RM 21,940 | POPULASI: 25,660,000 JIWA
2004: RM 20,550 | POPULASI: 25,060,000 JIWA
2003: RM 18,560 | POPULASI: 24,460,000 JIWA
2002: RM 16,798 | POPULASI: 23,870,000 JIWA
2001: RM 15,162 | POPULASI: 23,280,000 JIWA
2000: RM 13,574 | POPULASI: 22,690,000 JIWA
1999: RM 12,210 | POPULASI: 22,110,000 JIWA
1998: RM 10,821 | POPULASI: 21,530,000 JIWA
--------------------------------------------
UTANG & LIABILITAS MALONYET (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Status Kelumpuhan Pertahanan (SIPRI & Alutsista)
Vakum SIPRI (2024–2025): Status KOSONG total selama dua tahun berturut-turut. Tidak ada transfer senjata berat yang tercatat, menempatkan MALAYSEWA setara dengan Laos dan Kamboja.
Tren Mundur: Penurunan konsisten dari fase Planned (2020), Selected Not Yet Ordered (2022), hingga nihil aktivitas (2024–2025).
Kegagalan Simbolik: Pembatalan resmi akuisisi F/A-18 Hornet Kuwait sebanyak 4 kali bukti hilangnya kredibilitas finansial di pasar global.
Procurement Freeze (2026): Instruksi PM Anwar Ibrahim untuk pembekuan total pengadaan guna menghentikan korupsi sistemik dan kebocoran anggaran.
-
Model "Negara Penyewa" (Military-for-Rent)
Ketiadaan uang tunai memaksa militer beralih dari kepemilikan aset menjadi skema Leasing (Sewa):
Aset Sewaan (32+ Item): Mencakup 31 Helikopter (Blackhawk, AW139, AW149, Bell 429), pesawat latihan L39 ITCC, simulator jet tempur MKM, hingga motor polisi.
Skema Barter: Pengadaan yang tersisa (FA-50, PT-91M, Scorpene) terpaksa menggunakan Barter Kelapa Sawit (CPO) karena krisis devisa.
Aset Mangkrak: Proyek LCS & OPV yang karatan di galangan melibatkan 17 kreditor dengan bunga yang terus membengkak.
-
Spiral Utang "Gali Lubang Tutup Lubang"
Debt-Servicing Cycle: 58% hingga 64,3% pinjaman baru hanya digunakan untuk membayar bunga dan cicilan pokok utang lama.
Ledakan Liabilitas: Utang nasional melonjak drastis dari RM 407 Miliar (2010) menjadi proyeksi RM 1,79 Triliun (2026).
Rasio Kritis: Utang pemerintah menyentuh 69% GDP (melewati limit 65%) dan utang rumah tangga ekstrem di angka 84,3% GDP.
Tabung Harapan (2018): Bukti historis keputusasaan fiskal melalui penggalangan dana rakyat untuk membayar utang negara.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Bukti "Hutang Bayar Hutang" (Debt-Servicing Cycle)
Data resmi menunjukkan MALAYSEWA terjebak dalam siklus gali lubang tutup lubang kronis:
2018 (Fase Verifikasi): Utang menembus RM1 Triliun; pemerintah meluncurkan Tabung Harapan (donasi rakyat) untuk mencicil utang negara.
2019–2020: Ketergantungan meningkat; 59% hingga 60% pinjaman baru hanya untuk melunasi utang lama.
2023 (Rekor Terburuk): 64,3% dari total pinjaman kasar (RM145,8 Miliar) digunakan hanya untuk membayar utang jatuh tempo.
2025–2026: Proyeksi tetap kritis di angka 58%. Ruang fiskal untuk pembangunan dan alutsista praktis terkunci oleh cicilan utang.
-
Bukti "Vakum SIPRI" (2020–2025)
Kontras dengan klaim belanja "Cash", data SIPRI menunjukkan kekosongan aktivitas:
2020–2021: Berstatus Planned (Hanya rencana/dijangka).
2022–2023: Berstatus Not Yet Ordered (Terpilih tapi tidak ada kontrak/pesanan).
2024–2025: Status resmi KOSONG (Nihil transfer senjata berat selama 2 tahun berturut-turut).
Posisi Regional: MALAYSEWA kini sejajar dengan Laos dan Kamboja dalam hal nihilnya modernisasi alutsista berat.
-
Timeline "Prank" Alutsista (Janji vs Realitas)
Daftar kegagalan kontrak strategis yang mencoreng kredibilitas pertahanan:
Prank F/A-18 Hornet: Upaya akuisisi dari Kuwait Batal 4 Kali hingga resmi dihentikan pada 2026 karena masalah logistik dan dana.
Prank Dassault Rafale: Mangkrak sejak 2014 akibat krisis anggaran (kini diborong Indonesia).
Prank Kapal MRSS: Janji kontrak dengan PT PAL (Indonesia) pada 2018 yang tidak pernah terwujud.
Prank Helikopter Blackhawk: Proses sewa (leasing) yang mangkrak dan berbelit hingga 2025.
TOTAL AKUMULASI PHK NASIONAL
Hapus38.953 Orang: Total jumlah pekerja di Malaydesh yang terkena PHK dalam lima bulan pertama (Januari hingga Mei).
-
TREN ANGKA PHK BULANAn
Data bulanan menunjukkan dinamika pergerakan angka PHK yang fluktuatif sejak awal tahun:
Januari: 10.658 hingga 10.700 orang terkena PHK (puncak tertinggi akibat restrukturisasi awal tahun).
Februari: 7.512 orang kehilangan pekerjaan.
Maret: 5.855 orang kehilangan pekerjaan (titik terendah di awal tahun).
April: 7.057 orang terkena PHK (mengalami lonjakan sebesar 21% dibanding bulan Maret)
--------------------------------------------
--------------------------------------------
UTANG & LIABILITAS MALAYDESH (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
--------------------------------------------
OBLIGASI GLOBAL (1998–2026)
1998: Fokus restrukturisasi internal. Absen pasar global.
1999: Rilis Global Bond USD 1 miliar (AS/Eropa). Bukti pemulihan.
2002: Rilis Sukuk Ijarah Global pertama dunia USD 600 juta (London/Timur Tengah).
2004: Promosi surat utang luar negeri via Khazanah Nasional.
2006: Khazanah rilis Exchangeable Sukuk USD 750 juta (Asia/Eropa).
2011: Rilis Wakala Global Sukuk USD 2 miliar. Permintaan oversubscribed 4,5 kali.
2015: Rilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur.
2016: Rilis Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun).
2019: Diversifikasi ke Samurai Bond JPY 200 miliar bergaransi JBIC (Jepang).
2021: Rilis Sovereign Sustainability Sukuk pertama dunia USD 1,3 miliar. Permintaan melonjak 6,4 kali.
2022–2024: Absen valas. Fokus optimasi obligasi domestik (MGS/MGII).
2025: Bersiap kembali ke pasar valas lewat bank sindikasi internasional.
2026: Promosi rencana obligasi global baru USD 1 miliar.
dengan nilai RUPIAH yang makin tak berharga... ertinya INDIANESIA terpaksa berbelanja berkali ganda untuk membayar HUTANG KAPAL INDUK RONGSOKAN......HAHAHAHAHHA
BalasHapusRUGI...RUGi...RUGI...........
SEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
-
🪙 Daftar Negara & Produk
• Peru: Mata uang (Soles).
• Malonsia: Mata uang (Ringgit) & Paspor.
• Nepal: Mata uang (Rupee), Pita Cukai, & Prangko.
• Bangladesh: Mata uang (Taka).
• Sri Lanka: Mata uang (Rupee) & Paspor.
• Somalia: Mata uang (Shilling).
• Argentina: Mata uang (Peso).
• Pakistan: Pita Cukai.
• Filipina: Prangko.
• Guinea: Paspor.
-------------------------------------------
🔎 Sumber Berita & Media Resmi
1. Situs Resmi Peruri (Rilis Pers Ringgit) – Kerja sama cetak Ringgit Malonsia sejak 2010.
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail proyek dokumen imigrasi Sri Lanka.
3. detikFinance – Wawancara cetak mata uang Nepal, Somalia, dan Argentina.
4. Kompas – Catatan cetak prangko Filipina dan pita cukai Pakistan.
5. CNN Indonesia – Laporan ekspansi cetak uang Nepal dan paspor Guinea.
-------------------------------------------
BEBAN UTANG PER KAPITA & POPULASI (2026–1998)
2026: RM 94,544 | POPULASI: 36,385,115 JIWA
2025: RM 81,998 | POPULASI: 35,977,838 JIWA
2024: RM 79,315 | POPULASI: 34,671,895 JIWA
2023: RM 74,587 | POPULASI: 35,126,298 JIWA
2022: RM 70,901 | POPULASI: 34,695,493 JIWA
2021: RM 67,667 | POPULASI: 34,282,399 JIWA
2020: RM 63,464 | POPULASI: 33,870,000 JIWA
2019: RM 60,179 | POPULASI: 33,450,000 JIWA
2018: RM 57,605 | POPULASI: 33,000,000 JIWA
2017: RM 54,910 | POPULASI: 32,540,000 JIWA
2016: RM 52,699 | POPULASI: 32,040,000 JIWA
2015: RM 51,253 | POPULASI: 31,520,000 JIWA
2014: RM 47,927 | POPULASI: 30,980,000 JIWA
2013: RM 44,992 | POPULASI: 30,420,000 JIWA
2012: RM 41,326 | POPULASI: 29,850,000 JIWA
2011: RM 37,904 | POPULASI: 29,260,000 JIWA
2010: RM 34,488 | POPULASI: 28,650,000 JIWA
2009: RM 31,326 | POPULASI: 28,040,000 JIWA
2008: RM 26,155 | POPULASI: 27,450,000 JIWA
2007: RM 25,316 | POPULASI: 26,860,000 JIWA
2006: RM 23,381 | POPULASI: 26,260,000 JIWA
2005: RM 21,940 | POPULASI: 25,660,000 JIWA
2004: RM 20,550 | POPULASI: 25,060,000 JIWA
2003: RM 18,560 | POPULASI: 24,460,000 JIWA
2002: RM 16,798 | POPULASI: 23,870,000 JIWA
2001: RM 15,162 | POPULASI: 23,280,000 JIWA
2000: RM 13,574 | POPULASI: 22,690,000 JIWA
1999: RM 12,210 | POPULASI: 22,110,000 JIWA
1998: RM 10,821 | POPULASI: 21,530,000 JIWA
--------------------------------------------
UTANG & LIABILITAS MALONYET (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Perangkap Utang & Liabilitas (Eskalasi RM 1,79 Triliun)
Pertumbuhan beban finansial yang melumpuhkan negara:
2010: RM 407,1 Miliar.
2018: RM 1,19 Triliun (Ledakan pasca-transparansi 1MDB).
2026: Proyeksi RM 1,79 Triliun (Titik kritis manajemen utang).
Rasio Utang: Diproyeksikan menyentuh 69,54% dari PDB pada 2029 (Data Statista), melampaui batas aman.
-
Penurunan Daya Gentar & Reputasi
Global Firepower (GFP) 2026: MALAYSEWA (Peringkat 42) resmi disalip oleh Filipina (Peringkat 41) di ASEAN.
Status "Military-for-Rent": Karena tidak mampu membeli (Buying), beralih ke skema Sewa (Leasing) untuk 32+ item (Heli, simulator, hingga motor polisi).
Administrasi: Sanksi naturalisasi ilegal dan kekalahan WO 0-3 di bidang olahraga menjadi simbol runtuhnya tata kelola birokrasi nasional.
-
Kesimpulan Strategis
Indonesia: Berstatus "The Giant" dengan modernisasi agresif (Rafale, A400M, PPA) dan rasio utang pemerintah yang sehat (40% GDP).
MALAYSEWA: Berstatus "The Stagnant" yang terjebak dalam delusi klaim "Shopping Cash" sementara kenyataannya hanya mampu membayar bunga utang lama.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Analisa Kekuatan Udara: Buying vs. Prank
Indonesia melakukan modernisasi masif dengan kontrak resmi (Firm Order), sementara MALAYSEWA terjebak dalam pembatalan dan wacana:
Indonesia (Realisasi & Kontrak G2G):
42 Rafale: Kontrak lunas dan efektif (Dassault Aviation).
48 KAAN (Gen-5): Kerja sama strategis G2G dengan Turki (TAI).
48 KF-21 Boramae (Block II): Kesepakatan tahap akhir dengan Korea Selatan (KAI).
24 M-346F: Penandatanganan Letter of Award (LOA) dengan Leonardo.
MALAYSEWA (Pembatalan & Kegagalan):
F-18 Kuwait: Resmi BATAL (2026) setelah 4 kali upaya negosiasi (New Straits Times).
Status "Prank": Wacana JF-17, Rafale, Typhoon, dan Tejas berakhir tanpa kontrak.
MiG-29N: Pensiun tanpa pengganti (Tiada Ganti).
FA-50: Mengalami hambatan blokir/lisensi dari AS.
-
Analisa Geografis & Jangkauan Tempur
Jarak Pekanbaru ke KL (291 KM) dan Pontianak ke Sarawak (498 KM) sangat pendek dibandingkan radius tempur jet tempur baru Indonesia:
Rafale: ±1.852 KM (Sanggup menjangkau seluruh wilayah semenanjung dan Kalimantan).
KAAN & KF-21: ±1.100–1.400 KM (Dominasi ruang udara regional).
dengan nilai RUPIAH yang makin tak berharga... ertinya INDIANESIA terpaksa berbelanja berkali ganda untuk membayar HUTANG KAPAL INDUK RONGSOKAN......HAHAHAHAHHA
BalasHapusRUGI...RUGi...RUGI...........
SEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
-
🪙 Daftar Negara & Produk
• Peru: Mata uang (Soles).
• Malonsia: Mata uang (Ringgit) & Paspor.
• Nepal: Mata uang (Rupee), Pita Cukai, & Prangko.
• Bangladesh: Mata uang (Taka).
• Sri Lanka: Mata uang (Rupee) & Paspor.
• Somalia: Mata uang (Shilling).
• Argentina: Mata uang (Peso).
• Pakistan: Pita Cukai.
• Filipina: Prangko.
• Guinea: Paspor.
-------------------------------------------
🔎 Sumber Berita & Media Resmi
1. Situs Resmi Peruri (Rilis Pers Ringgit) – Kerja sama cetak Ringgit Malonsia sejak 2010.
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail proyek dokumen imigrasi Sri Lanka.
3. detikFinance – Wawancara cetak mata uang Nepal, Somalia, dan Argentina.
4. Kompas – Catatan cetak prangko Filipina dan pita cukai Pakistan.
5. CNN Indonesia – Laporan ekspansi cetak uang Nepal dan paspor Guinea.
-------------------------------------------
BEBAN UTANG PER KAPITA & POPULASI (2026–1998)
2026: RM 94,544 | POPULASI: 36,385,115 JIWA
2025: RM 81,998 | POPULASI: 35,977,838 JIWA
2024: RM 79,315 | POPULASI: 34,671,895 JIWA
2023: RM 74,587 | POPULASI: 35,126,298 JIWA
2022: RM 70,901 | POPULASI: 34,695,493 JIWA
2021: RM 67,667 | POPULASI: 34,282,399 JIWA
2020: RM 63,464 | POPULASI: 33,870,000 JIWA
2019: RM 60,179 | POPULASI: 33,450,000 JIWA
2018: RM 57,605 | POPULASI: 33,000,000 JIWA
2017: RM 54,910 | POPULASI: 32,540,000 JIWA
2016: RM 52,699 | POPULASI: 32,040,000 JIWA
2015: RM 51,253 | POPULASI: 31,520,000 JIWA
2014: RM 47,927 | POPULASI: 30,980,000 JIWA
2013: RM 44,992 | POPULASI: 30,420,000 JIWA
2012: RM 41,326 | POPULASI: 29,850,000 JIWA
2011: RM 37,904 | POPULASI: 29,260,000 JIWA
2010: RM 34,488 | POPULASI: 28,650,000 JIWA
2009: RM 31,326 | POPULASI: 28,040,000 JIWA
2008: RM 26,155 | POPULASI: 27,450,000 JIWA
2007: RM 25,316 | POPULASI: 26,860,000 JIWA
2006: RM 23,381 | POPULASI: 26,260,000 JIWA
2005: RM 21,940 | POPULASI: 25,660,000 JIWA
2004: RM 20,550 | POPULASI: 25,060,000 JIWA
2003: RM 18,560 | POPULASI: 24,460,000 JIWA
2002: RM 16,798 | POPULASI: 23,870,000 JIWA
2001: RM 15,162 | POPULASI: 23,280,000 JIWA
2000: RM 13,574 | POPULASI: 22,690,000 JIWA
1999: RM 12,210 | POPULASI: 22,110,000 JIWA
1998: RM 10,821 | POPULASI: 21,530,000 JIWA
--------------------------------------------
UTANG & LIABILITAS MALONYET (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Analisa Fiskal: Disiplin vs. Spiral Utang
Perbedaan fundamental dalam cara membiayai pertahanan:
Indonesia (Procurement/Buying): Rasio utang pemerintah sehat (40% GDP). Membeli aset untuk menjadi pemilik penuh.
MALAYSEWA (Leasing/Sewa): Rasio utang kritis (69% GDP) dengan utang rumah tangga ekstrem (84,3%). Karena krisis kas, MALAYSEWA berubah menjadi "Negara Penyewa":
Aset Sewaan: Helikopter Black Hawk (Aerotree), AW139, EC120B, Pesawat L39, Kapal Hidrografi, hingga Motor BMW R1250RT.
Status SIPRI: Indonesia mencatat "Lembar Belanja Penuh", MALAYSEWA KOSONG/ZONK selama 2 tahun berturut-turut (2024-2025).
-
Beban Rakyat & Masa Depan
Beban Per Kapita: Setiap warga MALAYSEWA menanggung beban utang kumulatif sebesar RM 81.998.
Gali Lubang Tutup Lubang: Tren utang baru hanya untuk membayar bunga utang lama sejak 2010, menyebabkan kemandekan pembangunan militer (LCS mangkrak, MRCA vakum).
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Status SIPRI: Vakum vs. Agresif
MALAYSEWA (Lembar Kosong): Mencatat status KOSONG selama dua tahun berturut-turut (2024–2025). Tidak ada transfer senjata berat yang terealisasi.
Indonesia (Lembar Penuh): Realisasi masif mencakup Rafale F-4, A400M Atlas, Rudal Khan/Bora, hingga mesin kapal PPA-L-Plus.
-
Kegagalan Pengadaan & Skandal Finansial
Skandal LCS: Proyek RM 9 Miliar yang belum mengirimkan satu pun kapal meski RM 6 Miliar telah dibayarkan. Terdeteksi penyimpangan dana RM 400 Juta untuk bayar utang perusahaan.
Sistem "Middlemen": Ketergantungan pada agen/makelar politik menyebabkan harga alutsista melambung tidak wajar dan spesifikasi yang tidak sesuai kebutuhan militer.
Drama SPH 155mm: Proyek tertunda sejak 2010 dan akhirnya dibatalkan Kemenkeu karena krisis anggaran.
FAKTA : USD 20 MILLIAR/SHOPPING versus USD 4,5 MILLIAR/LEASING
Hapus-
1. INDONESIA 🇮🇩
Anggaran: Rp335,2 triliun (~USD 20 miliar) | Naik 37% dari 2025.
Sumber: CNBC Indonesia - Anggaran Pertahanan RI Loncat ke Rp335 T.
-
2. SINGAPURA 🇸🇬
Anggaran: SGD 24,9 miliar (~USD 19,5–20 miliar) | 3–4% dari PDB.
Sumber: Bloomberg - Singapore Projects Nearly $20 Billion Defense Spend.
-
3. VIETNAM 🇻🇳
Anggaran: USD 6–7 miliar (Estimasi) | Target USD 10,2 miliar (2029).
Sumber: Data indeks militer regional Lowy Institute Asia Power Index.
-
4. THAILAND 🇹🇭
Anggaran: 204.434 juta Baht (~USD 5,7 miliar).
Sumber: Laporan belanja sektor publik Lowy Institute - Military Expenditure.
-
5. FILIPINA 🇵🇭
Anggaran: PHP 295–299 miliar (~USD 5,2 miliar) | Naik 16% dari 2025.
Sumber: Dokumen resmi Department of Budget and Management (DBM) Philippines.
-
6. MALONSIA 🇲🇾
Anggaran: RM 21,74 miIiar (~USD 4,5–4,7 miliar).
Sumber: The Sun Malonsia - Budget: Over RM21 billion allocated to boost national security.
--------------------------------------------
INDONESIA=
MRCA GEN 5 GEN4.5✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
PDB PPP 4X MALAYSEWA✔️
PDB NOMINAL 4X MALAYSEWA✔️
--------------------------------------------
KAYA .....
DAFTAR PENGADAAN ALUTSISTA ON PROGRESS
1 KAPAL INDUK GARILBADI/SRI WIJAYA
2 KRI Frigate Brawijaya Class dari Italia
4 KRI Frigate Merah Putih dari PT PAL
2 KRI Frigate Istif Class dari Turkiye
1 KRI Rigel Class dari Palindo/Jerman
2 KRI Kapal Cepat Rudal dari Turkiye
1 KRI Kapal Cepat Rudal dari Tesco Bekasi
2 KS Scorpene dari Perancis & PT PAL
1 Kapal Induk Giribaldi dari Italia
1 Kapal LHD Helikopter dari PT PAL
42 Jet Tempur Rafale dari Perancis
48 Jet Tempur KHAAN dari Turkiye
6 Jet Tempur T50 dari Korsel
2 Pesawat angkut A400M dari Spanyol
13 Radar GCI dari Thales Perancis
12 Radar Retia dari Retia
3 Baterai Rudal Balistik KHAN Turkiye
3 Baterai Rudal ADS Trisula dari Turkiye
22 Helikopter Blackhawk dari AS
12 Drone Anka dari Turkiye
60 Drone Bayraktar TB3 dari Turkiye
=============
=============
BUKTI IQ SUPER MALONTOLOL= MANGKRAK
GOVT DEBT 70,5% HOUSEHOLD 84,3% TO GDP❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
-
• LCS Maharaja Lela: Korupsi pangkas proyek jadi 5 kapal; dari 2011 belum ada yang selesai hingga target Desember 2026. (Free Malonsia Today / Naval News)
-
• OPV MMEA: 3 kapal patroli tertunda, sempat miring, dan kontrak galangan resmi diputus akhir 2024. (The Edge Malonsia / Kemenlu Malonsia)
-
• STRIDE & Rudal Taming Sari: Proyek tank dan rudal mangkrak jadi pajangan pameran karena nihil dana dan pesanan. (STRIDE Mindef)
-
• VB Berapi LP06: Senapan nasional gagal total karena desain aneh dan ditolak militer. (Military-Today)...
--------------------------------------------
GOVERNMENT DEBT : 69% of GDP
HOUSEHOLD DEBT : 84.3% of GDP
Federal Government Debt
• End of 2024: RM 1.25 trillion
• END OF 2025: RM 1.3 TRILLION
• Projected Debt-to-GDP: 69% by the end of 2025
Household Debt
2025 : RM1.73 trillion, or 85.8% of GDP
🤣BEDA KASTA BEDA LEVEL🤣
BEBAN MEMBAYAR HUTANG kapal INDUK RONGSOKAN semakin jelas....... HAHAHAHAHAH
BalasHapusRupiah Melemah 0,48%, Dolar AS Makin Dekati Level Rp18.000
https://www.cnbcindonesia.com/market/20260928144912-17-771487/rupiah-melemah-048-dolar-as-makin-dekati-level-rp18000
SEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
-
🪙 Daftar Negara & Produk
• Peru: Mata uang (Soles).
• Malonsia: Mata uang (Ringgit) & Paspor.
• Nepal: Mata uang (Rupee), Pita Cukai, & Prangko.
• Bangladesh: Mata uang (Taka).
• Sri Lanka: Mata uang (Rupee) & Paspor.
• Somalia: Mata uang (Shilling).
• Argentina: Mata uang (Peso).
• Pakistan: Pita Cukai.
• Filipina: Prangko.
• Guinea: Paspor.
-------------------------------------------
🔎 Sumber Berita & Media Resmi
1. Situs Resmi Peruri (Rilis Pers Ringgit) – Kerja sama cetak Ringgit Malonsia sejak 2010.
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail proyek dokumen imigrasi Sri Lanka.
3. detikFinance – Wawancara cetak mata uang Nepal, Somalia, dan Argentina.
4. Kompas – Catatan cetak prangko Filipina dan pita cukai Pakistan.
5. CNN Indonesia – Laporan ekspansi cetak uang Nepal dan paspor Guinea.
-------------------------------------------
BEBAN UTANG PER KAPITA & POPULASI (2026–1998)
2026: RM 94,544 | POPULASI: 36,385,115 JIWA
2025: RM 81,998 | POPULASI: 35,977,838 JIWA
2024: RM 79,315 | POPULASI: 34,671,895 JIWA
2023: RM 74,587 | POPULASI: 35,126,298 JIWA
2022: RM 70,901 | POPULASI: 34,695,493 JIWA
2021: RM 67,667 | POPULASI: 34,282,399 JIWA
2020: RM 63,464 | POPULASI: 33,870,000 JIWA
2019: RM 60,179 | POPULASI: 33,450,000 JIWA
2018: RM 57,605 | POPULASI: 33,000,000 JIWA
2017: RM 54,910 | POPULASI: 32,540,000 JIWA
2016: RM 52,699 | POPULASI: 32,040,000 JIWA
2015: RM 51,253 | POPULASI: 31,520,000 JIWA
2014: RM 47,927 | POPULASI: 30,980,000 JIWA
2013: RM 44,992 | POPULASI: 30,420,000 JIWA
2012: RM 41,326 | POPULASI: 29,850,000 JIWA
2011: RM 37,904 | POPULASI: 29,260,000 JIWA
2010: RM 34,488 | POPULASI: 28,650,000 JIWA
2009: RM 31,326 | POPULASI: 28,040,000 JIWA
2008: RM 26,155 | POPULASI: 27,450,000 JIWA
2007: RM 25,316 | POPULASI: 26,860,000 JIWA
2006: RM 23,381 | POPULASI: 26,260,000 JIWA
2005: RM 21,940 | POPULASI: 25,660,000 JIWA
2004: RM 20,550 | POPULASI: 25,060,000 JIWA
2003: RM 18,560 | POPULASI: 24,460,000 JIWA
2002: RM 16,798 | POPULASI: 23,870,000 JIWA
2001: RM 15,162 | POPULASI: 23,280,000 JIWA
2000: RM 13,574 | POPULASI: 22,690,000 JIWA
1999: RM 12,210 | POPULASI: 22,110,000 JIWA
1998: RM 10,821 | POPULASI: 21,530,000 JIWA
--------------------------------------------
OBLIGASI GLOBAL MALONYET (1998–2026)
1998: Fokus restrukturisasi internal. Absen pasar global.
1999: Rilis Global Bond USD 1 miliar (AS/Eropa). Bukti pemulihan.
2002: Rilis Sukuk Ijarah Global pertama dunia USD 600 juta (London/Timur Tengah).
2004: Promosi surat utang luar negeri via Khazanah Nasional.
2006: Khazanah rilis Exchangeable Sukuk USD 750 juta (Asia/Eropa).
2011: Rilis Wakala Global Sukuk USD 2 miliar. Permintaan oversubscribed 4,5 kali.
2015: Rilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur.
2016: Rilis Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun).
2019: Diversifikasi ke Samurai Bond JPY 200 miliar bergaransi JBIC (Jepang).
2021: Rilis Sovereign Sustainability Sukuk pertama dunia USD 1,3 miliar. Permintaan melonjak 6,4 kali.
2022–2024: Absen valas. Fokus optimasi obligasi domestik (MGS/MGII).
2025: Bersiap kembali ke pasar valas lewat bank sindikasi internasional.
2026: Promosi rencana obligasi global baru USD 1 miliar.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Kesenjangan Kemampuan (Capability Gap)
Ketiadaan Pesawat COIN: Menggunakan jet mahal (Su-30MKM) untuk operasi anti-gerilya yang seharusnya menggunakan pesawat ringan. Pengganti (FA-50M) baru akan tiba paling cepat 2026.
Logistik Terfragmentasi: Standarisasi alutsista yang buruk (campuran Rusia, AS, Polandia, China) menciptakan biaya pemeliharaan tinggi dan kesiapan operasional rendah.
Absennya Korps Marinir: Kemampuan amfibi yang terpecah antara AD dan AL melemahkan pertahanan kedaulatan di Laut China Selatan.
-
Krisis Fiskal & "Negara Penyewa"
Spiral Utang: Rasio utang pemerintah (69% GDP) dan rumah tangga (84,3%) yang ekstrem memaksa militer beralih ke skema Sewa (Leasing).
Aset Sewaan: Mencakup Helikopter Blackhawk, AW139, pesawat latihan L39, hingga kapal hidrografi dan motor patroli.
Efek Domino: Pembatalan F-18 Hornet Kuwait (2026) menjadi simbol hilangnya kredibilitas finansial di pasar pertahanan global.
-
Penurunan Daya Gentar (GFP 2026)
Peringkat Merosot: Turun ke posisi 42 Dunia (Peringkat 7 di ASEAN), kini berada di bawah Filipina (41) dan jauh tertinggal dari Indonesia (13).
Status Armada: Banyak aset utama berstatus grounded atau tidak layak selam (seperti kasus KD Rahman) akibat kekurangan suku cadang dan teknisi.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Status SIPRI: Vakum Total vs. Dominasi Regional
MALAYSEWA (Zonk): Mencatatkan status KOSONG pada lembar laporan SIPRI selama dua tahun berturut-turut (2024–2025). Tidak ada kontrak atau transfer senjata berat yang terealisasi.
Indonesia (Full Shopping): Memiliki lembar belanja penuh dengan aset strategis seperti Rafale F-4, A400M, Rudal Khan/Bora, drone Anka-S, hingga mesin kapal PPA-L-Plus.
-
Alutsista Usang & Krisis Pemeliharaan
Armada Tua: Mengoperasikan aset berusia 30–40 tahun seperti panser Condor (1980-an) dan kapal Lekiu-class (1990-an).
Masalah Kesiapan: Jet tempur utama (Su-30MKM & F/A-18D) memiliki jumlah armada kecil dan biaya perawatan yang mencekik anggaran.
Pensiun Tanpa Pengganti: Mundurnya MiG-29 pada 2017 tanpa pengganti langsung meninggalkan celah pertahanan udara yang lebar.
-
Skandal Korupsi & Kegagalan Pengadaan
Tragedi LCS: Proyek RM 9 Miliar yang meledak biayanya (cost overrun) hingga RM 1 Miliar, namun belum mengirimkan satu pun kapal meski dana telah terserap masif.
Sistem Makelar: Ketergantungan pada agen dan "middlemen" politik menyebabkan harga alutsista menjadi tidak masuk akal dan spesifikasi yang seringkali tidak sesuai kebutuhan militer.
Drama SPH 155mm: Pengadaan artileri medan yang tertunda sejak 2010 dan akhirnya dibatalkan oleh Kementerian Keuangan karena krisis kas.
MALONYET = NO MISSILE NO TORPEDO
HapusTLDM : TENTARA LAUT DIPERSENJATAI MERIAM
TLDM : TENTARA LAUT DIPERSENJATAI MERIAM
TLDM : TENTARA LAUT DIPERSENJATAI MERIAM
-
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = BANNED NSM
LMS B1 = NO MISSILE NO TORPEDO
LMS B2 = NO SONAR NO TORPEDO
LEKIU = EXO B2 EXPIRED
KASTURI = NO MISSILE NO TORPEDO
LAKSAMANA = = NO MISSILE NO TORPEDO
KEDAH = = NO MISSILE NO TORPEDO
PERDANA = = NO MISSILE NO TORPEDO
HANDALAN = = NO MISSILE NO TORPEDO
JERUNG = = NO MISSILE NO TORPEDO
========================
========================
Welcome to in force .......
1 UNIT KAPAL INDUK GIUSEPPE-GARIBALDI
4 UNIT FREEGAT MERAH PUTIH
2 UNIT PPA BRAWIJAYA CLASS
2 UNIT FREEGAT ISTIF
2 UNIT SCORPENE EVOLVED
-
DAFTAR KRI BUATAN INDONESIA (2006–2026)
1. Kapal Cepat Rudal (KCR) – PT PAL
Total: 6 Unit
KRI Kapak (625)
KRI Panah (626)
KRI Kerambit (627)
KRI Sampari (628)
KRI Tombak (629)
KRI Halasan (630)
-
2. Kapal Cepat Rudal (KCR) – Swasta Nasional
Total: 9 Unit
KRI Clurit (641)
KRI Kujang (642)
KRI Beladau (643)
KRI Alamang (644)
KRI Surik (645)
KRI Siwar (646)
KRI Parang (647)
KRI Terapang (648)
KRI Golok (688) – Trimaran Carbon Fiber
-
3. Fregat Kelas Martadinata (SIGMA 10514) – PT PAL (Joint Production Damen)
Total: 2 Unit
KRI Raden Eddy Martadinata (331)
KRI I Gusti Ngurah Rai (332)
-
4. Kapal LPD (Landing Platform Dock) – PT PAL
Total: 5 Unit
KRI Banjarmasin (592)
KRI Banda Aceh (593)
KRI Semarang (594)
KRI Dr. Wahidin Sudirohusodo (991) – Kapal Rumah Sakit (BRS)
KRI Dr. Radjiman Wedyodiningrat (992) – Kapal Rumah Sakit (BRS)
-
5. Kapal LST (Landing Ship Tank) Kelas Teluk Bintuni – Swasta Nasional
Total: 9 Unit (Kapal angkut tank berat produksi galangan domestik seperti PT DRU, PT DKB, dll)
KRI Teluk Bintuni (520)
KRI Teluk Kendari (521)
KRI Teluk Kupang (522)
KRI Teluk Palu (523)
KRI Teluk Calang (524)
KRI Teluk Youtefa (522)
KRI Teluk Palu (523)
KRI Teluk Weda (526)
KRI Teluk Wondama (527)
-
6. Kapal Korvet – Swasta Nasional / PT PAL
Total: 4 Unit (Mengeluarkan 4 kapal Kelas Diponegoro buatan Belanda)
KRI Bung Karno (369)
KRI Bung Hatta (370)
KRI Raja Ali Fisabilillah (391)
KRI Lukas Rumkoren (392)
-
7. Kapal Logistik / BCM (Bantu Cair Minyak) – Swasta Nasional
Total: 4 Unit (KRI Dumai batal, susunan nomor lambung diperbaiki)
KRI Tarakan (905)
KRI Sungai Gerong (906)
KRI Bontang (907)
KRI Balongan (908)
-
8. Kapal Patroli Cepat (PC) – Swasta Nasional & Dalam Negeri
Total: 26 Unit (Memasukkan KRI Krait 827)
KRI Krait (827)
KRI Pari (849)
KRI Sembilang (850)
KRI Sidat (851)
KRI Cakalang (852)
KRI Tatihu (853)
KRI Layaran (854)
KRI Madidihang (855)
KRI Kurau (856)
KRI Torani (860)
KRI Lepu (861)
KRI Albakora (867)
KRI Bubara (868)
KRI Gulamah (869)
KRI Posepa (870)
KRI Escolar (871)
KRI Karotang (872)
KRI Mata Bongsang (873)
KRI Dorang (874)
KRI Bawal (875)
KRI Tuna (876)
KRI Marlin (877)
KRI Butana (878)
KRI Selar (879)
KRI Hampala (880)
KRI Lumba-Lumba (881)
-
9. Kapal Selam Kelas Nagapasa – PT PAL (ToT DSME Korsel)
Total: 1 Unit
KRI Alugoro (405)
(Catatan: KRI Nagapasa 403 & KRI Ardadedali 404 diproduksi langsung di galangan Korsel)
-
10. Kapal Pemetaan Bawah Air (BHO) – Swasta Nasional
Total: 1 Unit
KRI Pollux (935)
-
11. Produk Baru / Proyek Berjalan 2025–2026
Total: 3 Unit
KRI Balaputradewa (322) – Fregat Merah Putih pertama
KRI Belati (622) – KCR
KRI Kerambit (627) – KCR / Optimalisasi batch lanjutan
-
CSG TNI AL : CV, FREGAT, KORVET, SUBS, LOGISTIK, UCAV
-
• Flagship: 1 Unit Kapal Induk Giuseppe Garibaldi (Pusat komando C2 & pangkalan drone).
• Pengawal Permukaan (10 Fregat):
4 Fregat Merah Putih (Termasuk KRI Balaputradewa 322)
2 PPA Brawijaya Class (Patroli serbaguna)
2 Fregat Istif Class (Serang permukaan/anti-rudal)
2 Martadinata Class (Pertahanan udara/AAW)
• Bawah Air: 2 Scorpène Evolved & Kelas Nagapasa/KRI Alugoro (
• Air Wing (Gugus Udara): Drone Kızılelma (Supersonik), Drone TB3 (Maritim STOL), & Helikopter AKS Panther).
• Logistik (BCM): KRI Bontang (907) & KRI Balongan (908)
-
🤣WELCOME CSG SRIWIJAYA versus TLDM NO MISSILE NO TORPEDO : KLAIM PROTOTIPE🤣
BEBAN MEMBAYAR HUTANG kapal INDUK RONGSOKAN semakin jelas....... HAHAHAHAHAH
BalasHapusRupiah Melemah 0,48%, Dolar AS Makin Dekati Level Rp18.000
https://www.cnbcindonesia.com/market/20260928144912-17-771487/rupiah-melemah-048-dolar-as-makin-dekati-level-rp18000
SEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
-
🪙 Daftar Negara & Produk
• Peru: Mata uang (Soles).
• Malonsia: Mata uang (Ringgit) & Paspor.
• Nepal: Mata uang (Rupee), Pita Cukai, & Prangko.
• Bangladesh: Mata uang (Taka).
• Sri Lanka: Mata uang (Rupee) & Paspor.
• Somalia: Mata uang (Shilling).
• Argentina: Mata uang (Peso).
• Pakistan: Pita Cukai.
• Filipina: Prangko.
• Guinea: Paspor.
-------------------------------------------
🔎 Sumber Berita & Media Resmi
1. Situs Resmi Peruri (Rilis Pers Ringgit) – Kerja sama cetak Ringgit Malonsia sejak 2010.
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail proyek dokumen imigrasi Sri Lanka.
3. detikFinance – Wawancara cetak mata uang Nepal, Somalia, dan Argentina.
4. Kompas – Catatan cetak prangko Filipina dan pita cukai Pakistan.
5. CNN Indonesia – Laporan ekspansi cetak uang Nepal dan paspor Guinea.
-------------------------------------------
BEBAN UTANG PER KAPITA & POPULASI (2026–1998)
2026: RM 94,544 | POPULASI: 36,385,115 JIWA
2025: RM 81,998 | POPULASI: 35,977,838 JIWA
2024: RM 79,315 | POPULASI: 34,671,895 JIWA
2023: RM 74,587 | POPULASI: 35,126,298 JIWA
2022: RM 70,901 | POPULASI: 34,695,493 JIWA
2021: RM 67,667 | POPULASI: 34,282,399 JIWA
2020: RM 63,464 | POPULASI: 33,870,000 JIWA
2019: RM 60,179 | POPULASI: 33,450,000 JIWA
2018: RM 57,605 | POPULASI: 33,000,000 JIWA
2017: RM 54,910 | POPULASI: 32,540,000 JIWA
2016: RM 52,699 | POPULASI: 32,040,000 JIWA
2015: RM 51,253 | POPULASI: 31,520,000 JIWA
2014: RM 47,927 | POPULASI: 30,980,000 JIWA
2013: RM 44,992 | POPULASI: 30,420,000 JIWA
2012: RM 41,326 | POPULASI: 29,850,000 JIWA
2011: RM 37,904 | POPULASI: 29,260,000 JIWA
2010: RM 34,488 | POPULASI: 28,650,000 JIWA
2009: RM 31,326 | POPULASI: 28,040,000 JIWA
2008: RM 26,155 | POPULASI: 27,450,000 JIWA
2007: RM 25,316 | POPULASI: 26,860,000 JIWA
2006: RM 23,381 | POPULASI: 26,260,000 JIWA
2005: RM 21,940 | POPULASI: 25,660,000 JIWA
2004: RM 20,550 | POPULASI: 25,060,000 JIWA
2003: RM 18,560 | POPULASI: 24,460,000 JIWA
2002: RM 16,798 | POPULASI: 23,870,000 JIWA
2001: RM 15,162 | POPULASI: 23,280,000 JIWA
2000: RM 13,574 | POPULASI: 22,690,000 JIWA
1999: RM 12,210 | POPULASI: 22,110,000 JIWA
1998: RM 10,821 | POPULASI: 21,530,000 JIWA
--------------------------------------------
UTANG & LIABILITAS MALONYET (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Hambatan Fiskal & Ketergantungan Asing
Anggaran Defisit: Belanja pertahanan hanya 1,0–1,5% PDB, di mana sebagian besar tersedot untuk gaji dan pensiun, menyisakan sedikit ruang untuk modernisasi.
Strategi Sewa (Leasing): Karena tidak mampu membeli tunai, militer terpaksa menyewa helikopter (Blackhawk, AW139) dan pesawat latihan (L39) dari pihak swasta.
Kerentanan Suku Cadang: Ketergantungan penuh pada pemasok luar negeri membuat militer rentan terhadap sanksi politik atau gangguan rantai pasok global.
-
Kelemahan Geopolitik & Operasional
Ancaman Laut China Selatan: Armada laut yang menua dan kecil (hanya 2 kapal selam) membuat MALAYSEWA sulit menghalau intrusi kapal penjaga pantai China di wilayah Luconia Shoals.
Absennya Integrasi: Kurangnya sistem Komando Gabungan yang kuat dan tidak adanya Korps Marinir yang terdedikasi melemahkan respon terhadap ancaman hibrida.
Penurunan Peringkat (GFP 2026): Berada di posisi 42 dunia, kini resmi disalip oleh Filipina (41) dan tertinggal jauh di bawah Indonesia (13).
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Inventaris Transfer Senjata (SIPRI 2024-2025)
Indonesia (Aktif):
Udara: Rafale F-4, A400M Atlas, Sistem Air Refuel, Drone ANKA-S.
Laut: PPA-L-Plus, Ship Engine (LM-2500).
Darat/Rudal: Rudal BORA, Rudal KHAN.
Mesin: TP400-D6.
MALAYSEWA (Kosong): Tidak ada catatan transfer signifikan dalam periode 2 tahun tersebut.
-
Akar Masalah Modernisasi (Structural Causes)
Anggaran: Dana pertahanan di bawah 1,5% PDB (lebih rendah dari Singapura & Thailand).
Skandal Pengadaan: Proyek LCS (Littoral Combat Ship) senilai RM9 miliar yang gagal kirim dan helikopter MD530G.
Ketergantungan Asing: Kurangnya industri pertahanan domestik memicu kerentanan terhadap fluktuasi mata uang dan sanksi.
Instabilitas Politik: Prioritas pertahanan sering berubah setiap pergantian pemerintah.
1.FOREST CITY = USD 100 BILLION
Hapus2. ECRL= USD 20 BILLION
3.CHINA-MALONYET QINZHOU INDUSTRIAL PARK (CMQIP) = USD 4,2 BILLION
4. MALONYET -CHINA KUANTAN INDUSTRIAL PARK (MCKIP) = USD 3,77 BILLION
5.CHINA RAILWAY ROLLING STOCK CORP’S ROLLING STOCK CENTER = USD 131 MILLION
6. 1 MDB = USD 4,5 BILLION
--------------------------------------------
UTANG & LIABILITAS MALAYDESH (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
--------------------------------------------
OBLIGASI GLOBAL (1998–2026)
1998: Fokus restrukturisasi internal. Absen pasar global.
1999: Rilis Global Bond USD 1 miliar (AS/Eropa). Bukti pemulihan.
2002: Rilis Sukuk Ijarah Global pertama dunia USD 600 juta (London/Timur Tengah).
2004: Promosi surat utang luar negeri via Khazanah Nasional.
2006: Khazanah rilis Exchangeable Sukuk USD 750 juta (Asia/Eropa).
2011: Rilis Wakala Global Sukuk USD 2 miliar. Permintaan oversubscribed 4,5 kali.
2015: Rilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur.
2016: Rilis Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun).
2019: Diversifikasi ke Samurai Bond JPY 200 miliar bergaransi JBIC (Jepang).
2021: Rilis Sovereign Sustainability Sukuk pertama dunia USD 1,3 miliar. Permintaan melonjak 6,4 kali.
2022–2024: Absen valas. Fokus optimasi obligasi domestik (MGS/MGII).
2025: Bersiap kembali ke pasar valas lewat bank sindikasi internasional.
2026: Promosi rencana obligasi global baru USD 1 miliar.
HANYA mampu KETAWA dan KASIHAN melihat INDIANESIA.....HAHAHAHAHHA
BalasHapusRekor Terburuk! 1 Ringgit Malaysia Kini Setara Rp 4.000
https://www.cnbcindonesia.com/research/20251111094953-128-684112/rekor-terburuk-1-ringgit-malaysia-kini-setara-rp-4000
SEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
RINGGIT DAN PASPOR MALONYET
RINGGIT DAN PASPOR MALONYET
-
Daftar ringkas negara yang mata uang atau dokumen negaranya dicetak oleh Perum Peruri, lengkap dengan tautan sumber berita resminya:
🪙 Daftar Negara & Produk
• Peru – Mata Uang: Soles
• Malonyet – Mata Uang: Ringgit & Paspor
• Nepal – Mata Uang: Rupee, Pita Cukai, & Prangko
• Bangladesh – Mata Uang: Taka
• Sri Lanka – Mata Uang: Rupee & Paspor
• Somalia – Mata Uang: Shilling
• Argentina – Mata Uang: Peso
• Pakistan – Dokumen Negara: Pita Cukai
• Filipina – Dokumen Negara: Prangko
• Guinea – Dokumen Negara: Paspor
----------------------------------
Sumber Berita Resmi & Media Nasional
1. Situs Resmi Peruri (Rilis Pers) – Laporan sejak tahun 2010, di mana Bank Negara Malonsia memercayakan pemenuhan kebutuhan pencetakan lembaran kertas mata uang Ringgit kepada Peruri
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail kerja sama pencetakan dokumen imigrasi paspor Sri Lanka.
3. detikFinance – Wawancara resmi terkait pencetakan mata uang Nepal, Somalia, hingga Argentina di Indonesia.
4. Kompas Interaktif – Catatan detail mengenai pencetakan prangko Filipina dan pita cukai Pakistan.
----------------------------------
UTANG & LIABILITAS MALAYDESH (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
--------------------------------------------
OBLIGASI GLOBAL (1998–2026)
1998: Fokus restrukturisasi internal. Absen pasar global.
1999: Rilis Global Bond USD 1 miliar (AS/Eropa). Bukti pemulihan.
2002: Rilis Sukuk Ijarah Global pertama dunia USD 600 juta (London/Timur Tengah).
2004: Promosi surat utang luar negeri via Khazanah Nasional.
2006: Khazanah rilis Exchangeable Sukuk USD 750 juta (Asia/Eropa).
2011: Rilis Wakala Global Sukuk USD 2 miliar. Permintaan oversubscribed 4,5 kali.
2015: Rilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur.
2016: Rilis Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun).
2019: Diversifikasi ke Samurai Bond JPY 200 miliar bergaransi JBIC (Jepang).
2021: Rilis Sovereign Sustainability Sukuk pertama dunia USD 1,3 miliar. Permintaan melonjak 6,4 kali.
2022–2024: Absen valas. Fokus optimasi obligasi domestik (MGS/MGII).
2025: Bersiap kembali ke pasar valas lewat bank sindikasi internasional.
2026: Promosi rencana obligasi global baru USD 1 miliar.
-
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Tantangan Operasional & Internal
Alutsista Tua: Ketergantungan pada Su-30MKM dan F/A-18D yang mulai menua; pensiunnya MiG-29 tanpa pengganti instan.
Keamanan Maritim: Kewalahan menghadapi intrusi di Laut China Selatan (LCS) dan Selat Malaka akibat kurangnya kapal patroli.
SDM: Gaji rendah dan kurangnya minat generasi muda menyebabkan sulitnya retensi tenaga ahli (pilot & insinyur).
Koordinasi Rendah: Kurangnya integrasi operasi gabungan antara Angkatan Darat, Laut, dan Udara.
-
Sorotan Skandal & Opini Publik
Kritik Kerajaan: Sultan Ibrahim menyebut helikopter Black Hawk tua sebagai "peti mati terbang".
Korupsi Internal: Operasi Sohor (2025) mengungkap intelijen militer yang membocorkan data ke penyelundup.
Kasus Kekerasan: Insiden penganiayaan kadet di UPNM yang memicu kemarahan publik di media sosial (#ReformATM).
Konspirasi: Keterlibatan sindikat yang membayar petugas hingga RM50.000 per perjalanan untuk aktivitas ilegal.
-
Kesimpulan Perbandingan
Indonesia: Fokus pada pengadaan besar-besaran (Big Ticket Items) dari berbagai negara (Perancis, Turki, AS).
MALAYSEWA: Mengalami stagnasi akibat jeratan utang proyek lama, skandal korupsi, dan krisis kepercayaan publik terhadap manajemen pengadaan.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Status Transfer Senjata (SIPRI 2024-2025)
INDONESIA (Agresif & Ekspansif):
Udara: Akuisisi Rafale F-4, pesawat angkut A400M Atlas, sistem Air Refuel, dan drone ANKA-S.
Laut: Mesin kapal LM-2500, kapal perang PPA-L-Plus, dan Ship Engine lainnya.
Darat/Rudal: Rudal balistik BORA dan KHAN, serta mesin TP400-D6.
MALAYSEWA (Stagnan/Kosong):
Tidak ada catatan transfer alutsista utama baru dalam database SIPRI periode tersebut.
-
Skandal & Masalah Struktural MALAYSEWA
Skandal LCS (Littoral Combat Ship): Dana RM9 miliar cair, namun tidak ada kapal yang dikirim hingga 2025.
Kegagalan MD530G: Pembayaran uang muka 35% untuk helikopter "hantu" yang pengirimannya terus tertunda.
Korupsi Internal: Operasi Sohor (2025) mengungkap intelijen militer yang menjual data klasifikasi ke sindikat penyelundup.
Krisis Anggaran: Pengeluaran pertahanan di bawah 1.5% PDB, jauh di bawah standar regional.
1.FOREST CITY = USD 100 BILLION
Hapus2. ECRL= USD 20 BILLION
3.CHINA-MALONYET QINZHOU INDUSTRIAL PARK (CMQIP) = USD 4,2 BILLION
4. MALONYET -CHINA KUANTAN INDUSTRIAL PARK (MCKIP) = USD 3,77 BILLION
5.CHINA RAILWAY ROLLING STOCK CORP’S ROLLING STOCK CENTER = USD 131 MILLION
6. 1 MDB = USD 4,5 BILLION
--------------------------------------------
UTANG & LIABILITAS MALAYDESH (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
--------------------------------------------
OBLIGASI GLOBAL (1998–2026)
1998: Fokus restrukturisasi internal. Absen pasar global.
1999: Rilis Global Bond USD 1 miliar (AS/Eropa). Bukti pemulihan.
2002: Rilis Sukuk Ijarah Global pertama dunia USD 600 juta (London/Timur Tengah).
2004: Promosi surat utang luar negeri via Khazanah Nasional.
2006: Khazanah rilis Exchangeable Sukuk USD 750 juta (Asia/Eropa).
2011: Rilis Wakala Global Sukuk USD 2 miliar. Permintaan oversubscribed 4,5 kali.
2015: Rilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur.
2016: Rilis Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun).
2019: Diversifikasi ke Samurai Bond JPY 200 miliar bergaransi JBIC (Jepang).
2021: Rilis Sovereign Sustainability Sukuk pertama dunia USD 1,3 miliar. Permintaan melonjak 6,4 kali.
2022–2024: Absen valas. Fokus optimasi obligasi domestik (MGS/MGII).
2025: Bersiap kembali ke pasar valas lewat bank sindikasi internasional.
2026: Promosi rencana obligasi global baru USD 1 miliar.
HANYA mampu KETAWA dan KASIHAN melihat INDIANESIA.....HAHAHAHAHHA
BalasHapusRekor Terburuk! 1 Ringgit Malaysia Kini Setara Rp 4.000
https://www.cnbcindonesia.com/research/20251111094953-128-684112/rekor-terburuk-1-ringgit-malaysia-kini-setara-rp-4000
SEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
RINGGIT DAN PASPOR MALONYET
RINGGIT DAN PASPOR MALONYET
-
Daftar ringkas negara yang mata uang atau dokumen negaranya dicetak oleh Perum Peruri, lengkap dengan tautan sumber berita resminya:
🪙 Daftar Negara & Produk
• Peru – Mata Uang: Soles
• Malonyet – Mata Uang: Ringgit & Paspor
• Nepal – Mata Uang: Rupee, Pita Cukai, & Prangko
• Bangladesh – Mata Uang: Taka
• Sri Lanka – Mata Uang: Rupee & Paspor
• Somalia – Mata Uang: Shilling
• Argentina – Mata Uang: Peso
• Pakistan – Dokumen Negara: Pita Cukai
• Filipina – Dokumen Negara: Prangko
• Guinea – Dokumen Negara: Paspor
----------------------------------
Sumber Berita Resmi & Media Nasional
1. Situs Resmi Peruri (Rilis Pers) – Laporan sejak tahun 2010, di mana Bank Negara Malonsia memercayakan pemenuhan kebutuhan pencetakan lembaran kertas mata uang Ringgit kepada Peruri
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail kerja sama pencetakan dokumen imigrasi paspor Sri Lanka.
3. detikFinance – Wawancara resmi terkait pencetakan mata uang Nepal, Somalia, hingga Argentina di Indonesia.
4. Kompas Interaktif – Catatan detail mengenai pencetakan prangko Filipina dan pita cukai Pakistan.
----------------------------------
UTANG & LIABILITAS MALAYDESH (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
--------------------------------------------
OBLIGASI GLOBAL (1998–2026)
1998: Fokus restrukturisasi internal. Absen pasar global.
1999: Rilis Global Bond USD 1 miliar (AS/Eropa). Bukti pemulihan.
2002: Rilis Sukuk Ijarah Global pertama dunia USD 600 juta (London/Timur Tengah).
2004: Promosi surat utang luar negeri via Khazanah Nasional.
2006: Khazanah rilis Exchangeable Sukuk USD 750 juta (Asia/Eropa).
2011: Rilis Wakala Global Sukuk USD 2 miliar. Permintaan oversubscribed 4,5 kali.
2015: Rilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur.
2016: Rilis Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun).
2019: Diversifikasi ke Samurai Bond JPY 200 miliar bergaransi JBIC (Jepang).
2021: Rilis Sovereign Sustainability Sukuk pertama dunia USD 1,3 miliar. Permintaan melonjak 6,4 kali.
2022–2024: Absen valas. Fokus optimasi obligasi domestik (MGS/MGII).
2025: Bersiap kembali ke pasar valas lewat bank sindikasi internasional.
2026: Promosi rencana obligasi global baru USD 1 miliar.
-
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Kontroversi Strategi "Leasing" (Sewa) Helikopter
Beban Finansial: Sewa 28 helikopter AW149 (RM16.5 miliar/15 tahun) dianggap lebih mahal dibanding Polandia yang membeli 32 unit seharga USD 1.83 miliar.
Kedaulatan Aset: Aset tidak dimiliki penuh, membatasi kemampuan upgrade, modifikasi, dan konfigurasi ulang untuk misi darurat.
Ketergantungan Swasta: Kesiapan tempur bergantung pada kontraktor (Weststar Aviation), berisiko jika terjadi sengketa hukum atau kegagalan servis.
Nihil Transfer Teknologi: Skema sewa mematikan peluang pertumbuhan industri pertahanan domestik dan penyerapan tenaga ahli lokal.
-
Kondisi Alutsista "Outdated" (Usang)
Laut (RMN): 28 kapal berusia di atas 40 tahun dengan sistem radar analog yang sulit mendeteksi drone atau kapal selam modern.
Udara (RMAF): Ketergantungan pada avionik lama; biaya perawatan melonjak karena suku cadang sudah diskontinu.
Darat (Army): Kendaraan lapis baja dan artileri kekurangan sistem kontrol tembakan berbasis GPS dan komunikasi semi-digital.
-
Kesimpulan Analisis
Indonesia bergerak menuju kekuatan regional dengan diversifikasi pemasok (Prancis, Turki, AS).
MALAYSEWA terjebak dalam "lingkaran setan" pengadaan: skandal masa lalu → anggaran terbatas → memilih opsi sewa yang mahal → ketergantungan teknologi asing yang kronis.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Sektor Pertahanan (SIPRI 2024-2025)
Indonesia (Ekspansi Alutsista): Memiliki daftar panjang transfer senjata modern (1 Lembar Penuh) termasuk:
Udara: Rafale F-4, A400M Atlas, ANKA-S (Drone), Air Refuel System.
Laut: PPA-L-Plus, Mesin Kapal LM-2500.
Rudal/Mesin: Rudal BORA & KHAN, Mesin TP400-D6.
MALAYSEWA (Stagnasi): Catatan transfer senjata KOSONG (Zero). Tidak ada pengadaan alutsista utama baru yang terdaftar.
-
Krisis Ketahanan Pangan MALAYSEWA
Ketergantungan tinggi pada impor akibat rendahnya tingkat kemandirian lokal:
Krisis Beras: Mengimpor 500.000 ton beras dari Indonesia (via Kalimantan Barat) per Mei 2025 untuk stok Sarawak.
Krisis Protein:
Unggas: Menjadi net importer ayam (Juli 2025) dan penghapusan total subsidi telur (Agustus 2025) demi hemat anggaran RM1,2 miliar.
Genetika: Terpaksa impor Ayam GPS (Grand Parent Stock) dari Amerika Serikat untuk memperbaiki kualitas indukan.
Daging Merah: Ketergantungan impor mencapai 90% (Sapi/Kambing) dengan tingkat kemandirian di bawah 15%.
1.FOREST CITY = USD 100 BILLION
Hapus2. ECRL= USD 20 BILLION
3.CHINA-MALONYET QINZHOU INDUSTRIAL PARK (CMQIP) = USD 4,2 BILLION
4. MALONYET -CHINA KUANTAN INDUSTRIAL PARK (MCKIP) = USD 3,77 BILLION
5.CHINA RAILWAY ROLLING STOCK CORP’S ROLLING STOCK CENTER = USD 131 MILLION
6. 1 MDB = USD 4,5 BILLION
--------------------------------------------
SURAT UTANG LUAR NEGERI MALONYET (1998–2026):
-
1998: Fokus restrukturisasi internal; absen di pasar global akibat pembatasan modal.
-
1999: Menerbitkan Global Bond USD 1 miliar di AS dan Eropa untuk bukti pemulihan.
-
2002: Merilis Sovereign Sukuk Ijarah Global pertama dunia USD 600 juta di London & Timur Tengah.
-
2004: Mempromosikan surat utang luar negeri melalui Khazanah Nasional.
-
2006: Khazanah menerbitkan Exchangeable Sukuk USD 750 juta di Asia dan Eropa.
-
2011: Menerbitkan Wakala Global Sukuk USD 2 miliar; kebanjiran permintaan 4,5 kali lipat.
-
2015: Merilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur dan utang.
-
2016: Menerbitkan Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun) demi efisiensi biaya.
-
2019: Diversifikasi ke Samurai Bond JPY 200 miliar dengan jaminan JBIC di Jepang.
-
2021: Meluncurkan Sovereign Sustainability Sukuk USD 1,3 miliar pertama dunia permintaan melonjak 6,4 kali lipat.
-
2022–2024: Absen di valas; fokus mempromosikan obligasi domestik (MGS/MGII) untuk menarik modal asing.
-
2025: Bersiap kembali ke pasar valas dengan menunjuk bank sindikasi internasional.
-
2026: Mempromosikan rencana obligasi global USD 1 miliar
--------------------------------------------
UTANG & LIABILITAS MALONYET (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook
RUPIAH JATUH TERSUNGKUR lagi guys....HAHAHAHHAHA
BalasHapusHANYA 1 RINGGIT sudah setara Rp 4,406.3497 IDR....HAHAHAHAHAHAH
SEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
-
🪙 Daftar Negara & Produk
• Peru: Mata uang (Soles).
• Malonsia: Mata uang (Ringgit) & Paspor.
• Nepal: Mata uang (Rupee), Pita Cukai, & Prangko.
• Bangladesh: Mata uang (Taka).
• Sri Lanka: Mata uang (Rupee) & Paspor.
• Somalia: Mata uang (Shilling).
• Argentina: Mata uang (Peso).
• Pakistan: Pita Cukai.
• Filipina: Prangko.
• Guinea: Paspor.
-------------------------------------------
🔎 Sumber Berita & Media Resmi
4. Situs Resmi Peruri (Rilis Pers Ringgit) – Kerja sama cetak Ringgit Malonsia sejak 2010.
5. Situs Resmi Peruri (Paspor Sri Lanka) – Detail proyek dokumen imigrasi Sri Lanka.
6. detikFinance – Wawancara cetak mata uang Nepal, Somalia, dan Argentina.
7. Kompas – Catatan cetak prangko Filipina dan pita cukai Pakistan.
8. CNN Indonesia – Laporan ekspansi cetak uang Nepal dan paspor Guinea.
--------------------------------
HUTANG & LIABILITAS MALONDESH 1998–2026
1998 : RM 165,4 Miliar
1999 : RM 178,3 Miliar
2000 : RM 192,2 Miliar
2001 : RM 207,2 Miliar
2002 : RM 223,3 Miliar
2003 : RM 240,7 Miliar
2004 : RM 259,5 Miliar
2005 : RM 279,7 Miliar
2006 : RM 301,5 Miliar
2007 : RM 325,0 Miliar
2008 : RM 350,4 Miliar
2009 : RM 377,7 Miliar
2010 : RM 407,1 Miliar
2011 : RM 456,1 Miliar
2012 : RM 501,6 Miliar
2013 : RM 547,7 Miliar
2014 : RM 582,8 Miliar
2015 : RM 630,5 Miliar
2016 : RM 648,5 Miliar
2017 : RM 686,8 Miliar
2018 : RM 1,19 Triliun
2019 : RM 1,25 Triliun
2020 : RM 1,32 Triliun
2021 : RM 1,38 Triliun
2022 : RM 1,45 Triliun
2023 : RM 1,53 Triliun
2024 : RM 1,63 Triliun
2025 : RM 1,71 Triliun
2026 : RM 1,79 Triliun
-
SUMBER :
Bloomberg & Reuters | CNA & The Star | The Edge Malondesh | MOF & Bernama | Kementerian Kewangan
--------------------------------
TAHUN RASIO UTANG TERHADAP GDP (%) 1998–2025
1998 : 35,8%
1999 : 40,4%
2000 : 36,1%
2001 : 42,5%
2002 : 44,9%
2003 : 45,9%
2004 : 45,1%
2005 : 43,8%
2006 : 41,5%
2007 : 41,1%
2008 : 41,3%
2009 : 51,1%
2010 : 52.4%
2011 : 51.8
2012 : 53.3
2013 : 54.7
2014 : 55.0
2015 : 55.1
2016 : 52.7
2017 : 51.9
2018 : 52.5
2019 : 52.4
2020 : 62.0
2021 : 63.3
2022 : 60.2
2023 : 64.3
2024 : 70.4
2025 : 70.5
-
SUMBER : Macrotrends / World Bank / Statista / Trading Economics
--------------------------------
DEFISIT FISKAL MALONDESH PERIODE 1998–2025:
1998 : -1,8% (± USD 33,6 MILIAR)
1999 : -3,2% (± USD 34,3 MILIAR)
2000 : -5,8% (± USD 32,5 MILIAR)
2001 : -5,5% (± USD 38,0 MILIAR)
2002 : -5,6% (± USD 39,5 MILIAR)
2003 : -5,0% (± USD 41,3 MILIAR)
2004 : -4,1% (± USD 41,9 MILIAR)
2005 : -3,6% (± USD 40,7 MILIAR)
2006 : -3,3% (± USD 39,6 MILIAR)
2007 : -3,2% (± USD 39,3 MILIAR)
2008 : -4,8% (± USD 39,3 MILIAR)
2009 : -6,7% (± USD 50,4 MILIAR)
2010 : -5,4% (± USD 51,8 MILIAR)
2011 : -4,8% (± USD 53,7 MILIAR)
2012 : -4,5% (± USD 55,6 MILIAR)
2013 : -3,9% (± USD 55,3 MILIAR)
2014 : -3,4% (± USD 56,9 MILIAR)
2015 : -3,2% (± USD 55,7 MILIAR)
2016 : -3,1% (± USD 54,3 MILIAR)
2017 : -3,0% (± USD 55,6 MILIAR)
2018 : -3,7% (± USD 57,0 MILIAR)
2019 : -3,4% (± USD 67,6 MILIAR)
2020 : -6,2% (± USD 69,1 MILIAR)
2021 : -6,4% (± USD 65,5 MILIAR)
2022 : -5,6% (± USD 69,7 MILIAR)
2023 : -5,0% (± USD 68,3 MILIAR)
2024 : -4,1% (± USD 298,4 MILIAR) (Pemangkasan subsidi)
2025 : -3,8% (± USD 325,6 MILIAR) (Rasionalisasi RON95)
-
SUMBER:
IMF | World Economic Outlook | World Bank | Bank Negara Malondesh.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Krisis Hutang & Beban Rakyat MALAYSEWA (2025)
Beban finansial yang mencapai titik kritis secara nasional maupun personal:
Hutang Pemerintah: Proyeksi melonjak hingga RM1,71 Triliun (69% dari PDB).
Hutang Rumah Tangga: Sangat tinggi di angka RM1,73 Triliun (85,8% dari PDB).
Beban Per Kapita (Rata-rata per orang):
Tanggungan Hutang Pemerintah: RM36.139 / orang.
Tanggungan Hutang Rumah Tangga: RM45.859 / orang.
Total Beban Hutang Gabungan: Mendekati RM82.000 per warga negara.
-
Perbandingan Strategis
Indonesia: Fokus pada penguatan kedaulatan militer dan menjadi eksportir pangan (beras) bagi tetangga.
MALAYSEWA: Menghadapi "Triple Crisis" (Hutang, Pangan, dan Alutsista). Prioritas anggaran bergeser dari modernisasi militer ke stabilitas perut rakyat dan pembayaran bunga hutang.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Realisasi Impor Senjata Global (SIPRI 2021–2025)
Daftar ini menunjukkan negara dengan kontrak nyata yang sedang berjalan:
Peringkat 18 (Dunia): Indonesia (Pemimpin di Asia Tenggara dengan pangsa 1,5%).
Peringkat 23: Filipina.
Peringkat 26: Singapura.
Peringkat 40: Thailand.
Status MALAYSEWA: KOSONG (Absen dari daftar 40 besar; status hanya Planned atau Not Yet Ordered).
-
Daftar Belanja Utama Indonesia (2024–2025)
Indonesia mencatatkan satu lembar penuh realisasi alutsista strategis:
Udara: Rafale F-4, A400M Atlas, Anka-S UAV, Air Refueling System.
Laut: PPA-L-Plus, Ship Engines, LM-2500 Gas Turbines.
Darat/Rudal: Rudal BORA, Rudal KHAN, Mesin TP400-D6.
-
Peringkat Kekuatan Militer ASEAN (GFP 2026)
Indonesia – Peringkat 13 Dunia (Nomor 1 ASEAN)
Vietnam – Peringkat 23
Thailand – Peringkat 24
Singapura – Peringkat 29
Myanmar – Peringkat 35
Filipina – Peringkat 41
MALAYSEWA – Peringkat 42
BEBAN UTANG PER KAPITA & POPULASI (2026–1998)
Hapus2026: RM 94,544 | POPULASI: 36,385,115 JIWA
2025: RM 81,998 | POPULASI: 35,977,838 JIWA
2024: RM 79,315 | POPULASI: 34,671,895 JIWA
2023: RM 74,587 | POPULASI: 35,126,298 JIWA
2022: RM 70,901 | POPULASI: 34,695,493 JIWA
2021: RM 67,667 | POPULASI: 34,282,399 JIWA
2020: RM 63,464 | POPULASI: 33,870,000 JIWA
2019: RM 60,179 | POPULASI: 33,450,000 JIWA
2018: RM 57,605 | POPULASI: 33,000,000 JIWA
2017: RM 54,910 | POPULASI: 32,540,000 JIWA
2016: RM 52,699 | POPULASI: 32,040,000 JIWA
2015: RM 51,253 | POPULASI: 31,520,000 JIWA
2014: RM 47,927 | POPULASI: 30,980,000 JIWA
2013: RM 44,992 | POPULASI: 30,420,000 JIWA
2012: RM 41,326 | POPULASI: 29,850,000 JIWA
2011: RM 37,904 | POPULASI: 29,260,000 JIWA
2010: RM 34,488 | POPULASI: 28,650,000 JIWA
2009: RM 31,326 | POPULASI: 28,040,000 JIWA
2008: RM 26,155 | POPULASI: 27,450,000 JIWA
2007: RM 25,316 | POPULASI: 26,860,000 JIWA
2006: RM 23,381 | POPULASI: 26,260,000 JIWA
2005: RM 21,940 | POPULASI: 25,660,000 JIWA
2004: RM 20,550 | POPULASI: 25,060,000 JIWA
2003: RM 18,560 | POPULASI: 24,460,000 JIWA
2002: RM 16,798 | POPULASI: 23,870,000 JIWA
2001: RM 15,162 | POPULASI: 23,280,000 JIWA
2000: RM 13,574 | POPULASI: 22,690,000 JIWA
1999: RM 12,210 | POPULASI: 22,110,000 JIWA
1998: RM 10,821 | POPULASI: 21,530,000 JIWA
--------------------------------------------
UTANG & LIABILITAS MALONYET (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
--------------------------------------------
5x Ganti RAJA = ZONK MRCA SPH LCS NSM
5x Ganti PM = PRANK MRCA SPH LCS NSM
6x Ganti Menteri Pertahanan = PRANK MRCA SPH LCS NSM
-
2011 Najib Razak Ahmad Zahid Hamidi
2015 Najib Razak Hishammuddin Hussein
2018 Mahathir Mohamad Mohamad Sabu
2020 Muhyiddin Yassin Ismail Sabri
2021 Ismail Sabri Hishammuddin Hussein
=============
=============
INDONESIA
(Note: The safety threshold of 60%)
-
2026 Government Debt-to-GDP Ratio: 40,46%
2026 Household Debt-to-GDP Ratio: 15,70%
RUPIAH JATUH TERSUNGKUR lagi guys....HAHAHAHHAHA
BalasHapusHANYA 1 RINGGIT sudah setara Rp 4,406.3497 IDR....HAHAHAHAHAHAH
SEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
-
🪙 Daftar Negara & Produk
• Peru: Mata uang (Soles).
• Malonsia: Mata uang (Ringgit) & Paspor.
• Nepal: Mata uang (Rupee), Pita Cukai, & Prangko.
• Bangladesh: Mata uang (Taka).
• Sri Lanka: Mata uang (Rupee) & Paspor.
• Somalia: Mata uang (Shilling).
• Argentina: Mata uang (Peso).
• Pakistan: Pita Cukai.
• Filipina: Prangko.
• Guinea: Paspor.
-------------------------------------------
🔎 Sumber Berita & Media Resmi
4. Situs Resmi Peruri (Rilis Pers Ringgit) – Kerja sama cetak Ringgit Malonsia sejak 2010.
5. Situs Resmi Peruri (Paspor Sri Lanka) – Detail proyek dokumen imigrasi Sri Lanka.
6. detikFinance – Wawancara cetak mata uang Nepal, Somalia, dan Argentina.
7. Kompas – Catatan cetak prangko Filipina dan pita cukai Pakistan.
8. CNN Indonesia – Laporan ekspansi cetak uang Nepal dan paspor Guinea.
--------------------------------
HUTANG & LIABILITAS MALONDESH 1998–2026
1998 : RM 165,4 Miliar
1999 : RM 178,3 Miliar
2000 : RM 192,2 Miliar
2001 : RM 207,2 Miliar
2002 : RM 223,3 Miliar
2003 : RM 240,7 Miliar
2004 : RM 259,5 Miliar
2005 : RM 279,7 Miliar
2006 : RM 301,5 Miliar
2007 : RM 325,0 Miliar
2008 : RM 350,4 Miliar
2009 : RM 377,7 Miliar
2010 : RM 407,1 Miliar
2011 : RM 456,1 Miliar
2012 : RM 501,6 Miliar
2013 : RM 547,7 Miliar
2014 : RM 582,8 Miliar
2015 : RM 630,5 Miliar
2016 : RM 648,5 Miliar
2017 : RM 686,8 Miliar
2018 : RM 1,19 Triliun
2019 : RM 1,25 Triliun
2020 : RM 1,32 Triliun
2021 : RM 1,38 Triliun
2022 : RM 1,45 Triliun
2023 : RM 1,53 Triliun
2024 : RM 1,63 Triliun
2025 : RM 1,71 Triliun
2026 : RM 1,79 Triliun
-
SUMBER :
Bloomberg & Reuters | CNA & The Star | The Edge Malondesh | MOF & Bernama | Kementerian Kewangan
--------------------------------
TAHUN RASIO UTANG TERHADAP GDP (%) 1998–2025
1998 : 35,8%
1999 : 40,4%
2000 : 36,1%
2001 : 42,5%
2002 : 44,9%
2003 : 45,9%
2004 : 45,1%
2005 : 43,8%
2006 : 41,5%
2007 : 41,1%
2008 : 41,3%
2009 : 51,1%
2010 : 52.4%
2011 : 51.8
2012 : 53.3
2013 : 54.7
2014 : 55.0
2015 : 55.1
2016 : 52.7
2017 : 51.9
2018 : 52.5
2019 : 52.4
2020 : 62.0
2021 : 63.3
2022 : 60.2
2023 : 64.3
2024 : 70.4
2025 : 70.5
-
SUMBER : Macrotrends / World Bank / Statista / Trading Economics
--------------------------------
DEFISIT FISKAL MALONDESH PERIODE 1998–2025:
1998 : -1,8% (± USD 33,6 MILIAR)
1999 : -3,2% (± USD 34,3 MILIAR)
2000 : -5,8% (± USD 32,5 MILIAR)
2001 : -5,5% (± USD 38,0 MILIAR)
2002 : -5,6% (± USD 39,5 MILIAR)
2003 : -5,0% (± USD 41,3 MILIAR)
2004 : -4,1% (± USD 41,9 MILIAR)
2005 : -3,6% (± USD 40,7 MILIAR)
2006 : -3,3% (± USD 39,6 MILIAR)
2007 : -3,2% (± USD 39,3 MILIAR)
2008 : -4,8% (± USD 39,3 MILIAR)
2009 : -6,7% (± USD 50,4 MILIAR)
2010 : -5,4% (± USD 51,8 MILIAR)
2011 : -4,8% (± USD 53,7 MILIAR)
2012 : -4,5% (± USD 55,6 MILIAR)
2013 : -3,9% (± USD 55,3 MILIAR)
2014 : -3,4% (± USD 56,9 MILIAR)
2015 : -3,2% (± USD 55,7 MILIAR)
2016 : -3,1% (± USD 54,3 MILIAR)
2017 : -3,0% (± USD 55,6 MILIAR)
2018 : -3,7% (± USD 57,0 MILIAR)
2019 : -3,4% (± USD 67,6 MILIAR)
2020 : -6,2% (± USD 69,1 MILIAR)
2021 : -6,4% (± USD 65,5 MILIAR)
2022 : -5,6% (± USD 69,7 MILIAR)
2023 : -5,0% (± USD 68,3 MILIAR)
2024 : -4,1% (± USD 298,4 MILIAR) (Pemangkasan subsidi)
2025 : -3,8% (± USD 325,6 MILIAR) (Rasionalisasi RON95)
-
SUMBER:
IMF | World Economic Outlook | World Bank | Bank Negara Malondesh.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Kronologi Kegagalan Kontrak MALAYSEWA (Timeline "Prank")
2005: Rudal KS-1A China (Zonk).
2014: Jet Rafale Prancis (Mangkrak anggaran).
2018: Kapal MRSS PT PAL (Zonk).
2022: Jet HAL Tejas India (Batal).
2023: IAG Guardian (Gagal spek PBB).
2024-2025: Sewa Black Hawk (Unit tidak kunjung tiba).
2026: Jet F/A-18 Hornet Kuwait (RESMI BATAL).
2026: Pembekuan Total seluruh pengadaan militer oleh PM Anwar Ibrahim.
-
Perbandingan Skala Ekonomi (PDB 2026)
Kesenjangan finansial yang menghambat modernisasi militer:
PDB PPP (Daya Beli Riil):
Indonesia: US$ 5,69 Triliun (Peringkat 6 Dunia)
MALAYSEWA: US$ 1,34 Triliun
Rasio: Indonesia 4,24 kali lipat lebih besar.
PDB Nominal (Nilai Pasar):
Indonesia: US$ 1,69 Triliun
MALAYSEWA: US$ 0,46 Triliun
Rasio: Indonesia 3,67 kali lipat lebih besar.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Kronologi Kegagalan Kontrak MALAYSEWA (Timeline "Prank")
2005: Rudal KS-1A China (Zonk).
2014: Jet Rafale Prancis (Mangkrak anggaran).
2018: Kapal MRSS PT PAL (Zonk).
2022: Jet HAL Tejas India (Batal).
2023: IAG Guardian (Gagal spek PBB).
2024-2025: Sewa Black Hawk (Unit tidak kunjung tiba).
2026: Jet F/A-18 Hornet Kuwait (RESMI BATAL).
2026: Pembekuan Total seluruh pengadaan militer oleh PM Anwar Ibrahim.
-
Perbandingan Skala Ekonomi (PDB 2026)
Kesenjangan finansial yang menghambat modernisasi militer:
PDB PPP (Daya Beli Riil):
Indonesia: US$ 5,69 Triliun (Peringkat 6 Dunia)
MALAYSEWA: US$ 1,34 Triliun
Rasio: Indonesia 4,24 kali lipat lebih besar.
PDB Nominal (Nilai Pasar):
Indonesia: US$ 1,69 Triliun
MALAYSEWA: US$ 0,46 Triliun
Rasio: Indonesia 3,67 kali lipat lebih besar.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Realitas SIPRI 2025: Belanja Nyata vs Lembar Kosong
Perbandingan realisasi transfer senjata internasional (2024–2025):
INDONESIA (1 Lembar Penuh): Sukses mengamankan aset strategis:
Udara: Rafale F-4, A400M Atlas, Anka-S UAV, Air Refuel System.
Laut: PPA-L-Plus, Ship Engines, Mesin LM-2500.
Rudal/Darat: Rudal BORA, Rudal KHAN, Mesin TP400-D6.
GRUP "SALAM KOSONG": Tidak mencatatkan aktivitas belanja/transfer senjata signifikan di SIPRI:
MALAYSEWA (Stagnasi total 6 tahun).
Timor Leste, Kamboja, Laos, Brunei.
-
Peringkat Kekuatan Militer ASEAN (GFP 2026)
Dominasi Indonesia di puncak hirarki regional:
Indonesia (Peringkat 13 Dunia) – Hegemon Mutlak
Vietnam (Peringkat 23)
Thailand (Peringkat 24)
Singapura (Peringkat 29)
Myanmar (Peringkat 35)
Filipina (Peringkat 41)
MALAYSEWA (Peringkat 42) – Terlempar ke papan bawah
MISKIN = HUTANG BAYAR HUTANG (2026–1998):
Hapus-
PENDAPATAN : RM334,1 Miliar
PENGELUARAN : RM470 Miliar
BUDGET MINUS : RM470 – RM334,1 = - RM135,9
-------------------------------------------
SURAT UTANG LUAR NEGERI MALONYET (1998–2026):
-
1998: Fokus restrukturisasi internal; absen di pasar global akibat pembatasan modal.
-
1999: Menerbitkan Global Bond USD 1 miliar di AS dan Eropa untuk bukti pemulihan.
-
2002: Merilis Sovereign Sukuk Ijarah Global pertama dunia USD 600 juta di London & Timur Tengah.
-
2004: Mempromosikan surat utang luar negeri melalui Khazanah Nasional.
-
2006: Khazanah menerbitkan Exchangeable Sukuk USD 750 juta di Asia dan Eropa.
-
2011: Menerbitkan Wakala Global Sukuk USD 2 miliar; kebanjiran permintaan 4,5 kali lipat.
-
2015: Merilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur dan utang.
-
2016: Menerbitkan Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun) demi efisiensi biaya.
-
2019: Diversifikasi ke Samurai Bond JPY 200 miliar dengan jaminan JBIC di Jepang.
-
2021: Meluncurkan Sovereign Sustainability Sukuk USD 1,3 miliar pertama dunia permintaan melonjak 6,4 kali lipat.
-
2022–2024: Absen di valas; fokus mempromosikan obligasi domestik (MGS/MGII) untuk menarik modal asing.
-
2025: Bersiap kembali ke pasar valas dengan menunjuk bank sindikasi internasional.
-
2026: Mempromosikan rencana obligasi global USD 1 miliar
--------------------------------------------
HUTANG & LIABILITAS MALONYET 1998–2026
-
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia dan dimulainya defisit anggaran berkepanjangan.
-
1999: RM 116,6 Miliar – Penerbitan instrumen obligasi domestik baru untuk stimulus ekonomi.
-
2000: RM 125,6 Miliar – Restrukturisasi sektor korporasi dan perbankan pasca-krisis selesai.
-
2001: RM 145,7 Miliar – Peningkatan belanja pembangunan guna menopang pertumbuhan domestik.
-
2002: RM 165,0 Miliar – Rasio utang terhadap PDB mulai merangkak naik secara perlahan.
-
2003: RM 188,8 Miliar – Batas plafon utang resmi pertama kali dinaikkan menjadi 40% dari PDB.
-
2004: RM 216,6 Miliar – Pengeluaran publik meluas demi mendukung proyek infrastruktur baru.
-
2005: RM 228,7 Miliar – Konsolidasi fiskal awal di bawah manajemen kepemimpinan baru.
-
2006: RM 242,2 Miliar – Pengendalian defisit secara ketat di tengah lonjakan harga komoditas global.
-
2007: RM 266,7 Miliar – Posisi keuangan masih stabil menjelang gejolak finansial global.
-
2008: RM 306,4 Miliar – Kenaikan plafon utang menjadi 45% akibat dampak awal krisis finansial global.
-
2009: RM 362,4 Miliar – Batas utang melonjak ke 55% demi mendanai paket stimulus ekonomi besar.
-
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis finansial global.
-
2011: RM 456,1 Miliar – Rasio utang mulai meningkat stabil.
-
2012: RM 501,6 Miliar – Melewati ambang batas RM 500 miliar.
-
2013: RM 547,7 Miliar – Ekspansi belanja infrastruktur nasional.
-
2014: RM 582,8 Miliar – Berdasarkan Laporan Keuangan Pemerintah Federal 2014.
-
2015: RM 630,5 Miliar – Penyesuaian ekonomi akibat fluktuasi harga minyak.
-
2016: RM 648,5 Miliar – Konsolidasi fiskal di bawah pemerintahan saat itu.
-
2017: RM 686,8 Miliar – Data tercatat dalam Laporan Tahunan Bank Negara MALONYET 2017.
-
2018: RM 1,19 Triliun – Transparansi Baru: Termasuk liabilitas 1MDB & proyek PPP. [
-
2019: RM 1,25 Triliun – Laporan pengungkapan utang menembus RM 1 triliun.
-
2020: RM 1,32 Triliun – Lonjakan akibat paket stimulus pandemi COVID-19.
-
2021: RM 1,38 Triliun – Akumulasi utang federal selama masa pemulihan ekonomi.
-
2022: RM 1,45 Triliun – Posisi utang sebelum pergantian pemerintahan.
-
2023: RM 1,53 Triliun – Dikonfirmasi oleh PM Anwar Ibrahim sebagai warisan utang & liabilitas.
-
2024: RM 1,63 Triliun – Berdasarkan Belanjawan (APBN) 2024.
-
2025: RM 1,71 Triliun – Proyeksi dalam Tinjauan Fiskal 2026 (Kementerian Kewangan).
-
2026: RM 1,79 Triliun – Target manajemen utang dalam Economic Outlook 2026.
=============
=============
INDONESIA
(Note: The safety threshold of 60%)
-
2026 Government Debt-to-GDP Ratio: 40,46%
2026 Household Debt-to-GDP Ratio: 15,70%
HANYA mampu KETAWA dan KASIHAN melihat INDIANESIA.....HAHAHAHAHHA
BalasHapusRekor Terburuk! 1 Ringgit Malaysia Kini Setara Rp 4.000
https://www.cnbcindonesia.com/research/20251111094953-128-684112/rekor-terburuk-1-ringgit-malaysia-kini-setara-rp-4000
SEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
-
🪙 Daftar Negara & Produk
• Peru: Mata uang (Soles).
• Malonsia: Mata uang (Ringgit) & Paspor.
• Nepal: Mata uang (Rupee), Pita Cukai, & Prangko.
• Bangladesh: Mata uang (Taka).
• Sri Lanka: Mata uang (Rupee) & Paspor.
• Somalia: Mata uang (Shilling).
• Argentina: Mata uang (Peso).
• Pakistan: Pita Cukai.
• Filipina: Prangko.
• Guinea: Paspor.
-------------------------------------------
🔎 Sumber Berita & Media Resmi
1. Situs Resmi Peruri (Rilis Pers Ringgit) – Kerja sama cetak Ringgit Malonsia sejak 2010.
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail proyek dokumen imigrasi Sri Lanka.
3. detikFinance – Wawancara cetak mata uang Nepal, Somalia, dan Argentina.
4. Kompas – Catatan cetak prangko Filipina dan pita cukai Pakistan.
5. CNN Indonesia – Laporan ekspansi cetak uang Nepal dan paspor Guinea.
--------------------------------
PENDAPATAN VS PENGELUARAN MALAYDESH
PENDAPATAN : RM334,1 Miliar
PENGELUARAN : RM470 Miliar
BEBAN SUBSIDI 23,9%
PANTAS HUTANG BAYAR HUTANG : RM470 – RM334,1 = MINUS RM135,9 ......
--------------------------------------------
BEBAN SUBSIDI
Pemerintah Malaydesh harus mengalokasikan sekitar 23,3% hingga 23,9% dari total seluruh pendapatan negaranya hanya untuk membayar rekor anggaran subsidi yang menyentuh RM80 miliar. Jika dihitung berdasarkan struktur pengeluaran, dana subsidi ini memakan porsi sekitar 17% hingga 19% dari total seluruh belanja negara, atau setara dengan 23,6% dari khusus anggaran operasional (Belanja Mengurus).
--------------------------------------------
PENDAPATAN NEGARA (HASIL KERAJAAN)
RM334,1 Miliar: Estimasi total pendapatan pemerintah Malaydesh.
-
75,8% Sumber Pendapatan: Berasal dari sektor pajak (pajak penghasilan individu dan perusahaan).
-
24,2% Sektor Non-Pajak: Berasal dari royalti minyak (Petronas), investasi, dan pungutan lainnya.
-
RM343,1 Miliar: Target proyeksi pendapatan negara.
--------------------------------------------
TOTAL PENGELUARAN NEGARA (BELANJA NEGARA)
RM419,2 Miliar hingga RM470 Miliar: Total belanja negara yang dialokasikan pemerintah Malaydesh.
-
RM338,2 Miliar (Belanja Mengurus): Dana habis pakai khusus untuk gaji pegawai negeri, pensiun, operasional kementerian, serta pembayaran subsidi dan bantuan sosial.
-
RM81 Miliar (Belanja Pembangunan): Dana infrastruktur publik seperti jalan tol, sekolah, dan fasilitas medis.
--------------------------------------------
MENGAPA ANGKA PENDAPATAN INI MEMAKSA MALAYDESH BERUTANG?
BELANJA OPERASIONAL MENYERAP SELURUH PENDAPATAN
Angka belanja operasional murni (Operating Expenditure) yang menyentuh RM338,2 miliar sudah menyedot hampir 100% dari total seluruh pendapatan negara yang masuk.
Hal ini membuat pemerintah Malaydesh sama sekali tidak memilik sisa dana pendapatan bersih untuk membiayai pembangunan fasilitas publik ataupun membayar rekor subsidi (yang sempat menyentuh RM80 miliar).
-
Defisit Anggaran Kronis
Jurang perbedaan antara total pendapatan (~RM343 miliar) dan total belanja (~RM419–RM470 miliar) menciptakan defisit anggaran berkisar di angka 3,5% hingga 3,6% dari PDB negara.
Satu-satunya jalan bagi pemerintah Malaydesh untuk menambal kekurangan uang puluhan miliar ringgit tersebut adalah dengan MENERBITKAN SURAT UTANG NEGARA BARU.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Analisa Ekonomi: "The Great Decoupling"
Indonesia secara resmi keluar dari level persaingan regional menuju elit global:
Kasta Elit Dunia: Indonesia Peringkat 6 Dunia (PDB PPP), melampaui Brasil, Inggris, dan Prancis.
Jurang Ekonomi: Ekonomi Indonesia secara riil (PPP) adalah 4,24 kali lipat lebih besar dari MALAYSEWA.
Kesehatan Fiskal: Rasio utang Indonesia sehat (~40%), sementara MALAYSEWA kritis (~69%) dengan proyeksi utang RM 1,79 Triliun pada 2026.
-
Status Pertahanan: Modernisasi vs Demiliterisasi
Indonesia (Modernisasi Masif): Melakukan hilirisasi ekonomi untuk membiayai alutsista premium (Rafale, Scorpene, KF-21).
MALAYSEWA (Demiliterisasi De Facto):
Siklus Prank: Kegagalan kontrak berulang (Rafale, Tejas, F-18 Kuwait).
Negara Leasing: Bergantung pada sewa (Black Hawk, AW139) karena tidak mampu beli tunai.
Pembekuan Total: PM Anwar Ibrahim menghentikan pengadaan akibat skandal korupsi dan krisis utang.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Realitas SIPRI 2025: Belanja Nyata vs Lembar Kosong
Perbandingan aktivitas transfer senjata internasional berdasarkan laporan terbaru:
INDONESIA (1 Lembar Penuh - Aktif): Berhasil mengamankan aset strategis:
Matra Udara: Rafale F-4, A400M Atlas, Anka-S UAV, Air Refueling System.
Matra Laut: PPA-L-Plus, Ship Engines, Mesin Gas Turbin LM-2500.
Rudal/Darat: Rudal BORA, Rudal KHAN, Mesin TP400-D6.
MALAYSEWA (Lembar Kosong - Lumpuh): Status pengadaan 6 tahun terakhir:
2020–2021: Planned (Hanya wacana).
2022: Selected Not Yet Ordered (Pilih tapi tidak beli).
2023: Not Yet Ordered (Tanpa pesanan).
2024–2025: KOSONG (Absen total dari radar SIPRI).
-
Hirarki Kekuatan Militer ASEAN (GFP 2026)
Pergeseran peringkat yang menunjukkan penurunan drastis kredibilitas pertahanan MALAYSEWA:
Indonesia – Peringkat 13 Dunia (Nomor 1 ASEAN)
Vietnam – Peringkat 23
Thailand – Peringkat 24
Singapura – Peringkat 29
Myanmar – Peringkat 35
Filipina – Peringkat 41
MALAYSEWA – Peringkat 42 (Kalah dari Filipina & Myanmar).
HANYA mampu KETAWA dan KASIHAN melihat INDIANESIA.....HAHAHAHAHHA
BalasHapusRekor Terburuk! 1 Ringgit Malaysia Kini Setara Rp 4.000
https://www.cnbcindonesia.com/research/20251111094953-128-684112/rekor-terburuk-1-ringgit-malaysia-kini-setara-rp-4000
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
UTANG & LIABILITAS MALAYDESH (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Analisa "The Great Decoupling" (Pemisahan Kasta Ekonomi)
Indonesia keluar dari level regional dan masuk ke elit global:
Skala Ekonomi (PPP): Indonesia Peringkat 6 Dunia (US$ 5,69 Triliun). Secara riil, ekonomi Indonesia 4,24 kali lipat lebih besar dari MALAYSEWA.
Kesehatan Fiskal: Rasio utang Indonesia aman (<40%), sedangkan MALAYSEWA kritis (>60%) dengan beban bunga utang yang mencekik belanja alutsista.
Leverage Global: Indonesia mengontrol 60% nikel dunia dan menjadi pusat gravitasi energi kawasan (Batu Bara).
-
Fenomena Demiliterisasi De Facto MALAYSEWA
Kondisi yang menyebabkan kelumpuhan pertahanan tetangga:
Negara Tukang Sewa (Leasing State): Akibat gagal bayar tunai, mobilitas militer bergantung pada sewa (Helikopter Black Hawk/AW139).
Siklus "Prank" Pertahanan: Kegagalan kontrak berulang sejak 2005 (Rafale, Tejas, hingga F-18 Kuwait yang resmi batal pada 2026).
Pembekuan Total: Kebijakan PM Anwar Ibrahim untuk menghentikan seluruh pengadaan akibat skandal korupsi sistemik di Kemenhan.
-
Kesimpulan Strategis 2026
Indonesia: Menjadi Hegemon Mutlak di Asia Tenggara dengan kekuatan finansial dan militer yang setara dengan negara G7 (Prancis/Inggris).
MALAYSEWA: Terjebak dalam Stagnasi Permanen dan penurunan kelas menjadi negara berkekuatan militer lemah di level ASEAN (Grup "Salam Kosong").
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Dominasi Skala Ekonomi: Indonesia sebagai Gajah Asia
Indonesia telah melakukan decoupling (pemisahan kasta) dari ekonomi regional ASEAN:
PDB PPP (Daya Beli Riil): Dengan angka US$ 5,69 Triliun, Indonesia menempati Peringkat 6 Dunia, melampaui Jerman, Inggris, dan Prancis.
Skala Banding: Ekonomi riil Indonesia setara dengan gabungan Thailand + Vietnam + Filipina.
Rasio vs MALAYSEWA: Indonesia 4,24x lebih besar.
PDB Nominal (Nilai Pasar): Indonesia mencapai US$ 1,69 Triliun (Peringkat 15 Dunia).
Rasio vs MALAYSEWA: Indonesia 3,67x lebih besar.
-
Kontras Kesehatan Fiskal & Profil Risiko
Perbedaan fundamental dalam pengelolaan keuangan negara:
Indonesia (Pruden & Sehat):
Rasio Utang: Terjaga stabil di kisaran 40%, jauh di bawah batas aman UU (60%).
Utang Rumah Tangga: Sangat rendah (16%), memberikan ruang konsumsi domestik yang kuat tanpa beban cicilan ekstrem.
MALAYSEWA (Zona Merah Fiskal):
Rasio Utang: Melonjak hingga 69% - 70,5% (2024-2025), melewati limit internal 65%.
Bom Waktu Rumah Tangga: Rasio utang rumah tangga mencapai 84,3%, salah satu yang tertinggi di Asia, yang mencekik daya beli rakyat.
MISKIN = HUTANG BAYAR HUTANG (2026–1998):
Hapus-
PENDAPATAN : RM334,1 Miliar
PENGELUARAN : RM470 Miliar
BUDGET MINUS : RM470 – RM334,1 = - RM135,9
--------------------------------
PENDAPATAN VS PENGELUARAN MALONYET
PENDAPATAN : RM334,1 Miliar
PENGELUARAN : RM470 Miliar
BEBAN SUBSIDI 23,9%
PANTAS HUTANG BAYAR HUTANG : RM470 – RM334,1 = MINUS RM135,9 ......
--------------------------------------------
PENDAPATAN NEGARA:
Berkisar RM334,1 Miliar hingga RM343,1 Miliar (75,8% dari pajak dan 24,2% non-pajak/Petronas).
-
TOTAL PENGELUARAN:
Mencapai RM419,2 Miliar hingga RM470 Miliar.
-
ALOKASI BELANJA:
Sebesar RM338,2 Miliar habis untuk operasional (gaji, pensiun, subsidi) dan hanya RM81 Miliar untuk pembangunan infrastruktur.
-
ALASAN UTAMA HARUS BERUTANG
PENDAPATAN HABIS TOtal: Biaya operasional murni (RM338,2 Miliar) langsung menelan hampir 100% dari seluruh pendapatan negara yang masuk.
-
DEFISIT ANGGARAN KRONIS: Selisih besar antara pendapatan dan total belanja menciptakan lubang defisit 3,5% hingga 3,6% dari PDB.
-
PENERBITAN UTANG BARU: Pemerintah terpaksa menarik utang baru senilai puluhan miliar ringgit karena tidak ada sisa dana bersih untuk membiayai proyek pembangunan dan subsidi.
--------------------------------------------
HUTANG & LIABILITAS MALONYET 1998–2026
-
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia dan dimulainya defisit anggaran berkepanjangan.
-
1999: RM 116,6 Miliar – Penerbitan instrumen obligasi domestik baru untuk stimulus ekonomi.
-
2000: RM 125,6 Miliar – Restrukturisasi sektor korporasi dan perbankan pasca-krisis selesai.
-
2001: RM 145,7 Miliar – Peningkatan belanja pembangunan guna menopang pertumbuhan domestik.
-
2002: RM 165,0 Miliar – Rasio utang terhadap PDB mulai merangkak naik secara perlahan.
-
2003: RM 188,8 Miliar – Batas plafon utang resmi pertama kali dinaikkan menjadi 40% dari PDB.
-
2004: RM 216,6 Miliar – Pengeluaran publik meluas demi mendukung proyek infrastruktur baru.
-
2005: RM 228,7 Miliar – Konsolidasi fiskal awal di bawah manajemen kepemimpinan baru.
-
2006: RM 242,2 Miliar – Pengendalian defisit secara ketat di tengah lonjakan harga komoditas global.
-
2007: RM 266,7 Miliar – Posisi keuangan masih stabil menjelang gejolak finansial global.
-
2008: RM 306,4 Miliar – Kenaikan plafon utang menjadi 45% akibat dampak awal krisis finansial global.
-
2009: RM 362,4 Miliar – Batas utang melonjak ke 55% demi mendanai paket stimulus ekonomi besar.
-
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis finansial global.
-
2011: RM 456,1 Miliar – Rasio utang mulai meningkat stabil.
-
2012: RM 501,6 Miliar – Melewati ambang batas RM 500 miliar.
-
2013: RM 547,7 Miliar – Ekspansi belanja infrastruktur nasional.
-
2014: RM 582,8 Miliar – Berdasarkan Laporan Keuangan Pemerintah Federal 2014.
-
2015: RM 630,5 Miliar – Penyesuaian ekonomi akibat fluktuasi harga minyak.
-
2016: RM 648,5 Miliar – Konsolidasi fiskal di bawah pemerintahan saat itu.
-
2017: RM 686,8 Miliar – Data tercatat dalam Laporan Tahunan Bank Negara MALONYET 2017.
-
2018: RM 1,19 Triliun – Transparansi Baru: Termasuk liabilitas 1MDB & proyek PPP. [
-
2019: RM 1,25 Triliun – Laporan pengungkapan utang menembus RM 1 triliun.
-
2020: RM 1,32 Triliun – Lonjakan akibat paket stimulus pandemi COVID-19.
-
2021: RM 1,38 Triliun – Akumulasi utang federal selama masa pemulihan ekonomi.
-
2022: RM 1,45 Triliun – Posisi utang sebelum pergantian pemerintahan.
-
2023: RM 1,53 Triliun – Dikonfirmasi oleh PM Anwar Ibrahim sebagai warisan utang & liabilitas.
-
2024: RM 1,63 Triliun – Berdasarkan Belanjawan (APBN) 2024.
-
2025: RM 1,71 Triliun – Proyeksi dalam Tinjauan Fiskal 2026 (Kementerian Kewangan).
-
2026: RM 1,79 Triliun – Target manajemen utang dalam Economic Outlook 2026.
Aset Baruw datang beruntun
BalasHapus✅️kapal induk 170 meter
✅️aav m35
semua free..
warganyet kl, makin PANIK🥶KOYAK🔥MeWeK😭 haha!😶🌫️🍌
rm tinggi pun tak ada guna,
BalasHapusNSM=NORWAY STOP MISSILES haha!🍌📛😋
Nato tolak negri🎰kasino genting..pembual tak berguna apalagi bermanfaat haha!👎🤥🍌
nato, blok timur sayang kita...hidup G20, hidup brics haha!🤗✌️😉
Warganyet pasti sudah berharap Australia mau hibahkan Tiger ke malaydesh tuhhhh. Kesiyan, sesama foda tapi tdk dianggap. Ha ha ha ha
BalasHapusKORPS MARINIR TNI-AL akan memiliki Refurbished AAV7 M35 Made in USA ex-USMC dalam 3 Batch:
BalasHapusBatch 2026 = 35 unit
Batch 2027 = 35 unit
Batch 2028 = 35 unit
Total= 105 unit
Disebar merata untuk 3 Pasmar I, II,III
Komentar ini telah dihapus oleh pengarang.
BalasHapusLagi lagi klaim, chant yo ayo ayo Indonesia di klaim oleh malingsia diraja beruk, beruk harimau malingsia merubah isi chant... 😁😁😁negeri tak tahu malu ahli klaim
BalasHapusJIRAN shoping aset baru...manakala si MISKIN jadi tempat PEMBUANGAN ASET SAMPAH RONGSOKAN....HAHAHAHAHA
BalasHapusLON ... IMPOR ALAT MILITER MADE IN INDONESIA
HapusCN235
FPB 57
SERAGAM MILITER
SS2
TENDA
PARASUT
MPCD HAWK
RHIB
AMUNISI KECIL DAN BESAR
-
📦 Ekspor Alat Militer Buatan Indonesia
• CN235 (Pesawat): Digunakan oleh Brunei (1 unit), Malaydesh (8 unit), Korea Selatan (8 unit AU, 4 unit Polisi), Pakistan (4 unit), UEA (7 unit), Burkina Faso (1 unit), dan Senegal (3 unit). (Sumber: Data Rilis Produsen / FlightGlobal)
• RHIB (Kapal Patroli Cepat): Sekoci cepat buatan Banyuwangi. Dibeli oleh Singapura (18 unit) dan Malaydesh (24 unit). Brunei berminat membeli 12 unit. (Sumber: Laporan Pengadaan Kontrak Maritim)
• Parasut & Tenda Militer: Diproduksi oleh pabrik Paiman. Militer Malaydesh memesan 7.000 unit tenda. (Sumber: Laporan Industri Manufaktur Pertahanan)
• MPCD Hawk (Avionik Cockpit): Ekspor perdana produk komponen kokpit buatan Infoglobal Surabaya ke Malaydesh pada Oktober 2021. (Sumber: Rilis Resmi Infoglobal)
• MRSS (Multimission Vessel): PT PAL memenangkan kontrak senilai USD 408,32 juta untuk memasok kapal ini ke Uni Emirat Arab. (Sumber: Janes Defence News / Naval News - IDEX 2023)
• SSV (Strategic Sealift Vessel): Angkatan Laut Filipina memesan kembali 2 unit kapal Landing Dock tambahan karena kepuasan performa batch pertama. (Sumber: Rilis Resmi Hubungan Masyarakat PT PAL Indonesia)
• Senapan Serbu SS2: Senjata andalan buatan PT Pindad. Varian SS2-V5 diperkenalkan dan diserahkan secara simbolis kepada militer Malaydesh, serta seri senapan serbu dan amunisinya turut diekspor ke Bangladesh. (Sumber: ANTARA News / Tempo / Laporan Ekspor PT Pindad)
• Amunisi Kaliber Kecil & Besar: Buatan PT Pindad Malang. Diimpor rutin oleh Malaydesh untuk kebutuhan latihan operasional pasukannya. (Sumber: Laporan PT Pindad)
• Fast Patrol Boat (FPB 57): Kapal patroli cepat buatan PT PAL. Diadopsi armada maritim Malaydesh untuk memperkuat pengawasan perbatasan laut. (Sumber: PT PAL / Janes)
• Seragam Militer & Atribut Taktis: Buatan industri tekstil Indonesia (seperti Sritex). Berupa PDL dan rompi antipeluru untuk standar militer Malaydesh. (Sumber: AIPPI)
--------------------------------------------
🏆 Pencapaian "Satu-satunya di ASEAN"
• Industri Penerbangan: PT Dirgantara Indonesia (PTDI) menjadi produsen pesawat terbang pertama dan satu-satunya di Asia Tenggara. (Sumber: Profil Korporat PT Dirgantara Indonesia / FlightGlobal)
• Produksi Tank Medium: PT Pindad menjadikan Indonesia sebagai satu-satunya negara di Asia Tenggara yang memproduksi tank tempurnya sendiri. (Sumber: Janes Land Warfare / Rilis Resmi PT Pindad)
• Kapal Selam Scorpène Evolved: Kerja sama PT PAL dan Naval Group Prancis untuk membangun 2 kapal selam diesel-elektrik di Surabaya lewat transfer teknologi penuh. Kontrak efektif per Juli 2025. (Sumber: Janes / Naval Technology)
• Kapal Selam Type 209 (Nagapasa Class): Sukses memproduksi kapal selam melalui kolaborasi PT PAL dengan Hanwha Ocean (eks DSME) Korea Selatan. (Sumber: Defensenews.com / Komite Kebijakan Industri Pertahanan - KKIP)
• Kapal Selam Otonom berbasis AI (KSOT): PT PAL mengembangkan 30 unit kapal selam tanpa awak untuk mengamankan jalur maritim strategis. Menjadikan Indonesia negara ke-4 di dunia setelah AS, Rusia, dan China yang memiliki kapabilitas ini. (Sumber: Pengumuman Resmi Kementerian Pertahanan RI)
--------------------------------------------
FAKTA : USD 20 MILLIAR/SHOPPING versus USD 4,5 MILLIAR/LEASING
-
INDONESIA 🇮🇩
Anggaran: Rp335,2 triliun (~USD 20 miliar) | Naik 37% dari 2025.
Sumber: CNBC Indonesia - Anggaran Pertahanan RI Loncat ke Rp335 T.
-
MALONSIA 🇲🇾
Anggaran: RM 21,74 miIiar (~USD 4,5–4,7 miliar).
Sumber: The Sun Malonsia - Budget: Over RM21 billion allocated to boost national security
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Trajektori Utang MALAYSEWA (2010–2026)
Data menunjukkan akumulasi utang yang tidak terkendali:
Era Transparansi (2018): Lonjakan drastis dari RM 686 Miliar ke RM 1,19 Triliun terjadi karena inklusi liabilitas tersembunyi (kasus 1MDB & proyek PPP).
Beban Pandemi & Pasca-Pandemi: Utang terus mendaki dari RM 1,32 T (2020) hingga diproyeksikan menyentuh RM 1,79 Triliun pada 2026.
Defisit Fiskal: Meskipun menyusut ke 3,8% (2025), nominal defisit tetap tinggi (± USD 17,8 Miliar), memaksa penambahan utang baru setiap tahun.
-
Implikasi Geopolitik & Pertahanan
Kesenjangan ekonomi ini berdampak langsung pada postur militer:
Indonesia: Memiliki Fiscal Space luas untuk modernisasi alutsista (Rafale, Scorpene) karena beban bunga utang yang rendah.
MALAYSEWA: Terjebak dalam siklus "Hutang Bayar Hutang". Beban bunga utang yang masif memaksa pemerintah melakukan pembekuan total pengadaan militer dan beralih ke skema sewa (leasing) karena ketidaksediaan dana tunai.
-
Kesimpulan Utama: Indonesia kini berada di liga elit ekonomi global (G20 Top 6 PPP), sementara MALAYSEWA menghadapi risiko sistemik akibat beban utang pemerintah dan rumah tangga yang ekstrem, yang berujung pada stagnasi nasional.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Dominasi Mutlak Indonesia di Level Global & ASEAN
Indonesia telah berhasil melakukan "Great Decoupling", memisahkan diri dari persaingan kelas menengah ASEAN dan masuk ke jajaran elit ekonomi dunia:
Peringkat 6 Dunia (PPP): Dengan PDB PPP sebesar US$ 5,69 Triliun, Indonesia secara riil lebih besar dari raksasa Eropa seperti Inggris dan Prancis.
Hegemon ASEAN:
Skala Riil (PPP): Ekonomi Indonesia mencapai 4,24x lipat ekonomi MALAYSEWA dan 6,69x lipat Singapura.
Skala Pasar (Nominal): Indonesia tetap dominan dengan angka 3,67x lebih besar dari MALAYSEWA ($1,69 T vs $0,46 T).
Top 5 Asia: Secara nominal, Indonesia kini berada di posisi ke-5 Asia, hanya di bawah Tiongkok, Jepang, India, dan Korea Selatan.
-
Krisis Fiskal & "Debt Trap" MALAYSEWA (2010–2026)
Data menunjukkan tren akumulasi utang MALAYSEWA yang mengkhawatirkan:
Ledakan 2018 (Transparansi Liabilitas): Terjadi lonjakan dari RM 686 Miliar ke RM 1,19 Triliun. Ini adalah titik balik di mana utang tersembunyi (1MDB & PPP) mulai diakui secara resmi.
Proyeksi 2026: Utang diperkirakan menyentuh RM 1,79 Triliun. Dalam 16 tahun (2010–2026), utang MALAYSEWA membengkak hampir 4,4 kali lipat.
Rasio Kritis: Rasio utang terhadap PDB melonjak dari 52% (2010) menjadi 70,5% (2024), melewati batas aman (65%).
-
Implikasi Strategis: Stagnasi Pertahanan & Ekonomi
Kesenjangan fiskal ini menjelaskan mengapa terjadi fenomena "SIPRI Kosong" pada MALAYSEWA:
Beban Bunga Utang: Dengan utang RM 1,79 T, sebagian besar pendapatan negara MALAYSEWA habis untuk membayar bunga, mengakibatkan pembekuan anggaran alutsista.
Daya Beli Domestik: Utang rumah tangga MALAYSEWA yang mencapai 84,3% menjadi "bom waktu" bagi konsumsi internal, sementara Indonesia dengan utang 16% memiliki daya beli yang jauh lebih stabil dan resilien.
JIRAN shoping aset baru...manakala si MISKIN jadi tempat PEMBUANGAN ASET SAMPAH RONGSOKAN....HAHAHAHAHA
BalasHapusLON ... IMPOR ALAT MILITER MADE IN INDONESIA
HapusCN235
FPB 57
SERAGAM MILITER
SS2
TENDA
PARASUT
MPCD HAWK
RHIB
AMUNISI KECIL DAN BESAR
-
📦 Ekspor Alat Militer Buatan Indonesia
• CN235 (Pesawat): Digunakan oleh Brunei (1 unit), Malaydesh (8 unit), Korea Selatan (8 unit AU, 4 unit Polisi), Pakistan (4 unit), UEA (7 unit), Burkina Faso (1 unit), dan Senegal (3 unit). (Sumber: Data Rilis Produsen / FlightGlobal)
• RHIB (Kapal Patroli Cepat): Sekoci cepat buatan Banyuwangi. Dibeli oleh Singapura (18 unit) dan Malaydesh (24 unit). Brunei berminat membeli 12 unit. (Sumber: Laporan Pengadaan Kontrak Maritim)
• Parasut & Tenda Militer: Diproduksi oleh pabrik Paiman. Militer Malaydesh memesan 7.000 unit tenda. (Sumber: Laporan Industri Manufaktur Pertahanan)
• MPCD Hawk (Avionik Cockpit): Ekspor perdana produk komponen kokpit buatan Infoglobal Surabaya ke Malaydesh pada Oktober 2021. (Sumber: Rilis Resmi Infoglobal)
• MRSS (Multimission Vessel): PT PAL memenangkan kontrak senilai USD 408,32 juta untuk memasok kapal ini ke Uni Emirat Arab. (Sumber: Janes Defence News / Naval News - IDEX 2023)
• SSV (Strategic Sealift Vessel): Angkatan Laut Filipina memesan kembali 2 unit kapal Landing Dock tambahan karena kepuasan performa batch pertama. (Sumber: Rilis Resmi Hubungan Masyarakat PT PAL Indonesia)
• Senapan Serbu SS2: Senjata andalan buatan PT Pindad. Varian SS2-V5 diperkenalkan dan diserahkan secara simbolis kepada militer Malaydesh, serta seri senapan serbu dan amunisinya turut diekspor ke Bangladesh. (Sumber: ANTARA News / Tempo / Laporan Ekspor PT Pindad)
• Amunisi Kaliber Kecil & Besar: Buatan PT Pindad Malang. Diimpor rutin oleh Malaydesh untuk kebutuhan latihan operasional pasukannya. (Sumber: Laporan PT Pindad)
• Fast Patrol Boat (FPB 57): Kapal patroli cepat buatan PT PAL. Diadopsi armada maritim Malaydesh untuk memperkuat pengawasan perbatasan laut. (Sumber: PT PAL / Janes)
• Seragam Militer & Atribut Taktis: Buatan industri tekstil Indonesia (seperti Sritex). Berupa PDL dan rompi antipeluru untuk standar militer Malaydesh. (Sumber: AIPPI)
--------------------------------------------
🏆 Pencapaian "Satu-satunya di ASEAN"
• Industri Penerbangan: PT Dirgantara Indonesia (PTDI) menjadi produsen pesawat terbang pertama dan satu-satunya di Asia Tenggara. (Sumber: Profil Korporat PT Dirgantara Indonesia / FlightGlobal)
• Produksi Tank Medium: PT Pindad menjadikan Indonesia sebagai satu-satunya negara di Asia Tenggara yang memproduksi tank tempurnya sendiri. (Sumber: Janes Land Warfare / Rilis Resmi PT Pindad)
• Kapal Selam Scorpène Evolved: Kerja sama PT PAL dan Naval Group Prancis untuk membangun 2 kapal selam diesel-elektrik di Surabaya lewat transfer teknologi penuh. Kontrak efektif per Juli 2025. (Sumber: Janes / Naval Technology)
• Kapal Selam Type 209 (Nagapasa Class): Sukses memproduksi kapal selam melalui kolaborasi PT PAL dengan Hanwha Ocean (eks DSME) Korea Selatan. (Sumber: Defensenews.com / Komite Kebijakan Industri Pertahanan - KKIP)
• Kapal Selam Otonom berbasis AI (KSOT): PT PAL mengembangkan 30 unit kapal selam tanpa awak untuk mengamankan jalur maritim strategis. Menjadikan Indonesia negara ke-4 di dunia setelah AS, Rusia, dan China yang memiliki kapabilitas ini. (Sumber: Pengumuman Resmi Kementerian Pertahanan RI)
--------------------------------------------
FAKTA : USD 20 MILLIAR/SHOPPING versus USD 4,5 MILLIAR/LEASING
-
INDONESIA 🇮🇩
Anggaran: Rp335,2 triliun (~USD 20 miliar) | Naik 37% dari 2025.
Sumber: CNBC Indonesia - Anggaran Pertahanan RI Loncat ke Rp335 T.
-
MALONSIA 🇲🇾
Anggaran: RM 21,74 miIiar (~USD 4,5–4,7 miliar).
Sumber: The Sun Malonsia - Budget: Over RM21 billion allocated to boost national security
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Kegagalan Finansial: Skandal "Belum Bayar" Petronas
Kasus sengketa gas Lapangan Kepodang menjadi bukti nyata tekanan likuiditas:
Kekalahan Internasional: Petronas (PCML) kalah gugatan di ICC Arbitrase Hong Kong (Juni 2024).
Gagal Bayar: Kewajiban denda Ship-or-Pay senilai US$ 32,2 Juta (± Rp500 Miliar) kepada PGN (Pertamina) belum tuntas dieksekusi.
Implikasi: Menjatuhkan kredibilitas Petronas sebagai mitra global di tengah beban dividen untuk menutup utang negara MALAYSEWA yang mencapai RM 1,79 Triliun.
-
Krisis Pangan: Bergantung pada Beras Indonesia
Ketahanan pangan MALAYSEWA berada di titik kritis (Defisit 50-60%):
Impor Masif: MALAYSEWA resmi mengimpor 500.000 Ton beras dari Indonesia (via Kalimantan Barat) pada 2025 untuk menstabilkan stok Sarawak.
Kapasitas Rendah: Produksi domestik hanya 1,44 juta metrik ton, sementara kebutuhan mencapai 3 juta metrik ton.
Solusi Putus Asa: Pejabat tinggi (Speaker Dewan Rakyat) menyarankan rakyat mengonsumsi Singkong (Cassava) sebagai pengganti nasi.
-
Kelumpuhan Protein: Krisis Ayam & Unggas
Kemandirian pangan hewani (SSL) MALAYSEWA merosot tajam:
Impor Genetik: Terpaksa impor 580.000 ekor ayam Grand Parent Stock (GPS) dari AS karena ketiadaan fasilitas pembibitan mandiri.
Krisis Harga: Penurunan SSL dari 100,2% menjadi 90,2% memicu kelangkaan daging ayam dan telur di pasar domestik pada 2025.
Ketergantungan Pakan: Produksi lokal lumpuh akibat ketergantungan 100% pada pakan ternak impor.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Rasio Utang Pemerintah terhadap PDB
Indonesia (Pruden): ~40% — Berada dalam kategori sangat sehat, jauh di bawah batas aman undang-undang (60%).
MALAYSEWA (Zona Merah): ~69–70% — Sudah melewati limit plafon utang mereka (65%).
-
Rasio Utang Rumah Tangga
Indonesia (Aman): 16% — Rendah, memberikan ketahanan tinggi terhadap konsumsi domestik.
MALAYSEWA (Ekstrem): 84,3% — Sangat tinggi (mencekik), sebagian besar pendapatan rakyat habis untuk membayar cicilan.
-
Defisit Fiskal (Tahun Anggaran 2025)
Indonesia (Terkendali): Di bawah 3% — Menunjukkan disiplin fiskal yang ketat dan manajemen anggaran yang stabil.
MALAYSEWA (Tinggi): 3,8% — Masih cukup tinggi, menambah beban akumulasi utang baru setiap tahun.
-
Kapasitas Belanja Negara
Indonesia (Tinggi): Fokus pada modernisasi alutsista strategis (Rafale, Scorpène) dan pembangunan infrastruktur karena fiscal space yang luas.
MALAYSEWA (Rendah): Fokus pada pembayaran bunga utang yang membengkak, mengakibatkan pembekuan pengadaan militer.
BUKTI EKONOMI SUPER MALONYET = DEFISIT
Hapus----------------------------------
DEFISIT 1998-2026 = TIDAK BAYAR HUTANG
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
-
Anwar Ibrahim menegaskan bahwa miliaran ringgit yang dibayarkan oleh pemerintah saat ini sebenarnya hanya digunakan untuk membayar khidmat utang (biaya layanan utang) atau membayar bunga/faedah saja, dan bukan untuk melunasi pokok atau jumlah utang tertunggak secara keseluruhan
--------------------------------------------
PENDAPATAN VS PENGELUARAN MALONYET
PENDAPATAN : RM334,1 Miliar
PENGELUARAN : RM470 Miliar
BEBAN SUBSIDI 23,9%
PANTAS HUTANG BAYAR HUTANG : RM470 – RM334,1 = MINUS RM135,9 ......
--------------------------------------------
PENDAPATAN NEGARA (HASIL KERAJAAN)
RM334,1 Miliar: Estimasi total pendapatan pemerintah MALONYET.
-
75,8% Sumber Pendapatan: Berasal dari sektor pajak (pajak penghasilan individu dan perusahaan).
-
24,2% Sektor Non-Pajak: Berasal dari royalti minyak (Petronas), investasi, dan pungutan lainnya.
-
RM343,1 Miliar: Target proyeksi pendapatan negara.
--------------------------------------------
TOTAL PENGELUARAN NEGARA (BELANJA NEGARA)
RM419,2 Miliar hingga RM470 Miliar: Total belanja negara yang dialokasikan pemerintah MALONYET.
-
RM338,2 Miliar (Belanja Mengurus): Dana habis pakai khusus untuk gaji pegawai negeri, pensiun, operasional kementerian, serta pembayaran subsidi dan bantuan sosial.
-
RM81 Miliar (Belanja Pembangunan): Dana infrastruktur publik seperti jalan tol, sekolah, dan fasilitas medis.
--------------------------------------------
MENGAPA ANGKA PENDAPATAN INI MEMAKSA MALONYET BERUTANG?
BELANJA OPERASIONAL MENYERAP SELURUH PENDAPATAN
Angka belanja operasional murni (Operating Expenditure) yang menyentuh RM338,2 miliar sudah menyedot hampir 100% dari total seluruh pendapatan negara yang masuk.
Hal ini membuat pemerintah MALONYET sama sekali tidak memilik sisa dana pendapatan bersih untuk membiayai pembangunan fasilitas publik ataupun membayar rekor subsidi (yang sempat menyentuh RM80 miliar).
-
Defisit Anggaran Kronis
Jurang perbedaan antara total pendapatan (~RM343 miliar) dan total belanja (~RM419–RM470 miliar) menciptakan defisit anggaran berkisar di angka 3,5% hingga 3,6% dari PDB negara.
Satu-satunya jalan bagi pemerintah MALONYET untuk menambal kekurangan uang puluhan miliar ringgit tersebut adalah dengan MENERBITKAN SURAT UTANG NEGARA BARU.
----------------------------------
----------------------------------
PENDAPATAN VS PENGELUARAN MALONYET
PENDAPATAN : RM334,1 Miliar
PENGELUARAN : RM470 Miliar
BEBAN SUBSIDI 23,9%
PANTAS HUTANG BAYAR HUTANG : RM470 – RM334,1 = MINUS RM135,9 ......
--------------------------------------------
PENDAPATAN NEGARA:
Berkisar RM334,1 Miliar hingga RM343,1 Miliar (75,8% dari pajak dan 24,2% non-pajak/Petronas).
-
TOTAL PENGELUARAN:
Mencapai RM419,2 Miliar hingga RM470 Miliar.
-
ALOKASI BELANJA:
Sebesar RM338,2 Miliar habis untuk operasional (gaji, pensiun, subsidi) dan hanya RM81 Miliar untuk pembangunan infrastruktur.
-
ALASAN UTAMA HARUS BERUTANG
PENDAPATAN HABIS TOtal: Biaya operasional murni (RM338,2 Miliar) langsung menelan hampir 100% dari seluruh pendapatan negara yang masuk.
-
DEFISIT ANGGARAN KRONIS: Selisih besar antara pendapatan dan total belanja menciptakan lubang defisit 3,5% hingga 3,6% dari PDB.
-
PENERBITAN UTANG BARU: Pemerintah terpaksa menarik utang baru senilai puluhan miliar ringgit karena tidak ada sisa dana bersih untuk membiayai proyek pembangunan dan subsidi.
SEJAK 2010 : MADE IN INDONESIA
BalasHapusRINGGIT DAN PASPOR MALONYET
RINGGIT DAN PASPOR MALONYET
RINGGIT DAN PASPOR MALONYET
-
Daftar ringkas negara yang mata uang atau dokumen negaranya dicetak oleh Perum Peruri, lengkap dengan tautan sumber berita resminya:
🪙 Daftar Negara & Produk
• Peru – Mata Uang: Soles
• Malonyet – Mata Uang: Ringgit & Paspor
• Nepal – Mata Uang: Rupee, Pita Cukai, & Prangko
• Bangladesh – Mata Uang: Taka
• Sri Lanka – Mata Uang: Rupee & Paspor
• Somalia – Mata Uang: Shilling
• Argentina – Mata Uang: Peso
• Pakistan – Dokumen Negara: Pita Cukai
• Filipina – Dokumen Negara: Prangko
• Guinea – Dokumen Negara: Paspor
----------------------------------
Sumber Berita Resmi & Media Nasional
1. Situs Resmi Peruri (Rilis Pers) – Laporan sejak tahun 2010, di mana Bank Negara Malonsia memercayakan pemenuhan kebutuhan pencetakan lembaran kertas mata uang Ringgit kepada Peruri
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail kerja sama pencetakan dokumen imigrasi paspor Sri Lanka.
3. detikFinance – Wawancara resmi terkait pencetakan mata uang Nepal, Somalia, hingga Argentina di Indonesia.
4. Kompas Interaktif – Catatan detail mengenai pencetakan prangko Filipina dan pita cukai Pakistan.
----------------------------------
UTANG & LIABILITAS MALAYDESH (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
--------------------------------------------
OBLIGASI GLOBAL (1998–2026)
1998: Fokus restrukturisasi internal. Absen pasar global.
1999: Rilis Global Bond USD 1 miliar (AS/Eropa). Bukti pemulihan.
2002: Rilis Sukuk Ijarah Global pertama dunia USD 600 juta (London/Timur Tengah).
2004: Promosi surat utang luar negeri via Khazanah Nasional.
2006: Khazanah rilis Exchangeable Sukuk USD 750 juta (Asia/Eropa).
2011: Rilis Wakala Global Sukuk USD 2 miliar. Permintaan oversubscribed 4,5 kali.
2015: Rilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur.
2016: Rilis Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun).
2019: Diversifikasi ke Samurai Bond JPY 200 miliar bergaransi JBIC (Jepang).
2021: Rilis Sovereign Sustainability Sukuk pertama dunia USD 1,3 miliar. Permintaan melonjak 6,4 kali.
2022–2024: Absen valas. Fokus optimasi obligasi domestik (MGS/MGII).
2025: Bersiap kembali ke pasar valas lewat bank sindikasi internasional.
2026: Promosi rencana obligasi global baru USD 1 miliar.
-
SEJAK 2010 : MADE IN INDONESIA
BalasHapusRINGGIT DAN PASPOR MALONYET
RINGGIT DAN PASPOR MALONYET
RINGGIT DAN PASPOR MALONYET
-
Daftar ringkas negara yang mata uang atau dokumen negaranya dicetak oleh Perum Peruri, lengkap dengan tautan sumber berita resminya:
🪙 Daftar Negara & Produk
• Peru – Mata Uang: Soles
• Malonyet – Mata Uang: Ringgit & Paspor
• Nepal – Mata Uang: Rupee, Pita Cukai, & Prangko
• Bangladesh – Mata Uang: Taka
• Sri Lanka – Mata Uang: Rupee & Paspor
• Somalia – Mata Uang: Shilling
• Argentina – Mata Uang: Peso
• Pakistan – Dokumen Negara: Pita Cukai
• Filipina – Dokumen Negara: Prangko
• Guinea – Dokumen Negara: Paspor
----------------------------------
Sumber Berita Resmi & Media Nasional
1. Situs Resmi Peruri (Rilis Pers) – Laporan sejak tahun 2010, di mana Bank Negara Malonsia memercayakan pemenuhan kebutuhan pencetakan lembaran kertas mata uang Ringgit kepada Peruri
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail kerja sama pencetakan dokumen imigrasi paspor Sri Lanka.
3. detikFinance – Wawancara resmi terkait pencetakan mata uang Nepal, Somalia, hingga Argentina di Indonesia.
4. Kompas Interaktif – Catatan detail mengenai pencetakan prangko Filipina dan pita cukai Pakistan.
----------------------------------
UTANG & LIABILITAS MALAYDESH (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
--------------------------------------------
OBLIGASI GLOBAL (1998–2026)
1998: Fokus restrukturisasi internal. Absen pasar global.
1999: Rilis Global Bond USD 1 miliar (AS/Eropa). Bukti pemulihan.
2002: Rilis Sukuk Ijarah Global pertama dunia USD 600 juta (London/Timur Tengah).
2004: Promosi surat utang luar negeri via Khazanah Nasional.
2006: Khazanah rilis Exchangeable Sukuk USD 750 juta (Asia/Eropa).
2011: Rilis Wakala Global Sukuk USD 2 miliar. Permintaan oversubscribed 4,5 kali.
2015: Rilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur.
2016: Rilis Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun).
2019: Diversifikasi ke Samurai Bond JPY 200 miliar bergaransi JBIC (Jepang).
2021: Rilis Sovereign Sustainability Sukuk pertama dunia USD 1,3 miliar. Permintaan melonjak 6,4 kali.
2022–2024: Absen valas. Fokus optimasi obligasi domestik (MGS/MGII).
2025: Bersiap kembali ke pasar valas lewat bank sindikasi internasional.
2026: Promosi rencana obligasi global baru USD 1 miliar.
-
SEJAK 2010 : MADE IN INDONESIA
BalasHapusRINGGIT DAN PASPOR MALONYET
-
🪙 Daftar Negara & Produk
• Peru: Mata uang (Soles).
• Malonsia: Mata uang (Ringgit) & Paspor.
• Nepal: Mata uang (Rupee), Pita Cukai, & Prangko.
• Bangladesh: Mata uang (Taka).
• Sri Lanka: Mata uang (Rupee) & Paspor.
• Somalia: Mata uang (Shilling).
• Argentina: Mata uang (Peso).
• Pakistan: Pita Cukai.
• Filipina: Prangko.
• Guinea: Paspor.
-------------------------------------------
🔎 Sumber Berita & Media Resmi
1. Situs Resmi Peruri (Rilis Pers Ringgit) – Kerja sama cetak Ringgit Malonsia sejak 2010.
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail proyek dokumen imigrasi Sri Lanka.
3. detikFinance – Wawancara cetak mata uang Nepal, Somalia, dan Argentina.
4. Kompas – Catatan cetak prangko Filipina dan pita cukai Pakistan.
5. CNN Indonesia – Laporan ekspansi cetak uang Nepal dan paspor Guinea.
-------------------------------------------
BEBAN UTANG PER KAPITA & POPULASI (2026–1998)
2026: RM 94,544 | POPULASI: 36,385,115 JIWA
2025: RM 81,998 | POPULASI: 35,977,838 JIWA
2024: RM 79,315 | POPULASI: 34,671,895 JIWA
2023: RM 74,587 | POPULASI: 35,126,298 JIWA
2022: RM 70,901 | POPULASI: 34,695,493 JIWA
2021: RM 67,667 | POPULASI: 34,282,399 JIWA
2020: RM 63,464 | POPULASI: 33,870,000 JIWA
2019: RM 60,179 | POPULASI: 33,450,000 JIWA
2018: RM 57,605 | POPULASI: 33,000,000 JIWA
2017: RM 54,910 | POPULASI: 32,540,000 JIWA
2016: RM 52,699 | POPULASI: 32,040,000 JIWA
2015: RM 51,253 | POPULASI: 31,520,000 JIWA
2014: RM 47,927 | POPULASI: 30,980,000 JIWA
2013: RM 44,992 | POPULASI: 30,420,000 JIWA
2012: RM 41,326 | POPULASI: 29,850,000 JIWA
2011: RM 37,904 | POPULASI: 29,260,000 JIWA
2010: RM 34,488 | POPULASI: 28,650,000 JIWA
2009: RM 31,326 | POPULASI: 28,040,000 JIWA
2008: RM 26,155 | POPULASI: 27,450,000 JIWA
2007: RM 25,316 | POPULASI: 26,860,000 JIWA
2006: RM 23,381 | POPULASI: 26,260,000 JIWA
2005: RM 21,940 | POPULASI: 25,660,000 JIWA
2004: RM 20,550 | POPULASI: 25,060,000 JIWA
2003: RM 18,560 | POPULASI: 24,460,000 JIWA
2002: RM 16,798 | POPULASI: 23,870,000 JIWA
2001: RM 15,162 | POPULASI: 23,280,000 JIWA
2000: RM 13,574 | POPULASI: 22,690,000 JIWA
1999: RM 12,210 | POPULASI: 22,110,000 JIWA
1998: RM 10,821 | POPULASI: 21,530,000 JIWA
--------------------------------------------
OBLIGASI GLOBAL MALONYET (1998–2026)
1998: Fokus restrukturisasi internal. Absen pasar global.
1999: Rilis Global Bond USD 1 miliar (AS/Eropa). Bukti pemulihan.
2002: Rilis Sukuk Ijarah Global pertama dunia USD 600 juta (London/Timur Tengah).
2004: Promosi surat utang luar negeri via Khazanah Nasional.
2006: Khazanah rilis Exchangeable Sukuk USD 750 juta (Asia/Eropa).
2011: Rilis Wakala Global Sukuk USD 2 miliar. Permintaan oversubscribed 4,5 kali.
2015: Rilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur.
2016: Rilis Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun).
2019: Diversifikasi ke Samurai Bond JPY 200 miliar bergaransi JBIC (Jepang).
2021: Rilis Sovereign Sustainability Sukuk pertama dunia USD 1,3 miliar. Permintaan melonjak 6,4 kali.
2022–2024: Absen valas. Fokus optimasi obligasi domestik (MGS/MGII).
2025: Bersiap kembali ke pasar valas lewat bank sindikasi internasional.
2026: Promosi rencana obligasi global baru USD 1 miliar.
INDONESIA=
BalasHapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
SURAT UTANG LUAR NEGERI MALONYET (1998–2026):
-
1998: Fokus restrukturisasi internal; absen di pasar global akibat pembatasan modal.
-
1999: Menerbitkan Global Bond USD 1 miliar di AS dan Eropa untuk bukti pemulihan.
-
2002: Merilis Sovereign Sukuk Ijarah Global pertama dunia USD 600 juta di London & Timur Tengah.
-
2004: Mempromosikan surat utang luar negeri melalui Khazanah Nasional.
-
2006: Khazanah menerbitkan Exchangeable Sukuk USD 750 juta di Asia dan Eropa.
-
2011: Menerbitkan Wakala Global Sukuk USD 2 miliar; kebanjiran permintaan 4,5 kali lipat.
-
2015: Merilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur dan utang.
-
2016: Menerbitkan Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun) demi efisiensi biaya.
-
2019: Diversifikasi ke Samurai Bond JPY 200 miliar dengan jaminan JBIC di Jepang.
-
2021: Meluncurkan Sovereign Sustainability Sukuk USD 1,3 miliar pertama dunia permintaan melonjak 6,4 kali lipat.
-
2022–2024: Absen di valas; fokus mempromosikan obligasi domestik (MGS/MGII) untuk menarik modal asing.
-
2025: Bersiap kembali ke pasar valas dengan menunjuk bank sindikasi internasional.
-
2026: Mempromosikan rencana obligasi global USD 1 miliar
Prindhavan malaydesh main tuh 😁😁😁
BalasHapusMana FAKTA malaydesh MISKIN shopping MRCA BRAND NEW?
BalasHapusGEMPURWIRA28 September 2026 pukul 19.15
JIRAN shoping aset baru...manakala si MISKIN jadi tempat PEMBUANGAN ASET SAMPAH RONGSOKAN....HAHAHAHAHA
Jiran shoping pesawat murahan sudah sembang mendunia
HapusMALAYDESH BANYAKAN BACOT BIN MEMBUAL TERNYATA CUMA BISA NGEMIS ASET RONGSOK 🙈🙈🙈🙈🙈🙈🇲🇾🤡🤡🤡🤡🤡🤡🤡🇲🇾🐷🐷🐷🐷🐷🐷🐷🇲🇾💩💩💩💩💩💩💩💩🇲🇾
HapusINDONESIA=
BalasHapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
-------------------------------
USD 20 MILLIAR/SHOPPING versus USD 4,5 MILLIAR/LEASING
-
1. INDONESIA 🇮🇩
Anggaran: Rp335,2 triliun (~USD 20 miliar) | Naik 37% dari 2025.
Sumber: CNBC Indonesia - Anggaran Pertahanan RI Loncat ke Rp335 T.
-
2. SINGAPURA 🇸🇬
Anggaran: SGD 24,9 miliar (~USD 19,5–20 miliar) | 3–4% dari PDB.
Sumber: Bloomberg - Singapore Projects Nearly $20 Billion Defense Spend.
-
3. VIETNAM 🇻🇳
Anggaran: USD 6–7 miliar (Estimasi) | Target USD 10,2 miliar (2029).
Sumber: Data indeks militer regional Lowy Institute Asia Power Index.
-
4. THAILAND 🇹🇭
Anggaran: 204.434 juta Baht (~USD 5,7 miliar).
Sumber: Laporan belanja sektor publik Lowy Institute - Military Expenditure.
-
5. FILIPINA 🇵🇭
Anggaran: PHP 295–299 miliar (~USD 5,2 miliar) | Naik 16% dari 2025.
Sumber: Dokumen resmi Department of Budget and Management (DBM) Philippines.
-
6. MALONSIA 🇲🇾
Anggaran: RM 21,74 miIiar (~USD 4,5–4,7 miliar).
Sumber: The Sun Malonsia - Budget: Over RM21 billion allocated to boost national security.
Yunani saja borong bekas pakai USMC 76 unit harus keluarkan UANG USD 268 juta
BalasHapusPemerintah AS telah menyetujui paket penjualan senilai US$268 juta yang mencakup 76 unit AAV-7A1 untuk memperkuat Brigade Marinir ke-32 Yunani. Paket ini terdiri dari 63 unit varian angkut personel (AAVP-7A1), 9 unit varian komando (AAVC-7A1), dan 4 unit varian pemulihan (recovery AAVR-7A1).
https://indomiliter.com/selain-indonesia-negara-negara-ini-juga-borong-ranpur-amfibi-aav-7a1-eks-usmc/
INDONESIA shopping 105 unit Refurbished AAV7 M35 Made in USA ex-USMC untuk KORPS MARINIR TNI-AL so pasti lebih besar UANG SHOPPING nya, right?
INDONESIA=
BalasHapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
BEBAN UTANG PER KAPITA & POPULASI (2026–1998)
2026: RM 94,544 | POPULASI: 36,385,115 JIWA
2025: RM 81,998 | POPULASI: 35,977,838 JIWA
2024: RM 79,315 | POPULASI: 34,671,895 JIWA
2023: RM 74,587 | POPULASI: 35,126,298 JIWA
2022: RM 70,901 | POPULASI: 34,695,493 JIWA
2021: RM 67,667 | POPULASI: 34,282,399 JIWA
2020: RM 63,464 | POPULASI: 33,870,000 JIWA
2019: RM 60,179 | POPULASI: 33,450,000 JIWA
2018: RM 57,605 | POPULASI: 33,000,000 JIWA
2017: RM 54,910 | POPULASI: 32,540,000 JIWA
2016: RM 52,699 | POPULASI: 32,040,000 JIWA
2015: RM 51,253 | POPULASI: 31,520,000 JIWA
2014: RM 47,927 | POPULASI: 30,980,000 JIWA
2013: RM 44,992 | POPULASI: 30,420,000 JIWA
2012: RM 41,326 | POPULASI: 29,850,000 JIWA
2011: RM 37,904 | POPULASI: 29,260,000 JIWA
2010: RM 34,488 | POPULASI: 28,650,000 JIWA
2009: RM 31,326 | POPULASI: 28,040,000 JIWA
2008: RM 26,155 | POPULASI: 27,450,000 JIWA
2007: RM 25,316 | POPULASI: 26,860,000 JIWA
2006: RM 23,381 | POPULASI: 26,260,000 JIWA
2005: RM 21,940 | POPULASI: 25,660,000 JIWA
2004: RM 20,550 | POPULASI: 25,060,000 JIWA
2003: RM 18,560 | POPULASI: 24,460,000 JIWA
2002: RM 16,798 | POPULASI: 23,870,000 JIWA
2001: RM 15,162 | POPULASI: 23,280,000 JIWA
2000: RM 13,574 | POPULASI: 22,690,000 JIWA
1999: RM 12,210 | POPULASI: 22,110,000 JIWA
1998: RM 10,821 | POPULASI: 21,530,000 JIWA
MATAWANG TAK LAKU................. HAHAHAHAHA
BalasHapus1 MYR SUDAH SETARA Rp 4,409.9124 IDR
https://www.xe.com/currencyconverter/convert/?Amount=1&From=MYR&To=IDR
MATAWANG TAK LAKU................. HAHAHAHAHA
BalasHapus1 MYR SUDAH SETARA Rp 4,409.9124 IDR
https://www.xe.com/currencyconverter/convert/?Amount=1&From=MYR&To=IDR
RUPIAH JATUH makin DALAM guys...... HAHAHAHAHAH
BalasHapusRUPIAH menuju 1 USD - Rp18.000........... HOREYYYYY....HAHAHAHAHHA
RUPIAH JATUH makin DALAM guys...... HAHAHAHAHAH
BalasHapusRUPIAH menuju 1 USD - Rp18.000........... HOREYYYYY....HAHAHAHAHHA
KLAIM CASH = HUTANG ASET MILITER
BalasHapus-
1. 🇹🇷 Turki (LMS Batch 2)
Model: G2G (Antar Pemerintah) via SSB.
Bunga: 4% – 6% (Fixed/OECD CIRR).
Tenor: 10 – 15 Tahun.
-
2. 🇰🇷 Korea Selatan (Pesawat FA-50)
Model: Hybrid (Kredit KEXIM & Barter CPO 50%).
Biaya: Management Fee sangat rendah (0,10% - 0,50%).
-
3. 🇬🇧 Inggris (Standar UKEF - Pesawat Hawk)
Syarat: Wajib DP 15% (Standar OECD).
Bunga: Stabil, mengikuti National Loans Fund.
-
4. 🇨🇳 China (LMS Batch 1)
Model: 100% Kredit Ekspor (China Eximbank).
Bunga: Sangat murah (3,5% Fixed).
Tenor: 10 Tahun.
-
5. 🇵🇱 Polandia (Tank PT-91M)
Model: DP 15% + Barter CPO (30-40%).
Tenor: 10 Tahun cicilan.
-
6. 🇩🇪 Jerman (Kedah-Class)
Model: Kredit Komersial dijamin negara (Euler Hermes).
Pendana: Deutsche Bank & Konsorsium.
-
7. Kredit Sindikasi (Proyek LCS - 17 Kreditor/Hutang)
Model: Konsorsium Bank Domestik/Intl (Skala Masif).
Bunga: 6% (Saldo Menurun).
Tenor: 15 Tahun (Akibat penundaan proyek).
-----------------KUALA LUMPUR:
The defence ministry has cancelled five procurement tenders for supplies, services and infrastructure projects. The cancellations were to avoid leakages in expenditure, and were in line with a policy of procurement through open tenders.
“Mindef has also taken serious note of Prime Minister Anwar Ibrahim’s statement regarding the leakage in expenditure at the Budget 2023 dialogue on Tuesday,” it said in a statement today
------------------
GANTI PM 5x = 84,3% TO GDP
GANTI MOF 5x = KLAIM LUNAS 2053 = GAGAL (NAMBAH DEBT)
BADUT 🦧GORILA = MEMBUAL KLAIM KAYA
------------------
GANTI PM 5x = TIDAK BAYAR HUTANG TERTUNGGAK
GANTI MOD 6x = KEKANGAN KEWANGAN
BADUT 🦧GORILA = MEMBUAL KLAIM KAYA
----------------
MRCA 2025-2017= ZONK = NO PROCUREMENT
5x GANTI PM
5x GANTI MOD
6x GANTI MOF
------------------
LCS 2025-2011 = BAYAR HUTANG NGPVs = MANGKRAK
5x GANTI PM
6x GANTI MOD
6x GANTI MOF
------------------
SPH 2025-2016 = ZONK = NO PROCUREMENT
5x GANTI PM
5x GANTI MOD
6x GANTI MOF
------------------
MRSS/LPD 2025-2016 = ZONK = NO PROCUREMENT
5x GANTI PM
5x GANTI MOD
6x GANTI MOF
Guys..... INDIANESIA PANIK... PANIK.. PANIK.....
BalasHapus1USD sudah cecah Rp18.000 guys.... 🔥🔥🤣🤣🤣🤣
BUKTI EKONOMI SUPER MALONYET = DEFISIT
Hapus----------------------------------
DEFISIT 1998-2026 = TIDAK BAYAR HUTANG
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
-
Anwar Ibrahim menegaskan bahwa miliaran ringgit yang dibayarkan oleh pemerintah saat ini sebenarnya hanya digunakan untuk membayar khidmat utang (biaya layanan utang) atau membayar bunga/faedah saja, dan bukan untuk melunasi pokok atau jumlah utang tertunggak secara keseluruhan
--------------------------------------------
UTANG & LIABILITAS MALONYET (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
--------------------------------------------
SURAT UTANG LUAR NEGERI MALONYET (1998–2026):
-
1998: Fokus restrukturisasi internal; absen di pasar global akibat pembatasan modal.
-
1999: Menerbitkan Global Bond USD 1 miliar di AS dan Eropa untuk bukti pemulihan.
-
2002: Merilis Sovereign Sukuk Ijarah Global pertama dunia USD 600 juta di London & Timur Tengah.
-
2004: Mempromosikan surat utang luar negeri melalui Khazanah Nasional.
-
2006: Khazanah menerbitkan Exchangeable Sukuk USD 750 juta di Asia dan Eropa.
-
2011: Menerbitkan Wakala Global Sukuk USD 2 miliar; kebanjiran permintaan 4,5 kali lipat.
-
2015: Merilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur dan utang.
-
2016: Menerbitkan Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun) demi efisiensi biaya.
-
2019: Diversifikasi ke Samurai Bond JPY 200 miliar dengan jaminan JBIC di Jepang.
-
2021: Meluncurkan Sovereign Sustainability Sukuk USD 1,3 miliar pertama dunia permintaan melonjak 6,4 kali lipat.
-
2022–2024: Absen di valas; fokus mempromosikan obligasi domestik (MGS/MGII) untuk menarik modal asing.
-
2025: Bersiap kembali ke pasar valas dengan menunjuk bank sindikasi internasional.
-
2026: Mempromosikan rencana obligasi global USD 1 miliar
INDONESIA USD 450 JUTA = RETROFIT KAPAL INDUK
HapusMALAYDESH USD 2,75 MILLIAR = LCS MANGKRAK SALAH POTONG
---------------------------------
🚢 PROFIL, ANGGARAN & KREDITUR
• INDONESIA: 1 unit kapal induk ringan seharga US$450 juta (murni biaya retrofit). (Sumber: Kemhan RI)
-
• MALAYDESH: Pangkas dari 6 jadi 5 unit dengan total anggaran membengkak ke US$2,75 miliar (Per unit = US$549 juta) [Gowind-class corvette], serta terjerat utang pada 17 kreditur proyek yaitu:
1. MTU Services (M) Sdn Bhd
2. Contraves Sdn Bhd
3. Axima Concept SA
4. Contraves Advanced Devices Sdn Bhd
5. Contraves Electrodynamics Sdn Bhd
6. Tyco Fire Security & Services Sdn Bhd
7. iXblue SAS
8. iXblue Sdn Bhd
9. Protank Mission Systems Sdn Bhd
10. Bank Pembangunan Bhd
11. AmBank Islamic Bhd
12. AmBank (M) Bhd
13. Affin Hwang Investment Bank Bhd
14. Bank Muamalat Bhd
15. Affin Bank Bhd
16. Bank Kerjasama Rakyat Bhd
17. Malayan Banking Bhd (Maybank) & Kuwait Finance House Bhd. (Sumber: Gowind-class corvette)
---------------------------------
🛠️ TEKNIS, KRISIS FISIK & EMBARGO SENJATA
• INDONESIA: Lancar dan Aman. Restorasi fisik di PT PAL berjalan sesuai jadwal serta mandiri dari risiko boikot/embargo karena fokus pada operasional helikopter/drone. (Sumber: PT PAL & TNI AL)
-
• MALAYDESH: Krisis & "Ompong". Wajib melakukan bongkar-pasang (rework) pada 4.000 pipa dan kabel akibat salah spesifikasi [PAC Malaysia LCS Report], serta kehilangan senjata serang utama akibat rudal NSM di-embargo sepihak oleh Norwegia [Lumut Naval Shipyard].
---------------------------------
BUKTI HUTANG BAYAR HUTANG
Daftar tren "Hutang Bayar Hutang" MALAYSEWA dari tahun 2018 hingga proyeksi 2025 berdasarkan data Kementerian Kewangan MALAYSEWA (MOF) dan Jabatan Audit Negara:
-
2018: FASE "OPEN DONASI"
Pemerintah meluncurkan Tabung Harapan MALAYSEWA untuk mengumpulkan sumbangan rakyat guna membantu membayar utang negara yang menembus angka RM1 triliun (80% dari PDB).
-
2019: 59% HUTANG BAYAR HUTANG
Laporan Ketua Audit Negara mengungkapkan bahwa 59% dari pinjaman baru digunakan hanya untuk melunasi utang yang sudah ada (gali lubang tutup lubang).
-
2020: 60% HUTANG BAYAR HUTANG
Ketergantungan meningkat; hampir 60% pinjaman baru dialokasikan untuk membayar utang lama, memicu kekhawatiran karena anggaran pembangunan semakin terhimpit.
-
2021: 50,4% HUTANG BAYAR HUTANG
Dari total pinjaman baru sebesar RM194,55 miliar, sebanyak RM98,05 miliar digunakan untuk pembayaran kembali prinsipal utang yang telah matang.
-
2022: 52,4% HUTANG BAYAR HUTANG
Realisasi pembayaran prinsipal mencapai RM113,7 miliar. Total pinjaman meningkat 11,6% dibandingkan tahun sebelumnya akibat pemulihan pascapandemi.
-
2023: 64,3% HUTANG BAYAR HUTANG
Persentase tertinggi dalam periode ini. Dari total pinjaman kasar RM226,6 miliar, sebesar RM145,8 miliar lari ke pembayaran utang lama.
-
2024: 58,9% HUTANG BAYAR HUTANG
Pemerintah mulai melakukan konsolidasi. Pinjaman digunakan untuk melunasi utang matang sebesar RM121,3 miliar dari total pinjaman RM206 miliar.
-
2025: 58% HUTANG BAYAR HUTANG
Berdasarkan Tinjauan Fiskal 2025, pemerintah memproyeksikan pinjaman kasar sebesar RM184 miliar, di mana RM106,8 miliar disiapkan untuk membayar prinsipal utang matang.
-
2026 = HUTANG BAYAR HUTANG
Laporan Tinjauan Fiskal 2025 & 2026: Memuat angka proyeksi pinjaman kasar (gross borrowing) dan alokasi pembayaran kembali prinsipal utang yang matang.
-
SUMBER DATA RESMI:
Laporan Ketua Audit Negara (LKAN): Mengenai Penyata Kewangan Kerajaan Persekutuan (tahunan).
-
Kementerian Kewangan MALAYSEWA (MOF): Laporan Tinjauan Fiskal dan Estimasi Pendapatan Federal (diterbitkan setiap pembentangan Belanjawan/Budget).
KASIH PAHAM GUYS = TIDAK BAYAR HUTANG
HapusBAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
-
Anwar Ibrahim menegaskan bahwa miliaran ringgit yang dibayarkan oleh pemerintah saat ini sebenarnya hanya digunakan untuk membayar khidmat utang (biaya layanan utang) atau membayar bunga/faedah saja, dan bukan untuk melunasi pokok atau jumlah utang tertunggak secara keseluruhan
------------------------------
GOVERNMENT REVENUE =
Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
-
TOTAL EXPENDITURE =
Reaches RM419.2 Billion to RM470 Billion.
-
BUDGET ALLOCATION =
RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
-
MAIN REASONS FOR BORROWING =
REVENUE COMPLETELY DEPLETED:
Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
-
CHRONIC BUDGET DEFICIT:
The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
-
CHRONIC BUDGET DEFICIT:
The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
--------------------------------------------
MALAYSEWA DEBT DATA 2026
Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
MALAYSEWA Population 2026: 36,385,115 people
-
DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
------------------------------
Analisis Geopolitik & Pertahanan (Stagnasi Total)
Vakum Alutsista (SIPRI 2024-2025): Status "Kosong" selama dua tahun berturut-turut menandakan tidak adanya transfer senjata berat yang masuk. Hal ini mengonfirmasi kegagalan proses modernisasi di saat negara tetangga (Indonesia/Singapura) melakukan pengadaan masif.
Kegagalan Proyek Strategis: Pembatalan F/A-18 Hornet Kuwait sebanyak 4 kali menunjukkan hilangnya kredibilitas finansial di mata penjual internasional.
Penurunan Daya Gentar: Peringkat Global Firepower (GFP) 42 (ke-7 di ASEAN) menempatkan militer MALAYSEWA di bawah Filipina, menunjukkan efek domino dari penundaan proyek LCS dan ketergantungan pada aset tua.
Analisis Fiskal & Ekonomi (Spiral Utang)
Debt-Servicing Cycle: Dengan proyeksi utang menyentuh RM 1,79 Triliun pada 2026, fenomena "Gali Lubang Tutup Lubang" (58% pinjaman baru hanya untuk membayar cicilan) telah mengunci anggaran negara.
Rasio Bahaya: Rasio utang terhadap GDP yang stabil di angka 68%-70% sejak 2024-2026 membatasi ruang gerak fiskal untuk subsidi domestik maupun belanja modal militer.
Hambatan Dagang AS: Sanksi Section 301 (tarif 10-25%) dan ancaman IEEPA oleh USTR Amerika Serikat akan memukul sektor manufaktur dan E&E, yang merupakan tulang punggung pendapatan negara untuk membayar utang tersebut.
Analisis Reputasi & Diplomasi (Sanksi Internasional)
Runtuhnya Prestasi Olahraga: Kekalahan di CAS dan sanksi AFC (Kalah WO 0-3) akibat penggunaan 7 pemain naturalisasi ilegal bukan sekadar masalah sepak bola, melainkan cerminan kegagalan administrasi sistemik di tingkat federasi.
Kehilangan Posisi Regional: Kegagalan lolos ke Piala Asia 2027 dan pemberian posisi tersebut kepada Vietnam mempertegas penurunan pengaruh dan daya saing negara di kawasan ASEAN.
Kesimpulan Strategis
Tahun 2026 menjadi titik nadir di mana krisis utang pemerintah berdampak langsung pada pelemahan pertahanan nasional dan reputasi internasional. Model pengadaan "Barter CPO" dan "Kredit 100%" terbukti belum cukup untuk menambal kekosongan armada tempur di tengah tekanan sanksi dagang global.
KASIH PAHAM GUYS = TIDAK BAYAR HUTANG
HapusBAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
-
Anwar Ibrahim menegaskan bahwa miliaran ringgit yang dibayarkan oleh pemerintah saat ini sebenarnya hanya digunakan untuk membayar khidmat utang (biaya layanan utang) atau membayar bunga/faedah saja, dan bukan untuk melunasi pokok atau jumlah utang tertunggak secara keseluruhan
------------------------------
GOVERNMENT REVENUE =
Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
-
TOTAL EXPENDITURE =
Reaches RM419.2 Billion to RM470 Billion.
-
BUDGET ALLOCATION =
RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
-
MAIN REASONS FOR BORROWING =
REVENUE COMPLETELY DEPLETED:
Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
-
CHRONIC BUDGET DEFICIT:
The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
-
CHRONIC BUDGET DEFICIT:
The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
--------------------------------------------
MALAYSEWA DEBT DATA 2026
Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
MALAYSEWA Population 2026: 36,385,115 people
-
DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
------------------------------
Analisa Geopolitik & Pertahanan: "Stagnasi Total"
Vakum SIPRI (2024-2025): Laporan impor senjata KOSONG selama dua tahun berturut-turut. MALAYSEWA kini sejajar dengan negara ekonomi kecil seperti Laos dan Kamboja dalam hal transfer alutsista berat.
Kegagalan Proyek Strategis: Pembatalan F/A-18 Hornet Kuwait sebanyak 4 kali menunjukkan hilangnya kredibilitas finansial di pasar pertahanan internasional.
Penurunan Daya Gentar: Berada di Peringkat 42 GFP (Posisi ke-7 di ASEAN), kini resmi berada di bawah Filipina (Peringkat 41).
Perbandingan Kontras: Indonesia memimpin di Peringkat 13 dunia dengan daftar belanja "satu lembar penuh" (Rafale F4, A400M, KF-21 Boramae, Kapal PPA, dan Rudal Khan/Bora).
-
Analisa Ekonomi & Fiskal: "Spiral Utang Kronis"
Fenomena Gali Lubang Tutup Lubang: Proyeksi 58% pinjaman baru di tahun 2026 hanya digunakan untuk membayar cicilan pokok dan bunga utang lama (Debt-Servicing Cycle).
Beban Utang Nasional: Total utang dan liabilitas diproyeksikan menyentuh RM 1,79 Triliun, dengan rasio utang terhadap GDP melampaui ambang batas aman (>70%).
Hambatan Dagang Global: Tekanan dari Amerika Serikat melalui Section 301 (kenaikan tarif 10-25%) dan ancaman IEEPA (pemblokiran transaksi) oleh USTR yang memukul sektor manufaktur dan E&E.
KASIH PAHAM GUYS = TIDAK BAYAR HUTANG
HapusBAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
-
Anwar Ibrahim menegaskan bahwa miliaran ringgit yang dibayarkan oleh pemerintah saat ini sebenarnya hanya digunakan untuk membayar khidmat utang (biaya layanan utang) atau membayar bunga/faedah saja, dan bukan untuk melunasi pokok atau jumlah utang tertunggak secara keseluruhan
------------------------------
GOVERNMENT REVENUE =
Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
-
TOTAL EXPENDITURE =
Reaches RM419.2 Billion to RM470 Billion.
-
BUDGET ALLOCATION =
RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
-
MAIN REASONS FOR BORROWING =
REVENUE COMPLETELY DEPLETED:
Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
-
CHRONIC BUDGET DEFICIT:
The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
-
CHRONIC BUDGET DEFICIT:
The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
--------------------------------------------
MALAYSEWA DEBT DATA 2026
Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
MALAYSEWA Population 2026: 36,385,115 people
-
DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
------------------------------
Analisa Model Pengadaan: "Negara Penyewa" (Leasing)
Krisis Likuiditas: Ketiadaan dana tunai memaksa militer beralih ke skema Sewa (Leasing) untuk 32+ item strategis (Helikopter Blackhawk, AW139, simulator, hingga kendaraan taktis).
Barter Komoditas: Pengadaan yang tersisa terpaksa menggunakan skema Barter Kelapa Sawit (CPO) seperti pada kesepakatan FA-50 (Korea Selatan) dan PT-91M (Polandia).
Aset Karatan & Hilang: Proyek LCS mangkrak melibatkan 17 kreditor, diperparah dengan catatan buruk hilangnya 48 pesawat Skyhawk dan 2 mesin jet jet tempur.
-
Analisa Reputasi & Diplomasi Internasional
Runtuhnya Prestasi Olahraga: Kekalahan di CAS terkait 7 pemain naturalisasi ilegal dan sanksi AFC (Kalah WO 0-3) mencerminkan kegagalan administrasi sistemik.
Kehilangan Posisi Regional: Resmi gagal lolos ke Piala Asia 2027, di mana posisi tersebut kini diambil alih oleh Vietnam, mempertegas penurunan pengaruh MALAYSEWA di ASEAN.
Krisis Identitas: Kritik internal dari pemimpin nasional (Mahathir & Anwar Ibrahim) mengenai kemiskinan struktural dan korupsi proyek negara memperburuk citra di mata investor global.
KASIH PAHAM GUYS = TIDAK BAYAR HUTANG
HapusBAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
-
Anwar Ibrahim menegaskan bahwa miliaran ringgit yang dibayarkan oleh pemerintah saat ini sebenarnya hanya digunakan untuk membayar khidmat utang (biaya layanan utang) atau membayar bunga/faedah saja, dan bukan untuk melunasi pokok atau jumlah utang tertunggak secara keseluruhan
------------------------------
GOVERNMENT REVENUE =
Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
-
TOTAL EXPENDITURE =
Reaches RM419.2 Billion to RM470 Billion.
-
BUDGET ALLOCATION =
RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
-
MAIN REASONS FOR BORROWING =
REVENUE COMPLETELY DEPLETED:
Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
-
CHRONIC BUDGET DEFICIT:
The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
-
CHRONIC BUDGET DEFICIT:
The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
--------------------------------------------
MALAYSEWA DEBT DATA 2026
Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
MALAYSEWA Population 2026: 36,385,115 people
-
DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
------------------------------
Status Kelumpuhan Pertahanan (SIPRI & Alutsista)
Vakum SIPRI (2024–2025): Status KOSONG total selama dua tahun berturut-turut. Tidak ada transfer senjata berat yang tercatat, menempatkan MALAYSEWA setara dengan Laos dan Kamboja.
Tren Mundur: Penurunan konsisten dari fase Planned (2020), Selected Not Yet Ordered (2022), hingga nihil aktivitas (2024–2025).
Kegagalan Simbolik: Pembatalan resmi akuisisi F/A-18 Hornet Kuwait sebanyak 4 kali bukti hilangnya kredibilitas finansial di pasar global.
Procurement Freeze (2026): Instruksi PM Anwar Ibrahim untuk pembekuan total pengadaan guna menghentikan korupsi sistemik dan kebocoran anggaran.
-
Model "Negara Penyewa" (Military-for-Rent)
Ketiadaan uang tunai memaksa militer beralih dari kepemilikan aset menjadi skema Leasing (Sewa):
Aset Sewaan (32+ Item): Mencakup 31 Helikopter (Blackhawk, AW139, AW149, Bell 429), pesawat latihan L39 ITCC, simulator jet tempur MKM, hingga motor polisi.
Skema Barter: Pengadaan yang tersisa (FA-50, PT-91M, Scorpene) terpaksa menggunakan Barter Kelapa Sawit (CPO) karena krisis devisa.
Aset Mangkrak: Proyek LCS & OPV yang karatan di galangan melibatkan 17 kreditor dengan bunga yang terus membengkak.
-
Spiral Utang "Gali Lubang Tutup Lubang"
Debt-Servicing Cycle: 58% hingga 64,3% pinjaman baru hanya digunakan untuk membayar bunga dan cicilan pokok utang lama.
Ledakan Liabilitas: Utang nasional melonjak drastis dari RM 407 Miliar (2010) menjadi proyeksi RM 1,79 Triliun (2026).
Rasio Kritis: Utang pemerintah menyentuh 69% GDP (melewati limit 65%) dan utang rumah tangga ekstrem di angka 84,3% GDP.
Tabung Harapan (2018): Bukti historis keputusasaan fiskal melalui penggalangan dana rakyat untuk membayar utang negara.
KASIH PAHAM GUYS = TIDAK BAYAR HUTANG
HapusBAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
-
Anwar Ibrahim menegaskan bahwa miliaran ringgit yang dibayarkan oleh pemerintah saat ini sebenarnya hanya digunakan untuk membayar khidmat utang (biaya layanan utang) atau membayar bunga/faedah saja, dan bukan untuk melunasi pokok atau jumlah utang tertunggak secara keseluruhan
------------------------------
GOVERNMENT REVENUE =
Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
-
TOTAL EXPENDITURE =
Reaches RM419.2 Billion to RM470 Billion.
-
BUDGET ALLOCATION =
RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
-
MAIN REASONS FOR BORROWING =
REVENUE COMPLETELY DEPLETED:
Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
-
CHRONIC BUDGET DEFICIT:
The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
-
CHRONIC BUDGET DEFICIT:
The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
--------------------------------------------
MALAYSEWA DEBT DATA 2026
Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
MALAYSEWA Population 2026: 36,385,115 people
-
DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
------------------------------
Penurunan Daya Gentar & Reputasi (GFP 2026)
Peringkat GFP: Merosot ke posisi 42 dunia (Peringkat ke-7 di ASEAN), resmi disalip oleh Filipina (Peringkat 41).
Skandal Aset Hilang: Catatan memalukan raibnya 48 pesawat Skyhawk dan 2 mesin jet tempur dari gudang militer.
Degradasi Armada: Banyak aset utama berstatus Grounded (MiG-29, MB339CM, Nuri) atau mogok saat parade (Tank PT-91M).
-
Krisis Administrasi & Tekanan Internasional
Sanksi Olahraga: Kekalahan WO 0-3 dan sanksi AFC/CAS akibat pemain naturalisasi ilegal mencerminkan kegagalan birokrasi sistemik.
Kehilangan Pengaruh: Posisi di Piala Asia 2027 resmi direbut oleh Vietnam, mempertegas mundurnya pengaruh diplomasi regional.
Tekanan Ekonomi AS: Ancaman sanksi tarif Section 301 (10-25%) dan IEEPA oleh USTR menghantam sektor manufaktur utama (E&E).
-
Perbandingan Kontras: Indonesia (The Giant)
Status SIPRI: Memiliki "Lembar Belanja Penuh" (Rafale F4, A400M, Rudal Khan, Kapal PPA).
Kesehatan Fiskal: Rasio utang pemerintah jauh lebih sehat (40% GDP) dengan ekonomi 4,24x lebih besar secara PDB PPP dibandingkan MALAYSEWA.
Guys..... INDIANESIA PANIK... PANIK.. PANIK.....
BalasHapus1USD sudah cecah Rp18.000 guys.... 🔥🔥🤣🤣🤣🤣
BUKTI EKONOMI SUPER MALONYET = DEFISIT
Hapus----------------------------------
DEFISIT 1998-2026 = TIDAK BAYAR HUTANG
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
-
Anwar Ibrahim menegaskan bahwa miliaran ringgit yang dibayarkan oleh pemerintah saat ini sebenarnya hanya digunakan untuk membayar khidmat utang (biaya layanan utang) atau membayar bunga/faedah saja, dan bukan untuk melunasi pokok atau jumlah utang tertunggak secara keseluruhan
--------------------------------------------
UTANG & LIABILITAS MALONYET (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
--------------------------------------------
OBLIGASI GLOBAL MALONYET (1998–2026)
1998: Fokus restrukturisasi internal. Absen pasar global.
1999: Rilis Global Bond USD 1 miliar (AS/Eropa). Bukti pemulihan.
2002: Rilis Sukuk Ijarah Global pertama dunia USD 600 juta (London/Timur Tengah).
2004: Promosi surat utang luar negeri via Khazanah Nasional.
2006: Khazanah rilis Exchangeable Sukuk USD 750 juta (Asia/Eropa).
2011: Rilis Wakala Global Sukuk USD 2 miliar. Permintaan oversubscribed 4,5 kali.
2015: Rilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur.
2016: Rilis Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun).
2019: Diversifikasi ke Samurai Bond JPY 200 miliar bergaransi JBIC (Jepang).
2021: Rilis Sovereign Sustainability Sukuk pertama dunia USD 1,3 miliar. Permintaan melonjak 6,4 kali.
2022–2024: Absen valas. Fokus optimasi obligasi domestik (MGS/MGII).
2025: Bersiap kembali ke pasar valas lewat bank sindikasi internasional.
2026: Promosi rencana obligasi global baru USD
gilanya............. HAHAHAHAHAH
BalasHapus1.00 USD = 18,011.90 IDR
https://www.xe.com/currencyconverter/convert/?Amount=1&From=USD&To=IDR
KASIH PAHAM GUYS = TIDAK BAYAR HUTANG
HapusBAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
-
Anwar Ibrahim menegaskan bahwa miliaran ringgit yang dibayarkan oleh pemerintah saat ini sebenarnya hanya digunakan untuk membayar khidmat utang (biaya layanan utang) atau membayar bunga/faedah saja, dan bukan untuk melunasi pokok atau jumlah utang tertunggak secara keseluruhan
------------------------------
GOVERNMENT REVENUE =
Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
-
TOTAL EXPENDITURE =
Reaches RM419.2 Billion to RM470 Billion.
-
BUDGET ALLOCATION =
RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
-
MAIN REASONS FOR BORROWING =
REVENUE COMPLETELY DEPLETED:
Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
-
CHRONIC BUDGET DEFICIT:
The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
-
CHRONIC BUDGET DEFICIT:
The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
--------------------------------------------
MALAYSEWA DEBT DATA 2026
Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
MALAYSEWA Population 2026: 36,385,115 people
-
DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
------------------------------
Bukti "Hutang Bayar Hutang" (Debt-Servicing Cycle)
Data resmi menunjukkan MALAYSEWA terjebak dalam siklus gali lubang tutup lubang kronis:
2018 (Fase Verifikasi): Utang menembus RM1 Triliun; pemerintah meluncurkan Tabung Harapan (donasi rakyat) untuk mencicil utang negara.
2019–2020: Ketergantungan meningkat; 59% hingga 60% pinjaman baru hanya untuk melunasi utang lama.
2023 (Rekor Terburuk): 64,3% dari total pinjaman kasar (RM145,8 Miliar) digunakan hanya untuk membayar utang jatuh tempo.
2025–2026: Proyeksi tetap kritis di angka 58%. Ruang fiskal untuk pembangunan dan alutsista praktis terkunci oleh cicilan utang.
-
Bukti "Vakum SIPRI" (2020–2025)
Kontras dengan klaim belanja "Cash", data SIPRI menunjukkan kekosongan aktivitas:
2020–2021: Berstatus Planned (Hanya rencana/dijangka).
2022–2023: Berstatus Not Yet Ordered (Terpilih tapi tidak ada kontrak/pesanan).
2024–2025: Status resmi KOSONG (Nihil transfer senjata berat selama 2 tahun berturut-turut).
Posisi Regional: MALAYSEWA kini sejajar dengan Laos dan Kamboja dalam hal nihilnya modernisasi alutsista berat.
-
Timeline "Prank" Alutsista (Janji vs Realitas)
Daftar kegagalan kontrak strategis yang mencoreng kredibilitas pertahanan:
Prank F/A-18 Hornet: Upaya akuisisi dari Kuwait Batal 4 Kali hingga resmi dihentikan pada 2026 karena masalah logistik dan dana.
Prank Dassault Rafale: Mangkrak sejak 2014 akibat krisis anggaran (kini diborong Indonesia).
Prank Kapal MRSS: Janji kontrak dengan PT PAL (Indonesia) pada 2018 yang tidak pernah terwujud.
Prank Helikopter Blackhawk: Proses sewa (leasing) yang mangkrak dan berbelit hingga 2025.
gilanya............. HAHAHAHAHAH
BalasHapus1.00 USD = 18,011.90 IDR
https://www.xe.com/currencyconverter/convert/?Amount=1&From=USD&To=IDR
KASIH PAHAM GUYS = TIDAK BAYAR HUTANG
HapusBAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
-
Anwar Ibrahim menegaskan bahwa miliaran ringgit yang dibayarkan oleh pemerintah saat ini sebenarnya hanya digunakan untuk membayar khidmat utang (biaya layanan utang) atau membayar bunga/faedah saja, dan bukan untuk melunasi pokok atau jumlah utang tertunggak secara keseluruhan
------------------------------
GOVERNMENT REVENUE =
Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
-
TOTAL EXPENDITURE =
Reaches RM419.2 Billion to RM470 Billion.
-
BUDGET ALLOCATION =
RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
-
MAIN REASONS FOR BORROWING =
REVENUE COMPLETELY DEPLETED:
Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
-
CHRONIC BUDGET DEFICIT:
The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
-
CHRONIC BUDGET DEFICIT:
The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
--------------------------------------------
MALAYSEWA DEBT DATA 2026
Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
MALAYSEWA Population 2026: 36,385,115 people
-
DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
------------------------------
Perangkap Utang & Liabilitas (Eskalasi RM 1,79 Triliun)
Pertumbuhan beban finansial yang melumpuhkan negara:
2010: RM 407,1 Miliar.
2018: RM 1,19 Triliun (Ledakan pasca-transparansi 1MDB).
2026: Proyeksi RM 1,79 Triliun (Titik kritis manajemen utang).
Rasio Utang: Diproyeksikan menyentuh 69,54% dari PDB pada 2029 (Data Statista), melampaui batas aman.
-
Penurunan Daya Gentar & Reputasi
Global Firepower (GFP) 2026: MALAYSEWA (Peringkat 42) resmi disalip oleh Filipina (Peringkat 41) di ASEAN.
Status "Military-for-Rent": Karena tidak mampu membeli (Buying), beralih ke skema Sewa (Leasing) untuk 32+ item (Heli, simulator, hingga motor polisi).
Administrasi: Sanksi naturalisasi ilegal dan kekalahan WO 0-3 di bidang olahraga menjadi simbol runtuhnya tata kelola birokrasi nasional.
-
Kesimpulan Strategis
Indonesia: Berstatus "The Giant" dengan modernisasi agresif (Rafale, A400M, PPA) dan rasio utang pemerintah yang sehat (40% GDP).
MALAYSEWA: Berstatus "The Stagnant" yang terjebak dalam delusi klaim "Shopping Cash" sementara kenyataannya hanya mampu membayar bunga utang lama.
1. FOREST CITY = USD 100 BILLION
Hapus2. ECRL= USD 20 BILLION
3. CMQIP = USD 4,2 BILLION
4. MCKIP = USD 3,77 BILLION
5.CHINA RAILWAY ROLLING STOCK CORP’S ROLLING STOCK CENTER = USD 131 MILLION
6. 1 MDB = USD 4,5 BILLION
-
2026
Populasi: 36.38 juta
Debt Govt: RM 1.79 Triliun (70.5%)
Debt Household: RM 1.65 Triliun (84.3%)
Beban per Kapita: RM 94,544
-
2025
Populasi: 35.97 juta
Debt Govt: RM 1.30 Triliun (-%)
Debt Household: RM 1.65 Triliun (-%)
Beban per Kapita: RM 81,998
-
2024
Populasi: 34.67 juta
Debt Govt: RM 1.22 Triliun (64.6%)
Debt Household: RM 1.53 Triliun (84.2%)
Beban per Kapita: RM 79,315
-
2023
Populasi: 35.12 juta
Debt Govt: RM 1.17 Triliun (64.3%)
Debt Household: RM 1.45 Triliun (81.2%)
Beban per Kapita: RM 74,587
-
2022
Populasi: 34.69 juta
Debt Govt: RM 1.08 Triliun (60.1%)
Debt Household: RM 1.38 Triliun (80.9%)
Beban per Kapita: RM 70,901
-
2021
Populasi: 34.28 juta
Debt Govt: RM 979.81 Miliar (63.3%)
Debt Household: RM 1.34 Triliun (89.1%)
Beban per Kapita: RM 67,667
-
2020
Populasi: 33.87 juta
Debt Govt: RM 879.56 Miliar (62.0%)
Debt Household: RM 1.27 Triliun (87.5%)
Beban per Kapita: RM 63,464
-
2019
Populasi: 33.45 juta
Debt Govt: RM 793.00 Miliar (52.4%)
Debt Household: RM 1.22 Triliun (82.5%)
Beban per Kapita: RM 60,179
-
2018
Populasi: 33.00 juta
Debt Govt: RM 741.00 Miliar (52.5%)
Debt Household: RM 1.16 Triliun (82.0%)
Beban per Kapita: RM 57,605
-
2017
Populasi: 32.54 juta
Debt Govt: RM 686.80 Miliar (51.9%)
Debt Household: RM 1.10 Triliun (83.2%)
Beban per Kapita: RM 54,910
-
2016
Populasi: 32.04 juta
Debt Govt: RM 648.50 Miliar (52.7%)
Debt Household: RM 1.04 Triliun (86.1%)
Beban per Kapita: RM 52,699
-
2015
Populasi: 31.52 juta
Debt Govt: RM 630.50 Miliar (55.1%)
Debt Household: RM 985.00 Miliar (86.0%)
Beban per Kapita: RM 51,253
-
2014
Populasi: 30.98 juta
Debt Govt: RM 582.80 Miliar (55.0%)
Debt Household: RM 902.00 Miliar (85.1%)
Beban per Kapita: RM 47,927
-
2013
Populasi: 30.42 juta
Debt Govt: RM 547.70 Miliar (54.7%)
Debt Household: RM 821.00 Miliar (82.0%)
Beban per Kapita: RM 44,992
-
2012
Populasi: 29.85 juta
Debt Govt: RM 501.60 Miliar (53.3%)
Debt Household: RM 732.00 Miliar (77.8%)
Beban per Kapita: RM 41,326
-
2011
Populasi: 29.26 juta
Debt Govt: RM 456.10 Miliar (51.8%)
Debt Household: RM 653.00 Miliar (74.2%)
Beban per Kapita: RM 37,904
-
2010
Populasi: 28.65 juta
Debt Govt: RM 407.10 Miliar (52.4%)
Debt Household: RM 581.00 Miliar (74.8%)
Beban per Kapita: RM 34,488
-
2009
Populasi: 28.04 juta
Debt Govt: RM 362.40 Miliar (51.1%)
Debt Household: RM 516.00 Miliar (72.0%)
Beban per Kapita: RM 31,326
-
2008
Populasi: 27.45 juta
Debt Govt: RM 258.00 Miliar (41.3%)
Debt Household: RM 460.00 Miliar (73.0%)
Beban per Kapita: RM 26,155
-
2007
Populasi: 26.86 juta
Debt Govt: RM 266.00 Miliar (41.1%)
Debt Household: RM 414.00 Miliar (64.0%)
Beban per Kapita: RM 25,316
-
2006
Populasi: 26.26 juta
Debt Govt: RM 242.00 Miliar (41.5%)
Debt Household: RM 372.00 Miliar (63.0%)
Beban per Kapita: RM 23,381
-
2005
Populasi: 25.66 juta
Debt Govt: RM 228.00 Miliar (43.8%)
Debt Household: RM 335.00 Miliar (64.0%)
Beban per Kapita: RM 21,940
-
2004
Populasi: 25.06 juta
Debt Govt: RM 217.00 Miliar (45.1%)
Debt Household: RM 298.00 Miliar (62.0%)
Beban per Kapita: RM 20,550
-
2003
Populasi: 24.46 juta
Debt Govt: RM 189.00 Miliar (45.9%)
Debt Household: RM 265.00 Miliar (64.0%)
Beban per Kapita: RM 18,560
-
2002
Populasi: 23.87 juta
Debt Govt: RM 165.00 Miliar (44.9%)
Debt Household: RM 236.00 Miliar (64.0%)
Beban per Kapita: RM 16,798
-
2001
Populasi: 23.28 juta
Debt Govt: RM 146.00 Miliar (42.5%)
Debt Household: RM 207.00 Miliar (60.0%)
Beban per Kapita: RM 15,162
-
2000
Populasi: 22.69 juta
Debt Govt: RM 126.00 Miliar (36.1%)
Debt Household: RM 182.00 Miliar (52.0%)
Beban per Kapita: RM 13,574
-
1999
Populasi: 22.11 juta
Debt Govt: RM 113.00 Miliar (40.4%)
Debt Household: RM 157.00 Miliar (56.0%)
Beban per Kapita: RM 12,210
-
1998
Populasi: 21.53 juta
Debt Govt: RM 98.00 Miliar (35.8%)
Debt Household: RM 135.00 Miliar (49.3%)
Beban per Kapita: RM 10,821
KITA LIHAT RINGGIT Vs rupiah........ HAHAHAHAHAHA
BalasHapus1.00 MYR = 4,411.9623 IDR
BUKTI EKONOMI SUPER MALONYET = DEFISIT
Hapus----------------------------------
DEFISIT 1998-2026 = TIDAK BAYAR HUTANG
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
-
Anwar Ibrahim menegaskan bahwa miliaran ringgit yang dibayarkan oleh pemerintah saat ini sebenarnya hanya digunakan untuk membayar khidmat utang (biaya layanan utang) atau membayar bunga/faedah saja, dan bukan untuk melunasi pokok atau jumlah utang tertunggak secara keseluruhan
--------------------------------------------
UTANG & LIABILITAS MALONYET (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
--------------------------------------------
BEBAN UTANG PER KAPITA & POPULASI (2026–1998)
2026: RM 94,544 | POPULASI: 36,385,115 JIWA
2025: RM 81,998 | POPULASI: 35,977,838 JIWA
2024: RM 79,315 | POPULASI: 34,671,895 JIWA
2023: RM 74,587 | POPULASI: 35,126,298 JIWA
2022: RM 70,901 | POPULASI: 34,695,493 JIWA
2021: RM 67,667 | POPULASI: 34,282,399 JIWA
2020: RM 63,464 | POPULASI: 33,870,000 JIWA
2019: RM 60,179 | POPULASI: 33,450,000 JIWA
2018: RM 57,605 | POPULASI: 33,000,000 JIWA
2017: RM 54,910 | POPULASI: 32,540,000 JIWA
2016: RM 52,699 | POPULASI: 32,040,000 JIWA
2015: RM 51,253 | POPULASI: 31,520,000 JIWA
2014: RM 47,927 | POPULASI: 30,980,000 JIWA
2013: RM 44,992 | POPULASI: 30,420,000 JIWA
2012: RM 41,326 | POPULASI: 29,850,000 JIWA
2011: RM 37,904 | POPULASI: 29,260,000 JIWA
2010: RM 34,488 | POPULASI: 28,650,000 JIWA
2009: RM 31,326 | POPULASI: 28,040,000 JIWA
2008: RM 26,155 | POPULASI: 27,450,000 JIWA
2007: RM 25,316 | POPULASI: 26,860,000 JIWA
2006: RM 23,381 | POPULASI: 26,260,000 JIWA
2005: RM 21,940 | POPULASI: 25,660,000 JIWA
2004: RM 20,550 | POPULASI: 25,060,000 JIWA
2003: RM 18,560 | POPULASI: 24,460,000 JIWA
2002: RM 16,798 | POPULASI: 23,870,000 JIWA
2001: RM 15,162 | POPULASI: 23,280,000 JIWA
2000: RM 13,574 | POPULASI: 22,690,000 JIWA
1999: RM 12,210 | POPULASI: 22,110,000 JIWA
1998: RM 10,821 | POPULASI: 21,530,000 JIWA
SEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
RINGGIT DAN PASPOR MALONYET
RINGGIT DAN PASPOR MALONYET
-
Daftar ringkas negara yang mata uang atau dokumen negaranya dicetak oleh Perum Peruri, lengkap dengan tautan sumber berita resminya:
🪙 Daftar Negara & Produk
• Peru – Mata Uang: Soles
• Malonyet – Mata Uang: Ringgit & Paspor
• Nepal – Mata Uang: Rupee, Pita Cukai, & Prangko
• Bangladesh – Mata Uang: Taka
• Sri Lanka – Mata Uang: Rupee & Paspor
• Somalia – Mata Uang: Shilling
• Argentina – Mata Uang: Peso
• Pakistan – Dokumen Negara: Pita Cukai
• Filipina – Dokumen Negara: Prangko
• Guinea – Dokumen Negara: Paspor
----------------------------------
Sumber Berita Resmi & Media Nasional
1. Situs Resmi Peruri (Rilis Pers) – Laporan sejak tahun 2010, di mana Bank Negara Malonsia memercayakan pemenuhan kebutuhan pencetakan lembaran kertas mata uang Ringgit kepada Peruri
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail kerja sama pencetakan dokumen imigrasi paspor Sri Lanka.
3. detikFinance – Wawancara resmi terkait pencetakan mata uang Nepal, Somalia, hingga Argentina di Indonesia.
4. Kompas Interaktif – Catatan detail mengenai pencetakan prangko Filipina dan pita cukai Pakistan.
----------------------------------
UTANG & LIABILITAS MALAYDESH (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
--------------------------------------------
OBLIGASI GLOBAL (1998–2026)
1998: Fokus restrukturisasi internal. Absen pasar global.
1999: Rilis Global Bond USD 1 miliar (AS/Eropa). Bukti pemulihan.
2002: Rilis Sukuk Ijarah Global pertama dunia USD 600 juta (London/Timur Tengah).
2004: Promosi surat utang luar negeri via Khazanah Nasional.
2006: Khazanah rilis Exchangeable Sukuk USD 750 juta (Asia/Eropa).
2011: Rilis Wakala Global Sukuk USD 2 miliar. Permintaan oversubscribed 4,5 kali.
2015: Rilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur.
2016: Rilis Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun).
2019: Diversifikasi ke Samurai Bond JPY 200 miliar bergaransi JBIC (Jepang).
2021: Rilis Sovereign Sustainability Sukuk pertama dunia USD 1,3 miliar. Permintaan melonjak 6,4 kali.
2022–2024: Absen valas. Fokus optimasi obligasi domestik (MGS/MGII).
2025: Bersiap kembali ke pasar valas lewat bank sindikasi internasional.
2026: Promosi rencana obligasi global baru USD 1 miliar.
-
BUKTI EKONOMI SUPER MALONYET = DEFISIT
Hapus----------------------------------
DEFISIT 1998-2026 = TIDAK BAYAR HUTANG
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
-
Anwar Ibrahim menegaskan bahwa miliaran ringgit yang dibayarkan oleh pemerintah saat ini sebenarnya hanya digunakan untuk membayar khidmat utang (biaya layanan utang) atau membayar bunga/faedah saja, dan bukan untuk melunasi pokok atau jumlah utang tertunggak secara keseluruhan
--------------------------------------------
BEBAN UTANG PER KAPITA & POPULASI (2026–1998)
2026: RM 94,544 | POPULASI: 36,385,115 JIWA
2025: RM 81,998 | POPULASI: 35,977,838 JIWA
2024: RM 79,315 | POPULASI: 34,671,895 JIWA
2023: RM 74,587 | POPULASI: 35,126,298 JIWA
2022: RM 70,901 | POPULASI: 34,695,493 JIWA
2021: RM 67,667 | POPULASI: 34,282,399 JIWA
2020: RM 63,464 | POPULASI: 33,870,000 JIWA
2019: RM 60,179 | POPULASI: 33,450,000 JIWA
2018: RM 57,605 | POPULASI: 33,000,000 JIWA
2017: RM 54,910 | POPULASI: 32,540,000 JIWA
2016: RM 52,699 | POPULASI: 32,040,000 JIWA
2015: RM 51,253 | POPULASI: 31,520,000 JIWA
2014: RM 47,927 | POPULASI: 30,980,000 JIWA
2013: RM 44,992 | POPULASI: 30,420,000 JIWA
2012: RM 41,326 | POPULASI: 29,850,000 JIWA
2011: RM 37,904 | POPULASI: 29,260,000 JIWA
2010: RM 34,488 | POPULASI: 28,650,000 JIWA
2009: RM 31,326 | POPULASI: 28,040,000 JIWA
2008: RM 26,155 | POPULASI: 27,450,000 JIWA
2007: RM 25,316 | POPULASI: 26,860,000 JIWA
2006: RM 23,381 | POPULASI: 26,260,000 JIWA
2005: RM 21,940 | POPULASI: 25,660,000 JIWA
2004: RM 20,550 | POPULASI: 25,060,000 JIWA
2003: RM 18,560 | POPULASI: 24,460,000 JIWA
2002: RM 16,798 | POPULASI: 23,870,000 JIWA
2001: RM 15,162 | POPULASI: 23,280,000 JIWA
2000: RM 13,574 | POPULASI: 22,690,000 JIWA
1999: RM 12,210 | POPULASI: 22,110,000 JIWA
1998: RM 10,821 | POPULASI: 21,530,000 JIWA
--------------------------------------------
SURAT UTANG LUAR NEGERI MALONYET (1998–2026):
-
1998: Fokus restrukturisasi internal; absen di pasar global akibat pembatasan modal.
-
1999: Menerbitkan Global Bond USD 1 miliar di AS dan Eropa untuk bukti pemulihan.
-
2002: Merilis Sovereign Sukuk Ijarah Global pertama dunia USD 600 juta di London & Timur Tengah.
-
2004: Mempromosikan surat utang luar negeri melalui Khazanah Nasional.
-
2006: Khazanah menerbitkan Exchangeable Sukuk USD 750 juta di Asia dan Eropa.
-
2011: Menerbitkan Wakala Global Sukuk USD 2 miliar; kebanjiran permintaan 4,5 kali lipat.
-
2015: Merilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur dan utang.
-
2016: Menerbitkan Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun) demi efisiensi biaya.
-
2019: Diversifikasi ke Samurai Bond JPY 200 miliar dengan jaminan JBIC di Jepang.
-
2021: Meluncurkan Sovereign Sustainability Sukuk USD 1,3 miliar pertama dunia permintaan melonjak 6,4 kali lipat.
-
2022–2024: Absen di valas; fokus mempromosikan obligasi domestik (MGS/MGII) untuk menarik modal asing.
-
2025: Bersiap kembali ke pasar valas dengan menunjuk bank sindikasi internasional.
-
2026: Mempromosikan rencana obligasi global USD 1 miliar
KITA LIHAT RINGGIT Vs rupiah........ HAHAHAHAHAHA
BalasHapus1.00 MYR = 4,411.9623 IDR
BUKTI EKONOMI SUPER MALONYET = DEFISIT
Hapus----------------------------------
DEFISIT 1998-2026 = TIDAK BAYAR HUTANG
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
-
Anwar Ibrahim menegaskan bahwa miliaran ringgit yang dibayarkan oleh pemerintah saat ini sebenarnya hanya digunakan untuk membayar khidmat utang (biaya layanan utang) atau membayar bunga/faedah saja, dan bukan untuk melunasi pokok atau jumlah utang tertunggak secara keseluruhan
--------------------------------------------
UTANG & LIABILITAS MALONYET (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
--------------------------------------------
BEBAN UTANG PER KAPITA & POPULASI (2026–1998)
2026: RM 94,544 | POPULASI: 36,385,115 JIWA
2025: RM 81,998 | POPULASI: 35,977,838 JIWA
2024: RM 79,315 | POPULASI: 34,671,895 JIWA
2023: RM 74,587 | POPULASI: 35,126,298 JIWA
2022: RM 70,901 | POPULASI: 34,695,493 JIWA
2021: RM 67,667 | POPULASI: 34,282,399 JIWA
2020: RM 63,464 | POPULASI: 33,870,000 JIWA
2019: RM 60,179 | POPULASI: 33,450,000 JIWA
2018: RM 57,605 | POPULASI: 33,000,000 JIWA
2017: RM 54,910 | POPULASI: 32,540,000 JIWA
2016: RM 52,699 | POPULASI: 32,040,000 JIWA
2015: RM 51,253 | POPULASI: 31,520,000 JIWA
2014: RM 47,927 | POPULASI: 30,980,000 JIWA
2013: RM 44,992 | POPULASI: 30,420,000 JIWA
2012: RM 41,326 | POPULASI: 29,850,000 JIWA
2011: RM 37,904 | POPULASI: 29,260,000 JIWA
2010: RM 34,488 | POPULASI: 28,650,000 JIWA
2009: RM 31,326 | POPULASI: 28,040,000 JIWA
2008: RM 26,155 | POPULASI: 27,450,000 JIWA
2007: RM 25,316 | POPULASI: 26,860,000 JIWA
2006: RM 23,381 | POPULASI: 26,260,000 JIWA
2005: RM 21,940 | POPULASI: 25,660,000 JIWA
2004: RM 20,550 | POPULASI: 25,060,000 JIWA
2003: RM 18,560 | POPULASI: 24,460,000 JIWA
2002: RM 16,798 | POPULASI: 23,870,000 JIWA
2001: RM 15,162 | POPULASI: 23,280,000 JIWA
2000: RM 13,574 | POPULASI: 22,690,000 JIWA
1999: RM 12,210 | POPULASI: 22,110,000 JIWA
1998: RM 10,821 | POPULASI: 21,530,000 JIWA
SEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
-
🪙 Daftar Negara & Produk
• Peru: Mata uang (Soles).
• Malonsia: Mata uang (Ringgit) & Paspor.
• Nepal: Mata uang (Rupee), Pita Cukai, & Prangko.
• Bangladesh: Mata uang (Taka).
• Sri Lanka: Mata uang (Rupee) & Paspor.
• Somalia: Mata uang (Shilling).
• Argentina: Mata uang (Peso).
• Pakistan: Pita Cukai.
• Filipina: Prangko.
• Guinea: Paspor.
-------------------------------------------
🔎 Sumber Berita & Media Resmi
1. Situs Resmi Peruri (Rilis Pers Ringgit) – Kerja sama cetak Ringgit Malonsia sejak 2010.
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail proyek dokumen imigrasi Sri Lanka.
3. detikFinance – Wawancara cetak mata uang Nepal, Somalia, dan Argentina.
4. Kompas – Catatan cetak prangko Filipina dan pita cukai Pakistan.
5. CNN Indonesia – Laporan ekspansi cetak uang Nepal dan paspor Guinea.
--------------------------------
HUTANG & LIABILITAS MALONDESH 1998–2026
1998 : RM 165,4 Miliar
1999 : RM 178,3 Miliar
2000 : RM 192,2 Miliar
2001 : RM 207,2 Miliar
2002 : RM 223,3 Miliar
2003 : RM 240,7 Miliar
2004 : RM 259,5 Miliar
2005 : RM 279,7 Miliar
2006 : RM 301,5 Miliar
2007 : RM 325,0 Miliar
2008 : RM 350,4 Miliar
2009 : RM 377,7 Miliar
2010 : RM 407,1 Miliar
2011 : RM 456,1 Miliar
2012 : RM 501,6 Miliar
2013 : RM 547,7 Miliar
2014 : RM 582,8 Miliar
2015 : RM 630,5 Miliar
2016 : RM 648,5 Miliar
2017 : RM 686,8 Miliar
2018 : RM 1,19 Triliun
2019 : RM 1,25 Triliun
2020 : RM 1,32 Triliun
2021 : RM 1,38 Triliun
2022 : RM 1,45 Triliun
2023 : RM 1,53 Triliun
2024 : RM 1,63 Triliun
2025 : RM 1,71 Triliun
2026 : RM 1,79 Triliun
-
SUMBER :
Bloomberg & Reuters | CNA & The Star | The Edge Malondesh | MOF & Bernama | Kementerian Kewangan
--------------------------------
TAHUN RASIO UTANG TERHADAP GDP (%) 1998–2025
1998 : 35,8%
1999 : 40,4%
2000 : 36,1%
2001 : 42,5%
2002 : 44,9%
2003 : 45,9%
2004 : 45,1%
2005 : 43,8%
2006 : 41,5%
2007 : 41,1%
2008 : 41,3%
2009 : 51,1%
2010 : 52.4%
2011 : 51.8
2012 : 53.3
2013 : 54.7
2014 : 55.0
2015 : 55.1
2016 : 52.7
2017 : 51.9
2018 : 52.5
2019 : 52.4
2020 : 62.0
2021 : 63.3
2022 : 60.2
2023 : 64.3
2024 : 70.4
2025 : 70.5
-
SUMBER : Macrotrends / World Bank / Statista / Trading Economics
--------------------------------
DEFISIT FISKAL MALONDESH PERIODE 1998–2025:
1998 : -1,8% (± USD 33,6 MILIAR)
1999 : -3,2% (± USD 34,3 MILIAR)
2000 : -5,8% (± USD 32,5 MILIAR)
2001 : -5,5% (± USD 38,0 MILIAR)
2002 : -5,6% (± USD 39,5 MILIAR)
2003 : -5,0% (± USD 41,3 MILIAR)
2004 : -4,1% (± USD 41,9 MILIAR)
2005 : -3,6% (± USD 40,7 MILIAR)
2006 : -3,3% (± USD 39,6 MILIAR)
2007 : -3,2% (± USD 39,3 MILIAR)
2008 : -4,8% (± USD 39,3 MILIAR)
2009 : -6,7% (± USD 50,4 MILIAR)
2010 : -5,4% (± USD 51,8 MILIAR)
2011 : -4,8% (± USD 53,7 MILIAR)
2012 : -4,5% (± USD 55,6 MILIAR)
2013 : -3,9% (± USD 55,3 MILIAR)
2014 : -3,4% (± USD 56,9 MILIAR)
2015 : -3,2% (± USD 55,7 MILIAR)
2016 : -3,1% (± USD 54,3 MILIAR)
2017 : -3,0% (± USD 55,6 MILIAR)
2018 : -3,7% (± USD 57,0 MILIAR)
2019 : -3,4% (± USD 67,6 MILIAR)
2020 : -6,2% (± USD 69,1 MILIAR)
2021 : -6,4% (± USD 65,5 MILIAR)
2022 : -5,6% (± USD 69,7 MILIAR)
2023 : -5,0% (± USD 68,3 MILIAR)
2024 : -4,1% (± USD 298,4 MILIAR) (Pemangkasan subsidi)
2025 : -3,8% (± USD 325,6 MILIAR) (Rasionalisasi RON95)
-
SUMBER:
IMF | World Economic Outlook | World Bank | Bank Negara Malondesh.
MALONYET (2026–1998)
Hapus(The safety threshold of 65%)
-
2026
Populasi: 36.38 juta
Utang Govt: RM 1.79 Triliun (70.5%)
Utang Household: RM 1.65 Triliun (84.3%)
Beban per Kapita: RM 94,544
-
2025
Populasi: 35.97 juta
Utang Govt: RM 1.30 Triliun (-%)
Utang Household: RM 1.65 Triliun (-%)
Beban per Kapita: RM 81,998
-
2024
Populasi: 34.67 juta
Utang Govt: RM 1.22 Triliun (64.6%)
Utang Household: RM 1.53 Triliun (84.2%)
Beban per Kapita: RM 79,315
-
2023
Populasi: 35.12 juta
Utang Govt: RM 1.17 Triliun (64.3%)
Utang Household: RM 1.45 Triliun (81.2%)
Beban per Kapita: RM 74,587
-
2022
Populasi: 34.69 juta
Utang Govt: RM 1.08 Triliun (60.1%) [1]
Utang Household: RM 1.38 Triliun (80.9%)
Beban per Kapita: RM 70,901 [1]
-
2021
Populasi: 34.28 juta
Utang Govt: RM 979.81 Miliar (63.3%)
Utang Household: RM 1.34 Triliun (89.1%)
Beban per Kapita: RM 67,667
-
2020
Populasi: 33.87 juta
Utang Govt: RM 879.56 Miliar (62.0%)
Utang Household: RM 1.27 Triliun (87.5%)
Beban per Kapita: RM 63,464
-
2019
Populasi: 33.45 juta
Utang Govt: RM 793.00 Miliar (52.4%)
Utang Household: RM 1.22 Triliun (82.5%)
Beban per Kapita: RM 60,179
-
2018
Populasi: 33.00 juta
Utang Govt: RM 741.00 Miliar (52.5%)
Utang Household: RM 1.16 Triliun (82.0%)
Beban per Kapita: RM 57,605
-
2017
Populasi: 32.54 juta
Utang Govt: RM 686.80 Miliar (51.9%)
Utang Household: RM 1.10 Triliun (83.2%)
Beban per Kapita: RM 54,910
-
2016
Populasi: 32.04 juta
Utang Govt: RM 648.50 Miliar (52.7%)
Utang Household: RM 1.04 Triliun (86.1%)
Beban per Kapita: RM 52,699
-
2015
Populasi: 31.52 juta
Utang Govt: RM 630.50 Miliar (55.1%)
Utang Household: RM 985.00 Miliar (86.0%)
Beban per Kapita: RM 51,253
-
2014
Populasi: 30.98 juta
Utang Govt: RM 582.80 Miliar (55.0%)
Utang Household: RM 902.00 Miliar (85.1%)
Beban per Kapita: RM 47,927
-
2013
Populasi: 30.42 juta
Utang Govt: RM 547.70 Miliar (54.7%)
Utang Household: RM 821.00 Miliar (82.0%)
Beban per Kapita: RM 44,992
-
2012
Populasi: 29.85 juta
Utang Govt: RM 501.60 Miliar (53.3%)
Utang Household: RM 732.00 Miliar (77.8%)
Beban per Kapita: RM 41,326
-
2011
Populasi: 29.26 juta
Utang Govt: RM 456.10 Miliar (51.8%)
Utang Household: RM 653.00 Miliar (74.2%)
Beban per Kapita: RM 37,904
-
2010
Populasi: 28.65 juta
Utang Govt: RM 407.10 Miliar (52.4%)
Utang Household: RM 581.00 Miliar (74.8%)
Beban per Kapita: RM 34,488
-
2009
Populasi: 28.04 juta
Utang Govt: RM 362.40 Miliar (51.1%)
Utang Household: RM 516.00 Miliar (72.0%)
Beban per Kapita: RM 31,326
-
2008
Populasi: 27.45 juta
Utang Govt: RM 258.00 Miliar (41.3%)
Utang Household: RM 460.00 Miliar (73.0%)
Beban per Kapita: RM 26,155
-
2007
Populasi: 26.86 juta
Utang Govt: RM 266.00 Miliar (41.1%)
Utang Household: RM 414.00 Miliar (64.0%)
Beban per Kapita: RM 25,316
-
2006
Populasi: 26.26 juta
Utang Govt: RM 242.00 Miliar (41.5%)
Utang Household: RM 372.00 Miliar (63.0%)
Beban per Kapita: RM 23,381
-
2005
Populasi: 25.66 juta
Utang Govt: RM 228.00 Miliar (43.8%)
Utang Household: RM 335.00 Miliar (64.0%)
Beban per Kapita: RM 21,940
-
2004
Populasi: 25.06 juta
Utang Govt: RM 217.00 Miliar (45.1%)
Utang Household: RM 298.00 Miliar (62.0%)
Beban per Kapita: RM 20,550
-
2003
Populasi: 24.46 juta
Utang Govt: RM 189.00 Miliar (45.9%)
Utang Household: RM 265.00 Miliar (64.0%)
Beban per Kapita: RM 18,560
-
2002
Populasi: 23.87 juta
Utang Govt: RM 165.00 Miliar (44.9%)
Utang Household: RM 236.00 Miliar (64.0%)
Beban per Kapita: RM 16,798
-
2001
Populasi: 23.28 juta
Utang Govt: RM 146.00 Miliar (42.5%)
Utang Household: RM 207.00 Miliar (60.0%)
Beban per Kapita: RM 15,162
-
2000
Populasi: 22.69 juta
Utang Govt: RM 126.00 Miliar (36.1%)
Utang Household: RM 182.00 Miliar (52.0%)
Beban per Kapita: RM 13,574
-
1999
Populasi: 22.11 juta
Utang Govt: RM 113.00 Miliar (40.4%)
Utang Household: RM 157.00 Miliar (56.0%)
Beban per Kapita: RM 12,210
-
1998
Populasi: 21.53 juta
Utang Govt: RM 98.00 Miliar (35.8%)
Utang Household: RM 135.00 Miliar (49.3%)
Beban per Kapita: RM 10,821
=============
=============
INDONESIA
(The safety threshold of 60%)
-
2026 Govt Debt-to-GDP : 40,46%
2026 Household Debt-to-GDP : 15,70%
BUKTI EKONOMI SUPER MALONYET = DEFISIT
BalasHapus----------------------------------
DEFISIT 1998-2026 = TIDAK BAYAR HUTANG
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
-
Anwar Ibrahim menegaskan bahwa miliaran ringgit yang dibayarkan oleh pemerintah saat ini sebenarnya hanya digunakan untuk membayar khidmat utang (biaya layanan utang) atau membayar bunga/faedah saja, dan bukan untuk melunasi pokok atau jumlah utang tertunggak secara keseluruhan
--------------------------------------------
BEBAN UTANG PER KAPITA & POPULASI (2026–1998)
2026: RM 94,544 | POPULASI: 36,385,115 JIWA
2025: RM 81,998 | POPULASI: 35,977,838 JIWA
2024: RM 79,315 | POPULASI: 34,671,895 JIWA
2023: RM 74,587 | POPULASI: 35,126,298 JIWA
2022: RM 70,901 | POPULASI: 34,695,493 JIWA
2021: RM 67,667 | POPULASI: 34,282,399 JIWA
2020: RM 63,464 | POPULASI: 33,870,000 JIWA
2019: RM 60,179 | POPULASI: 33,450,000 JIWA
2018: RM 57,605 | POPULASI: 33,000,000 JIWA
2017: RM 54,910 | POPULASI: 32,540,000 JIWA
2016: RM 52,699 | POPULASI: 32,040,000 JIWA
2015: RM 51,253 | POPULASI: 31,520,000 JIWA
2014: RM 47,927 | POPULASI: 30,980,000 JIWA
2013: RM 44,992 | POPULASI: 30,420,000 JIWA
2012: RM 41,326 | POPULASI: 29,850,000 JIWA
2011: RM 37,904 | POPULASI: 29,260,000 JIWA
2010: RM 34,488 | POPULASI: 28,650,000 JIWA
2009: RM 31,326 | POPULASI: 28,040,000 JIWA
2008: RM 26,155 | POPULASI: 27,450,000 JIWA
2007: RM 25,316 | POPULASI: 26,860,000 JIWA
2006: RM 23,381 | POPULASI: 26,260,000 JIWA
2005: RM 21,940 | POPULASI: 25,660,000 JIWA
2004: RM 20,550 | POPULASI: 25,060,000 JIWA
2003: RM 18,560 | POPULASI: 24,460,000 JIWA
2002: RM 16,798 | POPULASI: 23,870,000 JIWA
2001: RM 15,162 | POPULASI: 23,280,000 JIWA
2000: RM 13,574 | POPULASI: 22,690,000 JIWA
1999: RM 12,210 | POPULASI: 22,110,000 JIWA
1998: RM 10,821 | POPULASI: 21,530,000 JIWA
--------------------------------------------
UTANG & LIABILITAS MALONYET (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
SEJAK 2010 : MADE IN INDONESIA
BalasHapusRINGGIT DAN PASPOR MALONYET
-
🪙 Daftar Negara & Produk
• Peru: Mata uang (Soles).
• Malonsia: Mata uang (Ringgit) & Paspor.
• Nepal: Mata uang (Rupee), Pita Cukai, & Prangko.
• Bangladesh: Mata uang (Taka).
• Sri Lanka: Mata uang (Rupee) & Paspor.
• Somalia: Mata uang (Shilling).
• Argentina: Mata uang (Peso).
• Pakistan: Pita Cukai.
• Filipina: Prangko.
• Guinea: Paspor.
-------------------------------------------
🔎 Sumber Berita & Media Resmi
1. Situs Resmi Peruri (Rilis Pers Ringgit) – Kerja sama cetak Ringgit Malonsia sejak 2010.
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail proyek dokumen imigrasi Sri Lanka.
3. detikFinance – Wawancara cetak mata uang Nepal, Somalia, dan Argentina.
4. Kompas – Catatan cetak prangko Filipina dan pita cukai Pakistan.
5. CNN Indonesia – Laporan ekspansi cetak uang Nepal dan paspor Guinea.
--------------------------------
HUTANG & LIABILITAS MALONDESH 1998–2026
1998 : RM 165,4 Miliar
1999 : RM 178,3 Miliar
2000 : RM 192,2 Miliar
2001 : RM 207,2 Miliar
2002 : RM 223,3 Miliar
2003 : RM 240,7 Miliar
2004 : RM 259,5 Miliar
2005 : RM 279,7 Miliar
2006 : RM 301,5 Miliar
2007 : RM 325,0 Miliar
2008 : RM 350,4 Miliar
2009 : RM 377,7 Miliar
2010 : RM 407,1 Miliar
2011 : RM 456,1 Miliar
2012 : RM 501,6 Miliar
2013 : RM 547,7 Miliar
2014 : RM 582,8 Miliar
2015 : RM 630,5 Miliar
2016 : RM 648,5 Miliar
2017 : RM 686,8 Miliar
2018 : RM 1,19 Triliun
2019 : RM 1,25 Triliun
2020 : RM 1,32 Triliun
2021 : RM 1,38 Triliun
2022 : RM 1,45 Triliun
2023 : RM 1,53 Triliun
2024 : RM 1,63 Triliun
2025 : RM 1,71 Triliun
2026 : RM 1,79 Triliun
-
SUMBER :
Bloomberg & Reuters | CNA & The Star | The Edge Malondesh | MOF & Bernama | Kementerian Kewangan
--------------------------------
TAHUN RASIO UTANG TERHADAP GDP (%) 1998–2025
1998 : 35,8%
1999 : 40,4%
2000 : 36,1%
2001 : 42,5%
2002 : 44,9%
2003 : 45,9%
2004 : 45,1%
2005 : 43,8%
2006 : 41,5%
2007 : 41,1%
2008 : 41,3%
2009 : 51,1%
2010 : 52.4%
2011 : 51.8
2012 : 53.3
2013 : 54.7
2014 : 55.0
2015 : 55.1
2016 : 52.7
2017 : 51.9
2018 : 52.5
2019 : 52.4
2020 : 62.0
2021 : 63.3
2022 : 60.2
2023 : 64.3
2024 : 70.4
2025 : 70.5
-
SUMBER : Macrotrends / World Bank / Statista / Trading Economics
--------------------------------
DEFISIT FISKAL MALONDESH PERIODE 1998–2025:
1998 : -1,8% (± USD 33,6 MILIAR)
1999 : -3,2% (± USD 34,3 MILIAR)
2000 : -5,8% (± USD 32,5 MILIAR)
2001 : -5,5% (± USD 38,0 MILIAR)
2002 : -5,6% (± USD 39,5 MILIAR)
2003 : -5,0% (± USD 41,3 MILIAR)
2004 : -4,1% (± USD 41,9 MILIAR)
2005 : -3,6% (± USD 40,7 MILIAR)
2006 : -3,3% (± USD 39,6 MILIAR)
2007 : -3,2% (± USD 39,3 MILIAR)
2008 : -4,8% (± USD 39,3 MILIAR)
2009 : -6,7% (± USD 50,4 MILIAR)
2010 : -5,4% (± USD 51,8 MILIAR)
2011 : -4,8% (± USD 53,7 MILIAR)
2012 : -4,5% (± USD 55,6 MILIAR)
2013 : -3,9% (± USD 55,3 MILIAR)
2014 : -3,4% (± USD 56,9 MILIAR)
2015 : -3,2% (± USD 55,7 MILIAR)
2016 : -3,1% (± USD 54,3 MILIAR)
2017 : -3,0% (± USD 55,6 MILIAR)
2018 : -3,7% (± USD 57,0 MILIAR)
2019 : -3,4% (± USD 67,6 MILIAR)
2020 : -6,2% (± USD 69,1 MILIAR)
2021 : -6,4% (± USD 65,5 MILIAR)
2022 : -5,6% (± USD 69,7 MILIAR)
2023 : -5,0% (± USD 68,3 MILIAR)
2024 : -4,1% (± USD 298,4 MILIAR) (Pemangkasan subsidi)
2025 : -3,8% (± USD 325,6 MILIAR) (Rasionalisasi RON95)
-
SUMBER:
IMF | World Economic Outlook | World Bank | Bank Negara Malondesh.
KITA LIHAT RINGGIT Vs rupiah........ HAHAHAHAHAHA
BalasHapus1.00 MYR = 4,411.9623 IDR
BUKTI EKONOMI SUPER MALONYET = DEFISIT
Hapus----------------------------------
DEFISIT 1998-2026 = TIDAK BAYAR HUTANG
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
-
Anwar Ibrahim menegaskan bahwa miliaran ringgit yang dibayarkan oleh pemerintah saat ini sebenarnya hanya digunakan untuk membayar khidmat utang (biaya layanan utang) atau membayar bunga/faedah saja, dan bukan untuk melunasi pokok atau jumlah utang tertunggak secara keseluruhan
--------------------------------------------
2026
Populasi: 36.38 juta
Debt Govt: RM 1.79 Triliun (70.5%)
Debt Household: RM 1.65 Triliun (84.3%)
Beban per Kapita: RM 94,544
-
2025
Populasi: 35.97 juta
Debt Govt: RM 1.30 Triliun (-%)
Debt Household: RM 1.65 Triliun (-%)
Beban per Kapita: RM 81,998
-
2024
Populasi: 34.67 juta
Debt Govt: RM 1.22 Triliun (64.6%)
Debt Household: RM 1.53 Triliun (84.2%)
Beban per Kapita: RM 79,315
-
2023
Populasi: 35.12 juta
Debt Govt: RM 1.17 Triliun (64.3%)
Debt Household: RM 1.45 Triliun (81.2%)
Beban per Kapita: RM 74,587
-
2022
Populasi: 34.69 juta
Debt Govt: RM 1.08 Triliun (60.1%)
Debt Household: RM 1.38 Triliun (80.9%)
Beban per Kapita: RM 70,901
-
2021
Populasi: 34.28 juta
Debt Govt: RM 979.81 Miliar (63.3%)
Debt Household: RM 1.34 Triliun (89.1%)
Beban per Kapita: RM 67,667
-
2020
Populasi: 33.87 juta
Debt Govt: RM 879.56 Miliar (62.0%)
Debt Household: RM 1.27 Triliun (87.5%)
Beban per Kapita: RM 63,464
-
2019
Populasi: 33.45 juta
Debt Govt: RM 793.00 Miliar (52.4%)
Debt Household: RM 1.22 Triliun (82.5%)
Beban per Kapita: RM 60,179
-
2018
Populasi: 33.00 juta
Debt Govt: RM 741.00 Miliar (52.5%)
Debt Household: RM 1.16 Triliun (82.0%)
Beban per Kapita: RM 57,605
-
2017
Populasi: 32.54 juta
Debt Govt: RM 686.80 Miliar (51.9%)
Debt Household: RM 1.10 Triliun (83.2%)
Beban per Kapita: RM 54,910
-
2016
Populasi: 32.04 juta
Debt Govt: RM 648.50 Miliar (52.7%)
Debt Household: RM 1.04 Triliun (86.1%)
Beban per Kapita: RM 52,699
-
2015
Populasi: 31.52 juta
Debt Govt: RM 630.50 Miliar (55.1%)
Debt Household: RM 985.00 Miliar (86.0%)
Beban per Kapita: RM 51,253
-
2014
Populasi: 30.98 juta
Debt Govt: RM 582.80 Miliar (55.0%)
Debt Household: RM 902.00 Miliar (85.1%)
Beban per Kapita: RM 47,927
-
2013
Populasi: 30.42 juta
Debt Govt: RM 547.70 Miliar (54.7%)
Debt Household: RM 821.00 Miliar (82.0%)
Beban per Kapita: RM 44,992
-
2012
Populasi: 29.85 juta
Debt Govt: RM 501.60 Miliar (53.3%)
Debt Household: RM 732.00 Miliar (77.8%)
Beban per Kapita: RM 41,326
-
2011
Populasi: 29.26 juta
Debt Govt: RM 456.10 Miliar (51.8%)
Debt Household: RM 653.00 Miliar (74.2%)
Beban per Kapita: RM 37,904
-
2010
Populasi: 28.65 juta
Debt Govt: RM 407.10 Miliar (52.4%)
Debt Household: RM 581.00 Miliar (74.8%)
Beban per Kapita: RM 34,488
-
2009
Populasi: 28.04 juta
Debt Govt: RM 362.40 Miliar (51.1%)
Debt Household: RM 516.00 Miliar (72.0%)
Beban per Kapita: RM 31,326
-
2008
Populasi: 27.45 juta
Debt Govt: RM 258.00 Miliar (41.3%)
Debt Household: RM 460.00 Miliar (73.0%)
Beban per Kapita: RM 26,155
-
2007
Populasi: 26.86 juta
Debt Govt: RM 266.00 Miliar (41.1%)
Debt Household: RM 414.00 Miliar (64.0%)
Beban per Kapita: RM 25,316
-
2006
Populasi: 26.26 juta
Debt Govt: RM 242.00 Miliar (41.5%)
Debt Household: RM 372.00 Miliar (63.0%)
Beban per Kapita: RM 23,381
-
2005
Populasi: 25.66 juta
Debt Govt: RM 228.00 Miliar (43.8%)
Debt Household: RM 335.00 Miliar (64.0%)
Beban per Kapita: RM 21,940
-
2004
Populasi: 25.06 juta
Debt Govt: RM 217.00 Miliar (45.1%)
Debt Household: RM 298.00 Miliar (62.0%)
Beban per Kapita: RM 20,550
-
2003
Populasi: 24.46 juta
Debt Govt: RM 189.00 Miliar (45.9%)
Debt Household: RM 265.00 Miliar (64.0%)
Beban per Kapita: RM 18,560
-
2002
Populasi: 23.87 juta
Debt Govt: RM 165.00 Miliar (44.9%)
Debt Household: RM 236.00 Miliar (64.0%)
Beban per Kapita: RM 16,798
-
2001
Populasi: 23.28 juta
Debt Govt: RM 146.00 Miliar (42.5%)
Debt Household: RM 207.00 Miliar (60.0%)
Beban per Kapita: RM 15,162
-
2000
Populasi: 22.69 juta
Debt Govt: RM 126.00 Miliar (36.1%)
Debt Household: RM 182.00 Miliar (52.0%)
Beban per Kapita: RM 13,574
SEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
RINGGIT DAN PASPOR MALONYET
RINGGIT DAN PASPOR MALONYET
-
Daftar ringkas negara yang mata uang atau dokumen negaranya dicetak oleh Perum Peruri, lengkap dengan tautan sumber berita resminya:
🪙 Daftar Negara & Produk
• Peru – Mata Uang: Soles
• Malonyet – Mata Uang: Ringgit & Paspor
• Nepal – Mata Uang: Rupee, Pita Cukai, & Prangko
• Bangladesh – Mata Uang: Taka
• Sri Lanka – Mata Uang: Rupee & Paspor
• Somalia – Mata Uang: Shilling
• Argentina – Mata Uang: Peso
• Pakistan – Dokumen Negara: Pita Cukai
• Filipina – Dokumen Negara: Prangko
• Guinea – Dokumen Negara: Paspor
----------------------------------
Sumber Berita Resmi & Media Nasional
1. Situs Resmi Peruri (Rilis Pers) – Laporan sejak tahun 2010, di mana Bank Negara Malonsia memercayakan pemenuhan kebutuhan pencetakan lembaran kertas mata uang Ringgit kepada Peruri
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail kerja sama pencetakan dokumen imigrasi paspor Sri Lanka.
3. detikFinance – Wawancara resmi terkait pencetakan mata uang Nepal, Somalia, hingga Argentina di Indonesia.
4. Kompas Interaktif – Catatan detail mengenai pencetakan prangko Filipina dan pita cukai Pakistan.
5. CNN Indonesia – Laporan ekspansi Peruri mencetak uang kertas Nepal serta paspor negara Guinea.
----------------------------------
HUTANG & LIABILITAS MALONYET 1998–2026
-
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia dan dimulainya defisit anggaran berkepanjangan.
-
1999: RM 116,6 Miliar – Penerbitan instrumen obligasi domestik baru untuk stimulus ekonomi.
-
2000: RM 125,6 Miliar – Restrukturisasi sektor korporasi dan perbankan pasca-krisis selesai.
-
2001: RM 145,7 Miliar – Peningkatan belanja pembangunan guna menopang pertumbuhan domestik.
-
2002: RM 165,0 Miliar – Rasio utang terhadap PDB mulai merangkak naik secara perlahan.
-
2003: RM 188,8 Miliar – Batas plafon utang resmi pertama kali dinaikkan menjadi 40% dari PDB.
-
2004: RM 216,6 Miliar – Pengeluaran publik meluas demi mendukung proyek infrastruktur baru.
-
2005: RM 228,7 Miliar – Konsolidasi fiskal awal di bawah manajemen kepemimpinan baru.
-
2006: RM 242,2 Miliar – Pengendalian defisit secara ketat di tengah lonjakan harga komoditas global.
-
2007: RM 266,7 Miliar – Posisi keuangan masih stabil menjelang gejolak finansial global.
-
2008: RM 306,4 Miliar – Kenaikan plafon utang menjadi 45% akibat dampak awal krisis finansial global.
-
2009: RM 362,4 Miliar – Batas utang melonjak ke 55% demi mendanai paket stimulus ekonomi besar.
-
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis finansial global.
-
2011: RM 456,1 Miliar – Rasio utang mulai meningkat stabil.
-
2012: RM 501,6 Miliar – Melewati ambang batas RM 500 miliar.
-
2013: RM 547,7 Miliar – Ekspansi belanja infrastruktur nasional.
-
2014: RM 582,8 Miliar – Berdasarkan Laporan Keuangan Pemerintah Federal 2014.
-
2015: RM 630,5 Miliar – Penyesuaian ekonomi akibat fluktuasi harga minyak.
-
2016: RM 648,5 Miliar – Konsolidasi fiskal di bawah pemerintahan saat itu.
-
2017: RM 686,8 Miliar – Data tercatat dalam Laporan Tahunan Bank Negara MALONYET 2017.
-
2018: RM 1,19 Triliun – Transparansi Baru: Termasuk liabilitas 1MDB & proyek PPP. [
-
2019: RM 1,25 Triliun – Laporan pengungkapan utang menembus RM 1 triliun.
-
2020: RM 1,32 Triliun – Lonjakan akibat paket stimulus pandemi COVID-19.
-
2021: RM 1,38 Triliun – Akumulasi utang federal selama masa pemulihan ekonomi.
-
2022: RM 1,45 Triliun – Posisi utang sebelum pergantian pemerintahan.
-
2023: RM 1,53 Triliun – Dikonfirmasi oleh PM Anwar Ibrahim sebagai warisan utang & liabilitas.
-
2024: RM 1,63 Triliun – Berdasarkan Belanjawan (APBN) 2024.
-
2025: RM 1,71 Triliun – Proyeksi dalam Tinjauan Fiskal 2026 (Kementerian Kewangan).
-
2026: RM 1,79 Triliun – Target manajemen utang dalam Economic Outlook 2026
HUTANG BAYAR HUTANG (2026–1998):
Hapus(safety threshold of 65%)
-
2026
Populasi: 36.38 juta
Utang Govt: RM 1.79 Triliun (70.5%)
Utang Household: RM 1.65 Triliun (84.3%)
Beban per Kapita: RM 94,544
-
2025
Populasi: 35.97 juta
Utang Govt: RM 1.30 Triliun (-%)
Utang Household: RM 1.65 Triliun (-%)
Beban per Kapita: RM 81,998
-
2024
Populasi: 34.67 juta
Utang Govt: RM 1.22 Triliun (64.6%)
Utang Household: RM 1.53 Triliun (84.2%)
Beban per Kapita: RM 79,315
-
2023
Populasi: 35.12 juta
Utang Govt: RM 1.17 Triliun (64.3%)
Utang Household: RM 1.45 Triliun (81.2%)
Beban per Kapita: RM 74,587
-
2022
Populasi: 34.69 juta
Utang Govt: RM 1.08 Triliun (60.1%) [1]
Utang Household: RM 1.38 Triliun (80.9%)
Beban per Kapita: RM 70,901 [1]
-
2021
Populasi: 34.28 juta
Utang Govt: RM 979.81 Miliar (63.3%)
Utang Household: RM 1.34 Triliun (89.1%)
Beban per Kapita: RM 67,667
-
2020
Populasi: 33.87 juta
Utang Govt: RM 879.56 Miliar (62.0%)
Utang Household: RM 1.27 Triliun (87.5%)
Beban per Kapita: RM 63,464
-
2019
Populasi: 33.45 juta
Utang Govt: RM 793.00 Miliar (52.4%)
Utang Household: RM 1.22 Triliun (82.5%)
Beban per Kapita: RM 60,179
-
2018
Populasi: 33.00 juta
Utang Govt: RM 741.00 Miliar (52.5%)
Utang Household: RM 1.16 Triliun (82.0%)
Beban per Kapita: RM 57,605
-
2017
Populasi: 32.54 juta
Utang Govt: RM 686.80 Miliar (51.9%)
Utang Household: RM 1.10 Triliun (83.2%)
Beban per Kapita: RM 54,910
-
2016
Populasi: 32.04 juta
Utang Govt: RM 648.50 Miliar (52.7%)
Utang Household: RM 1.04 Triliun (86.1%)
Beban per Kapita: RM 52,699
-
2015
Populasi: 31.52 juta
Utang Govt: RM 630.50 Miliar (55.1%)
Utang Household: RM 985.00 Miliar (86.0%)
Beban per Kapita: RM 51,253
-
2014
Populasi: 30.98 juta
Utang Govt: RM 582.80 Miliar (55.0%)
Utang Household: RM 902.00 Miliar (85.1%)
Beban per Kapita: RM 47,927
-
2013
Populasi: 30.42 juta
Utang Govt: RM 547.70 Miliar (54.7%)
Utang Household: RM 821.00 Miliar (82.0%)
Beban per Kapita: RM 44,992
-
2012
Populasi: 29.85 juta
Utang Govt: RM 501.60 Miliar (53.3%)
Utang Household: RM 732.00 Miliar (77.8%)
Beban per Kapita: RM 41,326
-
2011
Populasi: 29.26 juta
Utang Govt: RM 456.10 Miliar (51.8%)
Utang Household: RM 653.00 Miliar (74.2%)
Beban per Kapita: RM 37,904
-
2010
Populasi: 28.65 juta
Utang Govt: RM 407.10 Miliar (52.4%)
Utang Household: RM 581.00 Miliar (74.8%)
Beban per Kapita: RM 34,488
-
2009
Populasi: 28.04 juta
Utang Govt: RM 362.40 Miliar (51.1%)
Utang Household: RM 516.00 Miliar (72.0%)
Beban per Kapita: RM 31,326
-
2008
Populasi: 27.45 juta
Utang Govt: RM 258.00 Miliar (41.3%)
Utang Household: RM 460.00 Miliar (73.0%)
Beban per Kapita: RM 26,155
-
2007
Populasi: 26.86 juta
Utang Govt: RM 266.00 Miliar (41.1%)
Utang Household: RM 414.00 Miliar (64.0%)
Beban per Kapita: RM 25,316
-
2006
Populasi: 26.26 juta
Utang Govt: RM 242.00 Miliar (41.5%)
Utang Household: RM 372.00 Miliar (63.0%)
Beban per Kapita: RM 23,381
-
2005
Populasi: 25.66 juta
Utang Govt: RM 228.00 Miliar (43.8%)
Utang Household: RM 335.00 Miliar (64.0%)
Beban per Kapita: RM 21,940
-
2004
Populasi: 25.06 juta
Utang Govt: RM 217.00 Miliar (45.1%)
Utang Household: RM 298.00 Miliar (62.0%)
Beban per Kapita: RM 20,550
-
2003
Populasi: 24.46 juta
Utang Govt: RM 189.00 Miliar (45.9%)
Utang Household: RM 265.00 Miliar (64.0%)
Beban per Kapita: RM 18,560
-
2002
Populasi: 23.87 juta
Utang Govt: RM 165.00 Miliar (44.9%)
Utang Household: RM 236.00 Miliar (64.0%)
Beban per Kapita: RM 16,798
-
2001
Populasi: 23.28 juta
Utang Govt: RM 146.00 Miliar (42.5%)
Utang Household: RM 207.00 Miliar (60.0%)
Beban per Kapita: RM 15,162
-
2000
Populasi: 22.69 juta
Utang Govt: RM 126.00 Miliar (36.1%)
Utang Household: RM 182.00 Miliar (52.0%)
Beban per Kapita: RM 13,574
-
1999
Populasi: 22.11 juta
Utang Govt: RM 113.00 Miliar (40.4%)
Utang Household: RM 157.00 Miliar (56.0%)
Beban per Kapita: RM 12,210
-
1998
Populasi: 21.53 juta
Utang Govt: RM 98.00 Miliar (35.8%)
Utang Household: RM 135.00 Miliar (49.3%)
Beban per Kapita: RM 10,821
=============
=============
INDONESIA
(safety threshold of 60%)
-
2026 Govt Debt-to-GDP : 40,46%
2026 Household Debt-to-GDP : 15,70%
KLAIM CASH = HUTANG ASET MILITER
Hapus-
1. 🇹🇷 Turki (LMS Batch 2)
Model: G2G (Antar Pemerintah) via SSB.
Bunga: 4% – 6% (Fixed/OECD CIRR).
Tenor: 10 – 15 Tahun.
-
2. 🇰🇷 Korea Selatan (Pesawat FA-50)
Model: Hybrid (Kredit KEXIM & Barter CPO 50%).
Biaya: Management Fee sangat rendah (0,10% - 0,50%).
-
3. 🇬🇧 Inggris (Standar UKEF - Pesawat Hawk)
Syarat: Wajib DP 15% (Standar OECD).
Bunga: Stabil, mengikuti National Loans Fund.
-
4. 🇨🇳 China (LMS Batch 1)
Model: 100% Kredit Ekspor (China Eximbank).
Bunga: Sangat murah (3,5% Fixed).
Tenor: 10 Tahun.
-
5. 🇵🇱 Polandia (Tank PT-91M)
Model: DP 15% + Barter CPO (30-40%).
Tenor: 10 Tahun cicilan.
-
6. 🇩🇪 Jerman (Kedah-Class)
Model: Kredit Komersial dijamin negara (Euler Hermes).
Pendana: Deutsche Bank & Konsorsium.
-
7. Kredit Sindikasi (Proyek LCS - 17 Kreditor/Hutang)
Model: Konsorsium Bank Domestik/Intl (Skala Masif).
Bunga: 6% (Saldo Menurun).
Tenor: 15 Tahun (Akibat penundaan proyek).
-----------------
2023 PM says =
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
-
KUALA LUMPUR:
The defence ministry has cancelled five procurement tenders for supplies, services and infrastructure projects. The cancellations were to avoid leakages in expenditure, and were in line with a policy of procurement through open tenders.
“Mindef has also taken serious note of Prime Minister Anwar Ibrahim’s statement regarding the leakage in expenditure at the Budget 2023 dialogue on Tuesday,” it said in a statement today
------------------
🦧GORILA KLAIM KAYA : 97.000 EKSODUS =
2025-2015 : ALASAN EKONOMI
2025-2015 : ALASAN EKONOMI
2025-2015 : ALASAN EKONOMI
2025-2015 : ALASAN EKONOMI
2025-2015 : ALASAN EKONOMI
2025-2015 : ALASAN EKONOMI
2025-2015 : ALASAN EKONOMI
2025-2015 : ALASAN EKONOMI
2025-2015 : ALASAN EKONOMI
2025-2015 : ALASAN EKONOMI
2025-2015 : ALASAN EKONOMI
---------------------------
Sumber Berita Utama:
Laporan Resmi: Portal JPN MALONYET (Update 9 Jan 2026).
Media : The Straits Times dan Harian Metro.Kompas Money dan CNBC Indonesia
The Straits Times (Singapore): "More than 57,000 MALONYETns renounced their citizenship for Singapore's over last 5 years: Report".
New Straits Times (MALONYET): "Economic factors, family main reasons 61,116 MALONYETns gave up citizenship".
VnExpress International: "Nearly 94% of MALONYETns who renounced citizenship moved to Singapore".
SAYS: "Why Thousands Of MALONYETns Are Giving Up Their Citizenship".
RinggitPlus: "Economic And Family Factors Drive MALONYETns To Renounce Citizenship
BUKTI EKONOMI SUPER MALONYET = DEFISIT
BalasHapus----------------------------------
DEFISIT 1998-2026 = TIDAK BAYAR HUTANG
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
-
Anwar Ibrahim menegaskan bahwa miliaran ringgit yang dibayarkan oleh pemerintah saat ini sebenarnya hanya digunakan untuk membayar khidmat utang (biaya layanan utang) atau membayar bunga/faedah saja, dan bukan untuk melunasi pokok atau jumlah utang tertunggak secara keseluruhan
--------------------------------------------
1.RASIO HUTANG 84.3% DARI GDP
2. HUTANG NEGARA RM 1,65 TRLLIUN
3. HUTANG 1MDB RM 18,2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VVSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST VSHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. MKM BARTER PALM OIL
62. MIG29N BARTER PALM OIL
63. A400M PEMBAYARAN BERPERINGKAT (HUTANG)
64. SCORPENE BARTER PALM OIL
65. PT91M BARTER PALM OIL RUBBER
67. FA50M BARTER PALM OIL
===================
SEWA = HUTANG 84.3% DARI GDP = NO SHOPPING
1. SEWA 28 HELI
2. SEWA L39 ITCC
3. SEWA EC120B
4. SEWA FLIGHT SIMULATION TRAINING DEVICE (FSTD)
5. SEWA 1 UNIT SISTEM SIMULATOR EC120B
6. SEWA HOVERCRAFT
7. SEWA AW139
8. SEWA FAST INTERCEPTOR BOAT (FIB)
9. SEWA UTILITY BOAT
10. SEWA RIGID HULL FENDER BOAT (RHFB)
11. SEWA ROVER FIBER GLASS (ROVER)
12. SEWA MV AISHAH AIM 4
13. SEWA BMW R1250RT
14. SEWA 4x4 VECHICLE
15. SEWA VSHORAD
16. SEWA TRUCK
17. SEWA HONDA CIVIC
18. SEWA PATROL BOATS
19. SEWA OUTBOARD MOTORS
20. SEWA TRAILERS
21. SEWA SUPERBIKES
22. SEWA SIMULATOR MKM
23. SEWA 12 AW149 TUDM
24. SEWA 4 AW139 TUDM
25. SEWA 5 EC120B TUDM
26. SEWA 2 AW159 TLDM
27. SEWA 4 UH-60A TDM
28. SEWA 12 AW149 TDM
29. SEWA 4 AW139 BOMBA
30. SEWA 2 AW159 MMEA
31. SEWA 7 BELL429 POLIS
32. SEWA MOTOR POLIS
SEJAK 2010 : MADE IN INDONESIA
BalasHapusRINGGIT DAN PASPOR MALONYET
RINGGIT DAN PASPOR MALONYET
RINGGIT DAN PASPOR MALONYET
-
Daftar ringkas negara yang mata uang atau dokumen negaranya dicetak oleh Perum Peruri, lengkap dengan tautan sumber berita resminya:
🪙 Daftar Negara & Produk
• Peru – Mata Uang: Soles
• Malonyet – Mata Uang: Ringgit & Paspor
• Nepal – Mata Uang: Rupee, Pita Cukai, & Prangko
• Bangladesh – Mata Uang: Taka
• Sri Lanka – Mata Uang: Rupee & Paspor
• Somalia – Mata Uang: Shilling
• Argentina – Mata Uang: Peso
• Pakistan – Dokumen Negara: Pita Cukai
• Filipina – Dokumen Negara: Prangko
• Guinea – Dokumen Negara: Paspor
----------------------------------
Sumber Berita Resmi & Media Nasional
1. Situs Resmi Peruri (Rilis Pers) – Laporan sejak tahun 2010, di mana Bank Negara Malonsia memercayakan pemenuhan kebutuhan pencetakan lembaran kertas mata uang Ringgit kepada Peruri
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail kerja sama pencetakan dokumen imigrasi paspor Sri Lanka.
3. detikFinance – Wawancara resmi terkait pencetakan mata uang Nepal, Somalia, hingga Argentina di Indonesia.
4. Kompas Interaktif – Catatan detail mengenai pencetakan prangko Filipina dan pita cukai Pakistan.
5. CNN Indonesia – Laporan ekspansi Peruri mencetak uang kertas Nepal serta paspor negara Guinea.
----------------------------------
HUTANG & LIABILITAS MALONYET 1998–2026
-
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia dan dimulainya defisit anggaran berkepanjangan.
-
1999: RM 116,6 Miliar – Penerbitan instrumen obligasi domestik baru untuk stimulus ekonomi.
-
2000: RM 125,6 Miliar – Restrukturisasi sektor korporasi dan perbankan pasca-krisis selesai.
-
2001: RM 145,7 Miliar – Peningkatan belanja pembangunan guna menopang pertumbuhan domestik.
-
2002: RM 165,0 Miliar – Rasio utang terhadap PDB mulai merangkak naik secara perlahan.
-
2003: RM 188,8 Miliar – Batas plafon utang resmi pertama kali dinaikkan menjadi 40% dari PDB.
-
2004: RM 216,6 Miliar – Pengeluaran publik meluas demi mendukung proyek infrastruktur baru.
-
2005: RM 228,7 Miliar – Konsolidasi fiskal awal di bawah manajemen kepemimpinan baru.
-
2006: RM 242,2 Miliar – Pengendalian defisit secara ketat di tengah lonjakan harga komoditas global.
-
2007: RM 266,7 Miliar – Posisi keuangan masih stabil menjelang gejolak finansial global.
-
2008: RM 306,4 Miliar – Kenaikan plafon utang menjadi 45% akibat dampak awal krisis finansial global.
-
2009: RM 362,4 Miliar – Batas utang melonjak ke 55% demi mendanai paket stimulus ekonomi besar.
-
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis finansial global.
-
2011: RM 456,1 Miliar – Rasio utang mulai meningkat stabil.
-
2012: RM 501,6 Miliar – Melewati ambang batas RM 500 miliar.
-
2013: RM 547,7 Miliar – Ekspansi belanja infrastruktur nasional.
-
2014: RM 582,8 Miliar – Berdasarkan Laporan Keuangan Pemerintah Federal 2014.
-
2015: RM 630,5 Miliar – Penyesuaian ekonomi akibat fluktuasi harga minyak.
-
2016: RM 648,5 Miliar – Konsolidasi fiskal di bawah pemerintahan saat itu.
-
2017: RM 686,8 Miliar – Data tercatat dalam Laporan Tahunan Bank Negara MALONYET 2017.
-
2018: RM 1,19 Triliun – Transparansi Baru: Termasuk liabilitas 1MDB & proyek PPP. [
-
2019: RM 1,25 Triliun – Laporan pengungkapan utang menembus RM 1 triliun.
-
2020: RM 1,32 Triliun – Lonjakan akibat paket stimulus pandemi COVID-19.
-
2021: RM 1,38 Triliun – Akumulasi utang federal selama masa pemulihan ekonomi.
-
2022: RM 1,45 Triliun – Posisi utang sebelum pergantian pemerintahan.
-
2023: RM 1,53 Triliun – Dikonfirmasi oleh PM Anwar Ibrahim sebagai warisan utang & liabilitas.
-
2024: RM 1,63 Triliun – Berdasarkan Belanjawan (APBN) 2024.
-
2025: RM 1,71 Triliun – Proyeksi dalam Tinjauan Fiskal 2026 (Kementerian Kewangan).
-
2026: RM 1,79 Triliun – Target manajemen utang dalam Economic Outlook 2026
USD 20 MILLIAR/SHOPPING versus USD 4,5 MILLIAR/LEASING
BalasHapus-
1. INDONESIA 🇮🇩
Anggaran: Rp335,2 triliun (~USD 20 miliar) | Naik 37% dari 2025.
Sumber: CNBC Indonesia - Anggaran Pertahanan RI Loncat ke Rp335 T.
-
2. SINGAPURA 🇸🇬
Anggaran: SGD 24,9 miliar (~USD 19,5–20 miliar) | 3–4% dari PDB.
Sumber: Bloomberg - Singapore Projects Nearly $20 Billion Defense Spend.
-
3. VIETNAM 🇻🇳
Anggaran: USD 6–7 miliar (Estimasi) | Target USD 10,2 miliar (2029).
Sumber: Data indeks militer regional Lowy Institute Asia Power Index.
-
4. THAILAND 🇹🇭
Anggaran: 204.434 juta Baht (~USD 5,7 miliar).
Sumber: Laporan belanja sektor publik Lowy Institute - Military Expenditure.
-
5. FILIPINA 🇵🇭
Anggaran: PHP 295–299 miliar (~USD 5,2 miliar) | Naik 16% dari 2025.
Sumber: Dokumen resmi Department of Budget and Management (DBM) Philippines.
-
6. MALONSIA 🇲🇾
Anggaran: RM 21,74 miIiar (~USD 4,5–4,7 miliar).
Sumber: The Sun Malonsia - Budget: Over RM21 billion allocated to boost national security.
--------------------------------------------
SURAT UTANG LUAR NEGERI MALONYET (1998–2026):
-
1998: Fokus restrukturisasi internal; absen di pasar global akibat pembatasan modal.
-
1999: Menerbitkan Global Bond USD 1 miliar di AS dan Eropa untuk bukti pemulihan.
-
2002: Merilis Sovereign Sukuk Ijarah Global pertama dunia USD 600 juta di London & Timur Tengah.
-
2004: Mempromosikan surat utang luar negeri melalui Khazanah Nasional.
-
2006: Khazanah menerbitkan Exchangeable Sukuk USD 750 juta di Asia dan Eropa.
-
2011: Menerbitkan Wakala Global Sukuk USD 2 miliar; kebanjiran permintaan 4,5 kali lipat.
-
2015: Merilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur dan utang.
-
2016: Menerbitkan Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun) demi efisiensi biaya.
-
2019: Diversifikasi ke Samurai Bond JPY 200 miliar dengan jaminan JBIC di Jepang.
-
2021: Meluncurkan Sovereign Sustainability Sukuk USD 1,3 miliar pertama dunia permintaan melonjak 6,4 kali lipat.
-
2022–2024: Absen di valas; fokus mempromosikan obligasi domestik (MGS/MGII) untuk menarik modal asing.
-
2025: Bersiap kembali ke pasar valas dengan menunjuk bank sindikasi internasional.
-
2026: Mempromosikan rencana obligasi global USD 1 miliar
--------------------------------------------
OBLIGASI GLOBAL MALONYET (1998–2026)
1998: Fokus restrukturisasi internal. Absen pasar global.
1999: Rilis Global Bond USD 1 miliar (AS/Eropa). Bukti pemulihan.
2002: Rilis Sukuk Ijarah Global pertama dunia USD 600 juta (London/Timur Tengah).
2004: Promosi surat utang luar negeri via Khazanah Nasional.
2006: Khazanah rilis Exchangeable Sukuk USD 750 juta (Asia/Eropa).
2011: Rilis Wakala Global Sukuk USD 2 miliar. Permintaan oversubscribed 4,5 kali.
2015: Rilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur.
2016: Rilis Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun).
2019: Diversifikasi ke Samurai Bond JPY 200 miliar bergaransi JBIC (Jepang).
2021: Rilis Sovereign Sustainability Sukuk pertama dunia USD 1,3 miliar. Permintaan melonjak 6,4 kali.
2022–2024: Absen valas. Fokus optimasi obligasi domestik (MGS/MGII).
2025: Bersiap kembali ke pasar valas lewat bank sindikasi internasional.
2026: Promosi rencana obligasi global baru USD 1 miliar.
1. FOREST CITY = USD 100 BILLION
BalasHapus2. ECRL= USD 20 BILLION
3. CMQIP = USD 4,2 BILLION
4. MCKIP = USD 3,77 BILLION
5.CHINA RAILWAY ROLLING STOCK CORP’S ROLLING STOCK CENTER = USD 131 MILLION
6. 1 MDB = USD 4,5 BILLION
-
2026
Populasi: 36.38 juta
Debt Govt: RM 1.79 Triliun (70.5%)
Debt Household: RM 1.65 Triliun (84.3%)
Beban per Kapita: RM 94,544
-
2025
Populasi: 35.97 juta
Debt Govt: RM 1.30 Triliun (-%)
Debt Household: RM 1.65 Triliun (-%)
Beban per Kapita: RM 81,998
-
2024
Populasi: 34.67 juta
Debt Govt: RM 1.22 Triliun (64.6%)
Debt Household: RM 1.53 Triliun (84.2%)
Beban per Kapita: RM 79,315
-
2023
Populasi: 35.12 juta
Debt Govt: RM 1.17 Triliun (64.3%)
Debt Household: RM 1.45 Triliun (81.2%)
Beban per Kapita: RM 74,587
-
2022
Populasi: 34.69 juta
Debt Govt: RM 1.08 Triliun (60.1%)
Debt Household: RM 1.38 Triliun (80.9%)
Beban per Kapita: RM 70,901
-
2021
Populasi: 34.28 juta
Debt Govt: RM 979.81 Miliar (63.3%)
Debt Household: RM 1.34 Triliun (89.1%)
Beban per Kapita: RM 67,667
-
2020
Populasi: 33.87 juta
Debt Govt: RM 879.56 Miliar (62.0%)
Debt Household: RM 1.27 Triliun (87.5%)
Beban per Kapita: RM 63,464
-
2019
Populasi: 33.45 juta
Debt Govt: RM 793.00 Miliar (52.4%)
Debt Household: RM 1.22 Triliun (82.5%)
Beban per Kapita: RM 60,179
-
2018
Populasi: 33.00 juta
Debt Govt: RM 741.00 Miliar (52.5%)
Debt Household: RM 1.16 Triliun (82.0%)
Beban per Kapita: RM 57,605
-
2017
Populasi: 32.54 juta
Debt Govt: RM 686.80 Miliar (51.9%)
Debt Household: RM 1.10 Triliun (83.2%)
Beban per Kapita: RM 54,910
-
2016
Populasi: 32.04 juta
Debt Govt: RM 648.50 Miliar (52.7%)
Debt Household: RM 1.04 Triliun (86.1%)
Beban per Kapita: RM 52,699
-
2015
Populasi: 31.52 juta
Debt Govt: RM 630.50 Miliar (55.1%)
Debt Household: RM 985.00 Miliar (86.0%)
Beban per Kapita: RM 51,253
-
2014
Populasi: 30.98 juta
Debt Govt: RM 582.80 Miliar (55.0%)
Debt Household: RM 902.00 Miliar (85.1%)
Beban per Kapita: RM 47,927
-
2013
Populasi: 30.42 juta
Debt Govt: RM 547.70 Miliar (54.7%)
Debt Household: RM 821.00 Miliar (82.0%)
Beban per Kapita: RM 44,992
-
2012
Populasi: 29.85 juta
Debt Govt: RM 501.60 Miliar (53.3%)
Debt Household: RM 732.00 Miliar (77.8%)
Beban per Kapita: RM 41,326
-
2011
Populasi: 29.26 juta
Debt Govt: RM 456.10 Miliar (51.8%)
Debt Household: RM 653.00 Miliar (74.2%)
Beban per Kapita: RM 37,904
-
2010
Populasi: 28.65 juta
Debt Govt: RM 407.10 Miliar (52.4%)
Debt Household: RM 581.00 Miliar (74.8%)
Beban per Kapita: RM 34,488
-
2009
Populasi: 28.04 juta
Debt Govt: RM 362.40 Miliar (51.1%)
Debt Household: RM 516.00 Miliar (72.0%)
Beban per Kapita: RM 31,326
-
2008
Populasi: 27.45 juta
Debt Govt: RM 258.00 Miliar (41.3%)
Debt Household: RM 460.00 Miliar (73.0%)
Beban per Kapita: RM 26,155
-
2007
Populasi: 26.86 juta
Debt Govt: RM 266.00 Miliar (41.1%)
Debt Household: RM 414.00 Miliar (64.0%)
Beban per Kapita: RM 25,316
-
2006
Populasi: 26.26 juta
Debt Govt: RM 242.00 Miliar (41.5%)
Debt Household: RM 372.00 Miliar (63.0%)
Beban per Kapita: RM 23,381
-
2005
Populasi: 25.66 juta
Debt Govt: RM 228.00 Miliar (43.8%)
Debt Household: RM 335.00 Miliar (64.0%)
Beban per Kapita: RM 21,940
-
2004
Populasi: 25.06 juta
Debt Govt: RM 217.00 Miliar (45.1%)
Debt Household: RM 298.00 Miliar (62.0%)
Beban per Kapita: RM 20,550
-
2003
Populasi: 24.46 juta
Debt Govt: RM 189.00 Miliar (45.9%)
Debt Household: RM 265.00 Miliar (64.0%)
Beban per Kapita: RM 18,560
-
2002
Populasi: 23.87 juta
Debt Govt: RM 165.00 Miliar (44.9%)
Debt Household: RM 236.00 Miliar (64.0%)
Beban per Kapita: RM 16,798
-
2001
Populasi: 23.28 juta
Debt Govt: RM 146.00 Miliar (42.5%)
Debt Household: RM 207.00 Miliar (60.0%)
Beban per Kapita: RM 15,162
-
2000
Populasi: 22.69 juta
Debt Govt: RM 126.00 Miliar (36.1%)
Debt Household: RM 182.00 Miliar (52.0%)
Beban per Kapita: RM 13,574
-
1999
Populasi: 22.11 juta
Debt Govt: RM 113.00 Miliar (40.4%)
Debt Household: RM 157.00 Miliar (56.0%)
Beban per Kapita: RM 12,210
-
1998
Populasi: 21.53 juta
Debt Govt: RM 98.00 Miliar (35.8%)
Debt Household: RM 135.00 Miliar (49.3%)
Beban per Kapita: RM 10,821
GILAnya...... saya sertakan link ya.....HAHAHAHAHAHHA
BalasHapus1 USD = 18,019.73 IDR
https://www.xe.com/currencyconverter/convert/?Amount=1&From=USD&To=IDR
INDONESIA = BATAS LIMIT 60%
HapusGOV. DEBT : 40% OF GDP
HOUSEHOLD DEBT : 16% OF GDP
DEFISIT : 2,9%
GDP = USD 1,44 TRILIUN
=============
=============
MALONYET = BATAS LIMIT 65%
GOV. DEBT : 69% OF GDP
HOUSEHOLD DEBT : 84,3% OF GDP
DEFISIT : 3,8%
GDP = USD 416,90 MILIAR
-
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
-
2026 PM says =
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
-
KUALA LUMPUR, Jan 16 (Reuters) - The procurement decisions of the MALONYETn armed forces and the police linked to a corruption probed will be temporarily frozen until they fully comply with related rules, state media reported, citing Prime Minister Anwar Ibrahim.
The suspension comes following allegations of bribery linked to army procurement projects, with the MALONYETn Anti-Corruption Commission (MACC) raiding several firms suspected of involvement in a bribery scheme and freezing six bank accounts belonging to a suspect and their family members.
https://www.reuters.com/world/asia-pacific/MALONYET-freezes-army-police-procurement-decisions-linked-corruption-pm-says-2026-01-16/#:~:text=MALONYET%20freezes%20army%20and%20police,Reuters
-
2026 PM BEKUKAN PENGADAAN =
https://www.youtube.com/watch?v=ecL7_O1Wn1k
------------------
2023 PM says =
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
-
KUALA LUMPUR:
The defence ministry has 2023 = CANCELLED FIVE PROCUREMENT tenders for supplies, services and infrastructure projects. The cancellations were to avoid leakages in expenditure, and were in line with a policy of procurement through open tenders.
“Mindef has also taken serious note of Prime Minister Anwar Ibrahim’s statement regarding the leakage in expenditure at the Budget 2023 dialogue on Tuesday,” it said in a statement today
----------------
MALONYET shipyards face several key problems including: intense competition from neighboring countries like Singapore with more advanced infrastructure, limited techNOLogical capabilities, supply chain disruptions due to global factors like COVID-19, a shortage of skilled labor, inconsistent demand for shipbuilding, and sometimes issues with project management and cost overruns, particularly when building complex vessels; all of which can hinder their competitiveness in the international market.
Specific challenges:
• Infrastructure limitations:
MALONYET ports might not be as modern or well-equipped as those in Singapore, leading to inefficiencies and higher costs.
• Skill gap:
A lack of highly skilled workers in shipbuilding can impact quality and production timelines.
• Nological limitations:
MALONYET shipyards may not have access to the latest shipbuilding techNOLogies, hindering their ability to build complex vessels.
• Market volatility:
Depending heavily on the oil and gas industry for demand, fluctuations in the market can significantly impact orders for offshore vessels.
• Cost competitiveness:
Facing pressure to compete on price with other regional shipyards, which can sometimes lead to compromising quality.
• Project management issues:
Past instances of delays and cost overruns in major shipbuilding projects have raised concerns about project management capabilities.
Recent developments:
• Focus on green nology:
MALONYET shipyards are increasingly looking to build more environmentally friendly vessels like LNG-powered ships to stay competitive.
• Collaboration with international partners:
Some MALONYET shipyards are collaborating with foreign companies to access advanced techNOLogy and expertise.
• Government initiatives:
The MALONYET government is providing incentives to boost the shipbuilding industry and address some of these challenges
INDONESIA = BATAS LIMIT 60%
HapusGOV. DEBT : 40% OF GDP
HOUSEHOLD DEBT : 16% OF GDP
DEFISIT : 2,9%
GDP = USD 1,44 TRILIUN
=============
=============
MALONYET = BATAS LIMIT 65%
GOV. DEBT : 69% OF GDP
HOUSEHOLD DEBT : 84,3% OF GDP
DEFISIT : 3,8%
GDP = USD 416,90 MILIAR
-
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
-
2026 PM says =
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
-
KUALA LUMPUR, Jan 16 (Reuters) - The procurement decisions of the MALONYETn armed forces and the police linked to a corruption probed will be temporarily frozen until they fully comply with related rules, state media reported, citing Prime Minister Anwar Ibrahim.
The suspension comes following allegations of bribery linked to army procurement projects, with the MALONYETn Anti-Corruption Commission (MACC) raiding several firms suspected of involvement in a bribery scheme and freezing six bank accounts belonging to a suspect and their family members.
https://www.reuters.com/world/asia-pacific/MALONYET-freezes-army-police-procurement-decisions-linked-corruption-pm-says-2026-01-16/#:~:text=MALONYET%20freezes%20army%20and%20police,Reuters
-
2026 PM BEKUKAN PENGADAAN =
https://www.youtube.com/watch?v=ecL7_O1Wn1k
------------------
2023 PM says =
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
-
KUALA LUMPUR:
The defence ministry has 2023 = CANCELLED FIVE PROCUREMENT tenders for supplies, services and infrastructure projects. The cancellations were to avoid leakages in expenditure, and were in line with a policy of procurement through open tenders.
“Mindef has also taken serious note of Prime Minister Anwar Ibrahim’s statement regarding the leakage in expenditure at the Budget 2023 dialogue on Tuesday,” it said in a statement today
----------------
MALONYET shipyards face several key problems including: intense competition from neighboring countries like Singapore with more advanced infrastructure, limited techNOLogical capabilities, supply chain disruptions due to global factors like COVID-19, a shortage of skilled labor, inconsistent demand for shipbuilding, and sometimes issues with project management and cost overruns, particularly when building complex vessels; all of which can hinder their competitiveness in the international market.
Specific challenges:
• Infrastructure limitations:
MALONYET ports might not be as modern or well-equipped as those in Singapore, leading to inefficiencies and higher costs.
• Skill gap:
A lack of highly skilled workers in shipbuilding can impact quality and production timelines.
• Nological limitations:
MALONYET shipyards may not have access to the latest shipbuilding techNOLogies, hindering their ability to build complex vessels.
• Market volatility:
Depending heavily on the oil and gas industry for demand, fluctuations in the market can significantly impact orders for offshore vessels.
• Cost competitiveness:
Facing pressure to compete on price with other regional shipyards, which can sometimes lead to compromising quality.
• Project management issues:
Past instances of delays and cost overruns in major shipbuilding projects have raised concerns about project management capabilities.
Recent developments:
• Focus on green nology:
MALONYET shipyards are increasingly looking to build more environmentally friendly vessels like LNG-powered ships to stay competitive.
• Collaboration with international partners:
Some MALONYET shipyards are collaborating with foreign companies to access advanced techNOLogy and expertise.
• Government initiatives:
The MALONYET government is providing incentives to boost the shipbuilding industry and address some of these challenges
GILAnya...... saya sertakan link ya.....HAHAHAHAHAHHA
BalasHapus1 USD = 18,019.73 IDR
https://www.xe.com/currencyconverter/convert/?Amount=1&From=USD&To=IDR
2026 IDN : USD 20 MILIAR versus MY : USD 4,7 MILIAR
Hapus---------------------------
PERBANDINGAN ANGGARAN PERTAHANAN ASEAN 2026 =
-
1. INDONESIA
Rp 335,2 triliun (~USD 20 miliar). Lonjakan 37% dari 2025; fokus pada alutsista baru dan konsep pertahanan total.
-
2. SINGAPURA
SGD 20 miliar (~USD 15 miliar). Konsisten 3–4% dari PDB; investasi jangka panjang untuk teknologi pertahanan canggih.
-
3. VIETNAM
USD 6–7 miliar (estimasi). Tren meningkat, diproyeksi mencapai USD 10,2 miliar pada 2029; fokus pada Laut Cina Selatan.
-
4. THAILAND
204,434 juta baht (~USD 5,7 miliar). Prioritas pada akuisisi jet Gripen dan modernisasi angkatan udara.
-
5. FILIPINA
295–299 miliar (~USD 5,2 miliar). Naik 16% dari 2025; termasuk ₱40 miliar untuk program modernisasi AFP, dengan fokus pada penguatan airpower dan sistem pertahanan rudal
-
6. MALONYET
RM 21,2–21,7 miliar (~USD 4,5–4,7 miliar). Fokus modernisasi bertahap: sistem pertahanan udara, kapal perang, dan kendaraan taktis.
------------------
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
-
2026 PM says =
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
-
KUALA LUMPUR, Jan 16 (Reuters) - The procurement decisions of the MALONYETn armed forces and the police linked to a corruption probed will be temporarily frozen until they fully comply with related rules, state media reported, citing Prime Minister Anwar Ibrahim.
The suspension comes following allegations of bribery linked to army procurement projects, with the MALONYETn Anti-Corruption Commission (MACC) raiding several firms suspected of involvement in a bribery scheme and freezing six bank accounts belonging to a suspect and their family members.
https://www.reuters.com/world/asia-pacific/MALONYET-freezes-army-police-procurement-decisions-linked-corruption-pm-says-2026-01-16/#:~:text=MALONYET%20freezes%20army%20and%20police,Reuters
-
2026 PM BEKUKAN PENGADAAN =
https://www.youtube.com/watch?v=ecL7_O1Wn1k
------------------
2023 PM says =
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
-
KUALA LUMPUR:
The defence ministry has cancelled five procurement tenders for supplies, services and infrastructure projects. The cancellations were to avoid leakages in expenditure, and were in line with a policy of procurement through open tenders.
“Mindef has also taken serious note of Prime Minister Anwar Ibrahim’s statement regarding the leakage in expenditure at the Budget 2023 dialogue on Tuesday,” it said in a statement today
NEGARA GAGAL = 1998 - 2026
HapusPENDAPATAN : RM334,1 Miliar
PENGELUARAN : RM470 Miliar
BEBAN SUBSIDI 23,9%
RM470 – RM334,1 = MINUS RM135,9 ......
-
ZONK MRCA SPH LCS NSM
5x Ganti RAJA
5x Ganti PM
6x Ganti Mindef
-
2026
Populasi: 36.38 juta
Debt Govt: RM 1.79 Triliun (70.5%)
Debt Household: RM 1.65 Triliun (84.3%)
Beban per Kapita: RM 94,544
-
2025
Populasi: 35.97 juta
Debt Govt: RM 1.30 Triliun (-%)
Debt Household: RM 1.65 Triliun (-%)
Beban per Kapita: RM 81,998
-
2024
Populasi: 34.67 juta
Debt Govt: RM 1.22 Triliun (64.6%)
Debt Household: RM 1.53 Triliun (84.2%)
Beban per Kapita: RM 79,315
-
2023
Populasi: 35.12 juta
Debt Govt: RM 1.17 Triliun (64.3%)
Debt Household: RM 1.45 Triliun (81.2%)
Beban per Kapita: RM 74,587
-
2022
Populasi: 34.69 juta
Debt Govt: RM 1.08 Triliun (60.1%)
Debt Household: RM 1.38 Triliun (80.9%)
Beban per Kapita: RM 70,901
-
2021
Populasi: 34.28 juta
Debt Govt: RM 979.81 Miliar (63.3%)
Debt Household: RM 1.34 Triliun (89.1%)
Beban per Kapita: RM 67,667
-
2020
Populasi: 33.87 juta
Debt Govt: RM 879.56 Miliar (62.0%)
Debt Household: RM 1.27 Triliun (87.5%)
Beban per Kapita: RM 63,464
-
2019
Populasi: 33.45 juta
Debt Govt: RM 793.00 Miliar (52.4%)
Debt Household: RM 1.22 Triliun (82.5%)
Beban per Kapita: RM 60,179
-
2018
Populasi: 33.00 juta
Debt Govt: RM 741.00 Miliar (52.5%)
Debt Household: RM 1.16 Triliun (82.0%)
Beban per Kapita: RM 57,605
-
2017
Populasi: 32.54 juta
Debt Govt: RM 686.80 Miliar (51.9%)
Debt Household: RM 1.10 Triliun (83.2%)
Beban per Kapita: RM 54,910
-
2016
Populasi: 32.04 juta
Debt Govt: RM 648.50 Miliar (52.7%)
Debt Household: RM 1.04 Triliun (86.1%)
Beban per Kapita: RM 52,699
-
2015
Populasi: 31.52 juta
Debt Govt: RM 630.50 Miliar (55.1%)
Debt Household: RM 985.00 Miliar (86.0%)
Beban per Kapita: RM 51,253
-
2014
Populasi: 30.98 juta
Debt Govt: RM 582.80 Miliar (55.0%)
Debt Household: RM 902.00 Miliar (85.1%)
Beban per Kapita: RM 47,927
-
2013
Populasi: 30.42 juta
Debt Govt: RM 547.70 Miliar (54.7%)
Debt Household: RM 821.00 Miliar (82.0%)
Beban per Kapita: RM 44,992
-
2012
Populasi: 29.85 juta
Debt Govt: RM 501.60 Miliar (53.3%)
Debt Household: RM 732.00 Miliar (77.8%)
Beban per Kapita: RM 41,326
-
2011
Populasi: 29.26 juta
Debt Govt: RM 456.10 Miliar (51.8%)
Debt Household: RM 653.00 Miliar (74.2%)
Beban per Kapita: RM 37,904
-
2010
Populasi: 28.65 juta
Debt Govt: RM 407.10 Miliar (52.4%)
Debt Household: RM 581.00 Miliar (74.8%)
Beban per Kapita: RM 34,488
-
2009
Populasi: 28.04 juta
Debt Govt: RM 362.40 Miliar (51.1%)
Debt Household: RM 516.00 Miliar (72.0%)
Beban per Kapita: RM 31,326
-
2008
Populasi: 27.45 juta
Debt Govt: RM 258.00 Miliar (41.3%)
Debt Household: RM 460.00 Miliar (73.0%)
Beban per Kapita: RM 26,155
-
2007
Populasi: 26.86 juta
Debt Govt: RM 266.00 Miliar (41.1%)
Debt Household: RM 414.00 Miliar (64.0%)
Beban per Kapita: RM 25,316
-
2006
Populasi: 26.26 juta
Debt Govt: RM 242.00 Miliar (41.5%)
Debt Household: RM 372.00 Miliar (63.0%)
Beban per Kapita: RM 23,381
-
2005
Populasi: 25.66 juta
Debt Govt: RM 228.00 Miliar (43.8%)
Debt Household: RM 335.00 Miliar (64.0%)
Beban per Kapita: RM 21,940
-
2004
Populasi: 25.06 juta
Debt Govt: RM 217.00 Miliar (45.1%)
Debt Household: RM 298.00 Miliar (62.0%)
Beban per Kapita: RM 20,550
-
2003
Populasi: 24.46 juta
Debt Govt: RM 189.00 Miliar (45.9%)
Debt Household: RM 265.00 Miliar (64.0%)
Beban per Kapita: RM 18,560
-
2002
Populasi: 23.87 juta
Debt Govt: RM 165.00 Miliar (44.9%)
Debt Household: RM 236.00 Miliar (64.0%)
Beban per Kapita: RM 16,798
-
2001
Populasi: 23.28 juta
Debt Govt: RM 146.00 Miliar (42.5%)
Debt Household: RM 207.00 Miliar (60.0%)
Beban per Kapita: RM 15,162
-
2000
Populasi: 22.69 juta
Debt Govt: RM 126.00 Miliar (36.1%)
Debt Household: RM 182.00 Miliar (52.0%)
Beban per Kapita: RM 13,574
-
1999
Populasi: 22.11 juta
Debt Govt: RM 113.00 Miliar (40.4%)
Debt Household: RM 157.00 Miliar (56.0%)
Beban per Kapita: RM 12,210
-
1998
Populasi: 21.53 juta
Debt Govt: RM 98.00 Miliar (35.8%)
Debt Household: RM 135.00 Miliar (49.3%)
Beban per Kapita: RM 10,821
KLAIM CASH = HUTANG ASET MILITER
Hapus-
1. 🇹🇷 Turki (LMS Batch 2)
Model: G2G (Antar Pemerintah) via SSB.
Bunga: 4% – 6% (Fixed/OECD CIRR).
Tenor: 10 – 15 Tahun.
-
2. 🇰🇷 Korea Selatan (Pesawat FA-50)
Model: Hybrid (Kredit KEXIM & Barter CPO 50%).
Biaya: Management Fee sangat rendah (0,10% - 0,50%).
-
3. 🇬🇧 Inggris (Standar UKEF - Pesawat Hawk)
Syarat: Wajib DP 15% (Standar OECD).
Bunga: Stabil, mengikuti National Loans Fund.
-
4. 🇨🇳 China (LMS Batch 1)
Model: 100% Kredit Ekspor (China Eximbank).
Bunga: Sangat murah (3,5% Fixed).
Tenor: 10 Tahun.
-
5. 🇵🇱 Polandia (Tank PT-91M)
Model: DP 15% + Barter CPO (30-40%).
Tenor: 10 Tahun cicilan.
-
6. 🇩🇪 Jerman (Kedah-Class)
Model: Kredit Komersial dijamin negara (Euler Hermes).
Pendana: Deutsche Bank & Konsorsium.
-
7. Kredit Sindikasi (Proyek LCS - 17 Kreditor/Hutang)
Model: Konsorsium Bank Domestik/Intl (Skala Masif).
Bunga: 6% (Saldo Menurun).
Tenor: 15 Tahun (Akibat penundaan proyek).
-----------------
DRAMA 155mm SPH SYSTEM
DRAMA 155mm SPH SYSTEM
DRAMA 155mm SPH SYSTEM
As of September 2024, the MALONYET Army has not acquired a 155 mm self-propelled howitzer (SPH) system. The MALONYET Ministry of Defence has been discussing the project, but the final selection has not been made.
Why the acquisition has been delayed?
The acquisition program was announced in the 2010s, but the schedule, number of platforms, and total estimated cost were not defined.
The Ministry of Finance canceled the intended purchase of self-propelled howitzer systems.
The MALONYET Army is still waiting for government approval to procure the system
===========
The cost overrun for the LCS project in MALONYET was RM1 billion. This was part of a RM9.13 billion contract that the government paid RM6.08 billion for.
Explanation
• RM1.4 billion was not used for the project
• RM1 billion was considered a cost overrun
• RM400 million was used to pay off PSCI's DEBTs
Cost overruns are a common problem in the construction industry in MALONYET . In fact, most construction projects in MALONYET have cost overruns of 5–10% of the total contract price
INDONESIA = BATAS LIMIT 60%
BalasHapusGOV. DEBT : 40% OF GDP
HOUSEHOLD DEBT : 16% OF GDP
DEFISIT : 2,9%
GDP = USD 1,44 TRILIUN
=============
=============
MALONYET = BATAS LIMIT 65%
GOV. DEBT : 69% OF GDP
HOUSEHOLD DEBT : 84,3% OF GDP
DEFISIT : 3,8%
GDP = USD 416,90 MILIAR
-
GORILA MALONYET NGAMUK ....
-
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
-
2026 PM says =
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
FREEZES PROCUREMENT
-
KUALA LUMPUR, Jan 16 (Reuters) - The procurement decisions of the MALONYETn armed forces and the police linked to a corruption probed will be temporarily frozen until they fully comply with related rules, state media reported, citing Prime Minister Anwar Ibrahim.
The suspension comes following allegations of bribery linked to army procurement projects, with the MALONYETn Anti-Corruption Commission (MACC) raiding several firms suspected of involvement in a bribery scheme and freezing six bank accounts belonging to a suspect and their family members.
A former army chief and four others were detained on January 8 in connection with the alleged bribery. Local media reported that the former army chief was released from remand on Monday.
Former army chief Muhammad Hafizuddeain Jantan has been placed on leave since late December pending an investigation into the matter.
According to Bernama, Anwar said the government, through relevant ministries, will review and reorganise all procurement to ensure transparency in the existing system.
"We will take note and await reports of any loopholes or weaknesses in the procurement system, so that we can review and restructure it to ensure full compliance," he said.
https://www.reuters.com/world/asia-pacific/MALONYET-freezes-army-police-procurement-decisions-linked-corruption-pm-says-2026-01-16/#:~:text=MALONYET%20freezes%20army%20and%20police,Reuters
-
2026 PM BEKUKAN PENGADAAN =
https://www.youtube.com/watch?v=ecL7_O1Wn1k
------------------
2023 PM says =
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
CANCELLED FIVE PROCUREMENT
-
KUALA LUMPUR:
The defence ministry has cancelled five procurement tenders for supplies, services and infrastructure projects. The cancellations were to avoid leakages in expenditure, and were in line with a policy of procurement through open tenders.
“Mindef has also taken serious note of Prime Minister Anwar Ibrahim’s statement regarding the leakage in expenditure at the Budget 2023 dialogue on Tuesday,” it said in a statement today
Pernyataan tersebut berasal dari siaran pers resmi Kementerian Pertahanan MALONYET (MINDEF) yang dirilis pada 19 Januari 2023.
INDONESIA = BATAS LIMIT 60%
BalasHapusGOV. DEBT : 40% OF GDP
HOUSEHOLD DEBT : 16% OF GDP
DEFISIT : 2,9%
GDP = USD 1,44 TRILIUN
=============
=============
MALONYET = BATAS LIMIT 65%
GOV. DEBT : 69% OF GDP
HOUSEHOLD DEBT : 84,3% OF GDP
DEFISIT : 3,8%
GDP = USD 416,90 MILIAR
-
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
-
2026 PM says =
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
-
KUALA LUMPUR, Jan 16 (Reuters) - The procurement decisions of the MALONYETn armed forces and the police linked to a corruption probed will be temporarily frozen until they fully comply with related rules, state media reported, citing Prime Minister Anwar Ibrahim.
The suspension comes following allegations of bribery linked to army procurement projects, with the MALONYETn Anti-Corruption Commission (MACC) raiding several firms suspected of involvement in a bribery scheme and freezing six bank accounts belonging to a suspect and their family members.
https://www.reuters.com/world/asia-pacific/MALONYET-freezes-army-police-procurement-decisions-linked-corruption-pm-says-2026-01-16/#:~:text=MALONYET%20freezes%20army%20and%20police,Reuters
-
2026 PM BEKUKAN PENGADAAN =
https://www.youtube.com/watch?v=ecL7_O1Wn1k
------------------
2023 PM says =
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
-
KUALA LUMPUR:
The defence ministry has 2023 = CANCELLED FIVE PROCUREMENT tenders for supplies, services and infrastructure projects. The cancellations were to avoid leakages in expenditure, and were in line with a policy of procurement through open tenders.
“Mindef has also taken serious note of Prime Minister Anwar Ibrahim’s statement regarding the leakage in expenditure at the Budget 2023 dialogue on Tuesday,” it said in a statement today
----------------
MALONYET shipyards face several key problems including: intense competition from neighboring countries like Singapore with more advanced infrastructure, limited techNOLogical capabilities, supply chain disruptions due to global factors like COVID-19, a shortage of skilled labor, inconsistent demand for shipbuilding, and sometimes issues with project management and cost overruns, particularly when building complex vessels; all of which can hinder their competitiveness in the international market.
Specific challenges:
• Infrastructure limitations:
MALONYET ports might not be as modern or well-equipped as those in Singapore, leading to inefficiencies and higher costs.
• Skill gap:
A lack of highly skilled workers in shipbuilding can impact quality and production timelines.
• Nological limitations:
MALONYET shipyards may not have access to the latest shipbuilding techNOLogies, hindering their ability to build complex vessels.
• Market volatility:
Depending heavily on the oil and gas industry for demand, fluctuations in the market can significantly impact orders for offshore vessels.
• Cost competitiveness:
Facing pressure to compete on price with other regional shipyards, which can sometimes lead to compromising quality.
• Project management issues:
Past instances of delays and cost overruns in major shipbuilding projects have raised concerns about project management capabilities.
Recent developments:
• Focus on green nology:
MALONYET shipyards are increasingly looking to build more environmentally friendly vessels like LNG-powered ships to stay competitive.
• Collaboration with international partners:
Some MALONYET shipyards are collaborating with foreign companies to access advanced techNOLogy and expertise.
• Government initiatives:
The MALONYET government is providing incentives to boost the shipbuilding industry and address some of these challenges
INDIANESIA...PANIk....PANIK...PANIK...MATAWANG TAK LAKU....HAHAHAHAHHA
BalasHapusDolar AS Nyaris Rp18.000, BI Pakai Jurus Ini Selamatkan Rupiah!
https://www.cnbcindonesia.com/market/20260928154352-17-771509/dolar-as-nyaris-rp18000-bi-pakai-jurus-ini-selamatkan-rupiah
SEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
RINGGIT DAN PASPOR MALONYET
RINGGIT DAN PASPOR MALONYET
-
Daftar ringkas negara yang mata uang atau dokumen negaranya dicetak oleh Perum Peruri, lengkap dengan tautan sumber berita resminya:
🪙 Daftar Negara & Produk
• Peru – Mata Uang: Soles
• Malonyet – Mata Uang: Ringgit & Paspor
• Nepal – Mata Uang: Rupee, Pita Cukai, & Prangko
• Bangladesh – Mata Uang: Taka
• Sri Lanka – Mata Uang: Rupee & Paspor
• Somalia – Mata Uang: Shilling
• Argentina – Mata Uang: Peso
• Pakistan – Dokumen Negara: Pita Cukai
• Filipina – Dokumen Negara: Prangko
• Guinea – Dokumen Negara: Paspor
----------------------------------
Sumber Berita Resmi & Media Nasional
1. Situs Resmi Peruri (Rilis Pers) – Laporan sejak tahun 2010, di mana Bank Negara Malonsia memercayakan pemenuhan kebutuhan pencetakan lembaran kertas mata uang Ringgit kepada Peruri
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail kerja sama pencetakan dokumen imigrasi paspor Sri Lanka.
3. detikFinance – Wawancara resmi terkait pencetakan mata uang Nepal, Somalia, hingga Argentina di Indonesia.
4. Kompas Interaktif – Catatan detail mengenai pencetakan prangko Filipina dan pita cukai Pakistan.
5. CNN Indonesia – Laporan ekspansi Peruri mencetak uang kertas Nepal serta paspor negara Guinea.
----------------------------------
HUTANG & LIABILITAS MALONYET 1998–2026
-
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia dan dimulainya defisit anggaran berkepanjangan.
-
1999: RM 116,6 Miliar – Penerbitan instrumen obligasi domestik baru untuk stimulus ekonomi.
-
2000: RM 125,6 Miliar – Restrukturisasi sektor korporasi dan perbankan pasca-krisis selesai.
-
2001: RM 145,7 Miliar – Peningkatan belanja pembangunan guna menopang pertumbuhan domestik.
-
2002: RM 165,0 Miliar – Rasio utang terhadap PDB mulai merangkak naik secara perlahan.
-
2003: RM 188,8 Miliar – Batas plafon utang resmi pertama kali dinaikkan menjadi 40% dari PDB.
-
2004: RM 216,6 Miliar – Pengeluaran publik meluas demi mendukung proyek infrastruktur baru.
-
2005: RM 228,7 Miliar – Konsolidasi fiskal awal di bawah manajemen kepemimpinan baru.
-
2006: RM 242,2 Miliar – Pengendalian defisit secara ketat di tengah lonjakan harga komoditas global.
-
2007: RM 266,7 Miliar – Posisi keuangan masih stabil menjelang gejolak finansial global.
-
2008: RM 306,4 Miliar – Kenaikan plafon utang menjadi 45% akibat dampak awal krisis finansial global.
-
2009: RM 362,4 Miliar – Batas utang melonjak ke 55% demi mendanai paket stimulus ekonomi besar.
-
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis finansial global.
-
2011: RM 456,1 Miliar – Rasio utang mulai meningkat stabil.
-
2012: RM 501,6 Miliar – Melewati ambang batas RM 500 miliar.
-
2013: RM 547,7 Miliar – Ekspansi belanja infrastruktur nasional.
-
2014: RM 582,8 Miliar – Berdasarkan Laporan Keuangan Pemerintah Federal 2014.
-
2015: RM 630,5 Miliar – Penyesuaian ekonomi akibat fluktuasi harga minyak.
-
2016: RM 648,5 Miliar – Konsolidasi fiskal di bawah pemerintahan saat itu.
-
2017: RM 686,8 Miliar – Data tercatat dalam Laporan Tahunan Bank Negara MALONYET 2017.
-
2018: RM 1,19 Triliun – Transparansi Baru: Termasuk liabilitas 1MDB & proyek PPP. [
-
2019: RM 1,25 Triliun – Laporan pengungkapan utang menembus RM 1 triliun.
-
2020: RM 1,32 Triliun – Lonjakan akibat paket stimulus pandemi COVID-19.
-
2021: RM 1,38 Triliun – Akumulasi utang federal selama masa pemulihan ekonomi.
-
2022: RM 1,45 Triliun – Posisi utang sebelum pergantian pemerintahan.
-
2023: RM 1,53 Triliun – Dikonfirmasi oleh PM Anwar Ibrahim sebagai warisan utang & liabilitas.
-
2024: RM 1,63 Triliun – Berdasarkan Belanjawan (APBN) 2024.
-
2025: RM 1,71 Triliun – Proyeksi dalam Tinjauan Fiskal 2026 (Kementerian Kewangan).
-
2026: RM 1,79 Triliun – Target manajemen utang dalam Economic Outlook 2026
KLAIM CASH = HUTANG ASET MILITER
Hapus-
1. 🇹🇷 Turki (LMS Batch 2)
Model: G2G (Antar Pemerintah) via SSB.
Bunga: 4% – 6% (Fixed/OECD CIRR).
Tenor: 10 – 15 Tahun.
-
2. 🇰🇷 Korea Selatan (Pesawat FA-50)
Model: Hybrid (Kredit KEXIM & Barter CPO 50%).
Biaya: Management Fee sangat rendah (0,10% - 0,50%).
-
3. 🇬🇧 Inggris (Standar UKEF - Pesawat Hawk)
Syarat: Wajib DP 15% (Standar OECD).
Bunga: Stabil, mengikuti National Loans Fund.
-
4. 🇨🇳 China (LMS Batch 1)
Model: 100% Kredit Ekspor (China Eximbank).
Bunga: Sangat murah (3,5% Fixed).
Tenor: 10 Tahun.
-
5. 🇵🇱 Polandia (Tank PT-91M)
Model: DP 15% + Barter CPO (30-40%).
Tenor: 10 Tahun cicilan.
-
6. 🇩🇪 Jerman (Kedah-Class)
Model: Kredit Komersial dijamin negara (Euler Hermes).
Pendana: Deutsche Bank & Konsorsium.
-
7. Kredit Sindikasi (Proyek LCS - 17 Kreditor/Hutang)
Model: Konsorsium Bank Domestik/Intl (Skala Masif).
Bunga: 6% (Saldo Menurun).
Tenor: 15 Tahun (Akibat penundaan proyek).
-----------------
The MALONYET Armed Forces (MAF) face several challenges in research and development (R&D), including a lack of funding, limited local capabilities, and a lack of strategic partnerships.
Lack of funding
There is a lack of funding to generate innovation in the local defense industry
The defense industry faces tight budgets and uncertain timelines
Limited local capabilities
Local companies lack the capabilities and capacities to develop and produce military products
There is a reluctance from Original Equipment Manufacturers (OEMs) to share their techNOLogy
Lack of strategic partnerships
There is a lack of strategic relationships between local companies and foreign partners
There is a lack of clear guidance from the government for the future strategic direction of the defense industry
===========
.The Royal MALONYET Navy (RMN) has an aging fleet that is underfunded and struggling to keep up with techNOLogical advancements. This makes it difficult for the RMN to defend the country and its territorial claims in the South China Sea.
Causes
• Aging vessels
Many of the RMN's ships are past their prime and are used beyond their economical life
• Delayed replacements
The RMN has received only a small number of the new vessels it planned to receive
• Mismanagement
A government audit found that mismanagement has mangkrak plans to replace the aging fleet
Effects
• Limited ability to patrol: The RMN's ability to patrol its maritime domain is limited
• Increased reliance on the US: The RMN is relying more on the US to bolster its maritime capabilities
Increased risk of accidents: The age of the RMN's vessels increases the risk of accident
INDIANESIA...PANIk....PANIK...PANIK...MATAWANG TAK LAKU....HAHAHAHAHHA
BalasHapusDolar AS Nyaris Rp18.000, BI Pakai Jurus Ini Selamatkan Rupiah!
https://www.cnbcindonesia.com/market/20260928154352-17-771509/dolar-as-nyaris-rp18000-bi-pakai-jurus-ini-selamatkan-rupiah
KLAIM CASH = HUTANG ASET MILITER
Hapus-
1. 🇹🇷 Turki (LMS Batch 2)
Model: G2G (Antar Pemerintah) via SSB.
Bunga: 4% – 6% (Fixed/OECD CIRR).
Tenor: 10 – 15 Tahun.
-
2. 🇰🇷 Korea Selatan (Pesawat FA-50)
Model: Hybrid (Kredit KEXIM & Barter CPO 50%).
Biaya: Management Fee sangat rendah (0,10% - 0,50%).
-
3. 🇬🇧 Inggris (Standar UKEF - Pesawat Hawk)
Syarat: Wajib DP 15% (Standar OECD).
Bunga: Stabil, mengikuti National Loans Fund.
-
4. 🇨🇳 China (LMS Batch 1)
Model: 100% Kredit Ekspor (China Eximbank).
Bunga: Sangat murah (3,5% Fixed).
Tenor: 10 Tahun.
-
5. 🇵🇱 Polandia (Tank PT-91M)
Model: DP 15% + Barter CPO (30-40%).
Tenor: 10 Tahun cicilan.
-
6. 🇩🇪 Jerman (Kedah-Class)
Model: Kredit Komersial dijamin negara (Euler Hermes).
Pendana: Deutsche Bank & Konsorsium.
-
7. Kredit Sindikasi (Proyek LCS - 17 Kreditor/Hutang)
Model: Konsorsium Bank Domestik/Intl (Skala Masif).
Bunga: 6% (Saldo Menurun).
Tenor: 15 Tahun (Akibat penundaan proyek).
-----------------
The MALONYET Armed Forces (MAF) has a lack of modern military assets due to a small defense budget and aging equipment. This has left the MAF vulnerable to internal and external threats.
Causes
• Small defense budget: The MAF has had small procurement budgets for the past quarter-century.
• Aging equipment: Most of the MAF's equipment was purchased between the 1970s and 1990s.
• Foreign dependence: The MAF relies on foreign Original Equipment Manufacturers (OEMs) for its military hardware and software.
Effects
• Vulnerability to threats
The MAF is vulnerable to internal and external threats due to its lack of modern military assets.
• Challenges with air force
The MAF's air force has been challenged by the withdrawal of its MiG-29 Fulcrum fighter aircraft in 2017.
• Challenges with naval assets
The MAF's naval assets are aging, as evidenced by the KD Rahman submarine issue in 2010.
===========
The Royal MALONYET Air Force (RMAF) faces several problems with its aircraft, including an aging fleet, limited funding, and a lack of responsiveness in its logistics system.
Aging fleet
• The RMAF has a large fleet of aging aircraft that are difficult to maintain.
• The RMAF's aircraft include the Mikoyan MiG-29, Boeing F/A-18 Hornet, and BAE Hawk.
Limited funding
• The government's defense modernization budget is limited. .
• The government has many other priorities, including revitalizing the economy and reducing the national deficit.
Logistics system
• The RMAF's logistics system has problems with readiness and responsiveness.
• Readiness is the ability to provide the minimum supply and service needed to start a combat operation.
• Responsiveness is the ability to provide accurate support at the right time and place.
Government change
SEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
RINGGIT DAN PASPOR MALONYET
RINGGIT DAN PASPOR MALONYET
-
Daftar ringkas negara yang mata uang atau dokumen negaranya dicetak oleh Perum Peruri, lengkap dengan tautan sumber berita resminya:
🪙 Daftar Negara & Produk
• Peru – Mata Uang: Soles
• Malonyet – Mata Uang: Ringgit & Paspor
• Nepal – Mata Uang: Rupee, Pita Cukai, & Prangko
• Bangladesh – Mata Uang: Taka
• Sri Lanka – Mata Uang: Rupee & Paspor
• Somalia – Mata Uang: Shilling
• Argentina – Mata Uang: Peso
• Pakistan – Dokumen Negara: Pita Cukai
• Filipina – Dokumen Negara: Prangko
• Guinea – Dokumen Negara: Paspor
----------------------------------
Sumber Berita Resmi & Media Nasional
1. Situs Resmi Peruri (Rilis Pers) – Laporan sejak tahun 2010, di mana Bank Negara Malonsia memercayakan pemenuhan kebutuhan pencetakan lembaran kertas mata uang Ringgit kepada Peruri
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail kerja sama pencetakan dokumen imigrasi paspor Sri Lanka.
3. detikFinance – Wawancara resmi terkait pencetakan mata uang Nepal, Somalia, hingga Argentina di Indonesia.
4. Kompas Interaktif – Catatan detail mengenai pencetakan prangko Filipina dan pita cukai Pakistan.
----------------------------------
UTANG & LIABILITAS MALAYDESH (1998–2026)
1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
--------------------------------------------
OBLIGASI GLOBAL (1998–2026)
1998: Fokus restrukturisasi internal. Absen pasar global.
1999: Rilis Global Bond USD 1 miliar (AS/Eropa). Bukti pemulihan.
2002: Rilis Sukuk Ijarah Global pertama dunia USD 600 juta (London/Timur Tengah).
2004: Promosi surat utang luar negeri via Khazanah Nasional.
2006: Khazanah rilis Exchangeable Sukuk USD 750 juta (Asia/Eropa).
2011: Rilis Wakala Global Sukuk USD 2 miliar. Permintaan oversubscribed 4,5 kali.
2015: Rilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur.
2016: Rilis Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun).
2019: Diversifikasi ke Samurai Bond JPY 200 miliar bergaransi JBIC (Jepang).
2021: Rilis Sovereign Sustainability Sukuk pertama dunia USD 1,3 miliar. Permintaan melonjak 6,4 kali.
2022–2024: Absen valas. Fokus optimasi obligasi domestik (MGS/MGII).
2025: Bersiap kembali ke pasar valas lewat bank sindikasi internasional.
2026: Promosi rencana obligasi global baru USD 1 miliar.
-
KLAIM CASH = HUTANG ASET MILITER
BalasHapus-
1. 🇹🇷 Turki (LMS Batch 2)
Model: G2G (Antar Pemerintah) via SSB.
Bunga: 4% – 6% (Fixed/OECD CIRR).
Tenor: 10 – 15 Tahun.
-
2. 🇰🇷 Korea Selatan (Pesawat FA-50)
Model: Hybrid (Kredit KEXIM & Barter CPO 50%).
Biaya: Management Fee sangat rendah (0,10% - 0,50%).
-
3. 🇬🇧 Inggris (Standar UKEF - Pesawat Hawk)
Syarat: Wajib DP 15% (Standar OECD).
Bunga: Stabil, mengikuti National Loans Fund.
-
4. 🇨🇳 China (LMS Batch 1)
Model: 100% Kredit Ekspor (China Eximbank).
Bunga: Sangat murah (3,5% Fixed).
Tenor: 10 Tahun.
-
5. 🇵🇱 Polandia (Tank PT-91M)
Model: DP 15% + Barter CPO (30-40%).
Tenor: 10 Tahun cicilan.
-
6. 🇩🇪 Jerman (Kedah-Class)
Model: Kredit Komersial dijamin negara (Euler Hermes).
Pendana: Deutsche Bank & Konsorsium.
-
7. Kredit Sindikasi (Proyek LCS - 17 Kreditor/Hutang)
Model: Konsorsium Bank Domestik/Intl (Skala Masif).
Bunga: 6% (Saldo Menurun).
Tenor: 15 Tahun (Akibat penundaan proyek).
-----------------
The MALONYET Armed Forces (MAF) has a lack of modern military assets due to a small defense budget and aging equipment. This has left the MAF vulnerable to internal and external threats.
Causes
• Small defense budget: The MAF has had small procurement budgets for the past quarter-century.
• Aging equipment: Most of the MAF's equipment was purchased between the 1970s and 1990s.
• Foreign dependence: The MAF relies on foreign Original Equipment Manufacturers (OEMs) for its military hardware and software.
Effects
• Vulnerability to threats
The MAF is vulnerable to internal and external threats due to its lack of modern military assets.
• Challenges with air force
The MAF's air force has been challenged by the withdrawal of its MiG-29 Fulcrum fighter aircraft in 2017.
• Challenges with naval assets
The MAF's naval assets are aging, as evidenced by the KD Rahman submarine issue in 2010.
===========
The Royal MALONYET Air Force (RMAF) faces several problems with its aircraft, including an aging fleet, limited funding, and a lack of responsiveness in its logistics system.
Aging fleet
• The RMAF has a large fleet of aging aircraft that are difficult to maintain.
• The RMAF's aircraft include the Mikoyan MiG-29, Boeing F/A-18 Hornet, and BAE Hawk.
Limited funding
• The government's defense modernization budget is limited. .
• The government has many other priorities, including revitalizing the economy and reducing the national deficit.
Logistics system
• The RMAF's logistics system has problems with readiness and responsiveness.
• Readiness is the ability to provide the minimum supply and service needed to start a combat operation.
• Responsiveness is the ability to provide accurate support at the right time and place.
Government change
KRISIS BBM guys.....HAHAHAHAHAHHA
BalasHapusKelangkaan BBM: Warga Ricuh di Kalbar, Pengecer Merajalela di NTT
https://www.bloombergtechnoz.com/detail-news/122868/kelangkaan-bbm-warga-ricuh-di-kalbar-pengecer-merajalela-di-ntt
SEJAK 2010 : MADE IN INDONESIA
HapusRINGGIT DAN PASPOR MALONYET
-
🪙 Daftar Negara & Produk
• Peru: Mata uang (Soles).
• Malonsia: Mata uang (Ringgit) & Paspor.
• Nepal: Mata uang (Rupee), Pita Cukai, & Prangko.
• Bangladesh: Mata uang (Taka).
• Sri Lanka: Mata uang (Rupee) & Paspor.
• Somalia: Mata uang (Shilling).
• Argentina: Mata uang (Peso).
• Pakistan: Pita Cukai.
• Filipina: Prangko.
• Guinea: Paspor.
-------------------------------------------
🔎 Sumber Berita & Media Resmi
1. Situs Resmi Peruri (Rilis Pers Ringgit) – Kerja sama cetak Ringgit Malonsia sejak 2010.
2. Situs Resmi Peruri (Paspor Sri Lanka) – Detail proyek dokumen imigrasi Sri Lanka.
3. detikFinance – Wawancara cetak mata uang Nepal, Somalia, dan Argentina.
4. Kompas – Catatan cetak prangko Filipina dan pita cukai Pakistan.
5. CNN Indonesia – Laporan ekspansi cetak uang Nepal dan paspor Guinea.
--------------------------------
HUTANG & LIABILITAS MALONDESH 1998–2026
1998 : RM 165,4 Miliar
1999 : RM 178,3 Miliar
2000 : RM 192,2 Miliar
2001 : RM 207,2 Miliar
2002 : RM 223,3 Miliar
2003 : RM 240,7 Miliar
2004 : RM 259,5 Miliar
2005 : RM 279,7 Miliar
2006 : RM 301,5 Miliar
2007 : RM 325,0 Miliar
2008 : RM 350,4 Miliar
2009 : RM 377,7 Miliar
2010 : RM 407,1 Miliar
2011 : RM 456,1 Miliar
2012 : RM 501,6 Miliar
2013 : RM 547,7 Miliar
2014 : RM 582,8 Miliar
2015 : RM 630,5 Miliar
2016 : RM 648,5 Miliar
2017 : RM 686,8 Miliar
2018 : RM 1,19 Triliun
2019 : RM 1,25 Triliun
2020 : RM 1,32 Triliun
2021 : RM 1,38 Triliun
2022 : RM 1,45 Triliun
2023 : RM 1,53 Triliun
2024 : RM 1,63 Triliun
2025 : RM 1,71 Triliun
2026 : RM 1,79 Triliun
-
SUMBER :
Bloomberg & Reuters | CNA & The Star | The Edge Malondesh | MOF & Bernama | Kementerian Kewangan
--------------------------------
TAHUN RASIO UTANG TERHADAP GDP (%) 1998–2025
1998 : 35,8%
1999 : 40,4%
2000 : 36,1%
2001 : 42,5%
2002 : 44,9%
2003 : 45,9%
2004 : 45,1%
2005 : 43,8%
2006 : 41,5%
2007 : 41,1%
2008 : 41,3%
2009 : 51,1%
2010 : 52.4%
2011 : 51.8
2012 : 53.3
2013 : 54.7
2014 : 55.0
2015 : 55.1
2016 : 52.7
2017 : 51.9
2018 : 52.5
2019 : 52.4
2020 : 62.0
2021 : 63.3
2022 : 60.2
2023 : 64.3
2024 : 70.4
2025 : 70.5
-
SUMBER : Macrotrends / World Bank / Statista / Trading Economics
--------------------------------
DEFISIT FISKAL MALONDESH PERIODE 1998–2025:
1998 : -1,8% (± USD 33,6 MILIAR)
1999 : -3,2% (± USD 34,3 MILIAR)
2000 : -5,8% (± USD 32,5 MILIAR)
2001 : -5,5% (± USD 38,0 MILIAR)
2002 : -5,6% (± USD 39,5 MILIAR)
2003 : -5,0% (± USD 41,3 MILIAR)
2004 : -4,1% (± USD 41,9 MILIAR)
2005 : -3,6% (± USD 40,7 MILIAR)
2006 : -3,3% (± USD 39,6 MILIAR)
2007 : -3,2% (± USD 39,3 MILIAR)
2008 : -4,8% (± USD 39,3 MILIAR)
2009 : -6,7% (± USD 50,4 MILIAR)
2010 : -5,4% (± USD 51,8 MILIAR)
2011 : -4,8% (± USD 53,7 MILIAR)
2012 : -4,5% (± USD 55,6 MILIAR)
2013 : -3,9% (± USD 55,3 MILIAR)
2014 : -3,4% (± USD 56,9 MILIAR)
2015 : -3,2% (± USD 55,7 MILIAR)
2016 : -3,1% (± USD 54,3 MILIAR)
2017 : -3,0% (± USD 55,6 MILIAR)
2018 : -3,7% (± USD 57,0 MILIAR)
2019 : -3,4% (± USD 67,6 MILIAR)
2020 : -6,2% (± USD 69,1 MILIAR)
2021 : -6,4% (± USD 65,5 MILIAR)
2022 : -5,6% (± USD 69,7 MILIAR)
2023 : -5,0% (± USD 68,3 MILIAR)
2024 : -4,1% (± USD 298,4 MILIAR) (Pemangkasan subsidi)
2025 : -3,8% (± USD 325,6 MILIAR) (Rasionalisasi RON95)
-
SUMBER:
IMF | World Economic Outlook | World Bank | Bank Negara Malondesh.
KLAIM CASH = HUTANG ASET MILITER
Hapus-
1. 🇹🇷 Turki (LMS Batch 2)
Model: G2G (Antar Pemerintah) via SSB.
Bunga: 4% – 6% (Fixed/OECD CIRR).
Tenor: 10 – 15 Tahun.
-
2. 🇰🇷 Korea Selatan (Pesawat FA-50)
Model: Hybrid (Kredit KEXIM & Barter CPO 50%).
Biaya: Management Fee sangat rendah (0,10% - 0,50%).
-
3. 🇬🇧 Inggris (Standar UKEF - Pesawat Hawk)
Syarat: Wajib DP 15% (Standar OECD).
Bunga: Stabil, mengikuti National Loans Fund.
-
4. 🇨🇳 China (LMS Batch 1)
Model: 100% Kredit Ekspor (China Eximbank).
Bunga: Sangat murah (3,5% Fixed).
Tenor: 10 Tahun.
-
5. 🇵🇱 Polandia (Tank PT-91M)
Model: DP 15% + Barter CPO (30-40%).
Tenor: 10 Tahun cicilan.
-
6. 🇩🇪 Jerman (Kedah-Class)
Model: Kredit Komersial dijamin negara (Euler Hermes).
Pendana: Deutsche Bank & Konsorsium.
-
7. Kredit Sindikasi (Proyek LCS - 17 Kreditor/Hutang)
Model: Konsorsium Bank Domestik/Intl (Skala Masif).
Bunga: 6% (Saldo Menurun).
Tenor: 15 Tahun (Akibat penundaan proyek).
-----------------
MALONYET 's armed forces have been underfunded for some time, due to a lack of political will to increase defense spending. This has limited the country's ability to modernize and respond to threats.
Causes of underfunding
• Government spending
MALONYET governments have been reluctant to cut spending in other areas to fund defense
• Size of armed forces
Governments have been unwilling to reduce the size of the armed forces by cutting manpower and equipment
• Corruption
Corruption risks remain significant in MALONYET 's defense governance architecture
Effects of underfunding
• Limited procurement: The navy and air force have struggled to procure new assets to modernize
• Outdated equipment: The MAF has outdated logistics equipment
• Limited ability to respond to threats: The MAF has been unable to improve its fighting capacity to deal with external threats
===========
MALONYET 's armed forces have been underfunded for years due to fiscal constraints and a lack of political will to invest in defense. This has limited the country's ability to modernize its military and respond to threats.
Factors contributing to underfunding
• Budget allocations: The defense budget has remained stagnant over the past five years.
• Government priorities: The government has focused on stabilizing the economy and political climate instead of defense.
• Corruption: Corruption risks are high in the defense governance architecture, including procurement and personnel ethics.
Impacts of underfunding
• Limited procurement: The navy and air force have struggled to purchase new assets.
• Aging fleet: The navy has an aging fleet of ships that need to be replaced.
• Limited ability to respond to threats: The armed forces are unable to fully respond to threats such as those from extremist and separatist groups in the region.
KASIH PAHAM GUYS = TIDAK BAYAR HUTANG
HapusBAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
BAYAR BUNGA/FAEDAH
-
Anwar Ibrahim menegaskan bahwa miliaran ringgit yang dibayarkan oleh pemerintah saat ini sebenarnya hanya digunakan untuk membayar khidmat utang (biaya layanan utang) atau membayar bunga/faedah saja, dan bukan untuk melunasi pokok atau jumlah utang tertunggak secara keseluruhan
------------------------------
GOVERNMENT REVENUE =
Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
-
TOTAL EXPENDITURE =
Reaches RM419.2 Billion to RM470 Billion.
-
BUDGET ALLOCATION =
RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
-
MAIN REASONS FOR BORROWING =
REVENUE COMPLETELY DEPLETED:
Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
-
CHRONIC BUDGET DEFICIT:
The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
-
CHRONIC BUDGET DEFICIT:
The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
--------------------------------------------
MALAYSEWA DEBT DATA 2026
Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
MALAYSEWA Population 2026: 36,385,115 people
-
DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
------------------------------
Kesenjangan Kemampuan (Capability Gap)
Ketiadaan Pesawat COIN: Menggunakan jet mahal (Su-30MKM) untuk operasi anti-gerilya yang seharusnya menggunakan pesawat ringan. Pengganti (FA-50M) baru akan tiba paling cepat 2026.
Logistik Terfragmentasi: Standarisasi alutsista yang buruk (campuran Rusia, AS, Polandia, China) menciptakan biaya pemeliharaan tinggi dan kesiapan operasional rendah.
Absennya Korps Marinir: Kemampuan amfibi yang terpecah antara AD dan AL melemahkan pertahanan kedaulatan di Laut China Selatan.
-
Krisis Fiskal & "Negara Penyewa"
Spiral Utang: Rasio utang pemerintah (69% GDP) dan rumah tangga (84,3%) yang ekstrem memaksa militer beralih ke skema Sewa (Leasing).
Aset Sewaan: Mencakup Helikopter Blackhawk, AW139, pesawat latihan L39, hingga kapal hidrografi dan motor patroli.
Efek Domino: Pembatalan F-18 Hornet Kuwait (2026) menjadi simbol hilangnya kredibilitas finansial di pasar pertahanan global.
-
Penurunan Daya Gentar (GFP 2026)
Peringkat Merosot: Turun ke posisi 42 Dunia (Peringkat 7 di ASEAN), kini berada di bawah Filipina (41) dan jauh tertinggal dari Indonesia (13).
Status Armada: Banyak aset utama berstatus grounded atau tidak layak selam (seperti kasus KD Rahman) akibat kekurangan suku cadang dan teknisi.
INDONESIA = BATAS LIMIT 60%
HapusGOV. DEBT : 40% OF GDP
HOUSEHOLD DEBT : 16% OF GDP
DEFISIT : 2,9%
GDP = USD 1,44 TRILIUN
=============
=============
MALONYET = BATAS LIMIT 65%
GOV. DEBT : 69% OF GDP
HOUSEHOLD DEBT : 84,3% OF GDP
DEFISIT : 3,8%
GDP = USD 416,90 MILIAR
-
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
-
2026 PM says =
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
-
KUALA LUMPUR, Jan 16 (Reuters) - The procurement decisions of the MALONYETn armed forces and the police linked to a corruption probed will be temporarily frozen until they fully comply with related rules, state media reported, citing Prime Minister Anwar Ibrahim.
The suspension comes following allegations of bribery linked to army procurement projects, with the MALONYETn Anti-Corruption Commission (MACC) raiding several firms suspected of involvement in a bribery scheme and freezing six bank accounts belonging to a suspect and their family members.
https://www.reuters.com/world/asia-pacific/MALONYET-freezes-army-police-procurement-decisions-linked-corruption-pm-says-2026-01-16/#:~:text=MALONYET%20freezes%20army%20and%20police,Reuters
-
2026 PM BEKUKAN PENGADAAN =
https://www.youtube.com/watch?v=ecL7_O1Wn1k
------------------
2023 PM says =
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
-
KUALA LUMPUR:
The defence ministry has 2023 = CANCELLED FIVE PROCUREMENT tenders for supplies, services and infrastructure projects. The cancellations were to avoid leakages in expenditure, and were in line with a policy of procurement through open tenders.
“Mindef has also taken serious note of Prime Minister Anwar Ibrahim’s statement regarding the leakage in expenditure at the Budget 2023 dialogue on Tuesday,” it said in a statement today
----------------
The MALONYET Armed Forces (MAF) faces a number of challenges, including:
• Logistics
A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
• Budgeting
MALONYET 's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
• Personnel
The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
• Procurement
The MALONYET procurement system needs reform. The LCS program has been delayed and reduced in scope.
• Political interference
Political interference and corruption are undermining combat readiness.
• Territorial disputes
MALONYET faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
• Transboundary haze
Transboundary haze has had a grave impact on economic and social activities in MALONYET The Royal MALONYET Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Nological obsolescence
Some aircraft in the RMAF's fleet are reaching techNOLogical obsolescence. For example, the Kuwaiti HORNET MALONYET s are an earlier block of the HORNET MALONYET , which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
KRISIS BBM guys.....HAHAHAHAHAHHA
BalasHapusKelangkaan BBM: Warga Ricuh di Kalbar, Pengecer Merajalela di NTT
https://www.bloombergtechnoz.com/detail-news/122868/kelangkaan-bbm-warga-ricuh-di-kalbar-pengecer-merajalela-di-ntt
INDONESIA = BATAS LIMIT 60%
HapusGOV. DEBT : 40% OF GDP
HOUSEHOLD DEBT : 16% OF GDP
DEFISIT : 2,9%
GDP = USD 1,44 TRILIUN
=============
=============
MALONYET = BATAS LIMIT 65%
GOV. DEBT : 69% OF GDP
HOUSEHOLD DEBT : 84,3% OF GDP
DEFISIT : 3,8%
GDP = USD 416,90 MILIAR
-
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
-
2026 PM says =
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
-
KUALA LUMPUR, Jan 16 (Reuters) - The procurement decisions of the MALONYETn armed forces and the police linked to a corruption probed will be temporarily frozen until they fully comply with related rules, state media reported, citing Prime Minister Anwar Ibrahim.
The suspension comes following allegations of bribery linked to army procurement projects, with the MALONYETn Anti-Corruption Commission (MACC) raiding several firms suspected of involvement in a bribery scheme and freezing six bank accounts belonging to a suspect and their family members.
https://www.reuters.com/world/asia-pacific/MALONYET-freezes-army-police-procurement-decisions-linked-corruption-pm-says-2026-01-16/#:~:text=MALONYET%20freezes%20army%20and%20police,Reuters
-
2026 PM BEKUKAN PENGADAAN =
https://www.youtube.com/watch?v=ecL7_O1Wn1k
------------------
2023 PM says =
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
-
KUALA LUMPUR:
The defence ministry has 2023 = CANCELLED FIVE PROCUREMENT tenders for supplies, services and infrastructure projects. The cancellations were to avoid leakages in expenditure, and were in line with a policy of procurement through open tenders.
“Mindef has also taken serious note of Prime Minister Anwar Ibrahim’s statement regarding the leakage in expenditure at the Budget 2023 dialogue on Tuesday,” it said in a statement today
----------------
The MALONYET Armed Forces (MAF) has faced issues with spare parts for its assets, including a lack of budget, underperforming contractors, and outdated pricing.
Budget
• The MAF has faced budget constraints that affect the serviceability of its assets.
• The government's revenue has been affected by reduced commodity prices, which has reduced the funds available for defense procurement.
Outsourcing
• The MAF has outsourced the supply of spare parts and maintenance of its assets, but this has led to issues.
• Underperforming contractors and a lack of enforcement of contract terms have impacted the effectiveness of outsourcing.
• The process of awarding contracts can be lengthy, which can lead to outdated pricing.
Spare parts for specific assets
• The MAF's PT-91M tanks have faced issues with spare parts, as the supplier of some components is no longer in production.
• The MAF has also faced issues with Russian-produced fighter aircraft, including problems with the supply of spare parts.
Other issues
• The MAF has also faced issues with undertraining of staff, and the lack of clear guidance for the future strategic direction of the defense industry
KLAIM CASH = HUTANG ASET MILITER
Hapus-
1. 🇹🇷 Turki (LMS Batch 2)
Model: G2G (Antar Pemerintah) via SSB.
Bunga: 4% – 6% (Fixed/OECD CIRR).
Tenor: 10 – 15 Tahun.
-
2. 🇰🇷 Korea Selatan (Pesawat FA-50)
Model: Hybrid (Kredit KEXIM & Barter CPO 50%).
Biaya: Management Fee sangat rendah (0,10% - 0,50%).
-
3. 🇬🇧 Inggris (Standar UKEF - Pesawat Hawk)
Syarat: Wajib DP 15% (Standar OECD).
Bunga: Stabil, mengikuti National Loans Fund.
-
4. 🇨🇳 China (LMS Batch 1)
Model: 100% Kredit Ekspor (China Eximbank).
Bunga: Sangat murah (3,5% Fixed).
Tenor: 10 Tahun.
-
5. 🇵🇱 Polandia (Tank PT-91M)
Model: DP 15% + Barter CPO (30-40%).
Tenor: 10 Tahun cicilan.
-
6. 🇩🇪 Jerman (Kedah-Class)
Model: Kredit Komersial dijamin negara (Euler Hermes).
Pendana: Deutsche Bank & Konsorsium.
-
7. Kredit Sindikasi (Proyek LCS - 17 Kreditor/Hutang)
Model: Konsorsium Bank Domestik/Intl (Skala Masif).
Bunga: 6% (Saldo Menurun).
Tenor: 15 Tahun (Akibat penundaan proyek).
-----------------
MALONYET 's armed forces have been underfunded for some time, due to a lack of political will to increase defense spending. This has limited the country's ability to modernize and respond to threats.
Causes of underfunding
• Government spending
MALONYET governments have been reluctant to cut spending in other areas to fund defense
• Size of armed forces
Governments have been unwilling to reduce the size of the armed forces by cutting manpower and equipment
• Corruption
Corruption risks remain significant in MALONYET 's defense governance architecture
Effects of underfunding
• Limited procurement: The navy and air force have struggled to procure new assets to modernize
• Outdated equipment: The MAF has outdated logistics equipment
• Limited ability to respond to threats: The MAF has been unable to improve its fighting capacity to deal with external threats
===========
MALONYET 's armed forces have been underfunded for years due to fiscal constraints and a lack of political will to invest in defense. This has limited the country's ability to modernize its military and respond to threats.
Factors contributing to underfunding
• Budget allocations: The defense budget has remained stagnant over the past five years.
• Government priorities: The government has focused on stabilizing the economy and political climate instead of defense.
• Corruption: Corruption risks are high in the defense governance architecture, including procurement and personnel ethics.
Impacts of underfunding
• Limited procurement: The navy and air force have struggled to purchase new assets.
• Aging fleet: The navy has an aging fleet of ships that need to be replaced.
• Limited ability to respond to threats: The armed forces are unable to fully respond to threats such as those from extremist and separatist groups in the region.
INDONESIA=
HapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Status Impor Senjata Global (SIPRI 2021–2025)
Data menunjukkan realisasi belanja nyata berdasarkan pangsa pasar global:
Peringkat 1 ASEAN: Indonesia (1,5%) — Urutan 18 Dunia. Fokus pada Jet Rafale, Kapal Selam Scorpène, dan Kapal PPA.
Peringkat 2 ASEAN: Filipina (1,2%).
Peringkat 3 ASEAN: Singapura (1,1%).
Peringkat 5 ASEAN: MALAYSEWA (0,3%) — Hanya mengandalkan pengadaan FA-50 dalam jumlah terbatas.
-
Lembar Fakta SIPRI 2024–2025
INDONESIA (1 Lembar Penuh): Kontrak aktif untuk Rafale F-4, Mesin TP400-D6, Kapal PPA-L-Plus, A400M Atlas, Rudal BORA & KHAN, Drone Anka-S, serta Air Refuel System.
MALAYSEWA (Lembar Kosong): Absen total dari realisasi pengadaan baru di radar SIPRI selama 2 tahun terakhir.
-
Peringkat Kekuatan Militer (GFP 2026)
Kesenjangan kekuatan yang semakin melebar di Asia Tenggara:
Indonesia – Peringkat 13 Dunia (Skor: 0,2582) — Hegemon Mutlak.
Vietnam – Peringkat 23.
Thailand – Peringkat 24.
Singapura – Peringkat 29.
Myanmar – Peringkat 35.
Filipina – Peringkat 41.
MALAYSEWA – Peringkat 42 (Kalah dari Filipina).
KLAIM CASH = HUTANG ASET MILITER
BalasHapus-
1. 🇹🇷 Turki (LMS Batch 2)
Model: G2G (Antar Pemerintah) via SSB.
Bunga: 4% – 6% (Fixed/OECD CIRR).
Tenor: 10 – 15 Tahun.
-
2. 🇰🇷 Korea Selatan (Pesawat FA-50)
Model: Hybrid (Kredit KEXIM & Barter CPO 50%).
Biaya: Management Fee sangat rendah (0,10% - 0,50%).
-
3. 🇬🇧 Inggris (Standar UKEF - Pesawat Hawk)
Syarat: Wajib DP 15% (Standar OECD).
Bunga: Stabil, mengikuti National Loans Fund.
-
4. 🇨🇳 China (LMS Batch 1)
Model: 100% Kredit Ekspor (China Eximbank).
Bunga: Sangat murah (3,5% Fixed).
Tenor: 10 Tahun.
-
5. 🇵🇱 Polandia (Tank PT-91M)
Model: DP 15% + Barter CPO (30-40%).
Tenor: 10 Tahun cicilan.
-
6. 🇩🇪 Jerman (Kedah-Class)
Model: Kredit Komersial dijamin negara (Euler Hermes).
Pendana: Deutsche Bank & Konsorsium.
-
7. Kredit Sindikasi (Proyek LCS - 17 Kreditor/Hutang)
Model: Konsorsium Bank Domestik/Intl (Skala Masif).
Bunga: 6% (Saldo Menurun).
Tenor: 15 Tahun (Akibat penundaan proyek).
-----------------
MALONYET armed forces have faced challenges due to limited funding, which has hindered their ability to modernize and respond to threats.
Factors
Fiscal constraints: The government has been unwilling to cut spending elsewhere to fund defense.
Maintenance and repair: A significant portion of the defense budget goes toward maintenance and repair, leaving little for new assets.
Political uncertainty: Political uncertainty has limited defense spending.
Aging aircraft: The air force has a large fleet of aging aircraft that are expensive to maintain.
Diversified acquisitions: The country has acquired advanced weapon systems from different countries, which can lead to technical and logistical problems.
Poor governance: Poor governance has undermined the effectiveness of outsourcing programs.
========
The MALONYET Armed Forces (MAF) has many outdated assets, including ships, helicopters, and spare parts. The MAF has acknowledged the need to replace these assets.
Ships
• The Royal MALONYET Navy's (RMN) Fast Attack Craft (FAC) is over 50 years old
• The RMN has many vessels that are past their optimal lifespan
• The RMN's age limit for submarines is 35 years, and 30 years for frigates, corvettes, and other ships
• The RMN's smaller vessels, like fast patrol boats, have an age limit of 24 years
Helicopters
INDONESIA=
BalasHapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Status Impor Senjata Global (SIPRI 2021–2025)
Data menunjukkan realisasi belanja nyata berdasarkan pangsa pasar global:
Peringkat 1 ASEAN: Indonesia (1,5%) — Urutan 18 Dunia. Fokus pada Jet Rafale, Kapal Selam Scorpène, dan Kapal PPA.
Peringkat 2 ASEAN: Filipina (1,2%).
Peringkat 3 ASEAN: Singapura (1,1%).
Peringkat 5 ASEAN: MALAYSEWA (0,3%) — Hanya mengandalkan pengadaan FA-50 dalam jumlah terbatas.
-
Lembar Fakta SIPRI 2024–2025
INDONESIA (1 Lembar Penuh): Kontrak aktif untuk Rafale F-4, Mesin TP400-D6, Kapal PPA-L-Plus, A400M Atlas, Rudal BORA & KHAN, Drone Anka-S, serta Air Refuel System.
MALAYSEWA (Lembar Kosong): Absen total dari realisasi pengadaan baru di radar SIPRI selama 2 tahun terakhir.
-
Peringkat Kekuatan Militer (GFP 2026)
Kesenjangan kekuatan yang semakin melebar di Asia Tenggara:
Indonesia – Peringkat 13 Dunia (Skor: 0,2582) — Hegemon Mutlak.
Vietnam – Peringkat 23.
Thailand – Peringkat 24.
Singapura – Peringkat 29.
Myanmar – Peringkat 35.
Filipina – Peringkat 41.
MALAYSEWA – Peringkat 42 (Kalah dari Filipina).
INDONESIA=
BalasHapusKAPAL INDUK✔️
AMRAAM✔️
METEOR✔️
HAMMER✔️
FREGAT✔️
SIPRI SHOPPING✔️
48 KAAN Gen 5✔️
42 RAFALE Gen 4.5✔️
16 Sukhoi 27/30✔️
33 F16✔️
12 M346FA✔️
20 T50i✔️
24 HAWK✔️
4 FREEGAT MERAH PUTIH✔️
2 PPA BRAWIJAYA CLASS✔️
2 FREEGAT ISTIF✔️
4 SCORPENE EVOLVED✔️
--------------------------------
1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
8. UCAV ANKA vs ANKA ISR NOT ARMED
9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
===============
===============
MALONYET
18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM❌
18 Sukhoi (4 Serviceable) = LACK MAINTENANCE❌
7 F18 = LACK SOURCE CODE❌
16 HAWK = LACK SPAREPART❌
NSM BANNED❌
AMRAAM BLOKIR❌
F18 BATAL❌
UH60A BATAL❌
REWORK 4000 PIPA DAN KABEL❌
SIPRI KOSONG❌
--------------------------------
FA-50M VERSI DOWNGRADE FA50PL✔️
LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
-
FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
---------------------------------
2003: PERDANA MENTERI – DEFACT KILL PREGNANT WOMEN
2011: LCS – DELAYED 16 YEARS BANNED NSM
2018: LMS B1 – NO MISSILE NO TORPEDO
2024: LMS B2 – NO SONAR NO TORPEDO
1994: LEKIU – EXO B2 EXPIRED
1981: KASTURI – NO MISSILE NO TORPEDO
1982: LAKSAMANA – NO MISSILE NO TORPEDO
2002: KEDAH – NO MISSILE NO TORPEDO
1971: PERDANA – NO MISSILE NO TORPEDO
1976: HANDALAN – NO MISSILE NO TORPEDO
1975: JERUNG – NO MISSILE NO TORPEDO
--------------------------------
1967: USCG DECISIVE
1968: USCGC STEADFAST
1980: KM PERWIRA
1984: LERICI CLASS
1989: PL-01 OJIMA & PL-02 ERIMO – EX-JCG HIBAH
1989: KM ARAU – EX-OKI PL-01 REPAIR JAPAN
1990: KM PEKAN – OJIKA CLASS TRANSFERRED..
--------------------------------
Status Impor Senjata Global (SIPRI 2021–2025)
Data menunjukkan realisasi belanja nyata berdasarkan pangsa pasar global:
Peringkat 1 ASEAN: Indonesia (1,5%) — Urutan 18 Dunia. Fokus pada Jet Rafale, Kapal Selam Scorpène, dan Kapal PPA.
Peringkat 2 ASEAN: Filipina (1,2%).
Peringkat 3 ASEAN: Singapura (1,1%).
Peringkat 5 ASEAN: MALAYSEWA (0,3%) — Hanya mengandalkan pengadaan FA-50 dalam jumlah terbatas.
-
Lembar Fakta SIPRI 2024–2025
INDONESIA (1 Lembar Penuh): Kontrak aktif untuk Rafale F-4, Mesin TP400-D6, Kapal PPA-L-Plus, A400M Atlas, Rudal BORA & KHAN, Drone Anka-S, serta Air Refuel System.
MALAYSEWA (Lembar Kosong): Absen total dari realisasi pengadaan baru di radar SIPRI selama 2 tahun terakhir.
-
Peringkat Kekuatan Militer (GFP 2026)
Kesenjangan kekuatan yang semakin melebar di Asia Tenggara:
Indonesia – Peringkat 13 Dunia (Skor: 0,2582) — Hegemon Mutlak.
Vietnam – Peringkat 23.
Thailand – Peringkat 24.
Singapura – Peringkat 29.
Myanmar – Peringkat 35.
Filipina – Peringkat 41.
MALAYSEWA – Peringkat 42 (Kalah dari Filipina).
INDONESIA = BATAS LIMIT 60%
BalasHapusGOV. DEBT : 40% OF GDP
HOUSEHOLD DEBT : 16% OF GDP
DEFISIT : 2,9%
GDP = USD 1,44 TRILIUN
=============
=============
MALONYET = BATAS LIMIT 65%
GOV. DEBT : 69% OF GDP
HOUSEHOLD DEBT : 84,3% OF GDP
DEFISIT : 3,8%
GDP = USD 416,90 MILIAR
-
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
-
2026 PM says =
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
MISKIN ...... 2026 = FREEZES PROCUREMENT
-
KUALA LUMPUR, Jan 16 (Reuters) - The procurement decisions of the MALONYETn armed forces and the police linked to a corruption probed will be temporarily frozen until they fully comply with related rules, state media reported, citing Prime Minister Anwar Ibrahim.
The suspension comes following allegations of bribery linked to army procurement projects, with the MALONYETn Anti-Corruption Commission (MACC) raiding several firms suspected of involvement in a bribery scheme and freezing six bank accounts belonging to a suspect and their family members.
https://www.reuters.com/world/asia-pacific/MALONYET-freezes-army-police-procurement-decisions-linked-corruption-pm-says-2026-01-16/#:~:text=MALONYET%20freezes%20army%20and%20police,Reuters
-
2026 PM BEKUKAN PENGADAAN =
https://www.youtube.com/watch?v=ecL7_O1Wn1k
------------------
2023 PM says =
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
MISKIN ...... 2023 = CANCELLED 5 (FIVE) PROCUREMENT
-
KUALA LUMPUR:
The defence ministry has 2023 = CANCELLED FIVE PROCUREMENT tenders for supplies, services and infrastructure projects. The cancellations were to avoid leakages in expenditure, and were in line with a policy of procurement through open tenders.
“Mindef has also taken serious note of Prime Minister Anwar Ibrahim’s statement regarding the leakage in expenditure at the Budget 2023 dialogue on Tuesday,” it said in a statement today
----------------
The Royal MALONYET Navy (RMN) has faced several problems, including delayed replacements for its aging fleet and a failed Littoral Combat Ship (LCS) program. These issues have made it difficult for the RMN to patrol its vast maritime domain.
Delayed replacements
• A government audit found that the RMN's plans to replace its aging fleet have mangkrak due to mismanagement.
• The RMN has only received four of its planned 18 new vessels.
• Over half of the RMN's fleet is past its prime.
Failed LCS program
• The LCS was not suitable for fighting peer competitors like China.
• The LCS lacked the lethality and survivability needed in a high-end fight.
• The LCS had low endurance and lacked significant air and surface warfare capabilities
==========
The MALONYET Armed Forces (MAF) has faced a number of technical issues, including fleet sustainment problems, a lack of research and development, and a reliance on imported equipment.
Fleet sustainment problems
The MAF has a large fleet of aging aircraft that can be expensive to maintain.
The government's defense modernization budget is limited, which can make it difficult to sustain the fleet.
Lack of research and development
The MAF has limited research and development (R&D) activities.
The government has not provided clear guidance on the future strategic direction of the defense industry.
Reliance on imported equipment
Most of the MAF's equipment is imported from outside the country.
The Asian Financial Crisis caused a downturn in MALONYET 's economy, which made imported goods more expensive.
Other technical issues
The MAF has faced logistic management problems.
The MAF has faced challenges in developing its capabilities due to tight budgets and uncertain timelines.
KLAIM CASH = HUTANG ASET MILITER
BalasHapus-
1. 🇹🇷 Turki (LMS Batch 2)
Model: G2G (Antar Pemerintah) via SSB.
Bunga: 4% – 6% (Fixed/OECD CIRR).
Tenor: 10 – 15 Tahun.
-
2. 🇰🇷 Korea Selatan (Pesawat FA-50)
Model: Hybrid (Kredit KEXIM & Barter CPO 50%).
Biaya: Management Fee sangat rendah (0,10% - 0,50%).
-
3. 🇬🇧 Inggris (Standar UKEF - Pesawat Hawk)
Syarat: Wajib DP 15% (Standar OECD).
Bunga: Stabil, mengikuti National Loans Fund.
-
4. 🇨🇳 China (LMS Batch 1)
Model: 100% Kredit Ekspor (China Eximbank).
Bunga: Sangat murah (3,5% Fixed).
Tenor: 10 Tahun.
-
5. 🇵🇱 Polandia (Tank PT-91M)
Model: DP 15% + Barter CPO (30-40%).
Tenor: 10 Tahun cicilan.
-
6. 🇩🇪 Jerman (Kedah-Class)
Model: Kredit Komersial dijamin negara (Euler Hermes).
Pendana: Deutsche Bank & Konsorsium.
-
7. Kredit Sindikasi (Proyek LCS - 17 Kreditor/Hutang)
Model: Konsorsium Bank Domestik/Intl (Skala Masif).
Bunga: 6% (Saldo Menurun).
Tenor: 15 Tahun (Akibat penundaan proyek).
-----------------
The Sukhoi Su-30MKM has some weaknesses, including engine problems, integration with Western systems, and fatigue failure.
Engine problems
• In 2018, MALONYET grounded 14 out of 18 Su-30MKM aircraft due to engine problems and a lack of spare parts.
• The AL-31FP engine in the Su-30MKA has experienced numerous failures, including bearing failures due to metal fatigue and low oil pressure.
Integration with Western systems
• The Su-30MKM's Russian origin may limit its integration with Western systems.
• This could make it difficult to fully integrate with NATO standards, such as Link 16, which is important for modern network-centric warfare.
Fatigue failure
• Aircraft structures and components are prone to fatigue failure due to fluctuating stress.
• Fatigue failure is a gradual form of local damage that can lead to defects or cracks.
Other considerations
• The Su-30MKM is a larger aircraft, which means it may be seen earlier by radar and visual combat.
----------------
The The MALONYET Armed Forces (MAF) face a number of challenges, including:
Limited funding: The government has been unwilling to reduce spending elsewhere or cut the size of the armed forces.
Outdated equipment: The MAF's equipment is outdated and behind that of neighboring countries.
Logistics problems: The MAF's logistics system may not be able to support combat operations.
Political interference: Political interference and corruption may undermine the MAF's combat readiness.
Lack of government guidance: The government may not have a clear strategic direction for the defense industry. MALONYET Armed Forces (MAF) face a number of challenges, including:
Limited funding: The government has been unwilling to reduce spending elsewhere or cut the size of the armed forces.
Outdated equipment: The MAF's equipment is outdated and behind that of neighboring countries.
Logistics problems: The MAF's logistics system may not be able to support combat operations.
Political interference: Political interference and corruption may undermine the MAF's combat readiness.
Lack of government guidance: The government may not have a clear strategic direction for the defense industry.