23 Desember 2014

Technical Testing for M3 and M4 Corvetttes

23 Desember 2014


Acceptance factory level of two corvettes M3, M4 (photo : ThanhNien)

(TNO) Corporation Bason (General Department of Defense Industry) has organized to plant or two corvettes M3, M4.

From 15 to 21 December Ba Son Corporation held trials plant or two rocket ships (12,418 design, pair of 2 - M3, M4) on the coast of Ba Ria-Vung Tau. These are 2 of 6 rocket by the Corporation Ba Son shipbuilding contract to the Navy from 2009 on the basis of technology transfer agreements between Vietnam and Russia.



Acceptance process has checked the operation of the equipment on board in accordance with document processes, test methods aim to try and test the entire functionality of the ship Specifications.

To try and examine the possibility of attack, defense of the ship, in addition to using two newbuildings have similar features to check all the possibilities for navigation, corporations Bason also combined use of aircraft to direct fighters to perform the calibration test the ability to not.

Test results show that M3 and M4 are closed vessel with the design, quality assurance and art. The system normal operation, the specifications, tactical requirements are achieved and exceeded.



Under the plan, the pair will be 2 ships the Navy and Department of Defense organizations and acceptance of 1/2015 you will then hand over to the Navy put to use.

This is one of the key activities of the factory celebrate 70 years of establishment of the People's Army of Vietnam.

(ThanhNien)

1 komentar: