05 November 2016

PT Daya Radar Utama Receives Order from TNI AL and TNI AD

05 November 2016


LCU for Leopard carrier with max payload 1500 DWT for TNI AD (photo : Defense Studies)

Second landing ship tank in build

Having delivered the landing ship tank (LST) KRI Teluk Bintuni to the Indonesian Navy (TNI-AL) last year, shipbuilder PT Daya Radar Utama (Hall A, Stand P020) is now working on additional orders for military logistics vessels.



The company confirmed to the Show Daily that it has recently received an order from the Ministry of Defence to build two 99m-long Landing Craft Utility vessels for the Indonesian Army (TNI-AD).

Delivery is planned from the end of 2018. In addition, PT Daya Radar Utama is working on the build of the second LST for the TNI-AL.



While derived from Teluk Bintuni, the absence of a hangar means the design is slightly smaller with regard to both length and beam. First steel was cut in June 2016, with handover planned for early 2018.

In addition, PT Daya Radar Utama is working on the build of the LST for the TNI AL. While derived from Teluk Bintuni, the absence of a hangar means the design is slightly smaller with regard to both length and beam. First steel was cut in June 2016, with handover planned for early 2018.

(ShowDaily)

5 komentar:

  1. Lst yg masih mangkrak di DRU kelanjutannya bgmn y?

    BalasHapus
    Balasan
    1. Kayaknya LST yang mangkrak bukan di DRU deh bro. Tapi ada di PT.DokBahari Jakarta.


      😁

      Hapus
    2. LST di DRU sudah selesai sejak tahun lalu dan sudah serah terima. Sekarang sudah operasi.

      Hapus
  2. kayaknya yg jagoang bikin kapal dan kerja cepat ya palindo batam deh

    BalasHapus
    Balasan
    1. PT.PAL enggak ya? Delivery selalu ontime loh dia, and never receive any complaint about quality defect.

      Hapus