12 September 2026

Preparing the Diponegoro Class for Future Missions

12 September 2026

Concept design for the Diponegoro Class refurbishment by Nevesbu (photos: Nevesbu)

Recently, Nevesbu presented its concept design for the Diponegoro Class refurbishment to the Indonesian Ministry of Defense, Navy and prime contractor PT Len Industri (Persero) (Official). The Platform System Integration (PSI) concept was well received, with constructive feedback supporting the next steps in its development.


We are proud of the Nevesbu team, who developed the concept design for the PSI solution for the extensive high-end SEWACO package in just three months. Looking forward to the full scale design solution for the refurbishment!

6 komentar:

  1. Dan maharajamangkrak masih betah di darat

    BalasHapus
  2. Apgrednya kurang nendang nich,
    harusnya korvet Sigma 9113 wajib pake VLS ama radarl aesa 250-400 km buat usung rudal panjangπŸš€ haha!πŸ‘πŸ˜ŽπŸ‘Œ

    BalasHapus
    Balasan
    1. Kalau dipasang VLS, kapal perlu menjalani perubahan struktur dan sistem yang cukup besar, karena dibutuhkan penguatan listrik, pendinginan, dan struktur dek, dan harus dilakukan perhitungan ulang stabilitas dan berat kapal.

      Hapus
    2. gpp om, namanya jugak apgred kudu total biar tambah ganteng poll om haha!πŸ‘ŒπŸ˜ŽπŸ¦Ύ

      kyk bung tomo klas ganti sea wolf ganti ke vl micaπŸ‘

      Hapus
  3. kalo perluw pake integrated mast dan tambah lagi CIWS haha!πŸ€—πŸ¦ΎπŸš€
    harus diatas spek opv 98 donk ah haha!πŸ˜‰πŸ€«πŸ˜„

    BalasHapus