16 Oktober 2026
TNI AL Uji Tembak Meriam KRI Raja Haji Fisabilillah-391 di Perairan Teluk Semangka
14 Oktober 2026
HD Hyundai Heavy Industries Launches Third 2,400-Ton Offshore Patrol Vessel of the Philippine Navy
09 Oktober 2026
Handover Ceremony for Riverine Patrol Crafts L.11–L.16
07 Oktober 2026
KD Yu Memperkukuh Kesiapsiagaan Operasi
02 Oktober 2026
First Sentinel-class Offshore Patrol Vessel (OPV) Launched in Germany
02 Oktober 2026
Launched of Sentinel OPV (photos: RSN)Earlier today, we launched our first Sentinel-class Offshore Patrol Vessel (OPV), Sentinel, in Germany. The OPVs are Singapore Government Vessels purpose-built to meet the increased demands and wider scope of maritime security operations.
The ceremony was officiated by Minister for Defence Mr Chan Chun Sing. He was joined by Mrs Chan as the Lady Sponsor who formally christened the ship, German Federal Minister of Defence Mr Boris Pistorius, Chief of German Navy Vice Admiral (VADM) Wilhelm Tobias Abry, our Chief of Navy Rear Admiral (RADM) Sean Wat, and senior defence officials from both countries.
The four OPVs will replace the existing Sentinel-class Maritime Security and Response Vessels (MSRVs) and will be delivered progressively from 2028.
(RSN)
16 September 2026
RAN Successfully Trial Heavy Lift and Tactical Surveillance Drones off its Arafura class OPV
12 September 2026
HJ Heavy Industries will Receive Orders from Southeast Asia for High-Speed Patrol Boats
30 Agustus 2026
Royal Australian Navy Commissions New Patrol Boats to Protect Australia's Maritime Security
23 Agustus 2026
Naval Command Western Mindanao Receives 42-foot Speedboat for Maritime Security
20 Agustus 2026
HMNZS Otago Back on the Blue
20 Agustus 2026
HMNZS Otago P-148, Offshore Patrol Vessel (photos: RNZN)
For the first time in over five years, our Offshore Patrol Vessel HMNZS Otago sailed from Devonport Naval Base today.
For the next week, Otago will be undertaking a series of Sea Acceptance Trials in the Hauraki Gulf as it tests new systems and machinery installed as part of its reactivation.
Once those have been successfully checked off, our Maritime Training Group will embark to conduct a core mariner skills work-up with the ship’s company to ensure they are prepared for more advanced training in September.
This is the moment a lot of people have worked towards for well over 12 months.
“Otago last went to sea in 2021 so sailing out into the Waitemata Harbour today with a 56-strong ship’s company will be something special. Otago is a versatile ship, tailor made for the tasks we’ll shortly be conducting in the Pacific region." ~ Commanding Officer of HMNZS Otago.
(RNZN)
30 Juli 2026
Alloy-hulled Patrol Boat Launched for Military Region 9
30 Juli 2026
Launching ceremony of a combined patrol and troop transport vessel at X-55 Shipyard (photo: CTV)
On July 24th, at the X55 Factory (Logistics and Engineering Department, Navy), the launching ceremony took place for the third ST-294 aluminum alloy hull patrol and troop transport vessel, which will be equipped for Military Region 9.
Major General Nguyen Van Tien - Deputy Commander of Military Region 9, along with other branches of the armed forces, participated in the launching ceremony.
This is a newly built ship equipped for Military Region 9 - an area considered to have a crucial strategic position in terms of economy , society, national defense, security, and foreign relations in the Southwest region of the country, playing a key role in the overall national defense posture.
After completion and commissioning, the ST-294 No. 3 vessel will undertake important tasks, including participating in training and combat readiness, contributing to the firm protection of the sacred sovereignty of the nation's seas, islands, and continental shelf.
ST-294 No. 3 vessel during launched ceremony (photo: VOV)The ship participates in transporting troops, equipment, logistical supplies, and technical support to the islands; at the same time, it also has the task of participating in search and rescue operations and maintaining security and order in the military region.
This is the central political task of the X55 Factory, so the forces have been determined and made every effort to overcome all difficulties to accelerate the construction progress and deliver the ships on schedule.
Throughout the shipbuilding and completion process, the shipyard received guidance and attention from the Command Headquarters, the General Staff, the Logistics and Technical Department, the Construction Supervision Team, and agencies and units under Military Region 9. The Military Ship Registration Center, the Naval Engineering Institute, and the design consulting unit closely supervised the technological process, ensuring compliance with the approved design.
Ship ST-294 No. 3 has completed the basic installation of equipment and is ready for launch. After the launching ceremony, the ship will continue to undergo finishing stages and acceptance testing according to the proper procedures before being officially handed over to Military Region 9.
(TuoiTre)
28 Juli 2026
Kapal Patroli Kelas T-994 Thailand Menerima Sentinel 30 RWS
11 Juli 2026
Two Rigid Inflatable Boats from U.S. to the PMC
Two RIB for Philippines (photo: US Embassy)










































