Kerajaan lulus pasang sistem pelancar misil antipermukaan atas 6 kapal TLDM Kelas KEDAH
KUALA LUMPUR: Kerajaan meluluskan pemasangan sistem pelancar misil antipermukaan atau 'Surface to Surface Missiles' (SSM) ke atas semua enam kapal Kelas KEDAH milik Tentera Laut Diraja Malaysia (TLDM).
Menteri Pertahanan, Datuk Sri Mohamed Khaled Nordin, berkata pemasangan itu dirancang secara berfasa, mengambil kira kesiapsiagaan teknikal kapal, keperluan operasi serta implikasi kos.
"Pada masa ini, TLDM sedang melaksanakan tinjauan harga bagi mengenal pasti kos sebenar keseluruhan projek," katanya melalui jawapan bertulis di laman web Parlimen.
Beliau menjawab soalan Nordin Ahmad Ismail (PN-Lumut) mengenai usaha pemasangan peluru berpandu NSM di atas kapal milik TLDM kelas Kedah di bawah Bajet 2026.
Mengulas lanjut, beliau berkata cadangan pemasangan peluru berpandu jenis Naval Strike Missile (NSM) ke atas kapal milik TLDM Kelas KEDAH adalah sebahagian inisiatif peningkatan keupayaan tempur permukaan bagi menangani keperluan operasi semasa dan masa hadapan.
"Pada peringkat awal, penilaian dan integrasi keupayaan ini memberi tumpuan kepada kapal utama sebagai platform perintis, sebelum dipertimbangkan peluasan kepada kapal-kapal lain dalam kelas yang sama, tertakluk keberkesanan pelaksanaan, keperluan operasi TLDM dan kelulusan peruntukan kerajaan," katanya.
Kapal Kelas KEDAH juga dikenali Kapal patrol Generasi Baharu (NGPV) adalah satu daripada lima kelas yang digariskan dalam Perancangan Transformasi 15-to-5 TLDM.
Dengan panjang 91.1 meter dan berat anggaran 1,650 tan, kapal ini mempunyai ruang dan berat simpanan untuk sistem persenjataan tambahan, namun tidak dipasang semasa ditauliahkan.
Ketika ini terdapat enam buah kapal dalam Kelas KEDAH iaitu KD Kedah, KD Pahang, KD Perak, KD Terengganu, KD Kelantan dan KD Selangor.
Dalam pada itu, Mohamed Khaled berkata, pendekatan berperingkat ini mencerminkan usaha Kementerian Pertahanan untuk memastikan peningkatan keupayaan tempur TLDM dilaksanakan secara berhemah, berkeutamaan dan memberikan nilai terbaik kepada kerajaan, selaras keperluan keselamatan maritim dan kemampuan fiskal negara.


2018 SALAH FOTONG
BalasHapus2026 SALAH PASANG PIPA & KABEL
Ambyaaaarrrr haha!πππ
Kerajaan Setujui Pemasangan Misil NSM Pada 6 Kapal Kelas KEDAH
BalasHapus------
AKANNNNNN LAGIII
dulu jugak setuju, begitu tanya harga
last last kensel haha!π€£π€₯π€£
Dr Si ReMeK dulu AKAN..AKAN..AKAANNM
BalasHapusPas Liat daftar harga...pikir2 dulu yaa, jimat kos, last last kabuurrrr haha!π€ͺππ€ͺ
⬇️⬇️⬇️⬇️⬇️⬇️⬇️
02 Agustus 2022
AL Malaysia Lengkapi Korvet Kelas Kedah dengan Naval Strike Missile
Angkatan Laut Kerajaan Malaysia (RMN) telah menyusun rencana dengan anggaran MYR214 juta (USD48 juta) untuk melengkapi dua korvet kelas Kedah (MEKO 100 RMN) dengan peluncur Naval Strike Missile (NSM).
NAVAL GRUP = SALAH PASANG
BalasHapusREWORK 4000 PIPA DAN KABEL LCS
REWORK 4000 PIPA DAN KABEL LCS
REWORK 4000 PIPA DAN KABEL LCS
REWORK 4000 PIPA DAN KABEL LCS
--
https://www.airtimes.my/2026/01/28/penyerahan-lcs-1-dan-2-rasmi-ditunda-kapal-pertama-lewat-4-bulan-ke-disember-2026/
KUALA LUMPUR, 28 JAN - Kerajaan hari ini secara rasmi mengesahkan bahawa penyerahan Kapal Tempur Pesisir (LCS) pertama kepada Tentera Laut Diraja Malaysia (TLDM) tidak akan dapat dilaksanakan pada tarikh sasaran Ogos 2026, sebaliknya ditunda selama empat bulan ke Disember 2026.
Menteri Pertahanan, Dato' Seri Mohamed Khaled Nordin membuat pengumuman penting itu semasa sesi soal jawab lisan di Dewan Rakyat. Beliau turut memperincikan bahawa kelewatan tersebut turut memberi kesan kepada kapal kedua (LCS 2) yang kini dijadualkan untuk penyerahan pada Ogos 2027.
Dalam penjelasan beliau, Mohamed Khaled mendedahkan bahawa kelewatan ini berpunca daripada dua faktor kritikal iaitu kelewatan penghantaran peralatan daripada Pengeluar Peralatan Asal (OEM) dan keperluan mendesak untuk melakukan kerja-kerja pemasangan semula (re-work) ke atas sistem perpaipan dan kabel kapal susulan teguran audit teknikal.
"Berdasarkan maklum balas oleh LUNAS yang dikemukakan kepada pasukan projek, jadual pentauhan kapal LCS 1 dipinda ke bulan Disember 2026. Maknanya memang ada lewat empat bulan. Manakala bagi kapal LCS 2 pula dipinda ke Ogos 2027," kata beliau semasa menjawab pertanyaan di Dewan Rakyat.
Beliau turut menjelaskan secara spesifik mengenai isu teknikal yang menyumbang kepada kelewatan ini, di mana Pihak Berkuasa Reka Bentuk (Design Authority), Naval Group, telah mengarahkan supaya penambahbaikan dilakukan demi keselamatan kapal.
"Naval Group buat audit, lihat supaya semua kerja berjalan sebagaimana spesifikasi, dan mereka telah membuat teguran supaya ditambah baik ataupun re-work pemasangan perpaipan dan juga kabel. Untuk makluman ada 4,000 unit paip, jadi diminta supaya dikaji semula dan dipasang semula," jelas Menteri Pertahanan.
Selain itu, Mohamed Khaled turut memperbetulkan persepsi umum mengenai status ujian laut kapal tersebut. Beliau menjelaskan bahawa ujian laut penuh (sea trial) yang melibatkan sistem tempur dan persenjataan sebenarnya belum bermula dan kini dijadualkan semula ke April 2025. Aktiviti kapal yang dilihat di perairan ketika ini hanyalah fasa sea going yang memfokuskan kepada pengujian sistem jentera dan kuasa semata-mata.
"Sea trial yang sepatutnya buat Oktober 2025, belum mula lagi. Sekarang saya nak beritahu, sea trial memang juga lambat, akan mula April 2026 ni," tegas beliau bagi menjawab kekeliruan yang dibangkitkan oleh Ahli Parlimen Tanah Merah mengenai keadaan fizikal kapal yang didakwa kelihatan usang.
Walaupun berdepan kelewatan pada dua kapal pertama, Mohamed Khaled memberikan jaminan bahawa jadual bagi kapal ketiga, keempat dan kelima tidak terjejas dan kekal mengikut perancangan asal, dengan kapal terakhir LCS 5 disasarkan siap pada April 2029.-airtimes.my
---------------------
PAC = TANPA PERSETUJUAN PENUH
LCS SALAH POTONG
LCS SALAH POTONG
LCS SALAH POTONG
LCS SALAH POTONG
LCS SALAH POTONG
-
Masalah utama:
Reka bentuk bertukar daripada model MEKO A100 (Jerman) yang dipersetujui TLDM kepada Gowind (Perancis) tanpa persetujuan penuh.
Akibatnya, pemotongan besi dan komponen awal yang sudah dilakukan menjadi tidak relevan (“salah potong”).
Kelewatan besar: sepatutnya kapal pertama siap 2019, tetapi hanya berjaya diluncurkan pada Mei 2024.
------------------
LCS TO PANGKOR = TARIK TUGBOAT
LCS TO PANGKOR = TARIK TUGBOAT
LCS TO PANGKOR = TARIK TUGBOAT
-
https://www.malaydeshndefence.com/wp-content/uploads/2026/01/615891933_122257611716152127_8374116749521824848_n-768x512.jpg
-
https://www.malaysiandefence.com/lcs-sea-trials-after-raya-and-commissioning-this-december/
-
πNAVAL : SALAH PASANG DAN PAC : SALAH POTONGπ
INDONESIA EXO B 3 = 80 UNIT
BalasHapusMALAYDESH NAVY = 55 VESSELS
80-55 = SISA 25 UNIT EXO B3
HAAAAAA.......KASIANNNNN π₯ π₯ π₯
----------
TNI AL =
✅️C802
✅️C705
✅️EXO B3
✅️YAKHONT 300 KM
✅️MICA
✅️MISTRAL
✅️NSM (KSR X-33)
✅️ATMACA
==========
==========
TLDM = BLOCK 2 : 72 KM
EXOCET MM40
(surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
-----
TLDM = NSM Operational Range: NSM 185 km (100 NM) LOI GHOIB
----
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = MANGKRAK 15 years
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
----
SIPRI LCS = DELIVERED : 0 (KONTRAK NOL) ......
SAK 70 MK 3 - DELIVERED = 0
MICA - DELIVERED = 0
SHIP ENGINE - DELIVERED = 0
FIRE CONTROL RADAR - DELIVERED = 0
AIR CONTROL RADAR - DELIVERED = 0
-
π80 UNIT-55 VESSEL= SISA 25 UNIT EXO B3π
Jadi Fiks pesan Only one kapal yaaa..terbukti hanya gowing Mahal Lele Aja yg dipasang haha!π¬ππ€
BalasHapus1 kapal buat NSM
1 meriam
warganyet kl, klaim shopping lengkap , eh taunya 2019 hanya kontrak 1
KAPAL KOSONG, KALAH LAGGIII..pembuall haha!π€₯❌️π€₯
⬇️⬇️⬇️⬇️⬇️
LIMA 2019: Malaysia awards only one LCS missile contract
28th March 2019 - 13:00 GMT | by Gordon Arthur in Langkawi
Malaysia’s six Littoral Combat Ships (LCS) will be armed with Naval Strike Missiles (NSM) anti-ship missiles and VL MICA surface-to-air missiles. However, while a deal for the NSM was one of seven contracts signed at LIMA 2019 on 28 March, conspicuous by its absence was any contract for the VL MICA.
The NSM will be installed aboard the LCS being built by Boustead Heavy Industries Corporation (BHIC) for the Royal Malaysian Navy (RMN).
https://www.shephardmedia.com/news/naval-warfare/lima-2019-malaysia-awards-only-one-lcs-missile-con/
Akhirnya mau dipasang juga. Sudah 20 tahun nih, tapi ternyata tidak jadi pakai Exocet.
BalasHapuseittt belum tentu, 2022 aja janji pasang last last kensel om haha!π¬ππ¬
HapusIni kuncinya, dan saya yakin takdewang alias tak cukup wang, lalu delay, lalu senyap, lalu GHOIB...π€£π€£ππ
Hapus=====
"....Pada masa ini, TLDM sedang melaksanakan tinjauan harga bagi mengenal pasti kos sebenar keseluruhan projek,"
Gempurwaria selalu teriak teriak tak de senjata..kosong kosong..ternyata milik malaydes SDH puluhan THN semenjak di belu tak bersenjata..ππ€ͺπmemalukan..puiihhh!
Hapus@PS ternyata itu kalimat paling penting.π
Hapuskahsiyan warganyet kl PEMBOHONG KENA TIPU haha!ππ€₯π
BalasHapuskatanya NSM, BOFORS uda komplit untuk 6 kapal tinggal pasang haha!ππ€£π
taunya hanya utk 1 kapal ajah, sisanya KOSONG...VL MIKA pun ZONK haha!π΅ππ
Pasang meriam, lalu bongkar pipa 4000 bijik dan urai kabel buat diganti oom....πππ€£π€£π€ͺπ
Hapusnyoiihhh SALAH PASANG jadinya pada Konslet om pedang haha!☠️π₯☠️
Hapusmakanya DELAY alhasil kapal ditarik TAGBOT kemana2 pencitraan ajah taunya kabelnya HANGUSπ₯haha!π΅π«ππ΅π«
Alesan OEM terlambat kirim..lah Nipu lagi pembual haha!π€₯ππ€₯
Singkatnya : hanya omon-omon jee, tak dee kontrak NSM 1 pun buat itu
BalasHapusπππ€£π€£π€ͺπ
=====
"...Datuk Sri Mohamed Khaled Nordin, berkata pemasangan itu dirancang secara berfasa, mengambil kira kesiapsiagaan teknikal kapal, keperluan operasi serta implikasi kos.
"Pada masa ini, TLDM sedang melaksanakan tinjauan harga bagi mengenal pasti kos sebenar keseluruhan projek," katanya
Akan
BalasHapusKonoha KETR KETIR sebab Balasungkawa hanya gunboat!
BalasHapusπ€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£
INDONESIA EXO B 3 = 80 UNIT
HapusMALAYDESH NAVY = 55 VESSELS
80-55 = SISA 25 UNIT EXO B3
HAAAAAA.......BELASUNGKAWA TLDM π₯ π₯ π₯
----------
TNI AL =
✅️C802
✅️C705
✅️EXO B3
✅️YAKHONT 300 KM
✅️MICA
✅️MISTRAL
✅️NSM (KSR X-33)
✅️ATMACA
==========
==========
TLDM = BLOCK 2 : 72 KM
EXOCET MM40
(surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
-----
TLDM = NSM Operational Range: NSM 185 km (100 NM) LOI GHOIB
----
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = MANGKRAK 15 years
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
----
SIPRI LCS = DELIVERED : 0 (KONTRAK NOL) ......
SAK 70 MK 3 - DELIVERED = 0
MICA - DELIVERED = 0
SHIP ENGINE - DELIVERED = 0
FIRE CONTROL RADAR - DELIVERED = 0
AIR CONTROL RADAR - DELIVERED = 0
-
π80 UNIT-55 VESSEL= SISA 25 UNIT = BELASUNGKAWA TLDMπ
2011 PENGADAAN LCS = Pengadaan enam LCS pada 2011 itu juga dilakukan tanpa tender terbuka. Kapal-kapal itu akan dibangun di Galangan Kapal Boustead dan unit pertama sedianya dikirim pada 2019.
Hapus---------------------
2019 LCS DIJANGKA = KD Maharaja Lela setelah ditugaskan, diluncurkan secara seremonial pada Agustus 2017. Seharusnya telah dikirim ke RMN pada April 2019
---------------------
2022 LCS DIJANGKA = menurut jadual asal, setakat Ogos 2022 sepatutnya lima buah kapal LCS harus disiap dan diserahkan kepada TLDM.
---------------------
2023 LCS DIJANGKA = Seharusnya telah dikirim ke RMN pada April 2019, dengan kapal terakhir dijadwalkan untuk serah terima pada Juni 2023. Namun, progres kapal pertama baru sekitar 60% selesai
---------------------
2025 LCS DIJANGKA = Kapal pertama Littoral Combat Ship (LCS) TLDM itu dijangka hanya akan siap pada tahun 2025, iaitu 12 tahun selepas projek itu bermula pada Oktober 2013 dan kerajaan telah memPAY RM6 bilion kepada kontraktor utama projek itu.
---------------------
2026 LCS DIJANGKA = Lima kapal LCS akan diserahkan kepada TLDM secara berperingkat dengan kapal pertama dijangka diserahkan pada penghujung 2026
---------------------
2029 LCS DIJANGKA = TLDM hanya akan dapat memperoleh kelima-lima LCS pada 2029 berbanding kontrak asal di mana 5 kapal LCS itu sepatutnya diserahkan pada 2022..
---------------------
17 KREDITUR LCS = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services MALAYDESH Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan MALAYDESH Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat MALAYDESH Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat MALAYDESH Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALAYDESH ) BHD.
---------------------
LOST = RM14.82 MILLION
SELL 51% CAD TO RHEINMETALL AG
SELL 51% CAD TO RHEINMETALL AG
Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
---------------------
HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
Former Royal MALAYDESH Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
---------------------
RM 12.4 BILLION NOT YET DELIVERED
LCS 2024-2011 = 15 YEARS
15 YEARS MANGKRAK
15 YEARS MANGKRAK
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and DEBT
---------------------
RENAME = COPY PASTE = SAME .....
PSC = 1995
PSC > BNS = 2005
BNC > LUNAS = 2024
PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, MALAYDESH government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa MALAYDESH in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
MYANMAR = Su-30SME
HapusMYANMAR = Su-30SME
MYANMAR = Su-30SME
Russia has fulfilled the contract to supply the Myanmar Air Force with all six Su-30SME multirole fighters ordered under the 2018 contract.
------
BANGLADESH = RAFALE
BANGLADESH = RAFALE
BANGLADESH = RAFALE
For the first batch, Bangladesh, which shares borders with Myanmar and India, plans to procure four Rafale F3-R variants, consisting of three two-seat fighters and one single-seat aircraft currently operated by the French Air Force.
For the second batch, Bangladesh intends to acquire eight single-seat Rafale F-4 variants from Dassault Aviation, the manufacturer of the fighter jets.
======
======
2024 HASRAT 4x F18 RONGSOK
2024 HASRAT 4x F18 RONGSOK
2024 HASRAT 4x F18 RONGSOK
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALAYDESH milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALAYDESH baharunya.
------
2023 SURAT 3x F18 RONGSOK
2023 SURAT 3x F18 RONGSOK
2023 SURAT 3x F18 RONGSOK
Bercakap di Parlimen semalam, Menteri Pertahanan Datuk Seri Mohamad Hassan berkata, kementeriannya serta Menteri Pertahanan terdahulu telah menulis surat sebanyak tiga kali kepada kerajaan Kuwait
------
40 SKYHAWK RONGSOK
40 SKYHAWK RONGSOK
40 SKYHAWK RONGSOK
The Tentera Udara Diraja MALAYDESH (TUDM, or Royal MALAYDESH Air Force) ordered 88 A-4s (25 A-4Cs and 63 A-4Ls), Only 40 PTM Skyhawks, 34 single seat versions and six two-seat trainers, were delivered......'
-----
48 SKYHAWK DISAPPEARED
48 SKYHAWK DISAPPEARED
48 SKYHAWK DISAPPEARED
The Tentera Udara Diraja MALAYDESH (TUDM, or Royal MALAYDESH Air Force) ordered 88 A-4s (25 A-4Cs and 63 A-4Ls), Only 40 PTM Skyhawks, 34 single seat versions and six two-seat trainers, were delivered.....
-----
FAKTA = KAYA VS MISKIN TIPU FIFA/UN
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
Tomczyk revealed that while Poland initially pursued the acquisition of the FA-50s from South Korea with the expectation of receiving operational aircraft, it subsequently emerged that the armaments intended for these aircraft had been discontinued. As a result, the Polish Ministry of Defence has received 12 aircraft that are no longer capable of fulfilling combat roles.....
-----
FAKTA = KAYA VS MISKIN TIPU FIFA/UN
FA50 = TRAINING AIRCRAFT
FA50 = TRAINING AIRCRAFT
So far, Poland has received 12 of the jets in the GF (Gap Filler) version, but Blaszczak failed to secure weapons for them, Cezary Tomczyk, a deputy defence minister, told parliament on Thursday.
According to him, the delivery of the 36 remaining jets in the PL version custom-made for Poland "is largely at risk" and delays in their deliveries may reach nine months.
While praising the role the FA-50s are playing in the Polish Air Force, Tomczyk said that they can only be used as training aircraft.
-----
PALM OIL = FA-50 LIGHT COMBAT AIRCRAFT.
PALM OIL = FA-50 LIGHT COMBAT AIRCRAFT.
PALM OIL = FA-50 LIGHT COMBAT AIRCRAFT.
MALAYDESH announced that at least half of the payment would be made in palm oil 8 FLIT 10 LCA : Eight of these aircraft are to be configured primarily as Lead Advanced Trainer (LIFT), while the remaining ten would be Light Fighter Aircraft (LCA) combat aircraft.
πBEHIND = MYANMAR BANGLADESHπ
DELAYED LCS ...........
HapusPROGRESS 70.1% (2025-2011 = 15 YEARS)
PROGRESS 70.1% (2025-2011 = 15 YEARS)
PROGRESS 70.1% (2025-2011 = 15 YEARS)
Deputy Defence Minister Adly Zahari said on Thursday that the overall progress of the long-delayed littoral combat ships (LCS) project had reached 70.1% as of Oct 25 this year.
=============
SLOWLY...........
70.1% : 15 YEARS = 4.6% PER YEARS
70.1% : 15 YEARS = 4.6% PER YEARS
70.1% : 15 YEARS = 4.6% PER YEARS
The progress — which includes design, construction, equipping, and testing — is slightly behind schedule by 0.59%, as the planned progress was 70.69%, according to the contract’s timeline.
On the first LCS (LCS 1), the construction is in its final phase and is expected to be completed by the end of this year, Adly noted.
===================
171 ASET USANG 33 TAHUN =
108 TDM
29 TUDM
34 TLDM
"The total number of MALAYDESH Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal MALAYDESH Air Force (RMAF), and 34 units for the Royal MALAYDESH Navy (RMN)," the MALAYDESH Defence Minister.
===================
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the MALAYDESH Navy in 2004 and complete the delivery in 2007.
Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
===================
PROBLEMS SHIPYARD = LCS OPV NGPVs FAILED
PROBLEMS SHIPYARD = LCS OPV NGPVs FAILED
PROBLEMS SHIPYARD = LCS OPV NGPVs FAILED
Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
Konoha KETR KETIR sebab Balasungkawa dan PPA hanya gunboat!
BalasHapusπ€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£
Kapal LCS 15 TAHUN π€‘π€‘π€‘π€‘π²πΎπ€£π€£π€£π²πΎπ΅π΅π΅
HapusNGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
HapusMYANMAR =
BUILT 2017 - COMMISSIONED 2024
BUILT 2017 - COMMISSIONED 2024
BUILT 2017 - COMMISSIONED 2024
The Senior General and party viewed launching the newlycommissioned 135-metre Frigate from the ship lift platform. The 135-metre Frigate King Thalun was built at the Naval Dockyard Command Headquarters in March 2017 under the guidance of the Senior General.
==============
==============
LCS MALAYDESH =
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, MALAYDESH ’s former Navy chief said today.
---------------------
RM 12.4 BILLION NOT YET DELIVERED
LCS 2024-2011 = 15 YEARS
15 YEARS MANGKRAK
15 YEARS MANGKRAK
15 YEARS MANGKRAK
LCS DIPAY 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and DEBT.
---------------------
NGPVs PAY DEBT LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada PAYan pendahuluan bagi projek LCS untuk menjelaskan DEBT lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenaMALAYDESH semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
----------------------
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOΓHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja MALAYDESH
---------------------
MALAYDESH 's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The MALAYDESH Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, MALAYDESH has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedure
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
AKAN..kontrak NSM pun tak ada
BalasHapusπ€£π€£πππ€ͺπ
Palu gada panik menerima berita ini...
BalasHapusKetar ketir!!
π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£
Kapal LCS 15 TAHUN π€‘π€‘π€‘π€‘π²πΎπ€£π€£π€£π€£π²πΎπ΅π΅π΅π΅
HapusLCS DISUNTIK DANA USUSD430 JUTA = MANGKRAK
HapusLCS 6 UNIT JADI 5 UNIT
Kementerian Pertahanan MALAYDESH mengumumkan langkah strategis terebut saat ajang LIMA 2023 minggu lalu. Kontrak terbaru ini akan memompa anggaran tambahan bagi MALAYDESH hingga USUSD430 juta untuk kapal-kapal tersebut. MALAYDESH juga akan mengurangi jumlah kapal yang akan diterima berdasarkan kontrak yang direvisi dari enam menjadi lima, dan menerima penundaan tambahan untuk pengiriman kapal.
-----------
OPV DISUNTIK DANA RM152,6 JUTA = TAMAT
THHE OPV 2 DAN 3 = TAMAT
Menteri Dalam Negeri, Datuk Seri Saifuddin Nasution Ismail berkata, OPV kedua pula dijangka dapat disiapkan pada Oktober tahun ini.
Beliau berkata, pembinaan dua kapal marititm itu mampu disiapkan selepas kerajaan bersetuju meluluskan suntikan dana berjumlah RM152.6 juta
-----------
LMS B2 = DOWNGRADE MILGEM VARIANT
LMS B2 = DOWNGRADE MILGEM VARIANT
LMS B2 = DOWNGRADE MILGEM VARIANT
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALAYDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOΓHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja MALAYDESH .
==============
FA50 CHEAPEST VARIANT
FA50 CHEAPEST VARIANT
FA50 CHEAPEST VARIANT
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
==============
MALAYDESH 's combat equipment has several weaknesses, including:
• Ageing equipment: The MALAYDESH military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The MALAYDESH Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: MALAYDESH has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The MALAYDESH procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
LCS DISUNTIK DANA USUSD430 JUTA = MANGKRAK
HapusLCS 6 UNIT JADI 5 UNIT
Kementerian Pertahanan MALAYDESH mengumumkan langkah strategis terebut saat ajang LIMA 2023 minggu lalu. Kontrak terbaru ini akan memompa anggaran tambahan bagi MALAYDESH hingga USUSD430 juta untuk kapal-kapal tersebut. MALAYDESH juga akan mengurangi jumlah kapal yang akan diterima berdasarkan kontrak yang direvisi dari enam menjadi lima, dan menerima penundaan tambahan untuk pengiriman kapal.
-----------
OPV DISUNTIK DANA RM152,6 JUTA = TAMAT
THHE OPV 2 DAN 3 = TAMAT
Menteri Dalam Negeri, Datuk Seri Saifuddin Nasution Ismail berkata, OPV kedua pula dijangka dapat disiapkan pada Oktober tahun ini.
Beliau berkata, pembinaan dua kapal marititm itu mampu disiapkan selepas kerajaan bersetuju meluluskan suntikan dana berjumlah RM152.6 juta
-----------
DATA STATISTA 2029-2020 : INCREASE DEBT
DATA STATISTA 2029-2020 : INCREASE DEBT
2029 = 438,09 BILLION USD
2028 = 412,2 BILLION USD
2027 = 386,51 BILLION USD
2026 = 362,19 BILLION USD
2025 = 338,75 BILLION USD
2024 = 316,15 BILLION USD
2023 = 293,83 BILLION USD
2022 = 271,49 BILLION USD
2021 = 247,49 BILLION USD
2020 = 221,49 BILLION USD
------------------
DATA STATISTA 2029-2020 : DEBT PAY DEBT
DATA STATISTA 2029-2020 : OVERLIMIT DEBT
2029 = 69,54% DEBT RATIO TO GDP
2028 = 69,34% DEBT RATIO TO GDP
2027 = 68,8% DEBT RATIO TO GDP
2026 = 68,17% DEBT RATIO TO GDP
2025 = 68,07% DEBT RATIO TO GDP
2024 = 68,38% DEBT RATIO TO GDP
2023 = 69,76% DEBT RATIO TO GDP
2022 = 65,5% DEBT RATIO TO GDP
2021 = 69,16% DEBT RATIO TO GDP
2020 = 67,69% DEBT RATIO TO GDP
==========
1. DEBT 84.3% DARI GDP
1. DEBT 84.3% DARI GDP
2. DEBT NEGARA RM 1.63 TRLLIUN
3. DEBT 1MDB RM 18.2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. DEBT KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VVSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIPAY 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST VSHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. SEWA 12 AW149 TUDM
62. SEWA 4 AW139 TUDM
63. SEWA 5 EC120B TUDM
64. SEWA 2 AW159 TLDM
65. SEWA 4 UH-60A TDM
67. SEWA 12 AW149 TDM
68. SEWA 4 AW139 BOMBA
69. SEWA 2 AW159 MMEA
70. SEWA 7 BELL429 POLIS
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
Pe-5-dhot _ PS Pensiun, Palu gada panik menerima berita ini...Ketar ketir!!
BalasHapusπ€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£
LCS DISUNTIK DANA USUSD430 JUTA = MANGKRAK
HapusLCS 6 UNIT JADI 5 UNIT
Kementerian Pertahanan MALAYDESH mengumumkan langkah strategis terebut saat ajang LIMA 2023 minggu lalu. Kontrak terbaru ini akan memompa anggaran tambahan bagi MALAYDESH hingga USUSD430 juta untuk kapal-kapal tersebut. MALAYDESH juga akan mengurangi jumlah kapal yang akan diterima berdasarkan kontrak yang direvisi dari enam menjadi lima, dan menerima penundaan tambahan untuk pengiriman kapal.
-----------
OPV DISUNTIK DANA RM152,6 JUTA = TAMAT
THHE OPV 2 DAN 3 = TAMAT
Menteri Dalam Negeri, Datuk Seri Saifuddin Nasution Ismail berkata, OPV kedua pula dijangka dapat disiapkan pada Oktober tahun ini.
Beliau berkata, pembinaan dua kapal marititm itu mampu disiapkan selepas kerajaan bersetuju meluluskan suntikan dana berjumlah RM152.6 juta
-----------
DELAYED LCS ...........
PROGRESS 70.1% (2025-2011 = 15 YEARS)
PROGRESS 70.1% (2025-2011 = 15 YEARS)
PROGRESS 70.1% (2025-2011 = 15 YEARS)
Deputy Defence Minister Adly Zahari said on Thursday that the overall progress of the long-delayed littoral combat ships (LCS) project had reached 70.1% as of Oct 25 this year.
=============
SLOWLY...........
70.1% : 15 YEARS = 4.6% PER YEARS
70.1% : 15 YEARS = 4.6% PER YEARS
70.1% : 15 YEARS = 4.6% PER YEARS
The progress — which includes design, construction, equipping, and testing — is slightly behind schedule by 0.59%, as the planned progress was 70.69%, according to the contract’s timeline.
On the first LCS (LCS 1), the construction is in its final phase and is expected to be completed by the end of this year, Adly noted.
===================
NGPVs 2024-1996 = 28 TAHUN
28 TAHUN MANGKRAK
28 TAHUN MANGKRAK
NGPVs DIPAY 27 JADI 6 = The Kedah-class offshore patrol vessels of the Royal MALAYDESH Navy (RMN) are six ships based on the MEKO 100 design by Blohm + Voss. Originally, a total of 27 ships were planned, but due to programme delays and overruns, only six were eventually ordered. Their construction began in the early 2000s, and by 2009, all six were in active service.
-----
NGPVs PAY DEBT LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada PAYan pendahuluan bagi projek LCS untuk menjelaskan DEBT lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenaMALAYDESH semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
-----
17 KREDITUR LCS
17 KREDITUR LCS
17 KREDITUR LCS
Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services MALAYDESH Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan MALAYDESH Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat MALAYDESH Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat MALAYDESH Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALAYDESH ) Bhd
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
LCS DISUNTIK DANA USUSD430 JUTA = MANGKRAK
HapusLCS 6 UNIT JADI 5 UNIT
Kementerian Pertahanan MALAYDESH mengumumkan langkah strategis terebut saat ajang LIMA 2023 minggu lalu. Kontrak terbaru ini akan memompa anggaran tambahan bagi MALAYDESH hingga USUSD430 juta untuk kapal-kapal tersebut. MALAYDESH juga akan mengurangi jumlah kapal yang akan diterima berdasarkan kontrak yang direvisi dari enam menjadi lima, dan menerima penundaan tambahan untuk pengiriman kapal.
-----------
OPV DISUNTIK DANA RM152,6 JUTA = TAMAT
THHE OPV 2 DAN 3 = TAMAT
Menteri Dalam Negeri, Datuk Seri Saifuddin Nasution Ismail berkata, OPV kedua pula dijangka dapat disiapkan pada Oktober tahun ini.
Beliau berkata, pembinaan dua kapal marititm itu mampu disiapkan selepas kerajaan bersetuju meluluskan suntikan dana berjumlah RM152.6 juta
-----------
171 ASET USANG 33 TAHUN =
108 TDM
29 TUDM
34 TLDM
"The total number of MALAYDESH Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal MALAYDESH Air Force (RMAF), and 34 units for the Royal MALAYDESH Navy (RMN)," the MALAYDESH Defence Minister.
===================
DESEMBER 2024 OPV TAMAT
DESEMBER 2024 OPV TAMAT
DESEMBER 2024 OPV TAMAT
“Kementerian Dalam Negeri dibenarkan menamatkan kontrak projek tersebut setelah mendapat pandangan daripada Jabatan Peguam Negara. Sehubungan itu, kerajaan menandatangani perjanjian penamatan bersama pihak syarikat pada 31 Disember 2024,” katanya dalam jawapan bertulis yang dimuat naik dalam laman web Parlimen pada Khamis malam...
-----
SEWA FAST INTERCEPTOR BOAT
SEWA UTILITY BOAT
SEWA RIGID HULL FENDER BOAT
SEWA ROVER FIBER GLASS
SEWA EC120B
SEWA FLIGHT SIMULATION TRAINING DEVICE
Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan SEWAan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
-----
SEWA KAPAL HIDROLOGI
SEWA KAPAL HIDROLOGI
SEWA KAPAL HIDROLOGI
Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak SEWAan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
Saya tanya, selain 1 bijik NSM tuu, mana ada kontrak NSM buat Kedah...tak ada satupun
BalasHapusπ€£π€£ππππ
TOLOL
Mana kamu tau tak ada? Tak semua kontrak kami kena reveal kepada kamu!
Hapusπ€£π€£ππππ
TOLOL
INDONESIA EXO B 3 = 80 UNIT
HapusMALAYDESH NAVY = 55 VESSELS
80-55 = SISA 25 UNIT EXO B3
HAAAAAA.......BELASUNGKAWA TLDM π₯ π₯ π₯
----------
TNI AL =
✅️C802
✅️C705
✅️EXO B3
✅️YAKHONT 300 KM
✅️MICA
✅️MISTRAL
✅️NSM (KSR X-33)
✅️ATMACA
==========
==========
TLDM = BLOCK 2 : 72 KM
EXOCET MM40
(surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
-----
TLDM = NSM Operational Range: NSM 185 km (100 NM) LOI GHOIB
----
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = MANGKRAK 15 years
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
----
SIPRI LCS = DELIVERED : 0 (KONTRAK NOL) ......
SAK 70 MK 3 - DELIVERED = 0
MICA - DELIVERED = 0
SHIP ENGINE - DELIVERED = 0
FIRE CONTROL RADAR - DELIVERED = 0
AIR CONTROL RADAR - DELIVERED = 0
-
π80 -55 = SISA 25 UNIT = BELASUNGKAWA TLDMπ
Kapal LCS 15 TAHUN π€‘π€‘π€‘π²πΎπ΅π΅π΅π²πΎπ€£π€£π€£ BOTOL...BODOH DAN TOLOL
HapusLCS DISUNTIK DANA USUSD430 JUTA = MANGKRAK
HapusCS 6 UNIT JADI 5 UNIT
Kementerian Pertahanan MALAYDESH mengumumkan langkah strategis terebut saat ajang LIMA 2023 minggu lalu. Kontrak terbaru ini akan memompa anggaran tambahan bagi MALAYDESH hingga USUSD430 juta untuk kapal-kapal tersebut. MALAYDESH juga akan mengurangi jumlah kapal yang akan diterima berdasarkan kontrak yang direvisi dari enam menjadi lima, dan menerima penundaan tambahan untuk pengiriman kapal.
-----------
OPV DISUNTIK DANA RM152,6 JUTA = TAMAT
THHE OPV 2 DAN 3 = TAMAT
Menteri Dalam Negeri, Datuk Seri Saifuddin Nasution Ismail berkata, OPV kedua pula dijangka dapat disiapkan pada Oktober tahun ini.
Beliau berkata, pembinaan dua kapal marititm itu mampu disiapkan selepas kerajaan bersetuju meluluskan suntikan dana berjumlah RM152.6 juta
-----------
2011 PENGADAAN LCS = Pengadaan enam LCS pada 2011 itu juga dilakukan tanpa tender terbuka. Kapal-kapal itu akan dibangun di Galangan Kapal Boustead dan unit pertama sedianya dikirim pada 2019.
-----
2019 LCS DIJANGKA = KD Maharaja Lela setelah ditugaskan, diluncurkan secara seremonial pada Agustus 2017. Seharusnya telah dikirim ke RMN pada April 2019
------
2022 LCS DIJANGKA = menurut jadual asal, setakat Ogos 2022 sepatutnya lima buah kapal LCS harus disiap dan diserahkan kepada TLDM.
-----
2023 LCS DIJANGKA = Seharusnya telah dikirim ke RMN pada April 2019, dengan kapal terakhir dijadwalkan untuk serah terima pada Juni 2023. Namun, progres kapal pertama baru sekitar 60% selesai
-----
2025 LCS DIJANGKA = Kapal pertama Littoral Combat Ship (LCS) TLDM itu dijangka hanya akan siap pada tahun 2025, iaitu 12 tahun selepas projek itu bermula pada Oktober 2013 dan kerajaan telah memPAY RM6 bilion kepada kontraktor utama projek itu.
-----
2026 LCS DIJANGKA = Lima kapal LCS akan diserahkan kepada TLDM secara berperingkat dengan kapal pertama dijangka diserahkan pada penghujung 2026
-----
2029 LCS DIJANGKA = TLDM hanya akan dapat memperoleh kelima-lima LCS pada 2029 berbanding kontrak asal di mana 5 kapal LCS itu sepatutnya diserahkan pada 2022..
-----
17 KREDITUR LCS = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services MALAYDESH Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan MALAYDESH Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat MALAYDESH Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat MALAYDESH Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALAYDESH ) BHD.
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
LCS PAY DEBT LAPUK NGPVs
HapusLCS PAY DEBT LAPUK NGPVs
LCS PAY DEBT LAPUK NGPVs
Seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada PAYan pendahuluan bagi projek LCS untuk menjelaskan DEBT lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenaMALAYDESH semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
-----
17 KREDITUR LCS
17 KREDITUR LCS
17 KREDITUR LCS
Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services MALAYDESH Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan MALAYDESH Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat MALAYDESH Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat MALAYDESH Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALAYDESH ) Bhd.
-----
DELAYED LCS ...........
PROGRESS 70.1% (2025-2011 = 15 YEARS)
PROGRESS 70.1% (2025-2011 = 15 YEARS)
PROGRESS 70.1% (2025-2011 = 15 YEARS)
Deputy Defence Minister Adly Zahari said on Thursday that the overall progress of the long-delayed littoral combat ships (LCS) project had reached 70.1% as of Oct 25 this year.
-----
SLOWLY...........
70.1% : 15 YEARS = 4.6% PER YEARS
70.1% : 15 YEARS = 4.6% PER YEARS
70.1% : 15 YEARS = 4.6% PER YEARS
The progress — which includes design, construction, equipping, and testing — is slightly behind schedule by 0.59%, as the planned progress was 70.69%, according to the contract’s timeline.
On the first LCS (LCS 1), the construction is in its final phase and is expected to be completed by the end of this year, Adly noted.
-----
THHE DESEMBER 2024 OPV TAMAT
THHE DESEMBER 2024 OPV TAMAT
THHE DESEMBER 2024 OPV TAMAT
“Kementerian Dalam Negeri dibenarkan menamatkan kontrak projek tersebut setelah mendapat pandangan daripada Jabatan Peguam Negara. Sehubungan itu, kerajaan menandatangani perjanjian penamatan bersama pihak syarikat pada 31 Disember 2024,” katanya dalam jawapan bertulis yang dimuat naik dalam laman web Parlimen pada Khamis malam.
==============
DATA STATISTA 2029-2020 : INCREASE DEBT
DATA STATISTA 2029-2020 : INCREASE DEBT
2029 = 438,09 BILLION USD
2028 = 412,2 BILLION USD
2027 = 386,51 BILLION USD
2026 = 362,19 BILLION USD
2025 = 338,75 BILLION USD
2024 = 316,15 BILLION USD
2023 = 293,83 BILLION USD
2022 = 271,49 BILLION USD
2021 = 247,49 BILLION USD
2020 = 221,49 BILLION USD
------------------
DATA STATISTA 2029-2020 : DEBT PAY DEBT
DATA STATISTA 2029-2020 : OVERLIMIT DEBT
2029 = 69,54% DEBT RATIO TO GDP
2028 = 69,34% DEBT RATIO TO GDP
2027 = 68,8% DEBT RATIO TO GDP
2026 = 68,17% DEBT RATIO TO GDP
2025 = 68,07% DEBT RATIO TO GDP
2024 = 68,38% DEBT RATIO TO GDP
2023 = 69,76% DEBT RATIO TO GDP
2022 = 65,5% DEBT RATIO TO GDP
2021 = 69,16% DEBT RATIO TO GDP
2020 = 67,69% DEBT RATIO TO GDP
==========
BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
MALAYDESH household DEBT is one of the highest in the ASEAN region. Against this backdrop, Bank Negara MALAYDESH (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in MALAYDESH , among other things. Using aggregated data from BNM's Central Credit Reference Information System (CCRIS), this dashboard gives you insight into key trends on household DEBT. For now, it displays data on the flow of borrowing activity on a monthly basis, broken down by purpose. In due time, it will be deepened with granular data showing the state of inDEBTedness of MALAYDESH
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
LAUGHING STOCK TO THE WORLD
HapusLAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
--------------------
HIBAH KAPAL 1967 = The post stated that among his achievements in the MMEA were that he was the team leader for a suitability study on absorbing the US Coast Guard cutter – USCG Decisive. Checks on the US Coast Guard website showed that Decisive– a Reliance class cutter – was laid in 1967 and commissioned in 1968
-----
HIBAH KAPAL 1968 = USCGC Steadfast (WMEC-623) was a United States Coast Guard medium endurance cutter in commission for 56 years. Commissioned in 1968, Steadfast was home ported in St. Petersburg, Florida for her first 24 years of service...
-----
HIBAH KAPAL 1980 = KM Perwira, one of the two Bay class patrol boats donated to MMEA by Australia. It is likely that the Bay class was the design proposed for the tri-nation VLPV project in the late 80s.
-----
PERBAIKAN DIBIAYAI JEPANG = Kapal patroli kedua yang disumbangkan oleh Jepang Coast Guard (JCG) untuk APMM/MMEA akan berlayar ke pulang pada akhir Mei, saat ini kapal dengan nama KM Arau ini sedang dalam tahap perbaikan akhir yang dilakukan di Jepang.
-----
HIBAH KAPAL 1989 DAN 1991 = Jepang menghibahkan dua kapal kelas 90m masing-masing PL-01 Ojima dan PL-02 Erimo, kedua kapal ini masuk dinas di JCG pada tahun 1989 dan 1991.
-----
HIBAH KAPAL1990–1991 = KM Pekan is an Ojika-class offshore patrol vessel operated by the MALAYDESH Coast Guard. This ship, together with KM Arau and KM Marlin was transferred from the Japan Coast Guard to MALAYDESH in order to strengthen the relations between the two countries. The ship was built as the Ojika for the Japanese Coast Guard in 1990–1991
-----
HIBAH KAPAL 1989 = KM Arau is an offshore patrol vessel operated by the MALAYDESH Coast Guard. She was the second ship transferred from the Japan Coast Guard together with KM Pekan and KM Marlin. KM Arau was formerly kNOwn as Oki (PL-01) in the Japan Coast Guard.
-----
KAPAL BUATAN 1960 =
BEKAS MARINE POLICE BEKAS MMEA = RMN informed us that they are getting a new boat – albeit a third hand one – courtesy of the MMEA. MMEA received from the Marine police back in 2011.
-----
KAPAL BEKAS BEKAS MMEA = RMN has taken delivery of ex-Sundang on October 23 after the patrol craft completed its refit. She is the first of two ex-MMEA PC
-----
SEWA FAST INTERCEPTOR BOAT
SEWA UTILITY BOAT
SEWA RIGID HULL FENDER BOAT
SEWA ROVER FIBER GLASS
SEWA EC120B
SEWA FLIGHT SIMULATION TRAINING DEVICE
Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan SEWAan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
Melalui kaedah SEWAan ini, tempoh masa untuk melaksanakan proses perolehan termasuk berkaitan tender serta pembinaan aset dapat dikurangkan.
-----
SEWA KAPAL HIDROLOGI
SEWA KAPAL HIDROLOGI
SEWA KAPAL HIDROLOGI
“Sehubungan itu, TLDM telah mengambil pendekatan di luar kotak dengan mendapatkan Aishah Aims 4 melalui konsep SEWAan yang mana kos operasinya jauh lebih rendah tetapi mampu keluarkan input lebih cepat dan berkesan,” katanya kepada pemberita selepas menyempurnakan majlis penerimaan kapal itu di Jeti Pusat Hidrografi Nasional (PHN) di sini.
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
Konon pasang meriam Bofors 57mm, tapi tak bisa tembak karena masalah wiring yang Naval Group minta dibongkar
BalasHapusHAHAHAHJJAHAHAH
Kabelnya lapuk...πππ€£ππ€ͺ
saya yakin takdewang alias tak cukup wang, lalu delay, lalu senyap, lalu GHOIB...π€£π€£ππ
BalasHapus=====
"....Pada masa ini, TLDM sedang melaksanakan tinjauan harga bagi mengenal pasti kos sebenar keseluruhan projek,"
πππ€£π€£π
Geng GORILLA TERSAKITI....HAHAHAHHA
BalasHapusKita ada duit. Hanya perlukan Political Will aja.
HapusINDON mana ada duit semua mengharapkan lender. Rupiah ANJLOK. IHSG Anjlok. Pelaburan asing lari keluar!
π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£
GORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
HapusGORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
GORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
REVISED (FINAL): RM11.2B FOR 5 SHIPS
(final agreed-upon contract price dealing with cost overruns)
RM 2.24 billion (2023) per unit + ToT (ceiling) [or USD948M (2023 inflation) or ~USD700M (2011 forex) or ~USD490M (2023 forex) (excluding ammo)
Inflation adjustment roughly equivalent to USD948 million in 2023 US dollars (excluding ammo)
-------------
REVISED (INITIAL): RM 9.128B FOR 5 SHIPS
(initial figures using the original contract price in dealing with cost overruns)
RM 1.8 billion (2011) per unit + ToT (ceiling) or USD560 million per ship (excluding ammo)
Inflation adjustment roughly equivalent to USD758 million in 2023 US dollars (excluding ammo)
-------------
ORIGINAL: RM 9B FOR 6 SHIPS
RM 1.5 billion (2011) per unit + ToT (ceiling) or USD466 million per ship (excluding cost overruns and ammo)
Inflation adjustment roughly equivalent to USD631 million in 2023 US dollars (excluding cost overruns and ammo)
===================
DATA STATISTA 2029-2020 : INCREASE DEBT
DATA STATISTA 2029-2020 : INCREASE DEBT
2029 = 438,09 BILLION USD
2028 = 412,2 BILLION USD
2027 = 386,51 BILLION USD
2026 = 362,19 BILLION USD
2025 = 338,75 BILLION USD
2024 = 316,15 BILLION USD
2023 = 293,83 BILLION USD
2022 = 271,49 BILLION USD
2021 = 247,49 BILLION USD
2020 = 221,49 BILLION USD
------------------
DATA STATISTA 2029-2020 : DEBT PAY DEBT
DATA STATISTA 2029-2020 : OVERLIMIT DEBT
2029 = 69,54% DEBT RATIO TO GDP
2028 = 69,34% DEBT RATIO TO GDP
2027 = 68,8% DEBT RATIO TO GDP
2026 = 68,17% DEBT RATIO TO GDP
2025 = 68,07% DEBT RATIO TO GDP
2024 = 68,38% DEBT RATIO TO GDP
2023 = 69,76% DEBT RATIO TO GDP
2022 = 65,5% DEBT RATIO TO GDP
2021 = 69,16% DEBT RATIO TO GDP
2020 = 67,69% DEBT RATIO TO GDP
==========
BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
MALAYDESH household DEBT is one of the highest in the ASEAN region. Against this backdrop, Bank Negara MALAYDESH (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in MALAYDESH , among other things......
-----------
LCS DISUNTIK DANA USUSD430 JUTA = MANGKRAK
LCS 6 UNIT JADI 5 UNIT
Kementerian Pertahanan MALAYDESH mengumumkan langkah strategis terebut saat ajang LIMA 2023 minggu lalu. Kontrak terbaru ini akan memompa anggaran tambahan bagi MALAYDESH hingga USUSD430 juta untuk kapal-kapal tersebut. MALAYDESH juga akan mengurangi jumlah kapal yang akan diterima berdasarkan kontrak yang direvisi dari enam menjadi lima, dan menerima penundaan tambahan untuk pengiriman kapal.
-----------
OPV DISUNTIK DANA RM152,6 JUTA = TAMAT
THHE OPV 2 DAN 3 = TAMAT
Menteri Dalam Negeri, Datuk Seri Saifuddin Nasution Ismail berkata, OPV kedua pula dijangka dapat disiapkan pada Oktober tahun ini.
Beliau berkata, pembinaan dua kapal marititm itu mampu disiapkan selepas kerajaan bersetuju meluluskan suntikan dana berjumlah RM152.6 juta
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
LCS DISUNTIK DANA USUSD430 JUTA = MANGKRAK
HapusLCS 6 UNIT JADI 5 UNIT
Kementerian Pertahanan MALAYDESH mengumumkan langkah strategis terebut saat ajang LIMA 2023 minggu lalu. Kontrak terbaru ini akan memompa anggaran tambahan bagi MALAYDESH hingga USUSD430 juta untuk kapal-kapal tersebut. MALAYDESH juga akan mengurangi jumlah kapal yang akan diterima berdasarkan kontrak yang direvisi dari enam menjadi lima, dan menerima penundaan tambahan untuk pengiriman kapal.
-----------
OPV DISUNTIK DANA RM152,6 JUTA = TAMAT
THHE OPV 2 DAN 3 = TAMAT
Menteri Dalam Negeri, Datuk Seri Saifuddin Nasution Ismail berkata, OPV kedua pula dijangka dapat disiapkan pada Oktober tahun ini.
Beliau berkata, pembinaan dua kapal marititm itu mampu disiapkan selepas kerajaan bersetuju meluluskan suntikan dana berjumlah RM152.6 juta
-----------
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the MALAYDESH Navy in 2004 and complete the delivery in 2007.
Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
===================
===================
LMS B2 = FFBNW DOWNGRADE HISAR OPV NO ASW
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALAYDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-------------
LCS = FFBNW MANGKRAK 15 YEARS
LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT ]
• USD 948 JUTA (EXCLUDING AMMO) = FFBNW = DELAYED
-NO NSM.
-NO VL MICA.
-NO TORPEDO RINGAN.
-NO SECONDARY GUNS.
-NO BOFORS MK3.
-----------
PRICE DESTROYER DAN FREGAT =
-KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
-TYPE 052D CLASS USD 500-600 JUTA.
-TYPE 055 CLASS USD 920 JUTA.
===================
READINESS AIR FORCE = 43%
READINESS AIR FORCE = 43%
READINESS AIR FORCE = 43%
On readiness levels, Azalina cited a 2017 Universiti TekNOLogi MALAYDESH study titled Aircraft Acquisition Conceptual Framework, which found that the Royal MALAYDESH Air Force's (RMAF) aircraft readiness was at just 43 per cent between 2011 and 2015 compared to the minimum 70 per cent mark.
---------------
READINESS NAVY = 58,6%
READINESS NAVY = 58,6%
READINESS NAVY = 58,6%
Panglima Tentera Laut, Laksamana Tan Sri Abdul Rahman Ayob hari ini menyatakan tahap kesiagaan armada Tentera Laut Diraja MALAYDESH (TLDM) adalah di bawah sasaran.
Perkara tersebut dinyatakan oleh beliau semasa menyampaikan Perutusan Tahun Baharu 2024 dan Setahun Pemerintahan Panglima Tentera Laut di Wisma Pertahanan.
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
INDON, Kami ada wang. Kami tak termakan cerita hoax kamu. Kalau tak ada wang masakan LCS yang terbengkalai boleh kami pulihkan. Kami hanya perlukan "Political Will" sahaja.
BalasHapusKamu INDON wangnya TIADA, semua pembelian disupport lender.
190juta warga mu MISKIN! Rupiah ANJLOK. IHSG Anjlok. Pelaburan asing lari keluar!
π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£
Kapal LCS 15 TAHUN π€‘π€‘π€‘π€‘π²πΎπ΅π΅π΅π΅π²πΎπ€£π€£π€£π€£ BODOH DAN TOLOL.. ALIAS BOTOL
Hapus⚓ 1. LCS (LITTORAL COMBAT SHIP) – Kegagalan Proyek Kapal Tempur
HapusMasalah utama:
• Keterlambatan ekstrem: Proyek dimulai pada 2011 untuk membangun 6 kapal tempur pesisir, namun hingga 2025 belum ada satu pun yang selesai.
• Pembengkakan biaya: Dari anggaran awal RM9 miliar, lebih dari RM6 miliar telah dibelanjakan tanpa hasil nyata.
• Manajemen buruk: Audit mengungkapkan penyimpangan dalam kontrak, perubahan desain tanpa persetujuan, dan lemahnya pengawasan oleh Kementerian Pertahanan.
• Dampak strategis: Kegagalan ini menghambat kemampuan Angkatan Laut Malaydesh untuk menjaga wilayah maritim secara efektif.
π« 2. VB BERAPI LP06 – SENAPAN SERBU YANG GAGAL TOTAL
Latar belakang:
• Senapan ini adalah upaya Malaydesh untuk mengembangkan senjata serbu lokal dengan desain bullpup, menggunakan peluru 5.56×45mm NATO.
• Dirancang oleh Viktor Prykhodko, seorang warga Rusia yang tinggal di Malaydesh, dan diproduksi oleh Vita Berapi.
Masalah utama:
• Desain buruk: Senapan ini menjadi bahan olok-olok internasional karena bentuknya yang tidak ergonomis dan tampak “aneh”.
• Tidak lolos uji militer: Tidak pernah digunakan secara resmi oleh militer Malaydesh karena performa dan reliabilitas yang diragukan.
• Kegagalan branding: Alih-alih menjadi simbol kemandirian industri pertahanan, VB Berapi LP06 justru mempermalukan reputasi Malaydesh di bidang ini.
π‘️ 3. TANK STRIDE – PROYEK TANK NASIONAL YANG MANDEK
Catatan:
• STRIDE (Science Technology Research Institute for Defence) adalah lembaga riset militer Malaydesh.
• Proyek tank ini bertujuan menciptakan kendaraan tempur ringan buatan lokal.
Masalah utama:
• Tidak pernah masuk tahap produksi massal: Prototipe sempat dipamerkan, namun tidak ada kelanjutan.
• Kurangnya dukungan industri: Malaydesh belum memiliki ekosistem manufaktur militer yang cukup matang untuk mendukung produksi kendaraan tempur berat.
• Kegagalan strategi: Proyek ini menunjukkan kurangnya perencanaan jangka panjang dan sinergi antara riset dan kebutuhan operasional militer.
π Kesimpulan dan Implikasi
Ketiga kasus ini mencerminkan kegagalan sistemik dalam pengadaan alutsista Malaydesh, termasuk:
• Lemahnya tata kelola proyek dan pengawasan internal.
• Ketergantungan pada pihak luar tanpa transfer teknologi yang efektif.
• Kurangnya integrasi antara riset, industri, dan kebutuhan militer.
----------------
5x PM BUAL MRCA LCS SPH MRSS = 2025 ZONK
6x MOD BUAL MRCA LCS SPH MRSS = 2025 ZONK
6x MOF BUAL MRCA LCS SPH MRSS = 2025 ZONK
SERIUS!!! BADUT GORILA IQ BOTOL = MEMBUAL SHOPPING
-
5x GANTI PM = 84,3% TO GDP
5x GANTI MOF = KLAIM LUNAS 2053 = GAGAL (NAMBAH DEBT)
SERIUS!!! BADUT GORILA IQ BOTOL = MEMBUAL KLAIM KAYA
-
5x GANTI PM = TIDAK BAYAR HUTANG TERTUNGGAK
6x GANTI MOD = KEKANGAN KEWANGAN
SERIUS!!! BADUT GORILA IQ BOTOL = MEMBUAL KLAIM KAYA
----------------
MRCA 2025-2017= ZONK = NO PROCUREMENT
5x GANTI PM
5x GANTI MOD
6x GANTI MOF
-
LCS 2025-2011 = ZONK = MANGKRAK
5x GANTI PM
6x GANTI MOD
6x GANTI MOF
-
SPH 2025-2016 = ZONK = NO PROCUREMENT
5x GANTI PM
5x GANTI MOD
6x GANTI MOF
-
MRSS/LPD 2025-2016 = ZONK = NO PROCUREMENT
5x GANTI PM
5x GANTI MOD
6x GANTI MOF
BERIKUT PENJELASAN RINCI BERDASARKAN PERBANDINGAN STRUKTUR, KEBIJAKAN, DAN KAPASITAS INDUSTRI PERTAHANAN
Hapus----------------
π ️ 1. Struktur dan Sejarah Industri Pertahanan
• Indonesia:
o Memiliki BUMN strategis seperti PT Dirgantara Indonesia (PTDI) untuk pesawat, PT Pindad untuk senjata dan kendaraan tempur, dan PT PAL untuk kapal perang.
o Sejak era Orde Baru, Indonesia sudah mengembangkan industri militer domestik sebagai bagian dari strategi kemandirian alutsista.
o Produk unggulan: pesawat CN-235 dan N-219, tank medium Harimau, kapal perang jenis korvet dan LPD.
-
• Malaydesh:
o Tidak memiliki BUMN militer sekuat Indonesia. Industri pertahanan lebih bergantung pada kerja sama luar negeri dan pengadaan langsung.
o Beberapa perusahaan seperti DefTech dan Boustead Naval Shipyard ada, tapi belum mampu memproduksi sistem senjata kompleks secara mandiri.
o Proyek kapal tempur Littoral Combat Ship (LCS) mengalami keterlambatan dan kontroversi besar.
----------------
π° 2. Anggaran dan Skala Militer
• Indonesia:
o Anggaran pertahanan lebih besar dan jumlah personel militer jauh lebih banyak: 400.000 personel aktif dan 400.000 cadangan, plus 250.000 paramiliter.
o Skala kebutuhan militer yang besar mendorong pengembangan industri dalam negeri.
-
• Malaydesh:
o Personel aktif hanya sekitar 113.000, dengan cadangan 51.600 dan paramiliter 100.000.
o Skala kebutuhan lebih kecil, sehingga tidak mendesak untuk membangun industri militer mandiri.
----------------
π§ 3. Kebutuhan Geopolitik dan Strategis
• Indonesia:
o Negara kepulauan dengan ribuan pulau dan perbatasan laut yang luas, membutuhkan kapal perang dan pesawat patroli untuk menjaga kedaulatan.
o Konflik perbatasan seperti Ambalat dan potensi ancaman di Laut Natuna Utara memperkuat urgensi pengembangan alutsista.
-
• Malaydesh:
o Fokus pertahanan lebih pada pengamanan internal dan kerja sama regional, bukan kemandirian industri militer.
o Ketergantungan pada aliansi dan pembelian dari negara lain seperti Prancis, Korea Selatan, dan Amerika Serikat.
----------------
π§© 4. Kebijakan dan Dukungan Pemerintah
• Indonesia:
o Ada dorongan politik kuat untuk kemandirian industri pertahanan, termasuk regulasi TKDN (Tingkat Komponen Dalam Negeri).
o Pemerintah aktif mendorong ekspor alutsista ke negara lain seperti Filipina dan Senegal.
-
• Malaydesh:
o Kebijakan industri pertahanan belum konsisten, dan proyek besar seperti LCS menghadapi masalah tata kelola dan transparansi.
o Belum ada roadmap jangka panjang yang jelas untuk membangun industri militer mandiri
----------------
5x PM BUAL MRCA LCS SPH MRSS = 2025 ZONK
6x MOD BUAL MRCA LCS SPH MRSS = 2025 ZONK
6x MOF BUAL MRCA LCS SPH MRSS = 2025 ZONK
SERIUS!!! BADUT GORILA IQ BOTOL = MEMBUAL SHOPPING
-
5x GANTI PM = 84,3% TO GDP
5x GANTI MOF = KLAIM LUNAS 2053 = GAGAL (NAMBAH DEBT)
SERIUS!!! BADUT GORILA IQ BOTOL = MEMBUAL KLAIM KAYA
-
5x GANTI PM = TIDAK BAYAR HUTANG TERTUNGGAK
6x GANTI MOD = KEKANGAN KEWANGAN
SERIUS!!! BADUT GORILA IQ BOTOL = MEMBUAL KLAIM KAYA
----------------
MRCA 2025-2017= ZONK = NO PROCUREMENT
5x GANTI PM
5x GANTI MOD
6x GANTI MOF
-
LCS 2025-2011 = ZONK = MANGKRAK
5x GANTI PM
6x GANTI MOD
6x GANTI MOF
-
SPH 2025-2016 = ZONK = NO PROCUREMENT
5x GANTI PM
5x GANTI MOD
6x GANTI MOF
-
MRSS/LPD 2025-2016 = ZONK = NO PROCUREMENT
5x GANTI PM
5x GANTI MOD
6x GANTI MOF
LCS = FFBNW MANGKRAK 15 YEARS
HapusLCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT ]
• USD 948 JUTA (EXCLUDING AMMO) = FFBNW = MANGKRAK DELAYED
-NO NSM.
-NO VL MICA.
-NO TORPEDO RINGAN.
-NO SECONDARY GUNS.
-NO BOFORS MK3.
-----------
PRICE DESTROYER DAN FREGAT =
-KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
-TYPE 052D CLASS USD 500-600 JUTA.
-TYPE 055 CLASS USD 920 JUTA.
-------------
LMS B2 = FFBNW DOWNGRADE HISAR OPV NO ASW
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALAYDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-------------
KEDAH = FFBNW NO MISSILE SINCE 2025=2009 : 17 YAERS GUNBOAT
In June 2006, after a total of 18 months of delays, the Royal MALAYDESH Navy commissioned KD Kedah, followed by a second hull, KD Pahang in August of the same year, and a third hull, KD Perak on 12 November 2007. By July 2009, six vessels had been launched.
-------------
LMS B1 = GUNBOAT NO MISSILE
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
=============
THHE 2024 OPV 2 DAN 3 = TAMAT
THHE 2024 OPV 2 DAN 3 = TAMAT
THHE 2024 OPV 2 DAN 3 = TAMAT
Beliau berkata keputusan itu dipersetujui oleh Kabinet pada 22 Mac 2024 sebelum ia dilaksanakan.
“Kementerian Dalam Negeri dibenarkan menamatkan kontrak projek tersebut setelah mendapat pandangan daripada Jabatan Peguam Negara. Sehubungan itu, kerajaan menandatangani perjanjian penamatan bersama pihak syarikat pada 31 Disember 2024,” katanya dalam jawapan bertulis yang dimuat naik dalam laman web Parlimen pada Khamis malam.
Saifuddin berkata TDSB turut dikenakan LAD di atas kelewatan penyiapan kapal OPV 1 yang berjumlah RM5.58 juta [ASUSD1.26 juta] dan RM9,600 [ASUSD2,167] bagi kelewatan pembekalan baki 12 unit General Purpose Machine Gun (GPMG) serta pembekalan Unmanned Aerial Vehicle (UAV) bermula 1 Oktober 2024 hingga tarikh penerimaan oleh kerajaan.
============
GOODBYE 2023 THHE DELISTED = BURSA MALAYDESH
GOODBYE 2023 THHE DELISTED = BURSA MALAYDESH
GOODBYE 2023 THHE DELISTED = BURSA MALAYDESH
Offshore fabricator and shipbuilder TH Heavy Engineering Bhd (THHE) is undertaking a voluntary winding-up, a year after it was delisted from Bursa MALAYDESH .
The company resolved to undertake voluntary winding-up as it is unable to continue its operations due to liabilities, it said in a winding-up notice dated Sept 13.
The winding-up notice also stated that a meeting of creditors is scheduled for Oct 4 at 3pm.
THHE is controlled by the Ministry of Finance-owned (MoF) unit Urusharta Jamaah Sdn Bhd, which holds a 64.45% stake in the company prior to its delisting on Sept 5, 2022
TH Heavy was delisted from Bursa MALAYDESH in September 2022, after failing to come up with a restructuring exercise despite being given eight extensions by the exchange since first entering Practice Note 17 status in April 2018.
The decision to wind up came after THHE filed an ex-parte originating summons in July to call for a creditors’ meeting to propose a scheme of arrangement for the company.
Global Mariner Offshore Services, Blackstone TechNOLogy Sdn Bhd and Dynac Sdn Bhd have reportedly filed applications to intervene in THHE’s ex-parte application.
THHE had a joint venture partnership with Global Mariner, but a legal dispute arose between the two companies. The High Court ordered THHE to pay Global Mariner approximately RM288.72 million in damages.
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
FUNDING USA = NGEMIS USA
HapusUPGRADE SHOOTING RANGE.
UPGRADE SHOOTING RANGE.
UPGRADE SHOOTING RANGE.
United States is continuing to provide funding for upgrades of facilities of the Armed Forces. The latest funding is for the upgrade of the Kota Belud firing range in Sabah. Army Eastern Field Commander Leftenant General Mohd Sofi Md Lepi said in Tawau on April 16 that they will work with the US Army Pacific (USARPAC) for the RM57.6 million upgrade of the shooting range.
--------------------
FUNDING USA = NGEMIS USA
EXPANSION MMEA HEADQUARTERS
EXPANSION MMEA HEADQUARTERS
EXPANSION MMEA HEADQUARTERS
the US through its Indo-Pacific Command ( IndoPacom) is funding the expansion of the MMEA headquarters in Kuching, Sarawak, the Tun Abang Salahuddin Complex or Komtas, located at Muara Tebas. The complex is located some 30km – by road – north of Kuching.
--------------------
FUNDING USA = NGEMIS USA
UPGRADE MSA CN235
UPGRADE MSA CN235
UPGRADE MSA CN235
The handover ceremony of the modified CN-235-200M MSA to RMAF Chief General Tan Sri Mohd Asghar Goriman Khan by the U.S. government represented by its ambassador to MALAYDESH , Edgard D. Kagan, took place at Subang Air Base today.
--------------------
GIFTED PAID BY USA = NGEMIS RADAR USA
GIFTED PAID BY USA = NGEMIS RADAR USA
GIFTED PAID BY USA = NGEMIS RADAR USA
Back in 2006, the US gifted MALAYDESH an unkTIADAwn number and type of coastal surveillance radars which were kTIADAwn colloquially as the 1206 radars. Some 17 years later the 1206 CSS radars have been upgraded which was also paid by the US.
--------------------
DONATED BY US = NGEMIS RADAR USA
DONATED BY US = NGEMIS RADAR USA
DONATED BY US = NGEMIS RADAR USA
Minister DSU Mohamad Hasan told Parliament on March 16 that the Lockheed Martin TPS-77 long range surveillance radar, donated by the US, will be commissioned in Labuan by year end.
--------------------
DONATED BY JAPAN = NGEMIS RADAR JAPAN
DONATED BY JAPAN = NGEMIS RADAR JAPAN
DONATED BY JAPAN = NGEMIS RADAR JAPAN
It appears that Japan has donated at least a single airfield surveillance radar (ASR) to MALAYDESH for use by the RMAF.
--------------------
MENUNGGU 2041-2045 C130J :
Diterangkan Utusan MALAYDESH , mereka baru bisa mendapatkan C-130 J Super Hercules paling tidak di tahun 2041 hingga 2045.
MENUNGGU 2055 HAWK :
Kerajaan merancang secara sistematik penggantian pesawat Hawk 108 dan Hawk 208 seperti yang digariskan dalam Pembangunan Keupayaan Tentera Udara Diraja MALAYDESH (TUDM) 2055
MENUNGGU 2053 DEBT = OVER LIMIT DEBT:
The Federal Government is expected to be able to settle its DEBTs by 2053 by taking into account the number of new loans made for deficit financing purposes and refinancing maturing DEBTs from 2024 onwards, said the Ministry of Finance (MoF)
-
MENUNGGU 2050 = KAPAL SELAM
MENUNGGU 2050 = MRSS
MENUNGGU 2050 = LCS
MENUNGGU 2050 = PV
MENUNGGU 2050 = LMS
“Mengikut Pelan Transformasi 15 ke 5 TLDM, ia dijangka akan memiliki 12 buah kapal Littoral Combat Ship (LCS), tiga buah kapal Multi Role Support Ship (MRSS), 18 buah kapal Littoral Mission Ship (LMS), 18 buah kapal Patrol Vessel (PV) dan empat buah kapal selam menjelang tahun 2050,” kata beliau dalam temuramah itu.
Nampak gaya,impian untuk melihat TLDM menambah bilangan kapal selam dimilikinya daripada dua buah kepada empat buah akan hanya direalisasikan menjelang tahun 2050.
-
UAV = MENUNGGU 2030
LMS B2 = MENUNGGU 2030
MRSS = MENUNGGU 2030
HELI = MENUNGGU 2030
RMKe-13 merangkumi tempoh tahun 2026-2030.
“Perolehan bagi baki 3 buah LMS lagi akan dimasukkan di bawah RMKe-13,” ujar beliau.
Selain LMS, TLDM turut merancang perolehan 2 buah kapal Multi Role Support Ship (MRSS), 3 buah kapal Littoral Mission Ship Batch 3, 4 buah helikopter anti kapal selam dan 6 buah Unmanned Aerial Vehicle (UAV).
“Proses perolehan bagi aset-aset baharu ini dijangka berlangsung sehingga 2030. Kesemua perolehan aset TLDM ini dianggarkan
2025 USD1.3 BILLION MINDEF =
HapusMAINTENANCE
REPAIRS
ASSETS.
(SEWA, SEWA AND SEWA)
-------------
Military spending
In 2025, MALAYDESH Ministry of Defense (MINDEF) was allocated USD4.8 billion to protect the country's sovereignty.
This budget included USD1.3 billion for maintenance, repairs, and new military assets..
=========
RELATED DEBT WITH BUDGET MILITARY
RELATED DEBT WITH BUDGET MILITARY
RELATED DEBT WITH BUDGET MILITARY
Public DEBT and defense spending in MALAYDESH are related, and the relationship between the two is important to consider for fiscal dynamics.
Military spending and external DEBT
Military spending can have security and economic consequences, especially for developing economies. Rapid expansion in military spending can lead to rising fiscal deficits.
Public DEBT and defense spending in MALAYDESH
Research has been conducted to study the relationship between public DEBT and defense spending in MALAYDESH . This research has used data from the World Bank to analyze the dynamic relationship between the two variables.
Policy implications
Policymakers need to balance the benefits and costs of incurring higher government DEBT. They need to consider the trade-off between the benefits of growth and the costs of slowing down growth due to additional DEBT.
=========
PUBLIC DEBT = DEFENSE SPENDING
Public DEBT has a positive correlation with defense spending in MALAYDESH , meaning that as public DEBT increases, so does defense spending. This is because the government allocates funds from the national budget to DEBT repayments and defense.
Explanation
DEBT and budget
The MALAYDESH government's budget includes allocations for DEBT repayments and defense. The government's income is often not enough to cover all expenditures, so it borrows money to finance the difference.
DEBT-to-GDP ratio
MALAYDESH DEBT-to-GDP ratio has been increasing over the years. In 2023, the DEBT-to-GDP ratio was 65.6%.
Interest payments
The government pays interest on its DEBT, which can be a significant cost. As interest rates rise, it becomes more expensive to refinance DEBT.
Defense budget
The defense budget is a general outline of the Ministry of Defense's spending, EXCLUDING a detailed breakdown
=========
2024 RASIO DEBT 84,3% DARI GDP
DEBT 2023 = RM 1.53 TRILLION
DEBT 2022 = RM 1.45 TRILLION
DEBT 2021 = RM 1.38 TRILLION
DEBT 2020 = RM 1.32 TRILLION
DEBT 2019 = RM 1.25 TRILLION
DEBT 2018 = RM 1.19 TRILLION
The Finance Ministry stated that the aggregate national household DEBT stood at RM1.53 trillion between 2018 and 2023. In aggregate, it said the household DEBT for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018). “The ratio of household DEBT to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.3% compared with 82% in 2018,” it said.
Wang omon omon lon?
BalasHapusππ€£π€£π€£ππ
Membual
Bukti membual mudah jee, tuu kapal 15 tahun tak selesai
Nampak TOLOL πππ€£π€£ππ€ͺπ€ͺ
LAMBAT tapi sampai ke destinasi.
HapusKamu?
1. ENAM buah FREMM kau sampai sekarang tak nampak.
https://www.defensenews.com/global/europe/2021/06/10/indonesia-orders-six-fremm-frigates-from-fincantieri/
2. Su-35??
https://en.tempo.co/read/2061504/russia-says-indonesias-purchase-of-11-sukhoi-su-35-jets-remains-delayed
3. F-15ID??
https://turdef.com/article/indonesia-secures-boeing-s-f-15-idn-fighter-jets
4. V-22??
https://www.flightglobal.com/defence/indonesia-cleared-to-buy-eight-mv-22-ospreys/139166.article
5. Changbogo II Submarine??
https://www.koreatimes.co.kr/southkorea/defense/20190413/south-korea-signs-1b-submarine-contract-with-indonesia
6. KF-21??
7. Mirage 2000 Qatar?
https://adj.com.my/2023/06/17/indonesia-buys-ex-qatari-fighters-to-maintain-air-power-capability/
π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£
5x PM BUAL MRCA LCS SPH MRSS = 2025 ZONK
Hapus6x MOD BUAL MRCA LCS SPH MRSS = 2025 ZONK
SERIUS!!! BADUT GORILA IQ BOTOL = MEMBUAL SHOPPING
-
5x GANTI PM = 84,3% TO GDP
5x GANTI MOF = KLAIM LUNAS 2053 = GAGAL (NAMBAH DEBT)
SERIUS!!! BADUT GORILA IQ BOTOL = MEMBUAL KLAIM KAYA
-
5x GANTI PM = TIDAK BAYAR HUTANG TERTUNGGAK
6x GANTI MOD = KEKANGAN KEWANGAN
SERIUS!!! BADUT GORILA IQ BOTOL = MEMBUAL KLAIM KAYA
----------------
MRCA 2025-2017= ZONK = NO PROCUREMENT
5x GANTI PM
5x GANTI MOD
-
LCS 2025-2011 = ZONK = MANGKRAK
5x GANTI PM
6x GANTI MOD
-
SPH 2025-2016 = ZONK = NO PROCUREMENT
5x GANTI PM
5x GANTI MOD
-
MRSS/LPD 2025-2016 = ZONK = NO PROCUREMENT
5x GANTI PM
5x GANTI MOD
----------------
GOVERNMENT DEBT : 69% of GDP
HOUSEHOLD DEBT : 84.3% of GDP
Federal Government Debt
• End of 2024: RM 1.25 trillion
• End of June 2025: RM 1.3 trillion
• Projected Debt-to-GDP: 69% by the end of 2025
Household Debt
2025 : RM1.73 trillion, or 85.8% of GDP -------
SEWA = HUTANG 84.3% DARI GDP = NO SHOPPING
1. SEWA 28 HELI
2. SEWA L39 ITCC
3. SEWA EC120B
4. SEWA Flight Simulation Training Device (FSTD)
5. SEWA 1 unit Sistem Simulator EC120B
6. SEWA HOVERCRAFT
7. SEWA AW139
8. SEWA Fast Interceptor Boat (FIB)
9. SEWA Utility Boat
10. SEWA Rigid Hull Fender Boat (RHFB)
11. SEWA Rover Fiber Glass (Rover)
12. SEWA MV Aishah AIM 4
13. SEWA BMW R1250RT
14. SEWA 4x4 VECHICLE
15. SEWA VSHORAD
16. SEWA TRUCK
17. SEWA HONDA CIVIC
18. SEWA PATROL BOATS
19. SEWA OUTBOARD MOTORS
20. SEWA TRAILERS
21. SEWA SUPERBIKES
22. SEWA SIMULATOR MKM
23. SEWA 12 AW149 TUDM
24. SEWA 4 AW139 TUDM
25. SEWA 5 EC120B TUDM
26. SEWA 2 AW159 TLDM
27. SEWA 4 UH-60A TDM
28. SEWA 12 AW149 TDM
29. SEWA 4 AW139 BOMBA
30. SEWA 2 AW159 MMEA
31. SEWA 7 BELL429 POLIS
32. SEWA MOTOR POLIS
=============
=============
DAFTAR PENGADAAN ALUTSISTA ON PROGRESS
2 KRI Frigate Brawijaya Class dari Italia
2 KRI Frigate Merah Putih dari PT PAL
2 KRI Frigate Istif Class dari Turkiye
1 KRI Rigel Class dari Palindo/Jerman
2 KRI Kapal Cepat Rudal dari Turkiye
1 KRI Kapal Cepat Rudal dari Tesco Bekasi
2 KS Scorpene dari Perancis & PT PAL
1 Kapal Induk Giribaldi dari Italia (Opsi)
1 Kapal LHD Helikopter dari PT PAL (Opsi)
42 Jet Tempur Rafale dari Perancis
48 Jet Tempur IFX kerjasama Korsel RI
48 Jet Tempur KHAAN dari Turkiye
6 Jet Tempur T50 dari Korsel
2 Pesawat angkut A400M dari Spanyol
13 Radar GCI dari Thales Perancis
12 Radar Retia dari Retia
3 Baterai Rudal Balistik KHAN Turkiye
3 Baterai Rudal ADS Trisula dari Turkiye
22 Helikopter Blackhawk dari AS
12 Drone Anka dari Turkiye
60 Drone Bayraktar TB3 dari Turkiye
45 Rudal anti kapal Atmaca dari Turkiye
π€£BEDA KASTA BEDA LEVELπ€£
SEWA = HUTANG 84.3% DARI GDP = NO SHOPPING
Hapus1. SEWA 28 HELI
2. SEWA L39 ITCC
3. SEWA EC120B
4. SEWA Flight Simulation Training Device (FSTD)
5. SEWA 1 unit Sistem Simulator EC120B
6. SEWA HOVERCRAFT
7. SEWA AW139
8. SEWA Fast Interceptor Boat (FIB)
9. SEWA Utility Boat
10. SEWA Rigid Hull Fender Boat (RHFB)
11. SEWA Rover Fiber Glass (Rover)
12. SEWA MV Aishah AIM 4
13. SEWA BMW R1250RT
14. SEWA 4x4 VECHICLE
15. SEWA VSHORAD
16. SEWA TRUCK
17. SEWA HONDA CIVIC
18. SEWA PATROL BOATS
19. SEWA OUTBOARD MOTORS
20. SEWA TRAILERS
21. SEWA SUPERBIKES
22. SEWA SIMULATOR MKM
23. SEWA 12 AW149 TUDM
24. SEWA 4 AW139 TUDM
25. SEWA 5 EC120B TUDM
26. SEWA 2 AW159 TLDM
27. SEWA 4 UH-60A TDM
28. SEWA 12 AW149 TDM
29. SEWA 4 AW139 BOMBA
30. SEWA 2 AW159 MMEA
31. SEWA 7 BELL429 POLIS
32. SEWA MOTOR POLIS
===================
SEWA 53 HELI BEKAS
SEWA 53 HELI BEKAS
SEWA 53 HELI BEKAS
TUDM SEWA =
12 AW149
4 AW139
5 EC120B
TLDM SEWA =
2 AW159
TDM SEWA =
4 UH-60A
12 AW149
BOMBA SEWA =
4 AW139
POLIS SEWA =
7 BELL429
JABATAN PM SEWA =
1 AW139
MMEA SEWA =
2 AW159.
===================
171 ASET USANG 33 TAHUN =
108 TDM
29 TUDM
34 TLDM
"The total number of MALAYDESH Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal MALAYDESH Air Force (RMAF), and 34 units for the Royal MALAYDESH Navy (RMN)," the MALAYDESH Defence Minister
4000 pipa dibongkar jangan lupa bongkar wiring pula..
BalasHapusπππ€£π€£ππ€ͺπ€ͺ
Hasil kerja 15 tahun tuu.
TOLOL
LCS lambat perjalanannya tapi sampai ke destinasi.
BalasHapusINDON?
1. ENAM buah FREMM kau sampai sekarang tak nampak.
https://www.defensenews.com/global/europe/2021/06/10/indonesia-orders-six-fremm-frigates-from-fincantieri/
2. Su-35??
https://en.tempo.co/read/2061504/russia-says-indonesias-purchase-of-11-sukhoi-su-35-jets-remains-delayed
3. F-15ID??
https://turdef.com/article/indonesia-secures-boeing-s-f-15-idn-fighter-jets
4. V-22??
https://www.flightglobal.com/defence/indonesia-cleared-to-buy-eight-mv-22-ospreys/139166.article
5. Changbogo II Submarine??
https://www.koreatimes.co.kr/southkorea/defense/20190413/south-korea-signs-1b-submarine-contract-with-indonesia
6. KF-21??
7. Mirage 2000 Qatar?
https://adj.com.my/2023/06/17/indonesia-buys-ex-qatari-fighters-to-maintain-air-power-capability/
Sibuk jaga tepi kain jiran, kain sendiri terlondeh habis.
π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£
LCS 2025-2011 = 15 TAHUN OMPONG
HapusLCS 2024-2011 = RM 12.4 BILLION
NO MERIAM
NO RADAR
NO MACHINE
NO MISSILE
LCS DIPAY 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and DEBT.
-----
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = MANGKRAK 15 years
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
-----
HIGH COURT =
CRIMINAL BREACH LCS RM 21 MILLION
CRIMINAL BREACH LCS RM 21 MILLION
CRIMINAL BREACH LCS RM 21 MILLION
Former Royal MALAYDESH Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
=========
PMX SEWA 15 YEARS
PMX SEWA 15 YEARS
PMX SEWA 15 YEARS
RMAF
RMN
MMEA
POLICE
FIRE
RESCUE DEPARTEMENT
PM DEPARTEMENT
PMX has defended the decision to SEWA the helicopters for the military and other government agencies – RM16.5 billion for 15 years – during the Parliament session on Thursday. Among others he said the government adopted the leasing model to reduce maintenance costs and at the same time improved the operational readiness of the fleet.
DS Anwar Ibrahim did not address the fact that the government will be paying some RM1 billion a year for 15 years for the helicopters. He also said the helicopters selected were based on the specifications and requirements of the agencies themselves.
He also confirmed that the Army will also be part of the leasing programme apart from RMAF,RMN, MMEA, police, Fire and Rescue Department, and the Prime Minister Department. Apart from RMAF 12 and police’s seven helicopters, he did not give the breakdown for the other services and agencies.
=========
MALAYDESH 's combat equipment has several weaknesses, including:
• Ageing equipment: The MALAYDESH military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The MALAYDESH Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: MALAYDESH has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The MALAYDESH procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
The MALAYDESH Armed Forces (MAF) face several challenges in research and development (R&D), including a lack of funding, limited local capabilities, and a lack of strategic partnerships.
HapusLack of funding
There is a lack of funding to generate innovation in the local defense industry
The defense industry faces tight budgets and uncertain timelines
Limited local capabilities
Local companies lack the capabilities and capacities to develop and produce military products
There is a reluctance from Original Equipment Manufacturers (OEMs) to share their techNOLogy
Lack of strategic partnerships
There is a lack of strategic relationships between local companies and foreign partners
There is a lack of clear guidance from the government for the future strategic direction of the defense industry
------------------
.The Royal MALAYDESH Navy (RMN) has an aging fleet that is underfunded and struggling to keep up with techNOLogical advancements. This makes it difficult for the RMN to defend the country and its territorial claims in the South China Sea.
Causes
• Aging vessels
Many of the RMN's ships are past their prime and are used beyond their economical life
• Delayed replacements
The RMN has received only a small number of the new vessels it planned to receive
• Mismanagement
A government audit found that mismanagement has mangkrak plans to replace the aging fleet
Effects
• Limited ability to patrol: The RMN's ability to patrol its maritime domain is limited
• Increased reliance on the US: The RMN is relying more on the US to bolster its maritime capabilities
Increased risk of accidents: The age of the RMN's vessels increases the risk of accident
===========
The MALAYDESH Armed Forces (MAF) face a variety of challenges, including personnel issues, logistics, and security threats.
Personnel issues
Lack of military knowledge
Military personnel may struggle with decision-making, thinking skills, and problem-solving due to a lack of military knowledge.
Civil-military relations
The military is controlled by civilians who exercise authority over the military.
Logistics issues
Readiness: The MAF must be able to provide the minimum supply and service needed to start a combat operation.
Responsiveness: The MAF must provide accurate support at the right place and time.
LCS lambat perjalanannya tapi sampai ke destinasi.
BalasHapusINDON?
1. ENAM buah FREMM kau sampai sekarang tak nampak.
https://www.defensenews.com/global/europe/2021/06/10/indonesia-orders-six-fremm-frigates-from-fincantieri/
2. Su-35??
https://en.tempo.co/read/2061504/russia-says-indonesias-purchase-of-11-sukhoi-su-35-jets-remains-delayed
3. F-15ID??
https://turdef.com/article/indonesia-secures-boeing-s-f-15-idn-fighter-jets
4. V-22??
https://www.flightglobal.com/defence/indonesia-cleared-to-buy-eight-mv-22-ospreys/139166.article
5. Changbogo II Submarine??
https://www.koreatimes.co.kr/southkorea/defense/20190413/south-korea-signs-1b-submarine-contract-with-indonesia
6. Mirage 2000 Qatar?
https://adj.com.my/2023/06/17/indonesia-buys-ex-qatari-fighters-to-maintain-air-power-capability/
7. KF-21??
Sibuk jaga tepi kain jiran, kain sendiri terlondeh habis.
π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£
CHANGE SKIN = CHANGE NAME = MANGKRAK DELATED 15 YEARS .....
HapusPSC = 1995 = TRAWLERS
PSC > BNS = 2005 = NGPVs (PAY 27 UNIT REAL 6 UNIT)
BNS > LUNAS = 2024 = LCS PAY 6 UNIT DELAYED 15 YEARS
PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, MALAYDESH government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa MALAYDESH in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
===================
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the MALAYDESH Navy in 2004 and complete the delivery in 2007.
Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
===================
LCS 2024-2011 = 15 TAHUN
15 TAHUN MANGKRAK
15 TAHUN MANGKRAK
LCS DIPAY 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and DEBT.
-----
NGPVs PAY DEBT LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada PAYan pendahuluan bagi projek LCS untuk menjelaskan DEBT lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenaMALAYDESH semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
-----
17 KREDITUR LCS = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services MALAYDESH Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan MALAYDESH Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat MALAYDESH Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat MALAYDESH Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALAYDESH ) BHD.
===================
MALAYDESH 's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The MALAYDESH Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, MALAYDESH has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
RENAME = COPY PASTE = MANGKRAK DELAYED 15 YEARS .....
HapusPSC = 1995 = TRAWLERS
PSC > BNS = 2005 = NGPVs (PAY 27 UNIT REAL 6 UNIT)
BNS > LUNAS = 2024 = LCS PAY 6 UNIT DELAYED 15 YEARS
PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, MALAYDESH government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa MALAYDESH in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
===================
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the MALAYDESH Navy in 2004 and complete the delivery in 2007.
Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
===================
MALAYDESH 's combat equipment has several weaknesses, including:
• Ageing equipment: The MALAYDESH military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The MALAYDESH Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: MALAYDESH has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The MALAYDESH procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
===================
PROBLEMS SHIPYARD = LCS OPV NGPVs FAILED
PROBLEMS SHIPYARD = LCS OPV NGPVs FAILED
PROBLEMS SHIPYARD = LCS OPV NGPVs FAILED
Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030.
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
The Royal MALAYDESH Air Force (RMAF) faces a number of issues with its aircraft, including fleet maintenance, the age of its aircraft, and the need for a multi-role combat aircraft.
HapusFleet maintenance
The RMAF has fleet sustainment problems due to its aging aircraft fleet.
The RMAF's logistics equipment quality has been criticized.
The RMAF has had issues with the reliability of its fleet, which has forced it to cut schedules.
Age of aircraft
The RMAF's main fighter fleet includes the Su-30MKMs and Boeing F/A-18 Hornets.
The RMAF's aircraft are aging, which can make them more difficult and expensive to maintain.
Need for a multi-role combat aircraft
The RMAF has stated that it needs a multi-role combat aircraft, but the government's defense budget is limited.
The RMAF has been discussing acquiring second-hand Kuwaiti F/A-18s, but no formal negotiations have taken place.
Other issues
The RMAF has faced issues with the quality of its logistics equipment.
The RMAF has been wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
============
MALAYDESH armed forces have faced challenges due to limited funding, which has hindered their ability to modernize and respond to threats.
Factors
Fiscal constraints: The government has been unwilling to cut spending elsewhere to fund defense.
Maintenance and repair: A significant portion of the defense budget goes toward maintenance and repair, leaving little for new assets.
Political uncertainty: Political uncertainty has limited defense spending.
Aging aircraft: The air force has a large fleet of aging aircraft that are expensive to maintain.
Diversified acquisitions: The country has acquired advanced weapon systems from different countries, which can lead to technical and logistical problems.
Poor governance: Poor governance has undermined the effectiveness of outsourcing programs.
------------------
The MALAYDESH Armed Forces (MAF) has many outdated assets, including ships, helicopters, and spare parts. The MAF has acknowledged the need to replace these assets.
Ships
• The Royal MALAYDESH Navy's (RMN) Fast Attack Craft (FAC) is over 50 years old
• The RMN has many vessels that are past their optimal lifespan
• The RMN's age limit for submarines is 35 years, and 30 years for frigates, corvettes, and other ships
• The RMN's smaller vessels, like fast patrol boats, have an age limit of 24 years
Helicopters
• Some helicopters in the MAF were commissioned in the 1960s
Spare parts
• The MAF has lost money due to spare parts that are no longer compatible with its fleet
LCS lambat perjalanannya tapi sampai ke destinasi.
BalasHapusINDON?
1. ENAM buah FREMM kau sampai sekarang tak nampak.
https://www.defensenews.com/global/europe/2021/06/10/indonesia-orders-six-fremm-frigates-from-fincantieri/
2. Su-35??
https://en.tempo.co/read/2061504/russia-says-indonesias-purchase-of-11-sukhoi-su-35-jets-remains-delayed
3. F-15ID??
https://turdef.com/article/indonesia-secures-boeing-s-f-15-idn-fighter-jets
4. V-22??
https://www.flightglobal.com/defence/indonesia-cleared-to-buy-eight-mv-22-ospreys/139166.article
5. Changbogo II Submarine??
https://www.koreatimes.co.kr/southkorea/defense/20190413/south-korea-signs-1b-submarine-contract-with-indonesia
6. Mirage 2000 Qatar?
https://adj.com.my/2023/06/17/indonesia-buys-ex-qatari-fighters-to-maintain-air-power-capability/
7. KF-21??
Sibuk jaga tepi kain jiran, kain sendiri terlondeh habis.
REALITY SUCKS ISN'T IT INDON??
π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£
INDONESIA EXO B 3 = 80 UNIT
HapusMALAYDESH NAVY = 55 VESSELS
80-55 = SISA 25 UNIT EXO B3
MAMPUS.......BELASUNGKAWA TLDM π₯ π₯ π₯
----------
TNI AL =
✅️C802
✅️C705
✅️EXO B3
✅️YAKHONT 300 KM
✅️MICA
✅️MISTRAL
✅️NSM (KSR X-33)
✅️ATMACA
==========
==========
TLDM = BLOCK 2 : 72 KM
EXOCET MM40
(surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
-----
TLDM = NSM Operational Range: NSM 185 km (100 NM) LOI GHOIB
----
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = MANGKRAK 15 years
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
----
SIPRI LCS = DELIVERED : 0 (KONTRAK NOL) ......
SAK 70 MK 3 - DELIVERED = 0
MICA - DELIVERED = 0
SHIP ENGINE - DELIVERED = 0
FIRE CONTROL RADAR - DELIVERED = 0
AIR CONTROL RADAR - DELIVERED = 0
-
π80 -55 = SISA 25 UNIT = BELASUNGKAWA TLDMπ
BUKTI LCS OMPONG MELOMPONG ......
HapusLOI NSM = LCS OMPONG
LOI NSM = LCS OMPONG
LOI TARANTULA = GOIB
Mindef hari ini menandatangani surat hasrat (LOI) bernilai RM1.8 bilion kepada Mildef International Technologies Sdn. Bhd. (MILDEF).
Selain Tarantula, Mindef turut menganugerahkan LOI bernilai RM800 juta kepada Lumut Naval Shipyard (Lunas) bagi perolehan kelengkapan logistik untuk kapal tempur pesisir (LCS). Seterusnya membekal 2 set pelancar Naval Strike Missile (NSM) bernilai RM44 juta.
----
BUKTI OPV GAGAL
BUKTI OPV GAGAL
BUKTI OPV GAGAL
Bagaimana pun kapal kedua dan ketiga (OPV 2, OPV 3) gagal disiapkan dengan kedua-duanya telah mencapai status pembinaan sebanyak 76% dan 57%.
Kerajaan memeterai perjanjian dengan THHE Destiny pada 2017 untuk membekalkan tiga unit OPV pada kos RM740 juta untuk APMM dan kapal peronda itu dijadual diserahkan pada 2022
----
MKM = BARTER PALM OIL
MIG29N = BARTER PALM OIL
MALAYDESH has used palm oil to barter for military equipment, including fighter jets. The MALAYDESH Armed Forces (MAF) is made up of the Royal MALAYDESH Navy, the Royal MALAYDESH Air Force, and the MALAYDESH Army.
----
A400M
PEMBAYARAN BERPERINGKAT = DEBT
MALAYDESH membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan bayar berperingkat.
----
FA50M BARTER PALM OIL
On the other hand, South Korea aims to sell another 18 FA-50s to MALAYDESH in the future. MALAYDESH announced that at least half of the payment would be made in palm oil
----
SCORPENE BARTER PALM OIL
Under the deal, France would buy RM819 million’s (€230 million) worth of MALAYDESH palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and techNOLogy transfer to local firms here.
----
PT91 BARTER PALM OIL RUBBER
Payment for the purchase includes 30 percent of direct off-set in the form of training and techNOLogy transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
----
GORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
GORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
GORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
REVISED (FINAL): RM11.2B FOR 5 SHIPS
(final agreed-upon contract price dealing with cost overruns)
RM 2.24 billion (2023) per unit + ToT (ceiling) [or USD948M (2023 inflation) or ~USD700M (2011 forex) or ~USD490M (2023 forex) (excluding ammo)
Inflation adjustment roughly equivalent to USD948 million in 2023 US dollars (excluding ammo)
-------------
REVISED (INITIAL): RM 9.128B FOR 5 SHIPS
(initial figures using the original contract price in dealing with cost overruns)
RM 1.8 billion (2011) per unit + ToT (ceiling) or USD560 million per ship (excluding ammo)
Inflation adjustment roughly equivalent to USD758 million in 2023 US dollars (excluding ammo)
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
HapusNEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the MALAYDESH Navy in 2004 and complete the delivery in 2007.
Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
===================
PROBLEMS SHIPYARD = LCS OPV NGPVs FAILED
PROBLEMS SHIPYARD = LCS OPV NGPVs FAILED
PROBLEMS SHIPYARD = LCS OPV NGPVs FAILED
Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.
===================
DATA STATISTA 2029-2020 : INCREASE DEBT
DATA STATISTA 2029-2020 : INCREASE DEBT
2029 = 438,09 BILLION USD
2028 = 412,2 BILLION USD
2027 = 386,51 BILLION USD
2026 = 362,19 BILLION USD
2025 = 338,75 BILLION USD
2024 = 316,15 BILLION USD
2023 = 293,83 BILLION USD
2022 = 271,49 BILLION USD
2021 = 247,49 BILLION USD
2020 = 221,49 BILLION USD
------------------
DATA STATISTA 2029-2020 : DEBT PAY DEBT
DATA STATISTA 2029-2020 : OVERLIMIT DEBT
2029 = 69,54% DEBT RATIO TO GDP
2028 = 69,34% DEBT RATIO TO GDP
2027 = 68,8% DEBT RATIO TO GDP
2026 = 68,17% DEBT RATIO TO GDP
2025 = 68,07% DEBT RATIO TO GDP
2024 = 68,38% DEBT RATIO TO GDP
2023 = 69,76% DEBT RATIO TO GDP
2022 = 65,5% DEBT RATIO TO GDP
2021 = 69,16% DEBT RATIO TO GDP
2020 = 67,69% DEBT RATIO TO GDP
==========
BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
MALAYDESH household DEBT is one of the highest in the ASEAN region. Against this backdrop, Bank Negara MALAYDESH (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in MALAYDESH , among other things......
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
CONTRACT 45 ATMACA
HapusThis contract, which covers the procurement of 45 missile rounds and associated launcher units and user terminals, paves the way for the Indonesian Navy to be the first export customer of the Turkish-developed guided weapon.
------
KONTRAK RUDAL ΓAKIR SUNGUR
MRO RCWS
Kementerian Pertahanan menandatangani kontrak kerja sama pengadaan Rudal Permukaan ke Permukaan Γakir dan Rudal Pertahanan Udara Sungur dengan Republikorp Indonesia. Dalam siaran pers resmi yang diterima ANTARA, penandatanganan itu dilakukan oleh Kepala Badan Sarana Pertahanan, Marsdya TNI Yusuf Jauhari dan Founder Republikorp, Norman Joesoef di depan Menteri Pertahanan Prabowo Subianto dan Secretary of Turkish Defence Industries, Haluk GΓΆrgΓΌn
Norman Joesoef, mewakili Republikorp, menandatangani perjanjian dengan ASELSAN untuk produksi Sistem Senjata Kendali Jarak Jauh (RCWS), serta dengan ROKETSAN untuk mendirikan fasilitas Maintenance, Repair, and Overhaul (MRO) dan produksi rudal ΓAKIR, ATMACA, dan HISAR
------
CONTRACT LPC TAIS TURKEY
TAIS Shipyards secured a contract for two 65 m LPCs for TNI-AL Turkish Private TAIS Shipyards will construct two Large Patrol Crafts, LPC-65, for the Indonesian Navy (TNI-AL). Even though it is named patrol craft, the vessel will feature a 76mm gun, a dual 35mm gun turret, two 12.7mm STAMP remote weapon stations (RWS), and a Roketsan ASW rocket launcher. The vessel may have eight ATMACA anti-ship missiles (AShMs) or prefer French Exocets.
------
TAI TURKI DI BANDUNG-INDONESIA
PT Turkish Aerospace Indonesia dari Turki didirikan di Bandung guna menjalin kerjasama strategis global. CEO of Turkish Aerospace, Mehmet DemiroΔlu, mengatakan, pihaknya bekerjasama dengan PT Dirgantara Indonensia untuk meningkatkan dan mengembangkan proyek-proyek kerjasama di bidang kedirgantaraan. "Jadi, kami menegaskan bahwa kami tidak bersaing, tapi saling melengkapi. Itu sebabnya kami ada di sini," ujarnya seusai launching PT. Turkish Aerospace Indonesia di Bandung...
=============
=============
LMS B2 = FFBNW DOWNGRADE HISAR OPV NO ASW
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALAYDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-------------
LCS = FFBNW MANGKRAK 15 YEARS
LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT ]
• USD 948 JUTA (EXCLUDING AMMO) = DESTROYER WITH AMMO
-------------
KEDAH = FFBNW NO MISSILE SINCE 2025=2009 : 17 YAERS GUNBOAT
In June 2006, after a total of 18 months of delays, the Royal MALAYDESH Navy commissioned KD Kedah, followed by a second hull, KD Pahang in August of the same year, and a third hull, KD Perak on 12 November 2007. By July 2009, six vessels had been launched.
-------------
THHE OPV 2 DAN OPV 3 = FFBNW TAMAT
Beliau berkata keputusan itu dipersetujui oleh Kabinet pada 22 Mac 2024 sebelum ia dilaksanakan.
“Kementerian Dalam Negeri dibenarkan menamatkan kontrak projek tersebut setelah mendapat pandangan daripada Jabatan Peguam Negara. Sehubungan itu, kerajaan menandatangani perjanjian penamatan bersama pihak syarikat pada 31 Disember 2024,” katanya dalam jawapan bertulis yang dimuat naik dalam laman web Parlimen pada Khamis malam.
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
MALAYDESH has faced several crises, including political, financial, and economic crises:
Hapus• Political crisis
From 2020–2022, MALAYDESH experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
MALAYDESH experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
MALAYDESH 's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, MALAYDESH 's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household DEBT crisis
As of the end of 2023, MALAYDESH 's household DEBT-to-GDP ratio was 84.3%, with household DEBT reaching RM1.53 trillion
MALAYDESH has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
------------------
The Royal MALAYDESH Navy (RMN) faces a number of challenges, including a fleet that is aging, delays in acquiring new ships, and corruption.
Aging fleet
• Half of the RMN's fleet of 49 ships are past their serviceable lifespan.
• The fleet is largely past its prime, making it difficult to monitor the country's extensive maritime domain.
Delays in acquiring new ships
• The RMN has experienced delays in acquiring new ships, which has contributed to the use of ships that are beyond their useful life.
• The RMN has canceled plans to add new batches of Lekiu frigates.
Corruption
• Some of the RMN's modernization efforts have been linked to corruption.
• The Public Accounts Committee (PAC) found that BNS subsidiaries did not use all of the government's payments for the RM9 billion warship procurement.
Other challenges
• Maritime boundary disputes with other countries, including China, Indonesia, and the Philippines
• Sea robbery, smuggling, and illegal sand mining
• Maritime piracy, which can also be used by terrorists to raise funds
China's assertiveness in the South China Sea
.
------------------
MALAYDESH 's armed forces have been underfunded for some time, due to a lack of political will to increase defense spending. This has limited the country's ability to modernize and respond to threats.
Causes of underfunding
• Government spending
MALAYDESH governments have been reluctant to cut spending in other areas to fund defense
• Size of armed forces
Governments have been unwilling to reduce the size of the armed forces by cutting manpower and equipment
• Corruption
Corruption risks remain significant in MALAYDESH 's defense governance architecture
Effects of underfunding
• Limited procurement: The navy and air force have struggled to procure new assets to modernize
• Outdated equipment: The MAF has outdated logistics equipment
• Limited ability to respond to threats: The MAF has been unable to improve its fighting capacity to deal with external threats
LCS lambat perjalanannya tapi sampai ke destinasi.
BalasHapusINDON?
1. ENAM buah FREMM kau sampai sekarang tak nampak.
https://www.defensenews.com/global/europe/2021/06/10/indonesia-orders-six-fremm-frigates-from-fincantieri/
2. Su-35??
https://en.tempo.co/read/2061504/russia-says-indonesias-purchase-of-11-sukhoi-su-35-jets-remains-delayed
3. F-15ID??
https://turdef.com/article/indonesia-secures-boeing-s-f-15-idn-fighter-jets
4. V-22??
https://www.flightglobal.com/defence/indonesia-cleared-to-buy-eight-mv-22-ospreys/139166.article
5. Changbogo II Submarine??
https://www.koreatimes.co.kr/southkorea/defense/20190413/south-korea-signs-1b-submarine-contract-with-indonesia
6. Mirage 2000 Qatar?
https://adj.com.my/2023/06/17/indonesia-buys-ex-qatari-fighters-to-maintain-air-power-capability/
7. KF-21??
Hmmm...yang ni malu nak cerita. Mencuri, membohong, menipu, mungkir janji, menghina, mengencing, mengkhianati, semua habis INDON tapau!
Sibuk jaga tepi kain jiran, kain sendiri terlondeh habis.
REALITY SUCKS ISN'T IT INDON??
π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£
GORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
HapusGORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
GORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
REVISED (FINAL): RM11.2B FOR 5 SHIPS
(final agreed-upon contract price dealing with cost overruns)
RM 2.24 billion (2023) per unit + ToT (ceiling) [or USD948M (2023 inflation) or ~USD700M (2011 forex) or ~USD490M (2023 forex) (excluding ammo)
Inflation adjustment roughly equivalent to USD948 million in 2023 US dollars (excluding ammo)
-------------
REVISED (INITIAL): RM 9.128B FOR 5 SHIPS
(initial figures using the original contract price in dealing with cost overruns)
RM 1.8 billion (2011) per unit + ToT (ceiling) or USD560 million per ship (excluding ammo)
Inflation adjustment roughly equivalent to USD758 million in 2023 US dollars (excluding ammo)
-------------
ORIGINAL: RM 9B FOR 6 SHIPS
RM 1.5 billion (2011) per unit + ToT (ceiling) or USD466 million per ship (excluding cost overruns and ammo)
Inflation adjustment roughly equivalent to USD631 million in 2023 US dollars (excluding cost overruns and ammo)
-------------
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
GORILA KUAT MANGKRAK LCS = 2025-2011
DELAYED LCS ...........
HapusPROGRESS 70.1% (2025-2011 = 15 YEARS)
PROGRESS 70.1% (2025-2011 = 15 YEARS)
PROGRESS 70.1% (2025-2011 = 15 YEARS)
Deputy Defence Minister Adly Zahari said on Thursday that the overall progress of the long-delayed littoral combat ships (LCS) project had reached 70.1% as of Oct 25 this year.
=============
SLOWLY...........
70.1% : 15 YEARS = 4.6% PER YEARS
70.1% : 15 YEARS = 4.6% PER YEARS
70.1% : 15 YEARS = 4.6% PER YEARS
The progress — which includes design, construction, equipping, and testing — is slightly behind schedule by 0.59%, as the planned progress was 70.69%, according to the contract’s timeline.
On the first LCS (LCS 1), the construction is in its final phase and is expected to be completed by the end of this year, Adly noted.
===================
DEBT 17 CREDITOR LCS =
1. MTU Services Ingat Kawan (M) Sdn Bhd
2. include Contraves Sdn Bhd
3. Axima Concept SA
4. Contraves Advanced Devices Sdn Bhd
5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
6. Security & Services MALAYDESH Sdn Bhd,
7. iXblue SAS
8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
9. Bank Pembangunan MALAYDESH Bhd
10. AmBank Islamic Bhd
11. AmBank (M) Bhd
12. Affin Hwang Investment Bank Bhd
13. Bank Muamalat MALAYDESH Bhd
14. Affin Bank Bhd
15. Bank Kerjasama Rakyat MALAYDESH Bhd
16. Malayan Banking Bhd (Maybank)
17. KUWAIT FINANCE HOUSE (MALAYDESH ) BHD.
==============
DATA STATISTA 2029-2020 : INCREASE DEBT
DATA STATISTA 2029-2020 : INCREASE DEBT
2029 = 438,09 BILLION USD
2028 = 412,2 BILLION USD
2027 = 386,51 BILLION USD
2026 = 362,19 BILLION USD
2025 = 338,75 BILLION USD
2024 = 316,15 BILLION USD
2023 = 293,83 BILLION USD
2022 = 271,49 BILLION USD
2021 = 247,49 BILLION USD
2020 = 221,49 BILLION USD
------------------
DATA STATISTA 2029-2020 : DEBT PAY DEBT
DATA STATISTA 2029-2020 : OVERLIMIT DEBT
2029 = 69,54% DEBT RATIO TO GDP
2028 = 69,34% DEBT RATIO TO GDP
2027 = 68,8% DEBT RATIO TO GDP
2026 = 68,17% DEBT RATIO TO GDP
2025 = 68,07% DEBT RATIO TO GDP
2024 = 68,38% DEBT RATIO TO GDP
2023 = 69,76% DEBT RATIO TO GDP
2022 = 65,5% DEBT RATIO TO GDP
2021 = 69,16% DEBT RATIO TO GDP
2020 = 67,69% DEBT RATIO TO GDP
==========
RINGIT TIDAK LAKU
https://www.youtube.com/watch?v=rZD9_nKqIWQ
==========
DEBT 2024 = RM 1.63 TRILLION
DEBT 2023 = RM 1,53 TRILLION
DEBT 2022 = RM 1,45 TRILLION
DEBT 2021 = RM 1,38 TRILLION
DEBT 2020 = RM 1,32 TRILLION
DEBT 2019 = RM 1,25 TRILLION
DEBT 2018 = RM 1,19 TRILLION
“The ratio of household DEBT to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.3% compared with 82% in 2018,” it said.
==========
BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
MALAYDESH household DEBT is one of the highest in the ASEAN region. Against this backdrop, Bank Negara MALAYDESH (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in MALAYDESH , among other things.
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
The MALAYDESH Armed Forces (MAF) face many challenges, including:
HapusPersonnel: The MAF has difficulty recruiting and retaining high-quality personnel, partly due to poor service conditions.
Equipment: The MAF needs to modernize its equipment, including replacing its fleet of Nuri helicopters.
Infrastructure: The MAF needs to improve its defense infrastructure, including living quarters.
Ethnic composition: The MAF needs to rebalance the ethnic composition of its forces.
Local content: The MAF needs to increase the local content of its equipment.
Research and development: The MAF needs to increase its research and development activities.
Logistic management: The MAF needs to improve its logistic management, including planning, operation implementation, and supply pre-budgeting.
Non-traditional security challenges: The MAF needs to increase its authority to tackle non-traditional security challenges.
------------------
The MALAYDESH Armed Forces (MAF) has a lack of modern military assets due to a small defense budget and aging equipment. This has left the MAF vulnerable to internal and external threats.
Causes
• Small defense budget: The MAF has had small procurement budgets for the past quarter-century.
• Aging equipment: Most of the MAF's equipment was purchased between the 1970s and 1990s.
• Foreign dependence: The MAF relies on foreign Original Equipment Manufacturers (OEMs) for its military hardware and software.
Effects
• Vulnerability to threats
The MAF is vulnerable to internal and external threats due to its lack of modern military assets.
• Challenges with air force
The MAF's air force has been challenged by the withdrawal of its MiG-29 Fulcrum fighter aircraft in 2017.
• Challenges with naval assets
The MAF's naval assets are aging, as evidenced by the KD Rahman submarine issue in 2010.
LCS lambat perjalanannya, penuh cabaran dan berliku-liku TETAPI sampai ke destinasinya.
BalasHapusINDON?
1. ENAM buah FREMM kau sampai sekarang tak nampak.
https://www.defensenews.com/global/europe/2021/06/10/indonesia-orders-six-fremm-frigates-from-fincantieri/
2. Su-35??
https://en.tempo.co/read/2061504/russia-says-indonesias-purchase-of-11-sukhoi-su-35-jets-remains-delayed
3. F-15ID??
https://turdef.com/article/indonesia-secures-boeing-s-f-15-idn-fighter-jets
4. V-22??
https://www.flightglobal.com/defence/indonesia-cleared-to-buy-eight-mv-22-ospreys/139166.article
5. Changbogo II Submarine??
https://www.koreatimes.co.kr/southkorea/defense/20190413/south-korea-signs-1b-submarine-contract-with-indonesia
6. Mirage 2000 Qatar?
https://adj.com.my/2023/06/17/indonesia-buys-ex-qatari-fighters-to-maintain-air-power-capability/
7. KF-21??
Hmmm...yang ni malu nak cerita. Mencuri, membohong, menipu, mungkir janji, menghina, mengencing, mengkhianati, semua habis INDON tapau!
Sibuk jaga tepi kain jiran, kain sendiri terlondeh habis.
REALITY SUCKS ISN'T IT INDON??
π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£
SEWA 28 HELI > 119 HELI BARU > ART : WAJIB LAPOR USA
HapusSEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X USD 31 JT= USD 857 JUTA
•USD 3.700JT ÷ USD 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
SEWAan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.MALAYDESH (ATM
--------------
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
GORILA SEWA 28 HELI = 119 BELI HELI BARU
NGEMIS LPD
HapusNGEMIS AH1Z
Initially, the MALAYDESH marine corps will lack an amphibious naval platform as the RMN’s only amphibious ship, It is currently in discussions with both France and South Korea over acquiring a landing platform deck (LPD). The U.S. has also offered MALAYDESH the LPD USS Denver after it decommissions it in 2014. U.S.-based defense companies are also discussing selling MALAYDESH the AH-1Z
----
NGEMIS POHANG
NGEMIS POHANG
NGEMIS POHANG
Asrizal Rusli Beli LCA F/A-50 18 buah, percuma Pohang-class 2 buah..kalau jadi kenyataan aku janji akan meminati K-Pop termasuk drama dan band-nya..aku juga akan sertai army BTS untuk melengkapkan lagi sokongan aku kepada produk Korea Selatan.
----
NGEMIS KAPAL 1967
NGEMIS KAPAL 1967
NGEMIS KAPAL 1967
The post stated that among his achievements in the MMEA were that he was the team leader for a suitability study on absorbing the US Coast Guard cutter – USCG Decisive. Checks on the US Coast Guard website showed that Decisive– a Reliance class cutter – was laid in 1967 and commissioned in 1968
-----
NGEMIS KAPAL 1968
NGEMIS KAPAL 1968
NGEMIS KAPAL 1968
USCGC Steadfast (WMEC-623) was a United States Coast Guard medium endurance cutter in commission for 56 years. Commissioned in 1968, Steadfast was home ported in St. Petersburg, Florida for her first 24 years of service...
===================
• LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
• USD 948 JUTA (EXCLUDING AMMO) = FFBNW = MANGKRAK DELAYED
-NO NSM.
-NO VL MICA.
-NO TORPEDO RINGAN.
-NO SECONDARY GUNS.
-NO BOFORS MK3.
https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
-------------
PRICE DESTROYER DAN FREGAT =
-KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
-TYPE 052D CLASS USD 500-600 JUTA.
-TYPE 055 CLASS USD 920 JUTA.
-OPV PPA USD 1,3 BILLION/2 UNIT = USD 650/UNIT
===================
SEWA BOAT SEWAan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
SEWA HIDROGRAFI tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak SEWAan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
SEWA HELI Kementerian Pertahanan MALAYDESH pada 27 Mei 2023 lalu telah menandatangani perjanjian SEWA dengan penyedia layanan penerbangan lokal, Aerotree, untuk menyediakan empat helikopter bekas Sikorsky UH-60A+ Black Hawk.
SEWA HELI 4 buah Helikopter Leonardo AW 139 yang diperolehi secara SEWAan ini adalah untuk kegunaan Tentera Udara Diraja MALAYDESH (TUDM)
SEWA HELI = Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
SEWA MOTOR The Royal Military Police Corp (KPTD) celebrated the SEWA of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
SEWA PESAWAT ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal MALAYDESH Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39
SEWA 4x4 Pejabat perusahaan mengatakan kepada Janes di pameran bahwa Angkatan Bersenjata MALAYDESH sedang mencari untuk menyewa Tarantula..
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
The Royal MALAYDESH Navy (RMN) has faced several problems, including delayed replacements for its aging fleet and a failed Littoral Combat Ship (LCS) program. These issues have made it difficult for the RMN to patrol its vast maritime domain.
HapusDelayed replacements
• A government audit found that the RMN's plans to replace its aging fleet have mangkrak due to mismanagement.
• The RMN has only received four of its planned 18 new vessels.
• Over half of the RMN's fleet is past its prime.
Failed LCS program
• The LCS was not suitable for fighting peer competitors like China.
• The LCS lacked the lethality and survivability needed in a high-end fight.
• The LCS had low endurance and lacked significant air and surface warfare capabilities
------------------
The MALAYDESH Armed Forces (MAF) has faced a number of technical issues, including fleet sustainment problems, a lack of research and development, and a reliance on imported equipment.
Fleet sustainment problems
The MAF has a large fleet of aging aircraft that can be expensive to maintain.
The government's defense modernization budget is limited, which can make it difficult to sustain the fleet.
Lack of research and development
The MAF has limited research and development (R&D) activities.
The government has not provided clear guidance on the future strategic direction of the defense industry.
Reliance on imported equipment
Most of the MAF's equipment is imported from outside the country.
The Asian Financial Crisis caused a downturn in MALAYDESH 's economy, which made imported goods more expensive.
Other technical issues
The MAF has faced logistic management problems.
The MAF has faced challenges in developing its capabilities due to tight budgets and uncertain timelines.
.
------------------
The MALAYDESH army has several weaknesses, including:
• Limited defense budgeting: The MALAYDESH government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the MALAYDESH Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The MALAYDESH military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, MALAYDESH ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
LAWAK BENAR SI MMW, MALON MINIM LITERASI
BalasHapusSEMOGA JANGAN DIGANGGU TUKANG KOMEN NYAMPAH, BIAR ASYIK MEMBULY LEBODOHAN MALON
LCS lambat perjalanannya, penuh cabaran dan berliku-liku TETAPI sampai ke destinasinya.
HapusINDON?
1. ENAM buah FREMM kau sampai sekarang tak nampak.
https://www.defensenews.com/global/europe/2021/06/10/indonesia-orders-six-fremm-frigates-from-fincantieri/
2. Su-35??
https://en.tempo.co/read/2061504/russia-says-indonesias-purchase-of-11-sukhoi-su-35-jets-remains-delayed
3. F-15ID??
https://turdef.com/article/indonesia-secures-boeing-s-f-15-idn-fighter-jets
4. V-22??
https://www.flightglobal.com/defence/indonesia-cleared-to-buy-eight-mv-22-ospreys/139166.article
5. Changbogo II Submarine??
https://www.koreatimes.co.kr/southkorea/defense/20190413/south-korea-signs-1b-submarine-contract-with-indonesia
6. Mirage 2000 Qatar?
https://adj.com.my/2023/06/17/indonesia-buys-ex-qatari-fighters-to-maintain-air-power-capability/
7. KF-21??
Hmmm...yang ni malu nak cerita. Mencuri, membohong, menipu, mungkir janji, menghina, mengencing, mengkhianati, semua habis INDON tapau!
Sibuk jaga tepi kain jiran, kain sendiri terlondeh habis.
REALITY SUCKS ISN'T IT INDON??
π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£
Tukang Dongan? Tukang karut ada le...
Hapusπ€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£
PRODUK DALAM NEGERI 2009-2024
HapusHASIL PROGRAM MINIMUM ESSENTIAL FORCE (MEF) TNI AL. ASET KAPAL PERANG STRIKING FORCE TNI AL
KAPAL CEPAT RUDAL PRODUK PT PAL =
1. KRI Kapak 625
2. KRI Panah 626
3. KRI Kerambit 627
4. KRI Sampari 628
5. KRI Tombak 629
6. KRI Halasan 630
KAPAL CEPAT RUDAL PRODUK SWASTA NASIONAL =
1. KRI Clurit 641
2. KRI Kujang 642
3. KRI Beladau 643
4. KRI Alamang 644
5. KRI Surik 645
6. KRI Siwar 646
7. KRI Parang 647
8. KRI Terapang 648
9. KRI Golok (Trimaran) 688
KAPAL PATROLI CEPAT PRODUK SWASTA NASIONAL =
1. KRI Pari 849
2. KRI Sembilang 850
3. KRI Sidat 851
4. KRI Cakalang 852
5. KRI Tatihu 853
6. KRI Layaran 854
7. KRI Madidihang 855
8. KRI Kurau 856
9. KRI Torani 860
10. KRI Lepu 861
11. KRI Albakora 867
12. KRI Bubara 868
13. KRI Gulamah 869
14. KRI Posepa 870
15. KRI Escolar 871
16. KRI Karotang 872
17. KRI Mata Bongsang 873
18. KRI Dorang 874
19. KRI Bawal 875
20. KRI Tuna 876
21. KRI Marlin 877
22. KRI Butana 878
23. KRI Selar 879
24. KRI Hampala 880
25. KRI Lumba-Lumba 881
KAPAL KORVET PRODUK SWASTA NASIONAL =
1. KRI VVIP Bung Karno 369
2. KRI Bung Hatta 370
3. KRI Raja Ali Fisabilillah 391
4. KRI Lukas Rumkoren 392
ASET KAPAL PERANG SUPPORTING FORCE TNI AL PRODUKSI DALAM NEGERI
KAPAL LOGISTIK PRODUK SWASTA NASIONAL =
1. KRI Dumai 904
2. KRI Tarakan 905
3. KRI Bontang 906
4. KRI Balongan 907
KAPAL LPD (LANDING PLATFORM DOCK) PRODUK PT PAL =
1. KRI Semarang 594
2. KRI Dr. Wahidin Sudirohusodo 991
3. KRI Dr. Rajiman Wedyodiningrat 992
KAPAL PEMETAAN BAWAH AIR PRODUK SWASTA NASIONAL =
1. KRI Pollux 935
KAPAL SELAM TRANSFER TEKNOLOGI KORSEL-PT PAL =
1. KRI Nagapasa 403
2. KRI Ardadedali 404
3. KRI Alugoro 405
===========
===========
1.RASIO HUTANG 84.3% DARI GDP
2. HUTANG NEGARA RM 1,65 TRLLIUN
3. HUTANG 1MDB RM 18,2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VVSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST VSHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. MKM BARTER PALM OIL
62. MIG29N BARTER PALM OIL
63. A400M PEMBAYARAN BERPERINGKAT (HUTANG)
64. SCORPENE BARTER PALM OIL
65. PT91M BARTER PALM OIL RUBBER
67. FA50M BARTER PALM OIL
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
PRODUK DALAM NEGERI 2009-2024
HapusHASIL PROGRAM MINIMUM ESSENTIAL FORCE (MEF) TNI AL. ASET KAPAL PERANG STRIKING FORCE TNI AL
KAPAL CEPAT RUDAL PRODUK PT PAL =
1. KRI Kapak 625
2. KRI Panah 626
3. KRI Kerambit 627
4. KRI Sampari 628
5. KRI Tombak 629
6. KRI Halasan 630
KAPAL CEPAT RUDAL PRODUK SWASTA NASIONAL =
1. KRI Clurit 641
2. KRI Kujang 642
3. KRI Beladau 643
4. KRI Alamang 644
5. KRI Surik 645
6. KRI Siwar 646
7. KRI Parang 647
8. KRI Terapang 648
9. KRI Golok (Trimaran) 688
KAPAL PATROLI CEPAT PRODUK SWASTA NASIONAL =
1. KRI Pari 849
2. KRI Sembilang 850
3. KRI Sidat 851
4. KRI Cakalang 852
5. KRI Tatihu 853
6. KRI Layaran 854
7. KRI Madidihang 855
8. KRI Kurau 856
9. KRI Torani 860
10. KRI Lepu 861
11. KRI Albakora 867
12. KRI Bubara 868
13. KRI Gulamah 869
14. KRI Posepa 870
15. KRI Escolar 871
16. KRI Karotang 872
17. KRI Mata Bongsang 873
18. KRI Dorang 874
19. KRI Bawal 875
20. KRI Tuna 876
21. KRI Marlin 877
22. KRI Butana 878
23. KRI Selar 879
24. KRI Hampala 880
25. KRI Lumba-Lumba 881
KAPAL KORVET PRODUK SWASTA NASIONAL =
1. KRI VVIP Bung Karno 369
2. KRI Bung Hatta 370
3. KRI Raja Ali Fisabilillah 391
4. KRI Lukas Rumkoren 392
ASET KAPAL PERANG SUPPORTING FORCE TNI AL PRODUKSI DALAM NEGERI
KAPAL LOGISTIK PRODUK SWASTA NASIONAL =
1. KRI Dumai 904
2. KRI Tarakan 905
3. KRI Bontang 906
4. KRI Balongan 907
KAPAL LPD (LANDING PLATFORM DOCK) PRODUK PT PAL =
1. KRI Semarang 594
2. KRI Dr. Wahidin Sudirohusodo 991
3. KRI Dr. Rajiman Wedyodiningrat 992
KAPAL PEMETAAN BAWAH AIR PRODUK SWASTA NASIONAL =
1. KRI Pollux 935
KAPAL SELAM TRANSFER TEKNOLOGI KORSEL-PT PAL =
1. KRI Nagapasa 403
2. KRI Ardadedali 404
3. KRI Alugoro 405
===========
===========
SEWA = HUTANG 84.3% DARI GDP = NO SHOPPING
1. SEWA 28 HELI
2. SEWA L39 ITCC
3. SEWA EC120B
4. SEWA Flight Simulation Training Device (FSTD)
5. SEWA 1 unit Sistem Simulator EC120B
6. SEWA HOVERCRAFT
7. SEWA AW139
8. SEWA Fast Interceptor Boat (FIB)
9. SEWA Utility Boat
10. SEWA Rigid Hull Fender Boat (RHFB)
11. SEWA Rover Fiber Glass (Rover)
12. SEWA MV Aishah AIM 4
13. SEWA BMW R1250RT
14. SEWA 4x4 VECHICLE
15. SEWA VSHORAD
16. SEWA TRUCK
17. SEWA HONDA CIVIC
18. SEWA PATROL BOATS
19. SEWA OUTBOARD MOTORS
20. SEWA TRAILERS
21. SEWA SUPERBIKES
22. SEWA SIMULATOR MKM
23. SEWA 12 AW149 TUDM
24. SEWA 4 AW139 TUDM
25. SEWA 5 EC120B TUDM
26. SEWA 2 AW159 TLDM
27. SEWA 4 UH-60A TDM
28. SEWA 12 AW149 TDM
29. SEWA 4 AW139 BOMBA
30. SEWA 2 AW159 MMEA
31. SEWA 7 BELL429 POLIS
32. SEWA MOTOR POLIS
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
HapusANWAR = ASTONISHED SHIPS
ANWAR = ASTONISHED SHIPS
ANWAR = ASTONISHED SHIPS
Anwar said he had been astonished to see a navy frigate dating from the 1970s on display at the recent LIMA maritime and aerospace expo in Langkawi.
“I want to salute these ships but I don’t know where to put my face. The last frigate (on display at LIMA) was from 1998,” he said
---------------
TUA BANGKA 2025 – 1953 = 72 UMUR KAPAL
KAPAL 1953 = LEBIH TUA DARI NEGARA
KAPAL 1953 = LEBIH TUA DARI NEGARA
KAPAL 1953 = LEBIH TUA DARI NEGARA
Launched 9 September 1953 Completed 9 September 1954 The ship was transferred to the Royal Malayan Navy on 1 April 1958, being renamed Sri Perlis. Following transfer, Sri Perlis' 40mm Bofors gun and minesweeping gear was removed and replaced by three 20 mm Oerlikon cannon
---------------
NGEMIS KAPAL 1967
NGEMIS KAPAL 1967
NGEMIS KAPAL 1967
The post stated that among his achievements in the MMEA were that he was the team leader for a suitability study on absorbing the US Coast Guard cutter – USCG Decisive. Checks on the US Coast Guard website showed that Decisive– a Reliance class cutter – was laid in 1967 and commissioned in 1968
-----
NGEMIS KAPAL 1968
NGEMIS KAPAL 1968
NGEMIS KAPAL 1968
USCGC Steadfast (WMEC-623) was a United States Coast Guard medium endurance cutter in commission for 56 years. Commissioned in 1968, Steadfast was home ported in St. Petersburg, Florida for her first 24 years of service...
---------------
PRODUK DALAM NEGERI 2009-2024
HASIL PROGRAM MINIMUM ESSENTIAL FORCE (MEF) TNI AL. ASET KAPAL PERANG STRIKING FORCE TNI AL
KAPAL CEPAT RUDAL PRODUK PT PAL =
1. KRI Kapak 625
2. KRI Panah 626
3. KRI Kerambit 627
4. KRI Sampari 628
5. KRI Tombak 629
6. KRI Halasan 630
KAPAL CEPAT RUDAL PRODUK SWASTA NASIONAL =
1. KRI Clurit 641
2. KRI Kujang 642
3. KRI Beladau 643
4. KRI Alamang 644
5. KRI Surik 645
6. KRI Siwar 646
7. KRI Parang 647
8. KRI Terapang 648
9. KRI Golok (Trimaran) 688
KAPAL PATROLI CEPAT PRODUK SWASTA NASIONAL =
1. KRI Pari 849
2. KRI Sembilang 850
3. KRI Sidat 851
4. KRI Cakalang 852
5. KRI Tatihu 853
6. KRI Layaran 854
7. KRI Madidihang 855
8. KRI Kurau 856
9. KRI Torani 860
10. KRI Lepu 861
11. KRI Albakora 867
12. KRI Bubara 868
13. KRI Gulamah 869
14. KRI Posepa 870
15. KRI Escolar 871
16. KRI Karotang 872
17. KRI Mata Bongsang 873
18. KRI Dorang 874
19. KRI Bawal 875
20. KRI Tuna 876
21. KRI Marlin 877
22. KRI Butana 878
23. KRI Selar 879
24. KRI Hampala 880
25. KRI Lumba-Lumba 881
KAPAL KORVET PRODUK SWASTA NASIONAL =
1. KRI VVIP Bung Karno 369
2. KRI Bung Hatta 370
3. KRI Raja Ali Fisabilillah 391
4. KRI Lukas Rumkoren 392
ASET KAPAL PERANG SUPPORTING FORCE TNI AL PRODUKSI DALAM NEGERI
KAPAL LOGISTIK PRODUK SWASTA NASIONAL =
1. KRI Dumai 904
2. KRI Tarakan 905
3. KRI Bontang 906
4. KRI Balongan 907
KAPAL LPD (LANDING PLATFORM DOCK) PRODUK PT PAL =
1. KRI Semarang 594
2. KRI Dr. Wahidin Sudirohusodo 991
3. KRI Dr. Rajiman Wedyodiningrat 992
KAPAL PEMETAAN BAWAH AIR PRODUK SWASTA NASIONAL =
1. KRI Pollux 935
KAPAL SELAM TRANSFER TEKNOLOGI KORSEL-PT PAL =
1. KRI Nagapasa 403
2. KRI Ardadedali 404
3. KRI Alugoro 405
LAUGHING STOCK TO THE WORLD
HapusLAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
----
NGEMIS LPD
NGEMIS AH1Z
Initially, the MALAYDESH marine corps will lack an amphibious naval platform as the RMN’s only amphibious ship, It is currently in discussions with both France and South Korea over acquiring a landing platform deck (LPD). The U.S. has also offered MALAYDESH the LPD USS Denver after it decommissions it in 2014. U.S.-based defense companies are also discussing selling MALAYDESH the AH-1Z
----
NGEMIS POHANG
NGEMIS POHANG
NGEMIS POHANG
Asrizal Rusli Beli LCA F/A-50 18 buah, percuma Pohang-class 2 buah..kalau jadi kenyataan aku janji akan meminati K-Pop termasuk drama dan band-nya..aku juga akan sertai army BTS untuk melengkapkan lagi sokongan aku kepada produk Korea Selatan.
----
NGEMIS KAPAL 1967
NGEMIS KAPAL 1967
NGEMIS KAPAL 1967
The post stated that among his achievements in the MMEA were that he was the team leader for a suitability study on absorbing the US Coast Guard cutter – USCG Decisive. Checks on the US Coast Guard website showed that Decisive– a Reliance class cutter – was laid in 1967 and commissioned in 1968
-----
NGEMIS KAPAL 1968
NGEMIS KAPAL 1968
NGEMIS KAPAL 1968
USCGC Steadfast (WMEC-623) was a United States Coast Guard medium endurance cutter in commission for 56 years. Commissioned in 1968, Steadfast was home ported in St. Petersburg, Florida for her first 24 years of service...
===================
• LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
• USD 948 JUTA (EXCLUDING AMMO) = FFBNW = MANGKRAK DELAYED
-NO NSM.
-NO VL MICA.
-NO TORPEDO RINGAN.
-NO SECONDARY GUNS.
-NO BOFORS MK3.
https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
-------------
PRICE DESTROYER DAN FREGAT =
-KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
-TYPE 052D CLASS USD 500-600 JUTA.
-TYPE 055 CLASS USD 920 JUTA.
-OPV PPA USD 1,3 BILLION/2 UNIT = USD 650/UNIT
-------------
MALAYDESH 's military equipment is old due to a number of factors, including:
• Outdated equipment
The majority of the MALAYDESH Armed Forces' (MAF) equipment was purchased between the 1970s and 1990s.
• Low and erratic allocations
The Royal MALAYDESH Navy (RMN) has many ships that are older than the HTMS Sukhothai, which sank in 2022.
• Government's inability to provide modern equipment
The government is unable to provide the MAF with modern defense assets.
• Defense industry issues
The defense industry is controlled by the government, but some say it lacks accountability and determination. Some issues include the import of critical components, local companies acting as intermediaries for foreign companies, and a lack of research and development.
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
GORILA IQ BOTOL = SEWA 28 HELI > 119 HELI BARU > ART : WAJIB LAPOR USA
HapusSEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X USD 31 JT= USD 857 JUTA
•USD 3.700JT ÷ USD 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
SEWAan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.MALAYDESH (ATM).
----
CHEAPEST VARIANT :
-
HARGA CN 235 = USUSD 27,50 Juta
-
HARGA ATR 72 = USUSD24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALAYDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
MALAYDESH to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in MALAYDESH service, and will NOt be equipped with any weaponry.
==========
1. DEBT 84.3% DARI GDP
1. DEBT 84.3% DARI GDP
2. DEBT NEGARA RM 1.63 TRLLIUN
3. DEBT 1MDB RM 18.2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. DEBT KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VVSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIPAY 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST VSHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. SEWA 12 AW149 TUDM
62. SEWA 4 AW139 TUDM
63. SEWA 5 EC120B TUDM
64. SEWA 2 AW159 TLDM
65. SEWA 4 UH-60A TDM
67. SEWA 12 AW149 TDM
68. SEWA 4 AW139 BOMBA
69. SEWA 2 AW159 MMEA
70. SEWA 7 BELL429 POLIS
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. SEWA
Alhamdulillah satu lagi bot cegah PATI Indon telah diupgrade.
BalasHapushttps://www.youtube.com/watch?v=FZt7ON0FWsg
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
Hapus165 KRI
136 KAL PATKAMLA
113 PESAWAT UDARA
388 KENDARAAN TEMPUR
Dengan demikian, kekuatan armada tempur TNI AL saat ini mencakup 165 kapal perang (KRI), 136 KAL, kapal-kapal patroli keamanan laut (patkamla), 113 pesawat udara, dan 388 kendaraan tempur.
---------------------
18 COMBAT BOAT - ARMOUR PROTECTION = Patkamla Jefman memiliki beberapa keunggulan yaitu memiliki Armour Protection Standard STANAG Level 2, mampu beroperasi di medan pesisir laut, alur sungai dan daerah rawa. Saat ini TNI AL telah memiliki 18 Combat Boat Standard, dimana untuk Koarmada III saat ini memkebutuhankan 9 Unit Special Mission Combat Boat lagi yang akan ditempatkan jajaran dibawahnya baik di Lantamal, Lanal, dan Fasharkan Manokwari.
---------------------
Combat Boat Milik TNI AL ....
1.Patkamla Mamzakaran
2.Patkamla Pulau Bakau
3.Patkamla Pulau Numfor
4.Patkamla Bali
5.Patkamla Pulau Salando
6.Patkamla Busalangga
7.Patkamla Lamaru
8.Patkamla Coebang
9.Patkamla Pelambong
10.Patkamla Pulau Sebesi
11.Patkamla Karimun
12.Patkamla Gebang
13.Patkamla Pulau Pagerungan
14.Patkamla Pulau Semau
15.Patkamla Pulau Yapen
16.Patkamla Pulau Langkai
17.Patkamla Kastela
18.Patkamla Santiago
19.Patkamla Binanga
20.Patkamla Balaroa
21.Patkamla Gorar
22.Patkamla Wasur
23.Patkamla Posa
CMB spesial kopaska
24.KAL Kilat
25.KAL Guruh
26.KAL Tornado
---------------------
PRODUK DALAM NEGERI 2009-2024
HASIL PROGRAM MINIMUM ESSENTIAL FORCE (MEF) TNI AL. ASET KAPAL PERANG STRIKING FORCE TNI AL
KAPAL CEPAT RUDAL PRODUK PT PAL =
1. KRI Kapak 625
2. KRI Panah 626
3. KRI Kerambit 627
4. KRI Sampari 628
5. KRI Tombak 629
6. KRI Halasan 630
KAPAL CEPAT RUDAL PRODUK SWASTA NASIONAL =
1. KRI Clurit 641
2. KRI Kujang 642
3. KRI Beladau 643
4. KRI Alamang 644
5. KRI Surik 645
6. KRI Siwar 646
7. KRI Parang 647
8. KRI Terapang 648
9. KRI Golok (Trimaran) 688
KAPAL PATROLI CEPAT PRODUK SWASTA NASIONAL =
1. KRI Pari 849
2. KRI Sembilang 850
3. KRI Sidat 851
4. KRI Cakalang 852
5. KRI Tatihu 853
6. KRI Layaran 854
7. KRI Madidihang 855
8. KRI Kurau 856
9. KRI Torani 860
10. KRI Lepu 861
11. KRI Albakora 867
12. KRI Bubara 868
13. KRI Gulamah 869
14. KRI Posepa 870
15. KRI Escolar 871
16. KRI Karotang 872
17. KRI Mata Bongsang 873
18. KRI Dorang 874
19. KRI Bawal 875
20. KRI Tuna 876
21. KRI Marlin 877
22. KRI Butana 878
23. KRI Selar 879
24. KRI Hampala 880
25. KRI Lumba-Lumba 881
KAPAL KORVET PRODUK SWASTA NASIONAL =
1. KRI VVIP Bung Karno 369
2. KRI Bung Hatta 370
3. KRI Raja Ali Fisabilillah 391
4. KRI Lukas Rumkoren 392
ASET KAPAL PERANG SUPPORTING FORCE TNI AL PRODUKSI DALAM NEGERI
KAPAL LOGISTIK PRODUK SWASTA NASIONAL =
1. KRI Dumai 904
2. KRI Tarakan 905
3. KRI Bontang 906
4. KRI Balongan 907
KAPAL LPD (LANDING PLATFORM DOCK) PRODUK PT PAL =
1. KRI Semarang 594
2. KRI Dr. Wahidin Sudirohusodo 991
3. KRI Dr. Rajiman Wedyodiningrat 992
KAPAL PEMETAAN BAWAH AIR PRODUK SWASTA NASIONAL =
1. KRI Pollux 935
KAPAL SELAM TRANSFER TEKNOLOGI KORSEL-PT PAL =
1. KRI Nagapasa 403
2. KRI Ardadedali 404
3. KRI Alugoro 405
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
HapusLCS = MANGKRAK 15 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
-----------
LCS DISUNTIK DANA USUSD430 JUTA = MANGKRAK
LCS 6 UNIT JADI 5 UNIT = DELIVERED NOL
Kementerian Pertahanan MALAYDESH mengumumkan langkah strategis terebut saat ajang LIMA 2023 minggu lalu. Kontrak terbaru ini akan memompa anggaran tambahan bagi MALAYDESH hingga USUSD430 juta untuk kapal-kapal tersebut. MALAYDESH juga akan mengurangi jumlah kapal yang akan diterima berdasarkan kontrak yang direvisi dari enam menjadi lima, dan menerima penundaan tambahan untuk pengiriman kapal.
-----------
OPV DISUNTIK DANA RM152,6 JUTA = TAMAT
THHE OPV 2 DAN 3 = TAMAT
Menteri Dalam Negeri, Datuk Seri Saifuddin Nasution Ismail berkata, OPV kedua pula dijangka dapat disiapkan pada Oktober tahun ini.
Beliau berkata, pembinaan dua kapal marititm itu mampu disiapkan selepas kerajaan bersetuju meluluskan suntikan dana berjumlah RM152.6 juta
===========
===========
PRODUK DALAM NEGERI 2009-2024
HASIL PROGRAM MINIMUM ESSENTIAL FORCE (MEF) TNI AL. ASET KAPAL PERANG STRIKING FORCE TNI AL
KAPAL CEPAT RUDAL PRODUK PT PAL =
1. KRI Kapak 625
2. KRI Panah 626
3. KRI Kerambit 627
4. KRI Sampari 628
5. KRI Tombak 629
6. KRI Halasan 630
KAPAL CEPAT RUDAL PRODUK SWASTA NASIONAL =
1. KRI Clurit 641
2. KRI Kujang 642
3. KRI Beladau 643
4. KRI Alamang 644
5. KRI Surik 645
6. KRI Siwar 646
7. KRI Parang 647
8. KRI Terapang 648
9. KRI Golok (Trimaran) 688
KAPAL PATROLI CEPAT PRODUK SWASTA NASIONAL =
1. KRI Pari 849
2. KRI Sembilang 850
3. KRI Sidat 851
4. KRI Cakalang 852
5. KRI Tatihu 853
6. KRI Layaran 854
7. KRI Madidihang 855
8. KRI Kurau 856
9. KRI Torani 860
10. KRI Lepu 861
11. KRI Albakora 867
12. KRI Bubara 868
13. KRI Gulamah 869
14. KRI Posepa 870
15. KRI Escolar 871
16. KRI Karotang 872
17. KRI Mata Bongsang 873
18. KRI Dorang 874
19. KRI Bawal 875
20. KRI Tuna 876
21. KRI Marlin 877
22. KRI Butana 878
23. KRI Selar 879
24. KRI Hampala 880
25. KRI Lumba-Lumba 881
KAPAL KORVET PRODUK SWASTA NASIONAL =
1. KRI VVIP Bung Karno 369
2. KRI Bung Hatta 370
3. KRI Raja Ali Fisabilillah 391
4. KRI Lukas Rumkoren 392
ASET KAPAL PERANG SUPPORTING FORCE TNI AL PRODUKSI DALAM NEGERI
KAPAL LOGISTIK PRODUK SWASTA NASIONAL =
1. KRI Dumai 904
2. KRI Tarakan 905
3. KRI Bontang 906
4. KRI Balongan 907
KAPAL LPD (LANDING PLATFORM DOCK) PRODUK PT PAL =
1. KRI Semarang 594
2. KRI Dr. Wahidin Sudirohusodo 991
3. KRI Dr. Rajiman Wedyodiningrat 992
KAPAL PEMETAAN BAWAH AIR PRODUK SWASTA NASIONAL =
1. KRI Pollux 935
KAPAL SELAM TRANSFER TEKNOLOGI KORSEL-PT PAL =
1. KRI Nagapasa 403
2. KRI Ardadedali 404
3. KRI Alugoro 405
-
PRODUK DALAM NEGERI 2009-2024
HapusHASIL PROGRAM MINIMUM ESSENTIAL FORCE (MEF) TNI AL. ASET KAPAL PERANG STRIKING FORCE TNI AL
KAPAL CEPAT RUDAL PRODUK PT PAL =
1. KRI Kapak 625
2. KRI Panah 626
3. KRI Kerambit 627
4. KRI Sampari 628
5. KRI Tombak 629
6. KRI Halasan 630
KAPAL CEPAT RUDAL PRODUK SWASTA NASIONAL =
1. KRI Clurit 641
2. KRI Kujang 642
3. KRI Beladau 643
4. KRI Alamang 644
5. KRI Surik 645
6. KRI Siwar 646
7. KRI Parang 647
8. KRI Terapang 648
9. KRI Golok (Trimaran) 688
KAPAL PATROLI CEPAT PRODUK SWASTA NASIONAL =
1. KRI Pari 849
2. KRI Sembilang 850
3. KRI Sidat 851
4. KRI Cakalang 852
5. KRI Tatihu 853
6. KRI Layaran 854
7. KRI Madidihang 855
8. KRI Kurau 856
9. KRI Torani 860
10. KRI Lepu 861
11. KRI Albakora 867
12. KRI Bubara 868
13. KRI Gulamah 869
14. KRI Posepa 870
15. KRI Escolar 871
16. KRI Karotang 872
17. KRI Mata Bongsang 873
18. KRI Dorang 874
19. KRI Bawal 875
20. KRI Tuna 876
21. KRI Marlin 877
22. KRI Butana 878
23. KRI Selar 879
24. KRI Hampala 880
25. KRI Lumba-Lumba 881
KAPAL KORVET PRODUK SWASTA NASIONAL =
1. KRI VVIP Bung Karno 369
2. KRI Bung Hatta 370
3. KRI Raja Ali Fisabilillah 391
4. KRI Lukas Rumkoren 392
ASET KAPAL PERANG SUPPORTING FORCE TNI AL PRODUKSI DALAM NEGERI
KAPAL LOGISTIK PRODUK SWASTA NASIONAL =
1. KRI Dumai 904
2. KRI Tarakan 905
3. KRI Bontang 906
4. KRI Balongan 907
KAPAL LPD (LANDING PLATFORM DOCK) PRODUK PT PAL =
1. KRI Semarang 594
2. KRI Dr. Wahidin Sudirohusodo 991
3. KRI Dr. Rajiman Wedyodiningrat 992
KAPAL PEMETAAN BAWAH AIR PRODUK SWASTA NASIONAL =
1. KRI Pollux 935
KAPAL SELAM TRANSFER TEKNOLOGI KORSEL-PT PAL =
1. KRI Nagapasa 403
2. KRI Ardadedali 404
3. KRI Alugoro 405
===========
===========
LCS DISUNTIK DANA USUSD430 JUTA = MANGKRAK
LCS 6 UNIT JADI 5 UNIT
Kementerian Pertahanan MALAYDESH mengumumkan langkah strategis terebut saat ajang LIMA 2023 minggu lalu. Kontrak terbaru ini akan memompa anggaran tambahan bagi MALAYDESH hingga USUSD430 juta untuk kapal-kapal tersebut. MALAYDESH juga akan mengurangi jumlah kapal yang akan diterima berdasarkan kontrak yang direvisi dari enam menjadi lima, dan menerima penundaan tambahan untuk pengiriman kapal.
-----------
OPV DISUNTIK DANA RM152,6 JUTA = TAMAT
THHE OPV 2 DAN 3 = TAMAT
Menteri Dalam Negeri, Datuk Seri Saifuddin Nasution Ismail berkata, OPV kedua pula dijangka dapat disiapkan pada Oktober tahun ini.
Beliau berkata, pembinaan dua kapal marititm itu mampu disiapkan selepas kerajaan bersetuju meluluskan suntikan dana berjumlah RM152.6 juta
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
PRODUK DALAM NEGERI 2009-2024
HapusHASIL PROGRAM MINIMUM ESSENTIAL FORCE (MEF) TNI AL. ASET KAPAL PERANG STRIKING FORCE TNI AL
KAPAL CEPAT RUDAL PRODUK PT PAL =
1. KRI Kapak 625
2. KRI Panah 626
3. KRI Kerambit 627
4. KRI Sampari 628
5. KRI Tombak 629
6. KRI Halasan 630
KAPAL CEPAT RUDAL PRODUK SWASTA NASIONAL =
1. KRI Clurit 641
2. KRI Kujang 642
3. KRI Beladau 643
4. KRI Alamang 644
5. KRI Surik 645
6. KRI Siwar 646
7. KRI Parang 647
8. KRI Terapang 648
9. KRI Golok (Trimaran) 688
KAPAL PATROLI CEPAT PRODUK SWASTA NASIONAL =
1. KRI Pari 849
2. KRI Sembilang 850
3. KRI Sidat 851
4. KRI Cakalang 852
5. KRI Tatihu 853
6. KRI Layaran 854
7. KRI Madidihang 855
8. KRI Kurau 856
9. KRI Torani 860
10. KRI Lepu 861
11. KRI Albakora 867
12. KRI Bubara 868
13. KRI Gulamah 869
14. KRI Posepa 870
15. KRI Escolar 871
16. KRI Karotang 872
17. KRI Mata Bongsang 873
18. KRI Dorang 874
19. KRI Bawal 875
20. KRI Tuna 876
21. KRI Marlin 877
22. KRI Butana 878
23. KRI Selar 879
24. KRI Hampala 880
25. KRI Lumba-Lumba 881
KAPAL KORVET PRODUK SWASTA NASIONAL =
1. KRI VVIP Bung Karno 369
2. KRI Bung Hatta 370
3. KRI Raja Ali Fisabilillah 391
4. KRI Lukas Rumkoren 392
ASET KAPAL PERANG SUPPORTING FORCE TNI AL PRODUKSI DALAM NEGERI
KAPAL LOGISTIK PRODUK SWASTA NASIONAL =
1. KRI Dumai 904
2. KRI Tarakan 905
3. KRI Bontang 906
4. KRI Balongan 907
KAPAL LPD (LANDING PLATFORM DOCK) PRODUK PT PAL =
1. KRI Semarang 594
2. KRI Dr. Wahidin Sudirohusodo 991
3. KRI Dr. Rajiman Wedyodiningrat 992
KAPAL PEMETAAN BAWAH AIR PRODUK SWASTA NASIONAL =
1. KRI Pollux 935
KAPAL SELAM TRANSFER TEKNOLOGI KORSEL-PT PAL =
1. KRI Nagapasa 403
2. KRI Ardadedali 404
3. KRI Alugoro 405
===========
===========
LCS = FFBNW MANGKRAK 15 YEARS
LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT ]
• USD 948 JUTA (EXCLUDING AMMO) = FFBNW = DELAYED
-NO NSM.
-NO VL MICA.
-NO TORPEDO RINGAN.
-NO SECONDARY GUNS.
-NO BOFORS MK3.
-----------
PRICE DESTROYER DAN FREGAT =
-KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
-TYPE 052D CLASS USD 500-600 JUTA.
-TYPE 055 CLASS USD 920 JUTA.
-------------
KEDAH = FFBNW NO MISSILE SINCE 2025=2009 : 17 YAERS GUNBOAT
In June 2006, after a total of 18 months of delays, the Royal MALAYDESH Navy commissioned KD Kedah, followed by a second hull, KD Pahang in August of the same year, and a third hull, KD Perak on 12 November 2007. By July 2009, six vessels had been launched.
-------------
THHE OPV 2 DAN OPV 3 = FFBNW TAMAT
THHE OPV 2 DAN OPV 3 = FFBNW TAMAT
THHE OPV 2 DAN OPV 3 = FFBNW TAMAT
Beliau berkata keputusan itu dipersetujui oleh Kabinet pada 22 Mac 2024 sebelum ia dilaksanakan.
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
NSM guys....ORANG KAYA
BalasHapusTak main la Exocet B3 bro... itu misil orang miskin!
Hapusπ€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£
MAMPUS.......BELASUNGKAWA TLDM π₯ π₯ π₯
Hapus-
INDONESIA EXO B 3 = 80 UNIT
MALAYDESH NAVY = 55 VESSELS
80-55 = SISA 25 UNIT EXO B3
----------
TNI AL =
✅️C802 = 180 KM
✅️C705 = 150 KM
✅️EXO B3 = 250 KM
✅️YAKHONT 300 KM
✅️MICA
✅️MISTRAL
✅️NSM (KSR X-33) = 185 KM
✅️ATMACA = 250 KM
==========
==========
TLDM = BLOCK 2 : 72 KM
EXOCET MM40
(surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
-----
TLDM = NSM Operational Range: NSM 185 km (100 NM) LOI GHOIB
----
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = MANGKRAK 15 years
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
----
SIPRI LCS = DELIVERED : 0 (KONTRAK NOL) ......
SAK 70 MK 3 - DELIVERED = 0
MICA - DELIVERED = 0
SHIP ENGINE - DELIVERED = 0
FIRE CONTROL RADAR - DELIVERED = 0
AIR CONTROL RADAR - DELIVERED = 0
-
π80 -55 = SISA 25 UNIT = BELASUNGKAWA TLDMπ
GORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
HapusGORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
GORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
REVISED (FINAL): RM11.2B FOR 5 SHIPS
(final agreed-upon contract price dealing with cost overruns)
RM 2.24 billion (2023) per unit + ToT (ceiling) [or USD948M (2023 inflation) or ~USD700M (2011 forex) or ~USD490M (2023 forex) (excluding ammo)
Inflation adjustment roughly equivalent to USD948 million in 2023 US dollars (excluding ammo)
-------------
REVISED (INITIAL): RM 9.128B FOR 5 SHIPS
(initial figures using the original contract price in dealing with cost overruns)
RM 1.8 billion (2011) per unit + ToT (ceiling) or USD560 million per ship (excluding ammo)
Inflation adjustment roughly equivalent to USD758 million in 2023 US dollars (excluding ammo)
-------------
ORIGINAL: RM 9B FOR 6 SHIPS
RM 1.5 billion (2011) per unit + ToT (ceiling) or USD466 million per ship (excluding cost overruns and ammo)
Inflation adjustment roughly equivalent to USD631 million in 2023 US dollars (excluding cost overruns and ammo)
-------------
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the MALAYDESH Navy in 2004 and complete the delivery in 2007.
Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
===================
===================
PRODUK DALAM NEGERI 2009-2024
HASIL PROGRAM MINIMUM ESSENTIAL FORCE (MEF) TNI AL. ASET KAPAL PERANG STRIKING FORCE TNI AL
KAPAL CEPAT RUDAL PRODUK PT PAL =
1. KRI Kapak 625
2. KRI Panah 626
3. KRI Kerambit 627
4. KRI Sampari 628
5. KRI Tombak 629
6. KRI Halasan 630
KAPAL CEPAT RUDAL PRODUK SWASTA NASIONAL =
1. KRI Clurit 641
2. KRI Kujang 642
3. KRI Beladau 643
4. KRI Alamang 644
5. KRI Surik 645
6. KRI Siwar 646
7. KRI Parang 647
8. KRI Terapang 648
9. KRI Golok (Trimaran) 688
KAPAL PATROLI CEPAT PRODUK SWASTA NASIONAL =
1. KRI Pari 849
2. KRI Sembilang 850
3. KRI Sidat 851
4. KRI Cakalang 852
5. KRI Tatihu 853
6. KRI Layaran 854
7. KRI Madidihang 855
8. KRI Kurau 856
9. KRI Torani 860
10. KRI Lepu 861
11. KRI Albakora 867
12. KRI Bubara 868
13. KRI Gulamah 869
14. KRI Posepa 870
15. KRI Escolar 871
16. KRI Karotang 872
17. KRI Mata Bongsang 873
18. KRI Dorang 874
19. KRI Bawal 875
20. KRI Tuna 876
21. KRI Marlin 877
22. KRI Butana 878
23. KRI Selar 879
24. KRI Hampala 880
25. KRI Lumba-Lumba 881
KAPAL KORVET PRODUK SWASTA NASIONAL =
1. KRI VVIP Bung Karno 369
2. KRI Bung Hatta 370
3. KRI Raja Ali Fisabilillah 391
4. KRI Lukas Rumkoren 392
ASET KAPAL PERANG SUPPORTING FORCE TNI AL PRODUKSI DALAM NEGERI
KAPAL LOGISTIK PRODUK SWASTA NASIONAL =
1. KRI Dumai 904
2. KRI Tarakan 905
3. KRI Bontang 906
4. KRI Balongan 907
KAPAL LPD (LANDING PLATFORM DOCK) PRODUK PT PAL =
1. KRI Semarang 594
2. KRI Dr. Wahidin Sudirohusodo 991
3. KRI Dr. Rajiman Wedyodiningrat 992
KAPAL PEMETAAN BAWAH AIR PRODUK SWASTA NASIONAL =
1. KRI Pollux 935
KAPAL SELAM TRANSFER TEKNOLOGI KORSEL-PT PAL =
1. KRI Nagapasa 403
2. KRI Ardadedali 404
3. KRI Alugoro 405
GORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
HapusREVISED (FINAL): RM11.2B FOR 5 SHIPS
(final agreed-upon contract price dealing with cost overruns)
RM 2.24 billion (2023) per unit + ToT (ceiling) [or USD948M (2023 inflation) or ~USD700M (2011 forex) or ~USD490M (2023 forex) (excluding ammo)
Inflation adjustment roughly equivalent to USD948 million in 2023 US dollars (excluding ammo)
-------------
REVISED (INITIAL): RM 9.128B FOR 5 SHIPS
(initial figures using the original contract price in dealing with cost overruns)
RM 1.8 billion (2011) per unit + ToT (ceiling) or USD560 million per ship (excluding ammo)
Inflation adjustment roughly equivalent to USD758 million in 2023 US dollars (excluding ammo)
-------------
ORIGINAL: RM 9B FOR 6 SHIPS
RM 1.5 billion (2011) per unit + ToT (ceiling) or USD466 million per ship (excluding cost overruns and ammo)
Inflation adjustment roughly equivalent to USD631 million in 2023 US dollars (excluding cost overruns and ammo)
=============
PROGRESS 70.1% (2025-2011 = 15 YEARS)
PROGRESS 70.1% (2025-2011 = 15 YEARS)
PROGRESS 70.1% (2025-2011 = 15 YEARS)
Deputy Defence Minister Adly Zahari said on Thursday that the overall progress of the long-delayed littoral combat ships (LCS) project had reached 70.1% as of Oct 25 this year.
-------------
SLOWLY...........
70.1% : 15 YEARS = 4.6% PER YEARS
70.1% : 15 YEARS = 4.6% PER YEARS
70.1% : 15 YEARS = 4.6% PER YEARS
The progress — which includes design, construction, equipping, and testing — is slightly behind schedule by 0.59%, as the planned progress was 70.69%, according to the contract’s timeline.
On the first LCS (LCS 1), the construction is in its final phase and is expected to be completed by the end of this year, Adly noted.
=============
2011 PENGADAAN LCS = Pengadaan enam LCS pada 2011 itu juga dilakukan tanpa tender terbuka. Kapal-kapal itu akan dibangun di Galangan Kapal Boustead dan unit pertama sedianya dikirim pada 2019.
-----
2019 LCS DIJANGKA = KD Maharaja Lela setelah ditugaskan, diluncurkan secara seremonial pada Agustus 2017. Seharusnya telah dikirim ke RMN pada April 2019
------
2022 LCS DIJANGKA = menurut jadual asal, setakat Ogos 2022 sepatutnya lima buah kapal LCS harus disiap dan diserahkan kepada TLDM.
-----
2023 LCS DIJANGKA = Seharusnya telah dikirim ke RMN pada April 2019, dengan kapal terakhir dijadwalkan untuk serah terima pada Juni 2023. Namun, progres kapal pertama baru sekitar 60% selesai
-----
2025 LCS DIJANGKA = Kapal pertama Littoral Combat Ship (LCS) TLDM itu dijangka hanya akan siap pada tahun 2025, iaitu 12 tahun selepas projek itu bermula pada Oktober 2013 dan kerajaan telah memPAY RM6 bilion kepada kontraktor utama projek itu.
-----
2026 LCS DIJANGKA = Lima kapal LCS akan diserahkan kepada TLDM secara berperingkat dengan kapal pertama dijangka diserahkan pada penghujung 2026
-----
2029 LCS DIJANGKA = TLDM hanya akan dapat memperoleh kelima-lima LCS pada 2029 berbanding kontrak asal di mana 5 kapal LCS itu sepatutnya diserahkan pada 2022..
-----
17 KREDITUR LCS = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services MALAYDESH Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan MALAYDESH Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat MALAYDESH Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat MALAYDESH Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALAYDESH ) BHD.
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
165 KRI
Hapus136 KAL PATKAMLA
113 PESAWAT UDARA
388 KENDARAAN TEMPUR
Dengan demikian, kekuatan armada tempur TNI AL saat ini mencakup 165 kapal perang (KRI), 136 KAL, kapal-kapal patroli keamanan laut (patkamla), 113 pesawat udara, dan 388 kendaraan tempur.
---------------------
18 COMBAT BOAT - ARMOUR PROTECTION = Patkamla Jefman memiliki beberapa keunggulan yaitu memiliki Armour Protection Standard STANAG Level 2, mampu beroperasi di medan pesisir laut, alur sungai dan daerah rawa. Saat ini TNI AL telah memiliki 18 Combat Boat Standard, dimana untuk Koarmada III saat ini memkebutuhankan 9 Unit Special Mission Combat Boat lagi yang akan ditempatkan jajaran dibawahnya baik di Lantamal, Lanal, dan Fasharkan Manokwari.
---------------------
Combat Boat Milik TNI AL ....
1.Patkamla Mamzakaran
2.Patkamla Pulau Bakau
3.Patkamla Pulau Numfor
4.Patkamla Bali
5.Patkamla Pulau Salando
6.Patkamla Busalangga
7.Patkamla Lamaru
8.Patkamla Coebang
9.Patkamla Pelambong
10.Patkamla Pulau Sebesi
11.Patkamla Karimun
12.Patkamla Gebang
13.Patkamla Pulau Pagerungan
14.Patkamla Pulau Semau
15.Patkamla Pulau Yapen
16.Patkamla Pulau Langkai
17.Patkamla Kastela
18.Patkamla Santiago
19.Patkamla Binanga
20.Patkamla Balaroa
21.Patkamla Gorar
22.Patkamla Wasur
23.Patkamla Posa
CMB spesial kopaska
24.KAL Kilat
25.KAL Guruh
26.KAL Tornado
---------------------
PRODUK DALAM NEGERI 2009-2024
HASIL PROGRAM MINIMUM ESSENTIAL FORCE (MEF) TNI AL. ASET KAPAL PERANG STRIKING FORCE TNI AL
KAPAL CEPAT RUDAL PRODUK PT PAL =
1. KRI Kapak 625
2. KRI Panah 626
3. KRI Kerambit 627
4. KRI Sampari 628
5. KRI Tombak 629
6. KRI Halasan 630
KAPAL CEPAT RUDAL PRODUK SWASTA NASIONAL =
1. KRI Clurit 641
2. KRI Kujang 642
3. KRI Beladau 643
4. KRI Alamang 644
5. KRI Surik 645
6. KRI Siwar 646
7. KRI Parang 647
8. KRI Terapang 648
9. KRI Golok (Trimaran) 688
KAPAL PATROLI CEPAT PRODUK SWASTA NASIONAL =
1. KRI Pari 849
2. KRI Sembilang 850
3. KRI Sidat 851
4. KRI Cakalang 852
5. KRI Tatihu 853
6. KRI Layaran 854
7. KRI Madidihang 855
8. KRI Kurau 856
9. KRI Torani 860
10. KRI Lepu 861
11. KRI Albakora 867
12. KRI Bubara 868
13. KRI Gulamah 869
14. KRI Posepa 870
15. KRI Escolar 871
16. KRI Karotang 872
17. KRI Mata Bongsang 873
18. KRI Dorang 874
19. KRI Bawal 875
20. KRI Tuna 876
21. KRI Marlin 877
22. KRI Butana 878
23. KRI Selar 879
24. KRI Hampala 880
25. KRI Lumba-Lumba 881
KAPAL KORVET PRODUK SWASTA NASIONAL =
1. KRI VVIP Bung Karno 369
2. KRI Bung Hatta 370
3. KRI Raja Ali Fisabilillah 391
4. KRI Lukas Rumkoren 392
ASET KAPAL PERANG SUPPORTING FORCE TNI AL PRODUKSI DALAM NEGERI
KAPAL LOGISTIK PRODUK SWASTA NASIONAL =
1. KRI Dumai 904
2. KRI Tarakan 905
3. KRI Bontang 906
4. KRI Balongan 907
KAPAL LPD (LANDING PLATFORM DOCK) PRODUK PT PAL =
1. KRI Semarang 594
2. KRI Dr. Wahidin Sudirohusodo 991
3. KRI Dr. Rajiman Wedyodiningrat 992
KAPAL PEMETAAN BAWAH AIR PRODUK SWASTA NASIONAL =
1. KRI Pollux 935
KAPAL SELAM TRANSFER TEKNOLOGI KORSEL-PT PAL =
1. KRI Nagapasa 403
2. KRI Ardadedali 404
3. KRI Alugoro 405
Dulu MEMBUAL sudah plug and play, tinggal butuh waktu 1 hari tuk pasang exocet. Tapi belasan tahun tak mampu beli satu pun
BalasHapusSekarang mau pasang NSM yang harga satuannya lebih murah. Tapi ntar tengok terpasang dg peluncur dan integrasinya yg mahal paling pikir2 lagi
π€£π€£π€£π€£π€£π€£
Exocet tinggal pasang, gak mau karena kemahalan, lalu pilih NSM yg murah
BalasHapusπ€£π€£π€£π€£π€£π€£π€£
manakala kapal INDIANESIA versi FFBNW NGUTANG LENDER....HAHAHAHHA
BalasHapus1. KAPAL FRIGAT MERAH PUTIH PINK OMPONG - GUN BOAT
2. KAPAL PPA OMPONG - GUN BOAT
GORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
HapusGORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
GORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
REVISED (FINAL): RM11.2B FOR 5 SHIPS
(final agreed-upon contract price dealing with cost overruns)
RM 2.24 billion (2023) per unit + ToT (ceiling) [or USD948M (2023 inflation) or ~USD700M (2011 forex) or ~USD490M (2023 forex) (excluding ammo)
Inflation adjustment roughly equivalent to USD948 million in 2023 US dollars (excluding ammo)
-------------
REVISED (INITIAL): RM 9.128B FOR 5 SHIPS
(initial figures using the original contract price in dealing with cost overruns)
RM 1.8 billion (2011) per unit + ToT (ceiling) or USD560 million per ship (excluding ammo)
Inflation adjustment roughly equivalent to USD758 million in 2023 US dollars (excluding ammo)
-------------
ORIGINAL: RM 9B FOR 6 SHIPS
RM 1.5 billion (2011) per unit + ToT (ceiling) or USD466 million per ship (excluding cost overruns and ammo)
Inflation adjustment roughly equivalent to USD631 million in 2023 US dollars (excluding cost overruns and ammo)
-------------
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the MALAYDESH Navy in 2004 and complete the delivery in 2007.
Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft
-------------
OVERLIMITS DEBT = MELARAT SEKARAT = SEWA
FEDERAL GOVERNMENT DEBT = PER PEOPLE : RM 36,139
HOUSEHOLD DEBT = PER PEOPLE : RM 45,859.
GOV + HOUSEHOLD = PER PEOPLE : RM 81,998
--------------------
1️⃣ DATA YANG DIGUNAKAN
• UTANG AKHIR 2024: RM 1.25 TRILIUN
• UTANG AKHIR JUNI 2025: RM 1.30 TRILIUN
• JUMLAH PENDUDUK MALAYDESH 2025 (PERKIRAAN PERTENGAHAN TAHUN): 35,977,838 JIWA
2️⃣ PERHITUNGAN UTANG PER PENDUDUK
1.30 TRILIUN = 1,300,000,000,000
PER ORANG = 1,300,000,000,000/35,977,838 : RM 36,139 PER ORANG
--------------------
1️⃣ DATA YANG DIGUNAKAN
• UTANG RUMAH TANGGA (AKHIR MARET 2025): RM 1.65 TRILIUN
• PERSENTASE TERHADAP PDB: 84.3%
• JUMLAH PENDUDUK MALAYDESH PERTENGAHAN 2025: 35,977,838 JIWA
2️⃣ PERHITUNGAN UTANG PER PENDUDUK
UTANG PER ORANG =1,650,000,000,000/35,977,838 : RM 45,859 PER ORANG
--------------------
GOVERNMENT DEBT : 69% OF GDP
HOUSEHOLD DEBT : 84.3% OF GDP
FEDERAL GOVERNMENT DEBT
• END OF 2024: RM 1.25 TRILLION
• END OF JUNE 2025: RM 1.3 TRILLION
• PROJECTED DEBT-TO-GDP: 69% BY THE END OF 2025
HOUSEHOLD DEBT
2025 : RM1.73 TRILLION, OR 85.8% OF GDP
GORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
HapusGORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
GORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
REVISED (FINAL): RM11.2B FOR 5 SHIPS
(final agreed-upon contract price dealing with cost overruns)
RM 2.24 billion (2023) per unit + ToT (ceiling) [or USD948M (2023 inflation) or ~USD700M (2011 forex) or ~USD490M (2023 forex) (excluding ammo)
Inflation adjustment roughly equivalent to USD948 million in 2023 US dollars (excluding ammo)
-------------
REVISED (INITIAL): RM 9.128B FOR 5 SHIPS
(initial figures using the original contract price in dealing with cost overruns)
RM 1.8 billion (2011) per unit + ToT (ceiling) or USD560 million per ship (excluding ammo)
Inflation adjustment roughly equivalent to USD758 million in 2023 US dollars (excluding ammo)
-------------
ORIGINAL: RM 9B FOR 6 SHIPS
RM 1.5 billion (2011) per unit + ToT (ceiling) or USD466 million per ship (excluding cost overruns and ammo)
Inflation adjustment roughly equivalent to USD631 million in 2023 US dollars (excluding cost overruns and ammo)
-------------
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the MALAYDESH Navy in 2004 and complete the delivery in 2007.
Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft
-------------
2011 PENGADAAN LCS = Pengadaan enam LCS pada 2011 itu juga dilakukan tanpa tender terbuka. Kapal-kapal itu akan dibangun di Galangan Kapal Boustead dan unit pertama sedianya dikirim pada 2019.
-----
2019 LCS DIJANGKA = KD Maharaja Lela setelah ditugaskan, diluncurkan secara seremonial pada Agustus 2017. Seharusnya telah dikirim ke RMN pada April 2019
------
2022 LCS DIJANGKA = menurut jadual asal, setakat Ogos 2022 sepatutnya lima buah kapal LCS harus disiap dan diserahkan kepada TLDM.
-----
2023 LCS DIJANGKA = Seharusnya telah dikirim ke RMN pada April 2019, dengan kapal terakhir dijadwalkan untuk serah terima pada Juni 2023. Namun, progres kapal pertama baru sekitar 60% selesai
-----
2025 LCS DIJANGKA = Kapal pertama Littoral Combat Ship (LCS) TLDM itu dijangka hanya akan siap pada tahun 2025, iaitu 12 tahun selepas projek itu bermula pada Oktober 2013 dan kerajaan telah memPAY RM6 bilion kepada kontraktor utama projek itu.
-----
2026 LCS DIJANGKA = Lima kapal LCS akan diserahkan kepada TLDM secara berperingkat dengan kapal pertama dijangka diserahkan pada penghujung 2026
-----
2029 LCS DIJANGKA = TLDM hanya akan dapat memperoleh kelima-lima LCS pada 2029 berbanding kontrak asal di mana 5 kapal LCS itu sepatutnya diserahkan pada 2022..
-----
17 KREDITUR LCS = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services MALAYDESH Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan MALAYDESH Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat MALAYDESH Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat MALAYDESH Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALAYDESH ) BHD.
DELAYED LCS ...........
HapusPROGRESS 70.1% (2025-2011 = 15 YEARS)
PROGRESS 70.1% (2025-2011 = 15 YEARS)
PROGRESS 70.1% (2025-2011 = 15 YEARS)
Deputy Defence Minister Adly Zahari said on Thursday that the overall progress of the long-delayed littoral combat ships (LCS) project had reached 70.1% as of Oct 25 this year.
=============
SLOWLY...........
70.1% : 15 YEARS = 4.6% PER YEARS
70.1% : 15 YEARS = 4.6% PER YEARS
70.1% : 15 YEARS = 4.6% PER YEARS
The progress — which includes design, construction, equipping, and testing — is slightly behind schedule by 0.59%, as the planned progress was 70.69%, according to the contract’s timeline.
On the first LCS (LCS 1), the construction is in its final phase and is expected to be completed by the end of this year, Adly noted.
===================
THHE DESEMBER 2024 OPV TAMAT
THHE DESEMBER 2024 OPV TAMAT
THHE DESEMBER 2024 OPV TAMAT
“Kementerian Dalam Negeri dibenarkan menamatkan kontrak projek tersebut setelah mendapat pandangan daripada Jabatan Peguam Negara. Sehubungan itu, kerajaan menandatangani perjanjian penamatan bersama pihak syarikat pada 31 Disember 2024,” katanya dalam jawapan bertulis yang dimuat naik dalam laman web Parlimen pada Khamis malam.
-----
SALAM MANGKRAK LCS 2025-2011 = 15 TAHUN
15 TAHUN MANGKRAK
15 TAHUN MANGKRAK
LCS DIPAY 6 RM 11.2 BILLION NOT YET DELIVERED = The cost of the LCS project is NOw RM11.2 billion. It must be NOted from that RM11.2 billion, Lunas or the former BNS used around RM1 billion to pay its DEBTs and to upgrade the facilities for the LCS project. And NOt a single ship has been delivered yet.
-----
NGPVs 2024-1996 = 28 TAHUN
28 TAHUN MANGKRAK
28 TAHUN MANGKRAK
NGPVs DIPAY 27 JADI 6 = The Kedah-class offshore patrol vessels of the Royal MALAYDESH Navy (RMN) are six ships based on the MEKO 100 design by Blohm + Voss. Originally, a total of 27 ships were planned, but due to programme delays and overruns, only six were eventually ordered. Their construction began in the early 2000s, and by 2009, all six were in active service.
-----
NGPVs PAY DEBT LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada PAYan pendahuluan bagi projek LCS untuk menjelaskan DEBT lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenaMALAYDESH semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
-----
17 KREDITUR LCS
17 KREDITUR LCS
17 KREDITUR LCS
Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services MALAYDESH Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan MALAYDESH Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat MALAYDESH Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat MALAYDESH Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALAYDESH ) Bhd.
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
kedah class ffbnw abadi
BalasHapusLohh... Tukang Karut nie buta huruf rupanyerr..
HapusBraille mana braille?
π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£
GORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
HapusGORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
GORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
REVISED (FINAL): RM11.2B FOR 5 SHIPS
(final agreed-upon contract price dealing with cost overruns)
RM 2.24 billion (2023) per unit + ToT (ceiling) [or USD948M (2023 inflation) or ~USD700M (2011 forex) or ~USD490M (2023 forex) (excluding ammo)
Inflation adjustment roughly equivalent to USD948 million in 2023 US dollars (excluding ammo)
-------------
REVISED (INITIAL): RM 9.128B FOR 5 SHIPS
(initial figures using the original contract price in dealing with cost overruns)
RM 1.8 billion (2011) per unit + ToT (ceiling) or USD560 million per ship (excluding ammo)
Inflation adjustment roughly equivalent to USD758 million in 2023 US dollars (excluding ammo)
-------------
ORIGINAL: RM 9B FOR 6 SHIPS
RM 1.5 billion (2011) per unit + ToT (ceiling) or USD466 million per ship (excluding cost overruns and ammo)
Inflation adjustment roughly equivalent to USD631 million in 2023 US dollars (excluding cost overruns and ammo)
-------------
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the MALAYDESH Navy in 2004 and complete the delivery in 2007.
Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft
-------------
5x GANTI PM = AKAN MISKIN
6x GANTI MENHAN = AKAN MISKIN
SERIUS!!! BADUT GORILA IQ BOTOL = MEMBUAL SHOPPING
-
2025 = 84,3% DARI GDP
MISKIN KLAIM LUNAS 2053 = GAGAL (NAMBAH DEBT)
-
PERDANA MENTERI = TIDAK BAYAR TERTUNGGAK
MENTERI PERTAHANAN = KEKANGAN KEWANGAN
SERIUS!!! BADUT GORILA IQ BOTOL = MEMBUAL KLAIM KAYA
=========
SALAM NGEMIS F18 KUWAIT 2025-2017=
5x GANTI PERDANA MENTERI
5x GANTI MENTERI PERTAHANAN
-
SALAM MANGKRAK LCS 2025-2011 =
5x GANTI PERDANA MENTERI
6x GANTI MENTERI PERTAHANAN
-
MEMBUAL SPH 2025-2016 =
5x GANTI PERDANA MENTERI
5x GANTI MENTERI PERTAHANAN
-
2025 = ZONK = NGEMIS MEMBUAL MISKIN
GORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
HapusGORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
GORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
REVISED (FINAL): RM11.2B FOR 5 SHIPS
(final agreed-upon contract price dealing with cost overruns)
RM 2.24 billion (2023) per unit + ToT (ceiling) [or USD948M (2023 inflation) or ~USD700M (2011 forex) or ~USD490M (2023 forex) (excluding ammo)
Inflation adjustment roughly equivalent to USD948 million in 2023 US dollars (excluding ammo)
-------------
REVISED (INITIAL): RM 9.128B FOR 5 SHIPS
(initial figures using the original contract price in dealing with cost overruns)
RM 1.8 billion (2011) per unit + ToT (ceiling) or USD560 million per ship (excluding ammo)
Inflation adjustment roughly equivalent to USD758 million in 2023 US dollars (excluding ammo)
-------------
ORIGINAL: RM 9B FOR 6 SHIPS
RM 1.5 billion (2011) per unit + ToT (ceiling) or USD466 million per ship (excluding cost overruns and ammo)
Inflation adjustment roughly equivalent to USD631 million in 2023 US dollars (excluding cost overruns and ammo)
-------------
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the MALAYDESH Navy in 2004 and complete the delivery in 2007.
Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
===================
===================
The Royal MALAYDESH Navy (RMN) faces a number of problems, including an aging fleet, a small defense budget, and corruption.
Aging fleet
• More than half of the RMN's fleet is past its prime
• Vital replacements have been delayed
• The RMN's ability to patrol its maritime domain is severely limited
Small defense budget
• MALAYDESH 's defense budget is relatively small
• The RMN's ability to patrol and secure its maritime domain is limited by its small defense budget
Corruption
• The RMN has gone through numerous modernization efforts, some of which are intertwined with corruption
• The RMN's military has been plagued by corruption
Mismanagement
• A government audit found that mismanagement has mangkrak plans to replace the RMN's aging fleet
The Public Accounts Committee (PAC) found that BNS subsidiaries did not use all of the government's payments
===================
LMS B2 = FFBNW DOWNGRADE HISAR OPV NO ASW
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALAYDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-------------
LCS = FFBNW MANGKRAK 15 YEARS
LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT ]
• USD 948 JUTA (EXCLUDING AMMO) = FFBNW = DELAYED
-NO NSM.
-NO VL MICA.
-NO TORPEDO RINGAN.
-NO SECONDARY GUNS.
-NO BOFORS MK3.
-----------
PRICE DESTROYER DAN FREGAT =
-KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
-TYPE 052D CLASS USD 500-600 JUTA.
-TYPE 055 CLASS USD 920 JUTA.
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
Guys...... jaga jaga dengan NSM Missile....HAHAHAHAH
BalasHapusBARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
HapusBARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
BARTER PALM OIL = MKM - MIG29N - FA50 - SCORPENE - PT91M
GORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
HapusGORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
GORILA MALAYDESH = EXCLUDING AMMO (KOSONG)
REVISED (FINAL): RM11.2B FOR 5 SHIPS
(final agreed-upon contract price dealing with cost overruns)
RM 2.24 billion (2023) per unit + ToT (ceiling) [or USD948M (2023 inflation) or ~USD700M (2011 forex) or ~USD490M (2023 forex) (excluding ammo)
Inflation adjustment roughly equivalent to USD948 million in 2023 US dollars (excluding ammo)
-------------
REVISED (INITIAL): RM 9.128B FOR 5 SHIPS
(initial figures using the original contract price in dealing with cost overruns)
RM 1.8 billion (2011) per unit + ToT (ceiling) or USD560 million per ship (excluding ammo)
Inflation adjustment roughly equivalent to USD758 million in 2023 US dollars (excluding ammo)
-------------
ORIGINAL: RM 9B FOR 6 SHIPS
RM 1.5 billion (2011) per unit + ToT (ceiling) or USD466 million per ship (excluding cost overruns and ammo)
Inflation adjustment roughly equivalent to USD631 million in 2023 US dollars (excluding cost overruns and ammo)
-------------
LMS B2 = FFBNW DOWNGRADE HISAR OPV NO ASW
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALAYDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-------------
LCS = FFBNW MANGKRAK 15 YEARS
LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT ]
• USD 948 JUTA (EXCLUDING AMMO) = FFBNW = DELAYED
-NO NSM.
-NO VL MICA.
-NO TORPEDO RINGAN.
-NO SECONDARY GUNS.
-NO BOFORS MK3.
-----------
PRICE DESTROYER DAN FREGAT =
-KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
-TYPE 052D CLASS USD 500-600 JUTA.
-TYPE 055 CLASS USD 920 JUTA.
-------------
KEDAH = FFBNW NO MISSILE SINCE 2025=2009 : 17 YAERS GUNBOAT
In June 2006, after a total of 18 months of delays, the Royal MALAYDESH Navy commissioned KD Kedah, followed by a second hull, KD Pahang in August of the same year, and a third hull, KD Perak on 12 November 2007. By July 2009, six vessels had been launched.
-------------
THHE OPV 2 DAN OPV 3 = FFBNW TAMAT
THHE OPV 2 DAN OPV 3 = FFBNW TAMAT
THHE OPV 2 DAN OPV 3 = FFBNW TAMAT
Beliau berkata keputusan itu dipersetujui oleh Kabinet pada 22 Mac 2024 sebelum ia dilaksanakan.
“Kementerian Dalam Negeri dibenarkan menamatkan kontrak projek tersebut setelah mendapat pandangan daripada Jabatan Peguam Negara. Sehubungan itu, kerajaan menandatangani perjanjian penamatan bersama pihak syarikat pada 31 Disember 2024,” katanya dalam jawapan bertulis yang dimuat naik dalam laman web Parlimen pada Khamis malam.
-------------
The MALAYDESH Armed Forces' (MAF) Littoral Combat Ships (LCS) have faced several issues, including delays, design flaws, and a lack of air and surface warfare capabilities.
Delays
• The first LCS was delayed by six years, from its scheduled delivery date.
• The LCS program has been plagued by delays due to a number of factors.
Design flaws
• The LCS hull, or sea frame, had issues with cracking.
• The propulsion plant design had issues from the start.
• Some mission module components were immature.
Lack of air and surface warfare capabilities
• Some say the LCS lacks significant air and surface warfare capabilities.
Other issues
• The LCS has faced issues with survivability in contested waters.
• The LCS has had limited flight deck and berthing space.
• The LCS has had command and control limitations.
• The LCS program has been plagued by allegations of corruption and political interference.
The MAF has also faced other challenges, including underfunding and an aging fleet.
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
LAWAKnya ....FFBNW OMPONG guys....HAHAHAHHAHA
BalasHapus1. KAPAL FRIGAT MERAH PUTIH PINK OMPONG - GUN BOAT
2. KAPAL PPA OMPONG - GUN BOAT
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
Hapus17 CREDITOR LCS
17 CREDITOR LCS
17 CREDITOR LCS
1. MTU Services Ingat Kawan (M) Sdn Bhd
2. include Contraves Sdn Bhd
3. Axima Concept SA
4. Contraves Advanced Devices Sdn Bhd
5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
6. Security & Services MALAYDESH Sdn Bhd,
7. iXblue SAS
8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
9. Bank Pembangunan MALAYDESH Bhd
10. AmBank Islamic Bhd
11. AmBank (M) Bhd
12. Affin Hwang Investment Bank Bhd
13. Bank Muamalat MALAYDESH Bhd
14. Affin Bank Bhd
15. Bank Kerjasama Rakyat MALAYDESH Bhd
16. Malayan Banking Bhd (Maybank)
17. KUWAIT FINANCE HOUSE (MALAYDESH ) BHD.
===================
PRODUK DALAM NEGERI 2009-2024
HASIL PROGRAM MINIMUM ESSENTIAL FORCE (MEF) TNI AL. ASET KAPAL PERANG STRIKING FORCE TNI AL
KAPAL CEPAT RUDAL PRODUK PT PAL =
1. KRI Kapak 625
2. KRI Panah 626
3. KRI Kerambit 627
4. KRI Sampari 628
5. KRI Tombak 629
6. KRI Halasan 630
KAPAL CEPAT RUDAL PRODUK SWASTA NASIONAL =
1. KRI Clurit 641
2. KRI Kujang 642
3. KRI Beladau 643
4. KRI Alamang 644
5. KRI Surik 645
6. KRI Siwar 646
7. KRI Parang 647
8. KRI Terapang 648
9. KRI Golok (Trimaran) 688
KAPAL PATROLI CEPAT PRODUK SWASTA NASIONAL =
1. KRI Pari 849
2. KRI Sembilang 850
3. KRI Sidat 851
4. KRI Cakalang 852
5. KRI Tatihu 853
6. KRI Layaran 854
7. KRI Madidihang 855
8. KRI Kurau 856
9. KRI Torani 860
10. KRI Lepu 861
11. KRI Albakora 867
12. KRI Bubara 868
13. KRI Gulamah 869
14. KRI Posepa 870
15. KRI Escolar 871
16. KRI Karotang 872
17. KRI Mata Bongsang 873
18. KRI Dorang 874
19. KRI Bawal 875
20. KRI Tuna 876
21. KRI Marlin 877
22. KRI Butana 878
23. KRI Selar 879
24. KRI Hampala 880
25. KRI Lumba-Lumba 881
KAPAL KORVET PRODUK SWASTA NASIONAL =
1. KRI VVIP Bung Karno 369
2. KRI Bung Hatta 370
3. KRI Raja Ali Fisabilillah 391
4. KRI Lukas Rumkoren 392
ASET KAPAL PERANG SUPPORTING FORCE TNI AL PRODUKSI DALAM NEGERI
KAPAL LOGISTIK PRODUK SWASTA NASIONAL =
1. KRI Dumai 904
2. KRI Tarakan 905
3. KRI Bontang 906
4. KRI Balongan 907
KAPAL LPD (LANDING PLATFORM DOCK) PRODUK PT PAL =
1. KRI Semarang 594
2. KRI Dr. Wahidin Sudirohusodo 991
3. KRI Dr. Rajiman Wedyodiningrat 992
KAPAL PEMETAAN BAWAH AIR PRODUK SWASTA NASIONAL =
1. KRI Pollux 935
KAPAL SELAM TRANSFER TEKNOLOGI KORSEL-PT PAL =
1. KRI Nagapasa 403
2. KRI Ardadedali 404
3. KRI Alugoro 405
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
HapusLCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
LCS RM12.4 BILLION /5 UNIT : RM2,48 PER UNIT = EXCLUDING AMMO
The MALAYDESH Armed Forces (MAF) has faced a number of weaknesses, including corruption, outdated equipment, and a lack of authority.
HapusCorruption
• The MAF has been plagued by corruption, which has undermined its combat readiness.
• The MAF's Integrity Plan addresses corruption, but it's not a strategic document and doesn't provide comprehensive guidelines.
• Commanders don't receive training on corruption issues before deployments.
Outdated equipment
• Most of the MAF's equipment was purchased between the 1970s and the 1990s.
• The MAF's equipment is outdated and behind that of neighboring countries.
• The government has been unable to provide the MAF with modern defense assets.
Lack of authority
• The MAF has limited authority, especially when it comes to non-traditional security challenges.
• The MAF's role is generally to assist other authorities, such as the police.
Other weaknesses
• Political interference has undermined the MAF's combat readiness.
• The MAF has faced budgetary constraints.
------------------
The MALAYDESH Armed Forces (MAF) has faced a number of weaknesses, including outdated equipment, corruption, and political interference.
Outdated equipment
• The MAF's equipment is outdated and lacks modern military assets.
• The MAF's equipment was purchased between the 1970s and 1990s.
• The MAF's KD Rahman submarine was unable to submerge due to technical problems in 2010.
Corruption
• Political interference and corruption have undermined the MAF's combat readiness.
• The MAF has been plagued by corruption.
Budgetary constraints
• The MAF's procurement has been held back by budgetary constraints.
• The MAF's budget is limited to 1.4% of MALAYDESH 's GDP.
Non-traditional security threats
• The MAF faces non-traditional security threats, such as territory disputes with neighboring countries.
• The MAF faces non-conventional threats, such as those that are transboundary in nature.
Regional strategic environment
• The MAF needs to consider the regional strategic environment when developing its strategic perspective.
------------------
The MALAYDESH Armed Forces (MAF) has faced a number of weaknesses, including outdated equipment, corruption, and political interference.
Outdated equipment
• The MAF's equipment is outdated and lacks modern military assets.
• The MAF's equipment was purchased between the 1970s and 1990s.
• The MAF's KD Rahman submarine was unable to submerge due to technical problems in 2010.
Corruption
• Political interference and corruption have undermined the MAF's combat readiness.
• The MAF has been plagued by corruption.
Budgetary constraints
• The MAF's procurement has been held back by budgetary constraints.
• The MAF's budget is limited to 1.4% of MALAYDESH 's GDP.
Non-traditional security threats
• The MAF faces non-traditional security threats, such as territory disputes with neighboring countries.
• The MAF faces non-conventional threats, such as those that are transboundary in nature.
Regional strategic environment
The MAF needs to consider the regional strategic environment when developing its strategic perspective
MALAYDESH 's armed forces have been underfunded for years due to fiscal constraints and a lack of political will to invest in defense. This has limited the country's ability to modernize its military and respond to threats.
HapusFactors contributing to underfunding
• Budget allocations: The defense budget has remained stagnant over the past five years.
• Government priorities: The government has focused on stabilizing the economy and political climate instead of defense.
• Corruption: Corruption risks are high in the defense governance architecture, including procurement and personnel ethics.
Impacts of underfunding
• Limited procurement: The navy and air force have struggled to purchase new assets.
• Aging fleet: The navy has an aging fleet of ships that need to be replaced.
• Limited ability to respond to threats: The armed forces are unable to fully respond to threats such as those from extremist and separatist groups in the region. F.
------------------
The MALAYDESH Armed Forces (MAF) has faced issues with spare parts for its assets, including a lack of budget, underperforming contractors, and outdated pricing.
Budget
• The MAF has faced budget constraints that affect the serviceability of its assets.
• The government's revenue has been affected by reduced commodity prices, which has reduced the funds available for defense procurement.
Outsourcing
• The MAF has outsourced the supply of spare parts and maintenance of its assets, but this has led to issues.
• Underperforming contractors and a lack of enforcement of contract terms have impacted the effectiveness of outsourcing.
• The process of awarding contracts can be lengthy, which can lead to outdated pricing.
Spare parts for specific assets
• The MAF's PT-91M tanks have faced issues with spare parts, as the supplier of some components is no longer in production.
• The MAF has also faced issues with Russian-produced fighter aircraft, including problems with the supply of spare parts.
Other issues
• The MAF has also faced issues with undertraining of staff, and the lack of clear guidance for the future strategic direction of the defense industry
MAMPUS.......BELASUNGKAWA TLDM π₯ π₯ π₯
BalasHapus-
INDONESIA EXO B 3 = 80 UNIT
MALAYDESH NAVY = 55 VESSELS
80-55 = SISA 25 UNIT EXO B3
----------
TNI AL =
✅️C802 = 180 KM
✅️C705 = 150 KM
✅️EXO B3 = 250 KM
✅️YAKHONT 300 KM
✅️MICA
✅️MISTRAL
✅️NSM (KSR X-33) = 185 KM
✅️ATMACA = 250 KM
==========
==========
TLDM = BLOCK 2 : 72 KM
EXOCET MM40
(surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
-----
TLDM = NSM Operational Range: NSM 185 km (100 NM) LOI GHOIB
----
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = MANGKRAK 15 years
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
----
SIPRI LCS = DELIVERED : 0 (KONTRAK NOL) ......
SAK 70 MK 3 - DELIVERED = 0
MICA - DELIVERED = 0
SHIP ENGINE - DELIVERED = 0
FIRE CONTROL RADAR - DELIVERED = 0
AIR CONTROL RADAR - DELIVERED = 0
-
π80 -55 = SISA 25 UNIT = BELASUNGKAWA TLDMπ
MAMPUS = BELASUNGKAWA TLDM π₯ π₯ π₯
BalasHapus-
INDONESIA EXO B 3 = 80 UNIT
MALAYDESH NAVY = 55 VESSELS
80-55 = SISA 25 UNIT EXO B3
----------
TNI AL =
✅️C802 = 180 KM
✅️C705 = 150 KM
✅️EXO B3 = 250 KM
✅️YAKHONT 300 KM
✅️MICA
✅️MISTRAL
✅️NSM (KSR X-33) = 185 KM
✅️ATMACA = 250 KM
==========
==========
TLDM = BLOCK 2 : 72 KM
EXOCET MM40
(surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
-----
TLDM = NSM Operational Range: NSM 185 km (100 NM) LOI GHOIB
----
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = MANGKRAK 15 years
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
----
SIPRI LCS = DELIVERED : 0 (KONTRAK NOL) ......
SAK 70 MK 3 - DELIVERED = 0
MICA - DELIVERED = 0
SHIP ENGINE - DELIVERED = 0
FIRE CONTROL RADAR - DELIVERED = 0
AIR CONTROL RADAR - DELIVERED = 0
-
π80 -55 = SISA 25 UNIT = BELASUNGKAWA TLDMπ
Bro... KONOHA Ketar ketir!!
BalasHapusπ€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£
MAMPUS = BELASUNGKAWA TLDM π₯ π₯ π₯
Hapus-
INDONESIA EXO B 3 = 80 UNIT
MALAYDESH NAVY = 55 VESSELS
80-55 = SISA 25 UNIT EXO B3
----------
TNI AL =
✅️C802 = 180 KM
✅️C705 = 150 KM
✅️EXO B3 = 250 KM
✅️YAKHONT 300 KM
✅️MICA
✅️MISTRAL
✅️NSM (KSR X-33) = 185 KM
✅️ATMACA = 250 KM
==========
==========
TLDM = BLOCK 2 : 72 KM
EXOCET MM40
(surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
-----
TLDM = NSM Operational Range: NSM 185 km (100 NM) LOI GHOIB
----
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = MANGKRAK 15 years
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
----
SIPRI LCS = DELIVERED : 0 (KONTRAK NOL) ......
SAK 70 MK 3 - DELIVERED = 0
MICA - DELIVERED = 0
SHIP ENGINE - DELIVERED = 0
FIRE CONTROL RADAR - DELIVERED = 0
AIR CONTROL RADAR - DELIVERED = 0
-
π80 -55 = SISA 25 UNIT = BELASUNGKAWA TLDMπ
MAMPUS = BELASUNGKAWA TLDM π₯ π₯ π₯
Hapus-
INDONESIA EXO B 3 = 80 UNIT
MALAYDESH NAVY = 55 VESSELS
80-55 = SISA 25 UNIT EXO B3
----------
TNI AL =
✅️YAKHONT 300 KM
✅️EXO B3 = 250 KM
✅️ATMACA = 250 KM
✅️NSM (KSR X-33) = 185 KM
✅️C802 = 180 KM
✅️C705 = 150 KM
==========
==========
TLDM = BLOCK 2 : 72 KM
EXOCET MM40
(surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
-----
TLDM = NSM Operational Range: NSM 185 km (100 NM) LOI GHOIB
----
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = MANGKRAK 15 years
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
----
SIPRI LCS = DELIVERED : 0 (KONTRAK NOL) ......
SAK 70 MK 3 - DELIVERED = 0
MICA - DELIVERED = 0
SHIP ENGINE - DELIVERED = 0
FIRE CONTROL RADAR - DELIVERED = 0
AIR CONTROL RADAR - DELIVERED = 0
-
π80 -55 = SISA 25 UNIT = BELASUNGKAWA TLDMπ
TIAP TAHUN TIPU-TIPU LCS DIJANGKA
Hapus===================
2011 PENGADAAN LCS = Pengadaan enam LCS pada 2011 itu juga dilakukan tanpa tender terbuka. Kapal-kapal itu akan dibangun di Galangan Kapal Boustead dan unit pertama sedianya dikirim pada 2019.
-----
2019 LCS DIJANGKA = KD Maharaja Lela setelah ditugaskan, diluncurkan secara seremonial pada Agustus 2017. Seharusnya telah dikirim ke RMN pada April 2019
------
2022 LCS DIJANGKA = menurut jadual asal, setakat Ogos 2022 sepatutnya lima buah kapal LCS harus disiap dan diserahkan kepada TLDM.
-----
2023 LCS DIJANGKA = Seharusnya telah dikirim ke RMN pada April 2019, dengan kapal terakhir dijadwalkan untuk serah terima pada Juni 2023. Namun, progres kapal pertama baru sekitar 60% selesai
-----
2025 LCS DIJANGKA = Kapal pertama Littoral Combat Ship (LCS) TLDM itu dijangka hanya akan siap pada tahun 2025, iaitu 12 tahun selepas projek itu bermula pada Oktober 2013 dan kerajaan telah memPAY RM6 bilion kepada kontraktor utama projek itu.
-----
2026 LCS DIJANGKA = Lima kapal LCS akan diserahkan kepada TLDM secara berperingkat dengan kapal pertama dijangka diserahkan pada penghujung 2026
-----
2029 LCS DIJANGKA = TLDM hanya akan dapat memperoleh kelima-lima LCS pada 2029 berbanding kontrak asal di mana 5 kapal LCS itu sepatutnya diserahkan pada 2022..
-----
17 KREDITUR LCS = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services MALAYDESH Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan MALAYDESH Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat MALAYDESH Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat MALAYDESH Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALAYDESH ) BHD.
===================
DATA STATISTA 2029-2020 : INCREASE DEBT
DATA STATISTA 2029-2020 : INCREASE DEBT
2029 = 438,09 BILLION USD
2028 = 412,2 BILLION USD
2027 = 386,51 BILLION USD
2026 = 362,19 BILLION USD
2025 = 338,75 BILLION USD
2024 = 316,15 BILLION USD
2023 = 293,83 BILLION USD
2022 = 271,49 BILLION USD
2021 = 247,49 BILLION USD
2020 = 221,49 BILLION USD
------------------
DATA STATISTA 2029-2020 : DEBT PAY DEBT
DATA STATISTA 2029-2020 : OVERLIMIT DEBT
2029 = 69,54% DEBT RATIO TO GDP
2028 = 69,34% DEBT RATIO TO GDP
2027 = 68,8% DEBT RATIO TO GDP
2026 = 68,17% DEBT RATIO TO GDP
2025 = 68,07% DEBT RATIO TO GDP
2024 = 68,38% DEBT RATIO TO GDP
2023 = 69,76% DEBT RATIO TO GDP
2022 = 65,5% DEBT RATIO TO GDP
2021 = 69,16% DEBT RATIO TO GDP
2020 = 67,69% DEBT RATIO TO GDP
==========
BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
MALAYDESH household DEBT is one of the highest in the ASEAN region. Against this backdrop, Bank Negara MALAYDESH (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in MALAYDESH , among other things. Using aggregated data from BNM's Central Credit Reference Information System (CCRIS), this dashboard gives you insight into key trends on household DEBT. For now, it displays data on the flow of borrowing activity on a monthly basis, broken down by purpose. In due time, it will be deepened with granular data showing the state of inDEBTedness of MALAYDESH
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
NGEMIS POHANG
HapusNGEMIS POHANG
NGEMIS POHANG
Asrizal Rusli Beli LCA F/A-50 18 buah, percuma Pohang-class 2 buah..kalau jadi kenyataan aku janji akan meminati K-Pop termasuk drama dan band-nya..aku juga akan sertai army BTS untuk melengkapkan lagi sokongan aku kepada produk Korea Selatan.
===
SPH CAESAR =
GEMPURWIRA 2 April 2022 pukul 19.36
Wkwkwkwkkw.... MALAYDESH SHOPING SPH guys.... ORANG KAYA
-----
SPH YAVUZ =
GEMPURWIRA 18 April 2022 pukul 12.26
SPH Masuk dalam aset terbaru ya guys... Shoping lagi. Wkwkkwkwkwkw
-----
SPH EVA =
GEMPURWIRA 14 September 2022 pukul 07.29
Video Eva SPH yang di runding oleh MALAYDESH guys.... pengisian peluru Auto guys
===
Asrizal Rusli Beli LCA F/A-50 18 buah, percuma Pohang-class 2 buah..kalau jadi kenyataan aku janji akan meminati K-Pop termasuk drama dan band-nya..aku juga akan sertai army BTS untuk melengkapkan lagi sokongan aku kepada produk Korea Selatan.
===
MALAYDESH 's combat equipment has several weaknesses, including:
• Ageing equipment: The MALAYDESH military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The MALAYDESH Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: MALAYDESH has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The MALAYDESH procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
===
MALAYDESH 's military assets face a number of maintenance problems, including outdated equipment, a lack of funds, and corruption. These problems can make it difficult for the military to respond to threats and protect the country's interests.
Outdated equipment :
• Many of MALAYDESH 's military assets are outdated and have exceeded their intended service life.
• The air force's MiG-29 Fulcrum fighter aircraft were withdrawn from service in 2017.
• The KD Rahman submarine had technical problems that prevented it from submerging in 2010.
Lack of funds :
• MALAYDESH 's military has faced a shortage of funds for many years.
• The government has been unable to provide the military with the modern assets it needs.
• Corruption Political interference and corruption have undermined the military's combat readiness.
• The military has experienced leakages and scandals in its defense spending.
• The military has difficulty verifying that contractual obligations have been met.
• The military has difficulty transferring techNOLogy from OEMs.
The military has difficulty procuring parts that are compatible with its existing fleet
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
MALAYSIA siap jadi pengguna misil NSM terbesar di ASEAN...HOREYYYYY
BalasHapus62 KRI (BUATAN INDONESIA 2006–2025)
Hapus1. Kapal Cepat Rudal (KCR) – PT PAL ➡️ Total: 6 unit
KRI Kapak 625
KRI Panah 626
KRI Kerambit 627
KRI Sampari 628
KRI Tombak 629
KRI Halasan 630
2. Kapal Cepat Rudal (KCR) – Swasta Nasional ➡️ Total: 9 unit
KRI Clurit 641
KRI Kujang 642
KRI Beladau 643
KRI Alamang 644
KRI Surik 645
KRI Siwar 646
KRI Parang 647
KRI Terapang 648
KRI Golok 688 (Trimaran)
3. Kapal Patroli Cepat – Swasta Nasional ➡️ Total: 25 unit
KRI Pari – 849
KRI Sembilang – 850
KRI Sidat – 851
KRI Cakalang – 852
KRI Tatihu – 853
KRI Layaran – 854
KRI Madidihang – 855
KRI Kurau – 856
KRI Torani – 860
KRI Lepu – 861
KRI Albakora – 867
KRI Bubara – 868
KRI Gulamah – 869
KRI Posepa – 870
KRI Escolar – 871
KRI Karotang – 872
KRI Mata Bongsang – 873
KRI Dorang – 874
KRI Bawal – 875
KRI Tuna – 876
KRI Marlin – 877
KRI Butana – 878
KRI Selar – 879
KRI Hampala – 880
KRI Lumba-Lumba – 881
4. Kapal Korvet – Swasta Nasional ➡️ Total: 8 unit
KRI Diponegoro 365
KRI Hasanuddin 366
KRI Sultan Iskandar Muda 367
KRI Frans Kaisiepo 368
KRI Bung Karno 369
KRI Bung Hatta 370
KRI Raja Ali Fisabilillah 391
KRI Lukas Rumkoren 392
5. Kapal Logistik – Swasta Nasional ➡️ Total: 4 unit
KRI Dumai 904
KRI Tarakan 905
KRI Bontang 906
KRI Balongan 907
6. Kapal LPD (Landing Platform Dock) – PT PAL ➡️ Total: 3 unit
KRI Semarang 594
KRI Dr. Wahidin Sudirohusodo 991
KRI Dr. Rajiman Wedyodiningrat 992
7. Kapal Pemetaan Bawah Air – Swasta Nasional ➡️ Total: 1 unit
KRI Pollux 935
8. Kapal Selam – PT PAL (ToT Korsel) ➡️ Total: 3 unit
KRI Nagapasa 403
KRI Ardadedali 404
KRI Alugoro 405
9. Produk Baru 2025 ➡️ Total: 3 unit
KRI Balaputradewa 322 (Fregat Merah Putih)
KRI Belati 622 (KCR)
KRI Kerambit 627 (KCR)
π Total Keseluruhan
KCR PT PAL = 6
KCR Swasta = 9
Kapal Patroli Cepat = 25
Korvet = 4
Logistik = 4
LPD = 3
Pemetaan = 1
Kapal Selam = 3
Produk Baru 2025 = 3
➡️ TOTAL: 62 kapal perang produksi dalam negeri (2006–2025).
===========
===========
PAC = LCS SALAH POTONG
PAC = LCS SALAH POTONG
PAC = LCS SALAH POTONG
PAC = LCS SALAH POTONG
---+---
Penyebab kapal LCS Malaydesh dikenal “salah potong” berasal dari temuan Jawatankuasa Kira-Kira Wang Negara (PAC) pada 2022, yang menyebutkan proses pembinaan di limbungan Boustead Naval Shipyard (BNS) mengalami kegagalan teknikal dan salah arah reka bentuk. Hal ini termasuk pemilihan reka bentuk kapal yang ditukar daripada model yang dipersetujui TLDM, menyebabkan kerja pemotongan besi dan komponen awal tidak sesuai dengan spesifikasi.
-
π Latar Belakang Skandal LCS
Projek: 6 kapal tempur pesisir (Littoral Combat Ship – LCS) untuk Tentera Laut Diraja Malaydesh (TLDM).
Nilai kontrak: RM9 bilion, dengan RM6 bilion sudah dibayar sebelum satu kapal pun siap.
Masalah utama:
Reka bentuk bertukar daripada model MEKO A100 (Jerman) yang dipersetujui TLDM kepada Gowind (Perancis) tanpa persetujuan penuh.
Akibatnya, pemotongan besi dan komponen awal yang sudah dilakukan menjadi tidak relevan (“salah potong”).
Kelewatan besar: sepatutnya kapal pertama siap 2019, tetapi hanya berjaya diluncurkan pada Mei 2024.
https://www.youtube.com/watch?v=4rMRmOqBDkY
BalasHapusπ€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£
INDONESIA EXO B 3 = 80 UNIT
HapusMALAYDESH NAVY = 55 VESSELS
80-55 = 25 UNIT
HAAAAAA.......KASIANNNNN π₯ π₯ π₯
----------
TNI AL =
✅️YAKHONT 300 KM
✅️EXO B3 = 250 KM
✅️ATMACA = 250 KM
✅️NSM (KSR X-33) = 185 KM
✅️C802 = 180 KM
✅️C705 = 150 KM
---------
62 KRI (BUATAN INDONESIA 2006–2025)
1. Kapal Cepat Rudal (KCR) – PT PAL ➡️ Total: 6 unit
KRI Kapak 625
KRI Panah 626
KRI Kerambit 627
KRI Sampari 628
KRI Tombak 629
KRI Halasan 630
2. Kapal Cepat Rudal (KCR) – Swasta Nasional ➡️ Total: 9 unit
KRI Clurit 641
KRI Kujang 642
KRI Beladau 643
KRI Alamang 644
KRI Surik 645
KRI Siwar 646
KRI Parang 647
KRI Terapang 648
KRI Golok 688 (Trimaran)
3. Kapal Patroli Cepat – Swasta Nasional ➡️ Total: 25 unit
KRI Pari – 849
KRI Sembilang – 850
KRI Sidat – 851
KRI Cakalang – 852
KRI Tatihu – 853
KRI Layaran – 854
KRI Madidihang – 855
KRI Kurau – 856
KRI Torani – 860
KRI Lepu – 861
KRI Albakora – 867
KRI Bubara – 868
KRI Gulamah – 869
KRI Posepa – 870
KRI Escolar – 871
KRI Karotang – 872
KRI Mata Bongsang – 873
KRI Dorang – 874
KRI Bawal – 875
KRI Tuna – 876
KRI Marlin – 877
KRI Butana – 878
KRI Selar – 879
KRI Hampala – 880
KRI Lumba-Lumba – 881
4. Kapal Korvet – Swasta Nasional ➡️ Total: 8 unit
KRI Diponegoro 365
KRI Hasanuddin 366
KRI Sultan Iskandar Muda 367
KRI Frans Kaisiepo 368
KRI Bung Karno 369
KRI Bung Hatta 370
KRI Raja Ali Fisabilillah 391
KRI Lukas Rumkoren 392
5. Kapal Logistik – Swasta Nasional ➡️ Total: 4 unit
KRI Dumai 904
KRI Tarakan 905
KRI Bontang 906
KRI Balongan 907
6. Kapal LPD (Landing Platform Dock) – PT PAL ➡️ Total: 3 unit
KRI Semarang 594
KRI Dr. Wahidin Sudirohusodo 991
KRI Dr. Rajiman Wedyodiningrat 992
7. Kapal Pemetaan Bawah Air – Swasta Nasional ➡️ Total: 1 unit
KRI Pollux 935
8. Kapal Selam – PT PAL (ToT Korsel) ➡️ Total: 3 unit
KRI Nagapasa 403
KRI Ardadedali 404
KRI Alugoro 405
9. Produk Baru 2025 ➡️ Total: 3 unit
KRI Balaputradewa 322 (Fregat Merah Putih)
KRI Belati 622 (KCR)
KRI Kerambit 627 (KCR)
π Total Keseluruhan
KCR PT PAL = 6
KCR Swasta = 9
Kapal Patroli Cepat = 25
Korvet = 4
Logistik = 4
LPD = 3
Pemetaan = 1
Kapal Selam = 3
Produk Baru 2025 = 3
➡️ TOTAL: 62 kapal perang produksi dalam negeri (2006–2025).
MAMPUS = BELASUNGKAWA TLDM π₯ π₯ π₯
BalasHapus-
INDONESIA EXO B 3 = 80 UNIT
MALAYDESH NAVY = 55 VESSELS
80-55 = SISA 25 UNIT EXO B3
----------
TNI AL =
✅️YAKHONT 300 KM
✅️EXO B3 = 250 KM
✅️ATMACA = 250 KM
✅️NSM (KSR X-33) = 185 KM
✅️C802 = 180 KM
✅️C705 = 150 KM
==========
==========
TLDM = BLOCK 2 : 72 KM
EXOCET MM40
(surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
-----
TLDM = NSM Operational Range: NSM 185 km (100 NM) LOI GHOIB
----
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = MANGKRAK 15 years
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
----
π80 -55 = SISA 25 UNIT = BELASUNGKAWA TLDMπ
NSM + Balaputradewa = Balasungkawa
BalasHapusπ€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£
4 UNIT WITH EXO B2 RANGE 70 KM
HapusLEKIU CLASS 2 UNIT = EXO B2 RANGE 70 KM
KASTURI CLASS 2 UNIT = EXO B2 RANGE 70 KM
-----------------------------------
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
------------------------------------
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = MANGKRAK 15 years
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
------------------------------------
THE MALAYDESH ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
• Logistics
A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
• Budgeting
MALAYDESH 's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
• Personnel
The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
• Procurement
The MALAYDESH procurement system needs reform. The LCS program has been delayed and reduced in scope.
• Political interference
Political interference and corruption are undermining combat readiness.
• Territorial disputes
MALAYDESH faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
• Transboundary haze
Transboundary haze has had a grave impact on economic and social activities in MALAYDESH The Royal MALAYDESH Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Nological obsolescence
Some aircraft in the RMAF's fleet are reaching techNOLogical obsolescence. For example, the Kuwaiti HORNET MALAYDESH s are an earlier block of the HORNET MALAYDESH , which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
=============================
INDONESIA EXO B 3 = 80 UNIT
MALAYDESH NAVY = 55 VESSELS
80-55 = 25 UNIT
HAAAAAA.......KASIANNNNN π₯ π₯ π₯
----------
TNI AL =
✅️YAKHONT 300 KM
✅️EXO B3 = 250 KM
✅️ATMACA = 250 KM
✅️NSM (KSR X-33) = 185 KM
✅️C802 = 180 KM
✅️C705 = 150 KM
-----
KAYA = GDP INDONESIA 1,429,743
MISKIN = GDP MALAYDESH 444,984
-----
KAYA = 2025 BUDGET USD 17 BILLION (245 T) = 48 KAAN 42 RAFALE
MISKIN = 2025 BUDGET MILITER USD 1,3 BILLION = NGEMIS F18 RONGSOK SEWA
-----
KAYA = 48 KAAN GEN 5 - 42 RAFALE
MISKIN = NGEMIS 33 F18 RONGSOK 33 TAHUN
-----
KAYA = 25 RADAR
MISKIN = 2 RADAR
πKAYA BLOCK 3 = MISKIN EXPIRED BLOCK 2π
17 CREDITOR LCS
Hapus17 CREDITOR LCS
17 CREDITOR LCS
1. MTU Services Ingat Kawan (M) Sdn Bhd
2. include Contraves Sdn Bhd
3. Axima Concept SA
4. Contraves Advanced Devices Sdn Bhd
5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
6. Security & Services MALAYDESH Sdn Bhd,
7. iXblue SAS
8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
9. Bank Pembangunan MALAYDESH Bhd
10. AmBank Islamic Bhd
11. AmBank (M) Bhd
12. Affin Hwang Investment Bank Bhd
13. Bank Muamalat MALAYDESH Bhd
14. Affin Bank Bhd
15. Bank Kerjasama Rakyat MALAYDESH Bhd
16. Malayan Banking Bhd (Maybank)
17. KUWAIT FINANCE HOUSE (MALAYDESH ) BHD.
===================
THE MALAYDESH LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
• Delayed delivery
The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was mangkrak in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
• Design issues
The Royal MALAYDESH Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
• Financial issues
Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
• Corruption
A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
• Aging fleet
The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
===================
THE MALAYDESH ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
• Logistics
A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
• Budgeting
MALAYDESH 's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
• Personnel
The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
• Procurement
The MALAYDESH procurement system needs reform. The LCS program has been delayed and reduced in scope.
• Political interference
Political interference and corruption are undermining combat readiness.
• Territorial disputes
MALAYDESH faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
• Transboundary haze
Transboundary haze has had a grave impact on economic and social activities in MALAYDESH The Royal MALAYDESH Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Nological obsolescence
Some aircraft in the RMAF's fleet are reaching techNOLogical obsolescence. For example, the Kuwaiti HORNET MALAYDESH s are an earlier block of the HORNET MALAYDESH , which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
Hapus• USD 948 JUTA (EXCLUDING AMMO) = FFBNW = MANGKRAK DELAYED
-NO NSM.
-NO VL MICA.
-NO TORPEDO RINGAN.
-NO SECONDARY GUNS.
-NO BOFORS MK3.
https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
-------------
PRICE DESTROYER DAN FREGAT =
-KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
-TYPE 052D CLASS USD 500-600 JUTA.
-TYPE 055 CLASS USD 920 JUTA.
-OPV PPA USD 1,3 BILLION/2 UNIT = USD 650/UNIT
===================
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = MANGKRAK 15 years
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
-------------
17 CREDITOR LCS
17 CREDITOR LCS
17 CREDITOR LCS
1. MTU Services Ingat Kawan (M) Sdn Bhd
2. include Contraves Sdn Bhd
3. Axima Concept SA
4. Contraves Advanced Devices Sdn Bhd
5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
6. Security & Services MALAYDESH Sdn Bhd,
7. iXblue SAS
8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
9. Bank Pembangunan MALAYDESH Bhd
10. AmBank Islamic Bhd
11. AmBank (M) Bhd
12. Affin Hwang Investment Bank Bhd
13. Bank Muamalat MALAYDESH Bhd
14. Affin Bank Bhd
15. Bank Kerjasama Rakyat MALAYDESH Bhd
16. Malayan Banking Bhd (Maybank)
17. KUWAIT FINANCE HOUSE (MALAYDESH ) BHD.
===================
THE MALAYDESH LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
• Delayed delivery
The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was mangkrak in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
• Design issues
The Royal MALAYDESH Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
• Financial issues
Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
• Corruption
A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
• Aging fleet
The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
4 UNIT WITH EXO B2 RANGE 70 KM
BalasHapusLEKIU CLASS 2 UNIT = EXO B2 RANGE 70 KM
KASTURI CLASS 2 UNIT = EXO B2 RANGE 70 KM
-----------------------------------
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
------------------------------------
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = MANGKRAK 15 years
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
------------------------------------
THE MALAYDESH LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
• Delayed delivery
The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was mangkrak in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
• Design issues
The Royal MALAYDESH Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
• Financial issues
Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
• Corruption
A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
• Aging fleet
The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
===================
THE MALAYDESH ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
• Logistics
A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
• Budgeting
MALAYDESH 's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
• Personnel
The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
• Procurement
The MALAYDESH procurement system needs reform. The LCS program has been delayed and reduced in scope.
• Political interference
Political interference and corruption are undermining combat readiness.
• Territorial disputes
MALAYDESH faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
• Transboundary haze
Transboundary haze has had a grave impact on economic and social activities in MALAYDESH The Royal MALAYDESH Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Nological obsolescence
Some aircraft in the RMAF's fleet are reaching techNOLogical obsolescence. For example, the Kuwaiti HORNET MALAYDESH s are an earlier block of the HORNET MALAYDESH , which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
=============================
INDONESIA EXO B 3 = 80 UNIT
MALAYDESH NAVY = 55 VESSELS
80-55 = 25 UNIT
HAAAAAA.......KASIANNNNN π₯ π₯ π₯
----------
TNI AL =
✅️YAKHONT 300 KM
✅️EXO B3 = 250 KM
✅️ATMACA = 250 KM
✅️NSM (KSR X-33) = 185 KM
✅️C802 = 180 KM
✅️C705 = 150 KM
πKAYA BLOCK 3 = MISKIN EXPIRED BLOCK 2π
Indonesia Exo B 3 = 80 UNIT
BalasHapusMALAYDESH NAVY = 55 VESSELS
80-55 = 25 UNIT
HAAAAAA.......KASIANNNNN π₯ π₯ π₯
----------
KAYA = GDP INDONESIA 1,429,743
MISKIN = GDP MALAYDESH 444,984
-----
KAYA = 2025 BUDGET USD 17 BILLION (245 T) = 48 KAAN 42 RAFALE
MISKIN = 2025 BUDGET MILITER USD 1,3 BILLION = NGEMIS F18 RONGSOK SEWA
-----
KAYA = 48 KAAN GEN 5 - 42 RAFALE
MISKIN = NGEMIS 33 F18 RONGSOK 33 TAHUN
-----
KAYA = 25 RADAR
MISKIN = 2 RADAR
-----
The MALAYDESH Armed Forces (MAF) has faced a number of challenges, including corruption, outdated equipment, and a lack of funding. These issues have contributed to the MAF's capabilities falling behind those of neighboring countries.
Challenges
• Corruption: The MAF has been involved in multiple corruption scandals.
• Outdated equipment: The MAF's equipment is outdated and unable to keep up with modern threats.
• Lack of funding: The MAF's budget has been de-prioritized by successive governments.
• Short service scheme: The MAF's 15-year service scheme means that many people are reluctant to join.
• Political interference: Some say that politicians have made decisions about the military's procurement and capacity building EXCLUDING consulting the service chiefs.
Impact
• The MAF's challenges have left it vulnerable to internal and external threats.
• The MAF's capabilities are unable to deter other regional states from attempting to intimidate MALAYDESH .
• Some veterans of the MAF fall below the poverty line upon retirement.
==========
1. DEBT 84.3% DARI GDP
2. DEBT NEGARA RM 1.63 TRLLIUN
3. DEBT 1MDB RM 18.2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. DEBT KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VVSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIPAY 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST VSHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. SEWA 12 AW149 TUDM
62. SEWA 4 AW139 TUDM
63. SEWA 5 EC120B TUDM
64. SEWA 2 AW159 TLDM
65. SEWA 4 UH-60A TDM
67. SEWA 12 AW149 TDM
68. SEWA 4 AW139 BOMBA
69. SEWA 2 AW159 MMEA
70. SEWA 7 BELL429 POLIS
πKAYA BLOCK 3 = MISKIN EXPIRED BLOCK 2π
INDONESIA EXO B 3 = 80 UNIT
BalasHapusMALAYDESH NAVY = 55 VESSELS
80-55 = 25 UNIT
HAAAAAA.......KASIANNNNN π₯ π₯ π₯
----------
TNI AL =
✅️YAKHONT 300 KM
✅️EXO B3 = 250 KM
✅️ATMACA = 250 KM
✅️NSM (KSR X-33) = 185 KM
✅️C802 = 180 KM
✅️C705 = 150 KM
==========
==========
TLDM = BLOCK 2 : 72 KM
EXOCET MM40
(surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
-----
TLDM = NSM Operational Range: NSM 185 km (100 NM) LOI GHOIB
----
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = MANGKRAK 15 years
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
----
SIPRI LCS = DELIVERED : 0 (KONTRAK NOL) ......
SAK 70 MK 3 - DELIVERED = 0
MICA - DELIVERED = 0
SHIP ENGINE - DELIVERED = 0
FIRE CONTROL RADAR - DELIVERED = 0
AIR CONTROL RADAR - DELIVERED = 0
----
The MALAYDESH Littoral Combat Ship (LCS) program has faced a number of issues, including:
• Delayed delivery
The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was mangkrak in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
• Design issues
The Royal MALAYDESH Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
• Financial issues
Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
• Corruption
A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
• Aging fleet
The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
----
FACT LCS 2025 - 2011 = 15 YEARS
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
----
FACT NOT YET DELIVERED :
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and DEBT.
πKAYA BLOCK 3 = MISKIN EXPIRED BLOCK 2π
INDONESIA EXO B 3 = 80 UNIT
BalasHapusMALAYDESH NAVY = 55 VESSELS
80-55 = 25 UNIT
HAAAAAA.......KASIANNNNN π₯ π₯ π₯
----------
TNI AL =
✅️YAKHONT 300 KM
✅️EXO B3 = 250 KM
✅️ATMACA = 250 KM
✅️NSM (KSR X-33) = 185 KM
✅️C802 = 180 KM
✅️C705 = 150 KM
==========
==========
TLDM = BLOCK 2 : 72 KM
EXOCET MM40
(surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
-----
TLDM = NSM Operational Range: NSM 185 km (100 NM) LOI GHOIB
----
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = MANGKRAK 15 years
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
----
SIPRI LCS = DELIVERED : 0 (KONTRAK NOL) ......
SAK 70 MK 3 - DELIVERED = 0
MICA - DELIVERED = 0
SHIP ENGINE - DELIVERED = 0
FIRE CONTROL RADAR - DELIVERED = 0
AIR CONTROL RADAR - DELIVERED = 0
-
ππππππππ
KEDAH CLASS FFBNW ABADI OMPONG
BalasHapusπ€£π€£π€£π€£π€£π€£
BELASAN TAHUN TIADA MISIL, SAMPAI LAUTAN MALON DIAMBIL CCG. KASIHAN π€£π€£π€£π€£π€£
DUIT BUAT BELI EXOCET HABIS KEPAKAI UNTUK KAPAL DARAT
Hapusπ€£π€£π€£π€£π€£π€£
NO MONEY SIPRI 2024 = NO GENG PENIPU KLAIM GOIB
BalasHapusNO MONEY SIPRI 2023 = NOT YET ORDERED
NO MONEY SIPRI 2022 = SELECTED NOT YET ORDERED
SALAM NOL SALAM SEWA ......
===========
RENAME = COPY PASTE = MANGKRAK DELAYED 15 YEARS .....
PSC = 1995 = TRAWLERS
PSC > BNS = 2005 = NGPVs (PAY 27 UNIT REAL 6 UNIT)
BNS > LUNAS = 2024 = LCS PAY 6 UNIT DELAYED 15 YEARS
PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, MALAYDESH government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa MALAYDESH in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
===================
PROBLEMS SHIPYARD = LCS OPV NGPVs FAILED
PROBLEMS SHIPYARD = LCS OPV NGPVs FAILED
PROBLEMS SHIPYARD = LCS OPV NGPVs FAILED
Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.
===================
LMS B2 = FFBNW DOWNGRADE HISAR OPV NO ASW
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALAYDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-------------
LCS = FFBNW MANGKRAK 15 YEARS
LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT ]
• USD 948 JUTA (EXCLUDING AMMO) = FFBNW = DELAYED
-NO NSM.
-NO VL MICA.
-NO TORPEDO RINGAN.
-NO SECONDARY GUNS.
-NO BOFORS MK3.
-----------
PRICE DESTROYER DAN FREGAT =
-KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
-TYPE 052D CLASS USD 500-600 JUTA.
-TYPE 055 CLASS USD 920 JUTA.
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
RENAME = COPY PASTE = MANGKRAK DELAYED 15 YEARS .....
BalasHapusPSC = 1995 = TRAWLERS
PSC > BNS = 2005 = NGPVs (PAY 27 UNIT REAL 6 UNIT)
BNS > LUNAS = 2024 = LCS PAY 6 UNIT DELAYED 15 YEARS
PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, MALAYDESH government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa MALAYDESH in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
===================
PROBLEMS SHIPYARD = LCS OPV NGPVs FAILED
PROBLEMS SHIPYARD = LCS OPV NGPVs FAILED
PROBLEMS SHIPYARD = LCS OPV NGPVs FAILED
Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.
===================
READINESS AIR FORCE = 43%
READINESS AIR FORCE = 43%
READINESS AIR FORCE = 43%
On readiness levels, Azalina cited a 2017 Universiti TekNOLogi MALAYDESH study titled Aircraft Acquisition Conceptual Framework, which found that the Royal MALAYDESH Air Force's (RMAF) aircraft readiness was at just 43 per cent between 2011 and 2015 compared to the minimum 70 per cent mark.
---------------
READINESS NAVY = 58,6%
READINESS NAVY = 58,6%
READINESS NAVY = 58,6%
Panglima Tentera Laut, Laksamana Tan Sri Abdul Rahman Ayob hari ini menyatakan tahap kesiagaan armada Tentera Laut Diraja MALAYDESH (TLDM) adalah di bawah sasaran.
Perkara tersebut dinyatakan oleh beliau semasa menyampaikan Perutusan Tahun Baharu 2024 dan Setahun Pemerintahan Panglima Tentera Laut di Wisma Pertahanan.
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
Klo membandingkan video sea trial gowind MALON dengan negara lain, NYATA BENAR BEDANYA
BalasHapusPunya MALON keliatan berantakan, kusam dan penuh karat.
Punya negara lain terlihat mulus, rapih dan gagah
Kenapa yah?????
π€£π€£π€£π€£π€£π€£
Karena banyak membual
HapusKARENA KEBANYAKAN MAKAN UANG SUBSIDI JUDI DAN CASINO GENTING JADI BOTOL OTAK NYA π€£π€£π€£π€£π€£π€£
Hapusπ€£π€£π€£π€£π€£π€£π€£
HapusLOST = RM14.82 MILLION
BalasHapusLOST = RM14.82 MILLION
SELL 51% CAD TO RHEINMETALL AG
SELL 51% CAD TO RHEINMETALL AG
SELL 51% CAD TO RHEINMETALL AG
Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
BHIC’s wholly owned subsidiary, BHIC Defence TechNOLogies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
---------------------
HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
Former Royal MALAYDESH Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
---------------------
LCS MALAYDESH =
LAUNCHING 2017 - MANGKRAK 2024
LAUNCHING 2017 - MANGKRAK 2024
LAUNCHING 2017 - MANGKRAK 2024
LAUNCHING 2017 - MANGKRAK 2024
LAUNCHING 2017 - MANGKRAK 2024
The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, MALAYDESH ’s former Navy chief said today.
---------------------
LCS 2024-2011 = 15 TAHUN
15 TAHUN MANGKRAK
15 TAHUN MANGKRAK
LCS DIPAY 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and DEBT.
---------------------
NGPVs PAY DEBT LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada PAYan pendahuluan bagi projek LCS untuk menjelaskan DEBT lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenaMALAYDESH semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
----------------------
MALAYDESH 's combat equipment has several weaknesses, including:
• Ageing equipment: The MALAYDESH military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The MALAYDESH Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: MALAYDESH has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The MALAYDESH procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
==============
==============
MYANMAR =
BUILT 2017 - COMMISSIONED 2024
BUILT 2017 - COMMISSIONED 2024
BUILT 2017 - COMMISSIONED 2024
The Senior General and party viewed launching the newlycommissioned 135-metre Frigate from the ship lift platform. The 135-metre Frigate King Thalun was built at the Naval Dockyard Command Headquarters in March 2017 under the guidance of the Senior General.
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
BalasHapusSOME PROBLEMS MALAYDESH SHIPYARDS FACE IN MAKING WARSHIPS INCLUDE:
• Supply chain disruptions
In 2022, COVID-19 and the Russia-Ukraine conflict disrupted supply chains and led to shortages of skilled personnel.
• Low-quality products
Workers may use sketches, photos, and previous experience instead of following good engineering practices, which can lead to low-quality products, reworks, higher costs, and late deliveries.
• Traditional shipbuilding
Traditional shipbuilding is a slow, expensive, and laborious process. It involves a systems approach, where each system has its own drawings, and work crews may compete for work space.
• Resource shortage
The shipbuilding industry is facing a shortage of resources due to an aging workforce and a lack of young people willing to enter the trade.
===================
PROBLEMS MALAYDESH SHIPYARD
Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.
==============
CHANGE SKIN = CHANGE NAME = SAME .....
PSC = 1995
PSC > BNS = 2005
BNC > LUNAS = 2024
PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, MALAYDESH government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa MALAYDESH in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
==============
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the MALAYDESH Navy in 2004 and complete the delivery in 2007.
Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
MYANMAR = Su-30SME
BalasHapusMYANMAR = Su-30SME
MYANMAR = Su-30SME
Russia has fulfilled the contract to supply the Myanmar Air Force with all six Su-30SME multirole fighters ordered under the 2018 contract.
------
MYANMAR = BUILT 2017 - COMMISSIONED 2024
BUILT 2017 - COMMISSIONED 2024
BUILT 2017 - COMMISSIONED 2024
The Senior General and party viewed launching the newlycommissioned 135-metre Frigate from the ship lift platform. The 135-metre Frigate King Thalun was built at the Naval Dockyard Command Headquarters in March 2017 under the guidance of the Senior General.
------
BANGLADESH = RAFALE
BANGLADESH = RAFALE
BANGLADESH = RAFALE
For the first batch, Bangladesh, which shares borders with Myanmar and India, plans to procure four Rafale F3-R variants, consisting of three two-seat fighters and one single-seat aircraft currently operated by the French Air Force.
For the second batch, Bangladesh intends to acquire eight single-seat Rafale F-4 variants from Dassault Aviation, the manufacturer of the fighter jets.
==============
==============
FACT LCS =
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, MALAYDESH ’s former Navy chief said today.
---------------------
FACT NOT YET DELIVERED :
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and DEBT.
--------------------
FA50 = TRAINING AIRCRAFT
FA50 = TRAINING AIRCRAFT
FA50 = TRAINING AIRCRAFT
So far, Poland has received 12 of the jets in the GF (Gap Filler) version, but Blaszczak failed to secure weapons for them, Cezary Tomczyk, a deputy defence minister, told parliament on Thursday.
According to him, the delivery of the 36 remaining jets in the PL version custom-made for Poland "is largely at risk" and delays in their deliveries may reach nine months.
While praising the role the FA-50s are playing in the Polish Air Force, Tomczyk said that they can only be used as training aircraft.
-----
PALM OIL = FA-50 LIGHT COMBAT AIRCRAFT.
PALM OIL = FA-50 LIGHT COMBAT AIRCRAFT.
PALM OIL = FA-50 LIGHT COMBAT AIRCRAFT.
MALAYDESH announced that at least half of the payment would be made in palm oil 8 FLIT 10 LCA : Eight of these aircraft are to be configured primarily as Lead Advanced Trainer (LIFT), while the remaining ten would be Light Fighter Aircraft (LCA) combat aircraft.
πBEHIND = MYANMARπ
LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
BalasHapus• USD 948 JUTA (EXCLUDING AMMO) = FFBNW = MANGKRAK DELAYED
-NO NSM.
-NO VL MICA.
-NO TORPEDO RINGAN.
-NO SECONDARY GUNS.
-NO BOFORS MK3.
https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
-------------
PRICE DESTROYER DAN FREGAT =
-KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
-TYPE 052D CLASS USD 500-600 JUTA.
-TYPE 055 CLASS USD 920 JUTA.
-OPV PPA USD 1,3 BILLION/2 UNIT = USD 650/UNIT
===================
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = MANGKRAK 15 years
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
===================
THE MALAYDESH ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
• Logistics
A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
• Budgeting
MALAYDESH 's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
• Personnel
The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
• Procurement
The MALAYDESH procurement system needs reform. The LCS program has been delayed and reduced in scope.
• Political interference
Political interference and corruption are undermining combat readiness.
• Territorial disputes
MALAYDESH faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
• Transboundary haze
Transboundary haze has had a grave impact on economic and social activities in MALAYDESH The Royal MALAYDESH Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Nological obsolescence
Some aircraft in the RMAF's fleet are reaching techNOLogical obsolescence. For example, the Kuwaiti HORNET MALAYDESH s are an earlier block of the HORNET MALAYDESH , which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
=========
THE MALAYDESH LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
• Delayed delivery
The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was mangkrak in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
• Design issues
The Royal MALAYDESH Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
• Financial issues
Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
• Corruption
A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
• Aging fleet
The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
LCS = FFBNW MANGKRAK 15 YEARS
BalasHapusLCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT ]
• USD 948 JUTA (EXCLUDING AMMO) = FFBNW = MANGKRAK DELAYED
-NO NSM.
-NO VL MICA.
-NO TORPEDO RINGAN.
-NO SECONDARY GUNS.
-NO BOFORS MK3.
-----------
PRICE DESTROYER DAN FREGAT =
-KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
-TYPE 052D CLASS USD 500-600 JUTA.
-TYPE 055 CLASS USD 920 JUTA.
-------------
LMS B2 = FFBNW DOWNGRADE HISAR OPV NO ASW
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALAYDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-------------
LMS B1 = GUNBOAT NO MISSILE
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
=============
SEWA VVSHORAD
SEWA TRUK CINA 3 TON
Three weeks ago, the Madani government announced that it had struck a deal with China to SEWA 62 new train sets for KTM Bhd. The estimated cost for the deal is RM10.7 billion and it will be covered in installments over a 30-year SEWA period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VVSHORAD proposals.
SEWA PESAWAT
ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal MALAYDESH Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
SEWA SIMULATOR MKM TAHUN
Five-year contract for Sukhoi’s simulators. Publicly listed HeiTech Padu Bhd has announced that it had been awarded a RM67 million, five-year contract to operate and maintain the Su-30MKM flight simulators at the RMAF airbase in Gong Kedak
SEWA HELI SEWA SIMULATOR
Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
SEWA HELI
4 buah Helikopter Leonardo AW 139 yang diperolehi secara SEWAan ini adalah untuk kegunaan Tentera Udara Diraja MALAYDESH (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
SEWA BOAT
SEWAan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
SEWA HIDROGRAFI
tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak SEWAan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
SEWA 4x4
Pejabat perusahaan mengatakan kepada Janes di pameran bahwa Angkatan Bersenjata MALAYDESH sedang mencari untuk menyewa Tarantula
SEWA MOTOR
The Royal Military Police Corp (KPTD) celebrated the SEWA of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
SEWA PATROL BOATS : SEWA OUTBOARD MOTORS : SEWA TRAILERS
Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
SEWA 28 HELI
The government signed an agreement with Weststar Aviation Sdn Bhd to SEWA 28 helicopters for use by ministries and other government agencies
LAUGHING STOCK TO THE WORLD
BalasHapusLAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
---------------------
BPA 316 DAYS = CHINA 1 MDB (USD 4,5 BILLION)
BPA 316 DAYS = CHINA 1 MDB (USD 4,5 BILLION)
BPA 316 DAYS = CHINA 1 MDB (USD 4,5 BILLION)
According to the Asia Maritime Transparency Initiative (AMTI) based in Washington, United States, Chinese coast guard vessels patrolled Patinggi Ali Shoal for 316 days last year, which is an increase from 279 days in 2020.....
---------------------
NGEMIS LPD
NGEMIS AH1Z
Initially, the MALAYDESH marine corps will lack an amphibious naval platform as the RMN’s only amphibious ship, It is currently in discussions with both France and South Korea over acquiring a landing platform deck (LPD). The U.S. has also offered MALAYDESH the LPD USS Denver after it decommissions it in 2014. U.S.-based defense companies are also discussing selling MALAYDESH the AH-1Z
----
NGEMIS POHANG
NGEMIS POHANG
NGEMIS POHANG
Asrizal Rusli Beli LCA F/A-50 18 buah, percuma Pohang-class 2 buah..kalau jadi kenyataan aku janji akan meminati K-Pop termasuk drama dan band-nya..aku juga akan sertai army BTS untuk melengkapkan lagi sokongan aku kepada produk Korea Selatan.
----
NGEMIS KAPAL 1967
NGEMIS KAPAL 1967
NGEMIS KAPAL 1967
The post stated that among his achievements in the MMEA were that he was the team leader for a suitability study on absorbing the US Coast Guard cutter – USCG Decisive. Checks on the US Coast Guard website showed that Decisive– a Reliance class cutter – was laid in 1967 and commissioned in 1968
-----
NGEMIS KAPAL 1968
NGEMIS KAPAL 1968
NGEMIS KAPAL 1968
USCGC Steadfast (WMEC-623) was a United States Coast Guard medium endurance cutter in commission for 56 years. Commissioned in 1968, Steadfast was home ported in St. Petersburg, Florida for her first 24 years of service...
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
NGEMIS LPD
BalasHapusNGEMIS AH1Z
Initially, the MALAYDESH marine corps will lack an amphibious naval platform as the RMN’s only amphibious ship, It is currently in discussions with both France and South Korea over acquiring a landing platform deck (LPD). The U.S. has also offered MALAYDESH the LPD USS Denver after it decommissions it in 2014. U.S.-based defense companies are also discussing selling MALAYDESH the AH-1Z
----
NGEMIS POHANG
NGEMIS POHANG
NGEMIS POHANG
Asrizal Rusli Beli LCA F/A-50 18 buah, percuma Pohang-class 2 buah..kalau jadi kenyataan aku janji akan meminati K-Pop termasuk drama dan band-nya..aku juga akan sertai army BTS untuk melengkapkan lagi sokongan aku kepada produk Korea Selatan.
----
NGEMIS KAPAL 1967
NGEMIS KAPAL 1967
NGEMIS KAPAL 1967
The post stated that among his achievements in the MMEA were that he was the team leader for a suitability study on absorbing the US Coast Guard cutter – USCG Decisive. Checks on the US Coast Guard website showed that Decisive– a Reliance class cutter – was laid in 1967 and commissioned in 1968
-----
NGEMIS KAPAL 1968
NGEMIS KAPAL 1968
NGEMIS KAPAL 1968
USCGC Steadfast (WMEC-623) was a United States Coast Guard medium endurance cutter in commission for 56 years. Commissioned in 1968, Steadfast was home ported in St. Petersburg, Florida for her first 24 years of service...
-----
HIBAH KAPAL 1980 = KM Perwira, one of the two Bay class patrol boats donated to MMEA by Australia. It is likely that the Bay class was the design proposed for the tri-nation VLPV project in the late 80s.
-----
PERBAIKAN DIBIAYAI JEPANG = Kapal patroli kedua yang disumbangkan oleh Jepang Coast Guard (JCG) untuk APMM/MMEA akan berlayar ke pulang pada akhir Mei, saat ini kapal dengan nama KM Arau ini sedang dalam tahap perbaikan akhir yang dilakukan di Jepang.
-----
HIBAH KAPAL 1989 DAN 1991 = Jepang menghibahkan dua kapal kelas 90m masing-masing PL-01 Ojima dan PL-02 Erimo, kedua kapal ini masuk dinas di JCG pada tahun 1989 dan 1991.
-----
HIBAH KAPAL1990–1991 = KM Pekan is an Ojika-class offshore patrol vessel operated by the MALAYDESH Coast Guard. This ship, together with KM Arau and KM Marlin was transferred from the Japan Coast Guard to MALAYDESH in order to strengthen the relations between the two countries. The ship was built as the Ojika for the Japanese Coast Guard in 1990–1991
-----
HIBAH KAPAL 1989 = KM Arau is an offshore patrol vessel operated by the MALAYDESH Coast Guard. She was the second ship transferred from the Japan Coast Guard together with KM Pekan and KM Marlin. KM Arau was formerly kNOwn as Oki (PL-01) in the Japan Coast Guard.
-----
KAPAL BUATAN 1960 =
BEKAS MARINE POLICE BEKAS MMEA = RMN informed us that they are getting a new boat – albeit a third hand one – courtesy of the MMEA. MMEA received from the Marine police back in 2011.
-----
KAPAL BEKAS BEKAS MMEA = RMN has taken delivery of ex-Sundang on October 23 after the patrol craft completed its refit. She is the first of two ex-MMEA PC
171 ASET USANG 33 TAHUN =
BalasHapus"The total number of MALAYDESH Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal MALAYDESH Air Force (RMAF), and 34 units for the Royal MALAYDESH Navy (RMN)," the MALAYDESH Defence Minister.
===================
DESEMBER 2024 OPV TAMAT
DESEMBER 2024 OPV TAMAT
DESEMBER 2024 OPV TAMAT
“Kementerian Dalam Negeri dibenarkan menamatkan kontrak projek tersebut setelah mendapat pandangan daripada Jabatan Peguam Negara. Sehubungan itu, kerajaan menandatangani perjanjian penamatan bersama pihak syarikat pada 31 Disember 2024,” katanya dalam jawapan bertulis yang dimuat naik dalam laman web Parlimen pada Khamis malam...
-----
SEWA FAST INTERCEPTOR BOAT
SEWA UTILITY BOAT
SEWA RIGID HULL FENDER BOAT
SEWA ROVER FIBER GLASS
SEWA EC120B
SEWA FLIGHT SIMULATION TRAINING DEVICE
Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan SEWAan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
-----
SEWA KAPAL HIDROLOGI
SEWA KAPAL HIDROLOGI
SEWA KAPAL HIDROLOGI
Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak SEWAan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
===================
SALAM MANGKRAK LCS 2025-2011 = 15 TAHUN
15 TAHUN MANGKRAK
15 TAHUN MANGKRAK
LCS DIPAY 6 RM 11.2 BILLION NOT YET DELIVERED = The cost of the LCS project is NOw RM11.2 billion. It must be NOted from that RM11.2 billion, Lunas or the former BNS used around RM1 billion to pay its DEBTs and to upgrade the facilities for the LCS project. And NOt a single ship has been delivered yet.
-----
NGPVs 2024-1996 = 28 TAHUN
28 TAHUN MANGKRAK
28 TAHUN MANGKRAK
NGPVs DIPAY 27 JADI 6 = The Kedah-class offshore patrol vessels of the Royal MALAYDESH Navy (RMN) are six ships based on the MEKO 100 design by Blohm + Voss. Originally, a total of 27 ships were planned, but due to programme delays and overruns, only six were eventually ordered. Their construction began in the early 2000s, and by 2009, all six were in active service.
-----
17 KREDITUR LCS
17 KREDITUR LCS
17 KREDITUR LCS
Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services MALAYDESH Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan MALAYDESH Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat MALAYDESH Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat MALAYDESH Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALAYDESH ) Bhd.
==============
NGPVs > LCS > OPV > LMS= EXCLUDING AMMO = FFBNW KOSONG
The MALAYDESH Armed Forces (MAF) faces a number of challenges, including:
BalasHapus• Logistics
A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
• Budgeting
MALAYDESH 's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
• Personnel
The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
• Procurement
The MALAYDESH procurement system needs reform. The LCS program has been delayed and reduced in scope.
• Political interference
Political interference and corruption are undermining combat readiness.
• Territorial disputes
MALAYDESH faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
• Transboundary haze
Transboundary haze has had a grave impact on economic and social activities in MALAYDESH The Royal MALAYDESH Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Nological obsolescence
Some aircraft in the RMAF's fleet are reaching techNOLogical obsolescence. For example, the Kuwaiti HORNET MALAYDESH s are an earlier block of the HORNET MALAYDESH , which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
------------------
The Sukhoi Su-30MKM has some weaknesses, including engine problems, integration with Western systems, and fatigue failure.
Engine problems
• In 2018, MALAYDESH grounded 14 out of 18 Su-30MKM aircraft due to engine problems and a lack of spare parts.
• The AL-31FP engine in the Su-30MKA has experienced numerous failures, including bearing failures due to metal fatigue and low oil pressure.
Integration with Western systems
• The Su-30MKM's Russian origin may limit its integration with Western systems.
• This could make it difficult to fully integrate with NATO standards, such as Link 16, which is important for modern network-centric warfare.
Fatigue failure
• Aircraft structures and components are prone to fatigue failure due to fluctuating stress.
• Fatigue failure is a gradual form of local damage that can lead to defects or cracks.
Other considerations
• The Su-30MKM is a larger aircraft, which means it may be seen earlier by radar and visual combat.
.
------------------
The The MALAYDESH Armed Forces (MAF) face a number of challenges, including:
Limited funding: The government has been unwilling to reduce spending elsewhere or cut the size of the armed forces.
Outdated equipment: The MAF's equipment is outdated and behind that of neighboring countries.
Logistics problems: The MAF's logistics system may not be able to support combat operations.
Political interference: Political interference and corruption may undermine the MAF's combat readiness.
Lack of government guidance: The government may not have a clear strategic direction for the defense industry. MALAYDESH Armed Forces (MAF) face a number of challenges, including:
Limited funding: The government has been unwilling to reduce spending elsewhere or cut the size of the armed forces.
Outdated equipment: The MAF's equipment is outdated and behind that of neighboring countries.
Logistics problems: The MAF's logistics system may not be able to support combat operations.
Political interference: Political interference and corruption may undermine the MAF's combat readiness.
Lack of government guidance: The government may not have a clear strategic direction for the defense industry
The MALAYDESH Armed Forces (MAF) face a number of equipment challenges, including:
BalasHapusAging aircraft
The RMAF's main fighter fleet includes the Su-30MKMs and Boeing F/A-18 Hornets, which are becoming technologically obsolete. Maintaining a large fleet of aging aircraft can be expensive.
Limited defense budget
The government's defense modernization budget is limited, making it difficult to afford new equipment.
Local content
Most MAF equipment is sourced from outside the country, and there is a lack of research and development (R&D) activities.
Local company capabilities
Local companies may not have the necessary capabilities to produce the equipment the MAF needs.
OEM reluctance
Original equipment manufacturers (OEMs) may be reluctant to share their technology for fear of competition.
Defense infrastructure
The condition of some military living quarters and defense infrastructure is poor
.
------------------
MALAYDESH armed forces face challenges due to limited funding, which has led to an aging equipment inventory and gaps in military capability.
Limited funding
Small procurement budgets
The military budget has remained small as a percentage of GDP, and governments have been unwilling to cut spending elsewhere
Postponed purchases
The global financial crisis has forced the MALAYDESH Armed Forces (MAF) to postpone large purchases
Aging equipment
Outdated inventory
The MAF's equipment is aging due to small procurement budgets and a lack of investment in maintenance and repair
Withdrawal of aircraft
The MAF withdrew its MiG-29 Fulcrum fighter aircraft in 2017, and is struggling to keep its Su-30MKM Flanker fighter operational
Other challenges
Procurement system: The procurement system needs reform, and there are delays in the delivery of new equipment
Corruption: There are weaknesses in anti-corruption standards and reporting, and political connections can influence promotion decisions
Oversight: There is little effective oversight of the defense sector
2025 USD1.3 BILLION MINDEF =
BalasHapusMAINTENANCE
REPAIRS
ASSETS.
(SEWA, SEWA AND SEWA)
-------------
Military spending
In 2025, MALAYDESH Ministry of Defense (MINDEF) was allocated USD4.8 billion to protect the country's sovereignty.
This budget included USD1.3 billion for maintenance, repairs, and new military assets..
=========
RELATED DEBT WITH BUDGET MILITARY
RELATED DEBT WITH BUDGET MILITARY
RELATED DEBT WITH BUDGET MILITARY
Public DEBT and defense spending in MALAYDESH are related, and the relationship between the two is important to consider for fiscal dynamics.
Military spending and external DEBT
Military spending can have security and economic consequences, especially for developing economies. Rapid expansion in military spending can lead to rising fiscal deficits.
Public DEBT and defense spending in MALAYDESH
Research has been conducted to study the relationship between public DEBT and defense spending in MALAYDESH . This research has used data from the World Bank to analyze the dynamic relationship between the two variables.
Policy implications
Policymakers need to balance the benefits and costs of incurring higher government DEBT. They need to consider the trade-off between the benefits of growth and the costs of slowing down growth due to additional DEBT.
=========
1. DEBT 84.3% DARI GDP
1. DEBT 84.3% DARI GDP
2. DEBT NEGARA RM 1.63 TRLLIUN
3. DEBT 1MDB RM 18.2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. DEBT KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VVSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIPAY 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST VSHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. SEWA 12 AW149 TUDM
62. SEWA 4 AW139 TUDM
63. SEWA 5 EC120B TUDM
64. SEWA 2 AW159 TLDM
65. SEWA 4 UH-60A TDM
67. SEWA 12 AW149 TDM
68. SEWA 4 AW139 BOMBA
69. SEWA 2 AW159 MMEA
70. SEWA 7 BELL429 POLIS
MENTERI PERTAHANAN .....
BalasHapusDIRANCANG = AKAN
DIRANCANG = AKAN
DIRANCANG = AKAN
DIRANCANG = AKAN
DIRANCANG = AKAN
DIRANCANG = AKAN
DIRANCANG = AKAN
DIRANCANG = AKAN
DIRANCANG = AKAN
DIRANCANG = AKAN
DIRANCANG = AKAN
DIRANCANG = AKAN
DIRANCANG = AKAN
DIRANCANG = AKAN
DIRANCANG = AKAN
DIRANCANG = AKAN
DIRANCANG = AKAN
DIRANCANG = AKAN
DIRANCANG = AKAN
DIRANCANG = AKAN
DIRANCANG = AKAN
DIRANCANG = AKAN
DIRANCANG = AKAN
DIRANCANG = AKAN
-
https://defense-studies.blogspot.com/2026/01/kerajaan-setujui-pemasangan-misil-nsm.html?sc=1769741807705#c5773043843888395587
Menteri Pertahanan, Datuk Sri Mohamed Khaled Nordin, berkata pemasangan itu dirancang secara berfasa, mengambil kira kesiapsiagaan teknikal kapal, keperluan operasi serta implikasi kos.
"Pada masa ini, TLDM sedang melaksanakan tinjauan harga bagi mengenal pasti kos sebenar keseluruhan projek," katanya melalui jawapan bertulis di laman web Parlimen.
2026 =
BUKTI LCS KARATAN
BUKTI LCS KARATAN
BUKTI LCS KARATAN
-
https://www.malaysiandefence.com/wp-content/uploads/2026/01/618729088_122257611464152127_3846135779091436202_n-768x512.jpg
------------------
2026 =
BUKTI LCS OMPONG
BUKTI LCS OMPONG
BUKTI LCS OMPONG
-
https://www.malaysiandefence.com/wp-content/uploads/2026/01/616602398_122257611656152127_3607545269913185334_n.jpg
------------------
2026 =
BUKTI LCS DELAY
BUKTI LCS DELAY
BUKTI LCS DELAY
-
Defence Minister DS Khaled Nordin told Parliament today that the sea trials for the ship has been rescheduled for April and its commissioning this December, a delay of four months of the original schedule. LCS 2 commissioning is postponed to August 27 while LCS 3 commissioning remained on schedule for December 2027. As with LCS 4 on August 2028 and LCS 5 April 2029.
------------------
LCS TO PANGKOR = TARIK TUGBOAT
LCS TO PANGKOR = TARIK TUGBOAT
LCS TO PANGKOR = TARIK TUGBOAT
-
https://www.malaydeshndefence.com/wp-content/uploads/2026/01/615891933_122257611716152127_8374116749521824848_n-768x512.jpg
-
https://www.malaysiandefence.com/lcs-sea-trials-after-raya-and-commissioning-this-december/
https://youtube.com/shorts/_kNNrIOk0Bg?si=t8YeM99mCKyGsLA7
BalasHapusOSI SAJA SAMPE NGEMIS KE JAKARTA, APALAGI JONGOS MACAM MALONDESH πππππ
Yang ini sebahagian dari 1.5 juta INDON yang mengemis pekerjaan di Malaysia Pak....
Hapushttps://www.youtube.com/shorts/T96BtdeRLPg
π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£
TAHUN BARU = CCG CHINA
HapusTAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
TAHUN BARU = CCG CHINA
----------
Pada 31 Desember 2025, kapal China Coast Guard (CCG) kembali terdeteksi memasuki Zon Ekonomi Eksklusif (ZEE) Malaydesh, khususnya di sekitar Kasawari Gas Field dan Luconia Shoals, memicu kekhawatiran atas kedaulatan maritim Malaydesh. Lokasi insiden: ZEE Malaydesh di Laut China Selatan, dekat Sarawak (Kasawari Gas Field, Luconia Shoals, dan sekitar 50 mil laut dari pantai Sarawak).
TAHUN BARU = KEMBANG API ❌
HapusTAHUN BARU = HELI JATUH✔️
------------
Timeline Kecelakaan Helikopter Militer Malaydesh =
-
1990-an – Beberapa insiden kecil melibatkan Alouette III (TUDM) saat latihan.
-
2004 – Nuri (Sikorsky S-61A-4, TUDM) jatuh di Genting Sempah.
-
13 Jul 2007 – Nuri (S-61A-4, TUDM) jatuh di Genting Sempah, menewaskan 6 kru.
-
2016 – EC725 Cougar (TUDM) alami pendaratan darurat di Kuantan, kru selamat.
-
2018 – Super Lynx (TLDM) alami pendaratan darurat saat operasi laut.
-
2020 – AgustaWestland AW139 (TUDM) insiden teknis di Johor, kru selamat.
-
2023 – EC725 (TUDM) pendaratan darurat di laut dekat Pulau Perak, kru selamat.
-
6 Februari 2024 – Lumut, Perak
Dua helikopter militer Malaydesh, AgustaWestland AW139 (MRCA) dan Eurocopter Fennec (TLDM), bertabrakan di udara saat latihan persiapan Hari Ulang Tahun TLDM ke-90.
-
6 Feb 2025 – Bell 206L4 (latihan gabungan) terbalik saat hover di Bentong, Pahang. 1 kru cedera.
-
31 Des 2025 – Super Lynx (TLDM) pendaratan darurat di perairan Pantai Klebang, Melaka. Kru selamat.
------------
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
4x MAHAL SEWA ❌ BELI BARU
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
SEWAan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.MAID OF LONDON (MALON) (ATM).
GOODBYE = LEKIU KASTURI LAKSAMANA KEDAH PERDANA HANDALAN JERUNG LMS LCS
HapusVULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
VULCANO 127mm 100 KM = ASTER 15/30 = TESEO
--
The 127mm VULCANO ammunition family, is composed by Ballistic Extended Range (BER) and Guided Long Range (GLR) ammunition with different multifunctional fuses, sensor and final guidance that extend the range of the gun up to 100km
------------------
BUKTI FULL TEMPUR
ASTER 15/30
TESEO
-
Berdasarkan laporan Fincantieri dan Janes Defence, kapal yang dialihkan ke Indonesia memang merupakan unit Pattugliatore Polivalente d'Altura (PPA) atau kapal patroli lepas pantai multiguna yang awalnya diproduksi untuk Angkatan Laut Italia (Marina Militare).
Berikut adalah poin-poin kunci terkait pengalihan kapal tersebut:
Jenis Kapal: Kapal yang dialihkan adalah PPA kelas Thaon di Revel yang memiliki spesifikasi tinggi, sering dikategorikan sebagai fregat ringan karena kapabilitas multimisi dan tempurnya.
Spesifikasi dan Fitur: Kapal ini memiliki panjang 143 meter dan dilengkapi dengan teknologi terkini, termasuk sistem peluncur vertikal (Vertical Launching System/VLS) DCNS Sylver A43 untuk pertahanan udara.
Persenjataan: Kapal ini dipersenjatai dengan sistem sensor dan senjata terintegrasi dari Leonardo, termasuk meriam utama Oto Melara 127 mm/64 Vulcano, meriam 76 mm/62 Strales, dan peluncur rudal anti-kapal Teseo MK2E
------------------
INDONESIA EXO B 3 = 80 UNIT
MALAYDESH NAVY = 55 VESSELS
80-55 = SISA 25 UNIT EXO B3
GORILA KETAR KETIR π₯π₯π₯
-
EXOCET
(SURFACE-LAUNCHED) – BLOCK 1, BLOCK 2 AND BLOCK 3: DEPLOYED ON WARSHIPS AND IN COASTAL BATTERIES. RANGE: 72 KM FOR THE BLOCK 2, IN EXCESS OF 200 KM FOR THE BLOCK 3
----------
TNI AL =
✅️YAKHONT 300 KM
✅️EXO B3 = 250 KM
✅️ATMACA = 250 KM
✅️NSM (KSR X-33) = 185 KM
✅️C802 = 180 KM
✅️C705 = 150 KM
==========
==========
TLDM =
❎EXO BLOCK 2 : 72 KM
❎NSM OPERATIONAL RANGE: NSM 185 KM (100 NM) LOI GHOIB
Yesss... cap jari sudah diambil, DNA sudah diambil.
BalasHapusTamatlah sudah bantuan Malaysia dalam pengembangan ekonomi INDON melalui kamu!
https://www.youtube.com/shorts/T96BtdeRLPg
π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£π€£
CPO GORILA MALAYDESH = KALAH TELAK
HapusCPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
CPO GORILA MALAYDESH = KALAH TELAK
---------------------
1. India
India adalah importir minyak sawit terbesar bagi kedua negara.
Indonesia: Menguasai sekitar 60–65% pangsa pasar di India. Indonesia mendominasi karena volume produksi yang besar dan kedekatan harga kompetitif.
Malaydesh: Memegang sekitar 18–20% pangsa pasar. Meski volume Malaydesh meningkat pada 2025, Indonesia tetap menjadi pemasok nomor satu bagi India.
-
2. Cina (Tiongkok)
Indonesia: Masih menjadi pemimpin pasar dengan penguasaan sekitar 65–70%. Pada 2025, Tiongkok tercatat memangkas sebagian impor dari Indonesia untuk beralih ke diversifikasi energi, namun Indonesia tetap dominan.
Malaydesh: Mengisi sisa pangsa pasar utama lainnya dengan porsi sekitar 25–30%.
-
3. Uni Eropa
Pasar Eropa mengalami dinamika akibat regulasi lingkungan (EUDR).
Indonesia: Pangsa pasar berkisar 45–50%. Uni Eropa baru-baru ini menyepakati kuota nol tarif untuk 1 juta ton CPO Indonesia per tahun melalui perjanjian CEPA yang diharapkan mulai berlaku penuh akhir 2026.
Malaydesh: Memiliki pangsa pasar sekitar 30–35%. Malaydesh seringkali lebih cepat dalam menyesuaikan standar sertifikasi keberlanjutan yang disukai pasar Eropa.
-
4. Amerika Serikat (AS)
Indonesia: Menguasai lebih dari 70% pasar minyak sawit di AS. Nilai ekspor ke AS melonjak pada 2025 mencapai rekor bulanan baru.
Malaydesh: Memiliki pangsa pasar yang lebih kecil, sekitar 15–20%, karena keterbatasan volume dibandingkan kapasitas produksi Indonesia untuk kebutuhan industri hilir AS.
-
5. Pakistan dan Turki
Pakistan: Indonesia mendominasi secara mutlak dengan pangsa pasar di atas 80%.
Turki: Indonesia memegang sekitar 55–60% pangsa pasar, bersaing ketat dengan Malaydesh yang memiliki keunggulan dalam beberapa perjanjian dagang bilateral tertentu.
-
6. Jepang dan Korea Selatan
Jepang: Pasar Jepang lebih menuntut sertifikasi RSPO/ISPO. Indonesia memimpin dengan pangsa sekitar 50–55%, sementara Malaydesh menyusul dengan 40%.
Korea Selatan: Indonesia menguasai sekitar 60% pasar, didorong oleh permintaan untuk bahan baku industri makanan dan kosmetik
NO MEMBER G20
HapusNO MEMBER BRICS
N0 MEMBER BOP
Malaydesh can potentially become a member of BRICS or the G20, but there are political, economic, and strategic reasons why it has not joined either group so far. Let’s look at both groups separately.
----------------
G20 (Group of Twenty)
✅ What is the G20?
• A group of the world’s 19 largest economies + the EU.
• Formed to discuss global economic and financial policy.
• Members include the US, China, India, Indonesia, Brazil, etc.
❌ Why Malaydesh is not a member:
1. Economic Size:
Malaydesh ’s economy is significantly smaller than G20 members.
The G20 mostly includes the largest economies by GDP or influence.
2. ASEAN Representation:
Indonesia (the largest Southeast Asian economy) already represents ASEAN in the G20.
G20 typically avoids duplication from the same region.
3. Membership is Fixed:
The G20 has remained relatively stable in membership since its creation.
It’s a closed group — there’s no formal application process or expansion mechanism.
----------------
BRICS
✅ What is BRICS?
• A group of emerging economies aiming to challenge Western-dominated institutions (like the IMF and World Bank).
• Recently expanded to include countries like Egypt, Ethiopia, Iran, etc.
❌ Why Malaydesh hasn’t joined BRICS:
1. Non-aligned Foreign Policy:
Malaydesh maintains a neutral, non-aligned stance in global politics.
Joining BRICS might signal a shift toward a China-Russia bloc, which Malaydesh may wish to avoid.
2. Geopolitical Calculations:
BRICS has geopolitical implications (especially in rivalry with the West).
Malaydesh values its ties with both Western countries and China, and may not want to upset the balance.
3. Malaydesh Has Not Applied (Yet):
Membership in BRICS is by invitation/application.
Malaydesh has not made moves to formally apply or express strong interest in joining.
----------------
60 NEGARA DIUNDANG BOP =
Negara yang Telah Mengonfirmasi Bergabung atau Menandatangani Piagam
Negara-negara berikut, termasuk Indonesia, telah menandatangani piagam BoP, yang menjadikan mereka sebagai anggota pendiri (founding members):
Amerika Serikat (Ketua)
Arab Saudi
Argentina
Bahrain
Hungaria
Indonesia
Israel
Kazakhstan
Maroko
Mesir
Pakistan
Paraguay
Qatar
Turki
Uni Emirat Arab
Uzbekistan
Vietnam
Yordania
Negara Lain yang Diundang
Beberapa negara lain yang dilaporkan menerima undangan, tetapi status keanggotaannya (menolak, sedang mempertimbangkan, atau belum mengonfirmasi) bervariasi:
Asia Tengah & Eropa Timur: Albania, Armenia, Azerbaijan, Belarus, Bulgaria, Kosovo, Mongolia.
Eropa Barat & Lainnya: Britania Raya, Kanada, Siprus, Yunani, India, Italia, Jepang, Slovenia, Thailand, Ukraina, Uni Eropa (eksekutifnya), Prancis, Norwegia, dan Swedia.
Negara-negara Besar Lainnya: Cina dan Rusia juga menerima undangan, namun statusnya masih dalam pertimbangan atau belum jelas.
----------------
GORILA KLAIM TUMUPUAN DUNIA ......
TIADA MALAYDESH = TIDAK DIANGGAP DUNIA
TIADA MALAYDESH = TIDAK DIANGGAP DUNIA
TIADA MALAYDESH = TIDAK DIANGGAP DUNIA
TIADA MALAYDESH = TIDAK DIANGGAP DUNIA
TIADA MALAYDESH = TIDAK DIANGGAP DUNIA
TIADA MALAYDESH = TIDAK DIANGGAP DUNIA
TIADA MALAYDESH = TIDAK DIANGGAP DUNIA
TIADA MALAYDESH = TIDAK DIANGGAP DUNIA
TIADA MALAYDESH = TIDAK DIANGGAP DUNIA
TIADA MALAYDESH = TIDAK DIANGGAP DUNIA
TIADA MALAYDESH = TIDAK DIANGGAP DUNIA
----------------
π Reality Sucks...isn't it MALAYDESH?= NO G20-NO BRICS-NO BOPπ
USD 20 MILIAR versus USD 4,7 MILIAR
Hapus---------------------------
PERBANDINGAN ANGGARAN PERTAHANAN ASEAN 2026 =
-
1. INDONESIA
Rp 335,2 triliun (~USD 20 miliar). Lonjakan 37% dari 2025; fokus pada alutsista baru dan konsep pertahanan total.
-
2. SINGAPURA
SGD 20 miliar (~USD 15 miliar). Konsisten 3–4% dari PDB; investasi jangka panjang untuk teknologi pertahanan canggih.
-
3. VIETNAM
USD 6–7 miliar (estimasi). Tren meningkat, diproyeksi mencapai USD 10,2 miliar pada 2029; fokus pada Laut Cina Selatan.
-
4. THAILAND
204,434 juta baht (~USD 5,7 miliar). Prioritas pada akuisisi jet Gripen dan modernisasi angkatan udara.
-
5. FILIPINA
295–299 miliar (~USD 5,2 miliar). Naik 16% dari 2025; termasuk ₱40 miliar untuk program modernisasi AFP, dengan fokus pada penguatan airpower dan sistem pertahanan rudal
-
6. MALAYDESH
RM 21,2–21,7 miliar (~USD 4,5–4,7 miliar). Fokus modernisasi bertahap: sistem pertahanan udara, kapal perang, dan kendaraan taktis.
------------------
DAFTAR PENGADAAN ALUTSISTA ON PROGRESS
2 KRI Frigate Brawijaya Class dari Italia
2 KRI Frigate Merah Putih dari PT PAL
2 KRI Frigate Istif Class dari Turkiye
1 KRI Rigel Class dari Palindo/Jerman
2 KRI Kapal Cepat Rudal dari Turkiye
1 KRI Kapal Cepat Rudal dari Tesco Bekasi
2 KS Scorpene dari Perancis & PT PAL
1 Kapal Induk Giribaldi dari Italia (Opsi)
1 Kapal LHD Helikopter dari PT PAL (Opsi
42 Jet Tempur Rafale dari Perancis
48 Jet Tempur IFX kerjasama Korsel RI
48 Jet Tempur KHAAN dari Turkiye
6 Jet Tempur T50 dari Korsel
2 Pesawat angkut A400M dari Spanyol
13 Radar GCI dari Thales Perancis
12 Radar Retia dari Retia
3 Baterai Rudal Balistik KHAN Turkiye
3 Baterai Rudal ADS Trisula dari Turkiye
22 Helikopter Blackhawk dari AS
12 Drone Anka dari Turkiye
60 Drone Bayraktar TB3 dari Turkiye
45 Rudal anti kapal Atmaca dari Turkiye
==============
==============
5x GANTI PM = AKAN
6x GANTI MENHAN = AKAN
SERIUS!!! BADUT GORILA IQ BOTOL = MEMBUAL SHOPPING
-
2025 = 84,3% DARI GDP
MISKIN KLAIM LUNAS 2053 = GAGAL (NAMBAH DEBT)
-
PERDANA MENTERI = TIDAK BAYAR TERTUNGGAK
MENTERI PERTAHANAN = KEKANGAN KEWANGAN
SERIUS!!! BADUT GORILA IQ BOTOL = MEMBUAL KLAIM KAYA
--------------------------
SALAM NGEMIS F18 KUWAIT 2025-2017=
5x GANTI PERDANA MENTERI
5x GANTI MENTERI PERTAHANAN
-
SALAM MANGKRAK LCS 2025-2011 =
5x GANTI PERDANA MENTERI
6x GANTI MENTERI PERTAHANAN
-
MEMBUAL SPH 2025-2016 =
5x GANTI PERDANA MENTERI
5x GANTI MENTERI PERTAHANAN
-
2026 = ZONK = NGEMIS MEMBUAL MISKIN
---------------------------
MALAYDESH ........
GOVERNMENT DEBT : 69% OF GDP
HOUSEHOLD DEBT : 84.3% OF GDP
FEDERAL GOVERNMENT DEBT
• END OF 2024: RM 1.25 TRILLION
• END OF JUNE 2025: RM 1.3 TRILLION
• PROJECTED DEBT-TO-GDP: 69% BY THE END OF 2025
HOUSEHOLD DEBT
2025 : RM1.73 TRILLION, OR 85.8% OF GDP
NASIB GORILA TERIAK HUTANG RINGGIT KUAT =
Hapus1. TIAP TAHUN = ASET MILITER SEWA
2. TIAP TAHUN = HUTANG GOVERMENT BERTAMBAH
3. TIAP TAHUN = HUTANG HOUSEHOLD BERTAMBAH
4. TIAP TAHUN = DEFISIT
5. TIAP TAHUN = HANYA BAYAR FAEDAH
------------------
GANTI PM 5x = 84,3% TO GDP
GANTI MOF 5x = KLAIM LUNAS 2053 = GAGAL (NAMBAH DEBT)
BADUT GORILA = MEMBUAL KLAIM KAYA
------------------
GANTI PM 5x = TIDAK BAYAR HUTANG TERTUNGGAK
GANTI MOD 6x = KEKANGAN KEWANGAN
BADUT GORILA = MEMBUAL KLAIM KAYA
----------------
MRCA 2025-2017= ZONK = NO PROCUREMENT
5x GANTI PM
5x GANTI MOD
6x GANTI MOF
------------------
LCS 2025-2011 = BAYAR HUTANG NGPVs = MANGKRAK
5x GANTI PM
6x GANTI MOD
6x GANTI MOF
------------------
SPH 2025-2016 = ZONK = NO PROCUREMENT
5x GANTI PM
5x GANTI MOD
6x GANTI MOF
------------------
MRSS/LPD 2025-2016 = ZONK = NO PROCUREMENT
5x GANTI PM
5x GANTI MOD
6x GANTI MOF
------------------
MALAYDESH ........
GOVERNMENT DEBT : 69% OF GDP
HOUSEHOLD DEBT : 84.3% OF GDP
FEDERAL GOVERNMENT DEBT
• END OF 2024: RM 1.25 TRILLION
• END OF JUNE 2025: RM 1.3 TRILLION
• PROJECTED DEBT-TO-GDP: 69% BY THE END OF 2025
HOUSEHOLD DEBT
2025 : RM1.73 TRILLION, OR 85.8% OF GDP
------------------
MALAYDESH ........
DATA STATISTA 2029-2020 : OVERLIMIT DEBT
2029 = 69,54% DEBT RATIO TO GDP
2028 = 69,34% DEBT RATIO TO GDP
2027 = 68,8% DEBT RATIO TO GDP
2026 = 68,17% DEBT RATIO TO GDP
2025 = 68,07% DEBT RATIO TO GDP
2024 = 68,38% DEBT RATIO TO GDP
2023 = 69,76% DEBT RATIO TO GDP
2022 = 65,5% DEBT RATIO TO GDP
2021 = 69,16% DEBT RATIO TO GDP
2020 = 67,69% DEBT RATIO TO GDP
------------------
MALAYDESH ........
DATA STATISTA 2029-2020 : INCREASE DEBT
2029 = 438,09 BILLION USD
2028 = 412,2 BILLION USD
2027 = 386,51 BILLION USD
2026 = 362,19 BILLION USD
2025 = 338,75 BILLION USD
2024 = 316,15 BILLION USD
2023 = 293,83 BILLION USD
2022 = 271,49 BILLION USD
2021 = 247,49 BILLION USD
2020 = 221,49 BILLION USD
------------------
MALAYDESH .........
DEBT 2025 = RM 1,73 TRILLION
DEBT 2024 = RM 1.63 TRILLION
DEBT 2023 = RM 1,53 TRILLION
DEBT 2022 = RM 1,45 TRILLION
DEBT 2021 = RM 1,38 TRILLION
DEBT 2020 = RM 1,32 TRILLION
The Finance Ministry stated that the aggregate national household DEBT stood at RM1.53 trillion between 2018 and 2023. In aggregate, it said the household DEBT for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018). “The ratio of household DEBT to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.3% compared with 82% in 2018,” it said.
------------------
MALAYDESH ........
BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
MALAYDESH household DEBT is one of the highest in the ASEAN region. Against this backdrop, Bank Negara MALAYDESH (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in MALAYDESH
GOODBYE = LEKIU KASTURI LAKSAMANA KEDAH PERDANA HANDALAN JERUNG LMS LCS
HapusVULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
-
Jangkauan meriam ini sangat bergantung pada jenis amunisi yang digunakan:
1. Munisi Standar (Conventional): Memiliki jangkauan konvensional sekitar 23-30 km.
-
2. Munisi Vulcano (Ballistic Extended Range - BER): Jangkauannya dapat mencapai lebih dari 60 km.
-
3. Munisi Vulcano (Guided Long Range - GLR): Jangkauan maksimalnya mencapai lebih dari 100 km dengan presisi tinggi.
--
The 127mm VULCANO ammunition family, is composed by Ballistic Extended Range (BER) and Guided Long Range (GLR) ammunition with different multifunctional fuses, sensor and final guidance that extend the range of the gun up to 100km
------------------
BUKTI FULL TEMPUR
ASTER 15/30
TESEO
-
Media Pertahanan Spesialis:
1. Indonesiadefense.com merinci penggunaan sistem rudal pertahanan udara Aster 15/30 yang ditempatkan pada peluncur vertikal DCNS Sylver A50 (16 sel).
-
2. Indomiliter dan laporan dari produsen rudal MBDA Systems mengonfirmasi bahwa varian PPA untuk ekspor/fregat membawa rudal anti-kapal keluarga Teseo/Otomat Mk-2/E sebagai senjata pemukul permukaan utama.
-
3. Publikasi Koarmada II: Laporan terbaru dari Koarmada II TNI AL pada September 2025 mengonfirmasi bahwa KRI Brawijaya-320 telah resmi bergabung dalam jajaran Satuan Kapal Eskorta (Satkor) dengan kesiapan tempur penuh
------------------
INDONESIA EXO B 3 = 80 UNIT
MALAYDESH NAVY = 55 VESSELS
80-55 = SISA 25 UNIT EXO B3
GORILA KETAR KETIR π₯π₯π₯
-
EXOCET
(SURFACE-LAUNCHED) – BLOCK 1, BLOCK 2 AND BLOCK 3: DEPLOYED ON WARSHIPS AND IN COASTAL BATTERIES. RANGE: 72 KM FOR THE BLOCK 2, IN EXCESS OF 200 KM FOR THE BLOCK 3
----------
TNI AL =
✅️YAKHONT 300 KM
✅️EXO B3 = 250 KM
✅️ATMACA = 250 KM
✅️NSM (KSR X-33) = 185 KM
✅️C802 = 180 KM
✅️C705 = 150 KM
==========
==========
TLDM =
❎EXO BLOCK 2 : 72 KM
❎NSM OPERATIONAL RANGE: NSM 185 KM (100 NM) LOI GHOIB
GOODBYE = LEKIU KASTURI LAKSAMANA KEDAH PERDANA HANDALAN JERUNG LMS LCS π₯ π₯ π₯
Hapus-
BUKTI FULL TEMPUR
ASTER 15/30
TESEO
-
Berdasarkan laporan Fincantieri dan Janes Defence, kapal yang dialihkan ke Indonesia memang merupakan unit Pattugliatore Polivalente d'Altura (PPA) atau kapal patroli lepas pantai multiguna yang awalnya diproduksi untuk Angkatan Laut Italia (Marina Militare).
Berikut adalah poin-poin kunci terkait pengalihan kapal tersebut:
Jenis Kapal: Kapal yang dialihkan adalah PPA kelas Thaon di Revel yang memiliki spesifikasi tinggi, sering dikategorikan sebagai fregat ringan karena kapabilitas multimisi dan tempurnya.
Spesifikasi dan Fitur: Kapal ini memiliki panjang 143 meter dan dilengkapi dengan teknologi terkini, termasuk sistem peluncur vertikal (Vertical Launching System/VLS) DCNS Sylver A43 untuk pertahanan udara.
Persenjataan: Kapal ini dipersenjatai dengan sistem sensor dan senjata terintegrasi dari Leonardo, termasuk meriam utama Oto Melara 127 mm/64 Vulcano, meriam 76 mm/62 Strales, dan peluncur rudal anti-kapal Teseo MK2E
-----------------
TNI AL =
✅️YAKHONT 300 KM
✅️EXO B3 = 250 KM
✅️ATMACA = 250 KM
✅️NSM (KSR X-33) = 185 KM
✅️C802 = 180 KM
✅️C705 = 150 KM
-----------------
62 KRI (BUATAN INDONESIA 2006–2025)
1. Kapal Cepat Rudal (KCR) – PT PAL ➡️ Total: 6 unit
KRI Kapak 625
KRI Panah 626
KRI Kerambit 627
KRI Sampari 628
KRI Tombak 629
KRI Halasan 630
2. Kapal Cepat Rudal (KCR) – Swasta Nasional ➡️ Total: 9 unit
KRI Clurit 641
KRI Kujang 642
KRI Beladau 643
KRI Alamang 644
KRI Surik 645
KRI Siwar 646
KRI Parang 647
KRI Terapang 648
KRI Golok 688 (Trimaran)
3. Kapal Patroli Cepat – Swasta Nasional ➡️ Total: 25 unit
KRI Pari – 849
KRI Sembilang – 850
KRI Sidat – 851
KRI Cakalang – 852
KRI Tatihu – 853
KRI Layaran – 854
KRI Madidihang – 855
KRI Kurau – 856
KRI Torani – 860
KRI Lepu – 861
KRI Albakora – 867
KRI Bubara – 868
KRI Gulamah – 869
KRI Posepa – 870
KRI Escolar – 871
KRI Karotang – 872
KRI Mata Bongsang – 873
KRI Dorang – 874
KRI Bawal – 875
KRI Tuna – 876
KRI Marlin – 877
KRI Butana – 878
KRI Selar – 879
KRI Hampala – 880
KRI Lumba-Lumba – 881
4. Kapal Korvet – Swasta Nasional ➡️ Total: 8 unit
KRI Diponegoro 365
KRI Hasanuddin 366
KRI Sultan Iskandar Muda 367
KRI Frans Kaisiepo 368
KRI Bung Karno 369
KRI Bung Hatta 370
KRI Raja Ali Fisabilillah 391
KRI Lukas Rumkoren 392
5. Kapal Logistik – Swasta Nasional ➡️ Total: 4 unit
KRI Dumai 904
KRI Tarakan 905
KRI Bontang 906
KRI Balongan 907
6. Kapal LPD (Landing Platform Dock) – PT PAL ➡️ Total: 3 unit
KRI Semarang 594
KRI Dr. Wahidin Sudirohusodo 991
KRI Dr. Rajiman Wedyodiningrat 992
7. Kapal Pemetaan Bawah Air – Swasta Nasional ➡️ Total: 1 unit
KRI Pollux 935
8. Kapal Selam – PT PAL (ToT Korsel) ➡️ Total: 3 unit
KRI Nagapasa 403
KRI Ardadedali 404
KRI Alugoro 405
9. Produk Baru 2025 ➡️ Total: 3 unit
KRI Balaputradewa 322 (Fregat Merah Putih)
KRI Belati 622 (KCR)
KRI Kerambit 627 (KCR)
π Total Keseluruhan
KCR PT PAL = 6
KCR Swasta = 9
Kapal Patroli Cepat = 25
Korvet = 4
Logistik = 4
LPD = 3
Pemetaan = 1
Kapal Selam = 3
Produk Baru 2025 = 3
➡️ TOTAL: 62 kapal perang produksi dalam negeri (2006–2025).
==========
==========
TLDM =
❎EXO BLOCK 2 : 72 KM
❎NSM OPERATIONAL RANGE: NSM 185 KM (100 NM) LOI GHOIB
ADA YANG WARAS ..,......
HapusKEDAH CLASS FOR APMM
CMS DAN RADAR BERMASALAH
CMS DAN RADAR BERMASALAH
CMS DAN RADAR BERMASALAH
CMS DAN RADAR BERMASALAH
CMS DAN RADAR BERMASALAH
CMS DAN RADAR BERMASALAH
-
Hulubalang says:
30 January 2026 at 6:15 PM
-
1) new CMS. The existing Atlas Elektronik COSYS-110M1 CMS on Kedahs are already 2 decades old without any upgrades.
-
2) TRS-3D radar. This should still be operationally capable. There are issues with the GAPU TRS-3D maintenance recently, but i hope that is not relatable to TLDM. Is it worthwhile to upgrade? Leave it as is? Or change to something cheap & new from Turkiye?
-
3) air defence missiles. Do we have the budget for it? Upgrading offensive systems while leaving it at risk of being sunk by enemy SSM/AShM is not a good plan.
-
Anyhow it would involve lots of money. Hundreds of million USD for sure. Is it worth it? I am of the opinion that it is not. Threat perceptions has changed, and i think a lightly armed ship like the kedah class is not suitable for wartime missions. So i am for leaving the Kedah class to remain as OPV under APMM control.
------------------
TLDM =
❎EXO BLOCK 2 : 72 KM
❎PRANK = NSM GHOIB
-
28 JANUARI = KLAIM NSM
30 JANUARI = KLAIM SSM
-
PRANK NSM (NASIB SI MISKIN)
PRANK NSM (NASIB SI MISKIN)
PRANK NSM (NASIB SI MISKIN)
PRANK NSM (NASIB SI MISKIN)
PRANK NSM (NASIB SI MISKIN)
PRANK NSM (NASIB SI MISKIN)
PRANK NSM (NASIB SI MISKIN)
PRANK NSM (NASIB SI MISKIN)
PRANK NSM (NASIB SI MISKIN)
PRANK NSM (NASIB SI MISKIN)
PRANK NSM (NASIB SI MISKIN)
PRANK NSM (NASIB SI MISKIN)
PRANK NSM (NASIB SI MISKIN)
------------------
https://www.malaysiandefence.com/it-could-be-atmaca-as-well/
The Defence Ministry has walked back its written answer published in Parliament on January 28. The original written reply had stated that the government has approved the funding for the surface-to-surface missiles for the Kedah class upgrade and the solution was the Naval Strike Missile (NSM).
The amended copy did not mentioned NSM at all and though the overall meaning was still the same, it appears that the SSM meant for the Kedah class could be something else
==================
==================
π₯π₯π₯π₯π₯π₯π₯π₯π₯π₯π₯
BUKTI FULL TEMPUR
ASTER 15/30
TESEO
-
Berdasarkan laporan Fincantieri dan Janes Defence, kapal yang dialihkan ke Indonesia memang merupakan unit Pattugliatore Polivalente d'Altura (PPA) atau kapal patroli lepas pantai multiguna yang awalnya diproduksi untuk Angkatan Laut Italia (Marina Militare).
Berikut adalah poin-poin kunci terkait pengalihan kapal tersebut:
Jenis Kapal: Kapal yang dialihkan adalah PPA kelas Thaon di Revel yang memiliki spesifikasi tinggi, sering dikategorikan sebagai fregat ringan karena kapabilitas multimisi dan tempurnya.
Spesifikasi dan Fitur: Kapal ini memiliki panjang 143 meter dan dilengkapi dengan teknologi terkini, termasuk sistem peluncur vertikal (Vertical Launching System/VLS) DCNS Sylver A43 untuk pertahanan udara.
Persenjataan: Kapal ini dipersenjatai dengan sistem sensor dan senjata terintegrasi dari Leonardo, termasuk meriam utama Oto Melara 127 mm/64 Vulcano, meriam 76 mm/62 Strales, dan peluncur rudal anti-kapal Teseo MK2E
------------------
TNI AL =
✅️TESEO = 350 KM
✅️YAKHONT 300 KM
✅️EXO B3 = 250 KM
✅️ATMACA = 250 KM
✅️NSM (KSR X-33) = 185 KM
✅️C802 = 180 KM
✅️C705 = 150 KM
bofor turet kopula kebesaran
BalasHapusFIKS GOWINH SALAH UKUR DISAIN mana bisa nembak sudut blakang
kurang Lebar kiri kanan pun sempit haha!ππ€ͺπ
mao mundur ada, bak mika haha!πππ
kahsiyan 1cc, KALAH LAGIII haha!ππ€₯π
⬇️⬇️⬇️⬇️⬇️
https://facebook.com/lumutnavalshipyard/photos/d41d8cd9/122257611416152127/?set=pcb.122257611944152127
======
sedangkan ruang tembak meriam PPA Lega Lebar..
meriam leluasa nembak sudut sempit di blakang haha!πππ
⬇️⬇️⬇️⬇️⬇️
https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEjuOrpygndNDQpjHSvsMMuu6tNFWRakLOjQ3hvdqj2YjUuGoc-ONopuqksPUambLZPLd45qMUFWyYsIs8Uwg62RBMS-sbRmZweogIMDgiauUSFDWFYqaXWsJwtz-ksPeN_RQe8qxVWsjB-yit2lnBW-OsI1dK34Nb3KlDH9EluY8gnFTBbSlNEq6PLHnGqE/s841/IMG-20260129-WA0016.jpg
GOODBYE = LEKIU KASTURI LAKSAMANA KEDAH PERDANA HANDALAN JERUNG LMS LCS π₯ π₯ π₯
BalasHapus-
BUKTI FULL TEMPUR
ASTER 15/30
TESEO
-
Berdasarkan laporan Fincantieri dan Janes Defence, kapal yang dialihkan ke Indonesia memang merupakan unit Pattugliatore Polivalente d'Altura (PPA) atau kapal patroli lepas pantai multiguna yang awalnya diproduksi untuk Angkatan Laut Italia (Marina Militare).
Berikut adalah poin-poin kunci terkait pengalihan kapal tersebut:
Jenis Kapal: Kapal yang dialihkan adalah PPA kelas Thaon di Revel yang memiliki spesifikasi tinggi, sering dikategorikan sebagai fregat ringan karena kapabilitas multimisi dan tempurnya.
Spesifikasi dan Fitur: Kapal ini memiliki panjang 143 meter dan dilengkapi dengan teknologi terkini, termasuk sistem peluncur vertikal (Vertical Launching System/VLS) DCNS Sylver A43 untuk pertahanan udara.
Persenjataan: Kapal ini dipersenjatai dengan sistem sensor dan senjata terintegrasi dari Leonardo, termasuk meriam utama Oto Melara 127 mm/64 Vulcano, meriam 76 mm/62 Strales, dan peluncur rudal anti-kapal Teseo MK2E
-----------------
62 KRI (BUATAN INDONESIA 2006–2025)
1. Kapal Cepat Rudal (KCR) – PT PAL ➡️ Total: 6 unit
KRI Kapak 625
KRI Panah 626
KRI Kerambit 627
KRI Sampari 628
KRI Tombak 629
KRI Halasan 630
2. Kapal Cepat Rudal (KCR) – Swasta Nasional ➡️ Total: 9 unit
KRI Clurit 641
KRI Kujang 642
KRI Beladau 643
KRI Alamang 644
KRI Surik 645
KRI Siwar 646
KRI Parang 647
KRI Terapang 648
KRI Golok 688 (Trimaran)
3. Kapal Patroli Cepat – Swasta Nasional ➡️ Total: 25 unit
KRI Pari – 849
KRI Sembilang – 850
KRI Sidat – 851
KRI Cakalang – 852
KRI Tatihu – 853
KRI Layaran – 854
KRI Madidihang – 855
KRI Kurau – 856
KRI Torani – 860
KRI Lepu – 861
KRI Albakora – 867
KRI Bubara – 868
KRI Gulamah – 869
KRI Posepa – 870
KRI Escolar – 871
KRI Karotang – 872
KRI Mata Bongsang – 873
KRI Dorang – 874
KRI Bawal – 875
KRI Tuna – 876
KRI Marlin – 877
KRI Butana – 878
KRI Selar – 879
KRI Hampala – 880
KRI Lumba-Lumba – 881
4. Kapal Korvet – Swasta Nasional ➡️ Total: 8 unit
KRI Diponegoro 365
KRI Hasanuddin 366
KRI Sultan Iskandar Muda 367
KRI Frans Kaisiepo 368
KRI Bung Karno 369
KRI Bung Hatta 370
KRI Raja Ali Fisabilillah 391
KRI Lukas Rumkoren 392
5. Kapal Logistik – Swasta Nasional ➡️ Total: 4 unit
KRI Dumai 904
KRI Tarakan 905
KRI Bontang 906
KRI Balongan 907
6. Kapal LPD (Landing Platform Dock) – PT PAL ➡️ Total: 3 unit
KRI Semarang 594
KRI Dr. Wahidin Sudirohusodo 991
KRI Dr. Rajiman Wedyodiningrat 992
7. Kapal Pemetaan Bawah Air – Swasta Nasional ➡️ Total: 1 unit
KRI Pollux 935
8. Kapal Selam – PT PAL (ToT Korsel) ➡️ Total: 3 unit
KRI Nagapasa 403
KRI Ardadedali 404
KRI Alugoro 405
9. Produk Baru 2025 ➡️ Total: 3 unit
KRI Balaputradewa 322 (Fregat Merah Putih)
KRI Belati 622 (KCR)
KRI Kerambit 627 (KCR)
π Total Keseluruhan
KCR PT PAL = 6
KCR Swasta = 9
Kapal Patroli Cepat = 25
Korvet = 4
Logistik = 4
LPD = 3
Pemetaan = 1
Kapal Selam = 3
Produk Baru 2025 = 3
➡️ TOTAL: 62 kapal perang produksi dalam negeri (2006–2025).
SSM YAAAH NOT NSM haha!⛔️π€£⛔️
BalasHapusmakloum Menhan dah berumur, SALAH BACA haha!π΅π«π€π΅π«
BREKING NIUUSSSSS
⛔️NOT NSM!!!!! But SSM
belum 24 jam, ternyata NSM diganti..entah rudal apaan
Alasan = JIMAT KOS haha!π€£ππ€£
⬇️⬇️⬇️⬇️⬇️
❌️awalnya
The original reply (translated into English).
The proposal to install the Naval Strike Missile (NSM) on Royal Malaysian Navy (RMN) Kedah-class vessels is part of the initiative to enhance the RMN’s surface combat capability in order to meet current and future operational requirements. The Government has also approved the installation of Surface-to-Surface Missile (SSM) launcher systems on all six Kedah-class ships. At present, the RMN is conducting a price survey to determine the actual overall cost of the project.
=======
✅️ralat alias amandemen
The amended reply (translated into English)
The proposal to install Surface-to-Surface Missiles (SSM) on vessels of the Royal Malaysian Navy (RMN) KEDAH class is part of an initiative to enhance the RMN’s surface combat capabilities in order to meet current and future operational requirements. The Government has also approved the installation of SSM launch systems on all six KEDAH-class vessels. At present, the RMN is conducting a price survey to determine the actual overall cost of the project
❌️MENHAN SEBLAH BILANG LCS SALAH PASANG PIPA & KABEL WIRE...ALAMAKKK DODOL haha!π€ͺπ΅π€ͺ
BalasHapus❌️MENHAN SEBLAH BILANG KEDAH KLAS PASANG NSM
eittt hari ini di Ralat NOT NSM but SSM haha!π€£π€₯π€£
soriii SALAH SEBUT EH BACA
⛔️NOT NSM!!!!! But SSM haha!ππ€ͺπ
BalasHapusNSM=NASIB SI MISQUENN
⛔️NOT NSM!!!!! But SSM haha!ππ€ͺπ
NSM=NASIB SI MISQUENN
Menhan seblah SALAH SEBUT SALAH BACA
warganyet kl, KENA PRENK NSM NGAMUKπ₯haha!πππ