08 Februari 2025

Havelsan Successfully Upgrades Turkish CN-235 Aircraft with Advent Marti System

08 Februari 2025

The interoperability feature of Havelsan's Advent Marti C2 system integrated with Türkiye's Coast Guard Command's TCSG-553 aircraft (infographic: Havelsan)

 ADVENT MARTI Command and Control System Integrated into TCSG-553 Aircraft

Developed with national engineering capabilities, the ADVENT MARTI Command and Control System has been successfully integrated into the TCSG-553 aircraft of the Turkish Coast Guard Command. This integration aims to enhance the operational efficiency of critical airborne platforms used in security and defense missions.

Air platforms, equipped with advanced mission systems, play a pivotal role in intelligence, reconnaissance, and surveillance operations. They are essential tools in combating drug smuggling, migrant trafficking, human trafficking, and preventing high-risk incidents like hijackings. Advanced decision support systems like ADVENT MARTI are vital in ensuring mission success in these scenarios.

CN-235 no registration TSCG-553 of the Turkish Coast Guard integrated with Advent Marti Command and Control System (photos: Havelsan)

The ADVENT MARTI solution, part of the ADVENT CMS product family developed under the leadership of the Turkish Naval Forces Command, is specifically designed for special mission aircraft and helicopters. It provides real-time situational awareness, advanced command and control capabilities, and a flexible structure to adapt to various mission requirements.

Advanced Features of ADVENT MARTI

The ADVENT MARTI system is highly adaptable and configurable, seamlessly integrating with a wide range of sensors and equipment. It is suitable for platforms such as Maritime Patrol Aircraft, Maritime Surveillance Aircraft, Helicopters, and UAVs.

Key Capabilities:

-Intelligence, Reconnaissance, and Surveillance

-Anti-Submarine Warfare (ASW) and Surface Warfare

-Electronic Warfare

-Search and Rescue (SAR)

-Tactical Data Link Relay

-Preventing Illegal Activities like Drug Smuggling, Human Trafficking, and Hijacking

HAVELSAN’s Combat Management System (CMS) enhances mission effectiveness through real-time decision-making capabilities and seamless integration with existing defense infrastructure.

By leveraging national engineering expertise, ADVENT MARTI continues to strengthen the operational efficiency of security forces and contribute to global security initiatives.

(Havelsan)

60 komentar:

  1. LCS = FFBNW STALLED 15 YEARS
    LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT ]
    • USD 948 JUTA (WITHOUT AMMO) = FFBNW = MANGKRAK DELAYED
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    -----------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -------------
    LMS B2 = FFBNW DOWNGRADE HISAR OPV NO ASW
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -------------
    KEDAH = FFBNW NO MISSILE SINCE 2025=2009 : 17 YAERS GUNBOAT
    In June 2006, after a total of 18 months of delays, the Royal Malaysian Navy commissioned KD Kedah, followed by a second hull, KD Pahang in August of the same year, and a third hull, KD Perak on 12 November 2007. By July 2009, six vessels had been launched.
    -------------
    LMS B1 = GUNBOAT NO MISSILE
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    =============
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    Three weeks ago, the Madani government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd. The estimated cost for the deal is RM10.7 billion and it will be covered in installments over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals.
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE SIMULATOR MKM TAHUN
    Five-year contract for Sukhoi’s simulators. Publicly listed HeiTech Padu Bhd has announced that it had been awarded a RM67 million, five-year contract to operate and maintain the Su-30MKM flight simulators at the RMAF airbase in Gong Kedak
    LEASE HELI LEASE SIMULATOR
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE 4x4
    Pejabat perusahaan mengatakan kepada Janes di pameran bahwa Angkatan Bersenjata Malon sedang mencari untuk menyewa Tarantula
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies

    BalasHapus
  2. 300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    İlk etapta 45 adet ATMACA gemisavar füzesi, ilgili fırlatıcı üniteleri ve kullanıcı terminallerinin tedarikini kapsayan tedarik sözleşmesi ile Endonezya Donanması, Türkiye'nin geliştirdiği gemisavar füzesinin ilk ihracat müşterisi olacak.
    Güney Asya ülkesi tarafından yapılan ATMACA alımının ilk parti teslimatlarda 45 adet olacağı, ilerleyen aşamada sayının 300 adedi geçeceği öngörülüyor.
    ===========
    ===========
    VSHORAD = LEASE
    VSHORAD = LEASE
    VSHORAD = LEASE
    The procurement division of the Defence Ministry has issued a tender for the supply, delivery, and commissioning for eight Very Short-Range Air Defence (VSHORAD) ground-based air defence system for the Army. The VSHORAD system is listed as the Army’s main asset and equipment for 2024.
    The 23-day tender published on November 20 closes on December 19. As usual the public specifications for the tender are limited.
    The indicative cost for the eight VSHORAD system is RM150 million. It is therefore unclear whether the VSHORAD system is meant for the four Starstreak carrier vehicles or Kenderaan Pembawa Misil Starstreak (KPMS) which tender was published last August.
    ------
    PRANK KS-1A
    PRANK KS-1A
    PRANK KS-1A
    Malonn has agreed in principle to purchase medium-range missiles from China, which in return will transfer technology on very short-range air defence to the country, Deputy Prime Minister Najib Razak said Tuesday.
    The procurement of the surface-to-air missiles was part of the armed forces modernisation program and would be made under the Ninth Malonn Plan from 2006-2009, he was quoted as saying by Bernama news agency.
    This includes provisions for special test facilities, tools, manufacturing process document, training and technical support.
    CNPMIEC president Wang Bingyan said China had also offered to conclude the KS-1A transaction on flexible payment terms, including counter-trade, barter and deferred payments.
    ------
    The Malonn Armed Forces (MAF) faces challenges with aging equipment, including aircraft, ships, and helicopters. These challenges include:
    Maintenance: Maintaining a large fleet of aging aircraft can be costly and burdensome.
    Operational capabilities: Aging assets can limit the operational capabilities of the MAF.
    Budget constraints: The MAF may not have enough budget to replace aging assets.
    Procurement system: The MAF's procurement system may need to be restructured to avoid political interference and excessive commissions.
    Scandals: The MAF has been involved in scandals involving fighter jets, submarines, and other equipment.
    Logistics: The MAF may have issues with delivering spares to soldiers in time

    BalasHapus
  3. DISERTIFIKASI OLEH TNI
    DISERTIFIKASI OLEH TNI
    DISERTIFIKASI OLEH TNI
    Tim Pelaksana Teknis Sertifikasi Kelaikudaraan Pertahanan (IDAA) dari Puslaik Kemhan yang diketuai oleh Letkol Tek Sugiri, S.T sebagai Supervisi bersama 4 anggota Tim Kelaikan Puslaik Kemhan melaksanakan Sertifikasi Kelaikudaraan Pertahanan Flight Test Video Downlink Pesawat CN235-220M RMAF yang bertempat di kantor PT. Dirgantara Indonesia (DI) Bandung Jawa Barat.
    ---
    OEM PT DI = Program naik taraf pesawat 'Maritime Surveillance Aircraft (MSA)' di bawah 'Maritime Security Initiative (MSI)' bagi pesawat CN235-220M milik Tentera Udara Diraja Malaysia (TUDM) telah bermula pada tahun 2018 hingga 2023. Tiga (3) buah pesawat CN235-220M dari No 1 Skn yang dinaik taraf menjadi MSA telah dihantar secara berperingkat ke PT Dirgantara Indonesia (PTDI) yang merupakan Original Equipment Manufacturer (OEM) bagi melaksanakan naik taraf pesawat tersebut.
    ==========================
    MSA = MINTA SEDEKAH AMERIKA
    Program naik taraf pesawat 'Maritime Surveillance Aircraft (MSA)' di bawah 'Maritime Security Initiative (MSI)' bagi pesawat CN235-220M milik Tentera Udara Diraja Malaysia (TUDM) telah bermula pada tahun 2018 hingga 2023. Tiga (3) buah pesawat CN235-220M dari No 1 Skn yang dinaik taraf menjadi MSA telah dihantar secara berperingkat ke PT Dirgantara Indonesia (PTDI) yang merupakan Original Equipment Manufacturer (OEM) bagi melaksanakan naik taraf pesawat tersebut.
    ---
    GIFTED BY US : The TPS-77 radar is gifted by the US to Malaysia under the Building Partner Capacity programme. Lockheed Martin has been awarded a firm contract from the US government to supply a long range air surveillance radar including support and training for the RMAF.
    ---
    US GRANT = US To Grant Long-Range Radar System To Malaysia. The United States has awarded a US$25.7 million contract to Lockheed Martin to supply a long-range ground-based radar system for the Royal Malaysian Air Force (RMAF).
    ---
    GIFTED PAID BY US : US gifted Malaysia an unknown number and type of coastal surveillance radars which were known colloquially as the 1206 radars. Some 17 years later the 1206 CSS radars have been upgraded which was also paid by the US.
    ---
    DONATED BY JAPAN : It appears that Japan has donated at least a single airfield surveillance radar (ASR) to Malaysia for use by the RMAF.
    ===================
    Malonn's armed forces procurement faces several weaknesses, including:
    1. Corruption
    The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
    2. Political influence
    Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
    Weak parliamentary oversight
    Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
    3. Limited financial scrutiny
    Financial scrutiny is limited by excessive secrecy.
    4. Violation of procedures
    Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures

    BalasHapus
  4. Bisalah cn 235 kita dibikin seperti itu

    BalasHapus
  5. CN-235MPA kita bertambah terus ...

    kahsiyan ada yg baruw akan merasakan MPA....eittt mo NGAMUK🔥 timfukin fisank haha!🍌🍌🍌

    BalasHapus
  6. bulan februari 2025 telah sampai, kira2 aset apalagi yang sampe nich?
    AWAS copot jantung para warganyet haha!😁😁😁
    Aset kita berdatangan, tiap tahun, tiap bulan, tiap minggu NON STOP SHOPPING haha!💰💰💰

    jiran kl Yang Sewa NGAMUKK haha!🔥🔥🔥blekhok sewa kaburrrr

    BalasHapus
  7. Gempur suka minta up berita negara di forum militer negara lain (Forum militer Indonesia) aneh

    Kenapa kau tidak di terima di forum militer negara mu sendiri gempur karena kau tukang bual dan bodah ya

    Hahahaha....

    BalasHapus
  8. Mantab... Pesawat CN235 buatan INDONESIA dan Spanyol...🔥🔥🔥


    MALON bisa apa..???? HAHAHAHA

    BalasHapus
  9. Parah bualnya bikin gelak sekawasan kau pork.LCS mangkrak misilnya expired akhirnya buat kapal usang. Kasihan.

    BalasHapus
  10. Woooiii santai kawan 😎😎😎
    Shoping tiada henti kawan 🤩🤩🤩
    ______

    Cadangan Devisa RI Melonjak, Tembus Rp2.550 Triliun per Januari 2025

    https://www.merdeka.com/amp/uang/cadangan-devisa-ri-melonjak-tembus-rp2550-triliun-per-januari-2025-305092-mvk.html

    BalasHapus
  11. Ha ha ha ha ciri khas beruk kalau lagi stress pasti ngomong nggak jelas di DS. Ha ha ha ha ha udah shoping dulu sana...

    BalasHapus
  12. Min..... Tayangin dong shoping malaydesh. Kasihan kan para beruk nggak ada yg bisa di banggakan.

    BalasHapus
  13. NO CONTRACT ATMACA
    While the Malonnn Navy continues to work on the choice of the anti-ship missile system of LMS, Naval News has learned that the Atmaca missile, developed by Roketsan, has emerged as a leading contender.
    -----
    PRANK KS-1A CHINA
    PRANK KS-1A CHINA
    PRANK KS-1A CHINA
    Malonn has agreed in principle to purchase medium-range missiles from China, which in return will transfer technology on very short-range air defence to the country, Deputy Prime Minister Najib Razak said Tuesday.
    The procurement of the surface-to-air missiles was part of the armed forces modernisation program and would be made under the Ninth Malonn Plan from 2006-2009, he was quoted as saying by Bernama news agency.
    CNPMIEC president Wang Bingyan said China had also offered to conclude the KS-1A transaction on flexible payment terms, including counter-trade, barter and deferred payments.
    ------
    VSHORAD = LEASE
    VSHORAD = LEASE
    VSHORAD = LEASE
    The procurement division of the Defence Ministry has issued a tender for the supply, delivery, and commissioning for eight Very Short-Range Air Defence (VSHORAD) ground-based air defence system for the Army. The VSHORAD system is listed as the Army’s main asset and equipment for 2024.
    The 23-day tender published on November 20 closes on December 19. As usual the public specifications for the tender are limited.
    ------
    DOWNGRADE NO SONAR = NO ASW
    DOWNGRADE NO SONAR = NO ASW
    DOWNGRADE NO SONAR = NO ASW
    STM, in its role as main contractor, will turn to the Turkish defence sector for such equipment as the Combat Management System; the Gun Fire Control System, to be supplied by HAVELSAN; and the 3D Search Radar, Fire Control Radar, IFF, 30mm Gun, ESM and Chaff Decoy System, as well as other electronic sensors, to be supplied by ASELSAN. ROKETSAN will be supplying its ATMACA Surface-to-Surface G/M System.
    ------
    Malonn armed forces face challenges due to limited funding, which has led to an aging equipment inventory and gaps in military capability.
    Limited funding
    Small procurement budgets
    The military budget has remained small as a percentage of GDP, and governments have been unwilling to cut spending elsewhere
    Postponed purchases
    The global financial crisis has forced the Malonn Armed Forces (MAF) to postpone large purchases
    Aging equipment
    Outdated inventory
    The MAF's equipment is aging due to small procurement budgets and a lack of investment in maintenance and repair
    Withdrawal of aircraft
    The MAF withdrew its MiG-29 Fulcrum fighter aircraft in 2017, and is struggling to keep its Su-30MKM Flanker fighter operational
    Other challenges
    Procurement system: The procurement system needs reform, and there are delays in the delivery of new equipment
    Corruption: There are weaknesses in anti-corruption standards and reporting, and political connections can influence promotion decisions
    Oversight: There is little effective oversight of the defense sector
    ========
    The Malonnn Armed Forces (MAF) has many outdated assets, including ships, helicopters, and spare parts. The MAF has acknowledged the need to replace these assets.
    Ships
    • The Royal Malonnn Navy's (RMN) Fast Attack Craft (FAC) is over 50 years old
    • The RMN has many vessels that are past their optimal lifespan
    • The RMN's age limit for submarines is 35 years, and 30 years for frigates, corvettes, and other ships
    • The RMN's smaller vessels, like fast patrol boats, have an age limit of 24 years
    Helicopters
    • Some helicopters in the MAF were commissioned in the 1960s
    Spare parts
    • The MAF has lost money due to spare parts that are no longer compatible with its fleet

    BalasHapus
  14. 300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    İlk etapta 45 adet ATMACA gemisavar füzesi, ilgili fırlatıcı üniteleri ve kullanıcı terminallerinin tedarikini kapsayan tedarik sözleşmesi ile Endonezya Donanması, Türkiye'nin geliştirdiği gemisavar füzesinin ilk ihracat müşterisi olacak.
    Güney Asya ülkesi tarafından yapılan ATMACA alımının ilk parti teslimatlarda 45 adet olacağı, ilerleyen aşamada sayının 300 adedi geçeceği öngörülüyor.
    ===========
    ===========
    NO CONTRACT ATMACA
    While the Malonnn Navy continues to work on the choice of the anti-ship missile system of LMS, Naval News has learned that the Atmaca missile, developed by Roketsan, has emerged as a leading contender.
    -----
    PRANK KS-1A CHINA
    PRANK KS-1A CHINA
    PRANK KS-1A CHINA
    Malonn has agreed in principle to purchase medium-range missiles from China, which in return will transfer technology on very short-range air defence to the country, Deputy Prime Minister Najib Razak said Tuesday.
    The procurement of the surface-to-air missiles was part of the armed forces modernisation program and would be made under the Ninth Malonn Plan from 2006-2009, he was quoted as saying by Bernama news agency.
    CNPMIEC president Wang Bingyan said China had also offered to conclude the KS-1A transaction on flexible payment terms, including counter-trade, barter and deferred payments.
    ------
    VSHORAD = LEASE
    VSHORAD = LEASE
    VSHORAD = LEASE
    The procurement division of the Defence Ministry has issued a tender for the supply, delivery, and commissioning for eight Very Short-Range Air Defence (VSHORAD) ground-based air defence system for the Army. The VSHORAD system is listed as the Army’s main asset and equipment for 2024.
    The 23-day tender published on November 20 closes on December 19. As usual the public specifications for the tender are limited.
    ------
    DOWNGRADE NO SONAR = NO ASW
    DOWNGRADE NO SONAR = NO ASW
    DOWNGRADE NO SONAR = NO ASW
    STM, in its role as main contractor, will turn to the Turkish defence sector for such equipment as the Combat Management System; the Gun Fire Control System, to be supplied by HAVELSAN; and the 3D Search Radar, Fire Control Radar, IFF, 30mm Gun, ESM and Chaff Decoy System, as well as other electronic sensors, to be supplied by ASELSAN. ROKETSAN will be supplying its ATMACA Surface-to-Surface G/M System.
    ==================
    The Malonnn Armed Forces (MAF) face several problems, including:
    • Budgetary constraints
    The Malonnn government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    • Poor service conditions
    The MAF has difficulty recruiting and retaining high-caliber personnel due to poor conditions of service.
    • Outdated equipment
    The MAF lacks modern military assets, which puts it at risk from internal and external threats.
    • Political interference
    Political interference and corruption undermine the MAF's combat readiness.
    • Logistics issues
    The MAF faces problems with logistics that impact the country's National Defence Policy.
    • Rapid military development
    The rapid development of the military has raised questions about the MAF's readiness to face threats.
    Other issues include:
    • The government's inability to provide and equip the MAF with modern defense assets
    • The MAF's difficulty in fixing defense infrastructure

    BalasHapus
  15. 300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    Roketsan tarafından geliştirilen Türkiye'nin ilk milli gemisavar füzesi ATMACA'nın ilk ihracatı Endonezya'ya gerçekleştirilirken ilk etapta 45 adet füze teslim edilecek.
    Janes tarafından yapılan habere göre Endonezya Savunma Bakanlığı, yerel savunma şirketi PT Republik Defensindo'ya Roketsan'dan ilk ATMACA gemisavar füzesi tedarik etme sözleşmesini verdi.
    İlk etapta 45 adet ATMACA gemisavar füzesi, ilgili fırlatıcı üniteleri ve kullanıcı terminallerinin tedarikini kapsayan tedarik sözleşmesi ile Endonezya Donanması, Türkiye'nin geliştirdiği gemisavar füzesinin ilk ihracat müşterisi olacak.
    Güney Asya ülkesi tarafından yapılan ATMACA alımının ilk parti teslimatlarda 45 adet olacağı, ilerleyen aşamada sayının 300 adedi geçeceği öngörülüyor.
    ===========
    ===========
    NO CONTRACT ATMACA
    While the Malonnn Navy continues to work on the choice of the anti-ship missile system of LMS, Naval News has learned that the Atmaca missile, developed by Roketsan, has emerged as a leading contender.
    -----
    PRANK KS-1A CHINA
    PRANK KS-1A CHINA
    PRANK KS-1A CHINA
    Malonn has agreed in principle to purchase medium-range missiles from China, which in return will transfer technology on very short-range air defence to the country, Deputy Prime Minister Najib Razak said Tuesday.
    The procurement of the surface-to-air missiles was part of the armed forces modernisation program and would be made under the Ninth Malonn Plan from 2006-2009, he was quoted as saying by Bernama news agency.
    CNPMIEC president Wang Bingyan said China had also offered to conclude the KS-1A transaction on flexible payment terms, including counter-trade, barter and deferred payments.
    ------
    VSHORAD = LEASE
    VSHORAD = LEASE
    VSHORAD = LEASE
    The procurement division of the Defence Ministry has issued a tender for the supply, delivery, and commissioning for eight Very Short-Range Air Defence (VSHORAD) ground-based air defence system for the Army. The VSHORAD system is listed as the Army’s main asset and equipment for 2024.
    The 23-day tender published on November 20 closes on December 19. As usual the public specifications for the tender are limited.
    ------
    DOWNGRADE NO SONAR = NO ASW
    DOWNGRADE NO SONAR = NO ASW
    DOWNGRADE NO SONAR = NO ASW
    STM, in its role as main contractor, will turn to the Turkish defence sector for such equipment as the Combat Management System; the Gun Fire Control System, to be supplied by HAVELSAN; and the 3D Search Radar, Fire Control Radar, IFF, 30mm Gun, ESM and Chaff Decoy System, as well as other electronic sensors, to be supplied by ASELSAN. ROKETSAN will be supplying its ATMACA Surface-to-Surface G/M System.
    ------
    The Royal Malonnn Navy (RMN) has an aging fleet that is underfunded and struggling to keep up with technological advancements. This makes it difficult for the RMN to defend the country and its territorial claims in the South China Sea.
    Causes
    • Aging vessels
    Many of the RMN's ships are past their prime and are used beyond their economical life
    • Delayed replacements
    The RMN has received only a small number of the new vessels it planned to receive
    • Mismanagement
    A government audit found that mismanagement has stalled plans to replace the aging fleet
    Effects
    • Limited ability to patrol: The RMN's ability to patrol its maritime domain is limited
    • Increased reliance on the US: The RMN is relying more on the US to bolster its maritime capabilities
    Increased risk of accidents: The age of the RMN's vessels increases the risk of accidents

    BalasHapus
  16. PPA Teseo MK2E : 350KM.
    YAKHONT : 300 KM
    EXO BLOCK 3 : 200 KM
    ----
    TLDM = BLOCK 2 : 72 KM
    EXOCET MM40
    (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
    TLDM = NSM Operational Range: NSM 185 km (100 NM)
    ==========
    ==========
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    ----
    SIPRI LCS = DELIVERED : 0 (KONTRAK KOSONG) ......
    SAK 70 MK 3 - DELIVERED = 0
    MICA - DELIVERED = 0
    SHIP ENGINE - DELIVERED = 0
    FIRE CONTROL RADAR - DELIVERED = 0
    AIR CONTROL RADAR - DELIVERED = 0
    ----
    FACT LCS 2025 - 2011 = 15 YEARS
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ----
    The Malonnn Armed Forces (MAF) has faced a number of challenges with missiles, including budgetary constraints, procurement disputes, and technical and logistical issues.
    Budgetary constraints
    • The 1997 Asian financial crisis limited the MAF's ability to purchase weapons.
    • The government's defense modernization budget is limited.
    Procurement disputes
    • The army and air force have disagreed on whether to introduce a mid-range surface-to-air missile system.
    • The government did not endorse a Malonnn private company's agreement to acquire a Chinese medium range air defense missile.
    Technical and logistical issues
    • The MAF has acquired advanced weapon systems from different countries, which can lead to technical and logistical issues.
    • The systems have different technical standards and specifications, which can lead to inefficiencies.
    • The MAF has fleet sustainment problems.
    Other challenges
    • The MAF has faced corruption.
    • Political interference has undermined combat readiness.
    The MAF needs to be flexible and mobile to meet the National Defence Policy objectives

    BalasHapus
  17. PPA Teseo MK2E : 350KM.
    YAKHONT : 300 KM
    EXO BLOCK 3 : 200 KM
    ------------------
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    İlk etapta 45 adet ATMACA gemisavar füzesi, ilgili fırlatıcı üniteleri ve kullanıcı terminallerinin tedarikini kapsayan tedarik sözleşmesi ile Endonezya Donanması, Türkiye'nin geliştirdiği gemisavar füzesinin ilk ihracat müşterisi olacak.
    Güney Asya ülkesi tarafından yapılan ATMACA alımının ilk parti teslimatlarda 45 adet olacağı, ilerleyen aşamada sayının 300 adedi geçeceği öngörülüyor.
    ===========
    ===========
    TLDM = BLOCK 2 : 72 KM
    EXOCET MM40
    (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
    TLDM = NSM Operational Range: NSM 185 km (100 NM)
    ----
    4 UNIT WITH EXO B2 RANGE 70 KM
    LEKIU CLASS 2 UNIT = EXO B2 RANGE 70 KM
    KASTURI CLASS 2 UNIT = EXO B2 RANGE 70 KM
    -----
    READINESS 58.6% X 55 Unit = 32 UNIT
    READINESS 58.6% X 55 Unit = 32 UNIT
    READINESS 58.6% X 55 Unit = 32 UNIT
    This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
    -----
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    ----
    THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
    • Logistics
    A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
    • Budgeting
    Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    • Personnel
    The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
    • Procurement
    The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
    • Political interference
    Political interference and corruption are undermining combat readiness.
    • Territorial disputes
    Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
    • Transboundary haze
    Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
    • Fleet sustainment
    The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
    • Technological obsolescence
    Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
    • Modernization
    The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

    BalasHapus
  18. PPA Teseo MK2E : 350KM.
    YAKHONT : 300 KM
    EXO BLOCK 3 : 200 KM
    ------------------
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    İlk etapta 45 adet ATMACA gemisavar füzesi, ilgili fırlatıcı üniteleri ve kullanıcı terminallerinin tedarikini kapsayan tedarik sözleşmesi ile Endonezya Donanması, Türkiye'nin geliştirdiği gemisavar füzesinin ilk ihracat müşterisi olacak.
    Güney Asya ülkesi tarafından yapılan ATMACA alımının ilk parti teslimatlarda 45 adet olacağı, ilerleyen aşamada sayının 300 adedi geçeceği öngörülüyor.
    ===========
    ===========
    TLDM = BLOCK 2 : 72 KM
    EXOCET MM40
    (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
    TLDM = NSM Operational Range: NSM 185 km (100 NM)
    ----
    4 UNIT WITH EXO B2 RANGE 70 KM
    LEKIU CLASS 2 UNIT = EXO B2 RANGE 70 KM
    KASTURI CLASS 2 UNIT = EXO B2 RANGE 70 KM
    -----
    READINESS 58.6% X 55 Unit = 32 UNIT
    READINESS 58.6% X 55 Unit = 32 UNIT
    READINESS 58.6% X 55 Unit = 32 UNIT
    This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
    -----
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    ----
    THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
    • Logistics
    A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
    • Budgeting
    Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    • Personnel
    The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
    • Procurement
    The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
    • Political interference
    Political interference and corruption are undermining combat readiness.
    • Territorial disputes
    Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
    • Transboundary haze
    Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
    • Fleet sustainment
    The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
    • Technological obsolescence
    Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
    • Modernization
    The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

    BalasHapus
  19. PPA Teseo MK2E : 350KM.
    YAKHONT : 300 KM
    EXO BLOCK 3 : 200 KM
    ------------------
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    İlk etapta 45 adet ATMACA gemisavar füzesi, ilgili fırlatıcı üniteleri ve kullanıcı terminallerinin tedarikini kapsayan tedarik sözleşmesi ile Endonezya Donanması, Türkiye'nin geliştirdiği gemisavar füzesinin ilk ihracat müşterisi olacak.
    Güney Asya ülkesi tarafından yapılan ATMACA alımının ilk parti teslimatlarda 45 adet olacağı, ilerleyen aşamada sayının 300 adedi geçeceği öngörülüyor.
    ===========
    ===========
    TLDM = BLOCK 2 : 72 KM
    EXOCET MM40
    (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
    TLDM = NSM Operational Range: NSM 185 km (100 NM)
    ----
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    ----
    SIPRI LCS = DELIVERED : 0 (KONTRAK KOSONG) ......
    SAK 70 MK 3 - DELIVERED = 0
    MICA - DELIVERED = 0
    SHIP ENGINE - DELIVERED = 0
    FIRE CONTROL RADAR - DELIVERED = 0
    AIR CONTROL RADAR - DELIVERED = 0
    ----
    FACT LCS 2025 - 2011 = 15 YEARS
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ----
    The Malonnn Armed Forces (MAF) has faced a number of challenges with missiles, including budgetary constraints, procurement disputes, and technical and logistical issues.
    Budgetary constraints
    • The 1997 Asian financial crisis limited the MAF's ability to purchase weapons.
    • The government's defense modernization budget is limited.
    Procurement disputes
    • The army and air force have disagreed on whether to introduce a mid-range surface-to-air missile system.
    • The government did not endorse a Malonnn private company's agreement to acquire a Chinese medium range air defense missile.
    Technical and logistical issues
    • The MAF has acquired advanced weapon systems from different countries, which can lead to technical and logistical issues.
    • The systems have different technical standards and specifications, which can lead to inefficiencies.
    • The MAF has fleet sustainment problems.
    Other challenges
    • The MAF has faced corruption.
    • Political interference has undermined combat readiness.
    The MAF needs to be flexible and mobile to meet the National Defence Policy objectives

    BalasHapus
  20. PPA Teseo MK2E : 350KM.
    YAKHONT : 300 KM
    EXO BLOCK 3 : 200 KM
    ------------------
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    İlk etapta 45 adet ATMACA gemisavar füzesi, ilgili fırlatıcı üniteleri ve kullanıcı terminallerinin tedarikini kapsayan tedarik sözleşmesi ile Endonezya Donanması, Türkiye'nin geliştirdiği gemisavar füzesinin ilk ihracat müşterisi olacak.
    Güney Asya ülkesi tarafından yapılan ATMACA alımının ilk parti teslimatlarda 45 adet olacağı, ilerleyen aşamada sayının 300 adedi geçeceği öngörülüyor.
    ===========
    ===========
    TLDM = BLOCK 2 : 72 KM
    EXOCET MM40
    (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
    TLDM = NSM Operational Range: NSM 185 km (100 NM)
    ----
    4 UNIT WITH EXO B2 RANGE 70 KM
    LEKIU CLASS 2 UNIT = EXO B2 RANGE 70 KM
    KASTURI CLASS 2 UNIT = EXO B2 RANGE 70 KM
    -----
    READINESS 58.6% X 55 Unit = 32 UNIT
    READINESS 58.6% X 55 Unit = 32 UNIT
    READINESS 58.6% X 55 Unit = 32 UNIT
    This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
    -----
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    ----
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ----
    The Malonnn Armed Forces (MAF) has faced challenges in modernizing its missile capabilities due to budgetary constraints, political interference, and a lack of modern assets.
    Budgetary constraints
    • The 1997 Asian financial crisis limited the MAF's ability to procure new weapons.
    • Malonn's defense budget is limited, which can affect the pace of acquisitions and upgrades.
    Political interference
    • Political leaders have been accused of interfering in procurement.
    Lack of modern assets
    • The MAF has aging military assets, including most of the navy's fleet and helicopters commissioned in the 1960s.
    • The MAF has experienced issues with the maintenance and spare parts for its aircraft.
    Other challenges the MAF has faced include: Poor planning, Personnel issues, and Critical problems with the PT-91M main battle tank.



    BalasHapus
  21. LCS = FFBNW STALLED 15 YEARS
    LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT ]
    • USD 948 JUTA (WITHOUT AMMO) = FFBNW = MANGKRAK DELAYED
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    -----------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -------------
    LMS B2 = FFBNW DOWNGRADE HISAR OPV NO ASW
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -------------
    KEDAH = FFBNW NO MISSILE SINCE 2025=2009 : 17 YAERS GUNBOAT
    In June 2006, after a total of 18 months of delays, the Royal Malaysian Navy commissioned KD Kedah, followed by a second hull, KD Pahang in August of the same year, and a third hull, KD Perak on 12 November 2007. By July 2009, six vessels had been launched.
    -------------
    LMS B1 = GUNBOAT NO MISSILE
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    =============
    LEASE 28 HELI = 119 HELI BARU :
    LEASE 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL LEASE DARIPADA BELI BARU =
    LEASE 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    LEASEan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    ===================
    LEASE FAST INTERCEPTOR BOAT
    LEASE UTILITY BOAT
    LEASE RIGID HULL FENDER BOAT
    LEASE ROVER FIBER GLASS
    LEASE EC120B
    LEASE FLIGHT SIMULATION TRAINING DEVICE
    Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
    Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    -----
    LEASE KAPAL HIDROLOGI
    LEASE KAPAL HIDROLOGI
    LEASE KAPAL HIDROLOGI
    Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak LEASEan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
    =========
    LCS BAYAR HUTANG NGPVs = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd....

    BalasHapus
  22. LCS = FFBNW STALLED 15 YEARS
    LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT ]
    • USD 948 JUTA (WITHOUT AMMO) = FFBNW = MANGKRAK DELAYED
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    -----------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -------------
    LMS B2 = FFBNW DOWNGRADE HISAR OPV NO ASW
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -------------
    KEDAH = FFBNW NO MISSILE SINCE 2025=2009 : 17 YAERS GUNBOAT
    In June 2006, after a total of 18 months of delays, the Royal Malaysian Navy commissioned KD Kedah, followed by a second hull, KD Pahang in August of the same year, and a third hull, KD Perak on 12 November 2007. By July 2009, six vessels had been launched.
    -------------
    LMS B1 = GUNBOAT NO MISSILE
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    =============
    LEASE 28 HELI = 119 HELI BARU :
    LEASE 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL LEASE DARIPADA BELI BARU =
    LEASE 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    LEASEan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    ===================
    LEASE FAST INTERCEPTOR BOAT
    LEASE UTILITY BOAT
    LEASE RIGID HULL FENDER BOAT
    LEASE ROVER FIBER GLASS
    LEASE EC120B
    LEASE FLIGHT SIMULATION TRAINING DEVICE
    Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
    Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    -----
    LEASE KAPAL HIDROLOGI
    LEASE KAPAL HIDROLOGI
    LEASE KAPAL HIDROLOGI
    Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak LEASEan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
    =========
    LCS BAYAR HUTANG NGPVs = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd....

    BalasHapus
  23. LCS = FFBNW STALLED 15 YEARS
    LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT ]
    • USD 948 JUTA (WITHOUT AMMO) = FFBNW = DELAYED
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    -------------
    LMS B2 = FFBNW DOWNGRADE HISAR OPV NO ASW
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -------------
    KEDAH = FFBNW NO MISSILE SINCE 2025=2009 : 17 YAERS GUNBOAT
    In June 2006, after a total of 18 months of delays, the Royal Malaysian Navy commissioned KD Kedah, followed by a second hull, KD Pahang in August of the same year, and a third hull, KD Perak on 12 November 2007. By July 2009, six vessels had been launched.
    -------------
    LMS B1 = GUNBOAT NO MISSILE
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    =============
    NO CONTRACT ATMACA
    While the Malonnn Navy continues to work on the choice of the anti-ship missile system of LMS, Naval News has learned that the Atmaca missile, developed by Roketsan, has emerged as a leading contender.
    -----
    PRANK KS-1A CHINA
    PRANK KS-1A CHINA
    PRANK KS-1A CHINA
    Malonn has agreed in principle to purchase medium-range missiles from China, which in return will transfer technology on very short-range air defence to the country, Deputy Prime Minister Najib Razak said Tuesday.
    The procurement of the surface-to-air missiles was part of the armed forces modernisation program and would be made under the Ninth Malonn Plan from 2006-2009, he was quoted as saying by Bernama news agency.
    CNPMIEC president Wang Bingyan said China had also offered to conclude the KS-1A transaction on flexible payment terms, including counter-trade, barter and deferred payments.
    ------
    VSHORAD = LEASE
    VSHORAD = LEASE
    VSHORAD = LEASE
    The procurement division of the Defence Ministry has issued a tender for the supply, delivery, and commissioning for eight Very Short-Range Air Defence (VSHORAD) ground-based air defence system for the Army. The VSHORAD system is listed as the Army’s main asset and equipment for 2024.
    The 23-day tender published on November 20 closes on December 19. As usual the public specifications for the tender are limited.
    ------
    Malonn armed forces face challenges due to limited funding, which has led to an aging equipment inventory and gaps in military capability.
    Limited funding
    Small procurement budgets
    The military budget has remained small as a percentage of GDP, and governments have been unwilling to cut spending elsewhere
    Postponed purchases
    The global financial crisis has forced the Malonn Armed Forces (MAF) to postpone large purchases
    Aging equipment
    Outdated inventory
    The MAF's equipment is aging due to small procurement budgets and a lack of investment in maintenance and repair
    Withdrawal of aircraft
    The MAF withdrew its MiG-29 Fulcrum fighter aircraft in 2017, and is struggling to keep its Su-30MKM Flanker fighter operational
    Other challenges
    Procurement system: The procurement system needs reform, and there are delays in the delivery of new equipment
    Corruption: There are weaknesses in anti-corruption standards and reporting, and political connections can influence promotion decisions
    Oversight: There is little effective oversight of the defense sector


    BalasHapus
  24. LCS = FFBNW STALLED 15 YEARS
    LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT ]
    • USD 948 JUTA (WITHOUT AMMO) = FFBNW = DELAYED
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    -------------
    LMS B2 = FFBNW DOWNGRADE HISAR OPV NO ASW
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -------------
    KEDAH = FFBNW NO MISSILE SINCE 2025=2009 : 17 YAERS GUNBOAT
    In June 2006, after a total of 18 months of delays, the Royal Malaysian Navy commissioned KD Kedah, followed by a second hull, KD Pahang in August of the same year, and a third hull, KD Perak on 12 November 2007. By July 2009, six vessels had been launched.
    -------------
    LMS B1 = GUNBOAT NO MISSILE
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    =============
    The Malonnn Armed Forces' (MAF) Littoral Combat Ships (LCS) have faced several issues, including delays, design flaws, and a lack of air and surface warfare capabilities.
    Delays
    • The first LCS was delayed by six years, from its scheduled delivery date.
    • The LCS program has been plagued by delays due to a number of factors.
    Design flaws
    • The LCS hull, or sea frame, had issues with cracking.
    • The propulsion plant design had issues from the start.
    • Some mission module components were immature.
    Lack of air and surface warfare capabilities
    • Some say the LCS lacks significant air and surface warfare capabilities.
    Other issues
    • The LCS has faced issues with survivability in contested waters.
    • The LCS has had limited flight deck and berthing space.
    • The LCS has had command and control limitations.
    • The LCS program has been plagued by allegations of corruption and political interference.
    The MAF has also faced other challenges, including underfunding and an aging fleet.
    =============
    The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
    Funding
    • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
    • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    Aging equipment
    • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
    • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
    • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
    Other challenges
    Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism

    BalasHapus
  25. LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT super bikes today. As for leasing vehicles, this has been common practise by government departments for the decade or so as it is supposed to be cheaper overall. The MPs had also taken delivery of Honda Civics under a leasing programme,
    -----
    LEASE FAST INTERCEPTOR BOAT
    LEASE UTILITY BOAT
    LEASE RIGID HULL FENDER BOAT
    LEASE ROVER FIBER GLASS
    LEASE EC120B
    LEASE FLIGHT SIMULATION TRAINING DEVICE
    Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
    Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    -----
    LEASE KAPAL HIDROLOGI
    LEASE KAPAL HIDROLOGI
    LEASE KAPAL HIDROLOGI
    Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak LEASEan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
    ===================
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    Three weeks ago, the Madani government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd. The estimated cost for the deal is RM10.7 billion and it will be covered in installments over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals.
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE SIMULATOR MKM TAHUN
    Five-year contract for Sukhoi’s simulators. Publicly listed HeiTech Padu Bhd has announced that it had been awarded a RM67 million, five-year contract to operate and maintain the Su-30MKM flight simulators at the RMAF airbase in Gong Kedak
    LEASE HELI LEASE SIMULATOR
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE 4x4
    Pejabat perusahaan mengatakan kepada Janes di pameran bahwa Angkatan Bersenjata Malon sedang mencari untuk menyewa Tarantula
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies

    BalasHapus
  26. LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT super bikes today. As for leasing vehicles, this has been common practise by government departments for the decade or so as it is supposed to be cheaper overall. The MPs had also taken delivery of Honda Civics under a leasing programme,
    -----
    LEASE FAST INTERCEPTOR BOAT
    LEASE UTILITY BOAT
    LEASE RIGID HULL FENDER BOAT
    LEASE ROVER FIBER GLASS
    LEASE EC120B
    LEASE FLIGHT SIMULATION TRAINING DEVICE
    Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
    Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    -----
    LEASE KAPAL HIDROLOGI
    LEASE KAPAL HIDROLOGI
    LEASE KAPAL HIDROLOGI
    Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak LEASEan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
    ===================
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    Three weeks ago, the Madani government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd. The estimated cost for the deal is RM10.7 billion and it will be covered in installments over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals.
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE SIMULATOR MKM TAHUN
    Five-year contract for Sukhoi’s simulators. Publicly listed HeiTech Padu Bhd has announced that it had been awarded a RM67 million, five-year contract to operate and maintain the Su-30MKM flight simulators at the RMAF airbase in Gong Kedak
    LEASE HELI LEASE SIMULATOR
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE 4x4
    Pejabat perusahaan mengatakan kepada Janes di pameran bahwa Angkatan Bersenjata Malon sedang mencari untuk menyewa Tarantula
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies

    BalasHapus
  27. NO CONTRACT ATMACA
    While the Malonnn Navy continues to work on the choice of the anti-ship missile system of LMS, Naval News has learned that the Atmaca missile, developed by Roketsan, has emerged as a leading contender.
    -----
    PRANK KS-1A CHINA
    PRANK KS-1A CHINA
    PRANK KS-1A CHINA
    Malonn has agreed in principle to purchase medium-range missiles from China, which in return will transfer technology on very short-range air defence to the country, Deputy Prime Minister Najib Razak said Tuesday.
    The procurement of the surface-to-air missiles was part of the armed forces modernisation program and would be made under the Ninth Malonn Plan from 2006-2009, he was quoted as saying by Bernama news agency.
    CNPMIEC president Wang Bingyan said China had also offered to conclude the KS-1A transaction on flexible payment terms, including counter-trade, barter and deferred payments.
    ------
    VSHORAD = LEASE
    VSHORAD = LEASE
    VSHORAD = LEASE
    The procurement division of the Defence Ministry has issued a tender for the supply, delivery, and commissioning for eight Very Short-Range Air Defence (VSHORAD) ground-based air defence system for the Army. The VSHORAD system is listed as the Army’s main asset and equipment for 2024.
    The 23-day tender published on November 20 closes on December 19. As usual the public specifications for the tender are limited.
    ------
    DOWNGRADE NO SONAR = NO ASW
    DOWNGRADE NO SONAR = NO ASW
    DOWNGRADE NO SONAR = NO ASW
    STM, in its role as main contractor, will turn to the Turkish defence sector for such equipment as the Combat Management System; the Gun Fire Control System, to be supplied by HAVELSAN; and the 3D Search Radar, Fire Control Radar, IFF, 30mm Gun, ESM and Chaff Decoy System, as well as other electronic sensors, to be supplied by ASELSAN. ROKETSAN will be supplying its ATMACA Surface-to-Surface G/M System.
    ------
    Malonn armed forces face challenges due to limited funding, which has led to an aging equipment inventory and gaps in military capability.
    Limited funding
    Small procurement budgets
    The military budget has remained small as a percentage of GDP, and governments have been unwilling to cut spending elsewhere
    Postponed purchases
    The global financial crisis has forced the Malonn Armed Forces (MAF) to postpone large purchases
    Aging equipment
    Outdated inventory
    The MAF's equipment is aging due to small procurement budgets and a lack of investment in maintenance and repair
    Withdrawal of aircraft
    The MAF withdrew its MiG-29 Fulcrum fighter aircraft in 2017, and is struggling to keep its Su-30MKM Flanker fighter operational
    Other challenges
    Procurement system: The procurement system needs reform, and there are delays in the delivery of new equipment
    Corruption: There are weaknesses in anti-corruption standards and reporting, and political connections can influence promotion decisions
    Oversight: There is little effective oversight of the defense sector
    ========
    The Malonnn Armed Forces (MAF) has many outdated assets, including ships, helicopters, and spare parts. The MAF has acknowledged the need to replace these assets.
    Ships
    • The Royal Malonnn Navy's (RMN) Fast Attack Craft (FAC) is over 50 years old
    • The RMN has many vessels that are past their optimal lifespan
    • The RMN's age limit for submarines is 35 years, and 30 years for frigates, corvettes, and other ships
    • The RMN's smaller vessels, like fast patrol boats, have an age limit of 24 years
    Helicopters
    • Some helicopters in the MAF were commissioned in the 1960s
    Spare parts
    • The MAF has lost money due to spare parts that are no longer compatible with its fleet

    BalasHapus
  28. LCS = FFBNW STALLED 15 YEARS
    LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT ]
    • USD 948 JUTA (WITHOUT AMMO) = FFBNW = DELAYED
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    -------------
    LMS B2 = FFBNW DOWNGRADE HISAR OPV NO ASW
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -------------
    KEDAH = FFBNW NO MISSILE SINCE 2025=2009 : 17 YAERS GUNBOAT
    In June 2006, after a total of 18 months of delays, the Royal Malaysian Navy commissioned KD Kedah, followed by a second hull, KD Pahang in August of the same year, and a third hull, KD Perak on 12 November 2007. By July 2009, six vessels had been launched.
    -------------
    LMS B1 = GUNBOAT NO MISSILE
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    =============
    The Malonnn Armed Forces' (MAF) Littoral Combat Ships (LCS) have faced several issues, including delays, design flaws, and a lack of air and surface warfare capabilities.
    Delays
    • The first LCS was delayed by six years, from its scheduled delivery date.
    • The LCS program has been plagued by delays due to a number of factors.
    Design flaws
    • The LCS hull, or sea frame, had issues with cracking.
    • The propulsion plant design had issues from the start.
    • Some mission module components were immature.
    Lack of air and surface warfare capabilities
    • Some say the LCS lacks significant air and surface warfare capabilities.
    Other issues
    • The LCS has faced issues with survivability in contested waters.
    • The LCS has had limited flight deck and berthing space.
    • The LCS has had command and control limitations.
    • The LCS program has been plagued by allegations of corruption and political interference.
    The MAF has also faced other challenges, including underfunding and an aging fleet.
    =============
    The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
    Funding
    • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
    • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    Aging equipment
    • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
    • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
    • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
    Other challenges
    Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism

    BalasHapus
  29. RENAME = COPY PASTE = STALLED 15 YEARS .....
    PSC = 1995
    PSC > BNS = 2005
    BNC > LUNAS = 2024
    PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malonnn government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malonn in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
    ===================
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
    Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
    ===================
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness.
    ===================
    PROBLEMS SHIPYARD
    PROBLEMS SHIPYARD
    PROBLEMS SHIPYARD
    Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.

    BalasHapus
  30. Ciri2 org stress, bicara diluar topik. Ha ha ha ha ha kasihan beruk2 lg pada stress tuh

    BalasHapus
    Balasan
    1. Beruk panik bro trolingnya ngawur, biasalah beruk stress 😂🤣😅

      Hapus
  31. https://nasional.kompas.com/read/2025/01/31/12120361/kemenhan-laksanakan-penghematan-anggaran-tapi-belanja-alutsista-tetap-jalan?utm_source=Various&utm_medium=Referral&utm_campaign=Top_Mobile
    ____________________
    SHOPING2 tetap jalan, bedalah sama negeri sebelah cukup SEWA saja 😅🤣😂🤣😅🤣😂

    BalasHapus
  32. eittt ATMACA kita duluan pake..dadaagg haha!🚀🚀🚀
    NSM=Nanem Sayur Mayurrr haha!🥬🥬🥬mo NGAMUK🔥 timfuk fisank haha!🍌🍌🍌

    BalasHapus
  33. PPA Teseo MK2E : 350KM.
    YAKHONT : 300 KM
    EXO BLOCK 3 : 200 KM
    ------------------
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    İlk etapta 45 adet ATMACA gemisavar füzesi, ilgili fırlatıcı üniteleri ve kullanıcı terminallerinin tedarikini kapsayan tedarik sözleşmesi ile Endonezya Donanması, Türkiye'nin geliştirdiği gemisavar füzesinin ilk ihracat müşterisi olacak.
    Güney Asya ülkesi tarafından yapılan ATMACA alımının ilk parti teslimatlarda 45 adet olacağı, ilerleyen aşamada sayının 300 adedi geçeceği öngörülüyor.
    ===========
    ===========
    TLDM = BLOCK 2 : 72 KM
    EXOCET MM40
    (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
    TLDM = NSM Operational Range: NSM 185 km (100 NM)
    ----
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    ----
    SIPRI LCS = DELIVERED : 0 (KONTRAK KOSONG) ......
    SAK 70 MK 3 - DELIVERED = 0
    MICA - DELIVERED = 0
    SHIP ENGINE - DELIVERED = 0
    FIRE CONTROL RADAR - DELIVERED = 0
    AIR CONTROL RADAR - DELIVERED = 0
    ----
    FACT LCS 2025 - 2011 = 15 YEARS
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ----
    The Malonnn Armed Forces (MAF) has faced a number of challenges with missiles, including budgetary constraints, procurement disputes, and technical and logistical issues.
    Budgetary constraints
    • The 1997 Asian financial crisis limited the MAF's ability to purchase weapons.
    • The government's defense modernization budget is limited.
    Procurement disputes
    • The army and air force have disagreed on whether to introduce a mid-range surface-to-air missile system.
    • The government did not endorse a Malonnn private company's agreement to acquire a Chinese medium range air defense missile.
    Technical and logistical issues
    • The MAF has acquired advanced weapon systems from different countries, which can lead to technical and logistical issues.
    • The systems have different technical standards and specifications, which can lead to inefficiencies.
    • The MAF has fleet sustainment problems.
    Other challenges
    • The MAF has faced corruption.
    • Political interference has undermined combat readiness.
    The MAF needs to be flexible and mobile to meet the National Defence Policy objectives

    BalasHapus
  34. PPA Teseo MK2E : 350KM.
    YAKHONT : 300 KM
    EXO BLOCK 3 : 200 KM
    ------------------
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    İlk etapta 45 adet ATMACA gemisavar füzesi, ilgili fırlatıcı üniteleri ve kullanıcı terminallerinin tedarikini kapsayan tedarik sözleşmesi ile Endonezya Donanması, Türkiye'nin geliştirdiği gemisavar füzesinin ilk ihracat müşterisi olacak.
    Güney Asya ülkesi tarafından yapılan ATMACA alımının ilk parti teslimatlarda 45 adet olacağı, ilerleyen aşamada sayının 300 adedi geçeceği öngörülüyor.
    ===========
    ===========
    TLDM = BLOCK 2 : 72 KM
    EXOCET MM40
    (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
    TLDM = NSM Operational Range: NSM 185 km (100 NM)
    ----
    4 UNIT WITH EXO B2 RANGE 70 KM
    LEKIU CLASS 2 UNIT = EXO B2 RANGE 70 KM
    KASTURI CLASS 2 UNIT = EXO B2 RANGE 70 KM
    -----
    READINESS 58.6% X 55 Unit = 32 UNIT
    READINESS 58.6% X 55 Unit = 32 UNIT
    READINESS 58.6% X 55 Unit = 32 UNIT
    This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
    -----
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    ----
    THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
    • Logistics
    A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
    • Budgeting
    Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    • Personnel
    The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
    • Procurement
    The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
    • Political interference
    Political interference and corruption are undermining combat readiness.
    • Territorial disputes
    Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
    • Transboundary haze
    Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
    • Fleet sustainment
    The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
    • Technological obsolescence
    Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
    • Modernization
    The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

    BalasHapus
  35. Malon miskin ngemis hormet bekas 🤣🤣

    BalasHapus
  36. PPA Teseo MK2E : 350KM.
    YAKHONT : 300 KM
    EXO BLOCK 3 : 200 KM
    ------------------
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    İlk etapta 45 adet ATMACA gemisavar füzesi, ilgili fırlatıcı üniteleri ve kullanıcı terminallerinin tedarikini kapsayan tedarik sözleşmesi ile Endonezya Donanması, Türkiye'nin geliştirdiği gemisavar füzesinin ilk ihracat müşterisi olacak.
    Güney Asya ülkesi tarafından yapılan ATMACA alımının ilk parti teslimatlarda 45 adet olacağı, ilerleyen aşamada sayının 300 adedi geçeceği öngörülüyor.
    ===========
    ===========
    TLDM = BLOCK 2 : 72 KM
    EXOCET MM40
    (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
    TLDM = NSM Operational Range: NSM 185 km (100 NM)
    ----
    4 UNIT WITH EXO B2 RANGE 70 KM
    LEKIU CLASS 2 UNIT = EXO B2 RANGE 70 KM
    KASTURI CLASS 2 UNIT = EXO B2 RANGE 70 KM
    -----
    READINESS 58.6% X 55 Unit = 32 UNIT
    READINESS 58.6% X 55 Unit = 32 UNIT
    READINESS 58.6% X 55 Unit = 32 UNIT
    This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
    -----
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    ----
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ----
    The Malonnn Armed Forces (MAF) has faced challenges in modernizing its missile capabilities due to budgetary constraints, political interference, and a lack of modern assets.
    Budgetary constraints
    • The 1997 Asian financial crisis limited the MAF's ability to procure new weapons.
    • Malonn's defense budget is limited, which can affect the pace of acquisitions and upgrades.
    Political interference
    • Political leaders have been accused of interfering in procurement.
    Lack of modern assets
    • The MAF has aging military assets, including most of the navy's fleet and helicopters commissioned in the 1960s.
    • The MAF has experienced issues with the maintenance and spare parts for its aircraft.
    Other challenges the MAF has faced include: Poor planning, Personnel issues, and Critical problems with the PT-91M main battle tank.

    BalasHapus
  37. At our Muggiano shipyard, the renaming ceremony was held for the two✅️MPCS (Multipurpose Combat Ship/PPA) units, built in our integrated Riva Trigoso-Muggiano shipyard. The ceremony was attended by our Chairman Biagio Mazzotta, the General Manager Naval Vessels Division Dario Deste, Admiral Muhammad Ali, Chief of the Indonesian Navy, and Admiral Giuseppe BeruttiBergotto, Deputy Chief of Staff of the Italian Navy.
    ------
    Fincantieri uda sebut secara Ofisial rebranding PPA jadi MPCS( multi purpose combat ship) hore haha!👏👏👏
    jadi djelas yak..kapal ini bukan opv

    $ 1,3 bn uda djelas FULL WEPON haha!🚀🚀🚀
    ✅️143meter kapal Terbesar se Asean
    ✅️radar Fixed Pertama se Asean
    ✅️meriam 127mm/64 terbesar se Asean
    ✅️bridge ter Moderen & Mewah
    makloum TIM ELIT SHOPPING SOPING
    Bajet Besar, apapun yang kita mau tinggal tunjuk..langsung dikirim haha!🤑🤑🤑

    sementara seblah KAHSIYAN warganyet kl(king leasing) NGAMUK🔥

    BalasHapus
  38. 4x ditolak...last last MeWeK haha!🤣🤣🤣

    BalasHapus
  39. 2025 $1.3 BILLION MINDEF =
    MAINTENANCE
    REPAIRS
    ASSETS.
    (LEASE, LEASE AND LEASE)
    -------------
    In 2025, Malonn Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
    This budget included $1.3 billion for maintenance, repairs, and new military assets..
    ------
    2024 RASIO HUTANG 84,2% DARI GDP
    HUTANG 2023 = RM 1.53 TRILLION
    HUTANG 2022 = RM 1.45 TRILLION
    HUTANG 2021 = RM 1.38 TRILLION
    HUTANG 2020 = RM 1.32 TRILLION
    HUTANG 2019 = RM 1.25 TRILLION
    HUTANG 2018 = RM 1.19 TRILLION
    The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023. In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018). “The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
    ==================
    ==================
    1. real contract and delivery five units C130J Hercules
    2. real contract and delivery two unit Frankethal class Countermine vessels (Pulau Fani class)
    3. real contract and delivery four units KCR 60 Fast missiles boats PT PAL
    4. real contract and delivery 9 units Bell 412 EPI
    5. real contract and delivery 8 additional H225 M
    6. real contract and delivery 2 units Bell 429 Global Ranger
    7. real contract and delivery 18 Medium weight tank Harimau
    8. real contract and delivery 22 Pandur II IFV
    9. real contract and delivery two unit Hospital Ships
    10. real contract and delivery one unit Command and control variant C295
    11. real contract and delivery one unit CN235 MPA
    12. real contract and delivery 7 Badak FSV, 26 ANOa apc and 10 additional Komodo recce vehicles in 2022
    13. real contract and delivery 4 AS 550 Fennec and 8 AS565 MBE, in 2024
    14. real contract and delivery five NC212i in 2023
    15. real contract and delivery one Leonardo RAT 31 DL/M
    16. real contract and delivery five C130H ordered from Australia in 2013 (finished in 2020) after received Grant of 4 C130H
    17. real contract and delivery 9 Teluk Bintuni class LST
    18. real contract and delivery six CH4B UCAV ordered in 2019
    19. real contract t and process building of Abeking & Rasmussen design ocean Hydrography ship
    20. real contract and process building two AH140 AAW Frigate
    21. real contract and process building two OPV 90 ASW patrol vessels
    22. real contract and process building 42 Dassault Rafale F4 fighter
    23. real contract and process building two A400M heavy cargo aircraft
    24. real contract and delivery M3 Amphibious bridging system
    25. real contract and delivery 3 KT1 Wong Bee ordered in 2018 along with radar and spares for T/A50
    26. real contract and process building 13 GM 403 GCI radar from Thales
    27. real contract and process building 12 ANKA S UCAV
    28. real contract and process building additional CH4B UCAV
    29. real contract and delivery Slingshot Satcom system
    30. real contract and delivery Falcon 8X aircraft
    31. real contract and process Thales Alenia earth observation satelite
    32. real contract and process 22 S70M Blackhawk
    33. real contract and process 6 N219 aircraft
    34. real contract and process 3 CN235 for Army
    35. real contract and process 2 PPA patrol Frigate
    36. real contract and process 2 Scorpene Subs
    37. real contract and process Khan Short Range ballistic missiles from Turki
    38. real contract and process Trisula Air defense system
    39. real contract and process 6 T50i aircraft
    40. real contract and delivery Oiler and replenishment ship
    41. real contract and delivery several Tug Harbor ships
    42. real contract and process Submarine rescue vessels and system
    43. real contract and delivery two Large LCU for army
    44. real contract and process 45 Atmaca

    BalasHapus
  40. 2025 $1.3 BILLION MINDEF =
    MAINTENANCE
    REPAIRS
    ASSETS.
    (LEASE, LEASE AND LEASE)
    -------------
    In 2025, Malonn Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
    This budget included $1.3 billion for maintenance, repairs, and new military assets...
    =============
    LENDER = MALON SHOPPING
    PUBLIC DEBT MALONN = DEFENCE SPENDING
    PUBLIC DEBT MALONN = DEFENCE SPENDING
    PUBLIC DEBT MALONN = DEFENCE SPENDING
    The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
    ==============
    2024 RASIO HUTANG 84,2% DARI GDP
    “The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
    ==============
    FACT GOVERNMENT ........
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
    Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
    Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
    ==============
    BUDGET 2025 FOR ......
    SALARIES AND OTHER STUFF
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.

    BalasHapus
  41. 2025 $1.3 BILLION MINDEF =
    MAINTENANCE
    REPAIRS
    ASSETS.
    (LEASE, LEASE AND LEASE)
    -------------
    In 2025, Malonn Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
    This budget included $1.3 billion for maintenance, repairs, and new military assets...
    =============
    LENDER = MALON SHOPPING
    PUBLIC DEBT MALONN = DEFENCE SPENDING
    PUBLIC DEBT MALONN = DEFENCE SPENDING
    PUBLIC DEBT MALONN = DEFENCE SPENDING
    The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
    ==============
    2024 RASIO HUTANG 84,2% DARI GDP
    “The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
    ==============
    FACT GOVERNMENT ........
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
    Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
    Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
    ==============
    BUDGET 2025 FOR ......
    SALARIES AND OTHER STUFF
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.

    BalasHapus
  42. 2025 $1.3 BILLION MINDEF =
    MAINTENANCE
    REPAIRS
    ASSETS.
    (LEASE, LEASE AND LEASE)
    -------------
    In 2025, Malonn Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
    This budget included $1.3 billion for maintenance, repairs, and new military assets..
    =============
    The Malonn Armed Forces (MAF) faces a number of challenges, including:
    • Outdated equipment
    Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern assets. For example, the KD Rahman submarine was unable to submerge due to technical issues in 2010.
    • Misappropriation of funds
    There have been multiple instances of public funds being misappropriated under the guise of meeting defense needs.
    • Army-centric mindset
    Malon has an army-centric mindset, even though the country is surrounded by water.
    • Double budgetary allocation
    The army receives more of the budget than the other services.
    • Lack of standard operating procedures
    There are issues with standard operating procedures, from the e-procurement process to inventory receipts.
    • Tension between public and military
    There is tension between the public's right to know and the military's "need-to-know" policies
    =============
    LEASE HELI AW139 : 4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di No.3 Skuadron, Pangkalan Udara Butterworth
    LEASE HELI EC120B : Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE PESAWAT L39 ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE VSHORAD LEASE TRUK
    The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals.
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment
    LEASE BOAT LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE 4x4 Pejabat perusahaan mengatakan kepada Janes di pameran bahwa Angkatan Bersenjata Malon sedang mencari untuk menyewa Tarantula
    LEASE MOTOR The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022.
    =============
    LEASE 28 HELI = 119 HELI BARU :
    LEASE 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL LEASE DARIPADA BELI BARU =
    LEASE 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    LEASEan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa

    BalasHapus
  43. 2025 $1.3 BILLION MINDEF =
    MAINTENANCE
    REPAIRS
    ASSETS.
    (LEASE, LEASE AND LEASE)
    -------------
    In 2025, Malonn Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
    This budget included $1.3 billion for maintenance, repairs, and new military assets.
    .=============
    FACT GOVERNMENT ........
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
    Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
    Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
    ==============
    FACT DEBT 2024 = RATIO 84.2% OF GDP
    DEBT 2023 = RM 1.53 TRILLION
    DEBT 2022 = RM 1.45 TRILLION
    DEBT 2021 = RM 1.38 TRILLION
    DEBT 2020 = RM 1.32 TRILLION
    DEBT 2019 = RM 1.25 TRILLION
    DEBT 2018 = RM 1.19 TRILLION
    The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023.
    In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018).
    “The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
    ==============
    The Malonn Armed Forces (MAF) faces a number of challenges, including:
    • Outdated equipment
    Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern assets. For example, the KD Rahman submarine was unable to submerge due to technical issues in 2010.
    • Misappropriation of funds
    There have been multiple instances of public funds being misappropriated under the guise of meeting defense needs.
    • Army-centric mindset
    Malon has an army-centric mindset, even though the country is surrounded by water.
    • Double budgetary allocation
    The army receives more of the budget than the other services.
    • Lack of standard operating procedures
    There are issues with standard operating procedures, from the e-procurement process to inventory receipts.
    • Tension between public and military
    There is tension between the public's right to know and the military's "need-to-know" policies

    BalasHapus
  44. ATMACA VERSI RENCANA... 👎👎🤣🤣🤣

    TRIBUNNEWS.COM, JAKARTA - Taring TNI semakin runcing jika rencana akuisisi puluhan rudal antikapal buatan Turki, Atmaca, berhasil diwujudkan.

    Januari silam, media militer, Janes, mengabarkan, Indonesia telah mengadakan sebuah kontrak pengadaan rudal Atmaca asal pabrikan Roketsan.

    Tak main-main, rencananya Indonesia akan membeli 45 unit rudal yang dilengkapi modul peluncuran.

    Jika ini terwujud, TNI AL adalah pelanggan pertama dari rudal asal Turki tersebut.

    BalasHapus
    Balasan
    1. PPA Teseo MK2E : 350KM.
      YAKHONT : 300 KM
      EXO BLOCK 3 : 200 KM
      ------------------
      300 ATMACA 45 BATCH 1
      300 ATMACA 45 BATCH 1
      300 ATMACA 45 BATCH 1
      İlk etapta 45 adet ATMACA gemisavar füzesi, ilgili fırlatıcı üniteleri ve kullanıcı terminallerinin tedarikini kapsayan tedarik sözleşmesi ile Endonezya Donanması, Türkiye'nin geliştirdiği gemisavar füzesinin ilk ihracat müşterisi olacak.
      Güney Asya ülkesi tarafından yapılan ATMACA alımının ilk parti teslimatlarda 45 adet olacağı, ilerleyen aşamada sayının 300 adedi geçeceği öngörülüyor.
      ===========
      ===========
      TLDM = BLOCK 2 : 72 KM
      EXOCET MM40
      (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
      TLDM = NSM Operational Range: NSM 185 km (100 NM)
      ----
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      ----
      SIPRI LCS = DELIVERED : 0 (KONTRAK KOSONG) ......
      SAK 70 MK 3 - DELIVERED = 0
      MICA - DELIVERED = 0
      SHIP ENGINE - DELIVERED = 0
      FIRE CONTROL RADAR - DELIVERED = 0
      AIR CONTROL RADAR - DELIVERED = 0
      ----
      FACT LCS 2025 - 2011 = 15 YEARS
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ----
      The Malonnn Armed Forces (MAF) has faced a number of challenges with missiles, including budgetary constraints, procurement disputes, and technical and logistical issues.
      Budgetary constraints
      • The 1997 Asian financial crisis limited the MAF's ability to purchase weapons.
      • The government's defense modernization budget is limited.
      Procurement disputes
      • The army and air force have disagreed on whether to introduce a mid-range surface-to-air missile system.
      • The government did not endorse a Malonnn private company's agreement to acquire a Chinese medium range air defense missile.
      Technical and logistical issues
      • The MAF has acquired advanced weapon systems from different countries, which can lead to technical and logistical issues.
      • The systems have different technical standards and specifications, which can lead to inefficiencies.
      • The MAF has fleet sustainment problems.
      Other challenges
      • The MAF has faced corruption.
      • Political interference has undermined combat readiness.
      The MAF needs to be flexible and mobile to meet the National Defence Policy objectives

      Hapus
    2. LCS = FFBNW STALLED 15 YEARS
      LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT ]
      • USD 948 JUTA (WITHOUT AMMO) = FFBNW = DELAYED
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      -------------
      LMS B2 = FFBNW DOWNGRADE HISAR OPV NO ASW
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -------------
      KEDAH = FFBNW NO MISSILE SINCE 2025=2009 : 17 YAERS GUNBOAT
      In June 2006, after a total of 18 months of delays, the Royal Malaysian Navy commissioned KD Kedah, followed by a second hull, KD Pahang in August of the same year, and a third hull, KD Perak on 12 November 2007. By July 2009, six vessels had been launched.
      -------------
      LMS B1 = GUNBOAT NO MISSILE
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      =============
      The Malonnn Armed Forces' (MAF) Littoral Combat Ships (LCS) have faced several issues, including delays, design flaws, and a lack of air and surface warfare capabilities.
      Delays
      • The first LCS was delayed by six years, from its scheduled delivery date.
      • The LCS program has been plagued by delays due to a number of factors.
      Design flaws
      • The LCS hull, or sea frame, had issues with cracking.
      • The propulsion plant design had issues from the start.
      • Some mission module components were immature.
      Lack of air and surface warfare capabilities
      • Some say the LCS lacks significant air and surface warfare capabilities.
      Other issues
      • The LCS has faced issues with survivability in contested waters.
      • The LCS has had limited flight deck and berthing space.
      • The LCS has had command and control limitations.
      • The LCS program has been plagued by allegations of corruption and political interference.
      The MAF has also faced other challenges, including underfunding and an aging fleet.
      =============
      The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
      Funding
      • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
      • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      Aging equipment
      • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
      • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
      • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
      Other challenges
      Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism

      Hapus
    3. CN235 MSA VERSI SEDEKAH MSI USA
      The program to convert the CN-235 transport aircraft to MSA variants was financed by the US Government under its Indo-Pacific Maritime Security Initiative (MSI) Program, which aims to improve the maritime surveillance capabilities of partner nations.PTDI worked in cooperation with the US company Integrated Surveillance and Defence Inc. (ISD), which supplied and integrated the Mission Management System (MMS) for the three aircraft.
      ----
      A400M
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      Malon membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan pembayaran berperingkat.
      ----
      FA50M SAWIT
      On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
      ----
      SCORPENE SAWIT
      Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
      ----
      PT91 SAWIT KARET
      Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
      ----
      ANKA = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      =========
      The Malonn Armed Forces (MAF) faces challenges in its defense industry, including a lack of indigenous capabilities, budget constraints, and a lack of government guidance.
      Lack of indigenous capabilities
      • Malonn imports most of its major defense assets from overseas.
      • Local companies lack the ability to design, manufacture, and develop technologically advanced defense systems.
      • Local companies lack the ability to innovate and commercialize products or processes.
      Budget constraints
      • The government prioritizes social and economic recovery over military development.
      • The pandemic, leakage of funds, and political uncertainty have limited defense spending.
      Lack of government guidance
      • The government lacks clear guidance for the future strategic direction of the industry.
      • The government lacks strategic patience and vision to groom and guide the industry.
      Other challenges
      • A lack of sufficient human talents, especially STEM specialists.
      • A lack of local industry engagement at the outset of capability and procurement planning.
      • Poor program management and oversight.
      Reluctance of Original Equipment Manufacturers (OEMs) to share their technology.

      Hapus
  45. PPA Teseo MK2E : 350KM.
    YAKHONT : 300 KM
    EXO BLOCK 3 : 200 KM
    ------------------
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    İlk etapta 45 adet ATMACA gemisavar füzesi, ilgili fırlatıcı üniteleri ve kullanıcı terminallerinin tedarikini kapsayan tedarik sözleşmesi ile Endonezya Donanması, Türkiye'nin geliştirdiği gemisavar füzesinin ilk ihracat müşterisi olacak.
    Güney Asya ülkesi tarafından yapılan ATMACA alımının ilk parti teslimatlarda 45 adet olacağı, ilerleyen aşamada sayının 300 adedi geçeceği öngörülüyor.
    ===========
    ===========
    TLDM = BLOCK 2 : 72 KM
    EXOCET MM40
    (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
    TLDM = NSM Operational Range: NSM 185 km (100 NM)
    ----
    4 UNIT WITH EXO B2 RANGE 70 KM
    LEKIU CLASS 2 UNIT = EXO B2 RANGE 70 KM
    KASTURI CLASS 2 UNIT = EXO B2 RANGE 70 KM
    -----
    READINESS 58.6% X 55 Unit = 32 UNIT
    READINESS 58.6% X 55 Unit = 32 UNIT
    READINESS 58.6% X 55 Unit = 32 UNIT
    This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
    -----
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    ----
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ----
    The Malonnn Armed Forces (MAF) has faced challenges in modernizing its missile capabilities due to budgetary constraints, political interference, and a lack of modern assets.
    Budgetary constraints
    • The 1997 Asian financial crisis limited the MAF's ability to procure new weapons.
    • Malonn's defense budget is limited, which can affect the pace of acquisitions and upgrades.
    Political interference
    • Political leaders have been accused of interfering in procurement.
    Lack of modern assets
    • The MAF has aging military assets, including most of the navy's fleet and helicopters commissioned in the 1960s.
    • The MAF has experienced issues with the maintenance and spare parts for its aircraft.
    Other challenges the MAF has faced include: Poor planning, Personnel issues, and Critical problems with the PT-91M main battle tank.

    BalasHapus
  46. PPA Teseo MK2E : 350KM.
    YAKHONT : 300 KM
    EXO BLOCK 3 : 200 KM
    ------------------
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    İlk etapta 45 adet ATMACA gemisavar füzesi, ilgili fırlatıcı üniteleri ve kullanıcı terminallerinin tedarikini kapsayan tedarik sözleşmesi ile Endonezya Donanması, Türkiye'nin geliştirdiği gemisavar füzesinin ilk ihracat müşterisi olacak.
    Güney Asya ülkesi tarafından yapılan ATMACA alımının ilk parti teslimatlarda 45 adet olacağı, ilerleyen aşamada sayının 300 adedi geçeceği öngörülüyor.
    ===========
    ===========
    TLDM = BLOCK 2 : 72 KM
    EXOCET MM40
    (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
    TLDM = NSM Operational Range: NSM 185 km (100 NM)
    ----
    4 UNIT WITH EXO B2 RANGE 70 KM
    LEKIU CLASS 2 UNIT = EXO B2 RANGE 70 KM
    KASTURI CLASS 2 UNIT = EXO B2 RANGE 70 KM
    -----
    READINESS 58.6% X 55 Unit = 32 UNIT
    READINESS 58.6% X 55 Unit = 32 UNIT
    READINESS 58.6% X 55 Unit = 32 UNIT
    This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
    -----
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    ----
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ----
    The Malonnn Armed Forces (MAF) has faced challenges in modernizing its missile capabilities due to budgetary constraints, political interference, and a lack of modern assets.
    Budgetary constraints
    • The 1997 Asian financial crisis limited the MAF's ability to procure new weapons.
    • Malonn's defense budget is limited, which can affect the pace of acquisitions and upgrades.
    Political interference
    • Political leaders have been accused of interfering in procurement.
    Lack of modern assets
    • The MAF has aging military assets, including most of the navy's fleet and helicopters commissioned in the 1960s.
    • The MAF has experienced issues with the maintenance and spare parts for its aircraft.
    Other challenges the MAF has faced include: Poor planning, Personnel issues, and Critical problems with the PT-91M main battle tank.

    BalasHapus
  47. LCS = FFBNW STALLED 15 YEARS
    LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT ]
    • USD 948 JUTA (WITHOUT AMMO) = FFBNW = DELAYED
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    -------------
    LMS B2 = FFBNW DOWNGRADE HISAR OPV NO ASW
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -------------
    KEDAH = FFBNW NO MISSILE SINCE 2025=2009 : 17 YAERS GUNBOAT
    In June 2006, after a total of 18 months of delays, the Royal Malaysian Navy commissioned KD Kedah, followed by a second hull, KD Pahang in August of the same year, and a third hull, KD Perak on 12 November 2007. By July 2009, six vessels had been launched.
    -------------
    LMS B1 = GUNBOAT NO MISSILE
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    =============
    NO CONTRACT ATMACA
    While the Malonnn Navy continues to work on the choice of the anti-ship missile system of LMS, Naval News has learned that the Atmaca missile, developed by Roketsan, has emerged as a leading contender.
    -----
    PRANK KS-1A CHINA
    PRANK KS-1A CHINA
    PRANK KS-1A CHINA
    Malonn has agreed in principle to purchase medium-range missiles from China, which in return will transfer technology on very short-range air defence to the country, Deputy Prime Minister Najib Razak said Tuesday.
    The procurement of the surface-to-air missiles was part of the armed forces modernisation program and would be made under the Ninth Malonn Plan from 2006-2009, he was quoted as saying by Bernama news agency.
    CNPMIEC president Wang Bingyan said China had also offered to conclude the KS-1A transaction on flexible payment terms, including counter-trade, barter and deferred payments.
    ------
    VSHORAD = LEASE
    VSHORAD = LEASE
    VSHORAD = LEASE
    The procurement division of the Defence Ministry has issued a tender for the supply, delivery, and commissioning for eight Very Short-Range Air Defence (VSHORAD) ground-based air defence system for the Army. The VSHORAD system is listed as the Army’s main asset and equipment for 2024.
    The 23-day tender published on November 20 closes on December 19. As usual the public specifications for the tender are limited.
    ------
    Malonn armed forces face challenges due to limited funding, which has led to an aging equipment inventory and gaps in military capability.
    Limited funding
    Small procurement budgets
    The military budget has remained small as a percentage of GDP, and governments have been unwilling to cut spending elsewhere
    Postponed purchases
    The global financial crisis has forced the Malonn Armed Forces (MAF) to postpone large purchases
    Aging equipment
    Outdated inventory
    The MAF's equipment is aging due to small procurement budgets and a lack of investment in maintenance and repair
    Withdrawal of aircraft
    The MAF withdrew its MiG-29 Fulcrum fighter aircraft in 2017, and is struggling to keep its Su-30MKM Flanker fighter operational
    Other challenges
    Procurement system: The procurement system needs reform, and there are delays in the delivery of new equipment
    Corruption: There are weaknesses in anti-corruption standards and reporting, and political connections can influence promotion decisions
    Oversight: There is little effective oversight of the defense sector

    BalasHapus
  48. 3 CN235 MSA VERSI MSI USA
    3 CN235 MSA VERSI MSI USA
    3 CN235 MSA VERSI MSI USA
    The program to convert the CN-235 transport aircraft to MSA variants was financed by the US Government under its Indo-Pacific Maritime Security Initiative (MSI) Program, which aims to improve the maritime surveillance capabilities of partner nations.PTDI worked in cooperation with the US company Integrated Surveillance and Defence Inc. (ISD), which supplied and integrated the Mission Management System (MMS) for the three aircraft.
    ==============
    3 B200T MSA RETIRED
    RMAF is to retire its three remaining Beechcraft Super King B200T maritime air surveillance (MSA) in the immediate future, its chief Gen Ackbal Abdul Samad said in his speech on the 63rd anniversary of the service.
    ==============
    CHEAPEST VARIANT
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    ==============
    HARGA 1 PPA = HARGA 3 LMS B2
    -
    PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
    -
    LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    ==============
    LMS B2 = DOWNGRADE MILGEM VARIANT
    LMS B2 = DOWNGRADE MILGEM VARIANT
    LMS B2 = DOWNGRADE MILGEM VARIANT
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    ==============
    FA50 CHEAPEST VARIANT
    FA50 CHEAPEST VARIANT
    FA50 CHEAPEST VARIANT
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    ==============
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness.
    ==============
    KEY WORDS =
    1. LMS B2 = DOWNGRADE MILGEM VARIANT
    2. MPA = CHEAPEST VARIANT
    3. FA 50 = CHEAPEST VARIANT

    BalasHapus
  49. 3 CN235 MSA VERSI MSI USA
    3 CN235 MSA VERSI MSI USA
    3 CN235 MSA VERSI MSI USA
    The program to convert the CN-235 transport aircraft to MSA variants was financed by the US Government under its Indo-Pacific Maritime Security Initiative (MSI) Program, which aims to improve the maritime surveillance capabilities of partner nations.PTDI worked in cooperation with the US company Integrated Surveillance and Defence Inc. (ISD), which supplied and integrated the Mission Management System (MMS) for the three aircraft.
    ==============
    3 B200T MSA RETIRED
    RMAF is to retire its three remaining Beechcraft Super King B200T maritime air surveillance (MSA) in the immediate future, its chief Gen Ackbal Abdul Samad said in his speech on the 63rd anniversary of the service.
    ==============
    CHEAPEST VARIANT
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    ==============
    HARGA 1 PPA = HARGA 3 LMS B2
    -
    PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
    -
    LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    ==============
    LMS B2 = DOWNGRADE MILGEM VARIANT
    LMS B2 = DOWNGRADE MILGEM VARIANT
    LMS B2 = DOWNGRADE MILGEM VARIANT
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    ==============
    FA50 CHEAPEST VARIANT
    FA50 CHEAPEST VARIANT
    FA50 CHEAPEST VARIANT
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    ==============
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness.
    ==============
    KEY WORDS =
    1. LMS B2 = DOWNGRADE MILGEM VARIANT
    2. MPA = CHEAPEST VARIANT
    3. FA 50 = CHEAPEST VARIANT

    BalasHapus
  50. CN235 MSA VERSI SEDEKAH MSI USA
    The program to convert the CN-235 transport aircraft to MSA variants was financed by the US Government under its Indo-Pacific Maritime Security Initiative (MSI) Program, which aims to improve the maritime surveillance capabilities of partner nations.PTDI worked in cooperation with the US company Integrated Surveillance and Defence Inc. (ISD), which supplied and integrated the Mission Management System (MMS) for the three aircraft.
    ----
    A400M
    PEMBAYARAN BERPERINGKAT = HUTANG
    PEMBAYARAN BERPERINGKAT = HUTANG
    PEMBAYARAN BERPERINGKAT = HUTANG
    Malon membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan pembayaran berperingkat.
    ----
    FA50M SAWIT
    On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
    ----
    SCORPENE SAWIT
    Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
    ----
    PT91 SAWIT KARET
    Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
    ----
    ANKA = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
    =========
    17 CREDITOR LCS
    17 CREDITOR LCS
    17 CREDITOR LCS
    1. MTU Services Ingat Kawan (M) Sdn Bhd
    2. include Contraves Sdn Bhd
    3. Axima Concept SA
    4. Contraves Advanced Devices Sdn Bhd
    5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
    6. Security & Services Malon Sdn Bhd,
    7. iXblue SAS
    8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
    9. Bank Pembangunan Malon Bhd
    10. AmBank Islamic Bhd
    11. AmBank (M) Bhd
    12. Affin Hwang Investment Bank Bhd
    13. Bank Muamalat Malon Bhd
    14. Affin Bank Bhd
    15. Bank Kerjasama Rakyat Malon Bhd
    16. Malayan Banking Bhd (Maybank)
    17. KUWAIT FINANCE HOUSE (MALON) BHD.
    =========
    Malonn defense budget has been increasing in recent years, but it is still relatively low compared to its neighbors. The budget is allocated to the Ministry of Defense (MINDEF).
    2025 defense budget
    • The 2025 defense budget was $4.8 billion, a 7.08% increase from 2024
    • The budget included $1.3 billion for maintenance and repair, and the procurement of new military assets
    • The budget also included an increase in maritime assets, such as patrol vessels and multi-purpose mission ships
    2024 defense budget
    • The 2024 defense budget was $4.3 billion
    • The budget included $1.7 billion for salaries and allowances, and $1.2 billion for procurement
    Factors affecting defense budget
    • Regional security challenges: Malonn is becoming more aware of regional security threats, such as disputes with neighboring nations
    • Need to upgrade the military: Malonn wants to modernize its armed forces
    • Economic limitations: Malonn has faced delays and cancellations of military modernization initiatives due to economic limitations
    Comparison to neighboring countries
    • Malonn defense spending is lower than many regional powers, such as Singapore, Vietnam and Indonesia

    BalasHapus
  51. CN235 MSA VERSI SEDEKAH MSI USA
    The program to convert the CN-235 transport aircraft to MSA variants was financed by the US Government under its Indo-Pacific Maritime Security Initiative (MSI) Program, which aims to improve the maritime surveillance capabilities of partner nations.PTDI worked in cooperation with the US company Integrated Surveillance and Defence Inc. (ISD), which supplied and integrated the Mission Management System (MMS) for the three aircraft.
    ----
    A400M
    PEMBAYARAN BERPERINGKAT = HUTANG
    PEMBAYARAN BERPERINGKAT = HUTANG
    PEMBAYARAN BERPERINGKAT = HUTANG
    Malon membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan pembayaran berperingkat.
    ----
    FA50M SAWIT
    On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
    ----
    SCORPENE SAWIT
    Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
    ----
    PT91 SAWIT KARET
    Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
    ----
    ANKA = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
    =========
    17 CREDITOR LCS
    17 CREDITOR LCS
    17 CREDITOR LCS
    1. MTU Services Ingat Kawan (M) Sdn Bhd
    2. include Contraves Sdn Bhd
    3. Axima Concept SA
    4. Contraves Advanced Devices Sdn Bhd
    5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
    6. Security & Services Malon Sdn Bhd,
    7. iXblue SAS
    8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
    9. Bank Pembangunan Malon Bhd
    10. AmBank Islamic Bhd
    11. AmBank (M) Bhd
    12. Affin Hwang Investment Bank Bhd
    13. Bank Muamalat Malon Bhd
    14. Affin Bank Bhd
    15. Bank Kerjasama Rakyat Malon Bhd
    16. Malayan Banking Bhd (Maybank)
    17. KUWAIT FINANCE HOUSE (MALON) BHD.
    =========
    The Malonnn Armed Forces (MAF) has a lack of modern military assets due to a small defense budget and aging equipment. This has left the MAF vulnerable to internal and external threats.
    Causes
    • Small defense budget: The MAF has had small procurement budgets for the past quarter-century.
    • Aging equipment: Most of the MAF's equipment was purchased between the 1970s and 1990s.
    • Foreign dependence: The MAF relies on foreign Original Equipment Manufacturers (OEMs) for its military hardware and software.
    Effects
    • Vulnerability to threats
    The MAF is vulnerable to internal and external threats due to its lack of modern military assets.
    • Challenges with air force
    The MAF's air force has been challenged by the withdrawal of its MiG-29 Fulcrum fighter aircraft in 2017.
    • Challenges with naval assets
    The MAF's naval assets are aging, as evidenced by the KD Rahman submarine issue in 2010.

    BalasHapus
  52. https://nasional.kompas.com/read/2025/01/31/12120361/kemenhan-laksanakan-penghematan-anggaran-tapi-belanja-alutsista-tetap-jalan?utm_source=Various&utm_medium=Referral&utm_campaign=Top_Mobile
    ________
    SHOPING tetap jalan ya geeessss, beda malaydesh budget TERSIKIT SEKAWASAN cukup SEWA saja 😅🤣😂🤣😅🤣

    BalasHapus
  53. NO CONTRACT ATMACA
    While the Malonnn Navy continues to work on the choice of the anti-ship missile system of LMS, Naval News has learned that the Atmaca missile, developed by Roketsan, has emerged as a leading contender.
    -----
    PRANK KS-1A CHINA
    PRANK KS-1A CHINA
    PRANK KS-1A CHINA
    Malonn has agreed in principle to purchase medium-range missiles from China, which in return will transfer technology on very short-range air defence to the country, Deputy Prime Minister Najib Razak said Tuesday.
    The procurement of the surface-to-air missiles was part of the armed forces modernisation program and would be made under the Ninth Malonn Plan from 2006-2009, he was quoted as saying by Bernama news agency.
    CNPMIEC president Wang Bingyan said China had also offered to conclude the KS-1A transaction on flexible payment terms, including counter-trade, barter and deferred payments.
    ------
    VSHORAD = LEASE
    VSHORAD = LEASE
    VSHORAD = LEASE
    The procurement division of the Defence Ministry has issued a tender for the supply, delivery, and commissioning for eight Very Short-Range Air Defence (VSHORAD) ground-based air defence system for the Army. The VSHORAD system is listed as the Army’s main asset and equipment for 2024.
    The 23-day tender published on November 20 closes on December 19. As usual the public specifications for the tender are limited.
    ------
    DOWNGRADE NO SONAR = NO ASW
    DOWNGRADE NO SONAR = NO ASW
    DOWNGRADE NO SONAR = NO ASW
    STM, in its role as main contractor, will turn to the Turkish defence sector for such equipment as the Combat Management System; the Gun Fire Control System, to be supplied by HAVELSAN; and the 3D Search Radar, Fire Control Radar, IFF, 30mm Gun, ESM and Chaff Decoy System, as well as other electronic sensors, to be supplied by ASELSAN. ROKETSAN will be supplying its ATMACA Surface-to-Surface G/M System.
    ------
    Malonn armed forces face challenges due to limited funding, which has led to an aging equipment inventory and gaps in military capability.
    Limited funding
    Small procurement budgets
    The military budget has remained small as a percentage of GDP, and governments have been unwilling to cut spending elsewhere
    Postponed purchases
    The global financial crisis has forced the Malonn Armed Forces (MAF) to postpone large purchases
    Aging equipment
    Outdated inventory
    The MAF's equipment is aging due to small procurement budgets and a lack of investment in maintenance and repair
    Withdrawal of aircraft
    The MAF withdrew its MiG-29 Fulcrum fighter aircraft in 2017, and is struggling to keep its Su-30MKM Flanker fighter operational
    Other challenges
    Procurement system: The procurement system needs reform, and there are delays in the delivery of new equipment
    Corruption: There are weaknesses in anti-corruption standards and reporting, and political connections can influence promotion decisions
    Oversight: There is little effective oversight of the defense sector
    ========
    The Malonnn Armed Forces (MAF) has many outdated assets, including ships, helicopters, and spare parts. The MAF has acknowledged the need to replace these assets.
    Ships
    • The Royal Malonnn Navy's (RMN) Fast Attack Craft (FAC) is over 50 years old
    • The RMN has many vessels that are past their optimal lifespan
    • The RMN's age limit for submarines is 35 years, and 30 years for frigates, corvettes, and other ships
    • The RMN's smaller vessels, like fast patrol boats, have an age limit of 24 years
    Helicopters
    • Some helicopters in the MAF were commissioned in the 1960s
    Spare parts
    • The MAF has lost money due to spare parts that are no longer compatible with its fleet

    BalasHapus
  54. ada yg NGAMUK🔥 TIMFUKIN FISANKKK haha!🍌🍌🍌

    BalasHapus
  55. INDONESIA = NOMOR 1
    INDONESIA = NOMOR 1
    (DEFENCE SECURITY ASIA) – In late January this year, Indonesia reportedly awarded a contract to its local company, PT Republik Defensindo, to acquire 45 “ATMACA” missiles from ROKETSAN of Turkey. — DSA
    -----
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    300 ATMACA 45 BATCH 1
    İlk etapta 45 adet ATMACA gemisavar füzesi, ilgili fırlatıcı üniteleri ve kullanıcı terminallerinin tedarikini kapsayan tedarik sözleşmesi ile Endonezya Donanması, Türkiye'nin geliştirdiği gemisavar füzesinin ilk ihracat müşterisi olacak.
    Güney Asya ülkesi tarafından yapılan ATMACA alımının ilk parti teslimatlarda 45 adet olacağı, ilerleyen aşamada sayının 300 adedi geçeceği öngörülüyor
    -----
    PPA Teseo MK2E : 350KM.
    YAKHONT : 300 KM
    EXO BLOCK 3 : 200 KM
    ===========
    ===========
    ATMACA = MALON NOMOR 2
    ATMACA = MALON NOMOR 2
    ATMACA = MALON NOMOR 2
    (DEFENCE SECURITY ASIA) – Malaysia has become the second Southeast Asian nation to adopt the “ATMACA” anti-ship missile, through the acquisition of three Littoral Mission Ships (LMS) Batch 2 for the Royal Malaysian Navy (RMN), which will be constructed by the Turkish company Savunma Teknolojieri Muhendiskil (STM).
    -----
    TLDM = BLOCK 2 : 72 KM
    EXOCET MM40
    (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
    TLDM = NSM Operational Range: NSM 185 km (100 NM)
    ----
    4 UNIT WITH EXO B2 RANGE 70 KM
    LEKIU CLASS 2 UNIT = EXO B2 RANGE 70 KM
    KASTURI CLASS 2 UNIT = EXO B2 RANGE 70 KM
    -----
    VSHORAD = LEASE
    VSHORAD = LEASE
    VSHORAD = LEASE
    The indicative cost for the eight VSHORAD system is RM150 million. It is therefore unclear whether the VSHORAD system is meant for the four Starstreak carrier vehicles or Kenderaan Pembawa Misil Starstreak (KPMS) which tender was published last August.
    ------
    PRANK KS-1A
    PRANK KS-1A
    PRANK KS-1A
    Malonn has agreed in principle to purchase medium-range missiles from China, which in return will transfer technology on very short-range air defence to the country, Deputy Prime Minister Najib Razak said Tuesday.
    The procurement of the surface-to-air missiles was part of the armed forces modernisation program and would be made under the Ninth Malonn Plan from 2006-2009, he was quoted as saying by Bernama news agency.
    This includes provisions for special test facilities, tools, manufacturing process document, training and technical support.
    CNPMIEC president Wang Bingyan said China had also offered to conclude the KS-1A transaction on flexible payment terms, including counter-trade, barter and deferred payments.

    BalasHapus
  56. Lokasi tiga kapal induk Jepang tengelam.🤔
    Semua secara langsung atau tidak langsung karena torpedo. Dua kapal selam USN dinyatakan dapat "kill" buat aksi tersebut.

    BalasHapus