02 Juli 2025

Korps Marinir Juga Pelajari Kendaraan Amfibi China di Stand Norinco Saat Indo Defence 2025

02 Juli 2025

Kendaraan pendarat amfibi AWAV 8x8 buatan Chaiseri, Thailand yang digunakan oleh Royal Thai Marines Corps (photo: Korps Marinir)

WadanKormar Melaksanakan Courtesy Call Dengan Vice Admiral Commandant of Royal Thai Marine Corps

Dispen Kormar TNI Angkatan Laut (Jakarta). Wakil Komandan Korps Marinir (Wadankormar) Brigadir Jenderal TNI (Mar) Muhammad Nadir, M.Tr.Opsla. mewakili Komandan Korps Marinir (Dankormar) Mayor Jenderal TNI (Mar) Dr. Endi Supardi, S.E., M.M., M.Tr.Opsla., CHRMP., CRMPR. melaksanakan Courtesy Call dengan Vice Admiral Apichat Sapprasert Commandant Of Royal Thai Marine Corps bertempat di Paviion Countries Thailand Indo Defence 2024 Exspo & Forum JIExspo Kemayoran, Jakarta Utara. Rabu (06/11/2025).

Dalam pertemuan singkat namun penuh kehangatan disele-sela kegiatan Indo Defence 2024 Exspo & Forum_tersebut, Wakil Komandan Korps Marinir melaksanakan Courtesy Call  dengan Vice Admiral Apichat Sapprasert  yang diterima langsung di Paviion Countries Thailand Indo Defence 2024 Exspo & Forum.

Kendaraan pendarat amfibi roda rantai VN-16 buatan Norinco, China yang juga digunakan oleh Royal Thai Marines Corps (photo: Korps Marinir)

Dalam Kesempatan Ini, Orang nomor 2 di Korps Marinir TNI Angkatan Laut ini memiliki tujuan untuk menjalin Komunikasi dalam peran peningkatan hubungan kerjasama dibidang latihan, Alutsista Marinir kedua negara guna menghadapi tantangan perkembangan teknologi Pasukan Marinir Angkatan Laut yang akan dihadapi kedua negara.

Pavilion China
Usai Giat Courtesy Call Wadan Kormar berkesempatan mengunjungi ke Beberapa Paviion Countries Perusahaan Pertahanan Indonesia dan Paviion Negara Sahabat peserta Indo Defence 2024 Esxpo & Forum.

Turut Hadir dalam kegiatan tersebut Asisten Perencanaan dan Anggaran Komandan Korps Marinir (Asrena Dankormar) Kolonel Marinir Wahyudi Saputra, S.E., M.M., Asisten Komunikasi dan Elektronika (Askomlek Dankormar) Kolonel Marinir Didiet Hendra Wijaya, M.Mp. dan Kepala Sekretariat Umum Korps Marinir (Kasetum Kormar) Letkol Marinir Iwan Permana.

79 komentar:

  1. POLANDIA ANGGOTA NATO =
    FA50PL = NO AMRAAMs
    FA50PL = KESULITAN IZIN SISTEM
    FA50PL = KESULITAN. LISENSI KOMPONEN
    Tanggal pengiriman awal yang ambisius pada tahun 2025 kemungkinan akan mundur paling cepat ke tahun 2027. Alasan di balik keterlambatan pengiriman tersebut ternyata bukan dari kemampuan produksi KAI, melainkan terkait izin atas lisensi komponen dan sistem.
    Pada tahap pengembangan varian FA-50PL (FA-50 Block 20), pihak-pihak terkait, yakni Badan Persenjataan Polandia, KAI, dan Lockheed Martin, harus menyelesaikan jalur hukum yang rumit untuk mendapatkan akses ke komponen yang dipatenkan guna mengintegrasikan senjata dan sistem kemampuan bertahan yang diinginkan.
    Sejauh negosiasi berlangsung, masalah utama yang tersisa adalah kurangnya perjanjian ekspor untuk GPS dan sistem persenjataan dari AS, yang membuat program tersebut berada dalam ketidakpastian. Selain itu, dilaporkan bahwa KAI masih menunggu izin dari Washington untuk mengintegrasikan rudal udara-ke-udara AIM-120 AMRAAM untuk FA-50PL.
    -------------
    1.RASIO HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1,63 TRLLIUN
    3. HUTANG 1MDB RM 18,2 BILLION
    4. TUNGGAKAN SEWA SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. SEWA SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. SEWA MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED SEWA BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. SEWA MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. SEWA VVSHORAD
    35. SEWA TRUK 3 TON
    36. 4X4 SEWA 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. SEWA BLACKHAWK SEWA AW159
    41. NO TRACKED SPH
    42. SEWA SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. SEWA AW139 SEWA COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED SEWA PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST VSHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. MKM BARTER PALM OIL
    62. MIG29N BARTER PALM OIL
    63. A400M PEMBAYARAN BERPERINGKAT (HUTANG)
    64. SCORPENE BARTER PALM OIL
    65. PT91M BARTER PALM OIL RUBBER
    67. FA50M BARTER PALM OIL
    ===================
    SEWA MALONDESH SEWA
    1. SEWA 28 HELI
    2. SEWA L39 ITCC
    3. SEWA EC120B
    4. SEWA FLIGHT SIMULATION TRAINING DEVICE (FSTD)
    5. SEWA 1 UNIT SISTEM SIMULATOR EC120B
    6. SEWA HOVERCRAFT
    7. SEWA AW139
    8. SEWA FAST INTERCEPTOR BOAT (FIB)
    9. SEWA UTILITY BOAT
    10. SEWA RIGID HULL FENDER BOAT (RHFB)
    11. SEWA ROVER FIBER GLASS (ROVER)
    12. SEWA MV AISHAH AIM 4
    13. SEWA BMW R1250RT
    14. SEWA 4x4 VECHICLE
    15. SEWA VSHORAD
    16. SEWA TRUCK
    17. SEWA HONDA CIVIC
    18. SEWA PATROL BOATS
    19. SEWA OUTBOARD MOTORS
    20. SEWA TRAILERS
    21. SEWA SUPERBIKES
    22. SEWA SIMULATOR MKM
    23. TUDM SEWA 12 AW149
    24. TUDM SEWA 4 AW139
    25. TUDM SEWA 5 EC120B
    26. TLDM SEWA 2 AW159
    27. TDM SEWA 4 UH-60A
    28. TDM SEWA 12 AW149
    29. BOMBA SEWA 4 AW139
    30. MMEA SEWA 2 AW159
    31. POLIS SEWA 7 BELL429
    32. SEWA MOTOR POLIS
    ==========
    POLANDIA NATO (North Atlantic Treaty Organization) = KESULITAN AMRAAMs USA
    MALONDESH NATO (Not Action Talk ONLY) = DOWNGRADE BARTER SAWIT

    BalasHapus
  2. POLANDIA ANGGOTA NATO =
    FA50PL = NO AMRAAMs
    FA50PL = KESULITAN IZIN SISTEM
    FA50PL = KESULITAN. LISENSI KOMPONEN
    Tanggal pengiriman awal yang ambisius pada tahun 2025 kemungkinan akan mundur paling cepat ke tahun 2027. Alasan di balik keterlambatan pengiriman tersebut ternyata bukan dari kemampuan produksi KAI, melainkan terkait izin atas lisensi komponen dan sistem.
    Pada tahap pengembangan varian FA-50PL (FA-50 Block 20), pihak-pihak terkait, yakni Badan Persenjataan Polandia, KAI, dan Lockheed Martin, harus menyelesaikan jalur hukum yang rumit untuk mendapatkan akses ke komponen yang dipatenkan guna mengintegrasikan senjata dan sistem kemampuan bertahan yang diinginkan.
    Sejauh negosiasi berlangsung, masalah utama yang tersisa adalah kurangnya perjanjian ekspor untuk GPS dan sistem persenjataan dari AS, yang membuat program tersebut berada dalam ketidakpastian. Selain itu, dilaporkan bahwa KAI masih menunggu izin dari Washington untuk mengintegrasikan rudal udara-ke-udara AIM-120 AMRAAM untuk FA-50PL.
    Meskipun kesepakatan baru-baru ini yang menandakan perluasan kemitraan strategis antara KAI dan Lockheed Martin ditandatangani di Paris minggu ini, subjek FA-50 PL tidak disebutkan. Penundaan pengiriman gelombang pertama jet tersebut kemungkinan besar akan melampaui 18 bulan, yang mendorong tanggal pengiriman awal hingga pertengaha
    ==============
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    SEWAan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.MALONDESH (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALONDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja MALONDESH.
    -------------------------------------
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in MALONDESH service, and will NOt be equipped with any weaponry.
    ==========
    POLANDIA NATO (North Atlantic Treaty Organization) = KESULITAN AMRAAMs USA
    MALONDESH NATO (Not Action Talk ONLY) = DOWNGRADE BARTER SAWIT

    BalasHapus
  3. POLANDIA ANGGOTA NATO =
    FA50PL = NO AMRAAMs
    FA50PL = KESULITAN IZIN SISTEM
    FA50PL = KESULITAN. LISENSI KOMPONEN
    Tanggal pengiriman awal yang ambisius pada tahun 2025 kemungkinan akan mundur paling cepat ke tahun 2027. Alasan di balik keterlambatan pengiriman tersebut ternyata bukan dari kemampuan produksi KAI, melainkan terkait izin atas lisensi komponen dan sistem.
    Pada tahap pengembangan varian FA-50PL (FA-50 Block 20), pihak-pihak terkait, yakni Badan Persenjataan Polandia, KAI, dan Lockheed Martin, harus menyelesaikan jalur hukum yang rumit untuk mendapatkan akses ke komponen yang dipatenkan guna mengintegrasikan senjata dan sistem kemampuan bertahan yang diinginkan.
    Sejauh negosiasi berlangsung, masalah utama yang tersisa adalah kurangnya perjanjian ekspor untuk GPS dan sistem persenjataan dari AS, yang membuat program tersebut berada dalam ketidakpastian. Selain itu, dilaporkan bahwa KAI masih menunggu izin dari Washington untuk mengintegrasikan rudal udara-ke-udara AIM-120 AMRAAM untuk FA-50PL.
    Meskipun kesepakatan baru-baru ini yang menandakan perluasan kemitraan strategis antara KAI dan Lockheed Martin ditandatangani di Paris minggu ini, subjek FA-50 PL tidak disebutkan. Penundaan pengiriman gelombang pertama jet tersebut kemungkinan besar akan melampaui 18 bulan, yang mendorong tanggal pengiriman awal hingga pertengahan 2027
    .==============
    2025-2017 = 9 TAHUN NGEMIS F18 KUWAIT
    2025-2017 = 9 TAHUN NGEMIS F18 KUWAIT
    2025-2017 = 9 TAHUN NGEMIS F18 KUWAIT
    MALONDESH has reportedly sought the Kuwaiti jets since at least 2017. The legacy Hornet is thought to “increase the level of preparedness and capability of the RMAF in safeguarding the country’s airspace”
    ==========
    MKM = BARTER PALM OIL
    MIG29N = BARTER PALM OIL
    MALONDESH has used palm oil to barter for military equipment, including fighter jets. The MALONDESH Armed Forces (MAF) is made up of the Royal MALONDESH Navy, the Royal MALONDESH Air Force, and the MALONDESH Army.
    ----
    A400M
    PEMBAYARAN BERPERINGKAT = DEBT
    MALONDESH membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan bayar berperingkat.
    ----
    FA50M BARTER PALM OIL
    On the other hand, South Korea aims to sell another 18 FA-50s to MALONDESH in the future. MALONDESH announced that at least half of the payment would be made in palm oil
    ----
    SCORPENE BARTER PALM OIL
    Under the deal, France would buy RM819 million’s (€230 million) worth of MALONDESH palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and techNOLogy transfer to local firms here.
    ----
    PT91 BARTER PALM OIL RUBBER
    Payment for the purchase includes 30 percent of direct off-set in the form of training and techNOLogy transfer and 30 percent of indirect off-set in commodities like palm oil and rubber
    ==========
    POLANDIA NATO (North Atlantic Treaty Organization) = KESULITAN AMRAAMs USA
    MALONDESH NATO (Not Action Talk Only) = DOWNGRADE BARTER SAWIT

    BalasHapus
  4. amfibi itali, uae, bangkok bahkan vn16 sikat semua...showroom haha!🤑👏🤑

    BalasHapus
  5. vn16 tes langsung bisa nich nyebrang ke seblah tanpa lst haha!🤭😂🤭
    semakin ketar ketir warganyet kl

    BalasHapus
    Balasan
    1. bawa gorengan bawa kopi ..... kirim rainbow bawa AR 1 atau AR 2 buat bommmm sebelah ..... Nobar om @palu gada

      Hapus
    2. Jedaaarrrrr haha!☠️😵‍💫☠️

      Hapus
  6. MAZOOOOOOK 💪🇨🇳ko xingping siap siap GANJAAANG🇲🇾🤮🪓MALAYDESH JILID 2 dulu kita buat GANJAANG 🇲🇾🤮🚀MALAYDESH JILID 1 kurang senjata dibantu negara 💪🇨🇳ko xingping apalagi sekarang 🇲🇾🤮🪓MALAYDESH terlemah dan mahaterukwangsa 🤣🤣🤣🤣🤣

    BalasHapus
  7. Bila disebut sahaja Elang Hitam ramai KONOHA tersakiti!
    Kenapa? Baru dapat PHK? Menganggur?
    Kabur aje kalau gitu!
    🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣

    BalasHapus
    Balasan
    1. MOF CANCELLED PROCUREMENTS ARMED FORCES
      MOF CANCELLED PROCUREMENTS ARMED FORCES
      MOF CANCELLED PROCUREMENTS ARMED FORCES
      The Ministry of Finance (MOF) in Malondesh can cancel procurements for the armed forces due to several reasons, including concerns about transparency, adherence to procedures, and potential financial implications. Specifically, these cancellations can stem from issues like direct negotiations bypassing established protocols, lack of proper specifications, or concerns about corruption.
      Here's a more detailed breakdown:
      Bypassing established procedures:
      The MOF may cancel procurements if they were awarded through direct negotiation, especially if it violates the Ministry's own procedures or lacks proper documentation.
      Lack of transparency and accountability:
      If the procurement process is not transparent and lacks proper oversight, the MOF may step in to ensure accountability and prevent potential corruption or misuse of funds.
      Financial concerns:
      The MOF has the authority to review and cancel procurements if they raise concerns about the financial implications, such as overspending or unfavorable contract terms.
      Political influence:
      The MOF can also cancel procurements if there are indications of political influence or if the decision was not based on professional military requirements.
      Ex-post scrutiny by parliament and audit bodies:
      While parliament and audit bodies primarily conduct ex-post scrutiny, meaning they review the process after it's been completed, they can also influence future procurements based on their findings.
      Lack of military specifications:
      Procurements may be cancelled if the purchases lack proper military specifications or are not aligned with the armed forces' operational needs.
      ========
      MALONDESH armed forces face a number of challenges with maintenance costs, including a lack of funding, outdated equipment, and corruption.
      Funding
      Limited budget: MALONDESH defense budget has been limited due to fiscal constraints.
      Unwillingness to cut spending: Successive governments have been unwilling to cut spending elsewhere to fund defense.
      Corruption: There have been allegations of kickbacks in tenders for military equipment.
      Outdated equipment
      Aging aircraft: The Royal MALONDESH Air Force (RMAF) has a fleet of aging aircraft that are difficult to maintain.
      Incompatible spare parts: The navy has spare parts that are no longer compatible with its fleet.
      Failure to modernize: The navy has failed to modernize its fleet to meet current and future challenges.
      Other challenges
      Political machinations: The military faces significant risks from political machinations.
      Bureaucratic corruption: The military faces significant risks from bureaucratic corruption.
      Lack of clear anti-corruption strategy: The National Defence Policy lacks a clear anti-corruption strategy.
      ==============
      MALONDESH armed forces face challenges with limited funding, which has led to a lack of progress in defense. These challenges include:
      • Limited budget
      The government has been unwilling to reduce spending in other areas or cut the size of the military.
      • Aging aircraft
      The military has a large fleet of aging aircraft that are difficult to maintain.
      • Outdated inventory
      The military's logistics equipment is outdated, which can put the country's security at risk.
      • Secrecy
      There is a lack of transparency around the military's pension fund and how it is managed.
      • Corruption
      There have been allegations of mismanagement and misuse of funds by the military's pension fund


      Hapus
    2. MOF CANCELLED PROCUREMENTS ARMED FORCES
      MOF CANCELLED PROCUREMENTS ARMED FORCES
      MOF CANCELLED PROCUREMENTS ARMED FORCES
      The Ministry of Finance (MOF) in Malondesh can cancel procurements for the armed forces due to several reasons, including concerns about transparency, adherence to procedures, and potential financial implications. Specifically, these cancellations can stem from issues like direct negotiations bypassing established protocols, lack of proper specifications, or concerns about corruption.
      Here's a more detailed breakdown:
      Bypassing established procedures:
      The MOF may cancel procurements if they were awarded through direct negotiation, especially if it violates the Ministry's own procedures or lacks proper documentation.
      Lack of transparency and accountability:
      If the procurement process is not transparent and lacks proper oversight, the MOF may step in to ensure accountability and prevent potential corruption or misuse of funds.
      Financial concerns:
      The MOF has the authority to review and cancel procurements if they raise concerns about the financial implications, such as overspending or unfavorable contract terms.
      Political influence:
      The MOF can also cancel procurements if there are indications of political influence or if the decision was not based on professional military requirements.
      Ex-post scrutiny by parliament and audit bodies:
      While parliament and audit bodies primarily conduct ex-post scrutiny, meaning they review the process after it's been completed, they can also influence future procurements based on their findings.
      Lack of military specifications:
      Procurements may be cancelled if the purchases lack proper military specifications or are not aligned with the armed forces' operational needs.
      ========
      MKM = BARTER PALM OIL
      MIG29N = BARTER PALM OIL
      MALONDESH has used palm oil to barter for military equipment, including fighter jets. The MALONDESH Armed Forces (MAF) is made up of the Royal MALONDESH Navy, the Royal MALONDESH Air Force, and the MALONDESH Army.
      ----
      A400M
      PEMBAYARAN BERPERINGKAT = DEBT
      MALONDESH membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan bayar berperingkat.
      ----
      FA50M BARTER PALM OIL
      On the other hand, South Korea aims to sell another 18 FA-50s to MALONDESH in the future. MALONDESH announced that at least half of the payment would be made in palm oil
      ----
      SCORPENE BARTER PALM OIL
      Under the deal, France would buy RM819 million’s (€230 million) worth of MALONDESH palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and techNOLogy transfer to local firms here.
      ----
      PT91 BARTER PALM OIL RUBBER
      Payment for the purchase includes 30 percent of direct off-set in the form of training and techNOLogy transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
      ----
      DEBT IS ONE OF THE HIGHEST IN THE ASEAN
      BEBAN ASEAN
      BEBAN ASEAN
      BEBAN ASEAN
      MALONDESH household DEBT is one of the highest in the ASEAN region. Against this backdrop, Bank Negara MALONDESH (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in MALONDESH, among other things. Using aggregated data from BNM's Central Credit Reference Information System (CCRIS), this dashboard gives you insight into key trends on household DEBT. For now, it displays data on the flow of borrowing activity on a monthly basis, broken down by purpose. In due time, it will be deepened with granular data showing the state of inDEBTedness of MALONDESH

      Hapus
    3. MOF CANCELLED PROCUREMENTS ARMED FORCES
      MOF CANCELLED PROCUREMENTS ARMED FORCES
      MOF CANCELLED PROCUREMENTS ARMED FORCES
      The Ministry of Finance (MOF) in Malondesh can cancel procurements for the armed forces due to several reasons, including concerns about transparency, adherence to procedures, and potential financial implications. Specifically, these cancellations can stem from issues like direct negotiations bypassing established protocols, lack of proper specifications, or concerns about corruption.
      Here's a more detailed breakdown:
      Bypassing established procedures:
      The MOF may cancel procurements if they were awarded through direct negotiation, especially if it violates the Ministry's own procedures or lacks proper documentation.
      Lack of transparency and accountability:
      If the procurement process is not transparent and lacks proper oversight, the MOF may step in to ensure accountability and prevent potential corruption or misuse of funds.
      Financial concerns:
      The MOF has the authority to review and cancel procurements if they raise concerns about the financial implications, such as overspending or unfavorable contract terms.
      Political influence:
      The MOF can also cancel procurements if there are indications of political influence or if the decision was not based on professional military requirements.
      Ex-post scrutiny by parliament and audit bodies:
      While parliament and audit bodies primarily conduct ex-post scrutiny, meaning they review the process after it's been completed, they can also influence future procurements based on their findings.
      Lack of military specifications:
      Procurements may be cancelled if the purchases lack proper military specifications or are not aligned with the armed forces' operational needs.
      ========
      15 YEARS = BAHAN KETAWA DUNIA
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and DEBT.
      ===================
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, MALONDESH’s former Navy chief said today.

      Hapus
    4. KEYWORDS =
      1. 1 UNIT APACHE = 13 UNIT MD530G
      2. 1 UNIT RAFALE = 4 UNIT FA50M
      3. 1 UNIT PPA = 3 UNIT LMS B2
      4. 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONDESH
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. SEWA 28 HELI = 119 HELI BARU
      7. 4.5 KM JAVELIN = 1 KM NLAW
      8. ANKA ISR NOT ARMED
      9. LCS EXCLUDING AMMO = DESTROYER INCLUDING AMMO
      ==============
      BADUT KASTA PENGHUTANG KLAIM KAYA =
      NO MONEY = 2024-2018 DEBT BAYAR DEBT
      ----------
      2024 = DEBT BAYAR DEBT
      "Pinjaman ini digunakan untuk melunasi DEBT matang sebesar RM20.6 miliar, dengan sisa RM49,9 miliar menutupi defisit dan masa jatuh tempo DEBT di masa depan," kata MOF.
      ---
      2023 = DEBT BAYAR DEBT
      Pada tahun 2023, pinjaman baru Kerajaan Persekutuan MALONDESH mencapai RM1.173 triliun, naik 8,6% dari tahun 2022.
      Rincian pinjaman. Pinjaman baru Kerajaan Persekutuan MALONDESH pada tahun 2023 naik RM92,918 miliar
      ---
      2022 = 52,4% DEBT BAYAR DEBT
      Kah Woh menjelaskan pada tahun lalu, kerajaan ada membuat pinjaman yang meningkat sebanyak 11.6 peratus daripada RM194.5 bilion pada tahun sebelumnya. Daripada jumlah itu, beliau berkata 52.4 peratus atau RM113.7 bilion digunakan untuk membayar prinsipal pinjaman matang.
      ---
      2021 = 50,4% DEBT BAYAR DEBT
      Sejumlah RM98.058 bilion atau 50.4 peratus daripada pinjaman baharu berjumlah RM194.555 bilion yang dibuat kerajaan pada tahun lalu digunakan untuk bayaran balik prinsipal pinjaman yang matang.
      ---
      2020 = 60% DEBT BAYAR DEBT
      Jabatan Audit Negara (JAN) bimbang dengan tindakan kerajaan menggunakan hampir 60 peratus pinjaman baharu untuk membayar DEBT sedia ada pada tahun lalu, berbanding bagi perbelanjaan pembangunan.
      ---
      2019 = 59% DEBT BAYAR DEBT
      Laporan Ketua Audit Negara mengenai Penyata Kewangan Kerajaan Persekutuan 2018 mendapati sejumlah 59 peratus pinjaman baharu kerajaan dibuat untuk membayar DEBT kerajaan terdahulu
      ---
      2018 = OPEN DONASI
      Kementerian Keuangan MALONDESH pada hari Rabu membuka rekening donasi supaya masyarakat dapat menyumbang untuk membantu negara membayar utang yang mencapai 1 triliun ringgit (US$ 250,8 miliar) atau 80 persen dari PDB.
      ===========
      SEWA HONDA CIVIC
      SEWA 40 BMW SUPERBIKES
      SEWAd BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT super bikes today. The superbikes are under SEWA from Syarikat Ammo Defence Sdn Bhd under a RM13.7 million Letter of Award.The tender for the superbikes was published in June, this year. Interestingly the reSEWA by Tentera Darat said the leasing period was for five years, but the tender notice said it was for a four-year period only. That said the leasing period could have been extended for another year during the negotiation process.
      As for leasing vehicles, this has been common practise by government departments for the decade or so as it is supposed to be cheaper overall. The MPs had also taken delivery of Honda Civics under a leasing programme,
      -----
      SEWA FAST INTERCEPTOR BOAT
      SEWA UTILITY BOAT
      SEWA RIGID HULL FENDER BOAT
      SEWA ROVER FIBER GLASS
      SEWA EC120B
      SEWA FLIGHT SIMULATION TRAINING DEVICE
      Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
      Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan SEWAan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
      -----
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak Sewaan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.

      Hapus
    5. SHEMALE MENUMPANG WANITA[MMW]
      DITANGGUNG HIDUP SAMA ISTRI
      FACT = LEMAH LOYO LETOY .....
      --------------------------
      MMW 21 April 2025 pukul 10.48
      YUPP tahun 2025 kami negara MISKIN
      Sementara pendapatan Isteri saya pula dua kali lipat pendapatan saya. Household income kami secara kasar sebulan tahun 2025 = RM25.000 sebulan............
      ===================
      2024 = DEBT BAYAR DEBT
      Pinjaman ini digunakan untuk melunasi DEBT matang sebesar RM20.6 miliar, dengan sisa RM49,9 miliar menutupi defisit dan masa jatuh tempo DEBT di masa depan," kata MOF.
      ---
      2023 = DEBT BAYAR DEBT
      Pada tahun 2023, pinjaman baru Kerajaan Persekutuan MALONDESH mencapai RM1.173 triliun, naik 8,6% dari tahun 2022.
      Rincian pinjaman. Pinjaman baru Kerajaan Persekutuan MALONDESH pada tahun 2023 naik RM92,918 miliar
      ---
      2022 = 52,4% DEBT BAYAR DEBT
      Kah Woh menjelaskan pada tahun lalu, kerajaan ada membuat pinjaman yang meningkat sebanyak 11.6 peratus daripada RM194.5 bilion pada tahun sebelumnya. Daripada jumlah itu, beliau berkata 52.4 peratus atau RM113.7 bilion digunakan untuk membayar prinsipal pinjaman matang.
      ---
      2021 = 50,4% DEBT BAYAR DEBT
      Sejumlah RM98.058 bilion atau 50.4 peratus daripada pinjaman baharu berjumlah RM194.555 bilion yang dibuat kerajaan pada tahun lalu digunakan untuk bayaran balik prinsipal pinjaman yang matang.
      ---
      2020 = 60% DEBT BAYAR DEBT
      Jabatan Audit Negara (JAN) bimbang dengan tindakan kerajaan menggunakan hampir 60 peratus pinjaman baharu untuk membayar DEBT sedia ada pada tahun lalu, berbanding bagi perbelanjaan pembangunan.
      ---
      2019 = 59% DEBT BAYAR DEBT
      Laporan Ketua Audit Negara mengenai Penyata Kewangan Kerajaan Persekutuan 2018 mendapati sejumlah 59 peratus pinjaman baharu kerajaan dibuat untuk membayar DEBT kerajaan terdahulu
      ---
      2018 = OPEN DONASI
      Kementerian Keuangan MALONDESH pada hari Rabu membuka rekening donasi supaya masyarakat dapat menyumbang untuk membantu negara membayar utang yang mencapai 1 triliun ringgit (US$ 250,8 miliar) atau 80 persen dari PDB.
      ====================
      MISKIN = 84% NO SAVING EVERY MONTH
      MISKIN = 84% NO SAVING EVERY MONTH
      MISKIN = 84% NO SAVING EVERY MONTH
      A recent survey conducted by the Financial Education Network (FEN) showed that 84 per cent of MALONDESHs do not have regular savings every month.
      ==========
      MAHATHIR = MALAS MISKIN
      menyebut orang-orang suku Melayu terus-terusan miskin karena tak mau bekerja keras. Ia pun mengkritik sifat warga Melayu yang malah menyalahkan etnis lain karena kesuksesan mereka.
      ==========
      ANWAR IBRAHIM = MISKIN
      “Tapi saya kata, sebagai contoh projek tebatan banjir…kerana banjir itu menyeksa rakyat dan yang jadi mangsa itu orang miskin dan majoriti yang miskin itu Melayu. "Sebab itu kalau kita nak belanjakan kita kena teliti. Ini soal tadbir urus, mengurus negara itu harus dengan ketertiban, peraturan dan ke arah yang betul.

      Hapus
  8. Cie... Cieeee...ada Malondesh Kepanasan sambil Loncat Loncat kesana kemari karena TNI AU punya UCAV MALE CH-4 Rainbow dengan Missile AR-1 dan AR-2

    Hahaha

    BalasHapus
  9. SOP Propaganda Negatif Framing Malondesh terhadap Shopping Military Asset Indonesia adalah:
    1. Hina Produk Riset Nasional Indonesia mulai fase Perencanaan, Prototipe, Uji Statis, Uji Dinamis

    (Kemudian Malondesh diam sesaat karena GAGAL TOTAL Negative Framing terhadap INDONESIA yang terus melangkah ke depan)

    2. Hina Saat Masuk fase Mass Production

    Kemudian diam sesaat lalu angkat issue diluar military asset dan defense industry yang ada di Indonesia


    Tuch pola yang dimainkan Malondesh di forum DS dari jaman doeloe sampai sekarang.


    Konklusi:
    Malondesh tidak bisa mengejar Perkembangan dan Pertumbuhan Industri Pertahanan Indonesia

    BalasHapus
    Balasan
    1. Perut lapar beras krisis mana bisa otak mikir sebelah ...... Om @bakul cermin

      Hapus
    2. OK banget...Om Pemburu... Hahaha

      Hapus
  10. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    SEWAan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.MALONDESH (ATM).
    =========
    KEYWORDS
    1 UNIT JAVELIN = 3 UNIT NLAW
    4.5 KM JAVELIN = 1 KM NLAW
    ---
    Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
    The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit generally around $30,000 to $33,000. It has a range of up to 1,000 meters and can destroy a tank in a single shot.
    =========
    KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
    -
    1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
    -
    2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
    -
    USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
    =========
    CHEAPEST VARIANT HISAR OPV
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALONDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    =========
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    =========
    ANKA OMPONG =
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    MALONDESH to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
    =========
    The Royal MALONDESH Air Force (RMAF) faces a number of issues with its aircraft, including fleet maintenance, the age of its aircraft, and the need for a multi-role combat aircraft.
    Fleet maintenance
    The RMAF has fleet sustainment problems due to its aging aircraft fleet.
    The RMAF's logistics equipment quality has been criticized.
    The RMAF has had issues with the reliability of its fleet, which has forced it to cut schedules.
    Age of aircraft
    The RMAF's main fighter fleet includes the Su-30MKMs and Boeing F/A-18 Hornets.
    The RMAF's aircraft are aging, which can make them more difficult and expensive to maintain.
    Need for a multi-role combat aircraft
    The RMAF has stated that it needs a multi-role combat aircraft, but the government's defense budget is limited.
    The RMAF has been discussing acquiring second-hand Kuwaiti F/A-18s, but no formal negotiations have taken place.
    Other issues
    The RMAF has faced issues with the quality of its logistics equipment.
    The RMAF has been wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    ============
    MALONDESH armed forces have faced challenges due to limited funding, which has hindered their ability to modernize and respond to threats.
    Factors
    Fiscal constraints: The government has been unwilling to cut spending elsewhere to fund defense.
    Maintenance and repair: A significant portion of the defense budget goes toward maintenance and repair, leaving little for new assets.
    Political uncertainty: Political uncertainty has limited defense spending.
    Aging aircraft: The air force has a large fleet of aging aircraft that are expensive to maintain.
    Diversified acquisitions: The country has acquired advanced weapon systems from different countries, which can lead to technical and logistical problems.
    Poor governance: Poor governance has undermined the effectiveness of outsourcing programs.

    BalasHapus
  11. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    SEWAan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.MALONDESH (ATM).
    =========
    KEYWORDS
    1 UNIT JAVELIN = 3 UNIT NLAW
    4.5 KM JAVELIN = 1 KM NLAW
    ---
    Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
    The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit generally around $30,000 to $33,000. It has a range of up to 1,000 meters and can destroy a tank in a single shot.
    =========
    KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
    -
    1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
    -
    2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
    -
    USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
    =========
    CHEAPEST VARIANT HISAR OPV
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALONDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    =========
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    =========
    ANKA OMPONG =
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    MALONDESH to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
    =========
    The Royal MALONDESH Navy (RMN) faces a number of challenges, including a fleet that is aging, delays in acquiring new ships, and corruption.
    Aging fleet
    • Half of the RMN's fleet of 49 ships are past their serviceable lifespan.
    • The fleet is largely past its prime, making it difficult to monitor the country's extensive maritime domain.
    Delays in acquiring new ships
    • The RMN has experienced delays in acquiring new ships, which has contributed to the use of ships that are beyond their useful life.
    • The RMN has canceled plans to add new batches of Lekiu frigates.
    Corruption
    • Some of the RMN's modernization efforts have been linked to corruption.
    • The Public Accounts Committee (PAC) found that BNS subsidiaries did not use all of the government's payments for the RM9 billion warship procurement.
    Other challenges
    • Maritime boundary disputes with other countries, including China, Indonesia, and the Philippines
    • Sea robbery, smuggling, and illegal sand mining
    • Maritime piracy, which can also be used by terrorists to raise funds
    China's assertiveness in the South China Sea
    .
    ------------------
    MALONDESH's armed forces have been underfunded for some time, due to a lack of political will to increase defense spending. This has limited the country's ability to modernize and respond to threats.
    Causes of underfunding
    • Government spending
    MALONDESH governments have been reluctant to cut spending in other areas to fund defense
    • Size of armed forces
    Governments have been unwilling to reduce the size of the armed forces by cutting manpower and equipment
    • Corruption
    Corruption risks remain significant in MALONDESH's defense governance architecture
    Effects of underfunding
    • Limited procurement: The navy and air force have struggled to procure new assets to modernize
    • Outdated equipment: The MAF has outdated logistics equipment
    • Limited ability to respond to threats: The MAF has been unable to improve its fighting capacity to deal with external threats

    BalasHapus
  12. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    SEWAan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.MALONDESH (ATM).
    =========
    KEYWORDS
    1 UNIT JAVELIN = 3 UNIT NLAW
    4.5 KM JAVELIN = 1 KM NLAW
    ---
    Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
    The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit generally around $30,000 to $33,000. It has a range of up to 1,000 meters and can destroy a tank in a single shot.
    =========
    KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
    -
    1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
    -
    2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
    -
    USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
    =========
    CHEAPEST VARIANT HISAR OPV
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALONDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    =========
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    =========
    ANKA OMPONG =
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    MALONDESH to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
    =========
    MALONDESH has faced several crises, including political, financial, and economic crises:
    • Political crisis
    From 2020–2022, MALONDESH experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
    • Financial crisis
    MALONDESH experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
    • Economic crisis
    MALONDESH's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, MALONDESH's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
    • Household DEBT crisis
    As of the end of 2023, MALONDESH's household DEBT-to-GDP ratio was 84.2%, with household DEBT reaching RM1.53 trillion
    MALONDESH has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior

    BalasHapus
  13. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    SEWAan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.MALONDESH (ATM).
    =========
    KEYWORDS
    1 UNIT JAVELIN = 3 UNIT NLAW
    4.5 KM JAVELIN = 1 KM NLAW
    ---
    Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
    The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit generally around $30,000 to $33,000. It has a range of up to 1,000 meters and can destroy a tank in a single shot.
    =========
    KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
    -
    1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
    -
    2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
    -
    USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
    =========
    CHEAPEST VARIANT HISAR OPV
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALONDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    =========
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    =========
    ANKA OMPONG =
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    MALONDESH to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
    =========
    The MALONDESH army has several weaknesses, including:
    • Limited defense budgeting: The MALONDESH government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
    • Outdated equipment: Most of the MALONDESH Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
    • Corruption: The MALONDESH military has been plagued by corruption.
    • Political interference: Political leaders have interfered in procurement.
    • Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
    • Low ranking in military capability: According to the Lowy Institute Asia Power Index, MALONDESH ranks 16th in military capability in Southeast Asia.
    Other challenges include:
    • The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
    • The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling

    BalasHapus
  14. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    SEWAan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.MALONDESH (ATM).
    =========
    KEYWORDS
    1 UNIT JAVELIN = 3 UNIT NLAW
    4.5 KM JAVELIN = 1 KM NLAW
    ---
    Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
    The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit generally around $30,000 to $33,000. It has a range of up to 1,000 meters and can destroy a tank in a single shot.
    =========
    KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
    -
    1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
    -
    2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
    -
    USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
    =========
    CHEAPEST VARIANT HISAR OPV
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALONDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    =========
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    =========
    ANKA OMPONG =
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    MALONDESH to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
    =========
    NGEMIS RONGSOKAN 33 TAHUN SAMPAI 2027 =
    MENUNGGU 47 SUPER HORNETS
    MENUNGGU 47 SUPER HORNETS
    DELAY DELIVERIES OF 47 SUPER HORNETS
    The Kuwait Air Force is expected to declare full operational capability for its Super Hornets by 2027. Only then will the legacy Hornets be released to Malondesh.
    The issue now is that the delivery of Kuwait’s Rhinos hinges on the completion of deliveries of 47 Super Hornets ordered by the US Navy as attrition replacements. Boeing is obligated to fulfil the US Navy’s order before delivering aircraft to Kuwait.
    ==========
    TIAP TAHUN NGEMIS

    2025 IZIN DISKUSI = NGEMIS 5x RONGSOK 33 TAHUN
    Amerika Serikat (AS) sebagai pembuat asli F/A-18C/D Hornet telah memberikan izin untuk memungkinkan Malondesh mengadakan diskusi lebih lanjut dan mendalam mengenai pembelian lebih dari 30 pesawat tempur bekas milik Angkatan Udara Kuwait (KAF).
    -----
    2024 NGEMIS 4x F18 KUWAIT
    Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONDESH milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONDESH baharunya.
    -----
    2023 NGEMIS 3x F18 KUWAIT
    Bercakap di Parlimen semalam, Menteri Pertahanan Datuk Seri Mohamad Hassan berkata, kementeriannya serta Menteri Pertahanan terdahulu telah menulis surat sebanyak tiga kali kepada kerajaan Kuwait
    -----
    2021 NO SALE OF HORNET MALONDESHS = Kuwait's Ministry of Defense on Thursday denied reports about purported negotiations to sell 33 used F/A-18 HORNET MALONDESH aircraft in possession of the Kuwait Air Force to the MALONDESH Air Force.


    BalasHapus
  15. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    SEWAan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.MALONDESH (ATM).
    =========
    KEYWORDS
    1 UNIT JAVELIN = 3 UNIT NLAW
    4.5 KM JAVELIN = 1 KM NLAW
    ---
    Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
    The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit generally around $30,000 to $33,000. It has a range of up to 1,000 meters and can destroy a tank in a single shot.
    =========
    KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
    -
    1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
    -
    2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
    -
    USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
    =========
    CHEAPEST VARIANT HISAR OPV
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALONDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    =========
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    =========
    ANKA OMPONG =
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    MALONDESH to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
    =========
    2025-2017 = 9 TAHUN NGEMIS F18 KUWAIT
    2025-2017 = 9 TAHUN NGEMIS F18 KUWAIT
    2025-2017 = 9 TAHUN NGEMIS F18 KUWAIT
    MALONDESH has reportedly sought the Kuwaiti jets since at least 2017. The legacy Hornet is thought to “increase the level of preparedness and capability of the RMAF in safeguarding the country’s airspace”
    ===================
    UNREADY ARMED FORCES
    UNREADY ARMED FORCES
    UNREADY ARMED FORCES
    the MALONDESH military is today the region’s weakest. It is riddled with corruption, poor planning, and interference by political leaders in procurement, no longer a potent force even in managing low-level intensity conflict at a time when tensions in the South China Sea are higher than they have been since the days of the Vietnam War.
    A 2019 White Paper on Defense – nearly four years ago – called for more funds and punch as well as an overhaul of the procurement system to allow professionals to decide on what weapon systems they need. Instead, PM Anwar Ibrahim’s proposal to increase the defense budget by 10 percent to fund procurement will be delayed because of budgetary considerations related to the flagging economy, expected by the World Bank to grow at a mediocre 3.9 percent in 2023, down from an earlier estimate of 4.3 percent in April

    BalasHapus
  16. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    SEWAan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.MALONDESH (ATM).
    =========
    KEYWORDS
    1 UNIT JAVELIN = 3 UNIT NLAW
    4.5 KM JAVELIN = 1 KM NLAW
    ---
    Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
    The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit generally around $30,000 to $33,000. It has a range of up to 1,000 meters and can destroy a tank in a single shot.
    =========
    KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
    -
    1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
    -
    2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
    -
    USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
    =========
    CHEAPEST VARIANT HISAR OPV
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALONDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    =========
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    =========
    ANKA OMPONG =
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    MALONDESH to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
    =========
    TIAP TAHUN MEMBUAL SPH

    2016 PRANK NEXTER
    Nexter in cooperation with Advanced Defense Systems (ADS) is proposing the CAESAR 155mm 52 .cal self propelled howitzer to the MALONDESH Army, in order to fill a capability gap. An LoI is signed during day three of DSA 2016. 20 units are to be supplied, which include the supporting vehicles, and will boost the MALONDESH Army's firepower inventory.
    --
    2023 PRANK MKE
    The MALONDESH Ministry of Defence has reportedly reviewing its planned acquisition of Yavuz 155mm
    --
    2022 PRANK KDS
    MALONDESH is expected to conclude a deal with Slovakia for the supply of EVA 155mm self-propelled howitzers for the MALONDESH Army.



    BalasHapus
  17. Punya MALE UCAV FULL WEAPON GA LON !!!!!!

    SORRY NEGARA MISKIN AKA MALONDESH CUMA BISA LIHAT SAJA 🤣🤣🤣🤣

    BalasHapus
  18. 2025 EH TEST FLIGHT 1 MONTH
    2024 OKTOBER VERSI MILITARY
    (ANTARA) Direktur Utama PT Dirgantara Indonesia (PT DI) Gita Amperiawan mengatakan bahwa pihaknya akan menguji kemampuan pesawat tanpa awak buatan Indonesia, yakni drone medium altitude long endurance (MALE) Elang Hitam selama 1 bulan ke depan.
    "Mungkin dalam 1 bulan ke depan kami akan demo flight MALE itu untuk bisa terbang 24 jam, kemudian payload-nya sekitar 300 kilogram," kata Gita kepada awak media saat ditemui di Kantor PT DI, Bandung, Jawa Barat.
    Pengembangan PTTA MALE buatan dalam negeri Elang Hitam dirintis sejak 2015 dan konsorsium untuk itu dibentuk pada tahun 2017 yang terdiri atas Kementerian Pertahanan RI, Badan Pengkajian dan Penerapan TekNOLogi (BPPT), TNI Angkatan Udara, Institut TekNOLogi Bandung, PT Dirgantara Indonesia dan PT Len Industri, kemudian pada tahun 2019 bertambah satu anggota, yaitu Lembaga Penerbangan dan Antariksa Nasional (LAPAN).
    PT DI dan BPPT (sekarang melebur menjadi bagian dari BRIN) pada tahun 2019 berhasil membuat rangka (airframe) PTTA MALE Elang Hitam dan meluncurkan itu ke hadapan publik di hanggar PT DI.
    Berlanjut ke hasil Rapat Pleno KKIP pada bulan Oktober 2024, pengembangan PTTA MALE untuk kekebutuhanan militer kembali berlanjut, dan dipimpin oleh PT DI sebagai lead integrator.
    -----
    SEPTEMBER 2024 = DRONE EH LANJUT ...
    SEPTEMBER 2024 = DRONE EH LANJUT ...
    (DEFENSE STUDIES) PT Dirgantara Indonesia (PTDI) menyatakan masih terus mengembangkan Pesawat Udara Nirawak Medium Altitude Long Endurance (PUNA MALE) Elang Hitam yang pernah masuk daftar prioritas riset nasional. PUNA MALE Elang Hitam adalah pesawat nirawak jenis drone tempur atau kombatan yang hingga akhir 2021 lalu masih dikerjakan konsorsium besar Kementerian Pertahanan, TNI AU, PTDI, Institut TekNOLogi Bandung, PT Len Industri, dan Lembaga Penerbangan dan Antariksa Nasional.
    -----
    COME INTO FORCE .....
    60 TB3
    9 AKINCI
    (DEFENCE SECURITY ASIA) – In a landmark move set to reshape the defense landscape of Southeast Asia, Indonesian and Turkish defense companies have sealed a pivotal agreement to forge a joint venture, spearheading the production, assembly, and maintenance of cutting-edge unmanned combat aerial vehicles (UCAVs) in the region.
    The agreement—sealed in the presence of Turkish President Recep Tayyip Erdoğan and Indonesian President Prabowo Subianto—ushers in a new era of defense collaboration, paving the way for Indonesia’s acquisition of up to 60 cutting-edge Bayraktar TB3 UCAVs and nine formidable Bayraktar Akıncı UCAVs.
    ==========
    ==========
    TEMPEL STICKER DRONE CHINA
    TEMPEL STICKER DRONE CHINA
    TEMPEL STICKER DRONE CHINA
    Perusahaan MALONDESH Malvus Sense meluncurkan CW-25H, sistem pesawat tak berawak (UAS) lepas landas dan mendarat vertikal (VTOL) bertenaga hidrogen listrik baru, bekerja sama dengan perusahaan UAS China JOUAV di pameran Defense Services Asia (DSA) 2024 diadakan di Kuala Lumpur dari tanggal 6 hingga 9 Mei.

    BalasHapus
  19. KEYWORDS =
    1. 1 UNIT APACHE = 13 UNIT MD530G
    2. 1 UNIT RAFALE = 4 UNIT FA50M
    3. 1 UNIT PPA = 3 UNIT LMS B2
    4. 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONDESH
    5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
    6. SEWA 28 HELI = 119 HELI BARU
    7. 4.5 KM JAVELIN = 1 KM NLAW
    8. ANKA ISR NOT ARMED
    9. LCS EXCLUDING AMMO = DESTROYER INCLUDING AMMO
    ==============
    SEWA VVSHORAD
    SEWA TRUK CINA 3 TON
    Three weeks ago, the Madani government announced that it had struck a deal with China to SEWA 62 new train sets for KTM Bhd. The estimated cost for the deal is RM10.7 billion and it will be covered in installments over a 30-year SEWA period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VVSHORAD proposals.
    SEWA PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal MALONDESH Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    SEWA SIMULATOR MKM TAHUN
    Five-year contract for Sukhoi’s simulators. Publicly listed HeiTech Padu Bhd has announced that it had been awarded a RM67 million, five-year contract to operate and maintain the Su-30MKM flight simulators at the RMAF airbase in Gong Kedak
    SEWA HELI SEWA SIMULATOR
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    SEWA HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara SEWAan ini adalah untuk kegunaan Tentera Udara Diraja MALONDESH (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    SEWA BOAT
    SEWAan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    SEWA HIDROGRAFI
    MV Aishah AIM 4, yang diperoleh menerusi kontrak SEWAan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    SEWA MOTOR
    The Royal Military Police Corp (KPTD) celebrated the SEWA of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    SEWA PATROL BOATS : SEWA OUTBOARD MOTORS : SEWA TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    SEWA 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to SEWA 28 helicopters for use by ministries and other government agencies

    BalasHapus
  20. KEYWORDS =
    1. 1 UNIT APACHE = 13 UNIT MD530G
    2. 1 UNIT RAFALE = 4 UNIT FA50M
    3. 1 UNIT PPA = 3 UNIT LMS B2
    4. 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONDESH
    5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
    6. SEWA 28 HELI = 119 HELI BARU
    7. 4.5 KM JAVELIN = 1 KM NLAW
    8. ANKA ISR NOT ARMED
    9. LCS EXCLUDING AMMO = DESTROYER INCLUDING AMMO
    =============
    MALONDESH Armed Forces (MAF) in terms of readiness, defense preparedness, and logistics.
    Challenges
    • Logistics: Outdated inventory can make it difficult to deliver the right supplies to soldiers at the right time. This can hinder operations and make it harder to mobilize soldiers in hostile environments.
    • Defense preparedness: Outdated equipment can make it difficult for the MAF to keep up with evolving geopolitical and strategic threats.
    • Fleet sustainment: A large fleet of aging aircraft can be expensive to maintain.
    ===========
    The defense industry of MALONDESH armed forces faces several weaknesses, including corruption, lack of human resources, and insufficient research and development.
    Corruption
    • Procurement
    The procurement process is vulnerable to corruption due to foreign and domestic interests.
    • Commanders
    Commanders may not receive training on corruption issues, which can leave troops ill-equipped to respond to corruption risks.
    Lack of human resources
    • STEM specialists
    There is a lack of STEM specialists, especially in the defense-industrial sector.
    • Local companies
    Local companies may not have the necessary capabilities to produce defense equipment.
    Insufficient research and development
    • Local universities and corporate sector
    There is little use of the research and development capabilities in local universities and the corporate sector.
    • Government guidance
    The government may not have clear guidance for the future strategic direction of the industry.
    Other weaknesses
    • Limited parliamentary oversight: Parliamentary oversight of the defense sector is weak.
    • Limited financial scrutiny: Financial scrutiny is limited by excessive secrecy.
    • Reluctance of OEMs: Original Equipment Manufacturers (OEMs) may be reluctant to share their techNOLogy.
    • Reluctance of MAF: The MALONDESH Armed Forces (MAF) may be reluctant to use locally produced products.
    MALONDESH armed forces face challenges in modernizing their budget due to economic limitations, historical budget constraints, and competing national priorities. However, the country has recently increased its military spending to address these challenges.
    Challenges
    Budget constraints: MALONDESH defense spending is low compared to other regional powers, and the country has faced delays and cancellations of military modernization initiatives.
    Aging aircraft: The country's fleet of aging aircraft is burdensome to maintain, which adds to fleet sustainment problems.
    Leakage of funds: The pandemic and political uncertainty have limited defense spending
    ===========
    DRAMA 155mm SPH SYSTEM
    DRAMA 155mm SPH SYSTEM
    DRAMA 155mm SPH SYSTEM
    As of September 2024, the MALONDESH Army has not acquired a 155 mm self-propelled howitzer (SPH) system. The MALONDESH Ministry of Defence has been discussing the project, but the final selection has not been made.
    Why the acquisition has been delayed?
    The acquisition program was announced in the 2010s, but the schedule, number of platforms, and total estimated cost were not defined.
    The Ministry of Finance canceled the intended purchase of self-propelled howitzer systems.
    The MALONDESH Army is still waiting for government approval to procure the system

    BalasHapus
  21. Bila disebut sahaja Elang Hitam ramai KONOHA tersakiti!
    Kenapa? Baru dapat PHK? Menganggur?
    Kabur aje kalau gitu!

    https://www.tempo.co/politik/partai-buruh-catat-sudah-70-ribu-buruh-kena-phk-sejak-januari-1563523

    🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣

    BalasHapus
    Balasan
    1. MISKIN = 84% NO SAVING EVERY MONTH
      MISKIN = 84% NO SAVING EVERY MONTH
      MISKIN = 84% NO SAVING EVERY MONTH
      A recent survey conducted by the Financial Education Network (FEN) showed that 84 per cent of MALONDESHs do not have regular savings every month.
      ==========
      MAHATHIR = MALAS MISKIN
      menyebut orang-orang suku Melayu terus-terusan miskin karena tak mau bekerja keras. Ia pun mengkritik sifat warga Melayu yang malah menyalahkan etnis lain karena kesuksesan mereka.
      ==========
      ANWAR IBRAHIM = MISKIN
      “Tapi saya kata, sebagai contoh projek tebatan banjir…kerana banjir itu menyeksa rakyat dan yang jadi mangsa itu orang miskin dan majoriti yang miskin itu Melayu. "Sebab itu kalau kita nak belanjakan kita kena teliti. Ini soal tadbir urus, mengurus negara itu harus dengan ketertiban, peraturan dan ke arah yang betul.
      --------
      DEBT IS ONE OF THE HIGHEST IN THE ASEAN
      BEBAN ASEAN
      BEBAN ASEAN
      BEBAN ASEAN
      MALONDESH household DEBT is one of the highest in the ASEAN region. Against this backdrop, Bank Negara MALONDESH (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in MALONDESH, among other things. Using aggregated data from BNM's Central Credit Reference Information System (CCRIS), this dashboard gives you insight into key trends on household DEBT. For now, it displays data on the flow of borrowing activity on a monthly basis, broken down by purpose. In due time, it will be deepened with granular data showing the state of inDEBTedness of MALONDESH
      --------
      HANYA BAYAR FAEDAH =
      TIDAK BAYAR HUTANG TERTUNGGAK
      TIDAK BAYAR HUTANG TERTUNGGAK
      TIDAK BAYAR HUTANG TERTUNGGAK
      TIDAK BAYAR HUTANG TERTUNGGAK
      Anwar berkata demikian pada sesi soal jawab Perdana Menteri (PMQ) pada sidang Dewan Rakyat di sini, hari ini.
      Menurutnya bayaran tersebut adalah bagi bayaran khidmat hutang atau hanya membayar faedah dan bukan
      --------
      SCANDALS MANGKRAK =
      1. The MALONDESH Cabinet is slated to deliberate the way forward for the mangkrak Kuala Lumpur-Singapore High-Speed Rail (HSR) project in the next few weeks, with the lack of funds to build the 350km line its biggest stumbling block, industry players said.
      -
      2.ECRL $ 20 bn dolar
      -
      3. Forest city $ 100bn dolar
      -
      4.China-MALONDESH Qinzhou Industrial Park (CMQIP) $ 4,2 bn dolar
      -
      5.MALONDESH-China Kuantan Industrial Park (MCKIP) $ 3,77 bn dolar
      -
      6.China Railway Rolling Stock Corp’s Rolling Stock Center - $ 131 juta dolar
      -
      7. 1 MDB = The 1MALONDESH Development Berhad scandal, often referred to as the 1MDB scandal or just 1MDB, is an ongoing corruption, bribery and money laundering conspiracy
      -
      8. LCS = MANGKRAK
      Kontrak terbaru ini akan memompa anggaran tambahan bagi MALONDESH hingga US$430 juta untuk kapal-kapal tersebut. MALONDESH juga akan mengurangi jumlah kapal yang akan diterima
      -
      9. OPV = MANGKRAK
      Menteri Dalam Negeri, Datuk Seri Saifuddin Nasution Ismail berkata, pembinaan dua kapal marititm itu mampu disiapkan selepas kerajaan bersetuju meluluskan suntikan dana berjumlah RM152.6 juta

      Hapus
    2. KEYWORDS =
      1. 1 UNIT APACHE = 13 UNIT MD530G
      2. 1 UNIT RAFALE = 4 UNIT FA50M
      3. 1 UNIT PPA = 3 UNIT LMS B2
      4. 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONDESH
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. SEWA 28 HELI = 119 HELI BARU
      7. 4.5 KM JAVELIN = 1 KM NLAW
      8. ANKA ISR NOT ARMED
      9. LCS EXCLUDING AMMO = DESTROYER INCLUDING AMMO
      ==============
      NGEMIS RONGSOKAN 33 TAHUN SAMPAI 2027 =
      MENUNGGU 47 SUPER HORNETS
      MENUNGGU 47 SUPER HORNETS
      DELAY DELIVERIES OF 47 SUPER HORNETS
      The Kuwait Air Force is expected to declare full operational capability for its Super Hornets by 2027. Only then will the legacy Hornets be released to Malondesh.
      The issue now is that the delivery of Kuwait’s Rhinos hinges on the completion of deliveries of 47 Super Hornets ordered by the US Navy as attrition
      ------------------
      THE MALONDESH ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      MALONDESH's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The MALONDESH procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      MALONDESH faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MALONDESHThe Royal MALONDESH Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Nological obsolescence
      Some aircraft in the RMAF's fleet are reaching techNOLogical obsolescence. For example, the Kuwaiti HORNET MALONDESHs are an earlier block of the HORNET MALONDESH, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
    3. $1.3 BILLION = SEWA = SURAT HASRAT = NGEMIS
      -------------
      2025 $1.3 BILLION MINDEF =
      MAINTENANCE
      REPAIRS
      ASSETS.
      Military spending In 2025, MALONDESH Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
      This budget included $1.3 billion for maintenance, repairs, and new military assets.
      -------------
      BEKAS RONGSOKAN 33 TAHUN =
      SG F35 A/B = BRAND NEW
      RI RAFALE F4 = BRAND NEW
      THAILAND GRIPEN E/F = BRAND NEW
      PINOY GRIPEN C/D = BRAND NEW
      MYANMAR SU30SME = BRAND NEW
      MALONDESH F18 = NGEMIS BEKAS RONGSOK
      -----------
      NGEMIS RONGSOKAN 33 TAHUN SAMPAI 2027 =
      MENUNGGU 47 SUPER HORNETS
      MENUNGGU 47 SUPER HORNETS
      DELAY DELIVERIES OF 47 SUPER HORNETS
      The Kuwait Air Force is expected to declare full operational capability for its Super Hornets by 2027. Only then will the legacy Hornets be released to Malondesh.
      The issue now is that the delivery of Kuwait’s Rhinos hinges on the completion of deliveries of 47 Super Hornets ordered by the US Navy as attrition
      -----------
      KASIAN KLAIM KAYA = BARTER SAWIT KARET
      KLAIM KAYA = SHOPPING MORTAR
      -----
      A400M
      BAYAR BERPERINGKAT = DEBT
      BAYAR BERPERINGKAT = DEBT
      BAYAR BERPERINGKAT = DEBT
      MALONDESH membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan bayar berperingkat.
      ----
      FA50M SAWIT
      On the other hand, South Korea aims to sell another 18 FA-50s to MALONDESH in the future. MALONDESH announced that at least half of the payment would be made in palm oil
      ----
      SCORPENE SAWIT
      Under the deal, France would buy RM819 million’s (€230 million) worth of MALONDESH palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and techNOLogy transfer to local firms here.
      ----
      PT91 SAWIT KARET
      Payment for the purchase includes 30 percent of direct off-set in the form of training and techNOLogy transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
      ----
      ANKA = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      MALONDESH to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
      ----
      KASIAN LOI = SURAT HASRAT
      KLAIM KAYA = SHOPPING MORTAR
      -----
      LIMA 2025
      -LOI kepada Mildef International Technologies Sdn Bhd bagi permohonan perolehan 136 unit Kenderaan Perisai Jenis A (KJA) & Infrastruktur yang bernilai RM1.88 bilion.
      -Penambahan 2 Long Range Radar (LRR) di Bukit Peteri, Terengganu dan Bukit Lunchu, Johor bernilai RM277 juta.
      -Perolehan 178 buah Light Anti-Tank Weapon Reloadable (LATW) – Short Range bernilai RM49 juta
      -Membekal dan menghantar 780 laras Light Anti-Tank Weapon (LAW) C90 bernilai RM35 juta
      -Membekal dan menghantar 18 laras Mortar 81mm bernilai RM30 juta
      -Pembekalan 2 set pelancar Naval Strike Missile (NSM) bernilai RM44 juta.
      -Membekal dan menghantar 1,300 butir Rounds 84mm Recoilless High Explosive (HE) bernilai RM42 juta.
      -Membekal dan menghantar 5,000 butir Mortar Bomb 60mm Illuminating IR kepada Tentera Darat bernilai RM34 juta
      -Membekal dan menghantar 1,900 butir Mortar Bomb 120mm High Explosive (HE) kepada Tentera Darat bernilai RM34 juta;l
      -Membekal dan menghantar peluru 5.56mm Ball bernilai RM32 juta
      -Membekal dan menghantar 1,000 butir Rounds 125mm HEAT-SD-T” bernilai RM31 juta.

      Hapus
    4. POLANDIA ANGGOTA NATO =
      FA50PL = NO AMRAAMs
      FA50PL = KESULITAN IZIN SISTEM
      FA50PL = KESULITAN. LISENSI KOMPONEN
      Tanggal pengiriman awal yang ambisius pada tahun 2025 kemungkinan akan mundur paling cepat ke tahun 2027. Alasan di balik keterlambatan pengiriman tersebut ternyata bukan dari kemampuan produksi KAI, melainkan terkait izin atas lisensi komponen dan sistem.
      Pada tahap pengembangan varian FA-50PL (FA-50 Block 20), pihak-pihak terkait, yakni Badan Persenjataan Polandia, KAI, dan Lockheed Martin, harus menyelesaikan jalur hukum yang rumit untuk mendapatkan akses ke komponen yang dipatenkan guna mengintegrasikan senjata dan sistem kemampuan bertahan yang diinginkan.
      Sejauh negosiasi berlangsung, masalah utama yang tersisa adalah kurangnya perjanjian ekspor untuk GPS dan sistem persenjataan dari AS, yang membuat program tersebut berada dalam ketidakpastian. Selain itu, dilaporkan bahwa KAI masih menunggu izin dari Washington untuk mengintegrasikan rudal udara-ke-udara AIM-120 AMRAAM untuk FA-50PL.
      Meskipun kesepakatan baru-baru ini yang menandakan perluasan kemitraan strategis antara KAI dan Lockheed Martin ditandatangani di Paris minggu ini, subjek FA-50 PL tidak disebutkan. Penundaan pengiriman gelombang pertama jet tersebut kemungkinan besar akan melampaui 18 bulan, yang mendorong tanggal pengiriman awal hingga pertengahan 2027
      .==============
      2025-2017 = 9 TAHUN NGEMIS F18 KUWAIT
      2025-2017 = 9 TAHUN NGEMIS F18 KUWAIT
      2025-2017 = 9 TAHUN NGEMIS F18 KUWAIT
      MALONDESH has reportedly sought the Kuwaiti jets since at least 2017. The legacy Hornet is thought to “increase the level of preparedness and capability of the RMAF in safeguarding the country’s airspace”
      ==========
      MKM = BARTER PALM OIL
      MIG29N = BARTER PALM OIL
      MALONDESH has used palm oil to barter for military equipment, including fighter jets. The MALONDESH Armed Forces (MAF) is made up of the Royal MALONDESH Navy, the Royal MALONDESH Air Force, and the MALONDESH Army.
      ----
      A400M
      PEMBAYARAN BERPERINGKAT = DEBT
      MALONDESH membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan bayar berperingkat.
      ----
      FA50M BARTER PALM OIL
      On the other hand, South Korea aims to sell another 18 FA-50s to MALONDESH in the future. MALONDESH announced that at least half of the payment would be made in palm oil
      ----
      SCORPENE BARTER PALM OIL
      Under the deal, France would buy RM819 million’s (€230 million) worth of MALONDESH palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and techNOLogy transfer to local firms here.
      ----
      PT91 BARTER PALM OIL RUBBER
      Payment for the purchase includes 30 percent of direct off-set in the form of training and techNOLogy transfer and 30 percent of indirect off-set in commodities like palm oil and rubber
      ==========
      POLANDIA NATO (North Atlantic Treaty Organization) = KESULITAN AMRAAMs USA
      MALONDESH NATO (Not Action Talk ONLY) = DOWNGRADE BARTER SAWIT

      Hapus
    5. BACA

      Although the first 12 FA-50s were delivered in record time, as they were a provisional version (GF, Gap Filler) taken from the inventory of the Republic of Korea Air Force (RoKAF),

      The Polish news site WNP reports that Korea Aerospace Industries, the manufacturer of the FA-50, is still waiting for permission from Washington to integrate the AMRAAM air-to-air missile into the fighters sold to Poland. Despite the fact that both Poland and South Korea already operate this weapons system, the bureaucratic process could cause further delays.

      https://www.google.com/url?sa=t&source=web&rct=j&opi=89978449&url=https://www.aviacionline.com/poland-faces-delays-in-the-delivery-of-fa-50pl-fighters-impact-on-training-and-modernization-of-its-air-force&ved=2ahUKEwjf0c-8iZ2OAxUKyDgGHQ-bD_cQFnoECEcQAQ&sqi=2&usg=AOvVaw21XFtO5WnYlsIP3kdb-LEm

      FA-50 YG KAU SEBUTKAN BLOCK 10 TUH ONLY GF


      GF = GAP FILLER FA-50GF YA TOLOL.. POLAND DAH BELI FA-50 B20 YA TOLOL.. DAH DELIVERY PESAWAT PERTAMA TAPI MASIH BERMASALAH INTEGRASI YA TOLOL



      BAHAS MILITER YA TOLOL

      Hapus
  22. BACA PORK.. BACA

    Although the first 12 FA-50s were delivered in record time, as they were a provisional version (GF, Gap Filler) taken from the inventory of the Republic of Korea Air Force (RoKAF),

    The Polish news site WNP reports that Korea Aerospace Industries, the manufacturer of the FA-50, is still waiting for permission from Washington to integrate the AMRAAM air-to-air missile into the fighters sold to Poland. Despite the fact that both Poland and South Korea already operate this weapons system, the bureaucratic process could cause further delays.

    https://www.google.com/url?sa=t&source=web&rct=j&opi=89978449&url=https://www.aviacionline.com/poland-faces-delays-in-the-delivery-of-fa-50pl-fighters-impact-on-training-and-modernization-of-its-air-force&ved=2ahUKEwjf0c-8iZ2OAxUKyDgGHQ-bD_cQFnoECEcQAQ&sqi=2&usg=AOvVaw21XFtO5WnYlsIP3kdb-LEm

    FA-50 YG KAU SEBUTKAN BLOCK 10 TUH ONLY GF


    GF = GAP FILLER FA-50GF YA TOLOL.. POLAND DAH BELI FA-50 B20 YA TOLOL.. DAH DELIVERY PESAWAT PERTAMA TAPI MASIH BERMASALAH INTEGRASI YA TOLOL

    BalasHapus
  23. MAHATHIR = MALAS MISKIN
    menyebut orang-orang suku Melayu terus-terusan miskin karena tak mau bekerja keras. Ia pun mengkritik sifat warga Melayu yang malah menyalahkan etnis lain karena kesuksesan mereka.
    ==========
    ANWAR IBRAHIM = MISKIN
    “Tapi saya kata, sebagai contoh projek tebatan banjir…kerana banjir itu menyeksa rakyat dan yang jadi mangsa itu orang miskin dan majoriti yang miskin itu Melayu. "Sebab itu kalau kita nak belanjakan kita kena teliti. Ini soal tadbir urus, mengurus negara itu harus dengan ketertiban, peraturan dan ke arah yang betul.
    ==========
    MALONDESH's household DEBT-to-GDP ratio
    December 2023 = 84.2%
    December 2020 = 93.1% (all-time high)
    December 2008 = 60.4% (record low)
    Some factors that have contributed to the growth in household DEBT include:
    • Government and private sector home ownership incentives
    • Sales and service tax (SST) incentives for the purchase of motor vehicles between 2020 and 2022
    ==========
    MALONDESH has faced several crises, including political, financial, and economic crises:
    • Political crisis
    From 2020–2022, MALONDESH experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
    • Financial crisis
    MALONDESH experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
    • Economic crisis
    MALONDESH's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, MALONDESH's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
    • Household DEBT crisis
    As of the end of 2023, MALONDESH's household DEBT-to-GDP ratio was 84.2%, with household DEBT reaching RM1.53 trillion
    • MALONDESH has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
    ==========
    MALONDESH telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
    • Krisis politik
    MALONDESH mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
    1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
    2. PeNOLakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
    3. Dampak politik pandemi COVID-19
    4. Proklamasi Darurat 2021
    5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
    • Krisis beras
    MALONDESH mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
    • Krisis mata uang
    Ringgit MALONDESH mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
    1. Kinerja ekspor yang buruk
    2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
    3. Kekhawatiran geopolitik
    4. Ketidakpastian mengenai prospek ekonomi China

    BalasHapus
  24. FOREIGN EXCHANGE RESERVES
    INDONESIA = USD 152.5 billion
    MALONDESH = USD 118,7 billion
    Indonesia’s foreign exchange reserves fell to USD 152.5 billion in April 2025,. The latest figures are sufficient to cover 6.4 months of imports or 6.2 months of imports and government foreign debt payments
    As of April 30, 2025, Bank Negara MALONDESH (BNM) held US$118.7 billion in international reserves. These reserves are sufficient to finance 5.0 months of imports of goods and services. The reserves are also 0.9 times the total short-term external debt.
    ========
    KURANG BERAS =
    • KEBUTUHAN BERAS = 3 JUTA METRIK TON
    • PRODUKSI BERAS = 1,44 JUTA MATRIK TON
    • KURANG BERAS : 3-1,44 = 1,56 JUTA METRIK TON
    Rice is an important staple food in MALONDESH. As of 2024, people in the country consumed approximately three million metric tons of rice. e Southeast Asian country produced around 1.44 million metric tons of rice, less than half of the annual consumption in the same year.
    ===================
    KURANG BERAS 50-60%
    KURANG BERAS 50-60%
    KURANG BERAS 50-60%
    Produksi beras di MALONDESH saat ini hanya mencukupi sekitar 40-50% dari kekebutuhanan nasionalnya. Ini berarti MALONDESH mengalami kekurangan beras dan bergantung pada impor untuk memenuhi sisa kekebutuhanan.
    ===================
    END 2024 RATIO DEBT 84,2 TO GDP
    END 2024 RATIO DEBT 84,2 TO GDP
    END 2024 RATIO DEBT 84,2 TO GDP
    DEBT RM 1,63 TRILLION
    DEBT RM 1,63 TRILLION
    DEBT RM 1,63 TRILLION
    As of the end of 2024, the Finance Ministry (MoF) of MALONDESH estimated that the national household DEBT would be RM1.63 trillion. This is equivalent to 84.2% of the country's gross domestic product (GDP).
    ==========
    DEBT 2024 = RM 1.63 TRILLION
    DEBT 2023 = RM 1,53 TRILLION
    DEBT 2022 = RM 1,45 TRILLION
    DEBT 2021 = RM 1,38 TRILLION
    DEBT 2020 = RM 1,32 TRILLION
    DEBT 2019 = RM 1,25 TRILLION
    DEBT 2018 = RM 1,19 TRILLION
    The Finance Ministry stated that the aggregate national household DEBT stood at RM1.53 trillion between 2018 and 2023. In aggregate, it said the household DEBT for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018). “The ratio of household DEBT to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
    ==========
    IMF 2024-2029 = DEBT MALONDESH $ 121,9 BILLION
    IMF 2024-2029 = DEBT MALONDESH $ 121,9 BILLION
    IMF 2024-2029 = DEBT MALONDESH $ 121,9 BILLION
    The national DEBT in MALONDESH was forecast to continuously increase between 2024 and 2029 by in total 121.9 billion U.S. dollars (+38.56 percent). After the tenth consecutive increasing year, the national DEBT is estimated to reach 438.09 billion U.S. dollars and therefore a new peak in 2029. Notably, the national DEBT was continuously increasing over the past years.
    As defined by the International Monetary Fund, the general government gross DEBT consists of all liabilities that require payment or payments of interest and/or principal by the DEBTor to the creditor at a date or dates in the future.

    BalasHapus
  25. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    SEWAan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.MALONDESH (ATM).
    =========
    KEYWORDS
    1 UNIT JAVELIN = 3 UNIT NLAW
    4.5 KM JAVELIN = 1 KM NLAW
    ---
    Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
    The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit generally around $30,000 to $33,000. It has a range of up to 1,000 meters and can destroy a tank in a single shot.
    =========
    KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
    -
    1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
    -
    2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
    -
    USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
    =========
    CHEAPEST VARIANT HISAR OPV
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALONDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    =========
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    =========
    ANKA OMPONG =
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    MALONDESH to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
    =========
    The Royal MALONDESH Navy (RMN) faces a number of challenges, including a fleet that is aging, delays in acquiring new ships, and corruption.
    Aging fleet
    • Half of the RMN's fleet of 49 ships are past their serviceable lifespan.
    • The fleet is largely past its prime, making it difficult to monitor the country's extensive maritime domain.
    Delays in acquiring new ships
    • The RMN has experienced delays in acquiring new ships, which has contributed to the use of ships that are beyond their useful life.
    • The RMN has canceled plans to add new batches of Lekiu frigates.
    Corruption
    • Some of the RMN's modernization efforts have been linked to corruption.
    • The Public Accounts Committee (PAC) found that BNS subsidiaries did not use all of the government's payments for the RM9 billion warship procurement.
    Other challenges
    • Maritime boundary disputes with other countries, including China, Indonesia, and the Philippines
    • Sea robbery, smuggling, and illegal sand mining
    • Maritime piracy, which can also be used by terrorists to raise funds
    China's assertiveness in the South China Sea
    .
    ------------------
    MALONDESH's armed forces have been underfunded for some time, due to a lack of political will to increase defense spending. This has limited the country's ability to modernize and respond to threats.
    Causes of underfunding
    • Government spending
    MALONDESH governments have been reluctant to cut spending in other areas to fund defense
    • Size of armed forces
    Governments have been unwilling to reduce the size of the armed forces by cutting manpower and equipment
    • Corruption
    Corruption risks remain significant in MALONDESH's defense governance architecture
    Effects of underfunding
    • Limited procurement: The navy and air force have struggled to procure new assets to modernize
    • Outdated equipment: The MAF has outdated logistics equipment
    • Limited ability to respond to threats: The MAF has been unable to improve its fighting capacity to deal with external threats

    BalasHapus
  26. Infonya FA-50 pesanan .alaydesh, Filipina dan Poland ia source code tidak kompatible antara radar aesa Kimbo dengan rudal² made in US...😅🤣😂 ke tunda 2 tàhun.??

    BalasHapus
  27. Pintar nya USA dalam berdagang mengunci kontrak Penjualan Rudal Air to Air sekelas AIM-9 Sidewinder dan AIM-120 AMRAAM kepada Negara Lain.

    1. USA mengunci Kontrak Procurement Rudal AIM-9 dan AIM-120 kepada negara lain. Artinya ada Uang Masuk ke Kasa USA

    2. Untuk Jet Fighter buatan Negara Lain Tidak Diberikan Source Code Rudal AIM-9 dan AIM-120. Artinya USA Memaksa Negara Lain yang beli Jet Fighter Bukan Buatan USA pada pilihan Sulit yaitu:
    1. Harus Beli Jet Fighter Made in USA

    2. Atau Upgrade Avionics Made in USA


    3. Malondesh masuk Jebakan Betmen USA karena telah Shopping FA-50 Made in Korea.

    4. Perhatikan situasi ekonomi USA yang over heat sehingga Harus dilakukan Segala Cara agar menjadi Sehat dan Tumbuh perekonomian USA.


    Kemudian... negara mana yang gigit jari?
    Tentu dong itu pasti Malondesh yang telah Shopping FA-50 Made in KOREA

    Opsi lain buat Malondesh adalah Shopping Rudal Air to Air Made in KOREA.

    BalasHapus
  28. Balasan
    1. $1.3 BILLION = SEWA = SURAT HASRAT = NGEMIS
      -------------
      2025 $1.3 BILLION MINDEF =
      MAINTENANCE
      REPAIRS
      ASSETS.
      Military spending In 2025, MALONDESH Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
      This budget included $1.3 billion for maintenance, repairs, and new military assets.
      -------------
      BEKAS RONGSOKAN 33 TAHUN =
      SG F35 A/B = BRAND NEW
      RI RAFALE F4 = BRAND NEW
      THAILAND GRIPEN E/F = BRAND NEW
      PINOY GRIPEN C/D = BRAND NEW
      MYANMAR SU30SME = BRAND NEW
      MALONDESH F18 = NGEMIS BEKAS RONGSOK
      -----------
      NGEMIS RONGSOKAN 33 TAHUN SAMPAI 2027 =
      MENUNGGU 47 SUPER HORNETS
      MENUNGGU 47 SUPER HORNETS
      DELAY DELIVERIES OF 47 SUPER HORNETS
      The Kuwait Air Force is expected to declare full operational capability for its Super Hornets by 2027. Only then will the legacy Hornets be released to Malondesh.
      The issue now is that the delivery of Kuwait’s Rhinos hinges on the completion of deliveries of 47 Super Hornets ordered by the US Navy as attrition
      -----------

      KASIAN LOI = SURAT HASRAT
      KLAIM KAYA = SHOPPING MORTAR
      -----
      LIMA 2025
      -LOI kepada Mildef International Technologies Sdn Bhd bagi permohonan perolehan 136 unit Kenderaan Perisai Jenis A (KJA) & Infrastruktur yang bernilai RM1.88 bilion.
      -Penambahan 2 Long Range Radar (LRR) di Bukit Peteri, Terengganu dan Bukit Lunchu, Johor bernilai RM277 juta.
      -Perolehan 178 buah Light Anti-Tank Weapon Reloadable (LATW) – Short Range bernilai RM49 juta
      -Membekal dan menghantar 780 laras Light Anti-Tank Weapon (LAW) C90 bernilai RM35 juta
      -Membekal dan menghantar 18 laras Mortar 81mm bernilai RM30 juta
      -Pembekalan 2 set pelancar Naval Strike Missile (NSM) bernilai RM44 juta.
      -Membekal dan menghantar 1,300 butir Rounds 84mm Recoilless High Explosive (HE) bernilai RM42 juta.
      -Membekal dan menghantar 5,000 butir Mortar Bomb 60mm Illuminating IR kepada Tentera Darat bernilai RM34 juta
      -Membekal dan menghantar 1,900 butir Mortar Bomb 120mm High Explosive (HE) kepada Tentera Darat bernilai RM34 juta;l
      -Membekal dan menghantar peluru 5.56mm Ball bernilai RM32 juta
      -Membekal dan menghantar 1,000 butir Rounds 125mm HEAT-SD-T” bernilai RM31 juta.
      ==========
      LOI NSM = LCS OMPONG
      LOI NSM = LCS OMPONG
      LOI TARANTULA = GOIB
      Mindef hari ini menandatangani surat hasrat (LOI) bernilai RM1.8 bilion kepada Mildef International Technologies Sdn. Bhd. (MILDEF).
      Selain Tarantula, Mindef turut menganugerahkan LOI bernilai RM800 juta kepada Lumut Naval Shipyard (Lunas) bagi perolehan kelengkapan logistik untuk kapal tempur pesisir (LCS). Seterusnya membekal 2 set pelancar Naval Strike Missile (NSM) bernilai RM44 juta.
      ===================
      SEWA MALONDESH SEWA
      1. SEWA 28 HELI
      2. SEWA L39 ITCC
      3. SEWA EC120B
      4. SEWA FLIGHT SIMULATION TRAINING DEVICE (FSTD)
      5. SEWA 1 UNIT SISTEM SIMULATOR EC120B
      6. SEWA HOVERCRAFT
      7. SEWA AW139
      8. SEWA FAST INTERCEPTOR BOAT (FIB)
      9. SEWA UTILITY BOAT
      10. SEWA RIGID HULL FENDER BOAT (RHFB)
      11. SEWA ROVER FIBER GLASS (ROVER)
      12. SEWA MV AISHAH AIM 4
      13. SEWA BMW R1250RT
      14. SEWA 4x4 VECHICLE
      15. SEWA VSHORAD
      16. SEWA TRUCK
      17. SEWA HONDA CIVIC
      18. SEWA PATROL BOATS
      19. SEWA OUTBOARD MOTORS
      20. SEWA TRAILERS
      21. SEWA SUPERBIKES
      22. SEWA SIMULATOR MKM
      23. TUDM SEWA 12 AW149
      24. TUDM SEWA 4 AW139
      25. TUDM SEWA 5 EC120B
      26. TLDM SEWA 2 AW159
      27. TDM SEWA 4 UH-60A
      28. TDM SEWA 12 AW149
      29. BOMBA SEWA 4 AW139
      30. MMEA SEWA 2 AW159
      31. POLIS SEWA 7 BELL429
      32. SEWA MOTOR POLIS

      Hapus
    2. $1.3 BILLION = SEWA = SURAT HASRAT = NGEMIS
      -------------
      2025 $1.3 BILLION MINDEF =
      MAINTENANCE
      REPAIRS
      ASSETS.
      Military spending In 2025, MALONDESH Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
      This budget included $1.3 billion for maintenance, repairs, and new military assets.
      -------------
      BEKAS RONGSOKAN 33 TAHUN =
      SG F35 A/B = BRAND NEW
      RI RAFALE F4 = BRAND NEW
      THAILAND GRIPEN E/F = BRAND NEW
      PINOY GRIPEN C/D = BRAND NEW
      MYANMAR SU30SME = BRAND NEW
      MALONDESH F18 = NGEMIS BEKAS RONGSOK
      -----------
      NGEMIS RONGSOKAN 33 TAHUN SAMPAI 2027 =
      MENUNGGU 47 SUPER HORNETS
      MENUNGGU 47 SUPER HORNETS
      DELAY DELIVERIES OF 47 SUPER HORNETS
      The Kuwait Air Force is expected to declare full operational capability for its Super Hornets by 2027. Only then will the legacy Hornets be released to Malondesh.
      The issue now is that the delivery of Kuwait’s Rhinos hinges on the completion of deliveries of 47 Super Hornets ordered by the US Navy as attrition
      -----------
      KASIAN LOI = SURAT HASRAT
      KLAIM KAYA = SHOPPING MORTAR
      -----
      LIMA 2025
      -LOI kepada Mildef International Technologies Sdn Bhd bagi permohonan perolehan 136 unit Kenderaan Perisai Jenis A (KJA) & Infrastruktur yang bernilai RM1.88 bilion.
      -Penambahan 2 Long Range Radar (LRR) di Bukit Peteri, Terengganu dan Bukit Lunchu, Johor bernilai RM277 juta.
      -Perolehan 178 buah Light Anti-Tank Weapon Reloadable (LATW) – Short Range bernilai RM49 juta
      -Membekal dan menghantar 780 laras Light Anti-Tank Weapon (LAW) C90 bernilai RM35 juta
      -Membekal dan menghantar 18 laras Mortar 81mm bernilai RM30 juta
      -Pembekalan 2 set pelancar Naval Strike Missile (NSM) bernilai RM44 juta.
      -Membekal dan menghantar 1,300 butir Rounds 84mm Recoilless High Explosive (HE) bernilai RM42 juta.
      -Membekal dan menghantar 5,000 butir Mortar Bomb 60mm Illuminating IR kepada Tentera Darat bernilai RM34 juta
      -Membekal dan menghantar 1,900 butir Mortar Bomb 120mm High Explosive (HE) kepada Tentera Darat bernilai RM34 juta;l
      -Membekal dan menghantar peluru 5.56mm Ball bernilai RM32 juta
      -Membekal dan menghantar 1,000 butir Rounds 125mm HEAT-SD-T” bernilai RM31 juta.
      ==========
      NO MONEY =
      THE MALAYS AREN’T GOING TO BUY YOUR STUFF
      THEY DON’T HAVE ANY MONEY
      Far-right US commentator Bill O’Reilly derided Chinese President Xi Jinping over the latter’s official visit to MALONDESH that ended today, disparaging the Southeast Asian nation’s economic capacity in a clip circulating online.
      Speaking dismissively in the clip, O’Reilly claimed not to know what Xi hoped to gain from visiting MALONDESH amid a brewing trade war between US and China.
      “The Malays aren’t going to buy your stuff, they don’t have any money!” he said in the clip.

      Hapus
    3. $1.3 BILLION = SEWA = SURAT HASRAT = NGEMIS
      -------------
      2025 $1.3 BILLION MINDEF =
      MAINTENANCE
      REPAIRS
      ASSETS.
      Military spending In 2025, MALONDESH Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
      This budget included $1.3 billion for maintenance, repairs, and new military assets.
      -------------
      BEKAS RONGSOKAN 33 TAHUN =
      SG F35 A/B = BRAND NEW
      RI RAFALE F4 = BRAND NEW
      THAILAND GRIPEN E/F = BRAND NEW
      PINOY GRIPEN C/D = BRAND NEW
      MYANMAR SU30SME = BRAND NEW
      MALONDESH F18 = NGEMIS BEKAS RONGSOK
      -----------
      NGEMIS RONGSOKAN 33 TAHUN SAMPAI 2027 =
      MENUNGGU 47 SUPER HORNETS
      MENUNGGU 47 SUPER HORNETS
      DELAY DELIVERIES OF 47 SUPER HORNETS
      The Kuwait Air Force is expected to declare full operational capability for its Super Hornets by 2027. Only then will the legacy Hornets be released to Malondesh.
      The issue now is that the delivery of Kuwait’s Rhinos hinges on the completion of deliveries of 47 Super Hornets ordered by the US Navy as attrition
      ===================
      ===================
      1. real contract and delivery five units C130J Hercules
      2. real contract and delivery two unit Frankethal class Countermine vessels (Pulau Fani class)
      3. real contract and delivery four units KCR 60 Fast missiles boats PT PAL
      4. real contract and delivery 9 units Bell 412 EPI
      5. real contract and delivery 8 additional H225 M
      6. real contract and delivery 2 units Bell 429 Global Ranger
      7. real contract and delivery 18 Medium weight tank Harimau
      8. real contract and delivery 22 Pandur II IFV
      9. real contract and delivery two unit Hospital Ships
      10. real contract and delivery one unit Command and control variant C295
      11. real contract and delivery one unit CN235 MPA
      12. real contract and delivery 7 Badak FSV, 26 ANOa apc and 10 additional Komodo recce vehicles in 2022
      13. real contract and delivery 4 AS 550 Fennec and 8 AS565 MBE, in 2024
      14. real contract and delivery five NC212i in 2023
      15. real contract and delivery one Leonardo RAT 31 DL/M
      16. real contract and delivery five C130H ordered from Australia in 2013 (finished in 2020) after received Grant of 4 C130H
      17. real contract and delivery 9 Teluk Bintuni class LST
      18. real contract and delivery six CH4B UCAV ordered in 2019
      19. real contract t and process building of Abeking & Rasmussen design ocean Hydrography ship
      20. real contract and process building two AH140 AAW Frigate
      21. real contract and process building two OPV 90 ASW patrol vessels
      22. real contract and process building 42 Dassault Rafale F4 fighter
      23. real contract and process building two A400M heavy cargo aircraft
      24. real contract and delivery M3 Amphibious bridging system
      25. real contract and delivery 3 KT1 Wong Bee ordered in 2018 along with radar and spares for T/A50
      26. real contract and process building 13 GM 403 GCI radar from Thales
      27. real contract and process building 12 ANKA S UCAV
      28. real contract and process building additional CH4B UCAV
      29. real contract and delivery Slingshot Satcom system
      30. real contract and delivery Falcon 8X aircraft
      31. real contract and process Thales Alenia earth observation satelite
      32. real contract and process 22 S70M Blackhawk
      33. real contract and process 6 N219 aircraft
      34. real contract and process 3 CN235 for Army
      35. real contract and process 2 PPA patrol Frigate
      36. real contract and process 2 Scorpene Subs
      37. real contract and process Khan Short Range ballistic missiles from Turki
      38. real contract and process Trisula Air defense system
      39. real contract and process 6 T50i aircraft
      40. real contract and delivery Oiler and replenishment ship
      41. real contract and delivery several Tug Harbor ships
      42. real contract and process Submarine rescue vessels and system
      43. real contract and delivery two Large LCU for army
      44. real contract and process 45 Atmaca

      Hapus
    4. $1.3 BILLION = SEWA = SURAT HASRAT = NGEMIS
      -------------
      2025 $1.3 BILLION MINDEF =
      MAINTENANCE
      REPAIRS
      ASSETS.
      Military spending In 2025, MALONDESH Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
      This budget included $1.3 billion for maintenance, repairs, and new military assets.
      -------------
      BEKAS RONGSOKAN 33 TAHUN =
      SG F35 A/B = BRAND NEW
      RI RAFALE F4 = BRAND NEW
      THAILAND GRIPEN E/F = BRAND NEW
      PINOY GRIPEN C/D = BRAND NEW
      MYANMAR SU30SME = BRAND NEW
      MALONDESH F18 = NGEMIS BEKAS RONGSOK
      -----------
      NGEMIS RONGSOKAN 33 TAHUN SAMPAI 2027 =
      MENUNGGU 47 SUPER HORNETS
      MENUNGGU 47 SUPER HORNETS
      DELAY DELIVERIES OF 47 SUPER HORNETS
      The Kuwait Air Force is expected to declare full operational capability for its Super Hornets by 2027. Only then will the legacy Hornets be released to Malondesh.
      The issue now is that the delivery of Kuwait’s Rhinos hinges on the completion of deliveries of 47 Super Hornets ordered by the US Navy as attrition
      -----------
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      SEWAan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.MALONDESH (ATM).
      ----
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit generally around $30,000 to $33,000. It has a range of up to 1,000 meters and can destroy a tank in a single shot.
      ----
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      ------
      CHEAPEST VARIANT HISAR OPV
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALONDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      ------
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      ------
      ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      MALONDESH to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.

      Hapus
  29. BERITA PERTAHANAN INDIANESIA MAKIN LUCU..... Akibat SEPI SHOPING.... 🤣🤣🤣

    1. BERITA SIGN MOU
    2. BERITA KERJASAMA
    3. BERITA PERENCANAAN
    4. BERITA LIHAT LIHAT

    BalasHapus
    Balasan
    1. $1.3 BILLION = SEWA = SURAT HASRAT = NGEMIS
      -------------
      2025 $1.3 BILLION MINDEF =
      MAINTENANCE
      REPAIRS
      ASSETS.
      Military spending In 2025, MALONDESH Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
      This budget included $1.3 billion for maintenance, repairs, and new military assets.
      -------------
      BEKAS RONGSOKAN 33 TAHUN =
      SG F35 A/B = BRAND NEW
      RI RAFALE F4 = BRAND NEW
      THAILAND GRIPEN E/F = BRAND NEW
      PINOY GRIPEN C/D = BRAND NEW
      MYANMAR SU30SME = BRAND NEW
      MALONDESH F18 = NGEMIS BEKAS RONGSOK
      -----------
      NGEMIS RONGSOKAN 33 TAHUN SAMPAI 2027 =
      MENUNGGU 47 SUPER HORNETS
      MENUNGGU 47 SUPER HORNETS
      DELAY DELIVERIES OF 47 SUPER HORNETS
      The Kuwait Air Force is expected to declare full operational capability for its Super Hornets by 2027. Only then will the legacy Hornets be released to Malondesh.
      The issue now is that the delivery of Kuwait’s Rhinos hinges on the completion of deliveries of 47 Super Hornets ordered by the US Navy as attrition
      -----------
      SOME PROBLEMS MALONDESH SHIPYARDS FACE IN MAKING WARSHIPS INCLUDE:
      • Supply chain disruptions
      In 2022, COVID-19 and the Russia-Ukraine conflict disrupted supply chains and led to shortages of skilled personnel.
      • Low-quality products
      Workers may use sketches, photos, and previous experience instead of following good engineering practices, which can lead to low-quality products, reworks, higher costs, and late deliveries.
      • Traditional shipbuilding
      Traditional shipbuilding is a slow, expensive, and laborious process. It involves a systems approach, where each system has its own drawings, and work crews may compete for work space.
      • Resource shortage
      The shipbuilding industry is facing a shortage of resources due to an aging workforce and a lack of young people willing to enter the trade.
      ===================
      SOME WEAKNESSES OF THE MALONDESH SHIPBUILDING INDUSTRY INCLUDE:
      1. Delays
      Consistent delays in delivering ships to customers has reduced profitability and financial results.
      2. Small tonnage
      MALONDESH shipbuilding industry is relatively weak compared to other countries in the region, as the tonnage of ships manufactured is relatively small.
      3. Supply chain disruptions
      Disruptions caused by COVID-19 and the Russia-Ukraine conflict have led to supply chain disruptions and shortages of skilled personnel
      ==============
      PROBLEMS MALONDESH SHIPYARD
      Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.


      Hapus
  30. BERITA PERTAHANAN INDIANESIA MAKIN LUCU..... Akibat SEPI SHOPING.... 🤣🤣🤣

    1. BERITA SIGN MOU
    2. BERITA KERJASAMA
    3. BERITA PERENCANAAN
    4. BERITA LIHAT LIHAT BROSHUR

    BalasHapus
    Balasan
    1. $1.3 BILLION = SEWA = SURAT HASRAT = NGEMIS
      -------------
      2025 $1.3 BILLION MINDEF =
      MAINTENANCE
      REPAIRS
      ASSETS.
      Military spending In 2025, MALONDESH Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
      This budget included $1.3 billion for maintenance, repairs, and new military assets.
      -------------
      BEKAS RONGSOKAN 33 TAHUN =
      SG F35 A/B = BRAND NEW
      RI RAFALE F4 = BRAND NEW
      THAILAND GRIPEN E/F = BRAND NEW
      PINOY GRIPEN C/D = BRAND NEW
      MYANMAR SU30SME = BRAND NEW
      MALONDESH F18 = NGEMIS BEKAS RONGSOK
      -----------
      NGEMIS RONGSOKAN 33 TAHUN SAMPAI 2027 =
      MENUNGGU 47 SUPER HORNETS
      MENUNGGU 47 SUPER HORNETS
      DELAY DELIVERIES OF 47 SUPER HORNETS
      The Kuwait Air Force is expected to declare full operational capability for its Super Hornets by 2027. Only then will the legacy Hornets be released to Malondesh.
      The issue now is that the delivery of Kuwait’s Rhinos hinges on the completion of deliveries of 47 Super Hornets ordered by the US Navy as attrition
      -----------
      SEWA 28 HELIKOPTER
      The government signed an agreement with Weststar Aviation Sdn Bhd to SEWA 28 helicopters for use by ministries and other government agencies.
      SEWA VVSHORAD CINA = 30 YEARS
      SEWA VVSHORAD CINA = 30 YEARS
      SEWA TRUK CINA 3 TON = 30 YEARS
      The Madani government announced that it had struck a deal with China to SEWA 62 new train sets for KTM Bhd. The estimated cost for the deal is RM10.7 billion and it will be covered in installments over a 30-year SEWA period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VVSHORAD proposals. There is also the massive leasing deals for helicopters for all the services to think about.
      SEWA PESAWAT
      ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal MALONDESH Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
      SEWA SIMULATOR MKM TAHUN
      Five-year contract for Sukhoi’s simulators. Publicly listed HeiTech Padu Bhd has announced that it had been awarded a RM67 million, five-year contract to operate and maintain the Su-30MKM flight simulators at the RMAF airbase in Gong Kedak
      SEWA HELI SEWA SIMULATOR
      Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
      SEWA HELI
      4 buah Helikopter Leonardo AW 139 yang diperolehi secara SEWAan ini adalah untuk kegunaan Tentera Udara Diraja MALONDESH (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
      SEWA BOAT
      SEWAan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
      SEWA HIDROGRAFI
      tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak SEWAan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
      SEWA MOTOR
      The Royal Military Police Corp (KPTD) celebrated the SEWA of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
      SEWA PATROL BOATS : SEWA OUTBOARD MOTORS : SEWA TRAILERS
      Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and


      Hapus
    2. $1.3 BILLION = SEWA = SURAT HASRAT = NGEMIS
      -------------
      2025 $1.3 BILLION MINDEF =
      MAINTENANCE
      REPAIRS
      ASSETS.
      Military spending In 2025, MALONDESH Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
      This budget included $1.3 billion for maintenance, repairs, and new military assets.
      -------------
      BEKAS RONGSOKAN 33 TAHUN =
      SG F35 A/B = BRAND NEW
      RI RAFALE F4 = BRAND NEW
      THAILAND GRIPEN E/F = BRAND NEW
      PINOY GRIPEN C/D = BRAND NEW
      MYANMAR SU30SME = BRAND NEW
      MALONDESH F18 = NGEMIS BEKAS RONGSOK
      -----------
      NGEMIS RONGSOKAN 33 TAHUN SAMPAI 2027 =
      MENUNGGU 47 SUPER HORNETS
      MENUNGGU 47 SUPER HORNETS
      DELAY DELIVERIES OF 47 SUPER HORNETS
      The Kuwait Air Force is expected to declare full operational capability for its Super Hornets by 2027. Only then will the legacy Hornets be released to Malondesh.
      The issue now is that the delivery of Kuwait’s Rhinos hinges on the completion of deliveries of 47 Super Hornets ordered by the US Navy as attrition
      -----------
      2025-2016 = 10 TAHUN PRANK SPH
      2016 LOI SPH CAESAR
      2016 LOI SPH CAESAR
      2016 LOI SPH CAESAR
      PRANK NEXTER :Nexter in cooperation with Advanced Defense Systems (ADS) is proposing the CAESAR 155mm 52 .cal self propelled howitzer to the Malondeshn Army, in order to fill a capability gap. An LoI is signed during day three of DSA 2016.
      20 units are to be supplied, which include the supporting vehicles, and will boost the Malondeshn Army's firepower inventory.
      ==========
      ===================
      1.RASIO HUTANG 84.2% DARI GDP
      2. HUTANG NEGARA RM 1,63 TRLLIUN
      3. HUTANG 1MDB RM 18,2 BILLION
      4. TUNGGAKAN SEWA SABAH USD 15 BILLION
      5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
      6. SEWA SIMULATOR MKM
      7. PESAWAT MIG GROUNDED
      8. SEWA MOTOR POLIS
      9. PESAWAT MB339CM GROUNDED
      10. NURI GROUNDED SEWA BLACKHAWK
      11. FIVE PROCUREMENT CANCELLED
      12. 48 PESAWAT SKYHAWK HILANG
      13. MESIN JET 2 BUAH HILANG
      14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
      15. NO LST
      16. NO LPD – NGEMIS LPD USA
      17. NO TANKER
      18. NO KCR
      19. MONUMEN MIG29M UNTUK JIMAT KOS
      20. NO SPH
      21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
      22. NO HELLFIRE
      23. NO MPA ATR72 DELAYED
      24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
      25. NO HELI HEAVY ATTACK NGEMIS AH1Z
      26. NO M3 AMPHIBIUS RIG
      27. LCS MANGKRAK KARATAN
      28. OPV MANGKRAK
      29. TANK MOGOK STOP SPARE PARTS
      30. CN 235 MSA VERSI MSI USA
      31. SEWA MOTOR MILITARY POLICE
      32. RADAR GIFTED PAID USA
      33. 84% NO SAVING EVERY MONTH
      34. SEWA VVSHORAD
      35. SEWA TRUK 3 TON
      36. 4X4 SEWA 6X6 CANCELLED
      37. C130H DIGANTI 2045
      38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
      39. NO DRONE UCAV – ANKA ISR OMPONG
      40. SEWA BLACKHAWK SEWA AW159
      41. NO TRACKED SPH
      42. SEWA SIMULATOR HELI
      43. SPH CANCELLED
      44. SCORPION V150 CONDOR SIMBAS RETIRED
      45. NO PESAWAT COIN
      46. PILATUS MK II KARATAN
      47. PENCEROBOHAN 43X BTA 316 HARI
      48. SEWA AW139 SEWA COLIBRI
      49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
      50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
      51. LYNX GROUNDED
      52. MRCA CANCELLED SEWA PESAWAT ITTC
      53. MICA CANCELLED NSM CANCELLED
      54. NO LRAD NO MRAD JUST VSHORAD
      55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
      56. 4X NGEMIS F18 KUWAIT
      57. MENUNGGU 2050 KAPAL SELAM
      58. NO TANK AMPHIBI AV8 MOGOK BERASAP
      59. 84% NO SAVING EVERY MONTH
      60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
      61. MKM BARTER PALM OIL
      62. MIG29N BARTER PALM OIL
      63. A400M PEMBAYARAN BERPERINGKAT (HUTANG)
      64. SCORPENE BARTER PALM OIL
      65. PT91M BARTER PALM OIL RUBBER
      67. FA50M BARTER PALM OIL

      Hapus
    3. SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      SEWAan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.MALONDESH (ATM).
      =========
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit generally around $30,000 to $33,000. It has a range of up to 1,000 meters and can destroy a tank in a single shot.
      =========
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      =========
      CHEAPEST VARIANT HISAR OPV
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALONDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      =========
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      =========
      ANKA OMPONG =
      WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      MALONDESH to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
      =========
      MALONDESH's military faces many problems, including corruption, poor planning, and outdated equipment. These issues have made the MALONDESH military vulnerable to threats from within and outside the country.
      Corruption
      • The defense sector is vulnerable to corruption from foreign and domestic interests.
      • There is a lack of parliamentary oversight and financial scrutiny.
      Poor planning
      • There are issues with procurement, including interference from political leaders.
      • The MALONDESH procurement system needs reform.
      Outdated equipment
      • Most of the equipment in the MALONDESH military was purchased between the 1970s and 1990s.
      • The military lacks modern and latest military assets.
      • The military has an aging fleet of trainer and light-combat aircraft.
      ============
      MALONDESH's military has been criticized for its outdated equipment and lack of modern assets. Some say that the military's preparedness is not aligned with the country's economic growth and geopolitical situation.
      Outdated equipment
      • Ships: The government's auditor-general found that half of the navy's ships were operating beyond their serviceable lifespan.
      • Helicopters: Many of the helicopters were commissioned in the 1960s.
      • Submarines: The KD Rahman submarine experienced technical issues in 2010, preventing it from submerging.
      Lack of modern assets
      • The government has been unable to provide the military with modern defense assets.
      • The military's procurement system has been criticized for being susceptible to external interference.

      Hapus
    4. SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      SEWAan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.MALONDESH (ATM).
      =========
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit generally around $30,000 to $33,000. It has a range of up to 1,000 meters and can destroy a tank in a single shot.
      =========
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      =========
      CHEAPEST VARIANT HISAR OPV
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALONDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      =========
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      =========
      ANKA OMPONG =
      WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      MALONDESH to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
      =========
      TIAP TAHUN MEMBUAL SPH

      2016 PRANK NEXTER
      Nexter in cooperation with Advanced Defense Systems (ADS) is proposing the CAESAR 155mm 52 .cal self propelled howitzer to the MALONDESH Army, in order to fill a capability gap. An LoI is signed during day three of DSA 2016. 20 units are to be supplied, which include the supporting vehicles, and will boost the MALONDESH Army's firepower inventory.
      --
      2023 PRANK MKE
      The MALONDESH Ministry of Defence has reportedly reviewing its planned acquisition of Yavuz 155mm
      --
      2022 PRANK KDS
      MALONDESH is expected to conclude a deal with Slovakia for the supply of EVA 155mm self-propelled howitzers for the MALONDESH Army.
      ===================
      The Royal MALONDESH Navy (RMN) has faced several weaknesses, including aging ships, a lack of modern assets, and personnel issues.
      Aging ships
      • The RMN's fleet includes ships that are operating past their serviceable lifespan.
      • A 45-year-old vessel sank during a patrol due to its age and a navigational error.
      • The KD Rahman submarine was unable to submerge in 2010 due to technical problems.
      Lack of modern assets
      • The RMN has struggled to acquire new ships.
      • The RMN has a lack of modern military assets.
      Personnel issues
      • Military personnel have struggled with thinking skills, decision-making, and problem-solving during operations.
      Management issues
      • The RMN has faced management failures, such as the delay in the acquisition of the New Generation Patrol Vessels (NGPVs).
      • The RMN has faced corruption scandals, such as the hijacking of allocated funds.


      Hapus
  31. Kenapa lon? Elo Kepanasan sambil Loncat Loncat kesana kemari kan?

    Tenang aja lon.... Indonesia sudah punya Rencana Strategis Procurement Military Asset baik buatan Dalam Negeri maupun Luar Negeri.

    Kamu hitung aja tiap tahun apakah Defense Budget Malondesh bisa mengejar Defense Budget Indonesia.

    Artinya
    Malondesh semakin terpinggirkan dan Tertinggal Donk

    Wkwkwk

    BalasHapus
  32. https://youtu.be/CegddbOL9vE?si=Iyji7dUDWgmMW93L

    Design Project Kapal Catamaran untuk Indonesian Coast Guard

    Lanjutkan ke Kontrak Efektif kepada Galangan Kapal Swasta Nasional Indonesia!!!

    BalasHapus
  33. GEMPURWIRA2 Juli 2025 pukul 14.15
    BERITA PERTAHANAN INDIANESIA MAKIN LUCU..... Akibat SEPI SHOPING.... 🤣🤣🤣

    1. BERITA SIGN MOU
    2. BERITA KERJASAMA
    3. BERITA PERENCANAAN
    4. BERITA LIHAT LIHAT BROSHUR
    ≈===≈===/========≈================

    Mereka tengah sesak duit to Bro...
    Sanggup jemput PMX utk bincang pasal pelaburan di Indon...🤣🤣🤣🤣🤣

    BalasHapus
    Balasan
    1. $1.3 BILLION = SEWA = SURAT HASRAT = NGEMIS
      -------------
      2025 $1.3 BILLION MINDEF =
      MAINTENANCE
      REPAIRS
      ASSETS.
      Military spending In 2025, MALONDESH Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
      This budget included $1.3 billion for maintenance, repairs, and new military assets.
      -------------
      BEKAS RONGSOKAN 33 TAHUN =
      SG F35 A/B = BRAND NEW
      RI RAFALE F4 = BRAND NEW
      THAILAND GRIPEN E/F = BRAND NEW
      PINOY GRIPEN C/D = BRAND NEW
      MYANMAR SU30SME = BRAND NEW
      MALONDESH F18 = NGEMIS BEKAS RONGSOK
      -----------
      NGEMIS RONGSOKAN 33 TAHUN SAMPAI 2027 =
      MENUNGGU 47 SUPER HORNETS
      MENUNGGU 47 SUPER HORNETS
      DELAY DELIVERIES OF 47 SUPER HORNETS
      The Kuwait Air Force is expected to declare full operational capability for its Super Hornets by 2027. Only then will the legacy Hornets be released to Malondesh.
      The issue now is that the delivery of Kuwait’s Rhinos hinges on the completion of deliveries of 47 Super Hornets ordered by the US Navy as attrition
      -----------
      OLDEST SHIP 2025 – 1953 = 72 YEARS
      72 YEARS = OLDEST SHIP
      72 YEARS = OLDEST SHIP
      72 YEARS = OLDEST SHIP
      Launched 9 September 1953 Completed 9 September 1954 The ship was transferred to the Royal Malayan Navy on 1 April 1958, being renamed Sri Perlis. Following transfer, Sri Perlis' 40mm Bofors gun and minesweeping gear was removed and replaced by three 20 mm Oerlikon cannon
      -----
      HIBAH KAPAL 1967 = The post stated that among his achievements in the MMEA were that he was the team leader for a suitability study on absorbing the US Coast Guard cutter – USCG Decisive. Checks on the US Coast Guard website showed that Decisive– a Reliance class cutter – was laid in 1967 and commissioned in 1968
      -----
      HIBAH KAPAL 1968 = USCGC Steadfast (WMEC-623) was a United States Coast Guard medium endurance cutter in commission for 56 years. Commissioned in 1968, Steadfast was home ported in St. Petersburg, Florida for her first 24 years of service...
      -----
      HIBAH KAPAL 1980 = KM Perwira, one of the two Bay class patrol boats donated to MMEA by Australia. It is likely that the Bay class was the design proposed for the tri-nation VLPV project in the late 80s.
      -----
      PERBAIKAN DIBIAYAI JEPANG = Kapal patroli kedua yang disumbangkan oleh Jepang Coast Guard (JCG) untuk APMM/MMEA akan berlayar ke pulang pada akhir Mei, saat ini kapal dengan nama KM Arau ini sedang dalam tahap perbaikan akhir yang dilakukan di Jepang.
      -----
      KAPAL MCMV 1984 = Kapal penangkis periuk api Lerici class ini dibina oleh Syarikat Intermarine di Itali dan dilancarkan pada 30 Oktober 1984
      -----
      HIBAH KAPAL 1989 DAN 1991 = Jepang menghibahkan dua kapal kelas 90m masing-masing PL-01 Ojima dan PL-02 Erimo, kedua kapal ini masuk dinas di JCG pada tahun 1989 dan 1991.
      -----
      HIBAH KAPAL1990–1991 = KM Pekan is an Ojika-class offshore patrol vessel operated by the MALONDESH Coast Guard. This ship, together with KM Arau and KM Marlin was transferred from the Japan Coast Guard to MALONDESH in order to strengthen the relations between the two countries. The ship was built as the Ojika for the Japanese Coast Guard in 1990–1991
      -----
      HIBAH KAPAL 1989 = KM Arau is an offshore patrol vessel operated by the MALONDESH Coast Guard. She was the second ship transferred from the Japan Coast Guard together with KM Pekan and KM Marlin. KM Arau was formerly kNOwn as Oki (PL-01) in the Japan Coast Guard.
      -----
      KAPAL BUATAN 1960 =
      BEKAS MARINE POLICE BEKAS MMEA = RMN informed us that they are getting a new boat – albeit a third hand one – courtesy of the MMEA. MMEA received from the Marine police back in 2011.
      -----
      KAPAL BEKAS BEKAS MMEA = RMN has taken delivery of ex-Sundang on October 23 after the patrol craft completed its refit. She is the first of two ex-MMEA PC




      Hapus
    2. $1.3 BILLION = SEWA = SURAT HASRAT = NGEMIS
      -------------
      2025 $1.3 BILLION MINDEF =
      MAINTENANCE
      REPAIRS
      ASSETS.
      Military spending In 2025, MALONDESH Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
      This budget included $1.3 billion for maintenance, repairs, and new military assets.
      -------------
      BEKAS RONGSOKAN 33 TAHUN =
      SG F35 A/B = BRAND NEW
      RI RAFALE F4 = BRAND NEW
      THAILAND GRIPEN E/F = BRAND NEW
      PINOY GRIPEN C/D = BRAND NEW
      MYANMAR SU30SME = BRAND NEW
      MALONDESH F18 = NGEMIS BEKAS RONGSOK
      -----------
      NGEMIS RONGSOKAN 33 TAHUN SAMPAI 2027 =
      MENUNGGU 47 SUPER HORNETS
      MENUNGGU 47 SUPER HORNETS
      DELAY DELIVERIES OF 47 SUPER HORNETS
      The Kuwait Air Force is expected to declare full operational capability for its Super Hornets by 2027. Only then will the legacy Hornets be released to Malondesh.
      The issue now is that the delivery of Kuwait’s Rhinos hinges on the completion of deliveries of 47 Super Hornets ordered by the US Navy as attrition
      -----------
      PMX =
      BAHAN KETAWA DUNIA
      BAHAN KETAWA DUNIA
      BAHAN KETAWA DUNIA
      Perdana Menteri Anwar Ibrahim dikritik kerana membuat gurauan berkaitan isteri kedua dalam pertemuannya dengan Presiden Rusia Vladimir Putin dalam lawatan rasmi ke Moscow.
      Tindakan itu dianggap kurang bijak, kurang sensitiviti terhadap budaya setempat sekali gus mencetuskan kecanggungan diplomatik.
      “Anwar patut malu. Dia yang mendakwa pakar budaya dunia, tidak sedar Rusia negara Kristian Ortodoks yang mengharamkan poligami.
      “Putin mengambil kesempatan untuk menunjukkan kejahilan budaya Anwar kepada media," kata Ketua Penerangan Bersatu Wan Saiful Wan Jan.
      Anggota Parlimen Tasek Gelugor mendakwa Putin juga sengaja memperolok Anwar dengan mendedahkan perbualan mereka.
      Wan Saiful juga berkata insiden itu menjadikan MALONDESH bahan ketawa dunia.
      ===========
      MKM = BARTER PALM OIL
      MIG29N = BARTER PALM OIL
      MALONDESH has used palm oil to barter for military equipment, including fighter jets. The MALONDESH Armed Forces (MAF) is made up of the Royal MALONDESH Navy, the Royal MALONDESH Air Force, and the MALONDESH Army.
      ----
      A400M
      PEMBAYARAN BERPERINGKAT = DEBT
      MALONDESH membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan bayar berperingkat.
      ----
      FA50M BARTER PALM OIL
      On the other hand, South Korea aims to sell another 18 FA-50s to MALONDESH in the future. MALONDESH announced that at least half of the payment would be made in palm oil
      ----
      SCORPENE BARTER PALM OIL
      Under the deal, France would buy RM819 million’s (€230 million) worth of MALONDESH palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and techNOLogy transfer to local firms here.
      ----
      PT91 BARTER PALM OIL RUBBER
      Payment for the purchase includes 30 percent of direct off-set in the form of training and techNOLogy transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.

      Hapus
    3. $1.3 BILLION = SEWA = SURAT HASRAT = NGEMIS
      -------------
      2025 $1.3 BILLION MINDEF =
      MAINTENANCE
      REPAIRS
      ASSETS.
      Military spending In 2025, MALONDESH Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
      This budget included $1.3 billion for maintenance, repairs, and new military assets.
      -------------
      BEKAS RONGSOKAN 33 TAHUN =
      SG F35 A/B = BRAND NEW
      RI RAFALE F4 = BRAND NEW
      THAILAND GRIPEN E/F = BRAND NEW
      PINOY GRIPEN C/D = BRAND NEW
      MYANMAR SU30SME = BRAND NEW
      MALONDESH F18 = NGEMIS BEKAS RONGSOK
      -----------
      NGEMIS RONGSOKAN 33 TAHUN SAMPAI 2027 =
      MENUNGGU 47 SUPER HORNETS
      MENUNGGU 47 SUPER HORNETS
      DELAY DELIVERIES OF 47 SUPER HORNETS
      The Kuwait Air Force is expected to declare full operational capability for its Super Hornets by 2027. Only then will the legacy Hornets be released to Malondesh.
      The issue now is that the delivery of Kuwait’s Rhinos hinges on the completion of deliveries of 47 Super Hornets ordered by the US Navy as attrition
      -----------
      1.RASIO HUTANG 84.2% DARI GDP
      2. HUTANG NEGARA RM 1,63 TRLLIUN
      3. HUTANG 1MDB RM 18,2 BILLION
      4. TUNGGAKAN SEWA SABAH USD 15 BILLION
      5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
      6. SEWA SIMULATOR MKM
      7. PESAWAT MIG GROUNDED
      8. SEWA MOTOR POLIS
      9. PESAWAT MB339CM GROUNDED
      10. NURI GROUNDED SEWA BLACKHAWK
      11. FIVE PROCUREMENT CANCELLED
      12. 48 PESAWAT SKYHAWK HILANG
      13. MESIN JET 2 BUAH HILANG
      14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
      15. NO LST
      16. NO LPD – NGEMIS LPD USA
      17. NO TANKER
      18. NO KCR
      19. MONUMEN MIG29M UNTUK JIMAT KOS
      20. NO SPH
      21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
      22. NO HELLFIRE
      23. NO MPA ATR72 DELAYED
      24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
      25. NO HELI HEAVY ATTACK NGEMIS AH1Z
      26. NO M3 AMPHIBIUS RIG
      27. LCS MANGKRAK KARATAN
      28. OPV MANGKRAK
      29. TANK MOGOK STOP SPARE PARTS
      30. CN 235 MSA VERSI MSI USA
      31. SEWA MOTOR MILITARY POLICE
      32. RADAR GIFTED PAID USA
      33. 84% NO SAVING EVERY MONTH
      34. SEWA VVSHORAD
      35. SEWA TRUK 3 TON
      36. 4X4 SEWA 6X6 CANCELLED
      37. C130H DIGANTI 2045
      38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
      39. NO DRONE UCAV – ANKA ISR OMPONG
      40. SEWA BLACKHAWK SEWA AW159
      41. NO TRACKED SPH
      42. SEWA SIMULATOR HELI
      43. SPH CANCELLED
      44. SCORPION V150 CONDOR SIMBAS RETIRED
      45. NO PESAWAT COIN
      46. PILATUS MK II KARATAN
      47. PENCEROBOHAN 43X BTA 316 HARI
      48. SEWA AW139 SEWA COLIBRI
      49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
      50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
      51. LYNX GROUNDED
      52. MRCA CANCELLED SEWA PESAWAT ITTC
      53. MICA CANCELLED NSM CANCELLED
      54. NO LRAD NO MRAD JUST VSHORAD
      55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
      56. 4X NGEMIS F18 KUWAIT
      57. MENUNGGU 2050 KAPAL SELAM
      58. NO TANK AMPHIBI AV8 MOGOK BERASAP
      59. 84% NO SAVING EVERY MONTH
      60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
      61. MKM BARTER PALM OIL
      62. MIG29N BARTER PALM OIL
      63. A400M PEMBAYARAN BERPERINGKAT (HUTANG)
      64. SCORPENE BARTER PALM OIL
      65. PT91M BARTER PALM OIL RUBBER
      67. FA50M BARTER PALM OIL
      ===================
      SEWA MALONDESH SEWA
      1. SEWA 28 HELI
      2. SEWA L39 ITCC
      3. SEWA EC120B
      4. SEWA FLIGHT SIMULATION TRAINING DEVICE (FSTD)
      5. SEWA 1 UNIT SISTEM SIMULATOR EC120B
      6. SEWA HOVERCRAFT
      7. SEWA AW139
      8. SEWA FAST INTERCEPTOR BOAT (FIB)
      9. SEWA UTILITY BOAT
      10. SEWA RIGID HULL FENDER BOAT (RHFB)
      11. SEWA ROVER FIBER GLASS (ROVER)
      12. SEWA MV AISHAH AIM 4
      13. SEWA BMW R1250RT
      14. SEWA 4x4 VECHICLE
      15. SEWA VSHORAD
      16. SEWA TRUCK
      17. SEWA HONDA CIVIC
      18. SEWA PATROL BOATS
      19. SEWA OUTBOARD MOTORS
      20. SEWA TRAILERS
      21. SEWA SUPERBIKES
      22. SEWA SIMULATOR MKM
      23. TUDM SEWA 12 AW149
      24. TUDM SEWA 4 AW139
      25. TUDM SEWA 5 EC120B
      26. TLDM SEWA 2 AW159
      27. TDM SEWA 4 UH-60A
      28. TDM SEWA 12 AW149
      29. BOMBA SEWA 4 AW139
      30. MMEA SEWA 2 AW159
      31. POLIS SEWA 7 BELL429
      32. SEWA MOTOR POLIS

      Hapus
    4. $1.3 BILLION = SEWA = SURAT HASRAT = NGEMIS
      -------------
      2025 $1.3 BILLION MINDEF =
      MAINTENANCE
      REPAIRS
      ASSETS.
      Military spending In 2025, MALONDESH Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
      This budget included $1.3 billion for maintenance, repairs, and new military assets.
      -------------
      BEKAS RONGSOKAN 33 TAHUN =
      SG F35 A/B = BRAND NEW
      RI RAFALE F4 = BRAND NEW
      THAILAND GRIPEN E/F = BRAND NEW
      PINOY GRIPEN C/D = BRAND NEW
      MYANMAR SU30SME = BRAND NEW
      MALONDESH F18 = NGEMIS BEKAS RONGSOK
      -----------
      NGEMIS RONGSOKAN 33 TAHUN SAMPAI 2027 =
      MENUNGGU 47 SUPER HORNETS
      MENUNGGU 47 SUPER HORNETS
      DELAY DELIVERIES OF 47 SUPER HORNETS
      The Kuwait Air Force is expected to declare full operational capability for its Super Hornets by 2027. Only then will the legacy Hornets be released to Malondesh.
      The issue now is that the delivery of Kuwait’s Rhinos hinges on the completion of deliveries of 47 Super Hornets ordered by the US Navy as attrition
      -----------
      2025-2016 = 10 TAHUN PRANK SPH
      2016 LOI SPH CAESAR
      2016 LOI SPH CAESAR
      2016 LOI SPH CAESAR
      PRANK NEXTER :Nexter in cooperation with Advanced Defense Systems (ADS) is proposing the CAESAR 155mm 52 .cal self propelled howitzer to the Malondeshn Army, in order to fill a capability gap. An LoI is signed during day three of DSA 2016.
      20 units are to be supplied, which include the supporting vehicles, and will boost the Malondeshn Army's firepower inventory.
      ==========
      KASIAN LOI = SURAT HASRAT
      KLAIM KAYA = SHOPPING MORTAR
      -----
      LIMA 2025
      -LOI kepada Mildef International Technologies Sdn Bhd bagi permohonan perolehan 136 unit Kenderaan Perisai Jenis A (KJA) & Infrastruktur yang bernilai RM1.88 bilion.
      -Penambahan 2 Long Range Radar (LRR) di Bukit Peteri, Terengganu dan Bukit Lunchu, Johor bernilai RM277 juta.
      -Perolehan 178 buah Light Anti-Tank Weapon Reloadable (LATW) – Short Range bernilai RM49 juta
      -Membekal dan menghantar 780 laras Light Anti-Tank Weapon (LAW) C90 bernilai RM35 juta
      -Membekal dan menghantar 18 laras Mortar 81mm bernilai RM30 juta
      -Pembekalan 2 set pelancar Naval Strike Missile (NSM) bernilai RM44 juta.
      -Membekal dan menghantar 1,300 butir Rounds 84mm Recoilless High Explosive (HE) bernilai RM42 juta.
      -Membekal dan menghantar 5,000 butir Mortar Bomb 60mm Illuminating IR kepada Tentera Darat bernilai RM34 juta
      -Membekal dan menghantar 1,900 butir Mortar Bomb 120mm High Explosive (HE) kepada Tentera Darat bernilai RM34 juta;l
      -Membekal dan menghantar peluru 5.56mm Ball bernilai RM32 juta
      -Membekal dan menghantar 1,000 butir Rounds 125mm HEAT-SD-T” bernilai RM31 juta.
      ==========
      LOI NSM = LCS OMPONG
      LOI NSM = LCS OMPONG
      LOI TARANTULA = GOIB
      Mindef hari ini menandatangani surat hasrat (LOI) bernilai RM1.8 bilion kepada Mildef International Technologies Sdn. Bhd. (MILDEF).
      Selain Tarantula, Mindef turut menganugerahkan LOI bernilai RM800 juta kepada Lumut Naval Shipyard (Lunas) bagi perolehan kelengkapan logistik untuk kapal tempur pesisir (LCS). Seterusnya membekal 2 set pelancar Naval Strike Missile (NSM) bernilai RM44 juta.

      Hapus
    5. SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      SEWAan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.MALONDESH (ATM).
      =========
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit generally around $30,000 to $33,000. It has a range of up to 1,000 meters and can destroy a tank in a single shot.
      =========
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      =========
      CHEAPEST VARIANT HISAR OPV
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALONDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      =========
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      =========
      ANKA OMPONG =
      WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      MALONDESH to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
      =========
      2025 $1.3 BILLION MINDEF =
      MAINTENANCE
      REPAIRS
      ASSETS.
      (SEWA, SEWA AND SEWA)
      -------------
      In 2025, MALONDESH Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
      This budget included $1.3 billion for maintenance, repairs, and new military assets...
      =============
      The MALONDESH Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
      Funding
      • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
      • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      Aging equipment
      • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
      • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
      • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
      Other challenges
      • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.
      • Disaster response: The MAF is responsible for disaster response.
      • National unity: The MAF is responsible for promoting national unity.

      Hapus
    6. MOF CANCELLED PROCUREMENTS ARMED FORCES
      MOF CANCELLED PROCUREMENTS ARMED FORCES
      MOF CANCELLED PROCUREMENTS ARMED FORCES
      The Ministry of Finance (MOF) in Malondesh can cancel procurements for the armed forces due to several reasons, including concerns about transparency, adherence to procedures, and potential financial implications. Specifically, these cancellations can stem from issues like direct negotiations bypassing established protocols, lack of proper specifications, or concerns about corruption.
      Here's a more detailed breakdown:
      Bypassing established procedures:
      The MOF may cancel procurements if they were awarded through direct negotiation, especially if it violates the Ministry's own procedures or lacks proper documentation.
      Lack of transparency and accountability:
      If the procurement process is not transparent and lacks proper oversight, the MOF may step in to ensure accountability and prevent potential corruption or misuse of funds.
      Financial concerns:
      The MOF has the authority to review and cancel procurements if they raise concerns about the financial implications, such as overspending or unfavorable contract terms.
      Political influence:
      The MOF can also cancel procurements if there are indications of political influence or if the decision was not based on professional military requirements.
      Ex-post scrutiny by parliament and audit bodies:
      While parliament and audit bodies primarily conduct ex-post scrutiny, meaning they review the process after it's been completed, they can also influence future procurements based on their findings.
      Lack of military specifications:
      Procurements may be cancelled if the purchases lack proper military specifications or are not aligned with the armed forces' operational needs.
      ========
      BADUT KASTA PENGHUTANG KLAIM KAYA =
      NO MONEY = 2024-2018 DEBT BAYAR DEBT
      ----------
      2024 = DEBT BAYAR DEBT
      2024 = DEBT BAYAR DEBT
      2024 = DEBT BAYAR DEBT
      "Pinjaman ini digunakan untuk melunasi DEBT matang sebesar RM20.6 miliar, dengan sisa RM49,9 miliar menutupi defisit dan masa jatuh tempo DEBT di masa depan," kata MOF.
      ---
      2023 = DEBT BAYAR DEBT
      2023 = DEBT BAYAR DEBT
      2023 = DEBT BAYAR DEBT
      Pada tahun 2023, pinjaman baru Kerajaan Persekutuan MALONDESH mencapai RM1.173 triliun, naik 8,6% dari tahun 2022.
      Rincian pinjaman
      • Pinjaman baru Kerajaan Persekutuan MALONDESH pada tahun 2023 naik RM92,918 miliar
      • Rasio utang terhadap PDB MALONDESH pada tahun 2023 mencapai 64,3%
      ---
      2022 = 52,4% DEBT BAYAR DEBT
      2022 = 52,4% DEBT BAYAR DEBT
      2022 = 52,4% DEBT BAYAR DEBT
      Kah Woh menjelaskan pada tahun lalu, kerajaan ada membuat pinjaman yang meningkat sebanyak 11.6 peratus daripada RM194.5 bilion pada tahun sebelumnya. Daripada jumlah itu, beliau berkata 52.4 peratus atau RM113.7 bilion digunakan untuk membayar prinsipal pinjaman matang.
      ---
      2021 = 50,4% DEBT BAYAR DEBT
      2021 = 50,4% DEBT BAYAR DEBT
      2021 = 50,4% DEBT BAYAR DEBT
      Sejumlah RM98.058 bilion atau 50.4 peratus daripada pinjaman baharu berjumlah RM194.555 bilion yang dibuat kerajaan pada tahun lalu digunakan untuk bayaran balik prinsipal pinjaman yang matang.
      ---
      2020 = 60% DEBT BAYAR DEBT
      2020 = 60% DEBT BAYAR DEBT
      2020 = 60% DEBT BAYAR DEBT
      Jabatan Audit Negara (JAN) bimbang dengan tindakan kerajaan menggunakan hampir 60 peratus pinjaman baharu untuk membayar DEBT sedia ada pada tahun lalu, berbanding bagi perbelanjaan pembangunan.
      ---
      2019 = 59% DEBT BAYAR DEBT
      2019 = 59% DEBT BAYAR DEBT
      2019 = 59% DEBT BAYAR DEBT
      Laporan Ketua Audit Negara mengenai Penyata Kewangan Kerajaan Persekutuan 2018 mendapati sejumlah 59 peratus pinjaman baharu kerajaan dibuat untuk membayar DEBT kerajaan terdahulu
      ---
      2018 = OPEN DONASI
      2018 = OPEN DONASI
      2018 = OPEN DONASI
      Kementerian Keuangan MALONDESH pada hari Rabu membuka rekening donasi supaya masyarakat dapat menyumbang untuk membantu negara membayar utang yang mencapai 1 triliun ringgit (US$ 250,8 miliar) atau 80 persen dari PDB.


      Hapus
    7. MOF CANCELLED PROCUREMENTS ARMED FORCES
      MOF CANCELLED PROCUREMENTS ARMED FORCES
      MOF CANCELLED PROCUREMENTS ARMED FORCES
      The Ministry of Finance (MOF) in Malondesh can cancel procurements for the armed forces due to several reasons, including concerns about transparency, adherence to procedures, and potential financial implications. Specifically, these cancellations can stem from issues like direct negotiations bypassing established protocols, lack of proper specifications, or concerns about corruption.
      Here's a more detailed breakdown:
      Bypassing established procedures:
      The MOF may cancel procurements if they were awarded through direct negotiation, especially if it violates the Ministry's own procedures or lacks proper documentation.
      Lack of transparency and accountability:
      If the procurement process is not transparent and lacks proper oversight, the MOF may step in to ensure accountability and prevent potential corruption or misuse of funds.
      Financial concerns:
      The MOF has the authority to review and cancel procurements if they raise concerns about the financial implications, such as overspending or unfavorable contract terms.
      Political influence:
      The MOF can also cancel procurements if there are indications of political influence or if the decision was not based on professional military requirements.
      Ex-post scrutiny by parliament and audit bodies:
      While parliament and audit bodies primarily conduct ex-post scrutiny, meaning they review the process after it's been completed, they can also influence future procurements based on their findings.
      Lack of military specifications:
      Procurements may be cancelled if the purchases lack proper military specifications or are not aligned with the armed forces' operational needs.
      ========
      The MALONDESH Armed Forces (MAF) has faced issues with vehicle maintenance, including breakdowns, accidents, and outdated vehicles.
      Vehicle maintenance issues
      • Breakdowns
      The MAF has experienced breakdowns of vehicles, including tanks and armored prime movers. These breakdowns can cause traffic jams and block roads.
      • Accidents
      The MAF has experienced accidents involving training and fighter aircraft, as well as vehicle damage.
      • Outdated vehicles
      Some have questioned the government's policy of maintaining outdated vehicles for defense.
      Factors contributing to vehicle maintenance issues
      • Lack of maintenance: Lack of maintenance can lead to electrical and mechanical failures, which can cause vehicles to stop working or reduce their performance.
      • Improper use: Improper use of vehicles can lead to electrical and mechanical failures.
      • Manufacturing defects: Manufacturing defects can lead to electrical and mechanical failures.
      ===========
      MALONDESH's armed forces (MAF) have aging equipment due to a lack of funding and an outdated procurement system. This makes it difficult for the MAF to keep up with the country's growing defense needs.
      Lack of funding
      • The government's defense budget is limited, making it difficult to fund the purchase of new equipment
      • The government's budget is also affected by the country's economy
      Outdated procurement system
      • The procurement system is outdated and allows for excessive commissions
      • The system doesn't allow professionals to decide on the best equipment
      Aging equipment
      • The MAF's aircraft, ships, and tanks are aging
      • The MAF's helicopters, submarines, and other vessels are aging
      Impact of aging equipment
      • The MAF's combat readiness is affected
      • The MAF is exposed to internal and external threats
      • The country's strategic deterrence capability is undermined

      Hapus
    8. MOF CANCELLED PROCUREMENTS ARMED FORCES
      MOF CANCELLED PROCUREMENTS ARMED FORCES
      MOF CANCELLED PROCUREMENTS ARMED FORCES
      The Ministry of Finance (MOF) in Malondesh can cancel procurements for the armed forces due to several reasons, including concerns about transparency, adherence to procedures, and potential financial implications. Specifically, these cancellations can stem from issues like direct negotiations bypassing established protocols, lack of proper specifications, or concerns about corruption.
      Here's a more detailed breakdown:
      Bypassing established procedures:
      The MOF may cancel procurements if they were awarded through direct negotiation, especially if it violates the Ministry's own procedures or lacks proper documentation.
      Lack of transparency and accountability:
      If the procurement process is not transparent and lacks proper oversight, the MOF may step in to ensure accountability and prevent potential corruption or misuse of funds.
      Financial concerns:
      The MOF has the authority to review and cancel procurements if they raise concerns about the financial implications, such as overspending or unfavorable contract terms.
      Political influence:
      The MOF can also cancel procurements if there are indications of political influence or if the decision was not based on professional military requirements.
      Ex-post scrutiny by parliament and audit bodies:
      While parliament and audit bodies primarily conduct ex-post scrutiny, meaning they review the process after it's been completed, they can also influence future procurements based on their findings.
      Lack of military specifications:
      Procurements may be cancelled if the purchases lack proper military specifications or are not aligned with the armed forces' operational needs.
      ========
      RICE CRISES = 1972-73, 1999, 2008, 2020-21,2023 AND 2025
      MALONDESH has experienced several rice crises, including in 1972-73, 1999, 2008, 2020-21, and 2023. These crises are often caused by imbalances in supply and demand, and are made worse by market speculation.
      Causes
      • Weather: Rice is sensitive to temperature and flooding, and a 1–2°C increase in temperature can cut harvests in half.
      • Protectionist policies: Policies that create a non-competitive market can lead to low production and high prices.
      • Subsidies: Subsidies can be poorly targeted, and may not reach farmers in need.
      • Import restrictions: When other exporters restrict shipments, demand for local rice increases.
      Effects
      • Food insecurity: Shortages can lead to higher prices and food insecurity.
      • Low yields: Low yields can be caused by a number of factors, including weather, subsidies, and policies.
      • Poverty: Low yields and high prices can lead to poverty among farmers.
      =========
      RICE CRISES =
      In Japan, the government was forced to reSEWA 210,000 tons of rice from its one-million-ton emergency reserve, a historical first, due to an extreme price hike of up to 82%.
      In MALONDESH, a shortage of local rice has triggered public panic. Shrinking supplies have led to soaring prices, while imported rice has also become more expensive.
      Meanwhile, in the Philippines, the government declared a food security emergency in early February 2025 after rice inflation surged to 24.4%, marking the highest increase in 15 years.

      Hapus
    9. PROJECT LCS RM11 BILLION =
      72.43%. = KELEWATAN (DELAY)
      72.43%. = KELEWATAN (DELAY)
      72.43%. = KELEWATAN (DELAY)
      Sehingga 25 Mei lalu kemajuan kerja keseluruhan yang dicapai bagi pembinaan ke-5 LCS adalah sebanyak 72.43%.
      Project LCS bernilai RM11 bilion yang mengalami kelewatan ini bagaimanapun masih penting kepada TLDM karena memerlukan kapal-kapal perang berteknologi modern
      ----------
      2025 $1.3 BILLION MINDEF = NGEMIS LOI SEWA
      MAINTENANCE
      REPAIRS
      ASSETS.
      (SEWA, SEWA AND SEWA)
      -----------
      Military spending
      In 2025, MALONDESH Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
      This budget included $1.3 billion for maintenance, repairs, and new military assets..
      =========
      NGEMIS F18 KUWAIT 2025-2017=
      5x GANTI PERDANA MENTERI
      5x GANTI MENTERI PERTAHANAN
      -
      MANGKRAK LCS 2025-2011 =
      5x GANTI PERDANA MENTERI
      6x GANTI MENTERI PERTAHANAN
      -
      SPH 2025-2016 =
      5x GANTI PERDANA MENTERI
      5x GANTI MENTERI PERTAHANAN
      -
      2025 F18 LCS SPH = AKAN ZONK MANGKRAK
      =========-
      MALONDESH's armed forces procurement faces several weaknesses, including:
      1. Corruption
      The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The MALONDESH Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
      2. Political influence
      Decisions are often driven by vendors and against strategic interests. For example, MALONDESH has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
      Weak parliamentary oversight
      Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
      3. Limited financial scrutiny
      Financial scrutiny is limited by excessive secrecy.
      4. Violation of procedures
      Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
      ==================
      SOME WEAKNESSES OF THE MALONDESH SHIPBUILDING INDUSTRY INCLUDE:
      1. Delays
      Consistent delays in delivering ships to customers has reduced profitability and financial results.
      2. Small tonnage
      MALONDESH shipbuilding industry is relatively weak compared to other countries in the region, as the tonnage of ships manufactured is relatively small.
      3. Supply chain disruptions
      Disruptions caused by COVID-19 and the Russia-Ukraine conflict have led to supply chain disruptions and shortages of skilled personnel.
      ==============
      MALONDESH military procurement faces challenges due to budget constraints, outdated equipment, and political influence.
      Budget constraints
      • The MALONDESH government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • The government has had small procurement budgets over the last quarter-century.
      • The government has had to deal with the economic impact of COVID-19.
      Outdated equipment
      • Most of the MALONDESH military's equipment was purchased between the 1970s and 1990s.
      • The air force's MiG-29 Fulcrum fighter aircraft were withdrawn from service in 2017.
      • The KD Rahman submarine had technical problems and could not submerge in 2010.
      Political influence
      • The procurement process is subject to political influence from suppliers.
      • The procurement process is sometimes vendor-driven and against strategic interests.

      Hapus
  34. $1.3 BILLION = SEWA = SURAT HASRAT = NGEMIS
    -------------
    2025 $1.3 BILLION MINDEF =
    MAINTENANCE
    REPAIRS
    ASSETS.
    Military spending In 2025, MALONDESH Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
    This budget included $1.3 billion for maintenance, repairs, and new military assets.
    -------------
    BEKAS RONGSOKAN 33 TAHUN =
    SG F35 A/B = BRAND NEW
    RI RAFALE F4 = BRAND NEW
    THAILAND GRIPEN E/F = BRAND NEW
    PINOY GRIPEN C/D = BRAND NEW
    MYANMAR SU30SME = BRAND NEW
    MALONDESH F18 = NGEMIS BEKAS RONGSOK
    -----------
    NGEMIS RONGSOKAN 33 TAHUN SAMPAI 2027 =
    MENUNGGU 47 SUPER HORNETS
    MENUNGGU 47 SUPER HORNETS
    DELAY DELIVERIES OF 47 SUPER HORNETS
    The Kuwait Air Force is expected to declare full operational capability for its Super Hornets by 2027. Only then will the legacy Hornets be released to Malondesh.
    The issue now is that the delivery of Kuwait’s Rhinos hinges on the completion of deliveries of 47 Super Hornets ordered by the US Navy as attrition
    -----------
    2025-2016 = 10 TAHUN PRANK SPH
    2016 LOI SPH CAESAR
    2016 LOI SPH CAESAR
    2016 LOI SPH CAESAR
    PRANK NEXTER :Nexter in cooperation with Advanced Defense Systems (ADS) is proposing the CAESAR 155mm 52 .cal self propelled howitzer to the Malondeshn Army, in order to fill a capability gap. An LoI is signed during day three of DSA 2016.
    20 units are to be supplied, which include the supporting vehicles, and will boost the Malondeshn Army's firepower inventory.
    ==========
    ===================
    1.RASIO HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1,63 TRLLIUN
    3. HUTANG 1MDB RM 18,2 BILLION
    4. TUNGGAKAN SEWA SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. SEWA SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. SEWA MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED SEWA BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. SEWA MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. SEWA VVSHORAD
    35. SEWA TRUK 3 TON
    36. 4X4 SEWA 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. SEWA BLACKHAWK SEWA AW159
    41. NO TRACKED SPH
    42. SEWA SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. SEWA AW139 SEWA COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED SEWA PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST VSHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. MKM BARTER PALM OIL
    62. MIG29N BARTER PALM OIL
    63. A400M PEMBAYARAN BERPERINGKAT (HUTANG)
    64. SCORPENE BARTER PALM OIL
    65. PT91M BARTER PALM OIL RUBBER
    67. FA50M BARTER PALM OIL

    BalasHapus
  35. $1.3 BILLION = SEWA = SURAT HASRAT = NGEMIS
    -------------
    2025 $1.3 BILLION MINDEF =
    MAINTENANCE
    REPAIRS
    ASSETS.
    Military spending In 2025, MALONDESH Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
    This budget included $1.3 billion for maintenance, repairs, and new military assets.
    -------------
    BEKAS RONGSOKAN 33 TAHUN =
    SG F35 A/B = BRAND NEW
    RI RAFALE F4 = BRAND NEW
    THAILAND GRIPEN E/F = BRAND NEW
    PINOY GRIPEN C/D = BRAND NEW
    MYANMAR SU30SME = BRAND NEW
    MALONDESH F18 = NGEMIS BEKAS RONGSOK
    -----------
    NGEMIS RONGSOKAN 33 TAHUN SAMPAI 2027 =
    MENUNGGU 47 SUPER HORNETS
    MENUNGGU 47 SUPER HORNETS
    DELAY DELIVERIES OF 47 SUPER HORNETS
    The Kuwait Air Force is expected to declare full operational capability for its Super Hornets by 2027. Only then will the legacy Hornets be released to Malondesh.
    The issue now is that the delivery of Kuwait’s Rhinos hinges on the completion of deliveries of 47 Super Hornets ordered by the US Navy as attrition
    ===================
    ===================
    1. real contract and delivery five units C130J Hercules
    2. real contract and delivery two unit Frankethal class Countermine vessels (Pulau Fani class)
    3. real contract and delivery four units KCR 60 Fast missiles boats PT PAL
    4. real contract and delivery 9 units Bell 412 EPI
    5. real contract and delivery 8 additional H225 M
    6. real contract and delivery 2 units Bell 429 Global Ranger
    7. real contract and delivery 18 Medium weight tank Harimau
    8. real contract and delivery 22 Pandur II IFV
    9. real contract and delivery two unit Hospital Ships
    10. real contract and delivery one unit Command and control variant C295
    11. real contract and delivery one unit CN235 MPA
    12. real contract and delivery 7 Badak FSV, 26 ANOa apc and 10 additional Komodo recce vehicles in 2022
    13. real contract and delivery 4 AS 550 Fennec and 8 AS565 MBE, in 2024
    14. real contract and delivery five NC212i in 2023
    15. real contract and delivery one Leonardo RAT 31 DL/M
    16. real contract and delivery five C130H ordered from Australia in 2013 (finished in 2020) after received Grant of 4 C130H
    17. real contract and delivery 9 Teluk Bintuni class LST
    18. real contract and delivery six CH4B UCAV ordered in 2019
    19. real contract t and process building of Abeking & Rasmussen design ocean Hydrography ship
    20. real contract and process building two AH140 AAW Frigate
    21. real contract and process building two OPV 90 ASW patrol vessels
    22. real contract and process building 42 Dassault Rafale F4 fighter
    23. real contract and process building two A400M heavy cargo aircraft
    24. real contract and delivery M3 Amphibious bridging system
    25. real contract and delivery 3 KT1 Wong Bee ordered in 2018 along with radar and spares for T/A50
    26. real contract and process building 13 GM 403 GCI radar from Thales
    27. real contract and process building 12 ANKA S UCAV
    28. real contract and process building additional CH4B UCAV
    29. real contract and delivery Slingshot Satcom system
    30. real contract and delivery Falcon 8X aircraft
    31. real contract and process Thales Alenia earth observation satelite
    32. real contract and process 22 S70M Blackhawk
    33. real contract and process 6 N219 aircraft
    34. real contract and process 3 CN235 for Army
    35. real contract and process 2 PPA patrol Frigate
    36. real contract and process 2 Scorpene Subs
    37. real contract and process Khan Short Range ballistic missiles from Turki
    38. real contract and process Trisula Air defense system
    39. real contract and process 6 T50i aircraft
    40. real contract and delivery Oiler and replenishment ship
    41. real contract and delivery several Tug Harbor ships
    42. real contract and process Submarine rescue vessels and system
    43. real contract and delivery two Large LCU for army
    44. real contract and process 45 Atmaca

    BalasHapus
  36. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    SEWAan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.MALONDESH (ATM).
    =========
    KEYWORDS
    1 UNIT JAVELIN = 3 UNIT NLAW
    4.5 KM JAVELIN = 1 KM NLAW
    ---
    Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
    The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit generally around $30,000 to $33,000. It has a range of up to 1,000 meters and can destroy a tank in a single shot.
    =========
    KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
    -
    1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
    -
    2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
    -
    USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
    =========
    CHEAPEST VARIANT HISAR OPV
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALONDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    =========
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    =========
    ANKA OMPONG =
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    MALONDESH to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
    =========
    2025-2017 = 9 TAHUN NGEMIS F18 KUWAIT
    2025-2017 = 9 TAHUN NGEMIS F18 KUWAIT
    2025-2017 = 9 TAHUN NGEMIS F18 KUWAIT
    MALONDESH has reportedly sought the Kuwaiti jets since at least 2017. The legacy Hornet is thought to “increase the level of preparedness and capability of the RMAF in safeguarding the country’s airspace”
    ===================
    UNREADY ARMED FORCES
    UNREADY ARMED FORCES
    UNREADY ARMED FORCES
    the MALONDESH military is today the region’s weakest. It is riddled with corruption, poor planning, and interference by political leaders in procurement, no longer a potent force even in managing low-level intensity conflict at a time when tensions in the South China Sea are higher than they have been since the days of the Vietnam War.
    A 2019 White Paper on Defense – nearly four years ago – called for more funds and punch as well as an overhaul of the procurement system to allow professionals to decide on what weapon systems they need. Instead, PM Anwar Ibrahim’s proposal to increase the defense budget by 10 percent to fund procurement will be delayed because of budgetary considerations related to the flagging economy, expected by the World Bank to grow at a mediocre 3.9 percent in 2023, down from an earlier estimate of 4.3 percent in April

    BalasHapus
  37. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    SEWAan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.MALONDESH (ATM).
    =========
    KEYWORDS
    1 UNIT JAVELIN = 3 UNIT NLAW
    4.5 KM JAVELIN = 1 KM NLAW
    ---
    Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
    The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit generally around $30,000 to $33,000. It has a range of up to 1,000 meters and can destroy a tank in a single shot.
    =========
    KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
    -
    1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
    -
    2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
    -
    USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
    =========
    CHEAPEST VARIANT HISAR OPV
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALONDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    =========
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    =========
    ANKA OMPONG =
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    MALONDESH to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
    =========
    TIAP TAHUN MEMBUAL SPH

    2016 PRANK NEXTER
    Nexter in cooperation with Advanced Defense Systems (ADS) is proposing the CAESAR 155mm 52 .cal self propelled howitzer to the MALONDESH Army, in order to fill a capability gap. An LoI is signed during day three of DSA 2016. 20 units are to be supplied, which include the supporting vehicles, and will boost the MALONDESH Army's firepower inventory.
    --
    2023 PRANK MKE
    The MALONDESH Ministry of Defence has reportedly reviewing its planned acquisition of Yavuz 155mm
    --
    2022 PRANK KDS
    MALONDESH is expected to conclude a deal with Slovakia for the supply of EVA 155mm self-propelled howitzers for the MALONDESH Army.




    BalasHapus
  38. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    SEWAan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.MALONDESH (ATM).
    =========
    KEYWORDS
    1 UNIT JAVELIN = 3 UNIT NLAW
    4.5 KM JAVELIN = 1 KM NLAW
    ---
    Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
    The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit generally around $30,000 to $33,000. It has a range of up to 1,000 meters and can destroy a tank in a single shot.
    =========
    KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
    -
    1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
    -
    2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
    -
    USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
    =========
    CHEAPEST VARIANT HISAR OPV
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALONDESH USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    =========
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    =========
    ANKA OMPONG =
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    MALONDESH to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
    =========
    TIAP TAHUN DIJANGKA

    2011 PENGADAAN LCS = Pengadaan enam LCS pada 2011 itu juga dilakukan tanpa tender terbuka. Kapal-kapal itu akan dibangun di Galangan Kapal Boustead dan unit pertama sedianya dikirim pada 2019.
    -----
    2019 LCS DIJANGKA = KD Maharaja Lela setelah ditugaskan, diluncurkan secara seremonial pada Agustus 2017. Seharusnya telah dikirim ke RMN pada April 2019
    ------
    2022 LCS DIJANGKA = menurut jadual asal, setakat Ogos 2022 sepatutnya lima buah kapal LCS harus disiap dan diserahkan kepada TLDM.
    -----
    2023 LCS DIJANGKA = Seharusnya telah dikirim ke RMN pada April 2019, dengan kapal terakhir dijadwalkan untuk serah terima pada Juni 2023. Namun, progres kapal pertama baru sekitar 60% selesai
    -----
    2025 LCS DIJANGKA = Kapal pertama Littoral Combat Ship (LCS) TLDM itu dijangka hanya akan siap pada tahun 2025, iaitu 12 tahun selepas projek itu bermula pada Oktober 2013 dan kerajaan telah memPAY RM6 bilion kepada kontraktor utama projek itu.
    -----
    2026 LCS DIJANGKA = Lima kapal LCS akan diserahkan kepada TLDM secara berperingkat dengan kapal pertama dijangka diserahkan pada penghujung 2026
    -----
    2029 LCS DIJANGKA = TLDM hanya akan dapat memperoleh kelima-lima LCS pada 2029 berbanding kontrak asal di mana 5 kapal LCS itu sepatutnya diserahkan pada 2022..
    -----
    17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services MALONDESH Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan MALONDESH Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat MALONDESH Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat MALONDESH Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALONDESH) BHD

    BalasHapus
  39. MOF CANCELLED PROCUREMENTS ARMED FORCES
    MOF CANCELLED PROCUREMENTS ARMED FORCES
    MOF CANCELLED PROCUREMENTS ARMED FORCES
    The Ministry of Finance (MOF) in Malondesh can cancel procurements for the armed forces due to several reasons, including concerns about transparency, adherence to procedures, and potential financial implications. Specifically, these cancellations can stem from issues like direct negotiations bypassing established protocols, lack of proper specifications, or concerns about corruption.
    Here's a more detailed breakdown:
    Bypassing established procedures:
    The MOF may cancel procurements if they were awarded through direct negotiation, especially if it violates the Ministry's own procedures or lacks proper documentation.
    Lack of transparency and accountability:
    If the procurement process is not transparent and lacks proper oversight, the MOF may step in to ensure accountability and prevent potential corruption or misuse of funds.
    Financial concerns:
    The MOF has the authority to review and cancel procurements if they raise concerns about the financial implications, such as overspending or unfavorable contract terms.
    Political influence:
    The MOF can also cancel procurements if there are indications of political influence or if the decision was not based on professional military requirements.
    Ex-post scrutiny by parliament and audit bodies:
    While parliament and audit bodies primarily conduct ex-post scrutiny, meaning they review the process after it's been completed, they can also influence future procurements based on their findings.
    Lack of military specifications:
    Procurements may be cancelled if the purchases lack proper military specifications or are not aligned with the armed forces' operational needs.
    ========
    BADUT KASTA PENGHUTANG KLAIM KAYA =
    NO MONEY = 2024-2018 DEBT BAYAR DEBT
    ----------
    2024 = DEBT BAYAR DEBT
    2024 = DEBT BAYAR DEBT
    2024 = DEBT BAYAR DEBT
    "Pinjaman ini digunakan untuk melunasi DEBT matang sebesar RM20.6 miliar, dengan sisa RM49,9 miliar menutupi defisit dan masa jatuh tempo DEBT di masa depan," kata MOF.
    ---
    2023 = DEBT BAYAR DEBT
    2023 = DEBT BAYAR DEBT
    2023 = DEBT BAYAR DEBT
    Pada tahun 2023, pinjaman baru Kerajaan Persekutuan MALONDESH mencapai RM1.173 triliun, naik 8,6% dari tahun 2022.
    Rincian pinjaman
    • Pinjaman baru Kerajaan Persekutuan MALONDESH pada tahun 2023 naik RM92,918 miliar
    • Rasio utang terhadap PDB MALONDESH pada tahun 2023 mencapai 64,3%
    ---
    2022 = 52,4% DEBT BAYAR DEBT
    2022 = 52,4% DEBT BAYAR DEBT
    2022 = 52,4% DEBT BAYAR DEBT
    Kah Woh menjelaskan pada tahun lalu, kerajaan ada membuat pinjaman yang meningkat sebanyak 11.6 peratus daripada RM194.5 bilion pada tahun sebelumnya. Daripada jumlah itu, beliau berkata 52.4 peratus atau RM113.7 bilion digunakan untuk membayar prinsipal pinjaman matang.
    ---
    2021 = 50,4% DEBT BAYAR DEBT
    2021 = 50,4% DEBT BAYAR DEBT
    2021 = 50,4% DEBT BAYAR DEBT
    Sejumlah RM98.058 bilion atau 50.4 peratus daripada pinjaman baharu berjumlah RM194.555 bilion yang dibuat kerajaan pada tahun lalu digunakan untuk bayaran balik prinsipal pinjaman yang matang.
    ---
    2020 = 60% DEBT BAYAR DEBT
    2020 = 60% DEBT BAYAR DEBT
    2020 = 60% DEBT BAYAR DEBT
    Jabatan Audit Negara (JAN) bimbang dengan tindakan kerajaan menggunakan hampir 60 peratus pinjaman baharu untuk membayar DEBT sedia ada pada tahun lalu, berbanding bagi perbelanjaan pembangunan.
    ---
    2019 = 59% DEBT BAYAR DEBT
    2019 = 59% DEBT BAYAR DEBT
    2019 = 59% DEBT BAYAR DEBT
    Laporan Ketua Audit Negara mengenai Penyata Kewangan Kerajaan Persekutuan 2018 mendapati sejumlah 59 peratus pinjaman baharu kerajaan dibuat untuk membayar DEBT kerajaan terdahulu
    ---
    2018 = OPEN DONASI
    2018 = OPEN DONASI
    2018 = OPEN DONASI
    Kementerian Keuangan MALONDESH pada hari Rabu membuka rekening donasi supaya masyarakat dapat menyumbang untuk membantu negara membayar utang yang mencapai 1 triliun ringgit (US$ 250,8 miliar) atau 80 persen dari PDB.


    BalasHapus
  40. POLANDIA ANGGOTA NATO =
    FA50PL = NO AMRAAMs
    FA50PL = KESULITAN IZIN SISTEM
    FA50PL = KESULITAN. LISENSI KOMPONEN
    Tanggal pengiriman awal yang ambisius pada tahun 2025 kemungkinan akan mundur paling cepat ke tahun 2027. Alasan di balik keterlambatan pengiriman tersebut ternyata bukan dari kemampuan produksi KAI, melainkan terkait izin atas lisensi komponen dan sistem.
    Sejauh negosiasi berlangsung, masalah utama yang tersisa adalah kurangnya perjanjian ekspor untuk GPS dan sistem persenjataan dari AS, yang membuat program tersebut berada dalam ketidakpastian. Selain itu, dilaporkan bahwa KAI masih menunggu izin dari Washington untuk mengintegrasikan rudal udara-ke-udara AIM-120 AMRAAM untuk FA-50PL.
    ==========
    POLANDIA ANGGOTA NATO =
    AMRAAMs = F16 F35A
    AMRAAMs = F16 F35A
    AMRAAMs = F16 F35A
    Poland already has AMRAAMs in its inventory, which are used to arm the Polish Air Force’s current fleet of F-16C/Ds and will in future arm its fleet of F-35A Joint Strike Fighters.
    -------------
    1.RASIO HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1,63 TRLLIUN
    3. HUTANG 1MDB RM 18,2 BILLION
    4. TUNGGAKAN SEWA SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. SEWA SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. SEWA MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED SEWA BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. SEWA MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. SEWA VVSHORAD
    35. SEWA TRUK 3 TON
    36. 4X4 SEWA 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. SEWA BLACKHAWK SEWA AW159
    41. NO TRACKED SPH
    42. SEWA SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. SEWA AW139 SEWA COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED SEWA PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST VSHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. MKM BARTER PALM OIL
    62. MIG29N BARTER PALM OIL
    63. A400M PEMBAYARAN BERPERINGKAT (HUTANG)
    64. SCORPENE BARTER PALM OIL
    65. PT91M BARTER PALM OIL RUBBER
    67. FA50M BARTER PALM OIL
    ===================
    SEWA MALONDESH SEWA
    1. SEWA 28 HELI
    2. SEWA L39 ITCC
    3. SEWA EC120B
    4. SEWA FLIGHT SIMULATION TRAINING DEVICE (FSTD)
    5. SEWA 1 UNIT SISTEM SIMULATOR EC120B
    6. SEWA HOVERCRAFT
    7. SEWA AW139
    8. SEWA FAST INTERCEPTOR BOAT (FIB)
    9. SEWA UTILITY BOAT
    10. SEWA RIGID HULL FENDER BOAT (RHFB)
    11. SEWA ROVER FIBER GLASS (ROVER)
    12. SEWA MV AISHAH AIM 4
    13. SEWA BMW R1250RT
    14. SEWA 4x4 VECHICLE
    15. SEWA VSHORAD
    16. SEWA TRUCK
    17. SEWA HONDA CIVIC
    18. SEWA PATROL BOATS
    19. SEWA OUTBOARD MOTORS
    20. SEWA TRAILERS
    21. SEWA SUPERBIKES
    22. SEWA SIMULATOR MKM
    23. TUDM SEWA 12 AW149
    24. TUDM SEWA 4 AW139
    25. TUDM SEWA 5 EC120B
    26. TLDM SEWA 2 AW159
    27. TDM SEWA 4 UH-60A
    28. TDM SEWA 12 AW149
    29. BOMBA SEWA 4 AW139
    30. MMEA SEWA 2 AW159
    31. POLIS SEWA 7 BELL429
    32. SEWA MOTOR POLIS
    ==========
    POLANDIA NATO (North Atlantic Treaty Organization) = KESULITAN AMRAAMs USA
    MALONDESH NATO (Not Action Talk ONLY) = DOWNGRADE BARTER SAWIT

    BalasHapus
  41. BACA

    Although the first 12 FA-50s were delivered in record time, as they were a provisional version (GF, Gap Filler) taken from the inventory of the Republic of Korea Air Force (RoKAF),

    The Polish news site WNP reports that Korea Aerospace Industries, the manufacturer of the FA-50, is still waiting for permission from Washington to integrate the AMRAAM air-to-air missile into the fighters sold to Poland. Despite the fact that both Poland and South Korea already operate this weapons system, the bureaucratic process could cause further delays.

    https://www.google.com/url?sa=t&source=web&rct=j&opi=89978449&url=https://www.aviacionline.com/poland-faces-delays-in-the-delivery-of-fa-50pl-fighters-impact-on-training-and-modernization-of-its-air-force&ved=2ahUKEwjf0c-8iZ2OAxUKyDgGHQ-bD_cQFnoECEcQAQ&sqi=2&usg=AOvVaw21XFtO5WnYlsIP3kdb-LEm

    FA-50 YG KAU SEBUTKAN BLOCK 10 TUH ONLY GF


    GF = GAP FILLER FA-50GF YA TOLOL.. POLAND DAH BELI FA-50 B20 YA TOLOL.. DAH DELIVERY PESAWAT PERTAMA TAPI MASIH BERMASALAH INTEGRASI YA TOLOL

    BalasHapus
  42. Seperti nya Duo Malondesh diatas semakin KOPLAK aja

    ..kenapa sekarang USA semakin Protektif memberikan Source Code atas product air to air Missile kepada Pabrikan Negara lain yang menjual Jet Fighter meskipun itu adalah sekutu USA atau anggota NATO.

    Ketika keunggulan kompetitif semakin tersebar di berbagai negara selain USA maka untuk Survive itu USA melakukan Proteksi terhadap produk produk dari Industri Pertahanan USA agar tetap bisa berproduksi hasilkan uang dan cipta kesempatan kerja untuk rakyat USA.

    Bayangkan aja di Asia itu ada beberapa negara yang bisa Produksi atau Manufaktur Jet Fighter berbasis Lisensi dan/atau design sendiri yakni:
    China, India, Israel, Japan, Korea Selatan, Taiwan, Pakistan
    Berikutnya adalah Indonesia apakah basis platform KF-21 atau KAAN.

    Nah..daya saing itu tersebar dan semakin Relatif dan memberikan ruang pilihan bagi negara lain yang butuh Jet Fighter.

    Jadi membangun industri manufaktur Jet Fighter itu juga harus membangun kapasitas dan kapabilitas sub system seperti radar jet fighter, mesin Jet Fighter, Avionics dan navigasinya, Missile dan smart bomb, dumb bomb dan lain lain secara bertahap. Jika belum dikuasai maka bisa pakai sub system dari negara lain.

    BalasHapus
  43. POLANDIA ANGGOTA NATO =
    FA50PL = NO AMRAAMs
    FA50PL = KESULITAN IZIN SISTEM
    FA50PL = KESULITAN. LISENSI KOMPONEN
    Tanggal pengiriman awal yang ambisius pada tahun 2025 kemungkinan akan mundur paling cepat ke tahun 2027. Alasan di balik keterlambatan pengiriman tersebut ternyata bukan dari kemampuan produksi KAI, melainkan terkait izin atas lisensi komponen dan sistem.
    Pada tahap pengembangan varian FA-50PL (FA-50 Block 20), pihak-pihak terkait, yakni Badan Persenjataan Polandia, KAI, dan Lockheed Martin, harus menyelesaikan jalur hukum yang rumit untuk mendapatkan akses ke komponen yang dipatenkan guna mengintegrasikan senjata dan sistem kemampuan bertahan yang diinginkan.
    Sejauh negosiasi berlangsung, masalah utama yang tersisa adalah kurangnya perjanjian ekspor untuk GPS dan sistem persenjataan dari AS, yang membuat program tersebut berada dalam ketidakpastian. Selain itu, dilaporkan bahwa KAI masih menunggu izin dari Washington untuk mengintegrasikan rudal udara-ke-udara AIM-120 AMRAAM untuk FA-50PL.
    Meskipun kesepakatan baru-baru ini yang menandakan perluasan kemitraan strategis antara KAI dan Lockheed Martin ditandatangani di Paris minggu ini, subjek FA-50 PL tidak disebutkan. Penundaan pengiriman gelombang pertama jet tersebut kemungkinan besar akan melampaui 18 bulan, yang mendorong tanggal pengiriman awal hingga pertengaha
    ==============
    DATA STATISTA 2029-2020 : INCREASE DEBT
    DATA STATISTA 2029-2020 : INCREASE DEBT
    2029 = 438,09 BILLION USD
    2028 = 412,2 BILLION USD
    2027 = 386,51 BILLION USD
    2026 = 362,19 BILLION USD
    2025 = 338,75 BILLION USD
    2024 = 316,15 BILLION USD
    2023 = 293,83 BILLION USD
    2022 = 271,49 BILLION USD
    2021 = 247,49 BILLION USD
    2020 = 221,49 BILLION USD
    ------------------
    DATA STATISTA 2029-2020 : DEBT PAY DEBT
    DATA STATISTA 2029-2020 : OVERLIMIT DEBT
    2029 = 69,54% DEBT RATIO TO GDP
    2028 = 69,34% DEBT RATIO TO GDP
    2027 = 68,8% DEBT RATIO TO GDP
    2026 = 68,17% DEBT RATIO TO GDP
    2025 = 68,07% DEBT RATIO TO GDP
    2024 = 68,38% DEBT RATIO TO GDP
    2023 = 69,76% DEBT RATIO TO GDP
    2022 = 65,5% DEBT RATIO TO GDP
    2021 = 69,16% DEBT RATIO TO GDP
    2020 = 67,69% DEBT RATIO TO GDP
    ==========
    RINGIT TIDAK LAKU
    https://www.youtube.com/watch?v=rZD9_nKqIWQ
    ==========
    DEBT 2024 = RM 1.63 TRILLION
    DEBT 2023 = RM 1,53 TRILLION
    DEBT 2022 = RM 1,45 TRILLION
    DEBT 2021 = RM 1,38 TRILLION
    DEBT 2020 = RM 1,32 TRILLION
    DEBT 2019 = RM 1,25 TRILLION
    DEBT 2018 = RM 1,19 TRILLION
    The Finance Ministry stated that the aggregate national household DEBT stood at RM1.53 trillion between 2018 and 2023. In aggregate, it said the household DEBT for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018). “The ratio of household DEBT to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    MALONDESH household DEBT is one of the highest in the ASEAN region. Against this backdrop, Bank Negara MALONDESH (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in MALONDESH, among other things.
    ==========
    POLANDIA NATO (North Atlantic Treaty Organization) = KESULITAN AMRAAMs USA
    MALONDESH NATO (Not Action Talk ONLY) = DOWNGRADE BARTER SAWIT

    BalasHapus
  44. Mampus Malon! F50 gagal bersenjata

    BalasHapus
  45. FA 50 MALONDESH DELAY LAGI S.AMPE 2027 🤣🤣🤣🤣

    PESAWAT OMPONG TIDAK BISA MELUNCURKAN RUDAL 🤣🤣🤣

    BalasHapus
  46. POLANDIA ANGGOTA NATO =
    FA50PL = NO AMRAAMs
    FA50PL = KESULITAN IZIN SISTEM
    FA50PL = KESULITAN. LISENSI KOMPONEN
    Tanggal pengiriman awal yang ambisius pada tahun 2025 kemungkinan akan mundur paling cepat ke tahun 2027. Alasan di balik keterlambatan pengiriman tersebut ternyata bukan dari kemampuan produksi KAI, melainkan terkait izin atas lisensi komponen dan sistem.
    Sejauh negosiasi berlangsung, masalah utama yang tersisa adalah kurangnya perjanjian ekspor untuk GPS dan sistem persenjataan dari AS, yang membuat program tersebut berada dalam ketidakpastian. Selain itu, dilaporkan bahwa KAI masih menunggu izin dari Washington untuk mengintegrasikan rudal udara-ke-udara AIM-120 AMRAAM untuk FA-50PL.
    ==========
    POLANDIA ANGGOTA NATO =
    AMRAAMs = F16 F35A
    AMRAAMs = F16 F35A
    AMRAAMs = F16 F35A
    Poland already has AMRAAMs in its inventory, which are used to arm the Polish Air Force’s current fleet of F-16C/Ds and will in future arm its fleet of F-35A Joint Strike Fighters
    ==========
    KEYWORDS =
    REQUIRED CONGRESSIONAL APPROVAL
    REQUIRED CONGRESSIONAL APPROVAL
    REQUIRED CONGRESSIONAL APPROVAL
    -----
    GEMPURWIRA29 Juni 2025 pukul 20.47
    This transaction, governed by the U.S. Arms Export Control Act, required Congressional approval due to the American origin of the aircraft.
    ==============
    KEYWORDS =
    ADDRESS CRITICAL GAPS
    ADDRESS CRITICAL GAPS
    ADDRESS CRITICAL GAPS
    -----
    GEMPURWIRA29 Juni 2025 pukul 20.47
    Malaysia’s pursuit of these jets, a mix of single-seat F/A-18C and two-seat F/A-18D variants, aims to address critical gaps in its air defense while the nation awaits a broader modernization effort projected for the 2040s. The deal underscores Malaysia’s urgency to maintain a credible air presence in a region where territorial disputes and military buildups are reshaping the strategic landscape.
    ==============
    2025 $1.3 BILLION MINDEF = NGEMIS LOI SEWA
    MAINTENANCE
    REPAIRS
    ASSETS.
    (SEWA, SEWA AND SEWA)
    -----------
    Military spending
    In 2025, MALONDESH Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
    This budget included $1.3 billion for maintenance, repairs, and new military assets..
    =========
    NGEMIS F18 KUWAIT 2025-2017=
    5x GANTI PERDANA MENTERI
    5x GANTI MENTERI PERTAHANAN
    -
    MANGKRAK LCS 2025-2011 =
    5x GANTI PERDANA MENTERI
    6x GANTI MENTERI PERTAHANAN
    -
    SPH 2025-2016 =
    5x GANTI PERDANA MENTERI
    5x GANTI MENTERI PERTAHANAN
    -
    2025 F18 LCS SPH = AKAN ZONK MANGKRAK

    BalasHapus
  47. LEMAHHHH =
    33 BUAH F18 =
    RONGSOK 33 TAHUN
    NO AMRAAMs
    NO AIM 9X
    RADAR AN/APG 65 = 110 KM
    ANALOG TAHUN 1990an
    -
    FA50 =
    NO AMRAAMs
    NO AIM 9X
    BLOKIR USA IZIN SISTEM
    BLOKIR USA. LISENSI KOMPONEN
    -----
    GEMPURWIRA2 Juli 2025 pukul 19.01
    MANAKALA MALAYSIA...ORANG KAYA.... 😎😎🇲🇾🇲🇾🇲🇾
    33 BUAH F18
    18 BUAH FA-50 BLOCK 20
    ==============
    F/A-18 LEGACY HORNET =
    AIM 7 AIM 9
    RADAR AN/APG 65 : 110 KM
    ANALOG TAHUN 1990an
    -
    F/A-18 Legacy Hornet yang dioperasikan oleh Kuwait pada tahun 1990-an, khususnya varian C dan D, memiliki spesifikasi senjata yang meliputi: meriam internal 20mm M61A1 Vulcan, serta berbagai rudal udara-ke-udara (seperti AIM-7 Sparrow dan AIM-9 Sidewinder), rudal udara-ke-permukaan (seperti AGM-65 Maverick), dan bom. Selain itu, pesawat ini dilengkapi dengan pod penargetan dan sistem penanda laser.
    Spesifikasi Senjata F/A-18 Legacy Hornet (Kuwait, 1990-an):
    Meriam:
    Meriam Gatling 20mm M61A1 Vulcan dengan 578 peluru.
    Rudal Udara-ke-Udara:
    AIM-7 Sparrow (rudal jarak menengah).
    AIM-9 Sidewinder (rudal jarak pendek).
    Rudal Udara-ke-Permukaan:
    AGM-65 Maverick (rudal berpemandu inframerah atau laser).
    radar AN/APG-65:
    Jangkauan deteksi maksimum:
    Sekitar 110 km (60 nm). Radar AN/APG-65 adalah sistem radar pulse-Doppler pada band I (8 hingga 12 GHz) yang dikembangkan untuk pesawat tempur F/A-18 Hornet
    ==============
    POLANDIA ANGGOTA NATO =
    FA50PL = NO AMRAAMs
    FA50PL = BLOKIR USA IZIN SISTEM
    FA50PL = BLOKIR USA. LISENSI KOMPONEN
    Tanggal pengiriman awal yang ambisius pada tahun 2025 kemungkinan akan mundur paling cepat ke tahun 2027. Alasan di balik keterlambatan pengiriman tersebut ternyata bukan dari kemampuan produksi KAI, melainkan terkait izin atas lisensi komponen dan sistem.
    Sejauh negosiasi berlangsung, masalah utama yang tersisa adalah kurangnya perjanjian ekspor untuk GPS dan sistem persenjataan dari AS, yang membuat program tersebut berada dalam ketidakpastian. Selain itu, dilaporkan bahwa KAI masih menunggu izin dari Washington untuk mengintegrasikan rudal udara-ke-udara AIM-120 AMRAAM untuk FA-50PL.
    ==============
    POLANDIA ANGGOTA NATO =
    AMRAAMs = F16 F35A
    AMRAAMs = F16 F35A
    AMRAAMs = F16 F35A
    Poland already has AMRAAMs in its inventory, which are used to arm the Polish Air Force’s current fleet of F-16C/Ds and will in future arm its fleet of F-35A Joint Strike Fighters
    ==============
    KEYWORDS =
    REQUIRED CONGRESSIONAL APPROVAL
    REQUIRED CONGRESSIONAL APPROVAL
    REQUIRED CONGRESSIONAL APPROVAL
    -----
    GEMPURWIRA29 Juni 2025 pukul 20.47
    This transaction, governed by the U.S. Arms Export Control Act, required Congressional approval due to the American origin of the aircraft.
    ==============
    KEYWORDS =
    ADDRESS CRITICAL GAPS
    ADDRESS CRITICAL GAPS
    ADDRESS CRITICAL GAPS
    -----
    GEMPURWIRA29 Juni 2025 pukul 20.47
    Malaysia’s pursuit of these jets, a mix of single-seat F/A-18C and two-seat F/A-18D variants, aims to address critical gaps in its air defense while the nation awaits a broader modernization effort projected for the 2040s. The deal underscores Malaysia’s urgency to maintain a credible air presence in a region where territorial disputes and military buildups are reshaping the strategic landscape.
    ==============
    2025 $1.3 BILLION MINDEF = NGEMIS LOI SEWA
    MAINTENANCE
    REPAIRS
    ASSETS.
    (SEWA, SEWA AND SEWA)
    Military spending
    In 2025, MALONDESH Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
    This budget included $1.3 billion for maintenance, repairs, and new military assets..
    =========
    NGEMIS F18 KUWAIT 2025-2017=
    5x GANTI PERDANA MENTERI
    5x GANTI MENTERI PERTAHANAN
    -
    MANGKRAK LCS 2025-2011 =
    5x GANTI PERDANA MENTERI
    6x GANTI MENTERI PERTAHANAN
    -
    SPH 2025-2016 =
    5x GANTI PERDANA MENTERI
    5x GANTI MENTERI PERTAHANAN
    -
    2025 F18 LCS SPH = ZONK

    BalasHapus