27 Agustus 2026

Singapore MINDEF Signs Contract to Acquire Two Landing Crafts

27 Agustus 2026


Vessels built by Penguin International shipyard (photo: Dymon Asia)

The Ministry of Defence (MINDEF) has signed a contract with Penguin International Limited to construct two landing crafts, intended to progressively replace the Republic of Singapore Navy’s (RSN) ageing Fast Craft Equipment and Personnel (FCEP) and Fast Craft Utility (FCU) vessels, which have been in service for more than 30 years.


 

The landing craft will be assessed for its suitability to meet the RSN’s operational requirements before any decision is made on the full replacement of the FCEP and FCU. This reflects MINDEF’s progressive approach towards capability development, ensuring that new platforms are rigorously evaluated before full fleet replacement.

 

Delivery of the craft is expected from 2029.


(RSN)

201 komentar:

  1. RELEASE US DEPARTEMENT OF WAR 24/08/2026
    F15IDN
    F15IDN
    F15IDN
    https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
    -
    INDONESIA
    a. 48 KAAN Gen 5
    b. 42 RAFALE Gen 4.5
    c. 16 Sukhoi 27/30
    d. 33 F16
    e. 12 M346FA
    f. 20 T50i
    g. 24 HAWK
    =============================
    =============================
    MALONYET
    a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
    b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
    c. 7 F18 = LACK SOURCE CODE
    d. 16 HAWK = LACK SPAREPART
    --------------------------------------------
    Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
    -
    TOTAL EXPENDITURE =
    Reaches RM419.2 Billion to RM470 Billion.
    -
    BUDGET ALLOCATION =
    RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
    -
    MAIN REASONS FOR BORROWING =
    REVENUE COMPLETELY DEPLETED:
    Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
    -
    CHRONIC BUDGET DEFICIT:
    The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
    -
    CHRONIC BUDGET DEFICIT:
    The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
    --------------------------------------------
    MALAYSEWA DEBT DATA 2026
    Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
    Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
    MALAYSEWA Population 2026: 36,385,115 people
    -
    DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
    Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
    Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
    ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
    --------------------------------------------
    USA BANNED MALONYET : USA PALAK ART USD 240 MILLIAR
    NSM
    AMRAAM
    F18
    UH60A
    --------------------------------------------
    🀣ART PALAK USD 240 MILLIAR = BANNED : NSM AMRAAM F18🀣

    BalasHapus
  2. "Keep calm and love penguins"
    Tulisan yg lucu buat dipasang di hangar pembuatan.πŸ˜†

    BalasHapus
    Balasan
    1. "Keep calm and love Snail"

      Tulisan yg cocok buat dipasang di hangar pembuatan kapal Malaydesh...πŸ˜‚πŸ˜‚πŸ€£πŸ˜›πŸ€ͺ

      Hapus
    2. LEBIH LUCU LAGI BERUK BOTOL MALAYDESH @OM IRS πŸ˜†πŸ˜†πŸ˜†πŸ˜†πŸ˜†

      Hapus
    3. Keep calm and be donkey.... Khusus buat keledai malay

      Hapus
    4. Maharajalela kalau dikerjakan at snail's speed udah lama operasional.πŸ˜… Kecuali kalau kecepatan rata2 semua pekerja sama dengan satu siput.πŸ€”

      Hapus
  3. RELEASE US DEPARTEMENT OF WAR 24/08/2026
    F15IDN
    F15IDN
    F15IDN
    https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
    -
    INDONESIA
    a. 48 KAAN Gen 5
    b. 42 RAFALE Gen 4.5
    c. 16 Sukhoi 27/30
    d. 33 F16
    e. 12 M346FA
    f. 20 T50i
    g. 24 HAWK
    =============================
    =============================
    MALONYET
    a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
    b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
    c. 7 F18 = LACK SOURCE CODE
    d. 16 HAWK = LACK SPAREPART
    --------------------------------------------
    BERITA 5 FEBRUARI 2026
    -
    GEMPURWIRA25 Agustus 2026 pukul 21.37
    NO KONTRAK ....NO PARTY..... HAHAHAHAHHA
    Boeing Setop Proses Jet Tempur F-15EX untuk RI, Kemhan Sebut Kemahalan
    https://video.kompas.com/watch/1907947/boeing-setop-proses-jet-tempur-f-15ex-untuk-ri-kemhan-sebut-kemahalan
    --------------------------------------------
    BERITA 3 FEBRUARI 2026
    -
    GEMPURWIRA25 Agustus 2026 pukul 21.38
    BATAL..... KAH...KAH...KAH.....
    Setelah Tiga Tahun MoU, Boeing Nyatakan Kesepakatan F-15EX dengan Indonesia Berakhir
    https://indomiliter.com/setelah-tiga-tahun-mou-boeing-nyatakan-kesepakatan-f-15ex-dengan-indonesia-berakhir/
    --------------------------------------------
    BERITA 3 FEBRUARI 2026
    -
    GEMPURWIRA25 Agustus 2026 pukul 21.39
    AYUH TUNJUK SAYA MANA KONTAK PEMBELIANNYA..... HAHAHAHAHHA
    Boeing says no longer building F-15 fighter jets for Indonesia
    https://www.thejakartapost.com/world/2026/02/03/boeing-says-no-longer-building-f-15-fighter-jets-for-indonesia
    --------------------------------------------
    BERITA 3 FEBRUARI 2026
    -
    GEMPURWIRA25 Agustus 2026 pukul 21.44
    Dimana yang kontrak efektif tu ya....?? HAHAHAHAHA
    Boeing Hentikan Proyek Jet Tempur F-15 untuk Indonesia, Modernisasi Alutsista TNI?
    https://internasional.kontan.co.id/news/boeing-hentikan-proyek-jet-tempur-f-15-untuk-indonesia-modernisasi-alutsista-tni
    --------------------------------------------
    NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
    1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
    2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
    3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
    4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
    5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
    6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
    7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
    8. UCAV ANKA vs ANKA ISR NOT ARMED
    9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
    --------------------------------
    FA-50M VERSI DOWNGRADE FA50PL✔️
    LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
    MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
    DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
    -
    FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
    BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
    AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
    --------------------------------
    DATA UTANG MALONYET 2026
    Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
    Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
    Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
    -
    PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
    Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
    Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
    ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544
    --------------------------------------------
    USA BANNED MALONYET : NOT PAID/FFBNP
    NSM
    AMRAAM
    F18
    UH60A
    --------------------------------------------
    RELEASE 24/08/2026 vs BERITA FEBRUARI 2026

    BalasHapus
  4. ART USD 240 MILLIAR = BANNED AMRAAM NSM F18
    ART USD 240 MILLIAR = BANNED AMRAAM NSM F18
    --------------------------------
    HUTANG BAYAR HUTANG (2026–1998):
    -
    PENDAPATAN : RM334,1 Miliar
    PENGELUARAN : RM470 Miliar
    BUDGET MINUS : RM334,1 - RM470 = - RM135,9
    --------------------------------
    2026 MALINGSIAL = CUT DEFENSE BUDGET
    2026 MALINGSIAL = NSM BANNED - AMRAAM BLOKIR
    2026 MALINGSIAL = F18 BATAL - UH60A BATAL
    2026 MALINGSIAL = REWORK 4000 PIPA DAN KABEL LCS
    2026 MALINGSIAL = PHK MASSAL
    2026 MALINGSIAL = FREEZE PROCUREMENT
    2025 MALINGSIAL = SIPRI KOSONG
    2024 MALINGSIAL = SIPRI KOSONG
    2023 MALINGSIAL = CANCELLED PROCUREMENTT
    --------------------------------
    INDONESIA .....
    STATUS 2026: HEGEMON KAWASAN & RAKSASA EKONOMI
    Realisasi SIPRI (Periode 2021–2025):
    Peringkat 18 Dunia: Importir senjata terbesar di Asia Tenggara (pangsa pasar 1,5%).
    Lembar Belanja 2024-2025: PENUH/LENGKAP (Rafale F-4, A400M Atlas, Rudal BORA & KHAN, Kapal PPA-L-Plus, Drone Anka-S, Air Refueling System).
    Skala Ekonomi (PDB 2026):
    PDB PPP: US$ 5,69 Triliun (Peringkat 6 Dunia) — 4,24 kali lipat lebih besar dari MALAYSEWA.
    PDB Nominal: US$ 1,69 Triliun.
    Peringkat Militer (GFP 2026):
    Peringkat 13 Dunia: Nomor 1 di ASEAN dengan modernisasi aktif dan mandiri.
    Ketahanan Fiskal:
    Sangat Sehat dengan ruang belanja luas untuk alutsista strategis generasi terbaru.
    ________________________________________
    MALAYSEWA.......
    STATUS 2023-2026: KEBANGKRUTAN SISTEMIK & SALAM KOSONG
    2026 MALINGSIAL = CUT DEFENSE BUDGET = MISKIN: Perintah Treasury untuk memotong anggaran operasional seluruh instansi akibat dampak konflik global (Reuters).
    2026 MALINGSIAL = PHK MASSAL = MISKIN: 24.100 PHK (Data SOCSO); restrukturisasi Petronas pangkas ±5.000 karyawan.
    2026 MALINGSIAL = FREEZE PROCUREMENT = MISKINNN: Pembekuan total kontrak militer dan polisi per 16 Januari 2026 akibat skandal suap pejabat senior.
    Status SIPRI (2024-2025) = KOSONG: Absen total dari daftar realisasi impor senjata global; modernisasi lumpuh total.
    Kronologi Kegagalan (Timeline "Prank"):
    2014: Jet Rafale Prancis (Mangkrak).
    2022: Jet HAL Tejas India (Batal).
    2024-2025: Sewa Black Hawk (Mangkrak/Unit tidak tiba).
    2026: F/A-18 HORNET KUWAIT RESMI BATAL.
    Data Utang & Beban Warga 2026:
    Utang Pemerintah: RM 1,79 Triliun (70,5% PDB — MELEWATI LIMIT 65%).
    Utang Household: RM 1,65 Triliun (84,3% PDB — MELEWATI LIMIT 65%).
    ➡️ TOTAL BEBAN PER WARGA: RM 94.544.
    Peringkat Militer (GFP 2026):
    Peringkat 42 Dunia: Posisi terbawah di antara negara utama ASEAN, resmi disalip Filipina (Peringkat 41).
    KESIMPULAN:
    INDONESIA PERINGKAT 13 DUNIA & SIPRI LENGKAP VS MALAYSEWA PERINGKAT 42 DUNIA & BEBAN UTANG RM 94K/JIWA

    BalasHapus
  5. Beda kasta....
    https://www.youtube.com/shorts/nqPfbzBEKuE
    🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣

    BalasHapus
    Balasan
    1. ART USD 240 MILLIAR = BANNED AMRAAM NSM F18
      ART USD 240 MILLIAR = BANNED AMRAAM NSM F18
      --------------------------------
      HUTANG BAYAR HUTANG (2026–1998):
      -
      PENDAPATAN : RM334,1 Miliar
      PENGELUARAN : RM470 Miliar
      BUDGET MINUS : RM334,1 - RM470 = - RM135,9
      --------------------------------
      2026 MALINGSIAL = CUT DEFENSE BUDGET
      2026 MALINGSIAL = NSM BANNED - AMRAAM BLOKIR
      2026 MALINGSIAL = F18 BATAL - UH60A BATAL
      2026 MALINGSIAL = REWORK 4000 PIPA DAN KABEL LCS
      2026 MALINGSIAL = PHK MASSAL
      2026 MALINGSIAL = FREEZE PROCUREMENT
      2025 MALINGSIAL = SIPRI KOSONG
      2024 MALINGSIAL = SIPRI KOSONG
      2023 MALINGSIAL = CANCELLED PROCUREMENTT
      --------------------------------
      MALAYSEWA.......
      STATUS 2023-2026: KEBANGKRUTAN SISTEMIK & MISKIN
      2026 MALINGSIAL = CUT DEFENSE BUDGET = MISKIN: Perbendaharaan memerintahkan pemangkasan anggaran operasional seluruh kementerian akibat dampak krisis global (Reuters).
      2026 MALINGSIAL = PHK MASSAL = MISKIN: Puncak krisis Januari 2026 dengan 24.100 PHK (Data SOCSO/PERKESO); Petronas pangkas ±5.000 karyawan.
      2026 MALINGSIAL = FREEZE PROCUREMENT = MISKINNN: Pembekuan total kontrak militer dan polisi per 16 Januari 2026 menyusul investigasi korupsi pejabat tinggi.
      2025-2024 MALINGSIAL = SIPRI KOSONG= MISKIN: Dua tahun berturut-turut tanpa catatan transfer senjata berat; sejajar dengan Laos dan Kamboja.
      2023 MALINGSIAL = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF karena kendala finansial.
      ________________________________________
      DATA UTANG & BEBAN RAKYAT 2026:
      Utang Pemerintah: RM 1,79 Triliun (70,5% PDB — MELEWATI LIMIT 65%).
      Utang Household: RM 1,65 Triliun (84,3% PDB — MELEWATI LIMIT 65%).
      Perhitungan Beban Kumulatif Per Warga (Populasi 36,3 Juta):
      Beban Utang Pemerintah: RM 49.196 / jiwa.
      Beban Utang Household: RM 45.348 / jiwa.
      ➡️ TOTAL BEBAN PER WARGA: RM 94.544.
      ________________________________________
      BUKTI "HUTANG BAYAR HUTANG" (DEBT-SERVICING):
      Rekor Terburuk (2023): 64,3% dari total pinjaman kasar (RM 145,8 Miliar) hanya habis untuk membayar utang lama (Gali lubang tutup lubang).
      Proyeksi 2025-2026: Konsisten di angka 58%. Ruang fiskal untuk belanja alutsista terkunci total oleh cicilan bunga utang.
      Tabung Harapan (2018): Bukti keputusasaan di mana negara harus meminta donasi rakyat untuk membayar utang yang menembus RM 1 Triliun.
      ________________________________________
      DEGRADASI MILITER & TIMELINE "PRANK":
      Penurunan Daya Gentar (GFP 2026): Merosot ke posisi 42 dunia; resmi disalip oleh Filipina (Peringkat 41).
      Skandal Aset Hilang: Catatan memalukan raibnya 48 pesawat Skyhawk dan 2 mesin jet tempur dari gudang militer.
      Vakum SIPRI (2020-2025): Dari status Planned (2020) turun ke Not Yet Ordered (2022) hingga akhirnya KOSONG TOTAL (2024-2025).
      Timeline Kegagalan (Prank):
      F/A-18 Hornet: Batal 4 kali upaya akuisisi dari Kuwait hingga resmi mati di 2026.
      Dassault Rafale: Mangkrak sejak 2014 akibat ketiadaan dana tunai.
      Kapal MRSS: Janji kontrak dengan PT PAL 2018 yang berakhir zonk.
      ________________________________________
      KRISIS ADMINISTRASI & REPUTASI:
      Sanksi Olahraga: Kekalahan WO 0-3 dan sanksi AFC/CAS akibat pemain ilegal mencerminkan kegagalan birokrasi sistemik.
      Tekanan Ekonomi: Ancaman sanksi tarif AS Section 301 (10-25%) dan IEEPA menghantam sektor manufaktur utama (E&E).
      Kontras Regional (Indonesia): Memiliki "Lembar Belanja SIPRI Penuh" (Rafale, KAAN, PPA) dengan rasio utang pemerintah yang sehat (40% PDB).
      KESIMPULAN:
      TOTAL BEBAN WARGA RM 94K + SPIRAL UTANG 70,5% PDB + SIPRI KOSONG = KEBANGKRUTAN NASIONAL TOTAL.

      Hapus
    2. ART USD 240 MILLIAR = BANNED AMRAAM NSM F18
      ART USD 240 MILLIAR = BANNED AMRAAM NSM F18
      --------------------------------
      HUTANG BAYAR HUTANG (2026–1998):
      -
      PENDAPATAN : RM334,1 Miliar
      PENGELUARAN : RM470 Miliar
      BUDGET MINUS : RM334,1 - RM470 = - RM135,9
      --------------------------------
      2026 MALINGSIAL = CUT DEFENSE BUDGET
      2026 MALINGSIAL = NSM BANNED - AMRAAM BLOKIR
      2026 MALINGSIAL = F18 BATAL - UH60A BATAL
      2026 MALINGSIAL = REWORK 4000 PIPA DAN KABEL LCS
      2026 MALINGSIAL = PHK MASSAL
      2026 MALINGSIAL = FREEZE PROCUREMENT
      2025 MALINGSIAL = SIPRI KOSONG
      2024 MALINGSIAL = SIPRI KOSONG
      2023 MALINGSIAL = CANCELLED PROCUREMENTT
      --------------------------------
      MALAYSEWA.......
      STATUS 2023-2026: KEBANGKRUTAN SISTEMIK & MILITER SEWAAN
      2026 MALINGSIAL = CUT DEFENSE BUDGET = MISKIN: Treasury memangkas anggaran operasional seluruh kementerian akibat dampak krisis global (Reuters).
      2026 MALINGSIAL = PHK MASSAL = MISKIN: Puncak krisis Januari 2026 dengan 24.100 PHK (Data SOCSO); Petronas pangkas ±5.000 karyawan.
      2026 MALINGSIAL = FREEZE PROCUREMENT = MISKINNN: Pembekuan total pengadaan militer oleh PM Anwar Ibrahim per 16 Januari 2026 akibat skandal korupsi sistemik.
      2025-2024 MALINGSIAL = SIPRI KOSONG= MISKIN: Status vakum total selama 2 tahun berturut-turut; setara dengan Laos dan Kamboja dalam hal nol transfer senjata berat.
      2023 MALINGSIAL = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF karena kendala finansial.
      ________________________________________
      DATA UTANG & BEBAN RAKYAT 2026:
      Utang Pemerintah: RM 1,79 Triliun (70,5% PDB — OVER LIMIT 65%).
      Utang Household: RM 1,65 Triliun (84,3% PDB — OVER LIMIT 65%).
      Beban Kumulatif Per Warga (Populasi 36,3 Juta):
      Beban Utang Pemerintah: RM 49.196 / jiwa.
      Beban Utang Household: RM 45.348 / jiwa.
      ➡️ TOTAL BEBAN PER WARGA: RM 94.544.
      ________________________________________
      ANALISA MODEL PENGADAAN: "NEGARA PENYEWA" (LEASING)
      Krisis Likuiditas: Ketiadaan dana tunai memaksa militer beralih ke skema Sewa (Leasing) untuk 32+ item strategis (Helikopter Blackhawk, AW139, simulator, hingga kendaraan taktis).
      Skema Barter Komoditas: Pengadaan yang tersisa (FA-50 & PT-91M) terpaksa menggunakan skema Barter Kelapa Sawit (CPO) karena minimnya cadangan devisa mata uang asing.
      Aset Karatan & Hilang: Proyek LCS mangkrak melibatkan 17 kreditor dengan bunga membengkak; diperparah skandal hilangnya 48 pesawat Skyhawk dan 2 mesin jet dari gudang.
      ________________________________________
      ANALISA REPUTASI & DIPLOMASI INTERNASIONAL:
      Runtuhnya Prestasi Olahraga: Kekalahan di CAS terkait 7 pemain naturalisasi ilegal dan sanksi AFC (Kalah WO 0-3) mencerminkan kegagalan administrasi sistemik.
      Kehilangan Posisi Regional: Gagal lolos ke Piala Asia 2027; posisi diambil alih oleh Vietnam, mempertegas penurunan pengaruh MALAYSEWA di ASEAN.
      Spiral Utang: Fenomena "Gali Lubang Tutup Lubang" di mana 58% pinjaman baru hanya habis untuk membayar bunga dan pokok utang lama (Debt-Servicing Cycle).

      Hapus
    3. ART USD 240 MILLIAR = BANNED AMRAAM NSM F18
      ART USD 240 MILLIAR = BANNED AMRAAM NSM F18
      --------------------------------
      HUTANG BAYAR HUTANG (2026–1998):
      -
      PENDAPATAN : RM334,1 Miliar
      PENGELUARAN : RM470 Miliar
      BUDGET MINUS : RM334,1 - RM470 = - RM135,9
      --------------------------------
      2026 MALINGSIAL = CUT DEFENSE BUDGET
      2026 MALINGSIAL = NSM BANNED - AMRAAM BLOKIR
      2026 MALINGSIAL = F18 BATAL - UH60A BATAL
      2026 MALINGSIAL = REWORK 4000 PIPA DAN KABEL LCS
      2026 MALINGSIAL = PHK MASSAL
      2026 MALINGSIAL = FREEZE PROCUREMENT
      2025 MALINGSIAL = SIPRI KOSONG
      2024 MALINGSIAL = SIPRI KOSONG
      2023 MALINGSIAL = CANCELLED PROCUREMENTT
      --------------------------------
      MALAYSEWA.......
      STATUS 2023-2026: SPIRAL UTANG & KEBANGKRUTAN STRATEGIS
      2026 MALINGSIAL = CUT DEFENSE BUDGET = MISKIN: Perbendaharaan memerintahkan pemangkasan anggaran operasional seluruh kementerian akibat dampak krisis global (Reuters).
      2026 MALINGSIAL = PHK MASSAL = MISKIN: Puncak krisis Januari 2026 dengan 24.100 PHK (Data SOCSO/PERKESO); Petronas pangkas ±5.000 karyawan.
      2026 MALINGSIAL = FREEZE PROCUREMENT = MISKINNN: Pembekuan total kontrak militer dan polisi per 16 Januari 2026 akibat investigasi suap pejabat tinggi dan mantan panglima.
      2025-2024 MALINGSIAL = SIPRI KOSONG= MISKIN: Dua tahun berturut-turut tanpa catatan transfer senjata berat. Status sejajar dengan Laos dan Kamboja.
      2023 MALINGSIAL = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur oleh MINDEF karena kendala finansial.
      ________________________________________
      DATA UTANG & BEBAN RAKYAT 2026:
      Utang Pemerintah: RM 1,79 Triliun (70,5% PDB — MELEWATI LIMIT 65%).
      Utang Household: RM 1,65 Triliun (84,3% PDB — MELEWATI LIMIT 65%).
      Perhitungan Beban Utang Per Warga (Populasi 36,3 Juta):
      Beban Utang Pemerintah: RM 49.196 / jiwa.
      Beban Utang Household: RM 45.348 / jiwa.
      ➡️ TOTAL BEBAN PER WARGA: RM 94.544.
      ________________________________________
      BUKTI NYATA "GALI LUBANG TUTUP LUBANG" (2018–2026):
      2018 (Tabung Harapan): Fase putus asa fiskal melalui open donation rakyat untuk bayar utang negara yang menembus RM 1 Triliun.
      2019 (59%): Laporan Audit Negara mengungkap 59% pinjaman baru hanya untuk bayar utang lama.
      2023 (64,3%): Rekor tertinggi; dari RM 226,6 Miliar pinjaman kasar, sebesar RM 145,8 Miliar lari ke utang lama.
      2025-2026 (58%): Proyeksi konsisten di angka 58%. Lebih dari separuh uang pinjaman tidak menjadi pembangunan, melainkan hanya menyambung napas bunga utang.
      ________________________________________
      ANALISA PERTAHANAN: STAGNASI TOTAL
      Penurunan Daya Gentar: Merosot ke Peringkat 42 GFP (Posisi ke-7 di ASEAN), kini resmi di bawah Filipina (Peringkat 41).
      Kegagalan F/A-18 Hornet: Pembatalan 4 kali upaya pembelian Hornet bekas Kuwait membuktikan hilangnya kredibilitas finansial di pasar internasional (Tiada Cash).
      Hambatan Dagang AS: Sanksi Section 301 (Tarif 10-25%) dan ancaman IEEPA oleh USTR menghantam sektor E&E, mematikan sumber pendapatan utama untuk bayar utang.

      Hapus
    4. ART USD 240 MILLIAR = BANNED AMRAAM NSM F18
      ART USD 240 MILLIAR = BANNED AMRAAM NSM F18
      --------------------------------
      HUTANG BAYAR HUTANG (2026–1998):
      -
      PENDAPATAN : RM334,1 Miliar
      PENGELUARAN : RM470 Miliar
      BUDGET MINUS : RM334,1 - RM470 = - RM135,9
      --------------------------------
      2026 MALINGSIAL = CUT DEFENSE BUDGET
      2026 MALINGSIAL = NSM BANNED - AMRAAM BLOKIR
      2026 MALINGSIAL = F18 BATAL - UH60A BATAL
      2026 MALINGSIAL = REWORK 4000 PIPA DAN KABEL LCS
      2026 MALINGSIAL = PHK MASSAL
      2026 MALINGSIAL = FREEZE PROCUREMENT
      2025 MALINGSIAL = SIPRI KOSONG
      2024 MALINGSIAL = SIPRI KOSONG
      2023 MALINGSIAL = CANCELLED PROCUREMENTT
      --------------------------------
      MALAYSEWA.......
      STATUS 2023-2026: SPIRAL UTANG & KEBANGKRUTAN STRATEGIS
      2026 MALINGSIAL = CUT DEFENSE BUDGET = MISKIN: Perbendaharaan memerintahkan pemangkasan anggaran operasional seluruh kementerian akibat dampak krisis global (Reuters).
      2026 MALINGSIAL = PHK MASSAL = MISKIN: Puncak krisis Januari 2026 dengan 24.100 PHK (Data SOCSO/PERKESO); Petronas pangkas ±5.000 karyawan.
      2026 MALINGSIAL = FREEZE PROCUREMENT = MISKINNN: Pembekuan total kontrak militer dan polisi per 16 Januari 2026 akibat investigasi suap pejabat tinggi dan mantan panglima.
      2025-2024 MALINGSIAL = SIPRI KOSONG= MISKIN: Dua tahun berturut-turut tanpa catatan transfer senjata berat. Status sejajar dengan Laos dan Kamboja.
      2023 MALINGSIAL = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur oleh MINDEF karena kendala finansial.
      ________________________________________
      DATA UTANG & BEBAN RAKYAT 2026:
      Utang Pemerintah: RM 1,79 Triliun (70,5% PDB — MELEWATI LIMIT 65%).
      Utang Household: RM 1,65 Triliun (84,3% PDB — MELEWATI LIMIT 65%).
      Perhitungan Beban Utang Per Warga (Populasi 36,3 Juta):
      Beban Utang Pemerintah: RM 49.196 / jiwa.
      Beban Utang Household: RM 45.348 / jiwa.
      ➡️ TOTAL BEBAN PER WARGA: RM 94.544.
      ________________________________________
      BUKTI NYATA "GALI LUBANG TUTUP LUBANG" (2018–2026):
      2018 (Tabung Harapan): Fase putus asa fiskal melalui open donation rakyat untuk bayar utang negara yang menembus RM 1 Triliun.
      2019 (59%): Laporan Audit Negara mengungkap 59% pinjaman baru hanya untuk bayar utang lama.
      2023 (64,3%): Rekor tertinggi; dari RM 226,6 Miliar pinjaman kasar, sebesar RM 145,8 Miliar lari ke utang lama.
      2025-2026 (58%): Proyeksi konsisten di angka 58%. Lebih dari separuh uang pinjaman tidak menjadi pembangunan, melainkan hanya menyambung napas bunga utang.
      ________________________________________
      ANALISA PERTAHANAN: STAGNASI TOTAL
      Penurunan Daya Gentar: Merosot ke Peringkat 42 GFP (Posisi ke-7 di ASEAN), kini resmi di bawah Filipina (Peringkat 41).
      Kegagalan F/A-18 Hornet: Pembatalan 4 kali upaya pembelian Hornet bekas Kuwait membuktikan hilangnya kredibilitas finansial di pasar internasional (Tiada Cash).
      Hambatan Dagang AS: Sanksi Section 301 (Tarif 10-25%) dan ancaman IEEPA oleh USTR menghantam sektor E&E, mematikan sumber pendapatan utama untuk bayar utang.

      Hapus
    5. ART USD 240 MILLIAR = BANNED AMRAAM NSM F18
      ART USD 240 MILLIAR = BANNED AMRAAM NSM F18
      --------------------------------
      HUTANG BAYAR HUTANG (2026–1998):
      -
      PENDAPATAN : RM334,1 Miliar
      PENGELUARAN : RM470 Miliar
      BUDGET MINUS : RM334,1 - RM470 = - RM135,9
      --------------------------------
      2026 MALINGSIAL = CUT DEFENSE BUDGET
      2026 MALINGSIAL = NSM BANNED - AMRAAM BLOKIR
      2026 MALINGSIAL = F18 BATAL - UH60A BATAL
      2026 MALINGSIAL = REWORK 4000 PIPA DAN KABEL LCS
      2026 MALINGSIAL = PHK MASSAL
      2026 MALINGSIAL = FREEZE PROCUREMENT
      2025 MALINGSIAL = SIPRI KOSONG
      2024 MALINGSIAL = SIPRI KOSONG
      2023 MALINGSIAL = CANCELLED PROCUREMENTT
      --------------------------------
      MALAYSEWA.......
      KETIDAKSTABILAN POLITIK = PROCUREMENT CHAOS
      5x Ganti PM = PRANK MRCA SPH LCS
      6x Ganti Menteri Pertahanan = PRANK MRCA SPH LCS
      ________________________________________
      DAFTAR "PRANK" ALUTSISTA (WINDOW SHOPPING):
      PRANK PAKISTAN (JF-17): Hanya sebatas minat; kesepakatan tidak pernah final.
      PRANK INDIA (TEJAS): Negosiasi "lanjut" untuk ganti MiG-29; gagal terpilih/batal.
      PRANK TURKI (YAVUZ/MKE): Akuisisi SPH 155mm terus ditinjau ulang tanpa hasil.
      PRANK FRANCE (NEXTER): LoI diteken DSA 2016 (20 unit); nol realisasi kontrak.
      PRANK INDONESIA (PT PAL): Klaim kontrak MRSS Agustus; batal terealisasi.
      PRANK FRANCE (DASSAULT): Klaim bicara eksklusif 18 Rafale ($2B); beku/batal.
      PRANK SLOVAKIA (EVA): Ekspektasi SPH 155mm berakhir tanpa kontrak.
      PRANK CHINA (KS-1A): Janji rudal & transfer teknologi; tidak terwujud.
      PRANK UN (IAG GUARDIAN): Ditolak PBB karena spek rendah; biaya tidak diganti (Sanksi).
      ________________________________________
      HUTANG & LIABILITAS MALAYSEWA 2010–2026:
      2010: RM 407,1 Miliar – Pertumbuhan pasca-krisis global.
      2014: RM 582,8 Miliar – Berdasarkan Laporan Keuangan Federal.
      2018: RM 1,19 Triliun – TRANSPARANSI BARU: Skandal 1MDB & Liabilitas PPP.
      2020: RM 1,32 Triliun – Lonjakan stimulus pandemi COVID-19.
      2023: RM 1,53 Triliun – Warisan hutang dikonfirmasi PM Anwar Ibrahim.
      2024: RM 1,63 Triliun – Estimasi Belanjawan (APBN) 2024.
      2026: RM 1,79 Triliun – Target Economic Outlook 2026.
      ________________________________________
      ANALISA SUMBER DATA:
      Bloomberg & Reuters: Total hutang tembus RM 1 Triliun (Efek 1MDB).
      The Edge: Akumulasi utang federal lampaui ambang batas baru.
      MOF 2026: Target manajemen utang di tengah risiko fiskal tinggi.
      ________________________________________
      INDONESIA .....
      MODERNISASI TUNAI & STABIL:
      KEPEMIMPINAN: Transisi stabil; tidak ada pembatalan kontrak strategis.
      STATUS: LENGKAP (Rafale, F-15IDN, Scorpene Evolved).
      FISKAL: Hutang 40% dari GDP; jauh di bawah limit keamanan 60%.

      Hapus
    6. PENGEMIS BERAS = LAUGHING STOCK TO THE WORLD
      REAL FREGAT VS FREGAT SALAH POTONG 17 KREDITOR REWORK 4000
      -
      INDONESIA
      AH-140 = FRIGAT MERAH PUTIH
      a. 140 M
      b. 6.626 TON
      c. Meriam 76mm Otmel
      d. CIWS 35mm Millenium
      e. 12.7mm Lionfish RCWS
      f. 64 Midlas VLS
      g. RADAR X-Band CENK 350KM AESA 4 FIXED RADAR
      h. RADAR L-Band CENK 400KM AESA
      i. SONAR HMS Fersah
      j. Torpedo B515
      k. SSM
      l. SAM
      =============================
      =============================
      MALONYET
      GOWING = LCS SALAH POTONG 17 KREDITOR REWORK 4000
      a. 111 M
      b. 3.100 TON
      c. Meriam 57mm
      d. NO CIWS FFBNP = NOT PAID
      e. 30mm RCWS
      f. VL MICA FFBNP = NOT PAID
      g. RADAR S-Band PESA = NO AESA
      h. SONAR = NOT PAID
      i. NO TORPEDO = NOT PAID
      j. SSM NSM FFBNP = NOT PAID
      k. SAM FFBNP = NOT PAID
      --------------------------------
      FACT LCS 2026 - 2011 = 16 YEARS
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      --------------------------------
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 BILLION PER UNIT = SETARA HARGA DESTROYER
      RM2,48 BILLION PER UNIT = SETARA HARGA DESTROYER
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and DEBT.
      --------------------------------
      Analisa Utang & Fiskal: "Spiral Debt-Pay-Debt"
      Klaim belanja militer seringkali disebut "Cash", namun data menunjukkan ketergantungan total pada hutang luar negeri dan barter:
      Total Utang & Liabilitas (2026): Mencapai RM 1,79 Triliun (Meningkat drastis dari RM 407 Miliar pada 2010).
      Rasio Utang Federal: Konsisten di angka 68% - 69% terhadap GDP (Melebihi plafon aman).
      Beban Utang Isi Rumah (Household Debt): 85,8% dari GDP (Tertinggi di ASEAN menurut BNM).
      Siklus Gali Lubang Tutup Lubang: Penggunaan pinjaman baru hanya untuk membayar bunga utang lama, membatasi anggaran belanja modal (CAPEX) militer.
      -
      Analisa Model Pembiayaan Alutsista (Bukan Tunai)
      Hampir seluruh aset utama MALAYSEWA dibeli melalui skema hutang jangka panjang atau barter komoditas:
      Turki (LMS Batch 2): Pinjaman G2G tenor 10-15 tahun (Bunga 4-6%).
      Korea Selatan (FA-50): Hybrid antara Kredit KEXIM dan Barter CPO 50%.
      China (LMS Batch 1): 100% Kredit Ekspor dari China Eximbank.
      Polandia (PT-91M): Barter CPO (30-40%) + cicilan 10 tahun.
      Kredit Sindikasi (Proyek LCS): Melibatkan 17 kreditor dengan bunga 6% yang terus membengkak akibat penundaan.
      -
      Analisa SIPRI: Vakum Alutsista (2024-2025)
      MALAYSEWA (Status Kosong): Selama dua tahun berturut-turut, tidak ada transfer senjata berat yang tercatat di SIPRI. Menempatkan MALAYSEWA sejajar dengan negara ekonomi kecil seperti Timor Leste, Laos, dan Kamboja.
      Indonesia (Status Dominan): Memiliki daftar belanja satu lembar penuh mencakup Rafale F4, Pesawat KAAN, Kapal PPA, dan Rudal Khan/Bora.
      Kegagalan Regional: Di saat Singapura, Vietnam, dan Filipina memperkuat armada, MALAYSEWA terjebak dalam pembatalan (Hornet Kuwait batal 4 kali).
      -
      Analisa Militer: Penurunan Daya Gentar & Budaya Sewa
      Military-for-Rent: Karena ketiadaan kas, MALAYSEWA beralih ke skema sewa untuk 32+ item (Blackhawk, AW139, simulator, hingga motor polisi).
      Aset Grounded/Hilang: MiG-29 jadi monumen, 48 Skyhawk hilang, dan 2 mesin jet hilang menjadi bukti kegagalan manajemen aset.
      Peringkat GFP: Merosot ke posisi 42 dunia (Peringkat ke-7 di ASEAN, di bawah Filipina).
      Analisa Sosial-Reputasi: Krisis Identitas & Administrasi
      Kritik Pemimpin: Pernyataan Mahathir tentang "Melayu Malas/Miskin" dan Anwar Ibrahim tentang korupsi proyek banjir mempertegas masalah struktural ekonomi.

      Hapus
    7. PENGEMIS BERAS = LAUGHING STOCK TO THE WORLD
      REAL FREGAT VS FREGAT SALAH POTONG 17 KREDITOR REWORK 4000
      -
      INDONESIA
      AH-140 = FRIGAT MERAH PUTIH
      a. 140 M
      b. 6.626 TON
      c. Meriam 76mm Otmel
      d. CIWS 35mm Millenium
      e. 12.7mm Lionfish RCWS
      f. 64 Midlas VLS
      g. RADAR X-Band CENK 350KM AESA 4 FIXED RADAR
      h. RADAR L-Band CENK 400KM AESA
      i. SONAR HMS Fersah
      j. Torpedo B515
      k. SSM
      l. SAM
      =============================
      =============================
      MALONYET
      GOWING = LCS SALAH POTONG 17 KREDITOR REWORK 4000
      a. 111 M
      b. 3.100 TON
      c. Meriam 57mm
      d. NO CIWS FFBNP = NOT PAID
      e. 30mm RCWS
      f. VL MICA FFBNP = NOT PAID
      g. RADAR S-Band PESA = NO AESA
      h. SONAR = NOT PAID
      i. NO TORPEDO = NOT PAID
      j. SSM NSM FFBNP = NOT PAID
      k. SAM FFBNP = NOT PAID
      --------------------------------
      FACT LCS 2026 - 2011 = 16 YEARS
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      --------------------------------
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 BILLION PER UNIT = SETARA HARGA DESTROYER
      RM2,48 BILLION PER UNIT = SETARA HARGA DESTROYER
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and DEBT.
      --------------------------------
      BUKTI HUTANG BAYAR HUTANG
      Daftar tren "Hutang Bayar Hutang" MALAYSEWA dari tahun 2018 hingga proyeksi 2025 berdasarkan data Kementerian Kewangan MALAYSEWA (MOF) dan Jabatan Audit Negara:
      -
      2018: FASE "OPEN DONASI"
      Pemerintah meluncurkan Tabung Harapan MALAYSEWA untuk mengumpulkan sumbangan rakyat guna membantu membayar utang negara yang menembus angka RM1 triliun (80% dari PDB).
      -
      2019: 59% HUTANG BAYAR HUTANG
      Laporan Ketua Audit Negara mengungkapkan bahwa 59% dari pinjaman baru digunakan hanya untuk melunasi utang yang sudah ada (gali lubang tutup lubang).
      -
      2020: 60% HUTANG BAYAR HUTANG
      Ketergantungan meningkat; hampir 60% pinjaman baru dialokasikan untuk membayar utang lama, memicu kekhawatiran karena anggaran pembangunan semakin terhimpit.
      -
      2021: 50,4% HUTANG BAYAR HUTANG
      Dari total pinjaman baru sebesar RM194,55 miliar, sebanyak RM98,05 miliar digunakan untuk pembayaran kembali prinsipal utang yang telah matang.
      -
      2022: 52,4% HUTANG BAYAR HUTANG
      Realisasi pembayaran prinsipal mencapai RM113,7 miliar. Total pinjaman meningkat 11,6% dibandingkan tahun sebelumnya akibat pemulihan pascapandemi.
      -
      2023: 64,3% HUTANG BAYAR HUTANG
      Persentase tertinggi dalam periode ini. Dari total pinjaman kasar RM226,6 miliar, sebesar RM145,8 miliar lari ke pembayaran utang lama.
      -
      2024: 58,9% HUTANG BAYAR HUTANG
      Pemerintah mulai melakukan konsolidasi. Pinjaman digunakan untuk melunasi utang matang sebesar RM121,3 miliar dari total pinjaman RM206 miliar.
      -
      2025: 58% HUTANG BAYAR HUTANG
      Berdasarkan Tinjauan Fiskal 2025, pemerintah memproyeksikan pinjaman kasar sebesar RM184 miliar, di mana RM106,8 miliar disiapkan untuk membayar prinsipal utang matang.
      -
      2026 = HUTANG BAYAR HUTANG
      Dokumen Resmi Pemerintah (Kementerian Kewangan MALAYSEWA - MOF)
      Data utama berasal dari laporan tahunan yang diterbitkan bersamaan dengan pembentangan anggaran negara:
      Laporan Tinjauan Fiskal 2025 & 2026: Memuat angka proyeksi pinjaman kasar (gross borrowing) dan alokasi pembayaran kembali prinsipal utang yang matang.
      -
      SUMBER DATA RESMI:
      Laporan Ketua Audit Negara (LKAN): Mengenai Penyata Kewangan Kerajaan Persekutuan (tahunan).
      -
      Kementerian Kewangan MALAYSEWA (MOF): Laporan Tinjauan Fiskal dan Estimasi Pendapatan Federal (diterbitkan setiap pembentangan Belanjawan/Budget).

      Hapus
    8. PENGEMIS BERAS = LAUGHING STOCK TO THE WORLD
      REAL FREGAT VS FREGAT SALAH POTONG 17 KREDITOR REWORK 4000
      -
      INDONESIA
      AH-140 = FRIGAT MERAH PUTIH
      a. 140 M
      b. 6.626 TON
      c. Meriam 76mm Otmel
      d. CIWS 35mm Millenium
      e. 12.7mm Lionfish RCWS
      f. 64 Midlas VLS
      g. RADAR X-Band CENK 350KM AESA 4 FIXED RADAR
      h. RADAR L-Band CENK 400KM AESA
      i. SONAR HMS Fersah
      j. Torpedo B515
      k. SSM
      l. SAM
      =============================
      =============================
      MALONYET
      GOWING = LCS SALAH POTONG 17 KREDITOR REWORK 4000
      a. 111 M
      b. 3.100 TON
      c. Meriam 57mm
      d. NO CIWS FFBNP = NOT PAID
      e. 30mm RCWS
      f. VL MICA FFBNP = NOT PAID
      g. RADAR S-Band PESA = NO AESA
      h. SONAR = NOT PAID
      i. NO TORPEDO = NOT PAID
      j. SSM NSM FFBNP = NOT PAID
      k. SAM FFBNP = NOT PAID
      --------------------------------
      FACT LCS 2026 - 2011 = 16 YEARS
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      --------------------------------
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 BILLION PER UNIT = SETARA HARGA DESTROYER
      RM2,48 BILLION PER UNIT = SETARA HARGA DESTROYER
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and DEBT.
      --------------------------------
      Analisa Geopolitik & Pertahanan: "Stagnasi Total"
      Vakum SIPRI (2024-2025): Laporan impor senjata KOSONG selama dua tahun berturut-turut. MALAYSEWA kini sejajar dengan negara ekonomi kecil seperti Laos dan Kamboja dalam hal transfer alutsista berat.
      Kegagalan Proyek Strategis: Pembatalan F/A-18 Hornet Kuwait sebanyak 4 kali menunjukkan hilangnya kredibilitas finansial di pasar pertahanan internasional.
      Penurunan Daya Gentar: Berada di Peringkat 42 GFP (Posisi ke-7 di ASEAN), kini resmi berada di bawah Filipina (Peringkat 41).
      Perbandingan Kontras: Indonesia memimpin di Peringkat 13 dunia dengan daftar belanja "satu lembar penuh" (Rafale F4, A400M, KF-21 Boramae, Kapal PPA, dan Rudal Khan/Bora).
      -
      Analisa Ekonomi & Fiskal: "Spiral Utang Kronis"
      Fenomena Gali Lubang Tutup Lubang: Proyeksi 58% pinjaman baru di tahun 2026 hanya digunakan untuk membayar cicilan pokok dan bunga utang lama (Debt-Servicing Cycle).
      Beban Utang Nasional: Total utang dan liabilitas diproyeksikan menyentuh RM 1,79 Triliun, dengan rasio utang terhadap GDP melampaui ambang batas aman (>70%).
      -
      Analisa Model Pengadaan: "Negara Penyewa" (Leasing)
      Krisis Likuiditas: Ketiadaan dana tunai memaksa militer beralih ke skema Sewa (Leasing) untuk 32+ item strategis (Helikopter Blackhawk, AW139, simulator, hingga kendaraan taktis).
      Barter Komoditas: Pengadaan yang tersisa terpaksa menggunakan skema Barter Kelapa Sawit (CPO) seperti pada kesepakatan FA-50 (Korea Selatan) dan PT-91M (Polandia).
      Aset Karatan & Hilang: Proyek LCS mangkrak melibatkan 17 kreditor, diperparah dengan catatan buruk hilangnya 48 pesawat Skyhawk dan 2 mesin jet jet tempur.
      -
      Analisa Reputasi & Diplomasi Internasional
      Runtuhnya Prestasi Olahraga: Kekalahan di CAS terkait 7 pemain naturalisasi ilegal dan sanksi AFC (Kalah WO 0-3) mencerminkan kegagalan administrasi sistemik.
      Kehilangan Posisi Regional: Resmi gagal lolos ke Piala Asia 2027, di mana posisi tersebut kini diambil alih oleh Vietnam, mempertegas penurunan pengaruh MALAYSEWA di ASEAN.
      Krisis Identitas: Kritik internal dari pemimpin nasional (Mahathir & Anwar Ibrahim) mengenai kemiskinan struktural dan korupsi proyek negara memperburuk citra di mata investor global.

      Hapus
    9. PENGEMIS BERAS = LAUGHING STOCK TO THE WORLD
      REAL FREGAT VS FREGAT SALAH POTONG 17 KREDITOR REWORK 4000
      -
      INDONESIA
      AH-140 = FRIGAT MERAH PUTIH
      a. 140 M
      b. 6.626 TON
      c. Meriam 76mm Otmel
      d. CIWS 35mm Millenium
      e. 12.7mm Lionfish RCWS
      f. 64 Midlas VLS
      g. RADAR X-Band CENK 350KM AESA 4 FIXED RADAR
      h. RADAR L-Band CENK 400KM AESA
      i. SONAR HMS Fersah
      j. Torpedo B515
      k. SSM
      l. SAM
      =============================
      =============================
      MALONYET
      GOWING = LCS SALAH POTONG 17 KREDITOR REWORK 4000
      a. 111 M
      b. 3.100 TON
      c. Meriam 57mm
      d. NO CIWS FFBNP = NOT PAID
      e. 30mm RCWS
      f. VL MICA FFBNP = NOT PAID
      g. RADAR S-Band PESA = NO AESA
      h. SONAR = NOT PAID
      i. NO TORPEDO = NOT PAID
      j. SSM NSM FFBNP = NOT PAID
      k. SAM FFBNP = NOT PAID
      --------------------------------
      FACT LCS 2026 - 2011 = 16 YEARS
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      --------------------------------
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 BILLION PER UNIT = SETARA HARGA DESTROYER
      RM2,48 BILLION PER UNIT = SETARA HARGA DESTROYER
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and DEBT.
      --------------------------------
      Status Kelumpuhan Pertahanan (SIPRI & Alutsista)
      Vakum SIPRI (2024–2025): Status KOSONG total selama dua tahun berturut-turut. Tidak ada transfer senjata berat yang tercatat, menempatkan MALAYSEWA setara dengan Laos dan Kamboja.
      Tren Mundur: Penurunan konsisten dari fase Planned (2020), Selected Not Yet Ordered (2022), hingga nihil aktivitas (2024–2025).
      Kegagalan Simbolik: Pembatalan resmi akuisisi F/A-18 Hornet Kuwait sebanyak 4 kali bukti hilangnya kredibilitas finansial di pasar global.
      Procurement Freeze (2026): Instruksi PM Anwar Ibrahim untuk pembekuan total pengadaan guna menghentikan korupsi sistemik dan kebocoran anggaran.
      -
      Model "Negara Penyewa" (Military-for-Rent)
      Ketiadaan uang tunai memaksa militer beralih dari kepemilikan aset menjadi skema Leasing (Sewa):
      Aset Sewaan (32+ Item): Mencakup 31 Helikopter (Blackhawk, AW139, AW149, Bell 429), pesawat latihan L39 ITCC, simulator jet tempur MKM, hingga motor polisi.
      Skema Barter: Pengadaan yang tersisa (FA-50, PT-91M, Scorpene) terpaksa menggunakan Barter Kelapa Sawit (CPO) karena krisis devisa.
      Aset Mangkrak: Proyek LCS & OPV yang karatan di galangan melibatkan 17 kreditor dengan bunga yang terus membengkak.
      -
      Spiral Utang "Gali Lubang Tutup Lubang"
      Debt-Servicing Cycle: 58% hingga 64,3% pinjaman baru hanya digunakan untuk membayar bunga dan cicilan pokok utang lama.
      Ledakan Liabilitas: Utang nasional melonjak drastis dari RM 407 Miliar (2010) menjadi proyeksi RM 1,79 Triliun (2026).
      Rasio Kritis: Utang pemerintah menyentuh 69% GDP (melewati limit 65%) dan utang rumah tangga ekstrem di angka 84,3% GDP.
      Tabung Harapan (2018): Bukti historis keputusasaan fiskal melalui penggalangan dana rakyat untuk membayar utang negara.
      -
      Penurunan Daya Gentar & Reputasi (GFP 2026)
      Peringkat GFP: Merosot ke posisi 42 dunia (Peringkat ke-7 di ASEAN), resmi disalip oleh Filipina (Peringkat 41).
      Skandal Aset Hilang: Catatan memalukan raibnya 48 pesawat Skyhawk dan 2 mesin jet tempur dari gudang militer.
      Degradasi Armada: Banyak aset utama berstatus Grounded (MiG-29, MB339CM, Nuri) atau mogok saat parade (Tank PT-91M).

      Hapus
    10. PENGEMIS BERAS = LAUGHING STOCK TO THE WORLD
      REAL FREGAT VS FREGAT SALAH POTONG 17 KREDITOR REWORK 4000
      -
      INDONESIA
      AH-140 = FRIGAT MERAH PUTIH
      a. 140 M
      b. 6.626 TON
      c. Meriam 76mm Otmel
      d. CIWS 35mm Millenium
      e. 12.7mm Lionfish RCWS
      f. 64 Midlas VLS
      g. RADAR X-Band CENK 350KM AESA 4 FIXED RADAR
      h. RADAR L-Band CENK 400KM AESA
      i. SONAR HMS Fersah
      j. Torpedo B515
      k. SSM
      l. SAM
      =============================
      =============================
      MALONYET
      GOWING = LCS SALAH POTONG 17 KREDITOR REWORK 4000
      a. 111 M
      b. 3.100 TON
      c. Meriam 57mm
      d. NO CIWS FFBNP = NOT PAID
      e. 30mm RCWS
      f. VL MICA FFBNP = NOT PAID
      g. RADAR S-Band PESA = NO AESA
      h. SONAR = NOT PAID
      i. NO TORPEDO = NOT PAID
      j. SSM NSM FFBNP = NOT PAID
      k. SAM FFBNP = NOT PAID
      --------------------------------
      FACT LCS 2026 - 2011 = 16 YEARS
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      --------------------------------
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 BILLION PER UNIT = SETARA HARGA DESTROYER
      RM2,48 BILLION PER UNIT = SETARA HARGA DESTROYER
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and DEBT.
      --------------------------------
      Status Kelumpuhan Pertahanan (SIPRI & Alutsista)
      Vakum SIPRI (2024–2025): Status KOSONG total selama dua tahun berturut-turut. Tidak ada transfer senjata berat yang tercatat, menempatkan MALAYSEWA setara dengan Laos dan Kamboja.
      Tren Mundur: Penurunan konsisten dari fase Planned (2020), Selected Not Yet Ordered (2022), hingga nihil aktivitas (2024–2025).
      Kegagalan Simbolik: Pembatalan resmi akuisisi F/A-18 Hornet Kuwait sebanyak 4 kali bukti hilangnya kredibilitas finansial di pasar global.
      Procurement Freeze (2026): Instruksi PM Anwar Ibrahim untuk pembekuan total pengadaan guna menghentikan korupsi sistemik dan kebocoran anggaran.
      -
      Model "Negara Penyewa" (Military-for-Rent)
      Ketiadaan uang tunai memaksa militer beralih dari kepemilikan aset menjadi skema Leasing (Sewa):
      Aset Sewaan (32+ Item): Mencakup 31 Helikopter (Blackhawk, AW139, AW149, Bell 429), pesawat latihan L39 ITCC, simulator jet tempur MKM, hingga motor polisi.
      Skema Barter: Pengadaan yang tersisa (FA-50, PT-91M, Scorpene) terpaksa menggunakan Barter Kelapa Sawit (CPO) karena krisis devisa.
      Aset Mangkrak: Proyek LCS & OPV yang karatan di galangan melibatkan 17 kreditor dengan bunga yang terus membengkak.
      -
      Spiral Utang "Gali Lubang Tutup Lubang"
      Debt-Servicing Cycle: 58% hingga 64,3% pinjaman baru hanya digunakan untuk membayar bunga dan cicilan pokok utang lama.
      Ledakan Liabilitas: Utang nasional melonjak drastis dari RM 407 Miliar (2010) menjadi proyeksi RM 1,79 Triliun (2026).
      Rasio Kritis: Utang pemerintah menyentuh 69% GDP (melewati limit 65%) dan utang rumah tangga ekstrem di angka 84,3% GDP.
      Tabung Harapan (2018): Bukti historis keputusasaan fiskal melalui penggalangan dana rakyat untuk membayar utang negara.
      -
      Penurunan Daya Gentar & Reputasi (GFP 2026)
      Peringkat GFP: Merosot ke posisi 42 dunia (Peringkat ke-7 di ASEAN), resmi disalip oleh Filipina (Peringkat 41).
      Skandal Aset Hilang: Catatan memalukan raibnya 48 pesawat Skyhawk dan 2 mesin jet tempur dari gudang militer.
      Degradasi Armada: Banyak aset utama berstatus Grounded (MiG-29, MB339CM, Nuri) atau mogok saat parade (Tank PT-91M).

      Hapus
    11. WITHOUT MALONYET = KASTA FFBNP : BANNED NSM AMRAAM : PALAK ART USD 240 MILLIAR
      THE 40 LARGEST RECIPIENTS OF MAJOR ARMS =
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -
      1 Ukraina
      2 India
      3 Arab Saudi
      4 Qatar
      5 Pakistan
      6 Jepang
      7 Polandia
      8 Amerika Serikat
      9 Kuwait
      10 Australia
      11 UEA
      12 Mesir
      13 Inggris
      14 Israel
      15 Belanda
      16 Korea Selatan
      17 Jerman
      18 Indonesia
      19 Yunani
      20 Norwegia
      21 China
      22 Italia
      23 Filipina
      24 TΓΌrkiye
      25 Brasil
      26 Singapura
      27 Bahrain
      28 Maroko
      29 Denmark
      30 Rumania
      31 Belgia
      32 Belarusia
      33 Aljazair
      34 Taiwan
      35 Hungaria
      36 Kazakhstan
      37 Serbia
      38 Kanada
      39 Spanyol
      40 Thailand
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -------------------------------
      INDONESIA .....
      STATUS 2026: HEGEMON KAWASAN & RAKSASA EKONOMI
      Realisasi SIPRI (Periode 2021–2025):
      Peringkat 18 Dunia: Importir senjata terbesar di Asia Tenggara (pangsa pasar 1,5%).
      Lembar Belanja 2024-2025: PENUH/LENGKAP (Rafale F-4, A400M Atlas, Rudal BORA & KHAN, Kapal PPA-L-Plus, Drone Anka-S, Air Refueling System).
      Skala Ekonomi (PDB 2026):
      PDB PPP: US$ 5,69 Triliun (Peringkat 6 Dunia) — 4,24 kali lipat lebih besar dari MALONYET.
      PDB Nominal: US$ 1,69 Triliun.
      Peringkat Militer (GFP 2026):
      Peringkat 13 Dunia: Nomor 1 di ASEAN dengan modernisasi aktif dan mandiri.
      Ketahanan Fiskal:
      Sangat Sehat dengan ruang belanja luas untuk alutsista strategis generasi terbaru.
      ________________________________________
      MALONYET.......
      STATUS 2023-2026: KEBANGKRUTAN SISTEMIK & SALAM KOSONG
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perintah Treasury untuk memotong anggaran operasional seluruh instansi akibat dampak konflik global (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: 24.100 PHK (Data SOCSO); restrukturisasi Petronas pangkas ±5.000 karyawan.
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan total kontrak militer dan polisi per 16 Januari 2026 akibat skandal suap pejabat senior.
      Status SIPRI (2024-2025) = KOSONG: Absen total dari daftar realisasi impor senjata global; modernisasi lumpuh total.
      Kronologi Kegagalan (Timeline "Prank"):
      2014: Jet Rafale Prancis (Mangkrak).
      2022: Jet HAL Tejas India (Batal).
      2024-2025: Sewa Black Hawk (Mangkrak/Unit tidak tiba).
      2026: F/A-18 HORNET KUWAIT RESMI BATAL.
      Data Utang & Beban Warga 2026:
      Utang Pemerintah: RM 1,79 Triliun (70,5% PDB — MELEWATI LIMIT 65%).
      Utang Household: RM 1,65 Triliun (84,3% PDB — MELEWATI LIMIT 65%).
      ➡️ TOTAL BEBAN PER WARGA: RM 94.544.
      Peringkat Militer (GFP 2026):
      Peringkat 42 Dunia: Posisi terbawah di antara negara utama ASEAN, resmi disalip Filipina (Peringkat 41).
      KESIMPULAN:
      INDONESIA PERINGKAT 13 DUNIA & SIPRI LENGKAP VS MALONYET PERINGKAT 42 DUNIA & BEBAN UTANG RM 94K/JIWA

      Hapus
    12. WITHOUT MALONYET = KASTA FFBNP : BANNED NSM AMRAAM : PALAK ART USD 240 MILLIAR
      THE 40 LARGEST RECIPIENTS OF MAJOR ARMS =
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -
      1 Ukraina
      2 India
      3 Arab Saudi
      4 Qatar
      5 Pakistan
      6 Jepang
      7 Polandia
      8 Amerika Serikat
      9 Kuwait
      10 Australia
      11 UEA
      12 Mesir
      13 Inggris
      14 Israel
      15 Belanda
      16 Korea Selatan
      17 Jerman
      18 Indonesia
      19 Yunani
      20 Norwegia
      21 China
      22 Italia
      23 Filipina
      24 TΓΌrkiye
      25 Brasil
      26 Singapura
      27 Bahrain
      28 Maroko
      29 Denmark
      30 Rumania
      31 Belgia
      32 Belarusia
      33 Aljazair
      34 Taiwan
      35 Hungaria
      36 Kazakhstan
      37 Serbia
      38 Kanada
      39 Spanyol
      40 Thailand
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -------------------------------
      INDONESIA .....
      STATUS 2026: HEGEMON MUTLAK & MODERNISASI TUNAI
      Realisasi Kekuatan Udara (Firm Order):
      42 Rafale: Kontrak lunas dan efektif (Dassault Aviation).
      48 KAAN (Gen-5): Kerja sama strategis G2G dengan Turki (TAI).
      48 KF-21 Boramae (Block II): Kesepakatan tahap akhir dengan Korea Selatan (KAI).
      24 M-346F: Penandatanganan Letter of Award (LOA) dengan Leonardo.
      Radius Tempur & Dominasi Geografis:
      Radius Rafale (±1.852 KM) sanggup menjangkau seluruh KL (dari Pekanbaru hanya 291 KM) dan Sarawak (dari Pontianak hanya 498 KM).
      Kesehatan Fiskal (Pruden):
      Gov. Debt: ~40% PDB (Jauh di bawah batas aman 60%).
      Household Debt: Sangat rendah (16% PDB).
      Status Kedaulatan: Berhasil menaikkan saham Freeport menjadi 63,23% dan menolak blanket overflight access bagi pesawat militer asing.
      ________________________________________
      MALONYET.......
      STATUS 2023-2026: KEBANGKRUTAN SISTEMIK & MILITER SEWAAN
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Treasury memangkas anggaran operasional seluruh kementerian akibat dampak krisis global (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Puncak krisis Januari 2026 dengan 24.100 PHK; Petronas pangkas ±5.000 karyawan.
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan total kontrak militer dan polisi akibat investigasi suap pejabat tinggi dan mantan panglima.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Status vakum total 2 tahun berturut-turut; setara dengan Laos dan Kamboja.
      Kegagalan Angkatan Udara (Timeline Prank):
      F/A-18 Hornet Kuwait: Resmi BATAL (Februari 2026) setelah 4 kali upaya negosiasi gagal total.
      MiG-29N: Pensiun dini tanpa pengganti (Tiada Ganti).
      FA-50: Mengalami hambatan blokir lisensi dari AS.
      Data Utang & Beban Warga 2026:
      Gov. Debt: RM 1,79 Triliun (70,5% PDB — OVER LIMIT 65%).
      Per Warga: Setiap penduduk menanggung beban kumulatif utang sebesar RM 94.544.
      Peringkat Global Firepower (GFP) 2026: Merosot ke posisi 42 dunia; resmi disalip oleh Filipina (Peringkat 41).

      Hapus
    13. WITHOUT MALONYET = KASTA FFBNP : BANNED NSM AMRAAM : PALAK ART USD 240 MILLIAR
      THE 40 LARGEST RECIPIENTS OF MAJOR ARMS =
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -
      1 Ukraina
      2 India
      3 Arab Saudi
      4 Qatar
      5 Pakistan
      6 Jepang
      7 Polandia
      8 Amerika Serikat
      9 Kuwait
      10 Australia
      11 UEA
      12 Mesir
      13 Inggris
      14 Israel
      15 Belanda
      16 Korea Selatan
      17 Jerman
      18 Indonesia
      19 Yunani
      20 Norwegia
      21 China
      22 Italia
      23 Filipina
      24 TΓΌrkiye
      25 Brasil
      26 Singapura
      27 Bahrain
      28 Maroko
      29 Denmark
      30 Rumania
      31 Belgia
      32 Belarusia
      33 Aljazair
      34 Taiwan
      35 Hungaria
      36 Kazakhstan
      37 Serbia
      38 Kanada
      39 Spanyol
      40 Thailand
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -------------------------------
      MALONYET.......
      STATUS 2023-2026: KEBANGKRUTAN SISTEMIK & MISKIN
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan pemangkasan anggaran operasional seluruh kementerian akibat dampak krisis global (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Puncak krisis Januari 2026 dengan 24.100 PHK (Data SOCSO/PERKESO); Petronas pangkas ±5.000 karyawan.
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan total kontrak militer dan polisi per 16 Januari 2026 menyusul investigasi korupsi pejabat tinggi.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Dua tahun berturut-turut tanpa catatan transfer senjata berat; sejajar dengan Laos dan Kamboja.
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF karena kendala finansial.
      ________________________________________
      DATA UTANG & BEBAN RAKYAT 2026:
      Utang Pemerintah: RM 1,79 Triliun (70,5% PDB — MELEWATI LIMIT 65%).
      Utang Household: RM 1,65 Triliun (84,3% PDB — MELEWATI LIMIT 65%).
      Perhitungan Beban Kumulatif Per Warga (Populasi 36,3 Juta):
      Beban Utang Pemerintah: RM 49.196 / jiwa.
      Beban Utang Household: RM 45.348 / jiwa.
      ➡️ TOTAL BEBAN PER WARGA: RM 94.544.
      ________________________________________
      BUKTI "BORROWING TO REPAY DEBT" (DEBT-SERVICING):
      Rekor Terburuk (2023): 64,3% dari total pinjaman kasar (RM 145,8 Miliar) hanya habis untuk membayar utang lama (Gali lubang tutup lubang).
      Proyeksi 2025-2026: Konsisten di angka 58%. Ruang fiskal untuk belanja alutsista terkunci total oleh cicilan bunga utang.
      Tabung Harapan (2018): Bukti keputusasaan di mana negara harus meminta donasi rakyat untuk membayar utang yang menembus RM 1 Triliun.
      ________________________________________
      DEGRADASI MILITER & TIMELINE "PRANK":
      Penurunan Daya Gentar (GFP 2026): Merosot ke posisi 42 dunia; resmi disalip oleh Filipina (Peringkat 41).
      Skandal Aset Hilang: Catatan memalukan raibnya 48 pesawat Skyhawk dan 2 mesin jet tempur dari gudang militer.
      Vakum SIPRI (2020-2025): Dari status Planned (2020) turun ke Not Yet Ordered (2022) hingga akhirnya KOSONG TOTAL (2024-2025).
      Timeline Kegagalan (Prank):
      F/A-18 Hornet: Batal 4 kali upaya akuisisi dari Kuwait hingga resmi mati di 2026.
      Dassault Rafale: Mangkrak sejak 2014 akibat ketiadaan dana tunai.
      Kapal MRSS: Janji kontrak dengan PT PAL 2018 yang berakhir zonk.
      ________________________________________
      KRISIS ADMINISTRASI & REPUTASI:
      Sanksi Olahraga: Kekalahan WO 0-3 dan sanksi AFC/CAS akibat pemain ilegal mencerminkan kegagalan birokrasi sistemik.
      Tekanan Ekonomi: Ancaman sanksi tarif AS Section 301 (10-25%) dan IEEPA menghantam sektor manufaktur utama (E&E).
      Kontras Regional (Indonesia): Memiliki "Lembar Belanja SIPRI Penuh" (Rafale, KAAN, PPA) dengan rasio utang pemerintah yang sehat (40% PDB).
      KESIMPULAN:
      TOTAL BEBAN WARGA RM 94K + SPIRAL UTANG 70,5% PDB + SIPRI KOSONG = KEBANGKRUTAN NASIONAL TOTAL.

      Hapus
    14. WITHOUT MALONYET = KASTA FFBNP : BANNED NSM AMRAAM : PALAK ART USD 240 MILLIAR
      THE 40 LARGEST RECIPIENTS OF MAJOR ARMS =
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -
      1 Ukraina
      2 India
      3 Arab Saudi
      4 Qatar
      5 Pakistan
      6 Jepang
      7 Polandia
      8 Amerika Serikat
      9 Kuwait
      10 Australia
      11 UEA
      12 Mesir
      13 Inggris
      14 Israel
      15 Belanda
      16 Korea Selatan
      17 Jerman
      18 Indonesia
      19 Yunani
      20 Norwegia
      21 China
      22 Italia
      23 Filipina
      24 TΓΌrkiye
      25 Brasil
      26 Singapura
      27 Bahrain
      28 Maroko
      29 Denmark
      30 Rumania
      31 Belgia
      32 Belarusia
      33 Aljazair
      34 Taiwan
      35 Hungaria
      36 Kazakhstan
      37 Serbia
      38 Kanada
      39 Spanyol
      40 Thailand
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -------------------------------
      MALONYET.......
      STATUS 2023-2026: KEBANGKRUTAN SISTEMIK & MILITER SEWAAN
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Treasury memangkas anggaran operasional seluruh kementerian akibat dampak krisis global (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Puncak krisis Januari 2026 dengan 24.100 PHK (Data SOCSO); Petronas pangkas ±5.000 karyawan.
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan total pengadaan militer oleh PM Anwar Ibrahim per 16 Januari 2026 akibat skandal korupsi sistemik.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Status vakum total selama 2 tahun berturut-turut; setara dengan Laos dan Kamboja dalam hal nol transfer senjata berat.
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF karena kendala finansial.
      ________________________________________
      DATA UTANG & BEBAN RAKYAT 2026:
      Utang Pemerintah: RM 1,79 Triliun (70,5% PDB — OVER LIMIT 65%).
      Utang Household: RM 1,65 Triliun (84,3% PDB — OVER LIMIT 65%).
      Beban Kumulatif Per Warga (Populasi 36,3 Juta):
      Beban Utang Pemerintah: RM 49.196 / jiwa.
      Beban Utang Household: RM 45.348 / jiwa.
      ➡️ TOTAL BEBAN PER WARGA: RM 94.544.
      ________________________________________
      ANALISA MODEL PENGADAAN: "NEGARA PENYEWA" (LEASING)
      Krisis Likuiditas: Ketiadaan dana tunai memaksa militer beralih ke skema Sewa (Leasing) untuk 32+ item strategis (Helikopter Blackhawk, AW139, simulator, hingga kendaraan taktis).
      Skema Barter Komoditas: Pengadaan yang tersisa (FA-50 & PT-91M) terpaksa menggunakan skema Barter Kelapa Sawit (CPO) karena minimnya cadangan devisa mata uang asing.
      Aset Karatan & Hilang: Proyek LCS mangkrak melibatkan 17 kreditor dengan bunga membengkak; diperparah skandal hilangnya 48 pesawat Skyhawk dan 2 mesin jet dari gudang.
      ________________________________________
      ANALISA REPUTASI & DIPLOMASI INTERNASIONAL:
      Runtuhnya Prestasi Olahraga: Kekalahan di CAS terkait 7 pemain naturalisasi ilegal dan sanksi AFC (Kalah WO 0-3) mencerminkan kegagalan administrasi sistemik.
      Kehilangan Posisi Regional: Gagal lolos ke Piala Asia 2027; posisi diambil alih oleh Vietnam, mempertegas penurunan pengaruh MALONYET di ASEAN.
      Spiral Utang: Fenomena "Gali Lubang Tutup Lubang" di mana 58% pinjaman baru hanya habis untuk membayar bunga dan pokok utang lama (Debt-Servicing Cycle).

      Hapus
    15. WITHOUT MALONYET = KASTA FFBNP : BANNED NSM AMRAAM : PALAK ART USD 240 MILLIAR
      THE 40 LARGEST RECIPIENTS OF MAJOR ARMS =
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -
      1 Ukraina
      2 India
      3 Arab Saudi
      4 Qatar
      5 Pakistan
      6 Jepang
      7 Polandia
      8 Amerika Serikat
      9 Kuwait
      10 Australia
      11 UEA
      12 Mesir
      13 Inggris
      14 Israel
      15 Belanda
      16 Korea Selatan
      17 Jerman
      18 Indonesia
      19 Yunani
      20 Norwegia
      21 China
      22 Italia
      23 Filipina
      24 TΓΌrkiye
      25 Brasil
      26 Singapura
      27 Bahrain
      28 Maroko
      29 Denmark
      30 Rumania
      31 Belgia
      32 Belarusia
      33 Aljazair
      34 Taiwan
      35 Hungaria
      36 Kazakhstan
      37 Serbia
      38 Kanada
      39 Spanyol
      40 Thailand
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -------------------------------
      MALONYET.......
      STATUS 2023-2026: SPIRAL UTANG & KEBANGKRUTAN STRATEGIS
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan pemangkasan anggaran operasional seluruh kementerian akibat dampak krisis global (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Puncak krisis Januari 2026 dengan 24.100 PHK (Data SOCSO/PERKESO); Petronas pangkas ±5.000 karyawan.
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan total kontrak militer dan polisi per 16 Januari 2026 akibat investigasi suap pejabat tinggi dan mantan panglima.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Dua tahun berturut-turut tanpa catatan transfer senjata berat. Status sejajar dengan Laos dan Kamboja.
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur oleh MINDEF karena kendala finansial.
      ________________________________________
      DATA UTANG & BEBAN RAKYAT 2026:
      Utang Pemerintah: RM 1,79 Triliun (70,5% PDB — MELEWATI LIMIT 65%).
      Utang Household: RM 1,65 Triliun (84,3% PDB — MELEWATI LIMIT 65%).
      Perhitungan Beban Utang Per Warga (Populasi 36,3 Juta):
      Beban Utang Pemerintah: RM 49.196 / jiwa.
      Beban Utang Household: RM 45.348 / jiwa.
      ➡️ TOTAL BEBAN PER WARGA: RM 94.544.
      ________________________________________
      BUKTI NYATA "GALI LUBANG TUTUP LUBANG" (2018–2026):
      2018 (Tabung Harapan): Fase putus asa fiskal melalui open donation rakyat untuk bayar utang negara yang menembus RM 1 Triliun.
      2019 (59%): Laporan Audit Negara mengungkap 59% pinjaman baru hanya untuk bayar utang lama.
      2023 (64,3%): Rekor tertinggi; dari RM 226,6 Miliar pinjaman kasar, sebesar RM 145,8 Miliar lari ke utang lama.
      2025-2026 (58%): Proyeksi konsisten di angka 58%. Lebih dari separuh uang pinjaman tidak menjadi pembangunan, melainkan hanya menyambung napas bunga utang.
      ________________________________________
      ANALISA PERTAHANAN: STAGNASI TOTAL
      Penurunan Daya Gentar: Merosot ke Peringkat 42 GFP (Posisi ke-7 di ASEAN), kini resmi di bawah Filipina (Peringkat 41).
      Kegagalan F/A-18 Hornet: Pembatalan 4 kali upaya pembelian Hornet bekas Kuwait membuktikan hilangnya kredibilitas finansial di pasar internasional (Tiada Cash).
      Hambatan Dagang AS: Sanksi Section 301 (Tarif 10-25%) dan ancaman IEEPA oleh USTR menghantam sektor E&E, mematikan sumber pendapatan utama untuk bayar utang.

      Hapus
  6. Beda kasta....

    https://www.youtube.com/shorts/nqPfbzBEKuE
    🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣

    BalasHapus
    Balasan
    1. KASTA FFBNP : BANNED NSM AMRAAM F18 UH60A : PALAK ART USD 240 MILLIAR
      GOVT DEBT 70,5% HOUSEHOLD 84,3% TO GDP .........
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      SUBSIDY BURDEN: 23.9%
      BORROWING TO REPAY DEBT: RM470 – RM334.1 = DEFICIT OF RM135.9
      ------------------------------
      KASTA FFBNP= NO SHOPPING BUT LEASING
      KASTA FFBNP= NO SHOPPING BUT LEASING
      ------------------------------
      GOVERNMENT REVENUE =
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      --------------------------------------------
      Analisis Geopolitik & Pertahanan (Stagnasi Total)
      Vakum Alutsista (SIPRI 2024-2025): Status "Kosong" selama dua tahun berturut-turut menandakan tidak adanya transfer senjata berat yang masuk. Hal ini mengonfirmasi kegagalan proses modernisasi di saat negara tetangga (Indonesia/Singapura) melakukan pengadaan masif.
      Kegagalan Proyek Strategis: Pembatalan F/A-18 Hornet Kuwait sebanyak 4 kali menunjukkan hilangnya kredibilitas finansial di mata penjual internasional.
      Penurunan Daya Gentar: Peringkat Global Firepower (GFP) 42 (ke-7 di ASEAN) menempatkan militer MALAYSEWA di bawah Filipina, menunjukkan efek domino dari penundaan proyek LCS dan ketergantungan pada aset tua.
      Analisis Fiskal & Ekonomi (Spiral Utang)
      Debt-Servicing Cycle: Dengan proyeksi utang menyentuh RM 1,79 Triliun pada 2026, fenomena "Gali Lubang Tutup Lubang" (58% pinjaman baru hanya untuk membayar cicilan) telah mengunci anggaran negara.
      Rasio Bahaya: Rasio utang terhadap GDP yang stabil di angka 68%-70% sejak 2024-2026 membatasi ruang gerak fiskal untuk subsidi domestik maupun belanja modal militer.
      Hambatan Dagang AS: Sanksi Section 301 (tarif 10-25%) dan ancaman IEEPA oleh USTR Amerika Serikat akan memukul sektor manufaktur dan E&E, yang merupakan tulang punggung pendapatan negara untuk membayar utang tersebut.
      Analisis Reputasi & Diplomasi (Sanksi Internasional)
      Runtuhnya Prestasi Olahraga: Kekalahan di CAS dan sanksi AFC (Kalah WO 0-3) akibat penggunaan 7 pemain naturalisasi ilegal bukan sekadar masalah sepak bola, melainkan cerminan kegagalan administrasi sistemik di tingkat federasi.
      Kehilangan Posisi Regional: Kegagalan lolos ke Piala Asia 2027 dan pemberian posisi tersebut kepada Vietnam mempertegas penurunan pengaruh dan daya saing negara di kawasan ASEAN.
      Kesimpulan Strategis
      Tahun 2026 menjadi titik nadir di mana krisis utang pemerintah berdampak langsung pada pelemahan pertahanan nasional dan reputasi internasional. Model pengadaan "Barter CPO" dan "Kredit 100%" terbukti belum cukup untuk menambal kekosongan armada tempur di tengah tekanan sanksi dagang global.

      Hapus
    2. KASTA FFBNP : BANNED NSM AMRAAM F18 UH60A : PALAK ART USD 240 MILLIAR
      GOVT DEBT 70,5% HOUSEHOLD 84,3% TO GDP .........
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      SUBSIDY BURDEN: 23.9%
      BORROWING TO REPAY DEBT: RM470 – RM334.1 = DEFICIT OF RM135.9
      ------------------------------
      KASTA FFBNP= NO SHOPPING BUT LEASING
      KASTA FFBNP= NO SHOPPING BUT LEASING
      ------------------------------
      GOVERNMENT REVENUE =
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ---------------------------------
      Analisa Geopolitik & Pertahanan: "Stagnasi Total"
      Vakum SIPRI (2024-2025): Laporan impor senjata KOSONG selama dua tahun berturut-turut. MALAYSEWA kini sejajar dengan negara ekonomi kecil seperti Laos dan Kamboja dalam hal transfer alutsista berat.
      Kegagalan Proyek Strategis: Pembatalan F/A-18 Hornet Kuwait sebanyak 4 kali menunjukkan hilangnya kredibilitas finansial di pasar pertahanan internasional.
      Penurunan Daya Gentar: Berada di Peringkat 42 GFP (Posisi ke-7 di ASEAN), kini resmi berada di bawah Filipina (Peringkat 41).
      Perbandingan Kontras: Indonesia memimpin di Peringkat 13 dunia dengan daftar belanja "satu lembar penuh" (Rafale F4, A400M, KF-21 Boramae, Kapal PPA, dan Rudal Khan/Bora).
      -
      Analisa Ekonomi & Fiskal: "Spiral Utang Kronis"
      Fenomena Gali Lubang Tutup Lubang: Proyeksi 58% pinjaman baru di tahun 2026 hanya digunakan untuk membayar cicilan pokok dan bunga utang lama (Debt-Servicing Cycle).
      Beban Utang Nasional: Total utang dan liabilitas diproyeksikan menyentuh RM 1,79 Triliun, dengan rasio utang terhadap GDP melampaui ambang batas aman (>70%).
      Hambatan Dagang Global: Tekanan dari Amerika Serikat melalui Section 301 (kenaikan tarif 10-25%) dan ancaman IEEPA (pemblokiran transaksi) oleh USTR yang memukul sektor manufaktur dan E&E.

      Hapus
    3. KASTA FFBNP : BANNED NSM AMRAAM F18 UH60A : PALAK ART USD 240 MILLIAR
      GOVT DEBT 70,5% HOUSEHOLD 84,3% TO GDP .........
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      SUBSIDY BURDEN: 23.9%
      BORROWING TO REPAY DEBT: RM470 – RM334.1 = DEFICIT OF RM135.9
      ------------------------------
      KASTA FFBNP= NO SHOPPING BUT LEASING
      KASTA FFBNP= NO SHOPPING BUT LEASING
      ------------------------------
      GOVERNMENT REVENUE =
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ---------------------------------
      Analisa Model Pengadaan: "Negara Penyewa" (Leasing)
      Krisis Likuiditas: Ketiadaan dana tunai memaksa militer beralih ke skema Sewa (Leasing) untuk 32+ item strategis (Helikopter Blackhawk, AW139, simulator, hingga kendaraan taktis).
      Barter Komoditas: Pengadaan yang tersisa terpaksa menggunakan skema Barter Kelapa Sawit (CPO) seperti pada kesepakatan FA-50 (Korea Selatan) dan PT-91M (Polandia).
      Aset Karatan & Hilang: Proyek LCS mangkrak melibatkan 17 kreditor, diperparah dengan catatan buruk hilangnya 48 pesawat Skyhawk dan 2 mesin jet jet tempur.
      -
      Analisa Reputasi & Diplomasi Internasional
      Runtuhnya Prestasi Olahraga: Kekalahan di CAS terkait 7 pemain naturalisasi ilegal dan sanksi AFC (Kalah WO 0-3) mencerminkan kegagalan administrasi sistemik.
      Kehilangan Posisi Regional: Resmi gagal lolos ke Piala Asia 2027, di mana posisi tersebut kini diambil alih oleh Vietnam, mempertegas penurunan pengaruh MALAYSEWA di ASEAN.
      Krisis Identitas: Kritik internal dari pemimpin nasional (Mahathir & Anwar Ibrahim) mengenai kemiskinan struktural dan korupsi proyek negara memperburuk citra di mata investor global.

      Hapus
    4. KASTA FFBNP : BANNED NSM AMRAAM F18 UH60A : PALAK ART USD 240 MILLIAR
      GOVT DEBT 70,5% HOUSEHOLD 84,3% TO GDP .........
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      SUBSIDY BURDEN: 23.9%
      BORROWING TO REPAY DEBT: RM470 – RM334.1 = DEFICIT OF RM135.9
      ------------------------------
      KASTA FFBNP= NO SHOPPING BUT LEASING
      KASTA FFBNP= NO SHOPPING BUT LEASING
      -------------------------------
      GOVERNMENT REVENUE =
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ---------------------------------
      Status Kelumpuhan Pertahanan (SIPRI & Alutsista)
      Vakum SIPRI (2024–2025): Status KOSONG total selama dua tahun berturut-turut. Tidak ada transfer senjata berat yang tercatat, menempatkan MALAYSEWA setara dengan Laos dan Kamboja.
      Tren Mundur: Penurunan konsisten dari fase Planned (2020), Selected Not Yet Ordered (2022), hingga nihil aktivitas (2024–2025).
      Kegagalan Simbolik: Pembatalan resmi akuisisi F/A-18 Hornet Kuwait sebanyak 4 kali bukti hilangnya kredibilitas finansial di pasar global.
      Procurement Freeze (2026): Instruksi PM Anwar Ibrahim untuk pembekuan total pengadaan guna menghentikan korupsi sistemik dan kebocoran anggaran.
      -
      Model "Negara Penyewa" (Military-for-Rent)
      Ketiadaan uang tunai memaksa militer beralih dari kepemilikan aset menjadi skema Leasing (Sewa):
      Aset Sewaan (32+ Item): Mencakup 31 Helikopter (Blackhawk, AW139, AW149, Bell 429), pesawat latihan L39 ITCC, simulator jet tempur MKM, hingga motor polisi.
      Skema Barter: Pengadaan yang tersisa (FA-50, PT-91M, Scorpene) terpaksa menggunakan Barter Kelapa Sawit (CPO) karena krisis devisa.
      Aset Mangkrak: Proyek LCS & OPV yang karatan di galangan melibatkan 17 kreditor dengan bunga yang terus membengkak.
      -
      Spiral Utang "Gali Lubang Tutup Lubang"
      Debt-Servicing Cycle: 58% hingga 64,3% pinjaman baru hanya digunakan untuk membayar bunga dan cicilan pokok utang lama.
      Ledakan Liabilitas: Utang nasional melonjak drastis dari RM 407 Miliar (2010) menjadi proyeksi RM 1,79 Triliun (2026).
      Rasio Kritis: Utang pemerintah menyentuh 69% GDP (melewati limit 65%) dan utang rumah tangga ekstrem di angka 84,3% GDP.
      Tabung Harapan (2018): Bukti historis keputusasaan fiskal melalui penggalangan dana rakyat untuk membayar utang negara.

      Hapus
    5. KASTA FFBNP : BANNED NSM AMRAAM F18 UH60A : PALAK ART USD 240 MILLIAR
      GOVT DEBT 70,5% HOUSEHOLD 84,3% TO GDP .........
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      SUBSIDY BURDEN: 23.9%
      BORROWING TO REPAY DEBT: RM470 – RM334.1 = DEFICIT OF RM135.9
      ------------------------------
      KASTA FFBNP= NO SHOPPING BUT LEASING
      KASTA FFBNP= NO SHOPPING BUT LEASING
      ------------------------------
      GOVERNMENT REVENUE =
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ---------------------------------
      Penurunan Daya Gentar & Reputasi (GFP 2026)
      Peringkat GFP: Merosot ke posisi 42 dunia (Peringkat ke-7 di ASEAN), resmi disalip oleh Filipina (Peringkat 41).
      Skandal Aset Hilang: Catatan memalukan raibnya 48 pesawat Skyhawk dan 2 mesin jet tempur dari gudang militer.
      Degradasi Armada: Banyak aset utama berstatus Grounded (MiG-29, MB339CM, Nuri) atau mogok saat parade (Tank PT-91M).
      -
      Krisis Administrasi & Tekanan Internasional
      Sanksi Olahraga: Kekalahan WO 0-3 dan sanksi AFC/CAS akibat pemain naturalisasi ilegal mencerminkan kegagalan birokrasi sistemik.
      Kehilangan Pengaruh: Posisi di Piala Asia 2027 resmi direbut oleh Vietnam, mempertegas mundurnya pengaruh diplomasi regional.
      Tekanan Ekonomi AS: Ancaman sanksi tarif Section 301 (10-25%) dan IEEPA oleh USTR menghantam sektor manufaktur utama (E&E).
      -
      Perbandingan Kontras: Indonesia (The Giant)
      Status SIPRI: Memiliki "Lembar Belanja Penuh" (Rafale F4, A400M, Rudal Khan, Kapal PPA).
      Kesehatan Fiskal: Rasio utang pemerintah jauh lebih sehat (40% GDP) dengan ekonomi 4,24x lebih besar secara PDB PPP dibandingkan MALAYSEWA.

      Hapus
    6. PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      ---------------------------------
      MALONYET CLAIMS TO BE RICH = GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP:
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      ---------------------------------
      2026 MALONYET BADUT FFBNP = CUT BUDGET
      2026 MALONYET BADUT FFBNP = NSM BANNED - AMRAAM BLOCKED
      2026 MALONYET BADUT FFBNP = F18 CANCELED - UH60A CANCELED
      2026 MALONYET BADUT FFBNP = REWORK OF 4000 LCS PIPES AND CABLES
      2026 MALONYET BADUT FFBNP = MASS LAYOFFS
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT
      2025 MALONYET BADUT FFBNP = SIPRI EMPTY
      2024 MALONYET BADUT FFBNP = SIPRI EMPTY
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT
      --------------------------------
      INDONESIA .....
      STATUS 2026: HEGEMON KAWASAN & RAKSASA EKONOMI
      Realisasi SIPRI (Periode 2021–2025):
      Peringkat 18 Dunia: Importir senjata terbesar di Asia Tenggara (pangsa pasar 1,5%).
      Lembar Belanja 2024-2025: PENUH/LENGKAP (Rafale F-4, A400M Atlas, Rudal BORA & KHAN, Kapal PPA-L-Plus, Drone Anka-S, Air Refueling System).
      Skala Ekonomi (PDB 2026):
      PDB PPP: US$ 5,69 Triliun (Peringkat 6 Dunia) — 4,24 kali lipat lebih besar dari MALONYET.
      PDB Nominal: US$ 1,69 Triliun.
      Peringkat Militer (GFP 2026):
      Peringkat 13 Dunia: Nomor 1 di ASEAN dengan modernisasi aktif dan mandiri.
      Ketahanan Fiskal:
      Sangat Sehat dengan ruang belanja luas untuk alutsista strategis generasi terbaru.
      ________________________________________
      MALONYET.......
      STATUS 2023-2026: KEBANGKRUTAN SISTEMIK & SALAM KOSONG
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perintah Treasury untuk memotong anggaran operasional seluruh instansi akibat dampak konflik global (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: 24.100 PHK (Data SOCSO); restrukturisasi Petronas pangkas ±5.000 karyawan.
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan total kontrak militer dan polisi per 16 Januari 2026 akibat skandal suap pejabat senior.
      Status SIPRI (2024-2025) = KOSONG: Absen total dari daftar realisasi impor senjata global; modernisasi lumpuh total.
      Kronologi Kegagalan (Timeline "Prank"):
      2014: Jet Rafale Prancis (Mangkrak).
      2022: Jet HAL Tejas India (Batal).
      2024-2025: Sewa Black Hawk (Mangkrak/Unit tidak tiba).
      2026: F/A-18 HORNET KUWAIT RESMI BATAL.
      Data Utang & Beban Warga 2026:
      Utang Pemerintah: RM 1,79 Triliun (70,5% PDB — MELEWATI LIMIT 65%).
      Utang Household: RM 1,65 Triliun (84,3% PDB — MELEWATI LIMIT 65%).
      ➡️ TOTAL BEBAN PER WARGA: RM 94.544.
      Peringkat Militer (GFP 2026):
      Peringkat 42 Dunia: Posisi terbawah di antara negara utama ASEAN, resmi disalip Filipina (Peringkat 41).
      KESIMPULAN:
      INDONESIA PERINGKAT 13 DUNIA & SIPRI LENGKAP VS MALONYET PERINGKAT 42 DUNIA & BEBAN UTANG RM 94K/JIWA

      Hapus
    7. PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      ---------------------------------
      MALONYET CLAIMS TO BE RICH = GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP:
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      ---------------------------------
      2026 MALONYET BADUT FFBNP = CUT BUDGET
      2026 MALONYET BADUT FFBNP = NSM BANNED - AMRAAM BLOCKED
      2026 MALONYET BADUT FFBNP = F18 CANCELED - UH60A CANCELED
      2026 MALONYET BADUT FFBNP = REWORK OF 4000 LCS PIPES AND CABLES
      2026 MALONYET BADUT FFBNP = MASS LAYOFFS
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT
      2025 MALONYET BADUT FFBNP = SIPRI EMPTY
      2024 MALONYET BADUT FFBNP = SIPRI EMPTY
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT
      --------------------------------
      INDONESIA .....
      STATUS 2026: HEGEMON MUTLAK & MODERNISASI TUNAI
      Realisasi Kekuatan Udara (Firm Order):
      42 Rafale: Kontrak lunas dan efektif (Dassault Aviation).
      48 KAAN (Gen-5): Kerja sama strategis G2G dengan Turki (TAI).
      48 KF-21 Boramae (Block II): Kesepakatan tahap akhir dengan Korea Selatan (KAI).
      24 M-346F: Penandatanganan Letter of Award (LOA) dengan Leonardo.
      Radius Tempur & Dominasi Geografis:
      Radius Rafale (±1.852 KM) sanggup menjangkau seluruh KL (dari Pekanbaru hanya 291 KM) dan Sarawak (dari Pontianak hanya 498 KM).
      Kesehatan Fiskal (Pruden):
      Gov. Debt: ~40% PDB (Jauh di bawah batas aman 60%).
      Household Debt: Sangat rendah (16% PDB).
      Status Kedaulatan: Berhasil menaikkan saham Freeport menjadi 63,23% dan menolak blanket overflight access bagi pesawat militer asing.
      ________________________________________
      MALONYET.......
      STATUS 2023-2026: KEBANGKRUTAN SISTEMIK & MILITER SEWAAN
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Treasury memangkas anggaran operasional seluruh kementerian akibat dampak krisis global (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Puncak krisis Januari 2026 dengan 24.100 PHK; Petronas pangkas ±5.000 karyawan.
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan total kontrak militer dan polisi akibat investigasi suap pejabat tinggi dan mantan panglima.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Status vakum total 2 tahun berturut-turut; setara dengan Laos dan Kamboja.
      Kegagalan Angkatan Udara (Timeline Prank):
      F/A-18 Hornet Kuwait: Resmi BATAL (Februari 2026) setelah 4 kali upaya negosiasi gagal total.
      MiG-29N: Pensiun dini tanpa pengganti (Tiada Ganti).
      FA-50: Mengalami hambatan blokir lisensi dari AS.
      Data Utang & Beban Warga 2026:
      Gov. Debt: RM 1,79 Triliun (70,5% PDB — OVER LIMIT 65%).
      Per Warga: Setiap penduduk menanggung beban kumulatif utang sebesar RM 94.544.
      Peringkat Global Firepower (GFP) 2026: Merosot ke posisi 42 dunia; resmi disalip oleh Filipina (Peringkat 41).

      Hapus
    8. PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      ---------------------------------
      MALONYET CLAIMS TO BE RICH = GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP:
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      ---------------------------------
      2026 MALONYET BADUT FFBNP = CUT BUDGET
      2026 MALONYET BADUT FFBNP = NSM BANNED - AMRAAM BLOCKED
      2026 MALONYET BADUT FFBNP = F18 CANCELED - UH60A CANCELED
      2026 MALONYET BADUT FFBNP = REWORK OF 4000 LCS PIPES AND CABLES
      2026 MALONYET BADUT FFBNP = MASS LAYOFFS
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT
      2025 MALONYET BADUT FFBNP = SIPRI EMPTY
      2024 MALONYET BADUT FFBNP = SIPRI EMPTY
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT
      --------------------------------
      MALONYET.......
      STATUS 2023-2026: KEBANGKRUTAN SISTEMIK & MISKIN
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan pemangkasan anggaran operasional seluruh kementerian akibat dampak krisis global (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Puncak krisis Januari 2026 dengan 24.100 PHK (Data SOCSO/PERKESO); Petronas pangkas ±5.000 karyawan.
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan total kontrak militer dan polisi per 16 Januari 2026 menyusul investigasi korupsi pejabat tinggi.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Dua tahun berturut-turut tanpa catatan transfer senjata berat; sejajar dengan Laos dan Kamboja.
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF karena kendala finansial.
      ________________________________________
      DATA UTANG & BEBAN RAKYAT 2026:
      Utang Pemerintah: RM 1,79 Triliun (70,5% PDB — MELEWATI LIMIT 65%).
      Utang Household: RM 1,65 Triliun (84,3% PDB — MELEWATI LIMIT 65%).
      Perhitungan Beban Kumulatif Per Warga (Populasi 36,3 Juta):
      Beban Utang Pemerintah: RM 49.196 / jiwa.
      Beban Utang Household: RM 45.348 / jiwa.
      ➡️ TOTAL BEBAN PER WARGA: RM 94.544.
      ________________________________________
      BUKTI "BORROWING TO REPAY DEBT" (DEBT-SERVICING):
      Rekor Terburuk (2023): 64,3% dari total pinjaman kasar (RM 145,8 Miliar) hanya habis untuk membayar utang lama (Gali lubang tutup lubang).
      Proyeksi 2025-2026: Konsisten di angka 58%. Ruang fiskal untuk belanja alutsista terkunci total oleh cicilan bunga utang.
      Tabung Harapan (2018): Bukti keputusasaan di mana negara harus meminta donasi rakyat untuk membayar utang yang menembus RM 1 Triliun.
      ________________________________________
      DEGRADASI MILITER & TIMELINE "PRANK":
      Penurunan Daya Gentar (GFP 2026): Merosot ke posisi 42 dunia; resmi disalip oleh Filipina (Peringkat 41).
      Skandal Aset Hilang: Catatan memalukan raibnya 48 pesawat Skyhawk dan 2 mesin jet tempur dari gudang militer.
      Vakum SIPRI (2020-2025): Dari status Planned (2020) turun ke Not Yet Ordered (2022) hingga akhirnya KOSONG TOTAL (2024-2025).
      Timeline Kegagalan (Prank):
      F/A-18 Hornet: Batal 4 kali upaya akuisisi dari Kuwait hingga resmi mati di 2026.
      Dassault Rafale: Mangkrak sejak 2014 akibat ketiadaan dana tunai.
      Kapal MRSS: Janji kontrak dengan PT PAL 2018 yang berakhir zonk.
      ________________________________________
      KRISIS ADMINISTRASI & REPUTASI:
      Sanksi Olahraga: Kekalahan WO 0-3 dan sanksi AFC/CAS akibat pemain ilegal mencerminkan kegagalan birokrasi sistemik.
      Tekanan Ekonomi: Ancaman sanksi tarif AS Section 301 (10-25%) dan IEEPA menghantam sektor manufaktur utama (E&E).
      Kontras Regional (Indonesia): Memiliki "Lembar Belanja SIPRI Penuh" (Rafale, KAAN, PPA) dengan rasio utang pemerintah yang sehat (40% PDB).
      KESIMPULAN:
      TOTAL BEBAN WARGA RM 94K + SPIRAL UTANG 70,5% PDB + SIPRI KOSONG = KEBANGKRUTAN NASIONAL TOTAL.

      Hapus
    9. PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      ---------------------------------
      MALONYET CLAIMS TO BE RICH = GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP:
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      ---------------------------------
      2026 MALONYET BADUT FFBNP = CUT BUDGET
      2026 MALONYET BADUT FFBNP = NSM BANNED - AMRAAM BLOCKED
      2026 MALONYET BADUT FFBNP = F18 CANCELED - UH60A CANCELED
      2026 MALONYET BADUT FFBNP = REWORK OF 4000 LCS PIPES AND CABLES
      2026 MALONYET BADUT FFBNP = MASS LAYOFFS
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT
      2025 MALONYET BADUT FFBNP = SIPRI EMPTY
      2024 MALONYET BADUT FFBNP = SIPRI EMPTY
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT
      --------------------------------
      MALONYET.......
      STATUS 2023-2026: KEBANGKRUTAN SISTEMIK & MILITER SEWAAN
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Treasury memangkas anggaran operasional seluruh kementerian akibat dampak krisis global (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Puncak krisis Januari 2026 dengan 24.100 PHK (Data SOCSO); Petronas pangkas ±5.000 karyawan.
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan total pengadaan militer oleh PM Anwar Ibrahim per 16 Januari 2026 akibat skandal korupsi sistemik.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Status vakum total selama 2 tahun berturut-turut; setara dengan Laos dan Kamboja dalam hal nol transfer senjata berat.
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF karena kendala finansial.
      ________________________________________
      DATA UTANG & BEBAN RAKYAT 2026:
      Utang Pemerintah: RM 1,79 Triliun (70,5% PDB — OVER LIMIT 65%).
      Utang Household: RM 1,65 Triliun (84,3% PDB — OVER LIMIT 65%).
      Beban Kumulatif Per Warga (Populasi 36,3 Juta):
      Beban Utang Pemerintah: RM 49.196 / jiwa.
      Beban Utang Household: RM 45.348 / jiwa.
      ➡️ TOTAL BEBAN PER WARGA: RM 94.544.
      ________________________________________
      ANALISA MODEL PENGADAAN: "NEGARA PENYEWA" (LEASING)
      Krisis Likuiditas: Ketiadaan dana tunai memaksa militer beralih ke skema Sewa (Leasing) untuk 32+ item strategis (Helikopter Blackhawk, AW139, simulator, hingga kendaraan taktis).
      Skema Barter Komoditas: Pengadaan yang tersisa (FA-50 & PT-91M) terpaksa menggunakan skema Barter Kelapa Sawit (CPO) karena minimnya cadangan devisa mata uang asing.
      Aset Karatan & Hilang: Proyek LCS mangkrak melibatkan 17 kreditor dengan bunga membengkak; diperparah skandal hilangnya 48 pesawat Skyhawk dan 2 mesin jet dari gudang.
      ________________________________________
      ANALISA REPUTASI & DIPLOMASI INTERNASIONAL:
      Runtuhnya Prestasi Olahraga: Kekalahan di CAS terkait 7 pemain naturalisasi ilegal dan sanksi AFC (Kalah WO 0-3) mencerminkan kegagalan administrasi sistemik.
      Kehilangan Posisi Regional: Gagal lolos ke Piala Asia 2027; posisi diambil alih oleh Vietnam, mempertegas penurunan pengaruh MALONYET di ASEAN.
      Spiral Utang: Fenomena "Gali Lubang Tutup Lubang" di mana 58% pinjaman baru hanya habis untuk membayar bunga dan pokok utang lama (Debt-Servicing Cycle).

      Hapus
    10. PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      ---------------------------------
      MALONYET CLAIMS TO BE RICH = GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP:
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      ---------------------------------
      2026 MALONYET BADUT FFBNP = CUT BUDGET
      2026 MALONYET BADUT FFBNP = NSM BANNED - AMRAAM BLOCKED
      2026 MALONYET BADUT FFBNP = F18 CANCELED - UH60A CANCELED
      2026 MALONYET BADUT FFBNP = REWORK OF 4000 LCS PIPES AND CABLES
      2026 MALONYET BADUT FFBNP = MASS LAYOFFS
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT
      2025 MALONYET BADUT FFBNP = SIPRI EMPTY
      2024 MALONYET BADUT FFBNP = SIPRI EMPTY
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT
      --------------------------------
      MALONYET.......
      STATUS 2023-2026: SPIRAL UTANG & KEBANGKRUTAN STRATEGIS
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan pemangkasan anggaran operasional seluruh kementerian akibat dampak krisis global (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Puncak krisis Januari 2026 dengan 24.100 PHK (Data SOCSO/PERKESO); Petronas pangkas ±5.000 karyawan.
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan total kontrak militer dan polisi per 16 Januari 2026 akibat investigasi suap pejabat tinggi dan mantan panglima.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Dua tahun berturut-turut tanpa catatan transfer senjata berat. Status sejajar dengan Laos dan Kamboja.
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur oleh MINDEF karena kendala finansial.
      ________________________________________
      DATA UTANG & BEBAN RAKYAT 2026:
      Utang Pemerintah: RM 1,79 Triliun (70,5% PDB — MELEWATI LIMIT 65%).
      Utang Household: RM 1,65 Triliun (84,3% PDB — MELEWATI LIMIT 65%).
      Perhitungan Beban Utang Per Warga (Populasi 36,3 Juta):
      Beban Utang Pemerintah: RM 49.196 / jiwa.
      Beban Utang Household: RM 45.348 / jiwa.
      ➡️ TOTAL BEBAN PER WARGA: RM 94.544.
      ________________________________________
      BUKTI NYATA "GALI LUBANG TUTUP LUBANG" (2018–2026):
      2018 (Tabung Harapan): Fase putus asa fiskal melalui open donation rakyat untuk bayar utang negara yang menembus RM 1 Triliun.
      2019 (59%): Laporan Audit Negara mengungkap 59% pinjaman baru hanya untuk bayar utang lama.
      2023 (64,3%): Rekor tertinggi; dari RM 226,6 Miliar pinjaman kasar, sebesar RM 145,8 Miliar lari ke utang lama.
      2025-2026 (58%): Proyeksi konsisten di angka 58%. Lebih dari separuh uang pinjaman tidak menjadi pembangunan, melainkan hanya menyambung napas bunga utang.
      ________________________________________
      ANALISA PERTAHANAN: STAGNASI TOTAL
      Penurunan Daya Gentar: Merosot ke Peringkat 42 GFP (Posisi ke-7 di ASEAN), kini resmi di bawah Filipina (Peringkat 41).
      Kegagalan F/A-18 Hornet: Pembatalan 4 kali upaya pembelian Hornet bekas Kuwait membuktikan hilangnya kredibilitas finansial di pasar internasional (Tiada Cash).
      Hambatan Dagang AS: Sanksi Section 301 (Tarif 10-25%) dan ancaman IEEPA oleh USTR menghantam sektor E&E, mematikan sumber pendapatan utama untuk bayar utang.

      Hapus
    11. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      --------------------------------------------
      BERITA 5 FEBRUARI 2026
      -
      GEMPURWIRA25 Agustus 2026 pukul 21.37
      NO KONTRAK ....NO PARTY..... HAHAHAHAHHA
      Boeing Setop Proses Jet Tempur F-15EX untuk RI, Kemhan Sebut Kemahalan
      https://video.kompas.com/watch/1907947/boeing-setop-proses-jet-tempur-f-15ex-untuk-ri-kemhan-sebut-kemahalan
      --------------------------------------------
      BERITA 3 FEBRUARI 2026
      -
      GEMPURWIRA25 Agustus 2026 pukul 21.38
      BATAL..... KAH...KAH...KAH.....
      Setelah Tiga Tahun MoU, Boeing Nyatakan Kesepakatan F-15EX dengan Indonesia Berakhir
      https://indomiliter.com/setelah-tiga-tahun-mou-boeing-nyatakan-kesepakatan-f-15ex-dengan-indonesia-berakhir/
      --------------------------------------------
      BERITA 3 FEBRUARI 2026
      -
      GEMPURWIRA25 Agustus 2026 pukul 21.39
      AYUH TUNJUK SAYA MANA KONTAK PEMBELIANNYA..... HAHAHAHAHHA
      Boeing says no longer building F-15 fighter jets for Indonesia
      https://www.thejakartapost.com/world/2026/02/03/boeing-says-no-longer-building-f-15-fighter-jets-for-indonesia
      --------------------------------------------
      BERITA 3 FEBRUARI 2026
      -
      GEMPURWIRA25 Agustus 2026 pukul 21.44
      Dimana yang kontrak efektif tu ya....?? HAHAHAHAHA
      Boeing Hentikan Proyek Jet Tempur F-15 untuk Indonesia, Modernisasi Alutsista TNI?
      https://internasional.kontan.co.id/news/boeing-hentikan-proyek-jet-tempur-f-15-untuk-indonesia-modernisasi-alutsista-tni
      --------------------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544
      --------------------------------------------
      USA BANNED MALONYET : NOT PAID/FFBNP
      NSM
      AMRAAM
      F18
      UH60A
      --------------------------------------------
      RELEASE 24/08/2026 vs BERITA FEBRUARI 2026

      Hapus
    12. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      --------------------------------------------
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      --------------------------------------------
      USA BANNED MALONYET : USA PALAK ART USD 240 MILLIAR
      NSM
      AMRAAM
      F18
      UH60A
      --------------------------------------------
      🀣ART PALAK USD 240 MILLIAR = BANNED : NSM AMRAAM F18🀣

      Hapus
    13. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      --------------------------------------------
      1️⃣ DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun
      Utang Rumah Tangga: RM 1,65 triliun
      Rasio Utang Pemerintah/PDB: 70,5% (Overlimit Batas 65%/PDB)
      Rasio Utang Rumah Tangga/PDB: 84,3% (Overlimit Batas 65%/PDB)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️Total Beban Kumulatif Per Warga : RM 49.196 + RM 45.348 = RM 94.544
      --------------------------------
      2️⃣ DATA YANG MALONYET 2025
      Utang Pemerintah akhir 2025: RM 1.30 triliun = 1,300,000,000,000
      Utang rumah tangga 2025 : RM 1.65 triliun = 1,650,000,000,000
      Jumlah penduduk MALONYET 2025 (perkiraan pertengahan tahun): 35,977,838 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2025
      Utang Pemerintah : 1,300,000,000,000/35,977,838 = RM 36,139
      Utang Rumah Tangga : 1,650,000,000,000/35,977,838 = RM 45,859
      ➡️Total Beban Kumulatif Per Warga MALONYET : RM 36,139 + RM 45,859 = RM 81.998
      --------------------------------
      3️⃣DATA UTANG MALONYET 2024
      Utang Pemerintah: RM 1,22 triliun
      Utang Rumah Tangga: RM 1,53 triliun
      Rasio Utang Pemerintah/PDB: 64,6%
      Rasio Utang Rumah Tangga/PDB: 84,2%
      Jumlah Penduduk: 34.671.895 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK 2024
      Utang Pemerintah: RM 1.220.000.000.000 / 34.671.895 = RM 35.187
      Utang Rumah Tangga: RM 1.530.000.000.000 / 34.671.895 = RM 44.128
      ➡️Total Beban Kumulatif Per Warga: RM 79.315
      --------------------------------
      4️⃣DATA UTANG MALONYET 2023
      Utang Pemerintah: RM 1,17 triliun
      Utang Rumah Tangga: RM 1,45 triliun
      Rasio Utang Pemerintah/PDB: 64,3%
      Rasio Utang Rumah Tangga/PDB: 81,2%
      Jumlah Penduduk: 35.126.298 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK 2023
      Utang Pemerintah: RM 1.170.000.000.000 / 35.126.298 = RM 33.308
      Utang Rumah Tangga: RM 1.450.000.000.000 / 35.126.298 = RM 41.279
      ➡️Total Beban Kumulatif Per Warga: RM 74.587
      --------------------------------
      5️⃣DATA UTANG MALONYET 2022
      Utang Pemerintah: RM 1,08 triliun
      Utang Rumah Tangga: RM 1,38 triliun
      Rasio Utang Pemerintah/PDB: 60,1%
      Rasio Utang Rumah Tangga/PDB: 80,9%
      Jumlah Penduduk: 34.695.493 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK 2022
      Utang Pemerintah: RM 1.080.000.000.000 / 34.695.493 = RM 31.127
      Utang Rumah Tangga: RM 1.380.000.000.000 / 34.695.493 = RM 39.774
      ➡️Total Beban Kumulatif Per Warga: RM 70.901
      --------------------------------
      6️⃣DATA UTANG MALONYET 2021
      Utang Pemerintah: RM 979,81 miliar
      Utang Rumah Tangga: RM 1,34 triliun
      Rasio Utang Pemerintah/PDB: 63,3%
      Rasio Utang Rumah Tangga/PDB: 89,1% (Puncak pandemi)
      Jumlah Penduduk: 34.282.399 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK 2021
      Utang Pemerintah: RM 979.810.000.000 / 34.282.399 = RM 28.580
      Utang Rumah Tangga: RM 1.340.000.000.000 / 34.282.399 = RM 39.087
      ➡️Total Beban Kumulatif Per Warga: RM 67.667
      --------------------------------------------
      USA BANNED MALONYET : USA PALAK ART USD 240 MILLIAR
      NSM
      AMRAAM
      F18
      UH60A
      --------------------------------------------
      🀣ART PALAK USD 240 MILLIAR = BANNED : NSM AMRAAM F18🀣

      Hapus
    14. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      --------------------------------------------
      HUTANG & LIABILITAS MALONDESH 1998–2026
      1998 : RM 165,4 Miliar
      1999 : RM 178,3 Miliar
      2000 : RM 192,2 Miliar
      2001 : RM 207,2 Miliar
      2002 : RM 223,3 Miliar
      2003 : RM 240,7 Miliar
      2004 : RM 259,5 Miliar
      2005 : RM 279,7 Miliar
      2006 : RM 301,5 Miliar
      2007 : RM 325,0 Miliar
      2008 : RM 350,4 Miliar
      2009 : RM 377,7 Miliar
      2010 : RM 407,1 Miliar
      2011 : RM 456,1 Miliar
      2012 : RM 501,6 Miliar
      2013 : RM 547,7 Miliar
      2014 : RM 582,8 Miliar
      2015 : RM 630,5 Miliar
      2016 : RM 648,5 Miliar
      2017 : RM 686,8 Miliar
      2018 : RM 1,19 Triliun
      2019 : RM 1,25 Triliun
      2020 : RM 1,32 Triliun
      2021 : RM 1,38 Triliun
      2022 : RM 1,45 Triliun
      2023 : RM 1,53 Triliun
      2024 : RM 1,63 Triliun
      2025 : RM 1,71 Triliun
      2026 : RM 1,79 Triliun
      -
      SUMBER :
      Bloomberg & Reuters | CNA & The Star | The Edge Malondesh | MOF & Bernama | Kementerian Kewangan
      --------------------------------_
      DEFISIT FISKAL MALONDESH PERIODE 1998–2025:
      1998 : -1,8% (± USD 33,6 MILIAR)
      1999 : -3,2% (± USD 34,3 MILIAR)
      2000 : -5,8% (± USD 32,5 MILIAR)
      2001 : -5,5% (± USD 38,0 MILIAR)
      2002 : -5,6% (± USD 39,5 MILIAR)
      2003 : -5,0% (± USD 41,3 MILIAR)
      2004 : -4,1% (± USD 41,9 MILIAR)
      2005 : -3,6% (± USD 40,7 MILIAR)
      2006 : -3,3% (± USD 39,6 MILIAR)
      2007 : -3,2% (± USD 39,3 MILIAR)
      2008 : -4,8% (± USD 39,3 MILIAR)
      2009 : -6,7% (± USD 50,4 MILIAR)
      2010 : -5,4% (± USD 51,8 MILIAR)
      2011 : -4,8% (± USD 53,7 MILIAR)
      2012 : -4,5% (± USD 55,6 MILIAR)
      2013 : -3,9% (± USD 55,3 MILIAR)
      2014 : -3,4% (± USD 56,9 MILIAR)
      2015 : -3,2% (± USD 55,7 MILIAR)
      2016 : -3,1% (± USD 54,3 MILIAR)
      2017 : -3,0% (± USD 55,6 MILIAR)
      2018 : -3,7% (± USD 57,0 MILIAR)
      2019 : -3,4% (± USD 67,6 MILIAR)
      2020 : -6,2% (± USD 69,1 MILIAR)
      2021 : -6,4% (± USD 65,5 MILIAR)
      2022 : -5,6% (± USD 69,7 MILIAR)
      2023 : -5,0% (± USD 68,3 MILIAR)
      2024 : -4,1% (± USD 298,4 MILIAR) (Pemangkasan subsidi)
      2025 : -3,8% (± USD 325,6 MILIAR) (Rasionalisasi RON95)
      -
      SUMBER:
      IMF | World Economic Outlook | World Bank | Bank Negara Malondesh.
      --------------------------------
      BEBAN UTANG PER KAPITA & POPULASI (2026–1998)
      2026: RM 94,544 | POPULASI: 36,385,115 JIWA
      2025: RM 81,998 | POPULASI: 35,977,838 JIWA
      2024: RM 79,315 | POPULASI: 34,671,895 JIWA
      2023: RM 74,587 | POPULASI: 35,126,298 JIWA
      2022: RM 70,901 | POPULASI: 34,695,493 JIWA
      2021: RM 67,667 | POPULASI: 34,282,399 JIWA
      2020: RM 63,464 | POPULASI: 33,870,000 JIWA
      2019: RM 60,179 | POPULASI: 33,450,000 JIWA
      2018: RM 57,605 | POPULASI: 33,000,000 JIWA
      2017: RM 54,910 | POPULASI: 32,540,000 JIWA
      2016: RM 52,699 | POPULASI: 32,040,000 JIWA
      2015: RM 51,253 | POPULASI: 31,520,000 JIWA
      2014: RM 47,927 | POPULASI: 30,980,000 JIWA
      2013: RM 44,992 | POPULASI: 30,420,000 JIWA
      2012: RM 41,326 | POPULASI: 29,850,000 JIWA
      2011: RM 37,904 | POPULASI: 29,260,000 JIWA
      2010: RM 34,488 | POPULASI: 28,650,000 JIWA
      2009: RM 31,326 | POPULASI: 28,040,000 JIWA
      2008: RM 26,155 | POPULASI: 27,450,000 JIWA
      2007: RM 25,316 | POPULASI: 26,860,000 JIWA
      2006: RM 23,381 | POPULASI: 26,260,000 JIWA
      2005: RM 21,940 | POPULASI: 25,660,000 JIWA
      2004: RM 20,550 | POPULASI: 25,060,000 JIWA
      2003: RM 18,560 | POPULASI: 24,460,000 JIWA
      2002: RM 16,798 | POPULASI: 23,870,000 JIWA
      2001: RM 15,162 | POPULASI: 23,280,000 JIWA
      2000: RM 13,574 | POPULASI: 22,690,000 JIWA
      1999: RM 12,210 | POPULASI: 22,110,000 JIWA
      1998: RM 10,821 | POPULASI: 21,530,000 JIWA
      --------------------------------------------
      USA BANNED MALONYET : USA PALAK ART USD 240 MILLIAR
      NSM
      AMRAAM
      F18
      UH60A
      --------------------------------------------
      🀣ART PALAK USD 240 MILLIAR = BANNED : NSM AMRAAM F18🀣


      Hapus
    15. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      --------------------------------------------
      UTANG & LIABILITAS MALONYET (1998–2026)
      1998: RM 103,1 Miliar – Dampak Krisis Keuangan Asia.
      1999: RM 116,6 Miliar – Penerbitan obligasi domestik baru.
      2000: RM 125,6 Miliar – Restrukturisasi korporasi & perbankan selesai.
      2001: RM 145,7 Miliar – Lonjakan belanja pembangunan domestik.
      2002: RM 165,0 Miliar – Rasio utang terhadap PDB naik.
      2003: RM 188,8 Miliar – Plafon utang naik ke 40% PDB.
      2004: RM 216,6 Miliar – Ekspansi proyek infrastruktur baru.
      2005: RM 228,7 Miliar – Konsolidasi fiskal manajemen baru.
      2006: RM 242,2 Miliar – Pengendalian defisit anggaran ketat.
      2007: RM 266,7 Miliar – Posisi keuangan stabil pra-krisis global.
      2008: RM 306,4 Miliar – Plafon utang naik ke 45% PDB.
      2009: RM 362,4 Miliar – Plafon utang melonjak ke 55% PDB.
      2010: RM 407,1 Miliar – Pertumbuhan awal pasca-krisis global.
      2011: RM 456,1 Miliar – Tren kenaikan utang stabil.
      2012: RM 501,6 Miliar – Menembus ambang batas RM 500 miliar.
      2013: RM 547,7 Miliar – Ekspansi besar infrastruktur nasional.
      2014: RM 582,8 Miliar – Berdasarkan Laporan Pemerintah Federal.
      2015: RM 630,5 Miliar – Dampak fluktuasi harga minyak.
      2016: RM 648,5 Miliar – Konsolidasi fiskal pemerintah berjalan.
      2017: RM 686,8 Miliar – Tercatat dalam Laporan Bank Negara.
      2018: RM 1,19 Triliun – Transparansi liabilitas 1MDB & proyek PPP.
      2019: RM 1,25 Triliun – Total pengungkapan resmi utang.
      2020: RM 1,32 Triliun – Dampak stimulus pandemi COVID-19.
      2021: RM 1,38 Triliun – Akumulasi masa pemulihan ekonomi.
      2022: RM 1,45 Triliun – Posisi akhir sebelum pergantian pemerintah.
      2023: RM 1,53 Triliun – Konfirmasi PM Anwar Ibrahim atas warisan utang.
      2024: RM 1,63 Triliun – Berdasarkan data APBN 2024.
      2025: RM 1,71 Triliun – Proyeksi Tinjauan Fiskal Kementerian Kewangan.
      2026: RM 1,79 Triliun – Target manajemen utang Economic Outlook.
      --------------------------------------------
      OBLIGASI GLOBAL MALONYET (1998–2026)
      1998: Fokus restrukturisasi internal. Absen pasar global.
      1999: Rilis Global Bond USD 1 miliar (AS/Eropa). Bukti pemulihan.
      2002: Rilis Sukuk Ijarah Global pertama dunia USD 600 juta (London/Timur Tengah).
      2004: Promosi surat utang luar negeri via Khazanah Nasional.
      2006: Khazanah rilis Exchangeable Sukuk USD 750 juta (Asia/Eropa).
      2011: Rilis Wakala Global Sukuk USD 2 miliar. Permintaan oversubscribed 4,5 kali.
      2015: Rilis Sukuk Wakala Global USD 1,5 miliar untuk infrastruktur.
      2016: Rilis Sukuk Global USD 1,5 miliar (tenor 10 & 30 tahun).
      2019: Diversifikasi ke Samurai Bond JPY 200 miliar bergaransi JBIC (Jepang).
      2021: Rilis Sovereign Sustainability Sukuk pertama dunia USD 1,3 miliar. Permintaan melonjak 6,4 kali.
      2022–2024: Absen valas. Fokus optimasi obligasi domestik (MGS/MGII).
      2025: Bersiap kembali ke pasar valas lewat bank sindikasi internasional.
      2026: Promosi rencana obligasi global baru USD 1 miliar
      --------------------------------------------
      USA BANNED MALONYET : USA PALAK ART USD 240 MILLIAR
      NSM
      AMRAAM
      F18
      UH60A
      --------------------------------------------
      🀣ART PALAK USD 240 MILLIAR = BANNED : NSM AMRAAM F18🀣

      Hapus
  7. Beda kasta....
    https://www.youtube.com/shorts/nqPfbzBEKuE
    🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣

    BalasHapus
    Balasan
    1. ART USD 240 MILLIAR = BANNED NSM AMRAAM
      1. 7th - 13th Century: Ruled by Sriwijaya
      2. 14th Century: Ruled by Majapahit
      3. Year 1511: Ruled by the Portuguese
      4. Year 1641: Ruled by the Dutch
      5. Year 1824: Ruled by the British
      6. Year 1942: Ruled by the Japanese
      7. From 1957 onwards, 999 years of subjugation and allegiance to the British
      https://id.m.wikipedia.org/wiki/Sejarah_MALONDESH
      -
      8. IDENTITY CRISIS = It is only in MALONDESH that we face problems of promoting Malay as the national language as even after 60 years of independence, a substantial segment of the population canNOt converse in Malay or only use it during official occasions.
      -
      9. IDENTITY CRISIS = It is only in MALONDESH that we face problems of promoting Malay as the national language as even after 60 years of independence, a substantial segment of the population canNOt converse in Malay or only use it during official occasions
      ------------------------------
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      SUBSIDY BURDEN: 23.9%
      BORROWING TO REPAY DEBT: RM470 – RM334.1 = DEFICIT OF RM135.9
      ------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ------------------------------
      Analisis Geopolitik & Pertahanan (Stagnasi Total)
      Vakum Alutsista (SIPRI 2024-2025): Status "Kosong" selama dua tahun berturut-turut menandakan tidak adanya transfer senjata berat yang masuk. Hal ini mengonfirmasi kegagalan proses modernisasi di saat negara tetangga (Indonesia/Singapura) melakukan pengadaan masif.
      Kegagalan Proyek Strategis: Pembatalan F/A-18 Hornet Kuwait sebanyak 4 kali menunjukkan hilangnya kredibilitas finansial di mata penjual internasional.
      Penurunan Daya Gentar: Peringkat Global Firepower (GFP) 42 (ke-7 di ASEAN) menempatkan militer MALAYSEWA di bawah Filipina, menunjukkan efek domino dari penundaan proyek LCS dan ketergantungan pada aset tua.
      Analisis Fiskal & Ekonomi (Spiral Utang)
      Debt-Servicing Cycle: Dengan proyeksi utang menyentuh RM 1,79 Triliun pada 2026, fenomena "Gali Lubang Tutup Lubang" (58% pinjaman baru hanya untuk membayar cicilan) telah mengunci anggaran negara.
      Rasio Bahaya: Rasio utang terhadap GDP yang stabil di angka 68%-70% sejak 2024-2026 membatasi ruang gerak fiskal untuk subsidi domestik maupun belanja modal militer.
      Hambatan Dagang AS: Sanksi Section 301 (tarif 10-25%) dan ancaman IEEPA oleh USTR Amerika Serikat akan memukul sektor manufaktur dan E&E, yang merupakan tulang punggung pendapatan negara untuk membayar utang tersebut.
      Analisis Reputasi & Diplomasi (Sanksi Internasional)
      Runtuhnya Prestasi Olahraga: Kekalahan di CAS dan sanksi AFC (Kalah WO 0-3) akibat penggunaan 7 pemain naturalisasi ilegal bukan sekadar masalah sepak bola, melainkan cerminan kegagalan administrasi sistemik di tingkat federasi.
      Kehilangan Posisi Regional: Kegagalan lolos ke Piala Asia 2027 dan pemberian posisi tersebut kepada Vietnam mempertegas penurunan pengaruh dan daya saing negara di kawasan ASEAN.
      Kesimpulan Strategis
      Tahun 2026 menjadi titik nadir di mana krisis utang pemerintah berdampak langsung pada pelemahan pertahanan nasional dan reputasi internasional. Model pengadaan "Barter CPO" dan "Kredit 100%" terbukti belum cukup untuk menambal kekosongan armada tempur di tengah tekanan sanksi dagang global.

      Hapus
    2. ART USD 240 MILLIAR = BANNED NSM AMRAAM
      1. 7th - 13th Century: Ruled by Sriwijaya
      2. 14th Century: Ruled by Majapahit
      3. Year 1511: Ruled by the Portuguese
      4. Year 1641: Ruled by the Dutch
      5. Year 1824: Ruled by the British
      6. Year 1942: Ruled by the Japanese
      7. From 1957 onwards, 999 years of subjugation and allegiance to the British
      https://id.m.wikipedia.org/wiki/Sejarah_MALONDESH
      -
      8. IDENTITY CRISIS = It is only in MALONDESH that we face problems of promoting Malay as the national language as even after 60 years of independence, a substantial segment of the population canNOt converse in Malay or only use it during official occasions.
      -
      9. IDENTITY CRISIS = It is only in MALONDESH that we face problems of promoting Malay as the national language as even after 60 years of independence, a substantial segment of the population canNOt converse in Malay or only use it during official occasions
      ------------------------------
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      SUBSIDY BURDEN: 23.9%
      BORROWING TO REPAY DEBT: RM470 – RM334.1 = DEFICIT OF RM135.9
      ------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ------------------------------
      Status Kelumpuhan Pertahanan (SIPRI & Alutsista)
      Vakum SIPRI (2024–2025): Status KOSONG total selama dua tahun berturut-turut. Tidak ada transfer senjata berat yang tercatat, menempatkan MALAYSEWA setara dengan Laos dan Kamboja.
      Tren Mundur: Penurunan konsisten dari fase Planned (2020), Selected Not Yet Ordered (2022), hingga nihil aktivitas (2024–2025).
      Kegagalan Simbolik: Pembatalan resmi akuisisi F/A-18 Hornet Kuwait sebanyak 4 kali bukti hilangnya kredibilitas finansial di pasar global.
      Procurement Freeze (2026): Instruksi PM Anwar Ibrahim untuk pembekuan total pengadaan guna menghentikan korupsi sistemik dan kebocoran anggaran.
      -
      Model "Negara Penyewa" (Military-for-Rent)
      Ketiadaan uang tunai memaksa militer beralih dari kepemilikan aset menjadi skema Leasing (Sewa):
      Aset Sewaan (32+ Item): Mencakup 31 Helikopter (Blackhawk, AW139, AW149, Bell 429), pesawat latihan L39 ITCC, simulator jet tempur MKM, hingga motor polisi.
      Skema Barter: Pengadaan yang tersisa (FA-50, PT-91M, Scorpene) terpaksa menggunakan Barter Kelapa Sawit (CPO) karena krisis devisa.
      Aset Mangkrak: Proyek LCS & OPV yang karatan di galangan melibatkan 17 kreditor dengan bunga yang terus membengkak.
      -
      Spiral Utang "Gali Lubang Tutup Lubang"
      Debt-Servicing Cycle: 58% hingga 64,3% pinjaman baru hanya digunakan untuk membayar bunga dan cicilan pokok utang lama.
      Ledakan Liabilitas: Utang nasional melonjak drastis dari RM 407 Miliar (2010) menjadi proyeksi RM 1,79 Triliun (2026).
      Rasio Kritis: Utang pemerintah menyentuh 69% GDP (melewati limit 65%) dan utang rumah tangga ekstrem di angka 84,3% GDP.
      Tabung Harapan (2018): Bukti historis keputusasaan fiskal melalui penggalangan dana rakyat untuk membayar utang negara.


      Hapus
    3. PEMBUNUH/GAGAL/ZALIM MALONYET
      #kerajaanPembunuh
      #kerajaanGagal
      #kerajaanZalim
      tagar KerajaanPembunuh (atau variasinya) benar-benar dipakai di media sosial saat banjir di Malondesh
      -
      “#KerajaanPembunuh trends on twitter as more bodies of flood victims are found” disebut bahwa warganet menggunakan #KerajaanPembunuh, #KerajaanGagal, dan #KerajaanZalim sebagai bentuk kemarahan terhadap respons pemerintah atas banjir besar.
      Dalam laporan lain, saat korban tewas akibat banjir ditemukan lebih banyak
      --------------------------------
      HUTANG & LIABILITAS MALONDESH 1998–2026
      1998 : RM 165,4 Miliar
      1999 : RM 178,3 Miliar
      2000 : RM 192,2 Miliar
      2001 : RM 207,2 Miliar
      2002 : RM 223,3 Miliar
      2003 : RM 240,7 Miliar
      2004 : RM 259,5 Miliar
      2005 : RM 279,7 Miliar
      2006 : RM 301,5 Miliar
      2007 : RM 325,0 Miliar
      2008 : RM 350,4 Miliar
      2009 : RM 377,7 Miliar
      2010 : RM 407,1 Miliar
      2011 : RM 456,1 Miliar
      2012 : RM 501,6 Miliar
      2013 : RM 547,7 Miliar
      2014 : RM 582,8 Miliar
      2015 : RM 630,5 Miliar
      2016 : RM 648,5 Miliar
      2017 : RM 686,8 Miliar
      2018 : RM 1,19 Triliun
      2019 : RM 1,25 Triliun
      2020 : RM 1,32 Triliun
      2021 : RM 1,38 Triliun
      2022 : RM 1,45 Triliun
      2023 : RM 1,53 Triliun
      2024 : RM 1,63 Triliun
      2025 : RM 1,71 Triliun
      2026 : RM 1,79 Triliun
      -
      SUMBER :
      Bloomberg & Reuters | CNA & The Star | The Edge Malondesh | MOF & Bernama | Kementerian Kewangan
      --------------------------------_
      DEFISIT FISKAL MALONDESH PERIODE 1998–2025:
      1998 : -1,8% (± USD 33,6 MILIAR)
      1999 : -3,2% (± USD 34,3 MILIAR)
      2000 : -5,8% (± USD 32,5 MILIAR)
      2001 : -5,5% (± USD 38,0 MILIAR)
      2002 : -5,6% (± USD 39,5 MILIAR)
      2003 : -5,0% (± USD 41,3 MILIAR)
      2004 : -4,1% (± USD 41,9 MILIAR)
      2005 : -3,6% (± USD 40,7 MILIAR)
      2006 : -3,3% (± USD 39,6 MILIAR)
      2007 : -3,2% (± USD 39,3 MILIAR)
      2008 : -4,8% (± USD 39,3 MILIAR)
      2009 : -6,7% (± USD 50,4 MILIAR)
      2010 : -5,4% (± USD 51,8 MILIAR)
      2011 : -4,8% (± USD 53,7 MILIAR)
      2012 : -4,5% (± USD 55,6 MILIAR)
      2013 : -3,9% (± USD 55,3 MILIAR)
      2014 : -3,4% (± USD 56,9 MILIAR)
      2015 : -3,2% (± USD 55,7 MILIAR)
      2016 : -3,1% (± USD 54,3 MILIAR)
      2017 : -3,0% (± USD 55,6 MILIAR)
      2018 : -3,7% (± USD 57,0 MILIAR)
      2019 : -3,4% (± USD 67,6 MILIAR)
      2020 : -6,2% (± USD 69,1 MILIAR)
      2021 : -6,4% (± USD 65,5 MILIAR)
      2022 : -5,6% (± USD 69,7 MILIAR)
      2023 : -5,0% (± USD 68,3 MILIAR)
      2024 : -4,1% (± USD 298,4 MILIAR) (Pemangkasan subsidi)
      2025 : -3,8% (± USD 325,6 MILIAR) (Rasionalisasi RON95)
      -
      SUMBER:
      IMF | World Economic Outlook | World Bank | Bank Negara Malondesh.
      --------------------------------
      BEBAN UTANG PER KAPITA & POPULASI (2026–1998)
      2026: RM 94,544 | POPULASI: 36,385,115 JIWA
      2025: RM 81,998 | POPULASI: 35,977,838 JIWA
      2024: RM 79,315 | POPULASI: 34,671,895 JIWA
      2023: RM 74,587 | POPULASI: 35,126,298 JIWA
      2022: RM 70,901 | POPULASI: 34,695,493 JIWA
      2021: RM 67,667 | POPULASI: 34,282,399 JIWA
      2020: RM 63,464 | POPULASI: 33,870,000 JIWA
      2019: RM 60,179 | POPULASI: 33,450,000 JIWA
      2018: RM 57,605 | POPULASI: 33,000,000 JIWA
      2017: RM 54,910 | POPULASI: 32,540,000 JIWA
      2016: RM 52,699 | POPULASI: 32,040,000 JIWA
      2015: RM 51,253 | POPULASI: 31,520,000 JIWA
      2014: RM 47,927 | POPULASI: 30,980,000 JIWA
      2013: RM 44,992 | POPULASI: 30,420,000 JIWA
      2012: RM 41,326 | POPULASI: 29,850,000 JIWA
      2011: RM 37,904 | POPULASI: 29,260,000 JIWA
      2010: RM 34,488 | POPULASI: 28,650,000 JIWA
      2009: RM 31,326 | POPULASI: 28,040,000 JIWA
      2008: RM 26,155 | POPULASI: 27,450,000 JIWA
      2007: RM 25,316 | POPULASI: 26,860,000 JIWA
      2006: RM 23,381 | POPULASI: 26,260,000 JIWA
      2005: RM 21,940 | POPULASI: 25,660,000 JIWA
      2004: RM 20,550 | POPULASI: 25,060,000 JIWA
      2003: RM 18,560 | POPULASI: 24,460,000 JIWA
      2002: RM 16,798 | POPULASI: 23,870,000 JIWA
      2001: RM 15,162 | POPULASI: 23,280,000 JIWA
      2000: RM 13,574 | POPULASI: 22,690,000 JIWA
      1999: RM 12,210 | POPULASI: 22,110,000 JIWA
      1998: RM 10,821 | POPULASI: 21,530,000 JIWA

      Hapus
    4. HUTANG BAYAR HUTANG (2026–1998):
      (safety threshold of 65%)
      -
      2026
      Populasi: 36.38 juta
      Utang Govt: RM 1.79 Triliun (70.5%)
      Utang Household: RM 1.65 Triliun (84.3%)
      Beban per Kapita: RM 94,544
      -
      2025
      Populasi: 35.97 juta
      Utang Govt: RM 1.30 Triliun (-%)
      Utang Household: RM 1.65 Triliun (-%)
      Beban per Kapita: RM 81,998
      -
      2024
      Populasi: 34.67 juta
      Utang Govt: RM 1.22 Triliun (64.6%)
      Utang Household: RM 1.53 Triliun (84.2%)
      Beban per Kapita: RM 79,315
      -
      2023
      Populasi: 35.12 juta
      Utang Govt: RM 1.17 Triliun (64.3%)
      Utang Household: RM 1.45 Triliun (81.2%)
      Beban per Kapita: RM 74,587
      -
      2022
      Populasi: 34.69 juta
      Utang Govt: RM 1.08 Triliun (60.1%) [1]
      Utang Household: RM 1.38 Triliun (80.9%)
      Beban per Kapita: RM 70,901 [1]
      -
      2021
      Populasi: 34.28 juta
      Utang Govt: RM 979.81 Miliar (63.3%)
      Utang Household: RM 1.34 Triliun (89.1%)
      Beban per Kapita: RM 67,667
      -
      2020
      Populasi: 33.87 juta
      Utang Govt: RM 879.56 Miliar (62.0%)
      Utang Household: RM 1.27 Triliun (87.5%)
      Beban per Kapita: RM 63,464
      -
      2019
      Populasi: 33.45 juta
      Utang Govt: RM 793.00 Miliar (52.4%)
      Utang Household: RM 1.22 Triliun (82.5%)
      Beban per Kapita: RM 60,179
      -
      2018
      Populasi: 33.00 juta
      Utang Govt: RM 741.00 Miliar (52.5%)
      Utang Household: RM 1.16 Triliun (82.0%)
      Beban per Kapita: RM 57,605
      -
      2017
      Populasi: 32.54 juta
      Utang Govt: RM 686.80 Miliar (51.9%)
      Utang Household: RM 1.10 Triliun (83.2%)
      Beban per Kapita: RM 54,910
      -
      2016
      Populasi: 32.04 juta
      Utang Govt: RM 648.50 Miliar (52.7%)
      Utang Household: RM 1.04 Triliun (86.1%)
      Beban per Kapita: RM 52,699
      -
      2015
      Populasi: 31.52 juta
      Utang Govt: RM 630.50 Miliar (55.1%)
      Utang Household: RM 985.00 Miliar (86.0%)
      Beban per Kapita: RM 51,253
      -
      2014
      Populasi: 30.98 juta
      Utang Govt: RM 582.80 Miliar (55.0%)
      Utang Household: RM 902.00 Miliar (85.1%)
      Beban per Kapita: RM 47,927
      -
      2013
      Populasi: 30.42 juta
      Utang Govt: RM 547.70 Miliar (54.7%)
      Utang Household: RM 821.00 Miliar (82.0%)
      Beban per Kapita: RM 44,992
      -
      2012
      Populasi: 29.85 juta
      Utang Govt: RM 501.60 Miliar (53.3%)
      Utang Household: RM 732.00 Miliar (77.8%)
      Beban per Kapita: RM 41,326
      -
      2011
      Populasi: 29.26 juta
      Utang Govt: RM 456.10 Miliar (51.8%)
      Utang Household: RM 653.00 Miliar (74.2%)
      Beban per Kapita: RM 37,904
      -
      2010
      Populasi: 28.65 juta
      Utang Govt: RM 407.10 Miliar (52.4%)
      Utang Household: RM 581.00 Miliar (74.8%)
      Beban per Kapita: RM 34,488
      -
      2009
      Populasi: 28.04 juta
      Utang Govt: RM 362.40 Miliar (51.1%)
      Utang Household: RM 516.00 Miliar (72.0%)
      Beban per Kapita: RM 31,326
      -
      2008
      Populasi: 27.45 juta
      Utang Govt: RM 258.00 Miliar (41.3%)
      Utang Household: RM 460.00 Miliar (73.0%)
      Beban per Kapita: RM 26,155
      -
      2007
      Populasi: 26.86 juta
      Utang Govt: RM 266.00 Miliar (41.1%)
      Utang Household: RM 414.00 Miliar (64.0%)
      Beban per Kapita: RM 25,316
      -
      2006
      Populasi: 26.26 juta
      Utang Govt: RM 242.00 Miliar (41.5%)
      Utang Household: RM 372.00 Miliar (63.0%)
      Beban per Kapita: RM 23,381
      -
      2005
      Populasi: 25.66 juta
      Utang Govt: RM 228.00 Miliar (43.8%)
      Utang Household: RM 335.00 Miliar (64.0%)
      Beban per Kapita: RM 21,940
      -
      2004
      Populasi: 25.06 juta
      Utang Govt: RM 217.00 Miliar (45.1%)
      Utang Household: RM 298.00 Miliar (62.0%)
      Beban per Kapita: RM 20,550
      -
      2003
      Populasi: 24.46 juta
      Utang Govt: RM 189.00 Miliar (45.9%)
      Utang Household: RM 265.00 Miliar (64.0%)
      Beban per Kapita: RM 18,560
      -
      2002
      Populasi: 23.87 juta
      Utang Govt: RM 165.00 Miliar (44.9%)
      Utang Household: RM 236.00 Miliar (64.0%)
      Beban per Kapita: RM 16,798
      -
      2001
      Populasi: 23.28 juta
      Utang Govt: RM 146.00 Miliar (42.5%)
      Utang Household: RM 207.00 Miliar (60.0%)
      Beban per Kapita: RM 15,162
      -
      2000
      Populasi: 22.69 juta
      Utang Govt: RM 126.00 Miliar (36.1%)
      Utang Household: RM 182.00 Miliar (52.0%)
      Beban per Kapita: RM 13,574
      -
      1999
      Populasi: 22.11 juta
      Utang Govt: RM 113.00 Miliar (40.4%)
      Utang Household: RM 157.00 Miliar (56.0%)
      Beban per Kapita: RM 12,210
      -
      1998
      Populasi: 21.53 juta
      Utang Govt: RM 98.00 Miliar (35.8%)
      Utang Household: RM 135.00 Miliar (49.3%)
      Beban per Kapita: RM 10,821
      =============
      =============
      INDONESIA
      (safety threshold of 60%)
      -
      2026 Govt Debt-to-GDP : 40,46%
      2026 Household Debt-to-GDP : 15,70%

      Hapus
    5. 1998 - 2026 = 28 TAHUN
      PENDAPATAN : RM334,1 Miliar
      PENGELUARAN : RM470 Miliar
      BEBAN SUBSIDI 23,9%
      RM470 – RM334,1 = MINUS RM135,9 ......
      -
      5x Ganti RAJA = ZONK MRCA SPH LCS NSM
      5x Ganti PM = PRANK MRCA SPH LCS NSM
      6x Ganti Mindef = PRANK MRCA SPH LCS NSM
      -
      2026
      Populasi: 36.38 juta
      Debt Govt: RM 1.79 Triliun (70.5%)
      Debt Household: RM 1.65 Triliun (84.3%)
      Beban per Kapita: RM 94,544
      -
      2025
      Populasi: 35.97 juta
      Debt Govt: RM 1.30 Triliun (-%)
      Debt Household: RM 1.65 Triliun (-%)
      Beban per Kapita: RM 81,998
      -
      2024
      Populasi: 34.67 juta
      Debt Govt: RM 1.22 Triliun (64.6%)
      Debt Household: RM 1.53 Triliun (84.2%)
      Beban per Kapita: RM 79,315
      -
      2023
      Populasi: 35.12 juta
      Debt Govt: RM 1.17 Triliun (64.3%)
      Debt Household: RM 1.45 Triliun (81.2%)
      Beban per Kapita: RM 74,587
      -
      2022
      Populasi: 34.69 juta
      Debt Govt: RM 1.08 Triliun (60.1%)
      Debt Household: RM 1.38 Triliun (80.9%)
      Beban per Kapita: RM 70,901
      -
      2021
      Populasi: 34.28 juta
      Debt Govt: RM 979.81 Miliar (63.3%)
      Debt Household: RM 1.34 Triliun (89.1%)
      Beban per Kapita: RM 67,667
      -
      2020
      Populasi: 33.87 juta
      Debt Govt: RM 879.56 Miliar (62.0%)
      Debt Household: RM 1.27 Triliun (87.5%)
      Beban per Kapita: RM 63,464
      -
      2019
      Populasi: 33.45 juta
      Debt Govt: RM 793.00 Miliar (52.4%)
      Debt Household: RM 1.22 Triliun (82.5%)
      Beban per Kapita: RM 60,179
      -
      2018
      Populasi: 33.00 juta
      Debt Govt: RM 741.00 Miliar (52.5%)
      Debt Household: RM 1.16 Triliun (82.0%)
      Beban per Kapita: RM 57,605
      -
      2017
      Populasi: 32.54 juta
      Debt Govt: RM 686.80 Miliar (51.9%)
      Debt Household: RM 1.10 Triliun (83.2%)
      Beban per Kapita: RM 54,910
      -
      2016
      Populasi: 32.04 juta
      Debt Govt: RM 648.50 Miliar (52.7%)
      Debt Household: RM 1.04 Triliun (86.1%)
      Beban per Kapita: RM 52,699
      -
      2015
      Populasi: 31.52 juta
      Debt Govt: RM 630.50 Miliar (55.1%)
      Debt Household: RM 985.00 Miliar (86.0%)
      Beban per Kapita: RM 51,253
      -
      2014
      Populasi: 30.98 juta
      Debt Govt: RM 582.80 Miliar (55.0%)
      Debt Household: RM 902.00 Miliar (85.1%)
      Beban per Kapita: RM 47,927
      -
      2013
      Populasi: 30.42 juta
      Debt Govt: RM 547.70 Miliar (54.7%)
      Debt Household: RM 821.00 Miliar (82.0%)
      Beban per Kapita: RM 44,992
      -
      2012
      Populasi: 29.85 juta
      Debt Govt: RM 501.60 Miliar (53.3%)
      Debt Household: RM 732.00 Miliar (77.8%)
      Beban per Kapita: RM 41,326
      -
      2011
      Populasi: 29.26 juta
      Debt Govt: RM 456.10 Miliar (51.8%)
      Debt Household: RM 653.00 Miliar (74.2%)
      Beban per Kapita: RM 37,904
      -
      2010
      Populasi: 28.65 juta
      Debt Govt: RM 407.10 Miliar (52.4%)
      Debt Household: RM 581.00 Miliar (74.8%)
      Beban per Kapita: RM 34,488
      -
      2009
      Populasi: 28.04 juta
      Debt Govt: RM 362.40 Miliar (51.1%)
      Debt Household: RM 516.00 Miliar (72.0%)
      Beban per Kapita: RM 31,326
      -
      2008
      Populasi: 27.45 juta
      Debt Govt: RM 258.00 Miliar (41.3%)
      Debt Household: RM 460.00 Miliar (73.0%)
      Beban per Kapita: RM 26,155
      -
      2007
      Populasi: 26.86 juta
      Debt Govt: RM 266.00 Miliar (41.1%)
      Debt Household: RM 414.00 Miliar (64.0%)
      Beban per Kapita: RM 25,316
      -
      2006
      Populasi: 26.26 juta
      Debt Govt: RM 242.00 Miliar (41.5%)
      Debt Household: RM 372.00 Miliar (63.0%)
      Beban per Kapita: RM 23,381
      -
      2005
      Populasi: 25.66 juta
      Debt Govt: RM 228.00 Miliar (43.8%)
      Debt Household: RM 335.00 Miliar (64.0%)
      Beban per Kapita: RM 21,940
      -
      2004
      Populasi: 25.06 juta
      Debt Govt: RM 217.00 Miliar (45.1%)
      Debt Household: RM 298.00 Miliar (62.0%)
      Beban per Kapita: RM 20,550
      -
      2003
      Populasi: 24.46 juta
      Debt Govt: RM 189.00 Miliar (45.9%)
      Debt Household: RM 265.00 Miliar (64.0%)
      Beban per Kapita: RM 18,560
      -
      2002
      Populasi: 23.87 juta
      Debt Govt: RM 165.00 Miliar (44.9%)
      Debt Household: RM 236.00 Miliar (64.0%)
      Beban per Kapita: RM 16,798
      -
      2001
      Populasi: 23.28 juta
      Debt Govt: RM 146.00 Miliar (42.5%)
      Debt Household: RM 207.00 Miliar (60.0%)
      Beban per Kapita: RM 15,162
      -
      2000
      Populasi: 22.69 juta
      Debt Govt: RM 126.00 Miliar (36.1%)
      Debt Household: RM 182.00 Miliar (52.0%)
      Beban per Kapita: RM 13,574
      -
      1999
      Populasi: 22.11 juta
      Debt Govt: RM 113.00 Miliar (40.4%)
      Debt Household: RM 157.00 Miliar (56.0%)
      Beban per Kapita: RM 12,210
      -
      1998
      Populasi: 21.53 juta
      Debt Govt: RM 98.00 Miliar (35.8%)
      Debt Household: RM 135.00 Miliar (49.3%)
      Beban per Kapita: RM 10,821

      Hapus
    6. PEMBUNUH/GAGAL/ZALIM MALONYET
      #kerajaanPembunuh
      #kerajaanGagal
      #kerajaanZalim
      tagar KerajaanPembunuh (atau variasinya) benar-benar dipakai di media sosial saat banjir di Malondesh
      -
      “#KerajaanPembunuh trends on twitter as more bodies of flood victims are found” disebut bahwa warganet menggunakan #KerajaanPembunuh, #KerajaanGagal, dan #KerajaanZalim sebagai bentuk kemarahan terhadap respons pemerintah atas banjir besar.
      Dalam laporan lain, saat korban tewas akibat banjir ditemukan lebih banyak
      -
      2026
      Populasi: 36.38 juta
      Debt Govt: RM 1.79 Triliun (70.5%)
      Debt Household: RM 1.65 Triliun (84.3%)
      Beban per Kapita: RM 94,544
      -
      2025
      Populasi: 35.97 juta
      Debt Govt: RM 1.30 Triliun (-%)
      Debt Household: RM 1.65 Triliun (-%)
      Beban per Kapita: RM 81,998
      -
      2024
      Populasi: 34.67 juta
      Debt Govt: RM 1.22 Triliun (64.6%)
      Debt Household: RM 1.53 Triliun (84.2%)
      Beban per Kapita: RM 79,315
      -
      2023
      Populasi: 35.12 juta
      Debt Govt: RM 1.17 Triliun (64.3%)
      Debt Household: RM 1.45 Triliun (81.2%)
      Beban per Kapita: RM 74,587
      -
      2022
      Populasi: 34.69 juta
      Debt Govt: RM 1.08 Triliun (60.1%)
      Debt Household: RM 1.38 Triliun (80.9%)
      Beban per Kapita: RM 70,901
      -
      2021
      Populasi: 34.28 juta
      Debt Govt: RM 979.81 Miliar (63.3%)
      Debt Household: RM 1.34 Triliun (89.1%)
      Beban per Kapita: RM 67,667
      -
      2020
      Populasi: 33.87 juta
      Debt Govt: RM 879.56 Miliar (62.0%)
      Debt Household: RM 1.27 Triliun (87.5%)
      Beban per Kapita: RM 63,464
      -
      2019
      Populasi: 33.45 juta
      Debt Govt: RM 793.00 Miliar (52.4%)
      Debt Household: RM 1.22 Triliun (82.5%)
      Beban per Kapita: RM 60,179
      -
      2018
      Populasi: 33.00 juta
      Debt Govt: RM 741.00 Miliar (52.5%)
      Debt Household: RM 1.16 Triliun (82.0%)
      Beban per Kapita: RM 57,605
      -
      2017
      Populasi: 32.54 juta
      Debt Govt: RM 686.80 Miliar (51.9%)
      Debt Household: RM 1.10 Triliun (83.2%)
      Beban per Kapita: RM 54,910
      -
      2016
      Populasi: 32.04 juta
      Debt Govt: RM 648.50 Miliar (52.7%)
      Debt Household: RM 1.04 Triliun (86.1%)
      Beban per Kapita: RM 52,699
      -
      2015
      Populasi: 31.52 juta
      Debt Govt: RM 630.50 Miliar (55.1%)
      Debt Household: RM 985.00 Miliar (86.0%)
      Beban per Kapita: RM 51,253
      -
      2014
      Populasi: 30.98 juta
      Debt Govt: RM 582.80 Miliar (55.0%)
      Debt Household: RM 902.00 Miliar (85.1%)
      Beban per Kapita: RM 47,927
      -
      2013
      Populasi: 30.42 juta
      Debt Govt: RM 547.70 Miliar (54.7%)
      Debt Household: RM 821.00 Miliar (82.0%)
      Beban per Kapita: RM 44,992
      -
      2012
      Populasi: 29.85 juta
      Debt Govt: RM 501.60 Miliar (53.3%)
      Debt Household: RM 732.00 Miliar (77.8%)
      Beban per Kapita: RM 41,326
      -
      2011
      Populasi: 29.26 juta
      Debt Govt: RM 456.10 Miliar (51.8%)
      Debt Household: RM 653.00 Miliar (74.2%)
      Beban per Kapita: RM 37,904
      -
      2010
      Populasi: 28.65 juta
      Debt Govt: RM 407.10 Miliar (52.4%)
      Debt Household: RM 581.00 Miliar (74.8%)
      Beban per Kapita: RM 34,488
      -
      2009
      Populasi: 28.04 juta
      Debt Govt: RM 362.40 Miliar (51.1%)
      Debt Household: RM 516.00 Miliar (72.0%)
      Beban per Kapita: RM 31,326
      -
      2008
      Populasi: 27.45 juta
      Debt Govt: RM 258.00 Miliar (41.3%)
      Debt Household: RM 460.00 Miliar (73.0%)
      Beban per Kapita: RM 26,155
      -
      2007
      Populasi: 26.86 juta
      Debt Govt: RM 266.00 Miliar (41.1%)
      Debt Household: RM 414.00 Miliar (64.0%)
      Beban per Kapita: RM 25,316
      -
      2006
      Populasi: 26.26 juta
      Debt Govt: RM 242.00 Miliar (41.5%)
      Debt Household: RM 372.00 Miliar (63.0%)
      Beban per Kapita: RM 23,381
      -
      2005
      Populasi: 25.66 juta
      Debt Govt: RM 228.00 Miliar (43.8%)
      Debt Household: RM 335.00 Miliar (64.0%)
      Beban per Kapita: RM 21,940
      -
      2004
      Populasi: 25.06 juta
      Debt Govt: RM 217.00 Miliar (45.1%)
      Debt Household: RM 298.00 Miliar (62.0%)
      Beban per Kapita: RM 20,550
      -
      2003
      Populasi: 24.46 juta
      Debt Govt: RM 189.00 Miliar (45.9%)
      Debt Household: RM 265.00 Miliar (64.0%)
      Beban per Kapita: RM 18,560
      -
      2002
      Populasi: 23.87 juta
      Debt Govt: RM 165.00 Miliar (44.9%)
      Debt Household: RM 236.00 Miliar (64.0%)
      Beban per Kapita: RM 16,798
      -
      2001
      Populasi: 23.28 juta
      Debt Govt: RM 146.00 Miliar (42.5%)
      Debt Household: RM 207.00 Miliar (60.0%)
      Beban per Kapita: RM 15,162
      -
      2000
      Populasi: 22.69 juta
      Debt Govt: RM 126.00 Miliar (36.1%)
      Debt Household: RM 182.00 Miliar (52.0%)
      Beban per Kapita: RM 13,574

      Hapus
    7. BANTUAN NGO BSR
      KANTOR PUSAT CHINA
      KANTOR PUSAT CHINA
      KANTOR PUSAT CHINA
      Blue Sky Rescue (BSR) adalah organisasi non-pemerintah (NGO) profesional yang berbasis di Tiongkok. Organisasi ini berdiri pada tahun 2007 dan dikenal sebagai salah satu tim penyelamat sipil terbesar di Asia, dengan fokus pada misi kemanusiaan, evakuasi bencana, dan bantuan medis
      -
      2026
      Populasi: 36.38 juta
      Debt Govt: RM 1.79 Triliun (70.5%)
      Debt Household: RM 1.65 Triliun (84.3%)
      Beban per Kapita: RM 94,544
      -
      2025
      Populasi: 35.97 juta
      Debt Govt: RM 1.30 Triliun (-%)
      Debt Household: RM 1.65 Triliun (-%)
      Beban per Kapita: RM 81,998
      -
      2024
      Populasi: 34.67 juta
      Debt Govt: RM 1.22 Triliun (64.6%)
      Debt Household: RM 1.53 Triliun (84.2%)
      Beban per Kapita: RM 79,315
      -
      2023
      Populasi: 35.12 juta
      Debt Govt: RM 1.17 Triliun (64.3%)
      Debt Household: RM 1.45 Triliun (81.2%)
      Beban per Kapita: RM 74,587
      -
      2022
      Populasi: 34.69 juta
      Debt Govt: RM 1.08 Triliun (60.1%)
      Debt Household: RM 1.38 Triliun (80.9%)
      Beban per Kapita: RM 70,901
      -
      2021
      Populasi: 34.28 juta
      Debt Govt: RM 979.81 Miliar (63.3%)
      Debt Household: RM 1.34 Triliun (89.1%)
      Beban per Kapita: RM 67,667
      -
      2020
      Populasi: 33.87 juta
      Debt Govt: RM 879.56 Miliar (62.0%)
      Debt Household: RM 1.27 Triliun (87.5%)
      Beban per Kapita: RM 63,464
      -
      2019
      Populasi: 33.45 juta
      Debt Govt: RM 793.00 Miliar (52.4%)
      Debt Household: RM 1.22 Triliun (82.5%)
      Beban per Kapita: RM 60,179
      -
      2018
      Populasi: 33.00 juta
      Debt Govt: RM 741.00 Miliar (52.5%)
      Debt Household: RM 1.16 Triliun (82.0%)
      Beban per Kapita: RM 57,605
      -
      2017
      Populasi: 32.54 juta
      Debt Govt: RM 686.80 Miliar (51.9%)
      Debt Household: RM 1.10 Triliun (83.2%)
      Beban per Kapita: RM 54,910
      -
      2016
      Populasi: 32.04 juta
      Debt Govt: RM 648.50 Miliar (52.7%)
      Debt Household: RM 1.04 Triliun (86.1%)
      Beban per Kapita: RM 52,699
      -
      2015
      Populasi: 31.52 juta
      Debt Govt: RM 630.50 Miliar (55.1%)
      Debt Household: RM 985.00 Miliar (86.0%)
      Beban per Kapita: RM 51,253
      -
      2014
      Populasi: 30.98 juta
      Debt Govt: RM 582.80 Miliar (55.0%)
      Debt Household: RM 902.00 Miliar (85.1%)
      Beban per Kapita: RM 47,927
      -
      2013
      Populasi: 30.42 juta
      Debt Govt: RM 547.70 Miliar (54.7%)
      Debt Household: RM 821.00 Miliar (82.0%)
      Beban per Kapita: RM 44,992
      -
      2012
      Populasi: 29.85 juta
      Debt Govt: RM 501.60 Miliar (53.3%)
      Debt Household: RM 732.00 Miliar (77.8%)
      Beban per Kapita: RM 41,326
      -
      2011
      Populasi: 29.26 juta
      Debt Govt: RM 456.10 Miliar (51.8%)
      Debt Household: RM 653.00 Miliar (74.2%)
      Beban per Kapita: RM 37,904
      -
      2010
      Populasi: 28.65 juta
      Debt Govt: RM 407.10 Miliar (52.4%)
      Debt Household: RM 581.00 Miliar (74.8%)
      Beban per Kapita: RM 34,488
      -
      2009
      Populasi: 28.04 juta
      Debt Govt: RM 362.40 Miliar (51.1%)
      Debt Household: RM 516.00 Miliar (72.0%)
      Beban per Kapita: RM 31,326
      -
      2008
      Populasi: 27.45 juta
      Debt Govt: RM 258.00 Miliar (41.3%)
      Debt Household: RM 460.00 Miliar (73.0%)
      Beban per Kapita: RM 26,155
      -
      2007
      Populasi: 26.86 juta
      Debt Govt: RM 266.00 Miliar (41.1%)
      Debt Household: RM 414.00 Miliar (64.0%)
      Beban per Kapita: RM 25,316
      -
      2006
      Populasi: 26.26 juta
      Debt Govt: RM 242.00 Miliar (41.5%)
      Debt Household: RM 372.00 Miliar (63.0%)
      Beban per Kapita: RM 23,381
      -
      2005
      Populasi: 25.66 juta
      Debt Govt: RM 228.00 Miliar (43.8%)
      Debt Household: RM 335.00 Miliar (64.0%)
      Beban per Kapita: RM 21,940
      -
      2004
      Populasi: 25.06 juta
      Debt Govt: RM 217.00 Miliar (45.1%)
      Debt Household: RM 298.00 Miliar (62.0%)
      Beban per Kapita: RM 20,550
      -
      2003
      Populasi: 24.46 juta
      Debt Govt: RM 189.00 Miliar (45.9%)
      Debt Household: RM 265.00 Miliar (64.0%)
      Beban per Kapita: RM 18,560
      -
      2002
      Populasi: 23.87 juta
      Debt Govt: RM 165.00 Miliar (44.9%)
      Debt Household: RM 236.00 Miliar (64.0%)
      Beban per Kapita: RM 16,798
      -
      2001
      Populasi: 23.28 juta
      Debt Govt: RM 146.00 Miliar (42.5%)
      Debt Household: RM 207.00 Miliar (60.0%)
      Beban per Kapita: RM 15,162
      -
      2000
      Populasi: 22.69 juta
      Debt Govt: RM 126.00 Miliar (36.1%)
      Debt Household: RM 182.00 Miliar (52.0%)
      Beban per Kapita: RM 13,574

      Hapus
    8. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      --------------------------------------------------
      HUTANG & LIABILITAS MALONYET 2010–2026
      2010: RM 407,1 Miliar
      2011: RM 456,1 Miliar
      2012: RM 501,6 Miliar
      2013: RM 547,7 Miliar
      2014: RM 582,8 Miliar
      2015: RM 630,5 Miliar
      2016: RM 648,5 Miliar
      2017: RM 686,8 Miliar
      2018: RM 1,19 Triliun
      2019: RM 1,25 Triliun
      2020: RM 1,32 Triliun
      2021: RM 1,38 Triliun
      2022: RM 1,45 Triliun
      2023: RM 1,53 Triliun
      2024: RM 1,63 Triliun
      2025: RM 1,71 Triliun
      2026: RM 1,79 Triliun
      ________________________________________
      Ringkasan Sumber Berita & Referensi:
      Bloomberg & Reuters (2018–2019): Laporan mengenai total utang yang melampaui RM 1 triliun setelah memasukkan komitmen jaminan dan liabilitas 1MDB.
      -
      CNA & The Star (2020): Analisis kenaikan plafon utang untuk pendanaan Kumpulan Wang COVID-19 (KWC).
      -
      The Edge MALONYET (2021–2022): Catatan akumulasi utang federal yang mencapai ambang batas baru pasca-pandemi.
      -
      MOF Portal & Bernama (2023–2024): Pernyataan PM Anwar Ibrahim mengenai beban utang RM 1,5 triliun untuk reformasi fiskal.
      -
      Kementerian Kewangan (MOF) MALONYET (2025–2026): Data proyeksi melalui dokumen Belanjawan 2026 dan strategi fiskal jangka menengah.
      ________________________________________
      BUKTI HUTANG BAYAR HUTANG
      Daftar tren "Hutang Bayar Hutang" MALONYET dari tahun 2018 hingga proyeksi 2025 berdasarkan data Kementerian Kewangan MALONYET (MOF) dan Jabatan Audit Negara:
      -
      2018: FASE "OPEN DONASI"
      Pemerintah meluncurkan Tabung Harapan MALONYET untuk mengumpulkan sumbangan rakyat guna membantu membayar utang negara yang menembus angka RM1 triliun (80% dari PDB).
      -
      2019: 59% HUTANG BAYAR HUTANG
      Laporan Ketua Audit Negara mengungkapkan bahwa 59% dari pinjaman baru digunakan hanya untuk melunasi utang yang sudah ada (gali lubang tutup lubang).
      -
      2020: 60% HUTANG BAYAR HUTANG
      Ketergantungan meningkat; hampir 60% pinjaman baru dialokasikan untuk membayar utang lama, memicu kekhawatiran karena anggaran pembangunan semakin terhimpit.
      -
      2021: 50,4% HUTANG BAYAR HUTANG
      Dari total pinjaman baru sebesar RM194,55 miliar, sebanyak RM98,05 miliar digunakan untuk pembayaran kembali prinsipal utang yang telah matang.
      -
      2022: 52,4% HUTANG BAYAR HUTANG
      Realisasi pembayaran prinsipal mencapai RM113,7 miliar. Total pinjaman meningkat 11,6% dibandingkan tahun sebelumnya akibat pemulihan pascapandemi.
      -
      2023: 64,3% HUTANG BAYAR HUTANG
      Persentase tertinggi dalam periode ini. Dari total pinjaman kasar RM226,6 miliar, sebesar RM145,8 miliar lari ke pembayaran utang lama.
      -
      2024: 58,9% HUTANG BAYAR HUTANG
      Pemerintah mulai melakukan konsolidasi. Pinjaman digunakan untuk melunasi utang matang sebesar RM121,3 miliar dari total pinjaman RM206 miliar.
      -
      2025: 58% HUTANG BAYAR HUTANG
      Berdasarkan Tinjauan Fiskal 2025, pemerintah memproyeksikan pinjaman kasar sebesar RM184 miliar, di mana RM106,8 miliar disiapkan untuk membayar prinsipal utang matang.
      -
      2026 = HUTANG BAYAR HUTANG
      Dokumen Resmi Pemerintah (Kementerian Kewangan MALONYET - MOF)
      Data utama berasal dari laporan tahunan yang diterbitkan bersamaan dengan pembentangan anggaran negara:
      Laporan Tinjauan Fiskal 2025 & 2026: Memuat angka proyeksi pinjaman kasar (gross borrowing) dan alokasi pembayaran kembali prinsipal utang yang matang.
      -
      SUMBER DATA RESMI:
      Laporan Ketua Audit Negara (LKAN): Mengenai Penyata Kewangan Kerajaan Persekutuan (tahunan).
      -
      Kementerian Kewangan MALONYET (MOF): Laporan Tinjauan Fiskal dan Estimasi Pendapatan Federal (diterbitkan setiap pembentangan Belanjawan/Budget).

      Hapus
    9. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      --------------------------------------------------
      GLOBAL FIREPOWER (GFP) 2026 – ASEAN :
      https://www.globalfirepower.com/countries-listing.php
      -
      1. INDONESIA – PERINGKAT 13
      -
      2. VIETNAM – PERINGKAT 23
      -
      3. THAILAND – PERINGKAT 24
      -
      4. SINGAPURA – PERINGKAT 29
      -
      5. MYANMAR – PERINGKAT 35
      -
      6. FILIPINA – PERINGKAT 41
      -
      7. MALONYET – PERINGKAT 42
      -
      8. KAMBOJA – PERINGKAT 83
      -
      9. LAOS – PERINGKAT 125
      ---------------------------------
      2025 = KOSONG
      Https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708518608
      -
      2024 = KOSONG
      https://defense-studies.blogspot.com/2025/03/order-dan-transfer-persenjataan-ke-dan_14.html
      -
      2023 = NOT YET ORDERED
      https://defense-studies.blogspot.com/2024/03/transfer-persenjataan-ke-dan-dari_15.html
      -
      2022 = SELECTED NOT YET ORDERED
      https://defense-studies.blogspot.com/2023/03/transfer-persenjataan-ke-dan-dari_17.html
      -
      2021 = PLANNED
      https://defense-studies.blogspot.com/2022/03/transfer-persenjataan-ke-MALONYET-2021.html
      -
      2020 = PLANNED
      https://defense-studies.blogspot.com/2021/03/transfer-persenjataan-ke-MALONYET-2020.html
      ---------------------------------
      Analisa Geopolitik & Pertahanan: "Stagnasi Total"
      Vakum SIPRI (2024-2025): Laporan impor senjata KOSONG selama dua tahun berturut-turut. MALONYET kini sejajar dengan negara ekonomi kecil seperti Laos dan Kamboja dalam hal transfer alutsista berat.
      Kegagalan Proyek Strategis: Pembatalan F/A-18 Hornet Kuwait sebanyak 4 kali menunjukkan hilangnya kredibilitas finansial di pasar pertahanan internasional.
      Penurunan Daya Gentar: Berada di Peringkat 42 GFP (Posisi ke-7 di ASEAN), kini resmi berada di bawah Filipina (Peringkat 41).
      Perbandingan Kontras: Indonesia memimpin di Peringkat 13 dunia dengan daftar belanja "satu lembar penuh" (Rafale F4, A400M, KF-21 Boramae, Kapal PPA, dan Rudal Khan/Bora).
      -
      Analisa Ekonomi & Fiskal: "Spiral Utang Kronis"
      Fenomena Gali Lubang Tutup Lubang: Proyeksi 58% pinjaman baru di tahun 2026 hanya digunakan untuk membayar cicilan pokok dan bunga utang lama (Debt-Servicing Cycle).
      Beban Utang Nasional: Total utang dan liabilitas diproyeksikan menyentuh RM 1,79 Triliun, dengan rasio utang terhadap GDP melampaui ambang batas aman (>70%).
      Hambatan Dagang Global: Tekanan dari Amerika Serikat melalui Section 301 (kenaikan tarif 10-25%) dan ancaman IEEPA (pemblokiran transaksi) oleh USTR yang memukul sektor manufaktur dan E&E.
      -
      Analisa Model Pengadaan: "Negara Penyewa" (Leasing)
      Krisis Likuiditas: Ketiadaan dana tunai memaksa militer beralih ke skema Sewa (Leasing) untuk 32+ item strategis (Helikopter Blackhawk, AW139, simulator, hingga kendaraan taktis).
      Barter Komoditas: Pengadaan yang tersisa terpaksa menggunakan skema Barter Kelapa Sawit (CPO) seperti pada kesepakatan FA-50 (Korea Selatan) dan PT-91M (Polandia).
      Aset Karatan & Hilang: Proyek LCS mangkrak melibatkan 17 kreditor, diperparah dengan catatan buruk hilangnya 48 pesawat Skyhawk dan 2 mesin jet jet tempur.
      -
      Analisa Reputasi & Diplomasi Internasional
      Kehilangan Posisi Regional: Resmi gagal lolos ke Piala Asia 2027, di mana posisi tersebut kini diambil alih oleh Vietnam, mempertegas penurunan pengaruh MALONYET di ASEAN.
      Krisis Identitas: Kritik internal dari pemimpin nasional (Mahathir & Anwar Ibrahim) mengenai kemiskinan struktural dan korupsi proyek negara memperburuk citra di mata investor global.

      Hapus
    10. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      ---------------------------------------------------
      2025 = KOSONG
      Https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708518608
      -
      2024 = KOSONG
      https://defense-studies.blogspot.com/2025/03/order-dan-transfer-persenjataan-ke-dan_14.html
      -
      2023 = NOT YET ORDERED
      https://defense-studies.blogspot.com/2024/03/transfer-persenjataan-ke-dan-dari_15.html
      -
      2022 = SELECTED NOT YET ORDERED
      https://defense-studies.blogspot.com/2023/03/transfer-persenjataan-ke-dan-dari_17.html
      -
      2021 = PLANNED
      https://defense-studies.blogspot.com/2022/03/transfer-persenjataan-ke-MALONYET-2021.html
      -
      2020 = PLANNED
      https://defense-studies.blogspot.com/2021/03/transfer-persenjataan-ke-MALONYET-2020.html
      ----------------------------------
      Status Kelumpuhan Pertahanan (SIPRI & Alutsista)
      Vakum SIPRI (2024–2025): Status KOSONG total selama dua tahun berturut-turut. Tidak ada transfer senjata berat yang tercatat, menempatkan MALONYET setara dengan Laos dan Kamboja.
      Tren Mundur: Penurunan konsisten dari fase Planned (2020), Selected Not Yet Ordered (2022), hingga nihil aktivitas (2024–2025).
      Kegagalan Simbolik: Pembatalan resmi akuisisi F/A-18 Hornet Kuwait sebanyak 4 kali bukti hilangnya kredibilitas finansial di pasar global.
      Procurement Freeze (2026): Instruksi PM Anwar Ibrahim untuk pembekuan total pengadaan guna menghentikan korupsi sistemik dan kebocoran anggaran.
      -
      Model "Negara Penyewa" (Military-for-Rent)
      Ketiadaan uang tunai memaksa militer beralih dari kepemilikan aset menjadi skema Leasing (Sewa):
      Aset Sewaan (32+ Item): Mencakup 31 Helikopter (Blackhawk, AW139, AW149, Bell 429), pesawat latihan L39 ITCC, simulator jet tempur MKM, hingga motor polisi.
      Skema Barter: Pengadaan yang tersisa (FA-50, PT-91M, Scorpene) terpaksa menggunakan Barter Kelapa Sawit (CPO) karena krisis devisa.
      Aset Mangkrak: Proyek LCS & OPV yang karatan di galangan melibatkan 17 kreditor dengan bunga yang terus membengkak.
      -
      Spiral Utang "Gali Lubang Tutup Lubang"
      Debt-Servicing Cycle: 58% hingga 64,3% pinjaman baru hanya digunakan untuk membayar bunga dan cicilan pokok utang lama.
      Ledakan Liabilitas: Utang nasional melonjak drastis dari RM 407 Miliar (2010) menjadi proyeksi RM 1,79 Triliun (2026).
      Rasio Kritis: Utang pemerintah menyentuh 69% GDP (melewati limit 65%) dan utang rumah tangga ekstrem di angka 84,3% GDP.
      Tabung Harapan (2018): Bukti historis keputusasaan fiskal melalui penggalangan dana rakyat untuk membayar utang negara.
      -
      Penurunan Daya Gentar & Reputasi (GFP 2026)
      Peringkat GFP: Merosot ke posisi 42 dunia (Peringkat ke-7 di ASEAN), resmi disalip oleh Filipina (Peringkat 41).
      Skandal Aset Hilang: Catatan memalukan raibnya 48 pesawat Skyhawk dan 2 mesin jet tempur dari gudang militer.
      Degradasi Armada: Banyak aset utama berstatus Grounded (MiG-29, MB339CM, Nuri) atau mogok saat parade (Tank PT-91M).
      -
      Krisis Administrasi & Tekanan Internasional
      Kehilangan Pengaruh: Posisi di Piala Asia 2027 resmi direbut oleh Vietnam, mempertegas mundurnya pengaruh diplomasi regional.
      Tekanan Ekonomi AS: Ancaman sanksi tarif Section 301 (10-25%) dan IEEPA oleh USTR menghantam sektor manufaktur utama (E&E).
      -
      Perbandingan Kontras: Indonesia (The Giant)
      Status SIPRI: Memiliki "Lembar Belanja Penuh" (Rafale F4, A400M, Rudal Khan, Kapal PPA).
      Kesehatan Fiskal: Rasio utang pemerintah jauh lebih sehat (40% GDP) dengan ekonomi 4,24x lebih besar secara PDB PPP dibandingkan MALONYET.

      Hapus
    11. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      --------------------------------------------------
      2025 = KOSONG
      Https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708518608
      -
      2024 = KOSONG
      https://defense-studies.blogspot.com/2025/03/order-dan-transfer-persenjataan-ke-dan_14.html
      -
      2023 = NOT YET ORDERED
      https://defense-studies.blogspot.com/2024/03/transfer-persenjataan-ke-dan-dari_15.html
      -
      2022 = SELECTED NOT YET ORDERED
      https://defense-studies.blogspot.com/2023/03/transfer-persenjataan-ke-dan-dari_17.html
      -
      2021 = PLANNED
      https://defense-studies.blogspot.com/2022/03/transfer-persenjataan-ke-MALONYET-2021.html
      -
      2020 = PLANNED
      https://defense-studies.blogspot.com/2021/03/transfer-persenjataan-ke-MALONYET-2020.html
      ---------------------------------

      Bukti "Hutang Bayar Hutang" (Debt-Servicing Cycle)
      Data resmi menunjukkan MALONYET terjebak dalam siklus gali lubang tutup lubang kronis:
      2018 (Fase Verifikasi): Utang menembus RM1 Triliun; pemerintah meluncurkan Tabung Harapan (donasi rakyat) untuk mencicil utang negara.
      2019–2020: Ketergantungan meningkat; 59% hingga 60% pinjaman baru hanya untuk melunasi utang lama.
      2023 (Rekor Terburuk): 64,3% dari total pinjaman kasar (RM145,8 Miliar) digunakan hanya untuk membayar utang jatuh tempo.
      2025–2026: Proyeksi tetap kritis di angka 58%. Ruang fiskal untuk pembangunan dan alutsista praktis terkunci oleh cicilan utang.
      -
      Bukti "Vakum SIPRI" (2020–2025)
      Kontras dengan klaim belanja "Cash", data SIPRI menunjukkan kekosongan aktivitas:
      2020–2021: Berstatus Planned (Hanya rencana/dijangka).
      2022–2023: Berstatus Not Yet Ordered (Terpilih tapi tidak ada kontrak/pesanan).
      2024–2025: Status resmi KOSONG (Nihil transfer senjata berat selama 2 tahun berturut-turut).
      Posisi Regional: MALONYET kini sejajar dengan Laos dan Kamboja dalam hal nihilnya modernisasi alutsista berat.
      -
      Timeline "Prank" Alutsista (Janji vs Realitas)
      Daftar kegagalan kontrak strategis yang mencoreng kredibilitas pertahanan:
      Prank F/A-18 Hornet: Upaya akuisisi dari Kuwait Batal 4 Kali hingga resmi dihentikan pada 2026 karena masalah logistik dan dana.
      Prank Dassault Rafale: Mangkrak sejak 2014 akibat krisis anggaran (kini diborong Indonesia).
      Prank Kapal MRSS: Janji kontrak dengan PT PAL (Indonesia) pada 2018 yang tidak pernah terwujud.
      Prank Helikopter Blackhawk: Proses sewa (leasing) yang mangkrak dan berbelit hingga 2025.
      -
      Perangkap Utang & Liabilitas (Eskalasi RM 1,79 Triliun)
      Pertumbuhan beban finansial yang melumpuhkan negara:
      2010: RM 407,1 Miliar.
      2018: RM 1,19 Triliun (Ledakan pasca-transparansi 1MDB).
      2026: Proyeksi RM 1,79 Triliun (Titik kritis manajemen utang).
      Rasio Utang: Diproyeksikan menyentuh 69,54% dari PDB pada 2029 (Data Statista), melampaui batas aman.
      -
      Penurunan Daya Gentar & Reputasi
      Global Firepower (GFP) 2026: MALONYET (Peringkat 42) resmi disalip oleh Filipina (Peringkat 41) di ASEAN.
      Status "Military-for-Rent": Karena tidak mampu membeli (Buying), beralih ke skema Sewa (Leasing) untuk 32+ item (Heli, simulator, hingga motor polisi).
      -
      Kesimpulan Strategis
      Indonesia: Berstatus "The Giant" dengan modernisasi agresif (Rafale, A400M, PPA) dan rasio utang pemerintah yang sehat (40% GDP).
      MALONYET: Berstatus "The Stagnant" yang terjebak dalam delusi klaim "Shopping Cash" sementara kenyataannya hanya mampu membayar bunga utang lama.

      Hapus
    12. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      --------------------------------------------------
      GLOBAL FIREPOWER (GFP) 2026 – ASEAN :
      https://www.globalfirepower.com/countries-listing.php
      -
      1. INDONESIA – PERINGKAT 13
      -
      2. VIETNAM – PERINGKAT 23
      -
      3. THAILAND – PERINGKAT 24
      -
      4. SINGAPURA – PERINGKAT 29
      -
      5. MYANMAR – PERINGKAT 35
      -
      6. FILIPINA – PERINGKAT 41
      -
      7. MALONYET – PERINGKAT 42
      -
      8. KAMBOJA – PERINGKAT 83
      -
      9. LAOS – PERINGKAT 125
      ---------------------------------
      2025 = KOSONG
      Https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708518608
      -
      2024 = KOSONG
      https://defense-studies.blogspot.com/2025/03/order-dan-transfer-persenjataan-ke-dan_14.html
      -
      2023 = NOT YET ORDERED
      https://defense-studies.blogspot.com/2024/03/transfer-persenjataan-ke-dan-dari_15.html
      -
      2022 = SELECTED NOT YET ORDERED
      https://defense-studies.blogspot.com/2023/03/transfer-persenjataan-ke-dan-dari_17.html
      -
      2021 = PLANNED
      https://defense-studies.blogspot.com/2022/03/transfer-persenjataan-ke-MALONYET-2021.html
      -
      2020 = PLANNED
      https://defense-studies.blogspot.com/2021/03/transfer-persenjataan-ke-MALONYET-2020.html
      ---------------------------------
      Analisa Kekuatan Udara: Buying vs. Prank
      Indonesia melakukan modernisasi masif dengan kontrak resmi (Firm Order), sementara MALONYET terjebak dalam pembatalan dan wacana:
      Indonesia (Realisasi & Kontrak G2G):
      42 Rafale: Kontrak lunas dan efektif (Dassault Aviation).
      48 KAAN (Gen-5): Kerja sama strategis G2G dengan Turki (TAI).
      24 M-346F: Penandatanganan Letter of Award (LOA) dengan Leonardo.
      MALONYET (Pembatalan & Kegagalan):
      F-18 Kuwait: Resmi BATAL (2026) setelah 4 kali upaya negosiasi (New Straits Times).
      Status "Prank": Wacana JF-17, Rafale, Typhoon, dan Tejas berakhir tanpa kontrak.
      MiG-29N: Pensiun tanpa pengganti (Tiada Ganti).
      FA-50: Mengalami hambatan blokir/lisensi dari AS.
      -
      Analisa Geografis & Jangkauan Tempur
      Jarak Pekanbaru ke KL (291 KM) dan Pontianak ke Sarawak (498 KM) sangat pendek dibandingkan radius tempur jet tempur baru Indonesia:
      Rafale: ±1.852 KM (Sanggup menjangkau seluruh wilayah semenanjung dan Kalimantan).
      KAAN & KF-21: ±1.100–1.400 KM (Dominasi ruang udara regional).
      -
      Analisa Fiskal: Disiplin vs. Spiral Utang
      Perbedaan fundamental dalam cara membiayai pertahanan:
      Indonesia (Procurement/Buying): Rasio utang pemerintah sehat (40% GDP). Membeli aset untuk menjadi pemilik penuh.
      MALONYET (Leasing/Sewa): Rasio utang kritis (69% GDP) dengan utang rumah tangga ekstrem (84,3%). Karena krisis kas, MALONYET berubah menjadi "Negara Penyewa":
      Aset Sewaan: Helikopter Black Hawk (Aerotree), AW139, EC120B, Pesawat L39, Kapal Hidrografi, hingga Motor BMW R1250RT.
      Status SIPRI: Indonesia mencatat "Lembar Belanja Penuh", MALONYET KOSONG/ZONK selama 2 tahun berturut-turut (2024-2025).
      -
      Beban Rakyat & Masa Depan
      Beban Per Kapita: Setiap warga MALONYET menanggung beban utang kumulatif sebesar RM 81.998.
      Gali Lubang Tutup Lubang: Tren utang baru hanya untuk membayar bunga utang lama sejak 2010, menyebabkan kemandekan pembangunan militer (LCS mangkrak, MRCA vakum).


      Hapus
  8. MIN MANA BERITA MALON SHOPING?
    UUUUPSSS .... LUPA MALON TIADA SHOPING
    🀣🀣🀣🀣🀣

    BalasHapus
  9. Beda kasta...

    https://www.youtube.com/watch?v=USR2ptCQ048

    🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣

    BalasHapus
    Balasan
    1. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      --------------------------------------------------
      GLOBAL FIREPOWER (GFP) 2026 – ASEAN :
      https://www.globalfirepower.com/countries-listing.php
      -
      1. INDONESIA – PERINGKAT 13
      -
      2. VIETNAM – PERINGKAT 23
      -
      3. THAILAND – PERINGKAT 24
      -
      4. SINGAPURA – PERINGKAT 29
      -
      5. MYANMAR – PERINGKAT 35
      -
      6. FILIPINA – PERINGKAT 41
      -
      7. MALONYET – PERINGKAT 42
      -
      8. KAMBOJA – PERINGKAT 83
      -
      9. LAOS – PERINGKAT 125
      ---------------------------------
      2025 = KOSONG
      Https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708518608
      -
      2024 = KOSONG
      https://defense-studies.blogspot.com/2025/03/order-dan-transfer-persenjataan-ke-dan_14.html
      -
      2023 = NOT YET ORDERED
      https://defense-studies.blogspot.com/2024/03/transfer-persenjataan-ke-dan-dari_15.html
      -
      2022 = SELECTED NOT YET ORDERED
      https://defense-studies.blogspot.com/2023/03/transfer-persenjataan-ke-dan-dari_17.html
      -
      2021 = PLANNED
      https://defense-studies.blogspot.com/2022/03/transfer-persenjataan-ke-MALONYET-2021.html
      -
      2020 = PLANNED
      https://defense-studies.blogspot.com/2021/03/transfer-persenjataan-ke-MALONYET-2020.html
      ---------------------------------
      Status SIPRI: Vakum vs. Agresif
      MALONYET (Lembar Kosong): Mencatat status KOSONG selama dua tahun berturut-turut (2024–2025). Tidak ada transfer senjata berat yang terealisasi.
      Indonesia (Lembar Penuh): Realisasi masif mencakup Rafale F-4, A400M Atlas, Rudal Khan/Bora, hingga mesin kapal PPA-L-Plus.
      -
      Kegagalan Pengadaan & Skandal Finansial
      Skandal LCS: Proyek RM 9 Miliar yang belum mengirimkan satu pun kapal meski RM 6 Miliar telah dibayarkan. Terdeteksi penyimpangan dana RM 400 Juta untuk bayar utang perusahaan.
      Sistem "Middlemen": Ketergantungan pada agen/makelar politik menyebabkan harga alutsista melambung tidak wajar dan spesifikasi yang tidak sesuai kebutuhan militer.
      Drama SPH 155mm: Proyek tertunda sejak 2010 dan akhirnya dibatalkan Kemenkeu karena krisis anggaran.
      -
      Kesenjangan Kemampuan (Capability Gap)
      Ketiadaan Pesawat COIN: Menggunakan jet mahal (Su-30MKM) untuk operasi anti-gerilya yang seharusnya menggunakan pesawat ringan. Pengganti (FA-50M) baru akan tiba paling cepat 2026.
      Logistik Terfragmentasi: Standarisasi alutsista yang buruk (campuran Rusia, AS, Polandia, China) menciptakan biaya pemeliharaan tinggi dan kesiapan operasional rendah.
      Absennya Korps Marinir: Kemampuan amfibi yang terpecah antara AD dan AL melemahkan pertahanan kedaulatan di Laut China Selatan.
      -
      Krisis Fiskal & "Negara Penyewa"
      Spiral Utang: Rasio utang pemerintah (69% GDP) dan rumah tangga (84,3%) yang ekstrem memaksa militer beralih ke skema Sewa (Leasing).
      Aset Sewaan: Mencakup Helikopter Blackhawk, AW139, pesawat latihan L39, hingga kapal hidrografi dan motor patroli.
      Efek Domino: Pembatalan F-18 Hornet Kuwait (2026) menjadi simbol hilangnya kredibilitas finansial di pasar pertahanan global.
      -
      Penurunan Daya Gentar (GFP 2026)
      Peringkat Merosot: Turun ke posisi 42 Dunia (Peringkat 7 di ASEAN), kini berada di bawah Filipina (41) dan jauh tertinggal dari Indonesia (13).
      Status Armada: Banyak aset utama berstatus grounded atau tidak layak selam (seperti kasus KD Rahman) akibat kekurangan suku cadang dan teknisi.

      Hapus
    2. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      --------------------------------------------------
      GLOBAL FIREPOWER (GFP) 2026 – ASEAN :
      https://www.globalfirepower.com/countries-listing.php
      -
      1. INDONESIA – PERINGKAT 13
      -
      2. VIETNAM – PERINGKAT 23
      -
      3. THAILAND – PERINGKAT 24
      -
      4. SINGAPURA – PERINGKAT 29
      -
      5. MYANMAR – PERINGKAT 35
      -
      6. FILIPINA – PERINGKAT 41
      -
      7. MALONYET – PERINGKAT 42
      -
      8. KAMBOJA – PERINGKAT 83
      -
      9. LAOS – PERINGKAT 125
      ---------------------------------
      2025 = KOSONG
      Https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708518608
      -
      2024 = KOSONG
      https://defense-studies.blogspot.com/2025/03/order-dan-transfer-persenjataan-ke-dan_14.html
      -
      2023 = NOT YET ORDERED
      https://defense-studies.blogspot.com/2024/03/transfer-persenjataan-ke-dan-dari_15.html
      -
      2022 = SELECTED NOT YET ORDERED
      https://defense-studies.blogspot.com/2023/03/transfer-persenjataan-ke-dan-dari_17.html
      -
      2021 = PLANNED
      https://defense-studies.blogspot.com/2022/03/transfer-persenjataan-ke-MALONYET-2021.html
      -
      2020 = PLANNED
      https://defense-studies.blogspot.com/2021/03/transfer-persenjataan-ke-MALONYET-2020.html
      ---------------------------------
      Status SIPRI: Vakum Total vs. Dominasi Regional
      MALONYET (Zonk): Mencatatkan status KOSONG pada lembar laporan SIPRI selama dua tahun berturut-turut (2024–2025). Tidak ada kontrak atau transfer senjata berat yang terealisasi.
      Indonesia (Full Shopping): Memiliki lembar belanja penuh dengan aset strategis seperti Rafale F-4, A400M, Rudal Khan/Bora, drone Anka-S, hingga mesin kapal PPA-L-Plus.
      -
      Alutsista Usang & Krisis Pemeliharaan
      Armada Tua: Mengoperasikan aset berusia 30–40 tahun seperti panser Condor (1980-an) dan kapal Lekiu-class (1990-an).
      Masalah Kesiapan: Jet tempur utama (Su-30MKM & F/A-18D) memiliki jumlah armada kecil dan biaya perawatan yang mencekik anggaran.
      Pensiun Tanpa Pengganti: Mundurnya MiG-29 pada 2017 tanpa pengganti langsung meninggalkan celah pertahanan udara yang lebar.
      -
      Skandal Korupsi & Kegagalan Pengadaan
      Tragedi LCS: Proyek RM 9 Miliar yang meledak biayanya (cost overrun) hingga RM 1 Miliar, namun belum mengirimkan satu pun kapal meski dana telah terserap masif.
      Sistem Makelar: Ketergantungan pada agen dan "middlemen" politik menyebabkan harga alutsista menjadi tidak masuk akal dan spesifikasi yang seringkali tidak sesuai kebutuhan militer.
      Drama SPH 155mm: Pengadaan artileri medan yang tertunda sejak 2010 dan akhirnya dibatalkan oleh Kementerian Keuangan karena krisis kas.
      -
      Hambatan Fiskal & Ketergantungan Asing
      Anggaran Defisit: Belanja pertahanan hanya 1,0–1,5% PDB, di mana sebagian besar tersedot untuk gaji dan pensiun, menyisakan sedikit ruang untuk modernisasi.
      Strategi Sewa (Leasing): Karena tidak mampu membeli tunai, militer terpaksa menyewa helikopter (Blackhawk, AW139) dan pesawat latihan (L39) dari pihak swasta.
      Kerentanan Suku Cadang: Ketergantungan penuh pada pemasok luar negeri membuat militer rentan terhadap sanksi politik atau gangguan rantai pasok global.
      -
      Kelemahan Geopolitik & Operasional
      Ancaman Laut China Selatan: Armada laut yang menua dan kecil (hanya 2 kapal selam) membuat MALONYET sulit menghalau intrusi kapal penjaga pantai China di wilayah Luconia Shoals.
      Absennya Integrasi: Kurangnya sistem Komando Gabungan yang kuat dan tidak adanya Korps Marinir yang terdedikasi melemahkan respon terhadap ancaman hibrida.
      Penurunan Peringkat (GFP 2026): Berada di posisi 42 dunia, kini resmi disalip oleh Filipina (41) dan tertinggal jauh di bawah Indonesia (13).

      Hapus
    3. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      --------------------------------------------------
      GLOBAL FIREPOWER (GFP) 2026 – ASEAN :
      https://www.globalfirepower.com/countries-listing.php
      -
      1. INDONESIA – PERINGKAT 13
      -
      2. VIETNAM – PERINGKAT 23
      -
      3. THAILAND – PERINGKAT 24
      -
      4. SINGAPURA – PERINGKAT 29
      -
      5. MYANMAR – PERINGKAT 35
      -
      6. FILIPINA – PERINGKAT 41
      -
      7. MALONYET – PERINGKAT 42
      -
      8. KAMBOJA – PERINGKAT 83
      -
      9. LAOS – PERINGKAT 125
      ---------------------------------
      2025 = KOSONG
      Https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708518608
      -
      2024 = KOSONG
      https://defense-studies.blogspot.com/2025/03/order-dan-transfer-persenjataan-ke-dan_14.html
      -
      2023 = NOT YET ORDERED
      https://defense-studies.blogspot.com/2024/03/transfer-persenjataan-ke-dan-dari_15.html
      -
      2022 = SELECTED NOT YET ORDERED
      https://defense-studies.blogspot.com/2023/03/transfer-persenjataan-ke-dan-dari_17.html
      -
      2021 = PLANNED
      https://defense-studies.blogspot.com/2022/03/transfer-persenjataan-ke-MALONYET-2021.html
      -
      2020 = PLANNED
      https://defense-studies.blogspot.com/2021/03/transfer-persenjataan-ke-MALONYET-2020.html
      ---------------------------------
      Inventaris Transfer Senjata (SIPRI 2024-2025)
      Indonesia (Aktif):
      Udara: Rafale F-4, A400M Atlas, Sistem Air Refuel, Drone ANKA-S.
      Laut: PPA-L-Plus, Ship Engine (LM-2500).
      Darat/Rudal: Rudal BORA, Rudal KHAN.
      Mesin: TP400-D6.
      MALONYET (Kosong): Tidak ada catatan transfer signifikan dalam periode 2 tahun tersebut.
      -
      Akar Masalah Modernisasi (Structural Causes)
      Anggaran: Dana pertahanan di bawah 1,5% PDB (lebih rendah dari Singapura & Thailand).
      Skandal Pengadaan: Proyek LCS (Littoral Combat Ship) senilai RM9 miliar yang gagal kirim dan helikopter MD530G.
      Ketergantungan Asing: Kurangnya industri pertahanan domestik memicu kerentanan terhadap fluktuasi mata uang dan sanksi.
      Instabilitas Politik: Prioritas pertahanan sering berubah setiap pergantian pemerintah.
      -
      Tantangan Operasional & Internal
      Alutsista Tua: Ketergantungan pada Su-30MKM dan F/A-18D yang mulai menua; pensiunnya MiG-29 tanpa pengganti instan.
      Keamanan Maritim: Kewalahan menghadapi intrusi di Laut China Selatan (LCS) dan Selat Malaka akibat kurangnya kapal patroli.
      SDM: Gaji rendah dan kurangnya minat generasi muda menyebabkan sulitnya retensi tenaga ahli (pilot & insinyur).
      Koordinasi Rendah: Kurangnya integrasi operasi gabungan antara Angkatan Darat, Laut, dan Udara.
      -
      Sorotan Skandal & Opini Publik
      Kritik Kerajaan: Sultan Ibrahim menyebut helikopter Black Hawk tua sebagai "peti mati terbang".
      Korupsi Internal: Operasi Sohor (2025) mengungkap intelijen militer yang membocorkan data ke penyelundup.
      Kasus Kekerasan: Insiden penganiayaan kadet di UPNM yang memicu kemarahan publik di media sosial (#ReformATM).
      Konspirasi: Keterlibatan sindikat yang membayar petugas hingga RM50.000 per perjalanan untuk aktivitas ilegal.
      -
      Kesimpulan Perbandingan
      Indonesia: Fokus pada pengadaan besar-besaran (Big Ticket Items) dari berbagai negara (Perancis, Turki, AS).
      MALONYET: Mengalami stagnasi akibat jeratan utang proyek lama, skandal korupsi, dan krisis kepercayaan publik terhadap manajemen pengadaan.

      Hapus
    4. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      --------------------------------------------------
      GLOBAL FIREPOWER (GFP) 2026 – ASEAN :
      https://www.globalfirepower.com/countries-listing.php
      -
      1. INDONESIA – PERINGKAT 13
      -
      2. VIETNAM – PERINGKAT 23
      -
      3. THAILAND – PERINGKAT 24
      -
      4. SINGAPURA – PERINGKAT 29
      -
      5. MYANMAR – PERINGKAT 35
      -
      6. FILIPINA – PERINGKAT 41
      -
      7. MALONYET – PERINGKAT 42
      -
      8. KAMBOJA – PERINGKAT 83
      -
      9. LAOS – PERINGKAT 125
      ---------------------------------
      2025 = KOSONG
      Https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708518608
      -
      2024 = KOSONG
      https://defense-studies.blogspot.com/2025/03/order-dan-transfer-persenjataan-ke-dan_14.html
      -
      2023 = NOT YET ORDERED
      https://defense-studies.blogspot.com/2024/03/transfer-persenjataan-ke-dan-dari_15.html
      -
      2022 = SELECTED NOT YET ORDERED
      https://defense-studies.blogspot.com/2023/03/transfer-persenjataan-ke-dan-dari_17.html
      -
      2021 = PLANNED
      https://defense-studies.blogspot.com/2022/03/transfer-persenjataan-ke-MALONYET-2021.html
      -
      2020 = PLANNED
      https://defense-studies.blogspot.com/2021/03/transfer-persenjataan-ke-MALONYET-2020.html
      ---------------------------------
      Status Transfer Senjata (SIPRI 2024-2025)
      INDONESIA (Agresif & Ekspansif):
      Udara: Akuisisi Rafale F-4, pesawat angkut A400M Atlas, sistem Air Refuel, dan drone ANKA-S.
      Laut: Mesin kapal LM-2500, kapal perang PPA-L-Plus, dan Ship Engine lainnya.
      Darat/Rudal: Rudal balistik BORA dan KHAN, serta mesin TP400-D6.
      MALONYET (Stagnan/Kosong):
      Tidak ada catatan transfer alutsista utama baru dalam database SIPRI periode tersebut.
      -
      Skandal & Masalah Struktural MALONYET
      Skandal LCS (Littoral Combat Ship): Dana RM9 miliar cair, namun tidak ada kapal yang dikirim hingga 2025.
      Kegagalan MD530G: Pembayaran uang muka 35% untuk helikopter "hantu" yang pengirimannya terus tertunda.
      Korupsi Internal: Operasi Sohor (2025) mengungkap intelijen militer yang menjual data klasifikasi ke sindikat penyelundup.
      Krisis Anggaran: Pengeluaran pertahanan di bawah 1.5% PDB, jauh di bawah standar regional.
      -
      Kontroversi Strategi "Leasing" (Sewa) Helikopter
      Beban Finansial: Sewa 28 helikopter AW149 (RM16.5 miliar/15 tahun) dianggap lebih mahal dibanding Polandia yang membeli 32 unit seharga USD 1.83 miliar.
      Kedaulatan Aset: Aset tidak dimiliki penuh, membatasi kemampuan upgrade, modifikasi, dan konfigurasi ulang untuk misi darurat.
      Ketergantungan Swasta: Kesiapan tempur bergantung pada kontraktor (Weststar Aviation), berisiko jika terjadi sengketa hukum atau kegagalan servis.
      Nihil Transfer Teknologi: Skema sewa mematikan peluang pertumbuhan industri pertahanan domestik dan penyerapan tenaga ahli lokal.
      -
      Kondisi Alutsista "Outdated" (Usang)
      Laut (RMN): 28 kapal berusia di atas 40 tahun dengan sistem radar analog yang sulit mendeteksi drone atau kapal selam modern.
      Udara (RMAF): Ketergantungan pada avionik lama; biaya perawatan melonjak karena suku cadang sudah diskontinu.
      Darat (Army): Kendaraan lapis baja dan artileri kekurangan sistem kontrol tembakan berbasis GPS dan komunikasi semi-digital.
      -
      Kesimpulan Analisis
      Indonesia bergerak menuju kekuatan regional dengan diversifikasi pemasok (Prancis, Turki, AS).
      MALONYET terjebak dalam "lingkaran setan" pengadaan: skandal masa lalu → anggaran terbatas → memilih opsi sewa yang mahal → ketergantungan teknologi asing yang kronis.

      Hapus
    5. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      --------------------------------------------------
      GLOBAL FIREPOWER (GFP) 2026 – ASEAN :
      https://www.globalfirepower.com/countries-listing.php
      -
      1. INDONESIA – PERINGKAT 13
      -
      2. VIETNAM – PERINGKAT 23
      -
      3. THAILAND – PERINGKAT 24
      -
      4. SINGAPURA – PERINGKAT 29
      -
      5. MYANMAR – PERINGKAT 35
      -
      6. FILIPINA – PERINGKAT 41
      -
      7. MALONYET – PERINGKAT 42
      -
      8. KAMBOJA – PERINGKAT 83
      -
      9. LAOS – PERINGKAT 125
      ---------------------------------
      2025 = KOSONG
      Https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708518608
      -
      2024 = KOSONG
      https://defense-studies.blogspot.com/2025/03/order-dan-transfer-persenjataan-ke-dan_14.html
      -
      2023 = NOT YET ORDERED
      https://defense-studies.blogspot.com/2024/03/transfer-persenjataan-ke-dan-dari_15.html
      -
      2022 = SELECTED NOT YET ORDERED
      https://defense-studies.blogspot.com/2023/03/transfer-persenjataan-ke-dan-dari_17.html
      -
      2021 = PLANNED
      https://defense-studies.blogspot.com/2022/03/transfer-persenjataan-ke-MALONYET-2021.html
      -
      2020 = PLANNED
      https://defense-studies.blogspot.com/2021/03/transfer-persenjataan-ke-MALONYET-2020.html
      ---------------------------------
      Sektor Pertahanan (SIPRI 2024-2025)
      Indonesia (Ekspansi Alutsista): Memiliki daftar panjang transfer senjata modern (1 Lembar Penuh) termasuk:
      Udara: Rafale F-4, A400M Atlas, ANKA-S (Drone), Air Refuel System.
      Laut: PPA-L-Plus, Mesin Kapal LM-2500.
      Rudal/Mesin: Rudal BORA & KHAN, Mesin TP400-D6.
      MALONYET (Stagnasi): Catatan transfer senjata KOSONG (Zero). Tidak ada pengadaan alutsista utama baru yang terdaftar.
      -
      Krisis Ketahanan Pangan MALONYET
      Ketergantungan tinggi pada impor akibat rendahnya tingkat kemandirian lokal:
      Krisis Beras: Mengimpor 500.000 ton beras dari Indonesia (via Kalimantan Barat) per Mei 2025 untuk stok Sarawak.
      Krisis Protein:
      Unggas: Menjadi net importer ayam (Juli 2025) dan penghapusan total subsidi telur (Agustus 2025) demi hemat anggaran RM1,2 miliar.
      Genetika: Terpaksa impor Ayam GPS (Grand Parent Stock) dari Amerika Serikat untuk memperbaiki kualitas indukan.
      Daging Merah: Ketergantungan impor mencapai 90% (Sapi/Kambing) dengan tingkat kemandirian di bawah 15%.
      -
      Krisis Hutang & Beban Rakyat MALONYET (2025)
      Beban finansial yang mencapai titik kritis secara nasional maupun personal:
      Hutang Pemerintah: Proyeksi melonjak hingga RM1,71 Triliun (69% dari PDB).
      Hutang Rumah Tangga: Sangat tinggi di angka RM1,73 Triliun (85,8% dari PDB).
      Beban Per Kapita (Rata-rata per orang):
      Tanggungan Hutang Pemerintah: RM36.139 / orang.
      Tanggungan Hutang Rumah Tangga: RM45.859 / orang.
      Total Beban Hutang Gabungan: Mendekati RM82.000 per warga negara.
      -
      Perbandingan Strategis
      Indonesia: Fokus pada penguatan kedaulatan militer dan menjadi eksportir pangan (beras) bagi tetangga.
      MALONYET: Menghadapi "Triple Crisis" (Hutang, Pangan, dan Alutsista). Prioritas anggaran bergeser dari modernisasi militer ke stabilitas perut rakyat dan pembayaran bunga hutang.

      Hapus
    6. WITHOUT MALONYET = KASTA FFBNP : BANNED NSM AMRAAM : PALAK ART USD 240 MILLIAR
      THE 40 LARGEST RECIPIENTS OF MAJOR ARMS =
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -
      1 Ukraina
      2 India
      3 Arab Saudi
      4 Qatar
      5 Pakistan
      6 Jepang
      7 Polandia
      8 Amerika Serikat
      9 Kuwait
      10 Australia
      11 UEA
      12 Mesir
      13 Inggris
      14 Israel
      15 Belanda
      16 Korea Selatan
      17 Jerman
      18 Indonesia
      19 Yunani
      20 Norwegia
      21 China
      22 Italia
      23 Filipina
      24 TΓΌrkiye
      25 Brasil
      26 Singapura
      27 Bahrain
      28 Maroko
      29 Denmark
      30 Rumania
      31 Belgia
      32 Belarusia
      33 Aljazair
      34 Taiwan
      35 Hungaria
      36 Kazakhstan
      37 Serbia
      38 Kanada
      39 Spanyol
      40 Thailand
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -------------------------------
      MALONYET.......
      NSM = BANNED
      NSM = BANNED
      NSM = BANNED
      KRISIS ALUTSISTA (LCS FAILURE):
      NORWAY EXPORT BLOCKADE: Keputusan sepihak Norwegia (April 2026) melarang pengiriman rudal NSM. Kontrak dibatalkan tanpa pemberitahuan awal.
      PCU MAHARAJA LELA (LCS1): Dudukan peluncur (ramps) NSM yang sudah terpasang harus DICOPOT/UNINSTALLED dari kapal. Kapal perang baru tanpa taring rudal strategis.
      STRATEGIC VACUUM: Kegagalan ini menciptakan kekosongan sistem pertahanan udara dan permukaan yang fatal.
      ________________________________________
      "CLAIM OF WEALTH = RISING DEBT BURDEN"
      TOTAL BEBAN HUTANG PER KAPITA (GOVT + HOUSEHOLD):
      2026: RM 94,544 (Lonjakan drastis RM 12,546 dalam setahun).
      2025: RM 81,998
      2024: RM 79,315
      2023: RM 74,587
      2022: RM 70,901
      2021: RM 67,667 (Puncak pandemi).
      STATUS FISKAL 2026:
      GOVT DEBT-TO-GDP: 70,5% (OVER LIMIT 65%).
      HOUSEHOLD DEBT-TO-GDP: 84,3% (OVER LIMIT 65%).
      ________________________________________
      ANALISA PEMIMPIN (INTERNAL CRITIC):
      MAHATHIR (MALAS/MISKIN): Mengkritik etnis mayoritas tetap miskin karena enggan bekerja keras dan cenderung menyalahkan pihak lain (NYT 2025, Kompas 2019).
      ANWAR IBRAHIM (MISKIN/TADBIR): Menyoroti kemiskinan tegar yang menyiksa rakyat, terutama korban banjir. Menunda proyek triliunan karena masalah tata kelola (Bernama 2025, ST 2022).
      ________________________________________
      RINCIAN DATA HUTANG 2026:
      Hutang Kerajaan: RM 1,79 Triliun (Beban per orang: RM 49,196).
      Hutang Isi Rumah: RM 1,65 Triliun (Beban per orang: RM 45,348).
      Total Populasi: 36.385.115 Jiwa.
      Status: FISCAL PARALYSIS – Beban hutang akumulatif melumpuhkan daya beli dan kemampuan belanja pertahanan.
      ________________________________________
      INDONESIA .....
      KONDISI FISKAL (CONTRAST):
      GOV. DEBT: 40% OF GDP (Jauh di bawah batas 60%).
      GDP: USD 1,44 TRILIUN.
      STATUS: LENGKAP – Pembayaran tunai alutsista Rafale, M346FA, dan KAAN tetap berjalan stabil di tengah krisis tetangga.

      Hapus
    7. WITHOUT MALONYET = KASTA FFBNP : BANNED NSM AMRAAM : PALAK ART USD 240 MILLIAR
      THE 40 LARGEST RECIPIENTS OF MAJOR ARMS =
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -
      1 Ukraina
      2 India
      3 Arab Saudi
      4 Qatar
      5 Pakistan
      6 Jepang
      7 Polandia
      8 Amerika Serikat
      9 Kuwait
      10 Australia
      11 UEA
      12 Mesir
      13 Inggris
      14 Israel
      15 Belanda
      16 Korea Selatan
      17 Jerman
      18 Indonesia
      19 Yunani
      20 Norwegia
      21 China
      22 Italia
      23 Filipina
      24 TΓΌrkiye
      25 Brasil
      26 Singapura
      27 Bahrain
      28 Maroko
      29 Denmark
      30 Rumania
      31 Belgia
      32 Belarusia
      33 Aljazair
      34 Taiwan
      35 Hungaria
      36 Kazakhstan
      37 Serbia
      38 Kanada
      39 Spanyol
      40 Thailand
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -------------------------------
      INDONESIA .....
      STATUS 2026: SUPERIOR & LENGKAP
      Anggaran Pertahanan 2026: USD 20 Miliar (Rp 335,2 Triliun).
      Pertumbuhan: Melonjak 37% dari tahun sebelumnya.
      Status SIPRI 2024-2025: LENGKAP (Transfer alutsista aktif).
      Daftar Belanja Alutsista Utama:
      42 Jet Rafale F-4 (Prancis).
      F-15IDN (USA).
      Kapal Selam Scorpene Evolved (Full Li-Ion Battery).
      Kapal Perang PPA-L-Plus & Frigat Merah Putih.
      Drone Tempur Anka-S (Turki).
      Rudal Balistik Khan & Bora.
      Kesehatan Fiskal:
      GDP: USD 1,44 Triliun.
      Hutang Pemerintah: 40% dari GDP (Jauh di bawah limit 60%).
      HUtang Household: 16% dari GDP.
      Defisit: 2,9%.
      Kekuatan Militer: Doktrin Pertahanan Total dengan integrasi teknologi tinggi.
      ________________________________________
      MALONYET.......
      STATUS 2023-2026: KRISIS & MISKIN
      Anggaran Pertahanan 2026: USD 4,7 Miliar (DIPANGKAS TOTAL).
      Status SIPRI 2024-2025: KOSONG (Nol transfer senjata global).
      Krisis 2026:
      PHK Massal: 24.100 pekerja (Data SOCSO Januari 2026).
      Freeze Procurement: Pembekuan seluruh kontrak akibat skandal suap pejabat senior.
      Cut Budget: Perintah Treasury untuk memotong anggaran operasional karena krisis finansial.
      Kegagalan Alutsista (Daftar Prank):
      NSM BANNED: Rudal NSM dilarang ekspor oleh Norwegia; dudukan rudal di kapal LCS harus dicopot.
      F/A-18 Kuwait: Batal (4x surat resmi ditolak).
      LCS Mangkrak: Proyek kapal perang karatan dan penuh cacat kabel/pipa.
      Prank Global: Pembatalan minat pada Tejas (India), JF-17 (Pakistan), Yavuz (Turki), dan Rafale (Prancis).
      Kesehatan Fiskal (Darurat):
      GDP: USD 416,90 Miliar.
      Hutang Pemerintah: 70,5% (OVER LIMIT 65%).
      HUtang Household: 84,3% (OVER LIMIT 65%).
      Defisit: 3,8% (Tidak pernah surplus sejak 1998).
      Beban Hutang Per Kapita (2026): RM 94,544 per jiwa.
      Sistem "Serba Sewa" (Rental Defence):
      Sewa Helikopter Black Hawk & AW139 (Bukan milik sendiri).
      Sewa Jet L-39 di Kanada untuk latihan pilot.
      Sewa Motor Polis, Truk, dan Kapal Hidrografi.
      Kondisi Internal: Ketidakstabilan politik (5x Ganti PM & 6x Ganti Menhan) melumpuhkan perencanaan jangka panjang.
      KESIMPULAN:
      INDONESIA BELI TUNAI VS MALONYET SERBA SEWA KARENA HUTANG MENUMPUK.

      Hapus
    8. WITHOUT MALONYET = KASTA FFBNP : BANNED NSM AMRAAM : PALAK ART USD 240 MILLIAR
      THE 40 LARGEST RECIPIENTS OF MAJOR ARMS =
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -
      1 Ukraina
      2 India
      3 Arab Saudi
      4 Qatar
      5 Pakistan
      6 Jepang
      7 Polandia
      8 Amerika Serikat
      9 Kuwait
      10 Australia
      11 UEA
      12 Mesir
      13 Inggris
      14 Israel
      15 Belanda
      16 Korea Selatan
      17 Jerman
      18 Indonesia
      19 Yunani
      20 Norwegia
      21 China
      22 Italia
      23 Filipina
      24 TΓΌrkiye
      25 Brasil
      26 Singapura
      27 Bahrain
      28 Maroko
      29 Denmark
      30 Rumania
      31 Belgia
      32 Belarusia
      33 Aljazair
      34 Taiwan
      35 Hungaria
      36 Kazakhstan
      37 Serbia
      38 Kanada
      39 Spanyol
      40 Thailand
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -------------------------------
      MALONYET.......
      STATUS 2023-2026: MISKIN & PROCUREMENT COLLAPSE
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan seluruh kementerian memangkas anggaran operasional akibat dampak konflik Timur Tengah (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Data SOCSO/PERKESO mencatat 24.100 PHK dengan puncak di Januari 2026; Petronas pangkas ±5.000 karyawan (CNBC & Bloomberg).
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan seluruh kontrak militer dan polisi sejak 16 Januari 2026 akibat skandal suap pejabat senior.
      2025 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Tidak ada transfer senjata besar yang tercatat dalam database global.
      2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Kelanjutan stagnasi modernisasi alutsista selama dua tahun berturut-turut.
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: MINDEF membatalkan secara resmi 5 tender bekalan dan infrastruktur.
      ________________________________________
      LIMITASI STRUKTUR KEKUATAN (FORCE LIMITATIONS):
      Ukuran Pasukan Kecil: Hanya memiliki ~113.000 personel aktif; sangat kontras dibandingkan Indonesia (~400.000) atau Vietnam (~600.000).
      Fragmentasi Matra: Kurangnya doktrin gabungan (Joint Doctrine) dan interoperabilitas antara Darat, Laut, dan Udara.
      Lemahnya Proyeksi Kekuatan: Tidak memiliki kapal induk, pembom berat, sistem rudal balistik, serta keterbatasan kapasitas pengisian bahan bakar di udara.
      Ketimpangan Anggaran: Lebih dari 40% anggaran habis untuk biaya personel (gaji/pensiun), mencekik dana modernisasi (CAPEX).
      Ketergantungan Impor: Industri pertahanan domestik sangat terbatas, hanya mampu untuk pemeliharaan dan kendaraan ringan.
      ________________________________________
      KETERGANTUNGAN PADA TEKNOLOGI USANG (LEGACY PLATFORMS):
      Definisi: Mengoperasikan alutsista tua yang mahal perawatannya namun terbatas secara operasional dalam perang modern.
      Penyebab: Siklus pengadaan yang tertunda (LCS Mangkrak) dan strategi modernisasi yang terfragmentasi (politik).
      Beban Pemeliharaan: Alutsista lama mengonsumsi anggaran besar untuk suku cadang tanpa memberikan peningkatan kapabilitas nyata.
      Daftar Aset Usang (Legacy List):
      MiG-29N Fulcrum: Dioperasikan sejak 1995, pensiun terlambat tanpa pengganti sepadan.
      F/A-18D Hornet: Aktif sejak 1997 dalam jumlah yang sangat terbatas.
      C-130 Hercules: Berasal dari era 1970-an; masih dipaksa beroperasi.
      Condor APC: Kendaraan lapis baja dari tahun 1980-an yang masih digunakan angkatan darat.
      Scorpene Submarine: Diperkenalkan 2009; kini mulai menua dengan jumlah armada yang tidak memadai.
      ________________________________________
      RISIKO STRATEGIS:
      Deterrence Collapse: Hilangnya daya getar di Laut Cina Selatan.
      Vulnerabilitas: Sangat rentan terhadap ancaman modern seperti drone, perang siber, dan serangan presisi.
      Fiscal Trap: Pembayaran cicilan tahunan (FA-50/A400M) menutup peluang untuk investasi alutsista baru.
      KESIMPULAN:
      FISKAL LUMPUH + PHK MASSAL + ASET KARATAN = KEBANGKRUTAN PERTAHANAN.

      Hapus
    9. WITHOUT MALONYET = KASTA FFBNP : BANNED NSM AMRAAM : PALAK ART USD 240 MILLIAR
      THE 40 LARGEST RECIPIENTS OF MAJOR ARMS =
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -
      1 Ukraina
      2 India
      3 Arab Saudi
      4 Qatar
      5 Pakistan
      6 Jepang
      7 Polandia
      8 Amerika Serikat
      9 Kuwait
      10 Australia
      11 UEA
      12 Mesir
      13 Inggris
      14 Israel
      15 Belanda
      16 Korea Selatan
      17 Jerman
      18 Indonesia
      19 Yunani
      20 Norwegia
      21 China
      22 Italia
      23 Filipina
      24 TΓΌrkiye
      25 Brasil
      26 Singapura
      27 Bahrain
      28 Maroko
      29 Denmark
      30 Rumania
      31 Belgia
      32 Belarusia
      33 Aljazair
      34 Taiwan
      35 Hungaria
      36 Kazakhstan
      37 Serbia
      38 Kanada
      39 Spanyol
      40 Thailand
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -------------------------------
      MALONYET.......
      STATUS 2023-2026: KEBANGKRUTAN STRATEGIS & MISKIN
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan seluruh instansi memangkas anggaran operasional 2026 akibat dampak ekonomi konflik Timur Tengah (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Data SOCSO/PERKESO mencatat 24.100 PHK; Petronas pangkas ±5.000 karyawan. Puncak krisis di Januari 2026 (CNBC & HLIB).
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan seluruh kontrak militer dan polisi per 16 Januari 2026 menyusul skandal suap pejabat tinggi dan mantan panglima.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Dua tahun berturut-turut tanpa catatan transfer senjata global (Defense Studies).
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF.
      ________________________________________
      PENYEBAB PELEMAHAN DAYA GETAR (REDUCED DETERRENCE):
      Keterbatasan Aset Strategis: Tidak memiliki rudal jarak jauh, pesawat siluman (stealth), atau platform laut canggih.
      Armada Udara Minim: Hanya bergantung pada 18 F/A-18D tua; pengadaan FA-50 jet tempur ringan dianggap tidak cukup untuk standar deterrence.
      Struktur Pasukan Terfragmentasi: Operasi antar matra berjalan sendiri-sendiri (silos) dengan koordinasi komando gabungan yang sangat lemah.
      Kekalahan Teknologi: Tertinggal jauh dalam kemampuan perang siber, perang elektronik, dan sistem nirawak (drone).
      Kerentanan Geostrategis: Ketidakmampuan merespons secara tegas intrusi kapal penjaga pantai dan pelanggaran wilayah udara oleh China di Laut Cina Selatan.
      Ambiguitas Diplomatik: Kebijakan luar negeri non-konfrontatif sering dianggap sebagai pasivitas strategis oleh lawan.
      ________________________________________
      MENGAPA MODERNISASI BERJALAN LAMBAT? (FISCAL PARALYSIS):
      Ketidakseimbangan Anggaran: 60-70% dana habis untuk gaji, pensiun, dan pemeliharaan rutin. Hanya sedikit yang tersisa untuk sistem baru.
      Skandal & Penundaan: Proyek LCS (Littoral Combat Ship) menghadapi penundaan bertahun-tahun, pembengkakan biaya, dan investigasi korupsi.
      Strategi Reaktif: Pengadaan alutsista didorong oleh siklus politik, bukan perencanaan strategis jangka panjang, menciptakan logistik yang rumit.
      Industri Domestik Lemah: Hanya fokus pada pemeliharaan dasar, gagal memenuhi kebutuhan sistem persenjataan canggih.
      Depresiasi Ringgit: Pelemahan nilai tukar menghancurkan daya beli alutsista impor sementara pendapatan negara dari minyak menurun.
      ________________________________________
      MENGAPA KESIAPAN TEMPUR (READINESS) SANGAT BURUK?
      Aging Equipment: Bergantung pada platform usang seperti C-130 (1970-an), Condor APC (1980-an), dan kapal selam Scorpene (2009) yang mulai menua.
      No Joint Command: Angkatan Darat, Laut, dan Udara minim integrasi, mengurangi efektivitas dalam misi multi-domain.
      Gap Pelatihan: Pembatasan anggaran berdampak pada frekuensi latihan tempur, pengadaan sistem simulasi, dan pengembangan doktrin modern.

      Hapus
    10. PENDAPATAN : RM334,1 Miliar
      PENGELUARAN : RM470 Miliar
      RM470 – RM334,1 = MINUS RM135,9 ......
      -
      Su-30MKM & MiG-29N: barter sawit.
      Airbus A400M: cicilan berperingkat.
      FA-50M: barter sawit.
      Scorpene: barter sawit.
      PT-91: barter sawit dan karet
      -
      2026
      Populasi: 36.38 juta
      Debt Govt: RM 1.79 Triliun (70.5%)
      Debt Household: RM 1.65 Triliun (84.3%)
      Beban per Kapita: RM 94,544
      -
      2025
      Populasi: 35.97 juta
      Debt Govt: RM 1.30 Triliun (-%)
      Debt Household: RM 1.65 Triliun (-%)
      Beban per Kapita: RM 81,998
      -
      2024
      Populasi: 34.67 juta
      Debt Govt: RM 1.22 Triliun (64.6%)
      Debt Household: RM 1.53 Triliun (84.2%)
      Beban per Kapita: RM 79,315
      -
      2023
      Populasi: 35.12 juta
      Debt Govt: RM 1.17 Triliun (64.3%)
      Debt Household: RM 1.45 Triliun (81.2%)
      Beban per Kapita: RM 74,587
      -
      2022
      Populasi: 34.69 juta
      Debt Govt: RM 1.08 Triliun (60.1%)
      Debt Household: RM 1.38 Triliun (80.9%)
      Beban per Kapita: RM 70,901
      -
      2021
      Populasi: 34.28 juta
      Debt Govt: RM 979.81 Miliar (63.3%)
      Debt Household: RM 1.34 Triliun (89.1%)
      Beban per Kapita: RM 67,667
      -
      2020
      Populasi: 33.87 juta
      Debt Govt: RM 879.56 Miliar (62.0%)
      Debt Household: RM 1.27 Triliun (87.5%)
      Beban per Kapita: RM 63,464
      -
      2019
      Populasi: 33.45 juta
      Debt Govt: RM 793.00 Miliar (52.4%)
      Debt Household: RM 1.22 Triliun (82.5%)
      Beban per Kapita: RM 60,179
      -
      2018
      Populasi: 33.00 juta
      Debt Govt: RM 741.00 Miliar (52.5%)
      Debt Household: RM 1.16 Triliun (82.0%)
      Beban per Kapita: RM 57,605
      -
      2017
      Populasi: 32.54 juta
      Debt Govt: RM 686.80 Miliar (51.9%)
      Debt Household: RM 1.10 Triliun (83.2%)
      Beban per Kapita: RM 54,910
      -
      2016
      Populasi: 32.04 juta
      Debt Govt: RM 648.50 Miliar (52.7%)
      Debt Household: RM 1.04 Triliun (86.1%)
      Beban per Kapita: RM 52,699
      -
      2015
      Populasi: 31.52 juta
      Debt Govt: RM 630.50 Miliar (55.1%)
      Debt Household: RM 985.00 Miliar (86.0%)
      Beban per Kapita: RM 51,253
      -
      2014
      Populasi: 30.98 juta
      Debt Govt: RM 582.80 Miliar (55.0%)
      Debt Household: RM 902.00 Miliar (85.1%)
      Beban per Kapita: RM 47,927
      -
      2013
      Populasi: 30.42 juta
      Debt Govt: RM 547.70 Miliar (54.7%)
      Debt Household: RM 821.00 Miliar (82.0%)
      Beban per Kapita: RM 44,992
      -
      2012
      Populasi: 29.85 juta
      Debt Govt: RM 501.60 Miliar (53.3%)
      Debt Household: RM 732.00 Miliar (77.8%)
      Beban per Kapita: RM 41,326
      -
      2011
      Populasi: 29.26 juta
      Debt Govt: RM 456.10 Miliar (51.8%)
      Debt Household: RM 653.00 Miliar (74.2%)
      Beban per Kapita: RM 37,904
      -
      2010
      Populasi: 28.65 juta
      Debt Govt: RM 407.10 Miliar (52.4%)
      Debt Household: RM 581.00 Miliar (74.8%)
      Beban per Kapita: RM 34,488
      -
      2009
      Populasi: 28.04 juta
      Debt Govt: RM 362.40 Miliar (51.1%)
      Debt Household: RM 516.00 Miliar (72.0%)
      Beban per Kapita: RM 31,326
      -
      2008
      Populasi: 27.45 juta
      Debt Govt: RM 258.00 Miliar (41.3%)
      Debt Household: RM 460.00 Miliar (73.0%)
      Beban per Kapita: RM 26,155
      -
      2007
      Populasi: 26.86 juta
      Debt Govt: RM 266.00 Miliar (41.1%)
      Debt Household: RM 414.00 Miliar (64.0%)
      Beban per Kapita: RM 25,316
      -
      2006
      Populasi: 26.26 juta
      Debt Govt: RM 242.00 Miliar (41.5%)
      Debt Household: RM 372.00 Miliar (63.0%)
      Beban per Kapita: RM 23,381
      -
      2005
      Populasi: 25.66 juta
      Debt Govt: RM 228.00 Miliar (43.8%)
      Debt Household: RM 335.00 Miliar (64.0%)
      Beban per Kapita: RM 21,940
      -
      2004
      Populasi: 25.06 juta
      Debt Govt: RM 217.00 Miliar (45.1%)
      Debt Household: RM 298.00 Miliar (62.0%)
      Beban per Kapita: RM 20,550
      -
      2003
      Populasi: 24.46 juta
      Debt Govt: RM 189.00 Miliar (45.9%)
      Debt Household: RM 265.00 Miliar (64.0%)
      Beban per Kapita: RM 18,560
      -
      2002
      Populasi: 23.87 juta
      Debt Govt: RM 165.00 Miliar (44.9%)
      Debt Household: RM 236.00 Miliar (64.0%)
      Beban per Kapita: RM 16,798
      -
      2001
      Populasi: 23.28 juta
      Debt Govt: RM 146.00 Miliar (42.5%)
      Debt Household: RM 207.00 Miliar (60.0%)
      Beban per Kapita: RM 15,162
      -
      2000
      Populasi: 22.69 juta
      Debt Govt: RM 126.00 Miliar (36.1%)
      Debt Household: RM 182.00 Miliar (52.0%)
      Beban per Kapita: RM 13,574
      -
      1999
      Populasi: 22.11 juta
      Debt Govt: RM 113.00 Miliar (40.4%)
      Debt Household: RM 157.00 Miliar (56.0%)
      Beban per Kapita: RM 12,210
      -
      1998
      Populasi: 21.53 juta
      Debt Govt: RM 98.00 Miliar (35.8%)
      Debt Household: RM 135.00 Miliar (49.3%)
      Beban per Kapita: RM 10,821

      Hapus
    11. SALAM SAMURAI BONDS
      The Government of MALONYET 's 200bil yen (RM7.3bil) 10-year Samurai bonds due 2029
      ---------------
      SALAM PANDA BONDS
      The China Construction Bank is proposing to issue panda bonds for MALONYET to help with the country's finances.
      -
      2026
      Populasi: 36.38 juta
      Debt Govt: RM 1.79 Triliun (70.5%)
      Debt Household: RM 1.65 Triliun (84.3%)
      Beban per Kapita: RM 94,544
      -
      2025
      Populasi: 35.97 juta
      Debt Govt: RM 1.30 Triliun (-%)
      Debt Household: RM 1.65 Triliun (-%)
      Beban per Kapita: RM 81,998
      -
      2024
      Populasi: 34.67 juta
      Debt Govt: RM 1.22 Triliun (64.6%)
      Debt Household: RM 1.53 Triliun (84.2%)
      Beban per Kapita: RM 79,315
      -
      2023
      Populasi: 35.12 juta
      Debt Govt: RM 1.17 Triliun (64.3%)
      Debt Household: RM 1.45 Triliun (81.2%)
      Beban per Kapita: RM 74,587
      -
      2022
      Populasi: 34.69 juta
      Debt Govt: RM 1.08 Triliun (60.1%)
      Debt Household: RM 1.38 Triliun (80.9%)
      Beban per Kapita: RM 70,901
      -
      2021
      Populasi: 34.28 juta
      Debt Govt: RM 979.81 Miliar (63.3%)
      Debt Household: RM 1.34 Triliun (89.1%)
      Beban per Kapita: RM 67,667
      -
      2020
      Populasi: 33.87 juta
      Debt Govt: RM 879.56 Miliar (62.0%)
      Debt Household: RM 1.27 Triliun (87.5%)
      Beban per Kapita: RM 63,464
      -
      2019
      Populasi: 33.45 juta
      Debt Govt: RM 793.00 Miliar (52.4%)
      Debt Household: RM 1.22 Triliun (82.5%)
      Beban per Kapita: RM 60,179
      -
      2018
      Populasi: 33.00 juta
      Debt Govt: RM 741.00 Miliar (52.5%)
      Debt Household: RM 1.16 Triliun (82.0%)
      Beban per Kapita: RM 57,605
      -
      2017
      Populasi: 32.54 juta
      Debt Govt: RM 686.80 Miliar (51.9%)
      Debt Household: RM 1.10 Triliun (83.2%)
      Beban per Kapita: RM 54,910
      -
      2016
      Populasi: 32.04 juta
      Debt Govt: RM 648.50 Miliar (52.7%)
      Debt Household: RM 1.04 Triliun (86.1%)
      Beban per Kapita: RM 52,699
      -
      2015
      Populasi: 31.52 juta
      Debt Govt: RM 630.50 Miliar (55.1%)
      Debt Household: RM 985.00 Miliar (86.0%)
      Beban per Kapita: RM 51,253
      -
      2014
      Populasi: 30.98 juta
      Debt Govt: RM 582.80 Miliar (55.0%)
      Debt Household: RM 902.00 Miliar (85.1%)
      Beban per Kapita: RM 47,927
      -
      2013
      Populasi: 30.42 juta
      Debt Govt: RM 547.70 Miliar (54.7%)
      Debt Household: RM 821.00 Miliar (82.0%)
      Beban per Kapita: RM 44,992
      -
      2012
      Populasi: 29.85 juta
      Debt Govt: RM 501.60 Miliar (53.3%)
      Debt Household: RM 732.00 Miliar (77.8%)
      Beban per Kapita: RM 41,326
      -
      2011
      Populasi: 29.26 juta
      Debt Govt: RM 456.10 Miliar (51.8%)
      Debt Household: RM 653.00 Miliar (74.2%)
      Beban per Kapita: RM 37,904
      -
      2010
      Populasi: 28.65 juta
      Debt Govt: RM 407.10 Miliar (52.4%)
      Debt Household: RM 581.00 Miliar (74.8%)
      Beban per Kapita: RM 34,488
      -
      2009
      Populasi: 28.04 juta
      Debt Govt: RM 362.40 Miliar (51.1%)
      Debt Household: RM 516.00 Miliar (72.0%)
      Beban per Kapita: RM 31,326
      -
      2008
      Populasi: 27.45 juta
      Debt Govt: RM 258.00 Miliar (41.3%)
      Debt Household: RM 460.00 Miliar (73.0%)
      Beban per Kapita: RM 26,155
      -
      2007
      Populasi: 26.86 juta
      Debt Govt: RM 266.00 Miliar (41.1%)
      Debt Household: RM 414.00 Miliar (64.0%)
      Beban per Kapita: RM 25,316
      -
      2006
      Populasi: 26.26 juta
      Debt Govt: RM 242.00 Miliar (41.5%)
      Debt Household: RM 372.00 Miliar (63.0%)
      Beban per Kapita: RM 23,381
      -
      2005
      Populasi: 25.66 juta
      Debt Govt: RM 228.00 Miliar (43.8%)
      Debt Household: RM 335.00 Miliar (64.0%)
      Beban per Kapita: RM 21,940
      -
      2004
      Populasi: 25.06 juta
      Debt Govt: RM 217.00 Miliar (45.1%)
      Debt Household: RM 298.00 Miliar (62.0%)
      Beban per Kapita: RM 20,550
      -
      2003
      Populasi: 24.46 juta
      Debt Govt: RM 189.00 Miliar (45.9%)
      Debt Household: RM 265.00 Miliar (64.0%)
      Beban per Kapita: RM 18,560
      -
      2002
      Populasi: 23.87 juta
      Debt Govt: RM 165.00 Miliar (44.9%)
      Debt Household: RM 236.00 Miliar (64.0%)
      Beban per Kapita: RM 16,798
      -
      2001
      Populasi: 23.28 juta
      Debt Govt: RM 146.00 Miliar (42.5%)
      Debt Household: RM 207.00 Miliar (60.0%)
      Beban per Kapita: RM 15,162
      -
      2000
      Populasi: 22.69 juta
      Debt Govt: RM 126.00 Miliar (36.1%)
      Debt Household: RM 182.00 Miliar (52.0%)
      Beban per Kapita: RM 13,574
      -
      1999
      Populasi: 22.11 juta
      Debt Govt: RM 113.00 Miliar (40.4%)
      Debt Household: RM 157.00 Miliar (56.0%)
      Beban per Kapita: RM 12,210
      -
      1998
      Populasi: 21.53 juta
      Debt Govt: RM 98.00 Miliar (35.8%)
      Debt Household: RM 135.00 Miliar (49.3%)
      Beban per Kapita: RM 10,821

      Hapus
  10. Beda kasta...

    https://www.youtube.com/watch?v=USR2ptCQ048

    🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣

    BalasHapus
    Balasan
    1. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      --------------------------------------------------
      2025 = KOSONG
      Https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708518608
      -
      2024 = KOSONG
      https://defense-studies.blogspot.com/2025/03/order-dan-transfer-persenjataan-ke-dan_14.html
      -
      2023 = NOT YET ORDERED
      https://defense-studies.blogspot.com/2024/03/transfer-persenjataan-ke-dan-dari_15.html
      -
      2022 = SELECTED NOT YET ORDERED
      https://defense-studies.blogspot.com/2023/03/transfer-persenjataan-ke-dan-dari_17.html
      -
      2021 = PLANNED
      https://defense-studies.blogspot.com/2022/03/transfer-persenjataan-ke-MALONYET-2021.html
      -
      2020 = PLANNED
      https://defense-studies.blogspot.com/2021/03/transfer-persenjataan-ke-MALONYET-2020.html
      ---------------------------------
      Realisasi Impor Senjata Global (SIPRI 2021–2025)
      Daftar ini menunjukkan negara dengan kontrak nyata yang sedang berjalan:
      Peringkat 18 (Dunia): Indonesia (Pemimpin di Asia Tenggara dengan pangsa 1,5%).
      Peringkat 23: Filipina.
      Peringkat 26: Singapura.
      Peringkat 40: Thailand.
      Status MALONYET: KOSONG (Absen dari daftar 40 besar; status hanya Planned atau Not Yet Ordered).
      -
      Daftar Belanja Utama Indonesia (2024–2025)
      Indonesia mencatatkan satu lembar penuh realisasi alutsista strategis:
      Udara: Rafale F-4, A400M Atlas, Anka-S UAV, Air Refueling System.
      Laut: PPA-L-Plus, Ship Engines, LM-2500 Gas Turbines.
      Darat/Rudal: Rudal BORA, Rudal KHAN, Mesin TP400-D6.
      -
      Peringkat Kekuatan Militer ASEAN (GFP 2026)
      Indonesia – Peringkat 13 Dunia (Nomor 1 ASEAN)
      Vietnam – Peringkat 23
      Thailand – Peringkat 24
      Singapura – Peringkat 29
      Myanmar – Peringkat 35
      Filipina – Peringkat 41
      MALONYET – Peringkat 42
      -
      Kronologi Kegagalan Kontrak MALONYET (Timeline "Prank")
      2005: Rudal KS-1A China (Zonk).
      2014: Jet Rafale Prancis (Mangkrak anggaran).
      2018: Kapal MRSS PT PAL (Zonk).
      2022: Jet HAL Tejas India (Batal).
      2023: IAG Guardian (Gagal spek PBB).
      2024-2025: Sewa Black Hawk (Unit tidak kunjung tiba).
      2026: Jet F/A-18 Hornet Kuwait (RESMI BATAL).
      2026: Pembekuan Total seluruh pengadaan militer oleh PM Anwar Ibrahim.
      -
      Perbandingan Skala Ekonomi (PDB 2026)
      Kesenjangan finansial yang menghambat modernisasi militer:
      PDB PPP (Daya Beli Riil):
      Indonesia: US$ 5,69 Triliun (Peringkat 6 Dunia)
      MALONYET: US$ 1,34 Triliun
      Rasio: Indonesia 4,24 kali lipat lebih besar.
      PDB Nominal (Nilai Pasar):
      Indonesia: US$ 1,69 Triliun
      MALONYET: US$ 0,46 Triliun
      Rasio: Indonesia 3,67 kali lipat lebih besar.

      Hapus
    2. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      --------------------------------------------------
      2025 = KOSONG
      Https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708518608
      -
      2024 = KOSONG
      https://defense-studies.blogspot.com/2025/03/order-dan-transfer-persenjataan-ke-dan_14.html
      -
      2023 = NOT YET ORDERED
      https://defense-studies.blogspot.com/2024/03/transfer-persenjataan-ke-dan-dari_15.html
      -
      2022 = SELECTED NOT YET ORDERED
      https://defense-studies.blogspot.com/2023/03/transfer-persenjataan-ke-dan-dari_17.html
      -
      2021 = PLANNED
      https://defense-studies.blogspot.com/2022/03/transfer-persenjataan-ke-MALONYET-2021.html
      -
      2020 = PLANNED
      https://defense-studies.blogspot.com/2021/03/transfer-persenjataan-ke-MALONYET-2020.html
      ---------------------------------
      Realitas SIPRI 2025: Belanja Nyata vs Lembar Kosong
      Perbandingan realisasi transfer senjata internasional (2024–2025):
      INDONESIA (1 Lembar Penuh): Sukses mengamankan aset strategis:
      Udara: Rafale F-4, A400M Atlas, Anka-S UAV, Air Refuel System.
      Laut: PPA-L-Plus, Ship Engines, Mesin LM-2500.
      Rudal/Darat: Rudal BORA, Rudal KHAN, Mesin TP400-D6.
      GRUP "SALAM KOSONG": Tidak mencatatkan aktivitas belanja/transfer senjata signifikan di SIPRI:
      MALONYET (Stagnasi total 6 tahun).
      Timor Leste, Kamboja, Laos, Brunei.
      -
      Peringkat Kekuatan Militer ASEAN (GFP 2026)
      Dominasi Indonesia di puncak hirarki regional:
      Indonesia (Peringkat 13 Dunia) – Hegemon Mutlak
      Vietnam (Peringkat 23)
      Thailand (Peringkat 24)
      Singapura (Peringkat 29)
      Myanmar (Peringkat 35)
      Filipina (Peringkat 41)
      MALONYET (Peringkat 42) – Terlempar ke papan bawah
      -
      Analisa Ekonomi: "The Great Decoupling"
      Indonesia secara resmi keluar dari level persaingan regional menuju elit global:
      Badut Elit Dunia: Indonesia Peringkat 6 Dunia (PDB PPP), melampaui Brasil, Inggris, dan Prancis.
      Jurang Ekonomi: Ekonomi Indonesia secara riil (PPP) adalah 4,24 kali lipat lebih besar dari MALONYET.
      Kesehatan Fiskal: Rasio utang Indonesia sehat (~40%), sementara MALONYET kritis (~69%) dengan proyeksi utang RM 1,79 Triliun pada 2026.
      -
      Status Pertahanan: Modernisasi vs Demiliterisasi
      Indonesia (Modernisasi Masif): Melakukan hilirisasi ekonomi untuk membiayai alutsista premium (Rafale, Scorpene, KF-21).
      MALONYET (Demiliterisasi De Facto):
      Siklus Prank: Kegagalan kontrak berulang (Rafale, Tejas, F-18 Kuwait).
      Negara Leasing: Bergantung pada sewa (Black Hawk, AW139) karena tidak mampu beli tunai.
      Pembekuan Total: PM Anwar Ibrahim menghentikan pengadaan akibat skandal korupsi dan krisis utang.

      Hapus
    3. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      --------------------------------------------------
      2025 = KOSONG
      Https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708518608
      -
      2024 = KOSONG
      https://defense-studies.blogspot.com/2025/03/order-dan-transfer-persenjataan-ke-dan_14.html
      -
      2023 = NOT YET ORDERED
      https://defense-studies.blogspot.com/2024/03/transfer-persenjataan-ke-dan-dari_15.html
      -
      2022 = SELECTED NOT YET ORDERED
      https://defense-studies.blogspot.com/2023/03/transfer-persenjataan-ke-dan-dari_17.html
      -
      2021 = PLANNED
      https://defense-studies.blogspot.com/2022/03/transfer-persenjataan-ke-MALONYET-2021.html
      -
      2020 = PLANNED
      https://defense-studies.blogspot.com/2021/03/transfer-persenjataan-ke-MALONYET-2020.html
      ---------------------------------
      Realitas SIPRI 2025: Belanja Nyata vs Lembar Kosong
      Perbandingan aktivitas transfer senjata internasional berdasarkan laporan terbaru:
      INDONESIA (1 Lembar Penuh - Aktif): Berhasil mengamankan aset strategis:
      Matra Udara: Rafale F-4, A400M Atlas, Anka-S UAV, Air Refueling System.
      Matra Laut: PPA-L-Plus, Ship Engines, Mesin Gas Turbin LM-2500.
      Rudal/Darat: Rudal BORA, Rudal KHAN, Mesin TP400-D6.
      MALONYET (Lembar Kosong - Lumpuh): Status pengadaan 6 tahun terakhir:
      2020–2021: Planned (Hanya wacana).
      2022: Selected Not Yet Ordered (Pilih tapi tidak beli).
      2023: Not Yet Ordered (Tanpa pesanan).
      2024–2025: KOSONG (Absen total dari radar SIPRI).
      -
      Hirarki Kekuatan Militer ASEAN (GFP 2026)
      Pergeseran peringkat yang menunjukkan penurunan drastis kredibilitas pertahanan MALONYET:
      Indonesia – Peringkat 13 Dunia (Nomor 1 ASEAN)
      Vietnam – Peringkat 23
      Thailand – Peringkat 24
      Singapura – Peringkat 29
      Myanmar – Peringkat 35
      Filipina – Peringkat 41
      MALONYET – Peringkat 42 (Kalah dari Filipina & Myanmar).
      -
      Analisa "The Great Decoupling" (Pemisahan Badut Ekonomi)
      Indonesia keluar dari level regional dan masuk ke elit global:
      Skala Ekonomi (PPP): Indonesia Peringkat 6 Dunia (US$ 5,69 Triliun). Secara riil, ekonomi Indonesia 4,24 kali lipat lebih besar dari MALONYET.
      Kesehatan Fiskal: Rasio utang Indonesia aman (<40%), sedangkan MALONYET kritis (>60%) dengan beban bunga utang yang mencekik belanja alutsista.
      Leverage Global: Indonesia mengontrol 60% nikel dunia dan menjadi pusat gravitasi energi kawasan (Batu Bara).
      -
      Fenomena Demiliterisasi De Facto MALONYET
      Kondisi yang menyebabkan kelumpuhan pertahanan tetangga:
      Negara Tukang Sewa (Leasing State): Akibat gagal bayar tunai, mobilitas militer bergantung pada sewa (Helikopter Black Hawk/AW139).
      Siklus "Prank" Pertahanan: Kegagalan kontrak berulang sejak 2005 (Rafale, Tejas, hingga F-18 Kuwait yang resmi batal pada 2026).
      Pembekuan Total: Kebijakan PM Anwar Ibrahim untuk menghentikan seluruh pengadaan akibat skandal korupsi sistemik di Kemenhan.
      -
      Kesimpulan Strategis 2026
      Indonesia: Menjadi Hegemon Mutlak di Asia Tenggara dengan kekuatan finansial dan militer yang setara dengan negara G7 (Prancis/Inggris).
      MALONYET: Terjebak dalam Stagnasi Permanen dan penurunan kelas menjadi negara berkekuatan militer lemah di level ASEAN (Grup "Salam Kosong").

      Hapus
    4. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      --------------------------------------------------
      2025 = KOSONG
      Https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708518608
      -
      2024 = KOSONG
      https://defense-studies.blogspot.com/2025/03/order-dan-transfer-persenjataan-ke-dan_14.html
      -
      2023 = NOT YET ORDERED
      https://defense-studies.blogspot.com/2024/03/transfer-persenjataan-ke-dan-dari_15.html
      -
      2022 = SELECTED NOT YET ORDERED
      https://defense-studies.blogspot.com/2023/03/transfer-persenjataan-ke-dan-dari_17.html
      -
      2021 = PLANNED
      https://defense-studies.blogspot.com/2022/03/transfer-persenjataan-ke-MALONYET-2021.html
      -
      2020 = PLANNED
      https://defense-studies.blogspot.com/2021/03/transfer-persenjataan-ke-MALONYET-2020.html
      ---------------------------------
      Dominasi Skala Ekonomi: Indonesia sebagai Gajah Asia
      Indonesia telah melakukan decoupling (pemisahan badut) dari ekonomi regional ASEAN:
      PDB PPP (Daya Beli Riil): Dengan angka US$ 5,69 Triliun, Indonesia menempati Peringkat 6 Dunia, melampaui Jerman, Inggris, dan Prancis.
      Skala Banding: Ekonomi riil Indonesia setara dengan gabungan Thailand + Vietnam + Filipina.
      Rasio vs MALONYET: Indonesia 4,24x lebih besar.
      PDB Nominal (Nilai Pasar): Indonesia mencapai US$ 1,69 Triliun (Peringkat 15 Dunia).
      Rasio vs MALONYET: Indonesia 3,67x lebih besar.
      -
      Kontras Kesehatan Fiskal & Profil Risiko
      Perbedaan fundamental dalam pengelolaan keuangan negara:
      Indonesia (Pruden & Sehat):
      Rasio Utang: Terjaga stabil di kisaran 40%, jauh di bawah batas aman UU (60%).
      Utang Rumah Tangga: Sangat rendah (16%), memberikan ruang konsumsi domestik yang kuat tanpa beban cicilan ekstrem.
      MALONYET (Zona Merah Fiskal):
      Rasio Utang: Melonjak hingga 69% - 70,4% (2024-2025), melewati limit internal 65%.
      Bom Waktu Rumah Tangga: Rasio utang rumah tangga mencapai 84,3%, salah satu yang tertinggi di Asia, yang mencekik daya beli rakyat.
      -
      Trajektori Utang MALONYET (2010–2026)
      Data menunjukkan akumulasi utang yang tidak terkendali:
      Era Transparansi (2018): Lonjakan drastis dari RM 686 Miliar ke RM 1,19 Triliun terjadi karena inklusi liabilitas tersembunyi (kasus 1MDB & proyek PPP).
      Beban Pandemi & Pasca-Pandemi: Utang terus mendaki dari RM 1,32 T (2020) hingga diproyeksikan menyentuh RM 1,79 Triliun pada 2026.
      Defisit Fiskal: Meskipun menyusut ke 3,8% (2025), nominal defisit tetap tinggi (± USD 17,8 Miliar), memaksa penambahan utang baru setiap tahun.
      -
      Implikasi Geopolitik & Pertahanan
      Kesenjangan ekonomi ini berdampak langsung pada postur militer:
      Indonesia: Memiliki Fiscal Space luas untuk modernisasi alutsista (Rafale, Scorpene) karena beban bunga utang yang rendah.
      MALONYET: Terjebak dalam siklus "Hutang Bayar Hutang". Beban bunga utang yang masif memaksa pemerintah melakukan pembekuan total pengadaan militer dan beralih ke skema sewa (leasing) karena ketidaksediaan dana tunai.
      -
      Kesimpulan Utama: Indonesia kini berada di liga elit ekonomi global (G20 Top 6 PPP), sementara MALONYET menghadapi risiko sistemik akibat beban utang pemerintah dan rumah tangga yang ekstrem, yang berujung pada stagnasi nasional.

      Hapus
    5. KASTA FFBNP : BANNED NSM AMRAAM F18 UH60A : PALAK ART USD 240 MILLIAR
      GOVT DEBT 70,5% HOUSEHOLD 84,3% TO GDP .........
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      SUBSIDY BURDEN: 23.9%
      BORROWING TO REPAY DEBT: RM470 – RM334.1 = DEFICIT OF RM135.9
      ------------------------------
      KASTA FFBNP= NO SHOPPING BUT LEASING
      KASTA FFBNP= NO SHOPPING BUT LEASING
      ------------------------------
      GOVERNMENT REVENUE =
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ---------------------------------
      Bukti "Hutang Bayar Hutang" (Debt-Servicing Cycle)
      Data resmi menunjukkan MALAYSEWA terjebak dalam siklus gali lubang tutup lubang kronis:
      2018 (Fase Verifikasi): Utang menembus RM1 Triliun; pemerintah meluncurkan Tabung Harapan (donasi rakyat) untuk mencicil utang negara.
      2019–2020: Ketergantungan meningkat; 59% hingga 60% pinjaman baru hanya untuk melunasi utang lama.
      2023 (Rekor Terburuk): 64,3% dari total pinjaman kasar (RM145,8 Miliar) digunakan hanya untuk membayar utang jatuh tempo.
      2025–2026: Proyeksi tetap kritis di angka 58%. Ruang fiskal untuk pembangunan dan alutsista praktis terkunci oleh cicilan utang.
      -
      Bukti "Vakum SIPRI" (2020–2025)
      Kontras dengan klaim belanja "Cash", data SIPRI menunjukkan kekosongan aktivitas:
      2020–2021: Berstatus Planned (Hanya rencana/dijangka).
      2022–2023: Berstatus Not Yet Ordered (Terpilih tapi tidak ada kontrak/pesanan).
      2024–2025: Status resmi KOSONG (Nihil transfer senjata berat selama 2 tahun berturut-turut).
      Posisi Regional: MALAYSEWA kini sejajar dengan Laos dan Kamboja dalam hal nihilnya modernisasi alutsista berat.
      -
      Timeline "Prank" Alutsista (Janji vs Realitas)
      Daftar kegagalan kontrak strategis yang mencoreng kredibilitas pertahanan:
      Prank F/A-18 Hornet: Upaya akuisisi dari Kuwait Batal 4 Kali hingga resmi dihentikan pada 2026 karena masalah logistik dan dana.
      Prank Dassault Rafale: Mangkrak sejak 2014 akibat krisis anggaran (kini diborong Indonesia).
      Prank Kapal MRSS: Janji kontrak dengan PT PAL (Indonesia) pada 2018 yang tidak pernah terwujud.
      Prank Helikopter Blackhawk: Proses sewa (leasing) yang mangkrak dan berbelit hingga 2025.

      Hapus
    6. KASTA FFBNP : BANNED NSM AMRAAM F18 UH60A : PALAK ART USD 240 MILLIAR
      GOVT DEBT 70,5% HOUSEHOLD 84,3% TO GDP .........
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      SUBSIDY BURDEN: 23.9%
      BORROWING TO REPAY DEBT: RM470 – RM334.1 = DEFICIT OF RM135.9
      ------------------------------
      KASTA FFBNP= NO SHOPPING BUT LEASING
      KASTA FFBNP= NO SHOPPING BUT LEASING
      ------------------------------
      GOVERNMENT REVENUE =
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ---------------------------------
      Analisa Kekuatan Udara: Buying vs. Prank
      Indonesia melakukan modernisasi masif dengan kontrak resmi (Firm Order), sementara MALAYSEWA terjebak dalam pembatalan dan wacana:
      Indonesia (Realisasi & Kontrak G2G):
      42 Rafale: Kontrak lunas dan efektif (Dassault Aviation).
      48 KAAN (Gen-5): Kerja sama strategis G2G dengan Turki (TAI).
      48 KF-21 Boramae (Block II): Kesepakatan tahap akhir dengan Korea Selatan (KAI).
      24 M-346F: Penandatanganan Letter of Award (LOA) dengan Leonardo.
      MALAYSEWA (Pembatalan & Kegagalan):
      F-18 Kuwait: Resmi BATAL (2026) setelah 4 kali upaya negosiasi (New Straits Times).
      Status "Prank": Wacana JF-17, Rafale, Typhoon, dan Tejas berakhir tanpa kontrak.
      MiG-29N: Pensiun tanpa pengganti (Tiada Ganti).
      FA-50: Mengalami hambatan blokir/lisensi dari AS.
      -
      Analisa Geografis & Jangkauan Tempur
      Jarak Pekanbaru ke KL (291 KM) dan Pontianak ke Sarawak (498 KM) sangat pendek dibandingkan radius tempur jet tempur baru Indonesia:
      Rafale: ±1.852 KM (Sanggup menjangkau seluruh wilayah semenanjung dan Kalimantan).
      KAAN & KF-21: ±1.100–1.400 KM (Dominasi ruang udara regional).

      Hapus
    7. KASTA FFBNP : BANNED NSM AMRAAM F18 UH60A : PALAK ART USD 240 MILLIAR
      GOVT DEBT 70,5% HOUSEHOLD 84,3% TO GDP .........
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      SUBSIDY BURDEN: 23.9%
      BORROWING TO REPAY DEBT: RM470 – RM334.1 = DEFICIT OF RM135.9
      ------------------------------
      KASTA FFBNP= NO SHOPPING BUT LEASING
      KASTA FFBNP= NO SHOPPING BUT LEASING
      ------------------------------
      GOVERNMENT REVENUE =
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ---------------------------------
      Analisa Kekuatan Udara: Buying vs. Prank
      Indonesia melakukan modernisasi masif dengan kontrak resmi (Firm Order), sementara MALAYSEWA terjebak dalam pembatalan dan wacana:
      Indonesia (Realisasi & Kontrak G2G):
      42 Rafale: Kontrak lunas dan efektif (Dassault Aviation).
      48 KAAN (Gen-5): Kerja sama strategis G2G dengan Turki (TAI).
      48 KF-21 Boramae (Block II): Kesepakatan tahap akhir dengan Korea Selatan (KAI).
      24 M-346F: Penandatanganan Letter of Award (LOA) dengan Leonardo.
      MALAYSEWA (Pembatalan & Kegagalan):
      F-18 Kuwait: Resmi BATAL (2026) setelah 4 kali upaya negosiasi (New Straits Times).
      Status "Prank": Wacana JF-17, Rafale, Typhoon, dan Tejas berakhir tanpa kontrak.
      MiG-29N: Pensiun tanpa pengganti (Tiada Ganti).
      FA-50: Mengalami hambatan blokir/lisensi dari AS.
      -
      Analisa Geografis & Jangkauan Tempur
      Jarak Pekanbaru ke KL (291 KM) dan Pontianak ke Sarawak (498 KM) sangat pendek dibandingkan radius tempur jet tempur baru Indonesia:
      Rafale: ±1.852 KM (Sanggup menjangkau seluruh wilayah semenanjung dan Kalimantan).
      KAAN & KF-21: ±1.100–1.400 KM (Dominasi ruang udara regional).

      Hapus
    8. PENDAPATAN : RM334,1 Miliar
      PENGELUARAN : RM470 Miliar
      RM470 – RM334,1 = MINUS RM135,9 ......
      -
      • Beban per Kapita: RM 94.544
      • Utang Pemerintah: RM 1,79 T (70,5% PDB).
      • Utang Rumah Tangga: RM 1,65 T (84,3% PDB).

      2026
      Populasi: 36.38 juta
      Debt Govt: RM 1.79 Triliun (70.5%)
      Debt Household: RM 1.65 Triliun (84.3%)
      Beban per Kapita: RM 94,544
      -
      2025
      Populasi: 35.97 juta
      Debt Govt: RM 1.30 Triliun (-%)
      Debt Household: RM 1.65 Triliun (-%)
      Beban per Kapita: RM 81,998
      -
      2024
      Populasi: 34.67 juta
      Debt Govt: RM 1.22 Triliun (64.6%)
      Debt Household: RM 1.53 Triliun (84.2%)
      Beban per Kapita: RM 79,315
      -
      2023
      Populasi: 35.12 juta
      Debt Govt: RM 1.17 Triliun (64.3%)
      Debt Household: RM 1.45 Triliun (81.2%)
      Beban per Kapita: RM 74,587
      -
      2022
      Populasi: 34.69 juta
      Debt Govt: RM 1.08 Triliun (60.1%)
      Debt Household: RM 1.38 Triliun (80.9%)
      Beban per Kapita: RM 70,901
      -
      2021
      Populasi: 34.28 juta
      Debt Govt: RM 979.81 Miliar (63.3%)
      Debt Household: RM 1.34 Triliun (89.1%)
      Beban per Kapita: RM 67,667
      -
      2020
      Populasi: 33.87 juta
      Debt Govt: RM 879.56 Miliar (62.0%)
      Debt Household: RM 1.27 Triliun (87.5%)
      Beban per Kapita: RM 63,464
      -
      2019
      Populasi: 33.45 juta
      Debt Govt: RM 793.00 Miliar (52.4%)
      Debt Household: RM 1.22 Triliun (82.5%)
      Beban per Kapita: RM 60,179
      -
      2018
      Populasi: 33.00 juta
      Debt Govt: RM 741.00 Miliar (52.5%)
      Debt Household: RM 1.16 Triliun (82.0%)
      Beban per Kapita: RM 57,605
      -
      2017
      Populasi: 32.54 juta
      Debt Govt: RM 686.80 Miliar (51.9%)
      Debt Household: RM 1.10 Triliun (83.2%)
      Beban per Kapita: RM 54,910
      -
      2016
      Populasi: 32.04 juta
      Debt Govt: RM 648.50 Miliar (52.7%)
      Debt Household: RM 1.04 Triliun (86.1%)
      Beban per Kapita: RM 52,699
      -
      2015
      Populasi: 31.52 juta
      Debt Govt: RM 630.50 Miliar (55.1%)
      Debt Household: RM 985.00 Miliar (86.0%)
      Beban per Kapita: RM 51,253
      -
      2014
      Populasi: 30.98 juta
      Debt Govt: RM 582.80 Miliar (55.0%)
      Debt Household: RM 902.00 Miliar (85.1%)
      Beban per Kapita: RM 47,927
      -
      2013
      Populasi: 30.42 juta
      Debt Govt: RM 547.70 Miliar (54.7%)
      Debt Household: RM 821.00 Miliar (82.0%)
      Beban per Kapita: RM 44,992
      -
      2012
      Populasi: 29.85 juta
      Debt Govt: RM 501.60 Miliar (53.3%)
      Debt Household: RM 732.00 Miliar (77.8%)
      Beban per Kapita: RM 41,326
      -
      2011
      Populasi: 29.26 juta
      Debt Govt: RM 456.10 Miliar (51.8%)
      Debt Household: RM 653.00 Miliar (74.2%)
      Beban per Kapita: RM 37,904
      -
      2010
      Populasi: 28.65 juta
      Debt Govt: RM 407.10 Miliar (52.4%)
      Debt Household: RM 581.00 Miliar (74.8%)
      Beban per Kapita: RM 34,488
      -
      2009
      Populasi: 28.04 juta
      Debt Govt: RM 362.40 Miliar (51.1%)
      Debt Household: RM 516.00 Miliar (72.0%)
      Beban per Kapita: RM 31,326
      -
      2008
      Populasi: 27.45 juta
      Debt Govt: RM 258.00 Miliar (41.3%)
      Debt Household: RM 460.00 Miliar (73.0%)
      Beban per Kapita: RM 26,155
      -
      2007
      Populasi: 26.86 juta
      Debt Govt: RM 266.00 Miliar (41.1%)
      Debt Household: RM 414.00 Miliar (64.0%)
      Beban per Kapita: RM 25,316
      -
      2006
      Populasi: 26.26 juta
      Debt Govt: RM 242.00 Miliar (41.5%)
      Debt Household: RM 372.00 Miliar (63.0%)
      Beban per Kapita: RM 23,381
      -
      2005
      Populasi: 25.66 juta
      Debt Govt: RM 228.00 Miliar (43.8%)
      Debt Household: RM 335.00 Miliar (64.0%)
      Beban per Kapita: RM 21,940
      -
      2004
      Populasi: 25.06 juta
      Debt Govt: RM 217.00 Miliar (45.1%)
      Debt Household: RM 298.00 Miliar (62.0%)
      Beban per Kapita: RM 20,550
      -
      2003
      Populasi: 24.46 juta
      Debt Govt: RM 189.00 Miliar (45.9%)
      Debt Household: RM 265.00 Miliar (64.0%)
      Beban per Kapita: RM 18,560
      -
      2002
      Populasi: 23.87 juta
      Debt Govt: RM 165.00 Miliar (44.9%)
      Debt Household: RM 236.00 Miliar (64.0%)
      Beban per Kapita: RM 16,798
      -
      2001
      Populasi: 23.28 juta
      Debt Govt: RM 146.00 Miliar (42.5%)
      Debt Household: RM 207.00 Miliar (60.0%)
      Beban per Kapita: RM 15,162
      -
      2000
      Populasi: 22.69 juta
      Debt Govt: RM 126.00 Miliar (36.1%)
      Debt Household: RM 182.00 Miliar (52.0%)
      Beban per Kapita: RM 13,574
      -
      1999
      Populasi: 22.11 juta
      Debt Govt: RM 113.00 Miliar (40.4%)
      Debt Household: RM 157.00 Miliar (56.0%)
      Beban per Kapita: RM 12,210
      -
      1998
      Populasi: 21.53 juta
      Debt Govt: RM 98.00 Miliar (35.8%)
      Debt Household: RM 135.00 Miliar (49.3%)
      Beban per Kapita: RM 10,821

      Hapus
    9. 1998 - 2026 = 28 TAHUN
      PENDAPATAN : RM334,1 Miliar
      PENGELUARAN : RM470 Miliar
      BEBAN SUBSIDI 23,9%
      RM470 – RM334,1 = MINUS RM135,9 ......
      -
      KLAIM KAYA
      HUTANG MENINGKAT!
      -
      2026
      Populasi: 36.38 juta
      Debt Govt: RM 1.79 Triliun (70.5%)
      Debt Household: RM 1.65 Triliun (84.3%)
      Beban per Kapita: RM 94,544
      -
      2025
      Populasi: 35.97 juta
      Debt Govt: RM 1.30 Triliun (-%)
      Debt Household: RM 1.65 Triliun (-%)
      Beban per Kapita: RM 81,998
      -
      2024
      Populasi: 34.67 juta
      Debt Govt: RM 1.22 Triliun (64.6%)
      Debt Household: RM 1.53 Triliun (84.2%)
      Beban per Kapita: RM 79,315
      -
      2023
      Populasi: 35.12 juta
      Debt Govt: RM 1.17 Triliun (64.3%)
      Debt Household: RM 1.45 Triliun (81.2%)
      Beban per Kapita: RM 74,587
      -
      2022
      Populasi: 34.69 juta
      Debt Govt: RM 1.08 Triliun (60.1%)
      Debt Household: RM 1.38 Triliun (80.9%)
      Beban per Kapita: RM 70,901
      -
      2021
      Populasi: 34.28 juta
      Debt Govt: RM 979.81 Miliar (63.3%)
      Debt Household: RM 1.34 Triliun (89.1%)
      Beban per Kapita: RM 67,667
      -
      2020
      Populasi: 33.87 juta
      Debt Govt: RM 879.56 Miliar (62.0%)
      Debt Household: RM 1.27 Triliun (87.5%)
      Beban per Kapita: RM 63,464
      -
      2019
      Populasi: 33.45 juta
      Debt Govt: RM 793.00 Miliar (52.4%)
      Debt Household: RM 1.22 Triliun (82.5%)
      Beban per Kapita: RM 60,179
      -
      2018
      Populasi: 33.00 juta
      Debt Govt: RM 741.00 Miliar (52.5%)
      Debt Household: RM 1.16 Triliun (82.0%)
      Beban per Kapita: RM 57,605
      -
      2017
      Populasi: 32.54 juta
      Debt Govt: RM 686.80 Miliar (51.9%)
      Debt Household: RM 1.10 Triliun (83.2%)
      Beban per Kapita: RM 54,910
      -
      2016
      Populasi: 32.04 juta
      Debt Govt: RM 648.50 Miliar (52.7%)
      Debt Household: RM 1.04 Triliun (86.1%)
      Beban per Kapita: RM 52,699
      -
      2015
      Populasi: 31.52 juta
      Debt Govt: RM 630.50 Miliar (55.1%)
      Debt Household: RM 985.00 Miliar (86.0%)
      Beban per Kapita: RM 51,253
      -
      2014
      Populasi: 30.98 juta
      Debt Govt: RM 582.80 Miliar (55.0%)
      Debt Household: RM 902.00 Miliar (85.1%)
      Beban per Kapita: RM 47,927
      -
      2013
      Populasi: 30.42 juta
      Debt Govt: RM 547.70 Miliar (54.7%)
      Debt Household: RM 821.00 Miliar (82.0%)
      Beban per Kapita: RM 44,992
      -
      2012
      Populasi: 29.85 juta
      Debt Govt: RM 501.60 Miliar (53.3%)
      Debt Household: RM 732.00 Miliar (77.8%)
      Beban per Kapita: RM 41,326
      -
      2011
      Populasi: 29.26 juta
      Debt Govt: RM 456.10 Miliar (51.8%)
      Debt Household: RM 653.00 Miliar (74.2%)
      Beban per Kapita: RM 37,904
      -
      2010
      Populasi: 28.65 juta
      Debt Govt: RM 407.10 Miliar (52.4%)
      Debt Household: RM 581.00 Miliar (74.8%)
      Beban per Kapita: RM 34,488
      -
      2009
      Populasi: 28.04 juta
      Debt Govt: RM 362.40 Miliar (51.1%)
      Debt Household: RM 516.00 Miliar (72.0%)
      Beban per Kapita: RM 31,326
      -
      2008
      Populasi: 27.45 juta
      Debt Govt: RM 258.00 Miliar (41.3%)
      Debt Household: RM 460.00 Miliar (73.0%)
      Beban per Kapita: RM 26,155
      -
      2007
      Populasi: 26.86 juta
      Debt Govt: RM 266.00 Miliar (41.1%)
      Debt Household: RM 414.00 Miliar (64.0%)
      Beban per Kapita: RM 25,316
      -
      2006
      Populasi: 26.26 juta
      Debt Govt: RM 242.00 Miliar (41.5%)
      Debt Household: RM 372.00 Miliar (63.0%)
      Beban per Kapita: RM 23,381
      -
      2005
      Populasi: 25.66 juta
      Debt Govt: RM 228.00 Miliar (43.8%)
      Debt Household: RM 335.00 Miliar (64.0%)
      Beban per Kapita: RM 21,940
      -
      2004
      Populasi: 25.06 juta
      Debt Govt: RM 217.00 Miliar (45.1%)
      Debt Household: RM 298.00 Miliar (62.0%)
      Beban per Kapita: RM 20,550
      -
      2003
      Populasi: 24.46 juta
      Debt Govt: RM 189.00 Miliar (45.9%)
      Debt Household: RM 265.00 Miliar (64.0%)
      Beban per Kapita: RM 18,560
      -
      2002
      Populasi: 23.87 juta
      Debt Govt: RM 165.00 Miliar (44.9%)
      Debt Household: RM 236.00 Miliar (64.0%)
      Beban per Kapita: RM 16,798
      -
      2001
      Populasi: 23.28 juta
      Debt Govt: RM 146.00 Miliar (42.5%)
      Debt Household: RM 207.00 Miliar (60.0%)
      Beban per Kapita: RM 15,162
      -
      2000
      Populasi: 22.69 juta
      Debt Govt: RM 126.00 Miliar (36.1%)
      Debt Household: RM 182.00 Miliar (52.0%)
      Beban per Kapita: RM 13,574
      -
      1999
      Populasi: 22.11 juta
      Debt Govt: RM 113.00 Miliar (40.4%)
      Debt Household: RM 157.00 Miliar (56.0%)
      Beban per Kapita: RM 12,210
      -
      1998
      Populasi: 21.53 juta
      Debt Govt: RM 98.00 Miliar (35.8%)
      Debt Household: RM 135.00 Miliar (49.3%)
      Beban per Kapita: RM 10,821

      Hapus
  11. Beda kasta...

    https://www.youtube.com/watch?v=USR2ptCQ048

    🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣

    BalasHapus
    Balasan
    1. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      --------------------------------------------------
      GLOBAL FIREPOWER (GFP) 2026 – ASEAN :
      https://www.globalfirepower.com/countries-listing.php
      -
      1. INDONESIA – PERINGKAT 13
      -
      2. VIETNAM – PERINGKAT 23
      -
      3. THAILAND – PERINGKAT 24
      -
      4. SINGAPURA – PERINGKAT 29
      -
      5. MYANMAR – PERINGKAT 35
      -
      6. FILIPINA – PERINGKAT 41
      -
      7. MALONYET – PERINGKAT 42
      -
      8. KAMBOJA – PERINGKAT 83
      -
      9. LAOS – PERINGKAT 125
      ---------------------------------
      2025 = KOSONG
      Https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708518608
      -
      2024 = KOSONG
      https://defense-studies.blogspot.com/2025/03/order-dan-transfer-persenjataan-ke-dan_14.html
      -
      2023 = NOT YET ORDERED
      https://defense-studies.blogspot.com/2024/03/transfer-persenjataan-ke-dan-dari_15.html
      -
      2022 = SELECTED NOT YET ORDERED
      https://defense-studies.blogspot.com/2023/03/transfer-persenjataan-ke-dan-dari_17.html
      -
      2021 = PLANNED
      https://defense-studies.blogspot.com/2022/03/transfer-persenjataan-ke-MALONYET-2021.html
      -
      2020 = PLANNED
      https://defense-studies.blogspot.com/2021/03/transfer-persenjataan-ke-MALONYET-2020.html
      ---------------------------------
      Kegagalan Finansial: Skandal "Belum Bayar" Petronas
      Kasus sengketa gas Lapangan Kepodang menjadi bukti nyata tekanan likuiditas:
      Kekalahan Internasional: Petronas (PCML) kalah gugatan di ICC Arbitrase Hong Kong (Juni 2024).
      Gagal Bayar: Kewajiban denda Ship-or-Pay senilai US$ 32,2 Juta (± Rp500 Miliar) kepada PGN (Pertamina) belum tuntas dieksekusi.
      Implikasi: Menjatuhkan kredibilitas Petronas sebagai mitra global di tengah beban dividen untuk menutup utang negara MALONYET yang mencapai RM 1,79 Triliun.
      -
      Krisis Pangan: Bergantung pada Beras Indonesia
      Ketahanan pangan MALONYET berada di titik kritis (Defisit 50-60%):
      Impor Masif: MALONYET resmi mengimpor 500.000 Ton beras dari Indonesia (via Kalimantan Barat) pada 2025 untuk menstabilkan stok Sarawak.
      Kapasitas Rendah: Produksi domestik hanya 1,44 juta metrik ton, sementara kebutuhan mencapai 3 juta metrik ton.
      Solusi Putus Asa: Pejabat tinggi (Speaker Dewan Rakyat) menyarankan rakyat mengonsumsi Singkong (Cassava) sebagai pengganti nasi.
      -
      Kelumpuhan Protein: Krisis Ayam & Unggas
      Kemandirian pangan hewani (SSL) MALONYET merosot tajam:
      Impor Genetik: Terpaksa impor 580.000 ekor ayam Grand Parent Stock (GPS) dari AS karena ketiadaan fasilitas pembibitan mandiri.
      Krisis Harga: Penurunan SSL dari 100,2% menjadi 90,2% memicu kelangkaan daging ayam dan telur di pasar domestik pada 2025.
      Ketergantungan Pakan: Produksi lokal lumpuh akibat ketergantungan 100% pada pakan ternak impor.


      Hapus
    2. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      --------------------------------------------------
      2025 = KOSONG
      Https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708518608
      -
      2024 = KOSONG
      https://defense-studies.blogspot.com/2025/03/order-dan-transfer-persenjataan-ke-dan_14.html
      -
      2023 = NOT YET ORDERED
      https://defense-studies.blogspot.com/2024/03/transfer-persenjataan-ke-dan-dari_15.html
      -
      2022 = SELECTED NOT YET ORDERED
      https://defense-studies.blogspot.com/2023/03/transfer-persenjataan-ke-dan-dari_17.html
      -
      2021 = PLANNED
      https://defense-studies.blogspot.com/2022/03/transfer-persenjataan-ke-MALONYET-2021.html
      -
      2020 = PLANNED
      https://defense-studies.blogspot.com/2021/03/transfer-persenjataan-ke-MALONYET-2020.html
      ---------------------------------
      Status Impor Senjata Global (SIPRI 2021–2025)
      Data menunjukkan realisasi belanja nyata berdasarkan pangsa pasar global:
      Peringkat 1 ASEAN: Indonesia (1,5%) — Urutan 18 Dunia. Fokus pada Jet Rafale, Kapal Selam ScorpΓ¨ne, dan Kapal PPA.
      Peringkat 2 ASEAN: Filipina (1,2%).
      Peringkat 3 ASEAN: Singapura (1,1%).
      Peringkat 5 ASEAN: MALONYET (0,3%) — Hanya mengandalkan pengadaan FA-50 dalam jumlah terbatas.
      -
      Lembar Fakta SIPRI 2024–2025
      INDONESIA (1 Lembar Penuh): Kontrak aktif untuk Rafale F-4, Mesin TP400-D6, Kapal PPA-L-Plus, A400M Atlas, Rudal BORA & KHAN, Drone Anka-S, serta Air Refuel System.
      MALONYET (Lembar Kosong): Absen total dari realisasi pengadaan baru di radar SIPRI selama 2 tahun terakhir.
      -
      Peringkat Kekuatan Militer (GFP 2026)
      Kesenjangan kekuatan yang semakin melebar di Asia Tenggara:
      Indonesia – Peringkat 13 Dunia (Skor: 0,2582) — Hegemon Mutlak.
      Vietnam – Peringkat 23.
      Thailand – Peringkat 24.
      Singapura – Peringkat 29.
      Myanmar – Peringkat 35.
      Filipina – Peringkat 41.
      MALONYET – Peringkat 42 (Kalah dari Filipina).
      -
      Daftar Alutsista Indonesia "On Progress"
      Indonesia sedang membangun kekuatan pemukul masif:
      Udara: 42 Rafale, 48 KAAN (Turki), 48 KF-21 Boramae, 2 A400M, 22 Black Hawk.
      Laut: 2 Fregat Brawijaya, 2 Fregat Merah Putih, 2 Fregat Istif, 2 Kapal Selam Scorpène Evolved, 1 Kapal Induk Garibaldi (Eks-Italia).
      Darat/Rudal: 3 Baterai Rudal KHAN, 3 Baterai Rudal Trisula, 12 Drone Anka, 60 Drone TB3.
      -
      Timeline "Prank" Pertahanan MALONYET (2005–2026)
      Rentetan kegagalan kontrak dan wacana yang berakhir "Zonk":
      2014: Jet Rafale (Mangkrak anggaran).
      2018: Kapal MRSS PT PAL (Zonk/Batal).
      2022: Jet HAL Tejas India (Batal).
      2024–2025: Sewa Black Hawk (Mangkrak, unit tidak tiba).
      2026: F/A-18 Hornet Kuwait (Resmi Batal karena biaya logistik & evaluasi buruk).
      2026: Pembekuan Total oleh PM Anwar Ibrahim terhadap seluruh pengadaan militer akibat korupsi.
      -
      Analisa "Salam Kosong" SIPRI (2020–2025)
      Status pengadaan MALONYET yang terjebak dalam retorika:
      2020–2021: Planned (Dijangka/Rencana).
      2022: Selected Not Yet Ordered (Pilih tapi tidak beli).
      2023: Not Yet Ordered (Tanpa pesanan).
      2024–2025: KOSONG (Amnesia belanja).

      Hapus
    3. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      --------------------------------------------------
      2025 = KOSONG
      Https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708518608
      -
      2024 = KOSONG
      https://defense-studies.blogspot.com/2025/03/order-dan-transfer-persenjataan-ke-dan_14.html
      -
      2023 = NOT YET ORDERED
      https://defense-studies.blogspot.com/2024/03/transfer-persenjataan-ke-dan-dari_15.html
      -
      2022 = SELECTED NOT YET ORDERED
      https://defense-studies.blogspot.com/2023/03/transfer-persenjataan-ke-dan-dari_17.html
      -
      2021 = PLANNED
      https://defense-studies.blogspot.com/2022/03/transfer-persenjataan-ke-MALONYET-2021.html
      -
      2020 = PLANNED
      https://defense-studies.blogspot.com/2021/03/transfer-persenjataan-ke-MALONYET-2020.html
      ---------------------------------
      Realisasi Impor Senjata (SIPRI 2021–2025)
      Data menunjukkan siapa yang benar-benar belanja alutsista di kawasan:
      Peringkat 1 ASEAN: Indonesia (1,5%) — Urutan 18 Dunia. Fokus: Rafale, ScorpΓ¨ne, PPA.
      Peringkat 2 ASEAN: Filipina (1,2%).
      Peringkat 3 ASEAN: Singapura (1,1%).
      Peringkat 4 ASEAN: Thailand (0,5%).
      Peringkat 5 ASEAN: MALONYET (0,3%) — Hanya FA-50 (skala terbatas).
      -
      Status Lembar Pengadaan SIPRI (2024–2025)
      Indonesia (1 Lembar Penuh): Kontrak aktif untuk Rafale F-4, Mesin TP400-D6, PPA-L-Plus, A400M Atlas, Rudal BORA/KHAN, Drone Anka-S, dan Air Refuel System.
      MALONYET (KOSONG): Tidak ada realisasi kontrak baru yang tercatat (Status: Salam Lembar Kosong).
      -
      Peringkat Kekuatan Militer (GFP 2026)
      Indonesia — Peringkat 13 Dunia (Skor: 0,2582) | Hegemon ASEAN.
      Vietnam — Peringkat 23 Dunia.
      Thailand — Peringkat 24 Dunia.
      Singapura — Peringkat 29 Dunia.
      Myanmar — Peringkat 35 Dunia.
      Filipina — Peringkat 41 Dunia.
      MALONYET — Peringkat 42 Dunia (Kalah dari Filipina).
      -
      Kronologi "Prank" Pertahanan MALONYET (2005–2026)
      Rentetan wacana yang gagal menjadi kontrak nyata (Zonk):
      2005: Rudal KS-1A China (Zonk).
      2014: Jet Rafale Prancis (Mangkrak anggaran).
      2018: Kapal MRSS PT PAL Indonesia (Zonk).
      2022: Jet HAL Tejas India (Batal/Pindah ke FA-50).
      2023: IAG Guardian (Gagal spek PBB/UNIFIL).
      2024–2025: Sewa Black Hawk (Mangkrak/Unit tidak tiba).
      2026: F/A-18 Hornet Kuwait (Resmi Batal akibat biaya logistik & evaluasi buruk).
      2026: Pembekuan Total oleh PM Anwar Ibrahim akibat skandal korupsi & kartel Kemenhan.
      -
      Jebakan Utang & Krisis Fiskal MALONYET
      Penyebab utama stagnasi pertahanan adalah beban finansial yang ekstrem:
      2010: RM 407,1 Miliar.
      2018: RM 1,19 Triliun (Inklusi liabilitas 1MDB).
      2023: RM 1,53 Triliun (Konfirmasi PM Anwar Ibrahim).
      2026: RM 1,79 Triliun (Target manajemen utang).
      Rasio Utang: 70,4% dari PDB (Melewati limit 65%).
      -
      Kesimpulan Strategis
      Indonesia: Mengukuhkan diri sebagai Raksasa Ekonomi (Top 6 PPP Dunia) dan kekuatan militer elit global.
      MALONYET: Mengalami Demiliterisasi De Facto dan penurunan kelas akibat krisis utang sistemik, korupsi, dan kegagalan kontrak berulang.

      Hapus
    4. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      --------------------------------------------------
      GLOBAL FIREPOWER (GFP) 2026 – ASEAN :
      https://www.globalfirepower.com/countries-listing.php
      -
      1. INDONESIA – PERINGKAT 13
      -
      2. VIETNAM – PERINGKAT 23
      -
      3. THAILAND – PERINGKAT 24
      -
      4. SINGAPURA – PERINGKAT 29
      -
      5. MYANMAR – PERINGKAT 35
      -
      6. FILIPINA – PERINGKAT 41
      -
      7. MALONYET – PERINGKAT 42
      -
      8. KAMBOJA – PERINGKAT 83
      -
      9. LAOS – PERINGKAT 125
      ---------------------------------
      2025 = KOSONG
      Https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708518608
      -
      2024 = KOSONG
      https://defense-studies.blogspot.com/2025/03/order-dan-transfer-persenjataan-ke-dan_14.html
      -
      2023 = NOT YET ORDERED
      https://defense-studies.blogspot.com/2024/03/transfer-persenjataan-ke-dan-dari_15.html
      -
      2022 = SELECTED NOT YET ORDERED
      https://defense-studies.blogspot.com/2023/03/transfer-persenjataan-ke-dan-dari_17.html
      -
      2021 = PLANNED
      https://defense-studies.blogspot.com/2022/03/transfer-persenjataan-ke-MALONYET-2021.html
      -
      2020 = PLANNED
      https://defense-studies.blogspot.com/2021/03/transfer-persenjataan-ke-MALONYET-2020.html
      ---------------------------------
      Status Pengadaan Alutsista (SIPRI 2024–2026)
      Vakum Total: Laporan SIPRI menunjukkan status "KOSONG" selama dua tahun berturut-turut (2024-2025).
      Pembatalan F/A-18 Hornet: Kegagalan akuisisi pesawat bekas Kuwait sebanyak 4 kali, resmi dibatalkan pada Februari 2026 karena kendala logistik dan teknis.
      Pembekuan Total (Procurement Freeze): Instruksi PM per Januari 2026 untuk menghentikan seluruh pengadaan militer guna investigasi suap dan korupsi sistemik.
      Perbandingan Regional: Indonesia memiliki "Lembar Belanja Penuh" (Rafale, A400M, Rudal Khan), sementara MALONYET setara dengan Timor Leste, Laos, dan Kamboja dalam hal nihilnya transfer senjata berat.
      -
      Indikator Kejatuhan Militer (GFP 2026)
      Penurunan Peringkat: Merosot ke posisi 42 Dunia (Peringkat ke-7 di ASEAN), resmi disalip oleh Filipina (Peringkat 41).
      Aset Mangkrak: Proyek Kapal LCS & OPV yang berkarat di galangan melibatkan 17 kreditor dengan bunga yang terus membengkak.
      Degradasi Armada: Banyak aset utama berstatus Grounded (MiG-29, MB339CM) atau hilang dari gudang (48 unit Skyhawk & 2 mesin jet).
      -
      Spiral Hutang & Krisis Fiskal (DSR)
      Jebakan Hutang (Debt-Pay-Debt): 58% hingga 64,3% pinjaman baru hanya digunakan untuk membayar cicilan pokok dan bunga utang lama.
      Ledakan Liabilitas: Utang nasional melonjak drastis dari RM 407 Miliar (2010) menjadi proyeksi RM 1,79 Triliun (2026).
      Rasio Kritis: Utang pemerintah menyentuh 69% GDP (melewati limit aman 65%) dan utang rumah tangga mencapai 84,3% GDP (salah satu yang tertinggi di ASEAN).
      -
      Model Ekonomi "Negara Penyewa"
      Aset Sewaan (32+ Item): Akibat ketiadaan kas, militer beralih ke skema Leasing (Sewa) untuk helikopter (Blackhawk, AW139), pesawat latihan, hingga kendaraan operasional.
      Skema Barter: Pengadaan yang tersisa terpaksa menggunakan Barter Kelapa Sawit (CPO) karena krisis devisa mata uang asing.
      -
      Krisis Administrasi & Reputasi
      Sanksi Internasional: Tekanan ekonomi dari AS melalui ancaman tarif Section 301 dan sanksi IEEPA yang menghantam sektor manufaktur.
      Kegagalan Olahraga: Kekalahan WO 0-3 dan sanksi AFC/CAS akibat pemain naturalisasi ilegal, mencerminkan kegagalan birokrasi sistemik yang meluas ke bidang non-militer.
      Kritik Internal: Pernyataan Mahathir Mohamad tentang "etnis malas/miskin" dan fokus Anwar Ibrahim pada korupsi proyek mencerminkan hilangnya kepercayaan pada tata kelola negara.

      Hapus
    5. PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      ---------------------------------
      MALONYET CLAIMS TO BE RICH = GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP:
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      ---------------------------------
      2026 MALONYET BADUT FFBNP = CUT BUDGET
      2026 MALONYET BADUT FFBNP = NSM BANNED - AMRAAM BLOCKED
      2026 MALONYET BADUT FFBNP = F18 CANCELED - UH60A CANCELED
      2026 MALONYET BADUT FFBNP = REWORK OF 4000 LCS PIPES AND CABLES
      2026 MALONYET BADUT FFBNP = MASS LAYOFFS
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT
      2025 MALONYET BADUT FFBNP = SIPRI EMPTY
      2024 MALONYET BADUT FFBNP = SIPRI EMPTY
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT
      --------------------------------
      INDONESIA .....
      STATUS 2026: SUPERIOR & LENGKAP
      Anggaran Pertahanan 2026: USD 20 Miliar (Rp 335,2 Triliun).
      Pertumbuhan: Melonjak 37% dari tahun sebelumnya.
      Status SIPRI 2024-2025: LENGKAP (Transfer alutsista aktif).
      Daftar Belanja Alutsista Utama:
      42 Jet Rafale F-4 (Prancis).
      F-15IDN (USA).
      Kapal Selam Scorpene Evolved (Full Li-Ion Battery).
      Kapal Perang PPA-L-Plus & Frigat Merah Putih.
      Drone Tempur Anka-S (Turki).
      Rudal Balistik Khan & Bora.
      Kesehatan Fiskal:
      GDP: USD 1,44 Triliun.
      Hutang Pemerintah: 40% dari GDP (Jauh di bawah limit 60%).
      HUtang Household: 16% dari GDP.
      Defisit: 2,9%.
      Kekuatan Militer: Doktrin Pertahanan Total dengan integrasi teknologi tinggi.
      ________________________________________
      MALONYET.......
      STATUS 2023-2026: KRISIS & MISKIN
      Anggaran Pertahanan 2026: USD 4,7 Miliar (DIPANGKAS TOTAL).
      Status SIPRI 2024-2025: KOSONG (Nol transfer senjata global).
      Krisis 2026:
      PHK Massal: 24.100 pekerja (Data SOCSO Januari 2026).
      Freeze Procurement: Pembekuan seluruh kontrak akibat skandal suap pejabat senior.
      Cut Budget: Perintah Treasury untuk memotong anggaran operasional karena krisis finansial.
      Kegagalan Alutsista (Daftar Prank):
      NSM BANNED: Rudal NSM dilarang ekspor oleh Norwegia; dudukan rudal di kapal LCS harus dicopot.
      F/A-18 Kuwait: Batal (4x surat resmi ditolak).
      LCS Mangkrak: Proyek kapal perang karatan dan penuh cacat kabel/pipa.
      Prank Global: Pembatalan minat pada Tejas (India), JF-17 (Pakistan), Yavuz (Turki), dan Rafale (Prancis).
      Kesehatan Fiskal (Darurat):
      GDP: USD 416,90 Miliar.
      Hutang Pemerintah: 70,5% (OVER LIMIT 65%).
      HUtang Household: 84,3% (OVER LIMIT 65%).
      Defisit: 3,8% (Tidak pernah surplus sejak 1998).
      Beban Hutang Per Kapita (2026): RM 94,544 per jiwa.
      Sistem "Serba Sewa" (Rental Defence):
      Sewa Helikopter Black Hawk & AW139 (Bukan milik sendiri).
      Sewa Jet L-39 di Kanada untuk latihan pilot.
      Sewa Motor Polis, Truk, dan Kapal Hidrografi.
      Kondisi Internal: Ketidakstabilan politik (5x Ganti PM & 6x Ganti Menhan) melumpuhkan perencanaan jangka panjang.
      KESIMPULAN:
      INDONESIA BELI TUNAI VS MALONYET SERBA SEWA KARENA HUTANG MENUMPUK.

      Hapus
    6. PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      ---------------------------------
      MALONYET CLAIMS TO BE RICH = GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP:
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      ---------------------------------
      2026 MALONYET BADUT FFBNP = CUT BUDGET
      2026 MALONYET BADUT FFBNP = NSM BANNED - AMRAAM BLOCKED
      2026 MALONYET BADUT FFBNP = F18 CANCELED - UH60A CANCELED
      2026 MALONYET BADUT FFBNP = REWORK OF 4000 LCS PIPES AND CABLES
      2026 MALONYET BADUT FFBNP = MASS LAYOFFS
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT
      2025 MALONYET BADUT FFBNP = SIPRI EMPTY
      2024 MALONYET BADUT FFBNP = SIPRI EMPTY
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT
      --------------------------------
      MALONYET.......
      STATUS 2023-2026: MISKIN & PROCUREMENT COLLAPSE
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan seluruh kementerian memangkas anggaran operasional akibat dampak konflik Timur Tengah (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Data SOCSO/PERKESO mencatat 24.100 PHK dengan puncak di Januari 2026; Petronas pangkas ±5.000 karyawan (CNBC & Bloomberg).
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan seluruh kontrak militer dan polisi sejak 16 Januari 2026 akibat skandal suap pejabat senior.
      2025 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Tidak ada transfer senjata besar yang tercatat dalam database global.
      2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Kelanjutan stagnasi modernisasi alutsista selama dua tahun berturut-turut.
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: MINDEF membatalkan secara resmi 5 tender bekalan dan infrastruktur.
      ________________________________________
      LIMITASI STRUKTUR KEKUATAN (FORCE LIMITATIONS):
      Ukuran Pasukan Kecil: Hanya memiliki ~113.000 personel aktif; sangat kontras dibandingkan Indonesia (~400.000) atau Vietnam (~600.000).
      Fragmentasi Matra: Kurangnya doktrin gabungan (Joint Doctrine) dan interoperabilitas antara Darat, Laut, dan Udara.
      Lemahnya Proyeksi Kekuatan: Tidak memiliki kapal induk, pembom berat, sistem rudal balistik, serta keterbatasan kapasitas pengisian bahan bakar di udara.
      Ketimpangan Anggaran: Lebih dari 40% anggaran habis untuk biaya personel (gaji/pensiun), mencekik dana modernisasi (CAPEX).
      Ketergantungan Impor: Industri pertahanan domestik sangat terbatas, hanya mampu untuk pemeliharaan dan kendaraan ringan.
      ________________________________________
      KETERGANTUNGAN PADA TEKNOLOGI USANG (LEGACY PLATFORMS):
      Definisi: Mengoperasikan alutsista tua yang mahal perawatannya namun terbatas secara operasional dalam perang modern.
      Penyebab: Siklus pengadaan yang tertunda (LCS Mangkrak) dan strategi modernisasi yang terfragmentasi (politik).
      Beban Pemeliharaan: Alutsista lama mengonsumsi anggaran besar untuk suku cadang tanpa memberikan peningkatan kapabilitas nyata.
      Daftar Aset Usang (Legacy List):
      MiG-29N Fulcrum: Dioperasikan sejak 1995, pensiun terlambat tanpa pengganti sepadan.
      F/A-18D Hornet: Aktif sejak 1997 dalam jumlah yang sangat terbatas.
      C-130 Hercules: Berasal dari era 1970-an; masih dipaksa beroperasi.
      Condor APC: Kendaraan lapis baja dari tahun 1980-an yang masih digunakan angkatan darat.
      Scorpene Submarine: Diperkenalkan 2009; kini mulai menua dengan jumlah armada yang tidak memadai.
      ________________________________________
      RISIKO STRATEGIS:
      Deterrence Collapse: Hilangnya daya getar di Laut Cina Selatan.
      Vulnerabilitas: Sangat rentan terhadap ancaman modern seperti drone, perang siber, dan serangan presisi.
      Fiscal Trap: Pembayaran cicilan tahunan (FA-50/A400M) menutup peluang untuk investasi alutsista baru.
      KESIMPULAN:
      FISKAL LUMPUH + PHK MASSAL + ASET KARATAN = KEBANGKRUTAN PERTAHANAN.

      Hapus
    7. PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      ---------------------------------
      MALONYET CLAIMS TO BE RICH = GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP:
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      ---------------------------------
      2026 MALONYET BADUT FFBNP = CUT BUDGET
      2026 MALONYET BADUT FFBNP = NSM BANNED - AMRAAM BLOCKED
      2026 MALONYET BADUT FFBNP = F18 CANCELED - UH60A CANCELED
      2026 MALONYET BADUT FFBNP = REWORK OF 4000 LCS PIPES AND CABLES
      2026 MALONYET BADUT FFBNP = MASS LAYOFFS
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT
      2025 MALONYET BADUT FFBNP = SIPRI EMPTY
      2024 MALONYET BADUT FFBNP = SIPRI EMPTY
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT
      --------------------------------
      MALONYET.......
      STATUS 2023-2026: KEBANGKRUTAN STRATEGIS & MISKIN
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan seluruh instansi memangkas anggaran operasional 2026 akibat dampak ekonomi konflik Timur Tengah (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Data SOCSO/PERKESO mencatat 24.100 PHK; Petronas pangkas ±5.000 karyawan. Puncak krisis di Januari 2026 (CNBC & HLIB).
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan seluruh kontrak militer dan polisi per 16 Januari 2026 menyusul skandal suap pejabat tinggi dan mantan panglima.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Dua tahun berturut-turut tanpa catatan transfer senjata global (Defense Studies).
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF.
      ________________________________________
      PENYEBAB PELEMAHAN DAYA GETAR (REDUCED DETERRENCE):
      Keterbatasan Aset Strategis: Tidak memiliki rudal jarak jauh, pesawat siluman (stealth), atau platform laut canggih.
      Armada Udara Minim: Hanya bergantung pada 18 F/A-18D tua; pengadaan FA-50 jet tempur ringan dianggap tidak cukup untuk standar deterrence.
      Struktur Pasukan Terfragmentasi: Operasi antar matra berjalan sendiri-sendiri (silos) dengan koordinasi komando gabungan yang sangat lemah.
      Kekalahan Teknologi: Tertinggal jauh dalam kemampuan perang siber, perang elektronik, dan sistem nirawak (drone).
      Kerentanan Geostrategis: Ketidakmampuan merespons secara tegas intrusi kapal penjaga pantai dan pelanggaran wilayah udara oleh China di Laut Cina Selatan.
      Ambiguitas Diplomatik: Kebijakan luar negeri non-konfrontatif sering dianggap sebagai pasivitas strategis oleh lawan.
      ________________________________________
      MENGAPA MODERNISASI BERJALAN LAMBAT? (FISCAL PARALYSIS):
      Ketidakseimbangan Anggaran: 60-70% dana habis untuk gaji, pensiun, dan pemeliharaan rutin. Hanya sedikit yang tersisa untuk sistem baru.
      Skandal & Penundaan: Proyek LCS (Littoral Combat Ship) menghadapi penundaan bertahun-tahun, pembengkakan biaya, dan investigasi korupsi.
      Strategi Reaktif: Pengadaan alutsista didorong oleh siklus politik, bukan perencanaan strategis jangka panjang, menciptakan logistik yang rumit.
      Industri Domestik Lemah: Hanya fokus pada pemeliharaan dasar, gagal memenuhi kebutuhan sistem persenjataan canggih.
      Depresiasi Ringgit: Pelemahan nilai tukar menghancurkan daya beli alutsista impor sementara pendapatan negara dari minyak menurun.
      ________________________________________
      MENGAPA KESIAPAN TEMPUR (READINESS) SANGAT BURUK?
      Aging Equipment: Bergantung pada platform usang seperti C-130 (1970-an), Condor APC (1980-an), dan kapal selam Scorpene (2009) yang mulai menua.
      No Joint Command: Angkatan Darat, Laut, dan Udara minim integrasi, mengurangi efektivitas dalam misi multi-domain.
      Gap Pelatihan: Pembatasan anggaran berdampak pada frekuensi latihan tempur, pengadaan sistem simulasi, dan pengembangan doktrin modern.

      Hapus
    8. Haaaaa ...MISKIN : SHOPINGG MURAH 5 FN MAG
      Kerajaan MALONYET telah menandatangani Letter of Acceptance (LOA) bersama syarikat pembuat senjata terkemuka dari Belgium, FN HERSTAL, bagi perolehan lima unit mesingan FN MAG 58M berkaliber 7.62mm.
      -
      2026
      Populasi: 36.38 juta
      Debt Govt: RM 1.79 Triliun (70.5%)
      Debt Household: RM 1.65 Triliun (84.3%)
      Beban per Kapita: RM 94,544
      -
      2025
      Populasi: 35.97 juta
      Debt Govt: RM 1.30 Triliun (-%)
      Debt Household: RM 1.65 Triliun (-%)
      Beban per Kapita: RM 81,998
      -
      2024
      Populasi: 34.67 juta
      Debt Govt: RM 1.22 Triliun (64.6%)
      Debt Household: RM 1.53 Triliun (84.2%)
      Beban per Kapita: RM 79,315
      -
      2023
      Populasi: 35.12 juta
      Debt Govt: RM 1.17 Triliun (64.3%)
      Debt Household: RM 1.45 Triliun (81.2%)
      Beban per Kapita: RM 74,587
      -
      2022
      Populasi: 34.69 juta
      Debt Govt: RM 1.08 Triliun (60.1%)
      Debt Household: RM 1.38 Triliun (80.9%)
      Beban per Kapita: RM 70,901
      -
      2021
      Populasi: 34.28 juta
      Debt Govt: RM 979.81 Miliar (63.3%)
      Debt Household: RM 1.34 Triliun (89.1%)
      Beban per Kapita: RM 67,667
      -
      2020
      Populasi: 33.87 juta
      Debt Govt: RM 879.56 Miliar (62.0%)
      Debt Household: RM 1.27 Triliun (87.5%)
      Beban per Kapita: RM 63,464
      -
      2019
      Populasi: 33.45 juta
      Debt Govt: RM 793.00 Miliar (52.4%)
      Debt Household: RM 1.22 Triliun (82.5%)
      Beban per Kapita: RM 60,179
      -
      2018
      Populasi: 33.00 juta
      Debt Govt: RM 741.00 Miliar (52.5%)
      Debt Household: RM 1.16 Triliun (82.0%)
      Beban per Kapita: RM 57,605
      -
      2017
      Populasi: 32.54 juta
      Debt Govt: RM 686.80 Miliar (51.9%)
      Debt Household: RM 1.10 Triliun (83.2%)
      Beban per Kapita: RM 54,910
      -
      2016
      Populasi: 32.04 juta
      Debt Govt: RM 648.50 Miliar (52.7%)
      Debt Household: RM 1.04 Triliun (86.1%)
      Beban per Kapita: RM 52,699
      -
      2015
      Populasi: 31.52 juta
      Debt Govt: RM 630.50 Miliar (55.1%)
      Debt Household: RM 985.00 Miliar (86.0%)
      Beban per Kapita: RM 51,253
      -
      2014
      Populasi: 30.98 juta
      Debt Govt: RM 582.80 Miliar (55.0%)
      Debt Household: RM 902.00 Miliar (85.1%)
      Beban per Kapita: RM 47,927
      -
      2013
      Populasi: 30.42 juta
      Debt Govt: RM 547.70 Miliar (54.7%)
      Debt Household: RM 821.00 Miliar (82.0%)
      Beban per Kapita: RM 44,992
      -
      2012
      Populasi: 29.85 juta
      Debt Govt: RM 501.60 Miliar (53.3%)
      Debt Household: RM 732.00 Miliar (77.8%)
      Beban per Kapita: RM 41,326
      -
      2011
      Populasi: 29.26 juta
      Debt Govt: RM 456.10 Miliar (51.8%)
      Debt Household: RM 653.00 Miliar (74.2%)
      Beban per Kapita: RM 37,904
      -
      2010
      Populasi: 28.65 juta
      Debt Govt: RM 407.10 Miliar (52.4%)
      Debt Household: RM 581.00 Miliar (74.8%)
      Beban per Kapita: RM 34,488
      -
      2009
      Populasi: 28.04 juta
      Debt Govt: RM 362.40 Miliar (51.1%)
      Debt Household: RM 516.00 Miliar (72.0%)
      Beban per Kapita: RM 31,326
      -
      2008
      Populasi: 27.45 juta
      Debt Govt: RM 258.00 Miliar (41.3%)
      Debt Household: RM 460.00 Miliar (73.0%)
      Beban per Kapita: RM 26,155
      -
      2007
      Populasi: 26.86 juta
      Debt Govt: RM 266.00 Miliar (41.1%)
      Debt Household: RM 414.00 Miliar (64.0%)
      Beban per Kapita: RM 25,316
      -
      2006
      Populasi: 26.26 juta
      Debt Govt: RM 242.00 Miliar (41.5%)
      Debt Household: RM 372.00 Miliar (63.0%)
      Beban per Kapita: RM 23,381
      -
      2005
      Populasi: 25.66 juta
      Debt Govt: RM 228.00 Miliar (43.8%)
      Debt Household: RM 335.00 Miliar (64.0%)
      Beban per Kapita: RM 21,940
      -
      2004
      Populasi: 25.06 juta
      Debt Govt: RM 217.00 Miliar (45.1%)
      Debt Household: RM 298.00 Miliar (62.0%)
      Beban per Kapita: RM 20,550
      -
      2003
      Populasi: 24.46 juta
      Debt Govt: RM 189.00 Miliar (45.9%)
      Debt Household: RM 265.00 Miliar (64.0%)
      Beban per Kapita: RM 18,560
      -
      2002
      Populasi: 23.87 juta
      Debt Govt: RM 165.00 Miliar (44.9%)
      Debt Household: RM 236.00 Miliar (64.0%)
      Beban per Kapita: RM 16,798
      -
      2001
      Populasi: 23.28 juta
      Debt Govt: RM 146.00 Miliar (42.5%)
      Debt Household: RM 207.00 Miliar (60.0%)
      Beban per Kapita: RM 15,162
      -
      2000
      Populasi: 22.69 juta
      Debt Govt: RM 126.00 Miliar (36.1%)
      Debt Household: RM 182.00 Miliar (52.0%)
      Beban per Kapita: RM 13,574
      -
      1999
      Populasi: 22.11 juta
      Debt Govt: RM 113.00 Miliar (40.4%)
      Debt Household: RM 157.00 Miliar (56.0%)
      Beban per Kapita: RM 12,210
      -
      1998
      Populasi: 21.53 juta
      Debt Govt: RM 98.00 Miliar (35.8%)
      Debt Household: RM 135.00 Miliar (49.3%)
      Beban per Kapita: RM 10,821

      Hapus
    9. 1998 - 2026 = 28 TAHUN
      PENDAPATAN : RM334,1 Miliar
      PENGELUARAN : RM470 Miliar
      BEBAN SUBSIDI 23,9%
      RM470 – RM334,1 = MINUS RM135,9 ......
      -
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      -
      2026
      Populasi: 36.38 juta
      Debt Govt: RM 1.79 Triliun (70.5%)
      Debt Household: RM 1.65 Triliun (84.3%)
      Beban per Kapita: RM 94,544
      -
      2025
      Populasi: 35.97 juta
      Debt Govt: RM 1.30 Triliun (-%)
      Debt Household: RM 1.65 Triliun (-%)
      Beban per Kapita: RM 81,998
      -
      2024
      Populasi: 34.67 juta
      Debt Govt: RM 1.22 Triliun (64.6%)
      Debt Household: RM 1.53 Triliun (84.2%)
      Beban per Kapita: RM 79,315
      -
      2023
      Populasi: 35.12 juta
      Debt Govt: RM 1.17 Triliun (64.3%)
      Debt Household: RM 1.45 Triliun (81.2%)
      Beban per Kapita: RM 74,587
      -
      2022
      Populasi: 34.69 juta
      Debt Govt: RM 1.08 Triliun (60.1%)
      Debt Household: RM 1.38 Triliun (80.9%)
      Beban per Kapita: RM 70,901
      -
      2021
      Populasi: 34.28 juta
      Debt Govt: RM 979.81 Miliar (63.3%)
      Debt Household: RM 1.34 Triliun (89.1%)
      Beban per Kapita: RM 67,667
      -
      2020
      Populasi: 33.87 juta
      Debt Govt: RM 879.56 Miliar (62.0%)
      Debt Household: RM 1.27 Triliun (87.5%)
      Beban per Kapita: RM 63,464
      -
      2019
      Populasi: 33.45 juta
      Debt Govt: RM 793.00 Miliar (52.4%)
      Debt Household: RM 1.22 Triliun (82.5%)
      Beban per Kapita: RM 60,179
      -
      2018
      Populasi: 33.00 juta
      Debt Govt: RM 741.00 Miliar (52.5%)
      Debt Household: RM 1.16 Triliun (82.0%)
      Beban per Kapita: RM 57,605
      -
      2017
      Populasi: 32.54 juta
      Debt Govt: RM 686.80 Miliar (51.9%)
      Debt Household: RM 1.10 Triliun (83.2%)
      Beban per Kapita: RM 54,910
      -
      2016
      Populasi: 32.04 juta
      Debt Govt: RM 648.50 Miliar (52.7%)
      Debt Household: RM 1.04 Triliun (86.1%)
      Beban per Kapita: RM 52,699
      -
      2015
      Populasi: 31.52 juta
      Debt Govt: RM 630.50 Miliar (55.1%)
      Debt Household: RM 985.00 Miliar (86.0%)
      Beban per Kapita: RM 51,253
      -
      2014
      Populasi: 30.98 juta
      Debt Govt: RM 582.80 Miliar (55.0%)
      Debt Household: RM 902.00 Miliar (85.1%)
      Beban per Kapita: RM 47,927
      -
      2013
      Populasi: 30.42 juta
      Debt Govt: RM 547.70 Miliar (54.7%)
      Debt Household: RM 821.00 Miliar (82.0%)
      Beban per Kapita: RM 44,992
      -
      2012
      Populasi: 29.85 juta
      Debt Govt: RM 501.60 Miliar (53.3%)
      Debt Household: RM 732.00 Miliar (77.8%)
      Beban per Kapita: RM 41,326
      -
      2011
      Populasi: 29.26 juta
      Debt Govt: RM 456.10 Miliar (51.8%)
      Debt Household: RM 653.00 Miliar (74.2%)
      Beban per Kapita: RM 37,904
      -
      2010
      Populasi: 28.65 juta
      Debt Govt: RM 407.10 Miliar (52.4%)
      Debt Household: RM 581.00 Miliar (74.8%)
      Beban per Kapita: RM 34,488
      -
      2009
      Populasi: 28.04 juta
      Debt Govt: RM 362.40 Miliar (51.1%)
      Debt Household: RM 516.00 Miliar (72.0%)
      Beban per Kapita: RM 31,326
      -
      2008
      Populasi: 27.45 juta
      Debt Govt: RM 258.00 Miliar (41.3%)
      Debt Household: RM 460.00 Miliar (73.0%)
      Beban per Kapita: RM 26,155
      -
      2007
      Populasi: 26.86 juta
      Debt Govt: RM 266.00 Miliar (41.1%)
      Debt Household: RM 414.00 Miliar (64.0%)
      Beban per Kapita: RM 25,316
      -
      2006
      Populasi: 26.26 juta
      Debt Govt: RM 242.00 Miliar (41.5%)
      Debt Household: RM 372.00 Miliar (63.0%)
      Beban per Kapita: RM 23,381
      -
      2005
      Populasi: 25.66 juta
      Debt Govt: RM 228.00 Miliar (43.8%)
      Debt Household: RM 335.00 Miliar (64.0%)
      Beban per Kapita: RM 21,940
      -
      2004
      Populasi: 25.06 juta
      Debt Govt: RM 217.00 Miliar (45.1%)
      Debt Household: RM 298.00 Miliar (62.0%)
      Beban per Kapita: RM 20,550
      -
      2003
      Populasi: 24.46 juta
      Debt Govt: RM 189.00 Miliar (45.9%)
      Debt Household: RM 265.00 Miliar (64.0%)
      Beban per Kapita: RM 18,560
      -
      2002
      Populasi: 23.87 juta
      Debt Govt: RM 165.00 Miliar (44.9%)
      Debt Household: RM 236.00 Miliar (64.0%)
      Beban per Kapita: RM 16,798
      -
      2001
      Populasi: 23.28 juta
      Debt Govt: RM 146.00 Miliar (42.5%)
      Debt Household: RM 207.00 Miliar (60.0%)
      Beban per Kapita: RM 15,162
      -
      2000
      Populasi: 22.69 juta
      Debt Govt: RM 126.00 Miliar (36.1%)
      Debt Household: RM 182.00 Miliar (52.0%)
      Beban per Kapita: RM 13,574
      -
      1999
      Populasi: 22.11 juta
      Debt Govt: RM 113.00 Miliar (40.4%)
      Debt Household: RM 157.00 Miliar (56.0%)
      Beban per Kapita: RM 12,210
      -
      1998
      Populasi: 21.53 juta
      Debt Govt: RM 98.00 Miliar (35.8%)
      Debt Household: RM 135.00 Miliar (49.3%)
      Beban per Kapita: RM 10,821

      Hapus
  12. RELEASE US DEPARTEMENT OF WAR 24/08/2026
    F15IDN
    F15IDN
    F15IDN
    https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
    -
    INDONESIA
    a. 48 KAAN Gen 5
    b. 42 RAFALE Gen 4.5
    c. 16 Sukhoi 27/30
    d. 33 F16
    e. 12 M346FA
    f. 20 T50i
    g. 24 HAWK
    =============================
    =============================
    MALONYET
    a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
    b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
    c. 7 F18 = LACK SOURCE CODE
    d. 16 HAWK = LACK SPAREPART
    --------------------------------------------
    1.RASIO HUTANG 84.3% DARI GDP
    2. HUTANG NEGARA RM 1,65 TRLLIUN
    3. HUTANG 1MDB RM 18,2 BILLION
    4. TUNGGAKAN SEWA SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. SEWA SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. SEWA MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED SEWA BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. SEWA MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. SEWA VVSHORAD
    35. SEWA TRUK 3 TON
    36. 4X4 SEWA 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. SEWA BLACKHAWK SEWA AW159
    41. NO TRACKED SPH
    42. SEWA SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. SEWA AW139 SEWA COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED SEWA PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST VSHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. MKM BARTER PALM OIL
    62. MIG29N BARTER PALM OIL
    63. A400M PEMBAYARAN BERPERINGKAT (HUTANG)
    64. SCORPENE BARTER PALM OIL
    65. PT91M BARTER PALM OIL RUBBER
    67. FA50M BARTER PALM OIL
    ===================
    SEWA = HUTANG 84.3% DARI GDP = NO SHOPPING
    1. SEWA 28 HELI
    2. SEWA L39 ITCC
    3. SEWA EC120B
    4. SEWA FLIGHT SIMULATION TRAINING DEVICE (FSTD)
    5. SEWA 1 UNIT SISTEM SIMULATOR EC120B
    6. SEWA HOVERCRAFT
    7. SEWA AW139
    8. SEWA FAST INTERCEPTOR BOAT (FIB)
    9. SEWA UTILITY BOAT
    10. SEWA RIGID HULL FENDER BOAT (RHFB)
    11. SEWA ROVER FIBER GLASS (ROVER)
    12. SEWA MV AISHAH AIM 4
    13. SEWA BMW R1250RT
    14. SEWA 4x4 VECHICLE
    15. SEWA VSHORAD
    16. SEWA TRUCK
    17. SEWA HONDA CIVIC
    18. SEWA PATROL BOATS
    19. SEWA OUTBOARD MOTORS
    20. SEWA TRAILERS
    21. SEWA SUPERBIKES
    22. SEWA SIMULATOR MKM
    23. SEWA 12 AW149 TUDM
    24. SEWA 4 AW139 TUDM
    25. SEWA 5 EC120B TUDM
    26. SEWA 2 AW159 TLDM
    27. SEWA 4 UH-60A TDM
    28. SEWA 12 AW149 TDM
    29. SEWA 4 AW139 BOMBA
    30. SEWA 2 AW159 MMEA
    31. SEWA 7 BELL429 POLIS
    32. SEWA MOTOR POLIS
    --------------------------------------------
    USA BANNED MALONYET : USA PALAK ART USD 240 MILLIAR
    NSM
    AMRAAM
    F18
    UH60A
    --------------------------------------------
    🀣ART PALAK USD 240 MILLIAR = BANNED : NSM AMRAAM F18🀣

    BalasHapus
  13. Singapore MINDEF Signs Contract to Acquire Two Landing Crafts
    Delivery of the craft is expected from 2029
    -----------


    Aset Baruw...ohh pasti tepat waktuw dibanding mantan patnernya di seblah, gowing ama damen opv miring 2 lagi full mangkrak haha!🍌🀣πŸ€₯

    BalasHapus
  14. https://www.youtube.com/watch?v=7HtKfU3NjBM

    20 Jam bantu padam kebakaran INDON.
    INDON tau hanya bagi kesusahan jerebu saja buat Malaysia. Malaysia juga yang bantu padam!
    🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣

    BalasHapus
    Balasan
    1. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      --------------------------------------------
      1.RASIO HUTANG 84.3% DARI GDP
      2. HUTANG NEGARA RM 1,65 TRLLIUN
      3. HUTANG 1MDB RM 18,2 BILLION
      4. TUNGGAKAN SEWA SABAH USD 15 BILLION
      5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
      6. SEWA SIMULATOR MKM
      7. PESAWAT MIG GROUNDED
      8. SEWA MOTOR POLIS
      9. PESAWAT MB339CM GROUNDED
      10. NURI GROUNDED SEWA BLACKHAWK
      11. FIVE PROCUREMENT CANCELLED
      12. 48 PESAWAT SKYHAWK HILANG
      13. MESIN JET 2 BUAH HILANG
      14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
      15. NO LST
      16. NO LPD – NGEMIS LPD USA
      17. NO TANKER
      18. NO KCR
      19. MONUMEN MIG29M UNTUK JIMAT KOS
      20. NO SPH
      21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
      22. NO HELLFIRE
      23. NO MPA ATR72 DELAYED
      24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
      25. NO HELI HEAVY ATTACK NGEMIS AH1Z
      26. NO M3 AMPHIBIUS RIG
      27. LCS MANGKRAK KARATAN
      28. OPV MANGKRAK
      29. TANK MOGOK STOP SPARE PARTS
      30. CN 235 MSA VERSI MSI USA
      31. SEWA MOTOR MILITARY POLICE
      32. RADAR GIFTED PAID USA
      33. 84% NO SAVING EVERY MONTH
      34. SEWA VVSHORAD
      35. SEWA TRUK 3 TON
      36. 4X4 SEWA 6X6 CANCELLED
      37. C130H DIGANTI 2045
      38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
      39. NO DRONE UCAV – ANKA ISR OMPONG
      40. SEWA BLACKHAWK SEWA AW159
      41. NO TRACKED SPH
      42. SEWA SIMULATOR HELI
      43. SPH CANCELLED
      44. SCORPION V150 CONDOR SIMBAS RETIRED
      45. NO PESAWAT COIN
      46. PILATUS MK II KARATAN
      47. PENCEROBOHAN 43X BTA 316 HARI
      48. SEWA AW139 SEWA COLIBRI
      49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
      50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
      51. LYNX GROUNDED
      52. MRCA CANCELLED SEWA PESAWAT ITTC
      53. MICA CANCELLED NSM CANCELLED
      54. NO LRAD NO MRAD JUST VSHORAD
      55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
      56. 4X NGEMIS F18 KUWAIT
      57. MENUNGGU 2050 KAPAL SELAM
      58. NO TANK AMPHIBI AV8 MOGOK BERASAP
      59. 84% NO SAVING EVERY MONTH
      60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
      61. MKM BARTER PALM OIL
      62. MIG29N BARTER PALM OIL
      63. A400M PEMBAYARAN BERPERINGKAT (HUTANG)
      64. SCORPENE BARTER PALM OIL
      65. PT91M BARTER PALM OIL RUBBER
      67. FA50M BARTER PALM OIL
      ===================
      SEWA = HUTANG 84.3% DARI GDP = NO SHOPPING
      1. SEWA 28 HELI
      2. SEWA L39 ITCC
      3. SEWA EC120B
      4. SEWA FLIGHT SIMULATION TRAINING DEVICE (FSTD)
      5. SEWA 1 UNIT SISTEM SIMULATOR EC120B
      6. SEWA HOVERCRAFT
      7. SEWA AW139
      8. SEWA FAST INTERCEPTOR BOAT (FIB)
      9. SEWA UTILITY BOAT
      10. SEWA RIGID HULL FENDER BOAT (RHFB)
      11. SEWA ROVER FIBER GLASS (ROVER)
      12. SEWA MV AISHAH AIM 4
      13. SEWA BMW R1250RT
      14. SEWA 4x4 VECHICLE
      15. SEWA VSHORAD
      16. SEWA TRUCK
      17. SEWA HONDA CIVIC
      18. SEWA PATROL BOATS
      19. SEWA OUTBOARD MOTORS
      20. SEWA TRAILERS
      21. SEWA SUPERBIKES
      22. SEWA SIMULATOR MKM
      23. SEWA 12 AW149 TUDM
      24. SEWA 4 AW139 TUDM
      25. SEWA 5 EC120B TUDM
      26. SEWA 2 AW159 TLDM
      27. SEWA 4 UH-60A TDM
      28. SEWA 12 AW149 TDM
      29. SEWA 4 AW139 BOMBA
      30. SEWA 2 AW159 MMEA
      31. SEWA 7 BELL429 POLIS
      32. SEWA MOTOR POLIS
      --------------------------------------------
      USA BANNED MALONYET : USA PALAK ART USD 240 MILLIAR
      NSM
      AMRAAM
      F18
      UH60A
      --------------------------------------------
      🀣ART PALAK USD 240 MILLIAR = BANNED : NSM AMRAAM F18🀣

      Hapus
    2. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA KLAIM CASH =
      SKEMA NON TUNAI = NON CASH
      SKEMA NON TUNAI = NON CASH
      SKEMA NON TUNAI = NON CASH
      --------------------
      1. Inventarisasi Alutsista Skema Non-Tunai
      Multi-Purpose Mission Ship (MPMS)
      Skema: EXIM KREDIT EKSPOR (HUTANG) (Hutang Lender Turki).
      Status: Hutang G-to-G melalui Turk Eximbank.
      -
      Kapal LMS Batch 2
      Skema: KREDIT EKSPOR (HUTANG) / Hutang Luar Negeri.
      -
      Jet Tempur FA-50M & Scorpene
      Skema: Barter Komoditas (Minyak Sawit/Palm Oil).
      Logika: Tidak mampu bayar cash, menggunakan hasil bumi.
      -
      Pesawat Airbus A400M
      Skema: Pembayaran Berperingkat (Ansuran/Debt).
      -
      Tank PT-91 Twardy
      Skema: Barter 30% Palm Oil & Rubber (Karet).
      -
      Jet Mig-29N & MKM
      Skema: Barter Palm Oil.
      -
      Helikopter AW139
      Skema: Sewa (Leasing).
      -
      2. Daftar Entitas Penagih Hutang (Tagih Hutang)
      Daftar lembaga dan vendor yang memiliki piutang terhadap proyek pertahanan/infrastruktur:
      Lembaga Perbankan: Maybank, AmBank, Affin Bank, Bank Muamalat, Bank Pembangunan MALONYET, Kuwait Finance House.
      Vendor/Kontraktor: MTU Services, Contraves Sdn Bhd, Axima Concept SA, iXblue SAS, Tyco Fire & Security.
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544

      Hapus
    3. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA KLAIM CASH =
      KREDIT EKSPOR (HUTANG)
      KREDIT EKSPOR (HUTANG)
      KREDIT EKSPOR (HUTANG)
      ---------------
      Kesimpulan Strategi Pembiayaan Pertahanan MALONYET
      Ketergantungan pada KREDIT EKSPOR (HUTANG) (G-to-G): MALONYET secara masif menggunakan fasilitas kredit dari lembaga penjamin ekspor negara asal (seperti Turk Eximbank) untuk proyek strategis seperti kapal LMS Batch 2 dan MPMS. Skema ini dipilih karena bunga kompetitif (kisaran 4%-6% dalam USD/Euro) dan jaminan penuh antar-pemerintah yang menurunkan risiko finansial.
      -
      Skema Deferred Payment (Bayar Tunda): Untuk mengatasi keterbatasan anggaran tahunan (fiskal), pembayaran ditangguhkan selama 10–15 tahun dengan masa tenggang (grace period) selama masa konstruksi. Pelunasan diintegrasikan ke dalam alokasi jangka panjang Rancangan MALONYET Lima Tahun (RMLT).
      -
      Inovasi Skema Sewa (Leasing): MALONYET memelopori pengalihan pengeluaran modal (CapEx) menjadi biaya operasional (OpEx) melalui penyewaan aset pendukung (contoh: Helikopter Leonardo AW139) guna menjaga kesiapan operasional tanpa beban pembelian utuh di awal.
      -
      Imbal Dagang & Barter: Tetap mengupayakan elemen counter-trade dan offset dalam kontrak untuk memastikan adanya manfaat ekonomi balik bagi industri domestik, meskipun tidak lagi murni menggunakan komoditas mentah.
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544

      Hapus
    4. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA MALONYET KLAIM CASH =
      SKEMA KREDIT EXIM = SKEMA DEFFERED = SKEMA BARTER = SKEMA SEWA
      SKEMA KREDIT EXIM = SKEMA DEFFERED = SKEMA BARTER = SKEMA SEWA
      SKEMA KREDIT EXIM = SKEMA DEFFERED = SKEMA BARTER = SKEMA SEWA
      MALONYET
      Mekanisme KREDIT EKSPOR (HUTANG): MALONYET memanfaatkan fasilitas kredit dari lembaga penjamin ekspor negara asal produsen. Salah satu contoh utamanya adalah pengadaan kapal Littoral Mission Ship (LMS) Batch 2 dari Turki. Proyek ini didukung oleh skema pembiayaan dari pemerintah Turki (G-to-G) melalui Turk Eximbank, yang memungkinkan MALONYET melakukan pembayaran secara bertahap sesuai dengan progres pembangunan kapal.
      -
      Skema Deferred Payment (Pembayaran Menangguh): Mengingat keterbatasan ruang fiskal dalam APBN (Belanjawan), Kementerian Pertahanan MALONYET sering menggunakan skema pembayaran yang ditangguhkan. Skema ini memungkinkan pengadaan alutsista seperti jet tempur ringan KAI FA-50 dari Korea Selatan dikirim terlebih dahulu, sementara pelunasan -dilakukan dalam jangka waktu 10 hingga 15 tahun menggunakan alokasi "Rancangan MALONYET Lima Tahun" (RMLT).
      -
      Skema Sewa (Leasing): Berbeda dengan negara tetangga, MALONYET mempelopori skema sewa untuk aset pendukung guna menghemat biaya modal (CapEx). Contohnya adalah penyewaan helikopter Leonardo AW139 untuk Angkatan Tentara MALONYET (ATM) guna menggantikan peran Nuri, di mana pemerintah membayar biaya operasional bulanan kepada penyedia jasa tanpa harus membeli pesawat secara utuh.
      -
      Barter/Offset (Trade-Back): Dalam beberapa kontrak, MALONYET tetap mengupayakan elemen counter-trade. Meskipun tidak lagi menggunakan komoditas minyak sawit secara mentah seperti era 90-an.
      -
      Sumber Berita: Laporan Belanjawan 2025/2026 MALONYET, Kementerian Pertahanan MALONYET (MINDEF), dan analisis pengadaan dari Janes Defence Weekly
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544

      Hapus
    5. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA KLAIM CASH = HUTANG
      SUKU BUNGA KREDIT = TURKI-KOREA-UK
      SUKU BUNGA KREDIT = TURKI-KOREA-UK
      SUKU BUNGA KREDIT = TURKI-KOREA-UK
      -------------------------
      1. Turki (TΓΌrkiye)
      Turki menggunakan standar bunga yang sangat kompetitif untuk menarik mitra strategis seperti MALONYET dalam proyek kapal perang.
      Jenis Bunga: Mengacu pada OECD CIRR (Commercial Interest Reference Rate).
      Estimasi Suku Bunga: Berada di kisaran 4% – 6% per tahun [Berdasarkan estimasi mekanisme G2G].
      Biaya Tambahan: Biasanya terdapat Premium Fee (biaya jaminan risiko negara) yang dibayarkan di muka atau dikapitalisasi ke dalam total hutang.
      Karakteristik: Bunga bersifat tetap (Fixed Rate) selama masa tenor 10–15 tahun, sehingga melindungi pembeli dari fluktuasi pasar global.
      -
      2. Korea Selatan
      Korea Selatan menawarkan MALONYET fleksibilitas tinggi dengan melibatkan lembaga negara KEXIM.
      Struktur Bunga: Terbagi menjadi dua bagian:
      Bagian Pinjaman (50%): Bunga kompetitif melalui KEXIM yang seringkali di bawah bunga pasar komersial (karena adanya subsidi ekspor negara).
      Bagian Barter (50%): Tidak berbunga, namun terdapat biaya logistik dan manajemen untuk komoditas minyak sawit.
      Biaya Administrasi: Terdapat Management Fee berkisar 0,10% - 0,50% tergantung pada nilai kontrak KEXIM Fee Structure.
      -
      3. Inggris (UK)
      Inggris melalui UK Export Finance (UKEF) memiliki aturan yang sangat ketat dan transparan ke malaysdesh.
      Suku Bunga: Menggunakan OECD CIRR atau biaya dana pemerintah (National Loans Fund rates) jika lebih tinggi UK Export Finance.
      UKEF Support Fee: Inggris membebankan premium fee untuk menutupi risiko kredit yang nilainya bervariasi tergantung pada rating kredit negara pembeli UKEF Annual Report.
      Ketentuan Uang Muka: Pembeli wajib membayar minimal 15% dari nilai kontrak sebagai uang muka sebelum fasilitas kredit dapat dicairkan GOV.UK Credit Terms





      Hapus
    6. PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      ---------------------------------
      MALONYET CLAIMS TO BE RICH = GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP:
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      ---------------------------------
      2026 MALONYET BADUT FFBNP = CUT BUDGET
      2026 MALONYET BADUT FFBNP = NSM BANNED - AMRAAM BLOCKED
      2026 MALONYET BADUT FFBNP = F18 CANCELED - UH60A CANCELED
      2026 MALONYET BADUT FFBNP = REWORK OF 4000 LCS PIPES AND CABLES
      2026 MALONYET BADUT FFBNP = MASS LAYOFFS
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT
      2025 MALONYET BADUT FFBNP = SIPRI EMPTY
      2024 MALONYET BADUT FFBNP = SIPRI EMPTY
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT
      --------------------------------
      MALONYET.......
      STATUS 2023-2026: KATASTROFE FISKAL & SKANDAL
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan pemangkasan anggaran operasional di seluruh kementerian akibat dampak ekonomi konflik Timur Tengah (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Puncak krisis di Januari 2026 dengan 24.100 PHK (Data SOCSO/PERKESO); Petronas pangkas ±5.000 karyawan (CNBC & Bloomberg).
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan total kontrak militer dan polisi per 16 Januari 2026 menyusul tuduhan suap terhadap pejabat senior dan mantan panglima.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Dua tahun berturut-turut tanpa aktivitas transfer senjata besar di level internasional (Defense Studies).
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF karena kendala anggaran.
      ________________________________________
      ANALISA KEGAGALAN PROYEK LCS (LITTORAL COMBAT SHIP):
      Mismanajemen Pengadaan: Dimulai sejak 2011; telah menghabiskan RM 6,08 Miliar hingga 2022 tanpa ada satu pun kapal yang dikirimkan.
      Perubahan Desain Fatal: Permintaan perubahan sistem tempur dan sensor di tengah jalan menyebabkan penundaan sertifikasi dan re-engineering bertahun-tahun.
      Masalah Rantai Pasok: Keterlambatan komponen dari OEM (Original Equipment Manufacturer) asing yang seringkali tidak kompatibel dengan revisi desain.
      Ledakan Biaya (Financial Overrun):
      Rencana Awal: RM 9 Miliar untuk 6 Kapal (Selesai 2023).
      Status Saat Ini: RM 11,22 Miliar hanya untuk 5 Kapal (Selesai 2029).
      Dampak: Pembengkakan biaya RM 2,22 Miliar memaksa pemerintah mengurangi jumlah pesanan.
      Lumpuhnya Keamanan Nasional: Penundaan ini meninggalkan celah besar di Laut Cina Selatan; Angkatan Laut terpaksa bergantung pada kapal tua (KD Kasturi & KD Lekir).
      ________________________________________
      MASALAH RANTAI PASOK PERTAHANAN (SUPPLY CHAIN ISSUES):
      Ketergantungan Ekstrim pada OEM Asing: Bergantung penuh pada pemasok internasional untuk avionik pesawat, sistem tempur laut, dan suku cadang kendaraan lapis baja.
      Kemampuan Manufaktur Lokal Terbatas: Industri domestik hanya mampu melakukan perawatan (MRO) dan kendaraan logistik dasar, bukan sistem canggih seperti radar atau rudal.
      Ekosistem Terfragmentasi: Kurangnya koordinasi antara pemangku kepentingan menyebabkan inefisiensi dan lemahnya ketahanan saat krisis.
      Tantangan Kustomisasi: Permintaan konfigurasi khusus sering kali menyebabkan ketidakcocokan teknis dan waktu tunggu yang jauh lebih lama dari OEM.
      Kurangnya Skala Ekonomi: Volume pesanan yang kecil membuat MALONYET menjadi prioritas rendah bagi vendor global, berujung pada biaya unit yang lebih mahal.
      Birokrasi & Politik: Perubahan spesifikasi dan kepemimpinan yang sering terjadi mengganggu jadwal pembayaran dan kepatuhan regulasi.
      KESIMPULAN:
      MISMANAJEMEN + HUTANG MENUMPUK + PROYEK MANGKRAK = KEGAGALAN TOTAL PERTAHANAN

      Hapus
    7. PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      ---------------------------------
      MALONYET CLAIMS TO BE RICH = GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP:
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      ---------------------------------
      2026 MALONYET BADUT FFBNP = CUT BUDGET
      2026 MALONYET BADUT FFBNP = NSM BANNED - AMRAAM BLOCKED
      2026 MALONYET BADUT FFBNP = F18 CANCELED - UH60A CANCELED
      2026 MALONYET BADUT FFBNP = REWORK OF 4000 LCS PIPES AND CABLES
      2026 MALONYET BADUT FFBNP = MASS LAYOFFS
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT
      2025 MALONYET BADUT FFBNP = SIPRI EMPTY
      2024 MALONYET BADUT FFBNP = SIPRI EMPTY
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT
      ---------------------------------
      MALONYET.......
      STATUS 2023-2026: KEBANGKRUTAN OPERASIONAL & MISKIN
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan pemotongan anggaran operasional di seluruh kementerian akibat dampak konflik Timur Tengah (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Data SOCSO (PERKESO) mencatat 24.100 PHK; Petronas pangkas ±5.000 karyawan. Puncak krisis Januari 2026 (CNBC & HLIB).
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan seluruh kontrak militer dan polisi per 16 Januari 2026 akibat skandal suap pejabat senior dan mantan panglima.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Dua tahun tanpa aktivitas transfer senjata besar di level internasional (Defense Studies).
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF karena kendala anggaran.
      ________________________________________
      KONTRAKSI FINANSIAL PERTAHANAN (FINANCIAL CONSTRAINTS):
      Alokasi Anggaran Terbatas: Belanja pertahanan hanya berkisar 1,2%–1,5% dari PDB, jauh di bawah standar regional untuk modernisasi.
      Biaya Operasional vs Modernisasi: Sebagian besar anggaran habis untuk gaji, pensiun, dan biaya harian, menyisakan dana sangat minim untuk pengadaan senjata canggih atau Litbang (R&D).
      Kompetisi Prioritas Domestik: Anggaran militer sering dikalahkan oleh prioritas pendidikan, kesehatan, dan infrastruktur sosial.
      Ketergantungan Teknologi Asing: Biaya tinggi pengadaan alutsista impor membuat MALONYET terpaksa membeli barang bekas (second-hand) atau menunda program pengadaan.
      Dampak Kesiapan Strategis: Peralatan tua (kapal, pesawat, kendaraan) dipaksa beroperasi melampaui usia teknisnya; pelatihan pasukan dikurangi demi penghematan.
      ________________________________________
      KELEMAHAN ARMADA LAUT (NAVAL LIMITATIONS):
      Aging Fleet (Armada Tua): Kapal utama seperti KD Kasturi dan KD Lekir berusia lebih dari 30 tahun dengan kemampuan tempur yang sangat terbatas.
      Skandal & Penundaan LCS: Program RM 11 miliar penuh mismanajemen dan korupsi. Hingga 2025, hanya mencapai 72% progres tanpa satu pun kapal yang siap tempur.
      Struktur Armada Terfragmentasi: Terlalu banyak kelas kapal yang berbeda menyebabkan logistik, pelatihan, dan perawatan menjadi sangat tidak efisien dan mahal.
      Lemahnya Pengawasan Maritim: Kurangnya radar jarak jauh, UAV, dan sistem deteksi kapal selam membuat zona ekonomi eksklusif (ZEE) sangat rentan terhadap infiltrasi asing.
      Vulnerabilitas Strategis: Tanpa daya getar angkatan laut yang kredibel, MALONYET kehilangan pengaruh strategis di Laut Cina Selatan menghadapi asertivitas kapal-kapal asing.
      ________________________________________
      RINGKASAN MASALAH UTAMA:
      Armada Tua: Kesiapan tempur terus menurun.
      Penundaan LCS: Tidak ada kapal kombatan permukaan modern.
      Logistik Inefisien: Akibat terlalu banyak jenis kelas kapal.
      Keterbatasan Anggaran: Modernisasi berjalan sangat lambat.
      ZEE Rentan: Pengawasan pantai dan laut sangat lemah.
      KESIMPULAN:
      FISKAL LUMPUH + SKANDAL LCS + ARMADA TUA = KELUMPUHAN TOTAL KEDAULATAN LAUT.

      Hapus
    8. PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      ---------------------------------
      MALONYET CLAIMS TO BE RICH = GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP:
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      ---------------------------------
      2026 MALONYET BADUT FFBNP = CUT BUDGET
      2026 MALONYET BADUT FFBNP = NSM BANNED - AMRAAM BLOCKED
      2026 MALONYET BADUT FFBNP = F18 CANCELED - UH60A CANCELED
      2026 MALONYET BADUT FFBNP = REWORK OF 4000 LCS PIPES AND CABLES
      2026 MALONYET BADUT FFBNP = MASS LAYOFFS
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT
      2025 MALONYET BADUT FFBNP = SIPRI EMPTY
      2024 MALONYET BADUT FFBNP = SIPRI EMPTY
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT
      --------------------------------
      MALONYET.......
      STATUS 2023-2026: KEBANGKRUTAN STRATEGIS & MISKIN
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan pemotongan anggaran operasional di seluruh instansi pemerintah akibat krisis ekonomi dampak konflik Timur Tengah (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Data SOCSO/PERKESO mencatat 24.100 PHK; Petronas pangkas ±5.000 karyawan. Puncak krisis Januari 2026 (CNBC & HLIB).
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan seluruh kontrak militer dan polisi per 16 Januari 2026 menyusul skandal suap yang melibatkan pejabat tinggi dan mantan panglima.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Dua tahun berturut-turut tanpa catatan transfer senjata global (Defense Studies).
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF karena kendala finansial.
      ________________________________________
      MASALAH PENUAAN ALUTSISTA (AGEING EQUIPMENT):
      TUDM (Udara): MiG-29 dan F-5E Tiger II berusia di atas 30 tahun; biaya pemeliharaan membengkak, suku cadang langka, dan kesiapan operasional sangat rendah.
      TLDM (Laut): Korvet kelas Kasturi dan kapal patroli kelas Perdana sudah berusia dekadean dengan kemampuan tempur yang sangat terbatas dibanding kapal modern.
      TDM (Darat): Kendaraan lapis baja Condor dan sistem artileri lama masih dipaksa bertugas meski sudah tidak memadai untuk ancaman perang asimetris modern.
      Konsekuensi: Efektivitas tempur menurun drastis dan platform lama sering kali tidak kompatibel dengan sistem komunikasi/senjata modern.
      ________________________________________
      KEGAGALAN MODERNISASI (DELAYED MODERNIZATION):
      Penundaan Jet Tempur: Penggantian MiG-29 dan F-5E terus tertunda; akuisisi Su-30MKM dan M346 jauh di bawah rencana awal.
      Skala Armada Laut Mengecil: Rencana pengadaan frigat, kapal selam, dan kapal kombatan multi-peran sering kali dipangkas atau berjalan sangat lambat.
      Prioritas Terbalik: Fokus lebih banyak pada peningkatan (upgrade) peralatan usang daripada penggantian penuh karena keterbatasan biaya.
      ________________________________________
      TANTANGAN KEBIJAKAN & ANGGARAN (STRATEGIC CHALLENGES):
      Ketidakpastian Politik: Perubahan pemerintah sejak 2018 mengganggu kontinuitas perencanaan pertahanan dan eksekusi kebijakan.
      Anomali Anggaran: Meski anggaran mencapai RM 19,73 Miliar (2024), lebih dari 40% habis hanya untuk gaji dan tunjangan, bukan untuk sistem baru.
      Hancurnya Daya Beli: Depresiasi Ringgit membuat harga peralatan impor menjadi sangat mahal bagi kas negara yang menipis.
      Industri Domestik Lemah: Kurangnya investasi R&D dan ketergantungan pada vendor asing (OEM) menghambat kemandirian pertahanan.
      Kelemahan Sinergi: Konsep Pertahanan Komprehensif (HANRUH) sering salah diartikan dan kolaborasi sipil-militer semakin melemah sejak era Kedaruratan Malaya.
      KESIMPULAN:
      FISKAL LUMPUH + POLITIK TIDAK STABIL + ASET USANG = KELUMPUHAN TOTAL DAYA GENTAR.

      Hapus
    9. PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      PENGEMIS BERAS FFBNP : DIPALAK ART USD 240 MILLIAR : BANNED NSM AMRAAM
      ---------------------------------
      MALONYET CLAIMS TO BE RICH = GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP:
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      ---------------------------------
      2026 MALONYET BADUT FFBNP = CUT BUDGET
      2026 MALONYET BADUT FFBNP = NSM BANNED - AMRAAM BLOCKED
      2026 MALONYET BADUT FFBNP = F18 CANCELED - UH60A CANCELED
      2026 MALONYET BADUT FFBNP = REWORK OF 4000 LCS PIPES AND CABLES
      2026 MALONYET BADUT FFBNP = MASS LAYOFFS
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT
      2025 MALONYET BADUT FFBNP = SIPRI EMPTY
      2024 MALONYET BADUT FFBNP = SIPRI EMPTY
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT
      --------------------------------
      MALONYET.......
      STATUS 2023-2026: KEBANGKRUTAN SISTEMIK & MISKIN
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan pemotongan anggaran operasional di seluruh kementerian akibat dampak ekonomi konflik Timur Tengah (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Data SOCSO/PERKESO mencatat 24.100 PHK; Petronas pangkas ±5.000 karyawan. Puncak krisis Januari 2026 (CNBC & HLIB).
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan seluruh kontrak militer dan polisi per 16 Januari 2026 menyusul skandal suap pejabat senior dan mantan panglima.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Dua tahun berturut-turut tanpa catatan transfer senjata global (Defense Studies).
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF karena kendala finansial.
      ________________________________________
      FAKTOR PEMBATAS ANGGARAN MILITER (BUDGETARY CONSTRAINTS):
      Prioritas Ekonomi Domestik: Pertahanan harus berbagi dana dengan sektor kesehatan, pendidikan, dan subsidi sosial di tengah perlambatan ekonomi.
      Alokasi PDB Rendah: Belanja militer umumnya hanya 1,5% - 2% dari PDB, jauh di bawah Singapura (~3%) atau Thailand (~2,5%).
      Beban Hutang & Kebijakan Fiskal: Defisit anggaran membatasi ruang gerak pemerintah untuk melakukan upgrade militer yang bersifat diskresioner.
      Dampak Riil: Penundaan modernisasi jet tempur dan kapal selam hingga dekadean; ketergantungan pada pemeliharaan aset tua daripada pengadaan baru.
      ________________________________________
      SKANDAL PEMBENGKAKAN BIAYA (COST OVERRUNS):
      Proyek LCS (Littoral Combat Ship): Anggaran awal RM 9 Miliar untuk 6 kapal, membengkak jadi RM 11 Miliar+ namun hanya menghasilkan 5 kapal (target selesai 2026-2029).
      Program NGPV (Patrol Vessel): Anggaran awal RM 5,35 Miliar untuk 27 kapal, berakhir dengan biaya RM 6,75 Miliar namun hanya mendapatkan sebagian kecil dari jumlah awal.
      Pengadaan Kapal Selam Scorpene: Tuduhan suap dan biaya tambahan logistik yang tidak terduga meningkatkan beban pengeluaran negara secara masif.
      Kasus Helikopter MD530G: Kontrak bermasalah dan kegagalan pengiriman yang menyebabkan kerugian finansial dan kekosongan operasional.
      ________________________________________
      PENYEBAB UTAMA MISMANAJEMEN:
      Intervensi Politik: Keputusan sering didasarkan pada koneksi politik daripada kebutuhan operasional murni.
      Korupsi & Kronisme: Penggunaan perusahaan cangkang dan perantara (intermediaries) yang menggelembungkan nilai kontrak.
      Lemahnya Pengawasan: Kurangnya transparansi parlemen dan penggunaan UU Rahasia Rasmi (OSA) untuk menyembunyikan penyimpangan keuangan.
      Tantangan Teknis: Akuisisi peralatan yang tidak kompatibel menuntut modifikasi mahal di kemudian hari.
      KESIMPULAN:
      FISKAL LUMPUH + SKANDAL LCS/NGPV + KORUPSI SISTEMIK = KELUMPUHAN TOTAL KEDAULATAN.

      Hapus
    10. PENGEMIS BERAS FFBNP : LCS BANNED NSM-LMS NO TORPEDO-F18 BATAL
      PENGEMIS BERAS FFBNP : LCS BANNED NSM-LMS NO TORPEDO-F18 BATAL
      ------------------------------
      MALONYET KLAIM CASH KAYA = GOVT DEBT 70,5% HOUSEHOLD 84,3% TO GDP:
      -
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------
      2026 MALONYET BADUT FFBNP = CUT BUDGET
      2026 MALONYET BADUT FFBNP = NSM BANNED - AMRAAM BLOKIR
      2026 MALONYET BADUT FFBNP =F18 BATAL - UH60A BATAL
      2026 MALONYET BADUT FFBNP =REWORK 4000 PIPA DAN KABEL LCS
      2026 MALONYET BADUT FFBNP =PHK MASSAL
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT
      2025 MALONYET BADUT FFBNP =SIPRI KOSONG
      2024 MALONYET BADUT FFBNP =SIPRI KOSONG
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT
      --------------------------------
      MALONYET.......
      STATUS 2023-2026: KEBANGKRUTAN ALUTSISTA & MISKIN
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan pemotongan anggaran operasional di seluruh instansi pemerintah akibat krisis ekonomi (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Puncak krisis Januari 2026 dengan 24.100 PHK (Data SOCSO/PERKESO); Petronas pangkas ±5.000 karyawan (CNBC & Bloomberg).
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan seluruh kontrak militer dan polisi per 16 Januari 2026 akibat skandal suap pejabat senior dan mantan panglima.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Dua tahun berturut-turut tanpa catatan transfer senjata global (Defense Studies).
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF karena kendala finansial.
      ________________________________________
      PENUAAN ALUTSISTA DI SELURUH MATRA (AGING EQUIPMENT):
      Aset di Atas 30 Tahun: Sebanyak 171 aset militer telah melewati usia pakai 30 tahun (Darat: 108 unit, Udara: 29 unit, Laut: 34 unit).
      Beban Pemeliharaan: Platform tua menuntut biaya perawatan tinggi dengan hasil performa dan reliabilitas yang terus menurun.
      Teknologi Usang: Sistem persenjataan ketinggalan zaman, sulit diintegrasikan dengan platform baru, dan tidak efektif dalam pertempuran modern.
      ________________________________________
      KELUMPUHAN ARMADA LAUT (NAVAL LIMITATIONS):
      Kapal Melewati Usia Pakai: Dari 53 kapal RMN, 34 unit melampaui usia teknis, bahkan 28 kapal di antaranya sudah berusia di atas 40 tahun.
      Gap Kapabilitas: Kapal tua (KD Lekiu & KD Kasturi) kehilangan teknologi sensor dan sistem senjata modern, melumpuhkan kemampuan patroli di zona maritim luas.
      Kegagalan Program 15-to-5: Rencana penyederhanaan kelas kapal terhambat kekurangan dana dan hambatan birokrasi pengadaan.
      Skandal LCS: Proyek 6 kapal yang tidak kunjung terkirim hingga 2025 akibat mismanajemen, meninggalkan celah kritis di ZEE dan Laut Cina Selatan.
      ________________________________________
      MASALAH PENGADAAN & OPERASIONAL (POLICY GAPS):
      Skandal "Peti Mati Terbang": Raja MALONYET membatalkan kesepakatan helikopter Black Hawk berusia 30 tahun yang dijuluki "peti mati terbang" dan mengecam penggunaan aset usang.
      Korupsi Makelar: Ketergantungan pada perantara (pensiunan perwira) menyebabkan harga melambung tinggi dan kesepakatan yang meragukan.
      Kurangnya Tender Terbuka: Hanya 20–30% kontrak besar diberikan melalui tender terbuka, merusak transparansi dan efisiensi nilai uang.
      Gap Teknologi & Pelatihan: Pasukan berlatih menggunakan platform yang tidak lagi mewakili kondisi medan perang modern, membatasi kesiapan taktis.
      Ketergantungan OEM Asing: Lemahnya industri pertahanan domestik memaksa ketergantungan penuh pada teknologi luar yang mahal dan lambat.
      KESIMPULAN:
      FISKAL LUMPUH + SKANDAL "PETI MATI TERBANG" + ARMADA 40 TAHUN = KEBANGKRUTAN PERTAHANAN TOTAL

      Hapus
  15. https://www.youtube.com/watch?v=7HtKfU3NjBM

    20 Jam bantu padam kebakaran INDON.
    INDON tau hanya bagi kesusahan jerebu saja buat Malaysia. Malaysia juga yang bantu padam!

    🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣

    BalasHapus
    Balasan
    1. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      --------------------------------------------
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      --------------------------------------------
      USA BANNED MALONYET : USA PALAK ART USD 240 MILLIAR
      NSM
      AMRAAM
      F18
      UH60A
      --------------------------------------------
      🀣ART PALAK USD 240 MILLIAR = BANNED : NSM AMRAAM F18🀣

      Hapus
    2. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA KLAIM CASH = HUTANG
      ANGSURAN FA50M = 10 TAHUN
      ANGSURAN FA50M = 10 TAHUN
      ANGSURAN FA50M = 10 TAHUN
      -------------------------
      angsuran untuk proyek Jet Tempur FA-50 Block 20 dengan skema Hybrid (Kredit & Barter) yang sangat unik:
      Parameter Simulasi
      Total Kontrak: US$ 920.000.000 (Sekitar RM 4,08 Miliar).
      Pembagian Skema (50:50):
      50% Kredit (Hutang): US$ 460.000.000
      50% Barter (Sawit): US$ 460.000.000
      Tenor (Jangka Waktu): 10 Tahun.
      Estimasi Bunga KEXIM: 4,5% per tahun (mengikuti standar OECD CIRR).
      ________________________________________
      1. Bagian Hutang Finansial (50% Melalui KEXIM)
      Menggunakan metode bunga tetap (Fixed Rate) untuk porsi pinjaman tunai:
      Pokok Pinjaman: US$ 460 Juta.
      Angsuran Pokok Tahunan: US$ 46 Juta.
      Estimasi Bunga per Tahun: US$ 20,7 Juta (Tahun pertama).
      Total Cicilan Tunai Tahun 1: US$ 66,7 Juta (Akan menurun seiring berkurangnya sisa pokok).
      2. Bagian Barter Komoditas (50% Melalui Minyak Sawit)
      Ini adalah bagian yang "tidak berbunga" secara finansial, namun dihitung berdasarkan volume ekspor:
      Nilai Barter: US$ 460 Juta.
      Target Barter Tahunan: US$ 46 Juta/tahun.
      Volume Sawit: Jika harga CPO rata-rata US$ 900/ton, maka pemerintah harus mengirim sekitar 51.111 ton CPO per tahun ke Korea Selatan selama 10 tahun.



      Hapus
    3. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      CICILAN FA50M = 10 TAHUN
      CICILAN FA50M = 10 TAHUN
      CICILAN FA50M = 10 TAHUN
      ------------------
      Kesimpulan: Skema "Gali Lubang" 10 Tahun FA-50M
      1. Ketergantungan Total pada Utang & Barter
      Pengadaan ini membuktikan ketidakmampuan finansial secara tunai (cash). Dengan total kontrak US$ 920 Juta (RM 4,08 Miliar), pemerintah harus memecah pembayaran menjadi dua jalur selama satu dekade penuh, yang mengunci anggaran pertahanan hingga jauh ke depan.
      2. Beban Bunga dan Fiskal yang Panjang
      Porsi kredit 50% melalui KEXIM (Korea) memaksa negara membayar bunga sekitar 4,5% per tahun. Artinya, harga asli pesawat membengkak karena akumulasi bunga selama 10 tahun. Setiap tahunnya, kas negara harus terkuras sekitar US$ 66,7 Juta hanya untuk mencicil sebagian dari 18 unit pesawat tersebut.
      3. Pertaruhan Komoditas (Sawit)
      Skema barter 50% menggunakan CPO (Minyak Sawit) adalah langkah berisiko tinggi.
      Volume Masif: Harus mengirim 51.111 ton CPO per tahun.
      Risiko Harga: Jika harga sawit dunia anjlok di bawah US

      900/ton,jumlahvolumesawityangharusdikirimakanmembengkakdemimenutupinilai**US900 / t o n comma j u m l a h v o l u m e s a w i t y a n g h a r u s d i k i r i m a k a n m e m b e n g k a k d e m i m e n u t u p i n i l a i * * cap U cap S
      900/π‘‘π‘œπ‘›,π‘—π‘’π‘šπ‘™π‘Žβ„Žπ‘£π‘œπ‘™π‘’π‘šπ‘’π‘ π‘Žπ‘€π‘–π‘‘π‘¦π‘Žπ‘›π‘”β„Žπ‘Žπ‘Ÿπ‘’π‘ π‘‘π‘–π‘˜π‘–π‘Ÿπ‘–π‘šπ‘Žπ‘˜π‘Žπ‘›π‘šπ‘’π‘šπ‘π‘’π‘›π‘”π‘˜π‘Žπ‘˜π‘‘π‘’π‘šπ‘–π‘šπ‘’π‘›π‘’π‘‘π‘’π‘π‘–π‘›π‘–π‘™π‘Žπ‘–**π‘ˆπ‘†
      46 Juta/tahun**, yang berpotensi merugikan pendapatan negara dari sektor ekspor.
      4. Status Alutsista "Kredit"
      Selama 10 tahun ke depan (hingga sekitar 2034/2035), jet tempur ini berstatus "belum lunas". Kondisi ini sangat kontras dengan negara yang memiliki ruang fiskal lebar yang mampu melakukan pengadaan secara bertahap namun tunai untuk menghindari beban bunga OECD.
      5. Dampak pada Pengadaan Lain
      Cicilan tetap selama 10 tahun ini menjadi alasan utama terjadinya "Kekangan Kewangan" untuk proyek lain seperti MRCA atau LCS. Anggaran yang seharusnya bisa digunakan untuk belanja baru justru habis tersedot untuk membayar cicilan pesawat ringan (Lead-in Fighter) yang teknologinya akan terus menua selama masa angsuran berlangsung.
      Ringkasan Kondisi:
      Membeli pesawat tempur dengan cicilan 10 tahun dan bayar pakai sawit adalah potret nyata ekonomi yang sedang "sesak napas", di mana alutsista didapat dengan cara menjaminkan kekayaan alam dan utang luar negeri jangka panjang.

      Hapus
    4. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA KLAIM CASH = HUTANG
      ANGSURAN MPMS TURKEY
      ANGSURAN MPMS TURKEY
      ANGSURAN MPMS TURKEY
      -------------------------
      angsuran untuk proyek
      Kapal MPMS (Multi-Purpose Mission Ship) yang melibatkan galangan kapal Desan Shipyard dari Turki:
      1. Parameter Utama Proyek
      ________________________________________
      Proyek ini menggunakan skema Export Credit Agency (ECA) yang didukung oleh kolaborasi antara lembaga keuangan domestik dan Turk Eximbank.
      Estimasi Nilai Kontrak: US$ 350.000.000 (Sekitar RM 1,6 Miliar).
      Mekanisme: 100% Kredit Ekspor (Hutang Finansial).
      Tenor (Jangka Waktu): 10 Tahun.
      Suku Bunga: Diasumsikan sebesar 5% per tahun (Mengacu pada rata-rata OECD CIRR untuk kategori kapal).
      2. Perhitungan Komponen Angsuran
      ________________________________________
      Berbeda dengan skema barter, seluruh pembayaran dilakukan dalam bentuk mata uang asing (USD).
      Pokok Pinjaman Tahunan:

      US$350.000.000/10=US$35.000.000cap U cap S $ 350.000 .000 / 10 equals bold cap U bold cap S $ 35.000 .000
      π‘ˆπ‘†$350.000.000/10=𝐔𝐒$πŸ‘πŸ“.𝟎𝟎𝟎.𝟎𝟎𝟎
      Bunga Tahun Pertama:

      5%×US$350.000.000=US$17.500.0005 % cross cap U cap S $ 350.000 .000 equals bold cap U bold cap S $ 17.500 .000
      5%×π‘ˆπ‘†$350.000.000=𝐔𝐒$πŸπŸ•.πŸ“πŸŽπŸŽ.𝟎𝟎𝟎
      Total Kewajiban Tahun Pertama:

      US$35.000.000+US$17.500.000=US$52.500.000cap U cap S $ 35.000 .000 plus cap U cap S $ 17.500 .000 equals bold cap U bold cap S $ 52.500 .000
      π‘ˆπ‘†$35.000.000+π‘ˆπ‘†$17.500.000=𝐔𝐒$πŸ“πŸ.πŸ“πŸŽπŸŽ.𝟎𝟎𝟎

      3. Rincian Simulasi Pembayaran (Daftar)
      ________________________________________
      Pembayaran menggunakan metode diminishing interest (bunga menurun):
      Tahun ke-1: US$ 52,5 Juta (Cicilan tertinggi karena saldo pokok masih utuh).
      Tahun ke-3: **US

      49,0Juta**(Bunga turun menjad iUS49 comma 0 cap J u t a * * open paren cap B u n g a t u r u n m e n j a d i cap U cap S
      49,0π½π‘’π‘‘π‘Ž**(π΅π‘’π‘›π‘”π‘Ž π‘‘π‘’π‘Ÿπ‘’π‘› π‘šπ‘’π‘›π‘—π‘Žπ‘‘π‘– π‘ˆπ‘†
      14 Juta seiring pembayaran pokok).
      Tahun ke-5: **US

      45,5Juta**(Bunga menurun menjadi US45 comma 5 cap J u t a * * open paren cap B u n g a m e n u r u n m e n j a d i cap U cap S
      45,5π½π‘’π‘‘π‘Ž**(π΅π‘’π‘›π‘”π‘Ž π‘šπ‘’π‘›π‘’π‘Ÿπ‘’π‘› π‘šπ‘’π‘›π‘—π‘Žπ‘‘π‘– π‘ˆπ‘†
      10,5 Juta).
      Tahun ke-8: **US

      40,25Juta**(Bunga menurun menjadi US40 comma 25 cap J u t a * * open paren cap B u n g a m e n u r u n m e n j a d i cap U cap S
      40,25π½π‘’π‘‘π‘Ž**(π΅π‘’π‘›π‘”π‘Ž π‘šπ‘’π‘›π‘’π‘Ÿπ‘’π‘› π‘šπ‘’π‘›π‘—π‘Žπ‘‘π‘– π‘ˆπ‘†
      5,25 Juta).
      Tahun ke-10: US$ 36,75 Juta (Cicilan final dengan beban bunga minimal).
      4. Catatan Penting Skema MPMS (Desan Shipyard)
      ________________________________________
      MoU Tripartit: Proyek ini didukung oleh kesepakatan antara EXIM Bank pemberi pinjaman, Turk Eximbank, dan Desan Shipyard untuk menjamin kelancaran arus kas selama masa konstruksi.
      Pembayaran Berbasis Milestone: Meskipun hutang dicairkan, pembayaran kepada galangan kapal dilakukan berdasarkan kemajuan fisik proyek (Milestone Payment), guna meminimalisir risiko kegagalan pengiriman.



      Hapus
    5. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      CICILAN FA50M = 10 TAHUN
      CICILAN FA50M = 10 TAHUN
      CICILAN FA50M = 10 TAHUN
      ------------------
      Kesimpulan: Skema "Gali Lubang" 10 Tahun FA-50M
      1. Ketergantungan Total pada Utang & Barter
      Pengadaan ini membuktikan ketidakmampuan finansial secara tunai (cash). Dengan total kontrak US$ 920 Juta (RM 4,08 Miliar), pemerintah harus memecah pembayaran menjadi dua jalur selama satu dekade penuh, yang mengunci anggaran pertahanan hingga jauh ke depan.
      2. Beban Bunga dan Fiskal yang Panjang
      Porsi kredit 50% melalui KEXIM (Korea) memaksa negara membayar bunga sekitar 4,5% per tahun. Artinya, harga asli pesawat membengkak karena akumulasi bunga selama 10 tahun. Setiap tahunnya, kas negara harus terkuras sekitar US$ 66,7 Juta hanya untuk mencicil sebagian dari 18 unit pesawat tersebut.
      3. Pertaruhan Komoditas (Sawit)
      Skema barter 50% menggunakan CPO (Minyak Sawit) adalah langkah berisiko tinggi.
      Volume Masif: Harus mengirim 51.111 ton CPO per tahun.
      Risiko Harga: Jika harga sawit dunia anjlok di bawah US

      900/ton,jumlahvolumesawityangharusdikirimakanmembengkakdemimenutupinilai**US900 / t o n comma j u m l a h v o l u m e s a w i t y a n g h a r u s d i k i r i m a k a n m e m b e n g k a k d e m i m e n u t u p i n i l a i * * cap U cap S
      900/π‘‘π‘œπ‘›,π‘—π‘’π‘šπ‘™π‘Žβ„Žπ‘£π‘œπ‘™π‘’π‘šπ‘’π‘ π‘Žπ‘€π‘–π‘‘π‘¦π‘Žπ‘›π‘”β„Žπ‘Žπ‘Ÿπ‘’π‘ π‘‘π‘–π‘˜π‘–π‘Ÿπ‘–π‘šπ‘Žπ‘˜π‘Žπ‘›π‘šπ‘’π‘šπ‘π‘’π‘›π‘”π‘˜π‘Žπ‘˜π‘‘π‘’π‘šπ‘–π‘šπ‘’π‘›π‘’π‘‘π‘’π‘π‘–π‘›π‘–π‘™π‘Žπ‘–**π‘ˆπ‘†
      46 Juta/tahun**, yang berpotensi merugikan pendapatan negara dari sektor ekspor.
      4. Status Alutsista "Kredit"
      Selama 10 tahun ke depan (hingga sekitar 2034/2035), jet tempur ini berstatus "belum lunas". Kondisi ini sangat kontras dengan negara yang memiliki ruang fiskal lebar yang mampu melakukan pengadaan secara bertahap namun tunai untuk menghindari beban bunga OECD.
      5. Dampak pada Pengadaan Lain
      Cicilan tetap selama 10 tahun ini menjadi alasan utama terjadinya "Kekangan Kewangan" untuk proyek lain seperti MRCA atau LCS. Anggaran yang seharusnya bisa digunakan untuk belanja baru justru habis tersedot untuk membayar cicilan pesawat ringan (Lead-in Fighter) yang teknologinya akan terus menua selama masa angsuran berlangsung.
      Ringkasan Kondisi:
      Membeli pesawat tempur dengan cicilan 10 tahun dan bayar pakai sawit adalah potret nyata ekonomi yang sedang "sesak napas", di mana alutsista didapat dengan cara menjaminkan kekayaan alam dan utang luar negeri jangka panjang.

      Hapus
    6. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA KLAIM CASH = HUTANG
      ANGSURAN LMS B2 TURKEY
      ANGSURAN LMS B2 TURKEY
      ANGSURAN LMS B2 TURKEY
      -------------------------
      angsuran untuk proyek
      Kapal Perang LMS B2 (Littoral Mission Ship Batch 2) yang dibangun oleh perusahaan pertahanan Turki, STM:
      1. Parameter Utama Proyek
      Total Nilai Kontrak: Estimasi US$ 500.000.000 (Sekitar RM 2,3 Miliar).
      Mekanisme: 100% Kredit Ekspor (Hutang G2G) melalui Turk Eximbank.
      Tenor (Jangka Waktu): 10 Tahun (Masa cicilan dimulai setelah kapal mulai dikerjakan/efektif).
      Suku Bunga: Diasumsikan menggunakan OECD CIRR sebesar 5,5% per tahun (Fixed Rate).
      ---------
      2. Perhitungan Komponen Tahunan
      Angsuran Pokok Tahunan:
      US$500.000.000/10=US$50.000.000cap U cap S $ 500.000 .000 / 10 equals bold cap U bold cap S $ 50.000 .000
      π‘ˆπ‘†$500.000.000/10=𝐔𝐒$πŸ“πŸŽ.𝟎𝟎𝟎.𝟎𝟎𝟎
      Bunga Tahun Pertama:
      5,5%×US$500.000.000=US$27.500.0005 comma 5 % cross cap U cap S $ 500.000 .000 equals bold cap U bold cap S $ 27.500 .000
      5,5%×π‘ˆπ‘†$500.000.000=𝐔𝐒$πŸπŸ•.πŸ“πŸŽπŸŽ.𝟎𝟎𝟎
      Premi Asuransi Ekspor (One-time/Amortized): Biasanya terdapat biaya tambahan sekitar 1% - 2% dari total nilai kontrak untuk jaminan risiko kredit ekspor.
      ---------
      3. Rincian Pembayaran Tahunan (Simulasi Daftar)
      Tahun ke-1: US$ 77,5 Juta (Cicilan pokok + bunga maksimal).
      Tahun ke-5: **US
      66,5Juta**(Bunga menurun karena saldo pokok berkurang menjadi US66 comma 5 cap J u t a * * open paren cap B u n g a m e n u r u n k a r e n a s a l d o p o k o k b e r k u r a n g m e n j a d i cap U cap S
      66,5π½π‘’π‘‘π‘Ž**(π΅π‘’π‘›π‘”π‘Ž π‘šπ‘’π‘›π‘’π‘Ÿπ‘’π‘› π‘˜π‘Žπ‘Ÿπ‘’π‘›π‘Ž π‘ π‘Žπ‘™π‘‘π‘œ π‘π‘œπ‘˜π‘œπ‘˜ π‘π‘’π‘Ÿπ‘˜π‘’π‘Ÿπ‘Žπ‘›π‘” π‘šπ‘’π‘›π‘—π‘Žπ‘‘π‘– π‘ˆπ‘†
      300 Juta).
      Tahun ke-10: US$ 52,75 Juta (Cicilan terakhir dengan beban bunga terendah).
      ---------
      4. Karakteristik "Kredit" Turki
      Pembiayaan Penuh (100%): Berbeda dengan Korea Selatan yang menggunakan sistem barter 50%, proyek LMS B2 ini murni dibayar dengan devisa tunai melalui fasilitas pinjaman luar negeri.
      Jaminan Pemerintah: Karena ini adalah skema Government-to-Government (G2G), syarat-syarat pinjaman biasanya lebih fleksibel dibandingkan pinjaman bank komersial, dengan masa tenggang (Grace Period) selama masa konstruksi kapal.


      Hapus
    7. PENGEMIS BERAS : BANNED NSM AMRAAM F18 UH60A : ART USD 240 MILLIAR
      GOVT DEBT 70,5% HOUSEHOLD 84,3% TO GDP .........
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      SUBSIDY BURDEN: 23.9%
      BORROWING TO REPAY DEBT: RM470 – RM334.1 = DEFICIT OF RM135.9
      ------------------------------
      KASTA FFBNP= NO SHOPPING BUT LEASING
      KASTA FFBNP= NO SHOPPING BUT LEASING
      ------------------------------
      GOVERNMENT REVENUE =
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ---------------------------------
      Bukti "Hutang Bayar Hutang" (Debt-Servicing Cycle)
      Data resmi menunjukkan MALAYSEWA terjebak dalam siklus gali lubang tutup lubang kronis:
      2018 (Fase Verifikasi): Utang menembus RM1 Triliun; pemerintah meluncurkan Tabung Harapan (donasi rakyat) untuk mencicil utang negara.
      2019–2020: Ketergantungan meningkat; 59% hingga 60% pinjaman baru hanya untuk melunasi utang lama.
      2023 (Rekor Terburuk): 64,3% dari total pinjaman kasar (RM145,8 Miliar) digunakan hanya untuk membayar utang jatuh tempo.
      2025–2026: Proyeksi tetap kritis di angka 58%. Ruang fiskal untuk pembangunan dan alutsista praktis terkunci oleh cicilan utang.
      -
      Bukti "Vakum SIPRI" (2020–2025)
      Kontras dengan klaim belanja "Cash", data SIPRI menunjukkan kekosongan aktivitas:
      2020–2021: Berstatus Planned (Hanya rencana/dijangka).
      2022–2023: Berstatus Not Yet Ordered (Terpilih tapi tidak ada kontrak/pesanan).
      2024–2025: Status resmi KOSONG (Nihil transfer senjata berat selama 2 tahun berturut-turut).
      Posisi Regional: MALAYSEWA kini sejajar dengan Laos dan Kamboja dalam hal nihilnya modernisasi alutsista berat.
      -
      Timeline "Prank" Alutsista (Janji vs Realitas)
      Daftar kegagalan kontrak strategis yang mencoreng kredibilitas pertahanan:
      Prank F/A-18 Hornet: Upaya akuisisi dari Kuwait Batal 4 Kali hingga resmi dihentikan pada 2026 karena masalah logistik dan dana.
      Prank Dassault Rafale: Mangkrak sejak 2014 akibat krisis anggaran (kini diborong Indonesia).
      Prank Kapal MRSS: Janji kontrak dengan PT PAL (Indonesia) pada 2018 yang tidak pernah terwujud.
      Prank Helikopter Blackhawk: Proses sewa (leasing) yang mangkrak dan berbelit hingga 2025.

      Hapus
    8. PENGEMIS BERAS : BANNED NSM AMRAAM F18 UH60A : ART USD 240 MILLIAR
      GOVT DEBT 70,5% HOUSEHOLD 84,3% TO GDP .........
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      SUBSIDY BURDEN: 23.9%
      BORROWING TO REPAY DEBT: RM470 – RM334.1 = DEFICIT OF RM135.9
      ------------------------------
      KASTA FFBNP= NO SHOPPING BUT LEASING
      KASTA FFBNP= NO SHOPPING BUT LEASING
      ------------------------------
      GOVERNMENT REVENUE =
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ---------------------------------
      Perangkap Utang & Liabilitas (Eskalasi RM 1,79 Triliun)
      Pertumbuhan beban finansial yang melumpuhkan negara:
      2010: RM 407,1 Miliar.
      2018: RM 1,19 Triliun (Ledakan pasca-transparansi 1MDB).
      2026: Proyeksi RM 1,79 Triliun (Titik kritis manajemen utang).
      Rasio Utang: Diproyeksikan menyentuh 69,54% dari PDB pada 2029 (Data Statista), melampaui batas aman.
      -
      Penurunan Daya Gentar & Reputasi
      Global Firepower (GFP) 2026: MALAYSEWA (Peringkat 42) resmi disalip oleh Filipina (Peringkat 41) di ASEAN.
      Status "Military-for-Rent": Karena tidak mampu membeli (Buying), beralih ke skema Sewa (Leasing) untuk 32+ item (Heli, simulator, hingga motor polisi).
      Administrasi: Sanksi naturalisasi ilegal dan kekalahan WO 0-3 di bidang olahraga menjadi simbol runtuhnya tata kelola birokrasi nasional.
      -
      Kesimpulan Strategis
      Indonesia: Berstatus "The Giant" dengan modernisasi agresif (Rafale, A400M, PPA) dan rasio utang pemerintah yang sehat (40% GDP).
      MALAYSEWA: Berstatus "The Stagnant" yang terjebak dalam delusi klaim "Shopping Cash" sementara kenyataannya hanya mampu membayar bunga utang lama.

      Hapus
    9. PENGEMIS BERAS : BANNED NSM AMRAAM F18 UH60A : ART USD 240 MILLIAR
      GOVT DEBT 70,5% HOUSEHOLD 84,3% TO GDP .........
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      SUBSIDY BURDEN: 23.9%
      BORROWING TO REPAY DEBT: RM470 – RM334.1 = DEFICIT OF RM135.9
      ------------------------------
      KASTA FFBNP= NO SHOPPING BUT LEASING
      KASTA FFBNP= NO SHOPPING BUT LEASING
      ------------------------------
      GOVERNMENT REVENUE =
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ---------------------------------
      Perangkap Utang & Liabilitas (Eskalasi RM 1,79 Triliun)
      Pertumbuhan beban finansial yang melumpuhkan negara:
      2010: RM 407,1 Miliar.
      2018: RM 1,19 Triliun (Ledakan pasca-transparansi 1MDB).
      2026: Proyeksi RM 1,79 Triliun (Titik kritis manajemen utang).
      Rasio Utang: Diproyeksikan menyentuh 69,54% dari PDB pada 2029 (Data Statista), melampaui batas aman.
      -
      Penurunan Daya Gentar & Reputasi
      Global Firepower (GFP) 2026: MALAYSEWA (Peringkat 42) resmi disalip oleh Filipina (Peringkat 41) di ASEAN.
      Status "Military-for-Rent": Karena tidak mampu membeli (Buying), beralih ke skema Sewa (Leasing) untuk 32+ item (Heli, simulator, hingga motor polisi).
      Administrasi: Sanksi naturalisasi ilegal dan kekalahan WO 0-3 di bidang olahraga menjadi simbol runtuhnya tata kelola birokrasi nasional.
      -
      Kesimpulan Strategis
      Indonesia: Berstatus "The Giant" dengan modernisasi agresif (Rafale, A400M, PPA) dan rasio utang pemerintah yang sehat (40% GDP).
      MALAYSEWA: Berstatus "The Stagnant" yang terjebak dalam delusi klaim "Shopping Cash" sementara kenyataannya hanya mampu membayar bunga utang lama.

      Hapus
    10. PENGEMIS BERAS : BANNED NSM AMRAAM F18 UH60A : ART USD 240 MILLIAR
      GOVT DEBT 70,5% HOUSEHOLD 84,3% TO GDP .........
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      SUBSIDY BURDEN: 23.9%
      BORROWING TO REPAY DEBT: RM470 – RM334.1 = DEFICIT OF RM135.9
      ------------------------------
      KASTA FFBNP= NO SHOPPING BUT LEASING
      KASTA FFBNP= NO SHOPPING BUT LEASING
      ------------------------------
      GOVERNMENT REVENUE =
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ---------------------------------
      Analisa Kekuatan Udara: Buying vs. Prank
      Indonesia melakukan modernisasi masif dengan kontrak resmi (Firm Order), sementara MALAYSEWA terjebak dalam pembatalan dan wacana:
      Indonesia (Realisasi & Kontrak G2G):
      42 Rafale: Kontrak lunas dan efektif (Dassault Aviation).
      48 KAAN (Gen-5): Kerja sama strategis G2G dengan Turki (TAI).
      48 KF-21 Boramae (Block II): Kesepakatan tahap akhir dengan Korea Selatan (KAI).
      24 M-346F: Penandatanganan Letter of Award (LOA) dengan Leonardo.
      MALAYSEWA (Pembatalan & Kegagalan):
      F-18 Kuwait: Resmi BATAL (2026) setelah 4 kali upaya negosiasi (New Straits Times).
      Status "Prank": Wacana JF-17, Rafale, Typhoon, dan Tejas berakhir tanpa kontrak.
      MiG-29N: Pensiun tanpa pengganti (Tiada Ganti).
      FA-50: Mengalami hambatan blokir/lisensi dari AS.
      -
      Analisa Geografis & Jangkauan Tempur
      Jarak Pekanbaru ke KL (291 KM) dan Pontianak ke Sarawak (498 KM) sangat pendek dibandingkan radius tempur jet tempur baru Indonesia:
      Rafale: ±1.852 KM (Sanggup menjangkau seluruh wilayah semenanjung dan Kalimantan).
      KAAN & KF-21: ±1.100–1.400 KM (Dominasi ruang udara regional).

      Hapus
  16. https://www.youtube.com/watch?v=7HtKfU3NjBM

    20 Jam bantu padam kebakaran INDON.
    INDON tau hanya bagi kesusahan jerebu saja buat Malaysia. Malaysia juga yang bantu padam!

    🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣

    BalasHapus
    Balasan
    1. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      --------------------------------------------
      1.RASIO HUTANG 84.3% DARI GDP
      2. HUTANG NEGARA RM 1,65 TRLLIUN
      3. HUTANG 1MDB RM 18,2 BILLION
      4. TUNGGAKAN SEWA SABAH USD 15 BILLION
      5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
      6. SEWA SIMULATOR MKM
      7. PESAWAT MIG GROUNDED
      8. SEWA MOTOR POLIS
      9. PESAWAT MB339CM GROUNDED
      10. NURI GROUNDED SEWA BLACKHAWK
      11. FIVE PROCUREMENT CANCELLED
      12. 48 PESAWAT SKYHAWK HILANG
      13. MESIN JET 2 BUAH HILANG
      14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
      15. NO LST
      16. NO LPD – NGEMIS LPD USA
      17. NO TANKER
      18. NO KCR
      19. MONUMEN MIG29M UNTUK JIMAT KOS
      20. NO SPH
      21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
      22. NO HELLFIRE
      23. NO MPA ATR72 DELAYED
      24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
      25. NO HELI HEAVY ATTACK NGEMIS AH1Z
      26. NO M3 AMPHIBIUS RIG
      27. LCS MANGKRAK KARATAN
      28. OPV MANGKRAK
      29. TANK MOGOK STOP SPARE PARTS
      30. CN 235 MSA VERSI MSI USA
      31. SEWA MOTOR MILITARY POLICE
      32. RADAR GIFTED PAID USA
      33. 84% NO SAVING EVERY MONTH
      34. SEWA VVSHORAD
      35. SEWA TRUK 3 TON
      36. 4X4 SEWA 6X6 CANCELLED
      37. C130H DIGANTI 2045
      38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
      39. NO DRONE UCAV – ANKA ISR OMPONG
      40. SEWA BLACKHAWK SEWA AW159
      41. NO TRACKED SPH
      42. SEWA SIMULATOR HELI
      43. SPH CANCELLED
      44. SCORPION V150 CONDOR SIMBAS RETIRED
      45. NO PESAWAT COIN
      46. PILATUS MK II KARATAN
      47. PENCEROBOHAN 43X BTA 316 HARI
      48. SEWA AW139 SEWA COLIBRI
      49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
      50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
      51. LYNX GROUNDED
      52. MRCA CANCELLED SEWA PESAWAT ITTC
      53. MICA CANCELLED NSM CANCELLED
      54. NO LRAD NO MRAD JUST VSHORAD
      55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
      56. 4X NGEMIS F18 KUWAIT
      57. MENUNGGU 2050 KAPAL SELAM
      58. NO TANK AMPHIBI AV8 MOGOK BERASAP
      59. 84% NO SAVING EVERY MONTH
      60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
      61. MKM BARTER PALM OIL
      62. MIG29N BARTER PALM OIL
      63. A400M PEMBAYARAN BERPERINGKAT (HUTANG)
      64. SCORPENE BARTER PALM OIL
      65. PT91M BARTER PALM OIL RUBBER
      67. FA50M BARTER PALM OIL
      ===================
      SEWA = HUTANG 84.3% DARI GDP = NO SHOPPING
      1. SEWA 28 HELI
      2. SEWA L39 ITCC
      3. SEWA EC120B
      4. SEWA FLIGHT SIMULATION TRAINING DEVICE (FSTD)
      5. SEWA 1 UNIT SISTEM SIMULATOR EC120B
      6. SEWA HOVERCRAFT
      7. SEWA AW139
      8. SEWA FAST INTERCEPTOR BOAT (FIB)
      9. SEWA UTILITY BOAT
      10. SEWA RIGID HULL FENDER BOAT (RHFB)
      11. SEWA ROVER FIBER GLASS (ROVER)
      12. SEWA MV AISHAH AIM 4
      13. SEWA BMW R1250RT
      14. SEWA 4x4 VECHICLE
      15. SEWA VSHORAD
      16. SEWA TRUCK
      17. SEWA HONDA CIVIC
      18. SEWA PATROL BOATS
      19. SEWA OUTBOARD MOTORS
      20. SEWA TRAILERS
      21. SEWA SUPERBIKES
      22. SEWA SIMULATOR MKM
      23. SEWA 12 AW149 TUDM
      24. SEWA 4 AW139 TUDM
      25. SEWA 5 EC120B TUDM
      26. SEWA 2 AW159 TLDM
      27. SEWA 4 UH-60A TDM
      28. SEWA 12 AW149 TDM
      29. SEWA 4 AW139 BOMBA
      30. SEWA 2 AW159 MMEA
      31. SEWA 7 BELL429 POLIS
      32. SEWA MOTOR POLIS
      --------------------------------------------
      USA BANNED MALONYET : USA PALAK ART USD 240 MILLIAR
      NSM
      AMRAAM
      F18
      UH60A
      --------------------------------------------
      🀣ART PALAK USD 240 MILLIAR = BANNED : NSM AMRAAM F18🀣

      Hapus
    2. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      CICILAN LMS B2 = 10 TAHUN
      CICILAN LMS B2 = 10 TAHUN
      CICILAN LMS B2 = 10 TAHUN
      --------------------------------
      Berikut adalah kesimpulan dari rincian angsuran proyek LMS Batch 2 (LMS B2) dengan galangan kapal STM Turki:
      Struktur Pendanaan: Proyek senilai US$ 500 juta ini didanai sepenuhnya (100%) melalui skema Kredit Ekspor G2G dari Turk Eximbank tanpa mekanisme barter.
      Beban Cicilan: Dengan tenor 10 tahun dan bunga tetap (Fixed Rate) sebesar 5,5%, total kewajiban tahun pertama mencapai US$ 77,5 juta.
      Metode Pembayaran: Menggunakan sistem bunga menurun (diminishing interest), di mana beban tahunan berkurang seiring pelunasan pokok, hingga mencapai US$ 52,75 juta pada tahun terakhir.
      Keunggulan Skema: Fasilitas G2G ini menawarkan fleksibilitas berupa Grace Period (masa tenggang) selama masa konstruksi, meskipun seluruh pembayaran tetap wajib dilakukan dalam mata uang asing (USD)
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544

      Hapus
    3. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA KLAIM CASH = HUTANG
      ANGSURAN LCS
      ANGSURAN LCS
      ANGSURAN LCS
      -------------------------
      angsuran untuk proyek
      angsuran untuk proyek
      LCS (Littoral Combat Ship), yang merupakan proyek dengan nilai kontrak terbesar dan skema pendanaan paling kompleks:
      1. Parameter Utama Proyek
      ________________________________________
      Proyek LCS mengalami beberapa kali restrukturisasi anggaran. Simulasi ini menggunakan estimasi sisa nilai kontrak atau tambahan plafon yang diperlukan untuk penyelesaian kapal.
      Estimasi Total Nilai Proyek: US$ 2.500.000.000 (Sekitar RM 11,2 Miliar).
      Mekanisme: Kredit domestik dan internasional dengan jaminan pemerintah (Government Guarantee).
      Tenor (Jangka Waktu): 15 Tahun (Tenor lebih panjang karena nilai proyek yang sangat besar).
      Suku Bunga: Diasumsikan 6% per tahun (Mengingat profil risiko proyek dan bunga pinjaman sindikasi perbankan).
      2. Perhitungan Komponen Angsuran
      ________________________________________
      Karena nilai proyek yang besar, beban bunga menjadi komponen yang sangat signifikan dalam anggaran tahunan.
      Pokok Pinjaman Tahunan:

      US$2.500.000.000/15=US$166.666.667cap U cap S $ 2.500 .000 .000 / 15 equals bold cap U bold cap S $ 166.666 .667
      π‘ˆπ‘†$2.500.000.000/15=𝐔𝐒$πŸπŸ”πŸ”.πŸ”πŸ”πŸ”.πŸ”πŸ”πŸ•
      Bunga Tahun Pertama:

      6%×US$2.500.000.000=US$150.000.0006 % cross cap U cap S $ 2.500 .000 .000 equals bold cap U bold cap S $ 150.000 .000
      6%×π‘ˆπ‘†$2.500.000.000=𝐔𝐒$πŸπŸ“πŸŽ.𝟎𝟎𝟎.𝟎𝟎𝟎
      Total Kewajiban Tahun Pertama:

      US$166,6 Juta+US$150 Juta=US$316,6 Jutacap U cap S $ 166 comma 6 Juta plus cap U cap S $ 150 Juta equals bold cap U bold cap S $ 316 comma 6 Juta
      π‘ˆπ‘†$166,6 Juta+π‘ˆπ‘†$150 Juta=𝐔𝐒$πŸ‘πŸπŸ”,πŸ” Juta

      3. Rincian Simulasi Pembayaran (Daftar)
      ________________________________________
      Pembayaran dihitung dengan metode saldo menurun:
      Tahun ke-1: US$ 316,6 Juta (Beban puncak, di mana bunga hampir setara dengan cicilan pokok).
      Tahun ke-5: **US

      276,6Juta**( π΅π‘’π‘›π‘”π‘Ž π‘šπ‘’π‘›π‘’π‘Ÿπ‘’π‘› π‘šπ‘’π‘›π‘—π‘Žπ‘‘π‘– π‘ˆπ‘† 276 comma 6 cap J u t a * * open paren cap B u n g a m e n u r u n m e n j a d i cap U cap S
      276,6π½π‘’π‘‘π‘Ž**(π΅π‘’π‘›π‘”π‘Ž π‘šπ‘’π‘›π‘’π‘Ÿπ‘’π‘› π‘šπ‘’π‘›π‘—π‘Žπ‘‘π‘– π‘ˆπ‘†
      110 Juta seiring berkurangnya saldo pokok).
      Tahun ke-10: **US

      226,6Juta**( π΅π‘’π‘›π‘”π‘Ž π‘šπ‘’π‘›π‘’π‘Ÿπ‘’π‘› π‘šπ‘’π‘›π‘—π‘Žπ‘‘π‘– π‘ˆπ‘† US226 comma 6 cap J u t a * * open paren cap B u n g a m e n u r u n m e n j a d i cap U cap S
      226,6π½π‘’π‘‘π‘Ž**( π΅π‘’π‘›π‘”π‘Ž π‘šπ‘’π‘›π‘’π‘Ÿπ‘’π‘› π‘šπ‘’π‘›π‘—π‘Žπ‘‘π‘– π‘ˆπ‘† 60 Juta).
      Tahun ke-15: **US

      176,6Juta**(Cicilan terakhir dengan bunga minima lsebesar US 176 comma 6 cap J u t a * * open paren cap C i c i l a n t e r a k h i r d e n g a n b u n g a m i n i m a l s e b e s a r cap U cap S
      176,6π½π‘’π‘‘π‘Ž**(πΆπ‘–π‘π‘–π‘™π‘Žπ‘› π‘‘π‘’π‘Ÿπ‘Žπ‘˜β„Žπ‘–π‘Ÿ π‘‘π‘’π‘›π‘”π‘Žπ‘› π‘π‘’π‘›π‘”π‘Ž π‘šπ‘–π‘›π‘–π‘šπ‘Žπ‘™ π‘ π‘’π‘π‘’π‘ π‘Žπ‘Ÿπ‘ˆπ‘†
      10 Juta).
      4. Karakteristik "Kredit" LCS
      ________________________________________
      Beban APBN Jangka Panjang: Berbeda dengan proyek FA-50 yang menggunakan barter sawit, LCS murni dibayar dengan tunai. Angsuran tahunan sebesar ±US$ 300 juta ini setara dengan porsi signifikan dari anggaran belanja modal pertahanan tahunan.
      Risiko Eskalasi Biaya: Karena tenor yang sangat panjang (15 tahun), fluktuasi nilai tukar mata uang asing menjadi risiko utama. Jika mata uang domestik melemah, nilai angsuran dalam USD akan terasa jauh lebih berat.
      Dukungan Perbankan Sindikasi: Proyek ini biasanya tidak hanya melibatkan satu bank, melainkan konsorsium perbankan karena limit kredit yang sangat besar.


      Hapus
    4. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      CICILAN LCS = 15 TAHUN
      CICILAN LCS = 15 TAHUN
      CICILAN LCS = 15 TAHUN
      CICILAN LCS = 15 TAHUN
      CICILAN LCS = 15 TAHUN
      CICILAN LCS = 15 TAHUN
      CICILAN LCS = 15 TAHUN
      CICILAN LCS = 15 TAHUN
      CICILAN LCS = 15 TAHUN
      CICILAN LCS = 15 TAHUN
      CICILAN LCS = 15 TAHUN
      CICILAN LCS = 15 TAHUN
      CICILAN LCS = 15 TAHUN
      CICILAN LCS = 15 TAHUN
      CICILAN LCS = 15 TAHUN
      CICILAN LCS = 15 TAHUN
      --------------------------------
      Berikut adalah kesimpulan dari rincian angsuran proyek
      Littoral Combat Ship (LCS) yang merupakan proyek pertahanan dengan nilai terbesar:
      Skala Keuangan Masif: Dengan estimasi nilai proyek mencapai US$ 2,5 Miliar (sekitar RM 11,2 Miliar), LCS menjadi proyek dengan beban anggaran paling berat dibandingkan proyek kapal perang lainnya.
      Struktur Pinjaman: Menggunakan mekanisme Kredit Sindikasi (internasional dan domestik) dengan jaminan penuh dari pemerintah (Government Guarantee) dan tenor panjang selama 15 tahun.
      Beban Anggaran Tahunan: Total kewajiban tahun pertama mencapai US$ 316,6 Juta. Angka ini merupakan beban puncak karena komponen bunga (6%) hampir setara dengan cicilan pokok akibat besarnya saldo hutang.
      Metode Pembayaran: Menggunakan sistem saldo menurun, di mana angsuran berkurang secara bertahap dari US
      316,6 Juta ditahun pertama hingga menjadi **US316 comma 6 cap J u t a d i t a h u n p e r t a m a h i n g g a m e n j a d i * * cap U cap S
      316,6 π½π‘’π‘‘π‘Ž π‘‘π‘–π‘‘π‘Žβ„Žπ‘’π‘›π‘ π‘’π‘Ÿπ‘‘π‘Žπ‘šπ‘Ž β„Žπ‘–π‘›π‘”π‘”π‘Ž π‘šπ‘’π‘›π‘—π‘Žπ‘‘π‘– **π‘ˆπ‘†
      176,6 Juta** pada tahun ke-15.
      Risiko Finansial: Tidak seperti proyek barter, LCS dibayar murni tunai (USD), sehingga sangat rentan terhadap fluktuasi nilai tukar dan risiko eskalasi biaya dalam jangka panjang yang dapat menekan APBN.

      Hapus
    5. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA KLAIM CASH = HUTANG
      ANGSURAN LMS B1 CHINA
      ANGSURAN LMS B1 CHINA
      ANGSURAN LMS B1 CHINA
      -------------------------
      angsuran untuk proyek
      Kapal LMS Batch 1 (Littoral Mission Ship) yang dibangun di China (Kerja sama CSOC dan Boustead Naval Shipyard):
      1. Parameter Utama Proyek
      ________________________________________
      Proyek LMS B1 ini merupakan pengadaan 4 unit kapal yang seluruhnya sudah selesai dikirim. Berbeda dengan Batch 2 yang beralih ke Turki, Batch 1 didanai melalui fasilitas kredit dari China.
      Total Nilai Kontrak: Estimasi US$ 250.000.000 (Sekitar RM 1,17 Miliar untuk 4 unit).
      Mekanisme: 100% Kredit Ekspor (Hutang) melalui China Eximbank.
      Tenor (Jangka Waktu): 10 Tahun.
      Suku Bunga: Diasumsikan sebesar 3% – 4% per tahun (China sering memberikan bunga "lunak/preferensial" untuk proyek strategis G2G agar lebih kompetitif dibanding standar OECD).
      2. Perhitungan Komponen Angsuran
      ________________________________________
      Simulasi menggunakan estimasi suku bunga tetap 3,5% per tahun:
      Pokok Pinjaman Tahunan:

      US$250.000.000/10=US$25.000.000cap U cap S $ 250.000 .000 / 10 equals bold cap U bold cap S $ 25.000 .000
      π‘ˆπ‘†$250.000.000/10=𝐔𝐒$πŸπŸ“.𝟎𝟎𝟎.𝟎𝟎𝟎
      Bunga Tahun Pertama:

      3,5%×US$250.000.000=US$8.750.0003 comma 5 % cross cap U cap S $ 250.000 .000 equals bold cap U bold cap S $ 8.750 .000
      3,5%×π‘ˆπ‘†$250.000.000=𝐔𝐒$πŸ–.πŸ•πŸ“πŸŽ.𝟎𝟎𝟎
      Total Kewajiban Tahun Pertama:

      US$25 Juta+US$8,75 Juta=US$33,75 Jutacap U cap S $ 25 Juta plus cap U cap S $ 8 comma 75 Juta equals bold cap U bold cap S $ 33 comma 75 Juta
      π‘ˆπ‘†$25 Juta+π‘ˆπ‘†$8,75 Juta=𝐔𝐒$πŸ‘πŸ‘,πŸ•πŸ“ Juta

      3. Rincian Simulasi Pembayaran (Daftar)
      ________________________________________
      Pembayaran menurun seiring berkurangnya saldo pokok (Effective Rate):
      Tahun ke-1: US$ 33,75 Juta (Beban bunga tertinggi di awal periode).
      Tahun ke-5: **US

      30,25Juta**( π΅π‘’π‘›π‘”π‘Ž π‘šπ‘’π‘›π‘’π‘Ÿπ‘’π‘› π‘šπ‘’π‘›π‘—π‘Žπ‘‘π‘– π‘ˆπ‘† US30 comma 25 cap J u t a * * open paren cap B u n g a m e n u r u n m e n j a d i cap U cap S
      30,25π½π‘’π‘‘π‘Ž**( π΅π‘’π‘›π‘”π‘Ž π‘šπ‘’π‘›π‘’π‘Ÿπ‘’π‘› π‘šπ‘’π‘›π‘—π‘Žπ‘‘π‘– π‘ˆπ‘† 5,25 Juta karena pokok berkurang).
      Tahun ke-8: **US

      27,62Juta**( π΅π‘’π‘›π‘”π‘Ž π‘šπ‘’π‘›π‘’π‘Ÿπ‘’π‘› π‘šπ‘’π‘›π‘—π‘Žπ‘‘π‘– π‘ˆπ‘† 27 comma 62 cap J u t a * * open paren cap B u n g a m e n u r u n m e n j a d i cap U cap S
      27,62π½π‘’π‘‘π‘Ž**( π΅π‘’π‘›π‘”π‘Ž π‘šπ‘’π‘›π‘’π‘Ÿπ‘’π‘› π‘šπ‘’π‘›π‘—π‘Žπ‘‘π‘– π‘ˆπ‘† 2,62 Juta).
      Tahun ke-10: US$ 25,87 Juta (Cicilan final dengan beban bunga minimal).

      Hapus
    6. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      CICILAN LMS B1 = 10 TAHUN
      CICILAN LMS B1 = 10 TAHUN
      CICILAN LMS B1 = 10 TAHUN
      ------------------
      Berikut adalah kesimpulan dari rincian angsuran proyek
      LMS Batch 1 (LMS B1) hasil kerja sama dengan China (CSOC):
      Nilai & Pendanaan: Proyek pengadaan 4 unit kapal ini memiliki nilai kontrak paling ekonomis, yakni US$ 250 Juta (sekitar RM 1,17 Miliar), yang didanai 100% melalui fasilitas kredit dari China Eximbank.
      Keunggulan Bunga: Menggunakan skema bunga "lunak" atau preferensial yang sangat kompetitif sebesar 3,5%, lebih rendah dibandingkan standar OECD yang digunakan pada proyek Turki atau Korea Selatan.
      Struktur Cicilan: Dengan tenor 10 tahun, kewajiban tahun pertama adalah US

      33,75Juta**.Karenamenggunakanmetodebungaefektif,jumlahiniterusmenurunhinggamencapai**US33 comma 75 cap J u t a * * point cap K a r e n a m e n g g u n a k a n m e t o d e b u n g a e f e k t i f comma j u m l a h i n i t e r u s m e n u r u n h i n g g a m e n c a p a i * * cap U cap S
      33,75π½π‘’π‘‘π‘Ž**.πΎπ‘Žπ‘Ÿπ‘’π‘›π‘Žπ‘šπ‘’π‘›π‘”π‘”π‘’π‘›π‘Žπ‘˜π‘Žπ‘›π‘šπ‘’π‘‘π‘œπ‘‘π‘’π‘π‘’π‘›π‘”π‘Žπ‘’π‘“π‘’π‘˜π‘‘π‘–π‘“,π‘—π‘’π‘šπ‘™π‘Žβ„Žπ‘–π‘›π‘–π‘‘π‘’π‘Ÿπ‘’π‘ π‘šπ‘’π‘›π‘’π‘Ÿπ‘’π‘›β„Žπ‘–π‘›π‘”π‘”π‘Žπ‘šπ‘’π‘›π‘π‘Žπ‘π‘Žπ‘–**π‘ˆπ‘†
      25,87 Juta pada tahun terakhir.
      Status Proyek: Berbeda dengan proyek LCS atau LMS B2 yang masih dalam tahap konstruksi/pendanaan, seluruh unit LMS B1 telah selesai dikirim, sehingga fokus saat ini adalah pada periode pelunasan hutang.
      Perbandingan Strategis: Proyek ini membuktikan bahwa jalur G2G dengan China memberikan beban bunga yang lebih ringan bagi APBN dibandingkan pinjaman komersial atau sindikasi internasional lainnya.
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544

      Hapus
    7. WITHOUT MALONYET = KASTA FFBNP : BANNED NSM AMRAAM : PALAK ART USD 240 MILLIAR
      THE 40 LARGEST RECIPIENTS OF MAJOR ARMS =
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -
      1 Ukraina
      2 India
      3 Arab Saudi
      4 Qatar
      5 Pakistan
      6 Jepang
      7 Polandia
      8 Amerika Serikat
      9 Kuwait
      10 Australia
      11 UEA
      12 Mesir
      13 Inggris
      14 Israel
      15 Belanda
      16 Korea Selatan
      17 Jerman
      18 Indonesia
      19 Yunani
      20 Norwegia
      21 China
      22 Italia
      23 Filipina
      24 TΓΌrkiye
      25 Brasil
      26 Singapura
      27 Bahrain
      28 Maroko
      29 Denmark
      30 Rumania
      31 Belgia
      32 Belarusia
      33 Aljazair
      34 Taiwan
      35 Hungaria
      36 Kazakhstan
      37 Serbia
      38 Kanada
      39 Spanyol
      40 Thailand
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -------------------------------
      MALONYET.......
      STATUS 2023-2026: KATASTROFE FISKAL & SKANDAL
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan pemangkasan anggaran operasional di seluruh kementerian akibat dampak ekonomi konflik Timur Tengah (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Puncak krisis di Januari 2026 dengan 24.100 PHK (Data SOCSO/PERKESO); Petronas pangkas ±5.000 karyawan (CNBC & Bloomberg).
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan total kontrak militer dan polisi per 16 Januari 2026 menyusul tuduhan suap terhadap pejabat senior dan mantan panglima.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Dua tahun berturut-turut tanpa aktivitas transfer senjata besar di level internasional (Defense Studies).
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF karena kendala anggaran.
      ________________________________________
      ANALISA KEGAGALAN PROYEK LCS (LITTORAL COMBAT SHIP):
      Mismanajemen Pengadaan: Dimulai sejak 2011; telah menghabiskan RM 6,08 Miliar hingga 2022 tanpa ada satu pun kapal yang dikirimkan.
      Perubahan Desain Fatal: Permintaan perubahan sistem tempur dan sensor di tengah jalan menyebabkan penundaan sertifikasi dan re-engineering bertahun-tahun.
      Masalah Rantai Pasok: Keterlambatan komponen dari OEM (Original Equipment Manufacturer) asing yang seringkali tidak kompatibel dengan revisi desain.
      Ledakan Biaya (Financial Overrun):
      Rencana Awal: RM 9 Miliar untuk 6 Kapal (Selesai 2023).
      Status Saat Ini: RM 11,22 Miliar hanya untuk 5 Kapal (Selesai 2029).
      Dampak: Pembengkakan biaya RM 2,22 Miliar memaksa pemerintah mengurangi jumlah pesanan.
      Lumpuhnya Keamanan Nasional: Penundaan ini meninggalkan celah besar di Laut Cina Selatan; Angkatan Laut terpaksa bergantung pada kapal tua (KD Kasturi & KD Lekir).
      ________________________________________
      MASALAH RANTAI PASOK PERTAHANAN (SUPPLY CHAIN ISSUES):
      Ketergantungan Ekstrim pada OEM Asing: Bergantung penuh pada pemasok internasional untuk avionik pesawat, sistem tempur laut, dan suku cadang kendaraan lapis baja.
      Kemampuan Manufaktur Lokal Terbatas: Industri domestik hanya mampu melakukan perawatan (MRO) dan kendaraan logistik dasar, bukan sistem canggih seperti radar atau rudal.
      Ekosistem Terfragmentasi: Kurangnya koordinasi antara pemangku kepentingan menyebabkan inefisiensi dan lemahnya ketahanan saat krisis.
      Tantangan Kustomisasi: Permintaan konfigurasi khusus sering kali menyebabkan ketidakcocokan teknis dan waktu tunggu yang jauh lebih lama dari OEM.
      Kurangnya Skala Ekonomi: Volume pesanan yang kecil membuat MALONYET menjadi prioritas rendah bagi vendor global, berujung pada biaya unit yang lebih mahal.
      Birokrasi & Politik: Perubahan spesifikasi dan kepemimpinan yang sering terjadi mengganggu jadwal pembayaran dan kepatuhan regulasi.
      KESIMPULAN:
      MISMANAJEMEN + HUTANG MENUMPUK + PROYEK MANGKRAK = KEGAGALAN TOTAL PERTAHANAN.

      Hapus
    8. WITHOUT MALONYET = PENGEMIS BERAS : BANNED NSM AMRAAM : ART USD 240 MILLIAR
      THE 40 LARGEST RECIPIENTS OF MAJOR ARMS =
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -
      1 Ukraina
      2 India
      3 Arab Saudi
      4 Qatar
      5 Pakistan
      6 Jepang
      7 Polandia
      8 Amerika Serikat
      9 Kuwait
      10 Australia
      11 UEA
      12 Mesir
      13 Inggris
      14 Israel
      15 Belanda
      16 Korea Selatan
      17 Jerman
      18 Indonesia
      19 Yunani
      20 Norwegia
      21 China
      22 Italia
      23 Filipina
      24 TΓΌrkiye
      25 Brasil
      26 Singapura
      27 Bahrain
      28 Maroko
      29 Denmark
      30 Rumania
      31 Belgia
      32 Belarusia
      33 Aljazair
      34 Taiwan
      35 Hungaria
      36 Kazakhstan
      37 Serbia
      38 Kanada
      39 Spanyol
      40 Thailand
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -------------------------------
      MALONYET.......
      STATUS 2023-2026: KEBANGKRUTAN OPERASIONAL & MISKIN
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan pemotongan anggaran operasional di seluruh kementerian akibat dampak konflik Timur Tengah (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Data SOCSO (PERKESO) mencatat 24.100 PHK; Petronas pangkas ±5.000 karyawan. Puncak krisis Januari 2026 (CNBC & HLIB).
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan seluruh kontrak militer dan polisi per 16 Januari 2026 akibat skandal suap pejabat senior dan mantan panglima.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Dua tahun tanpa aktivitas transfer senjata besar di level internasional (Defense Studies).
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF karena kendala anggaran.
      ________________________________________
      KONTRAKSI FINANSIAL PERTAHANAN (FINANCIAL CONSTRAINTS):
      Alokasi Anggaran Terbatas: Belanja pertahanan hanya berkisar 1,2%–1,5% dari PDB, jauh di bawah standar regional untuk modernisasi.
      Biaya Operasional vs Modernisasi: Sebagian besar anggaran habis untuk gaji, pensiun, dan biaya harian, menyisakan dana sangat minim untuk pengadaan senjata canggih atau Litbang (R&D).
      Kompetisi Prioritas Domestik: Anggaran militer sering dikalahkan oleh prioritas pendidikan, kesehatan, dan infrastruktur sosial.
      Ketergantungan Teknologi Asing: Biaya tinggi pengadaan alutsista impor membuat MALONYET terpaksa membeli barang bekas (second-hand) atau menunda program pengadaan.
      Dampak Kesiapan Strategis: Peralatan tua (kapal, pesawat, kendaraan) dipaksa beroperasi melampaui usia teknisnya; pelatihan pasukan dikurangi demi penghematan.
      ________________________________________
      KELEMAHAN ARMADA LAUT (NAVAL LIMITATIONS):
      Aging Fleet (Armada Tua): Kapal utama seperti KD Kasturi dan KD Lekir berusia lebih dari 30 tahun dengan kemampuan tempur yang sangat terbatas.
      Skandal & Penundaan LCS: Program RM 11 miliar penuh mismanajemen dan korupsi. Hingga 2025, hanya mencapai 72% progres tanpa satu pun kapal yang siap tempur.
      Struktur Armada Terfragmentasi: Terlalu banyak kelas kapal yang berbeda menyebabkan logistik, pelatihan, dan perawatan menjadi sangat tidak efisien dan mahal.
      Lemahnya Pengawasan Maritim: Kurangnya radar jarak jauh, UAV, dan sistem deteksi kapal selam membuat zona ekonomi eksklusif (ZEE) sangat rentan terhadap infiltrasi asing.
      Vulnerabilitas Strategis: Tanpa daya getar angkatan laut yang kredibel, MALONYET kehilangan pengaruh strategis di Laut Cina Selatan menghadapi asertivitas kapal-kapal asing.
      ________________________________________
      RINGKASAN MASALAH UTAMA:
      Armada Tua: Kesiapan tempur terus menurun.
      Penundaan LCS: Tidak ada kapal kombatan permukaan modern.
      Logistik Inefisien: Akibat terlalu banyak jenis kelas kapal.
      Keterbatasan Anggaran: Modernisasi berjalan sangat lambat.
      ZEE Rentan: Pengawasan pantai dan laut sangat lemah.
      KESIMPULAN:
      FISKAL LUMPUH + SKANDAL LCS + ARMADA TUA = KELUMPUHAN TOTAL KEDAULATAN LAUT.

      Hapus
    9. WITHOUT MALONYET = PENGEMIS BERAS : BANNED NSM AMRAAM : ART USD 240 MILLIAR
      THE 40 LARGEST RECIPIENTS OF MAJOR ARMS =
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -
      1 Ukraina
      2 India
      3 Arab Saudi
      4 Qatar
      5 Pakistan
      6 Jepang
      7 Polandia
      8 Amerika Serikat
      9 Kuwait
      10 Australia
      11 UEA
      12 Mesir
      13 Inggris
      14 Israel
      15 Belanda
      16 Korea Selatan
      17 Jerman
      18 Indonesia
      19 Yunani
      20 Norwegia
      21 China
      22 Italia
      23 Filipina
      24 TΓΌrkiye
      25 Brasil
      26 Singapura
      27 Bahrain
      28 Maroko
      29 Denmark
      30 Rumania
      31 Belgia
      32 Belarusia
      33 Aljazair
      34 Taiwan
      35 Hungaria
      36 Kazakhstan
      37 Serbia
      38 Kanada
      39 Spanyol
      40 Thailand
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -------------------------------
      MALONYET.......
      STATUS 2023-2026: KEBANGKRUTAN OPERASIONAL & MISKIN
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan pemotongan anggaran operasional di seluruh kementerian akibat dampak konflik Timur Tengah (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Data SOCSO (PERKESO) mencatat 24.100 PHK; Petronas pangkas ±5.000 karyawan. Puncak krisis Januari 2026 (CNBC & HLIB).
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan seluruh kontrak militer dan polisi per 16 Januari 2026 akibat skandal suap pejabat senior dan mantan panglima.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Dua tahun tanpa aktivitas transfer senjata besar di level internasional (Defense Studies).
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF karena kendala anggaran.
      ________________________________________
      KONTRAKSI FINANSIAL PERTAHANAN (FINANCIAL CONSTRAINTS):
      Alokasi Anggaran Terbatas: Belanja pertahanan hanya berkisar 1,2%–1,5% dari PDB, jauh di bawah standar regional untuk modernisasi.
      Biaya Operasional vs Modernisasi: Sebagian besar anggaran habis untuk gaji, pensiun, dan biaya harian, menyisakan dana sangat minim untuk pengadaan senjata canggih atau Litbang (R&D).
      Kompetisi Prioritas Domestik: Anggaran militer sering dikalahkan oleh prioritas pendidikan, kesehatan, dan infrastruktur sosial.
      Ketergantungan Teknologi Asing: Biaya tinggi pengadaan alutsista impor membuat MALONYET terpaksa membeli barang bekas (second-hand) atau menunda program pengadaan.
      Dampak Kesiapan Strategis: Peralatan tua (kapal, pesawat, kendaraan) dipaksa beroperasi melampaui usia teknisnya; pelatihan pasukan dikurangi demi penghematan.
      ________________________________________
      KELEMAHAN ARMADA LAUT (NAVAL LIMITATIONS):
      Aging Fleet (Armada Tua): Kapal utama seperti KD Kasturi dan KD Lekir berusia lebih dari 30 tahun dengan kemampuan tempur yang sangat terbatas.
      Skandal & Penundaan LCS: Program RM 11 miliar penuh mismanajemen dan korupsi. Hingga 2025, hanya mencapai 72% progres tanpa satu pun kapal yang siap tempur.
      Struktur Armada Terfragmentasi: Terlalu banyak kelas kapal yang berbeda menyebabkan logistik, pelatihan, dan perawatan menjadi sangat tidak efisien dan mahal.
      Lemahnya Pengawasan Maritim: Kurangnya radar jarak jauh, UAV, dan sistem deteksi kapal selam membuat zona ekonomi eksklusif (ZEE) sangat rentan terhadap infiltrasi asing.
      Vulnerabilitas Strategis: Tanpa daya getar angkatan laut yang kredibel, MALONYET kehilangan pengaruh strategis di Laut Cina Selatan menghadapi asertivitas kapal-kapal asing.
      ________________________________________
      RINGKASAN MASALAH UTAMA:
      Armada Tua: Kesiapan tempur terus menurun.
      Penundaan LCS: Tidak ada kapal kombatan permukaan modern.
      Logistik Inefisien: Akibat terlalu banyak jenis kelas kapal.
      Keterbatasan Anggaran: Modernisasi berjalan sangat lambat.
      ZEE Rentan: Pengawasan pantai dan laut sangat lemah.
      KESIMPULAN:
      FISKAL LUMPUH + SKANDAL LCS + ARMADA TUA = KELUMPUHAN TOTAL KEDAULATAN LAUT.

      Hapus
    10. WITHOUT MALONYET = PENGEMIS BERAS : BANNED NSM AMRAAM : ART USD 240 MILLIAR
      THE 40 LARGEST RECIPIENTS OF MAJOR ARMS =
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -
      1 Ukraina
      2 India
      3 Arab Saudi
      4 Qatar
      5 Pakistan
      6 Jepang
      7 Polandia
      8 Amerika Serikat
      9 Kuwait
      10 Australia
      11 UEA
      12 Mesir
      13 Inggris
      14 Israel
      15 Belanda
      16 Korea Selatan
      17 Jerman
      18 Indonesia
      19 Yunani
      20 Norwegia
      21 China
      22 Italia
      23 Filipina
      24 TΓΌrkiye
      25 Brasil
      26 Singapura
      27 Bahrain
      28 Maroko
      29 Denmark
      30 Rumania
      31 Belgia
      32 Belarusia
      33 Aljazair
      34 Taiwan
      35 Hungaria
      36 Kazakhstan
      37 Serbia
      38 Kanada
      39 Spanyol
      40 Thailand
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -------------------------------
      MALONYET.......
      STATUS 2023-2026: KEBANGKRUTAN SISTEMIK & MISKIN
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan pemotongan anggaran operasional di seluruh kementerian akibat dampak ekonomi konflik Timur Tengah (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Data SOCSO/PERKESO mencatat 24.100 PHK; Petronas pangkas ±5.000 karyawan. Puncak krisis Januari 2026 (CNBC & HLIB).
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan seluruh kontrak militer dan polisi per 16 Januari 2026 menyusul skandal suap pejabat senior dan mantan panglima.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Dua tahun berturut-turut tanpa catatan transfer senjata global (Defense Studies).
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF karena kendala finansial.
      ________________________________________
      FAKTOR PEMBATAS ANGGARAN MILITER (BUDGETARY CONSTRAINTS):
      Prioritas Ekonomi Domestik: Pertahanan harus berbagi dana dengan sektor kesehatan, pendidikan, dan subsidi sosial di tengah perlambatan ekonomi.
      Alokasi PDB Rendah: Belanja militer umumnya hanya 1,5% - 2% dari PDB, jauh di bawah Singapura (~3%) atau Thailand (~2,5%).
      Beban Hutang & Kebijakan Fiskal: Defisit anggaran membatasi ruang gerak pemerintah untuk melakukan upgrade militer yang bersifat diskresioner.
      Dampak Riil: Penundaan modernisasi jet tempur dan kapal selam hingga dekadean; ketergantungan pada pemeliharaan aset tua daripada pengadaan baru.
      ________________________________________
      SKANDAL PEMBENGKAKAN BIAYA (COST OVERRUNS):
      Proyek LCS (Littoral Combat Ship): Anggaran awal RM 9 Miliar untuk 6 kapal, membengkak jadi RM 11 Miliar+ namun hanya menghasilkan 5 kapal (target selesai 2026-2029).
      Program NGPV (Patrol Vessel): Anggaran awal RM 5,35 Miliar untuk 27 kapal, berakhir dengan biaya RM 6,75 Miliar namun hanya mendapatkan sebagian kecil dari jumlah awal.
      Pengadaan Kapal Selam Scorpene: Tuduhan suap dan biaya tambahan logistik yang tidak terduga meningkatkan beban pengeluaran negara secara masif.
      Kasus Helikopter MD530G: Kontrak bermasalah dan kegagalan pengiriman yang menyebabkan kerugian finansial dan kekosongan operasional.
      ________________________________________
      PENYEBAB UTAMA MISMANAJEMEN:
      Intervensi Politik: Keputusan sering didasarkan pada koneksi politik daripada kebutuhan operasional murni.
      Korupsi & Kronisme: Penggunaan perusahaan cangkang dan perantara (intermediaries) yang menggelembungkan nilai kontrak.
      Lemahnya Pengawasan: Kurangnya transparansi parlemen dan penggunaan UU Rahasia Rasmi (OSA) untuk menyembunyikan penyimpangan keuangan.
      Tantangan Teknis: Akuisisi peralatan yang tidak kompatibel menuntut modifikasi mahal di kemudian hari.
      KESIMPULAN:
      FISKAL LUMPUH + SKANDAL LCS/NGPV + KORUPSI SISTEMIK = KELUMPUHAN TOTAL KEDAULATAN.

      Hapus
    11. WITHOUT MALONYET = PENGEMIS BERAS : BANNED NSM AMRAAM : ART USD 240 MILLIAR
      THE 40 LARGEST RECIPIENTS OF MAJOR ARMS =
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -
      1 Ukraina
      2 India
      3 Arab Saudi
      4 Qatar
      5 Pakistan
      6 Jepang
      7 Polandia
      8 Amerika Serikat
      9 Kuwait
      10 Australia
      11 UEA
      12 Mesir
      13 Inggris
      14 Israel
      15 Belanda
      16 Korea Selatan
      17 Jerman
      18 Indonesia
      19 Yunani
      20 Norwegia
      21 China
      22 Italia
      23 Filipina
      24 TΓΌrkiye
      25 Brasil
      26 Singapura
      27 Bahrain
      28 Maroko
      29 Denmark
      30 Rumania
      31 Belgia
      32 Belarusia
      33 Aljazair
      34 Taiwan
      35 Hungaria
      36 Kazakhstan
      37 Serbia
      38 Kanada
      39 Spanyol
      40 Thailand
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -------------------------------
      MALONYET.......
      STATUS 2023-2026: KEBANGKRUTAN ALUTSISTA & MISKIN
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan pemotongan anggaran operasional di seluruh instansi pemerintah akibat krisis ekonomi (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Puncak krisis Januari 2026 dengan 24.100 PHK (Data SOCSO/PERKESO); Petronas pangkas ±5.000 karyawan (CNBC & Bloomberg).
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan seluruh kontrak militer dan polisi per 16 Januari 2026 akibat skandal suap pejabat senior dan mantan panglima.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Dua tahun berturut-turut tanpa catatan transfer senjata global (Defense Studies).
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF karena kendala finansial.
      ________________________________________
      PENUAAN ALUTSISTA DI SELURUH MATRA (AGING EQUIPMENT):
      Aset di Atas 30 Tahun: Sebanyak 171 aset militer telah melewati usia pakai 30 tahun (Darat: 108 unit, Udara: 29 unit, Laut: 34 unit).
      Beban Pemeliharaan: Platform tua menuntut biaya perawatan tinggi dengan hasil performa dan reliabilitas yang terus menurun.
      Teknologi Usang: Sistem persenjataan ketinggalan zaman, sulit diintegrasikan dengan platform baru, dan tidak efektif dalam pertempuran modern.
      ________________________________________
      KELUMPUHAN ARMADA LAUT (NAVAL LIMITATIONS):
      Kapal Melewati Usia Pakai: Dari 53 kapal RMN, 34 unit melampaui usia teknis, bahkan 28 kapal di antaranya sudah berusia di atas 40 tahun.
      Gap Kapabilitas: Kapal tua (KD Lekiu & KD Kasturi) kehilangan teknologi sensor dan sistem senjata modern, melumpuhkan kemampuan patroli di zona maritim luas.
      Kegagalan Program 15-to-5: Rencana penyederhanaan kelas kapal terhambat kekurangan dana dan hambatan birokrasi pengadaan.
      Skandal LCS: Proyek 6 kapal yang tidak kunjung terkirim hingga 2025 akibat mismanajemen, meninggalkan celah kritis di ZEE dan Laut Cina Selatan.
      ________________________________________
      MASALAH PENGADAAN & OPERASIONAL (POLICY GAPS):
      Skandal "Peti Mati Terbang": Raja MALONYET membatalkan kesepakatan helikopter Black Hawk berusia 30 tahun yang dijuluki "peti mati terbang" dan mengecam penggunaan aset usang.
      Korupsi Makelar: Ketergantungan pada perantara (pensiunan perwira) menyebabkan harga melambung tinggi dan kesepakatan yang meragukan.
      Kurangnya Tender Terbuka: Hanya 20–30% kontrak besar diberikan melalui tender terbuka, merusak transparansi dan efisiensi nilai uang.
      Gap Teknologi & Pelatihan: Pasukan berlatih menggunakan platform yang tidak lagi mewakili kondisi medan perang modern, membatasi kesiapan taktis.
      Ketergantungan OEM Asing: Lemahnya industri pertahanan domestik memaksa ketergantungan penuh pada teknologi luar yang mahal dan lambat.
      KESIMPULAN:
      FISKAL LUMPUH + SKANDAL "PETI MATI TERBANG" + ARMADA 40 TAHUN = KEBANGKRUTAN PERTAHANAN TOTAL

      Hapus
    12. WITHOUT MALONYET = PENGEMIS BERAS : BANNED NSM AMRAAM : ART USD 240 MILLIAR
      THE 40 LARGEST RECIPIENTS OF MAJOR ARMS =
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -
      1 Ukraina
      2 India
      3 Arab Saudi
      4 Qatar
      5 Pakistan
      6 Jepang
      7 Polandia
      8 Amerika Serikat
      9 Kuwait
      10 Australia
      11 UEA
      12 Mesir
      13 Inggris
      14 Israel
      15 Belanda
      16 Korea Selatan
      17 Jerman
      18 Indonesia
      19 Yunani
      20 Norwegia
      21 China
      22 Italia
      23 Filipina
      24 TΓΌrkiye
      25 Brasil
      26 Singapura
      27 Bahrain
      28 Maroko
      29 Denmark
      30 Rumania
      31 Belgia
      32 Belarusia
      33 Aljazair
      34 Taiwan
      35 Hungaria
      36 Kazakhstan
      37 Serbia
      38 Kanada
      39 Spanyol
      40 Thailand
      https://www.sipri.org/sites/default/files/2026-03/fs_2603_at_2025.pdf
      -------------------------------
      MALONYET.......
      STATUS 2023-2026: KEBANGKRUTAN ALUTSISTA & MISKIN
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan pemotongan anggaran operasional di seluruh instansi pemerintah akibat krisis ekonomi (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Puncak krisis Januari 2026 dengan 24.100 PHK (Data SOCSO/PERKESO); Petronas pangkas ±5.000 karyawan (CNBC & Bloomberg).
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan seluruh kontrak militer dan polisi per 16 Januari 2026 akibat skandal suap pejabat senior dan mantan panglima.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Dua tahun berturut-turut tanpa catatan transfer senjata global (Defense Studies).
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF karena kendala finansial.
      ________________________________________
      PENUAAN ALUTSISTA DI SELURUH MATRA (AGING EQUIPMENT):
      Aset di Atas 30 Tahun: Sebanyak 171 aset militer telah melewati usia pakai 30 tahun (Darat: 108 unit, Udara: 29 unit, Laut: 34 unit).
      Beban Pemeliharaan: Platform tua menuntut biaya perawatan tinggi dengan hasil performa dan reliabilitas yang terus menurun.
      Teknologi Usang: Sistem persenjataan ketinggalan zaman, sulit diintegrasikan dengan platform baru, dan tidak efektif dalam pertempuran modern.
      ________________________________________
      KELUMPUHAN ARMADA LAUT (NAVAL LIMITATIONS):
      Kapal Melewati Usia Pakai: Dari 53 kapal RMN, 34 unit melampaui usia teknis, bahkan 28 kapal di antaranya sudah berusia di atas 40 tahun.
      Gap Kapabilitas: Kapal tua (KD Lekiu & KD Kasturi) kehilangan teknologi sensor dan sistem senjata modern, melumpuhkan kemampuan patroli di zona maritim luas.
      Kegagalan Program 15-to-5: Rencana penyederhanaan kelas kapal terhambat kekurangan dana dan hambatan birokrasi pengadaan.
      Skandal LCS: Proyek 6 kapal yang tidak kunjung terkirim hingga 2025 akibat mismanajemen, meninggalkan celah kritis di ZEE dan Laut Cina Selatan.
      ________________________________________
      MASALAH PENGADAAN & OPERASIONAL (POLICY GAPS):
      Skandal "Peti Mati Terbang": Raja MALONYET membatalkan kesepakatan helikopter Black Hawk berusia 30 tahun yang dijuluki "peti mati terbang" dan mengecam penggunaan aset usang.
      Korupsi Makelar: Ketergantungan pada perantara (pensiunan perwira) menyebabkan harga melambung tinggi dan kesepakatan yang meragukan.
      Kurangnya Tender Terbuka: Hanya 20–30% kontrak besar diberikan melalui tender terbuka, merusak transparansi dan efisiensi nilai uang.
      Gap Teknologi & Pelatihan: Pasukan berlatih menggunakan platform yang tidak lagi mewakili kondisi medan perang modern, membatasi kesiapan taktis.
      Ketergantungan OEM Asing: Lemahnya industri pertahanan domestik memaksa ketergantungan penuh pada teknologi luar yang mahal dan lambat.
      KESIMPULAN:
      FISKAL LUMPUH + SKANDAL "PETI MATI TERBANG" + ARMADA 40 TAHUN = KEBANGKRUTAN PERTAHANAN TOTAL

      Hapus
    13. PENDAPATAN : RM334,1 Miliar
      PENGELUARAN : RM470 Miliar
      RM470 – RM334,1 = MINUS RM135,9 ......
      -
      Peringkat Kekuatan Militer ASEAN (GFP 2026)
      Indonesia – 13 Dunia (Nomor 1 ASEAN)
      Vietnam – 23
      Thailand – 24
      Singapura – 29
      Myanmar – 35
      Filipina – 41
      Malondesh – 42
      -
      2026
      Populasi: 36.38 juta
      Debt Govt: RM 1.79 Triliun (70.5%)
      Debt Household: RM 1.65 Triliun (84.3%)
      Beban per Kapita: RM 94,544
      -
      2025
      Populasi: 35.97 juta
      Debt Govt: RM 1.30 Triliun (-%)
      Debt Household: RM 1.65 Triliun (-%)
      Beban per Kapita: RM 81,998
      -
      2024
      Populasi: 34.67 juta
      Debt Govt: RM 1.22 Triliun (64.6%)
      Debt Household: RM 1.53 Triliun (84.2%)
      Beban per Kapita: RM 79,315
      -
      2023
      Populasi: 35.12 juta
      Debt Govt: RM 1.17 Triliun (64.3%)
      Debt Household: RM 1.45 Triliun (81.2%)
      Beban per Kapita: RM 74,587
      -
      2022
      Populasi: 34.69 juta
      Debt Govt: RM 1.08 Triliun (60.1%)
      Debt Household: RM 1.38 Triliun (80.9%)
      Beban per Kapita: RM 70,901
      -
      2021
      Populasi: 34.28 juta
      Debt Govt: RM 979.81 Miliar (63.3%)
      Debt Household: RM 1.34 Triliun (89.1%)
      Beban per Kapita: RM 67,667
      -
      2020
      Populasi: 33.87 juta
      Debt Govt: RM 879.56 Miliar (62.0%)
      Debt Household: RM 1.27 Triliun (87.5%)
      Beban per Kapita: RM 63,464
      -
      2019
      Populasi: 33.45 juta
      Debt Govt: RM 793.00 Miliar (52.4%)
      Debt Household: RM 1.22 Triliun (82.5%)
      Beban per Kapita: RM 60,179
      -
      2018
      Populasi: 33.00 juta
      Debt Govt: RM 741.00 Miliar (52.5%)
      Debt Household: RM 1.16 Triliun (82.0%)
      Beban per Kapita: RM 57,605
      -
      2017
      Populasi: 32.54 juta
      Debt Govt: RM 686.80 Miliar (51.9%)
      Debt Household: RM 1.10 Triliun (83.2%)
      Beban per Kapita: RM 54,910
      -
      2016
      Populasi: 32.04 juta
      Debt Govt: RM 648.50 Miliar (52.7%)
      Debt Household: RM 1.04 Triliun (86.1%)
      Beban per Kapita: RM 52,699
      -
      2015
      Populasi: 31.52 juta
      Debt Govt: RM 630.50 Miliar (55.1%)
      Debt Household: RM 985.00 Miliar (86.0%)
      Beban per Kapita: RM 51,253
      -
      2014
      Populasi: 30.98 juta
      Debt Govt: RM 582.80 Miliar (55.0%)
      Debt Household: RM 902.00 Miliar (85.1%)
      Beban per Kapita: RM 47,927
      -
      2013
      Populasi: 30.42 juta
      Debt Govt: RM 547.70 Miliar (54.7%)
      Debt Household: RM 821.00 Miliar (82.0%)
      Beban per Kapita: RM 44,992
      -
      2012
      Populasi: 29.85 juta
      Debt Govt: RM 501.60 Miliar (53.3%)
      Debt Household: RM 732.00 Miliar (77.8%)
      Beban per Kapita: RM 41,326
      -
      2011
      Populasi: 29.26 juta
      Debt Govt: RM 456.10 Miliar (51.8%)
      Debt Household: RM 653.00 Miliar (74.2%)
      Beban per Kapita: RM 37,904
      -
      2010
      Populasi: 28.65 juta
      Debt Govt: RM 407.10 Miliar (52.4%)
      Debt Household: RM 581.00 Miliar (74.8%)
      Beban per Kapita: RM 34,488
      -
      2009
      Populasi: 28.04 juta
      Debt Govt: RM 362.40 Miliar (51.1%)
      Debt Household: RM 516.00 Miliar (72.0%)
      Beban per Kapita: RM 31,326
      -
      2008
      Populasi: 27.45 juta
      Debt Govt: RM 258.00 Miliar (41.3%)
      Debt Household: RM 460.00 Miliar (73.0%)
      Beban per Kapita: RM 26,155
      -
      2007
      Populasi: 26.86 juta
      Debt Govt: RM 266.00 Miliar (41.1%)
      Debt Household: RM 414.00 Miliar (64.0%)
      Beban per Kapita: RM 25,316
      -
      2006
      Populasi: 26.26 juta
      Debt Govt: RM 242.00 Miliar (41.5%)
      Debt Household: RM 372.00 Miliar (63.0%)
      Beban per Kapita: RM 23,381
      -
      2005
      Populasi: 25.66 juta
      Debt Govt: RM 228.00 Miliar (43.8%)
      Debt Household: RM 335.00 Miliar (64.0%)
      Beban per Kapita: RM 21,940
      -
      2004
      Populasi: 25.06 juta
      Debt Govt: RM 217.00 Miliar (45.1%)
      Debt Household: RM 298.00 Miliar (62.0%)
      Beban per Kapita: RM 20,550
      -
      2003
      Populasi: 24.46 juta
      Debt Govt: RM 189.00 Miliar (45.9%)
      Debt Household: RM 265.00 Miliar (64.0%)
      Beban per Kapita: RM 18,560
      -
      2002
      Populasi: 23.87 juta
      Debt Govt: RM 165.00 Miliar (44.9%)
      Debt Household: RM 236.00 Miliar (64.0%)
      Beban per Kapita: RM 16,798
      -
      2001
      Populasi: 23.28 juta
      Debt Govt: RM 146.00 Miliar (42.5%)
      Debt Household: RM 207.00 Miliar (60.0%)
      Beban per Kapita: RM 15,162
      -
      2000
      Populasi: 22.69 juta
      Debt Govt: RM 126.00 Miliar (36.1%)
      Debt Household: RM 182.00 Miliar (52.0%)
      Beban per Kapita: RM 13,574
      -
      1999
      Populasi: 22.11 juta
      Debt Govt: RM 113.00 Miliar (40.4%)
      Debt Household: RM 157.00 Miliar (56.0%)
      Beban per Kapita: RM 12,210
      -
      1998
      Populasi: 21.53 juta
      Debt Govt: RM 98.00 Miliar (35.8%)
      Debt Household: RM 135.00 Miliar (49.3%)
      Beban per Kapita: RM 10,821

      Hapus
  17. PRESIDEN MINTA PRODUKSI MASSAL INOVASI TEPUNG SINGKONG UNTUK KARHUTLA.

    https://www.facebook.com/watch/?v=2093413501286789

    BANGANG!! Rakyat kebuluran dibuang begitu aja tepung singkong!
    🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣

    BalasHapus
    Balasan
    1. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      --------------------------------------------
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      --------------------------------------------
      USA BANNED MALONYET : USA PALAK ART USD 240 MILLIAR
      NSM
      AMRAAM
      F18
      UH60A
      --------------------------------------------
      🀣ART PALAK USD 240 MILLIAR = BANNED : NSM AMRAAM F18🀣

      Hapus
    2. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA KLAIM CASH = HUTANG
      ANGSURAN PT91M POLANDIA
      ANGSURAN PT91M POLANDIA
      ANGSURAN PT91M POLANDIA
      -------------------------
      skema angsuran pembelian PT-91M Pendekar dengan asumsi pembiayaan standar kredit ekspor (kombinasi tunai dan barter) selama 10 tahun:
      Total Pokok Pinjaman
      Nilai kontrak sebesar RM 1,4 Miliar. Setelah dikurangi estimasi uang muka (Down Payment) sebesar 15% (RM 210 Juta), sisa saldo yang diangsur adalah RM 1,19 Miliar.
      Pembayaran Uang Muka (Tahun ke-0)
      MALONYET membayar tunai sebesar RM 210 Juta pada saat penandatanganan kontrak di tahun 2003 untuk mengaktifkan proses produksi di pabrik Bumar-ŁabΔ™dy, Polandia.
      Angsuran Pokok Tahunan
      Dengan tenor 10 tahun, MALONYET mencicil pokok hutang rata-rata sebesar RM 119 Juta per tahun.
      Bunga Pinjaman (Estimasi)
      Menggunakan asumsi bunga kredit ekspor rata-rata 4-5% per tahun, beban bunga tahunan berkisar antara RM 5 juta hingga RM 50 juta (menurun setiap tahun seiring berkurangnya saldo pokok).
      Komposisi Pembayaran Barter (Minyak Sawit)
      Sebagian dari angsuran tahunan (sekitar 30-40%) tidak dibayar dengan uang tunai, melainkan dengan pengiriman komoditas minyak sawit ke Polandia. Estimasi nilai komoditas yang dikirim mencapai RM 40 - 50 Juta per tahun.
      Total Kewajiban Tahunan (Debt Service)
      Gabungan antara cicilan pokok, bunga, dan biaya provisi menghasilkan estimasi pembayaran tahunan sebesar RM 130 Juta hingga RM 160 Juta selama satu dekade.

      Hapus
    3. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA KREDIT (HUTANG) = KE TURKI =
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      KREDIT EKSPOR (HUTANG) TURKI
      ----------------------
      Turki (TΓΌrkiye)
      Negara ini menjadi mitra strategis utama dengan dukungan pembiayaan melalui Turk Eximbank dan skema Government-to-Government (G2G).
      Proyek LMS B2 (Littoral Mission Ship Batch 2):
      Mekanisme: KREDIT EKSPOR (HUTANG) dengan bunga kompetitif (estimasi 4% - 6%) mengacu pada standar OECD CIRR.
      Status: Jaminan penuh pemerintah Turki dengan masa tenor 10–15 tahun.
      Proyek MPMS (Multi-Purpose Mission Ship):
      Mekanisme: Skema Export Credit Agency (ECA) yang melibatkan Desan Shipyard.
      Status: Pembayaran berbasis milestone dan didukung MoU tripartit antara EXIM Bank MALONYET dan Turk Eximbank.
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544

      Hapus
    4. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA KREDIT (HUTANG) = KE POLANDIA =
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      KREDIT EKSPOR (HUTANG) POLANDIA
      ----------------------
      Polandia
      Polandia memiliki sejarah unik dalam kerja sama pertahanan dengan MALONYET melalui metode pembayaran non-tunai.
      Proyek Tank PT-91M "Pendekar":
      Mekanisme: KREDIT EKSPOR (HUTANG) Barter Sawit.
      Status: Sebagian besar nilai kontrak dibayar menggunakan komoditas minyak kelapa sawit mentah (CPO) sebagai bentuk kompensasi perdagangan, mengurangi beban devisa tunai negara.
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544

      Hapus
    5. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA KREDIT (HUTANG) = KE KOREA =
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      KREDIT EKSPOR (HUTANG) KOREA
      ----------------------
      Korea Selatan (Republik Korea)
      Negara ini menggunakan kombinasi pembiayaan lembaga keuangan negara dan skema imbal dagang (barter) untuk mendukung penjualan produk Korea Aerospace Industries (KAI).
      Proyek Jet Tempur FA-50 Block 20:
      Mekanisme Kredit: Melalui dukungan lembaga Export-Import Bank of Korea (KEXIM) yang menyediakan fasilitas KREDIT EKSPOR (HUTANG) untuk menutupi nilai kontrak sebesar kurang lebih US$920 juta (RM4,08 miliar).
      Skema Pembayaran Campuran: Berbeda dengan Turki yang murni finansial, Korea Selatan menyetujui kesepakatan di mana 50% dari total pembayaran dilakukan melalui metode Barter Minyak Kelapa Sawit.
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544

      Hapus
    6. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA KREDIT (HUTANG) = KE UK =
      KREDIT EKSPOR (HUTANG) UK
      KREDIT EKSPOR (HUTANG) UK
      KREDIT EKSPOR (HUTANG) UK
      KREDIT EKSPOR (HUTANG) UK
      KREDIT EKSPOR (HUTANG) UK
      KREDIT EKSPOR (HUTANG) UK
      KREDIT EKSPOR (HUTANG) UK
      KREDIT EKSPOR (HUTANG) UK
      KREDIT EKSPOR (HUTANG) UK
      KREDIT EKSPOR (HUTANG) UK
      KREDIT EKSPOR (HUTANG) UK
      KREDIT EKSPOR (HUTANG) UK
      KREDIT EKSPOR (HUTANG) UK
      KREDIT EKSPOR (HUTANG) UK
      KREDIT EKSPOR (HUTANG) UK
      KREDIT EKSPOR (HUTANG) UK
      KREDIT EKSPOR (HUTANG) UK
      KREDIT EKSPOR (HUTANG) UK
      KREDIT EKSPOR (HUTANG) UK
      KREDIT EKSPOR (HUTANG) UK
      KREDIT EKSPOR (HUTANG) UK
      ----------------------
      Britania Raya (United Kingdom)
      Inggris merupakan salah satu pionir pemberi KREDIT EKSPOR (HUTANG) untuk MALONYET melalui lembaga UK Export Finance (UKEF).
      Proyek Kapal Frigat Kelas Lekiu:
      Mekanisme: KREDIT EKSPOR (HUTANG) jangka panjang yang dijamin oleh pemerintah Inggris (dahulu bernama ECGD). Pembiayaan ini memfasilitasi pembangunan kapal di galangan Yarrow Shipbuilders (sekarang bagian dari BAE Systems).
      Status: Proyek ini menjadi salah satu contoh awal penggunaan KREDIT EKSPOR (HUTANG) luar negeri untuk modernisasi armada laut MALONYET.
      Proyek Pesawat Tempur Hawk (Hawk 108/208):
      Mekanisme: Skema pinjaman yang didukung oleh UKEF untuk pembelian 28 unit pesawat tempur ringan dari BAE Systems.
      Karakteristik: Inggris biasanya menawarkan paket pembiayaan yang mencakup pelatihan pilot dan pemeliharaan jangka panjang dalam satu paket kredit terpadu.
      Sistem Pertahanan Udara Starstreak:
      Mekanisme: KREDIT EKSPOR (HUTANG) komersial yang difasilitasi oleh bank-bank Inggris dengan jaminan dari pemerintah UK untuk pengadaan rudal pertahanan udara produksi Thales UK.
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544

      Hapus
    7. PENGEMIS BERAS = LAUGHING STOCK TO THE WORLD
      REAL FREGAT VS FREGAT SALAH POTONG 17 KREDITOR REWORK 4000
      -
      INDONESIA
      AH-140 = FRIGAT MERAH PUTIH
      a. 140 M
      b. 6.626 TON
      c. Meriam 76mm Otmel
      d. CIWS 35mm Millenium
      e. 12.7mm Lionfish RCWS
      f. 64 Midlas VLS
      g. RADAR X-Band CENK 350KM AESA 4 FIXED RADAR
      h. RADAR L-Band CENK 400KM AESA
      i. SONAR HMS Fersah
      j. Torpedo B515
      k. SSM
      l. SAM
      =============================
      =============================
      MALONYET
      GOWING = LCS SALAH POTONG 17 KREDITOR REWORK 4000
      a. 111 M
      b. 3.100 TON
      c. Meriam 57mm
      d. NO CIWS FFBNP = NOT PAID
      e. 30mm RCWS
      f. VL MICA FFBNP = NOT PAID
      g. RADAR S-Band PESA = NO AESA
      h. SONAR = NOT PAID
      i. NO TORPEDO = NOT PAID
      j. SSM NSM FFBNP = NOT PAID
      k. SAM FFBNP = NOT PAID
      --------------------------------
      FACT LCS 2026 - 2011 = 16 YEARS
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      --------------------------------
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 BILLION PER UNIT = SETARA HARGA DESTROYER
      RM2,48 BILLION PER UNIT = SETARA HARGA DESTROYER
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and DEBT.
      --------------------------------
      Analisa Kekuatan Udara: Buying vs. Prank
      Indonesia melakukan modernisasi masif dengan kontrak resmi (Firm Order), sementara MALAYSEWA terjebak dalam pembatalan dan wacana:
      Indonesia (Realisasi & Kontrak G2G):
      42 Rafale: Kontrak lunas dan efektif (Dassault Aviation).
      48 KAAN (Gen-5): Kerja sama strategis G2G dengan Turki (TAI).
      48 KF-21 Boramae (Block II): Kesepakatan tahap akhir dengan Korea Selatan (KAI).
      24 M-346F: Penandatanganan Letter of Award (LOA) dengan Leonardo.
      MALAYSEWA (Pembatalan & Kegagalan):
      F-18 Kuwait: Resmi BATAL (2026) setelah 4 kali upaya negosiasi (New Straits Times).
      Status "Prank": Wacana JF-17, Rafale, Typhoon, dan Tejas berakhir tanpa kontrak.
      MiG-29N: Pensiun tanpa pengganti (Tiada Ganti).
      FA-50: Mengalami hambatan blokir/lisensi dari AS.
      -
      Analisa Geografis & Jangkauan Tempur
      Jarak Pekanbaru ke KL (291 KM) dan Pontianak ke Sarawak (498 KM) sangat pendek dibandingkan radius tempur jet tempur baru Indonesia:
      Rafale: ±1.852 KM (Sanggup menjangkau seluruh wilayah semenanjung dan Kalimantan).
      KAAN & KF-21: ±1.100–1.400 KM (Dominasi ruang udara regional).
      -
      Analisa Fiskal: Disiplin vs. Spiral Utang
      Perbedaan fundamental dalam cara membiayai pertahanan:
      Indonesia (Procurement/Buying): Rasio utang pemerintah sehat (40% GDP). Membeli aset untuk menjadi pemilik penuh.
      MALAYSEWA (Leasing/Sewa): Rasio utang kritis (69% GDP) dengan utang rumah tangga ekstrem (84,3%). Karena krisis kas, MALAYSEWA berubah menjadi "Negara Penyewa":
      Aset Sewaan: Helikopter Black Hawk (Aerotree), AW139, EC120B, Pesawat L39, Kapal Hidrografi, hingga Motor BMW R1250RT.
      Status SIPRI: Indonesia mencatat "Lembar Belanja Penuh", MALAYSEWA KOSONG/ZONK selama 2 tahun berturut-turut (2024-2025).
      -
      Beban Rakyat & Masa Depan
      Beban Per Kapita: Setiap warga MALAYSEWA menanggung beban utang kumulatif sebesar RM 81.998.
      Gali Lubang Tutup Lubang: Tren utang baru hanya untuk membayar bunga utang lama sejak 2010, menyebabkan kemandekan pembangunan militer (LCS mangkrak, MRCA vakum).

      Hapus
    8. PENGEMIS BERAS = LAUGHING STOCK TO THE WORLD
      REAL FREGAT VS FREGAT SALAH POTONG 17 KREDITOR REWORK 4000
      -
      INDONESIA
      AH-140 = FRIGAT MERAH PUTIH
      a. 140 M
      b. 6.626 TON
      c. Meriam 76mm Otmel
      d. CIWS 35mm Millenium
      e. 12.7mm Lionfish RCWS
      f. 64 Midlas VLS
      g. RADAR X-Band CENK 350KM AESA 4 FIXED RADAR
      h. RADAR L-Band CENK 400KM AESA
      i. SONAR HMS Fersah
      j. Torpedo B515
      k. SSM
      l. SAM
      =============================
      =============================
      MALONYET
      GOWING = LCS SALAH POTONG 17 KREDITOR REWORK 4000
      a. 111 M
      b. 3.100 TON
      c. Meriam 57mm
      d. NO CIWS FFBNP = NOT PAID
      e. 30mm RCWS
      f. VL MICA FFBNP = NOT PAID
      g. RADAR S-Band PESA = NO AESA
      h. SONAR = NOT PAID
      i. NO TORPEDO = NOT PAID
      j. SSM NSM FFBNP = NOT PAID
      k. SAM FFBNP = NOT PAID
      --------------------------------
      FACT LCS 2026 - 2011 = 16 YEARS
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      --------------------------------
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 BILLION PER UNIT = SETARA HARGA DESTROYER
      RM2,48 BILLION PER UNIT = SETARA HARGA DESTROYER
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and DEBT.
      --------------------------------Status SIPRI: Vakum vs. Agresif
      MALAYSEWA (Lembar Kosong): Mencatat status KOSONG selama dua tahun berturut-turut (2024–2025). Tidak ada transfer senjata berat yang terealisasi.
      Indonesia (Lembar Penuh): Realisasi masif mencakup Rafale F-4, A400M Atlas, Rudal Khan/Bora, hingga mesin kapal PPA-L-Plus.
      -
      Kegagalan Pengadaan & Skandal Finansial
      Skandal LCS: Proyek RM 9 Miliar yang belum mengirimkan satu pun kapal meski RM 6 Miliar telah dibayarkan. Terdeteksi penyimpangan dana RM 400 Juta untuk bayar utang perusahaan.
      Sistem "Middlemen": Ketergantungan pada agen/makelar politik menyebabkan harga alutsista melambung tidak wajar dan spesifikasi yang tidak sesuai kebutuhan militer.
      Drama SPH 155mm: Proyek tertunda sejak 2010 dan akhirnya dibatalkan Kemenkeu karena krisis anggaran.
      -
      Kesenjangan Kemampuan (Capability Gap)
      Ketiadaan Pesawat COIN: Menggunakan jet mahal (Su-30MKM) untuk operasi anti-gerilya yang seharusnya menggunakan pesawat ringan. Pengganti (FA-50M) baru akan tiba paling cepat 2026.
      Logistik Terfragmentasi: Standarisasi alutsista yang buruk (campuran Rusia, AS, Polandia, China) menciptakan biaya pemeliharaan tinggi dan kesiapan operasional rendah.
      Absennya Korps Marinir: Kemampuan amfibi yang terpecah antara AD dan AL melemahkan pertahanan kedaulatan di Laut China Selatan.
      -
      Krisis Fiskal & "Negara Penyewa"
      Spiral Utang: Rasio utang pemerintah (69% GDP) dan rumah tangga (84,3%) yang ekstrem memaksa militer beralih ke skema Sewa (Leasing).
      Aset Sewaan: Mencakup Helikopter Blackhawk, AW139, pesawat latihan L39, hingga kapal hidrografi dan motor patroli.
      Efek Domino: Pembatalan F-18 Hornet Kuwait (2026) menjadi simbol hilangnya kredibilitas finansial di pasar pertahanan global.
      -
      Penurunan Daya Gentar (GFP 2026)
      Peringkat Merosot: Turun ke posisi 42 Dunia (Peringkat 7 di ASEAN), kini berada di bawah Filipina (41) dan jauh tertinggal dari Indonesia (13).
      Status Armada: Banyak aset utama berstatus grounded atau tidak layak selam (seperti kasus KD Rahman) akibat kekurangan suku cadang dan teknisi.

      Hapus
    9. PENGEMIS BERAS = LAUGHING STOCK TO THE WORLD
      REAL FREGAT VS FREGAT SALAH POTONG 17 KREDITOR REWORK 4000
      -
      INDONESIA
      AH-140 = FRIGAT MERAH PUTIH
      a. 140 M
      b. 6.626 TON
      c. Meriam 76mm Otmel
      d. CIWS 35mm Millenium
      e. 12.7mm Lionfish RCWS
      f. 64 Midlas VLS
      g. RADAR X-Band CENK 350KM AESA 4 FIXED RADAR
      h. RADAR L-Band CENK 400KM AESA
      i. SONAR HMS Fersah
      j. Torpedo B515
      k. SSM
      l. SAM
      =============================
      =============================
      MALONYET
      GOWING = LCS SALAH POTONG 17 KREDITOR REWORK 4000
      a. 111 M
      b. 3.100 TON
      c. Meriam 57mm
      d. NO CIWS FFBNP = NOT PAID
      e. 30mm RCWS
      f. VL MICA FFBNP = NOT PAID
      g. RADAR S-Band PESA = NO AESA
      h. SONAR = NOT PAID
      i. NO TORPEDO = NOT PAID
      j. SSM NSM FFBNP = NOT PAID
      k. SAM FFBNP = NOT PAID
      --------------------------------
      FACT LCS 2026 - 2011 = 16 YEARS
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      --------------------------------
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 BILLION PER UNIT = SETARA HARGA DESTROYER
      RM2,48 BILLION PER UNIT = SETARA HARGA DESTROYER
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and DEBT.
      --------------------------------
      Status SIPRI: Vakum Total vs. Dominasi Regional
      MALAYSEWA (Zonk): Mencatatkan status KOSONG pada lembar laporan SIPRI selama dua tahun berturut-turut (2024–2025). Tidak ada kontrak atau transfer senjata berat yang terealisasi.
      Indonesia (Full Shopping): Memiliki lembar belanja penuh dengan aset strategis seperti Rafale F-4, A400M, Rudal Khan/Bora, drone Anka-S, hingga mesin kapal PPA-L-Plus.
      -
      Alutsista Usang & Krisis Pemeliharaan
      Armada Tua: Mengoperasikan aset berusia 30–40 tahun seperti panser Condor (1980-an) dan kapal Lekiu-class (1990-an).
      Masalah Kesiapan: Jet tempur utama (Su-30MKM & F/A-18D) memiliki jumlah armada kecil dan biaya perawatan yang mencekik anggaran.
      Pensiun Tanpa Pengganti: Mundurnya MiG-29 pada 2017 tanpa pengganti langsung meninggalkan celah pertahanan udara yang lebar.
      -
      Skandal Korupsi & Kegagalan Pengadaan
      Tragedi LCS: Proyek RM 9 Miliar yang meledak biayanya (cost overrun) hingga RM 1 Miliar, namun belum mengirimkan satu pun kapal meski dana telah terserap masif.
      Sistem Makelar: Ketergantungan pada agen dan "middlemen" politik menyebabkan harga alutsista menjadi tidak masuk akal dan spesifikasi yang seringkali tidak sesuai kebutuhan militer.
      Drama SPH 155mm: Pengadaan artileri medan yang tertunda sejak 2010 dan akhirnya dibatalkan oleh Kementerian Keuangan karena krisis kas.
      -
      Hambatan Fiskal & Ketergantungan Asing
      Anggaran Defisit: Belanja pertahanan hanya 1,0–1,5% PDB, di mana sebagian besar tersedot untuk gaji dan pensiun, menyisakan sedikit ruang untuk modernisasi.
      Strategi Sewa (Leasing): Karena tidak mampu membeli tunai, militer terpaksa menyewa helikopter (Blackhawk, AW139) dan pesawat latihan (L39) dari pihak swasta.
      Kerentanan Suku Cadang: Ketergantungan penuh pada pemasok luar negeri membuat militer rentan terhadap sanksi politik atau gangguan rantai pasok global.
      -
      Kelemahan Geopolitik & Operasional
      Ancaman Laut China Selatan: Armada laut yang menua dan kecil (hanya 2 kapal selam) membuat MALAYSEWA sulit menghalau intrusi kapal penjaga pantai China di wilayah Luconia Shoals.
      Absennya Integrasi: Kurangnya sistem Komando Gabungan yang kuat dan tidak adanya Korps Marinir yang terdedikasi melemahkan respon terhadap ancaman hibrida.
      Penurunan Peringkat (GFP 2026): Berada di posisi 42 dunia, kini resmi disalip oleh Filipina (41) dan tertinggal jauh di bawah Indonesia (13).

      Hapus
    10. PENGEMIS BERAS = LAUGHING STOCK TO THE WORLD
      REAL FREGAT VS FREGAT SALAH POTONG 17 KREDITOR REWORK 4000
      -
      INDONESIA
      AH-140 = FRIGAT MERAH PUTIH
      a. 140 M
      b. 6.626 TON
      c. Meriam 76mm Otmel
      d. CIWS 35mm Millenium
      e. 12.7mm Lionfish RCWS
      f. 64 Midlas VLS
      g. RADAR X-Band CENK 350KM AESA 4 FIXED RADAR
      h. RADAR L-Band CENK 400KM AESA
      i. SONAR HMS Fersah
      j. Torpedo B515
      k. SSM
      l. SAM
      =============================
      =============================
      MALONYET
      GOWING = LCS SALAH POTONG 17 KREDITOR REWORK 4000
      a. 111 M
      b. 3.100 TON
      c. Meriam 57mm
      d. NO CIWS FFBNP = NOT PAID
      e. 30mm RCWS
      f. VL MICA FFBNP = NOT PAID
      g. RADAR S-Band PESA = NO AESA
      h. SONAR = NOT PAID
      i. NO TORPEDO = NOT PAID
      j. SSM NSM FFBNP = NOT PAID
      k. SAM FFBNP = NOT PAID
      --------------------------------
      FACT LCS 2026 - 2011 = 16 YEARS
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      --------------------------------
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 BILLION PER UNIT = SETARA HARGA DESTROYER
      RM2,48 BILLION PER UNIT = SETARA HARGA DESTROYER
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and DEBT.
      --------------------------------
      Inventaris Transfer Senjata (SIPRI 2024-2025)
      Indonesia (Aktif):
      Udara: Rafale F-4, A400M Atlas, Sistem Air Refuel, Drone ANKA-S.
      Laut: PPA-L-Plus, Ship Engine (LM-2500).
      Darat/Rudal: Rudal BORA, Rudal KHAN.
      Mesin: TP400-D6.
      MALAYSEWA (Kosong): Tidak ada catatan transfer signifikan dalam periode 2 tahun tersebut.
      -
      Akar Masalah Modernisasi (Structural Causes)
      Anggaran: Dana pertahanan di bawah 1,5% PDB (lebih rendah dari Singapura & Thailand).
      Skandal Pengadaan: Proyek LCS (Littoral Combat Ship) senilai RM9 miliar yang gagal kirim dan helikopter MD530G.
      Ketergantungan Asing: Kurangnya industri pertahanan domestik memicu kerentanan terhadap fluktuasi mata uang dan sanksi.
      Instabilitas Politik: Prioritas pertahanan sering berubah setiap pergantian pemerintah.
      -
      Tantangan Operasional & Internal
      Alutsista Tua: Ketergantungan pada Su-30MKM dan F/A-18D yang mulai menua; pensiunnya MiG-29 tanpa pengganti instan.
      Keamanan Maritim: Kewalahan menghadapi intrusi di Laut China Selatan (LCS) dan Selat Malaka akibat kurangnya kapal patroli.
      SDM: Gaji rendah dan kurangnya minat generasi muda menyebabkan sulitnya retensi tenaga ahli (pilot & insinyur).
      Koordinasi Rendah: Kurangnya integrasi operasi gabungan antara Angkatan Darat, Laut, dan Udara.
      -
      Sorotan Skandal & Opini Publik
      Kritik Kerajaan: Sultan Ibrahim menyebut helikopter Black Hawk tua sebagai "peti mati terbang".
      Korupsi Internal: Operasi Sohor (2025) mengungkap intelijen militer yang membocorkan data ke penyelundup.
      Kasus Kekerasan: Insiden penganiayaan kadet di UPNM yang memicu kemarahan publik di media sosial (#ReformATM).
      Konspirasi: Keterlibatan sindikat yang membayar petugas hingga RM50.000 per perjalanan untuk aktivitas ilegal.
      -
      Kesimpulan Perbandingan
      Indonesia: Fokus pada pengadaan besar-besaran (Big Ticket Items) dari berbagai negara (Perancis, Turki, AS).
      MALAYSEWA: Mengalami stagnasi akibat jeratan utang proyek lama, skandal korupsi, dan krisis kepercayaan publik terhadap manajemen pengadaan.

      Hapus
    11. PENGEMIS BERAS = LAUGHING STOCK TO THE WORLD
      REAL FREGAT VS FREGAT SALAH POTONG 17 KREDITOR REWORK 4000
      -
      INDONESIA
      AH-140 = FRIGAT MERAH PUTIH
      a. 140 M
      b. 6.626 TON
      c. Meriam 76mm Otmel
      d. CIWS 35mm Millenium
      e. 12.7mm Lionfish RCWS
      f. 64 Midlas VLS
      g. RADAR X-Band CENK 350KM AESA 4 FIXED RADAR
      h. RADAR L-Band CENK 400KM AESA
      i. SONAR HMS Fersah
      j. Torpedo B515
      k. SSM
      l. SAM
      =============================
      =============================
      MALONYET
      GOWING = LCS SALAH POTONG 17 KREDITOR REWORK 4000
      a. 111 M
      b. 3.100 TON
      c. Meriam 57mm
      d. NO CIWS FFBNP = NOT PAID
      e. 30mm RCWS
      f. VL MICA FFBNP = NOT PAID
      g. RADAR S-Band PESA = NO AESA
      h. SONAR = NOT PAID
      i. NO TORPEDO = NOT PAID
      j. SSM NSM FFBNP = NOT PAID
      k. SAM FFBNP = NOT PAID
      --------------------------------
      FACT LCS 2026 - 2011 = 16 YEARS
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      --------------------------------
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 BILLION PER UNIT = SETARA HARGA DESTROYER
      RM2,48 BILLION PER UNIT = SETARA HARGA DESTROYER
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and DEBT.
      --------------------------------
      Status Transfer Senjata (SIPRI 2024-2025)
      INDONESIA (Agresif & Ekspansif):
      Udara: Akuisisi Rafale F-4, pesawat angkut A400M Atlas, sistem Air Refuel, dan drone ANKA-S.
      Laut: Mesin kapal LM-2500, kapal perang PPA-L-Plus, dan Ship Engine lainnya.
      Darat/Rudal: Rudal balistik BORA dan KHAN, serta mesin TP400-D6.
      MALAYSEWA (Stagnan/Kosong):
      Tidak ada catatan transfer alutsista utama baru dalam database SIPRI periode tersebut.
      -
      Skandal & Masalah Struktural MALAYSEWA
      Skandal LCS (Littoral Combat Ship): Dana RM9 miliar cair, namun tidak ada kapal yang dikirim hingga 2025.
      Kegagalan MD530G: Pembayaran uang muka 35% untuk helikopter "hantu" yang pengirimannya terus tertunda.
      Korupsi Internal: Operasi Sohor (2025) mengungkap intelijen militer yang menjual data klasifikasi ke sindikat penyelundup.
      Krisis Anggaran: Pengeluaran pertahanan di bawah 1.5% PDB, jauh di bawah standar regional.
      -
      Kontroversi Strategi "Leasing" (Sewa) Helikopter
      Beban Finansial: Sewa 28 helikopter AW149 (RM16.5 miliar/15 tahun) dianggap lebih mahal dibanding Polandia yang membeli 32 unit seharga USD 1.83 miliar.
      Kedaulatan Aset: Aset tidak dimiliki penuh, membatasi kemampuan upgrade, modifikasi, dan konfigurasi ulang untuk misi darurat.
      Ketergantungan Swasta: Kesiapan tempur bergantung pada kontraktor (Weststar Aviation), berisiko jika terjadi sengketa hukum atau kegagalan servis.
      Nihil Transfer Teknologi: Skema sewa mematikan peluang pertumbuhan industri pertahanan domestik dan penyerapan tenaga ahli lokal.
      -
      Kondisi Alutsista "Outdated" (Usang)
      Laut (RMN): 28 kapal berusia di atas 40 tahun dengan sistem radar analog yang sulit mendeteksi drone atau kapal selam modern.
      Udara (RMAF): Ketergantungan pada avionik lama; biaya perawatan melonjak karena suku cadang sudah diskontinu.
      Darat (Army): Kendaraan lapis baja dan artileri kekurangan sistem kontrol tembakan berbasis GPS dan komunikasi semi-digital.
      -
      Kesimpulan Analisis
      Indonesia bergerak menuju kekuatan regional dengan diversifikasi pemasok (Prancis, Turki, AS).
      MALAYSEWA terjebak dalam "lingkaran setan" pengadaan: skandal masa lalu → anggaran terbatas → memilih opsi sewa yang mahal → ketergantungan teknologi asing yang kronis.

      Hapus
    12. PENDAPATAN : RM334,1 Miliar
      PENGELUARAN : RM470 Miliar
      RM470 – RM334,1 = MINUS RM135,9 ......
      -
      1 IN 4 ADOLESCENTS HAD DEPRESSION
      1 IN 10 ADOLESCENTS HAD ATTEMPTED SUICIDE
      1 IN 3 PEOPLE = HAVE A MENTAL DISORDER.
      -
      2026
      Populasi: 36.38 juta
      Debt Govt: RM 1.79 Triliun (70.5%)
      Debt Household: RM 1.65 Triliun (84.3%)
      Beban per Kapita: RM 94,544
      -
      2025
      Populasi: 35.97 juta
      Debt Govt: RM 1.30 Triliun (-%)
      Debt Household: RM 1.65 Triliun (-%)
      Beban per Kapita: RM 81,998
      -
      2024
      Populasi: 34.67 juta
      Debt Govt: RM 1.22 Triliun (64.6%)
      Debt Household: RM 1.53 Triliun (84.2%)
      Beban per Kapita: RM 79,315
      -
      2023
      Populasi: 35.12 juta
      Debt Govt: RM 1.17 Triliun (64.3%)
      Debt Household: RM 1.45 Triliun (81.2%)
      Beban per Kapita: RM 74,587
      -
      2022
      Populasi: 34.69 juta
      Debt Govt: RM 1.08 Triliun (60.1%)
      Debt Household: RM 1.38 Triliun (80.9%)
      Beban per Kapita: RM 70,901
      -
      2021
      Populasi: 34.28 juta
      Debt Govt: RM 979.81 Miliar (63.3%)
      Debt Household: RM 1.34 Triliun (89.1%)
      Beban per Kapita: RM 67,667
      -
      2020
      Populasi: 33.87 juta
      Debt Govt: RM 879.56 Miliar (62.0%)
      Debt Household: RM 1.27 Triliun (87.5%)
      Beban per Kapita: RM 63,464
      -
      2019
      Populasi: 33.45 juta
      Debt Govt: RM 793.00 Miliar (52.4%)
      Debt Household: RM 1.22 Triliun (82.5%)
      Beban per Kapita: RM 60,179
      -
      2018
      Populasi: 33.00 juta
      Debt Govt: RM 741.00 Miliar (52.5%)
      Debt Household: RM 1.16 Triliun (82.0%)
      Beban per Kapita: RM 57,605
      -
      2017
      Populasi: 32.54 juta
      Debt Govt: RM 686.80 Miliar (51.9%)
      Debt Household: RM 1.10 Triliun (83.2%)
      Beban per Kapita: RM 54,910
      -
      2016
      Populasi: 32.04 juta
      Debt Govt: RM 648.50 Miliar (52.7%)
      Debt Household: RM 1.04 Triliun (86.1%)
      Beban per Kapita: RM 52,699
      -
      2015
      Populasi: 31.52 juta
      Debt Govt: RM 630.50 Miliar (55.1%)
      Debt Household: RM 985.00 Miliar (86.0%)
      Beban per Kapita: RM 51,253
      -
      2014
      Populasi: 30.98 juta
      Debt Govt: RM 582.80 Miliar (55.0%)
      Debt Household: RM 902.00 Miliar (85.1%)
      Beban per Kapita: RM 47,927
      -
      2013
      Populasi: 30.42 juta
      Debt Govt: RM 547.70 Miliar (54.7%)
      Debt Household: RM 821.00 Miliar (82.0%)
      Beban per Kapita: RM 44,992
      -
      2012
      Populasi: 29.85 juta
      Debt Govt: RM 501.60 Miliar (53.3%)
      Debt Household: RM 732.00 Miliar (77.8%)
      Beban per Kapita: RM 41,326
      -
      2011
      Populasi: 29.26 juta
      Debt Govt: RM 456.10 Miliar (51.8%)
      Debt Household: RM 653.00 Miliar (74.2%)
      Beban per Kapita: RM 37,904
      -
      2010
      Populasi: 28.65 juta
      Debt Govt: RM 407.10 Miliar (52.4%)
      Debt Household: RM 581.00 Miliar (74.8%)
      Beban per Kapita: RM 34,488
      -
      2009
      Populasi: 28.04 juta
      Debt Govt: RM 362.40 Miliar (51.1%)
      Debt Household: RM 516.00 Miliar (72.0%)
      Beban per Kapita: RM 31,326
      -
      2008
      Populasi: 27.45 juta
      Debt Govt: RM 258.00 Miliar (41.3%)
      Debt Household: RM 460.00 Miliar (73.0%)
      Beban per Kapita: RM 26,155
      -
      2007
      Populasi: 26.86 juta
      Debt Govt: RM 266.00 Miliar (41.1%)
      Debt Household: RM 414.00 Miliar (64.0%)
      Beban per Kapita: RM 25,316
      -
      2006
      Populasi: 26.26 juta
      Debt Govt: RM 242.00 Miliar (41.5%)
      Debt Household: RM 372.00 Miliar (63.0%)
      Beban per Kapita: RM 23,381
      -
      2005
      Populasi: 25.66 juta
      Debt Govt: RM 228.00 Miliar (43.8%)
      Debt Household: RM 335.00 Miliar (64.0%)
      Beban per Kapita: RM 21,940
      -
      2004
      Populasi: 25.06 juta
      Debt Govt: RM 217.00 Miliar (45.1%)
      Debt Household: RM 298.00 Miliar (62.0%)
      Beban per Kapita: RM 20,550
      -
      2003
      Populasi: 24.46 juta
      Debt Govt: RM 189.00 Miliar (45.9%)
      Debt Household: RM 265.00 Miliar (64.0%)
      Beban per Kapita: RM 18,560
      -
      2002
      Populasi: 23.87 juta
      Debt Govt: RM 165.00 Miliar (44.9%)
      Debt Household: RM 236.00 Miliar (64.0%)
      Beban per Kapita: RM 16,798
      -
      2001
      Populasi: 23.28 juta
      Debt Govt: RM 146.00 Miliar (42.5%)
      Debt Household: RM 207.00 Miliar (60.0%)
      Beban per Kapita: RM 15,162
      -
      2000
      Populasi: 22.69 juta
      Debt Govt: RM 126.00 Miliar (36.1%)
      Debt Household: RM 182.00 Miliar (52.0%)
      Beban per Kapita: RM 13,574
      -
      1999
      Populasi: 22.11 juta
      Debt Govt: RM 113.00 Miliar (40.4%)
      Debt Household: RM 157.00 Miliar (56.0%)
      Beban per Kapita: RM 12,210
      -
      1998
      Populasi: 21.53 juta
      Debt Govt: RM 98.00 Miliar (35.8%)
      Debt Household: RM 135.00 Miliar (49.3%)
      Beban per Kapita: RM 10,821

      Hapus
  18. PRESIDEN MINTA PRODUKSI MASSAL INOVASI TEPUNG SINGKONG UNTUK KARHUTLA.

    https://www.facebook.com/watch/?v=2093413501286789

    BANGANG!! Rakyat kebuluran dibuang begitu aja tepung singkong!
    🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣

    BalasHapus
    Balasan
    1. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      --------------------------------------------
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      --------------------------------------------
      USA BANNED MALONYET : USA PALAK ART USD 240 MILLIAR
      NSM
      AMRAAM
      F18
      UH60A
      --------------------------------------------
      🀣ART PALAK USD 240 MILLIAR = BANNED : NSM AMRAAM F18🀣

      Hapus
    2. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA KREDIT (HUTANG) = KE GERMAN =
      KREDIT EKSPOR (HUTANG) GERMAN
      KREDIT EKSPOR (HUTANG) GERMAN
      KREDIT EKSPOR (HUTANG) GERMAN
      KREDIT EKSPOR (HUTANG) GERMAN
      KREDIT EKSPOR (HUTANG) GERMAN
      KREDIT EKSPOR (HUTANG) GERMAN
      KREDIT EKSPOR (HUTANG) GERMAN
      KREDIT EKSPOR (HUTANG) GERMAN
      KREDIT EKSPOR (HUTANG) GERMAN
      KREDIT EKSPOR (HUTANG) GERMAN
      KREDIT EKSPOR (HUTANG) GERMAN
      KREDIT EKSPOR (HUTANG) GERMAN
      KREDIT EKSPOR (HUTANG) GERMAN
      KREDIT EKSPOR (HUTANG) GERMAN
      KREDIT EKSPOR (HUTANG) GERMAN
      KREDIT EKSPOR (HUTANG) GERMAN
      KREDIT EKSPOR (HUTANG) GERMAN
      KREDIT EKSPOR (HUTANG) GERMAN
      KREDIT EKSPOR (HUTANG) GERMAN
      ----------------------
      Jerman (Germany)
      Jerman memberikan pembiayaan melalui lembaga KREDIT EKSPOR (HUTANG) resminya, Euler Hermes, yang sering kali bekerja sama dengan bank komersial besar seperti Deutsche Bank.
      Proyek Kapal Patroli Kedah-Class (MEKO 100 RMN):
      Mekanisme: KREDIT EKSPOR (HUTANG) yang dijamin oleh Euler Hermes untuk mendukung transfer teknologi dari galangan kapal Blohm+Voss (Grup LΓΌrssen).
      Status: Pembiayaan ini mencakup pembangunan enam unit kapal New Generation Patrol Vessel (NGPV) yang sebagian besar dirakit secara lokal di MALONYET.
      Pengadaan Kapal Selam Scorpene (Komponen Jerman):
      Mekanisme: Meskipun kapal utamanya dari Prancis, banyak komponen sensor dan mesin berasal dari vendor Jerman (seperti MTU). KREDIT EKSPOR (HUTANG) Jerman digunakan untuk menjamin pembayaran komponen-komponen strategis tersebut.
      Kendaraan Taktis & Mesin Diesel:
      Mekanisme: Pembiayaan jangka pendek hingga menengah untuk mesin-mesin MTU yang digunakan pada berbagai platform kendaraan angkut militer MALONYET.
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544

      Hapus
    3. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA KREDIT (HUTANG) = KE PERANCIS =
      KREDIT EKSPOR (HUTANG) PERANCIS
      KREDIT EKSPOR (HUTANG) PERANCIS
      KREDIT EKSPOR (HUTANG) PERANCIS
      KREDIT EKSPOR (HUTANG) PERANCIS
      KREDIT EKSPOR (HUTANG) PERANCIS
      KREDIT EKSPOR (HUTANG) PERANCIS
      KREDIT EKSPOR (HUTANG) PERANCIS
      KREDIT EKSPOR (HUTANG) PERANCIS
      KREDIT EKSPOR (HUTANG) PERANCIS
      KREDIT EKSPOR (HUTANG) PERANCIS
      KREDIT EKSPOR (HUTANG) PERANCIS
      KREDIT EKSPOR (HUTANG) PERANCIS
      KREDIT EKSPOR (HUTANG) PERANCIS
      KREDIT EKSPOR (HUTANG) PERANCIS
      KREDIT EKSPOR (HUTANG) PERANCIS
      KREDIT EKSPOR (HUTANG) PERANCIS
      KREDIT EKSPOR (HUTANG) PERANCIS
      ----------------------
      Prancis (France)
      MALONYET - Prancis merupakan mitra lama yang sering memberikan dukungan finansial melalui lembaga penjamin KREDIT EKSPOR (HUTANG)nya (seperti Bpifrance Assurance Export).
      Proyek Kapal Selam Scorpene: Pengadaan dua unit kapal selam ini didukung oleh KREDIT EKSPOR (HUTANG) jangka panjang dari konsorsium bank Prancis dengan jaminan pemerintah.
      Pesawat Airbus A400M: Pembiayaan untuk pesawat angkut berat ini melibatkan skema KREDIT EKSPOR (HUTANG) yang memfasilitasi pembayaran bertahap selama masa operasional pesawat
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544

      Hapus
    4. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA KREDIT (HUTANG) = KE ITALY =
      KREDIT EKSPOR (HUTANG) ITALY
      KREDIT EKSPOR (HUTANG) ITALY
      KREDIT EKSPOR (HUTANG) ITALY
      KREDIT EKSPOR (HUTANG) ITALY
      KREDIT EKSPOR (HUTANG) ITALY
      KREDIT EKSPOR (HUTANG) ITALY
      KREDIT EKSPOR (HUTANG) ITALY
      KREDIT EKSPOR (HUTANG) ITALY
      KREDIT EKSPOR (HUTANG) ITALY
      KREDIT EKSPOR (HUTANG) ITALY
      KREDIT EKSPOR (HUTANG) ITALY
      KREDIT EKSPOR (HUTANG) ITALY
      KREDIT EKSPOR (HUTANG) ITALY
      KREDIT EKSPOR (HUTANG) ITALY
      KREDIT EKSPOR (HUTANG) ITALY
      KREDIT EKSPOR (HUTANG) ITALY
      KREDIT EKSPOR (HUTANG) ITALY
      KREDIT EKSPOR (HUTANG) ITALY
      ----------------------
      Italia (Italy)
      Italia aktif menawarkan skema KREDIT EKSPOR (HUTANG) melalui SACE untuk mendukung perusahaan pertahanan mereka seperti Leonardo.
      Pesawat AW139 & AW149: Pengadaan helikopter untuk berbagai cabang militer MALONYET sering kali menggunakan paket pembiayaan yang dijamin oleh SACE untuk memastikan suku bunga tetap kompetitif bagi kementerian pertahanan.
      Meriam OTO Melara: Komponen persenjataan pada kapal-kapal perang MALONYET banyak didanai melalui skema kredit komersial Italia.
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544


      Hapus
    5. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA KREDIT (HUTANG) = KE USA =
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      ----------------------
      Amerika Serikat (United States)
      AS menggunakan mekanisme yang sedikit berbeda melalui Foreign Military Financing (FMF).
      Mekanisme: Ini bukan KREDIT EKSPOR (HUTANG) komersial biasa, melainkan bantuan atau pinjaman lunak dari pemerintah AS untuk pembelian peralatan militer asal Amerika.
      Pemanfaatan: Digunakan untuk suku cadang pesawat tempur F/A-18D Hornet dan sistem komunikasi taktis
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544

      Hapus
    6. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA KREDIT (HUTANG) = KE USA =
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      KREDIT EKSPOR (HUTANG) USA
      ----------------------
      Amerika Serikat (United States)
      AS menggunakan mekanisme yang sedikit berbeda melalui Foreign Military Financing (FMF).
      Mekanisme: Ini bukan KREDIT EKSPOR (HUTANG) komersial biasa, melainkan bantuan atau pinjaman lunak dari pemerintah AS untuk pembelian peralatan militer asal Amerika.
      Pemanfaatan: Digunakan untuk suku cadang pesawat tempur F/A-18D Hornet dan sistem komunikasi taktis
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544

      Hapus
    7. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA MALONYET KREDIT LMS B2 =KREDIT EKSPOR (HUTANG) TURKI = LMS B2
      KREDIT EKSPOR (HUTANG) TURKI = LMS B2
      KREDIT EKSPOR (HUTANG) TURKI = LMS B2
      KREDIT EKSPOR (HUTANG) TURKI = LMS B2
      -------------------------
      KREDIT EKSPOR (HUTANG) Turki untuk MALONYET (Update Kuartal I - 2026):
      1. Mekanisme KREDIT EKSPOR (HUTANG) (G-to-G)
      MALONYET memanfaatkan pembiayaan dari Turk Eximbank untuk pengadaan alutsista utama seperti kapal Littoral Mission Ship (LMS) Batch 2 dan jet tempur ringan. Karena skema ini dilakukan secara G2G, pemerintah Turki memberikan jaminan penuh terhadap kontrak tersebut, yang secara otomatis menurunkan profil risiko dan beban bunga bagi MALONYET 1.5.5.
      2. Estimasi Suku Bunga
      Bunga KREDIT EKSPOR (HUTANG) Turki: Dalam skema KREDIT EKSPOR (HUTANG) strategis, Turki biasanya menawarkan suku bunga yang mengacu pada CIRR (Commercial Interest Reference Rates) yang ditetapkan oleh OECD. Untuk periode 2025–2026, meskipun suku bunga domestik Turki sangat tinggi (mencapai 38% untuk mengimbangi inflasi), bunga untuk KREDIT EKSPOR (HUTANG) luar negeri dalam mata uang USD atau Euro tetap kompetitif, biasanya berada di kisaran 4% - 6% per tahun, tergantung pada masa tenor 1.1.1, 1.1.8.
      Perbandingan dengan MALONYET: Suku bunga pinjaman bank domestik di MALONYET berada di sekitar 4,6% per November 2025 1.4.1. Hal ini membuat kredit dari Turki menjadi pilihan yang masuk akal karena tidak jauh berbeda dengan biaya pinjaman domestik namun dengan keunggulan masa tenggang (grace period).
      3. Kondisi Pembayaran (Deferred Payment)
      Berdasarkan nota kesepahaman (MoU) yang diperbarui pada Langkawi International Maritime and Aerospace Exhibition (LIMA 2025), MALONYET menggunakan skema:
      Masa Tenor: Umumnya berkisar antara 10 hingga 15 tahun.
      Grace Period: MALONYET diberikan masa tenggang pembayaran pokok selama masa konstruksi aset (misalnya 3 tahun pertama saat kapal dibangun), sehingga pembayaran penuh hanya dimulai saat aset mulai beroperasi atau mendekati pengiriman 1.3.5.
      Sumber Berita Utama:
      Breaking Defense - MALONYET Inks Agreement for Turkish Corvettes (Update G2G)
      The Edge MALONYET - Strategic Defence Cooperation TΓΌrkiye (Update November 2025)
      Turk Eximbank Official - Export Credit Policy
      CEIC Data - Turkey & MALONYET Interest Rate Indicators 2025
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING

      Hapus
    8. PENDAPATAN : RM334,1 Miliar
      PENGELUARAN : RM470 Miliar
      RM470 – RM334,1 = MINUS RM135,9 ......
      -
      JAKARTA (1 KOTA): US$ 1,7 TRILIUN.
      -
      MALONDESH (13 NEGARA BAGIAN): US$ 1,34 TRILIUN
      ---------------------------------
      2026
      Populasi: 36.38 juta
      Debt Govt: RM 1.79 Triliun (70.5%)
      Debt Household: RM 1.65 Triliun (84.3%)
      Beban per Kapita: RM 94,544
      -
      2025
      Populasi: 35.97 juta
      Debt Govt: RM 1.30 Triliun (-%)
      Debt Household: RM 1.65 Triliun (-%)
      Beban per Kapita: RM 81,998
      -
      2024
      Populasi: 34.67 juta
      Debt Govt: RM 1.22 Triliun (64.6%)
      Debt Household: RM 1.53 Triliun (84.2%)
      Beban per Kapita: RM 79,315
      -
      2023
      Populasi: 35.12 juta
      Debt Govt: RM 1.17 Triliun (64.3%)
      Debt Household: RM 1.45 Triliun (81.2%)
      Beban per Kapita: RM 74,587
      -
      2022
      Populasi: 34.69 juta
      Debt Govt: RM 1.08 Triliun (60.1%)
      Debt Household: RM 1.38 Triliun (80.9%)
      Beban per Kapita: RM 70,901
      -
      2021
      Populasi: 34.28 juta
      Debt Govt: RM 979.81 Miliar (63.3%)
      Debt Household: RM 1.34 Triliun (89.1%)
      Beban per Kapita: RM 67,667
      -
      2020
      Populasi: 33.87 juta
      Debt Govt: RM 879.56 Miliar (62.0%)
      Debt Household: RM 1.27 Triliun (87.5%)
      Beban per Kapita: RM 63,464
      -
      2019
      Populasi: 33.45 juta
      Debt Govt: RM 793.00 Miliar (52.4%)
      Debt Household: RM 1.22 Triliun (82.5%)
      Beban per Kapita: RM 60,179
      -
      2018
      Populasi: 33.00 juta
      Debt Govt: RM 741.00 Miliar (52.5%)
      Debt Household: RM 1.16 Triliun (82.0%)
      Beban per Kapita: RM 57,605
      -
      2017
      Populasi: 32.54 juta
      Debt Govt: RM 686.80 Miliar (51.9%)
      Debt Household: RM 1.10 Triliun (83.2%)
      Beban per Kapita: RM 54,910
      -
      2016
      Populasi: 32.04 juta
      Debt Govt: RM 648.50 Miliar (52.7%)
      Debt Household: RM 1.04 Triliun (86.1%)
      Beban per Kapita: RM 52,699
      -
      2015
      Populasi: 31.52 juta
      Debt Govt: RM 630.50 Miliar (55.1%)
      Debt Household: RM 985.00 Miliar (86.0%)
      Beban per Kapita: RM 51,253
      -
      2014
      Populasi: 30.98 juta
      Debt Govt: RM 582.80 Miliar (55.0%)
      Debt Household: RM 902.00 Miliar (85.1%)
      Beban per Kapita: RM 47,927
      -
      2013
      Populasi: 30.42 juta
      Debt Govt: RM 547.70 Miliar (54.7%)
      Debt Household: RM 821.00 Miliar (82.0%)
      Beban per Kapita: RM 44,992
      -
      2012
      Populasi: 29.85 juta
      Debt Govt: RM 501.60 Miliar (53.3%)
      Debt Household: RM 732.00 Miliar (77.8%)
      Beban per Kapita: RM 41,326
      -
      2011
      Populasi: 29.26 juta
      Debt Govt: RM 456.10 Miliar (51.8%)
      Debt Household: RM 653.00 Miliar (74.2%)
      Beban per Kapita: RM 37,904
      -
      2010
      Populasi: 28.65 juta
      Debt Govt: RM 407.10 Miliar (52.4%)
      Debt Household: RM 581.00 Miliar (74.8%)
      Beban per Kapita: RM 34,488
      -
      2009
      Populasi: 28.04 juta
      Debt Govt: RM 362.40 Miliar (51.1%)
      Debt Household: RM 516.00 Miliar (72.0%)
      Beban per Kapita: RM 31,326
      -
      2008
      Populasi: 27.45 juta
      Debt Govt: RM 258.00 Miliar (41.3%)
      Debt Household: RM 460.00 Miliar (73.0%)
      Beban per Kapita: RM 26,155
      -
      2007
      Populasi: 26.86 juta
      Debt Govt: RM 266.00 Miliar (41.1%)
      Debt Household: RM 414.00 Miliar (64.0%)
      Beban per Kapita: RM 25,316
      -
      2006
      Populasi: 26.26 juta
      Debt Govt: RM 242.00 Miliar (41.5%)
      Debt Household: RM 372.00 Miliar (63.0%)
      Beban per Kapita: RM 23,381
      -
      2005
      Populasi: 25.66 juta
      Debt Govt: RM 228.00 Miliar (43.8%)
      Debt Household: RM 335.00 Miliar (64.0%)
      Beban per Kapita: RM 21,940
      -
      2004
      Populasi: 25.06 juta
      Debt Govt: RM 217.00 Miliar (45.1%)
      Debt Household: RM 298.00 Miliar (62.0%)
      Beban per Kapita: RM 20,550
      -
      2003
      Populasi: 24.46 juta
      Debt Govt: RM 189.00 Miliar (45.9%)
      Debt Household: RM 265.00 Miliar (64.0%)
      Beban per Kapita: RM 18,560
      -
      2002
      Populasi: 23.87 juta
      Debt Govt: RM 165.00 Miliar (44.9%)
      Debt Household: RM 236.00 Miliar (64.0%)
      Beban per Kapita: RM 16,798
      -
      2001
      Populasi: 23.28 juta
      Debt Govt: RM 146.00 Miliar (42.5%)
      Debt Household: RM 207.00 Miliar (60.0%)
      Beban per Kapita: RM 15,162
      -
      2000
      Populasi: 22.69 juta
      Debt Govt: RM 126.00 Miliar (36.1%)
      Debt Household: RM 182.00 Miliar (52.0%)
      Beban per Kapita: RM 13,574
      -
      1999
      Populasi: 22.11 juta
      Debt Govt: RM 113.00 Miliar (40.4%)
      Debt Household: RM 157.00 Miliar (56.0%)
      Beban per Kapita: RM 12,210
      -
      1998
      Populasi: 21.53 juta
      Debt Govt: RM 98.00 Miliar (35.8%)
      Debt Household: RM 135.00 Miliar (49.3%)
      Beban per Kapita: RM 10,821

      Hapus
  19. PRESIDEN MINTA PRODUKSI MASSAL INOVASI TEPUNG SINGKONG UNTUK KARHUTLA.

    https://www.facebook.com/watch/?v=2093413501286789

    BANGANG!! Rakyat kebuluran dibuang begitu aja tepung singkong!
    🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣🀣

    BalasHapus
    Balasan
    1. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      --------------------------------------------
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      --------------------------------------------
      USA BANNED MALONYET : USA PALAK ART USD 240 MILLIAR
      NSM
      AMRAAM
      F18
      UH60A
      --------------------------------------------
      🀣ART PALAK USD 240 MILLIAR = BANNED : NSM AMRAAM F18🀣

      Hapus
    2. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA MALONYET KREDIT MPMS =
      KREDIT EKSPOR (HUTANG) TURKI = MPMS
      KREDIT EKSPOR (HUTANG) TURKI = MPMS
      KREDIT EKSPOR (HUTANG) TURKI = MPMS
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544
      -------------------------
      Mekanisme KREDIT EKSPOR (HUTANG) Kapal MPMS
      Secara umum, mekanisme pembiayaan ini mengikuti pola Export Credit Agency (ECA) Financing:
      Dukungan Turk Eximbank: Sebagai lembaga KREDIT EKSPOR (HUTANG) Turki, Turk Eximbank menyediakan jaminan atau pinjaman langsung kepada pembeli (Pemerintah MALONYET) untuk mendanai pembelian kapal buatan Desan Shipyard.
      Pembayaran Berbasis Milestone: Kontrak kapal senilai kurang lebih RM339,85 juta (US$83,75 juta) per unit dibayarkan sesuai tahapan kemajuan konstruksi (Letter of Acceptance) yang disepakati.
      Penyaluran Dana: Bank akan menyalurkan dana langsung ke eksportir (Desan Shipyard) setelah dokumen pengapalan atau progres pembangunan kapal diverifikasi, sementara pemerintah MALONYET akan mencicil pinjaman tersebut kepada bank dalam jangka panjang.
      Sumber Berita Resmi (Update Januari 2026)
      Pengadaan ini telah dikonfirmasi melalui kunjungan resmi Perdana Menteri MALONYET, Anwar Ibrahim, ke Turki pada 7-9 Januari 2026. Berikut adalah referensi utamanya:
      Penandatanganan Kontrak MPMS 2: Dokumen Letter of Acceptance (LoA) untuk unit kedua (MPMS 2) diserahkan pada 7 Januari 2026 di Ankara, disaksikan langsung oleh PM Anwar Ibrahim dan Presiden Erdogan Bernama | Naval News.
      Mekanisme KREDIT EKSPOR (HUTANG): EXIM Bank MALONYET menandatangani MoU tripartit dengan Turk Eximbank dan firma rekayasa Turki pada 9 Januari 2026 untuk memfasilitasi pembiayaan perdagangan dan teknologi The Edge MALONYET | Bernama.
      Kunjungan Galangan Kapal: Kementerian Dalam Negeri MALONYET melakukan lawatan kemajuan proyek unit pertama (MPMS 1) di Desan Shipyard, Istanbul pada 9 Januari 2026 Instagram KDN.

      Hapus
    3. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA MALONYET KREDIT BARTER PT91M =
      KREDIT EKSPOR (HUTANG) BARTER SAWIT = POLANDIA
      KREDIT EKSPOR (HUTANG) BARTER SAWIT = POLANDIA
      KREDIT EKSPOR (HUTANG) BARTER SAWIT = POLANDIA
      KREDIT EKSPOR (HUTANG) BARTER SAWIT = POLANDIA
      -------------------------
      Mekanisme Kredit dan Pembayaran
      Kontrak senilai kurang lebih RM 1,4 miliar (atau sekitar US$ 370 juta) tersebut tidak seluruhnya dibayar dengan uang tunai secara langsung. Berikut adalah poin-poin utamanya:
      Skema Imbal Beli (Contra Trade): Sebagian dari nilai kontrak dibayar melalui komoditas MALONYET, terutama minyak sawit (CPO) dan produk turunannya. Hal ini dilakukan untuk meringankan beban cadangan devisa MALONYET sekaligus mempromosikan perdagangan bilateral.
      KREDIT EKSPOR (HUTANG): Pemerintah Polandia melalui lembaga keuangan negaranya memberikan fasilitas KREDIT EKSPOR (HUTANG) (pembayaran bertahap) dengan bunga yang kompetitif untuk mendanai produksi tank di pabrik Bumar-ŁabΔ™dy.
      Sumber Berita Utama
      Informasi mengenai mekanisme ini tercatat dalam berbagai laporan media dan dokumen resmi pada masa itu:
      The Star (April 2003): Melaporkan penandatanganan kontrak oleh Menteri Pertahanan MALONYET saat itu (Najib Razak) yang secara eksplisit menyebutkan penggunaan skema contra trade.
      Military Technology / Army Guide: Menjelaskan detail teknis dan keterlibatan perusahaan MALONYET dalam rantai produksi melalui lisensi perusahaan asing.
      ResearchGate / Jurnal Akademik: Mencatat proses persetujuan produksi massal setelah pengujian intensif di medan tropis MALONYET
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544

      Hapus
    4. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA MALONYET KREDIT BARTER FA50M =
      KREDIT EKSPOR (HUTANG) BARTER SAWIT = KOREA
      KREDIT EKSPOR (HUTANG) BARTER SAWIT = KOREA
      KREDIT EKSPOR (HUTANG) BARTER SAWIT = KOREA
      -------------------------
      Sistem Barter (Imbal Dagang)
      MALONYET mewajibkan adanya elemen imbal dagang untuk mengurangi pengeluaran mata uang asing secara langsung.
      • Proporsi: Sekitar 50% dari total nilai kontrak akan dibayarkan melalui skema barter atau imbal dagang.
      • Komoditas Utama: Pembayaran dilakukan menggunakan produk turunan minyak kelapa sawit (Crude Palm Oil) serta produk manufaktur lainnya dari MALONYET ke Korea Selatan.
      • Tujuan: Langkah ini strategis bagi MALONYET untuk mendukung industri kelapa sawit domestik sekaligus meringankan beban cash flow (arus kas) pemerintah.
      • Sumber Berita: Informasi mengenai mekanisme barter ini dilaporkan secara luas oleh Free MALONYET Today dan media pertahanan Indomiliter.
      3. Skema KREDIT EKSPOR (HUTANG)
      Sisa pembayaran yang tidak dicakup oleh barter akan dibiayai melalui fasilitas kredit.
      • Dukungan Finansial: Pembiayaan didukung oleh institusi keuangan Korea Selatan melalui skema KREDIT EKSPOR (HUTANG). Skema ini memungkinkan pemerintah MALONYET untuk membayar sisa kontrak melalui pinjaman jangka panjang dengan bunga yang kompetitif.
      • Manfaat: Memudahkan proses akuisisi tanpa harus menyediakan dana tunai dalam jumlah besar di muka, sehingga anggaran pertahanan dapat dialokasikan secara bertahap selama periode produksi dan pengiriman hingga tahun 2026-2027.
      • Sumber Berita: Mekanisme kredit ini divalidasi oleh laman resmi pemerintah Korea Selatan Korea.net dan media bisnis ChosunBiz.
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544

      Hapus
    5. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA MALONYET MD530G MILIK DESTINI =
      MD530G MILIK DESTINI
      MD530G MILIK DESTINI
      MD530G MILIK DESTINI
      -------------------------
      Mekanisme Kontrak dan Pembiayaan
      Nilai Kontrak: Total nilai pengadaan untuk enam unit helikopter ini diperkirakan mencapai sekitar RM300 juta hingga RM322 juta (sekitar US$71,8 juta hingga US$77,4 juta).
      Agen Perantara: Transaksi ini tidak dilakukan langsung ke pemerintah AS melalui skema Foreign Military Sales (FMS), melainkan melalui perusahaan lokal MALONYET sebagai kontraktor utama atau agen, yaitu Halaman Optima (yang kemudian diakuisisi 70% sahamnya oleh Destini Group/Destini Prima).
      Status Pengiriman: Kontrak ditandatangani pada awal 2016 dengan target pengiriman awal 2017-2018. Namun, karena masalah teknis dan administratif, pengiriman tertunda hingga akhirnya diterima sepenuhnya pada Februari - Juni 2022.
      KREDIT EKSPOR (HUTANG): Secara umum, pembelian alat utama sistem persenjataan (alutsista) dari AS ke MALONYET seringkali melibatkan skema pembayaran bertahap sesuai progres manufaktur dan pelatihan personel yang dilakukan di fasilitas MDHI di Arizona dan Texas.
      2. Sumber Berita Terpercaya
      Beberapa sumber utama yang mendokumentasikan proses pengadaan ini adalah:
      The Diplomat: Menjelaskan kontrak awal tahun 2016 sebagai kesepakatan senjata AS-MALONYET terbesar dalam 20 tahun terakhir.
      Bernama (Kantor Berita MALONYET): Mengonfirmasi penyelesaian pengiriman enam unit oleh Destini pada Juni 2022.
      FlightGlobal: Memberikan analisis mengenai keterlambatan pengiriman dan detail kontrak melalui agen Halaman Optima.
      The Star (MALONYET): Melaporkan selesainya tes penerimaan akhir (Final Acceptance Test).
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544

      Hapus
    6. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA MALONYET KREDIT EKSPOR (HUTANG) INGGRIS =
      KREDIT EKSPOR (HUTANG) INGGRIS = LEKIU CLASS
      KREDIT EKSPOR (HUTANG) INGGRIS = LEKIU CLASS
      KREDIT EKSPOR (HUTANG) INGGRIS = LEKIU CLASS
      -------------------------
      1. Skema Pendanaan dan KREDIT EKSPOR (HUTANG)
      Pengadaan ini merupakan bagian dari kontrak besar yang melibatkan dukungan finansial dari lembaga KREDIT EKSPOR (HUTANG) Inggris. Meskipun detail angka kredit spesifik untuk kelas Lekiu seringkali bersifat rahasia negara, skema umum yang digunakan dalam pembelian alutsista dari Inggris ke MALONYET biasanya melibatkan UK Export Finance (UKEF), yang memberikan jaminan kepada bank untuk meminjamkan dana kepada pembeli (Pemerintah MALONYET) agar dapat membayar eksportir Inggris.
      2. Proses pengiriman kapal sempat mengalami penundaan yang cukup lama karena masalah integrasi sistem senjata dan kontrol senjata (khususnya masalah perangkat lunak). Kapal yang diluncurkan pada 1994-1995 ini baru bisa diserahterahkan dan ditauliahkan (commissioning) pada akhir tahun 1999.
      3. Sumber Berita dan Referensi
      Informasi mengenai sejarah dan mekanisme pengadaan ini dapat ditemukan di berbagai arsip militer dan ensiklopedia pertahanan:
      Wikipedia & Wiki Militer: Memberikan kronologi pembangunan oleh Yarrow Shipbuilders dan masalah teknis yang dihadapi [Wikipedia Inggris, Military Wiki].
      Naval Technology: Mendetailkan spesifikasi teknis dan latar belakang proyek F2000 yang menjadi dasar kelas Lekiu [Naval Technology].
      Jurnal Akademik: Studi mengenai dinamika persenjataan MALONYET sering mengulas bagaimana skema pembelian dari Inggris ini menjadi tonggak modernisasi TLDM [Universitas Indonesia
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544

      Hapus
    7. ART USD 240 MILLIAR = BANNED NSM AMRAAM
      1. 7th - 13th Century: Ruled by Sriwijaya
      2. 14th Century: Ruled by Majapahit
      3. Year 1511: Ruled by the Portuguese
      4. Year 1641: Ruled by the Dutch
      5. Year 1824: Ruled by the British
      6. Year 1942: Ruled by the Japanese
      7. From 1957 onwards, 999 years of subjugation and allegiance to the British
      https://id.m.wikipedia.org/wiki/Sejarah_MALONDESH
      -
      8. IDENTITY CRISIS = It is only in MALONDESH that we face problems of promoting Malay as the national language as even after 60 years of independence, a substantial segment of the population canNOt converse in Malay or only use it during official occasions.
      -
      9. IDENTITY CRISIS = It is only in MALONDESH that we face problems of promoting Malay as the national language as even after 60 years of independence, a substantial segment of the population canNOt converse in Malay or only use it during official occasions
      ------------------------------
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      SUBSIDY BURDEN: 23.9%
      BORROWING TO REPAY DEBT: RM470 – RM334.1 = DEFICIT OF RM135.9
      ------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ------------------------------
      Bukti "Hutang Bayar Hutang" (Debt-Servicing Cycle)
      Data resmi menunjukkan MALAYSEWA terjebak dalam siklus gali lubang tutup lubang kronis:
      2018 (Fase Verifikasi): Utang menembus RM1 Triliun; pemerintah meluncurkan Tabung Harapan (donasi rakyat) untuk mencicil utang negara.
      2019–2020: Ketergantungan meningkat; 59% hingga 60% pinjaman baru hanya untuk melunasi utang lama.
      2023 (Rekor Terburuk): 64,3% dari total pinjaman kasar (RM145,8 Miliar) digunakan hanya untuk membayar utang jatuh tempo.
      2025–2026: Proyeksi tetap kritis di angka 58%. Ruang fiskal untuk pembangunan dan alutsista praktis terkunci oleh cicilan utang.
      -
      Bukti "Vakum SIPRI" (2020–2025)
      Kontras dengan klaim belanja "Cash", data SIPRI menunjukkan kekosongan aktivitas:
      2020–2021: Berstatus Planned (Hanya rencana/dijangka).
      2022–2023: Berstatus Not Yet Ordered (Terpilih tapi tidak ada kontrak/pesanan).
      2024–2025: Status resmi KOSONG (Nihil transfer senjata berat selama 2 tahun berturut-turut).
      Posisi Regional: MALAYSEWA kini sejajar dengan Laos dan Kamboja dalam hal nihilnya modernisasi alutsista berat.
      -
      Timeline "Prank" Alutsista (Janji vs Realitas)
      Daftar kegagalan kontrak strategis yang mencoreng kredibilitas pertahanan:
      Prank F/A-18 Hornet: Upaya akuisisi dari Kuwait Batal 4 Kali hingga resmi dihentikan pada 2026 karena masalah logistik dan dana.
      Prank Dassault Rafale: Mangkrak sejak 2014 akibat krisis anggaran (kini diborong Indonesia).
      Prank Kapal MRSS: Janji kontrak dengan PT PAL (Indonesia) pada 2018 yang tidak pernah terwujud.
      Prank Helikopter Blackhawk: Proses sewa (leasing) yang mangkrak dan berbelit hingga 2025.

      Hapus
    8. PENDAPATAN : RM334,1 Miliar
      PENGELUARAN : RM470 Miliar
      RM470 – RM334,1 = MINUS RM135,9 ......
      -
      2026 = CUT BUDGET
      2026 = NSM BANNED - AMRAAM BLOKIR
      2026 = F18 BATAL - UH60A BATAL
      2026 = REWORK 4000 PIPA DAN KABEL LCS
      -
      2026
      Populasi: 36.38 juta
      Debt Govt: RM 1.79 Triliun (70.5%)
      Debt Household: RM 1.65 Triliun (84.3%)
      Beban per Kapita: RM 94,544
      -
      2025
      Populasi: 35.97 juta
      Debt Govt: RM 1.30 Triliun (-%)
      Debt Household: RM 1.65 Triliun (-%)
      Beban per Kapita: RM 81,998
      -
      2024
      Populasi: 34.67 juta
      Debt Govt: RM 1.22 Triliun (64.6%)
      Debt Household: RM 1.53 Triliun (84.2%)
      Beban per Kapita: RM 79,315
      -
      2023
      Populasi: 35.12 juta
      Debt Govt: RM 1.17 Triliun (64.3%)
      Debt Household: RM 1.45 Triliun (81.2%)
      Beban per Kapita: RM 74,587
      -
      2022
      Populasi: 34.69 juta
      Debt Govt: RM 1.08 Triliun (60.1%)
      Debt Household: RM 1.38 Triliun (80.9%)
      Beban per Kapita: RM 70,901
      -
      2021
      Populasi: 34.28 juta
      Debt Govt: RM 979.81 Miliar (63.3%)
      Debt Household: RM 1.34 Triliun (89.1%)
      Beban per Kapita: RM 67,667
      -
      2020
      Populasi: 33.87 juta
      Debt Govt: RM 879.56 Miliar (62.0%)
      Debt Household: RM 1.27 Triliun (87.5%)
      Beban per Kapita: RM 63,464
      -
      2019
      Populasi: 33.45 juta
      Debt Govt: RM 793.00 Miliar (52.4%)
      Debt Household: RM 1.22 Triliun (82.5%)
      Beban per Kapita: RM 60,179
      -
      2018
      Populasi: 33.00 juta
      Debt Govt: RM 741.00 Miliar (52.5%)
      Debt Household: RM 1.16 Triliun (82.0%)
      Beban per Kapita: RM 57,605
      -
      2017
      Populasi: 32.54 juta
      Debt Govt: RM 686.80 Miliar (51.9%)
      Debt Household: RM 1.10 Triliun (83.2%)
      Beban per Kapita: RM 54,910
      -
      2016
      Populasi: 32.04 juta
      Debt Govt: RM 648.50 Miliar (52.7%)
      Debt Household: RM 1.04 Triliun (86.1%)
      Beban per Kapita: RM 52,699
      -
      2015
      Populasi: 31.52 juta
      Debt Govt: RM 630.50 Miliar (55.1%)
      Debt Household: RM 985.00 Miliar (86.0%)
      Beban per Kapita: RM 51,253
      -
      2014
      Populasi: 30.98 juta
      Debt Govt: RM 582.80 Miliar (55.0%)
      Debt Household: RM 902.00 Miliar (85.1%)
      Beban per Kapita: RM 47,927
      -
      2013
      Populasi: 30.42 juta
      Debt Govt: RM 547.70 Miliar (54.7%)
      Debt Household: RM 821.00 Miliar (82.0%)
      Beban per Kapita: RM 44,992
      -
      2012
      Populasi: 29.85 juta
      Debt Govt: RM 501.60 Miliar (53.3%)
      Debt Household: RM 732.00 Miliar (77.8%)
      Beban per Kapita: RM 41,326
      -
      2011
      Populasi: 29.26 juta
      Debt Govt: RM 456.10 Miliar (51.8%)
      Debt Household: RM 653.00 Miliar (74.2%)
      Beban per Kapita: RM 37,904
      -
      2010
      Populasi: 28.65 juta
      Debt Govt: RM 407.10 Miliar (52.4%)
      Debt Household: RM 581.00 Miliar (74.8%)
      Beban per Kapita: RM 34,488
      -
      2009
      Populasi: 28.04 juta
      Debt Govt: RM 362.40 Miliar (51.1%)
      Debt Household: RM 516.00 Miliar (72.0%)
      Beban per Kapita: RM 31,326
      -
      2008
      Populasi: 27.45 juta
      Debt Govt: RM 258.00 Miliar (41.3%)
      Debt Household: RM 460.00 Miliar (73.0%)
      Beban per Kapita: RM 26,155
      -
      2007
      Populasi: 26.86 juta
      Debt Govt: RM 266.00 Miliar (41.1%)
      Debt Household: RM 414.00 Miliar (64.0%)
      Beban per Kapita: RM 25,316
      -
      2006
      Populasi: 26.26 juta
      Debt Govt: RM 242.00 Miliar (41.5%)
      Debt Household: RM 372.00 Miliar (63.0%)
      Beban per Kapita: RM 23,381
      -
      2005
      Populasi: 25.66 juta
      Debt Govt: RM 228.00 Miliar (43.8%)
      Debt Household: RM 335.00 Miliar (64.0%)
      Beban per Kapita: RM 21,940
      -
      2004
      Populasi: 25.06 juta
      Debt Govt: RM 217.00 Miliar (45.1%)
      Debt Household: RM 298.00 Miliar (62.0%)
      Beban per Kapita: RM 20,550
      -
      2003
      Populasi: 24.46 juta
      Debt Govt: RM 189.00 Miliar (45.9%)
      Debt Household: RM 265.00 Miliar (64.0%)
      Beban per Kapita: RM 18,560
      -
      2002
      Populasi: 23.87 juta
      Debt Govt: RM 165.00 Miliar (44.9%)
      Debt Household: RM 236.00 Miliar (64.0%)
      Beban per Kapita: RM 16,798
      -
      2001
      Populasi: 23.28 juta
      Debt Govt: RM 146.00 Miliar (42.5%)
      Debt Household: RM 207.00 Miliar (60.0%)
      Beban per Kapita: RM 15,162
      -
      2000
      Populasi: 22.69 juta
      Debt Govt: RM 126.00 Miliar (36.1%)
      Debt Household: RM 182.00 Miliar (52.0%)
      Beban per Kapita: RM 13,574
      -
      1999
      Populasi: 22.11 juta
      Debt Govt: RM 113.00 Miliar (40.4%)
      Debt Household: RM 157.00 Miliar (56.0%)
      Beban per Kapita: RM 12,210
      -
      1998
      Populasi: 21.53 juta
      Debt Govt: RM 98.00 Miliar (35.8%)
      Debt Household: RM 135.00 Miliar (49.3%)
      Beban per Kapita: RM 10,821

      Hapus
  20. RELEASE US DEPARTEMENT OF WAR 24/08/2026
    F15IDN
    F15IDN
    F15IDN
    https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
    -
    INDONESIA
    a. 48 KAAN Gen 5
    b. 42 RAFALE Gen 4.5
    c. 16 Sukhoi 27/30
    d. 33 F16
    e. 12 M346FA
    f. 20 T50i
    g. 24 HAWK
    =============================
    =============================
    MALONYET
    a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
    b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
    c. 7 F18 = LACK SOURCE CODE
    d. 16 HAWK = LACK SPAREPART
    --------------------------------------------
    1.RASIO HUTANG 84.3% DARI GDP
    2. HUTANG NEGARA RM 1,65 TRLLIUN
    3. HUTANG 1MDB RM 18,2 BILLION
    4. TUNGGAKAN SEWA SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. SEWA SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. SEWA MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED SEWA BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. SEWA MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. SEWA VVSHORAD
    35. SEWA TRUK 3 TON
    36. 4X4 SEWA 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. SEWA BLACKHAWK SEWA AW159
    41. NO TRACKED SPH
    42. SEWA SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. SEWA AW139 SEWA COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED SEWA PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST VSHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. MKM BARTER PALM OIL
    62. MIG29N BARTER PALM OIL
    63. A400M PEMBAYARAN BERPERINGKAT (HUTANG)
    64. SCORPENE BARTER PALM OIL
    65. PT91M BARTER PALM OIL RUBBER
    67. FA50M BARTER PALM OIL
    ===================
    SEWA = HUTANG 84.3% DARI GDP = NO SHOPPING
    1. SEWA 28 HELI
    2. SEWA L39 ITCC
    3. SEWA EC120B
    4. SEWA FLIGHT SIMULATION TRAINING DEVICE (FSTD)
    5. SEWA 1 UNIT SISTEM SIMULATOR EC120B
    6. SEWA HOVERCRAFT
    7. SEWA AW139
    8. SEWA FAST INTERCEPTOR BOAT (FIB)
    9. SEWA UTILITY BOAT
    10. SEWA RIGID HULL FENDER BOAT (RHFB)
    11. SEWA ROVER FIBER GLASS (ROVER)
    12. SEWA MV AISHAH AIM 4
    13. SEWA BMW R1250RT
    14. SEWA 4x4 VECHICLE
    15. SEWA VSHORAD
    16. SEWA TRUCK
    17. SEWA HONDA CIVIC
    18. SEWA PATROL BOATS
    19. SEWA OUTBOARD MOTORS
    20. SEWA TRAILERS
    21. SEWA SUPERBIKES
    22. SEWA SIMULATOR MKM
    23. SEWA 12 AW149 TUDM
    24. SEWA 4 AW139 TUDM
    25. SEWA 5 EC120B TUDM
    26. SEWA 2 AW159 TLDM
    27. SEWA 4 UH-60A TDM
    28. SEWA 12 AW149 TDM
    29. SEWA 4 AW139 BOMBA
    30. SEWA 2 AW159 MMEA
    31. SEWA 7 BELL429 POLIS
    32. SEWA MOTOR POLIS
    --------------------------------------------
    USA BANNED MALONYET : USA PALAK ART USD 240 MILLIAR
    NSM
    AMRAAM
    F18
    UH60A
    --------------------------------------------
    🀣ART PALAK USD 240 MILLIAR = BANNED : NSM AMRAAM F18🀣

    BalasHapus
  21. Indonesia's First Aircraft Carrier from Italy: Italian Ship Giuseppe Garibaldi

    The Italian Navy's aircraft carrier, the Italian Ship Giuseppe Garibaldi, officially began its voyage to Indonesia on Monday evening (August 24, 2026).
    Upon arrival in Indonesia under this defense grant scheme, the ship is scheduled to be renamed KRI Gajah Mada and become Indonesia's first aircraft carrier.

    The Chief of Naval Staff (KSAL), Admiral Muhammad Ali, expressed his prayers to all Indonesians. He hoped that this long voyage to Indonesia would proceed smoothly, safely, and without any significant obstacles.

    ✅️KRI Gajah Mada is expected to arrive in Indonesian waters between September 15 and 20.
    https://youtube.com/watch?v=aDGggG1LBoo&pp=ygUUQW50YXJhbmV3cyBnYXJpYmFsZGk%3D
    ----

    Muantaaapppp..πŸ‘
    Pengiriman Aset Baruw Gratis..
    Grazie Italia hahha!πŸ₯³✌️πŸ˜‰

    warganyet kl yg cemburu, iri dengki dipersilakan BEBAS NGAMUKπŸ”₯ & MeWeK😭 haha!😭πŸ€ͺ🍌

    BalasHapus
  22. TAK JERA JERA BERUK BOTOL MALAYDESH SELUNDUP DADAH AKA NARKOBA KE KING INDO, DAN KING INDO BANTU TANGKAP BERUK BOTOL PEMBAWA DADAH BARANG HARAM 🀣🀣🀣🀣🀣

    Pengedar Vape Narkoba Asal Malaydesh Diciduk di Medan - [Metro Siang]
    https://www.youtube.com/watch?v=-xMhmxnVi2Y

    BalasHapus
  23. Buat latihan pendaratan dulu DON..asik tergelincir aja...
    Mendarat pun tidak mahir macam mana mau melawan pesawat musuh!

    https://www.youtube.com/watch?v=ku7to-tDDvQ

    https://www.instagram.com/reels/DcgHEEFiYqb/

    🀣🀣🀣🀣🀣 🀣🀣🀣🀣🀣 🀣🀣🀣🀣🀣 🀣🀣🀣🀣

    BalasHapus
    Balasan
    1. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      --------------------------------------------
      1.RASIO HUTANG 84.3% DARI GDP
      2. HUTANG NEGARA RM 1,65 TRLLIUN
      3. HUTANG 1MDB RM 18,2 BILLION
      4. TUNGGAKAN SEWA SABAH USD 15 BILLION
      5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
      6. SEWA SIMULATOR MKM
      7. PESAWAT MIG GROUNDED
      8. SEWA MOTOR POLIS
      9. PESAWAT MB339CM GROUNDED
      10. NURI GROUNDED SEWA BLACKHAWK
      11. FIVE PROCUREMENT CANCELLED
      12. 48 PESAWAT SKYHAWK HILANG
      13. MESIN JET 2 BUAH HILANG
      14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
      15. NO LST
      16. NO LPD – NGEMIS LPD USA
      17. NO TANKER
      18. NO KCR
      19. MONUMEN MIG29M UNTUK JIMAT KOS
      20. NO SPH
      21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
      22. NO HELLFIRE
      23. NO MPA ATR72 DELAYED
      24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
      25. NO HELI HEAVY ATTACK NGEMIS AH1Z
      26. NO M3 AMPHIBIUS RIG
      27. LCS MANGKRAK KARATAN
      28. OPV MANGKRAK
      29. TANK MOGOK STOP SPARE PARTS
      30. CN 235 MSA VERSI MSI USA
      31. SEWA MOTOR MILITARY POLICE
      32. RADAR GIFTED PAID USA
      33. 84% NO SAVING EVERY MONTH
      34. SEWA VVSHORAD
      35. SEWA TRUK 3 TON
      36. 4X4 SEWA 6X6 CANCELLED
      37. C130H DIGANTI 2045
      38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
      39. NO DRONE UCAV – ANKA ISR OMPONG
      40. SEWA BLACKHAWK SEWA AW159
      41. NO TRACKED SPH
      42. SEWA SIMULATOR HELI
      43. SPH CANCELLED
      44. SCORPION V150 CONDOR SIMBAS RETIRED
      45. NO PESAWAT COIN
      46. PILATUS MK II KARATAN
      47. PENCEROBOHAN 43X BTA 316 HARI
      48. SEWA AW139 SEWA COLIBRI
      49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
      50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
      51. LYNX GROUNDED
      52. MRCA CANCELLED SEWA PESAWAT ITTC
      53. MICA CANCELLED NSM CANCELLED
      54. NO LRAD NO MRAD JUST VSHORAD
      55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
      56. 4X NGEMIS F18 KUWAIT
      57. MENUNGGU 2050 KAPAL SELAM
      58. NO TANK AMPHIBI AV8 MOGOK BERASAP
      59. 84% NO SAVING EVERY MONTH
      60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
      61. MKM BARTER PALM OIL
      62. MIG29N BARTER PALM OIL
      63. A400M PEMBAYARAN BERPERINGKAT (HUTANG)
      64. SCORPENE BARTER PALM OIL
      65. PT91M BARTER PALM OIL RUBBER
      67. FA50M BARTER PALM OIL
      ===================
      SEWA = HUTANG 84.3% DARI GDP = NO SHOPPING
      1. SEWA 28 HELI
      2. SEWA L39 ITCC
      3. SEWA EC120B
      4. SEWA FLIGHT SIMULATION TRAINING DEVICE (FSTD)
      5. SEWA 1 UNIT SISTEM SIMULATOR EC120B
      6. SEWA HOVERCRAFT
      7. SEWA AW139
      8. SEWA FAST INTERCEPTOR BOAT (FIB)
      9. SEWA UTILITY BOAT
      10. SEWA RIGID HULL FENDER BOAT (RHFB)
      11. SEWA ROVER FIBER GLASS (ROVER)
      12. SEWA MV AISHAH AIM 4
      13. SEWA BMW R1250RT
      14. SEWA 4x4 VECHICLE
      15. SEWA VSHORAD
      16. SEWA TRUCK
      17. SEWA HONDA CIVIC
      18. SEWA PATROL BOATS
      19. SEWA OUTBOARD MOTORS
      20. SEWA TRAILERS
      21. SEWA SUPERBIKES
      22. SEWA SIMULATOR MKM
      23. SEWA 12 AW149 TUDM
      24. SEWA 4 AW139 TUDM
      25. SEWA 5 EC120B TUDM
      26. SEWA 2 AW159 TLDM
      27. SEWA 4 UH-60A TDM
      28. SEWA 12 AW149 TDM
      29. SEWA 4 AW139 BOMBA
      30. SEWA 2 AW159 MMEA
      31. SEWA 7 BELL429 POLIS
      32. SEWA MOTOR POLIS
      --------------------------------------------
      USA BANNED MALONYET : USA PALAK ART USD 240 MILLIAR
      NSM
      AMRAAM
      F18
      UH60A
      --------------------------------------------
      🀣ART PALAK USD 240 MILLIAR = BANNED : NSM AMRAAM F18🀣

      Hapus
    2. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA MALONYET KREDIT EKSPOR (HUTANG) KARAOK =
      KREDIT EKSPOR (HUTANG) TURKI = KARAOK
      KREDIT EKSPOR (HUTANG) TURKI = KARAOK
      KREDIT EKSPOR (HUTANG) TURKI = KARAOK
      -------------------------
      Mekanisme KREDIT EKSPOR (HUTANG)
      Meskipun detail spesifik mengenai skema pinjaman untuk proyek Karaok ini tidak dipublikasikan secara mendalam, kerja sama keuangan antara kedua negara didukung oleh:
      MOU Perbankan: Bank Negara MALONYET memiliki nota kesepahaman dengan Export Credit Bank of Turkey (Turk Eximbank) untuk memfasilitasi pembiayaan perdagangan bilateral dan investasi.
      Kepentingan Strategis: MALONYET memilih pemasok Turki untuk menghindari potensi sanksi akibat konflik Ukraina jika tetap membeli suku cadang atau sistem dari Rusia.
      Sumber Berita Utama:
      Defense News: Turkey's Roketsan wins MALONYETn deal for Karaok missiles (14 September 2023).
      Shephard Media: MALONYET turns to Turkey for new ATGMs (2 Oktober 2023).
      Defense Security Asia: MALONYET to Receive First Batch of ROKETSAN's "KARAOK" in 2026 (11 Mei 2024).
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544

      Hapus
    3. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA MALONYET KREDIT EKSPOR (HUTANG) HAWK =
      KREDIT EKSPOR (HUTANG) BRITISH = HAWK
      KREDIT EKSPOR (HUTANG) BRITISH = HAWK
      KREDIT EKSPOR (HUTANG) BRITISH = HAWK
      -------------------------
      1. Detail Pengadaan dan Pembiayaan
      MALONYET memesan 28 unit pesawat Hawk (terdiri dari 10 unit varian latih Hawk 108 dan 18 unit varian tempur ringan Hawk 208) pada akhir tahun 1990 sebagai bagian dari nota kesepahaman (MoU) pertahanan yang luas antara Inggris dan MALONYET.
      Skema KREDIT EKSPOR (HUTANG): Pembiayaan ini didukung oleh UK Export Finance (UKEF), lembaga KREDIT EKSPOR (HUTANG) resmi pemerintah Inggris. Skema ini memungkinkan pemerintah MALONYET untuk mencicil pembayaran dalam jangka panjang dengan jaminan dari pemerintah Inggris kepada bank-bank pemberi pinjaman.
      Nilai Kontrak: Total nilai paket pertahanan dalam MoU tersebut mencapai sekitar £1 miliar (kurs saat itu), yang mencakup tidak hanya pesawat Hawk, tetapi juga peralatan radar, rudal, dan kapal fregat.
      Jadwal Pengiriman: Pesawat-pesawat tersebut mulai dikirimkan pada tahun 1994 hingga 1995.
      2. Sumber Berita Utama:
      Reuters: Melaporkan sejarah panjang BAE Systems dalam menawarkan skema pembiayaan pemerintah Inggris untuk mempermudah MALONYET dalam melakukan pembayaran aset pertahanan mahal secara bertahap.
      GOV.UK: Mencatat peran strategis UKEF dalam mendukung ekspor pesawat Hawk ke berbagai negara sekutu, termasuk MALONYET, untuk mendukung industri manufaktur Inggris di Warton dan Brough.
      MPE Limited: Dokumen teknis mengenai detail pengiriman dan varian Hawk 108/208 yang digunakan oleh Tentara Udara Diraja MALONYET (TUDM)
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544

      Hapus
    4. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA MALONYET KREDIT EKSPOR (HUTANG) LMS B1 =
      KREDIT EKSPOR (HUTANG) CINA = LMS B1
      KREDIT EKSPOR (HUTANG) CINA = LMS B1
      KREDIT EKSPOR (HUTANG) CINA = LMS B1
      KREDIT EKSPOR (HUTANG) CINA = LMS B1
      -------------------------
      1. Skema Pembiayaan dan KREDIT EKSPOR (HUTANG)
      Lembaga Pembiayaan: Pembiayaan utama didukung oleh Export-Import Bank of China (China Eximbank) melalui fasilitas pinjaman lunak (soft loan) atau kredit pembeli (buyer's credit).
      Metode Pembayaran: Berbeda dengan produsen Barat, Cina menawarkan paket yang sangat kompetitif dengan tingkat bunga rendah dan tidak memerlukan pembayaran penuh di muka (upfront payment).
      Koneksi dengan Proyek Lain: Pengadaan militer ini merupakan bagian dari paket kerja sama ekonomi yang lebih luas antara MALONYET dan Cina, yang juga mencakup proyek infrastruktur besar seperti East Coast Rail Link (ECRL) yang dibiayai 75% oleh China Eximbank.
      2. Sumber Berita dan Referensi Utama
      Informasi ini telah dilaporkan secara luas oleh berbagai media internasional dan pertahanan terpercaya:
      Janes Defence: Melaporkan detail teknis, perubahan kontrak dari MYR 1,17 miliar ke MYR 1,05 miliar, dan lokasi pembangunan di Wuhan.
      Reuters: Melaporkan penandatanganan kesepakatan perdana saat kunjungan PM Najib Razak ke Beijing pada 2016.
      The Sun Daily & New Straits Times: Mengutip pernyataan Menteri Pertahanan saat itu, Hishammuddin Hussein, mengenai efisiensi biaya kapal Cina dibandingkan produsen Barat.
      GlobalSecurity.org: Menjelaskan peran pinjaman Cina dalam memfasilitasi akuisisi alutsista besar pertama MALONYET dari Beijing
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544

      Hapus
    5. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA MALONYET KREDIT EKSPOR (HUTANG) KIFV =
      KREDIT EKSPOR (HUTANG) KOREA = KIFV
      KREDIT EKSPOR (HUTANG) KOREA = KIFV
      KREDIT EKSPOR (HUTANG) KOREA = KIFV
      -------------------------
      1. Skema KREDIT EKSPOR (HUTANG) & Pembiayaan
      KREDIT EKSPOR (HUTANG) (Export Credit): Pemerintah Korea Selatan menyediakan fasilitas pinjaman kepada pemerintah pembeli (MALONYET) untuk mendanai pembelian alutsista dari produsen Korea (saat itu Daewoo Heavy Industries, sekarang Hanwha Aerospace).
      Kompensasi Perdagangan (Barter/Offset): Pembelian ini sering kali melibatkan kesepakatan imbal dagang. MALONYET dikenal menggunakan komoditas utamanya, seperti minyak kelapa sawit, sebagai bagian dari mekanisme pembayaran atau kompensasi ekonomi dalam kontrak-kontrak pertahanan besar untuk mengurangi beban devisa.
      2. Sumber Berita Utama:
      Wikipedia & Military Databases: Mencatat sejarah teknis dan jumlah unit.
      Defence Blog & Janes: Melaporkan detail modernisasi terbaru dan kerja sama Hanwha-Cendana Auto.
      Korea Eximbank (KEXIM): Sebagai lembaga penyedia KREDIT EKSPOR (HUTANG) untuk transaksi internasional Korea Selatan.
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544

      Hapus
    6. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA MALONYET MKM BARTER SAWIT =
      MKM BARTER SAWIT
      MKM BARTER SAWIT
      MKM BARTER SAWIT
      -------------------------
      1. Struktur Pembayaran (Tunai & Komoditas)
      30% Imbal Dagang (Minyak Sawit): Pemerintah Rusia setuju untuk menerima pembayaran sekitar US$ 270 juta (setara MYR 1,06 miliar) dalam bentuk komoditas minyak sawit mentah (CPO).
      2. Periode Kredit dan Pengadaan
      Tenor 5 Tahun: Pembayaran melalui minyak sawit tersebut dijadwalkan dilakukan secara bertahap selama periode lima tahun.
      3. Sumber Berita :
      Al Jazeera: Melalui laporan "MALONYET shells out oil for planes" (12 Oktober 2003), media ini merinci pernyataan Wakil Menteri Pertahanan MALONYET saat itu, Muhammad Shafie Apdal, di hadapan parlemen mengenai pembayaran parsial menggunakan minyak sawit sebesar 30% dari nilai kontrak.
      MALONYETn Palm Oil Board (MPOB): Lembaga ini mencatat sejarah pengadaan alutsista melalui skema komoditas, termasuk rincian usulan awal di mana minimal 20-30% nilai kontrak dibayar dengan minyak sawit untuk meringankan beban devisa.
      New Straits Times (NST): Media nasional MALONYET ini mendokumentasikan tawaran Rusia terkait offset pertahanan yang melibatkan komoditas sawit dalam artikel "Russia offers palm oil defence offset".
      Reuters via PressReader/Portal Berita: Berbagai arsip berita ekonomi tahun 2003 mencatat penandatanganan kontrak senilai US$ 900 juta tersebut di sela-sela kunjungan Presiden Vladimir Putin ke Kuala Lumpur
      --------------------------------
      NGEMIS = BERAS JAGUNG BATUBARA - BATAL = F18 NSM UH60A CUT BUDGET
      1. BUDGET MILITER USD 20 MILIAR vs USD 4,7 MILIAR
      2. BUDGET 1 UNIT RAFALE = 4 UNIT FA50M
      3. BUDGET 1 UNIT PPA = 3 UNIT LMS B2
      4. BUDGET 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONYET
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. BUDGET SEWA 28 HELI = BUDGET 119 HELI BARU
      7. BUDGET 1 UNIT APACHE = 13 UNIT MD530G
      8. UCAV ANKA vs ANKA ISR NOT ARMED
      9. BUDGET 1 UNIT LCS EXCLUDING AMMO = 1 UNIT DESTROYER INCLUDING AMMO
      --------------------------------
      FA-50M VERSI DOWNGRADE FA50PL✔️
      LMS B2 VERSI DOWNGRDE BABUR CLASS✔️
      MD530G VERSI SIPIL DOWNGRADE AH-6i✔️
      DOWNGRADE = SPEK TERMURAH BAWAH hahahaha
      -
      FA50 PL USD 60 JUTA vs FA50Murah USD 50 JUTA+VERSI BARTER
      BABUR CLASS USD 300 JUTA vs LMS B2 USD 150 JUTA+VERSI NO TORPEDO NO SONAR
      AH=6I USD 20 JUTA vs MD530G USD 12 JUTA+VERSI TRAINING
      --------------------------------
      DATA UTANG MALONYET 2026
      Utang Pemerintah: RM 1,79 triliun (Rasio Utang Pemerintah/PDB: 70,5% - Batas Limit 65%)
      Utang Rumah Tangga: RM 1,65 triliun (Rasio Utang Rumah Tangga/PDB: 84,3% - Batas Limit 65%)
      Jumlah Penduduk MALONYET 2026 : 36.385.115 jiwa
      -
      PERHITUNGAN UTANG PER PENDUDUK MALONYET 2026
      Utang Pemerintah: RM 1.790.000.000.000 / 36.385.115 = RM 49.196
      Utang Rumah Tangga: RM 1.650.000.000.000 / 36.385.115 = RM 45.348
      ➡️TOTAL BEBAN KUMULATIF PER WARGA : RM 49.196 + RM 45.348 = RM 94.544

      Hapus
    7. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      --------------------------------------------------
      GLOBAL FIREPOWER (GFP) 2026 – ASEAN :
      https://www.globalfirepower.com/countries-listing.php
      -
      1. INDONESIA – PERINGKAT 13
      -
      2. VIETNAM – PERINGKAT 23
      -
      3. THAILAND – PERINGKAT 24
      -
      4. SINGAPURA – PERINGKAT 29
      -
      5. MYANMAR – PERINGKAT 35
      -
      6. FILIPINA – PERINGKAT 41
      -
      7. MALONYET – PERINGKAT 42
      -
      8. KAMBOJA – PERINGKAT 83
      -
      9. LAOS – PERINGKAT 125
      ---------------------------------
      2025 = KOSONG
      Https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708518608
      -
      2024 = KOSONG
      https://defense-studies.blogspot.com/2025/03/order-dan-transfer-persenjataan-ke-dan_14.html
      -
      2023 = NOT YET ORDERED
      https://defense-studies.blogspot.com/2024/03/transfer-persenjataan-ke-dan-dari_15.html
      -
      2022 = SELECTED NOT YET ORDERED
      https://defense-studies.blogspot.com/2023/03/transfer-persenjataan-ke-dan-dari_17.html
      -
      2021 = PLANNED
      https://defense-studies.blogspot.com/2022/03/transfer-persenjataan-ke-MALONYET-2021.html
      -
      2020 = PLANNED
      https://defense-studies.blogspot.com/2021/03/transfer-persenjataan-ke-MALONYET-2020.html
      ---------------------------------
      Status SIPRI & Kelumpuhan Pengadaan
      Vakum Total (2024–2025): Lembar laporan SIPRI KOSONG selama dua tahun berturut-turut.
      Tren Penurunan Progresif: Berawal dari Planned (2020), turun menjadi Selected Not Yet Ordered (2022), hingga nihil aktivitas (2024-2025).
      Kontras Regional: Indonesia memiliki lembar belanja penuh (Rafale, A400M, Rudal Khan), sementara MALONYET setara dengan negara ekonomi kecil seperti Laos dan Kamboja.
      -
      Kegagalan Aset Strategis & Operasional
      Drama SPH 155mm: Proyek tertunda sejak 2010; hingga September 2024 Angkatan Darat belum memiliki sistem SPH karena pembatalan anggaran oleh Kemenkeu.
      Skandal LCS: Cost overrun sebesar RM 1 Miliar. Dari RM 6,08 Miliar yang dibayarkan, RM 400 Juta justru digunakan untuk membayar hutang perusahaan (PSCI), bukan untuk kapal.
      Armada Lumpuh (Grounded): Jet Hawk dan MB-339CM tidak bisa terbang; kapal selam KD Rahman sempat mengalami kendala teknis tidak bisa menyelam.
      Aset Usang: Inventaris yang menua memicu biaya pemeliharaan (sustainment) yang sangat tinggi dan tidak efisien.
      -
      Kelemahan Industri Pertahanan Domestik
      Korupsi Sistemik: Proses pengadaan sangat rentan terhadap campur tangan kepentingan asing dan domestik.
      Kesenjangan SDM: Kurangnya spesialis STEM dan keterbatasan teknologi membuat galangan kapal lokal tidak kompetitif dibanding Singapura.
      Keamanan Anggaran: Terjadi kebocoran dana (leakage) dan pengawasan parlemen yang sangat lemah terhadap sektor pertahanan yang tertutup.
      -
      Hambatan Fiskal & "Debt Service Ratio"
      Prioritas Nasional: Anggaran pertahanan stagnan karena pemerintah harus memprioritaskan pemulihan ekonomi dan pembayaran hutang.
      Siklus Hutang: Tingginya biaya pemeliharaan aset tua menghisap anggaran yang seharusnya digunakan untuk modernisasi alutsista baru.
      -
      Dampak pada Posisi Kawasan (GFP 2026)
      Penurunan Peringkat: Merosot ke posisi 42 dunia (Peringkat ke-7 di ASEAN), resmi disalip oleh Filipina (Peringkat 41).
      Kelemahan Maritim: Absennya Korps Marinir dan armada yang menua membuat MALONYET rentan dalam sengketa di Laut China Selatan (LCS).
      -
      Ringkasan Perbandingan 2026
      Indonesia: Peringkat 13 (Pemimpin ASEAN), belanja agresif, rasio utang sehat.
      MALONYET: Peringkat 42 (Papan Bawah), lembar belanja kosong, terjebak hutang dan korupsi.

      Hapus
    8. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      --------------------------------------------------
      2025 = KOSONG
      Https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708518608
      -
      2024 = KOSONG
      https://defense-studies.blogspot.com/2025/03/order-dan-transfer-persenjataan-ke-dan_14.html
      -
      2023 = NOT YET ORDERED
      https://defense-studies.blogspot.com/2024/03/transfer-persenjataan-ke-dan-dari_15.html
      -
      2022 = SELECTED NOT YET ORDERED
      https://defense-studies.blogspot.com/2023/03/transfer-persenjataan-ke-dan-dari_17.html
      -
      2021 = PLANNED
      https://defense-studies.blogspot.com/2022/03/transfer-persenjataan-ke-MALONYET-2021.html
      -
      2020 = PLANNED
      https://defense-studies.blogspot.com/2021/03/transfer-persenjataan-ke-MALONYET-2020.html
      ----------------------------------
      Perbandingan Status Strategis (SIPRI 2024–2025)
      Indonesia (Status Dominan): Memiliki "Daftar Belanja Penuh" mencakup aset mutakhir seperti Rafale F4, KF-21 Boramae, A400M Atlas, dan Kapal PPA. Masuk dalam daftar 40 besar importir senjata dunia (Peringkat 18).
      MALONYET (Status Vakum): Laporan SIPRI menunjukkan angka KOSONG selama dua tahun berturut-turut. Tidak ada transfer alutsista berat yang terealisasi, menempatkan posisinya setara dengan negara ekonomi kecil seperti Laos dan Kamboja.
      -
      Dikotomi Model Pengadaan (Buying vs Leasing)
      Indonesia (Buying/Pemilik): Menggunakan skema Procurement (Pembelian) yang memberikan kedaulatan penuh atas aset. Fokus pada kepemilikan teknologi generasi 4.5 ke atas.
      MALONYET (Leasing/Penyewa): Akibat krisis likuiditas, militer beralih ke skema Sewa (Leasing) untuk 32+ item strategis (Blackhawk, AW139, simulator). Status ini menurunkan derajat militer menjadi "Military-for-Rent".
      -
      Ketimpangan Fiskal & Kapasitas Belanja
      Indonesia (Ekonomi Sehat): PDB mencapai USD 1,44 Triliun dengan rasio utang pemerintah yang terjaga di 40% (batas aman 60%). Defisit fiskal hanya 2,9%.
      MALONYET (Ekonomi Kritis): Rasio utang pemerintah menembus 69% (melampaui batas limit 65%). Utang rumah tangga sangat ekstrem di angka 84,3% PDB.
      Spiral Utang: 58% pinjaman baru pada 2026 hanya digunakan untuk membayar bunga dan cicilan utang lama (Debt-Servicing Cycle).
      -
      Siklus Operasional: Modernisasi vs Pensiun Dini
      Indonesia: Melakukan regenerasi alutsista tua secara sistematis melalui program MEF yang berkelanjutan.
      MALONYET: Terjebak dalam tren Retirement (Pensiun Dini) tanpa pengganti. Aset strategis seperti MiG-29, MB339CM, dan helikopter Nuri berhenti beroperasi karena biaya perawatan yang tidak terjangkau.
      -
      Penurunan Daya Gentar & Reputasi (GFP 2026)
      Indonesia: Kokoh sebagai pemimpin ASEAN di Peringkat 13 Dunia.
      MALONYET: Merosot ke Peringkat 42 Dunia, resmi disalip oleh Filipina (Peringkat 41).
      Kredibilitas: Pembatalan akuisisi F/A-18 Hornet Kuwait sebanyak 4 kali dan pembekuan total pengadaan (Procurement Freeze 2026) memperburuk citra pertahanan di mata internasional.
      -
      Dampak Administrasi & Diplomasi
      Stabilitas Politik: Indonesia memiliki kontinuitas kebijakan, sementara MALONYET mengalami ketidakstabilan (5x PM, 6x Menhan) yang melumpuhkan perencanaan jangka panjang.
      Reputasi Sektoral: Kegagalan administrasi di bidang pertahanan selaras dengan kegagalan di bidang olahraga (sanksi naturalisasi ilegal dan kekalahan WO 0-3 dari Vietnam) yang mencerminkan penurunan pengaruh regional.


      Hapus
    9. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      --------------------------------------------------
      2025 = KOSONG
      Https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708518608
      -
      2024 = KOSONG
      https://defense-studies.blogspot.com/2025/03/order-dan-transfer-persenjataan-ke-dan_14.html
      -
      2023 = NOT YET ORDERED
      https://defense-studies.blogspot.com/2024/03/transfer-persenjataan-ke-dan-dari_15.html
      -
      2022 = SELECTED NOT YET ORDERED
      https://defense-studies.blogspot.com/2023/03/transfer-persenjataan-ke-dan-dari_17.html
      -
      2021 = PLANNED
      https://defense-studies.blogspot.com/2022/03/transfer-persenjataan-ke-MALONYET-2021.html
      -
      2020 = PLANNED
      https://defense-studies.blogspot.com/2021/03/transfer-persenjataan-ke-MALONYET-2020.html
      ----------------------------------
      Status Alutsista SIPRI (2020–2025): "Dua Tahun Kosong"
      Vakum Total: Laporan SIPRI 2024–2025 menunjukkan status KOSONG. MALONYET resmi sejajar dengan Timor Leste, Laos, dan Kamboja dalam hal nol transfer senjata berat.
      Tren Mundur: Berawal dari fase Planned (2020), lalu Selected Not Yet Ordered (2022), hingga akhirnya vakum total (2024–2025) karena ketiadaan dana tunai.
      Kegagalan Simbolik: Pembatalan akuisisi F/A-18 Hornet Kuwait sebanyak 4 kali menjadi bukti ketidakmampuan finansial, bahkan untuk membeli barang bekas sekalipun.
      -
      Model Pengadaan: "Negara Penyewa" (Military-for-Rent)
      Krisis likuiditas memaksa militer beralih dari kepemilikan menjadi penyewa aset (Leasing):
      Daftar Sewa: Mencakup 32+ item strategis, termasuk 31 Helikopter (Blackhawk, AW139, AW149, Bell 429), pesawat latihan L39, kapal hidrografi, hingga simulator jet tempur MKM.
      Logistik Sipil: Pengadaan kendaraan operasional (Honda Civic, BMW R1250RT, truk 3 ton) kini sepenuhnya menggunakan skema sewa.
      Barter Komoditas: Pengadaan sisa (FA-50, PT-91M, Scorpene) terpaksa menggunakan skema Barter Kelapa Sawit (CPO) karena minimnya cadangan devisa.
      -
      Analisa Fiskal: "Spiral Debt-Servicing"
      MALONYET terjebak dalam siklus "Gali Lubang Tutup Lubang" yang kronis:
      Siklus Utang: Proyeksi 2025–2026 menunjukkan 58% pinjaman baru hanya digunakan untuk membayar bunga dan pokok utang lama.
      Ledakan Utang: Dari RM 407,1 Miliar (2010) melonjak ke RM 1,79 Triliun (2026).
      Beban Rakyat: Utang rumah tangga mencapai 84,3% dari PDB, dengan fakta menyedihkan bahwa 84% masyarakat tidak memiliki tabungan setiap bulannya.
      -
      Degradasi Militer & Reputasi (GFP 2026)
      Peringkat GFP: Merosot ke posisi 42 dunia (Peringkat ke-7 di ASEAN), secara resmi disalip oleh Filipina (Peringkat 41).
      Aset Karatan & Hilang: Skandal mangkraknya proyek LCS & OPV, ditambah catatan hilangnya 48 pesawat Skyhawk serta 2 mesin jet tempur dari gudang negara.
      Status Armada: Mayoritas aset utama berstatus Grounded (MiG-29, MB339CM, Nuri, Lynx) atau beroperasi dengan keterbatasan suku cadang (Tank mogok/berasap).
      -
      Krisis Administrasi & Tekanan Global
      Pembekuan Total: PM Anwar Ibrahim menginstruksikan Procurement Freeze 2026 (pembekuan pengadaan) guna menghentikan kebocoran anggaran akibat korupsi proyek.
      Sanksi Internasional: Tekanan AS melalui Section 301 (tarif 10-25%) dan ancaman IEEPA mempersempit ruang gerak fiskal negara.
      Reputasi Regional: Kekalahan WO 0-3 (sanksi AFC/CAS) dan kegagalan lolos ke Piala Asia 2027 mencerminkan keruntuhan sistemik di level administrasi nasional.

      Hapus
    10. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      --------------------------------------------------
      2025 = KOSONG
      Https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708518608
      -
      2024 = KOSONG
      https://defense-studies.blogspot.com/2025/03/order-dan-transfer-persenjataan-ke-dan_14.html
      -
      2023 = NOT YET ORDERED
      https://defense-studies.blogspot.com/2024/03/transfer-persenjataan-ke-dan-dari_15.html
      -
      2022 = SELECTED NOT YET ORDERED
      https://defense-studies.blogspot.com/2023/03/transfer-persenjataan-ke-dan-dari_17.html
      -
      2021 = PLANNED
      https://defense-studies.blogspot.com/2022/03/transfer-persenjataan-ke-MALONYET-2021.html
      -
      2020 = PLANNED
      https://defense-studies.blogspot.com/2021/03/transfer-persenjataan-ke-MALONYET-2020.html
      -----------------------------------
      Status Realisasi Alutsista (Data SIPRI)
      Indonesia (Dominasi Kawasan): Memiliki daftar belanja satu lembar penuh mencakup Rafale F4, A400M Atlas, Kapal PPA, Rudal Khan/Bora, dan drone ANKA-S. Terdaftar sebagai importir senjata ke-18 dunia.
      MALONYET (Vakum Total): Laporan SIPRI menunjukkan angka KOSONG selama dua tahun berturut-turut (2024-2025). Status merosot dari fase Planned (2020) hingga nihil transfer senjata berat.
      Kegagalan Strategis: Pembatalan akuisisi F/A-18 Hornet Kuwait sebanyak 4 kali menjadi bukti hilangnya daya beli cash, bahkan untuk aset bekas.
      -
      Model Pengadaan: Kepemilikan vs Sewa
      Indonesia (Buying): Skema pembelian tunai/kredit ekspor untuk kepemilikan penuh aset guna menjamin kedaulatan operasional jangka panjang.
      MALONYET (Leasing): Krisis likuiditas memaksa militer beralih ke skema Sewa (Leasing) untuk 32+ item, termasuk 31 helikopter (Blackhawk, AW139, AW149), pesawat latihan L39, hingga kendaraan polisi.
      -
      Kondisi Fiskal & Perangkap Utang
      Indonesia (Stabil): Rasio utang pemerintah sehat (40% GDP), utang rumah tangga rendah (16% GDP), dan defisit terkendali di 2,9%.
      MALONYET (Kritis): Utang pemerintah menembus 69% GDP (melewati limit 65%) dan utang rumah tangga ekstrem di 84,3% GDP.
      Siklus Gali Lubang: 58% pinjaman baru pada 2026 hanya digunakan untuk membayar cicilan dan bunga utang lama (Debt-Servicing).
      -
      Peringkat Militer ASEAN (GFP 2026)
      Peringkat 1: Indonesia (Peringkat 13 Dunia) – Pemimpin mutlak kawasan.
      Peringkat 6: Filipina (Peringkat 41 Dunia) – Berhasil menyalip MALONYET melalui modernisasi aktif.
      Peringkat 7: MALONYET (Peringkat 42 Dunia) – Merosot ke posisi terendah di antara negara utama ASEAN akibat stagnasi belanja.
      -
      Krisis Administrasi & Degradasi Aset
      Pembekuan Total: PM Anwar Ibrahim menginstruksikan Procurement Freeze 2026 guna menghentikan kebocoran anggaran akibat korupsi proyek.
      Aset Karatan/Hilang: Skandal mangkraknya proyek LCS & OPV, ditambah catatan buruk hilangnya 48 pesawat Skyhawk dan 2 mesin jet tempur dari gudang negara.
      Status Grounded: Mayoritas armada udara (MiG-29, MB339CM, Nuri) tidak bisa terbang karena keterbatasan biaya perawatan.
      -
      Reputasi & Tekanan Internasional
      Sanksi Olahraga: Sanksi CAS/AFC akibat penggunaan pemain naturalisasi ilegal (Kalah WO 0-3 dari Vietnam) mencerminkan kegagalan administrasi sistemik.
      Tekanan Ekonomi: Ancaman sanksi tarif AS (Section 301 & IEEPA) oleh USTR yang mempersempit ruang fiskal untuk membayar utang nasional.

      Hapus
    11. PENGEMIS BERAS = 2 TAHUN SIPRI KOSONG
      GOVT DEBT 70.5% HOUSEHOLD 84.3% TO GDP
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------------------------
      SIPRI 2025-2024 = KOSONG
      -
      INDONESIA 1 LEMBAR = RAFALE F-4 | TP400-D6 | SHIP ENGINE | PPA-L-PLUS | A400M ATLAS | BORA | KHAN | ANKA-S | AIR REFUEL SYSTEM | LM-2500
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke.html
      -
      MALONYET 1 LEMBAR = KOSONG
      https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708590043
      --------------------------------------------------
      GLOBAL FIREPOWER (GFP) 2026 – ASEAN :
      https://www.globalfirepower.com/countries-listing.php
      -
      1. INDONESIA – PERINGKAT 13
      -
      2. VIETNAM – PERINGKAT 23
      -
      3. THAILAND – PERINGKAT 24
      -
      4. SINGAPURA – PERINGKAT 29
      -
      5. MYANMAR – PERINGKAT 35
      -
      6. FILIPINA – PERINGKAT 41
      -
      7. MALONYET – PERINGKAT 42
      -
      8. KAMBOJA – PERINGKAT 83
      -
      9. LAOS – PERINGKAT 125
      ---------------------------------
      2025 = KOSONG
      Https://defense-studies.blogspot.com/2026/03/transfer-persenjataan-dari-dan-ke_17.html?lr=1773708518608
      -
      2024 = KOSONG
      https://defense-studies.blogspot.com/2025/03/order-dan-transfer-persenjataan-ke-dan_14.html
      -
      2023 = NOT YET ORDERED
      https://defense-studies.blogspot.com/2024/03/transfer-persenjataan-ke-dan-dari_15.html
      -
      2022 = SELECTED NOT YET ORDERED
      https://defense-studies.blogspot.com/2023/03/transfer-persenjataan-ke-dan-dari_17.html
      -
      2021 = PLANNED
      https://defense-studies.blogspot.com/2022/03/transfer-persenjataan-ke-MALONYET-2021.html
      -
      2020 = PLANNED
      https://defense-studies.blogspot.com/2021/03/transfer-persenjataan-ke-MALONYET-2020.html
      ---------------------------------
      Kelumpuhan Matra Pertahanan (Analisis SIPRI)
      Data menunjukkan adanya degradasi progresif dari perencanaan ke ketiadaan aktivitas total:
      Vakum Total (2024–2025): Status "KOSONG" pada SIPRI mengonfirmasi tidak adanya kontrak baru atau transfer senjata berat. Ini menandakan hilangnya daya beli di pasar alutsista global.
      Kegagalan Akuisisi: Pembatalan berulang (seperti F/A-18 Kuwait) dan status Selected Not Yet Ordered mencerminkan ketidakpastian anggaran yang kronis.
      Model "Military-for-Rent": Pergeseran dari kepemilikan menjadi skema Leasing (Sewa) pada lebih dari 32 item (Helikopter, Simulator, dll.) menunjukkan militer hanya mampu membiayai operasional jangka pendek tanpa investasi aset strategis jangka panjang.
      -
      Krisis Fiskal: "Debt-Servicing Trap"
      Struktur ekonomi terjebak dalam siklus utang yang tidak sehat:
      Gali Lubang Tutup Lubang: Sejak 2019, rata-rata di atas 50% hingga 64% pinjaman baru hanya digunakan untuk membayar pokok dan bunga utang lama (principal repayment), bukan untuk pembangunan produktif.
      Rasio Kritis: Utang nasional yang diproyeksikan menyentuh RM 1,79 Triliun (2026) dengan rasio utang pemerintah 69% GDP telah melampaui batas aman fiskal.
      Ketergantungan Barter: Penggunaan CPO (Kelapa Sawit) sebagai alat bayar alutsista (FA-50, Scorpene) mengonfirmasi keterbatasan cadangan devisa tunai.
      -
      Degradasi Kredibilitas Internasional & Domestik
      Global Firepower (GFP) 2026: Penurunan ke peringkat 42 (disalip Filipina) adalah konsekuensi logis dari banyaknya aset yang grounded (MiG-29) dan skandal hilangnya inventaris (mesin jet/Skyhawk).
      Kritik Kepemimpinan: Pernyataan keras Mahathir (tentang etos kerja) dan fokus Anwar Ibrahim pada "Tata Kelola" (pemberantasan korupsi proyek banjir) menunjukkan bahwa masalah utama bukan sekadar teknis, melainkan sistemik dan administratif.
      Tekanan Eksternal: Ancaman sanksi tarif AS (Section 301) menambah beban pada sektor manufaktur yang merupakan tulang punggung ekonomi.


      Hapus
    12. PENDAPATAN : RM334,1 Miliar
      PENGELUARAN : RM470 Miliar
      RM470 – RM334,1 = MINUS RM135,9 ......
      -
      UTANG Govt = 70,5%
      UTANG HOUSEHOLD = 84,3%
      -
      2026
      Populasi: 36.38 juta
      Debt Govt: RM 1.79 Triliun (70.5%)
      Debt Household: RM 1.65 Triliun (84.3%)
      Beban per Kapita: RM 94,544
      -
      2025
      Populasi: 35.97 juta
      Debt Govt: RM 1.30 Triliun (-%)
      Debt Household: RM 1.65 Triliun (-%)
      Beban per Kapita: RM 81,998
      -
      2024
      Populasi: 34.67 juta
      Debt Govt: RM 1.22 Triliun (64.6%)
      Debt Household: RM 1.53 Triliun (84.2%)
      Beban per Kapita: RM 79,315
      -
      2023
      Populasi: 35.12 juta
      Debt Govt: RM 1.17 Triliun (64.3%)
      Debt Household: RM 1.45 Triliun (81.2%)
      Beban per Kapita: RM 74,587
      -
      2022
      Populasi: 34.69 juta
      Debt Govt: RM 1.08 Triliun (60.1%)
      Debt Household: RM 1.38 Triliun (80.9%)
      Beban per Kapita: RM 70,901
      -
      2021
      Populasi: 34.28 juta
      Debt Govt: RM 979.81 Miliar (63.3%)
      Debt Household: RM 1.34 Triliun (89.1%)
      Beban per Kapita: RM 67,667
      -
      2020
      Populasi: 33.87 juta
      Debt Govt: RM 879.56 Miliar (62.0%)
      Debt Household: RM 1.27 Triliun (87.5%)
      Beban per Kapita: RM 63,464
      -
      2019
      Populasi: 33.45 juta
      Debt Govt: RM 793.00 Miliar (52.4%)
      Debt Household: RM 1.22 Triliun (82.5%)
      Beban per Kapita: RM 60,179
      -
      2018
      Populasi: 33.00 juta
      Debt Govt: RM 741.00 Miliar (52.5%)
      Debt Household: RM 1.16 Triliun (82.0%)
      Beban per Kapita: RM 57,605
      -
      2017
      Populasi: 32.54 juta
      Debt Govt: RM 686.80 Miliar (51.9%)
      Debt Household: RM 1.10 Triliun (83.2%)
      Beban per Kapita: RM 54,910
      -
      2016
      Populasi: 32.04 juta
      Debt Govt: RM 648.50 Miliar (52.7%)
      Debt Household: RM 1.04 Triliun (86.1%)
      Beban per Kapita: RM 52,699
      -
      2015
      Populasi: 31.52 juta
      Debt Govt: RM 630.50 Miliar (55.1%)
      Debt Household: RM 985.00 Miliar (86.0%)
      Beban per Kapita: RM 51,253
      -
      2014
      Populasi: 30.98 juta
      Debt Govt: RM 582.80 Miliar (55.0%)
      Debt Household: RM 902.00 Miliar (85.1%)
      Beban per Kapita: RM 47,927
      -
      2013
      Populasi: 30.42 juta
      Debt Govt: RM 547.70 Miliar (54.7%)
      Debt Household: RM 821.00 Miliar (82.0%)
      Beban per Kapita: RM 44,992
      -
      2012
      Populasi: 29.85 juta
      Debt Govt: RM 501.60 Miliar (53.3%)
      Debt Household: RM 732.00 Miliar (77.8%)
      Beban per Kapita: RM 41,326
      -
      2011
      Populasi: 29.26 juta
      Debt Govt: RM 456.10 Miliar (51.8%)
      Debt Household: RM 653.00 Miliar (74.2%)
      Beban per Kapita: RM 37,904
      -
      2010
      Populasi: 28.65 juta
      Debt Govt: RM 407.10 Miliar (52.4%)
      Debt Household: RM 581.00 Miliar (74.8%)
      Beban per Kapita: RM 34,488
      -
      2009
      Populasi: 28.04 juta
      Debt Govt: RM 362.40 Miliar (51.1%)
      Debt Household: RM 516.00 Miliar (72.0%)
      Beban per Kapita: RM 31,326
      -
      2008
      Populasi: 27.45 juta
      Debt Govt: RM 258.00 Miliar (41.3%)
      Debt Household: RM 460.00 Miliar (73.0%)
      Beban per Kapita: RM 26,155
      -
      2007
      Populasi: 26.86 juta
      Debt Govt: RM 266.00 Miliar (41.1%)
      Debt Household: RM 414.00 Miliar (64.0%)
      Beban per Kapita: RM 25,316
      -
      2006
      Populasi: 26.26 juta
      Debt Govt: RM 242.00 Miliar (41.5%)
      Debt Household: RM 372.00 Miliar (63.0%)
      Beban per Kapita: RM 23,381
      -
      2005
      Populasi: 25.66 juta
      Debt Govt: RM 228.00 Miliar (43.8%)
      Debt Household: RM 335.00 Miliar (64.0%)
      Beban per Kapita: RM 21,940
      -
      2004
      Populasi: 25.06 juta
      Debt Govt: RM 217.00 Miliar (45.1%)
      Debt Household: RM 298.00 Miliar (62.0%)
      Beban per Kapita: RM 20,550
      -
      2003
      Populasi: 24.46 juta
      Debt Govt: RM 189.00 Miliar (45.9%)
      Debt Household: RM 265.00 Miliar (64.0%)
      Beban per Kapita: RM 18,560
      -
      2002
      Populasi: 23.87 juta
      Debt Govt: RM 165.00 Miliar (44.9%)
      Debt Household: RM 236.00 Miliar (64.0%)
      Beban per Kapita: RM 16,798
      -
      2001
      Populasi: 23.28 juta
      Debt Govt: RM 146.00 Miliar (42.5%)
      Debt Household: RM 207.00 Miliar (60.0%)
      Beban per Kapita: RM 15,162
      -
      2000
      Populasi: 22.69 juta
      Debt Govt: RM 126.00 Miliar (36.1%)
      Debt Household: RM 182.00 Miliar (52.0%)
      Beban per Kapita: RM 13,574
      -
      1999
      Populasi: 22.11 juta
      Debt Govt: RM 113.00 Miliar (40.4%)
      Debt Household: RM 157.00 Miliar (56.0%)
      Beban per Kapita: RM 12,210
      -
      1998
      Populasi: 21.53 juta
      Debt Govt: RM 98.00 Miliar (35.8%)
      Debt Household: RM 135.00 Miliar (49.3%)
      Beban per Kapita: RM 10,821

      Hapus
  24. Buat latihan pendaratan dulu DON..asik tergelincir aja...
    Mendarat pun tidak mahir macam mana mau melawan pesawat musuh!

    https://www.youtube.com/watch?v=ku7to-tDDvQ

    https://www.instagram.com/reels/DcgHEEFiYqb/

    🀣🀣🀣🀣🀣 🀣🀣🀣🀣🀣 🀣🀣🀣🀣🀣 🀣🀣🀣🀣

    BalasHapus
    Balasan
    1. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      --------------------------------------------
      1.RASIO HUTANG 84.3% DARI GDP
      2. HUTANG NEGARA RM 1,65 TRLLIUN
      3. HUTANG 1MDB RM 18,2 BILLION
      4. TUNGGAKAN SEWA SABAH USD 15 BILLION
      5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
      6. SEWA SIMULATOR MKM
      7. PESAWAT MIG GROUNDED
      8. SEWA MOTOR POLIS
      9. PESAWAT MB339CM GROUNDED
      10. NURI GROUNDED SEWA BLACKHAWK
      11. FIVE PROCUREMENT CANCELLED
      12. 48 PESAWAT SKYHAWK HILANG
      13. MESIN JET 2 BUAH HILANG
      14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
      15. NO LST
      16. NO LPD – NGEMIS LPD USA
      17. NO TANKER
      18. NO KCR
      19. MONUMEN MIG29M UNTUK JIMAT KOS
      20. NO SPH
      21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
      22. NO HELLFIRE
      23. NO MPA ATR72 DELAYED
      24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
      25. NO HELI HEAVY ATTACK NGEMIS AH1Z
      26. NO M3 AMPHIBIUS RIG
      27. LCS MANGKRAK KARATAN
      28. OPV MANGKRAK
      29. TANK MOGOK STOP SPARE PARTS
      30. CN 235 MSA VERSI MSI USA
      31. SEWA MOTOR MILITARY POLICE
      32. RADAR GIFTED PAID USA
      33. 84% NO SAVING EVERY MONTH
      34. SEWA VVSHORAD
      35. SEWA TRUK 3 TON
      36. 4X4 SEWA 6X6 CANCELLED
      37. C130H DIGANTI 2045
      38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
      39. NO DRONE UCAV – ANKA ISR OMPONG
      40. SEWA BLACKHAWK SEWA AW159
      41. NO TRACKED SPH
      42. SEWA SIMULATOR HELI
      43. SPH CANCELLED
      44. SCORPION V150 CONDOR SIMBAS RETIRED
      45. NO PESAWAT COIN
      46. PILATUS MK II KARATAN
      47. PENCEROBOHAN 43X BTA 316 HARI
      48. SEWA AW139 SEWA COLIBRI
      49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
      50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
      51. LYNX GROUNDED
      52. MRCA CANCELLED SEWA PESAWAT ITTC
      53. MICA CANCELLED NSM CANCELLED
      54. NO LRAD NO MRAD JUST VSHORAD
      55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
      56. 4X NGEMIS F18 KUWAIT
      57. MENUNGGU 2050 KAPAL SELAM
      58. NO TANK AMPHIBI AV8 MOGOK BERASAP
      59. 84% NO SAVING EVERY MONTH
      60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
      61. MKM BARTER PALM OIL
      62. MIG29N BARTER PALM OIL
      63. A400M PEMBAYARAN BERPERINGKAT (HUTANG)
      64. SCORPENE BARTER PALM OIL
      65. PT91M BARTER PALM OIL RUBBER
      67. FA50M BARTER PALM OIL
      ===================
      SEWA = HUTANG 84.3% DARI GDP = NO SHOPPING
      1. SEWA 28 HELI
      2. SEWA L39 ITCC
      3. SEWA EC120B
      4. SEWA FLIGHT SIMULATION TRAINING DEVICE (FSTD)
      5. SEWA 1 UNIT SISTEM SIMULATOR EC120B
      6. SEWA HOVERCRAFT
      7. SEWA AW139
      8. SEWA FAST INTERCEPTOR BOAT (FIB)
      9. SEWA UTILITY BOAT
      10. SEWA RIGID HULL FENDER BOAT (RHFB)
      11. SEWA ROVER FIBER GLASS (ROVER)
      12. SEWA MV AISHAH AIM 4
      13. SEWA BMW R1250RT
      14. SEWA 4x4 VECHICLE
      15. SEWA VSHORAD
      16. SEWA TRUCK
      17. SEWA HONDA CIVIC
      18. SEWA PATROL BOATS
      19. SEWA OUTBOARD MOTORS
      20. SEWA TRAILERS
      21. SEWA SUPERBIKES
      22. SEWA SIMULATOR MKM
      23. SEWA 12 AW149 TUDM
      24. SEWA 4 AW139 TUDM
      25. SEWA 5 EC120B TUDM
      26. SEWA 2 AW159 TLDM
      27. SEWA 4 UH-60A TDM
      28. SEWA 12 AW149 TDM
      29. SEWA 4 AW139 BOMBA
      30. SEWA 2 AW159 MMEA
      31. SEWA 7 BELL429 POLIS
      32. SEWA MOTOR POLIS
      --------------------------------------------
      USA BANNED MALONYET : USA PALAK ART USD 240 MILLIAR
      NSM
      AMRAAM
      F18
      UH60A
      --------------------------------------------
      🀣ART PALAK USD 240 MILLIAR = BANNED : NSM AMRAAM F18🀣

      Hapus
    2. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA MALONYET KREDIT EKSPOR (HUTANG) AV8 =
      KREDIT EKSPOR (HUTANG) TURKI = AV8
      KREDIT EKSPOR (HUTANG) TURKI = AV8
      KREDIT EKSPOR (HUTANG) TURKI = AV8
      1. Fasilitas KREDIT EKSPOR (HUTANG) (Export Credit)
      Meskipun diproduksi oleh perusahaan lokal DRB-HICOM DefTech, proyek ini didukung oleh fasilitas dari Export Credit Bank of Turkey (TΓΌrk Eximbank).
      Fungsi: Menyediakan pembiayaan jangka menengah hingga panjang untuk menutupi biaya lisensi, desain teknis, dan komponen utama yang diimpor dari FNSS Turki.
      Jaminan: Kredit ini sering kali mencakup perlindungan terhadap risiko politik dan komersial hingga 90%, dengan syarat uang muka (down payment) biasanya sebesar 15% dari nilai kontrak.
      2. Skema Pembayaran Bertahap (Milestone Payments)
      Pembayaran tidak dilakukan sekaligus, melainkan mengikuti perkembangan produksi massal:
      Termin Produksi: Pembayaran dilakukan berdasarkan pencapaian tahap tertentu (milestones), seperti penyelesaian desain, pengiriman prototipe, hingga penyerahan unit per batch kepada Angkatan Darat MALONYET.
      Dukungan Perbankan: Bank-bank komersial seringkali membentuk sindikasi untuk mendanai produksi di bawah payung penjaminan Lembaga KREDIT EKSPOR (HUTANG) (ECA) guna memastikan arus kas pengembang tetap stabil selama masa kontrak yang panjang
      3. Sumber Beritanya =
      FNSS Savunma Sistemleri (Turki): Melalui pengumuman resmi dan siaran pers, FNSS mengonfirmasi nilai kontrak sebesar US$ 559 juta dan perannya dalam mendukung pengembangan serta transfer teknologi desain berbasis Pars 8x8.
      Defence Turkey Magazine: Media industri pertahanan ini secara rinci mengulas bahwa proyek yang dimulai tahun 2011 tersebut merupakan kontrak ekspor sistem pertahanan darat tunggal terbesar bagi industri Turki, yang mencakup hak penjualan ke negara ketiga.
      DetikOto (detikcom): Mengulas kerja sama strategis antara DRB-HICOM DefTech dengan FNSS Turki, termasuk sejarah pengiriman batch pertama sebanyak 12 unit pada tahun 2014.
      The MALONYETn Reserve & Astro Awani: Melaporkan kelanjutan kemitraan antara DefTech dan FNSS pada ajang Defence Services Asia (DSA) 2022, yang menekankan peningkatan lokalisasi dan keahlian teknis lokal.
      Army Guide: Menyediakan data teknis dan rincian nilai penawaran (Letter of Offer and Acceptance/LOA) yang melibatkan komponen logistik terintegrasi untuk Angkatan Bersenjata MALONYET

      Hapus
    3. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA MALONYET KREDIT EKSPOR (HUTANG) EC725 =
      KREDIT EKSPOR (HUTANG) PERANCIS = EC725
      KREDIT EKSPOR (HUTANG) PERANCIS = EC725
      -------------------------
      1 Penjelasan Skema KREDIT EKSPOR (HUTANG)
      Skema ini merupakan fasilitas pendanaan yang diberikan oleh lembaga keuangan internasional atau konsorsium bank asing dengan jaminan dari Lembaga KREDIT EKSPOR (HUTANG) (Export Credit Agency/ECA) negara asal produsen (dalam hal ini Perancis).
      Tujuan: Memungkinkan negara pembeli (MALONYET) melakukan pengadaan alutsista bernilai besar tanpa harus membayar tunai di muka secara penuh, melainkan melalui cicilan jangka panjang.
      Cara Kerja: Pihak penyedia dana membayar produsen (Eurocopter/Airbus), kemudian pemerintah pembeli mencicil pinjaman tersebut kepada penyedia dana sesuai masa tenor yang disepakati.
      2. Konteks Pengadaan TUDM
      Periode: Kontrak awal ditandatangani pada akhir 2008, namun sempat tertunda akibat krisis ekonomi global sebelum akhirnya dilanjutkan kembali.
      Opsi Pembayaran: Pemerintah MALONYET mengevaluasi rencana pembayaran jangka panjang (long-term payment plan) atau penundaan pembelian untuk menyeimbangkan anggaran negara di tengah krisis.
      Tujuan Pengadaan: Untuk menggantikan armada helikopter Sikorsky S-61A-4 Nuri yang sudah tua setelah beroperasi selama puluhan tahun.
      3. Sumber Berita & Informasi
      Informasi mengenai skema dan proses pengadaan ini dapat diverifikasi melalui beberapa sumber:
      ResearchGate: Mencatat bahwa pada September 2008, Perdana Menteri MALONYET mengumumkan pengadaan 12 unit EC725 yang kemudian dievaluasi skema pembayarannya (apakah melalui cicilan jangka panjang) karena dampak krisis ekonomi MALONYET delays EC 725 helicopter procurement.
      Astro Awani: Melaporkan operasional helikopter H225M TUDM yang telah mencapai tonggak sejarah jam terbang setelah sukses diadakan melalui program tersebut TUDM terima penghargaan H225M.
      Sobat Militer/Analisis Alutsista: Sering mengulas perbandingan skema pengadaan Airbus H225M di kawasan Asia Tenggara, termasuk penggunaan dukungan bank internasional seperti BNP Paribas dalam struktur KREDIT EKSPOR (HUTANG) Analisis Pengadaan H225M.

      Hapus
    4. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET = ART PALAK USD 240 MILLIAR =
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      e. BANNED NSM
      f. BANNED AMRAAM
      g. CANCELLED F18
      h. CANCELLED UH60A
      -------------------------------------------
      GORILA MALONYET KREDIT EKSPOR (HUTANG) SCORPENE =
      KREDIT EKSPOR (HUTANG) PERANCIS = SCORPENE
      KREDIT EKSPOR (HUTANG) PERANCIS = SCORPENE
      -------------------------
      1 Skema pembiayaan kapal selam Scorpene MALONYET (KD Tunku Abdul Rahman dan KD Tunku Abdul Razak) menggunakan metode KREDIT EKSPOR (HUTANG) (Export Credit) untuk mendanai kontrak senilai sekitar €1,08 miliar (atau RM3,7 miliar pada kurs saat itu).
      Berikut adalah rincian mekanisme tersebut:
      Penyedia Kredit & Penjamin: Fasilitas kredit ini didukung oleh Coface (Compagnie FranΓ§aise d'Assurance pour le Commerce ExtΓ©rieur), lembaga penjamin KREDIT EKSPOR (HUTANG) asal Prancis, yang memberikan jaminan kepada bank komersial Eropa untuk menyalurkan pinjaman kepada pemerintah MALONYET.
      Mekanisme Pembayaran: Pembayaran tidak dilakukan secara tunai sekaligus di muka, melainkan melalui cicilan jangka panjang. Hal ini bertujuan untuk meringankan beban Anggaran Pendapatan dan Belanja Negara (APBN) MALONYET dalam satu tahun fiskal tertentu.
      Pembayaran Berbasis Milestone: Pengucuran dana pinjaman disesuaikan dengan tahapan pembangunan (milestone) kapal di galangan kapal. Setiap kali perkembangan fisik kapal mencapai persentase tertentu (misalnya pemotongan plat pertama atau peluncuran), pembayaran termin berikutnya akan dicairkan kepada pihak manufaktur (Naval Group dan Navantia)
      Sumber Berita :
      Lembaga Resmi & Penjamin: Laporan profil risiko negara dari Coface mengonfirmasi peran mereka sebagai lembaga penjamin KREDIT EKSPOR (HUTANG) dalam transaksi perdagangan internasional MALONYET.
      Analisis Keamanan Internasional: Organisasi Nuclear Threat Initiative (NTI) menyediakan rincian operasional dan latar belakang pengadaan dua kapal selam kelas Perdana Menteri (Tunku Abdul Rahman dan Tun Abdul Razak) yang didanai melalui kontrak Prancis-Spanyol senilai €1,08 miliar.
      Media Investigasi & Berita Ekonomi:
      Bloomberg dan New Straits Times memuat laporan terkait aspek hukum dan rincian transaksi finansial kontrak tersebut dalam cakupan penyelidikan "Scorpene Affair".
      CNBC Indonesia mengulas sejarah akuisisi tersebut sebagai referensi perbandingan untuk rencana pengadaan alutsista serupa oleh Indonesia.

      Hapus
    5. RELEASE 24/08/2026 vs BERITA FEBRUARI 2026F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      --------------------------------------------
      GOVERNMENT REVENUE =
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      --------------------------------------------
      Analisis Geopolitik & Pertahanan (Stagnasi Total)
      Vakum Alutsista (SIPRI 2024-2025): Status "Kosong" selama dua tahun berturut-turut menandakan tidak adanya transfer senjata berat yang masuk. Hal ini mengonfirmasi kegagalan proses modernisasi di saat negara tetangga (Indonesia/Singapura) melakukan pengadaan masif.
      Kegagalan Proyek Strategis: Pembatalan F/A-18 Hornet Kuwait sebanyak 4 kali menunjukkan hilangnya kredibilitas finansial di mata penjual internasional.
      Penurunan Daya Gentar: Peringkat Global Firepower (GFP) 42 (ke-7 di ASEAN) menempatkan militer MALAYSEWA di bawah Filipina, menunjukkan efek domino dari penundaan proyek LCS dan ketergantungan pada aset tua.
      Analisis Fiskal & Ekonomi (Spiral Utang)
      Debt-Servicing Cycle: Dengan proyeksi utang menyentuh RM 1,79 Triliun pada 2026, fenomena "Gali Lubang Tutup Lubang" (58% pinjaman baru hanya untuk membayar cicilan) telah mengunci anggaran negara.
      Rasio Bahaya: Rasio utang terhadap GDP yang stabil di angka 68%-70% sejak 2024-2026 membatasi ruang gerak fiskal untuk subsidi domestik maupun belanja modal militer.
      Hambatan Dagang AS: Sanksi Section 301 (tarif 10-25%) dan ancaman IEEPA oleh USTR Amerika Serikat akan memukul sektor manufaktur dan E&E, yang merupakan tulang punggung pendapatan negara untuk membayar utang tersebut.
      Analisis Reputasi & Diplomasi (Sanksi Internasional)
      Runtuhnya Prestasi Olahraga: Kekalahan di CAS dan sanksi AFC (Kalah WO 0-3) akibat penggunaan 7 pemain naturalisasi ilegal bukan sekadar masalah sepak bola, melainkan cerminan kegagalan administrasi sistemik di tingkat federasi.
      Kehilangan Posisi Regional: Kegagalan lolos ke Piala Asia 2027 dan pemberian posisi tersebut kepada Vietnam mempertegas penurunan pengaruh dan daya saing negara di kawasan ASEAN.

      Hapus
    6. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      --------------------------------------------
      GOVERNMENT REVENUE =
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ---------------------------------
      Analisa Geopolitik & Pertahanan: "Stagnasi Total"
      Vakum SIPRI (2024-2025): Laporan impor senjata KOSONG selama dua tahun berturut-turut. MALAYSEWA kini sejajar dengan negara ekonomi kecil seperti Laos dan Kamboja dalam hal transfer alutsista berat.
      Kegagalan Proyek Strategis: Pembatalan F/A-18 Hornet Kuwait sebanyak 4 kali menunjukkan hilangnya kredibilitas finansial di pasar pertahanan internasional.
      Penurunan Daya Gentar: Berada di Peringkat 42 GFP (Posisi ke-7 di ASEAN), kini resmi berada di bawah Filipina (Peringkat 41).
      Perbandingan Kontras: Indonesia memimpin di Peringkat 13 dunia dengan daftar belanja "satu lembar penuh" (Rafale F4, A400M, KF-21 Boramae, Kapal PPA, dan Rudal Khan/Bora).
      -
      Analisa Ekonomi & Fiskal: "Spiral Utang Kronis"
      Fenomena Gali Lubang Tutup Lubang: Proyeksi 58% pinjaman baru di tahun 2026 hanya digunakan untuk membayar cicilan pokok dan bunga utang lama (Debt-Servicing Cycle).
      Beban Utang Nasional: Total utang dan liabilitas diproyeksikan menyentuh RM 1,79 Triliun, dengan rasio utang terhadap GDP melampaui ambang batas aman (>70%).
      Hambatan Dagang Global: Tekanan dari Amerika Serikat melalui Section 301 (kenaikan tarif 10-25%) dan ancaman IEEPA (pemblokiran transaksi) oleh USTR yang memukul sektor manufaktur dan E&E.


      Hapus
    7. PENGEMIS BERAS FFBNP : LCS BANNED NSM-LMS NO TORPEDO-F18 BATAL
      PENGEMIS BERAS FFBNP : LCS BANNED NSM-LMS NO TORPEDO-F18 BATAL
      ------------------------------
      MALONYET KLAIM CASH KAYA = GOVT DEBT 70,5% HOUSEHOLD 84,3% TO GDP:
      -
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------
      2026 MALONYET BADUT FFBNP = CUT BUDGET
      2026 MALONYET BADUT FFBNP = NSM BANNED - AMRAAM BLOKIR
      2026 MALONYET BADUT FFBNP =F18 BATAL - UH60A BATAL
      2026 MALONYET BADUT FFBNP =REWORK 4000 PIPA DAN KABEL LCS
      2026 MALONYET BADUT FFBNP =PHK MASSAL
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT
      2025 MALONYET BADUT FFBNP =SIPRI KOSONG
      2024 MALONYET BADUT FFBNP =SIPRI KOSONG
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT
      --------------------------------
      MALONYET.......
      STATUS 2023-2026: KORUPSI SISTEMIK & MISKIN
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan pemotongan anggaran operasional di seluruh kementerian akibat dampak krisis ekonomi (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Puncak krisis Januari 2026 dengan 24.100 PHK; Petronas pangkas ±5.000 karyawan (CNBC & Bloomberg).
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan seluruh kontrak militer dan polisi per 16 Januari 2026 menyusul tuduhan suap terhadap pejabat tinggi dan mantan panglima.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Dua tahun berturut-turut tanpa aktivitas transfer senjata besar di level internasional (Defense Studies).
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF karena kendala finansial.
      ________________________________________
      SKANDAL MAKELAR & KRONISME (PROCUREMENT CORRUPTION):
      Dominasi Makelar (Middlemen): Pengadaan alutsista dikendalikan oleh "agen" yang mayoritas adalah pensiunan perwira militer untuk menggelembungkan harga.
      Kecaman Raja (Sultan Ibrahim): Pada 2025, Raja mengecam praktik makelar di Kemenhan dan membatalkan sewa helikopter Black Hawk berusia 30 tahun yang dijuluki "Peti Mati Terbang".
      Favoritisme Politik: Hanya 20–30% kontrak yang melalui tender terbuka; sisanya diberikan kepada perusahaan yang memiliki koneksi politik atau eks-militer.
      Skandal Kapal Selam Scorpene: Kasus suap masif yang melibatkan penyelidik Prancis (2018), mengungkap risiko kebocoran rahasia negara akibat pengaruh kontraktor asing.
      Lemahnya Pengawasan: Tidak ada komite parlemen independen yang mengaudit kontrak, sehingga konflik kepentingan terus berlanjut tanpa konsekuensi hukum.
      ________________________________________
      KELUMPUHAN ARMADA UDARA (RMAF LIMITATIONS):
      Armada Tua & Terbatas: Su-30MKM, F/A-18D, dan Hawk 208/108 sudah berusia di atas 20 tahun dengan biaya perawatan yang mencekik kas negara.
      Gap Superioritas Udara: Armada MiG-29N dipensiunkan (2015) tanpa pengganti sepadan, menciptakan kekosongan kekuatan tempur udara.
      Tanpa Jangkauan Strategis: Tidak memiliki kemampuan pengisian bahan bakar di udara (Air Refueling) dan tidak ada sistem peringatan dini (AEW&C).
      Logistik Campur Aduk: Bergantung pada campuran platform Barat (AS/Eropa) dan Rusia, mempersulit manajemen suku cadang dan mengurangi interoperabilitas.
      Opsi "Murah" FA-50: Karena miskin, pemerintah terpaksa memilih jet ringan FA-50 Korea Selatan yang kapabilitasnya terbatas dibanding pesawat multirole murni seperti Rafale.
      Krisis ISR & Drone: Kemampuan intelijen dan pengawasan sangat minimal; ketergantungan pada drone Turki masih dalam tahap awal dan belum terintegrasi penuh.
      ________________________________________
      DAMPAK NYATA PADA KESIAPAN TEMPUR:
      Pelatihan Usang: Pilot berlatih dengan platform tua yang tidak lagi mewakili medan perang modern.
      Respons Lambat: Kemampuan patroli udara 24/7 sangat terbatas karena jumlah armada yang siap terbang (serviceable) terus menyusut.
      Vulnerabilitas ZEE: Tanpa ISR yang kuat, wilayah udara di Laut Cina Selatan mudah dilanggar tanpa deteksi dini.
      KESIMPULAN:
      KORUPSI MAKELAR + "PETI MATI TERBANG" + FISKAL LUMPUH = KEHANCURAN PERTAHANAN UDARA

      Hapus
    8. PENGEMIS BERAS FFBNP : LCS BANNED NSM-LMS NO TORPEDO-F18 BATAL
      PENGEMIS BERAS FFBNP : LCS BANNED NSM-LMS NO TORPEDO-F18 BATAL
      ------------------------------
      MALONYET KLAIM CASH KAYA = GOVT DEBT 70,5% HOUSEHOLD 84,3% TO GDP:
      -
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------
      2026 MALONYET BADUT FFBNP = CUT BUDGET
      2026 MALONYET BADUT FFBNP = NSM BANNED - AMRAAM BLOKIR
      2026 MALONYET BADUT FFBNP =F18 BATAL - UH60A BATAL
      2026 MALONYET BADUT FFBNP =REWORK 4000 PIPA DAN KABEL LCS
      2026 MALONYET BADUT FFBNP =PHK MASSAL
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT
      2025 MALONYET BADUT FFBNP =SIPRI KOSONG
      2024 MALONYET BADUT FFBNP =SIPRI KOSONG
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT
      --------------------------------
      MALONYET.......
      STATUS 2023-2026: TATA KELOLA HANCUR & MISKIN
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan pemangkasan anggaran operasional di seluruh kementerian akibat krisis ekonomi (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Puncak krisis Januari 2026 dengan 24.100 PHK (Data SOCSO/PERKESO); Petronas pangkas ±5.000 karyawan.
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan total kontrak militer dan polisi per 16 Januari 2026 akibat skandal suap pejabat tinggi.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Dua tahun berturut-turut tanpa catatan transfer senjata global (Defense Studies).
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF karena kendala finansial.
      ________________________________________
      KEGAGALAN MANAJEMEN KONTRAK (AUDITOR GENERAL 2025):
      Skandal Kendaraan Gempita: Keterlambatan pengiriman 68 unit kendaraan lapis baja mengakibatkan denda RM 162,75 Juta, namun denda baru diklaim terlambat dua tahun.
      Pembayaran Buta: Pembayaran penuh tetap dilakukan kepada kontraktor meskipun tenggat waktu pengiriman telah terlewati.
      Denda Tak Tertagih: Sebanyak RM 167 Juta total denda keterlambatan belum ditagih oleh Kemenhan (Mindef) dari para kontraktor bermasalah.
      Pelanggaran Regulasi: Pengadaan batch kecil senilai RM 107,54 Juta (2020-2023) dilakukan tanpa tender terbuka, melanggar aturan pengadaan di atas RM 500.000.
      Krisis Suku Cadang: Layanan pemeliharaan dan suku cadang tertunda lebih dari 200 hari, melumpuhkan kesiapan tempur pasukan di lapangan.
      ________________________________________
      KORUPSI, KRONISME & KETERGANTUNGAN MAKELAR:
      Kecaman Raja: Raja MALONYET mengutuk ketergantungan Kemenhan pada "salesmen" dan membatalkan sewa Black Hawk 30 tahun yang disebut sebagai "Peti Mati Terbang".
      Tender Tertutup: Hanya 20–30% kontrak besar yang melalui tender terbuka; sisanya adalah penunjukan langsung ke perusahaan kroni politik.
      Skandal Scorpene: Kasus kapal selam yang melibatkan komisi ilegal dan perantara asing, merusak integritas rahasia negara.
      Otomatisasi Mismanajemen: Penggunaan perusahaan cangkang (shell companies) dalam proyek LCS untuk mengalihkan dana negara sebesar RM 1,4 Miliar demi menutup hutang proyek gagal masa lalu.
      ________________________________________
      KELEMAHAN STRATEGIS & SUMBER DAYA MANUSIA:
      Ketergantungan Asing: Kemampuan produksi pertahanan domestik yang sangat lemah menyebabkan ketergantungan total pada vendor asing yang mahal.
      Brain Drain: Angkatan Bersenjata kesulitan mempertahankan personel terampil di bidang teknis (teknisi kapal dan pemeliharaan penerbangan).
      Doktrin Usang: Pelatihan menggunakan alutsista kuno mengurangi efisiensi operasional dan interoperabilitas dengan militer modern.
      Kebijakan Reaktif: Keputusan pengadaan lebih didasarkan pada kepentingan politik sesaat daripada kebutuhan strategis jangka panjang.
      KESIMPULAN:
      MISMANAJEMEN KONTRAK + DENDA RM 167 JUTA TAK TERTAGIH + ASET "PETI MATI" = KEBANGKRUTAN TOTAL

      Hapus
    9. PENGEMIS BERAS FFBNP : LCS BANNED NSM-LMS NO TORPEDO-F18 BATAL
      PENGEMIS BERAS FFBNP : LCS BANNED NSM-LMS NO TORPEDO-F18 BATAL
      -----------------------------
      MALONYET KLAIM CASH KAYA = GOVT DEBT 70,5% HOUSEHOLD 84,3% TO GDP:
      -
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------
      2026 MALONYET BADUT FFBNP = CUT BUDGET
      2026 MALONYET BADUT FFBNP = NSM BANNED - AMRAAM BLOKIR
      2026 MALONYET BADUT FFBNP =F18 BATAL - UH60A BATAL
      2026 MALONYET BADUT FFBNP =REWORK 4000 PIPA DAN KABEL LCS
      2026 MALONYET BADUT FFBNP =PHK MASSAL
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT
      2025 MALONYET BADUT FFBNP =SIPRI KOSONG
      2024 MALONYET BADUT FFBNP =SIPRI KOSONG
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT
      --------------------------------
      MALONYET.......
      STATUS 2023-2026: KEBANGKRUTAN STRATEGIS & MISKIN
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan pemangkasan anggaran operasional di seluruh kementerian akibat dampak ekonomi konflik Timur Tengah (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Puncak krisis Januari 2026 dengan 24.100 PHK (Data SOCSO); Petronas pangkas ±5.000 karyawan (Bloomberg).
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan total kontrak militer dan polisi per 16 Januari 2026 menyusul skandal suap pejabat tinggi.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Dua tahun berturut-turut tanpa catatan transfer senjata global (Defense Studies).
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF karena kendala finansial.
      ________________________________________
      KEGAGALAN PROGRAM MRCA (MULTI-ROLE COMBAT AIRCRAFT):
      Ketidakpastian Selama 20 Tahun: Program pengganti MiG-29 dan F-5E pertama kali diusulkan awal 2000-an, namun hingga dua dekade kemudian tidak ada keputusan final.
      Gridlock Birokrasi: Keputusan terbagi antara Kemenhan (Mindef) dan Kemenkeu (MOF); kontrak di atas RM 7 juta wajib persetujuan MOF, memicu tumpang tindih prioritas dan penundaan masif.
      Tender Tidak Transparan: Pengadaan didominasi tender terbatas (hanya 20-30% tender terbuka), melibatkan pensiunan militer sebagai makelar politik.
      Daftar Penantian Panjang: Rafale, Typhoon, Gripen, hingga F/A-18 silih berganti dievaluasi tanpa ada pemilihan transparan yang difinalisasi.
      Pivot Karena Miskin: Karena keterbatasan dana, fokus beralih ke jet ringan (LCA) FA-50, mencerminkan strategi pengadaan yang reaktif, bukan proaktif berbasis kapabilitas.
      ________________________________________
      SKANDAL & KEBINGUNGAN PROGRAM SPH (SELF-PROPELLED HOWITZER):
      Proyek Terlantar Sejak 2010: Rencana akuisisi 66 unit SPH 155mm tetap berada dalam ketidakpastian selama lebih dari satu dekade.
      Kontroversi Kronisme: Pada 2022, muncul dugaan kontrak RM 819,09 Juta diberikan langsung kepada perusahaan yang terkait dengan keluarga mantan wakil menteri pertahanan.
      Kebingungan G2G (Yavuz SPH): Sempat berencana membeli Yavuz dari MKE Turki via G2G, namun kemudian diubah kembali menjadi tender terbuka karena ketidaksesuaian spesifikasi.
      Audit MOF vs Mindef: Meskipun MOF menyetujui tender pada Januari 2024, Mindef dipaksa negosiasi ulang harga, menunjukkan lemahnya otoritas pengadaan terpusat.
      Lumpuhnya Artileri Darat: Bergantung pada meriam tarik (towed) yang lambat; kegagalan SPH mematikan kemampuan bantuan tembakan cepat dalam pertempuran modern.
      ________________________________________
      RINGKASAN KELEMAHAN:
      MRCA: Tidak ada visi jangka panjang, hanya window shopping selama 20 tahun.
      SPH: Terjebak skandal kronisme dan ketidakjelasan prosedur G2G.
      Readiness: Armada jet tempur menipis dan artileri tidak memiliki mobilitas tinggi.
      KESIMPULAN:
      FISKAL LUMPUH + GRIDLOCK BIROKRASI + SKANDAL SPH = KEBANGKRUTAN PERTAHANAN NASIONAL

      Hapus
    10. PENGEMIS BERAS FFBNP : LCS BANNED NSM-LMS NO TORPEDO-F18 BATAL
      PENGEMIS BERAS FFBNP : LCS BANNED NSM-LMS NO TORPEDO-F18 BATAL
      -----------------------------
      MALONYET KLAIM CASH KAYA = GOVT DEBT 70,5% HOUSEHOLD 84,3% TO GDP:
      -
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------
      2026 MALONYET BADUT FFBNP = CUT BUDGET
      2026 MALONYET BADUT FFBNP = NSM BANNED - AMRAAM BLOKIR
      2026 MALONYET BADUT FFBNP =F18 BATAL - UH60A BATAL
      2026 MALONYET BADUT FFBNP =REWORK 4000 PIPA DAN KABEL LCS
      2026 MALONYET BADUT FFBNP =PHK MASSAL
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT
      2025 MALONYET BADUT FFBNP =SIPRI KOSONG
      2024 MALONYET BADUT FFBNP =SIPRI KOSONG
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT
      --------------------------------
      MALONYET.......
      STATUS 2023-2026: KRONISME SISTEMIK & MISKIN
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan pemangkasan anggaran operasional di seluruh instansi pemerintah akibat krisis ekonomi (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Puncak krisis Januari 2026 dengan 24.100 PHK (Data SOCSO/PERKESO); Petronas pangkas ±5.000 karyawan.
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan total kontrak militer dan polisi per 16 Januari 2026 menyusul skandal suap pejabat tinggi dan mantan panglima.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Dua tahun berturut-turut tanpa catatan transfer senjata global (Defense Studies).
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF karena kendala finansial.
      ________________________________________
      ANALISA KRONISME & KORUPSI KONTRAK PERTAHANAN:
      Dominasi Perusahaan Kroni: Kontrak sering diberikan kepada perusahaan yang tidak kompeten namun memiliki koneksi politik atau hubungan dengan pensiunan perwira militer.
      Kasus Proyek LCS (Littoral Combat Ship): Anggaran awal RM 9 Miliar membengkak jadi RM 11 Miliar+; lebih dari RM 6 Miliar telah dibayarkan, namun nol kapal terkirim tepat waktu.
      Konflik Kepentingan SPH: Kontrak Self-Propelled Howitzer (SPH) memicu kemarahan publik setelah terungkap melibatkan perusahaan yang terkait dengan keluarga mantan wakil menteri pertahanan.
      Mismanajemen Finansial: Perusahaan kroni sering kekurangan keahlian teknis, menyebabkan pengiriman kapal patroli terlambat 3 tahun dan pembengkakan biaya masif.
      Lemahnya Penegakan Hukum: Otoritas enggan menuntut perusahaan gagal karena takut mengungkap jaringan korupsi yang lebih dalam di dalam sistem pengadaan.
      ________________________________________
      REKAM JEJAK SKANDAL ALUTSISTA (LEGACY OF CORRUPTION):
      Skandal Kapal Selam Scorpene (2002): Pengadaan senilai RM 4,5 Miliar melalui perusahaan perantara (Perimekar) yang tidak punya rekam jejak. Komisi RM 510 Juta (11%) dibayarkan secara ilegal. Terlibat dalam kasus pembunuhan Altantuyaa Shaariibuugiin.
      Skandal Helikopter MD530G (2016): Kontrak RM 321 Juta untuk 6 unit helikopter gagal karena masalah spesifikasi dan pengiriman. Investigasi MACC berakhir tanpa penuntutan, memicu kemarahan publik atas "korupsi dari atas ke bawah".
      Fiasco NGPV (Patrol Vessel): Proyek 27 kapal desain Meko 100 yang diberikan kepada perusahaan kroni (PSC-ND). Hanya 6 unit selesai; biaya membengkak dari RM 5,35 Miliar menjadi RM 6,75 Miliar sebelum akhirnya bangkrut dan dicaplok Boustead.
      Skandal OPV (Offshore Patrol Vessel): Kontrak 6 kapal senilai RM 4,9 Miliar hanya menghasilkan 2 unit cacat. Terjadi kelebihan pembayaran 48% (Bayar RM 4,26 Miliar untuk hasil kerja senilai RM 2,87 Miliar); denda keterlambatan dihapuskan secara sepihak oleh pemerintah.

      Hapus
    11. PENGEMIS BERAS FFBNP : LCS BANNED NSM-LMS NO TORPEDO-F18 BATAL
      PENGEMIS BERAS FFBNP : LCS BANNED NSM-LMS NO TORPEDO-F18 BATAL
      -----------------------------
      MALONYET KLAIM CASH KAYA = GOVT DEBT 70,5% HOUSEHOLD 84,3% TO GDP:
      -
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      RM470 – RM334.1 = DEFICIT OF RM135.9
      --------------------------------
      2026 MALONYET BADUT FFBNP = CUT BUDGET
      2026 MALONYET BADUT FFBNP = NSM BANNED - AMRAAM BLOKIR
      2026 MALONYET BADUT FFBNP =F18 BATAL - UH60A BATAL
      2026 MALONYET BADUT FFBNP =REWORK 4000 PIPA DAN KABEL LCS
      2026 MALONYET BADUT FFBNP =PHK MASSAL
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT
      2025 MALONYET BADUT FFBNP =SIPRI KOSONG
      2024 MALONYET BADUT FFBNP =SIPRI KOSONG
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT
      --------------------------------
      MALONYET.......
      STATUS 2023-2026: KEBANGKRUTAN SISTEMIK & MISKIN
      2026 MALONYET BADUT FFBNP = CUT BUDGET = MISKIN: Perbendaharaan memerintahkan pemangkasan anggaran operasional di seluruh kementerian akibat dampak ekonomi konflik Timur Tengah (Reuters).
      2026 MALONYET BADUT FFBNP =PHK MASSAL = MISKIN: Puncak krisis Januari 2026 dengan 24.100 PHK (Data SOCSO/PERKESO); Petronas pangkas ±5.000 karyawan.
      2026 MALONYET BADUT FFBNP = FREEZE PROCUREMENT = MISKINNN: Pembekuan total kontrak militer dan polisi per 16 Januari 2026 menyusul skandal suap pejabat tinggi dan mantan panglima.
      2025-2024 MALONYET BADUT FFBNP =SIPRI KOSONG= MISKIN: Dua tahun berturut-turut tanpa catatan transfer senjata global (Defense Studies).
      2023 MALONYET BADUT FFBNP = CANCELLED PROCUREMENTT = MISKIN: Pembatalan resmi 5 tender infrastruktur dan pasokan oleh MINDEF karena kendala finansial.
      ________________________________________
      SKANDAL "PETI MATI TERBANG" & SEWA HELIKOPTER:
      Pembatalan Black Hawk UH-60A (Nov 2024): Kontrak sewa RM 187 Juta dengan Aerotree dibatalkan setelah pengiriman tertunda berkali-kali sejak Nov 2023.
      Intervensi Raja: Sultan Ibrahim secara terbuka menentang kesepakatan ini dan melabeli helikopter berusia 30 tahun tersebut sebagai "Peti Mati Terbang".
      Status Terkini: Karena tidak mampu beli tunai, pemerintah kembali meluncurkan tender sewa helikopter alternatif pada Agustus 2025 untuk menutup celah operasional.
      ________________________________________
      KEGAGALAN PROYEK STRATEGIS & KORUPSI:
      Fiasco LCS (2011-Present): Kontrak RM 9,13 Miliar; per Agustus 2022 nol kapal terkirim meski RM 6 Miliar telah dibayar. Biaya membengkak jadi RM 11,2 Miliar.
      Skandal Scorpene (2002): Komisi RM 510 Juta dibayarkan kepada makelar politik dalam pengadaan senilai RM 4,5 Miliar; performa kapal bermasalah.
      Skandal Helikopter MD530G: Kontrak RM 321 Juta gagal memenuhi spesifikasi teknis dan tenggat waktu; tidak ada penuntutan hukum meski dipantau MACC.
      Kasus Mesin Jet Hilang (2007): Dua mesin F-5E dicuri dari gudang RMAF dan muncul di Uruguay; terkait erat dengan korupsi pengadaan era Najib.
      ________________________________________
      KRONISME & LEMAHNYA TATA KELOLA:
      Dominasi Makelar: Pengadaan sering melibatkan perantara (pensiunan perwira) yang menggelembungkan harga; kurang dari 1/3 kontrak melalui tender terbuka.
      Audit Gempita (2025): Laporan Auditor Jenderal mengungkap kegagalan klaim denda RM 162,75 Juta atas keterlambatan kendaraan lapis baja dan praktik pemecahan kontrak (contract splitting) senilai RM 107,54 Juta.
      SIBMAS Armoured Vehicle: Tender diduga dimanipulasi demi produk yang tidak memenuhi spek (terlalu berat dan kurang tenaga).
      KESIMPULAN:
      5X PM 6X MOD + SKANDAL "PETI MATI TERBANG" + HUTANG RM 1,79T = KEBANGKRUTAN TOTAL

      Hapus
    12. PENDAPATAN : RM334,1 Miliar
      PENGELUARAN : RM470 Miliar
      RM470 – RM334,1 = MINUS RM135,9 ......
      -
      NGEMIS BERAS
      NGEMIS JAGUNG
      NGEMIS BATUBARA
      -
      2026
      Populasi: 36.38 juta
      Debt Govt: RM 1.79 Triliun (70.5%)
      Debt Household: RM 1.65 Triliun (84.3%)
      Beban per Kapita: RM 94,544
      -
      2025
      Populasi: 35.97 juta
      Debt Govt: RM 1.30 Triliun (-%)
      Debt Household: RM 1.65 Triliun (-%)
      Beban per Kapita: RM 81,998
      -
      2024
      Populasi: 34.67 juta
      Debt Govt: RM 1.22 Triliun (64.6%)
      Debt Household: RM 1.53 Triliun (84.2%)
      Beban per Kapita: RM 79,315
      -
      2023
      Populasi: 35.12 juta
      Debt Govt: RM 1.17 Triliun (64.3%)
      Debt Household: RM 1.45 Triliun (81.2%)
      Beban per Kapita: RM 74,587
      -
      2022
      Populasi: 34.69 juta
      Debt Govt: RM 1.08 Triliun (60.1%)
      Debt Household: RM 1.38 Triliun (80.9%)
      Beban per Kapita: RM 70,901
      -
      2021
      Populasi: 34.28 juta
      Debt Govt: RM 979.81 Miliar (63.3%)
      Debt Household: RM 1.34 Triliun (89.1%)
      Beban per Kapita: RM 67,667
      -
      2020
      Populasi: 33.87 juta
      Debt Govt: RM 879.56 Miliar (62.0%)
      Debt Household: RM 1.27 Triliun (87.5%)
      Beban per Kapita: RM 63,464
      -
      2019
      Populasi: 33.45 juta
      Debt Govt: RM 793.00 Miliar (52.4%)
      Debt Household: RM 1.22 Triliun (82.5%)
      Beban per Kapita: RM 60,179
      -
      2018
      Populasi: 33.00 juta
      Debt Govt: RM 741.00 Miliar (52.5%)
      Debt Household: RM 1.16 Triliun (82.0%)
      Beban per Kapita: RM 57,605
      -
      2017
      Populasi: 32.54 juta
      Debt Govt: RM 686.80 Miliar (51.9%)
      Debt Household: RM 1.10 Triliun (83.2%)
      Beban per Kapita: RM 54,910
      -
      2016
      Populasi: 32.04 juta
      Debt Govt: RM 648.50 Miliar (52.7%)
      Debt Household: RM 1.04 Triliun (86.1%)
      Beban per Kapita: RM 52,699
      -
      2015
      Populasi: 31.52 juta
      Debt Govt: RM 630.50 Miliar (55.1%)
      Debt Household: RM 985.00 Miliar (86.0%)
      Beban per Kapita: RM 51,253
      -
      2014
      Populasi: 30.98 juta
      Debt Govt: RM 582.80 Miliar (55.0%)
      Debt Household: RM 902.00 Miliar (85.1%)
      Beban per Kapita: RM 47,927
      -
      2013
      Populasi: 30.42 juta
      Debt Govt: RM 547.70 Miliar (54.7%)
      Debt Household: RM 821.00 Miliar (82.0%)
      Beban per Kapita: RM 44,992
      -
      2012
      Populasi: 29.85 juta
      Debt Govt: RM 501.60 Miliar (53.3%)
      Debt Household: RM 732.00 Miliar (77.8%)
      Beban per Kapita: RM 41,326
      -
      2011
      Populasi: 29.26 juta
      Debt Govt: RM 456.10 Miliar (51.8%)
      Debt Household: RM 653.00 Miliar (74.2%)
      Beban per Kapita: RM 37,904
      -
      2010
      Populasi: 28.65 juta
      Debt Govt: RM 407.10 Miliar (52.4%)
      Debt Household: RM 581.00 Miliar (74.8%)
      Beban per Kapita: RM 34,488
      -
      2009
      Populasi: 28.04 juta
      Debt Govt: RM 362.40 Miliar (51.1%)
      Debt Household: RM 516.00 Miliar (72.0%)
      Beban per Kapita: RM 31,326
      -
      2008
      Populasi: 27.45 juta
      Debt Govt: RM 258.00 Miliar (41.3%)
      Debt Household: RM 460.00 Miliar (73.0%)
      Beban per Kapita: RM 26,155
      -
      2007
      Populasi: 26.86 juta
      Debt Govt: RM 266.00 Miliar (41.1%)
      Debt Household: RM 414.00 Miliar (64.0%)
      Beban per Kapita: RM 25,316
      -
      2006
      Populasi: 26.26 juta
      Debt Govt: RM 242.00 Miliar (41.5%)
      Debt Household: RM 372.00 Miliar (63.0%)
      Beban per Kapita: RM 23,381
      -
      2005
      Populasi: 25.66 juta
      Debt Govt: RM 228.00 Miliar (43.8%)
      Debt Household: RM 335.00 Miliar (64.0%)
      Beban per Kapita: RM 21,940
      -
      2004
      Populasi: 25.06 juta
      Debt Govt: RM 217.00 Miliar (45.1%)
      Debt Household: RM 298.00 Miliar (62.0%)
      Beban per Kapita: RM 20,550
      -
      2003
      Populasi: 24.46 juta
      Debt Govt: RM 189.00 Miliar (45.9%)
      Debt Household: RM 265.00 Miliar (64.0%)
      Beban per Kapita: RM 18,560
      -
      2002
      Populasi: 23.87 juta
      Debt Govt: RM 165.00 Miliar (44.9%)
      Debt Household: RM 236.00 Miliar (64.0%)
      Beban per Kapita: RM 16,798
      -
      2001
      Populasi: 23.28 juta
      Debt Govt: RM 146.00 Miliar (42.5%)
      Debt Household: RM 207.00 Miliar (60.0%)
      Beban per Kapita: RM 15,162
      -
      2000
      Populasi: 22.69 juta
      Debt Govt: RM 126.00 Miliar (36.1%)
      Debt Household: RM 182.00 Miliar (52.0%)
      Beban per Kapita: RM 13,574
      -
      1999
      Populasi: 22.11 juta
      Debt Govt: RM 113.00 Miliar (40.4%)
      Debt Household: RM 157.00 Miliar (56.0%)
      Beban per Kapita: RM 12,210
      -
      1998
      Populasi: 21.53 juta
      Debt Govt: RM 98.00 Miliar (35.8%)
      Debt Household: RM 135.00 Miliar (49.3%)
      Beban per Kapita: RM 10,821

      Hapus
  25. Buat latihan pendaratan dulu DON..asik tergelincir aja...
    Mendarat pun tidak mahir macam mana mau melawan pesawat musuh!

    https://www.youtube.com/watch?v=ku7to-tDDvQ

    https://www.instagram.com/reels/DcgHEEFiYqb/

    🀣🀣🀣🀣🀣 🀣🀣🀣🀣🀣 🀣🀣🀣🀣🀣 🀣🀣🀣🀣

    BalasHapus
    Balasan
    1. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      --------------------------------------------
      1.RASIO HUTANG 84.3% DARI GDP
      2. HUTANG NEGARA RM 1,65 TRLLIUN
      3. HUTANG 1MDB RM 18,2 BILLION
      4. TUNGGAKAN SEWA SABAH USD 15 BILLION
      5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
      6. SEWA SIMULATOR MKM
      7. PESAWAT MIG GROUNDED
      8. SEWA MOTOR POLIS
      9. PESAWAT MB339CM GROUNDED
      10. NURI GROUNDED SEWA BLACKHAWK
      11. FIVE PROCUREMENT CANCELLED
      12. 48 PESAWAT SKYHAWK HILANG
      13. MESIN JET 2 BUAH HILANG
      14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
      15. NO LST
      16. NO LPD – NGEMIS LPD USA
      17. NO TANKER
      18. NO KCR
      19. MONUMEN MIG29M UNTUK JIMAT KOS
      20. NO SPH
      21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
      22. NO HELLFIRE
      23. NO MPA ATR72 DELAYED
      24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
      25. NO HELI HEAVY ATTACK NGEMIS AH1Z
      26. NO M3 AMPHIBIUS RIG
      27. LCS MANGKRAK KARATAN
      28. OPV MANGKRAK
      29. TANK MOGOK STOP SPARE PARTS
      30. CN 235 MSA VERSI MSI USA
      31. SEWA MOTOR MILITARY POLICE
      32. RADAR GIFTED PAID USA
      33. 84% NO SAVING EVERY MONTH
      34. SEWA VVSHORAD
      35. SEWA TRUK 3 TON
      36. 4X4 SEWA 6X6 CANCELLED
      37. C130H DIGANTI 2045
      38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
      39. NO DRONE UCAV – ANKA ISR OMPONG
      40. SEWA BLACKHAWK SEWA AW159
      41. NO TRACKED SPH
      42. SEWA SIMULATOR HELI
      43. SPH CANCELLED
      44. SCORPION V150 CONDOR SIMBAS RETIRED
      45. NO PESAWAT COIN
      46. PILATUS MK II KARATAN
      47. PENCEROBOHAN 43X BTA 316 HARI
      48. SEWA AW139 SEWA COLIBRI
      49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
      50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
      51. LYNX GROUNDED
      52. MRCA CANCELLED SEWA PESAWAT ITTC
      53. MICA CANCELLED NSM CANCELLED
      54. NO LRAD NO MRAD JUST VSHORAD
      55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
      56. 4X NGEMIS F18 KUWAIT
      57. MENUNGGU 2050 KAPAL SELAM
      58. NO TANK AMPHIBI AV8 MOGOK BERASAP
      59. 84% NO SAVING EVERY MONTH
      60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
      61. MKM BARTER PALM OIL
      62. MIG29N BARTER PALM OIL
      63. A400M PEMBAYARAN BERPERINGKAT (HUTANG)
      64. SCORPENE BARTER PALM OIL
      65. PT91M BARTER PALM OIL RUBBER
      67. FA50M BARTER PALM OIL
      ===================
      SEWA = HUTANG 84.3% DARI GDP = NO SHOPPING
      1. SEWA 28 HELI
      2. SEWA L39 ITCC
      3. SEWA EC120B
      4. SEWA FLIGHT SIMULATION TRAINING DEVICE (FSTD)
      5. SEWA 1 UNIT SISTEM SIMULATOR EC120B
      6. SEWA HOVERCRAFT
      7. SEWA AW139
      8. SEWA FAST INTERCEPTOR BOAT (FIB)
      9. SEWA UTILITY BOAT
      10. SEWA RIGID HULL FENDER BOAT (RHFB)
      11. SEWA ROVER FIBER GLASS (ROVER)
      12. SEWA MV AISHAH AIM 4
      13. SEWA BMW R1250RT
      14. SEWA 4x4 VECHICLE
      15. SEWA VSHORAD
      16. SEWA TRUCK
      17. SEWA HONDA CIVIC
      18. SEWA PATROL BOATS
      19. SEWA OUTBOARD MOTORS
      20. SEWA TRAILERS
      21. SEWA SUPERBIKES
      22. SEWA SIMULATOR MKM
      23. SEWA 12 AW149 TUDM
      24. SEWA 4 AW139 TUDM
      25. SEWA 5 EC120B TUDM
      26. SEWA 2 AW159 TLDM
      27. SEWA 4 UH-60A TDM
      28. SEWA 12 AW149 TDM
      29. SEWA 4 AW139 BOMBA
      30. SEWA 2 AW159 MMEA
      31. SEWA 7 BELL429 POLIS
      32. SEWA MOTOR POLIS
      --------------------------------------------
      USA BANNED MALONYET : USA PALAK ART USD 240 MILLIAR
      NSM
      AMRAAM
      F18
      UH60A
      --------------------------------------------
      🀣ART PALAK USD 240 MILLIAR = BANNED : NSM AMRAAM F18🀣

      Hapus
    2. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      --------------------------------------------
      GOVERNMENT REVENUE =
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ---------------------------------
      Analisa Model Pengadaan: "Negara Penyewa" (Leasing)
      Krisis Likuiditas: Ketiadaan dana tunai memaksa militer beralih ke skema Sewa (Leasing) untuk 32+ item strategis (Helikopter Blackhawk, AW139, simulator, hingga kendaraan taktis).
      Barter Komoditas: Pengadaan yang tersisa terpaksa menggunakan skema Barter Kelapa Sawit (CPO) seperti pada kesepakatan FA-50 (Korea Selatan) dan PT-91M (Polandia).
      Aset Karatan & Hilang: Proyek LCS mangkrak melibatkan 17 kreditor, diperparah dengan catatan buruk hilangnya 48 pesawat Skyhawk dan 2 mesin jet jet tempur.
      -
      Analisa Reputasi & Diplomasi Internasional
      Runtuhnya Prestasi Olahraga: Kekalahan di CAS terkait 7 pemain naturalisasi ilegal dan sanksi AFC (Kalah WO 0-3) mencerminkan kegagalan administrasi sistemik.
      Kehilangan Posisi Regional: Resmi gagal lolos ke Piala Asia 2027, di mana posisi tersebut kini diambil alih oleh Vietnam, mempertegas penurunan pengaruh MALAYSEWA di ASEAN.
      Krisis Identitas: Kritik internal dari pemimpin nasional (Mahathir & Anwar Ibrahim) mengenai kemiskinan struktural dan korupsi proyek negara memperburuk citra di mata investor global.

      Hapus
    3. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      --------------------------------------------
      GOVERNMENT REVENUE =
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ---------------------------------
      Status Kelumpuhan Pertahanan (SIPRI & Alutsista)
      Vakum SIPRI (2024–2025): Status KOSONG total selama dua tahun berturut-turut. Tidak ada transfer senjata berat yang tercatat, menempatkan MALAYSEWA setara dengan Laos dan Kamboja.
      Tren Mundur: Penurunan konsisten dari fase Planned (2020), Selected Not Yet Ordered (2022), hingga nihil aktivitas (2024–2025).
      Kegagalan Simbolik: Pembatalan resmi akuisisi F/A-18 Hornet Kuwait sebanyak 4 kali bukti hilangnya kredibilitas finansial di pasar global.
      Procurement Freeze (2026): Instruksi PM Anwar Ibrahim untuk pembekuan total pengadaan guna menghentikan korupsi sistemik dan kebocoran anggaran.
      -
      Model "Negara Penyewa" (Military-for-Rent)
      Ketiadaan uang tunai memaksa militer beralih dari kepemilikan aset menjadi skema Leasing (Sewa):
      Aset Sewaan (32+ Item): Mencakup 31 Helikopter (Blackhawk, AW139, AW149, Bell 429), pesawat latihan L39 ITCC, simulator jet tempur MKM, hingga motor polisi.
      Skema Barter: Pengadaan yang tersisa (FA-50, PT-91M, Scorpene) terpaksa menggunakan Barter Kelapa Sawit (CPO) karena krisis devisa.
      Aset Mangkrak: Proyek LCS & OPV yang karatan di galangan melibatkan 17 kreditor dengan bunga yang terus membengkak.
      -
      Spiral Utang "Gali Lubang Tutup Lubang"
      Debt-Servicing Cycle: 58% hingga 64,3% pinjaman baru hanya digunakan untuk membayar bunga dan cicilan pokok utang lama.
      Ledakan Liabilitas: Utang nasional melonjak drastis dari RM 407 Miliar (2010) menjadi proyeksi RM 1,79 Triliun (2026).
      Rasio Kritis: Utang pemerintah menyentuh 69% GDP (melewati limit 65%) dan utang rumah tangga ekstrem di angka 84,3% GDP.
      Tabung Harapan (2018): Bukti historis keputusasaan fiskal melalui penggalangan dana rakyat untuk membayar utang negara.

      Hapus
    4. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      --------------------------------------------
      GOVERNMENT REVENUE =
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ---------------------------------
      Penurunan Daya Gentar & Reputasi (GFP 2026)
      Peringkat GFP: Merosot ke posisi 42 dunia (Peringkat ke-7 di ASEAN), resmi disalip oleh Filipina (Peringkat 41).
      Skandal Aset Hilang: Catatan memalukan raibnya 48 pesawat Skyhawk dan 2 mesin jet tempur dari gudang militer.
      Degradasi Armada: Banyak aset utama berstatus Grounded (MiG-29, MB339CM, Nuri) atau mogok saat parade (Tank PT-91M).
      -
      Krisis Administrasi & Tekanan Internasional
      Sanksi Olahraga: Kekalahan WO 0-3 dan sanksi AFC/CAS akibat pemain naturalisasi ilegal mencerminkan kegagalan birokrasi sistemik.
      Kehilangan Pengaruh: Posisi di Piala Asia 2027 resmi direbut oleh Vietnam, mempertegas mundurnya pengaruh diplomasi regional.
      Tekanan Ekonomi AS: Ancaman sanksi tarif Section 301 (10-25%) dan IEEPA oleh USTR menghantam sektor manufaktur utama (E&E).
      -
      Perbandingan Kontras: Indonesia (The Giant)
      Status SIPRI: Memiliki "Lembar Belanja Penuh" (Rafale F4, A400M, Rudal Khan, Kapal PPA).
      Kesehatan Fiskal: Rasio utang pemerintah jauh lebih sehat (40% GDP) dengan ekonomi 4,24x lebih besar secara PDB PPP dibandingkan MALAYSEWA.

      Hapus
    5. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      --------------------------------------------
      GOVERNMENT REVENUE =
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ---------------------------------
      Bukti "Hutang Bayar Hutang" (Debt-Servicing Cycle)
      Data resmi menunjukkan MALAYSEWA terjebak dalam siklus gali lubang tutup lubang kronis:
      2018 (Fase Verifikasi): Utang menembus RM1 Triliun; pemerintah meluncurkan Tabung Harapan (donasi rakyat) untuk mencicil utang negara.
      2019–2020: Ketergantungan meningkat; 59% hingga 60% pinjaman baru hanya untuk melunasi utang lama.
      2023 (Rekor Terburuk): 64,3% dari total pinjaman kasar (RM145,8 Miliar) digunakan hanya untuk membayar utang jatuh tempo.
      2025–2026: Proyeksi tetap kritis di angka 58%. Ruang fiskal untuk pembangunan dan alutsista praktis terkunci oleh cicilan utang.
      -
      Bukti "Vakum SIPRI" (2020–2025)
      Kontras dengan klaim belanja "Cash", data SIPRI menunjukkan kekosongan aktivitas:
      2020–2021: Berstatus Planned (Hanya rencana/dijangka).
      2022–2023: Berstatus Not Yet Ordered (Terpilih tapi tidak ada kontrak/pesanan).
      2024–2025: Status resmi KOSONG (Nihil transfer senjata berat selama 2 tahun berturut-turut).
      Posisi Regional: MALAYSEWA kini sejajar dengan Laos dan Kamboja dalam hal nihilnya modernisasi alutsista berat.
      -
      Timeline "Prank" Alutsista (Janji vs Realitas)
      Daftar kegagalan kontrak strategis yang mencoreng kredibilitas pertahanan:
      Prank F/A-18 Hornet: Upaya akuisisi dari Kuwait Batal 4 Kali hingga resmi dihentikan pada 2026 karena masalah logistik dan dana.
      Prank Dassault Rafale: Mangkrak sejak 2014 akibat krisis anggaran (kini diborong Indonesia).
      Prank Kapal MRSS: Janji kontrak dengan PT PAL (Indonesia) pada 2018 yang tidak pernah terwujud.
      Prank Helikopter Blackhawk: Proses sewa (leasing) yang mangkrak dan berbelit hingga 2025.

      Hapus
    6. RELEASE US DEPARTEMENT OF WAR 24/08/2026
      F15IDN
      F15IDN
      F15IDN
      https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
      -
      INDONESIA
      a. 48 KAAN Gen 5
      b. 42 RAFALE Gen 4.5
      c. 16 Sukhoi 27/30
      d. 33 F16
      e. 12 M346FA
      f. 20 T50i
      g. 24 HAWK
      =============================
      =============================
      MALONYET
      a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
      b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
      c. 7 F18 = LACK SOURCE CODE
      d. 16 HAWK = LACK SPAREPART
      --------------------------------------------
      GOVERNMENT REVENUE =
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ---------------------------------
      Bukti "Hutang Bayar Hutang" (Debt-Servicing Cycle)
      Data resmi menunjukkan MALAYSEWA terjebak dalam siklus gali lubang tutup lubang kronis:
      2018 (Fase Verifikasi): Utang menembus RM1 Triliun; pemerintah meluncurkan Tabung Harapan (donasi rakyat) untuk mencicil utang negara.
      2019–2020: Ketergantungan meningkat; 59% hingga 60% pinjaman baru hanya untuk melunasi utang lama.
      2023 (Rekor Terburuk): 64,3% dari total pinjaman kasar (RM145,8 Miliar) digunakan hanya untuk membayar utang jatuh tempo.
      2025–2026: Proyeksi tetap kritis di angka 58%. Ruang fiskal untuk pembangunan dan alutsista praktis terkunci oleh cicilan utang.
      -
      Bukti "Vakum SIPRI" (2020–2025)
      Kontras dengan klaim belanja "Cash", data SIPRI menunjukkan kekosongan aktivitas:
      2020–2021: Berstatus Planned (Hanya rencana/dijangka).
      2022–2023: Berstatus Not Yet Ordered (Terpilih tapi tidak ada kontrak/pesanan).
      2024–2025: Status resmi KOSONG (Nihil transfer senjata berat selama 2 tahun berturut-turut).
      Posisi Regional: MALAYSEWA kini sejajar dengan Laos dan Kamboja dalam hal nihilnya modernisasi alutsista berat.
      -
      Timeline "Prank" Alutsista (Janji vs Realitas)
      Daftar kegagalan kontrak strategis yang mencoreng kredibilitas pertahanan:
      Prank F/A-18 Hornet: Upaya akuisisi dari Kuwait Batal 4 Kali hingga resmi dihentikan pada 2026 karena masalah logistik dan dana.
      Prank Dassault Rafale: Mangkrak sejak 2014 akibat krisis anggaran (kini diborong Indonesia).
      Prank Kapal MRSS: Janji kontrak dengan PT PAL (Indonesia) pada 2018 yang tidak pernah terwujud.
      Prank Helikopter Blackhawk: Proses sewa (leasing) yang mangkrak dan berbelit hingga 2025.

      Hapus
    7. PENGEMIS BERAS : BANNED NSM AMRAAM F18 UH60A : ART USD 240 MILLIAR
      GOVT DEBT 70,5% HOUSEHOLD 84,3% TO GDP .........
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      SUBSIDY BURDEN: 23.9%
      BORROWING TO REPAY DEBT: RM470 – RM334.1 = DEFICIT OF RM135.9
      ------------------------------
      KASTA FFBNP= NO SHOPPING BUT LEASING
      KASTA FFBNP= NO SHOPPING BUT LEASING
      ------------------------------
      GOVERNMENT REVENUE =
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ---------------------------------
      Kesenjangan Kemampuan (Capability Gap)
      Ketiadaan Pesawat COIN: Menggunakan jet mahal (Su-30MKM) untuk operasi anti-gerilya yang seharusnya menggunakan pesawat ringan. Pengganti (FA-50M) baru akan tiba paling cepat 2026.
      Logistik Terfragmentasi: Standarisasi alutsista yang buruk (campuran Rusia, AS, Polandia, China) menciptakan biaya pemeliharaan tinggi dan kesiapan operasional rendah.
      Absennya Korps Marinir: Kemampuan amfibi yang terpecah antara AD dan AL melemahkan pertahanan kedaulatan di Laut China Selatan.
      -
      Krisis Fiskal & "Negara Penyewa"
      Spiral Utang: Rasio utang pemerintah (69% GDP) dan rumah tangga (84,3%) yang ekstrem memaksa militer beralih ke skema Sewa (Leasing).
      Aset Sewaan: Mencakup Helikopter Blackhawk, AW139, pesawat latihan L39, hingga kapal hidrografi dan motor patroli.
      Efek Domino: Pembatalan F-18 Hornet Kuwait (2026) menjadi simbol hilangnya kredibilitas finansial di pasar pertahanan global.
      -
      Penurunan Daya Gentar (GFP 2026)
      Peringkat Merosot: Turun ke posisi 42 Dunia (Peringkat 7 di ASEAN), kini berada di bawah Filipina (41) dan jauh tertinggal dari Indonesia (13).
      Status Armada: Banyak aset utama berstatus grounded atau tidak layak selam (seperti kasus KD Rahman) akibat kekurangan suku cadang dan teknisi.

      Hapus
    8. PENGEMIS BERAS : BANNED NSM AMRAAM F18 UH60A : ART USD 240 MILLIAR
      GOVT DEBT 70,5% HOUSEHOLD 84,3% TO GDP .........
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      SUBSIDY BURDEN: 23.9%
      BORROWING TO REPAY DEBT: RM470 – RM334.1 = DEFICIT OF RM135.9
      ------------------------------
      KASTA FFBNP= NO SHOPPING BUT LEASING
      KASTA FFBNP= NO SHOPPING BUT LEASING
      ------------------------------
      GOVERNMENT REVENUE =
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ---------------------------------
      Status SIPRI: Vakum Total vs. Dominasi Regional
      MALAYSEWA (Zonk): Mencatatkan status KOSONG pada lembar laporan SIPRI selama dua tahun berturut-turut (2024–2025). Tidak ada kontrak atau transfer senjata berat yang terealisasi.
      Indonesia (Full Shopping): Memiliki lembar belanja penuh dengan aset strategis seperti Rafale F-4, A400M, Rudal Khan/Bora, drone Anka-S, hingga mesin kapal PPA-L-Plus.
      -
      Alutsista Usang & Krisis Pemeliharaan
      Armada Tua: Mengoperasikan aset berusia 30–40 tahun seperti panser Condor (1980-an) dan kapal Lekiu-class (1990-an).
      Masalah Kesiapan: Jet tempur utama (Su-30MKM & F/A-18D) memiliki jumlah armada kecil dan biaya perawatan yang mencekik anggaran.
      Pensiun Tanpa Pengganti: Mundurnya MiG-29 pada 2017 tanpa pengganti langsung meninggalkan celah pertahanan udara yang lebar.
      -
      Skandal Korupsi & Kegagalan Pengadaan
      Tragedi LCS: Proyek RM 9 Miliar yang meledak biayanya (cost overrun) hingga RM 1 Miliar, namun belum mengirimkan satu pun kapal meski dana telah terserap masif.
      Sistem Makelar: Ketergantungan pada agen dan "middlemen" politik menyebabkan harga alutsista menjadi tidak masuk akal dan spesifikasi yang seringkali tidak sesuai kebutuhan militer.
      Drama SPH 155mm: Pengadaan artileri medan yang tertunda sejak 2010 dan akhirnya dibatalkan oleh Kementerian Keuangan karena krisis kas.

      Hapus
    9. PENGEMIS BERAS : BANNED NSM AMRAAM F18 UH60A : ART USD 240 MILLIAR
      GOVT DEBT 70,5% HOUSEHOLD 84,3% TO GDP .........
      REVENUE: RM334.1 BILLION
      EXPENDITURE: RM470 BILLION
      SUBSIDY BURDEN: 23.9%
      BORROWING TO REPAY DEBT: RM470 – RM334.1 = DEFICIT OF RM135.9
      ------------------------------
      KASTA FFBNP= NO SHOPPING BUT LEASING
      KASTA FFBNP= NO SHOPPING BUT LEASING
      ------------------------------
      GOVERNMENT REVENUE =
      Ranges from RM334.1 Billion to RM343.1 Billion (75.8% from taxes and 24.2% non-tax/Petronas).
      -
      TOTAL EXPENDITURE =
      Reaches RM419.2 Billion to RM470 Billion.
      -
      BUDGET ALLOCATION =
      RM338.2 Billion is spent on operations (salaries, pensions, subsidies) and only RM81 Billion for infrastructure development.
      -
      MAIN REASONS FOR BORROWING =
      REVENUE COMPLETELY DEPLETED:
      Pure operating costs (RM338.2 Billion) directly consume nearly 100% of all incoming government revenue.
      -
      CHRONIC BUDGET DEFICIT:
      The massive gap between revenue and total spending creates a deficit hole of 3.5% to 3.6% of GDP.
      -
      CHRONIC BUDGET DEFICIT:
      The wide gulf between total revenue (~RM343 billion) and total expenditure (~RM419–RM470 billion) creates a budget deficit ranging from 3.5% to 3.6% of the country's GDP. The only way for the MALAYSEWA government to plug this tens-of-billions-of-ringgit funding gap is by ISSUING NEW GOVERNMENT BONDS.
      --------------------------------------------
      MALAYSEWA DEBT DATA 2026
      Government Debt: RM 1.79 trillion (Government Debt-to-GDP Ratio: 70.5% - Statutory Limit: 65%)
      Household Debt: RM 1.65 trillion (Household Debt-to-GDP Ratio: 84.3% - Statutory Limit: 65%)
      MALAYSEWA Population 2026: 36,385,115 people
      -
      DEBT PER CAPITA CALCULATION FOR MALAYSEWA 2026
      Government Debt: RM 1,790,000,000,000 / 36,385,115 = RM 49,196
      Household Debt: RM 1,650,000,000,000 / 36,385,115 = RM 45,348
      ➡️ TOTAL CUMULATIVE BURDEN PER CITIZEN: RM 49,196 + RM 45,348 = RM 94,544
      ---------------------------------Tantangan Operasional & Internal
      Alutsista Tua: Ketergantungan pada Su-30MKM dan F/A-18D yang mulai menua; pensiunnya MiG-29 tanpa pengganti instan.
      Keamanan Maritim: Kewalahan menghadapi intrusi di Laut China Selatan (LCS) dan Selat Malaka akibat kurangnya kapal patroli.
      SDM: Gaji rendah dan kurangnya minat generasi muda menyebabkan sulitnya retensi tenaga ahli (pilot & insinyur).
      Koordinasi Rendah: Kurangnya integrasi operasi gabungan antara Angkatan Darat, Laut, dan Udara.
      -
      Sorotan Skandal & Opini Publik
      Kritik Kerajaan: Sultan Ibrahim menyebut helikopter Black Hawk tua sebagai "peti mati terbang".
      Korupsi Internal: Operasi Sohor (2025) mengungkap intelijen militer yang membocorkan data ke penyelundup.
      Kasus Kekerasan: Insiden penganiayaan kadet di UPNM yang memicu kemarahan publik di media sosial (#ReformATM).
      Konspirasi: Keterlibatan sindikat yang membayar petugas hingga RM50.000 per perjalanan untuk aktivitas ilegal.
      -
      Kesimpulan Perbandingan
      Indonesia: Fokus pada pengadaan besar-besaran (Big Ticket Items) dari berbagai negara (Perancis, Turki, AS).
      MALAYSEWA: Mengalami stagnasi akibat jeratan utang proyek lama, skandal korupsi, dan krisis kepercayaan publik terhadap manajemen pengadaan.

      Hapus
    10. PENDAPATAN : RM334,1 Miliar
      PENGELUARAN : RM470 Miliar
      RM470 – RM334,1 = MINUS RM135,9 ......
      -
      ASET MILITER USANG
      SEWA ALAT MILITER
      KORUPSI MILITER
      -
      2026
      Populasi: 36.38 juta
      Debt Govt: RM 1.79 Triliun (70.5%)
      Debt Household: RM 1.65 Triliun (84.3%)
      Beban per Kapita: RM 94,544
      -
      2025
      Populasi: 35.97 juta
      Debt Govt: RM 1.30 Triliun (-%)
      Debt Household: RM 1.65 Triliun (-%)
      Beban per Kapita: RM 81,998
      -
      2024
      Populasi: 34.67 juta
      Debt Govt: RM 1.22 Triliun (64.6%)
      Debt Household: RM 1.53 Triliun (84.2%)
      Beban per Kapita: RM 79,315
      -
      2023
      Populasi: 35.12 juta
      Debt Govt: RM 1.17 Triliun (64.3%)
      Debt Household: RM 1.45 Triliun (81.2%)
      Beban per Kapita: RM 74,587
      -
      2022
      Populasi: 34.69 juta
      Debt Govt: RM 1.08 Triliun (60.1%)
      Debt Household: RM 1.38 Triliun (80.9%)
      Beban per Kapita: RM 70,901
      -
      2021
      Populasi: 34.28 juta
      Debt Govt: RM 979.81 Miliar (63.3%)
      Debt Household: RM 1.34 Triliun (89.1%)
      Beban per Kapita: RM 67,667
      -
      2020
      Populasi: 33.87 juta
      Debt Govt: RM 879.56 Miliar (62.0%)
      Debt Household: RM 1.27 Triliun (87.5%)
      Beban per Kapita: RM 63,464
      -
      2019
      Populasi: 33.45 juta
      Debt Govt: RM 793.00 Miliar (52.4%)
      Debt Household: RM 1.22 Triliun (82.5%)
      Beban per Kapita: RM 60,179
      -
      2018
      Populasi: 33.00 juta
      Debt Govt: RM 741.00 Miliar (52.5%)
      Debt Household: RM 1.16 Triliun (82.0%)
      Beban per Kapita: RM 57,605
      -
      2017
      Populasi: 32.54 juta
      Debt Govt: RM 686.80 Miliar (51.9%)
      Debt Household: RM 1.10 Triliun (83.2%)
      Beban per Kapita: RM 54,910
      -
      2016
      Populasi: 32.04 juta
      Debt Govt: RM 648.50 Miliar (52.7%)
      Debt Household: RM 1.04 Triliun (86.1%)
      Beban per Kapita: RM 52,699
      -
      2015
      Populasi: 31.52 juta
      Debt Govt: RM 630.50 Miliar (55.1%)
      Debt Household: RM 985.00 Miliar (86.0%)
      Beban per Kapita: RM 51,253
      -
      2014
      Populasi: 30.98 juta
      Debt Govt: RM 582.80 Miliar (55.0%)
      Debt Household: RM 902.00 Miliar (85.1%)
      Beban per Kapita: RM 47,927
      -
      2013
      Populasi: 30.42 juta
      Debt Govt: RM 547.70 Miliar (54.7%)
      Debt Household: RM 821.00 Miliar (82.0%)
      Beban per Kapita: RM 44,992
      -
      2012
      Populasi: 29.85 juta
      Debt Govt: RM 501.60 Miliar (53.3%)
      Debt Household: RM 732.00 Miliar (77.8%)
      Beban per Kapita: RM 41,326
      -
      2011
      Populasi: 29.26 juta
      Debt Govt: RM 456.10 Miliar (51.8%)
      Debt Household: RM 653.00 Miliar (74.2%)
      Beban per Kapita: RM 37,904
      -
      2010
      Populasi: 28.65 juta
      Debt Govt: RM 407.10 Miliar (52.4%)
      Debt Household: RM 581.00 Miliar (74.8%)
      Beban per Kapita: RM 34,488
      -
      2009
      Populasi: 28.04 juta
      Debt Govt: RM 362.40 Miliar (51.1%)
      Debt Household: RM 516.00 Miliar (72.0%)
      Beban per Kapita: RM 31,326
      -
      2008
      Populasi: 27.45 juta
      Debt Govt: RM 258.00 Miliar (41.3%)
      Debt Household: RM 460.00 Miliar (73.0%)
      Beban per Kapita: RM 26,155
      -
      2007
      Populasi: 26.86 juta
      Debt Govt: RM 266.00 Miliar (41.1%)
      Debt Household: RM 414.00 Miliar (64.0%)
      Beban per Kapita: RM 25,316
      -
      2006
      Populasi: 26.26 juta
      Debt Govt: RM 242.00 Miliar (41.5%)
      Debt Household: RM 372.00 Miliar (63.0%)
      Beban per Kapita: RM 23,381
      -
      2005
      Populasi: 25.66 juta
      Debt Govt: RM 228.00 Miliar (43.8%)
      Debt Household: RM 335.00 Miliar (64.0%)
      Beban per Kapita: RM 21,940
      -
      2004
      Populasi: 25.06 juta
      Debt Govt: RM 217.00 Miliar (45.1%)
      Debt Household: RM 298.00 Miliar (62.0%)
      Beban per Kapita: RM 20,550
      -
      2003
      Populasi: 24.46 juta
      Debt Govt: RM 189.00 Miliar (45.9%)
      Debt Household: RM 265.00 Miliar (64.0%)
      Beban per Kapita: RM 18,560
      -
      2002
      Populasi: 23.87 juta
      Debt Govt: RM 165.00 Miliar (44.9%)
      Debt Household: RM 236.00 Miliar (64.0%)
      Beban per Kapita: RM 16,798
      -
      2001
      Populasi: 23.28 juta
      Debt Govt: RM 146.00 Miliar (42.5%)
      Debt Household: RM 207.00 Miliar (60.0%)
      Beban per Kapita: RM 15,162
      -
      2000
      Populasi: 22.69 juta
      Debt Govt: RM 126.00 Miliar (36.1%)
      Debt Household: RM 182.00 Miliar (52.0%)
      Beban per Kapita: RM 13,574
      -
      1999
      Populasi: 22.11 juta
      Debt Govt: RM 113.00 Miliar (40.4%)
      Debt Household: RM 157.00 Miliar (56.0%)
      Beban per Kapita: RM 12,210
      -
      1998
      Populasi: 21.53 juta
      Debt Govt: RM 98.00 Miliar (35.8%)
      Debt Household: RM 135.00 Miliar (49.3%)
      Beban per Kapita: RM 10,821

      Hapus
  26. Duniya mengakui AF kita
    ☆Real Ace Kombat....come true✌️

    apalagi F15 uda epektip, makin banyak bahan konten dah haha!πŸ˜‰πŸ˜†πŸ₯³

    Beda ama negri🎰kasino genting, banyak kumpulin brosur, beli kagak haha!πŸ€₯🍌πŸ€ͺ

    ✅️✅️⬇️⬇️
    Indonesia's Air Force
    https://youtube.com/watch?v=NoTqNMTEkAc&pp=ugUEEgJlbtIHCQkTDAGHKiGM7w%3D%3D

    BalasHapus
  27. RELEASE US DEPARTEMENT OF WAR 24/08/2026
    F15IDN
    F15IDN
    F15IDN
    https://www.war.gov/News/Contracts/Contract/Article/4581800/contracts-for-aug-24-2026/
    -
    INDONESIA
    a. 48 KAAN Gen 5
    b. 42 RAFALE Gen 4.5
    c. 16 Sukhoi 27/30
    d. 33 F16
    e. 12 M346FA
    f. 20 T50i
    g. 24 HAWK
    =============================
    =============================
    MALONYET
    a. 18 FA50Murah (10 LCA + 8 LIFT) = LACK BVR AMRAAM
    b. 18 Sukhoi (4 Serviceable) = LACK MAINTENANCE
    c. 7 F18 = LACK SOURCE CODE
    d. 16 HAWK = LACK SPAREPART
    --------------------------------------------
    1.RASIO HUTANG 84.3% DARI GDP
    2. HUTANG NEGARA RM 1,65 TRLLIUN
    3. HUTANG 1MDB RM 18,2 BILLION
    4. TUNGGAKAN SEWA SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. SEWA SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. SEWA MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED SEWA BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. SEWA MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. SEWA VVSHORAD
    35. SEWA TRUK 3 TON
    36. 4X4 SEWA 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. SEWA BLACKHAWK SEWA AW159
    41. NO TRACKED SPH
    42. SEWA SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. SEWA AW139 SEWA COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED SEWA PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST VSHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. MKM BARTER PALM OIL
    62. MIG29N BARTER PALM OIL
    63. A400M PEMBAYARAN BERPERINGKAT (HUTANG)
    64. SCORPENE BARTER PALM OIL
    65. PT91M BARTER PALM OIL RUBBER
    67. FA50M BARTER PALM OIL
    ===================
    SEWA = HUTANG 84.3% DARI GDP = NO SHOPPING
    1. SEWA 28 HELI
    2. SEWA L39 ITCC
    3. SEWA EC120B
    4. SEWA FLIGHT SIMULATION TRAINING DEVICE (FSTD)
    5. SEWA 1 UNIT SISTEM SIMULATOR EC120B
    6. SEWA HOVERCRAFT
    7. SEWA AW139
    8. SEWA FAST INTERCEPTOR BOAT (FIB)
    9. SEWA UTILITY BOAT
    10. SEWA RIGID HULL FENDER BOAT (RHFB)
    11. SEWA ROVER FIBER GLASS (ROVER)
    12. SEWA MV AISHAH AIM 4
    13. SEWA BMW R1250RT
    14. SEWA 4x4 VECHICLE
    15. SEWA VSHORAD
    16. SEWA TRUCK
    17. SEWA HONDA CIVIC
    18. SEWA PATROL BOATS
    19. SEWA OUTBOARD MOTORS
    20. SEWA TRAILERS
    21. SEWA SUPERBIKES
    22. SEWA SIMULATOR MKM
    23. SEWA 12 AW149 TUDM
    24. SEWA 4 AW139 TUDM
    25. SEWA 5 EC120B TUDM
    26. SEWA 2 AW159 TLDM
    27. SEWA 4 UH-60A TDM
    28. SEWA 12 AW149 TDM
    29. SEWA 4 AW139 BOMBA
    30. SEWA 2 AW159 MMEA
    31. SEWA 7 BELL429 POLIS
    32. SEWA MOTOR POLIS
    --------------------------------------------
    USA BANNED MALONYET : USA PALAK ART USD 240 MILLIAR
    NSM
    AMRAAM
    F18
    UH60A
    --------------------------------------------
    🀣ART PALAK USD 240 MILLIAR = BANNED : NSM AMRAAM F18🀣

    BalasHapus
  28. KARENA KEBANYAKAN DADAH JADI BOTOL SEMUA BERUK MALAYDESH SAMPAI ADA KORBAN MENINGGAL πŸ€ͺπŸ€ͺπŸ€ͺπŸ€ͺπŸ€ͺπŸ€ͺπŸ€ͺ

    Insiden Kursi Pelontar di Hangar Pangkalan Udara Butterworth (2002)
    - Kronologi Peristiwa: Seorang teknisi Angkatan Udara Kerajaan Malaysia (RMAF) sedang melakukan pekerjaan pemeliharaan di dalam kokpit pesawat.
    - Penyebab: Kursi pelontar secara tidak sengaja teraktivasi dan meluncur keluar dari kokpit.
    - Dampak: Kursi tersebut menghantam atap hangar lalu jatuh ke tanah.
    - Korban: Seorang teknisi berusia 25 tahun, Shawn Christopher Chew, tewas seketika di tempat kejadian, sementara enam teknisi muda lainnya mengalami luka-luka akibat serpihan.

    https://m.malaysiakini.com/news/10773

    BalasHapus
  29. F15 kita lancarrr jayaaaa

    tim SEWA NGAMUKπŸ”₯ haha!πŸ€ͺ😀😭

    BalasHapus