26 Januari 2025

Calon Dubes Afrika Sub-Sahara Kunjungi PTDI, Tingkatkan Wawasan Potensi Produk Dirgantara Dalam Negeri

26 Januari 2025

Pembekalan Dubes Kawasan Afrika Sub-Sahara tentang produk CN235-220, NC212i, dan N219 (photo: PT DI)

Bandung – PT Dirgantara Indonesia (PTDI) menerima kunjungan para Calon Duta Besar (Dubes) Luar Biasa Berkuasa Penuh (LBBP) RI untuk Kawasan Afrika Sub-Sahara. Rombongan yang dipimpin oleh Bambang Suharto, Calon Duta Besar LBBP RI untuk Nigeria, diterima langsung Direktur Utama PTDI, Gita Amperiawan, beserta Direksi dan Manajemen PTDI di Ruang Rapat Paripurna Lt.9 Gedung Pusat Management (GPM) PTDI. Kunjungan ini bertujuan untuk memperkuat hubungan kerja sama Indonesia dengan negara-negara di kawasan tersebut, khususnya di sektor industri dirgantara.

PTDI sebagai BUMN industri pertahanan memiliki peran strategis dalam mendukung kemandirian industri pertahanan nasional, serta mempromosikan produk-produk unggulan Indonesia di pasar global. Hal ini sejalan dengan upaya PTDI untuk mengembangkan pasar internasional, khususnya di kawasan Afrika yang memiliki potensi besar untuk pengembangan pasar pesawat, terutama untuk pesawat sekelas CN235-220, NC212i, dan N219. Dengan kondisi geografis yang beragam, termasuk wilayah terpencil dan sulit dijangkau, pesawat-pesawat produksi PTDI menawarkan solusi optimal untuk kebutuhan transportasi udara di wilayah tersebut, baik untuk keperluan komersial, angkutan logistik, maupun operasi kemanusiaan.

Pesawat angkut CN-235 (photo: PT DI)

Pesanan 5 pesawat dari Afrika pada tahun 2024
Adapun pada kesempatan High-Level Forum on Multi-Stakeholder Partnership (HLF MSP) dan Indonesia-Africa Forum (IAF) yang diselenggarakan oleh Kementerian Luar Negeri RI dan Bappenas pada September 2024 lalu, PTDI berhasil memperoleh kontrak pengadaaan 5 unit N219 dengan PT Setdco Group untuk end-user Pemerintah Demokratik Republik Kongo. Hal ini menjadi pencapaian penting karena merupakan kontrak ekspor pertama untuk pesawat N219. Selain itu, pada kesempatan yang sama PTDI juga melakukan penandatanganan Framework Agreement (FA) dengan A.D. Trade Belgium Company selaku reseller PTDI di kawasan Afrika untuk pengadaan 2 (dua) unit pesawat CN235-220 Military Transport untuk end user Angkatan Udara Kongo dan kontrak perawatan Periodic Inspection 4-Year untuk 2 (dua) unit pesawat CN235-220 milik Angkatan Udara Senegal.

Saat ini, tercatat sebanyak 5 unit CN235 series produksi PTDI di benua Afrika, yaitu 3 unit di Senegal, 2 unit di Guinea dan 1 unit di Burkina Faso, yang kemudian menjadi potensi bagi PTDI untuk melakukan pekerjaan perawatannya, tidak terbatas pada pesawat produksi PTDI saja, tetapi juga pesawat sekelas yang beroperasi di negara lainnya di kawasan Afrika. Di samping itu, PTDI bersama Anak Perusahaannya, dalam hal ini PT Nusantara Turbin & Propulsi (PT NTP) juga berkolaborasi dalam memberikan solusi pelayanan perawatan engine pesawat.

Pesawat angkut NC-212i (photo: Antara)

Calon Dubes LBBP RI untuk Nigeria, Bambang Suharto, menyampaikan “Tujuan kami ingin membangun jejaring dan mengetahui lebih dalam tentang PTDI sebagai bekal kami untuk bertugas di wilayah masing-masing. Kami disini berkomitmen untuk memajukan diplomasi ekonomi melalui produk-produk Indonesia di luar negeri.”

Adapun untuk terobosan sinergi pemberdayaan kemitraan, Pemerintah RI melalui Kementerian Perdagangan RI dan Kementerian Keuangan RI – Lembaga Dana Kerja Sama Pembangunan Internasional (LDKPI) juga telah mendukung PTDI dengan memberikan berbagai alternatif solusi untuk pembiayaan maupun penawaran program hibah untuk kerja sama pembangunan internasional di kawasan Afrika.

Pesawat angkut N-219 (photo: PT DI)

Pada kesempatan ini, calon Duta Besar LBBP RI juga berkesempatan untuk melihat langsung fasilitas produksi dan inovasi yang dilakukan oleh PTDI. Mereka berdiskusi mengenai langkah-langkah konkret untuk memperkuat penetrasi pasar PTDI di Afrika Sub-Sahara, termasuk peluang kerja sama kedepan di bidang dirgantara, termasuk Transfer of Technology (ToT) yang kemudian diharapkan dapat memberikan dampak ekonomi positif bagi kedua negara.

 (PT DI)

89 komentar:

  1. INDONESIA SUPPLIERS MILITARY EQUIPMENT MALON =
    1. AMERIKA SERIKAT
    2. RUSIA
    3. TIONGKOK (CINA)
    4. TURKI
    5. UNI EROPA
    6. PERANCIS
    7. INGGRIS
    8. JERMAN
    9. INDONESIA
    10. POLANDIA
    https://id.wikipedia.org/wiki/Angkatan_Tentara_Malonn
    -----
    CN235 MADE IN INDONESIA
    Di kawasan ada Brunei yang memiliki 1 unit CN235. Selain itu sebanyak 8 unit dimiliki Tentera Udara Diraja Malonn, 8 unit dimiliki Angkatan Udara Korea Selatan dan 4 unit untuk Polisi Korea Selatan, 4 unit untuk Pakistan, 7 unit untuk Uni Emirate Arab, 1 unit untuk Burkina Faso, dan 3 unit Senegal.
    -----
    RHIB MADE IN INDONESIA
    Kapal patroli jenis rigid inflatable boat (RIB) atau sekoci cepat buatan Banyuwangi, Jawa Timur, telah dibeli angkatan laut Malonndan Singapura. Brunei Darussalam pun juga berminat membeli 12 kapal itu. Angkatan laut Singapura telah membeli 18 unit dan Malonnjuga telah membeli sekitar 24 unit.
    -----
    PARASUT DAN TENDA MILITER MADE IN INDONESIA
    Rupanya tak hanya instansi dan lembaga pemerintah yang menggunakan parasut produksinya, sejumlah negara sahabat juga sudah melirik parasut yang terkenal dengan kualitasnya ini. Tapi tak hanya parasut, pabrik Paiman juga membuat tenda, satuan militer dari Malonnpun memesan 7.000 tenda,,
    -----
    MPCD HAWK MADE IN INDONESIA
    Infoglobal melakukan pelepasan ekspor perdana produk avionik Multi Purpose Cockpit Display (MPCD) ke Malonnpada Senin, 18 Oktober 2021. Seremoni pelepasan ekspor dilakukan dengan pemotongan pita di Workshop Infoglobal Surabaya dan disaksikan secara virtual dari Jakarta
    -----
    MRSS UEA MADE IN INDONESIA
    The United Arab Emirates (UAE) anNOunced it had awarded the Indonesian shipyard PT PAL an AED1.5 billion (USD408.32 million) contract to supply a “multimission vessel” during the IDEX 2023 show being held in Abu Dhabi from 20 to 24 February.
    -----
    B2 SSV FILIPINA MADE IN INDONESIA
    Dipercayakannya PT PAL Indonesia dalam pengadaan 2 (dua) unit kapal perang jenis Landing Dock oleh Angkatan Laut Filipina, karena kepuasan Pemerintah Filipina dan Angkatan Laut Filipina atas pengoperasian 2 unit Landing Dock atau Strategic Sealift Vessel (SSV) yang telah diserahterimakan oleh PAL beberapa tahun lalu.
    -----
    EKSPOR PELURU DAN SENAPAN SEJAK 2006
    PT Pindad (Persero) telah cukup lama menggeluti penjualan ekspor. Terhitung mulai 2006 Pindad mulai menggiatkan ekspornya ke beberapa negara seperti Kamboja dan Nigeria untuk senapan serbu, Malonndan Australia untuk penanganan huru-hara, Korea Selatan, Singapura, Timor Leste, Filipina untuk amunisi, Laos untuk senjata dan amunisi, dan beberapa negara lainnya di kawasan Asia dengan rata-rata penjualan per tahun di kisaran 5 juta USD. Thailand tersendiri merupakan pelanggan ekspor utama saat ini bagi Pindad sejak tahun 2006 untuk produk amunisi kaliber kecil.
    ==============
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats..
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness

    BalasHapus
  2. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
    ----
    CHEAPEST VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    ------
    CHEAPEST VARIANT HISAR OPV
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    ------
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    ------
    ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
    ==========
    1. HUTANG 84.2% DARI GDP
    1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN SEWA SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. SEWA SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. SEWA MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED SEWA BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. SEWA MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. SEWA VSHORAD
    35. SEWA TRUK 3 TON
    36. 4X4 SEWA 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. SEWA BLACKHAWK SEWA AW159
    41. NO TRACKED SPH
    42. SEWA SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. SEWA AW139 SEWA COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED SEWA PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM SEWA 12 AW149
    62. TUDM SEWA 4 AW139
    63. TUDM SEWA 5 EC120B
    64. TLDM SEWA 2 AW159
    65. TDM SEWA 4 UH-60A
    67. TDM SEWA 12 AW149
    68. BOMBA SEWA 4 AW139
    69. MMEA SEWA 2 AW159
    70. POLIS SEWA 7 BELL429
    ==============
    KEY WORDS =
    1. DOWNGRADE
    2. CHEAPEST VARIANT
    3. LEASE

    BalasHapus
  3. Kesian... Akibat tak Laku..... 👎👎🤣🤣

    BalasHapus
    Balasan
    1. SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
      -------------------------------------
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      -
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
      -------------------------------------
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
      -------------------------------------
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      -------------------------------------
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      CHEAPEST VARIANT LMS
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
      -------------------------------------
      DOWNGRADE ANKA
      DOWNGRADE ANKA
      2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance
      While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance
      ==============
      Malonn's economy has faced a number of challenges, including:
      • Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
      • Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
      • Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
      • High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
      • High dependency on food imports: Malonn imports 60% of the food it consumes.
      • Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
      Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn

      Hapus
    2. SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
      ----
      CHEAPEST VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      ------
      CHEAPEST VARIANT HISAR OPV
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      ------
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      ------
      ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance
      While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
      ==========
      1. HUTANG 84.2% DARI GDP
      1. HUTANG 84.2% DARI GDP
      2. HUTANG NEGARA RM 1.5 TRLLIUN
      3. HUTANG 1MDB RM 18.2 BILLION
      4. TUNGGAKAN SEWA SABAH USD 15 BILLION
      5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
      6. SEWA SIMULATOR MKM
      7. PESAWAT MIG GROUNDED
      8. SEWA MOTOR POLIS
      9. PESAWAT MB339CM GROUNDED
      10. NURI GROUNDED SEWA BLACKHAWK
      11. FIVE PROCUREMENT CANCELLED
      12. 48 PESAWAT SKYHAWK HILANG
      13. MESIN JET 2 BUAH HILANG
      14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
      15. NO LST
      16. NO LPD – NGEMIS LPD USA
      17. NO TANKER
      18. NO KCR
      19. MONUMEN MIG29M UNTUK JIMAT KOS
      20. NO SPH
      21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
      22. NO HELLFIRE
      23. NO MPA ATR72 DELAYED
      24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
      25. NO HELI HEAVY ATTACK NGEMIS AH1Z
      26. NO M3 AMPHIBIUS RIG
      27. LCS MANGKRAK KARATAN
      28. OPV MANGKRAK
      29. TANK MOGOK STOP SPARE PARTS
      30. CN 235 MSA VERSI MSI USA
      31. SEWA MOTOR MILITARY POLICE
      32. RADAR GIFTED PAID USA
      33. 84% NO SAVING EVERY MONTH
      34. SEWA VSHORAD
      35. SEWA TRUK 3 TON
      36. 4X4 SEWA 6X6 CANCELLED
      37. C130H DIGANTI 2045
      38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
      39. NO DRONE UCAV – ANKA ISR OMPONG
      40. SEWA BLACKHAWK SEWA AW159
      41. NO TRACKED SPH
      42. SEWA SIMULATOR HELI
      43. SPH CANCELLED
      44. SCORPION V150 CONDOR SIMBAS RETIRED
      45. NO PESAWAT COIN
      46. PILATUS MK II KARATAN
      47. PENCEROBOHAN 43X BTA 316 HARI
      48. SEWA AW139 SEWA COLIBRI
      49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
      50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
      51. LYNX GROUNDED
      52. MRCA CANCELLED SEWA PESAWAT ITTC
      53. MICA CANCELLED NSM CANCELLED
      54. NO LRAD NO MRAD JUST SHORAD
      55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
      56. 4X NGEMIS F18 KUWAIT
      57. MENUNGGU 2050 KAPAL SELAM
      58. NO TANK AMPHIBI AV8 MOGOK BERASAP
      59. 84% NO SAVING EVERY MONTH
      60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
      61. TUDM SEWA 12 AW149
      62. TUDM SEWA 4 AW139
      63. TUDM SEWA 5 EC120B
      64. TLDM SEWA 2 AW159
      65. TDM SEWA 4 UH-60A
      67. TDM SEWA 12 AW149
      68. BOMBA SEWA 4 AW139
      69. MMEA SEWA 2 AW159
      70. POLIS SEWA 7 BELL429
      ==============
      KEY WORDS =
      1. DOWNGRADE
      2. CHEAPEST VARIANT
      3. LEASE

      Hapus
    3. FACT DATA ANGGARAN MILITER INDONESIA DARI TAHUN KE TAHUN :
      • 2025: Komisi I DPR RI menyetujui anggaran pagu indikatif Kemhan sebesar Rp155 triliun.
      • 2024: Anggaran militer Indonesia sebesar Rp139,26 triliun.
      • 2023: Anggaran militer Indonesia sebesar Rp144,2 triliun.
      • 2022: Anggaran militer Indonesia sebesar Rp150,3 triliun.
      • 2021: Anggaran militer Indonesia sebesar Rp125,887 triliun.
      • 2020: Anggaran militer Indonesia sebesar Rp136,871 triliun.
      • 2019: Anggaran militer Indonesia sebesar Rp115,351 triliun.
      • 2010: Anggaran pertahanan Indonesia sebesar Rp17.080.482.218.813.
      • 2009: Anggaran pertahanan Indonesia sebesar Rp13.145.658.918.442.
      • 2008: Realisasi belanja pertahanan Indonesia sebesar Rp9.158.461.735.835.
      • 2007: Realisasi belanja pertahanan Indonesia sebesar Rp30.685.860.754.906.
      ==============
      ==============
      FACT DATA ANGGARAN MILITER MALON DARI TAHUN KE TAHUN :
      • Rata-rata pengeluaran militer Malon dari tahun 1957 hingga 2023 adalah 1,82104 miliar USD.
      • Pada tahun 2024, anggaran pertahanan Malon mencapai 4,3 miliar USD.
      • Pada tahun 2025, Malon menganggarkan belanja militer sebesar 21,2 miliar ringgit Malon atau sekitar Rp 75,8 triliun
      --------------------
      FACT BUDGET 2025 ......
      SALARIES AND OTHER STUFF
      NOT ASSETS
      NOT ASSETS
      NOT ASSETS
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.
      --------------------
      FACT BUDGET 2025 ......
      ASSET PROCUREMENT DOWN
      ASSET PROCUREMENT DOWN
      ASSET PROCUREMENT DOWN
      Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
      --------------------
      2024 RASIO HUTANG 84,2% DARI GDP
      HUTANG 2023 = RM 1.53 TRILLION
      HUTANG 2022 = RM 1.45 TRILLION
      HUTANG 2021 = RM 1.38 TRILLION
      HUTANG 2020 = RM 1.32 TRILLION
      HUTANG 2019 = RM 1.25 TRILLION
      HUTANG 2018 = RM 1.19 TRILLION
      The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023.
      In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018).
      “The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.

      Hapus
    4. FACT 2024 RASIO HUTANG 84,2% DARI GDP
      HUTANG 2023 = RM 1.53 TRILLION
      HUTANG 2022 = RM 1.45 TRILLION
      HUTANG 2021 = RM 1.38 TRILLION
      HUTANG 2020 = RM 1.32 TRILLION
      HUTANG 2019 = RM 1.25 TRILLION
      HUTANG 2018 = RM 1.19 TRILLION
      The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023.
      In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018).
      “The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
      -------------------------------------
      BUDGET 2025 = SALARIES AND ALLOWANCES
      BUDGET 2025 = NOT ASSETS
      BUDGET 2025 = NOT ASSETS
      BUDGET 2025 = NOT ASSETS
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
      -------------------------------------
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
      -------------------------------------
      THE MALONN ARMY HAS FACED SOME CHALLENGES, INCLUDING CORRUPTION AND ISSUES WITH MILITARY PERSONNEL:
      1. Corruption
      Malon's military has been involved in corruption, and the country's military doctrine doesn't recognize it as a threat. The Integrity Plan addresses corruption, but it's not a strategic document, and commanders don't receive training on corruption issues before deployments.
      2. Military personnel
      Some say that military personnel have struggles with thinking skills, decision-making, and problem-solving.
      3. Logistics
      Some say that Malon has had problems ensuring the readiness of the Malonn Armed Forces (MAF) in the face of threats
      -------------------------------------
      MALONN ARMED FORCES (MAF) FACES SEVERAL CHALLENGES WITH MAINTAINING ITS EQUIPMENT, INCLUDING:
      1. Budget
      The MAF has a limited budget, which affects the serviceability of its assets.
      2. Outsourcing
      The MAF has outsourced maintenance of its assets since the 1970s, but the outsourcing program has faced challenges such as undertrained staff, underperforming contractors, and lack of contract enforcement.
      3. Old inventory
      The Royal Malonn Navy (RMN) has a number of old ships in service, including the Kasturi-class Corvette, the Laksamana Corvette class, the Perdana-class gunboat, and the Handalan and Jerung class.
      4. Spare parts
      There are issues with delivering spare parts to soldiers on the ground at the right time
      -------------------------------------
      THE MALONN ARMY HAS FACED SOME CHALLENGES, INCLUDING CORRUPTION AND ISSUES WITH MILITARY PERSONNEL:
      1. Corruption
      Malon's military has been involved in corruption, and the country's military doctrine doesn't recognize it as a threat. The Integrity Plan addresses corruption, but it's not a strategic document, and commanders don't receive training on corruption issues before deployments.
      2. Military personnel
      Some say that military personnel have struggles with thinking skills, decision-making, and problem-solving.
      3. Logistics
      Some say that Malon has had problems ensuring the readiness of the Malonn Armed Forces (MAF) in the face of threats

      Hapus
    5. FACT GOVERNMENT ........
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
      Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
      Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
      ==============
      BUDGET 2025 FOR ......
      SALARIES AND OTHER STUFF
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.
      ==============
      BUDGET 2025 ......
      ASSET PROCUREMENT DOWN
      ASSET PROCUREMENT DOWN
      ASSET PROCUREMENT DOWN
      Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
      ==============
      Malonn has faced several crises, including political, financial, and economic crises:
      • Political crisis
      From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
      • Financial crisis
      Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
      • Economic crisis
      Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
      • Household debt crisis
      As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
      • Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....

      Hapus
    6. OLDEST SHIP 2024 – 1953 = 71 YEARS
      71 YEARS = OLDEST SHIP
      71 YEARS = OLDEST SHIP
      71 YEARS = OLDEST SHIP
      Launched 9 September 1953 Completed 9 September 1954 The ship was transferred to the Royal Malayan Navy on 1 April 1958, being renamed Sri Perlis. Following transfer, Sri Perlis' 40mm Bofors gun and minesweeping gear was removed and replaced by three 20 mm Oerlikon cannon
      -----
      HIBAH KAPAL 1967 = The post stated that among his achievements in the MMEA were that he was the team leader for a suitability study on absorbing the US Coast Guard cutter – USCG Decisive. Checks on the US Coast Guard website showed that Decisive– a Reliance class cutter – was laid in 1967 and commissioned in 1968
      -----
      HIBAH KAPAL 1968 = USCGC Steadfast (WMEC-623) was a United States Coast Guard medium endurance cutter in commission for 56 years. Commissioned in 1968, Steadfast was home ported in St. Petersburg, Florida for her first 24 years of service...
      -----
      HIBAH KAPAL 1980 = KM Perwira, one of the two Bay class patrol boats donated to MMEA by Australia. It is likely that the Bay class was the design proposed for the tri-nation VLPV project in the late 80s.
      -----
      PERBAIKAN DIBIAYAI JEPANG = Kapal patroli kedua yang disumbangkan oleh Jepang Coast Guard (JCG) untuk APMM/MMEA akan berlayar ke pulang pada akhir Mei, saat ini kapal dengan nama KM Arau ini sedang dalam tahap perbaikan akhir yang dilakukan di Jepang.
      -----
      KAPAL MCMV 1984 = Kapal penangkis periuk api Lerici class ini dibina oleh Syarikat Intermarine di Itali dan dilancarkan pada 30 Oktober 1984
      -----
      HIBAH KAPAL 1989 DAN 1991 = Jepang menghibahkan dua kapal kelas 90m masing-masing PL-01 Ojima dan PL-02 Erimo, kedua kapal ini masuk dinas di JCG pada tahun 1989 dan 1991.
      -----
      HIBAH KAPAL1990–1991 = KM Pekan is an Ojika-class offshore patrol vessel operated by the Malonn Coast Guard. This ship, together with KM Arau and KM Marlin was transferred from the Japan Coast Guard to Malon in order to strengthen the relations between the two countries. The ship was built as the Ojika for the Japanese Coast Guard in 1990–1991
      -----
      HIBAH KAPAL 1989 = KM Arau is an offshore patrol vessel operated by the Malonn Coast Guard. She was the second ship transferred from the Japan Coast Guard together with KM Pekan and KM Marlin. KM Arau was formerly kNOwn as Oki (PL-01) in the Japan Coast Guard.
      -----
      KAPAL BUATAN 1960 =
      BEKAS MARINE POLICE BEKAS MMEA = RMN informed us that they are getting a new boat – albeit a third hand one – courtesy of the MMEA. MMEA received from the Marine police back in 2011.
      -----
      KAPAL BEKAS BEKAS MMEA = RMN has taken delivery of ex-Sundang on October 23 after the patrol craft completed its refit. She is the first of two ex-MMEA PC
      -----
      171 ASSETS EXCEEDING 30 YEARS =
      108 TDM
      29 TUDM
      34 TLDM
      "The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
      ----
      SOME WEAKNESSES OF THE MALONNN SHIPBUILDING INDUSTRY INCLUDE:
      1. Delays
      Consistent delays in delivering ships to customers has reduced profitability and financial results.
      2. Small tonnage
      Malonnn shipbuilding industry is relatively weak compared to other countries in the region, as the tonnage of ships manufactured is relatively small.
      3. Supply chain disruptions
      Disruptions caused by COVID-19 and the Russia-Ukraine conflict have led to supply chain disruptions and shortages of skilled personnel.
      ----
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      ==============
      KEYWORDS =
      SIPRI LCS = DELIVERED : 0 (KONTRAK KOSONG) ......
      SAK 70 MK 3 - DELIVERED = 0
      MICA - DELIVERED = 0
      SHIP ENGINE - DELIVERED = 0
      FIRE CONTROL RADAR - DELIVERED = 0
      AIR CONTROL RADAR - DELIVERED = 0

      Hapus
    7. FACT :
      1. 1 UNIT APACHE = 13 UNIT MD530G
      2. 1 UNIT RAFALE = 4 UNIT FA50M
      3. 1 UNIT PPA = 3 UNIT LMS B2
      4. 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. SEWA 28 HELI = 119 HELI BARU
      7. 4.5 KM JAVELIN = 1 KM NLAW
      8. ANKA ISR NOT ARMED
      =========
      KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
      -
      1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
      -
      2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      =========
      KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
      -
      1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
      -
      2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
      =========
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      Apache AH-64E contract for Indonesia for $1.42 BILLION
      -
      The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      =========
      KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
      -
      PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
      -
      LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      =========
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      =========
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
      =========
      ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
      =========
      BUDGET 2025 FOR ......
      SALARIES AND OTHER STUFF
      NOT ASSETS
      NOT ASSETS
      NOT ASSETS
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.
      ==============
      BUDGET 2025 ......
      ASSET PROCUREMENT DOWN
      ASSET PROCUREMENT DOWN
      ASSET PROCUREMENT DOWN
      Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR

      Hapus
    8. FACT :
      1. HUTANG 84.2% DARI GDP
      1. HUTANG 84.2% DARI GDP
      2. HUTANG NEGARA RM 1.5 TRLLIUN
      3. HUTANG 1MDB RM 18.2 BILLION
      4. TUNGGAKAN SEWA SABAH USD 15 BILLION
      5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
      6. SEWA SIMULATOR MKM
      7. PESAWAT MIG GROUNDED
      8. SEWA MOTOR POLIS
      9. PESAWAT MB339CM GROUNDED
      10. NURI GROUNDED SEWA BLACKHAWK
      11. FIVE PROCUREMENT CANCELLED
      12. 48 PESAWAT SKYHAWK HILANG
      13. MESIN JET 2 BUAH HILANG
      14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
      15. NO LST
      16. NO LPD – NGEMIS LPD USA
      17. NO TANKER
      18. NO KCR
      19. MONUMEN MIG29M UNTUK JIMAT KOS
      20. NO SPH
      21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
      22. NO HELLFIRE
      23. NO MPA ATR72 DELAYED
      24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
      25. NO HELI HEAVY ATTACK NGEMIS AH1Z
      26. NO M3 AMPHIBIUS RIG
      27. LCS MANGKRAK KARATAN
      28. OPV MANGKRAK
      29. TANK MOGOK STOP SPARE PARTS
      30. CN 235 MSA VERSI MSI USA
      31. SEWA MOTOR MILITARY POLICE
      32. RADAR GIFTED PAID USA
      33. 84% NO SAVING EVERY MONTH
      34. SEWA VSHORAD
      35. SEWA TRUK 3 TON
      36. 4X4 SEWA 6X6 CANCELLED
      37. C130H DIGANTI 2045
      38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
      39. NO DRONE UCAV – ANKA ISR OMPONG
      40. SEWA BLACKHAWK SEWA AW159
      41. NO TRACKED SPH
      42. SEWA SIMULATOR HELI
      43. SPH CANCELLED
      44. SCORPION V150 CONDOR SIMBAS RETIRED
      45. NO PESAWAT COIN
      46. PILATUS MK II KARATAN
      47. PENCEROBOHAN 43X BTA 316 HARI
      48. SEWA AW139 SEWA COLIBRI
      49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
      50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
      51. LYNX GROUNDED
      52. MRCA CANCELLED SEWA PESAWAT ITTC
      53. MICA CANCELLED NSM CANCELLED
      54. NO LRAD NO MRAD JUST SHORAD
      55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
      56. 4X NGEMIS F18 KUWAIT
      57. MENUNGGU 2050 KAPAL SELAM
      58. NO TANK AMPHIBI AV8 MOGOK BERASAP
      59. 84% NO SAVING EVERY MONTH
      60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
      61. TUDM SEWA 12 AW149
      62. TUDM SEWA 4 AW139
      63. TUDM SEWA 5 EC120B
      64. TLDM SEWA 2 AW159
      65. TDM SEWA 4 UH-60A
      67. TDM SEWA 12 AW149
      68. BOMBA SEWA 4 AW139
      69. MMEA SEWA 2 AW159
      70. POLIS SEWA 7 BELL429
      ==============
      Malonn's military assets face a number of maintenance problems, including outdated equipment, a lack of funds, and corruption. These problems can make it difficult for the military to respond to threats and protect the country's interests.
      Outdated equipment :
      • 1. Many of Malonn's military assets are outdated and have exceeded their intended service life.
      • 2. The air force's MiG-29 Fulcrum fighter aircraft were withdrawn from service in 2017.
      • 3. The KD Rahman submarine had technical problems that prevented it from submerging in 2010.
      Lack of funds :
      • 1. Malonn's military has faced a shortage of funds for many years.
      • 2. The government has been unable to provide the military with the modern assets it needs.
      3. Corruption
      • Political interference and corruption have undermined the military's combat readiness.
      • 4. The military has experienced leakages and scandals in its defense spending.
      • 5. The military has difficulty verifying that contractual obligations have been met.
      • 6. The military has difficulty transferring technology from OEMs.
      • 7. The military has difficulty procuring parts that are compatible with its existing fleet
      ==========
      Malon's combat equipment has several weaknesses, including:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness

      Hapus
    9. SEWA VSHORAD SEWA TRUK
      The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals.
      SEWA BOAT sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
      SEWA HIDROGRAFI tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak sewaan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
      SEWA PATROL BOATS : SEWA OUTBOARD MOTORS : SEWA TRAILERS
      Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment
      SEWA MOTOR The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022.
      SEWA PESAWAT ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
      SEWA HELI Kementerian Pertahanan Malon pada 27 Mei 2023 lalu telah menandatangani perjanjian sewa dengan penyedia layanan penerbangan lokal, Aerotree, untuk menyediakan empat helikopter bekas Sikorsky UH-60A+ Black Hawk.
      SEWA HELI 4 buah Helikopter Leonardo AW 139 yang diperolehi secara sewaan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di No.3 Skuadron, Pangkalan Udara Butterworth
      SEWA HELI = Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
      SEWA 4x4 Pejabat perusahaan mengatakan kepada Janes di pameran bahwa Angkatan Bersenjata Malon sedang mencari untuk menyewa Tarantula
      =========
      RETIRED MIG29 Malon recently retired the MiG-29 Fulcrum due to its inability to maintain them.
      RETIRED MB339CM the Aermacchi MB-339CM trainer jets that are currently grounded
      RETIRED SCORPION Scorpions to be retired. The Army has recommended that it’s fleet of Scorpion light tanks be retired due to the high cost of maintenance and obsolescence issues.
      RETIRED CONDOR SIBMAS Condor armoured 4X4 and Sibmas armoured recovery vehicle as retired from service as off January 1, 2023.
      RETIRED V150 = . It was used by the Malonn Army in Second Malayan Emergency (now retired)
      ==========
      171 ASET USANG 30 TAHUN =
      108 TDM
      29 TUDM
      34 TLDM
      "The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
      ==========
      Malon's combat equipment has several weaknesses, including:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness

      Hapus
    10. Malonn's military assets face a number of maintenance problems, including outdated equipment, a lack of funds, and corruption. These problems can make it difficult for the military to respond to threats and protect the country's interests.
      Outdated equipment :
      • Many of Malonn's military assets are outdated and have exceeded their intended service life.
      • The air force's MiG-29 Fulcrum fighter aircraft were withdrawn from service in 2017.
      • The KD Rahman submarine had technical problems that prevented it from submerging in 2010.
      Lack of funds :
      • Malonn's military has faced a shortage of funds for many years.
      • The government has been unable to provide the military with the modern assets it needs.
      • Corruption Political interference and corruption have undermined the military's combat readiness.
      • The military has experienced leakages and scandals in its defense spending.
      • The military has difficulty verifying that contractual obligations have been met.
      • The military has difficulty transferring technology from OEMs.
      The military has difficulty procuring parts that are compatible with its existing fleet
      ==============

      The Malonnn Armed Forces (MAF) faces a number of challenges, including:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
      ==============
      The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
      Funding
      • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
      • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      Aging equipment
      • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
      • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
      • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
      Other challenges
      • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.
      • Disaster response: The MAF is responsible for disaster response.
      • National unity: The MAF is responsible for promoting national unity.

      Hapus
    11. Malonn's military assets face a number of maintenance problems, including outdated equipment, a lack of funds, and corruption. These problems can make it difficult for the military to respond to threats and protect the country's interests.
      Outdated equipment :
      • Many of Malonn's military assets are outdated and have exceeded their intended service life.
      • The air force's MiG-29 Fulcrum fighter aircraft were withdrawn from service in 2017.
      • The KD Rahman submarine had technical problems that prevented it from submerging in 2010.
      Lack of funds :
      • Malonn's military has faced a shortage of funds for many years.
      • The government has been unable to provide the military with the modern assets it needs.
      • Corruption Political interference and corruption have undermined the military's combat readiness.
      • The military has experienced leakages and scandals in its defense spending.
      • The military has difficulty verifying that contractual obligations have been met.
      • The military has difficulty transferring technology from OEMs.
      The military has difficulty procuring parts that are compatible with its existing fleet
      ===============
      Malon's combat equipment has several weaknesses, including:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness.
      ==============
      The Malonnn Armed Forces (MAF) faces a number of challenges, including:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
    12. Kasihan akibat Malas yah srpi berita bermutu beruk ngamuk tiap hari bikin lawak di DS.

      Hapus
    13. Malon ape yg bisa di perbuat.
      Ape yg mau di jual..punya produk strategis jg tak punye..Ooo..jual Kondom unimex..🤣😜😝😛🤭😭😂

      Hapus
  4. SEWA VSHORAD SEWA TRUK
    The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals.
    SEWA BOAT sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    SEWA HIDROGRAFI tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak sewaan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    SEWA PATROL BOATS : SEWA OUTBOARD MOTORS : SEWA TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment
    SEWA MOTOR The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022.
    SEWA PESAWAT ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    SEWA HELI Kementerian Pertahanan Malon pada 27 Mei 2023 lalu telah menandatangani perjanjian sewa dengan penyedia layanan penerbangan lokal, Aerotree, untuk menyediakan empat helikopter bekas Sikorsky UH-60A+ Black Hawk.
    SEWA HELI 4 buah Helikopter Leonardo AW 139 yang diperolehi secara sewaan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di No.3 Skuadron, Pangkalan Udara Butterworth
    SEWA HELI = Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    SEWA 4x4 Pejabat perusahaan mengatakan kepada Janes di pameran bahwa Angkatan Bersenjata Malon sedang mencari untuk menyewa Tarantula
    =========
    RETIRED MIG29 Malon recently retired the MiG-29 Fulcrum due to its inability to maintain them.
    RETIRED MB339CM the Aermacchi MB-339CM trainer jets that are currently grounded
    RETIRED SCORPION Scorpions to be retired. The Army has recommended that it’s fleet of Scorpion light tanks be retired due to the high cost of maintenance and obsolescence issues.
    RETIRED CONDOR SIBMAS Condor armoured 4X4 and Sibmas armoured recovery vehicle as retired from service as off January 1, 2023.
    RETIRED V150 = . It was used by the Malonn Army in Second Malayan Emergency (now retired)
    ==========
    171 ASET USANG 30 TAHUN =
    108 TDM
    29 TUDM
    34 TLDM
    "The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
    ==========
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness

    BalasHapus
  5. RUGI.... GAJI pekerja saja tak dibayar... 🤣🤣🤣

    Ratusan Buruh PTDI Demo di Lingkungan Kerja, Tuntut Hak Gaji dan THR

    https://www.liputan6.com/regional/read/5565548/ratusan-buruh-ptdi-demo-di-lingkungan-kerja-tuntut-hak-gaji-dan-thr

    BalasHapus
    Balasan
    1. Malonn's military assets face a number of maintenance problems, including outdated equipment, a lack of funds, and corruption. These problems can make it difficult for the military to respond to threats and protect the country's interests.
      Outdated equipment :
      • Many of Malonn's military assets are outdated and have exceeded their intended service life.
      • The air force's MiG-29 Fulcrum fighter aircraft were withdrawn from service in 2017.
      • The KD Rahman submarine had technical problems that prevented it from submerging in 2010.
      Lack of funds :
      • Malonn's military has faced a shortage of funds for many years.
      • The government has been unable to provide the military with the modern assets it needs.
      • Corruption Political interference and corruption have undermined the military's combat readiness.
      • The military has experienced leakages and scandals in its defense spending.
      • The military has difficulty verifying that contractual obligations have been met.
      • The military has difficulty transferring technology from OEMs.
      The military has difficulty procuring parts that are compatible with its existing fleet
      ===============
      Malon's combat equipment has several weaknesses, including:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness.
      ==============
      The Malonnn Armed Forces (MAF) faces a number of challenges, including:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
    2. Cerite zaman dulu wkwkwk..berakhir dgn kedengkian si malonwkwkwk🤣🤣🤣

      Hapus
  6. RUGI.... GAJI pekerja saja tak dibayar... 🤣🤣🤣

    Ratusan Buruh PTDI Demo di Lingkungan Kerja, Tuntut Hak Gaji dan THR

    https://www.liputan6.com/regional/read/5565548/ratusan-buruh-ptdi-demo-di-lingkungan-kerja-tuntut-hak-gaji-dan-thr

    BalasHapus
    Balasan
    1. Malonn's military assets face a number of maintenance problems, including outdated equipment, a lack of funds, and corruption. These problems can make it difficult for the military to respond to threats and protect the country's interests.
      Outdated equipment :
      • Many of Malonn's military assets are outdated and have exceeded their intended service life.
      • The air force's MiG-29 Fulcrum fighter aircraft were withdrawn from service in 2017.
      • The KD Rahman submarine had technical problems that prevented it from submerging in 2010.
      Lack of funds :
      • Malonn's military has faced a shortage of funds for many years.
      • The government has been unable to provide the military with the modern assets it needs.
      • Corruption Political interference and corruption have undermined the military's combat readiness.
      • The military has experienced leakages and scandals in its defense spending.
      • The military has difficulty verifying that contractual obligations have been met.
      • The military has difficulty transferring technology from OEMs.
      The military has difficulty procuring parts that are compatible with its existing fleet
      ==============

      The Malonnn Armed Forces (MAF) faces a number of challenges, including:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
      ==============
      The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
      Funding
      • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
      • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      Aging equipment
      • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
      • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
      • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
      Other challenges
      • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.
      • Disaster response: The MAF is responsible for disaster response.
      • National unity: The MAF is responsible for promoting national unity.

      Hapus
    2. The Malonnn Armed Forces (MAF) faces a number of challenges, including:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
      -------------------------------------
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
      -------------------------------------
      DOWNGRADE HISAR
      CHEAPEST VARIANT LMS
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
      -------------------------------------
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      -
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
      -------------------------------------
      DOWNGRADE ANKA
      DOWNGRADE ANKA
      2023 ANKA OMPONG = WILL NOT ARMED
      Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.

      Hapus
    3. The Malonn Armed Forces (MAF) faces a number of challenges, including:
      • Outdated equipment
      Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern assets. For example, the KD Rahman submarine was unable to submerge due to technical issues in 2010.
      • Misappropriation of funds
      There have been multiple instances of public funds being misappropriated under the guise of meeting defense needs.
      • Army-centric mindset
      Malon has an army-centric mindset, even though the country is surrounded by water.
      • Double budgetary allocation
      The army receives more of the budget than the other services.
      • Lack of standard operating procedures
      There are issues with standard operating procedures, from the e-procurement process to inventory receipts.
      • Tension between public and military
      There is tension between the public's right to know and the military's "need-to-know" policies
      -------------------------------------
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
      -------------------------------------
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      -------------------------------------
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      CHEAPEST VARIANT LMS
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
      -------------------------------------
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      -
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
      -------------------------------------
      DOWNGRADE ANKA
      DOWNGRADE ANKA
      2023 ANKA OMPONG = WILL NOT ARMED
      Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.

      Hapus
    4. DEBT 2024 = RATIO 84.2% OF GDP
      DEBT 2023 = RM 1.53 TRILLION
      DEBT 2022 = RM 1.45 TRILLION
      DEBT 2021 = RM 1.38 TRILLION
      DEBT 2020 = RM 1.32 TRILLION
      DEBT 2019 = RM 1.25 TRILLION
      DEBT 2018 = RM 1.19 TRILLION
      The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023.
      In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018).
      “The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
      -------------------------------------
      US DEPARTEMENT OF JUSTICE =
      1. ONE OF THE WORLD'S GREATEST FINANCIAL SCANDALS
      2. LARGEST KLEPTOCRACY CASE TO DATE
      Although it began in Malon, the scandal's global scope implicated institutions and individuals in politics, banking, and entertainment, and led to criminal investigations in a number of nations. The 1MDB scandal has been described as "one of the world's greatest financial scandals" and declared by the United States Department of Justice as the "largest kleptocracy case to date"
      -
      DEBT TRAP BRI PROJECTS = MANGKRAK
      DEBT TRAP BRI PROJECTS = MANGKRAK
      DEBT TRAP BRI PROJECTS = MANGKRAK
      Malonn has several Chinese Belt and Road Initiative projects under construction, including the East Coast Rail Line, Kuantan Port Expansion, Green Technology Park in Pahang, Forest City, Robotic Future City, and Samalaju Industrial Park Steel Complex
      -
      SCANDALS = NOw and then, by exception, scandals spill out into the public domain, like Bumiputera Malon Finance 1982, Bank Negara’s FX losses in the 1980s and 1990s, the Scorpene submarines of 2002, the National Feedlot scandal – “cowgate” – of 2012, 1MDB, and the latest LCS naval procurement. But these are just the tip of the iceberg of systematic pilferage. It has become the institutional NOrm.
      ==============
      MALONN ARMED FORCES (MAF) FACES SEVERAL CHALLENGES WITH MAINTAINING ITS EQUIPMENT, INCLUDING:
      1. Budget
      The MAF has a limited budget, which affects the serviceability of its assets.
      2. Outsourcing
      The MAF has outsourced maintenance of its assets since the 1970s, but the outsourcing program has faced challenges such as undertrained staff, underperforming contractors, and lack of contract enforcement.
      3. Old inventory
      The Royal Malonn Navy (RMN) has a number of old ships in service, including the Kasturi-class Corvette, the Laksamana Corvette class, the Perdana-class gunboat, and the Handalan and Jerung class.
      4. Spare parts
      There are issues with delivering spare parts to soldiers on the ground at the right time
      -------------------------------------
      THE MALONN ARMY HAS FACED SOME CHALLENGES, INCLUDING CORRUPTION AND ISSUES WITH MILITARY PERSONNEL:
      1. Corruption
      Malon's military has been involved in corruption, and the country's military doctrine doesn't recognize it as a threat. The Integrity Plan addresses corruption, but it's not a strategic document, and commanders don't receive training on corruption issues before deployments.
      2. Military personnel
      Some say that military personnel have struggles with thinking skills, decision-making, and problem-solving.
      3. Logistics
      Some say that Malon has had problems ensuring the readiness of the Malonn Armed Forces (MAF) in the face of threats
      -------------------------------------
      KEYWORD =
      DEBT TRAP BRI PROJECTS = MANGKRAK
      ONE OF THE WORLD'S GREATEST FINANCIAL SCANDALS
      LARGEST KLEPTOCRACY CASE TO DATE

      Hapus
    5. Dengki la..link zaman dulu🤣😂😭

      Hapus
  7. Parah..... 🤣🤣🤣

    Liputan6.com, Bandung - Buruh di PT Dirgantara Indonesia (PTDI) menuntut pembayaran gaji dan tunjangan hari raya (THR) yang diaku belum dibayar penuh oleh perusahaan. Ratusan buruh perusahaan yang terletak di Kota Bandung itu dikabarkan sempat menggelar demo di lingkungan kerja, Rabu (3/4/2024).

    BalasHapus
    Balasan
    1. SEWA VSHORAD SEWA TRUK
      The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals.
      SEWA BOAT sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
      SEWA HIDROGRAFI tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak sewaan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
      SEWA PATROL BOATS : SEWA OUTBOARD MOTORS : SEWA TRAILERS
      Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment
      SEWA MOTOR The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022.
      SEWA PESAWAT ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
      SEWA HELI Kementerian Pertahanan Malon pada 27 Mei 2023 lalu telah menandatangani perjanjian sewa dengan penyedia layanan penerbangan lokal, Aerotree, untuk menyediakan empat helikopter bekas Sikorsky UH-60A+ Black Hawk.
      SEWA HELI 4 buah Helikopter Leonardo AW 139 yang diperolehi secara sewaan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di No.3 Skuadron, Pangkalan Udara Butterworth
      SEWA HELI = Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
      SEWA 4x4 Pejabat perusahaan mengatakan kepada Janes di pameran bahwa Angkatan Bersenjata Malon sedang mencari untuk menyewa Tarantula
      =========
      RETIRED MIG29 Malon recently retired the MiG-29 Fulcrum due to its inability to maintain them.
      RETIRED MB339CM the Aermacchi MB-339CM trainer jets that are currently grounded
      RETIRED SCORPION Scorpions to be retired. The Army has recommended that it’s fleet of Scorpion light tanks be retired due to the high cost of maintenance and obsolescence issues.
      RETIRED CONDOR SIBMAS Condor armoured 4X4 and Sibmas armoured recovery vehicle as retired from service as off January 1, 2023.
      RETIRED V150 = . It was used by the Malonn Army in Second Malayan Emergency (now retired)
      ==========
      171 ASET USANG 30 TAHUN =
      108 TDM
      29 TUDM
      34 TLDM
      "The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
      ==========
      Malon's combat equipment has several weaknesses, including:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness

      Hapus
    2. 171 ASET USANG 30 TAHUN =
      108 TDM
      29 TUDM
      34 TLDM
      "The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister.
      ----
      PANTAS 2025 SEWA ................
      ARMY ASSET RM 980 MILLION = USD 217 MILLION
      RMN ASSET RM 2,1 BILLION = USD 466 MILLION
      RMAF ASSET RM 2,2 BILLION = USD 488 MILLION
      From the DE, the Army will be getting RM1.197 billion, of which RM218 million is for construction of new facilities and RM980 million is for assets. RMN is getting RM2.25 billion, RM150 million (facilities) and RM2.1 billion, assets. RM2.3 billion is for RMAF, RM65 million for facilities and RM2.2 billion for assets. For the three services, RM663 million is allocated.
      ==================
      ==================
      1. real contract and delivery five units C130J Hercules
      2. real contract and delivery two unit Frankethal class Countermine vessels (Pulau Fani class)
      3. real contract and delivery four units KCR 60 Fast missiles boats PT PAL
      4. real contract and delivery 9 units Bell 412 EPI
      5. real contract and delivery 8 additional H225 M
      6. real contract and delivery 2 units Bell 429 Global Ranger
      7. real contract and delivery 18 Medium weight tank Harimau
      8. real contract and delivery 22 Pandur II IFV
      9. real contract and delivery two unit Hospital Ships
      10. real contract and delivery one unit Command and control variant C295
      11. real contract and delivery one unit CN235 MPA
      12. real contract and delivery 7 Badak FSV, 26 ANOa apc and 10 additional Komodo recce vehicles in 2022
      13. real contract and delivery 4 AS 550 Fennec and 8 AS565 MBE, in 2024
      14. real contract and delivery five NC212i in 2023
      15. real contract and delivery one Leonardo RAT 31 DL/M
      16. real contract and delivery five C130H ordered from Australia in 2013 (finished in 2020) after received Grant of 4 C130H
      17. real contract and delivery 9 Teluk Bintuni class LST
      18. real contract and delivery six CH4B UCAV ordered in 2019
      19. real contract t and process building of Abeking & Rasmussen design ocean Hydrography ship
      20. real contract and process building two AH140 AAW Frigate
      21. real contract and process building two OPV 90 ASW patrol vessels
      22. real contract and process building 42 Dassault Rafale F4 fighter
      23. real contract and process building two A400M heavy cargo aircraft
      24. real contract and delivery M3 Amphibious bridging system
      25. real contract and delivery 3 KT1 Wong Bee ordered in 2018 along with radar and spares for T/A50
      26. real contract and process building 13 GM 403 GCI radar from Thales
      27. real contract and process building 12 ANKA S UCAV
      28. real contract and process building additional CH4B UCAV
      29. real contract and delivery Slingshot Satcom system
      30. real contract and delivery Falcon 8X aircraft
      31. real contract and process Thales Alenia earth observation satelite
      32. real contract and process 22 S70M Blackhawk
      33. real contract and process 6 N219 aircraft
      34. real contract and process 3 CN235 for Army
      35. real contract and process 2 PPA patrol Frigate
      36. real contract and process 2 Scorpene Subs
      37. real contract and process Khan Short Range ballistic missiles from Turki
      38. real contract and process Trisula Air defense system
      39. real contract and process 6 T50i aircraft
      40. real contract and delivery Oiler and replenishment ship
      41. real contract and delivery several Tug Harbor ships
      42. real contract and process Submarine rescue vessels and system
      43. real contract and delivery two Large LCU for army
      44. real contract and process 45 Atmaca

      Hapus
    3. PANTAS 2025 SEWA ................
      ARMY ASSET RM 980 MILLION = USD 217 MILLION
      RMN ASSET RM 2,1 BILLION = USD 466 MILLION
      RMAF ASSET RM 2,2 BILLION = USD 488 MILLION
      From the DE, the Army will be getting RM1.197 billion, of which RM218 million is for construction of new facilities and RM980 million is for assets. RMN is getting RM2.25 billion, RM150 million (facilities) and RM2.1 billion, assets. RM2.3 billion is for RMAF, RM65 million for facilities and RM2.2 billion for assets. For the three services, RM663 million is allocated.
      ------
      2024 RASIO HUTANG 84,2% DARI GDP
      HUTANG 2023 = RM 1.53 TRILLION
      HUTANG 2022 = RM 1.45 TRILLION
      HUTANG 2021 = RM 1.38 TRILLION
      HUTANG 2020 = RM 1.32 TRILLION
      HUTANG 2019 = RM 1.25 TRILLION
      HUTANG 2018 = RM 1.19 TRILLION
      The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023. In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018). “The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
      ==================
      ==================
      1. real contract and delivery five units C130J Hercules
      2. real contract and delivery two unit Frankethal class Countermine vessels (Pulau Fani class)
      3. real contract and delivery four units KCR 60 Fast missiles boats PT PAL
      4. real contract and delivery 9 units Bell 412 EPI
      5. real contract and delivery 8 additional H225 M
      6. real contract and delivery 2 units Bell 429 Global Ranger
      7. real contract and delivery 18 Medium weight tank Harimau
      8. real contract and delivery 22 Pandur II IFV
      9. real contract and delivery two unit Hospital Ships
      10. real contract and delivery one unit Command and control variant C295
      11. real contract and delivery one unit CN235 MPA
      12. real contract and delivery 7 Badak FSV, 26 ANOa apc and 10 additional Komodo recce vehicles in 2022
      13. real contract and delivery 4 AS 550 Fennec and 8 AS565 MBE, in 2024
      14. real contract and delivery five NC212i in 2023
      15. real contract and delivery one Leonardo RAT 31 DL/M
      16. real contract and delivery five C130H ordered from Australia in 2013 (finished in 2020) after received Grant of 4 C130H
      17. real contract and delivery 9 Teluk Bintuni class LST
      18. real contract and delivery six CH4B UCAV ordered in 2019
      19. real contract t and process building of Abeking & Rasmussen design ocean Hydrography ship
      20. real contract and process building two AH140 AAW Frigate
      21. real contract and process building two OPV 90 ASW patrol vessels
      22. real contract and process building 42 Dassault Rafale F4 fighter
      23. real contract and process building two A400M heavy cargo aircraft
      24. real contract and delivery M3 Amphibious bridging system
      25. real contract and delivery 3 KT1 Wong Bee ordered in 2018 along with radar and spares for T/A50
      26. real contract and process building 13 GM 403 GCI radar from Thales
      27. real contract and process building 12 ANKA S UCAV
      28. real contract and process building additional CH4B UCAV
      29. real contract and delivery Slingshot Satcom system
      30. real contract and delivery Falcon 8X aircraft
      31. real contract and process Thales Alenia earth observation satelite
      32. real contract and process 22 S70M Blackhawk
      33. real contract and process 6 N219 aircraft
      34. real contract and process 3 CN235 for Army
      35. real contract and process 2 PPA patrol Frigate
      36. real contract and process 2 Scorpene Subs
      37. real contract and process Khan Short Range ballistic missiles from Turki
      38. real contract and process Trisula Air defense system
      39. real contract and process 6 T50i aircraft
      40. real contract and delivery Oiler and replenishment ship
      41. real contract and delivery several Tug Harbor ships
      42. real contract and process Submarine rescue vessels and system
      43. real contract and delivery two Large LCU for army
      44. real contract and process 45 Atmaca

      Hapus
    4. Malonn has faced several crises, including political, financial, and economic crises:
      • Political crisis
      From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
      • Financial crisis
      Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
      • Economic crisis
      Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
      • Household debt crisis
      As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
      Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
      -------------------------------------
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
      -------------------------------------
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      -------------------------------------
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      CHEAPEST VARIANT LMS
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
      -------------------------------------
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      -
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
      -------------------------------------
      DOWNGRADE ANKA
      DOWNGRADE ANKA
      2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance

      equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance

      Hapus
  8. Parah..... 🤣🤣🤣

    Liputan6.com, Bandung - Buruh di PT Dirgantara Indonesia (PTDI) menuntut pembayaran gaji dan tunjangan hari raya (THR) yang diaku belum dibayar penuh oleh perusahaan. Ratusan buruh perusahaan yang terletak di Kota Bandung itu dikabarkan sempat menggelar demo di lingkungan kerja, Rabu (3/4/2024).

    BalasHapus
    Balasan
    1. FACT :
      1. HUTANG 84.2% DARI GDP
      1. HUTANG 84.2% DARI GDP
      2. HUTANG NEGARA RM 1.5 TRLLIUN
      3. HUTANG 1MDB RM 18.2 BILLION
      4. TUNGGAKAN SEWA SABAH USD 15 BILLION
      5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
      6. SEWA SIMULATOR MKM
      7. PESAWAT MIG GROUNDED
      8. SEWA MOTOR POLIS
      9. PESAWAT MB339CM GROUNDED
      10. NURI GROUNDED SEWA BLACKHAWK
      11. FIVE PROCUREMENT CANCELLED
      12. 48 PESAWAT SKYHAWK HILANG
      13. MESIN JET 2 BUAH HILANG
      14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
      15. NO LST
      16. NO LPD – NGEMIS LPD USA
      17. NO TANKER
      18. NO KCR
      19. MONUMEN MIG29M UNTUK JIMAT KOS
      20. NO SPH
      21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
      22. NO HELLFIRE
      23. NO MPA ATR72 DELAYED
      24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
      25. NO HELI HEAVY ATTACK NGEMIS AH1Z
      26. NO M3 AMPHIBIUS RIG
      27. LCS MANGKRAK KARATAN
      28. OPV MANGKRAK
      29. TANK MOGOK STOP SPARE PARTS
      30. CN 235 MSA VERSI MSI USA
      31. SEWA MOTOR MILITARY POLICE
      32. RADAR GIFTED PAID USA
      33. 84% NO SAVING EVERY MONTH
      34. SEWA VSHORAD
      35. SEWA TRUK 3 TON
      36. 4X4 SEWA 6X6 CANCELLED
      37. C130H DIGANTI 2045
      38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
      39. NO DRONE UCAV – ANKA ISR OMPONG
      40. SEWA BLACKHAWK SEWA AW159
      41. NO TRACKED SPH
      42. SEWA SIMULATOR HELI
      43. SPH CANCELLED
      44. SCORPION V150 CONDOR SIMBAS RETIRED
      45. NO PESAWAT COIN
      46. PILATUS MK II KARATAN
      47. PENCEROBOHAN 43X BTA 316 HARI
      48. SEWA AW139 SEWA COLIBRI
      49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
      50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
      51. LYNX GROUNDED
      52. MRCA CANCELLED SEWA PESAWAT ITTC
      53. MICA CANCELLED NSM CANCELLED
      54. NO LRAD NO MRAD JUST SHORAD
      55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
      56. 4X NGEMIS F18 KUWAIT
      57. MENUNGGU 2050 KAPAL SELAM
      58. NO TANK AMPHIBI AV8 MOGOK BERASAP
      59. 84% NO SAVING EVERY MONTH
      60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
      61. TUDM SEWA 12 AW149
      62. TUDM SEWA 4 AW139
      63. TUDM SEWA 5 EC120B
      64. TLDM SEWA 2 AW159
      65. TDM SEWA 4 UH-60A
      67. TDM SEWA 12 AW149
      68. BOMBA SEWA 4 AW139
      69. MMEA SEWA 2 AW159
      70. POLIS SEWA 7 BELL429
      ==============
      Malonn's military assets face a number of maintenance problems, including outdated equipment, a lack of funds, and corruption. These problems can make it difficult for the military to respond to threats and protect the country's interests.
      Outdated equipment :
      • 1. Many of Malonn's military assets are outdated and have exceeded their intended service life.
      • 2. The air force's MiG-29 Fulcrum fighter aircraft were withdrawn from service in 2017.
      • 3. The KD Rahman submarine had technical problems that prevented it from submerging in 2010.
      Lack of funds :
      • 1. Malonn's military has faced a shortage of funds for many years.
      • 2. The government has been unable to provide the military with the modern assets it needs.
      3. Corruption
      • Political interference and corruption have undermined the military's combat readiness.
      • 4. The military has experienced leakages and scandals in its defense spending.
      • 5. The military has difficulty verifying that contractual obligations have been met.
      • 6. The military has difficulty transferring technology from OEMs.
      • 7. The military has difficulty procuring parts that are compatible with its existing fleet
      ==========
      Malon's combat equipment has several weaknesses, including:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness

      Hapus
    2. Malonn's military assets face a number of maintenance problems, including outdated equipment, a lack of funds, and corruption. These problems can make it difficult for the military to respond to threats and protect the country's interests.
      Outdated equipment :
      • Many of Malonn's military assets are outdated and have exceeded their intended service life.
      • The air force's MiG-29 Fulcrum fighter aircraft were withdrawn from service in 2017.
      • The KD Rahman submarine had technical problems that prevented it from submerging in 2010.
      Lack of funds :
      • Malonn's military has faced a shortage of funds for many years.
      • The government has been unable to provide the military with the modern assets it needs.
      • Corruption Political interference and corruption have undermined the military's combat readiness.
      • The military has experienced leakages and scandals in its defense spending.
      • The military has difficulty verifying that contractual obligations have been met.
      • The military has difficulty transferring technology from OEMs.
      The military has difficulty procuring parts that are compatible with its existing fleet
      ==============
      The Malonnn Armed Forces (MAF) faces a number of challenges, including:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
      ==============
      Malon's combat equipment has several weaknesses, including:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness.

      Hapus
    3. 171 ASET USANG 30 TAHUN =
      108 TDM
      29 TUDM
      34 TLDM
      "The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister.
      ------
      Malon's combat equipment has several weaknesses, including:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness
      ==================
      ==================
      1. real contract and delivery five units C130J Hercules
      2. real contract and delivery two unit Frankethal class Countermine vessels (Pulau Fani class)
      3. real contract and delivery four units KCR 60 Fast missiles boats PT PAL
      4. real contract and delivery 9 units Bell 412 EPI
      5. real contract and delivery 8 additional H225 M
      6. real contract and delivery 2 units Bell 429 Global Ranger
      7. real contract and delivery 18 Medium weight tank Harimau
      8. real contract and delivery 22 Pandur II IFV
      9. real contract and delivery two unit Hospital Ships
      10. real contract and delivery one unit Command and control variant C295
      11. real contract and delivery one unit CN235 MPA
      12. real contract and delivery 7 Badak FSV, 26 ANOa apc and 10 additional Komodo recce vehicles in 2022
      13. real contract and delivery 4 AS 550 Fennec and 8 AS565 MBE, in 2024
      14. real contract and delivery five NC212i in 2023
      15. real contract and delivery one Leonardo RAT 31 DL/M
      16. real contract and delivery five C130H ordered from Australia in 2013 (finished in 2020) after received Grant of 4 C130H
      17. real contract and delivery 9 Teluk Bintuni class LST
      18. real contract and delivery six CH4B UCAV ordered in 2019
      19. real contract t and process building of Abeking & Rasmussen design ocean Hydrography ship
      20. real contract and process building two AH140 AAW Frigate
      21. real contract and process building two OPV 90 ASW patrol vessels
      22. real contract and process building 42 Dassault Rafale F4 fighter
      23. real contract and process building two A400M heavy cargo aircraft
      24. real contract and delivery M3 Amphibious bridging system
      25. real contract and delivery 3 KT1 Wong Bee ordered in 2018 along with radar and spares for T/A50
      26. real contract and process building 13 GM 403 GCI radar from Thales
      27. real contract and process building 12 ANKA S UCAV
      28. real contract and process building additional CH4B UCAV
      29. real contract and delivery Slingshot Satcom system
      30. real contract and delivery Falcon 8X aircraft
      31. real contract and process Thales Alenia earth observation satelite
      32. real contract and process 22 S70M Blackhawk
      33. real contract and process 6 N219 aircraft
      34. real contract and process 3 CN235 for Army
      35. real contract and process 2 PPA patrol Frigate
      36. real contract and process 2 Scorpene Subs
      37. real contract and process Khan Short Range ballistic missiles from Turki
      38. real contract and process Trisula Air defense system
      39. real contract and process 6 T50i aircraft
      40. real contract and delivery Oiler and replenishment ship
      41. real contract and delivery several Tug Harbor ships
      42. real contract and process Submarine rescue vessels and system
      43. real contract and delivery two Large LCU for army
      44. real contract and process 45 Atmaca

      Hapus
    4. The Malonnn army has several weaknesses, including:
      • Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
      • Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
      • Corruption: The Malonnn military has been plagued by corruption.
      • Political interference: Political leaders have interfered in procurement.
      • Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
      • Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
      Other challenges include:
      • The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
      • The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
      -------------------------------------
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
      -------------------------------------
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      -------------------------------------
      DOWNGRADE HISAR
      CHEAPEST VARIANT LMS
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
      -------------------------------------
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      -
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
      -------------------------------------
      DOWNGRADE ANKA
      DOWNGRADE ANKA
      2023 ANKA OMPONG = WILL NOT ARMED
      Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.

      Hapus
  9. KAH.. KAH.. KAH....🤣🤣 👎👎👎

    PTDI Janji Bayar Gaji Pegawai Bulan Maret pada 5 April 2024

    https://www.liputan6.com/bisnis/read/5566386/ptdi-janji-bayar-gaji-pegawai-bulan-maret-pada-5-april-2024

    BalasHapus
    Balasan
    1. KEYWORDS .........
      DIDENDA RM 66.000
      SALES N219 PT DI
      ----
      AIROD DIDENDA RM 66.000 = Mahkamah Majistret di sini hari ini mendenda AIROD Sdn Bhd sebanyak RM66,000 selepas syarikat penyelenggaraan, pembaikan dan baik pulih pesawat itu mengaku bersalah atas 44 pertuduhan gagal mematuhi tempoh pembayaran gaji pekerja.
      AIROD Sdn Bhd, selaku orang kena saman (OKS) dan diwakili Presiden Kumpulan Syarikat National Aerospace & Defence Industries Bhd (NADI) Datuk Abdul Rahim Abdul Rahman, didakwa sebagai majikan telah gagal mematuhi tempoh pembayaran upah kepada 11 pekerja syarikat
      ----
      SALES PT DI = Defense Minister Prabowo Subianto witnessed the signing of the MoU between PT Dirgantara Indonesia (PTDI) and AIROD Sdn. Bhd. to market and sell the N219 aircraft produced by PTDI
      ================
      MALON'S COMBAT EQUIPMENT HAS SEVERAL WEAKNESSES, INCLUDING:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness
      -------------------------------------
      MALONN ARMED FORCES (MAF) FACES SEVERAL CHALLENGES WITH MAINTAINING ITS EQUIPMENT, INCLUDING:
      1. Budget
      The MAF has a limited budget, which affects the serviceability of its assets.
      2. Outsourcing
      The MAF has outsourced maintenance of its assets since the 1970s, but the outsourcing program has faced challenges such as undertrained staff, underperforming contractors, and lack of contract enforcement.
      3. Old inventory
      The Royal Malonn Navy (RMN) has a number of old ships in service, including the Kasturi-class Corvette, the Laksamana Corvette class, the Perdana-class gunboat, and the Handalan and Jerung class.
      4. Spare parts
      There are issues with delivering spare parts to soldiers on the ground at the right time
      -------------------------------------
      THE MALONN ARMY HAS FACED SOME CHALLENGES, INCLUDING CORRUPTION AND ISSUES WITH MILITARY PERSONNEL:
      1. Corruption
      Malon's military has been involved in corruption, and the country's military doctrine doesn't recognize it as a threat. The Integrity Plan addresses corruption, but it's not a strategic document, and commanders don't receive training on corruption issues before deployments.
      2. Military personnel
      Some say that military personnel have struggles with thinking skills, decision-making, and problem-solving.
      3. Logistics
      Some say that Malon has had problems ensuring the readiness of the Malonn Armed Forces (MAF) in the face of threats
      -------------------------------------
      MALONN ARMED FORCES (MAF) FACES SEVERAL CHALLENGES WITH MAINTAINING ITS EQUIPMENT, INCLUDING:
      1. Budget
      The MAF has a limited budget, which affects the serviceability of its assets.
      2. Outsourcing
      The MAF has outsourced maintenance of its assets since the 1970s, but the outsourcing program has faced challenges such as undertrained staff, underperforming contractors, and lack of contract enforcement.
      3. Old inventory
      The Royal Malonn Navy (RMN) has a number of old ships in service, including the Kasturi-class Corvette, the Laksamana Corvette class, the Perdana-class gunboat, and the Handalan and Jerung class.
      4. Spare parts
      There are issues with delivering spare parts to soldiers on the ground at the right time

      Hapus
    2. KEYWORDS .........
      DIDENDA RM 66.000
      SALES N219 PT DI
      ----
      AIROD DIDENDA RM 66.000 = Mahkamah Majistret di sini hari ini mendenda AIROD Sdn Bhd sebanyak RM66,000 selepas syarikat penyelenggaraan, pembaikan dan baik pulih pesawat itu mengaku bersalah atas 44 pertuduhan gagal mematuhi tempoh pembayaran gaji pekerja.
      AIROD Sdn Bhd, selaku orang kena saman (OKS) dan diwakili Presiden Kumpulan Syarikat National Aerospace & Defence Industries Bhd (NADI) Datuk Abdul Rahim Abdul Rahman, didakwa sebagai majikan telah gagal mematuhi tempoh pembayaran upah kepada 11 pekerja syarikat
      ----
      SALES PT DI = Defense Minister Prabowo Subianto witnessed the signing of the MoU between PT Dirgantara Indonesia (PTDI) and AIROD Sdn. Bhd. to market and sell the N219 aircraft produced by PTDI
      ================
      MALON'S COMBAT EQUIPMENT HAS SEVERAL WEAKNESSES, INCLUDING:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness
      -------------------------------------
      MALONN ARMED FORCES (MAF) FACES SEVERAL CHALLENGES WITH MAINTAINING ITS EQUIPMENT, INCLUDING:
      1. Budget
      The MAF has a limited budget, which affects the serviceability of its assets.
      2. Outsourcing
      The MAF has outsourced maintenance of its assets since the 1970s, but the outsourcing program has faced challenges such as undertrained staff, underperforming contractors, and lack of contract enforcement.
      3. Old inventory
      The Royal Malonn Navy (RMN) has a number of old ships in service, including the Kasturi-class Corvette, the Laksamana Corvette class, the Perdana-class gunboat, and the Handalan and Jerung class.
      4. Spare parts
      There are issues with delivering spare parts to soldiers on the ground at the right time
      -------------------------------------
      THE MALONN ARMY HAS FACED SOME CHALLENGES, INCLUDING CORRUPTION AND ISSUES WITH MILITARY PERSONNEL:
      1. Corruption
      Malon's military has been involved in corruption, and the country's military doctrine doesn't recognize it as a threat. The Integrity Plan addresses corruption, but it's not a strategic document, and commanders don't receive training on corruption issues before deployments.
      2. Military personnel
      Some say that military personnel have struggles with thinking skills, decision-making, and problem-solving.
      3. Logistics
      Some say that Malon has had problems ensuring the readiness of the Malonn Armed Forces (MAF) in the face of threats
      -------------------------------------
      MALONN ARMED FORCES (MAF) FACES SEVERAL CHALLENGES WITH MAINTAINING ITS EQUIPMENT, INCLUDING:
      1. Budget
      The MAF has a limited budget, which affects the serviceability of its assets.
      2. Outsourcing
      The MAF has outsourced maintenance of its assets since the 1970s, but the outsourcing program has faced challenges such as undertrained staff, underperforming contractors, and lack of contract enforcement.
      3. Old inventory
      The Royal Malonn Navy (RMN) has a number of old ships in service, including the Kasturi-class Corvette, the Laksamana Corvette class, the Perdana-class gunboat, and the Handalan and Jerung class.
      4. Spare parts
      There are issues with delivering spare parts to soldiers on the ground at the right time

      Hapus
    3. Malonn has faced several crises, including political, financial, and economic crises:
      • Political crisis
      From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
      • Financial crisis
      Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
      • Economic crisis
      Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
      • Household debt crisis
      As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
      Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
      -------------------------------------
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
      -------------------------------------
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      -------------------------------------
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      CHEAPEST VARIANT LMS
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
      -------------------------------------
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      -
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
      -------------------------------------
      DOWNGRADE ANKA
      DOWNGRADE ANKA
      2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance
      While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance

      Hapus
    4. The Malonnn army has several weaknesses, including:
      • Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
      • Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
      • Corruption: The Malonnn military has been plagued by corruption.
      • Political interference: Political leaders have interfered in procurement.
      • Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
      • Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
      Other challenges include:
      • The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
      • The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
      -------------------------------------
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
      -------------------------------------
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      -------------------------------------
      DOWNGRADE HISAR
      CHEAPEST VARIANT LMS
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
      -------------------------------------
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      -
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
      -------------------------------------
      DOWNGRADE ANKA
      DOWNGRADE ANKA
      2023 ANKA OMPONG = WILL NOT ARMED
      Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and

      Hapus
  10. KAH.. KAH.. KAH....🤣🤣 👎👎.

    PTDI Janji Bayar Gaji Pegawai Bulan Maret pada 5 April 2024

    https://www.liputan6.com/bisnis/read/5566386/ptdi-janji-bayar-gaji-pegawai-bulan-maret-pada-5-april-2024

    BalasHapus
    Balasan
    1. KEYWORDS .........
      DIDENDA RM 66.000
      SALES N219 PT DI
      ----
      AIROD DIDENDA RM 66.000 = Mahkamah Majistret di sini hari ini mendenda AIROD Sdn Bhd sebanyak RM66,000 selepas syarikat penyelenggaraan, pembaikan dan baik pulih pesawat itu mengaku bersalah atas 44 pertuduhan gagal mematuhi tempoh pembayaran gaji pekerja.
      AIROD Sdn Bhd, selaku orang kena saman (OKS) dan diwakili Presiden Kumpulan Syarikat National Aerospace & Defence Industries Bhd (NADI) Datuk Abdul Rahim Abdul Rahman, didakwa sebagai majikan telah gagal mematuhi tempoh pembayaran upah kepada 11 pekerja syarikat
      ----
      SALES PT DI = Defense Minister Prabowo Subianto witnessed the signing of the MoU between PT Dirgantara Indonesia (PTDI) and AIROD Sdn. Bhd. to market and sell the N219 aircraft produced by PTDI
      ================
      MALON'S COMBAT EQUIPMENT HAS SEVERAL WEAKNESSES, INCLUDING:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness
      -------------------------------------
      MALONN ARMED FORCES (MAF) FACES SEVERAL CHALLENGES WITH MAINTAINING ITS EQUIPMENT, INCLUDING:
      1. Budget
      The MAF has a limited budget, which affects the serviceability of its assets.
      2. Outsourcing
      The MAF has outsourced maintenance of its assets since the 1970s, but the outsourcing program has faced challenges such as undertrained staff, underperforming contractors, and lack of contract enforcement.
      3. Old inventory
      The Royal Malonn Navy (RMN) has a number of old ships in service, including the Kasturi-class Corvette, the Laksamana Corvette class, the Perdana-class gunboat, and the Handalan and Jerung class.
      4. Spare parts
      There are issues with delivering spare parts to soldiers on the ground at the right time
      -------------------------------------
      THE MALONN ARMY HAS FACED SOME CHALLENGES, INCLUDING CORRUPTION AND ISSUES WITH MILITARY PERSONNEL:
      1. Corruption
      Malon's military has been involved in corruption, and the country's military doctrine doesn't recognize it as a threat. The Integrity Plan addresses corruption, but it's not a strategic document, and commanders don't receive training on corruption issues before deployments.
      2. Military personnel
      Some say that military personnel have struggles with thinking skills, decision-making, and problem-solving.
      3. Logistics
      Some say that Malon has had problems ensuring the readiness of the Malonn Armed Forces (MAF) in the face of threats
      -------------------------------------
      MALONN ARMED FORCES (MAF) FACES SEVERAL CHALLENGES WITH MAINTAINING ITS EQUIPMENT, INCLUDING:
      1. Budget
      The MAF has a limited budget, which affects the serviceability of its assets.
      2. Outsourcing
      The MAF has outsourced maintenance of its assets since the 1970s, but the outsourcing program has faced challenges such as undertrained staff, underperforming contractors, and lack of contract enforcement.
      3. Old inventory
      The Royal Malonn Navy (RMN) has a number of old ships in service, including the Kasturi-class Corvette, the Laksamana Corvette class, the Perdana-class gunboat, and the Handalan and Jerung class.
      4. Spare parts
      There are issues with delivering spare parts to soldiers on the ground at the right time

      Hapus
    2. KEYWORDS .........
      DIDENDA RM 66.000
      SALES N219 PT DI
      ----
      AIROD DIDENDA RM 66.000 = Mahkamah Majistret di sini hari ini mendenda AIROD Sdn Bhd sebanyak RM66,000 selepas syarikat penyelenggaraan, pembaikan dan baik pulih pesawat itu mengaku bersalah atas 44 pertuduhan gagal mematuhi tempoh pembayaran gaji pekerja.
      AIROD Sdn Bhd, selaku orang kena saman (OKS) dan diwakili Presiden Kumpulan Syarikat National Aerospace & Defence Industries Bhd (NADI) Datuk Abdul Rahim Abdul Rahman, didakwa sebagai majikan telah gagal mematuhi tempoh pembayaran upah kepada 11 pekerja syarikat
      ----
      SALES PT DI = Defense Minister Prabowo Subianto witnessed the signing of the MoU between PT Dirgantara Indonesia (PTDI) and AIROD Sdn. Bhd. to market and sell the N219 aircraft produced by PTDI
      ================
      Malonn's military assets face a number of maintenance problems, including outdated equipment, a lack of funds, and corruption. These problems can make it difficult for the military to respond to threats and protect the country's interests.
      Outdated equipment :
      • Many of Malonn's military assets are outdated and have exceeded their intended service life.
      • The air force's MiG-29 Fulcrum fighter aircraft were withdrawn from service in 2017.
      • The KD Rahman submarine had technical problems that prevented it from submerging in 2010.
      Lack of funds :
      • Malonn's military has faced a shortage of funds for many years.
      • The government has been unable to provide the military with the modern assets it needs.
      • Corruption Political interference and corruption have undermined the military's combat readiness.
      • The military has experienced leakages and scandals in its defense spending.
      • The military has difficulty verifying that contractual obligations have been met.
      • The military has difficulty transferring technology from OEMs.
      The military has difficulty procuring parts that are compatible with its existing fleet
      ==============
      The Malonnn Armed Forces (MAF) faces a number of challenges, including:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
    3. SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
      -------------------------------------
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      -------------------------------------
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      CHEAPEST VARIANT LMS
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
      -------------------------------------
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      -
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
      -------------------------------------
      DOWNGRADE ANKA
      DOWNGRADE ANKA
      2023 ANKA OMPONG = WILL NOT ARMED
      Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
      -------------------------------------
      The Malonnn Armed Forces (MAF) faces several weaknesses, including outdated equipment, corruption, and a lack of leadership.
      Outdated equipment
      • Much of the MAF's equipment was purchased between the 1970s and 1990s, making it outdated and unable to meet modern threats
      • The MAF's submarines are outdated and cannot submerge properly
      Corruption
      • Corruption is not recognized as a military doctrine, and commanders are not trained to address corruption risks
      • Corruption has been involved in major projects, which has decreased morale and made it difficult to maximize the budget for national security
      Lack of leadership
      • There is a need to improve leadership in defense planning
      • There is a need to break down old mindsets and service rivalries
      Other challenges
      • The MAF faces challenges from big power politics and non-traditional security threats
      • The MAF needs to expand its capabilities to address cyber and space threats
      • The MAF needs to implement jointness to confront crises, conflicts, and wars

      Hapus
  11. KEYWORDS .........
    DIDENDA RM 66.000
    SALES N219 PT DI
    ----
    AIROD DIDENDA RM 66.000 = Mahkamah Majistret di sini hari ini mendenda AIROD Sdn Bhd sebanyak RM66,000 selepas syarikat penyelenggaraan, pembaikan dan baik pulih pesawat itu mengaku bersalah atas 44 pertuduhan gagal mematuhi tempoh pembayaran gaji pekerja.
    AIROD Sdn Bhd, selaku orang kena saman (OKS) dan diwakili Presiden Kumpulan Syarikat National Aerospace & Defence Industries Bhd (NADI) Datuk Abdul Rahim Abdul Rahman, didakwa sebagai majikan telah gagal mematuhi tempoh pembayaran upah kepada 11 pekerja syarikat
    ----
    SALES PT DI = Defense Minister Prabowo Subianto witnessed the signing of the MoU between PT Dirgantara Indonesia (PTDI) and AIROD Sdn. Bhd. to market and sell the N219 aircraft produced by PTDI
    ================
    Malonn's military assets face a number of maintenance problems, including outdated equipment, a lack of funds, and corruption. These problems can make it difficult for the military to respond to threats and protect the country's interests.
    Outdated equipment :
    • Many of Malonn's military assets are outdated and have exceeded their intended service life.
    • The air force's MiG-29 Fulcrum fighter aircraft were withdrawn from service in 2017.
    • The KD Rahman submarine had technical problems that prevented it from submerging in 2010.
    Lack of funds :
    • Malonn's military has faced a shortage of funds for many years.
    • The government has been unable to provide the military with the modern assets it needs.
    • Corruption Political interference and corruption have undermined the military's combat readiness.
    • The military has experienced leakages and scandals in its defense spending.
    • The military has difficulty verifying that contractual obligations have been met.
    • The military has difficulty transferring technology from OEMs.
    The military has difficulty procuring parts that are compatible with its existing fleet
    ==============
    The Malonnn Armed Forces (MAF) faces a number of challenges, including:
    • Logistics
    A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
    • Budgeting
    Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    • Personnel
    The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
    • Procurement
    The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
    • Political interference
    Political interference and corruption are undermining combat readiness.
    • Territorial disputes
    Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
    • Transboundary haze
    Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
    • Fleet sustainment
    The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
    • Technological obsolescence
    Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
    • Modernization
    The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

    BalasHapus
  12. Terjawab... Kenapa gaji pekerjanya NUNGGAK...Psstttt rugi Rp21 TRILIUN guys.... 🤣🤣🤣

    PT DI Rugi Rp 21 Triliun: Janggalnya Realisasi Bansos Kemensos

    https://probolinggo.disway.id/read/1286/pt-di-rugi-rp-21-triliun-janggalnya-realisasi-bansos-kemensos/15

    BalasHapus
    Balasan
    1. KEYWORDS .........
      DIDENDA RM 66.000
      SALES N219 PT DI
      ----
      AIROD DIDENDA RM 66.000 = Mahkamah Majistret di sini hari ini mendenda AIROD Sdn Bhd sebanyak RM66,000 selepas syarikat penyelenggaraan, pembaikan dan baik pulih pesawat itu mengaku bersalah atas 44 pertuduhan gagal mematuhi tempoh pembayaran gaji pekerja.
      AIROD Sdn Bhd, selaku orang kena saman (OKS) dan diwakili Presiden Kumpulan Syarikat National Aerospace & Defence Industries Bhd (NADI) Datuk Abdul Rahim Abdul Rahman, didakwa sebagai majikan telah gagal mematuhi tempoh pembayaran upah kepada 11 pekerja syarikat
      ----
      SALES PT DI = Defense Minister Prabowo Subianto witnessed the signing of the MoU between PT Dirgantara Indonesia (PTDI) and AIROD Sdn. Bhd. to market and sell the N219 aircraft produced by PTDI
      ================
      Malonn's military assets face a number of maintenance problems, including outdated equipment, a lack of funds, and corruption. These problems can make it difficult for the military to respond to threats and protect the country's interests.
      Outdated equipment :
      • Many of Malonn's military assets are outdated and have exceeded their intended service life.
      • The air force's MiG-29 Fulcrum fighter aircraft were withdrawn from service in 2017.
      • The KD Rahman submarine had technical problems that prevented it from submerging in 2010.
      Lack of funds :
      • Malonn's military has faced a shortage of funds for many years.
      • The government has been unable to provide the military with the modern assets it needs.
      • Corruption Political interference and corruption have undermined the military's combat readiness.
      • The military has experienced leakages and scandals in its defense spending.
      • The military has difficulty verifying that contractual obligations have been met.
      • The military has difficulty transferring technology from OEMs.
      The military has difficulty procuring parts that are compatible with its existing fleet
      ==============
      The Malonnn Armed Forces (MAF) faces a number of challenges, including:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
    2. KEYWORDS .........
      DIDENDA RM 66.000
      SALES N219 PT DI
      ----
      AIROD DIDENDA RM 66.000 = Mahkamah Majistret di sini hari ini mendenda AIROD Sdn Bhd sebanyak RM66,000 selepas syarikat penyelenggaraan, pembaikan dan baik pulih pesawat itu mengaku bersalah atas 44 pertuduhan gagal mematuhi tempoh pembayaran gaji pekerja.
      AIROD Sdn Bhd, selaku orang kena saman (OKS) dan diwakili Presiden Kumpulan Syarikat National Aerospace & Defence Industries Bhd (NADI) Datuk Abdul Rahim Abdul Rahman, didakwa sebagai majikan telah gagal mematuhi tempoh pembayaran upah kepada 11 pekerja syarikat
      ----
      SALES PT DI = Defense Minister Prabowo Subianto witnessed the signing of the MoU between PT Dirgantara Indonesia (PTDI) and AIROD Sdn. Bhd. to market and sell the N219 aircraft produced by PTDI
      ================
      MALON'S COMBAT EQUIPMENT HAS SEVERAL WEAKNESSES, INCLUDING:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness
      -------------------------------------
      MALONN ARMED FORCES (MAF) FACES SEVERAL CHALLENGES WITH MAINTAINING ITS EQUIPMENT, INCLUDING:
      1. Budget
      The MAF has a limited budget, which affects the serviceability of its assets.
      2. Outsourcing
      The MAF has outsourced maintenance of its assets since the 1970s, but the outsourcing program has faced challenges such as undertrained staff, underperforming contractors, and lack of contract enforcement.
      3. Old inventory
      The Royal Malonn Navy (RMN) has a number of old ships in service, including the Kasturi-class Corvette, the Laksamana Corvette class, the Perdana-class gunboat, and the Handalan and Jerung class.
      4. Spare parts
      There are issues with delivering spare parts to soldiers on the ground at the right time
      -------------------------------------
      THE MALONN ARMY HAS FACED SOME CHALLENGES, INCLUDING CORRUPTION AND ISSUES WITH MILITARY PERSONNEL:
      1. Corruption
      Malon's military has been involved in corruption, and the country's military doctrine doesn't recognize it as a threat. The Integrity Plan addresses corruption, but it's not a strategic document, and commanders don't receive training on corruption issues before deployments.
      2. Military personnel
      Some say that military personnel have struggles with thinking skills, decision-making, and problem-solving.
      3. Logistics
      Some say that Malon has had problems ensuring the readiness of the Malonn Armed Forces (MAF) in the face of threats
      -------------------------------------
      MALONN ARMED FORCES (MAF) FACES SEVERAL CHALLENGES WITH MAINTAINING ITS EQUIPMENT, INCLUDING:
      1. Budget
      The MAF has a limited budget, which affects the serviceability of its assets.
      2. Outsourcing
      The MAF has outsourced maintenance of its assets since the 1970s, but the outsourcing program has faced challenges such as undertrained staff, underperforming contractors, and lack of contract enforcement.
      3. Old inventory
      The Royal Malonn Navy (RMN) has a number of old ships in service, including the Kasturi-class Corvette, the Laksamana Corvette class, the Perdana-class gunboat, and the Handalan and Jerung class.
      4. Spare parts
      There are issues with delivering spare parts to soldiers on the ground at the right time

      Hapus
  13. Terjawab... Kenapa gaji pekerjanya NUNGGAK...Psstttt rugi Rp21 TRILIUN guys.... 🤣🤣🤣

    PT DI Rugi Rp 21 Triliun: Janggalnya Realisasi Bansos Kemensos

    https://probolinggo.disway.id/read/1286/pt-di-rugi-rp-21-triliun-janggalnya-realisasi-bansos-kemensos/15

    BalasHapus
    Balasan
    1. KEYWORDS .........
      DIDENDA RM 66.000
      SALES N219 PT DI
      ----
      AIROD DIDENDA RM 66.000 = Mahkamah Majistret di sini hari ini mendenda AIROD Sdn Bhd sebanyak RM66,000 selepas syarikat penyelenggaraan, pembaikan dan baik pulih pesawat itu mengaku bersalah atas 44 pertuduhan gagal mematuhi tempoh pembayaran gaji pekerja.
      AIROD Sdn Bhd, selaku orang kena saman (OKS) dan diwakili Presiden Kumpulan Syarikat National Aerospace & Defence Industries Bhd (NADI) Datuk Abdul Rahim Abdul Rahman, didakwa sebagai majikan telah gagal mematuhi tempoh pembayaran upah kepada 11 pekerja syarikat
      ----
      SALES PT DI = Defense Minister Prabowo Subianto witnessed the signing of the MoU between PT Dirgantara Indonesia (PTDI) and AIROD Sdn. Bhd. to market and sell the N219 aircraft produced by PTDI
      ================
      Malonn's military assets face a number of maintenance problems, including outdated equipment, a lack of funds, and corruption. These problems can make it difficult for the military to respond to threats and protect the country's interests.
      Outdated equipment :
      • Many of Malonn's military assets are outdated and have exceeded their intended service life.
      • The air force's MiG-29 Fulcrum fighter aircraft were withdrawn from service in 2017.
      • The KD Rahman submarine had technical problems that prevented it from submerging in 2010.
      Lack of funds :
      • Malonn's military has faced a shortage of funds for many years.
      • The government has been unable to provide the military with the modern assets it needs.
      • Corruption Political interference and corruption have undermined the military's combat readiness.
      • The military has experienced leakages and scandals in its defense spending.
      • The military has difficulty verifying that contractual obligations have been met.
      • The military has difficulty transferring technology from OEMs.
      The military has difficulty procuring parts that are compatible with its existing fleet
      ==============
      The Malonnn Armed Forces (MAF) faces a number of challenges, including:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
    2. KEYWORDS .........
      DIDENDA RM 66.000
      SALES N219 PT DI
      ----
      AIROD DIDENDA RM 66.000 = Mahkamah Majistret di sini hari ini mendenda AIROD Sdn Bhd sebanyak RM66,000 selepas syarikat penyelenggaraan, pembaikan dan baik pulih pesawat itu mengaku bersalah atas 44 pertuduhan gagal mematuhi tempoh pembayaran gaji pekerja.
      AIROD Sdn Bhd, selaku orang kena saman (OKS) dan diwakili Presiden Kumpulan Syarikat National Aerospace & Defence Industries Bhd (NADI) Datuk Abdul Rahim Abdul Rahman, didakwa sebagai majikan telah gagal mematuhi tempoh pembayaran upah kepada 11 pekerja syarikat
      ----
      SALES PT DI = Defense Minister Prabowo Subianto witnessed the signing of the MoU between PT Dirgantara Indonesia (PTDI) and AIROD Sdn. Bhd. to market and sell the N219 aircraft produced by PTDI
      ================
      MALON'S COMBAT EQUIPMENT HAS SEVERAL WEAKNESSES, INCLUDING:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness
      -------------------------------------
      MALONN ARMED FORCES (MAF) FACES SEVERAL CHALLENGES WITH MAINTAINING ITS EQUIPMENT, INCLUDING:
      1. Budget
      The MAF has a limited budget, which affects the serviceability of its assets.
      2. Outsourcing
      The MAF has outsourced maintenance of its assets since the 1970s, but the outsourcing program has faced challenges such as undertrained staff, underperforming contractors, and lack of contract enforcement.
      3. Old inventory
      The Royal Malonn Navy (RMN) has a number of old ships in service, including the Kasturi-class Corvette, the Laksamana Corvette class, the Perdana-class gunboat, and the Handalan and Jerung class.
      4. Spare parts
      There are issues with delivering spare parts to soldiers on the ground at the right time
      -------------------------------------
      THE MALONN ARMY HAS FACED SOME CHALLENGES, INCLUDING CORRUPTION AND ISSUES WITH MILITARY PERSONNEL:
      1. Corruption
      Malon's military has been involved in corruption, and the country's military doctrine doesn't recognize it as a threat. The Integrity Plan addresses corruption, but it's not a strategic document, and commanders don't receive training on corruption issues before deployments.
      2. Military personnel
      Some say that military personnel have struggles with thinking skills, decision-making, and problem-solving.
      3. Logistics
      Some say that Malon has had problems ensuring the readiness of the Malonn Armed Forces (MAF) in the face of threats
      -------------------------------------
      MALONN ARMED FORCES (MAF) FACES SEVERAL CHALLENGES WITH MAINTAINING ITS EQUIPMENT, INCLUDING:
      1. Budget
      The MAF has a limited budget, which affects the serviceability of its assets.
      2. Outsourcing
      The MAF has outsourced maintenance of its assets since the 1970s, but the outsourcing program has faced challenges such as undertrained staff, underperforming contractors, and lack of contract enforcement.
      3. Old inventory
      The Royal Malonn Navy (RMN) has a number of old ships in service, including the Kasturi-class Corvette, the Laksamana Corvette class, the Perdana-class gunboat, and the Handalan and Jerung class.
      4. Spare parts
      There are issues with delivering spare parts to soldiers on the ground at the right time

      Hapus
    3. KEYWORDS .........
      DIDENDA RM 66.000
      SALES N219 PT DI
      ----
      AIROD DIDENDA RM 66.000 = Mahkamah Majistret di sini hari ini mendenda AIROD Sdn Bhd sebanyak RM66,000 selepas syarikat penyelenggaraan, pembaikan dan baik pulih pesawat itu mengaku bersalah atas 44 pertuduhan gagal mematuhi tempoh pembayaran gaji pekerja.
      AIROD Sdn Bhd, selaku orang kena saman (OKS) dan diwakili Presiden Kumpulan Syarikat National Aerospace & Defence Industries Bhd (NADI) Datuk Abdul Rahim Abdul Rahman, didakwa sebagai majikan telah gagal mematuhi tempoh pembayaran upah kepada 11 pekerja syarikat
      ----
      SALES PT DI = Defense Minister Prabowo Subianto witnessed the signing of the MoU between PT Dirgantara Indonesia (PTDI) and AIROD Sdn. Bhd. to market and sell the N219 aircraft produced by PTDI
      ================
      MALON'S COMBAT EQUIPMENT HAS SEVERAL WEAKNESSES, INCLUDING:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness
      -------------------------------------
      MALONN ARMED FORCES (MAF) FACES SEVERAL CHALLENGES WITH MAINTAINING ITS EQUIPMENT, INCLUDING:
      1. Budget
      The MAF has a limited budget, which affects the serviceability of its assets.
      2. Outsourcing
      The MAF has outsourced maintenance of its assets since the 1970s, but the outsourcing program has faced challenges such as undertrained staff, underperforming contractors, and lack of contract enforcement.
      3. Old inventory
      The Royal Malonn Navy (RMN) has a number of old ships in service, including the Kasturi-class Corvette, the Laksamana Corvette class, the Perdana-class gunboat, and the Handalan and Jerung class.
      4. Spare parts
      There are issues with delivering spare parts to soldiers on the ground at the right time
      -------------------------------------
      THE MALONN ARMY HAS FACED SOME CHALLENGES, INCLUDING CORRUPTION AND ISSUES WITH MILITARY PERSONNEL:
      1. Corruption
      Malon's military has been involved in corruption, and the country's military doctrine doesn't recognize it as a threat. The Integrity Plan addresses corruption, but it's not a strategic document, and commanders don't receive training on corruption issues before deployments.
      2. Military personnel
      Some say that military personnel have struggles with thinking skills, decision-making, and problem-solving.
      3. Logistics
      Some say that Malon has had problems ensuring the readiness of the Malonn Armed Forces (MAF) in the face of threats
      -------------------------------------
      MALONN ARMED FORCES (MAF) FACES SEVERAL CHALLENGES WITH MAINTAINING ITS EQUIPMENT, INCLUDING:
      1. Budget
      The MAF has a limited budget, which affects the serviceability of its assets.
      2. Outsourcing
      The MAF has outsourced maintenance of its assets since the 1970s, but the outsourcing program has faced challenges such as undertrained staff, underperforming contractors, and lack of contract enforcement.
      3. Old inventory
      The Royal Malonn Navy (RMN) has a number of old ships in service, including the Kasturi-class Corvette, the Laksamana Corvette class, the Perdana-class gunboat, and the Handalan and Jerung class.
      4. Spare parts
      There are issues with delivering spare parts to soldiers on the ground at the right time

      Hapus
  14. HUTANGNYA BESAR guys... 🤣🤣🤣

    PT DI dikabarkan mengalami kerugian kumulatif senilai Rp 21 triliun. Tak hanya itu, produsen pesawat terbang pertama dan satu-satunya di Indonesia ini juga memiliki utang ke perbankan senilai USD 158 miliar atau sekitar Rp 2,5 triliun.

    Hal tersebut diketahui dalam slide presentasi yang ditampilkan saat Dirut PT DI, Gita Amperiawan, mengadakan pertemuan dengan seluruh karyawan, yang menggelar demo untuk meminta gaji dan THR segera dibayarkan, pada Rabu (3/4).

    BalasHapus
    Balasan
    1. Komentar ini telah dihapus oleh pengarang.

      Hapus
    2. SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
      -------------------------------------
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      -------------------------------------
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      CHEAPEST VARIANT LMS
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
      -------------------------------------
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      -
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
      -------------------------------------
      DOWNGRADE ANKA
      DOWNGRADE ANKA
      2023 ANKA OMPONG = WILL NOT ARMED
      Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
      -------------------------------------
      The Malonnn Armed Forces (MAF) faces several weaknesses, including outdated equipment, corruption, and a lack of leadership.
      Outdated equipment
      • Much of the MAF's equipment was purchased between the 1970s and 1990s, making it outdated and unable to meet modern threats
      • The MAF's submarines are outdated and cannot submerge properly
      Corruption
      • Corruption is not recognized as a military doctrine, and commanders are not trained to address corruption risks
      • Corruption has been involved in major projects, which has decreased morale and made it difficult to maximize the budget for national security
      Lack of leadership
      • There is a need to improve leadership in defense planning
      • There is a need to break down old mindsets and service rivalries
      Other challenges
      • The MAF faces challenges from big power politics and non-traditional security threats
      • The MAF needs to expand its capabilities to address cyber and space threats
      • The MAF needs to implement jointness to confront crises, conflicts, and wars

      Hapus
    3. KEYWORDS .........
      DIDENDA RM 66.000
      SALES N219 PT DI
      ----
      AIROD DIDENDA RM 66.000 = Mahkamah Majistret di sini hari ini mendenda AIROD Sdn Bhd sebanyak RM66,000 selepas syarikat penyelenggaraan, pembaikan dan baik pulih pesawat itu mengaku bersalah atas 44 pertuduhan gagal mematuhi tempoh pembayaran gaji pekerja.
      AIROD Sdn Bhd, selaku orang kena saman (OKS) dan diwakili Presiden Kumpulan Syarikat National Aerospace & Defence Industries Bhd (NADI) Datuk Abdul Rahim Abdul Rahman, didakwa sebagai majikan telah gagal mematuhi tempoh pembayaran upah kepada 11 pekerja syarikat
      ----
      SALES PT DI = Defense Minister Prabowo Subianto witnessed the signing of the MoU between PT Dirgantara Indonesia (PTDI) and AIROD Sdn. Bhd. to market and sell the N219 aircraft produced by PTDI
      ================
      Malonn's military assets face a number of maintenance problems, including outdated equipment, a lack of funds, and corruption. These problems can make it difficult for the military to respond to threats and protect the country's interests.
      Outdated equipment :
      • Many of Malonn's military assets are outdated and have exceeded their intended service life.
      • The air force's MiG-29 Fulcrum fighter aircraft were withdrawn from service in 2017.
      • The KD Rahman submarine had technical problems that prevented it from submerging in 2010.
      Lack of funds :
      • Malonn's military has faced a shortage of funds for many years.
      • The government has been unable to provide the military with the modern assets it needs.
      • Corruption Political interference and corruption have undermined the military's combat readiness.
      • The military has experienced leakages and scandals in its defense spending.
      • The military has difficulty verifying that contractual obligations have been met.
      • The military has difficulty transferring technology from OEMs.
      The military has difficulty procuring parts that are compatible with its existing fleet
      ==============
      The Malonnn Armed Forces (MAF) faces a number of challenges, including:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
    4. Malonn has faced several crises, including political, financial, and economic crises:
      • Political crisis
      From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
      • Financial crisis
      Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
      • Economic crisis
      Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
      • Household debt crisis
      As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
      Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
      -------------------------------------
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
      -------------------------------------
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      -------------------------------------
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      CHEAPEST VARIANT LMS
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
      -------------------------------------
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      -
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
      -------------------------------------
      DOWNGRADE ANKA
      DOWNGRADE ANKA
      2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance
      While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance

      Hapus
    5. TLDM DIBENTUK 27 APRIL 1934 = MADE IN BRITISH
      TDM DIBENTUK 01 MARET 1933 = MADE IN BRITISH
      POLIS DIBENTUK 25 MARET 1807 = MADE IN BRITISH
      ==============
      The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
      Funding
      • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
      • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      Aging equipment
      • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
      • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
      • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
      Other challenges
      • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.
      • Disaster response: The MAF is responsible for disaster response.
      National unity: The MAF is responsible for promoting national unity
      ==============
      The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
      Funding
      • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
      • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      Aging equipment
      • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
      • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
      • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
      Other challenges
      • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.
      • Disaster response: The MAF is responsible for disaster response.
      • National unity: The MAF is responsible for promoting national unity.
      =============
      Some factors that contribute to the Malonn Army's perceived weakness include:
      • Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
      • Corruption: The MAF has been plagued by corruption.
      • Poor planning: The MAF has been criticized for poor planning.
      • Political interference: Political leaders have interfered in the MAF's procurement process.
      • Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
      Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations –

      Hapus
    6. The Malonnn Armed Forces (MAF) has faced a number of problems with procurement, including corruption, budgetary constraints, and a lack of transparency.
      Corruption
      • Corruption has been a problem in the procurement of defense equipment in Malonn.
      Budgetary constraints
      • The Malonnn government has been unwilling to cut spending elsewhere or reduce the size of the armed forces to fund defense.
      • Budget constraints have forced the MAF to focus on service life extension and upgrades instead of large-scale procurement.
      Lack of transparency
      • The decision-making process for defense procurement in Malonn has been opaque.
      • There has been tension between the public's right to know and the military's "need-to-know" policies.
      Other problems
      • The MAF has sourced weapons systems and platforms from many different foreign suppliers, which can make it difficult to find personnel to manage the equipment.
      • The MAF has imported a lot of defense products because the local companies' production capacity and profit margins are not enough to justify the quantity of products and services required.
      The MAF's military outposts are located away from the nearest Malonnn air and naval bases
      -------------------------------------
      MENUNGGU 2041-2045 = C130J
      Diterangkan Utusan Malon, mereka baru bisa mendapatkan C-130 J Super Hercules paling tidak di tahun 2041 hingga 2045.
      MENUNGGU 2055 = HAWK :
      Kerajaan merancang secara sistematik penggantian pesawat Hawk 108 dan Hawk 208 seperti yang digariskan dalam Pembangunan Keupayaan Tentera Udara Diraja Malon (TUDM) 2055
      -------------------------------------
      MENUNGGU 2050 = KAPAL SELAM
      MENUNGGU 2050 = MRSS
      MENUNGGU 2050 = LCS
      MENUNGGU 2050 = PV
      MENUNGGU 2050 = LMS
      Panglima TLDM Laksamana Tan Sri Mohd Reza Mohd Sany berkata, bilangan kapal itu mungkin akan berubah bergantung kepada keadaan geo-strategik rantau itu yang dinamik.
      Dalam temuramah dengan majalah pertahanan berbahasa Inggeris tempatan, Asian Defence Journal (ADJ) keluaran May-Jun tahun ini, beliau juga memaklumkan bilangan jenis-jenis kapal perang yang dirancang dimiliki oleh TLDM dibawah pelan transformasi itu.
      “Mengikut Pelan Transformasi 15 ke 5 TLDM, ia dijangka akan memiliki 12 buah kapal Littoral Combat Ship (LCS), tiga buah kapal Multi Role Support Ship (MRSS), 18 buah kapal Littoral Mission Ship (LMS), 18 buah kapal Patrol Vessel (PV) dan empat buah kapal selam menjelang tahun 2050,” kata beliau dalam temuramah itu.
      Nampak gaya,impian untuk melihat TLDM menambah bilangan kapal selam dimilikinya daripada dua buah kepada empat buah akan hanya direalisasikan menjelang tahun 2050.
      -------------------------------------
      MENUNGGU 2030 = UAV ANKA
      MENUNGGU 2030 = LMS B2
      MENUNGGU 2030 = HELI
      MENUNGGU 2030 = MRSS
      Perolehan 3 buah LMSB2 itu dilakukan melalui kaedah Government to Government (G2G) dengan negara Turkiye.
      RMKe-13 merangkumi tempoh tahun 2026-2030.
      “Perolehan bagi baki 3 buah LMS lagi akan dimasukkan di bawah RMKe-13,” ujar beliau.
      Selain LMS, TLDM turut merancang perolehan 2 buah kapal Multi Role Support Ship (MRSS), 3 buah kapal Littoral Mission Ship Batch 3, 4 buah helikopter anti kapal selam dan 6 buah Unmanned Aerial Vehicle (UAV).
      “Proses perolehan bagi aset-aset baharu ini dijangka berlangsung sehingga 2030. Kesemua perolehan aset TLDM ini dianggarkan
      -------------------------------------
      MALONN ARMED FORCES (MAF) FACES SEVERAL CHALLENGES WITH MAINTAINING ITS EQUIPMENT, INCLUDING:
      1. Budget
      The MAF has a limited budget, which affects the serviceability of its assets.
      2. Outsourcing
      The MAF has outsourced maintenance of its assets since the 1970s, but the outsourcing program has faced challenges such as undertrained staff, underperforming contractors, and lack of contract enforcement.
      3. Old inventory
      The Royal Malonn Navy (RMN) has a number of old ships in service, including the Kasturi-class Corvette, the Laksamana Corvette class, the Perdana-class gunboat, and the Handalan and Jerung class.
      4. Spare parts
      There are issues with delivering spare parts to soldiers on the ground at the right time

      Hapus
  15. HUTANGNYA BESAR guys... 🤣🤣🤣

    PT DI dikabarkan mengalami kerugian kumulatif senilai Rp 21 triliun. Tak hanya itu, produsen pesawat terbang pertama dan satu-satunya di Indonesia ini juga memiliki utang ke perbankan senilai USD 158 miliar atau sekitar Rp 2,5 triliun.

    Hal tersebut diketahui dalam slide presentasi yang ditampilkan saat Dirut PT DI, Gita Amperiawan, mengadakan pertemuan dengan seluruh karyawan, yang menggelar demo untuk meminta gaji dan THR segera dibayarkan, pada Rabu (3/4).

    BalasHapus
    Balasan
    1. KEYWORDS .........
      DIDENDA RM 66.000
      SALES N219 PT DI
      ----
      AIROD DIDENDA RM 66.000 = Mahkamah Majistret di sini hari ini mendenda AIROD Sdn Bhd sebanyak RM66,000 selepas syarikat penyelenggaraan, pembaikan dan baik pulih pesawat itu mengaku bersalah atas 44 pertuduhan gagal mematuhi tempoh pembayaran gaji pekerja.
      AIROD Sdn Bhd, selaku orang kena saman (OKS) dan diwakili Presiden Kumpulan Syarikat National Aerospace & Defence Industries Bhd (NADI) Datuk Abdul Rahim Abdul Rahman, didakwa sebagai majikan telah gagal mematuhi tempoh pembayaran upah kepada 11 pekerja syarikat
      ----
      SALES PT DI = Defense Minister Prabowo Subianto witnessed the signing of the MoU between PT Dirgantara Indonesia (PTDI) and AIROD Sdn. Bhd. to market and sell the N219 aircraft produced by PTDI
      ================
      MALON'S COMBAT EQUIPMENT HAS SEVERAL WEAKNESSES, INCLUDING:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness
      -------------------------------------
      MALONN ARMED FORCES (MAF) FACES SEVERAL CHALLENGES WITH MAINTAINING ITS EQUIPMENT, INCLUDING:
      1. Budget
      The MAF has a limited budget, which affects the serviceability of its assets.
      2. Outsourcing
      The MAF has outsourced maintenance of its assets since the 1970s, but the outsourcing program has faced challenges such as undertrained staff, underperforming contractors, and lack of contract enforcement.
      3. Old inventory
      The Royal Malonn Navy (RMN) has a number of old ships in service, including the Kasturi-class Corvette, the Laksamana Corvette class, the Perdana-class gunboat, and the Handalan and Jerung class.
      4. Spare parts
      There are issues with delivering spare parts to soldiers on the ground at the right time
      -------------------------------------
      THE MALONN ARMY HAS FACED SOME CHALLENGES, INCLUDING CORRUPTION AND ISSUES WITH MILITARY PERSONNEL:
      1. Corruption
      Malon's military has been involved in corruption, and the country's military doctrine doesn't recognize it as a threat. The Integrity Plan addresses corruption, but it's not a strategic document, and commanders don't receive training on corruption issues before deployments.
      2. Military personnel
      Some say that military personnel have struggles with thinking skills, decision-making, and problem-solving.
      3. Logistics
      Some say that Malon has had problems ensuring the readiness of the Malonn Armed Forces (MAF) in the face of threats
      -------------------------------------
      MALONN ARMED FORCES (MAF) FACES SEVERAL CHALLENGES WITH MAINTAINING ITS EQUIPMENT, INCLUDING:
      1. Budget
      The MAF has a limited budget, which affects the serviceability of its assets.
      2. Outsourcing
      The MAF has outsourced maintenance of its assets since the 1970s, but the outsourcing program has faced challenges such as undertrained staff, underperforming contractors, and lack of contract enforcement.
      3. Old inventory
      The Royal Malonn Navy (RMN) has a number of old ships in service, including the Kasturi-class Corvette, the Laksamana Corvette class, the Perdana-class gunboat, and the Handalan and Jerung class.
      4. Spare parts
      There are issues with delivering spare parts to soldiers on the ground at the right time

      Hapus
    2. KEYWORDS .........
      DIDENDA RM 66.000
      SALES N219 PT DI
      ----
      AIROD DIDENDA RM 66.000 = Mahkamah Majistret di sini hari ini mendenda AIROD Sdn Bhd sebanyak RM66,000 selepas syarikat penyelenggaraan, pembaikan dan baik pulih pesawat itu mengaku bersalah atas 44 pertuduhan gagal mematuhi tempoh pembayaran gaji pekerja.
      AIROD Sdn Bhd, selaku orang kena saman (OKS) dan diwakili Presiden Kumpulan Syarikat National Aerospace & Defence Industries Bhd (NADI) Datuk Abdul Rahim Abdul Rahman, didakwa sebagai majikan telah gagal mematuhi tempoh pembayaran upah kepada 11 pekerja syarikat
      ----
      SALES PT DI = Defense Minister Prabowo Subianto witnessed the signing of the MoU between PT Dirgantara Indonesia (PTDI) and AIROD Sdn. Bhd. to market and sell the N219 aircraft produced by PTDI
      ================
      Malonn's military assets face a number of maintenance problems, including outdated equipment, a lack of funds, and corruption. These problems can make it difficult for the military to respond to threats and protect the country's interests.
      Outdated equipment :
      • Many of Malonn's military assets are outdated and have exceeded their intended service life.
      • The air force's MiG-29 Fulcrum fighter aircraft were withdrawn from service in 2017.
      • The KD Rahman submarine had technical problems that prevented it from submerging in 2010.
      Lack of funds :
      • Malonn's military has faced a shortage of funds for many years.
      • The government has been unable to provide the military with the modern assets it needs.
      • Corruption Political interference and corruption have undermined the military's combat readiness.
      • The military has experienced leakages and scandals in its defense spending.
      • The military has difficulty verifying that contractual obligations have been met.
      • The military has difficulty transferring technology from OEMs.
      The military has difficulty procuring parts that are compatible with its existing fleet
      ==============
      The Malonnn Armed Forces (MAF) faces a number of challenges, including:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
    3. SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
      -------------------------------------
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      -------------------------------------
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      CHEAPEST VARIANT LMS
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
      -------------------------------------
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      -
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
      -------------------------------------
      DOWNGRADE ANKA
      DOWNGRADE ANKA
      2023 ANKA OMPONG = WILL NOT ARMED
      Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
      -------------------------------------
      The Malonnn Armed Forces (MAF) faces several weaknesses, including outdated equipment, corruption, and a lack of leadership.
      Outdated equipment
      • Much of the MAF's equipment was purchased between the 1970s and 1990s, making it outdated and unable to meet modern threats
      • The MAF's submarines are outdated and cannot submerge properly
      Corruption
      • Corruption is not recognized as a military doctrine, and commanders are not trained to address corruption risks
      • Corruption has been involved in major projects, which has decreased morale and made it difficult to maximize the budget for national security
      Lack of leadership
      • There is a need to improve leadership in defense planning
      • There is a need to break down old mindsets and service rivalries
      Other challenges
      • The MAF faces challenges from big power politics and non-traditional security threats
      • The MAF needs to expand its capabilities to address cyber and space threats
      • The MAF needs to implement jointness to confront crises, conflicts, and wars

      Hapus
    4. SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
      -------------------------------------
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      -------------------------------------
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      CHEAPEST VARIANT LMS
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
      -------------------------------------
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      -
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
      -------------------------------------
      DOWNGRADE ANKA
      DOWNGRADE ANKA
      2023 ANKA OMPONG = WILL NOT ARMED
      Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
      -------------------------------------
      The Malonnn Armed Forces (MAF) faces several weaknesses, including outdated equipment, corruption, and a lack of leadership.
      Outdated equipment
      • Much of the MAF's equipment was purchased between the 1970s and 1990s, making it outdated and unable to meet modern threats
      • The MAF's submarines are outdated and cannot submerge properly
      Corruption
      • Corruption is not recognized as a military doctrine, and commanders are not trained to address corruption risks
      • Corruption has been involved in major projects, which has decreased morale and made it difficult to maximize the budget for national security
      Lack of leadership
      • There is a need to improve leadership in defense planning
      • There is a need to break down old mindsets and service rivalries
      Other challenges
      • The MAF faces challenges from big power politics and non-traditional security threats
      • The MAF needs to expand its capabilities to address cyber and space threats
      • The MAF needs to implement jointness to confront crises, conflicts, and wars

      Hapus
    5. Malonn has faced several crises, including political, financial, and economic crises:
      • Political crisis
      From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
      • Financial crisis
      Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
      • Economic crisis
      Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
      • Household debt crisis
      As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
      Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
      -------------------------------------
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
      -------------------------------------
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      -------------------------------------
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      CHEAPEST VARIANT LMS
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
      -------------------------------------
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      -
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
      -------------------------------------
      DOWNGRADE ANKA
      DOWNGRADE ANKA
      2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance
      While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance

      Hapus
    6. The Malonnn army has several weaknesses, including:
      • Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
      • Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
      • Corruption: The Malonnn military has been plagued by corruption.
      • Political interference: Political leaders have interfered in procurement.
      • Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
      • Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
      Other challenges include:
      • The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
      • The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
      -------------------------------------
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
      -------------------------------------
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      -------------------------------------
      DOWNGRADE HISAR
      CHEAPEST VARIANT LMS
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
      -------------------------------------
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      -
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
      -------------------------------------
      DOWNGRADE ANKA
      DOWNGRADE ANKA
      2023 ANKA OMPONG = WILL NOT ARMED
      Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.

      Hapus
    7. FACT GOVERNMENT ........
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. BUT AGAIN, MAF HAS BEEN LET DOWN BY THE GOVERNMENT WHICH HAS NOT SAY WHY IT HAS NOT APPROVE THE BUDGET REQUESTS. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
      Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
      Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
      ==============
      2024 RASIO HUTANG 84,2% DARI GDP
      HUTANG 2023 = RM 1.53 TRILLION
      HUTANG 2022 = RM 1.45 TRILLION
      HUTANG 2021 = RM 1.38 TRILLION
      HUTANG 2020 = RM 1.32 TRILLION
      HUTANG 2019 = RM 1.25 TRILLION
      HUTANG 2018 = RM 1.19 TRILLION
      The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023. In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018). “The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
      ==============
      Some factors that contribute to the Malonn Army's perceived weakness include:
      • Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
      • Corruption: The MAF has been plagued by corruption.
      • Poor planning: The MAF has been criticized for poor planning.
      • Political interference: Political leaders have interfered in the MAF's procurement process.
      • Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
      Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
      ==============
      Malon's combat equipment has several weaknesses, including:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness

      Hapus

    8. Malonn has faced several crises, including political, financial, and economic crises:
      • Political crisis
      From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
      • Financial crisis
      Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
      • Economic crisis
      Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
      • Household debt crisis
      As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
      Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
      ==============
      The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
      Funding
      • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
      • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      Aging equipment
      • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
      • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
      • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
      Other challenges
      • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.
      • Disaster response: The MAF is responsible for disaster response.
      National unity: The MAF is responsible for promoting national unity
      ==============
      Some factors that contribute to the Malonn Army's perceived weakness include:
      • Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
      • Corruption: The MAF has been plagued by corruption.
      • Poor planning: The MAF has been criticized for poor planning.
      • Political interference: Political leaders have interfered in the MAF's procurement process.
      • Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
      Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations –

      Hapus
    9. The Malaysian Armed Forces (MAF) has faced a number of problems with procurement, including corruption, budgetary constraints, and a lack of transparency.
      Corruption
      • Corruption has been a problem in the procurement of defense equipment in Malaysia.
      Budgetary constraints
      • The Malaysian government has been unwilling to cut spending elsewhere or reduce the size of the armed forces to fund defense.
      • Budget constraints have forced the MAF to focus on service life extension and upgrades instead of large-scale procurement.
      Lack of transparency
      • The decision-making process for defense procurement in Malaysia has been opaque.
      • There has been tension between the public's right to know and the military's "need-to-know" policies.
      Other problems
      • The MAF has sourced weapons systems and platforms from many different foreign suppliers, which can make it difficult to find personnel to manage the equipment.
      • The MAF has imported a lot of defense products because the local companies' production capacity and profit margins are not enough to justify the quantity of products and services required.
      • The MAF's military outposts are located away from the nearest Malaysian air and naval bases
      ==============
      Some factors that contribute to the Malonn Army's perceived weakness include:
      • Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
      • Corruption: The MAF has been plagued by corruption.
      • Poor planning: The MAF has been criticized for poor planning.
      • Political interference: Political leaders have interfered in the MAF's procurement process.
      • Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
      Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations –
      ==============
      Some factors that contribute to the Malonn Army's perceived weakness include:
      • Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
      • Corruption: The MAF has been plagued by corruption.
      • Poor planning: The MAF has been criticized for poor planning.
      • Political interference: Political leaders have interfered in the MAF's procurement process.
      • Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
      Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations

      Hapus
    10. The Malonn Armed Forces (MAF) has faced several weaknesses with its equipment, including outdated assets, a lack of modern equipment, and a lack of operational compatibility.
      Outdated assets
      The MAF has many assets that were purchased between the 1970s and 1990s, and are now outdated.
      The MAF has had issues with its submarines, including a conventional submarine that couldn't submerge due to technical problems.
      Lack of modern equipment
      The MAF has faced challenges in acquiring modern equipment due to weak economic growth and limited defense spending.
      The MAF has been unable to provide its forces with the latest defense assets.
      Lack of operational compatibility
      The MAF has acquired weapons and equipment for specific peacekeeping operations that may not be compatible with its conventional force development needs.
      This has led to logistical and maintenance problems.
      The MAF has been working to modernize its equipment, including its Navy, Air Force, and Army.
      ============
      The Malonn Armed Forces (MAF) has faced challenges with maintenance and logistics, including the age of its fleet and the quality of its equipment.
      Maintenance
      Aging fleet
      The MAF's fleet has been criticized for its age, which has raised questions about its ability to defend the country. For example, a 45-year-old navy ship sank during a patrol due to its age and a navigational error.
      Maintenance budget
      The MAF's maintenance budget is part of the annual defense budget allocated to the Ministry of Defense (MINDEF).
      Logistics
      Outdated inventory
      Studies have identified weaknesses in the quality of MAF logistics equipment and the outdated nature of its inventory stock.
      Spare parts delivery
      The delivery of spare parts to soldiers on the ground has been identified as a potential stumbling block in operations.
      Other challenges
      Defense ecosystem
      The first Malaysia Defence White Paper (DWP) identified glitches in the country's defense ecosystem.
      Regional security
      Malaysia's military capability has been ranked lower than other countries in the region.
      ============
      The Malonn Armed Forces (MAF) has faced issues with the age and condition of its vessels, as well as with its logistics.
      Vessel age
      The Royal Malaysian Navy's (TLDM) fleet includes many ships that are well beyond their serviceable lifespan.
      The MAF's helicopters were commissioned in the 1960s.
      The 260-ton patrol boat KD Pendekar was commissioned in 1979.
      Vessel condition
      The hull of the KD Pendekar was weak, which contributed to flooding and the sinking of the vessel.
      The KD Pendekar was off course when it hit the reef, which was caused by a navigation error.
      Logistics
      The MAF has faced issues with the quality of its logistics equipment.
      There are concerns that the MAF's rapid development since the Cold War has raised questions about its readiness to face threats.
      There are concerns that the MAF's logistics weakness could affect the country's security.

      Hapus
  16. KEYWORDS .........
    DIDENDA RM 66.000
    SALES N219 PT DI
    ----
    AIROD DIDENDA RM 66.000 = Mahkamah Majistret di sini hari ini mendenda AIROD Sdn Bhd sebanyak RM66,000 selepas syarikat penyelenggaraan, pembaikan dan baik pulih pesawat itu mengaku bersalah atas 44 pertuduhan gagal mematuhi tempoh pembayaran gaji pekerja.
    AIROD Sdn Bhd, selaku orang kena saman (OKS) dan diwakili Presiden Kumpulan Syarikat National Aerospace & Defence Industries Bhd (NADI) Datuk Abdul Rahim Abdul Rahman, didakwa sebagai majikan telah gagal mematuhi tempoh pembayaran upah kepada 11 pekerja syarikat
    ----
    SALES PT DI = Defense Minister Prabowo Subianto witnessed the signing of the MoU between PT Dirgantara Indonesia (PTDI) and AIROD Sdn. Bhd. to market and sell the N219 aircraft produced by PTDI
    ================
    Malonn's military assets face a number of maintenance problems, including outdated equipment, a lack of funds, and corruption. These problems can make it difficult for the military to respond to threats and protect the country's interests.
    Outdated equipment :
    • Many of Malonn's military assets are outdated and have exceeded their intended service life.
    • The air force's MiG-29 Fulcrum fighter aircraft were withdrawn from service in 2017.
    • The KD Rahman submarine had technical problems that prevented it from submerging in 2010.
    Lack of funds :
    • Malonn's military has faced a shortage of funds for many years.
    • The government has been unable to provide the military with the modern assets it needs.
    • Corruption Political interference and corruption have undermined the military's combat readiness.
    • The military has experienced leakages and scandals in its defense spending.
    • The military has difficulty verifying that contractual obligations have been met.
    • The military has difficulty transferring technology from OEMs.
    The military has difficulty procuring parts that are compatible with its existing fleet
    ==============
    The Malonnn Armed Forces (MAF) faces a number of challenges, including:
    • Logistics
    A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
    • Budgeting
    Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    • Personnel
    The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
    • Procurement
    The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
    • Political interference
    Political interference and corruption are undermining combat readiness.
    • Territorial disputes
    Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
    • Transboundary haze
    Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
    • Fleet sustainment
    The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
    • Technological obsolescence
    Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
    • Modernization
    The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

    BalasHapus
  17. KEYWORDS .........
    DIDENDA RM 66.000
    SALES N219 PT DI
    ----
    AIROD DIDENDA RM 66.000 = Mahkamah Majistret di sini hari ini mendenda AIROD Sdn Bhd sebanyak RM66,000 selepas syarikat penyelenggaraan, pembaikan dan baik pulih pesawat itu mengaku bersalah atas 44 pertuduhan gagal mematuhi tempoh pembayaran gaji pekerja.
    AIROD Sdn Bhd, selaku orang kena saman (OKS) dan diwakili Presiden Kumpulan Syarikat National Aerospace & Defence Industries Bhd (NADI) Datuk Abdul Rahim Abdul Rahman, didakwa sebagai majikan telah gagal mematuhi tempoh pembayaran upah kepada 11 pekerja syarikat
    ----
    SALES PT DI = Defense Minister Prabowo Subianto witnessed the signing of the MoU between PT Dirgantara Indonesia (PTDI) and AIROD Sdn. Bhd. to market and sell the N219 aircraft produced by PTDI
    ================
    Malonn's military assets face a number of maintenance problems, including outdated equipment, a lack of funds, and corruption. These problems can make it difficult for the military to respond to threats and protect the country's interests.
    Outdated equipment :
    • Many of Malonn's military assets are outdated and have exceeded their intended service life.
    • The air force's MiG-29 Fulcrum fighter aircraft were withdrawn from service in 2017.
    • The KD Rahman submarine had technical problems that prevented it from submerging in 2010.
    Lack of funds :
    • Malonn's military has faced a shortage of funds for many years.
    • The government has been unable to provide the military with the modern assets it needs.
    • Corruption Political interference and corruption have undermined the military's combat readiness.
    • The military has experienced leakages and scandals in its defense spending.
    • The military has difficulty verifying that contractual obligations have been met.
    • The military has difficulty transferring technology from OEMs.
    The military has difficulty procuring parts that are compatible with its existing fleet
    ==============
    The Malonnn Armed Forces (MAF) faces a number of challenges, including:
    • Logistics
    A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
    • Budgeting
    Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    • Personnel
    The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
    • Procurement
    The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
    • Political interference
    Political interference and corruption are undermining combat readiness.
    • Territorial disputes
    Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
    • Transboundary haze
    Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
    • Fleet sustainment
    The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
    • Technological obsolescence
    Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
    • Modernization
    The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

    BalasHapus
  18. Beruk2 iri tuh, IQ tinggi hanya bisa bikin kondom unisex dan Vita berlendir 😁😁😁😁

    BalasHapus
  19. TLDM DIBENTUK 27 APRIL 1934 = MADE IN BRITISH
    TDM DIBENTUK 01 MARET 1933 = MADE IN BRITISH
    POLIS DIBENTUK 25 MARET 1807 = MADE IN BRITISH
    ==============
    The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
    Funding
    • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
    • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    Aging equipment
    • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
    • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
    • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
    Other challenges
    • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.
    • Disaster response: The MAF is responsible for disaster response.
    National unity: The MAF is responsible for promoting national unity
    ==============
    The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
    Funding
    • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
    • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    Aging equipment
    • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
    • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
    • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
    Other challenges
    • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.
    • Disaster response: The MAF is responsible for disaster response.
    • National unity: The MAF is responsible for promoting national unity.
    =============
    Some factors that contribute to the Malonn Army's perceived weakness include:
    • Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
    • Corruption: The MAF has been plagued by corruption.
    • Poor planning: The MAF has been criticized for poor planning.
    • Political interference: Political leaders have interfered in the MAF's procurement process.
    • Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
    Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations –

    BalasHapus
  20. Membual bangsa IQ tinggi, bikin kapal 14 thn tak selesai2 😁😁😁😁😁😁 itu IQ minus

    BalasHapus
  21. MALONDESH MANA BISA BIKIN PESAWAT, OTAKNYA SETARA BERUK......HAHAHAA
    URUS SAJA KONDOM DAN SELANG YA LON....ITU SAJA KECAKAPAN MALONDESH !!!!!!

    BalasHapus
  22. https://www.bolasport.com/read/314209198/diklaim-keturunan-malaysia-pemain-spanyol-permalukan-harimau-malaya
    ______________________
    Klaim, klaim, klaim 😂🤣😅
    Apapun diklaim punya malon, lama2 planet namec pun diklaim koloni malon....MEMALUKAN !
    🤣😅😂😅🤣😅

    BalasHapus
  23. Jom nyanyi bersama buat gempur

    Tak pernah ucap hello...
    Gempur selalu membual ...
    Harimaw..harimaww..harimawww..
    Kucing malaya ....

    BalasHapus
  24. Cukup tahu aja klo sebelah hanya pandai menyewa aset
    Kohkohkohkoh 🤣🤣😍

    BalasHapus
  25. Apa yg dijual dri Airdod malon ni?
    Baut..mur..selang kah😅😅

    BalasHapus
  26. Ya Tuhan gempur..carilah ngetrol yg tak bikin kami tertawe..😭😂🤣

    BalasHapus
  27. Pusing ko ya..tak tahu ape yg bise malon nak jual..tak de produk2 strategis macam Indonesia kecuali tipu2..

    BalasHapus
  28. Pusing ko ya..🤣🤣🤣 di + LG frigate Merah Putih nak di Luncurkan pule tahun ni..berpikir keras Malon nak di kasih tarok di mane muke ni 🤣😭😜😝😛🤭🤪

    BalasHapus
  29. Pusing ko ya..🤣🤣🤣 di + LG frigate Merah Putih nak di Luncurkan pule tahun ni..berpikir keras Malon nak di kasih tarok di mane muke ni 🤣😭😜😝😛🤭🤪

    BalasHapus
  30. The Malonnn Armed Forces (MAF) has been criticized for its lack of transparency, which has led to concerns about corruption and mismanagement. The Official Secrets Act (OSA) of 1972 limits public access to information about the MAF, including defense budgets and acquisition plans.
    Explanation
    • Limited access to information
    The OSA is the primary framework for restricting public access to government information in Malonn. This includes information about defense budgets, expenditures, and acquisition planning.
    • Opaque pension fund
    The military's pension fund, LTAT, is opaque, and there is little scrutiny of how it is run. LTAT owns many publicly listed companies that have been accused of mismanagement and misuse of funds.
    • Tension between public and military
    There is a tension between the public's right to know and the military's "need-to-know" policies.
    • Criticism of defense procurement
    Some senior Armed Forces professionals have criticized the role of the Ministry of Finance (MOF) in defense procurement. They say that MOF officials are civilians who lack military expertise.
    Impact
    • The lack of transparency in the MAF increases the risk of corruption and mismanagement.
    • It also erodes public trust in the institutions that are responsible for national security.
    ==============
    The Malonnn Armed Forces (MAF) has faced a number of logistics weaknesses, including outdated inventory, poor food supply, and delivery delays. These weaknesses can affect the MAF's ability to operate effectively in hostile environments.
    Outdated inventory
    • Outdated inventory can make it difficult to mobilize soldiers and vehicles
    • Outdated inventory can put soldiers at risk of being captured, tortured, or killed by the enemy
    Poor food supply
    • Contractors may not adhere to contractual obligations, resulting in inadequate supplies and delivery delays
    • Food may not meet specified requirements
    Delivery delays
    • Delivery delays can make it difficult to get supplies to soldiers on the ground in a timely manner
    • Delivery delays can make it difficult to mobilize soldiers and vehicles
    Poor road conditions
    • Poor road conditions can make it difficult to transport troops and supplies

    BalasHapus