12 Januari 2025

Resmikan Pembangunan Yontaipur, Pangkostrad Sebut Tekad Kostrad Jadi Satuan Pemukul Strategis TNI AD

12 Januari 2025

Acara peresmian pembangunan Yontaipur Kostrad (photo: Kostrad)

KOMPAS.com - Panglima Kostrad (Pangkostrad) Letjen TNI Mohammad Fadjar, M.P.I.C.T, bersama Penjabat (Pj.) Bupati Bekasi Drs. Dedy Supriyadi, MM., meresmikan Pembangunan Tahap I Batalyon Intai Tempur (Yontaipur) Kostrad di Desa Sukadami, Kecamatan Cikarang Selatan, Kabupaten Bekasi, Jawa Barat, Kamis (9/1/2025). 

Dalam sambutannya, Pangkostrad mengingatkan kembali tekad Kostrad menjadi satuan pemukul strategis TNI Angkatan Darat (AD). Apalagi, Kostrad adalah satuan terbesar dan terkuat dengan tiga Divisi Infanteri. 

Oleh karenanya, Pangkostrad mengatakan, prajurit-prajurit harus selalu siap dan mampu melaksanakan tugas operasi dalam segala bentuk medan dan cuaca, serta siap digerakan untuk melaksanakan tugas kapan pun dan di manapun juga. 

Selain itu, Mohammad Fadjar menyebut, sarana dan prasarana juga menjadi faktor penting untuk mendukung tekad Kostrad tersebut.

“Hal tersebut dapat terwujud di antaranya dengan tersedianya sarana dan prasarana yang memadai, seperti alutsista, tempat latihan, perkantoran dan perumahan untuk kesejahteraan bagi prajurit,” kata Pangkostrad.

Taipur Kostrad ketika berlatih menggunakan sumpit (photo: Okezone)

Atas dasar itu, pembangunan Batalyon Intai Tempur (Yontaipur) Kostrad juga menjadi langkah penting. 

“Hal ini menandai bahwa sarana dan prasarana untuk mewujudkan prajurit Kostrad yang profesional dalam rangka menunjang terlaksananya tugas pokok, secara bertahap telah terwujud,” ujar Pangkostrad. 

Lebih lanjut, Pangkostrad tak lupa mengucapkan terima kasih kepada semua pihak yang telah ikut serta mendukung dalam proses pembangunan ini, khususnya kepada Pemkab Bekasi. 

Dia berharap pembangunan Yontaipur ini memberikan manfaat yang cukup besar bagi prajurit Kostrad dan masyarakat.

Dalam kesempatan yang sama, Penjabat (Pj) Bupati Bekasi, Drs. Dedy Supriyadi, MM., juga menyampaikan apresiasi atas sinergi antara Kostrad dan Pemerintah Kabupaten (Pemkab) Bekasi. 

Apalagi, menurut dia, sinergi tersebut tak hanya memberikan manfaat bagi prajurit TNI, tetapi juga bermanfaat besar bagi masyarakat. 

Aksi Taipur Kostrad ketika latihan menyerbu pantai (photo: Merdeka)

"Pembangunan Batalyon Taipur Kostrad di Bekasi ini akan saling membutuhkan kolaborasi antara berbagai pihak, baik dalam hal sumber daya manusia, teknologi, maupun dukungan masyarakat,” kata Dedy. 

"Dengan semangat kebersamaan dan sinergi, pembangunan ini diharapkan dapat membawa manfaat besar bagi keamanan warga Bekasi dan stabilitas nasional,” ujarnya lagi.

Dedy pun mencontohkan manfaat yang didapat oleh masyarakat. Salah satu yang terpenting adalah memberikan keamanan. 

"Seperti contoh banyaknya kasus begal yang terjadi di wilayah ini, semoga dengan dibangunnya Batalyon Taipur Kostrad ini, tidak akan terjadi lagi kasus begal hingga mengakibatkan pembunuhan," katanya. 

Dalam kegiatan ini juga dilaksanakan pemberian tali asih paket sembako kepada masyarakat dan anak yatim, foto bersama serta penandatanganan prasasti dan pemotongan pita.

207 komentar:

  1. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • 5 UNIT TOTAL HARGA USD 4,74 BILLION, atau USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    ===================
    ===================
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    -------------
    17 CREDITOR LCS
    17 CREDITOR LCS
    17 CREDITOR LCS
    1. MTU Services Ingat Kawan (M) Sdn Bhd
    2. include Contraves Sdn Bhd
    3. Axima Concept SA
    4. Contraves Advanced Devices Sdn Bhd
    5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
    6. Security & Services Malon Sdn Bhd,
    7. iXblue SAS
    8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
    9. Bank Pembangunan Malon Bhd
    10. AmBank Islamic Bhd
    11. AmBank (M) Bhd
    12. Affin Hwang Investment Bank Bhd
    13. Bank Muamalat Malon Bhd
    14. Affin Bank Bhd
    15. Bank Kerjasama Rakyat Malon Bhd
    16. Malayan Banking Bhd (Maybank)
    17. KUWAIT FINANCE HOUSE (MALON) BHD.
    ===================
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ===================
    KEYWORS
    LCS WITHOUT AMMO = DESTROYER WITH AMMO

    BalasHapus
  2. UNREADY ARMED FORCES
    UNREADY ARMED FORCES
    UNREADY ARMED FORCES
    the Malonnn military is today the region’s weakest. It is riddled with corruption, poor planning, and interference by political leaders in procurement, no longer a potent force even in managing low-level intensity conflict at a time when tensions in the South China Sea are higher than they have been since the days of the Vietnam War.
    A 2019 White Paper on Defense – nearly four years ago – called for more funds and punch as well as an overhaul of the procurement system to allow professionals to decide on what weapon systems they need. Instead, PM Anwar Ibrahim’s proposal to increase the defense budget by 10 percent to fund procurement will be delayed because of budgetary considerations related to the flagging economy, expected by the World Bank to grow at a mediocre 3.9 percent in 2023, down from an earlier estimate of 4.3 percent in April
    ===================
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ===================
    THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
    • Logistics
    A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
    • Budgeting
    Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    • Personnel
    The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
    • Procurement
    The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
    • Political interference
    Political interference and corruption are undermining combat readiness.
    • Territorial disputes
    Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
    • Transboundary haze
    Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
    • Fleet sustainment
    The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
    • Technological obsolescence
    Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
    • Modernization
    The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

    BalasHapus
  3. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • 5 UNIT TOTAL HARGA USD 4,74 BILLION, atau USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
    -
    1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
    -
    2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    =========
    KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
    -
    1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
    -
    2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
    =========
    KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
    -
    1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
    -
    2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
    -
    Apache AH-64E contract for Indonesia for $1.42 BILLION
    -
    The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
    -
    USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
    =========
    KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
    -
    PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
    -
    LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    =========
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    =========
    KEYWORDS
    1 UNIT JAVELIN = 3 UNIT NLAW
    4.5 KM JAVELIN = 1 KM NLAW
    ---
    Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
    The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
    =========
    ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
    =========
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

    BalasHapus
  4. Pejuang OPM saja KETAWA melihat nya... 🔥🔥🤣🤣

    BalasHapus
    Balasan
    1. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
      -
      1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
      -
      2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      =========
      KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
      -
      1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
      -
      2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
      =========
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      Apache AH-64E contract for Indonesia for $1.42 BILLION
      -
      The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      =========
      KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
      -
      PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
      -
      LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      =========
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      =========
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
      =========
      ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
      =========
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    2. UNREADY ARMED FORCES
      UNREADY ARMED FORCES
      UNREADY ARMED FORCES
      the Malonnn military is today the region’s weakest. It is riddled with corruption, poor planning, and interference by political leaders in procurement, no longer a potent force even in managing low-level intensity conflict at a time when tensions in the South China Sea are higher than they have been since the days of the Vietnam War.
      A 2019 White Paper on Defense – nearly four years ago – called for more funds and punch as well as an overhaul of the procurement system to allow professionals to decide on what weapon systems they need. Instead, PM Anwar Ibrahim’s proposal to increase the defense budget by 10 percent to fund procurement will be delayed because of budgetary considerations related to the flagging economy, expected by the World Bank to grow at a mediocre 3.9 percent in 2023, down from an earlier estimate of 4.3 percent in April
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
    3. 17 CREDITOR LCS =
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      SIPRI LCS = DELIVERED : 0 (KONTRAK KOSONG) ......
      SAK 70 MK 3 - DELIVERED = 0
      MICA - DELIVERED = 0
      SHIP ENGINE - DELIVERED = 0
      FIRE CONTROL RADAR - DELIVERED = 0
      AIR CONTROL RADAR - DELIVERED = 0
      ===================
      FACT LCS 2025 - 2011 = 15 YEARS
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      FACT ..........
      BLASTING = MENGHILANGKAN KARAT LCS
      PAINTING = MENUTUP BEKAS KARAT LCS
      Littoral Combat Ship (LCS) 2 has successfully completed the blasting and first level of painting process, marking a significant milestone in its construction journey. It will later transition to further surface preparation and coating applications to ensure all critical areas meet the required standards
      ===================
      The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
  5. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • TOTAL HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    ===================
    ===================
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    -------------
    17 CREDITOR LCS
    17 CREDITOR LCS
    17 CREDITOR LCS
    1. MTU Services Ingat Kawan (M) Sdn Bhd
    2. include Contraves Sdn Bhd
    3. Axima Concept SA
    4. Contraves Advanced Devices Sdn Bhd
    5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
    6. Security & Services Malon Sdn Bhd,
    7. iXblue SAS
    8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
    9. Bank Pembangunan Malon Bhd
    10. AmBank Islamic Bhd
    11. AmBank (M) Bhd
    12. Affin Hwang Investment Bank Bhd
    13. Bank Muamalat Malon Bhd
    14. Affin Bank Bhd
    15. Bank Kerjasama Rakyat Malon Bhd
    16. Malayan Banking Bhd (Maybank)
    17. KUWAIT FINANCE HOUSE (MALON) BHD.
    ===================
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ===================
    KEYWORS
    LCS WITHOUT AMMO = DESTROYER WITH AMMO

    BalasHapus
  6. BOM PASUKAN KAWAN = Seperti dikutip dari Manila Bulletin yang mengunggah artikel pada 6 Maret 2013 Silam, Agbimuddin mengklaim jika bom yang dijatuhkan tadi telak mengenai kamp pasukan dan polisi Malon di Desa Tanduo, Lahad Datu yang merupakan bekas markas milisi Sulu.
    -----
    DITEMBAK APMM = Dua anggota Agensi Penguatkuasaan Maritim (Maritim Malon) cedera ditembak ketika sedang menjalankan rondaan Op Khas Pagar Laut di perairan Kunak pada 8.30 pagi tadi.
    -----
    TEMBAK PERWIRA = Seorang perwira tentara elit Malon tewas tertembak dalam sebuah demonstrasi di sebuah kamp militer di Kota Kinabalu, Sabah. Mayor Mohd Zahir Armaya, ayah lima anak berusia 36 tahun tertembak dalam sebuah latihan oleh seorang prajurit Angkatan Darat.
    -----
    TEMBAK KAWAN = Royal Malonn Air Force (RMAF )dikejutkan dengan ulah seorang anggotanya, yang tiba menembak mati tiga teman, yang bersama berjaga di pos.
    Peristiwa terjadi Jumat (13/8/2021) pagi waktu setempat di kamp Royal Malonn Air Force (RMAF) di Kota Samarahan, Sarawak, Malon.
    -----
    GRANAT KAWAN = Dua prajurit Angkatan Udara Kerajaan Malon (TUDM) tewas saat menjalani latihan menembak dan melempar granat di Tempat Latihan Dasar Granat Kem Syed Sirajuddin Target Range, Gemas Negeri Sembilan
    -----
    TABRAK KAPAL KAWAN = insiden itu berlaku ketika melaksanakan demonstrasi manuver bagi memintas bot mencurigakan di jeti Pangkalan TLDM Lumut sempena HTA22
    =============
    Malonn's armed forces procurement faces several weaknesses, including:
    1. Corruption
    The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
    2. Political influence
    Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
    Weak parliamentary oversight
    Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
    3. Limited financial scrutiny
    Financial scrutiny is limited by excessive secrecy.
    4. Violation of procedures
    Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
    ============
    Malonn has faced several crises, including political, financial, and economic crises:
    • Political crisis
    From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
    • Financial crisis
    Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
    • Economic crisis
    Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
    • Household debt crisis
    As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
    • Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....

    BalasHapus
  7. Jom kita lihat kapal siapa yang OMPONG...Siapa HUTANG dan siapa CASH.. 🔥🔥🤣🤣

    MALAYSIA - LMS BATCH 2 - 3 BUAH (KORVET) - CASH
    1. MERIAM 76MM
    2. MISIL ATMACA
    3. MISIL K-SAAM
    4. MERIAM SMASH 30MM

    INDIANESIA - PPA LIGHT PLUS (OPV) - 2 BUAH KAPAL BEKAS - HUTANG LENDER
    1. MERIAM 127MM
    2. MERIAM 76MM

    BalasHapus
    Balasan
    1. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
      -
      1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
      -
      2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      =========
      KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
      -
      1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
      -
      2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
      =========
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      Apache AH-64E contract for Indonesia for $1.42 BILLION
      -
      The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      =========
      KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
      -
      PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
      -
      LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      =========
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      =========
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
      =========
      ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
      =========
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    2. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
      -
      1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
      -
      2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      =========
      KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
      -
      1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
      -
      2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
      =========
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      Apache AH-64E contract for Indonesia for $1.42 BILLION
      -
      The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      =========
      KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
      -
      PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
      -
      LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      =========
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      =========
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
      =========
      ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
      =========
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    3. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • TOTAL HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      ===================
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      -------------
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
  8. Jom kita lihat kapal siapa yang OMPONG...Siapa HUTANG dan siapa CASH.. 🔥🔥🤣🤣

    MALAYSIA - LMS BATCH 2 - 3 BUAH (KORVET) - CASH
    1. MERIAM 76MM
    2. MISIL ATMACA
    3. MISIL K-SAAM
    4. MERIAM SMASH 30MM

    INDIANESIA - PPA LIGHT PLUS (OPV) - 2 BUAH KAPAL BEKAS - HUTANG LENDER
    1. MERIAM 127MM
    2. MERIAM 76MM

    BalasHapus
    Balasan
    1. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • TOTAL HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      ===================
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      -------------
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
  9. Kapal PPA versi GUN BOAT.... 🔥🔥🤣🤣

    BalasHapus
    Balasan
    1. BOM PASUKAN KAWAN = Seperti dikutip dari Manila Bulletin yang mengunggah artikel pada 6 Maret 2013 Silam, Agbimuddin mengklaim jika bom yang dijatuhkan tadi telak mengenai kamp pasukan dan polisi Malon di Desa Tanduo, Lahad Datu yang merupakan bekas markas milisi Sulu.
      -----
      DITEMBAK APMM = Dua anggota Agensi Penguatkuasaan Maritim (Maritim Malon) cedera ditembak ketika sedang menjalankan rondaan Op Khas Pagar Laut di perairan Kunak pada 8.30 pagi tadi.
      -----
      TEMBAK PERWIRA = Seorang perwira tentara elit Malon tewas tertembak dalam sebuah demonstrasi di sebuah kamp militer di Kota Kinabalu, Sabah. Mayor Mohd Zahir Armaya, ayah lima anak berusia 36 tahun tertembak dalam sebuah latihan oleh seorang prajurit Angkatan Darat.
      -----
      TEMBAK KAWAN = Royal Malonn Air Force (RMAF )dikejutkan dengan ulah seorang anggotanya, yang tiba menembak mati tiga teman, yang bersama berjaga di pos.
      Peristiwa terjadi Jumat (13/8/2021) pagi waktu setempat di kamp Royal Malonn Air Force (RMAF) di Kota Samarahan, Sarawak, Malon.
      -----
      GRANAT KAWAN = Dua prajurit Angkatan Udara Kerajaan Malon (TUDM) tewas saat menjalani latihan menembak dan melempar granat di Tempat Latihan Dasar Granat Kem Syed Sirajuddin Target Range, Gemas Negeri Sembilan
      -----
      TABRAK KAPAL KAWAN = insiden itu berlaku ketika melaksanakan demonstrasi manuver bagi memintas bot mencurigakan di jeti Pangkalan TLDM Lumut sempena HTA22
      =============
      Malonn's armed forces procurement faces several weaknesses, including:
      1. Corruption
      The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
      2. Political influence
      Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
      Weak parliamentary oversight
      Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
      3. Limited financial scrutiny
      Financial scrutiny is limited by excessive secrecy.
      4. Violation of procedures
      Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
      ============
      Malonn has faced several crises, including political, financial, and economic crises:
      • Political crisis
      From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
      • Financial crisis
      Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
      • Economic crisis
      Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
      • Household debt crisis
      As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
      • Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....

      Hapus
    2. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • TOTAL HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      ===================
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      -------------
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
  10. Ini LAWAK...KAPAL OMPONG semahal FREMM.... 🤣🤣

    DIPERTANYAKAN HARGA 2 Kapal Fregat FREMM Mesir Sama dengan Harga 2 Kapal PPA Indonesia, Kok Bisa?

    https://medan.tribunnews.com/2024/04/19/dipertanyakan-harga-2-kapal-fregat-fremm-mesir-sama-dengan-harga-2-kapal-ppa-indonesia-kok-bisa

    BalasHapus
    Balasan
    1. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • TOTAL HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      ===================
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      -------------
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
  11. Ini lawak.... Masak negara tdk punya kapal yg pakai rudal 😁😁😁😁😁😁 Timor Leste pasti tertawa

    BalasHapus
  12. Kasihan ada ya negara yg kapalnya tdk ada rudalnya dan menggunakan kapal tua yg sudah tenggelam utk digunakan lagi 😁😁😁😁😁
    Minggir lu miskin parahhhh

    BalasHapus
  13. Lah ternyata...patutlah Itali beriya iya mahu menjual 2 buah kapal ini... 🔥🔥🤣🤣

    PPA INDONESIA MEMANG SENGAJA DIBUANG OLEH ANGKATAN LAUT ITALIA SETELAH MEREKA TAU HAL INI

    https://m.youtube.com/watch?v=zxhWBmcishs

    BalasHapus
    Balasan
    1. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
      -
      1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
      -
      2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      =========
      KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
      -
      1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
      -
      2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
      =========
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      Apache AH-64E contract for Indonesia for $1.42 BILLION
      -
      The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      =========
      KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
      -
      PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
      -
      LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      =========
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      =========
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
      =========
      ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
      =========
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
  14. Lah ternyata...patutlah Itali beriya iya mahu menjual 2 buah kapal ini... 🔥🔥🤣🤣

    PPA INDONESIA MEMANG SENGAJA DIBUANG OLEH ANGKATAN LAUT ITALIA SETELAH MEREKA TAU HAL INI

    https://m.youtube.com/watch?v=zxhWBmcishs

    BalasHapus
    Balasan
    1. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
      -
      1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
      -
      2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      =========
      KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
      -
      1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
      -
      2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
      =========
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      Apache AH-64E contract for Indonesia for $1.42 BILLION
      -
      The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      =========
      KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
      -
      PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
      -
      LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      =========
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      =========
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
      =========
      ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
      =========
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
  15. Ini beerti Itali jual KAPAL PPA yang mereka tidak mahu untuk diganti kan dengan 2 KAPAL PPA VERSI terbaru EVO... Lah jelas INDIANESIA di PRANK... 🔥🔥🤣🤣

    BalasHapus
    Balasan
    1. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
      -
      1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
      -
      2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      =========
      KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
      -
      1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
      -
      2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
      =========
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      Apache AH-64E contract for Indonesia for $1.42 BILLION
      -
      The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      =========
      KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
      -
      PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
      -
      LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      =========
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      =========
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
      =========
      ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
      =========
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    2. 17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
    3. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • TOTAL HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      ===================
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      -------------
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
  16. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • TOTAL HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    ===================
    ===================
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    -------------
    17 CREDITOR LCS
    17 CREDITOR LCS
    17 CREDITOR LCS
    1. MTU Services Ingat Kawan (M) Sdn Bhd
    2. include Contraves Sdn Bhd
    3. Axima Concept SA
    4. Contraves Advanced Devices Sdn Bhd
    5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
    6. Security & Services Malon Sdn Bhd,
    7. iXblue SAS
    8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
    9. Bank Pembangunan Malon Bhd
    10. AmBank Islamic Bhd
    11. AmBank (M) Bhd
    12. Affin Hwang Investment Bank Bhd
    13. Bank Muamalat Malon Bhd
    14. Affin Bank Bhd
    15. Bank Kerjasama Rakyat Malon Bhd
    16. Malayan Banking Bhd (Maybank)
    17. KUWAIT FINANCE HOUSE (MALON) BHD.
    ===================
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ===================
    KEYWORS
    LCS WITHOUT AMMO = DESTROYER WITH AMMO

    BalasHapus
  17. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • TOTAL HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    ===================
    ===================
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    -------------
    17 CREDITOR LCS
    17 CREDITOR LCS
    17 CREDITOR LCS
    1. MTU Services Ingat Kawan (M) Sdn Bhd
    2. include Contraves Sdn Bhd
    3. Axima Concept SA
    4. Contraves Advanced Devices Sdn Bhd
    5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
    6. Security & Services Malon Sdn Bhd,
    7. iXblue SAS
    8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
    9. Bank Pembangunan Malon Bhd
    10. AmBank Islamic Bhd
    11. AmBank (M) Bhd
    12. Affin Hwang Investment Bank Bhd
    13. Bank Muamalat Malon Bhd
    14. Affin Bank Bhd
    15. Bank Kerjasama Rakyat Malon Bhd
    16. Malayan Banking Bhd (Maybank)
    17. KUWAIT FINANCE HOUSE (MALON) BHD.
    ===================
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ===================
    KEYWORS
    LCS WITHOUT AMMO = DESTROYER WITH AMMO

    BalasHapus
  18. Nampak tak permainan ITALI... JUAL secepat mungkin 2 KAPAL PPA VERSI awal LIGHT PLUS dan Ganti dengan 2 KAPAL PPA versi EVO yang terbaru...🤣🤣

    Fincantieri beralasan "Unit-unit tersebut akan dapat mendukung Indonesia dalam melindungi kepentingan nasional dan berkontribusi pada stabilitas kuadran strategis Indo-Pasifik yang rapuh".

    Sebagai ganti kapal PPA yang dijual ke Indonesia, Fincantieri siap menambal kekurangan 2 kapal pesanan Italia dengan PPA Evo.

    BalasHapus
    Balasan
    1. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      FACT LCS 2025 - 2011 = 15 YEARS
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
      ===================
      FACT GOVERNMENT ........
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
      Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
      Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
      ==============
      BUDGET 2025 FOR ......
      SALARIES AND OTHER STUFF
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.

      Hapus
    2. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
      -
      1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
      -
      2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      =========
      KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
      -
      1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
      -
      2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
      =========
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      Apache AH-64E contract for Indonesia for $1.42 BILLION
      -
      The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      =========
      KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
      -
      PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
      -
      LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      =========
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      =========
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
      =========
      ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
      =========
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    3. LOST = RM14.82 MILLION
      LOST = RM14.82 MILLION
      SELL 51% CAD TO RHEINMETALL AG
      SELL 51% CAD TO RHEINMETALL AG
      SELL 51% CAD TO RHEINMETALL AG
      Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
      BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
      ---------------------
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
      High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
      The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
      ---------------------
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      FACT LCS 2025 - 2011 = 15 YEARS
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.

      Hapus
  19. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    FACT LCS 2025 - 2011 = 15 YEARS
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ===================
    FACT NOT YET DELIVERED :
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ===================
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
    ===================
    FACT GOVERNMENT ........
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
    Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
    Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
    ==============
    BUDGET 2025 FOR ......
    SALARIES AND OTHER STUFF
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.

    BalasHapus
  20. Nampak tak permainan ITALI... JUAL secepat mungkin 2 KAPAL PPA VERSI awal LIGHT PLUS dan Ganti dengan 2 KAPAL PPA versi EVO yang terbaru...🤣🤣

    Fincantieri beralasan "Unit-unit tersebut akan dapat mendukung Indonesia dalam melindungi kepentingan nasional dan berkontribusi pada stabilitas kuadran strategis Indo-Pasifik yang rapuh".

    Sebagai ganti kapal PPA yang dijual ke Indonesia, Fincantieri siap menambal kekurangan 2 kapal pesanan Italia dengan PPA Evo.

    BalasHapus
    Balasan
    1. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      FACT LCS 2025 - 2011 = 15 YEARS
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
      ===================
      FACT GOVERNMENT ........
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
      Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
      Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
      ==============
      BUDGET 2025 FOR ......
      SALARIES AND OTHER STUFF
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.

      Hapus
    2. mengklaim jika bom yang dijatuhkan tadi telak mengenai kamp pasukan dan polisi Malon di Desa Tanduo, Lahad Datu yang merupakan bekas markas milisi Sulu.
      -----
      DITEMBAK APMM = Dua anggota Agensi Penguatkuasaan Maritim (Maritim Malon) cedera ditembak ketika sedang menjalankan rondaan Op Khas Pagar Laut di perairan Kunak pada 8.30 pagi tadi.
      -----
      TEMBAK PERWIRA = Seorang perwira tentara elit Malon tewas tertembak dalam sebuah demonstrasi di sebuah kamp militer di Kota Kinabalu, Sabah. Mayor Mohd Zahir Armaya, ayah lima anak berusia 36 tahun tertembak dalam sebuah latihan oleh seorang prajurit Angkatan Darat.
      -----
      TEMBAK KAWAN = Royal Malonn Air Force (RMAF )dikejutkan dengan ulah seorang anggotanya, yang tiba menembak mati tiga teman, yang bersama berjaga di pos.
      Peristiwa terjadi Jumat (13/8/2021) pagi waktu setempat di kamp Royal Malonn Air Force (RMAF) di Kota Samarahan, Sarawak, Malon.
      -----
      GRANAT KAWAN = Dua prajurit Angkatan Udara Kerajaan Malon (TUDM) tewas saat menjalani latihan menembak dan melempar granat di Tempat Latihan Dasar Granat Kem Syed Sirajuddin Target Range, Gemas Negeri Sembilan
      -----
      TABRAK KAPAL KAWAN = insiden itu berlaku ketika melaksanakan demonstrasi manuver bagi memintas bot mencurigakan di jeti Pangkalan TLDM Lumut sempena HTA22
      =============
      Malonn's armed forces procurement faces several weaknesses, including:
      1. Corruption
      The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
      2. Political influence
      Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
      Weak parliamentary oversight
      Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
      3. Limited financial scrutiny
      Financial scrutiny is limited by excessive secrecy.
      4. Violation of procedures
      Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
      ============
      Malonn has faced several crises, including political, financial, and economic crises:
      • Political crisis
      From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
      • Financial crisis
      Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
      • Economic crisis
      Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
      • Household debt crisis
      As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
      • Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....

      Hapus
    3. LOST = RM14.82 MILLION
      LOST = RM14.82 MILLION
      SELL 51% CAD TO RHEINMETALL AG
      SELL 51% CAD TO RHEINMETALL AG
      SELL 51% CAD TO RHEINMETALL AG
      Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
      BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
      ---------------------
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
      High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
      The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
      ---------------------
      FACT LCS 2025 - 2011 = 15 YEARS
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
      ===================
      ===================
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA

      Hapus
    4. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
      -
      1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
      -
      2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      =========
      KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
      -
      1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
      -
      2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
      =========
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      Apache AH-64E contract for Indonesia for $1.42 BILLION
      -
      The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      =========
      KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
      -
      PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
      -
      LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      =========
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      =========
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
      =========
      ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
      =========
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
  21. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
    -
    1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
    -
    2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    =========
    KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
    -
    1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
    -
    2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
    =========
    KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
    -
    1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
    -
    2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
    -
    Apache AH-64E contract for Indonesia for $1.42 BILLION
    -
    The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
    -
    USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
    =========
    KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
    -
    PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
    -
    LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    =========
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    =========
    KEYWORDS
    1 UNIT JAVELIN = 3 UNIT NLAW
    4.5 KM JAVELIN = 1 KM NLAW
    ---
    Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
    The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
    =========
    ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
    =========
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

    BalasHapus
  22. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • TOTAL HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    ===================
    ===================
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    -------------
    17 CREDITOR LCS
    17 CREDITOR LCS
    17 CREDITOR LCS
    1. MTU Services Ingat Kawan (M) Sdn Bhd
    2. include Contraves Sdn Bhd
    3. Axima Concept SA
    4. Contraves Advanced Devices Sdn Bhd
    5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
    6. Security & Services Malon Sdn Bhd,
    7. iXblue SAS
    8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
    9. Bank Pembangunan Malon Bhd
    10. AmBank Islamic Bhd
    11. AmBank (M) Bhd
    12. Affin Hwang Investment Bank Bhd
    13. Bank Muamalat Malon Bhd
    14. Affin Bank Bhd
    15. Bank Kerjasama Rakyat Malon Bhd
    16. Malayan Banking Bhd (Maybank)
    17. KUWAIT FINANCE HOUSE (MALON) BHD.
    ===================
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ===================
    KEYWORS
    LCS WITHOUT AMMO = DESTROYER WITH AMMO

    BalasHapus
  23. Nampak tak permainan ITALI... JUAL secepat mungkin 2 KAPAL PPA VERSI awal LIGHT PLUS dan Ganti dengan 2 KAPAL PPA versi EVO yang terbaru...🤣🤣

    Fincantieri beralasan "Unit-unit tersebut akan dapat mendukung Indonesia dalam melindungi kepentingan nasional dan berkontribusi pada stabilitas kuadran strategis Indo-Pasifik yang rapuh".

    Sebagai ganti kapal PPA yang dijual ke Indonesia, Fincantieri siap menambal kekurangan 2 kapal pesanan Italia dengan PPA Evo.

    BalasHapus
    Balasan
    1. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      FACT LCS 2025 - 2011 = 15 YEARS
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
      ===================
      FACT GOVERNMENT ........
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
      Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
      Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
      ==============
      BUDGET 2025 FOR ......
      SALARIES AND OTHER STUFF
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.

      Hapus
    2. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • TOTAL HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      ===================
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      -------------
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
  24. Nampak tak permainan ITALI... JUAL secepat mungkin 2 KAPAL PPA VERSI awal LIGHT PLUS dan Ganti dengan 2 KAPAL PPA versi EVO yang terbaru...🤣🤣

    Fincantieri beralasan "Unit-unit tersebut akan dapat mendukung Indonesia dalam melindungi kepentingan nasional dan berkontribusi pada stabilitas kuadran strategis Indo-Pasifik yang rapuh".

    Sebagai ganti kapal PPA yang dijual ke Indonesia, Fincantieri siap menambal kekurangan 2 kapal pesanan Italia dengan PPA Evo.

    BalasHapus
    Balasan
    1. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
      -
      1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
      -
      2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      =========
      KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
      -
      1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
      -
      2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
      =========
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      Apache AH-64E contract for Indonesia for $1.42 BILLION
      -
      The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      =========
      KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
      -
      PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
      -
      LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      =========
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      =========
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
      =========
      ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
      =========
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    2. UNREADY ARMED FORCES
      UNREADY ARMED FORCES
      UNREADY ARMED FORCES
      the Malonnn military is today the region’s weakest. It is riddled with corruption, poor planning, and interference by political leaders in procurement, no longer a potent force even in managing low-level intensity conflict at a time when tensions in the South China Sea are higher than they have been since the days of the Vietnam War.
      A 2019 White Paper on Defense – nearly four years ago – called for more funds and punch as well as an overhaul of the procurement system to allow professionals to decide on what weapon systems they need. Instead, PM Anwar Ibrahim’s proposal to increase the defense budget by 10 percent to fund procurement will be delayed because of budgetary considerations related to the flagging economy, expected by the World Bank to grow at a mediocre 3.9 percent in 2023, down from an earlier estimate of 4.3 percent in April
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
  25. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    FACT LCS 2025 - 2011 = 15 YEARS
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ===================
    FACT NOT YET DELIVERED :
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ===================
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
    ===================
    FACT GOVERNMENT ........
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
    Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
    Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
    ==============
    BUDGET 2025 FOR ......
    SALARIES AND OTHER STUFF
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.

    BalasHapus
  26. 17 CREDITOR LCS
    17 CREDITOR LCS
    17 CREDITOR LCS
    1. MTU Services Ingat Kawan (M) Sdn Bhd
    2. include Contraves Sdn Bhd
    3. Axima Concept SA
    4. Contraves Advanced Devices Sdn Bhd
    5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
    6. Security & Services Malon Sdn Bhd,
    7. iXblue SAS
    8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
    9. Bank Pembangunan Malon Bhd
    10. AmBank Islamic Bhd
    11. AmBank (M) Bhd
    12. Affin Hwang Investment Bank Bhd
    13. Bank Muamalat Malon Bhd
    14. Affin Bank Bhd
    15. Bank Kerjasama Rakyat Malon Bhd
    16. Malayan Banking Bhd (Maybank)
    17. KUWAIT FINANCE HOUSE (MALON) BHD.
    ===================
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ===================
    THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
    • Logistics
    A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
    • Budgeting
    Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    • Personnel
    The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
    • Procurement
    The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
    • Political interference
    Political interference and corruption are undermining combat readiness.
    • Territorial disputes
    Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
    • Transboundary haze
    Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
    • Fleet sustainment
    The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
    • Technological obsolescence
    Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
    • Modernization
    The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

    BalasHapus
  27. Ini bermakna Itali jual dengan segera 2 kapal PPA versi awal yang LEMAH dan diganti dengan 2 kapal PPA versi paling berkuasa EVO... Pandai Itali... 👍🏻👍🏻🤣🤣

    ROME — New versions of Italy’s PPA multimission navy vessels are to be kitted out with extra missile launchers, including cruise missile launchers, Italian industry officials said at the Euronaval trade show in Paris.

    The ships’ new “EVO” variant, which the Italian Navy may order next year, will get extra Sylver 50 launch modules, which house Aster missiles, but also Sylver 70 launch modules which will fire Aster missiles as well as cruise missiles, including the MdCN naval land-attack missile.

    BalasHapus
  28. Ada negara kena GAME sama Itali guys... 🤣🤣🤣

    BalasHapus
    Balasan
    1. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
  29. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    17 CREDITOR LCS
    17 CREDITOR LCS
    17 CREDITOR LCS
    1. MTU Services Ingat Kawan (M) Sdn Bhd
    2. include Contraves Sdn Bhd
    3. Axima Concept SA
    4. Contraves Advanced Devices Sdn Bhd
    5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
    6. Security & Services Malon Sdn Bhd,
    7. iXblue SAS
    8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
    9. Bank Pembangunan Malon Bhd
    10. AmBank Islamic Bhd
    11. AmBank (M) Bhd
    12. Affin Hwang Investment Bank Bhd
    13. Bank Muamalat Malon Bhd
    14. Affin Bank Bhd
    15. Bank Kerjasama Rakyat Malon Bhd
    16. Malayan Banking Bhd (Maybank)
    17. KUWAIT FINANCE HOUSE (MALON) BHD.
    ===================
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

    BalasHapus
  30. Ini bermakna Itali jual dengan segera 2 kapal PPA versi awal yang LEMAH dan diganti dengan 2 kapal PPA versi paling berkuasa EVO... Pandai Itali... 👍🏻👍🏻🤣🤣

    ROME — New versions of Italy’s PPA multimission navy vessels are to be kitted out with extra missile launchers, including cruise missile launchers, Italian industry officials said at the Euronaval trade show in Paris.

    The ships’ new “EVO” variant, which the Italian Navy may order next year, will get extra Sylver 50 launch modules, which house Aster missiles, but also Sylver 70 launch modules which will fire Aster missiles as well as cruise missiles, including the MdCN naval land-attack missile.

    BalasHapus
    Balasan
    1. UNREADY ARMED FORCES
      UNREADY ARMED FORCES
      UNREADY ARMED FORCES
      the Malonnn military is today the region’s weakest. It is riddled with corruption, poor planning, and interference by political leaders in procurement, no longer a potent force even in managing low-level intensity conflict at a time when tensions in the South China Sea are higher than they have been since the days of the Vietnam War.
      A 2019 White Paper on Defense – nearly four years ago – called for more funds and punch as well as an overhaul of the procurement system to allow professionals to decide on what weapon systems they need. Instead, PM Anwar Ibrahim’s proposal to increase the defense budget by 10 percent to fund procurement will be delayed because of budgetary considerations related to the flagging economy, expected by the World Bank to grow at a mediocre 3.9 percent in 2023, down from an earlier estimate of 4.3 percent in April
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
    2. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      FACT LCS 2025 - 2011 = 15 YEARS
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
      ===================
      FACT GOVERNMENT ........
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
      Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
      Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
      ==============
      BUDGET 2025 FOR ......
      SALARIES AND OTHER STUFF
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.

      Hapus
    3. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • TOTAL HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      ===================
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      -------------
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
  31. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
    -
    1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
    -
    2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    =========
    KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
    -
    1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
    -
    2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
    =========
    KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
    -
    1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
    -
    2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
    -
    Apache AH-64E contract for Indonesia for $1.42 BILLION
    -
    The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
    -
    USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
    =========
    KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
    -
    PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
    -
    LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    =========
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    =========
    KEYWORDS
    1 UNIT JAVELIN = 3 UNIT NLAW
    4.5 KM JAVELIN = 1 KM NLAW
    ---
    Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
    The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
    =========
    ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
    =========
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

    BalasHapus
  32. Ini bermakna Itali jual dengan segera 2 kapal PPA versi awal yang LEMAH dan diganti dengan 2 kapal PPA versi paling berkuasa EVO... Pandai Itali... 👍🏻👍🏻🤣🤣

    ROME — New versions of Italy’s PPA multimission navy vessels are to be kitted out with extra missile launchers, including cruise missile launchers, Italian industry officials said at the Euronaval trade show in Paris.

    The ships’ new “EVO” variant, which the Italian Navy may order next year, will get extra Sylver 50 launch modules, which house Aster missiles, but also Sylver 70 launch modules which will fire Aster missiles as well as cruise missiles, including the MdCN naval land-attack missile.

    BalasHapus
    Balasan
    1. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      FACT LCS 2025 - 2011 = 15 YEARS
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
      ===================
      FACT GOVERNMENT ........
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
      Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
      Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
      ==============
      BUDGET 2025 FOR ......
      SALARIES AND OTHER STUFF
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.


      Hapus
    2. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
      -
      1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
      -
      2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      =========
      KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
      -
      1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
      -
      2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
      =========
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      Apache AH-64E contract for Indonesia for $1.42 BILLION
      -
      The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      =========
      KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
      -
      PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
      -
      LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      =========
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      =========
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
      =========
      ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
      =========
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    3. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
  33. PPA INDONESIA MEMANG SENGAJA DIBUANG OLEH ANGAKATAN LAUT ITALIA SETELAH MEREKA TAU HAL INI

    https://m.youtube.com/watch?v=zxhWBmcishs

    BalasHapus
    Balasan
    1. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    2. UNREADY ARMED FORCES
      UNREADY ARMED FORCES
      UNREADY ARMED FORCES
      the Malonnn military is today the region’s weakest. It is riddled with corruption, poor planning, and interference by political leaders in procurement, no longer a potent force even in managing low-level intensity conflict at a time when tensions in the South China Sea are higher than they have been since the days of the Vietnam War.
      A 2019 White Paper on Defense – nearly four years ago – called for more funds and punch as well as an overhaul of the procurement system to allow professionals to decide on what weapon systems they need. Instead, PM Anwar Ibrahim’s proposal to increase the defense budget by 10 percent to fund procurement will be delayed because of budgetary considerations related to the flagging economy, expected by the World Bank to grow at a mediocre 3.9 percent in 2023, down from an earlier estimate of 4.3 percent in April
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
    3. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      FACT LCS 2025 - 2011 = 15 YEARS
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
      ===================
      FACT GOVERNMENT ........
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
      Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
      Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
      ==============
      BUDGET 2025 FOR ......
      SALARIES AND OTHER STUFF
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.

      Hapus
  34. PPA INDONESIA MEMANG SENGAJA DIBUANG OLEH ANGAKATAN LAUT ITALIA SETELAH MEREKA TAU HAL INI

    https://m.youtube.com/watch?v=zxhWBmcishs

    BalasHapus
    Balasan
    1. 17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
    2. 165 KRI
      136 KAL PATKAMLA
      113 PESAWAT UDARA
      388 KENDARAAN TEMPUR
      Dengan demikian, kekuatan armada tempur TNI AL saat ini mencakup 165 kapal perang (KRI), 136 KAL, kapal-kapal patroli keamanan laut (patkamla), 113 pesawat udara, dan 388 kendaraan tempur.
      ---------------------
      18 COMBAT BOAT - ARMOUR PROTECTION = Patkamla Jefman memiliki beberapa keunggulan yaitu memiliki Armour Protection Standard STANAG Level 2, mampu beroperasi di medan pesisir laut, alur sungai dan daerah rawa. Saat ini TNI AL telah memiliki 18 Combat Boat Standard, dimana untuk Koarmada III saat ini membutuhkan 9 Unit Special Mission Combat Boat lagi yang akan ditempatkan jajaran dibawahnya baik di Lantamal, Lanal, dan Fasharkan Manokwari.
      ----
      Combat Boat Milik TNI AL ....
      1.Patkamla Mamburungan
      2.Patkamla Pulau Bakau
      3.Patkamla Pulau Numfor
      4.Patkamla Bali
      5.Patkamla Pulau Salando
      6.Patkamla Busalangga
      7.Patkamla Lamaru
      8.Patkamla Coebang
      9.Patkamla Pelambong
      10.Patkamla Pulau Sebesi
      11.Patkamla Karimun
      12.Patkamla Gebang
      13.Patkamla Pulau Pagerungan
      14.Patkamla Pulau Semau
      15.Patkamla Pulau Yapen
      16.Patkamla Pulau Langkai
      17.Patkamla Kastela
      18.Patkamla Santiago
      19.Patkamla Binanga
      20.Patkamla Balaroa
      21.Patkamla Gorar
      22.Patkamla Wasur
      23.Patkamla Posa
      CMB spesial kopaska
      24.KAL Kilat
      25.KAL Guruh
      26.KAL Tornado
      ===========
      ===========
      4 UNIT PLAT TIPIS G2000 Mk II memiliki lambung aluminium dan berbobot sekitar 26 ton pada beban standarnya.
      ---------------------
      SEWA FAST INTERCEPTOR BOAT
      SEWA UTILITY BOAT
      SEWA RIGID HULL FENDER BOAT
      SEWA ROVER FIBER GLASS
      SEWA EC120B
      SEWA FLIGHT SIMULATION TRAINING DEVICE
      Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
      Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
      Melalui kaedah sewaan ini, tempoh masa untuk melaksanakan proses perolehan termasuk berkaitan tender serta pembinaan aset dapat dikurangkan.
      ---------------------
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak sewaan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
      ---------------------
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      ---------------------
      READINESS 58.6% X 55 Unit = 32 UNIT
      READINESS 58.6% X 55 Unit = 32 UNIT
      READINESS 58.6% X 55 Unit = 32 UNIT
      This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.


      Hapus
    3. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • TOTAL HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      ===================
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      -------------
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
  35. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • TOTAL HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    ===================
    ===================
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    -------------
    17 CREDITOR LCS
    17 CREDITOR LCS
    17 CREDITOR LCS
    1. MTU Services Ingat Kawan (M) Sdn Bhd
    2. include Contraves Sdn Bhd
    3. Axima Concept SA
    4. Contraves Advanced Devices Sdn Bhd
    5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
    6. Security & Services Malon Sdn Bhd,
    7. iXblue SAS
    8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
    9. Bank Pembangunan Malon Bhd
    10. AmBank Islamic Bhd
    11. AmBank (M) Bhd
    12. Affin Hwang Investment Bank Bhd
    13. Bank Muamalat Malon Bhd
    14. Affin Bank Bhd
    15. Bank Kerjasama Rakyat Malon Bhd
    16. Malayan Banking Bhd (Maybank)
    17. KUWAIT FINANCE HOUSE (MALON) BHD.
    ===================
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ===================
    KEYWORS
    LCS WITHOUT AMMO = DESTROYER WITH AMMO

    BalasHapus
  36. Kasihan. Pasti beruk2 dari negara miskin yg hanya punya gun boat sangat iri dg kapal2 TNI AL yg punya rudal komplitttt... Ha ha ha ha
    Minggir lu miskin parahhhh

    BalasHapus
  37. 17 CREDITOR LCS =
    1. MTU Services Ingat Kawan (M) Sdn Bhd
    2. include Contraves Sdn Bhd
    3. Axima Concept SA
    4. Contraves Advanced Devices Sdn Bhd
    5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
    6. Security & Services Malon Sdn Bhd,
    7. iXblue SAS
    8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
    9. Bank Pembangunan Malon Bhd
    10. AmBank Islamic Bhd
    11. AmBank (M) Bhd
    12. Affin Hwang Investment Bank Bhd
    13. Bank Muamalat Malon Bhd
    14. Affin Bank Bhd
    15. Bank Kerjasama Rakyat Malon Bhd
    16. Malayan Banking Bhd (Maybank)
    17. KUWAIT FINANCE HOUSE (MALON) BHD.
    ===================
    SIPRI LCS = DELIVERED : 0 (KONTRAK KOSONG) ......
    SAK 70 MK 3 - DELIVERED = 0
    MICA - DELIVERED = 0
    SHIP ENGINE - DELIVERED = 0
    FIRE CONTROL RADAR - DELIVERED = 0
    AIR CONTROL RADAR - DELIVERED = 0
    ===================
    FACT LCS 2025 - 2011 = 15 YEARS
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ===================
    FACT NOT YET DELIVERED :
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ===================
    FACT ..........
    BLASTING = MENGHILANGKAN KARAT LCS
    PAINTING = MENUTUP BEKAS KARAT LCS
    Littoral Combat Ship (LCS) 2 has successfully completed the blasting and first level of painting process, marking a significant milestone in its construction journey. It will later transition to further surface preparation and coating applications to ensure all critical areas meet the required standards
    ===================
    The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years


    BalasHapus
  38. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • TOTAL HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    ===================
    ===================
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    -------------
    17 CREDITOR LCS
    17 CREDITOR LCS
    17 CREDITOR LCS
    1. MTU Services Ingat Kawan (M) Sdn Bhd
    2. include Contraves Sdn Bhd
    3. Axima Concept SA
    4. Contraves Advanced Devices Sdn Bhd
    5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
    6. Security & Services Malon Sdn Bhd,
    7. iXblue SAS
    8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
    9. Bank Pembangunan Malon Bhd
    10. AmBank Islamic Bhd
    11. AmBank (M) Bhd
    12. Affin Hwang Investment Bank Bhd
    13. Bank Muamalat Malon Bhd
    14. Affin Bank Bhd
    15. Bank Kerjasama Rakyat Malon Bhd
    16. Malayan Banking Bhd (Maybank)
    17. KUWAIT FINANCE HOUSE (MALON) BHD.
    ===================
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ===================
    KEYWORS
    LCS WITHOUT AMMO = DESTROYER WITH AMMO

    BalasHapus
  39. Punya kapal Stealth selama 13 thn tak tampak oleh mata, hanya jin yg bisa lihat. Ha ha ha ha

    BalasHapus
  40. Punya kapal Stealth selama 13 thn tak tampak oleh mata, hanya jin yg bisa lihat. Ha ha ha ha

    BalasHapus
  41. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    FACT LCS 2025 - 2011 = 15 YEARS
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ===================
    FACT NOT YET DELIVERED :
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ===================
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
    ===================
    FACT GOVERNMENT ........
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
    Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
    Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
    ==============
    BUDGET 2025 FOR ......
    SALARIES AND OTHER STUFF
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.

    BalasHapus
  42. Hahahaha GEMPUR HALU akibat DENGKI AKUT kerajaannya NO SHOPING dan militernya LEMAH.
    KASIHAN 🤣🤣🤣🤣🤣

    BalasHapus
  43. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    FACT LCS 2025 - 2011 = 15 YEARS
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ===================
    FACT NOT YET DELIVERED :
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ===================
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.

    BalasHapus
  44. LOST = RM14.82 MILLION
    LOST = RM14.82 MILLION
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
    BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
    ---------------------
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
    High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
    The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
    ---------------------
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    FACT LCS 2025 - 2011 = 15 YEARS
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ===================
    FACT NOT YET DELIVERED :
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ===================
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.

    BalasHapus
  45. Kesian... Jelas di GAME sama Itali.. 🔥🔥🤣🤣

    PPA INDONESIA MEMANG SENGAJA DIBUANG OLEH ANGAKATAN LAUT ITALIA SETELAH MEREKA TAU HAL INI

    https://m.youtube.com/watch?v=zxhWBmcishs

    BalasHapus
    Balasan
    1. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
  46. Sejak kapan PPA pesanan Indonesia harganya setara fremm mesir, 😂😂😂
    Coba di baca lagi, kenapa malondesh ini 😝😝😝


    "Mesir membeli dua Kapal perang Fregat FREMM senilai Rp 20, 8 triliun.

    Sementara, Indonesia membeli dua Kapal sekelas patroli juga senilai Rp 20,3 triliun. "

    BalasHapus
  47. Sejak kapan PPA pesanan Indonesia harganya setara fremm mesir, 😂😂😂
    Coba di baca lagi, kenapa malondesh ini 😝😝😝


    "Mesir membeli dua Kapal perang Fregat FREMM senilai Rp 20, 8 triliun.

    Sementara, Indonesia membeli dua Kapal sekelas patroli juga senilai Rp 20,3 triliun. "

    BalasHapus
  48. Sejak kapan LCS di buang eh salah 🤣🤣🤣

    BalasHapus
  49. Setelah Itali dapat tahu yang Fincantieri bakal mengeluarkan KAPAL PPA versi paling BERKUASA iaitu PPA EVO.. Mereka segera menjual kapal. PPA mereka dari versi DOWNGRADE LIGHT PLUS OMPONG kepada mana mana negara yang berminat... 🤣🤣

    JUAL 2 PPA DOWNGRADE DIGANTI dengan 2 PPA EVO versi terbaru... ada negara termakan GAME Itali guys... 🤣🤣

    BalasHapus
    Balasan
    1. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      FACT LCS 2025 - 2011 = 15 YEARS
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
      ===================
      FACT GOVERNMENT ........
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
      Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
      Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
      ==============
      BUDGET 2025 FOR ......
      SALARIES AND OTHER STUFF
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.

      Hapus
  50. ITALI banyak UNTUNG...🤣🤣

    1. Dapat GANTI dengan 2 kapal baru PPA EVO
    2. KAPAL OPV LIGHT PLUS OMPONG seharga KAPAL FREMM FULL COMBAT..

    BalasHapus
    Balasan
    1. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
      -
      1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
      -
      2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      =========
      KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
      -
      1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
      -
      2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
      =========
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      Apache AH-64E contract for Indonesia for $1.42 BILLION
      -
      The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      =========
      KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
      -
      PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
      -
      LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      =========
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      =========
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
      =========
      ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
      =========
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    2. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      FACT LCS 2025 - 2011 = 15 YEARS
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
      ===================
      FACT GOVERNMENT ........
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
      Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
      Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
      ==============
      BUDGET 2025 FOR ......
      SALARIES AND OTHER STUFF
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.

      Hapus
    3. The Malonnn Armed Forces (MAF) faces a number of challenges, including:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
      =========
      A400M
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      Malon membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan pembayaran berperingkat.
      ----
      FA50M SAWIT
      On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
      ----
      SCORPENE SAWIT
      Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
      ----
      PT91 SAWIT KARET
      Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
      ----
      ANKA = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.

      Hapus
    4. READINESS 58.6% X 55 Unit = 32 UNIT
      READINESS 58.6% X 55 Unit = 32 UNIT
      READINESS 58.6% X 55 Unit = 32 UNIT
      This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
      ------------------------------------
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      ------------------------------------
      The Malonn army has faced some challenges, including corruption and issues with military personnel:
      • Corruption
      Malon's military has been involved in corruption, and the country's military doctrine doesn't recognize it as a threat. The Integrity Plan addresses corruption, but it's not a strategic document, and commanders don't receive training on corruption issues before deployments.
      • Military personnel
      Some say that military personnel have struggles with thinking skills, decision-making, and problem-solving.
      • Logistics
      Some say that Malon has had problems ensuring the readiness of the Malonn Armed Forces (MAF) in the face of threats
      -------------------------------------
      The Royal Malonnn Navy (RMN) has a few weaknesses, including:
      • Lack of modernization: The RMN's fleet is not up to date with current and future challenges. This makes it harder for Malonn to respond to disputes with other countries.
      • Funding shortages: The RMN has a history of funding shortages.
      • Location: The RMN is located between major powers, which could make its waters a frontier in the event of a naval conflict. This could threaten Malonn's sovereignty and maritime interests
      =============================
      The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    5. A400M
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      Malon membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan pembayaran berperingkat.
      ----
      FA50M SAWIT
      On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
      ----
      SCORPENE SAWIT
      Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
      ----
      PT91 SAWIT KARET
      Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
      ----
      ANKA = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      =========
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
      ===================
      ===================
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
  51. Masa kapal hanya setahap OPV LIGHT PLUS OMPONG.... hampir seharga FRIGAT FREMM FULL COMBAT..? 🤣🤣🤣

    "Mesir membeli dua Kapal perang Fregat FREMM senilai Rp 20, 8 triliun.

    Sementara, Indonesia membeli dua Kapal sekelas patroli juga senilai Rp 20,3 triliun. "

    BalasHapus
    Balasan
    1. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
      -
      1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
      -
      2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      =========
      KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
      -
      1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
      -
      2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
      =========
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      Apache AH-64E contract for Indonesia for $1.42 BILLION
      -
      The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      =========
      KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
      -
      PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
      -
      LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      =========
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      =========
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
      =========
      ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
      =========
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    2. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • TOTAL HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      ===================
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      -------------
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
    3. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • TOTAL HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      ===================
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      -------------
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
    4. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • TOTAL HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      ===================
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      -------------
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
    5. 17 CREDITOR LCS =
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      SIPRI LCS = DELIVERED : 0 (KONTRAK KOSONG) ......
      SAK 70 MK 3 - DELIVERED = 0
      MICA - DELIVERED = 0
      SHIP ENGINE - DELIVERED = 0
      FIRE CONTROL RADAR - DELIVERED = 0
      AIR CONTROL RADAR - DELIVERED = 0
      ===================
      FACT LCS 2025 - 2011 = 15 YEARS
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      FACT ..........
      BLASTING = MENGHILANGKAN KARAT LCS
      PAINTING = MENUTUP BEKAS KARAT LCS
      Littoral Combat Ship (LCS) 2 has successfully completed the blasting and first level of painting process, marking a significant milestone in its construction journey. It will later transition to further surface preparation and coating applications to ensure all critical areas meet the required standards
      ===================
      The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
  52. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
    -
    1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
    -
    2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    =========
    KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
    -
    1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
    -
    2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
    =========
    KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
    -
    1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
    -
    2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
    -
    Apache AH-64E contract for Indonesia for $1.42 BILLION
    -
    The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
    -
    USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
    =========
    KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
    -
    PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
    -
    LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    =========
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    =========
    KEYWORDS
    1 UNIT JAVELIN = 3 UNIT NLAW
    4.5 KM JAVELIN = 1 KM NLAW
    ---
    Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
    The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
    =========
    ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
    =========
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

    BalasHapus
  53. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • TOTAL HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    ===================
    ===================
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    -------------
    17 CREDITOR LCS
    17 CREDITOR LCS
    17 CREDITOR LCS
    1. MTU Services Ingat Kawan (M) Sdn Bhd
    2. include Contraves Sdn Bhd
    3. Axima Concept SA
    4. Contraves Advanced Devices Sdn Bhd
    5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
    6. Security & Services Malon Sdn Bhd,
    7. iXblue SAS
    8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
    9. Bank Pembangunan Malon Bhd
    10. AmBank Islamic Bhd
    11. AmBank (M) Bhd
    12. Affin Hwang Investment Bank Bhd
    13. Bank Muamalat Malon Bhd
    14. Affin Bank Bhd
    15. Bank Kerjasama Rakyat Malon Bhd
    16. Malayan Banking Bhd (Maybank)
    17. KUWAIT FINANCE HOUSE (MALON) BHD.
    ===================
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ===================
    KEYWORS
    LCS WITHOUT AMMO = DESTROYER WITH AMMO

    BalasHapus
  54. HEBAT GAME ITALI... 🤣🤣
    JUAL 2 kapal PPA LIGHT PLUS yang mereka tak mahu.. Ganti dengan 2 kapal PPA EVO versi terbaru yang lagi berkuasa...LAWAKnya ada yang kena GAME Itali.. 🤣🤣

    ROME — New versions of Italy’s PPA multimission navy vessels are to be kitted out with extra missile launchers, including cruise missile launchers, Italian industry officials said at the Euronaval trade show in Paris.

    The ships’ new “EVO” variant, which the Italian Navy may order next year, will get extra Sylver 50 launch modules, which house Aster missiles, but also Sylver 70 launch modules which will fire Aster missiles as well as cruise missiles, including the MdCN naval land-attack missile.

    BalasHapus
    Balasan
    1. A400M
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      Malon membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan pembayaran berperingkat.
      ----
      FA50M SAWIT
      On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
      ----
      SCORPENE SAWIT
      Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
      ----
      PT91 SAWIT KARET
      Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
      ----
      ANKA = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      =========
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
      ===================
      ===================
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
    2. LOST = RM14.82 MILLION
      LOST = RM14.82 MILLION
      SELL 51% CAD TO RHEINMETALL AG
      SELL 51% CAD TO RHEINMETALL AG
      SELL 51% CAD TO RHEINMETALL AG
      Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
      BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
      ---------------------
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
      High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
      The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
      ---------------------
      FACT LCS 2025 - 2011 = 15 YEARS
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
      ===================
      ===================
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
    3. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years


      Hapus
    4. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
      -
      1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
      -
      2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      =========
      KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
      -
      1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
      -
      2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
      =========
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      Apache AH-64E contract for Indonesia for $1.42 BILLION
      -
      The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      =========
      KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
      -
      PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
      -
      LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      =========
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      =========
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
      =========
      ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
      =========
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    5. UNREADY ARMED FORCES
      UNREADY ARMED FORCES
      UNREADY ARMED FORCES
      the Malonnn military is today the region’s weakest. It is riddled with corruption, poor planning, and interference by political leaders in procurement, no longer a potent force even in managing low-level intensity conflict at a time when tensions in the South China Sea are higher than they have been since the days of the Vietnam War.
      A 2019 White Paper on Defense – nearly four years ago – called for more funds and punch as well as an overhaul of the procurement system to allow professionals to decide on what weapon systems they need. Instead, PM Anwar Ibrahim’s proposal to increase the defense budget by 10 percent to fund procurement will be delayed because of budgetary considerations related to the flagging economy, expected by the World Bank to grow at a mediocre 3.9 percent in 2023, down from an earlier estimate of 4.3 percent in April
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
    6. 17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
  55. Selisih 0.5 triliun malondesh cakap setara 😂😂, malondesh kalau bodoh kelewatan 🤣🤣🤣

    BalasHapus
    Balasan
    1. A400M
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      Malon membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan pembayaran berperingkat.
      ----
      FA50M SAWIT
      On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
      ----
      SCORPENE SAWIT
      Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
      ----
      PT91 SAWIT KARET
      Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
      ----
      ANKA = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      =========
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
      ===================
      ===================
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
    2. LOST = RM14.82 MILLION
      LOST = RM14.82 MILLION
      SELL 51% CAD TO RHEINMETALL AG
      SELL 51% CAD TO RHEINMETALL AG
      SELL 51% CAD TO RHEINMETALL AG
      Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
      BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
      ---------------------
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
      High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
      The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
      ---------------------
      FACT LCS 2025 - 2011 = 15 YEARS
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
      ===================
      ===================
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO


      Hapus
    3. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      FACT LCS 2025 - 2011 = 15 YEARS
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
      ===================
      FACT GOVERNMENT ........
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
      Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
      Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
      ==============
      BUDGET 2025 FOR ......
      SALARIES AND OTHER STUFF
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.

      Hapus
    4. UNREADY ARMED FORCES
      UNREADY ARMED FORCES
      UNREADY ARMED FORCES
      the Malonnn military is today the region’s weakest. It is riddled with corruption, poor planning, and interference by political leaders in procurement, no longer a potent force even in managing low-level intensity conflict at a time when tensions in the South China Sea are higher than they have been since the days of the Vietnam War.
      A 2019 White Paper on Defense – nearly four years ago – called for more funds and punch as well as an overhaul of the procurement system to allow professionals to decide on what weapon systems they need. Instead, PM Anwar Ibrahim’s proposal to increase the defense budget by 10 percent to fund procurement will be delayed because of budgetary considerations related to the flagging economy, expected by the World Bank to grow at a mediocre 3.9 percent in 2023, down from an earlier estimate of 4.3 percent in April
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
  56. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
    -
    1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
    -
    2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    =========
    KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
    -
    1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
    -
    2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
    =========
    KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
    -
    1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
    -
    2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
    -
    Apache AH-64E contract for Indonesia for $1.42 BILLION
    -
    The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
    -
    USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
    =========
    KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
    -
    PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
    -
    LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    =========
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    =========
    KEYWORDS
    1 UNIT JAVELIN = 3 UNIT NLAW
    4.5 KM JAVELIN = 1 KM NLAW
    ---
    Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
    The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
    =========
    ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
    =========
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

    BalasHapus
  57. PARAH CANGGIH SANGAT😂😂😂
    Malondesh untung besar 😜😜😜

    Malondesh memang benar LCS di desain stealth, selama 14 tahun tak ada radar yang mampu deteksi alias halimunan tak nampak radar, itu sebuah prestasi yang luar biasa, bahkan Indonesia dan Singapura yang biasa bikin kapal kombatan dibuat melongo, karena kemampuan malondesh yang melampaui jauh kedua duanya 😂😂

    Konon ya guys LCS ini sudah beroperasi di laut cina selatan, selat melaka tak ada satupun kapal negara lain yang bisa mendeteksi keberadaan nya, teknologi LCS memang benar benar halimunan bangsa malondesh harus berbangga atas pencapaian nya 😜😜

    Negara macam Indonesia, Singapura, Thailand, Vietnam patut berhati-hati karena kemampuan LCS ini diatas kapal-kapal kombatan yang ada saat ini, karena LCS sangat unggul di berbagai teknologi, persenjataannya pun konon juga mengadopsi teknologi stealth 😝😝😝

    Maka negara-negara serantau sangat di wajibkan berhati-hati 🤣🤣🤣

    SALAM IQ MALONDESH
    😜😜😜

    BalasHapus
  58. HEBAT GAME ITALI... 🤣🤣
    JUAL 2 kapal PPA LIGHT PLUS yang mereka tak mahu.. Ganti dengan 2 kapal PPA EVO versi terbaru yang lagi berkuasa...LAWAKnya ada yang kena GAME Itali.. 🤣🤣

    ROME — New versions of Italy’s PPA multimission navy vessels are to be kitted out with extra missile launchers, including cruise missile launchers, Italian industry officials said at the Euronaval trade show in Paris.

    The ships’ new “EVO” variant, which the Italian Navy may order next year, will get extra Sylver 50 launch modules, which house Aster missiles, but also Sylver 70 launch modules which will fire Aster missiles as well as cruise missiles, including the MdCN naval land-attack missile.

    BalasHapus
    Balasan
    1. FACT BUDGET 2025 ......
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      SALARIES AND OTHER STUFF
      PMX DS Anwar Ibrahim today announce an allocation of RM40.6 billion for the national security sector from the RM461 billion 2025 national budget. This is an increase of RM2 billion for the sector which includes Home and Defence ministries, from the 2024 budget of RM38.7 billion.
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.
      Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) while asset procurement is down to RM5.585 billion, down by some RM250 million from last year.
      From the DE, the Army will be getting RM1.197 billion, of which RM218 million is for construction of new facilities and RM980 million is for assets. RMN is getting RM2.25 billion, RM150 million (facilities) and RM2.1 billion, assets. RM2.3 billion is for RMAF, RM65 million for facilities and RM2.2 billion for assets. For the three services, RM663 million is allocated.
      -------------------------------------
      FACT BUDGET 2025 ......
      ASSET PROCUREMENT DOWN
      ASSET PROCUREMENT DOWN
      ASSET PROCUREMENT DOWN
      Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
      From the DE, the Army will be getting RM1.197 billion, of which RM218 million is for construction of new facilities and RM980 million is for assets. RMN is getting RM2.25 billion, RM150 million (facilities) and RM2.1 billion, assets. RM2.3 billion is for RMAF, RM65 million for facilities and RM2.2 billion for assets. For the three services, RM663 million is allocated.
      ==============
      MALONN ARMED FORCES (MAF) FACES SEVERAL CHALLENGES WITH MAINTAINING ITS EQUIPMENT, INCLUDING:
      1. Budget
      The MAF has a limited budget, which affects the serviceability of its assets.
      2. Outsourcing
      The MAF has outsourced maintenance of its assets since the 1970s, but the outsourcing program has faced challenges such as undertrained staff, underperforming contractors, and lack of contract enforcement.
      3. Old inventory
      The Royal Malonn Navy (RMN) has a number of old ships in service, including the Kasturi-class Corvette, the Laksamana Corvette class, the Perdana-class gunboat, and the Handalan and Jerung class.
      4. Spare parts
      There are issues with delivering spare parts to soldiers on the ground at the right time
      -------------------------------------
      KEYWORDS BUDGET 2025 :
      1. SALARIES AND OTHER STUFF
      2. NOT ASSETS = NO SHOPPING
      3. ASSET PROCUREMENT DOWN

      Hapus
    2. The Malonnn Armed Forces (MAF) faces a number of challenges, including:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
      =========
      A400M
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      Malon membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan pembayaran berperingkat.
      ----
      FA50M SAWIT
      On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
      ----
      SCORPENE SAWIT
      Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
      ----
      PT91 SAWIT KARET
      Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
      ----
      ANKA = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.


      Hapus
    3. READINESS 58.6% X 55 Unit = 32 UNIT
      READINESS 58.6% X 55 Unit = 32 UNIT
      READINESS 58.6% X 55 Unit = 32 UNIT
      This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
      ------------------------------------
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      ------------------------------------
      The Malonn army has faced some challenges, including corruption and issues with military personnel:
      • Corruption
      Malon's military has been involved in corruption, and the country's military doctrine doesn't recognize it as a threat. The Integrity Plan addresses corruption, but it's not a strategic document, and commanders don't receive training on corruption issues before deployments.
      • Military personnel
      Some say that military personnel have struggles with thinking skills, decision-making, and problem-solving.
      • Logistics
      Some say that Malon has had problems ensuring the readiness of the Malonn Armed Forces (MAF) in the face of threats
      -------------------------------------
      The Royal Malonnn Navy (RMN) has a few weaknesses, including:
      • Lack of modernization: The RMN's fleet is not up to date with current and future challenges. This makes it harder for Malonn to respond to disputes with other countries.
      • Funding shortages: The RMN has a history of funding shortages.
      • Location: The RMN is located between major powers, which could make its waters a frontier in the event of a naval conflict. This could threaten Malonn's sovereignty and maritime interests
      =============================
      The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    4. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
  59. A400M
    PEMBAYARAN BERPERINGKAT = HUTANG
    PEMBAYARAN BERPERINGKAT = HUTANG
    PEMBAYARAN BERPERINGKAT = HUTANG
    Malon membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan pembayaran berperingkat.
    ----
    FA50M SAWIT
    On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
    ----
    SCORPENE SAWIT
    Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
    ----
    PT91 SAWIT KARET
    Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
    ----
    ANKA = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
    =========
    17 CREDITOR LCS
    17 CREDITOR LCS
    17 CREDITOR LCS
    1. MTU Services Ingat Kawan (M) Sdn Bhd
    2. include Contraves Sdn Bhd
    3. Axima Concept SA
    4. Contraves Advanced Devices Sdn Bhd
    5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
    6. Security & Services Malon Sdn Bhd,
    7. iXblue SAS
    8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
    9. Bank Pembangunan Malon Bhd
    10. AmBank Islamic Bhd
    11. AmBank (M) Bhd
    12. Affin Hwang Investment Bank Bhd
    13. Bank Muamalat Malon Bhd
    14. Affin Bank Bhd
    15. Bank Kerjasama Rakyat Malon Bhd
    16. Malayan Banking Bhd (Maybank)
    17. KUWAIT FINANCE HOUSE (MALON) BHD.
    =========
    BUDGET 2025 FOR ......
    SALARIES AND OTHER STUFF
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.
    ==============
    BUDGET 2025 ......
    ASSET PROCUREMENT DOWN
    ASSET PROCUREMENT DOWN
    ASSET PROCUREMENT DOWN
    Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR

    BalasHapus
  60. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    FACT LCS 2025 - 2011 = 15 YEARS
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ===================
    FACT NOT YET DELIVERED :
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ===================
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
    ===================
    FACT GOVERNMENT ........
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
    Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
    Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
    ==============
    BUDGET 2025 FOR ......
    SALARIES AND OTHER STUFF
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.

    BalasHapus
  61. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
    -
    1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
    -
    2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    =========
    KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
    -
    1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
    -
    2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
    =========
    KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
    -
    1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
    -
    2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
    -
    Apache AH-64E contract for Indonesia for $1.42 BILLION
    -
    The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
    -
    USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
    =========
    KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
    -
    PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
    -
    LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    =========
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    =========
    KEYWORDS
    1 UNIT JAVELIN = 3 UNIT NLAW
    4.5 KM JAVELIN = 1 KM NLAW
    ---
    Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
    The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
    =========
    ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
    =========
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

    BalasHapus
  62. Masa kapal PPA GUN BOAT semahal itu... Setara harga FREMM FULL COMBAT guys... 🤣🤣🤣

    Mesir membeli dua Kapal perang Fregat FREMM senilai Rp 20, 8 triliun.

    Indonesia membeli dua Kapal sekelas patroli juga senilai Rp 20,3 triliun.

    BalasHapus
    Balasan
    1. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
      -
      1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
      -
      2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      =========
      KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
      -
      1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
      -
      2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
      =========
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      Apache AH-64E contract for Indonesia for $1.42 BILLION
      -
      The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      =========
      KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
      -
      PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
      -
      LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      =========
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      =========
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
      =========
      ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
      =========
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    2. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    3. UNREADY ARMED FORCES
      UNREADY ARMED FORCES
      UNREADY ARMED FORCES
      the Malonnn military is today the region’s weakest. It is riddled with corruption, poor planning, and interference by political leaders in procurement, no longer a potent force even in managing low-level intensity conflict at a time when tensions in the South China Sea are higher than they have been since the days of the Vietnam War.
      A 2019 White Paper on Defense – nearly four years ago – called for more funds and punch as well as an overhaul of the procurement system to allow professionals to decide on what weapon systems they need. Instead, PM Anwar Ibrahim’s proposal to increase the defense budget by 10 percent to fund procurement will be delayed because of budgetary considerations related to the flagging economy, expected by the World Bank to grow at a mediocre 3.9 percent in 2023, down from an earlier estimate of 4.3 percent in April
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
    4. A400M
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      Malon membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan pembayaran berperingkat.
      ----
      FA50M SAWIT
      On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
      ----
      SCORPENE SAWIT
      Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
      ----
      PT91 SAWIT KARET
      Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
      ----
      ANKA = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      =========
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
      ===================
      ===================
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
  63. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    FACT LCS 2025 - 2011 = 15 YEARS
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ===================
    FACT NOT YET DELIVERED :
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ===================
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
    ===================
    FACT GOVERNMENT ........
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
    Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
    Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
    ==============
    BUDGET 2025 FOR ......
    SALARIES AND OTHER STUFF
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS

    BalasHapus
  64. UNREADY ARMED FORCES
    UNREADY ARMED FORCES
    UNREADY ARMED FORCES
    the Malonnn military is today the region’s weakest. It is riddled with corruption, poor planning, and interference by political leaders in procurement, no longer a potent force even in managing low-level intensity conflict at a time when tensions in the South China Sea are higher than they have been since the days of the Vietnam War.
    A 2019 White Paper on Defense – nearly four years ago – called for more funds and punch as well as an overhaul of the procurement system to allow professionals to decide on what weapon systems they need. Instead, PM Anwar Ibrahim’s proposal to increase the defense budget by 10 percent to fund procurement will be delayed because of budgetary considerations related to the flagging economy, expected by the World Bank to grow at a mediocre 3.9 percent in 2023, down from an earlier estimate of 4.3 percent in April
    ===================
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ===================
    THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
    • Logistics
    A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
    • Budgeting
    Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    • Personnel
    The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
    • Procurement
    The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
    • Political interference
    Political interference and corruption are undermining combat readiness.
    • Territorial disputes
    Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
    • Transboundary haze
    Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
    • Fleet sustainment
    The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
    • Technological obsolescence
    Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
    • Modernization
    The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

    BalasHapus
  65. LOST = RM14.82 MILLION
    LOST = RM14.82 MILLION
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
    BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
    ---------------------
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
    High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
    The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
    ---------------------
    FACT LCS 2025 - 2011 = 15 YEARS
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ===================
    FACT NOT YET DELIVERED :
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ===================
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
    ===================
    ===================
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    ===================
    KEYWORS
    LCS WITHOUT AMMO = DESTROYER WITH AMMO

    BalasHapus
  66. HEBAT GAME ITALI.. JUAL secepat mungkin 2 KAPAL PPA LIGHT PLUS... segera ganti dengan 2 KAPAL PPA EVO... 🔥🔥🤣🤣

    ROME — New versions of Italy’s PPA multimission navy vessels are to be kitted out with extra missile launchers, including cruise missile launchers, Italian industry officials said at the Euronaval trade show in Paris.

    The ships’ new “EVO” variant, which the Italian Navy may order next year, will get extra Sylver 50 launch modules, which house Aster missiles, but also Sylver 70 launch modules which will fire Aster missiles as well as cruise missiles, including the MdCN naval land-attack missile.

    BalasHapus
    Balasan
    1. A400M
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      Malon membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan pembayaran berperingkat.
      ----
      FA50M SAWIT
      On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
      ----
      SCORPENE SAWIT
      Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
      ----
      PT91 SAWIT KARET
      Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
      ----
      ANKA = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      =========
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
      ===================
      ===================
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
    2. LOST = RM14.82 MILLION
      LOST = RM14.82 MILLION
      SELL 51% CAD TO RHEINMETALL AG
      SELL 51% CAD TO RHEINMETALL AG
      SELL 51% CAD TO RHEINMETALL AG
      Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
      BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
      ---------------------
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
      High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
      The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
      ---------------------
      FACT LCS 2025 - 2011 = 15 YEARS
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
      ===================
      ===================
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
  67. A400M
    PEMBAYARAN BERPERINGKAT = HUTANG
    PEMBAYARAN BERPERINGKAT = HUTANG
    PEMBAYARAN BERPERINGKAT = HUTANG
    Malon membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan pembayaran berperingkat.
    ----
    FA50M SAWIT
    On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
    ----
    SCORPENE SAWIT
    Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
    ----
    PT91 SAWIT KARET
    Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
    ----
    ANKA = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
    =========
    17 CREDITOR LCS
    17 CREDITOR LCS
    17 CREDITOR LCS
    1. MTU Services Ingat Kawan (M) Sdn Bhd
    2. include Contraves Sdn Bhd
    3. Axima Concept SA
    4. Contraves Advanced Devices Sdn Bhd
    5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
    6. Security & Services Malon Sdn Bhd,
    7. iXblue SAS
    8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
    9. Bank Pembangunan Malon Bhd
    10. AmBank Islamic Bhd
    11. AmBank (M) Bhd
    12. Affin Hwang Investment Bank Bhd
    13. Bank Muamalat Malon Bhd
    14. Affin Bank Bhd
    15. Bank Kerjasama Rakyat Malon Bhd
    16. Malayan Banking Bhd (Maybank)
    17. KUWAIT FINANCE HOUSE (MALON) BHD.
    =========
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
    ===================
    ===================
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    ===================
    KEYWORS
    LCS WITHOUT AMMO = DESTROYER WITH AMMO

    BalasHapus
  68. HEBAT GAME ITALI.. JUAL secepat mungkin 2 KAPAL PPA LIGHT PLUS... segera ganti dengan 2 KAPAL PPA EVO... 🔥🔥🤣🤣

    ROME — New versions of Italy’s PPA multimission navy vessels are to be kitted out with extra missile launchers, including cruise missile launchers, Italian industry officials said at the Euronaval trade show in Paris.

    The ships’ new “EVO” variant, which the Italian Navy may order next year, will get extra Sylver 50 launch modules, which house Aster missiles, but also Sylver 70 launch modules which will fire Aster missiles as well as cruise missiles, including the MdCN naval land-attack missile.

    BalasHapus
    Balasan
    1. LOST = RM14.82 MILLION
      LOST = RM14.82 MILLION
      SELL 51% CAD TO RHEINMETALL AG
      SELL 51% CAD TO RHEINMETALL AG
      SELL 51% CAD TO RHEINMETALL AG
      Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
      BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
      ---------------------
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
      High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
      The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
      ---------------------
      FACT LCS 2025 - 2011 = 15 YEARS
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
      ===================
      ===================
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
    2. A400M
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      Malon membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan pembayaran berperingkat.
      ----
      FA50M SAWIT
      On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
      ----
      SCORPENE SAWIT
      Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
      ----
      PT91 SAWIT KARET
      Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
      ----
      ANKA = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      =========
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
      ===================
      ===================
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
    3. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    4. UNREADY ARMED FORCES
      UNREADY ARMED FORCES
      UNREADY ARMED FORCES
      the Malonnn military is today the region’s weakest. It is riddled with corruption, poor planning, and interference by political leaders in procurement, no longer a potent force even in managing low-level intensity conflict at a time when tensions in the South China Sea are higher than they have been since the days of the Vietnam War.
      A 2019 White Paper on Defense – nearly four years ago – called for more funds and punch as well as an overhaul of the procurement system to allow professionals to decide on what weapon systems they need. Instead, PM Anwar Ibrahim’s proposal to increase the defense budget by 10 percent to fund procurement will be delayed because of budgetary considerations related to the flagging economy, expected by the World Bank to grow at a mediocre 3.9 percent in 2023, down from an earlier estimate of 4.3 percent in April
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited



      Hapus
    5. 17 CREDITOR LCS =
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      SIPRI LCS = DELIVERED : 0 (KONTRAK KOSONG) ......
      SAK 70 MK 3 - DELIVERED = 0
      MICA - DELIVERED = 0
      SHIP ENGINE - DELIVERED = 0
      FIRE CONTROL RADAR - DELIVERED = 0
      AIR CONTROL RADAR - DELIVERED = 0
      ===================
      FACT LCS 2025 - 2011 = 15 YEARS
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      FACT ..........
      BLASTING = MENGHILANGKAN KARAT LCS
      PAINTING = MENUTUP BEKAS KARAT LCS
      Littoral Combat Ship (LCS) 2 has successfully completed the blasting and first level of painting process, marking a significant milestone in its construction journey. It will later transition to further surface preparation and coating applications to ensure all critical areas meet the required standards
      ===================
      The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
  69. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    FACT LCS 2025 - 2011 = 15 YEARS
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ===================
    FACT NOT YET DELIVERED :
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ===================
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
    ===================
    FACT GOVERNMENT ........
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
    Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
    Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
    ==============
    BUDGET 2025 FOR ......
    SALARIES AND OTHER STUFF
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.

    BalasHapus
  70. Psssttttt.... Ada negara termakan UMPAN... 🤣🤣

    PPA INDONESIA MEMANG SENGAJA DIBUANG OLEH ANGAKATAN LAUT ITALIA SETELAH MEREKA TAU HAL INI

    https://m.youtube.com/watch?v=zxhWBmcishs

    BalasHapus
    Balasan
    1. 17 CREDITOR LCS =
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      SIPRI LCS = DELIVERED : 0 (KONTRAK KOSONG) ......
      SAK 70 MK 3 - DELIVERED = 0
      MICA - DELIVERED = 0
      SHIP ENGINE - DELIVERED = 0
      FIRE CONTROL RADAR - DELIVERED = 0
      AIR CONTROL RADAR - DELIVERED = 0
      ===================
      FACT LCS 2025 - 2011 = 15 YEARS
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      FACT ..........
      BLASTING = MENGHILANGKAN KARAT LCS
      PAINTING = MENUTUP BEKAS KARAT LCS
      Littoral Combat Ship (LCS) 2 has successfully completed the blasting and first level of painting process, marking a significant milestone in its construction journey. It will later transition to further surface preparation and coating applications to ensure all critical areas meet the required standards
      ===================
      The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    2. 165 KRI
      136 KAL PATKAMLA
      113 PESAWAT UDARA
      388 KENDARAAN TEMPUR
      Dengan demikian, kekuatan armada tempur TNI AL saat ini mencakup 165 kapal perang (KRI), 136 KAL, kapal-kapal patroli keamanan laut (patkamla), 113 pesawat udara, dan 388 kendaraan tempur.
      ---------------------
      18 COMBAT BOAT - ARMOUR PROTECTION = Patkamla Jefman memiliki beberapa keunggulan yaitu memiliki Armour Protection Standard STANAG Level 2, mampu beroperasi di medan pesisir laut, alur sungai dan daerah rawa. Saat ini TNI AL telah memiliki 18 Combat Boat Standard, dimana untuk Koarmada III saat ini membutuhkan 9 Unit Special Mission Combat Boat lagi yang akan ditempatkan jajaran dibawahnya baik di Lantamal, Lanal, dan Fasharkan Manokwari.
      ----
      Combat Boat Milik TNI AL ....
      1.Patkamla Mamburungan
      2.Patkamla Pulau Bakau
      3.Patkamla Pulau Numfor
      4.Patkamla Bali
      5.Patkamla Pulau Salando
      6.Patkamla Busalangga
      7.Patkamla Lamaru
      8.Patkamla Coebang
      9.Patkamla Pelambong
      10.Patkamla Pulau Sebesi
      11.Patkamla Karimun
      12.Patkamla Gebang
      13.Patkamla Pulau Pagerungan
      14.Patkamla Pulau Semau
      15.Patkamla Pulau Yapen
      16.Patkamla Pulau Langkai
      17.Patkamla Kastela
      18.Patkamla Santiago
      19.Patkamla Binanga
      20.Patkamla Balaroa
      21.Patkamla Gorar
      22.Patkamla Wasur
      23.Patkamla Posa
      CMB spesial kopaska
      24.KAL Kilat
      25.KAL Guruh
      26.KAL Tornado
      ===========
      ===========
      4 UNIT PLAT TIPIS G2000 Mk II memiliki lambung aluminium dan berbobot sekitar 26 ton pada beban standarnya.
      ---------------------
      SEWA FAST INTERCEPTOR BOAT
      SEWA UTILITY BOAT
      SEWA RIGID HULL FENDER BOAT
      SEWA ROVER FIBER GLASS
      SEWA EC120B
      SEWA FLIGHT SIMULATION TRAINING DEVICE
      Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
      Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
      Melalui kaedah sewaan ini, tempoh masa untuk melaksanakan proses perolehan termasuk berkaitan tender serta pembinaan aset dapat dikurangkan.
      ---------------------
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak sewaan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
      ---------------------
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      ---------------------
      READINESS 58.6% X 55 Unit = 32 UNIT
      READINESS 58.6% X 55 Unit = 32 UNIT
      READINESS 58.6% X 55 Unit = 32 UNIT
      This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.

      Hapus
    3. 17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited


      Hapus
    4. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
      -
      1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
      -
      2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      =========
      KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
      -
      1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
      -
      2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
      =========
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      Apache AH-64E contract for Indonesia for $1.42 BILLION
      -
      The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      =========
      KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
      -
      PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
      -
      LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      =========
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      =========
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
      =========
      ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
      =========
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
  71. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • TOTAL HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    ===================
    ===================
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    -------------
    17 CREDITOR LCS
    17 CREDITOR LCS
    17 CREDITOR LCS
    1. MTU Services Ingat Kawan (M) Sdn Bhd
    2. include Contraves Sdn Bhd
    3. Axima Concept SA
    4. Contraves Advanced Devices Sdn Bhd
    5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
    6. Security & Services Malon Sdn Bhd,
    7. iXblue SAS
    8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
    9. Bank Pembangunan Malon Bhd
    10. AmBank Islamic Bhd
    11. AmBank (M) Bhd
    12. Affin Hwang Investment Bank Bhd
    13. Bank Muamalat Malon Bhd
    14. Affin Bank Bhd
    15. Bank Kerjasama Rakyat Malon Bhd
    16. Malayan Banking Bhd (Maybank)
    17. KUWAIT FINANCE HOUSE (MALON) BHD.
    ===================
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ===================
    KEYWORS
    LCS WITHOUT AMMO = DESTROYER WITH AMMO

    BalasHapus
  72. ITALI jelas tak mahu kapal PPA versi awal yang lemah... Segera ganti dengan KAPAL PPA versi terkuat EVO... 😎😎🤣🤣

    BalasHapus
    Balasan
    1. FACT BUDGET 2025 ......
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      SALARIES AND OTHER STUFF
      PMX DS Anwar Ibrahim today announce an allocation of RM40.6 billion for the national security sector from the RM461 billion 2025 national budget. This is an increase of RM2 billion for the sector which includes Home and Defence ministries, from the 2024 budget of RM38.7 billion.
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.
      Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) while asset procurement is down to RM5.585 billion, down by some RM250 million from last year.
      From the DE, the Army will be getting RM1.197 billion, of which RM218 million is for construction of new facilities and RM980 million is for assets. RMN is getting RM2.25 billion, RM150 million (facilities) and RM2.1 billion, assets. RM2.3 billion is for RMAF, RM65 million for facilities and RM2.2 billion for assets. For the three services, RM663 million is allocated.
      -------------------------------------
      FACT BUDGET 2025 ......
      ASSET PROCUREMENT DOWN
      ASSET PROCUREMENT DOWN
      ASSET PROCUREMENT DOWN
      Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
      From the DE, the Army will be getting RM1.197 billion, of which RM218 million is for construction of new facilities and RM980 million is for assets. RMN is getting RM2.25 billion, RM150 million (facilities) and RM2.1 billion, assets. RM2.3 billion is for RMAF, RM65 million for facilities and RM2.2 billion for assets. For the three services, RM663 million is allocated.
      ==============
      MALONN ARMED FORCES (MAF) FACES SEVERAL CHALLENGES WITH MAINTAINING ITS EQUIPMENT, INCLUDING:
      1. Budget
      The MAF has a limited budget, which affects the serviceability of its assets.
      2. Outsourcing
      The MAF has outsourced maintenance of its assets since the 1970s, but the outsourcing program has faced challenges such as undertrained staff, underperforming contractors, and lack of contract enforcement.
      3. Old inventory
      The Royal Malonn Navy (RMN) has a number of old ships in service, including the Kasturi-class Corvette, the Laksamana Corvette class, the Perdana-class gunboat, and the Handalan and Jerung class.
      4. Spare parts
      There are issues with delivering spare parts to soldiers on the ground at the right time
      -------------------------------------
      KEYWORDS BUDGET 2025 :
      1. SALARIES AND OTHER STUFF
      2. NOT ASSETS = NO SHOPPING
      3. ASSET PROCUREMENT DOWN

      Hapus
    2. A400M
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      Malon membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan pembayaran berperingkat.
      ----
      FA50M SAWIT
      On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
      ----
      SCORPENE SAWIT
      Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
      ----
      PT91 SAWIT KARET
      Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
      ----
      ANKA = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      =========
      LENDER = SHOPPING
      PUBLIC DEBT MALONN = DEFENCE SPENDING
      PUBLIC DEBT MALONN = DEFENCE SPENDING
      PUBLIC DEBT MALONN = DEFENCE SPENDING
      The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
      =========
      2024 RASIO HUTANG 84,2% DARI GDP
      HUTANG 2023 = RM 1.53 TRILLION
      HUTANG 2022 = RM 1.45 TRILLION
      HUTANG 2021 = RM 1.38 TRILLION
      HUTANG 2020 = RM 1.32 TRILLION
      HUTANG 2019 = RM 1.25 TRILLION
      HUTANG 2018 = RM 1.19 TRILLION
      The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023. In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018). “The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said..
      =========
      FACT :
      1. 1 UNIT APACHE = 13 UNIT MD530G
      2. 1 UNIT RAFALE = 4 UNIT FA50M
      3. 1 UNIT PPA = 3 UNIT LMS B2
      4. 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. SEWA 28 HELI = 119 HELI BARU
      7. 4.5 KM JAVELIN = 1 KM NLAW
      8. ANKA ISR NOT ARMED

      Hapus
    3. BUDGET 2025 = SALARIES AND ALLOWANCES
      BUDGET 2025 = NOT ASSETS
      BUDGET 2025 = NOT ASSETS
      BUDGET 2025 = NOT ASSETS
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
      ==============
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
      ==============
      Malonn has faced several crises, including political, financial, and economic crises:
      • Political crisis
      From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
      • Financial crisis
      Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
      • Economic crisis
      Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
      • Household debt crisis
      As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
      Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
      =========
      Malonn has a number of weaknesses, including:
      • Economic
      Malonn's budget income is highly dependent on the oil and gas sector, and fiscal revenues are low. The country also has high levels of household and corporate debt, and a high dependency on food imports.
      • Political
      Malonn has a divided political landscape, and the country has experienced political instability since 2018. The 2022 election resulted in a hung parliament, the first time this has happened since Malonn's independence.
      • Environmental
      Malonn ranks 147 out of 210 economies on the Environmental Sustainability Index, due to challenges with climate change vulnerability, recycling rate, and renewable electricity output.
      • Public procurement
      Some weaknesses in public procurement in Malonn include non-compliance with contract terms, delayed project completion, poor documentation, and low quality of products and services.
      • Property market
      In the second half of 2023, sales volumes in the property market declined, and prices rose by only 0.1% year-on-year.
      • Currency
      The Malonnn ringgit (MYR) could potentially go down in value further. A weaker currency can have negative economic impacts, particularly for businesses that rely on imports.

      Hapus
    4. TNI AL = BLOCK 3 : 200 KM
      ----
      TLDM = BLOCK 2 : 72 KM
      EXOCET MM40
      (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
      ==========
      ==========
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      ----
      SIPRI LCS = DELIVERED : 0 (KONTRAK KOSONG) ......
      SAK 70 MK 3 - DELIVERED = 0
      MICA - DELIVERED = 0
      SHIP ENGINE - DELIVERED = 0
      FIRE CONTROL RADAR - DELIVERED = 0
      AIR CONTROL RADAR - DELIVERED = 0
      ----
      The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ----
      FACT LCS 2025 - 2011 = 15 YEARS
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ----
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ----
      Malon's combat equipment has several weaknesses, including:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness

      Hapus
    5. PPA UPGRADE FREMM
      PPA UPGRADE FREMM
      PPA UPGRADE FREMM
      PPA (Patrol Patrol Ship) can be upgraded to become a FREMM (Frigate European Multi-Mission). The PPA is a patrol vessel that can be used for a variety of purposes, including patrolling, rescuing people at sea, and protecting civilians. The PPA can be upgraded to become a FREMM by making changes to the ship's design and adding new features:
      • Missile launchers: The PPA can be upgraded to have more missile launchers, including Sylver 70 launchers.
      • Crane: A crane in the center of the ship can be removed to make room for more missile modules.
      • Artificial intelligence: The bridge can be supported by artificial intelligence.
      • Digital twin: A "digital twin" of the ship can be used to help with maintenance.
      • Communication: Communication between the bridge and drones can be improved to prepare for the deployment of drones.
      The PPA is a ship with a length of 143 meters, a width of about 16.5 meters, and a displacement of 6,250 tons. It has a maximum speed of 30 knots and a range of 5,000 nautical miles. The PPA is equipped with a variety of weapons, including the Aster 15 surface-to-air missile system, the Vulcano 127 mm gun, the Strales 76 mm gun, and the 25 mm light gun.
      ----
      KCR 60M = BOFORS 57 MK 3
      KCR 60M = BOFORS 57 MK 3
      KCR 60M = BOFORS 57 MK 3
      TNI AL MERIAM 57mm SEJAK 1980
      Meriam kaliber 57 mm sejak dekade 80-an telah identik sebagai sistem senjata utama pada Kapal Cepat Rudal (KCR) TNI AL, yakni dimulai pada adopsi meriam Bofors 57 MK1 di KCR Mandau class buatan Korea Selatan, kemudian berlanjut pada generasi KCR dari FPB-57 series yang menggunakan Bofors 57 MK2, dan yang terbaru, instalasi Bofors 57 MK3 pada KCR 60M produksi PT PAL Indonesia
      ----
      MRO BOFORS 57mm 40mm
      MRO BOFORS 57mm 40mm
      MRO BOFORS 57mm 40mm
      29 November 2021, PT PAL Indonesia telah resmi menyandang status sebagai mitra global BAE Systems Bofors AB (Bofors) dalam pemeliharaan dan perbaikan (MRO) senjata kapal.
      ----
      1 PPA TOTAL VOLCANO = 56 UNIT
      56 VOLCANO - 55 VESSEL RMN = SISA 1 VOLCANO
      56 VOLCANO - 55 VESSEL RMN = SISA 1 VOLCANO
      56 VOLCANO - 55 VESSEL RMN = SISA 1 VOLCANO
      . The rate of fire is 32rds per minute. General Purpose FREMMs are getting the highly Automated Ammunition Handling System for the 127/64 mm gun, which holds 350 127mm shells in addition to the 56 in the four reload drums of the gun turret.
      ----
      GOODBYE = LEKIU KASTURI LAKSAMANA KEDAH PERDANA HANDALAN JERUNG LMS LCS
      VULCANO 127mm = 100 KM
      VULCANO 127mm = 100 KM
      VULCANO 127mm = 100 KM.
      The 127mm VULCANO ammunition family, is composed by Ballistic Extended Range (BER) and Guided Long Range (GLR) ammunition with different multifunctional fuses, sensor and final guidance that extend the range of the gun up to 100km.
      ----
      EXOCET MM40 (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
      ----
      TNI AL = BLOCK 3 : 200 KM
      ----
      TLDM = BLOCK 2 : 72 KM
      ==========
      ==========
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      ----
      SIPRI LCS = DELIVERED : 0 (KONTRAK KOSONG) ......
      SAK 70 MK 3 - DELIVERED = 0
      MICA - DELIVERED = 0
      SHIP ENGINE - DELIVERED = 0
      FIRE CONTROL RADAR - DELIVERED = 0
      AIR CONTROL RADAR - DELIVERED = 0

      Hapus
    6. SEWA 53 HELI BEKAS
      SEWA 53 HELI BEKAS
      SEWA 53 HELI BEKAS
      TUDM SEWA =
      12 AW149
      4 AW139
      5 EC120B
      TLDM SEWA =
      2 AW159
      TDM SEWA =
      4 UH-60A
      12 AW149
      BOMBA SEWA =
      4 AW139
      POLIS SEWA =
      7 BELL429
      MMEA SEWA =
      2 AW159
      JABATAN PM SEWA =
      1 AW189
      https://www.facebook.com/share/p/gnmpDnsCCTn8tx6b/
      ---
      SEWA 28 HELI = The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
      =============
      MENERUSI KAEDAH SEWA HELI LYNX = Panglima TLDM, terdapat kemungkinan angkatan itu mendapatkan helikopter baru itu menerusi kaedah sewa apabila perkhidmatan helikopter Super Lynx Mk300 itu dihentikan secara berperingkat. Antara nama-nama helikopter yang disebut-sebut berpotensi untuk menggantikan helikopter Super Lynx milik TLDM adalah AW159 “Wildcat” yang dibangunkan oleh syarikat Leonardo..
      =============
      SEWA HELI AW139 : 4 buah Helikopter Leonardo AW 139 yang diperolehi secara sewaan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di No.3 Skuadron, Pangkalan Udara Butterworth
      SEWA HELI EC120B : Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
      SEWA PESAWAT L39 ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
      SEWA VSHORAD SEWA TRUK
      The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals.
      SEWA PATROL BOATS : SEWA OUTBOARD MOTORS : SEWA TRAILERS
      Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment
      SEWA BOAT sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
      SEWA HIDROGRAFI tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak sewaan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
      SEWA 4x4 Pejabat perusahaan mengatakan kepada Janes di pameran bahwa Angkatan Bersenjata Malon sedang mencari untuk menyewa Tarantula
      SEWA MOTOR The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022.
      =============
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
      =============
      KEYWORDS :
      1. SEWA 28 HELI = 119 HELI BARU
      2. 4x LEBIH MAHAL SEWA DARIPADA BELI BARU

      Hapus
    7. LENDER = MALON SHOPPING
      NO LENDER = MALON NO SHOPPING
      PUBLIC DEBT MALONN = DEFENCE SPENDING
      PUBLIC DEBT MALONN = DEFENCE SPENDING
      PUBLIC DEBT MALONN = DEFENCE SPENDING
      The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
      ==============
      2024 RASIO HUTANG 84,2% DARI GDP
      “The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
      ==============
      1. HUTANG 84.2% DARI GDP
      1. HUTANG 84.2% DARI GDP
      2. HUTANG NEGARA RM 1.5 TRLLIUN
      3. HUTANG 1MDB RM 18.2 BILLION
      4. TUNGGAKAN SEWA SABAH USD 15 BILLION
      5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
      6. SEWA SIMULATOR MKM
      7. PESAWAT MIG GROUNDED
      8. SEWA MOTOR POLIS
      9. PESAWAT MB339CM GROUNDED
      10. NURI GROUNDED SEWA BLACKHAWK
      11. FIVE PROCUREMENT CANCELLED
      12. 48 PESAWAT SKYHAWK HILANG
      13. MESIN JET 2 BUAH HILANG
      14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
      15. NO LST
      16. NO LPD – NGEMIS LPD USA
      17. NO TANKER
      18. NO KCR
      19. MONUMEN MIG29M UNTUK JIMAT KOS
      20. NO SPH
      21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
      22. NO HELLFIRE
      23. NO MPA ATR72 DELAYED
      24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
      25. NO HELI HEAVY ATTACK NGEMIS AH1Z
      26. NO M3 AMPHIBIUS RIG
      27. LCS MANGKRAK KARATAN
      28. OPV MANGKRAK
      29. TANK MOGOK STOP SPARE PARTS
      30. CN 235 MSA VERSI MSI USA
      31. SEWA MOTOR MILITARY POLICE
      32. RADAR GIFTED PAID USA
      33. 84% NO SAVING EVERY MONTH
      34. SEWA VSHORAD
      35. SEWA TRUK 3 TON
      36. 4X4 SEWA 6X6 CANCELLED
      37. C130H DIGANTI 2045
      38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
      39. NO DRONE UCAV – ANKA ISR OMPONG
      40. SEWA BLACKHAWK SEWA AW159
      41. NO TRACKED SPH
      42. SEWA SIMULATOR HELI
      43. SPH CANCELLED
      44. SCORPION V150 CONDOR SIMBAS RETIRED
      45. NO PESAWAT COIN
      46. PILATUS MK II KARATAN
      47. PENCEROBOHAN 43X BTA 316 HARI
      48. SEWA AW139 SEWA COLIBRI
      49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
      50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
      51. LYNX GROUNDED
      52. MRCA CANCELLED SEWA PESAWAT ITTC
      53. MICA CANCELLED NSM CANCELLED
      54. NO LRAD NO MRAD JUST SHORAD
      55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
      56. 4X NGEMIS F18 KUWAIT
      57. MENUNGGU 2050 KAPAL SELAM
      58. NO TANK AMPHIBI AV8 MOGOK BERASAP
      59. 84% NO SAVING EVERY MONTH
      60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
      61. TUDM SEWA 12 AW149
      62. TUDM SEWA 4 AW139
      63. TUDM SEWA 5 EC120B
      64. TLDM SEWA 2 AW159
      65. TDM SEWA 4 UH-60A
      67. TDM SEWA 12 AW149
      68. BOMBA SEWA 4 AW139
      69. MMEA SEWA 2 AW159
      70. POLIS SEWA 7 BELL429
      ==============
      KEYWORDS :
      1. LENDER = MALON SHOPPING
      2. NO LENDER = MALON NO SHOPPING

      Hapus
  73. LENDER = SHOPPING
    PUBLIC DEBT MALONN = DEFENCE SPENDING
    PUBLIC DEBT MALONN = DEFENCE SPENDING
    PUBLIC DEBT MALONN = DEFENCE SPENDING
    The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
    ==============
    2024 RASIO HUTANG 84,2% DARI GDP
    “The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
    ==============
    U.S. SEEKS TO RECOVER $1 BILLION IN LARGEST KLEPTOCRACY CASE TO DATE
    The U.S. government is seeking to recover more than $1 billion in assets tied to international public corruption and a global money laundering conspiracy in what Department of Justice officials describe as the largest single action ever brought under the Kleptocracy Asset Recovery Initiative.At a press conference today, Attorney General Loretta E. Lynch announced civil forfeiture complaints to recover assets associated with a fund owned by the Malonnn government that raised nearly $8 billion to benefit the Malonnn people. Instead, much of the money was diverted by high-ranking fund officials and their associates to purchase yachts, hotels, a $35 million jet, artwork by Vincent Van Gogh and Claude Monet, and to bankroll the popular 2013 film The Wolf of Wall Street.“This fraud went on around the world,” said Special Agent Darryl Wegner, chief of the FBI’s International Corruption Unit, which investigated the case along with the Internal Revenue Service’s Criminal Investigative Division. “At least $1 billion traceable to the conspiracy was laundered through the United States and used to purchase assets here.”From 2009 through 2015, according to the complaints, more than $3.5 billion in funds belonging to 1Malonn Development Berhad (1MDB) was allegedly misappropriated.The fund was created by the Malonnn government to promote economic development in that country through global partnerships and foreign direct investment. But members of the conspiracy—which included 1MDB officials, their relatives, and other associates—diverted billions of dollars using a web of shell companies with bank accounts in Singapore, Switzerland, Luxembourg, and the U.S. These complex schemes were intended to conceal the origin and ownership of the funds.
    https://www.fbi.gov/news/stories/us-seeks-to-recover-1-billion-in-largest-kleptocracy-case-to-date
    -------------------------------------
    US DEPARTEMENT OF JUSTICE =
    1. ONE OF THE WORLD'S GREATEST FINANCIAL SCANDALS
    2. LARGEST KLEPTOCRACY CASE TO DATE
    Although it began in Malon, the scandal's global scope implicated institutions and individuals in politics, banking, and entertainment, and led to criminal investigations in a number of nations. The 1MDB scandal has been described as "one of the world's greatest financial scandals" and declared by the United States Department of Justice as the "largest kleptocracy case to date"
    -------------------------------------
    DEBT TRAP BRI PROJECTS
    DEBT TRAP BRI PROJECTS
    DEBT TRAP BRI PROJECTS
    Malonn has several Chinese Belt and Road Initiative projects under construction, including the East Coast Rail Line, Kuantan Port Expansion, Green Technology Park in Pahang, Forest City, Robotic Future City, and Samalaju Industrial Park Steel Complex

    BalasHapus
  74. PPA UPGRADE FREMM
    PPA UPGRADE FREMM
    PPA UPGRADE FREMM
    PPA (Patrol Patrol Ship) can be upgraded to become a FREMM (Frigate European Multi-Mission). The PPA is a patrol vessel that can be used for a variety of purposes, including patrolling, rescuing people at sea, and protecting civilians. The PPA can be upgraded to become a FREMM by making changes to the ship's design and adding new features:
    • Missile launchers: The PPA can be upgraded to have more missile launchers, including Sylver 70 launchers.
    • Crane: A crane in the center of the ship can be removed to make room for more missile modules.
    • Artificial intelligence: The bridge can be supported by artificial intelligence.
    • Digital twin: A "digital twin" of the ship can be used to help with maintenance.
    • Communication: Communication between the bridge and drones can be improved to prepare for the deployment of drones.
    The PPA is a ship with a length of 143 meters, a width of about 16.5 meters, and a displacement of 6,250 tons. It has a maximum speed of 30 knots and a range of 5,000 nautical miles. The PPA is equipped with a variety of weapons, including the Aster 15 surface-to-air missile system, the Vulcano 127 mm gun, the Strales 76 mm gun, and the 25 mm light gun.
    ----
    KCR 60M = BOFORS 57 MK 3
    KCR 60M = BOFORS 57 MK 3
    KCR 60M = BOFORS 57 MK 3
    TNI AL MERIAM 57mm SEJAK 1980
    Meriam kaliber 57 mm sejak dekade 80-an telah identik sebagai sistem senjata utama pada Kapal Cepat Rudal (KCR) TNI AL, yakni dimulai pada adopsi meriam Bofors 57 MK1 di KCR Mandau class buatan Korea Selatan, kemudian berlanjut pada generasi KCR dari FPB-57 series yang menggunakan Bofors 57 MK2, dan yang terbaru, instalasi Bofors 57 MK3 pada KCR 60M produksi PT PAL Indonesia
    ----
    MRO BOFORS 57mm 40mm
    MRO BOFORS 57mm 40mm
    MRO BOFORS 57mm 40mm
    29 November 2021, PT PAL Indonesia telah resmi menyandang status sebagai mitra global BAE Systems Bofors AB (Bofors) dalam pemeliharaan dan perbaikan (MRO) senjata kapal.
    ----
    1 PPA TOTAL VOLCANO = 56 UNIT
    56 VOLCANO - 55 VESSEL RMN = SISA 1 VOLCANO
    56 VOLCANO - 55 VESSEL RMN = SISA 1 VOLCANO
    56 VOLCANO - 55 VESSEL RMN = SISA 1 VOLCANO
    . The rate of fire is 32rds per minute. General Purpose FREMMs are getting the highly Automated Ammunition Handling System for the 127/64 mm gun, which holds 350 127mm shells in addition to the 56 in the four reload drums of the gun turret.
    ----
    GOODBYE = LEKIU KASTURI LAKSAMANA KEDAH PERDANA HANDALAN JERUNG LMS LCS
    VULCANO 127mm = 100 KM
    VULCANO 127mm = 100 KM
    VULCANO 127mm = 100 KM.
    The 127mm VULCANO ammunition family, is composed by Ballistic Extended Range (BER) and Guided Long Range (GLR) ammunition with different multifunctional fuses, sensor and final guidance that extend the range of the gun up to 100km.
    ----
    EXOCET MM40 (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
    ----
    TNI AL = BLOCK 3 : 200 KM
    ----
    TLDM = BLOCK 2 : 72 KM
    ==========
    ==========
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    ----
    SIPRI LCS = DELIVERED : 0 (KONTRAK KOSONG) ......
    SAK 70 MK 3 - DELIVERED = 0
    MICA - DELIVERED = 0
    SHIP ENGINE - DELIVERED = 0
    FIRE CONTROL RADAR - DELIVERED = 0
    AIR CONTROL RADAR - DELIVERED = 0

    BalasHapus
  75. SEWA VSHORAD SEWA TRUK
    The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals.
    SEWA BOAT sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    SEWA HIDROGRAFI tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak sewaan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    SEWA PATROL BOATS : SEWA OUTBOARD MOTORS : SEWA TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment
    SEWA MOTOR The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022.
    SEWA PESAWAT ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    SEWA HELI Kementerian Pertahanan Malon pada 27 Mei 2023 lalu telah menandatangani perjanjian sewa dengan penyedia layanan penerbangan lokal, Aerotree, untuk menyediakan empat helikopter bekas Sikorsky UH-60A+ Black Hawk.
    SEWA HELI 4 buah Helikopter Leonardo AW 139 yang diperolehi secara sewaan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di No.3 Skuadron, Pangkalan Udara Butterworth
    SEWA HELI = Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    SEWA 4x4 Pejabat perusahaan mengatakan kepada Janes di pameran bahwa Angkatan Bersenjata Malon sedang mencari untuk menyewa Tarantula
    =========
    RETIRED MIG29 Malon recently retired the MiG-29 Fulcrum due to its inability to maintain them.
    RETIRED MB339CM the Aermacchi MB-339CM trainer jets that are currently grounded
    RETIRED SCORPION Scorpions to be retired. The Army has recommended that it’s fleet of Scorpion light tanks be retired due to the high cost of maintenance and obsolescence issues.
    RETIRED CONDOR SIBMAS Condor armoured 4X4 and Sibmas armoured recovery vehicle as retired from service as off January 1, 2023.
    RETIRED V150 = . It was used by the Malonn Army in Second Malayan Emergency (now retired)
    ==========
    171 ASET USANG 30 TAHUN =
    108 TDM
    29 TUDM
    34 TLDM
    "The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
    ==========
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness

    BalasHapus
  76. FACT 2024 RASIO HUTANG 84,2% DARI GDP
    HUTANG 2023 = RM 1.53 TRILLION
    HUTANG 2022 = RM 1.45 TRILLION
    HUTANG 2021 = RM 1.38 TRILLION
    HUTANG 2020 = RM 1.32 TRILLION
    HUTANG 2019 = RM 1.25 TRILLION
    HUTANG 2018 = RM 1.19 TRILLION
    The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023.
    In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018).
    “The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
    ===================
    FACT GOVERNMENT ........
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
    Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
    Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
    ==============
    BUDGET 2025 FOR ......
    SALARIES AND OTHER STUFF
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.
    ==============
    BUDGET 2025 ......
    ASSET PROCUREMENT DOWN
    ASSET PROCUREMENT DOWN
    ASSET PROCUREMENT DOWN
    Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR

    BalasHapus
  77. LENDER = MALON SHOPPING
    NO LENDER = MALON NO SHOPPING
    PUBLIC DEBT MALONN = DEFENCE SPENDING
    PUBLIC DEBT MALONN = DEFENCE SPENDING
    PUBLIC DEBT MALONN = DEFENCE SPENDING
    The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
    ==============
    2024 RASIO HUTANG 84,2% DARI GDP
    “The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
    ==============
    1. HUTANG 84.2% DARI GDP
    1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN SEWA SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. SEWA SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. SEWA MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED SEWA BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. SEWA MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. SEWA VSHORAD
    35. SEWA TRUK 3 TON
    36. 4X4 SEWA 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. SEWA BLACKHAWK SEWA AW159
    41. NO TRACKED SPH
    42. SEWA SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. SEWA AW139 SEWA COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED SEWA PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM SEWA 12 AW149
    62. TUDM SEWA 4 AW139
    63. TUDM SEWA 5 EC120B
    64. TLDM SEWA 2 AW159
    65. TDM SEWA 4 UH-60A
    67. TDM SEWA 12 AW149
    68. BOMBA SEWA 4 AW139
    69. MMEA SEWA 2 AW159
    70. POLIS SEWA 7 BELL429
    ==============
    KEYWORDS :
    1. LENDER = MALON SHOPPING
    2. NO LENDER = MALON NO SHOPPING

    BalasHapus
  78. Akal akalan ITALI...jelas Itali mahu 2 kapal PPA EVO... .🤭🤭

    JUAL 2 PPA LIGHT PLUS ganti segera dengan 2 PPA EVO versi terbaru... 🔥🔥🤣🤣...

    BalasHapus
  79. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    ===================
    FACT :
    1. HUTANG 84.2% DARI GDP
    1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN SEWA SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. SEWA SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. SEWA MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED SEWA BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. SEWA MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. SEWA VSHORAD
    35. SEWA TRUK 3 TON
    36. 4X4 SEWA 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. SEWA BLACKHAWK SEWA AW159
    41. NO TRACKED SPH
    42. SEWA SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. SEWA AW139 SEWA COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED SEWA PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM SEWA 12 AW149
    62. TUDM SEWA 4 AW139
    63. TUDM SEWA 5 EC120B
    64. TLDM SEWA 2 AW159
    65. TDM SEWA 4 UH-60A
    67. TDM SEWA 12 AW149
    68. BOMBA SEWA 4 AW139
    69. MMEA SEWA 2 AW159
    70. POLIS SEWA 7 BELL429
    ==============
    Malonn has faced several crises, including political, financial, and economic crises:
    • Political crisis
    From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
    • Financial crisis
    Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
    • Economic crisis
    Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
    • Household debt crisis
    As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
    • Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....

    BalasHapus
  80. PINTAR ITALI... 👍🏻👍🏻🤣🤣🔥

    ROME — New versions of Italy’s PPA multimission navy vessels are to be kitted out with extra missile launchers, including cruise missile launchers, Italian industry officials said at the Euronaval trade show in Paris.

    The ships’ new “EVO” variant, which the Italian Navy may order next year, will get extra Sylver 50 launch modules, which house Aster missiles, but also Sylver 70 launch modules which will fire Aster missiles as well as cruise missiles, including the MdCN naval land-attack missile.

    BalasHapus
    Balasan
    1. LOST = RM14.82 MILLION
      LOST = RM14.82 MILLION
      SELL 51% CAD TO RHEINMETALL AG
      SELL 51% CAD TO RHEINMETALL AG
      SELL 51% CAD TO RHEINMETALL AG
      Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
      BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
      ---------------------
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
      High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
      The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
      ---------------------
      FACT LCS 2025 - 2011 = 15 YEARS
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
      ===================
      ===================
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
    2. A400M
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      Malon membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan pembayaran berperingkat.
      ----
      FA50M SAWIT
      On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
      ----
      SCORPENE SAWIT
      Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
      ----
      PT91 SAWIT KARET
      Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
      ----
      ANKA = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      =========
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
      ===================
      ===================
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
    3. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
  81. A400M
    PEMBAYARAN BERPERINGKAT = HUTANG
    PEMBAYARAN BERPERINGKAT = HUTANG
    PEMBAYARAN BERPERINGKAT = HUTANG
    Malon membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan pembayaran berperingkat.
    ----
    FA50M SAWIT
    On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
    ----
    SCORPENE SAWIT
    Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
    ----
    PT91 SAWIT KARET
    Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
    ----
    ANKA = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
    =========
    17 CREDITOR LCS
    17 CREDITOR LCS
    17 CREDITOR LCS
    1. MTU Services Ingat Kawan (M) Sdn Bhd
    2. include Contraves Sdn Bhd
    3. Axima Concept SA
    4. Contraves Advanced Devices Sdn Bhd
    5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
    6. Security & Services Malon Sdn Bhd,
    7. iXblue SAS
    8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
    9. Bank Pembangunan Malon Bhd
    10. AmBank Islamic Bhd
    11. AmBank (M) Bhd
    12. Affin Hwang Investment Bank Bhd
    13. Bank Muamalat Malon Bhd
    14. Affin Bank Bhd
    15. Bank Kerjasama Rakyat Malon Bhd
    16. Malayan Banking Bhd (Maybank)
    17. KUWAIT FINANCE HOUSE (MALON) BHD.
    =========
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
    ===================
    ===================
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    ===================
    KEYWORS
    LCS WITHOUT AMMO = DESTROYER WITH AMMO

    BalasHapus
  82. Sebelumnya DI klaim kapal PPA FULL.. ternyata yang sampai hanya kapal PPA LIGHT PLUS je...KECEWA.. 🔥🔥🤣🤣

    BalasHapus
    Balasan
    1. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    2. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      FACT LCS 2025 - 2011 = 15 YEARS
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
      ===================
      FACT GOVERNMENT ........
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
      Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
      Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
      ==============
      BUDGET 2025 FOR ......
      SALARIES AND OTHER STUFF
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      NOT ASSETS = NO SHOPPING
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.


      Hapus
    3. LOST = RM14.82 MILLION
      LOST = RM14.82 MILLION
      SELL 51% CAD TO RHEINMETALL AG
      SELL 51% CAD TO RHEINMETALL AG
      SELL 51% CAD TO RHEINMETALL AG
      Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
      BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
      ---------------------
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
      High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
      The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
      ---------------------
      FACT LCS 2025 - 2011 = 15 YEARS
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
      ===================
      ===================
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO


      Hapus
  83. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    ===================
    FACT :
    1. HUTANG 84.2% DARI GDP
    1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN SEWA SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. SEWA SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. SEWA MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED SEWA BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. SEWA MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. SEWA VSHORAD
    35. SEWA TRUK 3 TON
    36. 4X4 SEWA 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. SEWA BLACKHAWK SEWA AW159
    41. NO TRACKED SPH
    42. SEWA SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. SEWA AW139 SEWA COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED SEWA PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM SEWA 12 AW149
    62. TUDM SEWA 4 AW139
    63. TUDM SEWA 5 EC120B
    64. TLDM SEWA 2 AW159
    65. TDM SEWA 4 UH-60A
    67. TDM SEWA 12 AW149
    68. BOMBA SEWA 4 AW139
    69. MMEA SEWA 2 AW159
    70. POLIS SEWA 7 BELL429
    ==============
    Malonn has faced several crises, including political, financial, and economic crises:
    • Political crisis
    From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
    • Financial crisis
    Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
    • Economic crisis
    Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
    • Household debt crisis
    As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
    • Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....

    BalasHapus
  84. Jelas.... Itali segera mahu 2 kapal PPA EVO selepas jual 2 kapal PPA LIGHT PLUS OMPONG... 🤣🤣🤣

    PPA INDONESIA MEMANG SENGAJA DIBUANG OLEH ANGKATAN LAUT ITALIA SETELAH MEREKA TAU HAL INI

    https://m.youtube.com/watch?v=zxhWBmcishs

    BalasHapus
    Balasan
    1. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
      -
      1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
      -
      2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      =========
      KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
      -
      1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
      -
      2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
      =========
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      Apache AH-64E contract for Indonesia for $1.42 BILLION
      -
      The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      =========
      KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
      -
      PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
      -
      LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      =========
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      =========
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
      =========
      ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
      =========
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    2. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    3. LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      FACT :
      1. HUTANG 84.2% DARI GDP
      1. HUTANG 84.2% DARI GDP
      2. HUTANG NEGARA RM 1.5 TRLLIUN
      3. HUTANG 1MDB RM 18.2 BILLION
      4. TUNGGAKAN SEWA SABAH USD 15 BILLION
      5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
      6. SEWA SIMULATOR MKM
      7. PESAWAT MIG GROUNDED
      8. SEWA MOTOR POLIS
      9. PESAWAT MB339CM GROUNDED
      10. NURI GROUNDED SEWA BLACKHAWK
      11. FIVE PROCUREMENT CANCELLED
      12. 48 PESAWAT SKYHAWK HILANG
      13. MESIN JET 2 BUAH HILANG
      14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
      15. NO LST
      16. NO LPD – NGEMIS LPD USA
      17. NO TANKER
      18. NO KCR
      19. MONUMEN MIG29M UNTUK JIMAT KOS
      20. NO SPH
      21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
      22. NO HELLFIRE
      23. NO MPA ATR72 DELAYED
      24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
      25. NO HELI HEAVY ATTACK NGEMIS AH1Z
      26. NO M3 AMPHIBIUS RIG
      27. LCS MANGKRAK KARATAN
      28. OPV MANGKRAK
      29. TANK MOGOK STOP SPARE PARTS
      30. CN 235 MSA VERSI MSI USA
      31. SEWA MOTOR MILITARY POLICE
      32. RADAR GIFTED PAID USA
      33. 84% NO SAVING EVERY MONTH
      34. SEWA VSHORAD
      35. SEWA TRUK 3 TON
      36. 4X4 SEWA 6X6 CANCELLED
      37. C130H DIGANTI 2045
      38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
      39. NO DRONE UCAV – ANKA ISR OMPONG
      40. SEWA BLACKHAWK SEWA AW159
      41. NO TRACKED SPH
      42. SEWA SIMULATOR HELI
      43. SPH CANCELLED
      44. SCORPION V150 CONDOR SIMBAS RETIRED
      45. NO PESAWAT COIN
      46. PILATUS MK II KARATAN
      47. PENCEROBOHAN 43X BTA 316 HARI
      48. SEWA AW139 SEWA COLIBRI
      49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
      50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
      51. LYNX GROUNDED
      52. MRCA CANCELLED SEWA PESAWAT ITTC
      53. MICA CANCELLED NSM CANCELLED
      54. NO LRAD NO MRAD JUST SHORAD
      55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
      56. 4X NGEMIS F18 KUWAIT
      57. MENUNGGU 2050 KAPAL SELAM
      58. NO TANK AMPHIBI AV8 MOGOK BERASAP
      59. 84% NO SAVING EVERY MONTH
      60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
      61. TUDM SEWA 12 AW149
      62. TUDM SEWA 4 AW139
      63. TUDM SEWA 5 EC120B
      64. TLDM SEWA 2 AW159
      65. TDM SEWA 4 UH-60A
      67. TDM SEWA 12 AW149
      68. BOMBA SEWA 4 AW139
      69. MMEA SEWA 2 AW159
      70. POLIS SEWA 7 BELL429
      ==============
      Malonn has faced several crises, including political, financial, and economic crises:
      • Political crisis
      From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
      • Financial crisis
      Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
      • Economic crisis
      Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
      • Household debt crisis
      As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
      • Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....

      Hapus
  85. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    FACT LCS 2025 - 2011 = 15 YEARS
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ===================
    FACT NOT YET DELIVERED :
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ===================
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
    ===================
    FACT GOVERNMENT ........
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
    Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
    Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
    ==============
    BUDGET 2025 FOR ......
    SALARIES AND OTHER STUFF
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.

    BalasHapus
  86. PINTAR ITALI... JUAL 2 kapal PPA versi LEMAH ganti dengan KAPAL PPA yang lagi berkuasa... 👍🏻👍🏻🤣🤣🔥

    ROME — New versions of Italy’s PPA multimission navy vessels are to be kitted out with extra missile launchers, including cruise missile launchers, Italian industry officials said at the Euronaval trade show in Paris.

    The ships’ new “EVO” variant, which the Italian Navy may order next year, will get extra Sylver 50 launch modules, which house Aster missiles, but also Sylver 70 launch modules which will fire Aster missiles as well as cruise missiles, including the MdCN naval land-attack missile.

    BalasHapus
    Balasan
    1. A400M
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      PEMBAYARAN BERPERINGKAT = HUTANG
      Malon membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan pembayaran berperingkat.
      ----
      FA50M SAWIT
      On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
      ----
      SCORPENE SAWIT
      Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
      ----
      PT91 SAWIT KARET
      Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
      ----
      ANKA = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
      =========
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      =========
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
      ===================
      ===================
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
    2. LOST = RM14.82 MILLION
      LOST = RM14.82 MILLION
      SELL 51% CAD TO RHEINMETALL AG
      SELL 51% CAD TO RHEINMETALL AG
      SELL 51% CAD TO RHEINMETALL AG
      Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
      BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
      ---------------------
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
      High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
      The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
      ---------------------
      FACT LCS 2025 - 2011 = 15 YEARS
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
      ===================
      ===================
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      LCS WITHOUT AMMO = DESTROYER WITH AMMO
      • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
      • USD 948 JUTA =
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -FREMM CLASS USD 525-675 JUTA
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO


      Hapus
  87. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    ===================
    FACT :
    1. HUTANG 84.2% DARI GDP
    1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN SEWA SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. SEWA SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. SEWA MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED SEWA BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. SEWA MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. SEWA VSHORAD
    35. SEWA TRUK 3 TON
    36. 4X4 SEWA 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. SEWA BLACKHAWK SEWA AW159
    41. NO TRACKED SPH
    42. SEWA SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. SEWA AW139 SEWA COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED SEWA PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM SEWA 12 AW149
    62. TUDM SEWA 4 AW139
    63. TUDM SEWA 5 EC120B
    64. TLDM SEWA 2 AW159
    65. TDM SEWA 4 UH-60A
    67. TDM SEWA 12 AW149
    68. BOMBA SEWA 4 AW139
    69. MMEA SEWA 2 AW159
    70. POLIS SEWA 7 BELL429
    ==============
    Malonn has faced several crises, including political, financial, and economic crises:
    • Political crisis
    From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
    • Financial crisis
    Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
    • Economic crisis
    Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
    • Household debt crisis
    As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
    • Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....

    BalasHapus
  88. PINTAR ITALI... JUAL 2 kapal PPA versi LEMAH ganti dengan KAPAL PPA yang lagi berkuasa... 👍🏻👍🏻🤣🤣🔥
    ..
    ROME — New versions of Italy’s PPA multimission navy vessels are to be kitted out with extra missile launchers, including cruise missile launchers, Italian industry officials said at the Euronaval trade show in Paris.

    The ships’ new “EVO” variant, which the Italian Navy may order next year, will get extra Sylver 50 launch modules, which house Aster missiles, but also Sylver 70 launch modules which will fire Aster missiles as well as cruise missiles, including the MdCN naval land-attack missile.

    BalasHapus
  89. LOST = RM14.82 MILLION
    LOST = RM14.82 MILLION
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
    BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
    ---------------------
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
    High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
    The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
    ---------------------
    FACT LCS 2025 - 2011 = 15 YEARS
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ===================
    FACT NOT YET DELIVERED :
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ===================
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
    ===================
    ===================
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    ===================
    KEYWORS
    LCS WITHOUT AMMO = DESTROYER WITH AMMO


    BalasHapus
  90. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    FACT LCS 2025 - 2011 = 15 YEARS
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ===================
    FACT NOT YET DELIVERED :
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ===================
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
    ===================
    FACT GOVERNMENT ........
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
    Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
    Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
    ==============
    BUDGET 2025 FOR ......
    SALARIES AND OTHER STUFF
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.

    BalasHapus
  91. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
    -
    1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
    -
    2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    =========
    KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
    -
    1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
    -
    2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
    =========
    KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
    -
    1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
    -
    2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
    -
    Apache AH-64E contract for Indonesia for $1.42 BILLION
    -
    The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
    -
    USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
    =========
    KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
    -
    PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
    -
    LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    =========
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    =========
    KEYWORDS
    1 UNIT JAVELIN = 3 UNIT NLAW
    4.5 KM JAVELIN = 1 KM NLAW
    ---
    Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
    The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
    =========
    ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
    =========
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

    BalasHapus
  92. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
    -
    1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
    -
    2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    =========
    KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
    -
    1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
    -
    2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
    =========
    KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
    -
    1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
    -
    2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
    -
    Apache AH-64E contract for Indonesia for $1.42 BILLION
    -
    The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
    -
    USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
    =========
    KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
    -
    PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
    -
    LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    =========
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    =========
    KEYWORDS
    1 UNIT JAVELIN = 3 UNIT NLAW
    4.5 KM JAVELIN = 1 KM NLAW
    ---
    Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
    The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
    =========
    ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
    =========
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

    BalasHapus
  93. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    FACT LCS 2025 - 2011 = 15 YEARS
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ===================
    FACT NOT YET DELIVERED :
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ===================
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
    ===================
    FACT GOVERNMENT ........
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
    Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
    Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
    ==============
    BUDGET 2025 FOR ......
    SALARIES AND OTHER STUFF
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.

    BalasHapus
  94. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    17 CREDITOR LCS
    17 CREDITOR LCS
    17 CREDITOR LCS
    1. MTU Services Ingat Kawan (M) Sdn Bhd
    2. include Contraves Sdn Bhd
    3. Axima Concept SA
    4. Contraves Advanced Devices Sdn Bhd
    5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
    6. Security & Services Malon Sdn Bhd,
    7. iXblue SAS
    8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
    9. Bank Pembangunan Malon Bhd
    10. AmBank Islamic Bhd
    11. AmBank (M) Bhd
    12. Affin Hwang Investment Bank Bhd
    13. Bank Muamalat Malon Bhd
    14. Affin Bank Bhd
    15. Bank Kerjasama Rakyat Malon Bhd
    16. Malayan Banking Bhd (Maybank)
    17. KUWAIT FINANCE HOUSE (MALON) BHD.
    ===================
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

    BalasHapus
  95. LOST = RM14.82 MILLION
    LOST = RM14.82 MILLION
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
    BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
    ---------------------
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
    High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
    The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
    ---------------------
    FACT LCS 2025 - 2011 = 15 YEARS
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ===================
    FACT NOT YET DELIVERED :
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ===================
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
    ===================
    ===================
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    ===================
    KEYWORS
    LCS WITHOUT AMMO = DESTROYER WITH AMMO

    BalasHapus
  96. A400M
    PEMBAYARAN BERPERINGKAT = HUTANG
    PEMBAYARAN BERPERINGKAT = HUTANG
    PEMBAYARAN BERPERINGKAT = HUTANG
    Malon membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan pembayaran berperingkat.
    ----
    FA50M SAWIT
    On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
    ----
    SCORPENE SAWIT
    Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
    ----
    PT91 SAWIT KARET
    Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
    ----
    ANKA = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
    =========
    17 CREDITOR LCS
    17 CREDITOR LCS
    17 CREDITOR LCS
    1. MTU Services Ingat Kawan (M) Sdn Bhd
    2. include Contraves Sdn Bhd
    3. Axima Concept SA
    4. Contraves Advanced Devices Sdn Bhd
    5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
    6. Security & Services Malon Sdn Bhd,
    7. iXblue SAS
    8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
    9. Bank Pembangunan Malon Bhd
    10. AmBank Islamic Bhd
    11. AmBank (M) Bhd
    12. Affin Hwang Investment Bank Bhd
    13. Bank Muamalat Malon Bhd
    14. Affin Bank Bhd
    15. Bank Kerjasama Rakyat Malon Bhd
    16. Malayan Banking Bhd (Maybank)
    17. KUWAIT FINANCE HOUSE (MALON) BHD.
    =========
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
    ===================
    ===================
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    ===================
    KEYWORS
    LCS WITHOUT AMMO = DESTROYER WITH AMMO

    BalasHapus
  97. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    ===================
    FACT :
    1. HUTANG 84.2% DARI GDP
    1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN SEWA SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. SEWA SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. SEWA MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED SEWA BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. SEWA MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. SEWA VSHORAD
    35. SEWA TRUK 3 TON
    36. 4X4 SEWA 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. SEWA BLACKHAWK SEWA AW159
    41. NO TRACKED SPH
    42. SEWA SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. SEWA AW139 SEWA COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED SEWA PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM SEWA 12 AW149
    62. TUDM SEWA 4 AW139
    63. TUDM SEWA 5 EC120B
    64. TLDM SEWA 2 AW159
    65. TDM SEWA 4 UH-60A
    67. TDM SEWA 12 AW149
    68. BOMBA SEWA 4 AW139
    69. MMEA SEWA 2 AW159
    70. POLIS SEWA 7 BELL429
    ==============
    Malonn has faced several crises, including political, financial, and economic crises:
    • Political crisis
    From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
    • Financial crisis
    Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
    • Economic crisis
    Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
    • Household debt crisis
    As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
    • Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....

    BalasHapus
  98. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    17 CREDITOR LCS
    17 CREDITOR LCS
    17 CREDITOR LCS
    1. MTU Services Ingat Kawan (M) Sdn Bhd
    2. include Contraves Sdn Bhd
    3. Axima Concept SA
    4. Contraves Advanced Devices Sdn Bhd
    5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
    6. Security & Services Malon Sdn Bhd,
    7. iXblue SAS
    8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
    9. Bank Pembangunan Malon Bhd
    10. AmBank Islamic Bhd
    11. AmBank (M) Bhd
    12. Affin Hwang Investment Bank Bhd
    13. Bank Muamalat Malon Bhd
    14. Affin Bank Bhd
    15. Bank Kerjasama Rakyat Malon Bhd
    16. Malayan Banking Bhd (Maybank)
    17. KUWAIT FINANCE HOUSE (MALON) BHD.
    ===================
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

    BalasHapus
  99. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    FACT LCS 2025 - 2011 = 15 YEARS
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    15 YEARS = LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ===================
    FACT NOT YET DELIVERED :
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ===================
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
    ===================
    FACT GOVERNMENT ........
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
    Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
    Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
    ==============
    BUDGET 2025 FOR ......
    SALARIES AND OTHER STUFF
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.

    BalasHapus
  100. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    =========
    KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
    -
    1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
    -
    2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    =========
    KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
    -
    1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
    -
    2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
    =========
    KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
    -
    1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
    -
    2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
    -
    Apache AH-64E contract for Indonesia for $1.42 BILLION
    -
    The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
    -
    USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
    =========
    KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
    -
    PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
    -
    LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    =========
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    =========
    KEYWORDS
    1 UNIT JAVELIN = 3 UNIT NLAW
    4.5 KM JAVELIN = 1 KM NLAW
    ---
    Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
    The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
    =========
    ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
    =========
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

    BalasHapus

  101. UNREADY ARMED FORCES
    UNREADY ARMED FORCES
    UNREADY ARMED FORCES
    the Malonnn military is today the region’s weakest. It is riddled with corruption, poor planning, and interference by political leaders in procurement, no longer a potent force even in managing low-level intensity conflict at a time when tensions in the South China Sea are higher than they have been since the days of the Vietnam War.
    A 2019 White Paper on Defense – nearly four years ago – called for more funds and punch as well as an overhaul of the procurement system to allow professionals to decide on what weapon systems they need. Instead, PM Anwar Ibrahim’s proposal to increase the defense budget by 10 percent to fund procurement will be delayed because of budgetary considerations related to the flagging economy, expected by the World Bank to grow at a mediocre 3.9 percent in 2023, down from an earlier estimate of 4.3 percent in April
    ===================
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ===================
    THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
    • Logistics
    A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
    • Budgeting
    Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    • Personnel
    The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
    • Procurement
    The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
    • Political interference
    Political interference and corruption are undermining combat readiness.
    • Territorial disputes
    Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
    • Transboundary haze
    Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
    • Fleet sustainment
    The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
    • Technological obsolescence
    Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
    • Modernization
    The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

    BalasHapus
  102. LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • TOTAL HARGA USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA =
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -FREMM CLASS USD 525-675 JUTA
    ===================
    ===================
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    -------------
    17 CREDITOR LCS
    17 CREDITOR LCS
    17 CREDITOR LCS
    1. MTU Services Ingat Kawan (M) Sdn Bhd
    2. include Contraves Sdn Bhd
    3. Axima Concept SA
    4. Contraves Advanced Devices Sdn Bhd
    5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
    6. Security & Services Malon Sdn Bhd,
    7. iXblue SAS
    8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
    9. Bank Pembangunan Malon Bhd
    10. AmBank Islamic Bhd
    11. AmBank (M) Bhd
    12. Affin Hwang Investment Bank Bhd
    13. Bank Muamalat Malon Bhd
    14. Affin Bank Bhd
    15. Bank Kerjasama Rakyat Malon Bhd
    16. Malayan Banking Bhd (Maybank)
    17. KUWAIT FINANCE HOUSE (MALON) BHD.
    ===================
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ===================
    KEYWORS
    LCS WITHOUT AMMO = DESTROYER WITH AMMO

    BalasHapus