06 Januari 2024
Training on HMBS 60T from China for (all photos: 525th Combat Engineer)The 525th Combat Engineer “Forerunner” Battalion of the Combat Engineer Regiment, Philippine Army, under the command of Lt. Col. Michael Rey L. Bautista, provided Eight (525CEB Subject Matter Experts (SME) in the conduct of Heavy Mechanized Bridge System (HMBS) Training to the twenty-one (21) participants conducted at Forerunner Training Area, 525CEB, CER, PA, and 33rd Combat Engineer Company, 3rd Naval Combat Engineer Battalion (3NCEB) based at Naval Station Jose Francisco Fort Bonifacio, Taguig City from 16-21 December 2024.
Each HMBS can transport and launch a single bridge, providing critical bridging support for Combat Engineer and Disaster Response Operations.
Personnel from the Philippine Army and Philippine Navy, specifically from 525CEB, CER, PA, and 33rd CEC, 3rd NCEB, participated in the training, aimed at equipping them with the knowledge and skills necessary for the operation and maintenance of the HMBS.
The training was led by Subject Matter Expert (SME) 1LT Nazar Louie O. Edma (CE) PA, from the 525CEB, CER, PA.
Throughout the duration of the training, which covered numerous practical exercises using the issued two (2) units HMBS os PN, both 525CEB and 3rd NCEB personnel demonstrated integrity and proficiency in deploying the HMBS, culminating in successful practical exercises at FTA LNMB, showcasing their capability to operate and maintain the equipment effectively.
The Said sailors are now confident to utilize and operate the Heavy Mechanized Bridge System (HMBS).
Jembatan dari China
BalasHapusVULCANO 127mm = 100 KM
BalasHapusVULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
terdiri dari amunisi Ballistic Extended Range (BER) dan Guided Long Range (GLR) dengan berbagai sekering multifungsi, sensor, dan pemandu akhir yang memperluas jangkauan senjata hingga 100 km
--------
EXOCET MM40 (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
--------
TNI AL = BLOCK 3 : 200 KM
--------
TLDM = BLOCK 2 : 72 KM
==========
==========
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
--------
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
--------
The Royal Malonnn Navy (RMN) has a few weaknesses, including:
• Lack of modernization: The RMN's fleet is not up to date with current and future challenges. This makes it harder for Malonn to respond to disputes with other countries.
• Funding shortages: The RMN has a history of funding shortages.
Location: The RMN is located between major powers, which could make its waters a frontier in the event of a naval conflict. This could threaten Malonn's sovereignty and maritime interests
--------
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
saran saja jika KRI AHMAD YANI CLASS yang di pensiunkan di tranfer ke BAKAMLA saja untuk menambah kekuatan ARMADA BAKAMLA..
BalasHapusπͺπ²π¨⚓π₯π₯π₯π₯⚔️
TOLONG JANGAN DIHIBAHKAN KE MALAYDESH NANTI DIKIRA MENGHINA sebelah karena otaknya IQ 1000000000 DAN MEREKA MAMPU DALAM SEJARAHNYA BIKIN JONG..
JADI BIARKAN MEREKA ..
πͺπ²π¨⚓π₯π₯π₯π₯⚔️
BalasHapusMalon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
==============
The Malonnn Armed Forces (MAF) faces a number of challenges, including:
• Logistics
A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
• Budgeting
Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
• Personnel
The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
• Procurement
The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
• Political interference
Political interference and corruption are undermining combat readiness.
• Territorial disputes
Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
• Transboundary haze
Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Technological obsolescence
Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
==============
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
OI BABI TOLOP GEMPORK
BalasHapusINI GUN BOAT WW2 BENAR KAN
••KEDAH CLASS.
••LAKSAMANA CLASS.
••LeMeS BATCH 1 CLASS.
••HANDALAN CLASS.
••PERDANA CLASS.
••JERUNG CLASS.
••SRI INDERA SAKTI CLASS.
••SRI PERLIS CLASS.
KAPAL ZOMBIE EDO TENSEI.. MATI. TENGGELAM DIHIDUPKAN LAGI
••KD PENDEKAR TUA.
••KD HIU TUA N USANG
Purrr seblm kau bual besak baik.
BalasHapus1 LCS UNSLIP TUH SELESAIKAN DULU YA NYET... ππππππ... KAPAL MASIH UNSLIP DAH SEMBANG.
TERUS.
••NSM ZONK.
••VL MICA BUAL.
••BOFORS MK3 TIPU.
••DS30 AUTOCANON OMONG KOSONG.
untuk LCS tuh beli dulu baru JUAL CAKAP...
KAPAL SEBIJI ITUPON CACAT, SENJATA BLUM ADA DAH JUAL TAMPANG
LAWAKAN DARI BABI TOLOL
Sebelah masih pakai jerigen ππππ
BalasHapusPrihatin banget.....pasukan khusus maenan mobil bodong, ginilah kalo budaya Hedon merasuki semua kalangan π₯π₯π₯
BalasHapusGue mah pilih yg udel bodong aja π
https://youtu.be/1xpICoK87xQ?si=c6SsoeG3S27P9sXD
17 CREDITOR LCS =
BalasHapus1. MTU Services Ingat Kawan (M) Sdn Bhd
2. include Contraves Sdn Bhd
3. Axima Concept SA
4. Contraves Advanced Devices Sdn Bhd
5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
6. Security & Services Malon Sdn Bhd,
7. iXblue SAS
8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
9. Bank Pembangunan Malon Bhd
10. AmBank Islamic Bhd
11. AmBank (M) Bhd
12. Affin Hwang Investment Bank Bhd
13. Bank Muamalat Malon Bhd
14. Affin Bank Bhd
15. Bank Kerjasama Rakyat Malon Bhd
16. Malayan Banking Bhd (Maybank)
17. KUWAIT FINANCE HOUSE (MALON) BHD.
==========
PESAWAT SAWIT
On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
----
KAPAL SELAM SAWIT
Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
----
TANK SAWIT KARET
Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
=========
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
----
KEYWORDS
1 UNIT JAVELIN = 3 UNIT NLAW
4.5 KM JAVELIN = 1 KM NLAW
---
Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit generally around $30,000 to $33,000. It has a range of up to 1,000 meters and can destroy a tank in a single shot.
----
KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
-
1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
-
2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
-
USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
2024 RASIO HUTANG 84,2% DARI GDP
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
==============
FACT :
1. 1 UNIT APACHE = 13 UNIT MD530G
2. 1 UNIT RAFALE = 4 UNIT FA50M
3. 1 UNIT PPA = 3 UNIT LMS B2
4. 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. SEWA 28 HELI = 119 HELI BARU
7. 4.5 KM JAVELIN = 1 KM NLAW
8. ANKA ISR NOT ARMED
17 CREDITOR LCS =
BalasHapus1. MTU Services Ingat Kawan (M) Sdn Bhd
2. include Contraves Sdn Bhd
3. Axima Concept SA
4. Contraves Advanced Devices Sdn Bhd
5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
6. Security & Services Malon Sdn Bhd,
7. iXblue SAS
8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
9. Bank Pembangunan Malon Bhd
10. AmBank Islamic Bhd
11. AmBank (M) Bhd
12. Affin Hwang Investment Bank Bhd
13. Bank Muamalat Malon Bhd
14. Affin Bank Bhd
15. Bank Kerjasama Rakyat Malon Bhd
16. Malayan Banking Bhd (Maybank)
17. KUWAIT FINANCE HOUSE (MALON) BHD.
==========
FA50M SAWIT
On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
----
SCORPENE SAWIT
Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
----
PT91 SAWIT KARET
Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
=========
SEWA FAST INTERCEPTOR BOAT
SEWA UTILITY BOAT
SEWA RIGID HULL FENDER BOAT
SEWA ROVER FIBER GLASS
SEWA EC120B
SEWA FLIGHT SIMULATION TRAINING DEVICE
Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
Melalui kaedah sewaan ini, tempoh masa untuk melaksanakan proses perolehan termasuk berkaitan tender serta pembinaan aset dapat dikurangkan.
==========
SEWA KAPAL HIDROLOGI
SEWA KAPAL HIDROLOGI
SEWA KAPAL HIDROLOGI
Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak sewaan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
==========
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
==========
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
==========
The Royal Malonnn Navy (RMN) has a few weaknesses, including:
• Lack of modernization: The RMN's fleet is not up to date with current and future challenges. This makes it harder for Malonn to respond to disputes with other countries.
• Funding shortages: The RMN has a history of funding shortages.
Location: The RMN is located between major powers, which could make its waters a frontier in the event of a naval conflict. This could threaten Malonn's sovereignty and maritime interests
17 CREDITOR LCS =
BalasHapus1. MTU Services Ingat Kawan (M) Sdn Bhd
2. include Contraves Sdn Bhd
3. Axima Concept SA
4. Contraves Advanced Devices Sdn Bhd
5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
6. Security & Services Malon Sdn Bhd,
7. iXblue SAS
8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
9. Bank Pembangunan Malon Bhd
10. AmBank Islamic Bhd
11. AmBank (M) Bhd
12. Affin Hwang Investment Bank Bhd
13. Bank Muamalat Malon Bhd
14. Affin Bank Bhd
15. Bank Kerjasama Rakyat Malon Bhd
16. Malayan Banking Bhd (Maybank)
17. KUWAIT FINANCE HOUSE (MALON) BHD.
===================
1. HUTANG 84.2% DARI GDP
1. HUTANG 84.2% DARI GDP
2. HUTANG NEGARA RM 1.5 TRLLIUN
3. HUTANG 1MDB RM 18.2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST SHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. TUDM SEWA 12 AW149
62. TUDM SEWA 4 AW139
63. TUDM SEWA 5 EC120B
64. TLDM SEWA 2 AW159
65. TDM SEWA 4 UH-60A
67. TDM SEWA 12 AW149
68. BOMBA SEWA 4 AW139
69. MMEA SEWA 2 AW159
70. POLIS SEWA 7 BELL429
===================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
KEYWORDS
1 UNIT JAVELIN = 3 UNIT NLAW
4.5 KM JAVELIN = 1 KM NLAW
---
Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit generally around $30,000 to $33,000. It has a range of up to 1,000 meters and can destroy a tank in a single shot.
----
KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
-
1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
-
2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
-
USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
17 CREDITOR LCS =
BalasHapus1. MTU Services Ingat Kawan (M) Sdn Bhd
2. include Contraves Sdn Bhd
3. Axima Concept SA
4. Contraves Advanced Devices Sdn Bhd
5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
6. Security & Services Malon Sdn Bhd,
7. iXblue SAS
8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
9. Bank Pembangunan Malon Bhd
10. AmBank Islamic Bhd
11. AmBank (M) Bhd
12. Affin Hwang Investment Bank Bhd
13. Bank Muamalat Malon Bhd
14. Affin Bank Bhd
15. Bank Kerjasama Rakyat Malon Bhd
16. Malayan Banking Bhd (Maybank)
17. KUWAIT FINANCE HOUSE (MALON) BHD.
==========
PESAWAT SAWIT
On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
----
KAPAL SELAM SAWIT
Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
----
TANK SAWIT KARET
Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
=========
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
----
KEYWORDS
1 UNIT JAVELIN = 3 UNIT NLAW
4.5 KM JAVELIN = 1 KM NLAW
---
Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit generally around $30,000 to $33,000. It has a range of up to 1,000 meters and can destroy a tank in a single shot.
----
KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
-
1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
-
2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
-
USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
2024 RASIO HUTANG 84,2% DARI GDP
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
==============
FACT :
1. 1 UNIT APACHE = 13 UNIT MD530G
2. 1 UNIT RAFALE = 4 UNIT FA50M
3. 1 UNIT PPA = 3 UNIT LMS B2
4. 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. SEWA 28 HELI = 119 HELI BARU
7. 4.5 KM JAVELIN = 1 KM NLAW
8. ANKA ISR NOT ARMED
17 CREDITOR LCS =
BalasHapus1. MTU Services Ingat Kawan (M) Sdn Bhd
2. include Contraves Sdn Bhd
3. Axima Concept SA
4. Contraves Advanced Devices Sdn Bhd
5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
6. Security & Services Malon Sdn Bhd,
7. iXblue SAS
8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
9. Bank Pembangunan Malon Bhd
10. AmBank Islamic Bhd
11. AmBank (M) Bhd
12. Affin Hwang Investment Bank Bhd
13. Bank Muamalat Malon Bhd
14. Affin Bank Bhd
15. Bank Kerjasama Rakyat Malon Bhd
16. Malayan Banking Bhd (Maybank)
17. KUWAIT FINANCE HOUSE (MALON) BHD.
===================
FACT LCS 2025 - 2011 = 15 YEARS
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
===================
FACT NOT YET DELIVERED :
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
===================
2024 RASIO HUTANG 84,2% DARI GDP
The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023.
In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018).
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
===================
FACT LCS = 17 CREDITORS > RM12,4 BILLION > 15 YEARS > STALLED
Lagi tepat nii..
BalasHapusVideo TERBARU LCS 2 OMPONG yang buat geng MALAYDESHYA tak pernah senang ... π₯π€£π€£π€£
FACT LCS 2025 - 2011 = 15 YEARS
BalasHapusLAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
===================
FACT NOT YET DELIVERED :
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
===================
2024 RASIO HUTANG 84,2% DARI GDP
HUTANG 2023 = RM 1.53 TRILLION
HUTANG 2022 = RM 1.45 TRILLION
HUTANG 2021 = RM 1.38 TRILLION
HUTANG 2020 = RM 1.32 TRILLION
HUTANG 2019 = RM 1.25 TRILLION
HUTANG 2018 = RM 1.19 TRILLION
The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023.
In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018).
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
FACT LCS 2025 - 2011 = 15 YEARS
BalasHapusLAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
===================
FACT NOT YET DELIVERED :
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
===================
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
===================
2024 RASIO HUTANG 84,2% DARI GDP
HUTANG 2023 = RM 1.53 TRILLION
HUTANG 2022 = RM 1.45 TRILLION
HUTANG 2021 = RM 1.38 TRILLION
HUTANG 2020 = RM 1.32 TRILLION
HUTANG 2019 = RM 1.25 TRILLION
HUTANG 2018 = RM 1.19 TRILLION
The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023.
In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018).
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
Kerja 14 tahun hanya dapat ini?
BalasHapusWakakakakakakakqkaka
π€£π€£πππ€£π€£
14 tahun gemana .. 15 tahun kok, entar selesai technology nya jadul pula buat target latihan KRI kita...
Hapusπππππ
171 ASSETS EXCEEDING 30 YEARS =
BalasHapus108 TDM
29 TUDM
34 TLDM
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
----
2024 MILITARY STRENGTH RANKING
GLOBAL FIRE POWER – GFP
13. Indonesia US$ 25 Billion = SHOPPING
22. Vietnam US$ 7,9 Billion = SHOPPING
25. Thailand US$ 7,7 Billion = SHOPPING
30. Singapura US$ 13,493 Billion = SHOPPING
42. Malon US$ 4,370 Billion = LEASE
=========
KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
-
1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
-
2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
=========
KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
-
1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
-
2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
=========
KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
-
1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
-
2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
-
Apache AH-64E contract for Indonesia for $1.42 BILLION
-
The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
-
USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
=========
KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
-
PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
-
LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
=========
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
=========
KEYWORDS
1 UNIT JAVELIN = 3 UNIT NLAW
4.5 KM JAVELIN = 1 KM NLAW
---
Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
=========
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
=========
THE MALONN ARMY HAS FACED SOME CHALLENGES, INCLUDING CORRUPTION AND ISSUES WITH MILITARY PERSONNEL:
1. Corruption
Malon's military has been involved in corruption, and the country's military doctrine doesn't recognize it as a threat. The Integrity Plan addresses corruption, but it's not a strategic document, and commanders don't receive training on corruption issues before deployments.
2. Military personnel
Some say that military personnel have struggles with thinking skills, decision-making, and problem-solving.
3. Logistics
Some say that Malon has had problems ensuring the readiness of the Malonn Armed Forces (MAF) in the face of threats
=========
The Malonn Armed Forces (MAF) faces a number of challenges, including:
• Outdated equipment
Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern assets. For example, the KD Rahman submarine was unable to submerge due to technical issues in 2010.
• Misappropriation of funds
There have been multiple instances of public funds being misappropriated under the guise of meeting defense needs.
• Army-centric mindset
Malon has an army-centric mindset, even though the country is surrounded by water.
• Double budgetary allocation
The army receives more of the budget than the other services.
• Lack of standard operating procedures
There are issues with standard operating procedures, from the e-procurement process to inventory receipts.
• Tension between public and military
There is tension between the public's right to know and the military's "need-to-know" policies
Malonn's defense budget is considered not in accordance with its objectives. Some of the things to consider are:
BalasHapus• The allocation of salaries and allowances for 2024 reaches 40% of the total defense budget.
• The allocation for procurement has increased slightly from 2023, but there may be no real benefit due to the depreciation of the ringgit.
• The Ministry of Finance assesses the availability of funds for programs and procurement requirements in private.
• Hundreds of Malonnn military assets have exceeded the 30-year service limit.
==========
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
==========
Malonn has several issues related to assault rifles, including:
• Smuggling
Malonn's long and porous borders make it difficult to stop the smuggling of firearms and ammunition into the country. The border between Malonn and Thailand is particularly vulnerable to gun smuggling.
• Outdated inventory
The Malonnn Armed Forces (MAF) has outdated inventory stock, which can be a stumbling block for ongoing operations.
• Wary of Russian-made weapons
Malonn is becoming wary of its Russian-made weapons
==========
Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
• Krisis politik
Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
3. Dampak politik pandemi COVID-19
4. Proklamasi Darurat 2021
5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
• Krisis beras
Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
• Krisis mata uang
Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
1. Kinerja ekspor yang buruk
2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
3. Kekhawatiran geopolitik
4. Ketidakpastian mengenai prospek ekonomi China
Malonn has faced several crises, including political, financial, and economic crises:
BalasHapus• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
=========
Malonn has a number of weaknesses, including:
• Economic
Malonn's budget income is highly dependent on the oil and gas sector, and fiscal revenues are low. The country also has high levels of household and corporate debt, and a high dependency on food imports.
• Political
Malonn has a divided political landscape, and the country has experienced political instability since 2018. The 2022 election resulted in a hung parliament, the first time this has happened since Malonn's independence.
• Environmental
Malonn ranks 147 out of 210 economies on the Environmental Sustainability Index, due to challenges with climate change vulnerability, recycling rate, and renewable electricity output.
• Public procurement
Some weaknesses in public procurement in Malonn include non-compliance with contract terms, delayed project completion, poor documentation, and low quality of products and services.
• Property market
In the second half of 2023, sales volumes in the property market declined, and prices rose by only 0.1% year-on-year.
• Currency
The Malonnn ringgit (MYR) could potentially go down in value further. A weaker currency can have negative economic impacts, particularly for businesses that rely on imports.
=========
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
The Royal Malonn Air Force (RMAF) has faced several challenges, including:
BalasHapus• Aircraft maintenance
The RMAF has had issues with maintenance and spare parts for its aircraft, including the Sukhoi Su-30MKM and the Kuwaiti HORNET MALONN. For example, in 2018, only four of the RMAF's Sukhoi Su-30MKM aircraft were flyable due to maintenance issues. The Kuwaiti HORNET MALONNs are an earlier model than the Malonn fighters, which may cause compatibility issues.
• Budget constraints
Malon's defense budget is limited, which can affect the pace of acquisitions and upgrades. The government must balance defense spending with other national priorities.
• Regional competition
Neighboring countries like Indonesia and Singapore are also increasing their air force capabilities, which puts pressure on Malon to keep pace.
• Corruption
Malon's military has been involved in multiple corruption scandals
==================
LARGE GAPS MILITARY CAPABILITY
LARGE GAPS MILITARY CAPABILITY
LARGE GAPS MILITARY CAPABILITY
Large gaps in Malon’s military capability remain, however. These are largely the result of the small procurement budgets of the last quarter-century and ageing equipment inventory. Equipment-modernisation challenges are not Malon’s only defence woes. The Malonn Armed Forces have difficulty recruiting and retaining sufficient high-calibre personnel, partly because of poor conditions of service. In June, Anwar remarked that he was ‘appalled’ by the condition of some military living quarters. But beyond immediate remedial measures, fixing defence infrastructure will probably not happen until 2024 at the earliest, as the government is currently prioritising the repair of dilapidated school buildings.
Many in Malon’s defence community have tentatively welcomed the Anwar government’s early efforts to respond to some of the country’s military shortcomings and particularly the alleged wastage of defence funds through corrupt practices. However, given the wide-ranging nature of the demands on the government’s resources and attention, and in the absence of clear-cut threats, Anwar may find it difficult to continue treading the fine line between neglecting and over-indulging the defence sector.
==================
Malon's military budget is driven by a number of factors, including:
• Security threats: Malon needs to protect its sovereignty and address security threats like piracy and terrorism.
• Regional security landscape: Malon faces challenges in the regional security landscape, including strategic, geopolitical, security, and economic challenges.
• Military capability: In 2021, Malon was ranked 16th out of 26 for military capability.
• Military modernization: Malon's defense budget is expected to grow to $6.2 billion by 2028 to support military modernization efforts.
• Disaster response: The budget will support disaster response capabilities.
• International commitments: The budget will support international commitments.
• Economic interests: The budget will contribute to the country's economic interests
==============
HIGH COURT =
CRIMINAL BREACH LCS RM 21 MILLION
CRIMINAL BREACH LCS RM 21 MILLION
CRIMINAL BREACH LCS RM 21 MILLION
Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
The Royal Malonn Air Force (RMAF) has faced several challenges, including:
BalasHapus• Aircraft maintenance
The RMAF has had issues with maintenance and spare parts for its aircraft, including the Sukhoi Su-30MKM and the Kuwaiti HORNET MALONN. For example, in 2018, only four of the RMAF's Sukhoi Su-30MKM aircraft were flyable due to maintenance issues. The Kuwaiti HORNET MALONNs are an earlier model than the Malonn fighters, which may cause compatibility issues.
• Budget constraints
Malon's defense budget is limited, which can affect the pace of acquisitions and upgrades. The government must balance defense spending with other national priorities.
• Regional competition
Neighboring countries like Indonesia and Singapore are also increasing their air force capabilities, which puts pressure on Malon to keep pace.
• Corruption
Malon's military has been involved in multiple corruption scandals
=========
The Royal Malonn Navy (RMN) faces several challenges, including:
• Aging fleet: More than half of the RMN's fleet is past its prime, and the country has only received four of the 18 new vessels it planned to acquire. The last time the RMN acquired a combat ship was in 1997.
• Delayed replacements: The RMN's plans to replace its aging fleet have been stalled due to mismanagement.
• Insufficient defense budget: Malon's defense budget is less than one percent of its GDP, while neighboring Singapore spends six percent.
• Lack of coordination: There is a lack of coordination among agencies.
• Outdated assets: The RMN's ships and assets are outdated.
• Combat system issues: The RMN has observed deficiencies with the combat system of its LMS type vessels.
• Low endurance: The LCS's endurance was too low to stay with a carrier strike group or amphibious ready group without significant refueling.
• Lack of air and surface warfare capabilities: The LCS lacked significant air and surface warfare capabilities
=========
BUDGET 2025 = SALARIES AND ALLOWANCES
BUDGET 2025 = NOT ASSETS
BUDGET 2025 = NOT ASSETS
BUDGET 2025 = NOT ASSETS
Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
==============
BUDGET 2025 = ASSET PROCUREMENT DOWN
BUDGET 2025 = ASSET PROCUREMENT DOWN
BUDGET 2025 = ASSET PROCUREMENT DOWN
Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
=========
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
Some problems Malonn shipyards face in making warships include:
BalasHapus• Supply chain disruptions
In 2022, COVID-19 and the Russia-Ukraine conflict disrupted supply chains and led to shortages of skilled personnel.
• Low-quality products
Workers may use sketches, photos, and previous experience instead of following good engineering practices, which can lead to low-quality products, reworks, higher costs, and late deliveries.
• Traditional shipbuilding
Traditional shipbuilding is a slow, expensive, and laborious process. It involves a systems approach, where each system has its own drawings, and work crews may compete for work space.
• Resource shortage
The shipbuilding industry is facing a shortage of resources due to an aging workforce and a lack of young people willing to enter the trade.
----------
The Royal Malonn Navy (RMN) has faced challenges with its readiness rate, including a lack of modern assets, aging vessels, and budget limitations:
• Lack of modern assets
The RMN has faced challenges in obtaining modern military assets, which can expose it to internal and external threats.
• Aging vessels
Many of the RMN's assets are over 20 years old, and the budget to replace them is limited.
• Political interference and corruption
Some say that political interference and corruption are undermining the RMN's combat readiness.
===========
===========
Indonesia's warship industry has several advantages, including:
• Strategic location: Indonesia's location in Southeast Asia, with a coastline that stretches across the Indian and Pacific Oceans, makes it a hub for maritime trade. Two of the world's most important maritime trade routes pass through its waters.
• Natural resources: Indonesia is rich in natural resources.
• Large archipelago: Indonesia is the world's largest archipelagic country, with over 17,000 islands. Ships are important for connecting the islands and transporting goods and passengers.
• National defense: Ships are vital to the national defense system.
• Shipbuilding company: PT PAL Indonesia is Indonesia's largest shipbuilding company, with capabilities in warship and commercial ship construction and design.
• Maritime technology: Maritime technology can strengthen the sovereignty and defense of the Indonesian marine, improve the welfare of fishermen and ship owners, and create a sustainable technology education system.
----------
Warships made by PT PAL Indonesia have many advantages, including:
• Quality
PT PAL has a strong commitment to quality, which is reflected in their products and services. They have a good quality assurance system that ensures their products are high quality and meet the needs of their users.
• Design capability
PT PAL has a strong design capability that has been recognized internationally.
• Modern technology
PT PAL uses advanced technology in their production, including modern management systems and professional and experienced human resources.
• Maintenance and repair
PT PAL can also perform maintenance and repair on warships, submarines, and commercial vessels.
• Domestic production
PT PAL is capable of producing, repairing, and modernizing defense equipment domestically.
• Global reach
PT PAL's products have sailed in waters all over the world.
• Auxiliary vessels
PT PAL can also build and manufacture auxiliary vessels, such as Landing Platform Docks (LPD).
• Combat assistance
PT PAL's vessels can carry out combat assistance, as well as non-war military operations like humanitarian missions and disaster relie
Some factors that contribute to the Malonn Army's perceived weakness include:
BalasHapus• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
============
Factors that influence Malon's military budget include:
• Fiscal limitations
Malonn governments have been unwilling to fund defense by cutting government spending or reducing the size of the armed forces.
• Public debt
A study found a positive association between public debt and defense spending in Malon.
• Exchange rate
The depreciation of the ringgit can impact the real gain in procurement funding.
• Military imports
The size of military imports is closely linked to variations in expenditure.
• Military aid
The availability of military aid plays a central role in military expenditure.
• Non-conventional security issues
These issues are beginning to shape and influence the nature of threats to national defense and security.
• Corruption
Corruption risks are critical in terms of military operations.
• Competition between the U.S.A. and China
The increasing competition between the U.S.A. and China has triggered an increase in military expenditure in the region.
• Conflicts and potential conflicts
Conflicts and potential conflicts between countries in the Southeast Asian region are permanent causes
============
LIGHT TWIN HELO = GAGAL
LIGHT TWIN HELO = GAGAL
LIGHT TWIN HELO = GAGAL
The Procurement division of the Home Ministry issued two separate tenders for the supply and delivery of seven twin-engine utility and transport aircraft and five light twin engine helicopters for the police’s Air Wing. the tender for the five twin-engine helicopters has been canceled. Checks on the Eperolehan website today confirmed the cancelation
----
BLACKHAWK = GAGAL
BLACKHAWK = GAGAL
BLACKHAWK = GAGAL
Shah Alam: Kementerian Pertahanan sudah menyerahkan notis pembatalan kontrak kepada syarikat pembekal empat helikopter UH-60A Black Hawk untuk kegunaan Tentera Darat Malon (TDM).
Menteri Pertahanan, Datuk Seri Mohamed Khaled Nordin berkata, ia susulan pelanjutan kontrak oleh syarikat itu pada Oktober lalu selepas gagal mematuhi kontrak penyerahannya.
"Oktober sudah berakhir. Tiada apa-apa (Black Hawks), tiada apa-apa.
"Notis pembatalan sudahpun dihantar," katanya ringkas dalam sidang media selepas Majlis Penghantaran Kumpulan Pertama Batalian Malon (Malbatt) 850-12 ke Lubnan di Pangkalan Udara Subang di sini, hari ini.
Sebelum ini, Mohamed Khaled dilaporkan berkata, kementerian memberi tempoh kepada syarikat pembekal sehingga Oktober untuk memenuhi penghantaran empat Black Hawk.
Pada Ogos lalu, kementerian itu sudah mendapat maklum balas daripada Pejabat Peguam Negara berkaitan cadangan pembatalan kontrak sewaan Black Hawk untuk TDM.
Kementeriannya sebelum ini dilaporkan akan menilai secara menyeluruh perjanjian pajakan empat helikopter Black Hawk sebelum membuat keputusan sama ada membatalkan kontrak atau memberikan masa tambahan kepada pembekal.
Pada Mei tahun lalu, mereka menandatangani kontrak menyewa empat helikopter dengan syarikat tempatan, Aerotree Defence and Services Sdn Bhd selama lima tahun bernilai RM187 juta.
---
SEWA 53 HELI BEKAS
SEWA 53 HELI BEKAS
SEWA 53 HELI BEKAS
TUDM SEWA =
12 AW149
4 AW139
5 EC120B
TLDM SEWA =
2 AW159
TDM SEWA =
4 UH-60A
12 AW149
BOMBA SEWA =
4 AW139
POLIS SEWA =
7 BELL429
MMEA SEWA =
2 AW159
JABATAN PM SEWA =
1 AW189
BalasHapusThe Malonn Armed Forces (MAF) faces a number of challenges, including:
• Outdated equipment
Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern assets. For example, the KD Rahman submarine was unable to submerge due to technical issues in 2010.
• Misappropriation of funds
There have been multiple instances of public funds being misappropriated under the guise of meeting defense needs.
• Army-centric mindset
Malon has an army-centric mindset, even though the country is surrounded by water.
• Double budgetary allocation
The army receives more of the budget than the other services.
• Lack of standard operating procedures
There are issues with standard operating procedures, from the e-procurement process to inventory receipts.
• Tension between public and military
There is tension between the public's right to know and the military's "need-to-know" policies
============
1. HUTANG 84.2% DARI GDP
2. HUTANG NEGARA RM 1.5 TRLLIUN
3. HUTANG 1MDB RM 18.2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST SHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. TUDM SEWA 12 AW149
62. TUDM SEWA 4 AW139
63. TUDM SEWA 5 EC120B
64. TLDM SEWA 2 AW159
65. TDM SEWA 4 UH-60A
67. TDM SEWA 12 AW149
68. BOMBA SEWA 4 AW139
69. MMEA SEWA 2 AW159
70. POLIS SEWA 7 BELL429
PROBLEMS MALON SHIPYARD
BalasHapusLocal shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.
===================
Some problems Malonn shipyards face in making warships include:
• Supply chain disruptions
In 2022, COVID-19 and the Russia-Ukraine conflict disrupted supply chains and led to shortages of skilled personnel.
• Low-quality products
Workers may use sketches, photos, and previous experience instead of following good engineering practices, which can lead to low-quality products, reworks, higher costs, and late deliveries.
• Traditional shipbuilding
Traditional shipbuilding is a slow, expensive, and laborious process. It involves a systems approach, where each system has its own drawings, and work crews may compete for work space.
• Resource shortage
The shipbuilding industry is facing a shortage of resources due to an aging workforce and a lack of young people willing to enter the trade.
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
===================
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE NO SONAR NO ASW = HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
SEWA 28 HELI = 119 HELI BARU :
BalasHapusSEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOΓHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
DOWNGRADE ANKA
DOWNGRADE ANKA
2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance
==============
Malonn's economy has faced a number of challenges, including:
• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
SEWA 28 HELI = 119 HELI BARU :
BalasHapusSEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
==============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
==============
BUDGET 2025 = SALARIES AND ALLOWANCES
BUDGET 2025 = NOT ASSETS
BUDGET 2025 = NOT ASSETS
BUDGET 2025 = NOT ASSETS
Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
==============
BUDGET 2025 = ASSET PROCUREMENT DOWN
BUDGET 2025 = ASSET PROCUREMENT DOWN
BUDGET 2025 = ASSET PROCUREMENT DOWN
Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
==============
KEY WORDS =
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
Sangat lawak, kerja 14 tahun hanya dapatkan itu..
BalasHapusYaa ampuun...
Separah itu engineer Malaydesh
πππ€£π€£π€£ππ€£ππ€£π€£
Saya sangka hasil kerja 14 tahun videonya kapal lengkap meriam, rudal, radar, torpedo....
BalasHapusLaaah..ini JANGKAR pon tak deee
Ya ampuuun
π€£π€£π€£π€£ππππππ
Itupon masih painting buat tutup KARAT jee
BalasHapusWakakakakakaakkaakakka
Jangan kata OMPONG, jangkar pon tak deee..
π€£π€£π€£πππππ€£π€£
The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
BalasHapus• Delayed delivery
The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
• Design issues
The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
• Financial issues
Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
• Corruption
A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
• Aging fleet
The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
===================
FACT LCS 2025 - 2011 = 15 YEARS
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
===================
FACT NOT YET DELIVERED :
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
===================
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
Saya sangka hasil kerja 14 tahun videonya kapal lengkap meriam, rudal, radar, torpedo....
BalasHapusLaaah..ini JANGKAR pon tak deee
Ya ampuuun
π€£π€£π€£π€£ππππππ
Itupon masih painting buat tutup KARAT jee
Wakakakakakaakkaakakka
Tapi mereka sudah melewati fase tersulit pengerjaan lcs 1 malon yaitu pemasangan SELANG π
BalasHapusππ π€£π ππ
Bladting dan Painting proses penting dalam pembinaan LCS MALON
BalasHapusBlasting untuk menghilangkan karat yang tumbuh subur selama belasan tahun
Painting biar bekas2 karat tidak kelihatan
π€£π€£π€£π€£π€£π€£
FACT ..........
BalasHapusBLASTING = MENGHILANGKAN KARAT LCS
PAINTING = MENUTUP BEKAS KARAT
----------------------------------
Blasting dan painting vessel adalah proses pembersihan dan pengecatan pada kapal:
• Blasting
Proses pembersihan material pada kapal dengan cara menyemprotkan pasir steel grit atau pasir silika dengan tekanan tinggi. Tujuannya untuk menghilangkan kontaminan seperti karat, cat, garam, dan oli.
• Painting
Proses pelapisan material pada kapal menggunakan cat dengan metode roll, spray, dan kuas. Tujuannya untuk merawat dan melindungi lambung kapal dari kerusakan akibat korosi dan fouling.
Blasting dan painting pada kapal memiliki beberapa manfaat, di antaranya:
• Membersihkan kontaminan seperti kotoran, debu, minyak, dan bekas cat lama
• Mengangkat kerak atau bekas-bekas karat
• Memperhalus bodi kapal, termasuk memperhalus bekas las dan tepian tajam
Teknik blasting dan painting memiliki beberapa kekurangan, di antaranya:
• Dapat menimbulkan dampak lingkungan, seperti pencemaran udara
• Membutuhkan waktu yang cukup lama dan tenaga kerja yang terlatih
• Penggunaan bahan abrasif dapat membahayakan kesehatan pekerja
===================
Littoral Combat Ship (LCS) 2 has successfully completed the blasting and first level of painting process, marking a significant milestone in its construction journey. It will later transition to further surface preparation and coating applications to ensure all critical areas meet the required standards.
===================
The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
• Delayed delivery
The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
• Design issues
The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
• Financial issues
Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
• Corruption
A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
• Aging fleet
The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
===================
FACT LCS 2025 - 2011 = 15 YEARS
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
===================
FACT NOT YET DELIVERED :
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
Karat mana bisa hilang, terlanjur MANGKRAK pulohan tahun..
BalasHapus"..biar bekas2 karat tidak kelihatan" >> ini BETUL
πππ€£π€£π€£π€£π€ͺπ
FACT ..........
BalasHapusBLASTING = MENGHILANGKAN KARAT LCS
PAINTING = MENUTUP BEKAS KARAT LCS
----------------------------------
Blasting dan painting vessel adalah proses pembersihan dan pengecatan pada kapal:
• Blasting
Proses pembersihan material pada kapal dengan cara menyemprotkan pasir steel grit atau pasir silika dengan tekanan tinggi. Tujuannya untuk menghilangkan kontaminan seperti karat, cat, garam, dan oli.
• Painting
Proses pelapisan material pada kapal menggunakan cat dengan metode roll, spray, dan kuas. Tujuannya untuk merawat dan melindungi lambung kapal dari kerusakan akibat korosi dan fouling.
Blasting dan painting pada kapal memiliki beberapa manfaat, di antaranya:
• Membersihkan kontaminan seperti kotoran, debu, minyak, dan bekas cat lama
• Mengangkat kerak atau bekas-bekas karat
• Memperhalus bodi kapal, termasuk memperhalus bekas las dan tepian tajam
Teknik blasting dan painting memiliki beberapa kekurangan, di antaranya:
• Dapat menimbulkan dampak lingkungan, seperti pencemaran udara
• Membutuhkan waktu yang cukup lama dan tenaga kerja yang terlatih
• Penggunaan bahan abrasif dapat membahayakan kesehatan pekerja
===================
Littoral Combat Ship (LCS) 2 has successfully completed the blasting and first level of painting process, marking a significant milestone in its construction journey. It will later transition to further surface preparation and coating applications to ensure all critical areas meet the required standards.
===================
The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
• Delayed delivery
The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
• Design issues
The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
• Financial issues
Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
• Corruption
A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
• Aging fleet
The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
===================
FACT LCS 2025 - 2011 = 15 YEARS
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
===================
FACT NOT YET DELIVERED :
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
Bisa ilang om, diblasting sampe bolong π€£π€£π€£π€£π€£
BalasHapusPakai sand blasting. Tapi bikin tipis platnya om
BalasHapuskaratan.. terus .. plat menipis.. bocor dimana mana.. kesenggol kapal nguyen.. karam deh...
BalasHapussi nguyen ketawa ngakak lagi..
πππππ
LCS Malon mah proyek gagal, yg sekarang hanya asal jadi aja. Biar gak malu πππ
BalasHapusEmang ada proyek kapal MALON yang tidak GAGAL????
BalasHapusKena Patrick dan Spongebob aja tembus tuh kapal wkwkwkwkkw.....
BalasHapusThe Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
BalasHapus• Delayed delivery
The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
• Design issues
The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
• Financial issues
Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
• Corruption
A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
• Aging fleet
The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
===================
FACT LCS 2025 - 2011 = 15 YEARS
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
===================
FACT NOT YET DELIVERED :
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
===================
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
SEWA 28 HELI = 119 HELI BARU :
BalasHapusSEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOΓHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
DOWNGRADE ANKA
DOWNGRADE ANKA
2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance
==============
Malonn's economy has faced a number of challenges, including:
• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
Some factors that contribute to the Malonn Army's perceived weakness include:
BalasHapus• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
===================
PROBLEMS MALON SHIPYARD
Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.
===================
LOST = RM14.82 MILLION
LOST = RM14.82 MILLION
SELL 51% CAD TO RHEINMETALL AG
SELL 51% CAD TO RHEINMETALL AG
SELL 51% CAD TO RHEINMETALL AG
Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
===================
HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
===================
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
SEWA 28 HELI = 119 HELI BARU :
BalasHapusSEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
==============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
==============
BUDGET 2025 = SALARIES AND ALLOWANCES
BUDGET 2025 = NOT ASSETS
BUDGET 2025 = NOT ASSETS
BUDGET 2025 = NOT ASSETS
Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
==============
BUDGET 2025 = ASSET PROCUREMENT DOWN
BUDGET 2025 = ASSET PROCUREMENT DOWN
BUDGET 2025 = ASSET PROCUREMENT DOWN
Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
==============
KEY WORDS =
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
JOM GELAK...KAPAL PPA versi LAWAK..π€£π€£π€£
BalasHapus1. KAPAL BEKAS
2. TIADA MISIL ANTI KAPAL
3. TIADSA MISIL SAM
4. TIADA TORPEDO
5. HUTANG LENDER
JOM GELAK...KAPAL PPA versi LAWAK..π€£π€£π€£
BalasHapus1. KAPAL BEKAS
2. TIADA MISIL ANTI KAPAL
3. TIADA MISIL SAM
4. TIADA TORPEDO
5. HUTANG LENDER
Tajuk berita saja sudah mengesahkan betapa LEMAH,.... OMPONG lagi DOWNGRADE kapal PPA versi NGUTANG LENDER.... sehingga menggantikan kapal usang Kelas Ahmad Yani pun tak layak... π€£π€£
BalasHapusBukan PPA, KSAL Sebut Fregat Merah Putih Akan Gantikan Kelas Ahmad Yani
FACT ..........
BalasHapusBLASTING = MENGHILANGKAN KARAT LCS
PAINTING = MENUTUP BEKAS KARAT LCS
----------------------------------
Blasting dan painting vessel adalah proses pembersihan dan pengecatan pada kapal:
• Blasting
Proses pembersihan material pada kapal dengan cara menyemprotkan pasir steel grit atau pasir silika dengan tekanan tinggi. Tujuannya untuk menghilangkan kontaminan seperti karat, cat, garam, dan oli.
• Painting
Proses pelapisan material pada kapal menggunakan cat dengan metode roll, spray, dan kuas. Tujuannya untuk merawat dan melindungi lambung kapal dari kerusakan akibat korosi dan fouling.
Blasting dan painting pada kapal memiliki beberapa manfaat, di antaranya:
• Membersihkan kontaminan seperti kotoran, debu, minyak, dan bekas cat lama
• Mengangkat kerak atau bekas-bekas karat
• Memperhalus bodi kapal, termasuk memperhalus bekas las dan tepian tajam
Teknik blasting dan painting memiliki beberapa kekurangan, di antaranya:
• Dapat menimbulkan dampak lingkungan, seperti pencemaran udara
• Membutuhkan waktu yang cukup lama dan tenaga kerja yang terlatih
• Penggunaan bahan abrasif dapat membahayakan kesehatan pekerja
===================
Littoral Combat Ship (LCS) 2 has successfully completed the blasting and first level of painting process, marking a significant milestone in its construction journey. It will later transition to further surface preparation and coating applications to ensure all critical areas meet the required standards.
===================
The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
• Delayed delivery
The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
• Design issues
The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
• Financial issues
Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
• Corruption
A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
• Aging fleet
The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
===================
FACT LCS 2025 - 2011 = 15 YEARS
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
===================
FACT NOT YET DELIVERED :
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
BalasHapus• Delayed delivery
The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
• Design issues
The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
• Financial issues
Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
• Corruption
A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
• Aging fleet
The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
===================
FACT LCS 2025 - 2011 = 15 YEARS
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
===================
FACT NOT YET DELIVERED :
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
===================
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
SEWA 28 HELI = 119 HELI BARU :
BalasHapusSEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOΓHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
DOWNGRADE ANKA
DOWNGRADE ANKA
2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance
==============
Malonn's economy has faced a number of challenges, including:
• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
LAWAK la GORILLA....
BalasHapusVULCANO 127mm = 100 KM..? π€£π€£π€£
Woiiii ATMACA 220KM woiiii.... π₯π₯π₯π€£π€£π€£
Some factors that contribute to the Malonn Army's perceived weakness include:
BalasHapus• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
===================
PROBLEMS MALON SHIPYARD
Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.
===================
LOST = RM14.82 MILLION
LOST = RM14.82 MILLION
SELL 51% CAD TO RHEINMETALL AG
SELL 51% CAD TO RHEINMETALL AG
SELL 51% CAD TO RHEINMETALL AG
Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
===================
HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
===================
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
Tak masuk akal... NGUTANG kapal PPA semahal itu hanya dapat 2 kapal PPA BEKAS dan dari versi DOWNGRADE LIGHT PLUS OMPONG....? π₯π₯π€£π€£π€£
BalasHapusIni beerti kapal PPA versi NGUTANG LENDER Hanya sebatas kapal GUN BOAT... π₯π₯π€£π€£
BalasHapusYuuuuk...kita cek kronologis production by Fincantieri
BalasHapusPesanan PPA Paolo Thaon di Revel Class unit ke-3 untuk ITALIAN NAVY yakni P-432 Raimondo Montecuccoli diserahkan secara resmi pada 27 September 2023
Jadwal Produksi PPA by Fincantieri
https://en.wikipedia.org/wiki/Thaon_di_Revel-class_offshore_patrol_vessel
KONFIRMASI MEDIA PENYERAHAN PPA unit ke-3 kepada ITALIAN NAVY pada 27 September 2023
https://www.janes.com/osint-insights/defence-news/sea/first-ppa-in-light-plus-configuration-delivered-to-italian-navy
jadi PAHAM kan BAHWA PPA PAOLO THAON DI REVEL CLASS unit ke-4 dan ke-5 untuk TNI AL adalah BRAND NEW PREMIUM QUALITY yang akan segera hadir di INDONESIA.
In March 2024, Fincantieri and the Indonesian Ministry of Defence have signed a 1.18 billion euro contract for the supply of two PPA Units.[41] According to Janes, Indonesia has secured a 1.25 billion US dollar funding from several European financial institutions for the acquisition of two PPAs. The Indonesian government also planned to named the two vessels as KRI Brawijaya (320) and KRI Prabu Siliwangi (321).[42]
Yuuuuk...kita cek kronologis production by Fincantieri
BalasHapusPesanan PPA Paolo Thaon di Revel Class unit ke-3 untuk ITALIAN NAVY yakni P-432 Raimondo Montecuccoli diserahkan secara resmi pada 27 September 2023
Jadwal Produksi PPA by Fincantieri
https://en.wikipedia.org/wiki/Thaon_di_Revel-class_offshore_patrol_vessel
KONFIRMASI MEDIA PENYERAHAN PPA unit ke-3 kepada ITALIAN NAVY pada 27 September 2023
https://www.janes.com/osint-insights/defence-news/sea/first-ppa-in-light-plus-configuration-delivered-to-italian-navy
jadi PAHAM kan BAHWA PPA PAOLO THAON DI REVEL CLASS unit ke-4 dan ke-5 untuk TNI AL adalah BRAND NEW PREMIUM QUALITY yang akan segera hadir di INDONESIA.
In March 2024, Fincantieri and the Indonesian Ministry of Defence have signed a 1.18 billion euro contract for the supply of two PPA Units.[41] According to Janes, Indonesia has secured a 1.25 billion US dollar funding from several European financial institutions for the acquisition of two PPAs. The Indonesian government also planned to named the two vessels as KRI Brawijaya (320) and KRI Prabu Siliwangi (321).[42]
konklusi :
>>> malon GAGAL FRAMING LAGIIII NICH YEEE....
He he he seru liat beruk panik dg kapal PPA, sementara TLDM semua aset usang dan 2024 tak ada penambahan ππππ. Tetap semangat para beruk, teruslah pamer ke bodohan.
BalasHapusVULCANO 127mm = 100 KM
BalasHapusVULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
According to Oto Melara, the 127/64 LW is a state of art medium caliber gun suitable for installation on large and medium size ships and intended for surface fire and naval gunfire support as main role and anti-aircraft fire as secondary role. The compactness of the gun feeding system makes possible the installation on narrow section crafts. The 127mm VULCANO ammunition family, is composed by Ballistic Extended Range (BER) and Guided Long Range (GLR) ammunition with different multifunctional fuses, sensor and final guidance that extend the range of the gun up to 100km.
--------
EXOCET MM40 (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
--------
TNI AL = BLOCK 3 : 200 KM
--------
TLDM = BLOCK 2 : 72 KM
==========
==========
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
--------
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
--------
The Royal Malonnn Navy (RMN) has a few weaknesses, including:
• Lack of modernization: The RMN's fleet is not up to date with current and future challenges. This makes it harder for Malonn to respond to disputes with other countries.
• Funding shortages: The RMN has a history of funding shortages.
Location: The RMN is located between major powers, which could make its waters a frontier in the event of a naval conflict. This could threaten Malonn's sovereignty and maritime interests
--------
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
>>>> sederhana aja koq.....
BalasHapus>>>> malon itu IRI DENGKI SAKIT HATI KEPADA INDONESIA YANG SEMAKIN MAJU, MAKMUR, KUAT BISA MEMBELI BRAND NEW PREMIUM QUALITY MILITARY ASSETS.
FAKTA :
>>>> ASSET MILITER INDONESIA TIAP TAHUN SELALU BERTAMBAH DAN DINAS AKTIF OPERASIONAL baik untuk TUJUAN:
>>>>> A. MENGGANTIKAN ASSET LAMA DENGAN ASSET BARU SEHINGGA SECARA JUMLAH TETAP SAMA
>>>>> B. MENAMBAH ASSET BARU SEHINGGA SECARA JUMLAH MENJADI BERTAMBAH BANYAK DARIPADA SEBELUMNYA
VULCANO 127mm = 100 KM
BalasHapusVULCANO 127mm = 100 KM
VULCANO 127mm 100 KM = LEKIU KASTURI LAKSAMANA KEDAH PERDANA HANDALAN JERUNG LMS : GOODBYE
According to Oto Melara, the 127/64 LW is a state of art medium caliber gun suitable for installation on large and medium size ships and intended for surface fire and naval gunfire support as main role and anti-aircraft fire as secondary role. The compactness of the gun feeding system makes possible the installation on narrow section crafts. The 127mm VULCANO ammunition family, is composed by Ballistic Extended Range (BER) and Guided Long Range (GLR) ammunition with different multifunctional fuses, sensor and final guidance that extend the range of the gun up to 100km.
--------
EXOCET MM40 (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
--------
TNI AL = BLOCK 3 : 200 KM
--------
TLDM = BLOCK 2 : 72 KM
==========
==========
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
--------
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
--------
The Royal Malonnn Navy (RMN) has a few weaknesses, including:
• Lack of modernization: The RMN's fleet is not up to date with current and future challenges. This makes it harder for Malonn to respond to disputes with other countries.
• Funding shortages: The RMN has a history of funding shortages.
Location: The RMN is located between major powers, which could make its waters a frontier in the event of a naval conflict. This could threaten Malonn's sovereignty and maritime interests
--------
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
VULCANO 127mm = 100 KM
BalasHapusVULCANO 127mm = 100 KM
VULCANO 127mm 100 KM = LEKIU KASTURI LAKSAMANA KEDAH PERDANA HANDALAN JERUNG LMS : GOODBYE
According to Oto Melara, the 127/64 LW is a state of art medium caliber gun suitable for installation on large and medium size ships and intended for surface fire and naval gunfire support as main role and anti-aircraft fire as secondary role. The compactness of the gun feeding system makes possible the installation on narrow section crafts. The 127mm VULCANO ammunition family, is composed by Ballistic Extended Range (BER) and Guided Long Range (GLR) ammunition with different multifunctional fuses, sensor and final guidance that extend the range of the gun up to 100km.
--------
EXOCET MM40 (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
--------
TNI AL = BLOCK 3 : 200 KM
--------
TLDM = BLOCK 2 : 72 KM
==========
==========
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
--------
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
--------
The Royal Malonnn Navy (RMN) has a few weaknesses, including:
• Lack of modernization: The RMN's fleet is not up to date with current and future challenges. This makes it harder for Malonn to respond to disputes with other countries.
• Funding shortages: The RMN has a history of funding shortages.
Location: The RMN is located between major powers, which could make its waters a frontier in the event of a naval conflict. This could threaten Malonn's sovereignty and maritime interests
--------
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
VULCANO 127mm = 100 KM
BalasHapusVULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
GOODBYE = LEKIU KASTURI LAKSAMANA KEDAH PERDANA HANDALAN JERUNG LMS
According to Oto Melara, the 127/64 LW is a state of art medium caliber gun suitable for installation on large and medium size ships and intended for surface fire and naval gunfire support as main role and anti-aircraft fire as secondary role. The compactness of the gun feeding system makes possible the installation on narrow section crafts. The 127mm VULCANO ammunition family, is composed by Ballistic Extended Range (BER) and Guided Long Range (GLR) ammunition with different multifunctional fuses, sensor and final guidance that extend the range of the gun up to 100km.
--------
EXOCET MM40 (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
--------
TNI AL = BLOCK 3 : 200 KM
--------
TLDM = BLOCK 2 : 72 KM
==========
==========
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
--------
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
--------
The Royal Malonnn Navy (RMN) has a few weaknesses, including:
• Lack of modernization: The RMN's fleet is not up to date with current and future challenges. This makes it harder for Malonn to respond to disputes with other countries.
• Funding shortages: The RMN has a history of funding shortages.
Location: The RMN is located between major powers, which could make its waters a frontier in the event of a naval conflict. This could threaten Malonn's sovereignty and maritime interests
--------
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
Apa INDIANESIA banyak kapal....? Lah jadi itu apa..? fregat kelas Ahmad Yani masih terus dipakai.... π€£π€£
BalasHapusNantinya, lanjut Ali, kehadiran dua fregat merah putih produksi dalam negeri akan menggantikan fregat kelas Ahmad Yani secara bertahap, bukan sekaligus untuk di-nonaktifkan, karena dia menilai jumlah unit kapal perang eks Belanda itu masih cukup dalam menjaga perairan Indonesia.
GOODBYE = LEKIU KASTURI LAKSAMANA KEDAH PERDANA HANDALAN JERUNG LMS
HapusVULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
According to Oto Melara, the 127/64 LW is a state of art medium caliber gun suitable for installation on large and medium size ships and intended for surface fire and naval gunfire support as main role and anti-aircraft fire as secondary role. The compactness of the gun feeding system makes possible the installation on narrow section crafts. The 127mm VULCANO ammunition family, is composed by Ballistic Extended Range (BER) and Guided Long Range (GLR) ammunition with different multifunctional fuses, sensor and final guidance that extend the range of the gun up to 100km.
--------
EXOCET MM40 (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
--------
TNI AL = BLOCK 3 : 200 KM
--------
TLDM = BLOCK 2 : 72 KM
==========
==========
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
--------
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
--------
The Royal Malonnn Navy (RMN) has a few weaknesses, including:
• Lack of modernization: The RMN's fleet is not up to date with current and future challenges. This makes it harder for Malonn to respond to disputes with other countries.
• Funding shortages: The RMN has a history of funding shortages.
Location: The RMN is located between major powers, which could make its waters a frontier in the event of a naval conflict. This could threaten Malonn's sovereignty and maritime interests
--------
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
Apa INDIANESIA banyak kapal....? Lah jadi itu apa..? fregat kelas Ahmad Yani masih terus dipakai.... π€£π€£
BalasHapus..
Nantinya, lanjut Ali, kehadiran dua fregat merah putih produksi dalam negeri akan menggantikan fregat kelas Ahmad Yani secara bertahap, bukan sekaligus untuk di-nonaktifkan, karena dia menilai jumlah unit kapal perang eks Belanda itu masih cukup dalam menjaga perairan Indonesia.
FACT LCS 2025 - 2011 = 15 YEARS
HapusLAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
===================
FACT NOT YET DELIVERED :
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
===================
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
===================
2024 RASIO HUTANG 84,2% DARI GDP
HUTANG 2023 = RM 1.53 TRILLION
HUTANG 2022 = RM 1.45 TRILLION
HUTANG 2021 = RM 1.38 TRILLION
HUTANG 2020 = RM 1.32 TRILLION
HUTANG 2019 = RM 1.25 TRILLION
HUTANG 2018 = RM 1.19 TRILLION
The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023.
In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018).
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
Kalau untuk.kawan kapal beruk, cukup kcr 60m saja. Toh kawannya hanya gun boat usang dan karatan ππππ
BalasHapusKalau untuk.kawan kapal beruk, cukup kcr 60m saja. Toh kawannya hanya gun boat usang dan karatan ππππ
BalasHapusGOODBYE = LEKIU KASTURI LAKSAMANA KEDAH PERDANA HANDALAN JERUNG LMS
BalasHapusVULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
According to Oto Melara, the 127/64 LW is a state of art medium caliber gun suitable for installation on large and medium size ships and intended for surface fire and naval gunfire support as main role and anti-aircraft fire as secondary role. The compactness of the gun feeding system makes possible the installation on narrow section crafts. The 127mm VULCANO ammunition family, is composed by Ballistic Extended Range (BER) and Guided Long Range (GLR) ammunition with different multifunctional fuses, sensor and final guidance that extend the range of the gun up to 100km.
--------
EXOCET MM40 (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
--------
TNI AL = BLOCK 3 : 200 KM
--------
TLDM = BLOCK 2 : 72 KM
==========
==========
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
--------
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
--------
The Royal Malonnn Navy (RMN) has a few weaknesses, including:
• Lack of modernization: The RMN's fleet is not up to date with current and future challenges. This makes it harder for Malonn to respond to disputes with other countries.
• Funding shortages: The RMN has a history of funding shortages.
Location: The RMN is located between major powers, which could make its waters a frontier in the event of a naval conflict. This could threaten Malonn's sovereignty and maritime interests
--------
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
GORILLA kalau MEMBUAL memang seram guys... Banyak kapal konon... π₯π₯π€£π€£
BalasHapusThe Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
Hapus• Delayed delivery
The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
• Design issues
The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
• Financial issues
Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
• Corruption
A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
• Aging fleet
The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
===================
FACT LCS 2025 - 2011 = 15 YEARS
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
===================
FACT NOT YET DELIVERED :
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
===================
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
Berbanding Malaydeshya tuu..
BalasHapusBoat sudah dibuang, tapi dipungut balik...tenggelam, lalu diangkat balik lagi..
Ya ampuun...
π€£π€£ππππ
FACT LCS 2025 - 2011 = 15 YEARS
BalasHapusLAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
===================
FACT NOT YET DELIVERED :
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
===================
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
===================
2024 RASIO HUTANG 84,2% DARI GDP
HUTANG 2023 = RM 1.53 TRILLION
HUTANG 2022 = RM 1.45 TRILLION
HUTANG 2021 = RM 1.38 TRILLION
HUTANG 2020 = RM 1.32 TRILLION
HUTANG 2019 = RM 1.25 TRILLION
HUTANG 2018 = RM 1.19 TRILLION
The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023.
In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018).
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
Ahmad yani class masih lebih dari cukup untuk mengalahkan kapal2 usang nan lemah tldm
BalasHapusLaah..
BalasHapusHasil kerja 14 tahun, sangka senjata lengkap, ternyata jangkar pon tak dee..
π€£π€£π€£ππππππ
FAKTA BICARA :
BalasHapus>>>> malon malon di forum DS tau benar bahwa Project LCS Gowind Class adalah PROJECT BUSUK DAN GAGAL TOTAL DAN MASIH BUTUH TAMBAHAN ANGGARAN LAGI sekedar penuhi permainan elit politik malon untuk memperkaya diri.
COBA DIPIKIR DECH....NGAPAI FRAMING BESAR BESARAN PROSES BLASTING DAN PAINTING LCS GOWIND CLASS unit ke-2 di berbagai media online dan off line ???
>>> EMANGNYA proses melakukan SAND BLASTING DAN PAINTING itu MEMBERIKAN KONTRIBUSI BERAPA PERSEN (%) dari TOTAL PROGRESS REPORT dari 1 unit kapal LCS gowind class ?
KONKLUSI :
>>> itu hanya MARKETING GIMMICK DOANG yang dilakukan malon .
TENTU DONG itu BERBANDING TERBALIK dengan Situasi yang terjadi di INDONESIA yang selalu BERHASIL MENAMBAH ASSET BARU DAN PENINGKATAN KAPASITAS DAN KAPABILITAS INDUSTRI PERTAHANAN NASIONAL INDONESIA.
HAHAHAHAHAHAHAHAHAHAH
Malon cocoklah gunakan kapal karatan πππ
HapusTernyata Walaupun sudah menerima kapal Frigat merah Putih pink.. Kapal Frigat usang kelas Ahmad Yani masih terus dipakai ya.... π₯π₯π€£π€£...
BalasHapusNantinya, lanjut Ali, kehadiran dua fregat merah putih produksi dalam negeri akan menggantikan fregat kelas Ahmad Yani secara bertahap, bukan sekaligus untuk di-nonaktifkan, karena dia menilai jumlah unit kapal perang eks Belanda itu masih cukup dalam menjaga perairan Indonesia.
GOODBYE = LEKIU KASTURI LAKSAMANA KEDAH PERDANA HANDALAN JERUNG LMS
HapusVULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
According to Oto Melara, the 127/64 LW is a state of art medium caliber gun suitable for installation on large and medium size ships and intended for surface fire and naval gunfire support as main role and anti-aircraft fire as secondary role. The compactness of the gun feeding system makes possible the installation on narrow section crafts. The 127mm VULCANO ammunition family, is composed by Ballistic Extended Range (BER) and Guided Long Range (GLR) ammunition with different multifunctional fuses, sensor and final guidance that extend the range of the gun up to 100km.
--------
EXOCET MM40 (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
--------
TNI AL = BLOCK 3 : 200 KM
--------
TLDM = BLOCK 2 : 72 KM
==========
==========
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
--------
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
--------
The Royal Malonnn Navy (RMN) has a few weaknesses, including:
• Lack of modernization: The RMN's fleet is not up to date with current and future challenges. This makes it harder for Malonn to respond to disputes with other countries.
• Funding shortages: The RMN has a history of funding shortages.
Location: The RMN is located between major powers, which could make its waters a frontier in the event of a naval conflict. This could threaten Malonn's sovereignty and maritime interests
--------
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
kenapa tidak ? unit2 kapal perang itu masih berfungsi optimal.
HapusFAKTA BICARA :
BalasHapus>>>> malon malon di forum DS tau benar bahwa Project LCS Gowind Class adalah PROJECT BUSUK DAN GAGAL TOTAL DAN MASIH BUTUH TAMBAHAN ANGGARAN LAGI sekedar penuhi permainan elit politik malon untuk memperkaya diri.
COBA DIPIKIR DECH....NGAPAIN FRAMING BESAR BESARAN PROSES BLASTING DAN PAINTING LCS GOWIND CLASS unit ke-2 di berbagai media online dan off line ???
>>> EMANGNYA proses melakukan SAND BLASTING DAN PAINTING itu MEMBERIKAN KONTRIBUSI BERAPA PERSEN (%) dari TOTAL PROGRESS REPORT dari 1 unit kapal LCS gowind class ?
KONKLUSI :
>>> itu hanya MARKETING GIMMICK DOANG yang dilakukan malon .
TENTU DONG itu BERBANDING TERBALIK dengan Situasi yang terjadi di INDONESIA yang selalu BERHASIL MENAMBAH ASSET BARU DAN PENINGKATAN KAPASITAS DAN KAPABILITAS INDUSTRI PERTAHANAN NASIONAL INDONESIA.
netizen INDONESIA TERTAWA LEPAS .....
HAHAHAHAHAHAHAHAHAHAHA
Ternyata Walaupun sudah menerima kapal Frigat merah Putih pink.. Kapal Frigat usang kelas Ahmad Yani masih terus dipakai ya.... π₯π₯π€£π€£
BalasHapusNantinya, lanjut Ali, kehadiran dua fregat merah putih produksi dalam negeri akan menggantikan fregat kelas Ahmad Yani secara bertahap, bukan sekaligus untuk di-nonaktifkan, karena dia menilai jumlah unit kapal perang eks Belanda itu masih cukup dalam menjaga perairan Indonesia.
GOODBYE = LEKIU KASTURI LAKSAMANA KEDAH PERDANA HANDALAN JERUNG LMS
HapusVULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
According to Oto Melara, the 127/64 LW is a state of art medium caliber gun suitable for installation on large and medium size ships and intended for surface fire and naval gunfire support as main role and anti-aircraft fire as secondary role. The compactness of the gun feeding system makes possible the installation on narrow section crafts. The 127mm VULCANO ammunition family, is composed by Ballistic Extended Range (BER) and Guided Long Range (GLR) ammunition with different multifunctional fuses, sensor and final guidance that extend the range of the gun up to 100km.
--------
EXOCET MM40 (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
--------
TNI AL = BLOCK 3 : 200 KM
--------
TLDM = BLOCK 2 : 72 KM
==========
==========
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
--------
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
--------
The Royal Malonnn Navy (RMN) has a few weaknesses, including:
• Lack of modernization: The RMN's fleet is not up to date with current and future challenges. This makes it harder for Malonn to respond to disputes with other countries.
• Funding shortages: The RMN has a history of funding shortages.
Location: The RMN is located between major powers, which could make its waters a frontier in the event of a naval conflict. This could threaten Malonn's sovereignty and maritime interests
--------
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
FACT LCS 2025 - 2011 = 15 YEARS
HapusLAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
===================
FACT NOT YET DELIVERED :
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
===================
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
===================
2024 RASIO HUTANG 84,2% DARI GDP
HUTANG 2023 = RM 1.53 TRILLION
HUTANG 2022 = RM 1.45 TRILLION
HUTANG 2021 = RM 1.38 TRILLION
HUTANG 2020 = RM 1.32 TRILLION
HUTANG 2019 = RM 1.25 TRILLION
HUTANG 2018 = RM 1.19 TRILLION
The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023.
In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018).
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
Hapus• Delayed delivery
The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
• Design issues
The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
• Financial issues
Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
• Corruption
A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
• Aging fleet
The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
===================
FACT LCS 2025 - 2011 = 15 YEARS
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
===================
FACT NOT YET DELIVERED :
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
===================
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
171 ASSETS EXCEEDING 30 YEARS =
Hapus108 TDM
29 TUDM
34 TLDM
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
----
2024 MILITARY STRENGTH RANKING
GLOBAL FIRE POWER – GFP
13. Indonesia US$ 25 Billion = SHOPPING
22. Vietnam US$ 7,9 Billion = SHOPPING
25. Thailand US$ 7,7 Billion = SHOPPING
30. Singapura US$ 13,493 Billion = SHOPPING
42. Malon US$ 4,370 Billion = LEASE
=========
KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
-
1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
-
2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
=========
KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
-
1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
-
2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
=========
KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
-
1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
-
2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
-
Apache AH-64E contract for Indonesia for $1.42 BILLION
-
The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
-
USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
=========
KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
-
PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
-
LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
=========
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
=========
KEYWORDS
1 UNIT JAVELIN = 3 UNIT NLAW
4.5 KM JAVELIN = 1 KM NLAW
---
Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
=========
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
=========
THE MALONN ARMY HAS FACED SOME CHALLENGES, INCLUDING CORRUPTION AND ISSUES WITH MILITARY PERSONNEL:
1. Corruption
Malon's military has been involved in corruption, and the country's military doctrine doesn't recognize it as a threat. The Integrity Plan addresses corruption, but it's not a strategic document, and commanders don't receive training on corruption issues before deployments.
2. Military personnel
Some say that military personnel have struggles with thinking skills, decision-making, and problem-solving.
3. Logistics
Some say that Malon has had problems ensuring the readiness of the Malonn Armed Forces (MAF) in the face of threats
=========
The Malonn Armed Forces (MAF) faces a number of challenges, including:
• Outdated equipment
Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern assets. For example, the KD Rahman submarine was unable to submerge due to technical issues in 2010.
• Misappropriation of funds
There have been multiple instances of public funds being misappropriated under the guise of meeting defense needs.
• Army-centric mindset
Malon has an army-centric mindset, even though the country is surrounded by water.
• Double budgetary allocation
The army receives more of the budget than the other services.
• Lack of standard operating procedures
There are issues with standard operating procedures, from the e-procurement process to inventory receipts.
• Tension between public and military
There is tension between the public's right to know and the military's "need-to-know" policies
Tepatnya lebih dari cukup untuk tanggelamkan semua fregat dan korvet MALON
Hapusπ€£π€£π€£π€£π€£π€£
17 CREDITOR LCS =
Hapus1. MTU Services Ingat Kawan (M) Sdn Bhd
2. include Contraves Sdn Bhd
3. Axima Concept SA
4. Contraves Advanced Devices Sdn Bhd
5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
6. Security & Services Malon Sdn Bhd,
7. iXblue SAS
8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
9. Bank Pembangunan Malon Bhd
10. AmBank Islamic Bhd
11. AmBank (M) Bhd
12. Affin Hwang Investment Bank Bhd
13. Bank Muamalat Malon Bhd
14. Affin Bank Bhd
15. Bank Kerjasama Rakyat Malon Bhd
16. Malayan Banking Bhd (Maybank)
17. KUWAIT FINANCE HOUSE (MALON) BHD.
==========
PESAWAT SAWIT
On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
----
KAPAL SELAM SAWIT
Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
----
TANK SAWIT KARET
Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
=========
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
----
KEYWORDS
1 UNIT JAVELIN = 3 UNIT NLAW
4.5 KM JAVELIN = 1 KM NLAW
---
Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit generally around $30,000 to $33,000. It has a range of up to 1,000 meters and can destroy a tank in a single shot.
----
KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
-
1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
-
2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
-
USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
2024 RASIO HUTANG 84,2% DARI GDP
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
==============
FACT :
1. 1 UNIT APACHE = 13 UNIT MD530G
2. 1 UNIT RAFALE = 4 UNIT FA50M
3. 1 UNIT PPA = 3 UNIT LMS B2
4. 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. SEWA 28 HELI = 119 HELI BARU
7. 4.5 KM JAVELIN = 1 KM NLAW
8. ANKA ISR NOT ARMED
GORILA MALON MINIM LITERASI π€£π€£π€£π€£π€£
BalasHapusMenghina kapal2 TNI AL, tapi kapal2 tldm jauh lebih lemah dari yg dihina. Ini namanya menghina kapal sendiri
π€£π€£π€£π€£π€£π€£π€£
Tak ada satu pun kapal Malon yg gunakan rudal aktif. Bukan rudal kadaluarsa ya ππππ
BalasHapusGOODBYE = LEKIU KASTURI LAKSAMANA KEDAH PERDANA HANDALAN JERUNG LMS
BalasHapusVULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
According to Oto Melara, the 127/64 LW is a state of art medium caliber gun suitable for installation on large and medium size ships and intended for surface fire and naval gunfire support as main role and anti-aircraft fire as secondary role. The compactness of the gun feeding system makes possible the installation on narrow section crafts. The 127mm VULCANO ammunition family, is composed by Ballistic Extended Range (BER) and Guided Long Range (GLR) ammunition with different multifunctional fuses, sensor and final guidance that extend the range of the gun up to 100km.
--------
EXOCET MM40 (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
--------
TNI AL = BLOCK 3 : 200 KM
--------
TLDM = BLOCK 2 : 72 KM
==========
==========
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
--------
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
--------
The Royal Malonnn Navy (RMN) has a few weaknesses, including:
• Lack of modernization: The RMN's fleet is not up to date with current and future challenges. This makes it harder for Malonn to respond to disputes with other countries.
• Funding shortages: The RMN has a history of funding shortages.
Location: The RMN is located between major powers, which could make its waters a frontier in the event of a naval conflict. This could threaten Malonn's sovereignty and maritime interests
--------
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
171 ASSETS EXCEEDING 30 YEARS =
BalasHapus108 TDM
29 TUDM
34 TLDM
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
----
2024 MILITARY STRENGTH RANKING
GLOBAL FIRE POWER – GFP
13. Indonesia US$ 25 Billion = SHOPPING
22. Vietnam US$ 7,9 Billion = SHOPPING
25. Thailand US$ 7,7 Billion = SHOPPING
30. Singapura US$ 13,493 Billion = SHOPPING
42. Malon US$ 4,370 Billion = LEASE
=========
KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
-
1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
-
2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
=========
KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
-
1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
-
2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
=========
KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
-
1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
-
2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
-
Apache AH-64E contract for Indonesia for $1.42 BILLION
-
The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
-
USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
=========
KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
-
PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
-
LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
=========
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
=========
KEYWORDS
1 UNIT JAVELIN = 3 UNIT NLAW
4.5 KM JAVELIN = 1 KM NLAW
---
Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
=========
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
=========
THE MALONN ARMY HAS FACED SOME CHALLENGES, INCLUDING CORRUPTION AND ISSUES WITH MILITARY PERSONNEL:
1. Corruption
Malon's military has been involved in corruption, and the country's military doctrine doesn't recognize it as a threat. The Integrity Plan addresses corruption, but it's not a strategic document, and commanders don't receive training on corruption issues before deployments.
2. Military personnel
Some say that military personnel have struggles with thinking skills, decision-making, and problem-solving.
3. Logistics
Some say that Malon has had problems ensuring the readiness of the Malonn Armed Forces (MAF) in the face of threats
=========
The Malonn Armed Forces (MAF) faces a number of challenges, including:
• Outdated equipment
Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern assets. For example, the KD Rahman submarine was unable to submerge due to technical issues in 2010.
• Misappropriation of funds
There have been multiple instances of public funds being misappropriated under the guise of meeting defense needs.
• Army-centric mindset
Malon has an army-centric mindset, even though the country is surrounded by water.
• Double budgetary allocation
The army receives more of the budget than the other services.
• Lack of standard operating procedures
There are issues with standard operating procedures, from the e-procurement process to inventory receipts.
• Tension between public and military
There is tension between the public's right to know and the military's "need-to-know" policies
FAKTA BICARA :
BalasHapus>>> kapal perang malon TENGGELAM>>>> diangkat lagi >>> di-reHULL >>>> DIAKTIFKAN DINAS OPERASIONAL LAGI
HAHAHAHAHAHAHA.....
Tak masuk akal... NGUTANG kapal PPA semahal itu hanya dapat 2 kapal PPA BEKAS dan dari versi DOWNGRADE LIGHT PLUS OMPONG....? π₯π₯π€£π€£π€£
BalasHapus
HapusFACT ..........
BLASTING = MENGHILANGKAN KARAT LCS
PAINTING = MENUTUP BEKAS KARAT LCS
----------------------------------
Blasting dan painting vessel adalah proses pembersihan dan pengecatan pada kapal:
• Blasting
Proses pembersihan material pada kapal dengan cara menyemprotkan pasir steel grit atau pasir silika dengan tekanan tinggi. Tujuannya untuk menghilangkan kontaminan seperti karat, cat, garam, dan oli.
• Painting
Proses pelapisan material pada kapal menggunakan cat dengan metode roll, spray, dan kuas. Tujuannya untuk merawat dan melindungi lambung kapal dari kerusakan akibat korosi dan fouling.
Blasting dan painting pada kapal memiliki beberapa manfaat, di antaranya:
• Membersihkan kontaminan seperti kotoran, debu, minyak, dan bekas cat lama
• Mengangkat kerak atau bekas-bekas karat
• Memperhalus bodi kapal, termasuk memperhalus bekas las dan tepian tajam
Teknik blasting dan painting memiliki beberapa kekurangan, di antaranya:
• Dapat menimbulkan dampak lingkungan, seperti pencemaran udara
• Membutuhkan waktu yang cukup lama dan tenaga kerja yang terlatih
• Penggunaan bahan abrasif dapat membahayakan kesehatan pekerja
===================
Littoral Combat Ship (LCS) 2 has successfully completed the blasting and first level of painting process, marking a significant milestone in its construction journey. It will later transition to further surface preparation and coating applications to ensure all critical areas meet the required standards.
===================
The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
• Delayed delivery
The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
• Design issues
The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
• Financial issues
Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
• Corruption
A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
• Aging fleet
The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
===================
FACT LCS 2025 - 2011 = 15 YEARS
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
===================
FACT NOT YET DELIVERED :
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
165 KRI
Hapus136 KAL PATKAMLA
113 PESAWAT UDARA
388 KENDARAAN TEMPUR
Dengan demikian, kekuatan armada tempur TNI AL saat ini mencakup 165 kapal perang (KRI), 136 KAL, kapal-kapal patroli keamanan laut (patkamla), 113 pesawat udara, dan 388 kendaraan tempur.
---------------------
18 COMBAT BOAT - ARMOUR PROTECTION = Patkamla Jefman memiliki beberapa keunggulan yaitu memiliki Armour Protection Standard STANAG Level 2, mampu beroperasi di medan pesisir laut, alur sungai dan daerah rawa. Saat ini TNI AL telah memiliki 18 Combat Boat Standard, dimana untuk Koarmada III saat ini membutuhkan 9 Unit Special Mission Combat Boat lagi yang akan ditempatkan jajaran dibawahnya baik di Lantamal, Lanal, dan Fasharkan Manokwari.
----
Combat Boat Milik TNI AL ....
1.Patkamla Mamburungan
2.Patkamla Pulau Bakau
3.Patkamla Pulau Numfor
4.Patkamla Bali
5.Patkamla Pulau Salando
6.Patkamla Busalangga
7.Patkamla Lamaru
8.Patkamla Coebang
9.Patkamla Pelambong
10.Patkamla Pulau Sebesi
11.Patkamla Karimun
12.Patkamla Gebang
13.Patkamla Pulau Pagerungan
14.Patkamla Pulau Semau
15.Patkamla Pulau Yapen
16.Patkamla Pulau Langkai
17.Patkamla Kastela
18.Patkamla Santiago
19.Patkamla Binanga
20.Patkamla Balaroa
21.Patkamla Gorar
22.Patkamla Wasur
23.Patkamla Posa
CMB spesial kopaska
24.KAL Kilat
25.KAL Guruh
26.KAL Tornado
===========
===========
4 UNIT PLAT TIPIS G2000 Mk II memiliki lambung aluminium dan berbobot sekitar 26 ton pada beban standarnya.
---------------------
SEWA FAST INTERCEPTOR BOAT
SEWA UTILITY BOAT
SEWA RIGID HULL FENDER BOAT
SEWA ROVER FIBER GLASS
SEWA EC120B
SEWA FLIGHT SIMULATION TRAINING DEVICE
Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
Melalui kaedah sewaan ini, tempoh masa untuk melaksanakan proses perolehan termasuk berkaitan tender serta pembinaan aset dapat dikurangkan.
---------------------
SEWA KAPAL HIDROLOGI
SEWA KAPAL HIDROLOGI
SEWA KAPAL HIDROLOGI
Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak sewaan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
---------------------
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
---------------------
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
READINESS 58.6% X 55 Unit = 32 UNIT
HapusREADINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
------------------------------------
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
------------------------------------
The Malonn army has faced some challenges, including corruption and issues with military personnel:
• Corruption
Malon's military has been involved in corruption, and the country's military doctrine doesn't recognize it as a threat. The Integrity Plan addresses corruption, but it's not a strategic document, and commanders don't receive training on corruption issues before deployments.
• Military personnel
Some say that military personnel have struggles with thinking skills, decision-making, and problem-solving.
• Logistics
Some say that Malon has had problems ensuring the readiness of the Malonn Armed Forces (MAF) in the face of threats
-------------------------------------
The Royal Malonnn Navy (RMN) has a few weaknesses, including:
• Lack of modernization: The RMN's fleet is not up to date with current and future challenges. This makes it harder for Malonn to respond to disputes with other countries.
• Funding shortages: The RMN has a history of funding shortages.
• Location: The RMN is located between major powers, which could make its waters a frontier in the event of a naval conflict. This could threaten Malonn's sovereignty and maritime interests
=============================
=============================
165 KRI
136 KAL PATKAMLA
113 PESAWAT UDARA
388 KENDARAAN TEMPUR
Dengan demikian, kekuatan armada tempur TNI AL saat ini mencakup 165 kapal perang (KRI), 136 KAL, kapal-kapal patroli keamanan laut (patkamla), 113 pesawat udara, dan 388 kendaraan tempur.
FACT 2024 RASIO HUTANG 84,2% DARI GDP
HapusHUTANG 2023 = RM 1.53 TRILLION
HUTANG 2022 = RM 1.45 TRILLION
HUTANG 2021 = RM 1.38 TRILLION
HUTANG 2020 = RM 1.32 TRILLION
HUTANG 2019 = RM 1.25 TRILLION
HUTANG 2018 = RM 1.19 TRILLION
The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023.
In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018).
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
===================
FACT GOVERNMENT ........
BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
==============
BUDGET 2025 FOR ......
SALARIES AND OTHER STUFF
NOT ASSETS
NOT ASSETS
NOT ASSETS
Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.
==============
BUDGET 2025 ......
ASSET PROCUREMENT DOWN
ASSET PROCUREMENT DOWN
ASSET PROCUREMENT DOWN
Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
17 CREDITOR LCS =
Hapus1. MTU Services Ingat Kawan (M) Sdn Bhd
2. include Contraves Sdn Bhd
3. Axima Concept SA
4. Contraves Advanced Devices Sdn Bhd
5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
6. Security & Services Malon Sdn Bhd,
7. iXblue SAS
8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
9. Bank Pembangunan Malon Bhd
10. AmBank Islamic Bhd
11. AmBank (M) Bhd
12. Affin Hwang Investment Bank Bhd
13. Bank Muamalat Malon Bhd
14. Affin Bank Bhd
15. Bank Kerjasama Rakyat Malon Bhd
16. Malayan Banking Bhd (Maybank)
17. KUWAIT FINANCE HOUSE (MALON) BHD.
==========
PESAWAT SAWIT
On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
----
KAPAL SELAM SAWIT
Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
----
TANK SAWIT KARET
Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
=========
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
----
KEYWORDS
1 UNIT JAVELIN = 3 UNIT NLAW
4.5 KM JAVELIN = 1 KM NLAW
---
Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit generally around $30,000 to $33,000. It has a range of up to 1,000 meters and can destroy a tank in a single shot.
----
KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
-
1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
-
2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
-
USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
2024 RASIO HUTANG 84,2% DARI GDP
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
==============
FACT :
1. 1 UNIT APACHE = 13 UNIT MD530G
2. 1 UNIT RAFALE = 4 UNIT FA50M
3. 1 UNIT PPA = 3 UNIT LMS B2
4. 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
6. SEWA 28 HELI = 119 HELI BARU
7. 4.5 KM JAVELIN = 1 KM NLAW
8. ANKA ISR NOT ARMED
Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
Hapus• Krisis politik
Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
3. Dampak politik pandemi COVID-19
4. Proklamasi Darurat 2021
5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
• Krisis beras
Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
• Krisis mata uang
Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
1. Kinerja ekspor yang buruk
2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
3. Kekhawatiran geopolitik
4. Ketidakpastian mengenai prospek ekonomi China
==========
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
==========
BUDGET 2025 = SALARIES AND ALLOWANCES
BUDGET 2025 = NOT ASSETS
BUDGET 2025 = NOT ASSETS
BUDGET 2025 = NOT ASSETS
Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
==============
BUDGET 2025 = ASSET PROCUREMENT DOWN
BUDGET 2025 = ASSET PROCUREMENT DOWN
BUDGET 2025 = ASSET PROCUREMENT DOWN
Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
Tak masuk akal... NGUTANG kapal PPA semahal itu hanya dapat 2 kapal PPA BEKAS dan dari versi DOWNGRADE LIGHT PLUS OMPONG....? π₯π₯π€£π€£π€£
BalasHapusGOODBYE = LEKIU KASTURI LAKSAMANA KEDAH PERDANA HANDALAN JERUNG LMS
HapusVULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
According to Oto Melara, the 127/64 LW is a state of art medium caliber gun suitable for installation on large and medium size ships and intended for surface fire and naval gunfire support as main role and anti-aircraft fire as secondary role. The compactness of the gun feeding system makes possible the installation on narrow section crafts. The 127mm VULCANO ammunition family, is composed by Ballistic Extended Range (BER) and Guided Long Range (GLR) ammunition with different multifunctional fuses, sensor and final guidance that extend the range of the gun up to 100km.
--------
EXOCET MM40 (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
--------
TNI AL = BLOCK 3 : 200 KM
--------
TLDM = BLOCK 2 : 72 KM
==========
==========
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
--------
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
--------
The Royal Malonnn Navy (RMN) has a few weaknesses, including:
• Lack of modernization: The RMN's fleet is not up to date with current and future challenges. This makes it harder for Malonn to respond to disputes with other countries.
• Funding shortages: The RMN has a history of funding shortages.
Location: The RMN is located between major powers, which could make its waters a frontier in the event of a naval conflict. This could threaten Malonn's sovereignty and maritime interests
--------
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
FACT LCS 2025 - 2011 = 15 YEARS
HapusLAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
===================
FACT NOT YET DELIVERED :
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
===================
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
===================
2024 RASIO HUTANG 84,2% DARI GDP
HUTANG 2023 = RM 1.53 TRILLION
HUTANG 2022 = RM 1.45 TRILLION
HUTANG 2021 = RM 1.38 TRILLION
HUTANG 2020 = RM 1.32 TRILLION
HUTANG 2019 = RM 1.25 TRILLION
HUTANG 2018 = RM 1.19 TRILLION
The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023.
In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018).
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
GOODBYE = LEKIU KASTURI LAKSAMANA KEDAH PERDANA HANDALAN JERUNG LMS
HapusVULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
According to Oto Melara, the 127/64 LW is a state of art medium caliber gun suitable for installation on large and medium size ships and intended for surface fire and naval gunfire support as main role and anti-aircraft fire as secondary role. The compactness of the gun feeding system makes possible the installation on narrow section crafts. The 127mm VULCANO ammunition family, is composed by Ballistic Extended Range (BER) and Guided Long Range (GLR) ammunition with different multifunctional fuses, sensor and final guidance that extend the range of the gun up to 100km.
--------
EXOCET MM40 (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
--------
TNI AL = BLOCK 3 : 200 KM
--------
TLDM = BLOCK 2 : 72 KM
==========
==========
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
--------
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
--------
The Royal Malonnn Navy (RMN) has a few weaknesses, including:
• Lack of modernization: The RMN's fleet is not up to date with current and future challenges. This makes it harder for Malonn to respond to disputes with other countries.
• Funding shortages: The RMN has a history of funding shortages.
Location: The RMN is located between major powers, which could make its waters a frontier in the event of a naval conflict. This could threaten Malonn's sovereignty and maritime interests
--------
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
Hapus• Delayed delivery
The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
• Design issues
The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
• Financial issues
Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
• Corruption
A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
• Aging fleet
The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
===================
FACT LCS 2025 - 2011 = 15 YEARS
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
===================
FACT NOT YET DELIVERED :
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
===================
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
Some factors that contribute to the Malonn Army's perceived weakness include:
Hapus• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
===================
PROBLEMS MALON SHIPYARD
Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.
===================
LOST = RM14.82 MILLION
LOST = RM14.82 MILLION
SELL 51% CAD TO RHEINMETALL AG
SELL 51% CAD TO RHEINMETALL AG
SELL 51% CAD TO RHEINMETALL AG
Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
===================
HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
===================
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
BalasHapusFACT ..........
BLASTING = MENGHILANGKAN KARAT LCS
PAINTING = MENUTUP BEKAS KARAT LCS
----------------------------------
Blasting dan painting vessel adalah proses pembersihan dan pengecatan pada kapal:
• Blasting
Proses pembersihan material pada kapal dengan cara menyemprotkan pasir steel grit atau pasir silika dengan tekanan tinggi. Tujuannya untuk menghilangkan kontaminan seperti karat, cat, garam, dan oli.
• Painting
Proses pelapisan material pada kapal menggunakan cat dengan metode roll, spray, dan kuas. Tujuannya untuk merawat dan melindungi lambung kapal dari kerusakan akibat korosi dan fouling.
Blasting dan painting pada kapal memiliki beberapa manfaat, di antaranya:
• Membersihkan kontaminan seperti kotoran, debu, minyak, dan bekas cat lama
• Mengangkat kerak atau bekas-bekas karat
• Memperhalus bodi kapal, termasuk memperhalus bekas las dan tepian tajam
Teknik blasting dan painting memiliki beberapa kekurangan, di antaranya:
• Dapat menimbulkan dampak lingkungan, seperti pencemaran udara
• Membutuhkan waktu yang cukup lama dan tenaga kerja yang terlatih
• Penggunaan bahan abrasif dapat membahayakan kesehatan pekerja
===================
Littoral Combat Ship (LCS) 2 has successfully completed the blasting and first level of painting process, marking a significant milestone in its construction journey. It will later transition to further surface preparation and coating applications to ensure all critical areas meet the required standards.
===================
The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
• Delayed delivery
The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
• Design issues
The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
• Financial issues
Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
• Corruption
A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
• Aging fleet
The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
===================
FACT LCS 2025 - 2011 = 15 YEARS
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
===================
FACT NOT YET DELIVERED :
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
GOODBYE = LEKIU KASTURI LAKSAMANA KEDAH PERDANA HANDALAN JERUNG LMS
BalasHapusVULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
According to Oto Melara, the 127/64 LW is a state of art medium caliber gun suitable for installation on large and medium size ships and intended for surface fire and naval gunfire support as main role and anti-aircraft fire as secondary role. The compactness of the gun feeding system makes possible the installation on narrow section crafts. The 127mm VULCANO ammunition family, is composed by Ballistic Extended Range (BER) and Guided Long Range (GLR) ammunition with different multifunctional fuses, sensor and final guidance that extend the range of the gun up to 100km.
--------
EXOCET MM40 (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
--------
TNI AL = BLOCK 3 : 200 KM
--------
TLDM = BLOCK 2 : 72 KM
==========
==========
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
--------
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
--------
The Royal Malonnn Navy (RMN) has a few weaknesses, including:
• Lack of modernization: The RMN's fleet is not up to date with current and future challenges. This makes it harder for Malonn to respond to disputes with other countries.
• Funding shortages: The RMN has a history of funding shortages.
Location: The RMN is located between major powers, which could make its waters a frontier in the event of a naval conflict. This could threaten Malonn's sovereignty and maritime interests
--------
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
GOODBYE = LEKIU KASTURI LAKSAMANA KEDAH PERDANA HANDALAN JERUNG LMS
BalasHapusVULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
According to Oto Melara, the 127/64 LW is a state of art medium caliber gun suitable for installation on large and medium size ships and intended for surface fire and naval gunfire support as main role and anti-aircraft fire as secondary role. The compactness of the gun feeding system makes possible the installation on narrow section crafts. The 127mm VULCANO ammunition family, is composed by Ballistic Extended Range (BER) and Guided Long Range (GLR) ammunition with different multifunctional fuses, sensor and final guidance that extend the range of the gun up to 100km.
--------
EXOCET MM40 (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
--------
TNI AL = BLOCK 3 : 200 KM
--------
TLDM = BLOCK 2 : 72 KM
==========
==========
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
--------
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
--------
The Royal Malonnn Navy (RMN) has a few weaknesses, including:
• Lack of modernization: The RMN's fleet is not up to date with current and future challenges. This makes it harder for Malonn to respond to disputes with other countries.
• Funding shortages: The RMN has a history of funding shortages.
Location: The RMN is located between major powers, which could make its waters a frontier in the event of a naval conflict. This could threaten Malonn's sovereignty and maritime interests
--------
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
BalasHapus• Delayed delivery
The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
• Design issues
The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
• Financial issues
Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
• Corruption
A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
• Aging fleet
The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
===================
FACT LCS 2025 - 2011 = 15 YEARS
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
===================
FACT NOT YET DELIVERED :
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
===================
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
2017 LAUNCHING – 2025 NOT YET DELIVERED
The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
165 KRI
BalasHapus136 KAL PATKAMLA
113 PESAWAT UDARA
388 KENDARAAN TEMPUR
Dengan demikian, kekuatan armada tempur TNI AL saat ini mencakup 165 kapal perang (KRI), 136 KAL, kapal-kapal patroli keamanan laut (patkamla), 113 pesawat udara, dan 388 kendaraan tempur.
---------------------
18 COMBAT BOAT - ARMOUR PROTECTION = Patkamla Jefman memiliki beberapa keunggulan yaitu memiliki Armour Protection Standard STANAG Level 2, mampu beroperasi di medan pesisir laut, alur sungai dan daerah rawa. Saat ini TNI AL telah memiliki 18 Combat Boat Standard, dimana untuk Koarmada III saat ini membutuhkan 9 Unit Special Mission Combat Boat lagi yang akan ditempatkan jajaran dibawahnya baik di Lantamal, Lanal, dan Fasharkan Manokwari.
----
Combat Boat Milik TNI AL ....
1.Patkamla Mamburungan
2.Patkamla Pulau Bakau
3.Patkamla Pulau Numfor
4.Patkamla Bali
5.Patkamla Pulau Salando
6.Patkamla Busalangga
7.Patkamla Lamaru
8.Patkamla Coebang
9.Patkamla Pelambong
10.Patkamla Pulau Sebesi
11.Patkamla Karimun
12.Patkamla Gebang
13.Patkamla Pulau Pagerungan
14.Patkamla Pulau Semau
15.Patkamla Pulau Yapen
16.Patkamla Pulau Langkai
17.Patkamla Kastela
18.Patkamla Santiago
19.Patkamla Binanga
20.Patkamla Balaroa
21.Patkamla Gorar
22.Patkamla Wasur
23.Patkamla Posa
CMB spesial kopaska
24.KAL Kilat
25.KAL Guruh
26.KAL Tornado
===========
===========
4 UNIT PLAT TIPIS G2000 Mk II memiliki lambung aluminium dan berbobot sekitar 26 ton pada beban standarnya.
---------------------
SEWA FAST INTERCEPTOR BOAT
SEWA UTILITY BOAT
SEWA RIGID HULL FENDER BOAT
SEWA ROVER FIBER GLASS
SEWA EC120B
SEWA FLIGHT SIMULATION TRAINING DEVICE
Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
Melalui kaedah sewaan ini, tempoh masa untuk melaksanakan proses perolehan termasuk berkaitan tender serta pembinaan aset dapat dikurangkan.
---------------------
SEWA KAPAL HIDROLOGI
SEWA KAPAL HIDROLOGI
SEWA KAPAL HIDROLOGI
Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak sewaan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
---------------------
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
---------------------
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
FACT ..........
BalasHapusBLASTING = MENGHILANGKAN KARAT LCS
PAINTING = MENUTUP BEKAS KARAT LCS
----------------------------------
Blasting dan painting vessel adalah proses pembersihan dan pengecatan pada kapal:
• Blasting
Proses pembersihan material pada kapal dengan cara menyemprotkan pasir steel grit atau pasir silika dengan tekanan tinggi. Tujuannya untuk menghilangkan kontaminan seperti karat, cat, garam, dan oli.
• Painting
Proses pelapisan material pada kapal menggunakan cat dengan metode roll, spray, dan kuas. Tujuannya untuk merawat dan melindungi lambung kapal dari kerusakan akibat korosi dan fouling.
Blasting dan painting pada kapal memiliki beberapa manfaat, di antaranya:
• Membersihkan kontaminan seperti kotoran, debu, minyak, dan bekas cat lama
• Mengangkat kerak atau bekas-bekas karat
• Memperhalus bodi kapal, termasuk memperhalus bekas las dan tepian tajam
Teknik blasting dan painting memiliki beberapa kekurangan, di antaranya:
• Dapat menimbulkan dampak lingkungan, seperti pencemaran udara
• Membutuhkan waktu yang cukup lama dan tenaga kerja yang terlatih
• Penggunaan bahan abrasif dapat membahayakan kesehatan pekerja
===================
Littoral Combat Ship (LCS) 2 has successfully completed the blasting and first level of painting process, marking a significant milestone in its construction journey. It will later transition to further surface preparation and coating applications to ensure all critical areas meet the required standards.
===================
The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
• Delayed delivery
The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
• Design issues
The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
• Financial issues
Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
• Corruption
A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
• Aging fleet
The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
===================
FACT LCS 2025 - 2011 = 15 YEARS
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
LAUGHING STOCK TO THE WORLD
Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
===================
FACT NOT YET DELIVERED :
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
>>>> malon ini aslinya KEPANASAN LONCAT LONCAT KESANA KEMARI BERGELANTUNGAN SAMBIL TERIAK TERIAK NEGATIF FRAMING KEPADA INDONESIA.
BalasHapustau kenapa ?
karena malon ini IRI DENGKI SAKIT HATI karena INDONESIA AKAN ADA PENAMBAHAN UNIT FRIGAT MERAH PUTIH unit ke-3 dan ke-4 sehingga total menjadi 6 unit Frigat Merah Putih Pengganti Frigat Van Speijk Class .
PPA Thaon di Revel Class TNI AL tetap menjadi FRIGAT PEMUKUL STRATEGIS
INDONESIA (TNI AL) DONG yang SUKA SUKA BIKIN KELAS DAN TUPOKSI SENDIRI ATAS ASSET KAPAL KAPAL PERANG BARU.
INGAT RUMUS :
TNI AL menuju BLUE WATER NAVY
malon KOPLAK LOW IQ berkomentar:
GEMPURWIRA6 Januari 2025 pukul 15.04
Ternyata Walaupun sudah menerima kapal Frigat merah Putih pink.. Kapal Frigat usang kelas Ahmad Yani masih terus dipakai ya.... π₯π₯π€£π€£
Nantinya, lanjut Ali, kehadiran dua fregat merah putih produksi dalam negeri akan menggantikan fregat kelas Ahmad Yani secara bertahap, bukan sekaligus untuk di-nonaktifkan, karena dia menilai jumlah unit kapal perang eks Belanda itu masih cukup dalam menjaga perairan Indonesia.
SEWA 28 HELI = 119 HELI BARU :
BalasHapusSEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOΓHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
DOWNGRADE ANKA
DOWNGRADE ANKA
2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance
==============
Malonn's economy has faced a number of challenges, including:
• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
Malon's combat equipment has several weaknesses, including:
BalasHapus• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
==============
The Malonnn Armed Forces (MAF) faces a number of challenges, including:
• Logistics
A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
• Budgeting
Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
• Personnel
The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
• Procurement
The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
• Political interference
Political interference and corruption are undermining combat readiness.
• Territorial disputes
Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
• Transboundary haze
Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Technological obsolescence
Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
==============
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
Malon's combat equipment has several weaknesses, including:
BalasHapus• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
==============
The Malonnn Armed Forces (MAF) faces a number of challenges, including:
• Logistics
A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
• Budgeting
Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
• Personnel
The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
• Procurement
The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
• Political interference
Political interference and corruption are undermining combat readiness.
• Territorial disputes
Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
• Transboundary haze
Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Technological obsolescence
Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
==============
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
The Malonnn army has several weaknesses, including:
BalasHapus• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
Factors that influence Malon's military budget include:
• Fiscal limitations
Malonn governments have been unwilling to fund defense by cutting government spending or reducing the size of the armed forces.
• Public debt
A study found a positive association between public debt and defense spending in Malon.
• Exchange rate
The depreciation of the ringgit can impact the real gain in procurement funding.
• Military imports
The size of military imports is closely linked to variations in expenditure.
• Military aid
The availability of military aid plays a central role in military expenditure.
• Non-conventional security issues
These issues are beginning to shape and influence the nature of threats to national defense and security.
• Corruption
Corruption risks are critical in terms of military operations.
• Competition between the U.S.A. and China
The increasing competition between the U.S.A. and China has triggered an increase in military expenditure in the region.
• Conflicts and potential conflicts
Conflicts and potential conflicts between countries in the Southeast Asian region are permanent causes
==============
The Malonnn Armed Forces (MAF) faces a number of challenges, including:
• Logistics
A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
• Budgeting
Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
• Personnel
The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
• Procurement
The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
• Political interference
Political interference and corruption are undermining combat readiness.
• Territorial disputes
Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
• Transboundary haze
Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Technological obsolescence
Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
171 ASSETS EXCEEDING 30 YEARS =
BalasHapus108 TDM
29 TUDM
34 TLDM
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
----
2024 MILITARY STRENGTH RANKING
GLOBAL FIRE POWER – GFP
13. Indonesia US$ 25 Billion = SHOPPING
22. Vietnam US$ 7,9 Billion = SHOPPING
25. Thailand US$ 7,7 Billion = SHOPPING
30. Singapura US$ 13,493 Billion = SHOPPING
42. Malon US$ 4,370 Billion = LEASE
=========
KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
-
1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
-
2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
=========
KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
-
1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
-
2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
=========
KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
-
1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
-
2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
-
Apache AH-64E contract for Indonesia for $1.42 BILLION
-
The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
-
USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
=========
KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
-
PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
-
LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
=========
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
=========
KEYWORDS
1 UNIT JAVELIN = 3 UNIT NLAW
4.5 KM JAVELIN = 1 KM NLAW
---
Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
=========
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry
=========
THE MALONN ARMY HAS FACED SOME CHALLENGES, INCLUDING CORRUPTION AND ISSUES WITH MILITARY PERSONNEL:
1. Corruption
Malon's military has been involved in corruption, and the country's military doctrine doesn't recognize it as a threat. The Integrity Plan addresses corruption, but it's not a strategic document, and commanders don't receive training on corruption issues before deployments.
2. Military personnel
Some say that military personnel have struggles with thinking skills, decision-making, and problem-solving.
3. Logistics
Some say that Malon has had problems ensuring the readiness of the Malonn Armed Forces (MAF) in the face of threats
=========
The Malonn Armed Forces (MAF) faces a number of challenges, including:
• Outdated equipment
Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern assets. For example, the KD Rahman submarine was unable to submerge due to technical issues in 2010.
• Misappropriation of funds
There have been multiple instances of public funds being misappropriated under the guise of meeting defense needs.
• Army-centric mindset
Malon has an army-centric mindset, even though the country is surrounded by water.
• Double budgetary allocation
The army receives more of the budget than the other services.
• Lack of standard operating procedures
There are issues with standard operating procedures, from the e-procurement process to inventory receipts.
• Tension between public and military
There is tension between the public's right to know and the military's "need-to-know" policies
Malonn's defense budget is considered not in accordance with its objectives. Some of the things to consider are:
BalasHapus• The allocation of salaries and allowances for 2024 reaches 40% of the total defense budget.
• The allocation for procurement has increased slightly from 2023, but there may be no real benefit due to the depreciation of the ringgit.
• The Ministry of Finance assesses the availability of funds for programs and procurement requirements in private.
• Hundreds of Malonnn military assets have exceeded the 30-year service limit.
==========
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
==========
Malonn has several issues related to assault rifles, including:
• Smuggling
Malonn's long and porous borders make it difficult to stop the smuggling of firearms and ammunition into the country. The border between Malonn and Thailand is particularly vulnerable to gun smuggling.
• Outdated inventory
The Malonnn Armed Forces (MAF) has outdated inventory stock, which can be a stumbling block for ongoing operations.
• Wary of Russian-made weapons
Malonn is becoming wary of its Russian-made weapons
==========
Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
• Krisis politik
Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
3. Dampak politik pandemi COVID-19
4. Proklamasi Darurat 2021
5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
• Krisis beras
Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
• Krisis mata uang
Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
1. Kinerja ekspor yang buruk
2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
3. Kekhawatiran geopolitik
4. Ketidakpastian mengenai prospek ekonomi China
TOTAL VOLCANO = 56 UNIT
BalasHapus56-55 VESSEL RMN = SISA 1 VOLCANO
56-55 VESSEL RMN = SISA 1 VOLCANO
56-55 VESSEL RMN = SISA 1 VOLCANO
The OTO Melara 127mm/64cal Lightweight (LW) on the GP variant is part of the VULCANO system which consists of four key sub-systems: the medium caliber 127/64 LW Gun assembly, the Automated Ammunition Handling System, the Naval Fire Control Support and the VULCANO family of ammunition. The system is intended for surface fire and naval gunfire support as main role and anti-aircraft fire as secondary role. The 127/64 LW - VULCANO is equipped with a modular feeding magazine, composed by 4 drums with 14 ready to fire ammunition each (56 in total), reloadable during firing, and highly flexible in terms of selection of ammunition, independently from their position in the drums. Ammunition flow is reversible as rounds can be downloaded automatically. The 127mm VULCANO ammunition family, is composed by Ballistic Extended Range (BER) and Guided Long Range (GLR) ammunition with different multifunctional fuses, sensor and final guidance that extend the range of the gun up to 100km. The rate of fire is 32rds per minute. General Purpose FREMMs are getting the highly Automated Ammunition Handling System for the 127/64 mm gun, which holds 350 127mm shells in addition to the 56 in the four reload drums of the gun turret.
==========
GOODBYE = LEKIU KASTURI LAKSAMANA KEDAH PERDANA HANDALAN JERUNG LMS
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
VULCANO 127mm = 100 KM
According to Oto Melara, the 127/64 LW is a state of art medium caliber gun suitable for installation on large and medium size ships and intended for surface fire and naval gunfire support as main role and anti-aircraft fire as secondary role. The compactness of the gun feeding system makes possible the installation on narrow section crafts. The 127mm VULCANO ammunition family, is composed by Ballistic Extended Range (BER) and Guided Long Range (GLR) ammunition with different multifunctional fuses, sensor and final guidance that extend the range of the gun up to 100km.
--------
EXOCET MM40 (surface-launched) – Block 1, Block 2 and Block 3: deployed on warships and in coastal batteries. Range: 72 km for the Block 2, in excess of 200 km for the Block 3
--------
TNI AL = BLOCK 3 : 200 KM
--------
TLDM = BLOCK 2 : 72 KM
==========
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
--------
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
READINESS 58.6% X 55 Unit = 32 UNIT
This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
OLDEST SHIP 2024 – 1953 = 71 YEARS
BalasHapus71 YEARS = OLDEST SHIP
71 YEARS = OLDEST SHIP
71 YEARS = OLDEST SHIP
Launched 9 September 1953 Completed 9 September 1954 The ship was transferred to the Royal Malayan Navy on 1 April 1958, being renamed Sri Perlis. Following transfer, Sri Perlis' 40mm Bofors gun and minesweeping gear was removed and replaced by three 20 mm Oerlikon cannon
-----
HIBAH KAPAL 1967 = The post stated that among his achievements in the MMEA were that he was the team leader for a suitability study on absorbing the US Coast Guard cutter – USCG Decisive. Checks on the US Coast Guard website showed that Decisive– a Reliance class cutter – was laid in 1967 and commissioned in 1968
-----
HIBAH KAPAL 1968 = USCGC Steadfast (WMEC-623) was a United States Coast Guard medium endurance cutter in commission for 56 years. Commissioned in 1968, Steadfast was home ported in St. Petersburg, Florida for her first 24 years of service...
-----
HIBAH KAPAL 1980 = KM Perwira, one of the two Bay class patrol boats donated to MMEA by Australia. It is likely that the Bay class was the design proposed for the tri-nation VLPV project in the late 80s.
-----
PERBAIKAN DIBIAYAI JEPANG = Kapal patroli kedua yang disumbangkan oleh Jepang Coast Guard (JCG) untuk APMM/MMEA akan berlayar ke pulang pada akhir Mei, saat ini kapal dengan nama KM Arau ini sedang dalam tahap perbaikan akhir yang dilakukan di Jepang.
-----
KAPAL MCMV 1984 = Kapal penangkis periuk api Lerici class ini dibina oleh Syarikat Intermarine di Itali dan dilancarkan pada 30 Oktober 1984
-----
HIBAH KAPAL 1989 DAN 1991 = Jepang menghibahkan dua kapal kelas 90m masing-masing PL-01 Ojima dan PL-02 Erimo, kedua kapal ini masuk dinas di JCG pada tahun 1989 dan 1991.
-----
HIBAH KAPAL1990–1991 = KM Pekan is an Ojika-class offshore patrol vessel operated by the Malonn Coast Guard. This ship, together with KM Arau and KM Marlin was transferred from the Japan Coast Guard to Malon in order to strengthen the relations between the two countries. The ship was built as the Ojika for the Japanese Coast Guard in 1990–1991
-----
HIBAH KAPAL 1989 = KM Arau is an offshore patrol vessel operated by the Malonn Coast Guard. She was the second ship transferred from the Japan Coast Guard together with KM Pekan and KM Marlin. KM Arau was formerly kNOwn as Oki (PL-01) in the Japan Coast Guard.
-----
KAPAL BUATAN 1960 =
BEKAS MARINE POLICE BEKAS MMEA = RMN informed us that they are getting a new boat – albeit a third hand one – courtesy of the MMEA. MMEA received from the Marine police back in 2011.
-----
KAPAL BEKAS BEKAS MMEA = RMN has taken delivery of ex-Sundang on October 23 after the patrol craft completed its refit. She is the first of two ex-MMEA PC
-----
171 ASSETS EXCEEDING 30 YEARS =
108 TDM
29 TUDM
34 TLDM
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
----
SOME WEAKNESSES OF THE MALONNN SHIPBUILDING INDUSTRY INCLUDE:
1. Delays
Consistent delays in delivering ships to customers has reduced profitability and financial results.
2. Small tonnage
Malonnn shipbuilding industry is relatively weak compared to other countries in the region, as the tonnage of ships manufactured is relatively small.
3. Supply chain disruptions
Disruptions caused by COVID-19 and the Russia-Ukraine conflict have led to supply chain disruptions and shortages of skilled personnel.
----
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
==============
KEYWORDS =
1. LEASE BOAT
2. ASSETS EXCEEDING 30 YEARS
SOME PROBLEMS MALONN SHIPYARDS FACE IN MAKING WARSHIPS INCLUDE:
BalasHapus• Supply chain disruptions
In 2022, COVID-19 and the Russia-Ukraine conflict disrupted supply chains and led to shortages of skilled personnel.
• Low-quality products
Workers may use sketches, photos, and previous experience instead of following good engineering practices, which can lead to low-quality products, reworks, higher costs, and late deliveries.
• Traditional shipbuilding
Traditional shipbuilding is a slow, expensive, and laborious process. It involves a systems approach, where each system has its own drawings, and work crews may compete for work space.
• Resource shortage
The shipbuilding industry is facing a shortage of resources due to an aging workforce and a lack of young people willing to enter the trade.
===================
SOME WEAKNESSES OF THE MALONNN SHIPBUILDING INDUSTRY INCLUDE:
1. Delays
Consistent delays in delivering ships to customers has reduced profitability and financial results.
2. Small tonnage
Malonnn shipbuilding industry is relatively weak compared to other countries in the region, as the tonnage of ships manufactured is relatively small.
3. Supply chain disruptions
Disruptions caused by COVID-19 and the Russia-Ukraine conflict have led to supply chain disruptions and shortages of skilled personnel
==============
PROBLEMS MALON SHIPYARD
Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
KEY WORDS = COMBAT EQUIPMENT WEAKNESSES