30 Januari 2025

Renaming MPCS/PPA for the Indonesian Navy

30 Januari 2025

Ship naming 2 MPCS/PPA into KRI Brawijaya 320 and KRI Prabu Siliwangi 321 (photos: Fincantieri)

At our Muggiano shipyard, the renaming ceremony was held for the two MPCS (Multipurpose Combat Ship/PPA) units, built in our integrated Riva Trigoso-Muggiano shipyard. The ceremony was attended by our Chairman Biagio Mazzotta, the General Manager Naval Vessels Division Dario Deste, Admiral Muhammad Ali, Chief of the Indonesian Navy, and Admiral Giuseppe BeruttiBergotto, Deputy Chief of Staff of the Italian Navy.


The two units, formerly named "Marcantonio Colonna" and "Ruggiero di Lauria," sold to the Indonesian Navy and renamed KRI BRAWIJAYA-320 and KRI PRABU SILIWANGI-321, are intended to become the largest combat ships in the Indonesian Navy and will be delivered in the course of 2025.


The ceremony follows the contract signed by our Group in 2024 and underscores the importance of cooperation between the two countries in the naval defense sector, highlighting our commitment and mission towards the future of maritime security.

230 komentar:

  1. Tahun Baruw 2025, Kabar Baik datang
    ✅️BRICS TEMBUS
    ✅️GM400 ALPHA SIYAP KIRIM
    ✅️PPA SIYAP KIRIM
    ✅️AH140 SIYAP LONCING
    ✅️POHANG SIYAP KIRIM
    ✅️T50 SIYAP KIRIM
    ✅️NC212 SIYAP KIRIM
    ✅️A400M SIYAP KIRIM
    ✅️ANKA SIYAP KIRIM
    ✅️ASET MDV 65M LUNCUR
    ✅️P2 TIGER FACELIFT diresmikan
    ✅️DRON ARUNA
    ✅️BRAHMOS SIYAP KONTRAK
    ✅️BAKAMLA tambah 2 kapal
    ✅️STY OUT, PK IN🚀
    ASET KITA Tambah Berkat Non-STOP SHOPPING..
    makloum BAJET Besar haha!🤑🤑🤑

    Lah tetangga seblah SEPI SHOPPING
    warganyet kl(king leasing) NGAMUK🔥

    BalasHapus
    Balasan
    1. Selanjutnya Om
      1. OPV 90m Noahtu
      2. KCR70 Turki
      3. KCR65 Tesco
      4. Korvet Bung Karno Class kedua
      5. FAB Lundin
      6. Kapal BH0
      7. PC60
      8. RAFAEL
      9. Dst

      Hapus
  2. 8th LARGEST ECONOMY IN THE WORLD BY GDP (PPP)
    8th LARGEST ECONOMY IN THE WORLD BY GDP (PPP)
    8th LARGEST ECONOMY IN THE WORLD BY GDP (PPP)
    1. China 37,070,000
    2. United States 29,170,000
    3. India 16,024,460
    4. Russia 6,910,000
    5. Japan 6,570,000
    6. Germany 6,020,000
    7. Brazil 4,702,004
    8. Indonesia 4,661,542
    9. France 4,360,000
    10. United Kingdom 4,280,000
    Indonesia is the 8th largest economy in the world by GDP (PPP). It is also the largest economy in Southeast Asia.
    ---------
    Indonesia is considered the 8th largest economy in the world based on purchasing power parity (PPP) in 2024. This is due to a number of factors, including:
    • Natural resources: Indonesia has a wealth of natural resources, including oil, coal, tin, copper, and renewable energy sources
    • Government policy: The government has implemented policies to support economic recovery, such as fiscal and monetary stimulus
    • Trade openness: Indonesia has increased its trade openness over the past 50 years
    • Young labor force: Indonesia has a large and growing labor force
    • Low government debt: Indonesia has low government debt and prudent fiscal management
    • Resilient economic growth: Indonesia has experienced resilient economic growth, even during the COVID-19 pandemic
    Indonesia's economic growth has been shaped by its geographic location, natural resources, and people.
    ===================
    ===================-
    IMF 2024-2029 = DEBT MALON $ 121,9 BILLION
    IMF 2024-2029 = DEBT MALON $ 121,9 BILLION
    IMF 2024-2029 = DEBT MALON $ 121,9 BILLION
    The national debt in Malonn was forecast to continuously increase between 2024 and 2029 by in total 121.9 billion U.S. dollars (+38.56 percent). After the tenth consecutive increasing year, the national debt is estimated to reach 438.09 billion U.S. dollars and therefore a new peak in 2029. Notably, the national debt was continuously increasing over the past years.
    ---------
    The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
    Funding
    • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
    • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    Aging equipment
    • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
    • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
    • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
    Other challenges
    • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.

    BalasHapus
  3. Barang MAHAL ini tak seperti boat negara tetangga...

    BalasHapus
  4. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2023 ANKA OMPONG = WILL NOT ARMED
    Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
    -------------------------------------
    The Malonnn Armed Forces (MAF) faces several weaknesses, including outdated equipment, corruption, and a lack of leadership.
    Outdated equipment
    • Much of the MAF's equipment was purchased between the 1970s and 1990s, making it outdated and unable to meet modern threats
    • The MAF's submarines are outdated and cannot submerge properly
    Corruption
    • Corruption is not recognized as a military doctrine, and commanders are not trained to address corruption risks
    • Corruption has been involved in major projects, which has decreased morale and made it difficult to maximize the budget for national security
    Lack of leadership
    • There is a need to improve leadership in defense planning
    • There is a need to break down old mindsets and service rivalries
    Other challenges
    • The MAF faces challenges from big power politics and non-traditional security threats
    • The MAF needs to expand its capabilities to address cyber and space threats
    • The MAF needs to implement jointness to confront crises, conflicts, and wars

    BalasHapus
  5. 2025 : $1.3 BILLION =
    MAINTENANCE AND REPAIR WORK
    THE PROCUREMENT OF NEW MILITARY ASSETS.
    ---------
    Malonn recently announced an allocation of $4.8 billion to the Ministry of Defense (MINDEF) to safeguard the nation’s sovereignty from threats. OF THIS, $1.3 BILLION WAS ALLOCATED FOR MAINTENANCE AND REPAIR WORK AND THE PROCUREMENT OF NEW MILITARY ASSETS. Maritime assets will be increased, including the procurement of vessels such as multi-purpose mission ships and patrol vessels for the Malonnn Maritime Enforcement Agency (MMEA).
    The Ministry of Home Affairs (MOHA),responsible for public order, border and maritime security, crime, and terrorism prevention, has been allocated $4.4 billion. More than $480 million is budgeted for equipment for the Royal Malonn Police and other agencies. Malonn is also looking to equip law enforcement agencies with drone and AI technology to enhance monitoring capabilities.
    =========
    KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
    -
    1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
    -
    2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    =========
    KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
    -
    1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
    -
    2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
    =========
    KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
    -
    1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
    -
    2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
    -
    Apache AH-64E contract for Indonesia for $1.42 BILLION
    -
    The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
    -
    USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
    =========
    KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
    -
    PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
    -
    LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    =========
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    =========
    KEYWORDS
    1 UNIT JAVELIN = 3 UNIT NLAW
    4.5 KM JAVELIN = 1 KM NLAW
    ---
    Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
    The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
    =========
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2023 ANKA OMPONG = WILL NOT ARMED
    Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
    =========
    FACT :
    1. 1 UNIT PPA = 3 UNIT LMS B2
    2. 1 UNIT RAFALE = 4 UNIT FA50M
    3. 1 UNIT APACHE = 13 UNIT MD530G
    4. 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
    5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
    6. SEWA 28 HELI = 119 HELI BARU
    7. 4.5 KM JAVELIN = 1 KM NLAW
    8. ANKA ISR NOT ARMED

    BalasHapus
  6. Besar, Mewah, Mahal...
    Khas orang kaya..😁👍

    Bye malon....khas Bangla Ciput, Ringan, Murah

    😂😂😂🤣🤣🤪😁

    BalasHapus
    Balasan
    1. Gak juga om. MALON bukan levelnya Bangladesh. Kapal rudal mereka belasan dan gak pakai misil usang

      Hapus
    2. "BESAR, MEWAH, MAHAL".......pas, lha ini apa yg dicari 👇👇👇

      https://youtu.be/cI0YqNmKXk0?si=-QUgkIf1lEn2y_6c

      Hapus
  7. SELAMAT PAGI SAUDARA SAUDARA SETANAH AIR..
    DARI SABANG SAMPAI MERAUKE..
    DARI MIANGAS SAMPAI ROTE..
    DAN DISELURUH DUNIA ..

    NKRI TELAH KEHILANGAN PEKERJA MIGRAN..
    SAUDARA KITA DARI RIAU..
    YANG LAIN DITEMBAK SECARA BIADAB OLEH MEREKA YANG MENAMAKAN DIRINNYA KERAJAAN NEKOLIM..
    SESAAT LAGI JAKARTA AKAN MELAKUKAN..
    👇
    https://www.bloombergtechnoz.com/detail-news/61484/kasus-penembakan-wni-buruh-bakal-gelar-demo-di-kedubes-malaysia

    https://www.tempo.co/politik/buruh-gelar-demontrasi-di-kedutaan-malaysia-besok-tuntut-hukum-penembak-buruh-migran-indonesia-1200084


    https://nasional.kompas.com/read/2025/01/29/10454071/besok-buruh-demo-kedubes-malaysia-buntut-5-pmi-ditembak


    YA..
    BENAR ..
    DAN KEBERINGASAN ANTEK ANTEK NEKOLIM... INI MENJADI JADI..

    150 PMI KITA TELAH PULANG DENGAN SELAMAT..
    HARAPAN KAMI SEMUA PULANG..
    SAAT INI DIWARUNG ..
    WARKOP..
    PEMBICARAAN GANJAANG MENJADI PANAS BARA ..
    DI DERMAGA PELABUHAN INI..
    SAUDARA KITA TIONGHOA, BATAK, MALUKU, PAPUA, AMBON, MADURA, MAKASAR, NTT, FLORES, SEMUAKUMPUL YANG DIBICARAKAN SUDAH BUKAN TOPIK LINGKUNGAN CANDA LAGI..

    TAPI GANJAAAANG...
    RUPANYA SEMANGAT 45💪🇲🇨⚓🔥🔥🔥🔥⚔️
    KOTA INI TETAP MEMBARA SETELAH MEMBUNUH 2 JENDRAL BRITISH DITAHUN 45' PERANG YANG MENGGAUNGKAN NAMA DERMAGA INI..

    KITA YANG ADA DISINI JIKA..

    GANJANG UNTUK MEMBELA HARKAT DAN MARTABAT NKRI..
    DENGAN SENANG HATI..
    SELALU SIAP UNTUK MENG GANJANG ANTEK NEKOLIM..

    MEREKA INI NEGARA SEUKURAN KECAMATAN YANG HANYA BERANI DENGAN WARGA SIPIL SAUDARA SAUDARA..
    YAKINLAH YANG KUASA BERSAMA KITA..
    UNTUK MELIBAS MEREKA AGAR PRILAKU BIADAB MEREKA BERHENTI DENGAN CARA MEMBINASAKAN SELURUH WARGA KERAJAAN NEKOLIM ITU..

    SEMANGAAAT..
    MERDEKAAAA..
    💪🇲🇨⚓🔥🔥🔥🔥🔥⚔️

    *JIKA MACAM MACAM KOMENTAR GANJANG SAJA..
    BUNGKAM CONGORNYA MEREKA..
    💪🇲🇨⚓🔥🔥🔥🔥🔥🔥⚔️

    BalasHapus
  8. Geng MALAYDESH makin ketar ketir... Hahahahahabaha


    Kapal LCS MALON semakin berantakan.. Hahahaha

    BalasHapus
  9. RUGGIERO DI LAURIA = LAUNCHED 2023
    The construction was started with the first steel cutting ceremony on 7 April 2021 at Fincantieri Muggiano. Ruggiero di Lauria was launched on 10 October 2023
    -----
    MARCANTONIO COLONNA = LAUNCHED 2022
    It was laid down on 3 September 2020 at Fincantieri Muggiano and was launched on 26 November 2022. Marcantonio Colonna started sea trials in July 2023
    ========
    ========
    2011 PENGADAAN LCS = Pengadaan enam LCS pada 2011 itu juga dilakukan tanpa tender terbuka. Kapal-kapal itu akan dibangun di Galangan Kapal Boustead dan unit pertama sedianya dikirim pada 2019.
    -----
    2019 LCS DIJANGKA = KD Maharaja Lela setelah ditugaskan, diluncurkan secara seremonial pada Agustus 2017. Seharusnya telah dikirim ke RMN pada April 2019
    ------
    2022 LCS DIJANGKA = menurut jadual asal, setakat Ogos 2022 sepatutnya lima buah kapal LCS harus disiap dan diserahkan kepada TLDM.
    -----
    2023 LCS DIJANGKA = Seharusnya telah dikirim ke RMN pada April 2019, dengan kapal terakhir dijadwalkan untuk serah terima pada Juni 2023. Namun, progres kapal pertama baru sekitar 60% selesai
    -----
    2025 LCS DIJANGKA = Kapal pertama Littoral Combat Ship (LCS) TLDM itu dijangka hanya akan siap pada tahun 2025, iaitu 12 tahun selepas projek itu bermula pada Oktober 2013 dan kerajaan telah membayar RM6 bilion kepada kontraktor utama projek itu.
    -----
    2026 LCS DIJANGKA = Lima kapal LCS akan diserahkan kepada TLDM secara berperingkat dengan kapal pertama dijangka diserahkan pada penghujung 2026
    -----
    2029 LCS DIJANGKA = TLDM hanya akan dapat memperoleh kelima-lima LCS pada 2029 berbanding kontrak asal di mana 5 kapal LCS itu sepatutnya diserahkan pada 2022..
    -----
    17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
    ===================
    The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
    Funding
    • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
    • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    Aging equipment
    • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
    • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
    • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
    Other challenges
    • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.
    • Disaster response: The MAF is responsible for disaster response.
    • National unity: The MAF is responsible for promoting national unity.

    BalasHapus
  10. MANA


    BABI TOLOL GEMPORK & MMW/MEMEK BABI YANG DULU NGOMONG... " BELUM FINAL KONTRAK "


    AYO KLUAR KALIAN KELOMPOK " 🤡🤡 BABI TOLOL "

    BalasHapus
  11. Pe-5-dhot _ PS Pensiun30 Januari 2025 pukul 07.53
    Besar, Mewah, Mahal...
    Khas orang kaya..😁👍

    Bye malon....khas Bangla Ciput, Ringan, Murah

    😂😂😂🤣🤣🤪😁

    Balas
    Balasan

    Tukang Dongan30 Januari 2025 pukul 08.07
    Gak juga om. MALON bukan levelnya Bangladesh. Kapal rudal mereka belasan dan gak pakai misil usang


    Lapor Mas Gapres 🐒30 Januari 2025 pukul 08.16
    "BESAR, MEWAH, MAHAL".......pasar, lha ini apa yg dicari 👇👇👇

    https://youtu.be/cI0YqNmKXk0?si=-QUgkIf1lEn2y_6c

    Hapus

    Lapor Mas Gapres 🐒30 Januari 2025 pukul 08.17
    "BESAR, MEWAH, MAHAL".......pas, lha ini apa yg dicari 👇👇👇

    https://youtu.be/cI0YqNmKXk0?si=-QUgkIf1lEn2y_6c

    BalasHapus
    Balasan
    1. Piye mas'e..
      Opo sing gawe njenengan ketar-ketir bab PPA iki...?🤤

      Hapus
  12. Klo nyanyian sebelah itu
    Tak pernah ucap helo pergi kau melambai..halimauu..halimauu..!

    Kita edit lirik nya untuk PPA 🇮🇩

    Kita ucap hello..sambut kapal mewah..
    Garuda..garuda..garuda..🤭🤭😇😇


    BalasHapus
  13. Asekkk dapat 2 kapal baru gede sangar gagah samudra
    Kami tunggu rombongan Prabu

    BalasHapus
  14. Siap dihantarr..hahha
    Makin koyak poranda sebelah

    BalasHapus
  15. Duo melayu keling malaydesh, di persilahkan ngamuk


    # MALAYA =INDIA SELATAN /PRINDAVAN SELATAN AKA TAMIL

    BalasHapus
  16. Saye suke..saya suke..saya suke
    PPA sangarr gagah mempesona
    Tolong Pak Kasal,pak menhan klo bisa pesan 2 unit lgi donk biar makin strongg TNI AL 💪💪💪🇮🇩🇮🇩

    BalasHapus
    Balasan
    1. Buat nutup gap, oke lah ambil PPA ..
      Semoga OPV buatan lokal terus dikembangkan Mk2, Mk3..dst

      Hapus
  17. Kontrak kosong kata MALONDESH.......hahaaaa
    Kapal MALONDESH dilarang dekat-dekat , barang PREMIUM ini hanya orang kaya yg mampu beli.
    Beda level sangat terlihat, KING INDO nih bozzz

    BalasHapus
  18. Selanjutnya 2 Frigate MP meluncurr ,kalo TNI AL jadi deal ambil kapal type O52 saya dukungg asal beli byk hahhaayy,tempatkan di armada 3 biar bisa main air sama Ausie 😀

    BalasHapus
  19. Kerenn.. kapalnya...PANJANG ,,GEDE,, BERURATTT

    BalasHapus
  20. Nanti ada beruk beruk malondesh yang bengok bengok teriak hasil photoshop

    BalasHapus
  21. Rename kapal itu biasa, yang aneh tu rename shipyard 2x macam Malaydesh...😂😂🤣🤣🤣🤤

    BalasHapus
  22. WOOOWWW... Kapal PPA PATROLI VERSI OMPONG guys.... 🤣🤣🤣

    GUN BOAT.... 🤣🤣

    BalasHapus
    Balasan
    1. CHANGE SKIN = CHANGE NAME = SAME .....
      PSC = 1995
      PSC > BNS = 2005
      BNC > LUNAS = 2024
      PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malonnn government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malonn in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
      ===================
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
      Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
      ===================
      LCS 2024-2011 = 13 TAHUN
      13 TAHUN MANGKRAK
      13 TAHUN MANGKRAK
      LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      -----
      NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
      -----
      17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      Malonn's armed forces procurement faces several weaknesses, including:
      1. Corruption
      The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
      2. Political influence
      Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
      Weak parliamentary oversight
      Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
      3. Limited financial scrutiny
      Financial scrutiny is limited by excessive secrecy.
      4. Violation of procedures
      Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures

      Hapus
    2. MALONDESH punya ta......Upsss negara miskin mana punya.....Hahaaaaa

      Hapus
    3. RENAME = COPY PASTE = SAME .....
      PSC = 1995
      PSC > BNS = 2005
      BNC > LUNAS = 2024
      PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malonnn government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malonn in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
      ===================
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
      Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
      ===================
      Malon's combat equipment has several weaknesses, including:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness.
      ===================
      PROBLEMS SHIPYARD
      PROBLEMS SHIPYARD
      PROBLEMS SHIPYARD
      Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.

      Hapus
    4. RUGGIERO DI LAURIA = LAUNCHED 2023
      The construction was started with the first steel cutting ceremony on 7 April 2021 at Fincantieri Muggiano. Ruggiero di Lauria was launched on 10 October 2023
      -----
      MARCANTONIO COLONNA = LAUNCHED 2022
      It was laid down on 3 September 2020 at Fincantieri Muggiano and was launched on 26 November 2022. Marcantonio Colonna started sea trials in July 2023
      ========
      ========
      2011 PENGADAAN LCS = Pengadaan enam LCS pada 2011 itu juga dilakukan tanpa tender terbuka. Kapal-kapal itu akan dibangun di Galangan Kapal Boustead dan unit pertama sedianya dikirim pada 2019.
      -----
      2019 LCS DIJANGKA = KD Maharaja Lela setelah ditugaskan, diluncurkan secara seremonial pada Agustus 2017. Seharusnya telah dikirim ke RMN pada April 2019
      ------
      2022 LCS DIJANGKA = menurut jadual asal, setakat Ogos 2022 sepatutnya lima buah kapal LCS harus disiap dan diserahkan kepada TLDM.
      -----
      2023 LCS DIJANGKA = Seharusnya telah dikirim ke RMN pada April 2019, dengan kapal terakhir dijadwalkan untuk serah terima pada Juni 2023. Namun, progres kapal pertama baru sekitar 60% selesai
      -----
      2025 LCS DIJANGKA = Kapal pertama Littoral Combat Ship (LCS) TLDM itu dijangka hanya akan siap pada tahun 2025, iaitu 12 tahun selepas projek itu bermula pada Oktober 2013 dan kerajaan telah membayar RM6 bilion kepada kontraktor utama projek itu.
      -----
      2026 LCS DIJANGKA = Lima kapal LCS akan diserahkan kepada TLDM secara berperingkat dengan kapal pertama dijangka diserahkan pada penghujung 2026
      -----
      2029 LCS DIJANGKA = TLDM hanya akan dapat memperoleh kelima-lima LCS pada 2029 berbanding kontrak asal di mana 5 kapal LCS itu sepatutnya diserahkan pada 2022..
      -----
      17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
      Funding
      • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
      • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      Aging equipment
      • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
      • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
      • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
      Other challenges
      • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.

      Hapus
  23. RUGI 2 KALI....KAPAL OPV OMPONG.. 🤣🤣🤣

    1. KAPAL HUTANG LENDER semahal FREMM FULL WEAPON

    2. KAPAL HANYA SETAHAP OPV LIGHT PLUS OMPONG GUN BOAT...

    BalasHapus
    Balasan
    1. RUGGIERO DI LAURIA = LAUNCHED 2023
      The construction was started with the first steel cutting ceremony on 7 April 2021 at Fincantieri Muggiano. Ruggiero di Lauria was launched on 10 October 2023
      -----
      MARCANTONIO COLONNA = LAUNCHED 2022
      It was laid down on 3 September 2020 at Fincantieri Muggiano and was launched on 26 November 2022. Marcantonio Colonna started sea trials in July 2023
      ========
      ========
      2011 PENGADAAN LCS = Pengadaan enam LCS pada 2011 itu juga dilakukan tanpa tender terbuka. Kapal-kapal itu akan dibangun di Galangan Kapal Boustead dan unit pertama sedianya dikirim pada 2019.
      -----
      2019 LCS DIJANGKA = KD Maharaja Lela setelah ditugaskan, diluncurkan secara seremonial pada Agustus 2017. Seharusnya telah dikirim ke RMN pada April 2019
      ------
      2022 LCS DIJANGKA = menurut jadual asal, setakat Ogos 2022 sepatutnya lima buah kapal LCS harus disiap dan diserahkan kepada TLDM.
      -----
      2023 LCS DIJANGKA = Seharusnya telah dikirim ke RMN pada April 2019, dengan kapal terakhir dijadwalkan untuk serah terima pada Juni 2023. Namun, progres kapal pertama baru sekitar 60% selesai
      -----
      2025 LCS DIJANGKA = Kapal pertama Littoral Combat Ship (LCS) TLDM itu dijangka hanya akan siap pada tahun 2025, iaitu 12 tahun selepas projek itu bermula pada Oktober 2013 dan kerajaan telah membayar RM6 bilion kepada kontraktor utama projek itu.
      -----
      2026 LCS DIJANGKA = Lima kapal LCS akan diserahkan kepada TLDM secara berperingkat dengan kapal pertama dijangka diserahkan pada penghujung 2026
      -----
      2029 LCS DIJANGKA = TLDM hanya akan dapat memperoleh kelima-lima LCS pada 2029 berbanding kontrak asal di mana 5 kapal LCS itu sepatutnya diserahkan pada 2022..
      -----
      17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
      Funding
      • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
      • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      Aging equipment
      • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
      • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
      • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
      Other challenges
      • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.

      Hapus
    2. RENAME = COPY PASTE = SAME .....
      PSC = 1995
      PSC > BNS = 2005
      BNC > LUNAS = 2024
      PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malonnn government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malonn in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
      ===================
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
      Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
      ===================
      Malon's combat equipment has several weaknesses, including:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness.
      ===================
      PROBLEMS SHIPYARD
      PROBLEMS SHIPYARD
      PROBLEMS SHIPYARD
      Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.

      Hapus
    3. RENAME = COPY PASTE = STALLED 15 YEARS .....
      PSC = 1995
      PSC > BNS = 2005
      BNC > LUNAS = 2024
      PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malonnn government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malonn in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
      ===================
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
      Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
      ===================
      Malon's combat equipment has several weaknesses, including:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness.
      ===================
      PROBLEMS SHIPYARD
      PROBLEMS SHIPYARD
      PROBLEMS SHIPYARD
      Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.

      Hapus
    4. RUGGIERO DI LAURIA = LAUNCHED 2023
      The construction was started with the first steel cutting ceremony on 7 April 2021 at Fincantieri Muggiano. Ruggiero di Lauria was launched on 10 October 2023
      -----
      MARCANTONIO COLONNA = LAUNCHED 2022
      It was laid down on 3 September 2020 at Fincantieri Muggiano and was launched on 26 November 2022. Marcantonio Colonna started sea trials in July 2023
      ========
      ========
      2011 PENGADAAN LCS = Pengadaan enam LCS pada 2011 itu juga dilakukan tanpa tender terbuka. Kapal-kapal itu akan dibangun di Galangan Kapal Boustead dan unit pertama sedianya dikirim pada 2019.
      -----
      2019 LCS DIJANGKA = KD Maharaja Lela setelah ditugaskan, diluncurkan secara seremonial pada Agustus 2017. Seharusnya telah dikirim ke RMN pada April 2019
      ------
      2022 LCS DIJANGKA = menurut jadual asal, setakat Ogos 2022 sepatutnya lima buah kapal LCS harus disiap dan diserahkan kepada TLDM.
      -----
      2023 LCS DIJANGKA = Seharusnya telah dikirim ke RMN pada April 2019, dengan kapal terakhir dijadwalkan untuk serah terima pada Juni 2023. Namun, progres kapal pertama baru sekitar 60% selesai
      -----
      2025 LCS DIJANGKA = Kapal pertama Littoral Combat Ship (LCS) TLDM itu dijangka hanya akan siap pada tahun 2025, iaitu 12 tahun selepas projek itu bermula pada Oktober 2013 dan kerajaan telah membayar RM6 bilion kepada kontraktor utama projek itu.
      -----
      2026 LCS DIJANGKA = Lima kapal LCS akan diserahkan kepada TLDM secara berperingkat dengan kapal pertama dijangka diserahkan pada penghujung 2026
      -----
      2029 LCS DIJANGKA = TLDM hanya akan dapat memperoleh kelima-lima LCS pada 2029 berbanding kontrak asal di mana 5 kapal LCS itu sepatutnya diserahkan pada 2022..
      -----
      17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
      Funding
      • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
      • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      Aging equipment
      • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
      • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
      • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
      Other challenges
      • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.

      Hapus
  24. Bukti rename shipyard :
    Penang Shipbuilding and Construction - Naval Dockyard Sdn Bhd (PSC-ND)

    Rename #1 :
    Boustead Naval Shipyard Sdn Bhd

    Rename #2 :
    Lumut Naval Shipyard (LUNAS)

    ====
    Tetap kapalnya MANGKRAK

    🤣🤣🤣😂😂😂😂

    BalasHapus
  25. PPA HANYA SETAHAP OPV.... VERSI GUN BOAT... 🤣🤣🤣

    Satgas itu akan menjadi bagian dari awak kapal patroli lepas pantai Pattugliatore Polivalente d'Altura (PPA) atau Offshore Patrol Vessel (OPV) yang telah dibeli oleh Indonesia.

    Artikel ini telah tayang di Kompas.com dengan judul "TNI AL Kirim Satgas ke Italia Terkait Pembelian Kapal Patroli", Klik untuk baca: https://nasional.kompas.com/read/2024/12/18/09521161/tni-al-kirim-satgas-ke-italia-terkait-pembelian-kapal-patroli.

    BalasHapus
    Balasan
    1. RUGGIERO DI LAURIA = LAUNCHED 2023
      The construction was started with the first steel cutting ceremony on 7 April 2021 at Fincantieri Muggiano. Ruggiero di Lauria was launched on 10 October 2023
      -----
      MARCANTONIO COLONNA = LAUNCHED 2022
      It was laid down on 3 September 2020 at Fincantieri Muggiano and was launched on 26 November 2022. Marcantonio Colonna started sea trials in July 2023
      ========
      ========
      2011 PENGADAAN LCS = Pengadaan enam LCS pada 2011 itu juga dilakukan tanpa tender terbuka. Kapal-kapal itu akan dibangun di Galangan Kapal Boustead dan unit pertama sedianya dikirim pada 2019.
      -----
      2019 LCS DIJANGKA = KD Maharaja Lela setelah ditugaskan, diluncurkan secara seremonial pada Agustus 2017. Seharusnya telah dikirim ke RMN pada April 2019
      ------
      2022 LCS DIJANGKA = menurut jadual asal, setakat Ogos 2022 sepatutnya lima buah kapal LCS harus disiap dan diserahkan kepada TLDM.
      -----
      2023 LCS DIJANGKA = Seharusnya telah dikirim ke RMN pada April 2019, dengan kapal terakhir dijadwalkan untuk serah terima pada Juni 2023. Namun, progres kapal pertama baru sekitar 60% selesai
      -----
      2025 LCS DIJANGKA = Kapal pertama Littoral Combat Ship (LCS) TLDM itu dijangka hanya akan siap pada tahun 2025, iaitu 12 tahun selepas projek itu bermula pada Oktober 2013 dan kerajaan telah membayar RM6 bilion kepada kontraktor utama projek itu.
      -----
      2026 LCS DIJANGKA = Lima kapal LCS akan diserahkan kepada TLDM secara berperingkat dengan kapal pertama dijangka diserahkan pada penghujung 2026
      -----
      2029 LCS DIJANGKA = TLDM hanya akan dapat memperoleh kelima-lima LCS pada 2029 berbanding kontrak asal di mana 5 kapal LCS itu sepatutnya diserahkan pada 2022..
      -----
      17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
      Funding
      • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
      • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      Aging equipment
      • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
      • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
      • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
      Other challenges
      • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.

      Hapus
    2. CHANGE SKIN = CHANGE NAME = SAME .....
      PSC = 1995
      PSC > BNS = 2005
      BNC > LUNAS = 2024
      PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malonnn government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malonn in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
      ===================
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
      Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
      ===================
      LCS 2024-2011 = 13 TAHUN
      13 TAHUN MANGKRAK
      13 TAHUN MANGKRAK
      LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      -----
      NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
      -----
      17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      Malonn's armed forces procurement faces several weaknesses, including:
      1. Corruption
      The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
      2. Political influence
      Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
      Weak parliamentary oversight
      Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
      3. Limited financial scrutiny
      Financial scrutiny is limited by excessive secrecy.
      4. Violation of procedures
      Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures

      Hapus
    3. RENAME = COPY PASTE = SAME .....
      PSC = 1995
      PSC > BNS = 2005
      BNC > LUNAS = 2024
      PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malonnn government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malonn in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
      ===================
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
      Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
      ===================
      Malon's combat equipment has several weaknesses, including:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness.
      ===================
      PROBLEMS SHIPYARD
      PROBLEMS SHIPYARD
      PROBLEMS SHIPYARD
      Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.

      Hapus
  26. RUGI BERKALI-KALI MALONDESH BINA KAPAL MUSEUM SAMPAI 14 TAHUN .....HAHAAAA

    BalasHapus
  27. Selepas jual kapal PPA VERSI GUN BOAT ke INDIANESIA... ITALI terus shoping 2 kapal PPA EVO.... Nampak sangat sebelah tu di PRANK.. 🤣🤣🤣

    PPA INDONESIA MEMANG SENGAJA DIBUANG OLEH ANGAKATAN LAUT ITALIA SETELAH MEREKA TAU HAL INI

    https://m.youtube.com/watch?v=zxhWBmcishs

    BalasHapus
    Balasan
    1. RENAME = COPY PASTE = SAME .....
      PSC = 1995
      PSC > BNS = 2005
      BNC > LUNAS = 2024
      PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malonnn government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malonn in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
      ===================
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
      Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
      ===================
      Malon's combat equipment has several weaknesses, including:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness.
      ===================
      PROBLEMS SHIPYARD
      PROBLEMS SHIPYARD
      PROBLEMS SHIPYARD
      Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.

      Hapus
  28. Selepas jual kapal PPA VERSI GUN BOAT ke INDIANESIA... ITALI terus shoping 2 kapal PPA EVO.... Nampak sangat sebelah tu di PRANK.. 🤣🤣🤣

    PPA INDONESIA MEMANG SENGAJA DIBUANG OLEH ANGAKATAN LAUT ITALIA SETELAH MEREKA TAU HAL INI

    https://m.youtube.com/watch?v=zxhWBmcishs

    BalasHapus
    Balasan
    1. RUGGIERO DI LAURIA = LAUNCHED 2023
      The construction was started with the first steel cutting ceremony on 7 April 2021 at Fincantieri Muggiano. Ruggiero di Lauria was launched on 10 October 2023
      -----
      MARCANTONIO COLONNA = LAUNCHED 2022
      It was laid down on 3 September 2020 at Fincantieri Muggiano and was launched on 26 November 2022. Marcantonio Colonna started sea trials in July 2023
      ========
      ========
      2011 PENGADAAN LCS = Pengadaan enam LCS pada 2011 itu juga dilakukan tanpa tender terbuka. Kapal-kapal itu akan dibangun di Galangan Kapal Boustead dan unit pertama sedianya dikirim pada 2019.
      -----
      2019 LCS DIJANGKA = KD Maharaja Lela setelah ditugaskan, diluncurkan secara seremonial pada Agustus 2017. Seharusnya telah dikirim ke RMN pada April 2019
      ------
      2022 LCS DIJANGKA = menurut jadual asal, setakat Ogos 2022 sepatutnya lima buah kapal LCS harus disiap dan diserahkan kepada TLDM.
      -----
      2023 LCS DIJANGKA = Seharusnya telah dikirim ke RMN pada April 2019, dengan kapal terakhir dijadwalkan untuk serah terima pada Juni 2023. Namun, progres kapal pertama baru sekitar 60% selesai
      -----
      2025 LCS DIJANGKA = Kapal pertama Littoral Combat Ship (LCS) TLDM itu dijangka hanya akan siap pada tahun 2025, iaitu 12 tahun selepas projek itu bermula pada Oktober 2013 dan kerajaan telah membayar RM6 bilion kepada kontraktor utama projek itu.
      -----
      2026 LCS DIJANGKA = Lima kapal LCS akan diserahkan kepada TLDM secara berperingkat dengan kapal pertama dijangka diserahkan pada penghujung 2026
      -----
      2029 LCS DIJANGKA = TLDM hanya akan dapat memperoleh kelima-lima LCS pada 2029 berbanding kontrak asal di mana 5 kapal LCS itu sepatutnya diserahkan pada 2022..
      -----
      17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
      Funding
      • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
      • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      Aging equipment
      • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
      • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
      • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
      Other challenges
      • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.

      Hapus
    2. CHANGE SKIN = CHANGE NAME = SAME .....
      PSC = 1995
      PSC > BNS = 2005
      BNC > LUNAS = 2024
      PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malonnn government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malonn in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
      ===================
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
      Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
      ===================
      LCS 2024-2011 = 13 TAHUN
      13 TAHUN MANGKRAK
      13 TAHUN MANGKRAK
      LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      -----
      NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
      -----
      17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      Malonn's armed forces procurement faces several weaknesses, including:
      1. Corruption
      The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
      2. Political influence
      Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
      Weak parliamentary oversight
      Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
      3. Limited financial scrutiny
      Financial scrutiny is limited by excessive secrecy.
      4. Violation of procedures
      Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures

      Hapus
    3. RUGGIERO DI LAURIA = LAUNCHED 2023
      The construction was started with the first steel cutting ceremony on 7 April 2021 at Fincantieri Muggiano. Ruggiero di Lauria was launched on 10 October 2023
      -----
      MARCANTONIO COLONNA = LAUNCHED 2022
      It was laid down on 3 September 2020 at Fincantieri Muggiano and was launched on 26 November 2022. Marcantonio Colonna started sea trials in July 2023
      ========
      ========
      2011 PENGADAAN LCS = Pengadaan enam LCS pada 2011 itu juga dilakukan tanpa tender terbuka. Kapal-kapal itu akan dibangun di Galangan Kapal Boustead dan unit pertama sedianya dikirim pada 2019.
      -----
      2019 LCS DIJANGKA = KD Maharaja Lela setelah ditugaskan, diluncurkan secara seremonial pada Agustus 2017. Seharusnya telah dikirim ke RMN pada April 2019
      ------
      2022 LCS DIJANGKA = menurut jadual asal, setakat Ogos 2022 sepatutnya lima buah kapal LCS harus disiap dan diserahkan kepada TLDM.
      -----
      2023 LCS DIJANGKA = Seharusnya telah dikirim ke RMN pada April 2019, dengan kapal terakhir dijadwalkan untuk serah terima pada Juni 2023. Namun, progres kapal pertama baru sekitar 60% selesai
      -----
      2025 LCS DIJANGKA = Kapal pertama Littoral Combat Ship (LCS) TLDM itu dijangka hanya akan siap pada tahun 2025, iaitu 12 tahun selepas projek itu bermula pada Oktober 2013 dan kerajaan telah membayar RM6 bilion kepada kontraktor utama projek itu.
      -----
      2026 LCS DIJANGKA = Lima kapal LCS akan diserahkan kepada TLDM secara berperingkat dengan kapal pertama dijangka diserahkan pada penghujung 2026
      -----
      2029 LCS DIJANGKA = TLDM hanya akan dapat memperoleh kelima-lima LCS pada 2029 berbanding kontrak asal di mana 5 kapal LCS itu sepatutnya diserahkan pada 2022..
      -----
      17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
      Funding
      • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
      • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      Aging equipment
      • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
      • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
      • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
      Other challenges
      • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.

      Hapus
  29. RENAME = COPY PASTE = SAME .....
    PSC = 1995
    PSC > BNS = 2005
    BNC > LUNAS = 2024
    PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malonnn government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malonn in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
    ===================
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
    Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
    ===================
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness.
    ===================
    PROBLEMS SHIPYARD
    PROBLEMS SHIPYARD
    PROBLEMS SHIPYARD
    Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.

    BalasHapus
  30. GUN BOAT HARGA SEMAHAL FREMM....? HUTANG SEMAHAL ITU..? 🤣🤣🤣

    DIPERTANYAKAN HARGA 2 Kapal Fregat FREMM Mesir Sama dengan Harga 2 Kapal PPA Indonesia, Kok Bisa?.

    https://medan.tribunnews.com/2024/04/19/dipertanyakan-harga-2-kapal-fregat-fremm-mesir-sama-dengan-harga-2-kapal-ppa-indonesia-kok-bisa

    BalasHapus
    Balasan
    1. CHANGE SKIN = CHANGE NAME = STALLED 15 YEARS .....
      PSC = 1995
      PSC > BNS = 2005
      BNC > LUNAS = 2024
      PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malonnn government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malonn in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
      ===================
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
      Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
      ===================
      LCS 2024-2011 = 13 TAHUN
      13 TAHUN MANGKRAK
      13 TAHUN MANGKRAK
      LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      -----
      NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
      -----
      17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      Malonn's armed forces procurement faces several weaknesses, including:
      1. Corruption
      The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
      2. Political influence
      Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
      Weak parliamentary oversight
      Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
      3. Limited financial scrutiny
      Financial scrutiny is limited by excessive secrecy.
      4. Violation of procedures
      Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures

      Hapus
  31. DIPERTANYAKAN HARGA 2 Kapal Fregat FREMM Mesir Sama dengan Harga 2 Kapal PPA Indonesia, Kok Bisa?.

    https://medan.tribunnews.com/2024/04/19/dipertanyakan-harga-2-kapal-fregat-fremm-mesir-sama-dengan-harga-2-kapal-ppa-indonesia-kok-bisa

    BalasHapus
    Balasan
    1. RUGGIERO DI LAURIA = LAUNCHED 2023
      The construction was started with the first steel cutting ceremony on 7 April 2021 at Fincantieri Muggiano. Ruggiero di Lauria was launched on 10 October 2023
      -----
      MARCANTONIO COLONNA = LAUNCHED 2022
      It was laid down on 3 September 2020 at Fincantieri Muggiano and was launched on 26 November 2022. Marcantonio Colonna started sea trials in July 2023
      ========
      ========
      2011 PENGADAAN LCS = Pengadaan enam LCS pada 2011 itu juga dilakukan tanpa tender terbuka. Kapal-kapal itu akan dibangun di Galangan Kapal Boustead dan unit pertama sedianya dikirim pada 2019.
      -----
      2019 LCS DIJANGKA = KD Maharaja Lela setelah ditugaskan, diluncurkan secara seremonial pada Agustus 2017. Seharusnya telah dikirim ke RMN pada April 2019
      ------
      2022 LCS DIJANGKA = menurut jadual asal, setakat Ogos 2022 sepatutnya lima buah kapal LCS harus disiap dan diserahkan kepada TLDM.
      -----
      2023 LCS DIJANGKA = Seharusnya telah dikirim ke RMN pada April 2019, dengan kapal terakhir dijadwalkan untuk serah terima pada Juni 2023. Namun, progres kapal pertama baru sekitar 60% selesai
      -----
      2025 LCS DIJANGKA = Kapal pertama Littoral Combat Ship (LCS) TLDM itu dijangka hanya akan siap pada tahun 2025, iaitu 12 tahun selepas projek itu bermula pada Oktober 2013 dan kerajaan telah membayar RM6 bilion kepada kontraktor utama projek itu.
      -----
      2026 LCS DIJANGKA = Lima kapal LCS akan diserahkan kepada TLDM secara berperingkat dengan kapal pertama dijangka diserahkan pada penghujung 2026
      -----
      2029 LCS DIJANGKA = TLDM hanya akan dapat memperoleh kelima-lima LCS pada 2029 berbanding kontrak asal di mana 5 kapal LCS itu sepatutnya diserahkan pada 2022..
      -----
      17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
      Funding
      • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
      • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      Aging equipment
      • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
      • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
      • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
      Other challenges
      • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.

      Hapus
  32. Harap kapal saja besar tapi LEMAH.... 🤣🤣🤣

    HANYA ADA MERIAM..... 😂😂😂

    BalasHapus
    Balasan
    1. RUGGIERO DI LAURIA = LAUNCHED 2023
      The construction was started with the first steel cutting ceremony on 7 April 2021 at Fincantieri Muggiano. Ruggiero di Lauria was launched on 10 October 2023
      -----
      MARCANTONIO COLONNA = LAUNCHED 2022
      It was laid down on 3 September 2020 at Fincantieri Muggiano and was launched on 26 November 2022. Marcantonio Colonna started sea trials in July 2023
      ========
      ========
      2011 PENGADAAN LCS = Pengadaan enam LCS pada 2011 itu juga dilakukan tanpa tender terbuka. Kapal-kapal itu akan dibangun di Galangan Kapal Boustead dan unit pertama sedianya dikirim pada 2019.
      -----
      2019 LCS DIJANGKA = KD Maharaja Lela setelah ditugaskan, diluncurkan secara seremonial pada Agustus 2017. Seharusnya telah dikirim ke RMN pada April 2019
      ------
      2022 LCS DIJANGKA = menurut jadual asal, setakat Ogos 2022 sepatutnya lima buah kapal LCS harus disiap dan diserahkan kepada TLDM.
      -----
      2023 LCS DIJANGKA = Seharusnya telah dikirim ke RMN pada April 2019, dengan kapal terakhir dijadwalkan untuk serah terima pada Juni 2023. Namun, progres kapal pertama baru sekitar 60% selesai
      -----
      2025 LCS DIJANGKA = Kapal pertama Littoral Combat Ship (LCS) TLDM itu dijangka hanya akan siap pada tahun 2025, iaitu 12 tahun selepas projek itu bermula pada Oktober 2013 dan kerajaan telah membayar RM6 bilion kepada kontraktor utama projek itu.
      -----
      2026 LCS DIJANGKA = Lima kapal LCS akan diserahkan kepada TLDM secara berperingkat dengan kapal pertama dijangka diserahkan pada penghujung 2026
      -----
      2029 LCS DIJANGKA = TLDM hanya akan dapat memperoleh kelima-lima LCS pada 2029 berbanding kontrak asal di mana 5 kapal LCS itu sepatutnya diserahkan pada 2022..
      -----
      17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
      Funding
      • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
      • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      Aging equipment
      • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
      • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
      • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
      Other challenges
      • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.

      Hapus
    2. 2025 = 8th LARGEST ECONOMY IN THE WORLD BY GDP (PPP)
      2025 = 8th LARGEST ECONOMY IN THE WORLD BY GDP (PPP)
      2025 = 8th LARGEST ECONOMY IN THE WORLD BY GDP (PPP)
      1. China 37,070,000
      2. United States 29,170,000
      3. India 16,024,460
      4. Russia 6,910,000
      5. Japan 6,570,000
      6. Germany 6,020,000
      7. Brazil 4,702,004
      8. Indonesia 4,661,542
      9. France 4,360,000
      10. United Kingdom 4,280,000
      Indonesia is the 8th largest economy in the world by GDP (PPP). It is also the largest economy in Southeast Asia.
      Explanation
      • In 2023, Indonesia's nominal GDP was $1.371 trillion, making it the 16th largest economy in the world by nominal GDP.
      • Indonesia is a member of the G20 and the Association of Southeast Asian Nations (ASEAN).
      • Indonesia is an upper-middle income country and a newly industrialized country.
      • Indonesia has seen significant economic growth since the Asian financial crisis in the late 1990s.
      • Indonesia's economy is expected to benefit from a young population, continued urbanization, and the resurgence of Asia.
      • Indonesia is a member of the BRICS
      ===================
      ===================-
      IMF 2024-2029 = DEBT MALON $ 121,9 BILLION
      IMF 2024-2029 = DEBT MALON $ 121,9 BILLION
      IMF 2024-2029 = DEBT MALON $ 121,9 BILLION
      The national debt in Malonn was forecast to continuously increase between 2024 and 2029 by in total 121.9 billion U.S. dollars (+38.56 percent). After the tenth consecutive increasing year, the national debt is estimated to reach 438.09 billion U.S. dollars and therefore a new peak in 2029. Notably, the national debt was continuously increasing over the past years.
      As defined by the International Monetary Fund, the general government gross debt consists of all liabilities that require payment or payments of interest and/or principal by the debtor to the creditor at a date or dates in the future.
      -------------
      Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
      • Krisis politik
      Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
      1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
      2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
      3. Dampak politik pandemi COVID-19
      4. Proklamasi Darurat 2021
      5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
      • Krisis beras
      Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
      • Krisis mata uang
      Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
      1. Kinerja ekspor yang buruk
      2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
      3. Kekhawatiran geopolitik
      4. Ketidakpastian mengenai prospek ekonomi China

      Hapus
    3. 2025 = 8th LARGEST ECONOMY IN THE WORLD BY GDP (PPP)
      2025 = 8th LARGEST ECONOMY IN THE WORLD BY GDP (PPP)
      2025 = 8th LARGEST ECONOMY IN THE WORLD BY GDP (PPP)
      1. China 37,070,000
      2. United States 29,170,000
      3. India 16,024,460
      4. Russia 6,910,000
      5. Japan 6,570,000
      6. Germany 6,020,000
      7. Brazil 4,702,004
      8. Indonesia 4,661,542
      9. France 4,360,000
      10. United Kingdom 4,280,000
      Indonesia is the 8th largest economy in the world by GDP (PPP). It is also the largest economy in Southeast Asia.
      Explanation
      • In 2023, Indonesia's nominal GDP was $1.371 trillion, making it the 16th largest economy in the world by nominal GDP.
      • Indonesia is a member of the G20 and the Association of Southeast Asian Nations (ASEAN).
      • Indonesia is an upper-middle income country and a newly industrialized country.
      • Indonesia has seen significant economic growth since the Asian financial crisis in the late 1990s.
      • Indonesia's economy is expected to benefit from a young population, continued urbanization, and the resurgence of Asia.
      • Indonesia is a member of the BRICS
      ===================
      ===================-
      IMF 2024-2029 = DEBT MALON $ 121,9 BILLION
      IMF 2024-2029 = DEBT MALON $ 121,9 BILLION
      IMF 2024-2029 = DEBT MALON $ 121,9 BILLION
      The national debt in Malonn was forecast to continuously increase between 2024 and 2029 by in total 121.9 billion U.S. dollars (+38.56 percent). After the tenth consecutive increasing year, the national debt is estimated to reach 438.09 billion U.S. dollars and therefore a new peak in 2029. Notably, the national debt was continuously increasing over the past years.
      As defined by the International Monetary Fund, the general government gross debt consists of all liabilities that require payment or payments of interest and/or principal by the debtor to the creditor at a date or dates in the future.-------------
      Malonn has faced several crises, including political, financial, and economic crises:
      • Political crisis
      From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
      • Financial crisis
      Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
      • Economic crisis
      Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
      • Household debt crisis
      As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
      • Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior

      Hapus
  33. Sayang sekali kapal. Sebesar ini hanya versi GUN BOAT... 🤣🤣

    BalasHapus
    Balasan
    1. RUGGIERO DI LAURIA = LAUNCHED 2023
      The construction was started with the first steel cutting ceremony on 7 April 2021 at Fincantieri Muggiano. Ruggiero di Lauria was launched on 10 October 2023
      -----
      MARCANTONIO COLONNA = LAUNCHED 2022
      It was laid down on 3 September 2020 at Fincantieri Muggiano and was launched on 26 November 2022. Marcantonio Colonna started sea trials in July 2023
      ========
      ========
      2011 PENGADAAN LCS = Pengadaan enam LCS pada 2011 itu juga dilakukan tanpa tender terbuka. Kapal-kapal itu akan dibangun di Galangan Kapal Boustead dan unit pertama sedianya dikirim pada 2019.
      -----
      2019 LCS DIJANGKA = KD Maharaja Lela setelah ditugaskan, diluncurkan secara seremonial pada Agustus 2017. Seharusnya telah dikirim ke RMN pada April 2019
      ------
      2022 LCS DIJANGKA = menurut jadual asal, setakat Ogos 2022 sepatutnya lima buah kapal LCS harus disiap dan diserahkan kepada TLDM.
      -----
      2023 LCS DIJANGKA = Seharusnya telah dikirim ke RMN pada April 2019, dengan kapal terakhir dijadwalkan untuk serah terima pada Juni 2023. Namun, progres kapal pertama baru sekitar 60% selesai
      -----
      2025 LCS DIJANGKA = Kapal pertama Littoral Combat Ship (LCS) TLDM itu dijangka hanya akan siap pada tahun 2025, iaitu 12 tahun selepas projek itu bermula pada Oktober 2013 dan kerajaan telah membayar RM6 bilion kepada kontraktor utama projek itu.
      -----
      2026 LCS DIJANGKA = Lima kapal LCS akan diserahkan kepada TLDM secara berperingkat dengan kapal pertama dijangka diserahkan pada penghujung 2026
      -----
      2029 LCS DIJANGKA = TLDM hanya akan dapat memperoleh kelima-lima LCS pada 2029 berbanding kontrak asal di mana 5 kapal LCS itu sepatutnya diserahkan pada 2022..
      -----
      17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
      Funding
      • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
      • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      Aging equipment
      • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
      • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
      • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
      Other challenges
      • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.

      Hapus
    2. 8th LARGEST ECONOMY IN THE WORLD BY GDP (PPP)
      8th LARGEST ECONOMY IN THE WORLD BY GDP (PPP)
      8th LARGEST ECONOMY IN THE WORLD BY GDP (PPP)
      1. China 37,070,000
      2. United States 29,170,000
      3. India 16,024,460
      4. Russia 6,910,000
      5. Japan 6,570,000
      6. Germany 6,020,000
      7. Brazil 4,702,004
      8. Indonesia 4,661,542
      9. France 4,360,000
      10. United Kingdom 4,280,000
      Indonesia is the 8th largest economy in the world by GDP (PPP). It is also the largest economy in Southeast Asia.
      ---------
      Indonesia is considered the 8th largest economy in the world based on purchasing power parity (PPP) in 2024. This is due to a number of factors, including:
      • Natural resources: Indonesia has a wealth of natural resources, including oil, coal, tin, copper, and renewable energy sources
      • Government policy: The government has implemented policies to support economic recovery, such as fiscal and monetary stimulus
      • Trade openness: Indonesia has increased its trade openness over the past 50 years
      • Young labor force: Indonesia has a large and growing labor force
      • Low government debt: Indonesia has low government debt and prudent fiscal management
      • Resilient economic growth: Indonesia has experienced resilient economic growth, even during the COVID-19 pandemic
      Indonesia's economic growth has been shaped by its geographic location, natural resources, and people.
      ===================
      ===================-
      IMF 2024-2029 = DEBT MALON $ 121,9 BILLION
      IMF 2024-2029 = DEBT MALON $ 121,9 BILLION
      IMF 2024-2029 = DEBT MALON $ 121,9 BILLION
      The national debt in Malonn was forecast to continuously increase between 2024 and 2029 by in total 121.9 billion U.S. dollars (+38.56 percent). After the tenth consecutive increasing year, the national debt is estimated to reach 438.09 billion U.S. dollars and therefore a new peak in 2029. Notably, the national debt was continuously increasing over the past years.
      ---------
      The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
      Funding
      • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
      • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      Aging equipment
      • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
      • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
      • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
      Other challenges
      • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.

      Hapus
    3. 2025 = 8th LARGEST ECONOMY IN THE WORLD BY GDP (PPP)
      2025 = 8th LARGEST ECONOMY IN THE WORLD BY GDP (PPP)
      2025 = 8th LARGEST ECONOMY IN THE WORLD BY GDP (PPP)
      1. China 37,070,000
      2. United States 29,170,000
      3. India 16,024,460
      4. Russia 6,910,000
      5. Japan 6,570,000
      6. Germany 6,020,000
      7. Brazil 4,702,004
      8. Indonesia 4,661,542
      9. France 4,360,000
      10. United Kingdom 4,280,000
      Indonesia is the 8th largest economy in the world by GDP (PPP). It is also the largest economy in Southeast Asia.
      Explanation
      • In 2023, Indonesia's nominal GDP was $1.371 trillion, making it the 16th largest economy in the world by nominal GDP.
      • Indonesia is a member of the G20 and the Association of Southeast Asian Nations (ASEAN).
      • Indonesia is an upper-middle income country and a newly industrialized country.
      • Indonesia has seen significant economic growth since the Asian financial crisis in the late 1990s.
      • Indonesia's economy is expected to benefit from a young population, continued urbanization, and the resurgence of Asia.
      • Indonesia is a member of the BRICS
      ===================
      ===================-
      IMF 2024-2029 = DEBT MALON $ 121,9 BILLION
      IMF 2024-2029 = DEBT MALON $ 121,9 BILLION
      IMF 2024-2029 = DEBT MALON $ 121,9 BILLION
      The national debt in Malonn was forecast to continuously increase between 2024 and 2029 by in total 121.9 billion U.S. dollars (+38.56 percent). After the tenth consecutive increasing year, the national debt is estimated to reach 438.09 billion U.S. dollars and therefore a new peak in 2029. Notably, the national debt was continuously increasing over the past years.
      As defined by the International Monetary Fund, the general government gross debt consists of all liabilities that require payment or payments of interest and/or principal by the debtor to the creditor at a date or dates in the future.
      -------------
      The Malonn military has faced several problems with procurement, including cost, political influence, and a lack of transparency.
      Cost
      Fiscal limitations
      The Malonn government has been unwilling to cut spending elsewhere to fund defense.
      Mixing and matching equipment
      The military has sourced equipment from many different suppliers, which can make it difficult to find personnel to manage it.
      Political influence
      Vendor-driven decisions: Decisions are sometimes made in favor of vendors rather than strategic interests.
      Political influence on suppliers: For example, Malonn has sometimes exchanged hardware for palm oil.
      Weak external oversight: Political influence can be used to bypass established protocols.
      Lack of transparency
      Tension between the public and the military: The public has a right to know, but the military has a need to know.
      Unethical conduct: Issues include corruption, cronyism, and interference from outside parties.
      Accountability: Parliament and audit bodies can only provide ex-post scrutiny.
      Other issues include:
      The difficulty of finding personnel to manage sophisticated equipment
      The need to balance public accountability, confidentiality, and efficiency

      Hapus
    4. RENAME = COPY PASTE = STALLED 15 YEARS .....
      PSC = 1995
      PSC > BNS = 2005
      BNC > LUNAS = 2024
      PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malonnn government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malonn in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
      ===================
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
      Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
      ===================
      Malon's combat equipment has several weaknesses, including:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness.
      ===================
      PROBLEMS SHIPYARD
      PROBLEMS SHIPYARD
      PROBLEMS SHIPYARD
      Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.

      Hapus
  34. Mana ada didunia ini, shipyard rename 2x, tapi kapalnya tetap MANGKRAK

    Hanya oleh Malaydesh
    🤣🤣🤫😂😂🤣🤣

    BalasHapus
  35. Kesian di PRANK..... Sebelum ni di klaim oleh geng GORILLA konon kapal PPA nya versi FULL PPA FULL WEAPON....

    Lah berita terbaru kapal PPA nya ternyata hanya versi LIGHT PLUS OMPONG... 🤣🤣🤣

    BalasHapus
    Balasan
    1. RUGGIERO DI LAURIA = LAUNCHED 2023
      The construction was started with the first steel cutting ceremony on 7 April 2021 at Fincantieri Muggiano. Ruggiero di Lauria was launched on 10 October 2023
      -----
      MARCANTONIO COLONNA = LAUNCHED 2022
      It was laid down on 3 September 2020 at Fincantieri Muggiano and was launched on 26 November 2022. Marcantonio Colonna started sea trials in July 2023
      ========
      ========
      2011 PENGADAAN LCS = Pengadaan enam LCS pada 2011 itu juga dilakukan tanpa tender terbuka. Kapal-kapal itu akan dibangun di Galangan Kapal Boustead dan unit pertama sedianya dikirim pada 2019.
      -----
      2019 LCS DIJANGKA = KD Maharaja Lela setelah ditugaskan, diluncurkan secara seremonial pada Agustus 2017. Seharusnya telah dikirim ke RMN pada April 2019
      ------
      2022 LCS DIJANGKA = menurut jadual asal, setakat Ogos 2022 sepatutnya lima buah kapal LCS harus disiap dan diserahkan kepada TLDM.
      -----
      2023 LCS DIJANGKA = Seharusnya telah dikirim ke RMN pada April 2019, dengan kapal terakhir dijadwalkan untuk serah terima pada Juni 2023. Namun, progres kapal pertama baru sekitar 60% selesai
      -----
      2025 LCS DIJANGKA = Kapal pertama Littoral Combat Ship (LCS) TLDM itu dijangka hanya akan siap pada tahun 2025, iaitu 12 tahun selepas projek itu bermula pada Oktober 2013 dan kerajaan telah membayar RM6 bilion kepada kontraktor utama projek itu.
      -----
      2026 LCS DIJANGKA = Lima kapal LCS akan diserahkan kepada TLDM secara berperingkat dengan kapal pertama dijangka diserahkan pada penghujung 2026
      -----
      2029 LCS DIJANGKA = TLDM hanya akan dapat memperoleh kelima-lima LCS pada 2029 berbanding kontrak asal di mana 5 kapal LCS itu sepatutnya diserahkan pada 2022..
      -----
      17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
      Funding
      • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
      • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      Aging equipment
      • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
      • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
      • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
      Other challenges
      • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.

      Hapus
  36. CHANGE SKIN = CHANGE NAME = STALLED 15 YEARS .....
    PSC = 1995
    PSC > BNS = 2005
    BNC > LUNAS = 2024
    PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malonnn government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malonn in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
    ===================
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
    Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
    ===================
    LCS 2024-2011 = 13 TAHUN
    13 TAHUN MANGKRAK
    13 TAHUN MANGKRAK
    LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    -----
    NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
    -----
    17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
    ===================
    Malonn's armed forces procurement faces several weaknesses, including:
    1. Corruption
    The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
    2. Political influence
    Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
    Weak parliamentary oversight
    Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
    3. Limited financial scrutiny
    Financial scrutiny is limited by excessive secrecy.
    4. Violation of procedures
    Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures

    BalasHapus
  37. Kesian di PRANK..... Sebelum ni di klaim oleh geng GORILLA konon kapal PPA nya versi FULL PPA FULL WEAPON....

    Lah berita terbaru kapal PPA nya ternyata hanya versi LIGHT PLUS OMPONG... 🤣🤣🤣

    BalasHapus
    Balasan
    1. RUGGIERO DI LAURIA = LAUNCHED 2023
      The construction was started with the first steel cutting ceremony on 7 April 2021 at Fincantieri Muggiano. Ruggiero di Lauria was launched on 10 October 2023
      -----
      MARCANTONIO COLONNA = LAUNCHED 2022
      It was laid down on 3 September 2020 at Fincantieri Muggiano and was launched on 26 November 2022. Marcantonio Colonna started sea trials in July 2023
      ========
      ========
      2011 PENGADAAN LCS = Pengadaan enam LCS pada 2011 itu juga dilakukan tanpa tender terbuka. Kapal-kapal itu akan dibangun di Galangan Kapal Boustead dan unit pertama sedianya dikirim pada 2019.
      -----
      2019 LCS DIJANGKA = KD Maharaja Lela setelah ditugaskan, diluncurkan secara seremonial pada Agustus 2017. Seharusnya telah dikirim ke RMN pada April 2019
      ------
      2022 LCS DIJANGKA = menurut jadual asal, setakat Ogos 2022 sepatutnya lima buah kapal LCS harus disiap dan diserahkan kepada TLDM.
      -----
      2023 LCS DIJANGKA = Seharusnya telah dikirim ke RMN pada April 2019, dengan kapal terakhir dijadwalkan untuk serah terima pada Juni 2023. Namun, progres kapal pertama baru sekitar 60% selesai
      -----
      2025 LCS DIJANGKA = Kapal pertama Littoral Combat Ship (LCS) TLDM itu dijangka hanya akan siap pada tahun 2025, iaitu 12 tahun selepas projek itu bermula pada Oktober 2013 dan kerajaan telah membayar RM6 bilion kepada kontraktor utama projek itu.
      -----
      2026 LCS DIJANGKA = Lima kapal LCS akan diserahkan kepada TLDM secara berperingkat dengan kapal pertama dijangka diserahkan pada penghujung 2026
      -----
      2029 LCS DIJANGKA = TLDM hanya akan dapat memperoleh kelima-lima LCS pada 2029 berbanding kontrak asal di mana 5 kapal LCS itu sepatutnya diserahkan pada 2022..
      -----
      17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
      Funding
      • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
      • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      Aging equipment
      • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
      • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
      • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
      Other challenges
      • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.

      Hapus
  38. Kesian di PRANK..... Sebelum ni di klaim oleh geng GORILLA konon kapal PPA nya versi FULL PPA FULL WEAPON....

    Lah berita terbaru kapal PPA nya ternyata hanya versi LIGHT PLUS OMPONG... 🤣🤣🤣

    BalasHapus
    Balasan
    1. TLDM DIBENTUK 27 APRIL 1934 = MADE IN BRITISH
      TDM DIBENTUK 01 MARET 1933 = MADE IN BRITISH
      POLIS DIBENTUK 25 MARET 1807 = MADE IN BRITISH
      ==============
      SOME WEAKNESSES OF THE MALONNN SHIPBUILDING INDUSTRY INCLUDE:
      1. Delays
      Consistent delays in delivering ships to customers has reduced profitability and financial results.
      2. Small tonnage
      Malonnn shipbuilding industry is relatively weak compared to other countries in the region, as the tonnage of ships manufactured is relatively small.
      3. Supply chain disruptions
      Disruptions caused by COVID-19 and the Russia-Ukraine conflict have led to supply chain disruptions and shortages of skilled personnel.
      ==============
      Malonn's armed forces procurement faces several weaknesses, including:
      1. Corruption
      The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
      2. Political influence
      Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
      Weak parliamentary oversight
      Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
      3. Limited financial scrutiny
      Financial scrutiny is limited by excessive secrecy.
      4. Violation of procedures
      Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
      =============
      Malonn's military has faced a number of challenges in maintaining its equipment, including:
      • Budgetary limitations
      Successive governments have been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Corruption
      Defence procurement has been characterized by corruption, budgetary uncertainty, and opaque decision making.
      • Outdated equipment
      The Royal Malonnn Air Force (RMAF) has a large fleet of aging aircraft that are difficult to maintain.
      • Political interference
      Political interference has undermined combat readiness.
      • Logistics weaknesses
      There are issues with the quality of logistics equipment and the delivery of spares to soldiers .

      Hapus
  39. CHANGE SKIN = CHANGE NAME = STALLED 15 YEARS .....
    PSC = 1995
    PSC > BNS = 2005
    BNC > LUNAS = 2024
    PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malonnn government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malonn in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
    ===================
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
    Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
    ===================
    LCS 2024-2011 = 13 TAHUN
    13 TAHUN MANGKRAK
    13 TAHUN MANGKRAK
    LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    -----
    NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
    -----
    17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
    ===================
    Malonn's armed forces procurement faces several weaknesses, including:
    1. Corruption
    The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
    2. Political influence
    Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
    Weak parliamentary oversight
    Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
    3. Limited financial scrutiny
    Financial scrutiny is limited by excessive secrecy.
    4. Violation of procedures
    Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures

    BalasHapus
  40. NGUTANG Rp20 TRILIUN lebih hanya untuk 2 kapal PPA setahap OPV LIGHT PLUS OMPONG...?

    Psssttttt...... Hampir setara kapal FREMM FULL WEAPON woiii... 🤣🤣🤣

    BalasHapus
    Balasan
    1. 2025 $1.3 BILLION MINDEF =
      MAINTENANCE
      REPAIRS
      ASSETS.
      (LEASE, LEASE AND LEASE)
      -------------
      Military spending
      In 2025, Malonn Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
      This budget included $1.3 billion for maintenance, repairs, and new military assets..
      =========
      RELATED DEBT WITH BUDGET MILITARY
      RELATED DEBT WITH BUDGET MILITARY
      RELATED DEBT WITH BUDGET MILITARY
      Public debt and defense spending in Malonn are related, and the relationship between the two is important to consider for fiscal dynamics.
      Military spending and external debt
      Military spending can have security and economic consequences, especially for developing economies. Rapid expansion in military spending can lead to rising fiscal deficits.
      Public debt and defense spending in Malonn
      Research has been conducted to study the relationship between public debt and defense spending in Malonn. This research has used data from the World Bank to analyze the dynamic relationship between the two variables.
      Policy implications
      Policymakers need to balance the benefits and costs of incurring higher government debt. They need to consider the trade-off between the benefits of growth and the costs of slowing down growth due to additional debt.
      =========
      The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
      Funding
      • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
      • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      Aging equipment
      • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
      • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
      • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
      Other challenges
      • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.

      Hapus
  41. NGUTANG Rp20 TRILIUN lebih hanya untuk 2 kapal PPA setahap OPV LIGHT PLUS OMPONG...?

    Psssttttt...... Harga kapal Hampir setara kapal FREMM FULL WEAPON woiii... 🤣🤣🤣

    BalasHapus
    Balasan
    1. RUGGIERO DI LAURIA = LAUNCHED 2023
      The construction was started with the first steel cutting ceremony on 7 April 2021 at Fincantieri Muggiano. Ruggiero di Lauria was launched on 10 October 2023
      -----
      MARCANTONIO COLONNA = LAUNCHED 2022
      It was laid down on 3 September 2020 at Fincantieri Muggiano and was launched on 26 November 2022. Marcantonio Colonna started sea trials in July 2023
      ========
      ========
      2011 PENGADAAN LCS = Pengadaan enam LCS pada 2011 itu juga dilakukan tanpa tender terbuka. Kapal-kapal itu akan dibangun di Galangan Kapal Boustead dan unit pertama sedianya dikirim pada 2019.
      -----
      2019 LCS DIJANGKA = KD Maharaja Lela setelah ditugaskan, diluncurkan secara seremonial pada Agustus 2017. Seharusnya telah dikirim ke RMN pada April 2019
      ------
      2022 LCS DIJANGKA = menurut jadual asal, setakat Ogos 2022 sepatutnya lima buah kapal LCS harus disiap dan diserahkan kepada TLDM.
      -----
      2023 LCS DIJANGKA = Seharusnya telah dikirim ke RMN pada April 2019, dengan kapal terakhir dijadwalkan untuk serah terima pada Juni 2023. Namun, progres kapal pertama baru sekitar 60% selesai
      -----
      2025 LCS DIJANGKA = Kapal pertama Littoral Combat Ship (LCS) TLDM itu dijangka hanya akan siap pada tahun 2025, iaitu 12 tahun selepas projek itu bermula pada Oktober 2013 dan kerajaan telah membayar RM6 bilion kepada kontraktor utama projek itu.
      -----
      2026 LCS DIJANGKA = Lima kapal LCS akan diserahkan kepada TLDM secara berperingkat dengan kapal pertama dijangka diserahkan pada penghujung 2026
      -----
      2029 LCS DIJANGKA = TLDM hanya akan dapat memperoleh kelima-lima LCS pada 2029 berbanding kontrak asal di mana 5 kapal LCS itu sepatutnya diserahkan pada 2022..
      -----
      17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
      Funding
      • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
      • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      Aging equipment
      • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
      • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
      • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
      Other challenges
      • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.

      Hapus
  42. DIPERTANYAKAN HARGA 2 Kapal Fregat FREMM Mesir Sama dengan Harga 2 Kapal PPA Indonesia, Kok Bisa?

    https://medan.tribunnews.com/2024/04/19/dipertanyakan-harga-2-kapal-fregat-fremm-mesir-sama-dengan-harga-2-kapal-ppa-indonesia-kok-bisa

    BalasHapus
    Balasan
    1. CHANGE SKIN = CHANGE NAME = STALLED 15 YEARS .....
      PSC = 1995
      PSC > BNS = 2005
      BNC > LUNAS = 2024
      PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malonnn government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malonn in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
      ===================
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
      Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
      Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
      ===================
      LCS 2024-2011 = 13 TAHUN
      13 TAHUN MANGKRAK
      13 TAHUN MANGKRAK
      LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      -----
      NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
      -----
      17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      Malonn's armed forces procurement faces several weaknesses, including:
      1. Corruption
      The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
      2. Political influence
      Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
      Weak parliamentary oversight
      Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
      3. Limited financial scrutiny
      Financial scrutiny is limited by excessive secrecy.
      4. Violation of procedures
      Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures

      Hapus
    2. SEWA VSHORAD SEWA TRUK
      The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals.
      SEWA PATROL BOATS : SEWA OUTBOARD MOTORS : SEWA TRAILERS
      Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment
      SEWA BOAT
      sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
      SEWA HIDROGRAFI
      tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak sewaan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
      SEWA HELI AW139
      4 buah Helikopter Leonardo AW 139 yang diperolehi secara sewaan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di No.3 Skuadron, Pangkalan Udara Butterworth
      SEWA HELI EC120B
      Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
      SEWA PESAWAT
      L39 ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
      SEWA 4x4
      Pejabat perusahaan mengatakan kepada Janes di pameran bahwa Angkatan Bersenjata Malon sedang mencari untuk menyewa Tarantula
      SEWA MOTOR
      The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022.

      Hapus
    3. Malonn's military procurement has several weaknesses, including:
      • Corruption: The defense sector is vulnerable to corruption, and there is a high risk of corruption.
      • Weak parliamentary oversight: Parliamentary oversight is weak, and financial scrutiny is limited by excessive secrecy.
      • External influences: Decisions are often influenced by vendors and are against strategic interests. For example, Malonn sometimes procures hardware in exchange for palm oil.
      • Mixing and matching equipment: The Malonnn military sources weapons systems and platforms from a large variety of foreign suppliers. This makes it difficult to find personnel to manage the equipment.
      • Budgetary uncertainty: There is budgetary uncertainty in defense procurement.
      • Opaque decision making: Decision making in defense procurement is opaque.
      • Shifting priorities: Priorities in defense procurement shift.
      • Sustainability: There are issues with sustaining logistics support during an operation.
      Voting system: The voting system for contractors has issues, such as not considering the value of the jobs

      Hapus
  43. RENAME = COPY PASTE = STALLED 15 YEARS .....
    PSC = 1995
    PSC > BNS = 2005
    BNC > LUNAS = 2024
    PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malonnn government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malonn in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
    ===================
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
    Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
    ===================
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness.
    ===================
    PROBLEMS SHIPYARD
    PROBLEMS SHIPYARD
    PROBLEMS SHIPYARD
    Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.

    BalasHapus
  44. DIPERTANYAKAN HARGA 2 Kapal Fregat FREMM Mesir Sama dengan Harga 2 Kapal PPA Indonesia, Kok Bisa?

    https://medan.tribunnews.com/2024/04/19/dipertanyakan-harga-2-kapal-fregat-fremm-mesir-sama-dengan-harga-2-kapal-ppa-indonesia-kok-bisa

    BalasHapus
    Balasan
    1. 2025 $1.3 BILLION MINDEF =
      MAINTENANCE
      REPAIRS
      ASSETS.
      (LEASE, LEASE AND LEASE)
      -------------
      Military spending
      In 2025, Malonn Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
      This budget included $1.3 billion for maintenance, repairs, and new military assets..
      =========
      Malonn's armed forces procurement faces several weaknesses, including:
      1. Corruption
      The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
      2. Political influence
      Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
      Weak parliamentary oversight
      Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
      3. Limited financial scrutiny
      Financial scrutiny is limited by excessive secrecy.
      4. Violation of procedures
      Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
      =========
      The Malonn Armed Forces (MAF) face a number of issues, including budget constraints, outdated equipment, and complaints from personnel.
      Budget constraints
      • The MAF budget has not exceeded 1.5% of GDP in the past 20 years.
      • The government has other priorities, such as cutting spending and reducing the national deficit.
      • The government has been grappling with the fiscal cost of the COVID-19 pandemic.
      Outdated equipment
      • The MAF has a large number of old ships, including the Kasturi-class Corvette, the Laksamana Corvette class, and the Perdana-class gunboat.
      • The MAF has outdated inventory stock.
      • The MAF's logistics equipment quality has been criticized.
      Complaints from personnel
      • Some personnel feel that they are not being treated fairly.
      • Some personnel feel that they are not being given the opportunity to voice their concerns.
      Some personnel feel that their superiors are not listening to them.

      Hapus
    2. SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
      -------------------------------------
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      -------------------------------------
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      CHEAPEST VARIANT LMS
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
      -------------------------------------
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      -
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
      -------------------------------------
      DOWNGRADE ANKA
      DOWNGRADE ANKA
      2023 ANKA OMPONG = WILL NOT ARMED
      Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
      -------------------------------------
      The Malonnn Armed Forces (MAF) faces several weaknesses, including outdated equipment, corruption, and a lack of leadership.
      Outdated equipment
      • Much of the MAF's equipment was purchased between the 1970s and 1990s, making it outdated and unable to meet modern threats
      • The MAF's submarines are outdated and cannot submerge properly
      Corruption
      • Corruption is not recognized as a military doctrine, and commanders are not trained to address corruption risks
      • Corruption has been involved in major projects, which has decreased morale and made it difficult to maximize the budget for national security
      Lack of leadership
      • There is a need to improve leadership in defense planning
      • There is a need to break down old mindsets and service rivalries
      Other challenges
      • The MAF faces challenges from big power politics and non-traditional security threats
      • The MAF needs to expand its capabilities to address cyber and space threats
      • The MAF needs to implement jointness to confront crises, conflicts, and wars

      Hapus
    3. Malonn's military has faced a number of challenges in maintaining its equipment, including:
      • Budgetary limitations
      Successive governments have been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Corruption
      Defence procurement has been characterized by corruption, budgetary uncertainty, and opaque decision making.
      • Outdated equipment
      The Royal Malonnn Air Force (RMAF) has a large fleet of aging aircraft that are difficult to maintain.
      • Political interference
      Political interference has undermined combat readiness.
      • Logistics weaknesses
      There are issues with the quality of logistics equipment and the delivery of spares to soldiers .

      Hapus
  45. 2025 : $1.3 BILLION =
    MAINTENANCE AND REPAIR WORK
    THE PROCUREMENT OF NEW MILITARY ASSETS.
    ---------
    Malonn recently announced an allocation of $4.8 billion to the Ministry of Defense (MINDEF) to safeguard the nation’s sovereignty from threats. OF THIS, $1.3 BILLION WAS ALLOCATED FOR MAINTENANCE AND REPAIR WORK AND THE PROCUREMENT OF NEW MILITARY ASSETS. Maritime assets will be increased, including the procurement of vessels such as multi-purpose mission ships and patrol vessels for the Malonnn Maritime Enforcement Agency (MMEA).
    The Ministry of Home Affairs (MOHA),responsible for public order, border and maritime security, crime, and terrorism prevention, has been allocated $4.4 billion. More than $480 million is budgeted for equipment for the Royal Malonn Police and other agencies. Malonn is also looking to equip law enforcement agencies with drone and AI technology to enhance monitoring capabilities.
    =========
    KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
    -
    1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
    -
    2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    =========
    KEYWORDS 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
    -
    1. SCORPENE IDN 2 UNIT HARGA € 2 BILLION = € 1 BILLION /UNIT
    -
    2. SCORPENE MALON 2 UNIT HARGA € 1,04 BILLION = € 0,52 /UNIT
    =========
    KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
    -
    1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
    -
    2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
    -
    Apache AH-64E contract for Indonesia for $1.42 BILLION
    -
    The Malonnn Army Aviation ordered the MD530G in 2016 for $77 MILLION
    -
    USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
    =========
    KEYWORDS 1 UNIT PPA = 3 UNIT LMS B2
    -
    PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
    -
    LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    =========
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    =========
    KEYWORDS
    1 UNIT JAVELIN = 3 UNIT NLAW
    4.5 KM JAVELIN = 1 KM NLAW
    ---
    Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
    The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit around $30,000 to $33,000. It has a range of up to 1,000 meters
    =========
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2023 ANKA OMPONG = WILL NOT ARMED
    Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
    =========
    FACT :
    1. 1 UNIT PPA = 3 UNIT LMS B2
    2. 1 UNIT RAFALE = 4 UNIT FA50M
    3. 1 UNIT APACHE = 13 UNIT MD530G
    4. 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
    5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
    6. SEWA 28 HELI = 119 HELI BARU
    7. 4.5 KM JAVELIN = 1 KM NLAW
    8. ANKA ISR NOT ARMED

    BalasHapus
  46. Jom. Kita lihat kapal PPA VERSI DOWNGRADE OMPONG...Hanya versi LIGHT PLUS guys....GUN BOAT... 🤣🤣🤣
    1. MERIAM 127MM ✅
    2. MERIAM 76MM ✅
    3. MISIL ANTI KAPAL ❌
    4. MISIL SAM ❌
    5. TORPEDO ❌
    6. SONAR ❌

    BalasHapus
    Balasan
    1. Malonn's military procurement has several weaknesses, including:
      • Corruption: The defense sector is vulnerable to corruption, and there is a high risk of corruption.
      • Weak parliamentary oversight: Parliamentary oversight is weak, and financial scrutiny is limited by excessive secrecy.
      • External influences: Decisions are often influenced by vendors and are against strategic interests. For example, Malonn sometimes procures hardware in exchange for palm oil.
      • Mixing and matching equipment: The Malonnn military sources weapons systems and platforms from a large variety of foreign suppliers. This makes it difficult to find personnel to manage the equipment.
      • Budgetary uncertainty: There is budgetary uncertainty in defense procurement.
      • Opaque decision making: Decision making in defense procurement is opaque.
      • Shifting priorities: Priorities in defense procurement shift.
      • Sustainability: There are issues with sustaining logistics support during an operation.
      Voting system: The voting system for contractors has issues, such as not considering the value of the jobs

      Hapus
    2. Some say that Malonn's military has outdated aircraft, but the country has also been modernizing its military with new equipment and programs.
      Outdated aircraft
      • Some say that Malonn's aircraft are becoming technologically obsolete.
      • A larger fleet of older aircraft could be difficult to maintain.
      Modernization programs
      • The Malonnn Army has a program called the Future Soldier System (FSS) to equip soldiers with personal protection equipment.
      • The Malonnn government has allocated funds for maintenance, repairs, and new military assets.
      Defense budget
      • Malonn's defense budget is $4 billion, which supports a modest ground force and an improving air force.
      • The government has allocated funds for maintenance, repairs, and new military assets

      Hapus
    3. Malonn military budget is allocated to protect the country's sovereignty and security. The budget includes the cost of military personnel, maintenance, procurement, research and development, and military aid.
      • Budget constraints
      Historical budget constraints and competing national priorities can limit the military budget.
      • Economic limitations
      Economic limitations can delay or cancel military modernization initiatives.
      • Regional security challenges
      The country's awareness of regional security challenges can impact the military budget.
      What is the military budget for 2025?
      • Malonn 2025 defense allocation was RM21.2 billion ($4.5 billion), a 7.08% increase from the previous year.
      • The budget included $1.3 billion for maintenance and repair work and the procurement of new military assets.

      Hapus
    4. The Malonn Armed Forces (MAF) has faced challenges with its equipment due to a lack of resources, outdated equipment, and corruption.
      Lack of resources
      • The government's defense budget is limited, making it difficult to afford modern equipment
      • The government has not provided clear guidance for the future of the defense industry
      • The government has not been able to increase the local content of equipment
      Outdated equipment
      • The RMAF's main fighter fleet includes the Su-30MKMs and Boeing F/A-18 Hornets, which are considered technologically obsolete
      • The RMN has many old ships, including the Kasturi-class Corvette and the Laksamana Corvette class, which were built in the 1980s
      • The KD Rahman submarine had technical problems that prevented it from submerging
      Corruption
      • The MAF has been involved in many corruption scandals
      Other challenges
      • The MAF has struggled to increase research and development (R&D) activities
      • The MAF has struggled to increase the capabilities of local companies
      • The MAF has struggled to balance the public's right to know with the military's need-to-know policies

      Hapus
  47. Jom. Kita lihat kapal PPA VERSI DOWNGRADE OMPONG...Hanya versi LIGHT PLUS guys....GUN BOAT... 🤣🤣🤣
    1. MERIAM 127MM ✅
    2. MERIAM 76MM ✅
    3. MISIL ANTI KAPAL ❌
    4. MISIL SAM ❌
    5. TORPEDO ❌
    6. SONAR ❌

    BalasHapus
    Balasan
    1. Some say that Malonn's military has outdated aircraft, but the country has also been modernizing its military with new equipment and programs.
      Outdated aircraft
      • Some say that Malonn's aircraft are becoming technologically obsolete.
      • A larger fleet of older aircraft could be difficult to maintain.
      Modernization programs
      • The Malonnn Army has a program called the Future Soldier System (FSS) to equip soldiers with personal protection equipment.
      • The Malonnn government has allocated funds for maintenance, repairs, and new military assets.
      Defense budget
      • Malonn's defense budget is $4 billion, which supports a modest ground force and an improving air force.
      • The government has allocated funds for maintenance, repairs, and new military assets

      Hapus
    2. SEWA VSHORAD SEWA TRUK
      The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals.
      SEWA PATROL BOATS : SEWA OUTBOARD MOTORS : SEWA TRAILERS
      Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment
      SEWA BOAT
      sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
      SEWA HIDROGRAFI
      tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak sewaan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
      SEWA HELI AW139
      4 buah Helikopter Leonardo AW 139 yang diperolehi secara sewaan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di No.3 Skuadron, Pangkalan Udara Butterworth
      SEWA HELI EC120B
      Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
      SEWA PESAWAT
      L39 ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
      SEWA 4x4
      Pejabat perusahaan mengatakan kepada Janes di pameran bahwa Angkatan Bersenjata Malon sedang mencari untuk menyewa Tarantula
      SEWA MOTOR
      The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022.

      Hapus
  48. GUN BOAT... MASA SEMAHAL ITU.... NGUTANG LENDER pula tu... 🤣🤣🤣

    DUA Kapal yang Dibeli Indonesia Menjadi Sorotan, Harga Kapal PPA Setara dengan Kapal Fregat FREMM

    https://medan.tribunnews.com/2024/04/20/dua-kapal-yang-dibeli-indonesia-menjadi-sorotan-harga-kapal-ppa-setara-dengan-kapal-fregat-fremm?page=4

    BalasHapus
    Balasan
    1. Malonn military procurement faces challenges due to budget constraints, outdated equipment, and political influence.
      Budget constraints
      • The Malonn government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • The government has had small procurement budgets over the last quarter-century.
      • The government has had to deal with the economic impact of COVID-19.
      Outdated equipment
      • Most of the Malonn military's equipment was purchased between the 1970s and 1990s.
      • The air force's MiG-29 Fulcrum fighter aircraft were withdrawn from service in 2017.
      • The KD Rahman submarine had technical problems and could not submerge in 2010.
      Political influence
      • The procurement process is subject to political influence from suppliers.
      • The procurement process is sometimes vendor-driven and against strategic interests.
      • External oversight of the process is weak.
      Mixing and matching equipment
      • The Malonn military has sourced weapons systems from many different foreign suppliers.
      • This has led to a variation in advanced technological terms.
      • This makes it difficult to find appropriate military personnel to manage the equipment.

      Hapus
    2. SOME WEAKNESSES OF THE MALONNN SHIPBUILDING INDUSTRY INCLUDE:
      1. Delays
      Consistent delays in delivering ships to customers has reduced profitability and financial results.
      2. Small tonnage
      Malonnn shipbuilding industry is relatively weak compared to other countries in the region, as the tonnage of ships manufactured is relatively small.
      3. Supply chain disruptions
      Disruptions caused by COVID-19 and the Russia-Ukraine conflict have led to supply chain disruptions and shortages of skilled personnel.
      ==============
      Malonn's armed forces procurement faces several weaknesses, including:
      1. Corruption
      The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
      2. Political influence
      Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
      Weak parliamentary oversight
      Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
      3. Limited financial scrutiny
      Financial scrutiny is limited by excessive secrecy.
      4. Violation of procedures
      Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures

      Hapus
  49. GUN BOAT... MASA SEMAHAL ITU.... NGUTANG LENDER pula tu... 🤣🤣🤣

    DUA Kapal yang Dibeli Indonesia Menjadi Sorotan, Harga Kapal PPA Setara dengan Kapal Fregat FREMM

    https://medan.tribunnews.com/2024/04/20/dua-kapal-yang-dibeli-indonesia-menjadi-sorotan-harga-kapal-ppa-setara-dengan-kapal-fregat-fremm?page=4

    BalasHapus
    Balasan
    1. Malonn's armed forces procurement faces several weaknesses, including:
      1. Corruption
      The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
      2. Political influence
      Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
      Weak parliamentary oversight
      Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
      3. Limited financial scrutiny
      Financial scrutiny is limited by excessive secrecy.
      4. Violation of procedures
      Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures

      Hapus
    2. The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
      Funding
      • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
      • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      Aging equipment
      • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
      • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
      • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
      Other challenges
      • Internal and external threats: The MAF faces threats from within and outside the country, including territorial incursions, radicalization, and violent extremism.

      Hapus
    3. • LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
      • USD 948 JUTA (WITHOUT AMMO) = FFBNW = MANGKRAK DELAYED
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -OPV PPA USD 1,3 BILLION/2 UNIT = USD 650/UNIT
      ===================
      SEWA FAST INTERCEPTOR BOAT
      SEWA UTILITY BOAT
      SEWA RIGID HULL FENDER BOAT
      SEWA ROVER FIBER GLASS
      SEWA EC120B
      SEWA FLIGHT SIMULATION TRAINING DEVICE
      Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
      Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover)..
      --------------------
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      Tentera Laut Diraja Malon (TLDM) hari ini menerima kapal MV Aishah Aims 4 (Aishah Aims 4) yang berkeupayaan dalam melaksanakan liputan data pengukuran hidrografi yang meluas dan komprehensif.
      Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak sewaan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
      --------------------
      LCS BAYAR HUTANG NGPVs = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd....
      --------------------
      PAY RM 12.4 BILLION = 6 TO 5 OMPONG
      PAY RM 12.4 BILLION = 6 TO 5 OMPONG
      PAY RM 12.4 BILLION = 6 TO 5 OMPONG
      The number of Littoral Combat Ships (LCS) in Malon was reduced from six to five due to the LCS 6 not starting construction and the equipment being used on the other LCS. The construction of the five LCSs is expected to be completed in 2029, which is a significant delay from the original contract where LCS 5 was supposed to be delivered in 2022
      --------------------
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
  50. GUN BOAT... MASA SEMAHAL ITU.... NGUTANG LENDER pula tu... 🤣🤣🤣

    DUA Kapal yang Dibeli Indonesia Menjadi Sorotan, Harga Kapal PPA Setara dengan Kapal Fregat FREMM

    https://medan.tribunnews.com/2024/04/20/dua-kapal-yang-dibeli-indonesia-menjadi-sorotan-harga-kapal-ppa-setara-dengan-kapal-fregat-fremm?page=4

    BalasHapus
    Balasan
    1. THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    2. Malonn military budget faces challenges such as a need for more funding, aging assets, and competing national priorities.
      Funding
      Budget constraints
      Malonn defense spending is low compared to other countries in the region.
      Maintenance and repair
      The budget for maintenance and repair is limited, which can make it difficult to acquire new assets.
      Economic limitations
      The government has faced delays and cancellations of military modernization projects due to economic limitations.
      Other priorities
      The government has other priorities, such as revitalizing the economy and reducing the national deficit.
      Aging assets
      Outdated aircraft
      The Malonn air force has been facing a shortage of funding to buy new assets.
      Ageing equipment
      The military's equipment is aging, which can make it difficult to maintain.
      Competing priorities
      Other national priorities
      The government has other national priorities, such as revitalizing the economy and reducing the national deficit.
      Local defense industry
      Malonn is looking to develop its local defense industry, but it faces challenges such as high import costs.
      Corruption
      Corruption in defense procurement: Corruption has been a problem in Malonn defense procurement system

      Hapus
  51. Jom. Kita lihat kapal PPA VERSI DOWNGRADE OMPONG...Hanya versi LIGHT PLUS guys....GUN BOAT... 🤣🤣🤣
    1. MERIAM 127MM ✅
    2. MERIAM 76MM ✅
    3. MISIL ANTI KAPAL ❌
    4. MISIL SAM ❌
    5. TORPEDO ❌
    6. SONAR ❌

    BalasHapus
    Balasan
    1. PUBLIC DEBT = DEFENSE SPENDING
      Public debt has a positive correlation with defense spending in Malonn, meaning that as public debt increases, so does defense spending. This is because the government allocates funds from the national budget to debt repayments and defense.
      Explanation
      Debt and budget
      The Malonn government's budget includes allocations for debt repayments and defense. The government's income is often not enough to cover all expenditures, so it borrows money to finance the difference.
      Debt-to-GDP ratio
      Malonn debt-to-GDP ratio has been increasing over the years. In 2023, the debt-to-GDP ratio was 65.6%.
      Interest payments
      The government pays interest on its debt, which can be a significant cost. As interest rates rise, it becomes more expensive to refinance debt.
      Defense budget
      The defense budget is a general outline of the Ministry of Defense's spending, without a detailed breakdown.

      Hapus
    2. RELATED DEBT WITH BUDGET MILITARY
      RELATED DEBT WITH BUDGET MILITARY
      RELATED DEBT WITH BUDGET MILITARY
      Public debt and defense spending in Malonn are related, and the relationship between the two is important to consider for fiscal dynamics.
      Explanation
      Debt and economic growth
      The relationship between government debt and economic growth is a key policy question. Some research suggests that there is a non-linear relationship between the two variables.
      Military spending and external debt
      Military spending can have security and economic consequences, especially for developing economies. Rapid expansion in military spending can lead to rising fiscal deficits.
      Public debt and defense spending in Malonn
      Research has been conducted to study the relationship between public debt and defense spending in Malonn. This research has used data from the World Bank to analyze the dynamic relationship between the two variables.
      Policy implications
      Policymakers need to balance the benefits and costs of incurring higher government debt. They need to consider the trade-off between the benefits of growth and the costs of slowing down growth due to additional debt.

      Hapus
    3. • LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
      • USD 948 JUTA (WITHOUT AMMO) = FFBNW = MANGKRAK DELAYED
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -OPV PPA USD 1,3 BILLION/2 UNIT = USD 650/UNIT
      ===================
      SEWA FAST INTERCEPTOR BOAT
      SEWA UTILITY BOAT
      SEWA RIGID HULL FENDER BOAT
      SEWA ROVER FIBER GLASS
      SEWA EC120B
      SEWA FLIGHT SIMULATION TRAINING DEVICE
      Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
      Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover)..
      --------------------
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      Tentera Laut Diraja Malon (TLDM) hari ini menerima kapal MV Aishah Aims 4 (Aishah Aims 4) yang berkeupayaan dalam melaksanakan liputan data pengukuran hidrografi yang meluas dan komprehensif.
      Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak sewaan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
      --------------------
      LCS BAYAR HUTANG NGPVs = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd....
      --------------------
      PAY RM 12.4 BILLION = 6 TO 5 OMPONG
      PAY RM 12.4 BILLION = 6 TO 5 OMPONG
      PAY RM 12.4 BILLION = 6 TO 5 OMPONG
      The number of Littoral Combat Ships (LCS) in Malon was reduced from six to five due to the LCS 6 not starting construction and the equipment being used on the other LCS. The construction of the five LCSs is expected to be completed in 2029, which is a significant delay from the original contract where LCS 5 was supposed to be delivered in 2022
      --------------------
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
    4. LCS 2025-2011 = STALLED 15 YEARS
      LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
      USD 948 JUTA (WITHOUT AMMO) = FFBNW = MANGKRAK DELAYED
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3
      --------------
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      --------------
      LITTORAL COMBAT SHIP (LCS) PROGRAM HAS BEEN INVOLVED IN A SCANDAL THAT INCLUDES:
      • Construction delays
      The Public Accounts Committee found that the construction of the six LCS ships was delayed and had discrepancies.
      • Cost overruns
      The cost of building the ships increased by 22% to RM11.14 billion, which could result in losses of RM890.22 million for Boustead Heavy Industries Corp Bhd.
      • Power abuse
      Several high-profile people were accused of abusing their power and siphoning money in the purchase of the ships.
      • Launch before completion
      The RMN's first LCS, LCS 1 Maharaja Lela, was launched in 2017 before it was fully completed.
      • Radar choice
      The RMN reportedly requested the Thales Herakles radar, but BHIC chose the SMART-S radar instead.
      The original program plan called for the delivery of LCS 1 Maharaja Lela to the RMN in 2019, with all six ships delivered by 2023.
      The LCS is a class of Small Surface Combatants designed to provide joint force access in the littorals
      --------------
      HIBAH KAPAL 1967 = The post stated that among his achievements in the MMEA were that he was the team leader for a suitability study on absorbing the US Coast Guard cutter – USCG Decisive. Checks on the US Coast Guard website showed that Decisive– a Reliance class cutter – was laid in 1967 and commissioned in 1968
      -----
      HIBAH KAPAL 1968 = USCGC Steadfast (WMEC-623) was a United States Coast Guard medium endurance cutter in commission for 56 years. Commissioned in 1968, Steadfast was home ported in St. Petersburg, Florida for her first 24 years of service...
      -----
      HIBAH KAPAL 1980 = KM Perwira, one of the two Bay class patrol boats donated to MMEA by Australia. It is likely that the Bay class was the design proposed for the tri-nation VLPV project in the late 80s.
      -----
      PERBAIKAN DIBIAYAI JEPANG = Kapal patroli kedua yang disumbangkan oleh Jepang Coast Guard (JCG) untuk APMM/MMEA akan berlayar ke pulang pada akhir Mei, saat ini kapal dengan nama KM Arau ini sedang dalam tahap perbaikan akhir yang dilakukan di Jepang.
      -----
      HIBAH KAPAL 1989 DAN 1991 = Jepang menghibahkan dua kapal kelas 90m masing-masing PL-01 Ojima dan PL-02 Erimo, kedua kapal ini masuk dinas di JCG pada tahun 1989 dan 1991.
      -----
      HIBAH KAPAL1990–1991 = KM Pekan is an Ojika-class offshore patrol vessel operated by the Malonn Coast Guard. This ship, together with KM Arau and KM Marlin was transferred from the Japan Coast Guard to Malon in order to strengthen the relations between the two countries. The ship was built as the Ojika for the Japanese Coast Guard in 1990–1991
      -----
      HIBAH KAPAL 1989 = KM Arau is an offshore patrol vessel operated by the Malonn Coast Guard. She was the second ship transferred from the Japan Coast Guard together with KM Pekan and KM Marlin. KM Arau was formerly kNOwn as Oki (PL-01) in the Japan Coast Guard.
      -----
      KAPAL BUATAN 1960 =
      BEKAS MARINE POLICE BEKAS MMEA = RMN informed us that they are getting a new boat – albeit a third hand one – courtesy of the MMEA. MMEA received from the Marine police back in 2011.
      -----
      KAPAL BEKAS BEKAS MMEA = RMN has taken delivery of ex-Sundang on October 23 after the patrol craft completed its refit. She is the first of two ex-MMEA PC

      Hapus
  52. 2 KAPAL PERANG BUATAN ITALIA SIAP PERKUAT TNI ANGKATAN LAUT

    Jalesveva Jayamahe--

    Jakarta, 30 Januari 2025--Sebanyak dua kapal perang buatan Italia akan memperkuat jajaran TNI Angkatan Laut. Kepala Staf Angkatan Laut (Kasal) Laksamana TNI Dr. Muhammad Ali didampingi Ketua Umum Jalasenastri Ny. Fera Muhammad Ali memimpin upacara pemberian nama secara simbolis (Shipnaming) KRI Brawijaya-320 dan KRI Prabu Siliwangi-321 di galangan kapal Fincantieri Muggiano, Italia. Rabu (29/1).

    Kedua kapal tersebut merupakan jenis Offshore Patrol Vessels / Pattugliatore Polivalente d’Altura (PPA), dimana kehadiran kapal-kapal ini nantinya tidak hanya menjadi bagian dari armada Angkatan Laut Indonesia, tetapi juga tonggak penting dalam modernisasi alutsista untuk menjaga kedaulatan dan keamanan negara.

    Kedua kapal perang ini merupakan bagian dari kerja sama strategis antara Kementerian Pertahanan Republik Indonesia dengan Fincantieri, salah satu perusahaan galangan kapal terkemuka di dunia.

    Kapal ini memiliki panjang 143 m, lebar 16,5 m, draft 5,2 m, max speed 32 knots dengan pendorongan combine diesel, electric dan gas turbin. Selain itu senjata yang dimiliki yaitu SAM : 16 VL Sistem, SSM : 8 Teseo Mk-2E, Meriam 127 mm, Meriam 76 mm dan torpedo.

    Dalam sambutan Menteri Pertahanan RI Sjafrie Sjamsoeddin yang dibacakan oleh Kasal. Menhan RI menyampaikan bahwa ini merupakan komitmen nyata pemerintah dalam memperkuat pertahanan negara, khususnya Angkatan Laut Indonesia.

    Lebih jauh, kerja sama ini menunjukkan bahwa kemitraan strategis antara Indonesia dengan mitra internasional dapat menghasilkan alutsista yang modern dan berdaya saing tinggi.

    "Kita baru saja menyaksikan upacara pemberian nama dua Kapal Patroli Lepas Pantai, KRI Brawijaya dengan nomor lambung 320 dan KRI Prabu Siliwangi dengan nomor lambung 321. Seperti kita ketahui pemberian nama kapal bukan sekadar formalitas, tetapi merupakan langkah strategis dalam membangun identitas kapal. Nama-nama yang dipilih tersebut merupakan simbol harapan, doa, dan tekad untuk menegakkan kedaulatan dan kehormatan bangsa di seluruh lautan dunia," ungkapnya.

    Nama KRI Brawijaya dan KRI Prabu Siliwangi terinspirasi dari raja-raja Nusantara yang dipilih dengan harapan agar kapal-kapal ini kelak menjadi legenda baru yang berkontribusi besar bagi kejayaan bangsa. Dimana kapal-kapal tersebut dilengkapi dengan teknologi terkini dan sistem persenjataan modern, saya yakin kapal-kapal ini akan berhasil menyelesaikan setiap misi yang diberikan kepada mereka.

    Kerja sama ini mencerminkan keseriusan Kementerian Pertahanan dalam meningkatkan kemampuan tempur Angkatan Laut Indonesia. Dengan demikian, mereka akan mampu menghadapi tantangan di perairan nasional dan regional dengan lebih efektif.

    Turut hadir dalam kegiatan tersebut, Dirjen Kuathan Kemhan, Marsda TNI H. Haris Haryanto, Aslog Kasal Laksda TNI Eko Sunarjanto, Kadisadal Laksma TNI Ifa Djaya Sakti. Sedangkan dari pihak Italian Navy dihadiri oleh Deputy Chief of the Italian Navy, Vice Admiral Giuseppe Berutti Bergotto, CEO Fincantieri Mr. Dario Deste, DCM KBRI di Roma Tika Wihanasari, Athan RI di Roma Kolonel Laut (P) Andre M. Dotulung serta Dansatgas Yekda PPA Laksma TNI Sumarji Bimoaji.

    Demikian berita Dinas Penerangan Angkatan Laut.

    BalasHapus
  53. Jom. Kita lihat kapal PPA VERSI DOWNGRADE OMPONG...Hanya versi LIGHT PLUS guys....GUN BOAT... 🤣🤣🤣
    1. MERIAM 127MM ✅
    2. MERIAM 76MM ✅
    3. MISIL ANTI KAPAL ❌
    4. MISIL SAM ❌
    5. TORPEDO ❌
    6. SONAR ❌

    BalasHapus
    Balasan
    1. Malonn has faced several crises, including political, financial, and economic crises:
      • Political crisis
      From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
      • Financial crisis
      Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
      • Economic crisis
      Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
      • Household debt crisis
      As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
      • Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior

      Hapus
    2. SEWA FAST INTERCEPTOR BOAT
      SEWA UTILITY BOAT
      SEWA RIGID HULL FENDER BOAT
      SEWA ROVER FIBER GLASS
      SEWA EC120B
      SEWA FLIGHT SIMULATION TRAINING DEVICE
      Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
      Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover)..
      -----
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      Tentera Laut Diraja Malon (TLDM) hari ini menerima kapal MV Aishah Aims 4 (Aishah Aims 4) yang berkeupayaan dalam melaksanakan liputan data pengukuran hidrografi yang meluas dan komprehensif.
      Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak sewaan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
      =========
      LCS 2025-2011 = 15 TAHUN OMPONG
      NO MERIAM
      NO RADAR
      NO MACHINE
      NO MISSILE
      LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      -----
      LCS BAYAR HUTANG NGPVs = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd....
      ---
      PAY RM 12.4 BILLION = 6 TO 5 OMPONG
      PAY RM 12.4 BILLION = 6 TO 5 OMPONG
      PAY RM 12.4 BILLION = 6 TO 5 OMPONG
      The number of Littoral Combat Ships (LCS) in Malon was reduced from six to five due to the LCS 6 not starting construction and the equipment being used on the other LCS. The construction of the five LCSs is expected to be completed in 2029, which is a significant delay from the original contract where LCS 5 was supposed to be delivered in 2022.
      -----
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      -----
      The Malonnn army has several weaknesses, including:
      • Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
      • Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
      • Corruption: The Malonnn military has been plagued by corruption.
      • Political interference: Political leaders have interfered in procurement.
      • Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
      • Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
      Other challenges include:
      • The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
      • The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
    3. LCS 2025-2011 = STALLED 15 YEARS
      LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
      USD 948 JUTA (WITHOUT AMMO) = FFBNW = MANGKRAK DELAYED
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3
      --------------
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      --------------
      LITTORAL COMBAT SHIP (LCS) PROGRAM HAS BEEN INVOLVED IN A SCANDAL THAT INCLUDES:
      • Construction delays
      The Public Accounts Committee found that the construction of the six LCS ships was delayed and had discrepancies.
      • Cost overruns
      The cost of building the ships increased by 22% to RM11.14 billion, which could result in losses of RM890.22 million for Boustead Heavy Industries Corp Bhd.
      • Power abuse
      Several high-profile people were accused of abusing their power and siphoning money in the purchase of the ships.
      • Launch before completion
      The RMN's first LCS, LCS 1 Maharaja Lela, was launched in 2017 before it was fully completed.
      • Radar choice
      The RMN reportedly requested the Thales Herakles radar, but BHIC chose the SMART-S radar instead.
      The original program plan called for the delivery of LCS 1 Maharaja Lela to the RMN in 2019, with all six ships delivered by 2023.
      The LCS is a class of Small Surface Combatants designed to provide joint force access in the littorals
      --------------
      HIBAH KAPAL 1967 = The post stated that among his achievements in the MMEA were that he was the team leader for a suitability study on absorbing the US Coast Guard cutter – USCG Decisive. Checks on the US Coast Guard website showed that Decisive– a Reliance class cutter – was laid in 1967 and commissioned in 1968
      -----
      HIBAH KAPAL 1968 = USCGC Steadfast (WMEC-623) was a United States Coast Guard medium endurance cutter in commission for 56 years. Commissioned in 1968, Steadfast was home ported in St. Petersburg, Florida for her first 24 years of service...
      -----
      HIBAH KAPAL 1980 = KM Perwira, one of the two Bay class patrol boats donated to MMEA by Australia. It is likely that the Bay class was the design proposed for the tri-nation VLPV project in the late 80s.
      -----
      PERBAIKAN DIBIAYAI JEPANG = Kapal patroli kedua yang disumbangkan oleh Jepang Coast Guard (JCG) untuk APMM/MMEA akan berlayar ke pulang pada akhir Mei, saat ini kapal dengan nama KM Arau ini sedang dalam tahap perbaikan akhir yang dilakukan di Jepang.
      -----
      HIBAH KAPAL 1989 DAN 1991 = Jepang menghibahkan dua kapal kelas 90m masing-masing PL-01 Ojima dan PL-02 Erimo, kedua kapal ini masuk dinas di JCG pada tahun 1989 dan 1991.
      -----
      HIBAH KAPAL1990–1991 = KM Pekan is an Ojika-class offshore patrol vessel operated by the Malonn Coast Guard. This ship, together with KM Arau and KM Marlin was transferred from the Japan Coast Guard to Malon in order to strengthen the relations between the two countries. The ship was built as the Ojika for the Japanese Coast Guard in 1990–1991
      -----
      HIBAH KAPAL 1989 = KM Arau is an offshore patrol vessel operated by the Malonn Coast Guard. She was the second ship transferred from the Japan Coast Guard together with KM Pekan and KM Marlin. KM Arau was formerly kNOwn as Oki (PL-01) in the Japan Coast Guard.
      -----
      KAPAL BUATAN 1960 =
      BEKAS MARINE POLICE BEKAS MMEA = RMN informed us that they are getting a new boat – albeit a third hand one – courtesy of the MMEA. MMEA received from the Marine police back in 2011.
      -----
      KAPAL BEKAS BEKAS MMEA = RMN has taken delivery of ex-Sundang on October 23 after the patrol craft completed its refit. She is the first of two ex-MMEA PC

      Hapus
    4. LCS 2025-2011 = STALLED 15 YEARS
      LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
      USD 948 JUTA (WITHOUT AMMO) = FFBNW = MANGKRAK DELAYED
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3
      --------------
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      --------------
      LITTORAL COMBAT SHIP (LCS) PROGRAM HAS BEEN INVOLVED IN A SCANDAL THAT INCLUDES:
      • Construction delays
      The Public Accounts Committee found that the construction of the six LCS ships was delayed and had discrepancies.
      • Cost overruns
      The cost of building the ships increased by 22% to RM11.14 billion, which could result in losses of RM890.22 million for Boustead Heavy Industries Corp Bhd.
      • Power abuse
      Several high-profile people were accused of abusing their power and siphoning money in the purchase of the ships.
      • Launch before completion
      The RMN's first LCS, LCS 1 Maharaja Lela, was launched in 2017 before it was fully completed.
      • Radar choice
      The RMN reportedly requested the Thales Herakles radar, but BHIC chose the SMART-S radar instead.
      The original program plan called for the delivery of LCS 1 Maharaja Lela to the RMN in 2019, with all six ships delivered by 2023.
      The LCS is a class of Small Surface Combatants designed to provide joint force access in the littorals
      --------------
      SEWA FAST INTERCEPTOR BOAT
      SEWA UTILITY BOAT
      SEWA RIGID HULL FENDER BOAT
      SEWA ROVER FIBER GLASS
      SEWA EC120B
      SEWA FLIGHT SIMULATION TRAINING DEVICE
      Memang dalam perancangan TUDM untuk membeli helikopter baharu, namun dengan mengambil kira situasi semasa termasuk ancaman pandemik, perolehan secara sewaan menggunakan konsep Government Operate, Company Own and Maintain (GOCOM) adalah lebih efektif buat masa ini.
      Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
      Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
      Melalui kaedah sewaan ini, tempoh masa untuk melaksanakan proses perolehan termasuk berkaitan tender serta pembinaan aset dapat dikurangkan.
      -----
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      “Sehubungan itu, TLDM telah mengambil pendekatan di luar kotak dengan mendapatkan Aishah Aims 4 melalui konsep sewaan yang mana kos operasinya jauh lebih rendah tetapi mampu keluarkan input lebih cepat dan berkesan,” katanya kepada pemberita selepas menyempurnakan majlis penerimaan kapal itu di Jeti Pusat Hidrografi Nasional (PHN) di sini.
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
  54. Jelas kapal besar mewah..berbanding LCS versi prank bual wkkwkwkw

    Jom ada yg kepanasann 🤭🤭😁😁😁

    BalasHapus
  55. 🤣🤣🤣😂😂

    Senang lihat si Malaydesh jadi stress

    Hahahahahaaaw

    BalasHapus
  56. • LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
    • USD 948 JUTA (WITHOUT AMMO) = FFBNW = MANGKRAK DELAYED
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -OPV PPA USD 1,3 BILLION/2 UNIT = USD 650/UNIT
    ===================
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
    High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
    The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
    --------------------
    SEWA FAST INTERCEPTOR BOAT
    SEWA UTILITY BOAT
    SEWA RIGID HULL FENDER BOAT
    SEWA ROVER FIBER GLASS
    SEWA EC120B
    SEWA FLIGHT SIMULATION TRAINING DEVICE
    Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
    Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover)..
    -----
    SEWA KAPAL HIDROLOGI
    SEWA KAPAL HIDROLOGI
    SEWA KAPAL HIDROLOGI
    Tentera Laut Diraja Malon (TLDM) hari ini menerima kapal MV Aishah Aims 4 (Aishah Aims 4) yang berkeupayaan dalam melaksanakan liputan data pengukuran hidrografi yang meluas dan komprehensif.
    Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak sewaan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
    --------------------
    LITTORAL COMBAT SHIP (LCS) PROGRAM HAS BEEN INVOLVED IN A SCANDAL THAT INCLUDES:
    • Construction delays
    The Public Accounts Committee found that the construction of the six LCS ships was delayed and had discrepancies.
    • Cost overruns
    The cost of building the ships increased by 22% to RM11.14 billion, which could result in losses of RM890.22 million for Boustead Heavy Industries Corp Bhd.
    • Power abuse
    Several high-profile people were accused of abusing their power and siphoning money in the purchase of the ships.
    • Launch before completion
    The RMN's first LCS, LCS 1 Maharaja Lela, was launched in 2017 before it was fully completed.
    • Radar choice
    The RMN reportedly requested the Thales Herakles radar, but BHIC chose the SMART-S radar instead.
    The original program plan called for the delivery of LCS 1 Maharaja Lela to the RMN in 2019, with all six ships delivered by 2023.
    The LCS is a class of Small Surface Combatants designed to provide joint force access in the littorals.
    ===================
    KEYWORS
    LCS WITHOUT AMMO = DESTROYER WITH AMMO

    BalasHapus
  57. Beruk iri tuh ha ha ha ha ha hanya punya gun boat usang sedekah dari as kapal 1967 😁😁😁😁😁
    Minggir lu miskin parahhhh

    BalasHapus
  58. Senang saya kalau lihat para beruk jadi gila 😁😁😁😁😁😁

    BalasHapus
  59. 2 KAPAL PERANG BUATAN ITALIA SIAP PERKUAT TNI ANGKATAN LAUT

    Jalesveva Jayamahe--

    Jakarta, 30 Januari 2025--Sebanyak dua kapal perang buatan Italia akan memperkuat jajaran TNI Angkatan Laut. Kepala Staf Angkatan Laut (Kasal) Laksamana TNI Dr. Muhammad Ali didampingi Ketua Umum Jalasenastri Ny. Fera Muhammad Ali memimpin upacara pemberian nama secara simbolis (Shipnaming) KRI Brawijaya-320 dan KRI Prabu Siliwangi-321 di galangan kapal Fincantieri Muggiano, Italia. Rabu (29/1).

    Kedua kapal tersebut merupakan jenis Offshore Patrol Vessels / Pattugliatore Polivalente d’Altura (PPA), dimana kehadiran kapal-kapal ini nantinya tidak hanya menjadi bagian dari armada Angkatan Laut Indonesia, tetapi juga tonggak penting dalam modernisasi alutsista untuk menjaga kedaulatan dan keamanan negara.

    Kedua kapal perang ini merupakan bagian dari kerja sama strategis antara Kementerian Pertahanan Republik Indonesia dengan Fincantieri, salah satu perusahaan galangan kapal terkemuka di dunia.

    Kapal ini memiliki panjang 143 m, lebar 16,5 m, draft 5,2 m, max speed 32 knots dengan pendorongan combine diesel, electric dan gas turbin. Selain itu senjata yang dimiliki yaitu SAM : 16 VL Sistem, SSM : 8 Teseo Mk-2E, Meriam 127 mm, Meriam 76 mm dan torpedo.

    Dalam sambutan Menteri Pertahanan RI Sjafrie Sjamsoeddin yang dibacakan oleh Kasal. Menhan RI menyampaikan bahwa ini merupakan komitmen nyata pemerintah dalam memperkuat pertahanan negara, khususnya Angkatan Laut Indonesia.

    Lebih jauh, kerja sama ini menunjukkan bahwa kemitraan strategis antara Indonesia dengan mitra internasional dapat menghasilkan alutsista yang modern dan berdaya saing tinggi.

    "Kita baru saja menyaksikan upacara pemberian nama dua Kapal Patroli Lepas Pantai, KRI Brawijaya dengan nomor lambung 320 dan KRI Prabu Siliwangi dengan nomor lambung 321. Seperti kita ketahui pemberian nama kapal bukan sekadar formalitas, tetapi merupakan langkah strategis dalam membangun identitas kapal. Nama-nama yang dipilih tersebut merupakan simbol harapan, doa, dan tekad untuk menegakkan kedaulatan dan kehormatan bangsa di seluruh lautan dunia," ungkapnya.

    Nama KRI Brawijaya dan KRI Prabu Siliwangi terinspirasi dari raja-raja Nusantara yang dipilih dengan harapan agar kapal-kapal ini kelak menjadi legenda baru yang berkontribusi besar bagi kejayaan bangsa. Dimana kapal-kapal tersebut dilengkapi dengan teknologi terkini dan sistem persenjataan modern, saya yakin kapal-kapal ini akan berhasil menyelesaikan setiap misi yang diberikan kepada mereka.

    Kerja sama ini mencerminkan keseriusan Kementerian Pertahanan dalam meningkatkan kemampuan tempur Angkatan Laut Indonesia. Dengan demikian, mereka akan mampu menghadapi tantangan di perairan nasional dan regional dengan lebih efektif.

    Turut hadir dalam kegiatan tersebut, Dirjen Kuathan Kemhan, Marsda TNI H. Haris Haryanto, Aslog Kasal Laksda TNI Eko Sunarjanto, Kadisadal Laksma TNI Ifa Djaya Sakti. Sedangkan dari pihak Italian Navy dihadiri oleh Deputy Chief of the Italian Navy, Vice Admiral Giuseppe Berutti Bergotto, CEO Fincantieri Mr. Dario Deste, DCM KBRI di Roma Tika Wihanasari, Athan RI di Roma Kolonel Laut (P) Andre M. Dotulung serta Dansatgas Yekda PPA Laksma TNI Sumarji Bimoaji.

    Demikian berita Dinas Penerangan Angkatan Laut.

    BalasHapus
  60. Uhuuyyyy 2 kapal baru siap dikirim
    No bual no hoax no prank

    Gempur terkoyak2 melancap wkwkkwkw
    Say hello kapal LCS versi mangkrak
    😭😭😭😂😂

    BalasHapus
  61. Frigate tercepat 32 knot, jgn bandingkan dg kapal2 usang Malon ya 😁😁😁😁😁😁

    BalasHapus
  62. LCS 2025-2011 = STALLED 15 YEARS
    LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
    USD 948 JUTA (WITHOUT AMMO) = FFBNW = MANGKRAK DELAYED
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3
    --------------
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    --------------
    LITTORAL COMBAT SHIP (LCS) PROGRAM HAS BEEN INVOLVED IN A SCANDAL THAT INCLUDES:
    • Construction delays
    The Public Accounts Committee found that the construction of the six LCS ships was delayed and had discrepancies.
    • Cost overruns
    The cost of building the ships increased by 22% to RM11.14 billion, which could result in losses of RM890.22 million for Boustead Heavy Industries Corp Bhd.
    • Power abuse
    Several high-profile people were accused of abusing their power and siphoning money in the purchase of the ships.
    • Launch before completion
    The RMN's first LCS, LCS 1 Maharaja Lela, was launched in 2017 before it was fully completed.
    • Radar choice
    The RMN reportedly requested the Thales Herakles radar, but BHIC chose the SMART-S radar instead.
    The original program plan called for the delivery of LCS 1 Maharaja Lela to the RMN in 2019, with all six ships delivered by 2023.
    The LCS is a class of Small Surface Combatants designed to provide joint force access in the littorals
    --------------
    SEWA FAST INTERCEPTOR BOAT
    SEWA UTILITY BOAT
    SEWA RIGID HULL FENDER BOAT
    SEWA ROVER FIBER GLASS
    SEWA EC120B
    SEWA FLIGHT SIMULATION TRAINING DEVICE
    Memang dalam perancangan TUDM untuk membeli helikopter baharu, namun dengan mengambil kira situasi semasa termasuk ancaman pandemik, perolehan secara sewaan menggunakan konsep Government Operate, Company Own and Maintain (GOCOM) adalah lebih efektif buat masa ini.
    Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
    Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    Melalui kaedah sewaan ini, tempoh masa untuk melaksanakan proses perolehan termasuk berkaitan tender serta pembinaan aset dapat dikurangkan.
    -----
    SEWA KAPAL HIDROLOGI
    SEWA KAPAL HIDROLOGI
    SEWA KAPAL HIDROLOGI
    “Sehubungan itu, TLDM telah mengambil pendekatan di luar kotak dengan mendapatkan Aishah Aims 4 melalui konsep sewaan yang mana kos operasinya jauh lebih rendah tetapi mampu keluarkan input lebih cepat dan berkesan,” katanya kepada pemberita selepas menyempurnakan majlis penerimaan kapal itu di Jeti Pusat Hidrografi Nasional (PHN) di sini.
    ===================
    KEYWORS
    LCS WITHOUT AMMO = DESTROYER WITH AMMO

    BalasHapus
  63. Lon,
    Jikalah betul andai Italia mahu buang, mereka akan buang yang tipe Light..bukan Light plus

    Tapi kami maklum, logic Malaydesh memang TOLOL

    🤣🤣😂😂🤣🤣🤣

    BalasHapus
  64. Meriam nya dah besar..sanggup tenggelam kan kapal yg lagi celap celup kapal mahatolelelle😭😀😂😂😂😂😂😂😂😂😂😂😂😂😂

    BalasHapus
  65. Jangan nak MEMBOHONG itu tak bagus... Kapal PPA versi INDIANESIA adalah versi LIGHT PLUS OMPONG hanya ada MERIAM... 🤣🤣🤣

    Yang ini adalah versi FULL EVO yang di pesan oleh Itali YA selepas jual 2 kapal PPA LIGHT PLUS OMPONG ke INDIANESIA .. 🤣🤣

    Kapal ini memiliki panjang 143 m, lebar 16,5 m, draft 5,2 m, max speed 32 knots dengan pendorongan combine diesel, electric dan gas turbin. Selain itu senjata yang dimiliki yaitu SAM : 16 VL Sistem, SSM : 8 Teseo Mk-2E, Meriam 127 mm, Meriam 76 mm dan torpedo.

    BalasHapus
    Balasan
    1. LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ---------------------
      BPA 316 DAYS = CHINA 1 MDB
      BPA 316 DAYS = CHINA 1 MDB
      BPA 316 DAYS = CHINA 1 MDB
      According to the Asia Maritime Transparency Initiative (AMTI) based in Washington, United States, Chinese coast guard vessels patrolled Patinggi Ali Shoal for 316 days last year, which is an increase from 279 days in 2020.....
      ---------------------
      NGEMIS LPD
      NGEMIS AH1Z
      Initially, the Malonnn marine corps will lack an amphibious naval platform as the RMN’s only amphibious ship, It is currently in discussions with both France and South Korea over acquiring a landing platform deck (LPD). The U.S. has also offered Malonn the LPD USS Denver after it decommissions it in 2014. U.S.-based defense companies are also discussing selling Malonn the AH-1Z
      ----
      NGEMIS POHANG
      NGEMIS POHANG
      NGEMIS POHANG
      Asrizal Rusli Beli LCA F/A-50 18 buah, percuma Pohang-class 2 buah..kalau jadi kenyataan aku janji akan meminati K-Pop termasuk drama dan band-nya..aku juga akan sertai army BTS untuk melengkapkan lagi sokongan aku kepada produk Korea Selatan.
      ----
      NGEMIS KAPAL 1967
      NGEMIS KAPAL 1967
      NGEMIS KAPAL 1967
      The post stated that among his achievements in the MMEA were that he was the team leader for a suitability study on absorbing the US Coast Guard cutter – USCG Decisive. Checks on the US Coast Guard website showed that Decisive– a Reliance class cutter – was laid in 1967 and commissioned in 1968
      -----
      NGEMIS KAPAL 1968
      NGEMIS KAPAL 1968
      NGEMIS KAPAL 1968
      USCGC Steadfast (WMEC-623) was a United States Coast Guard medium endurance cutter in commission for 56 years. Commissioned in 1968, Steadfast was home ported in St. Petersburg, Florida for her first 24 years of service...
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    2. LCS 2025-2011 = STALLED 15 YEARS
      LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
      USD 948 JUTA (WITHOUT AMMO) = FFBNW = MANGKRAK DELAYED
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3
      --------------
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      --------------
      LITTORAL COMBAT SHIP (LCS) PROGRAM HAS BEEN INVOLVED IN A SCANDAL THAT INCLUDES:
      • Construction delays
      The Public Accounts Committee found that the construction of the six LCS ships was delayed and had discrepancies.
      • Cost overruns
      The cost of building the ships increased by 22% to RM11.14 billion, which could result in losses of RM890.22 million for Boustead Heavy Industries Corp Bhd.
      • Power abuse
      Several high-profile people were accused of abusing their power and siphoning money in the purchase of the ships.
      • Launch before completion
      The RMN's first LCS, LCS 1 Maharaja Lela, was launched in 2017 before it was fully completed.
      • Radar choice
      The RMN reportedly requested the Thales Herakles radar, but BHIC chose the SMART-S radar instead.
      The original program plan called for the delivery of LCS 1 Maharaja Lela to the RMN in 2019, with all six ships delivered by 2023.
      The LCS is a class of Small Surface Combatants designed to provide joint force access in the littorals
      --------------
      SEWA FAST INTERCEPTOR BOAT
      SEWA UTILITY BOAT
      SEWA RIGID HULL FENDER BOAT
      SEWA ROVER FIBER GLASS
      SEWA EC120B
      SEWA FLIGHT SIMULATION TRAINING DEVICE
      Memang dalam perancangan TUDM untuk membeli helikopter baharu, namun dengan mengambil kira situasi semasa termasuk ancaman pandemik, perolehan secara sewaan menggunakan konsep Government Operate, Company Own and Maintain (GOCOM) adalah lebih efektif buat masa ini.
      Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
      Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
      Melalui kaedah sewaan ini, tempoh masa untuk melaksanakan proses perolehan termasuk berkaitan tender serta pembinaan aset dapat dikurangkan.
      -----
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      “Sehubungan itu, TLDM telah mengambil pendekatan di luar kotak dengan mendapatkan Aishah Aims 4 melalui konsep sewaan yang mana kos operasinya jauh lebih rendah tetapi mampu keluarkan input lebih cepat dan berkesan,” katanya kepada pemberita selepas menyempurnakan majlis penerimaan kapal itu di Jeti Pusat Hidrografi Nasional (PHN) di sini.
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus

    3. • LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
      • USD 948 JUTA (WITHOUT AMMO) = FFBNW = MANGKRAK DELAYED
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -OPV PPA USD 1,3 BILLION/2 UNIT = USD 650/UNIT
      ===================
      SEWA BOAT sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
      SEWA HIDROGRAFI tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak sewaan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
      SEWA HELI Kementerian Pertahanan Malonn pada 27 Mei 2023 lalu telah menandatangani perjanjian sewa dengan penyedia layanan penerbangan lokal, Aerotree, untuk menyediakan empat helikopter bekas Sikorsky UH-60A+ Black Hawk.
      SEWA HELI 4 buah Helikopter Leonardo AW 139 yang diperolehi secara sewaan ini adalah untuk kegunaan Tentera Udara Diraja Malonn (TUDM)
      SEWA HELI = Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
      SEWA MOTOR The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
      SEWA PESAWAT ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonnn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39
      SEWA 4x4 Pejabat perusahaan mengatakan kepada Janes di pameran bahwa Angkatan Bersenjata Malonn sedang mencari untuk menyewa Tarantula..
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years

      Hapus
    4. • LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
      • USD 948 JUTA (WITHOUT AMMO) = FFBNW = MANGKRAK DELAYED
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -OPV PPA USD 1,3 BILLION/2 UNIT = USD 650/UNIT
      ===================
      SEWA FAST INTERCEPTOR BOAT
      SEWA UTILITY BOAT
      SEWA RIGID HULL FENDER BOAT
      SEWA ROVER FIBER GLASS
      SEWA EC120B
      SEWA FLIGHT SIMULATION TRAINING DEVICE
      Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
      Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover)..
      --------------------
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      Tentera Laut Diraja Malon (TLDM) hari ini menerima kapal MV Aishah Aims 4 (Aishah Aims 4) yang berkeupayaan dalam melaksanakan liputan data pengukuran hidrografi yang meluas dan komprehensif.
      Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak sewaan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
      --------------------
      LCS BAYAR HUTANG NGPVs = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd....
      --------------------
      PAY RM 12.4 BILLION = 6 TO 5 OMPONG
      PAY RM 12.4 BILLION = 6 TO 5 OMPONG
      PAY RM 12.4 BILLION = 6 TO 5 OMPONG
      The number of Littoral Combat Ships (LCS) in Malon was reduced from six to five due to the LCS 6 not starting construction and the equipment being used on the other LCS. The construction of the five LCSs is expected to be completed in 2029, which is a significant delay from the original contract where LCS 5 was supposed to be delivered in 2022
      --------------------
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
  66. Maharajakarat apa kabarnya 😁😁😁😁😁 kapal usang. 14 thn tdk selesai2. Maklum lah yg buat para beruk IQ minus

    BalasHapus
  67. Meriam pun dah cukup karamkan kapal Mangkrak LcS wkkwkwkw

    Huhuuujuh malon miskin
    Nak sewa je lagi

    BalasHapus
  68. BPA 316 DAYS = CHINA 1 MDB
    BPA 316 DAYS = CHINA 1 MDB
    BPA 316 DAYS = CHINA 1 MDB
    According to the Asia Maritime Transparency Initiative (AMTI) based in Washington, United States, Chinese coast guard vessels patrolled Patinggi Ali Shoal for 316 days last year, which is an increase from 279 days in 2020.....
    ---------------------
    UNHCR = 162.040 ROHINGYA
    UNHCR = 162.040 ROHINGYA
    UNHCR = 162.040 ROHINGYA
    As of end November 2023, there are some 185,000 refugees and asylum-seekers registered with UNHCR in Malonn.
    Some 162,040 are from Myanmar, comprising some 107,520 Rohingyas, 24,820 Chins, and 29,700 other ethnic groups from conflict-affected areas or fleeing persecution in Myanmar.
    ---------------------
    HIBAH KAPAL 1967 = The post stated that among his achievements in the MMEA were that he was the team leader for a suitability study on absorbing the US Coast Guard cutter – USCG Decisive. Checks on the US Coast Guard website showed that Decisive– a Reliance class cutter – was laid in 1967 and commissioned in 1968
    -----
    HIBAH KAPAL 1968 = USCGC Steadfast (WMEC-623) was a United States Coast Guard medium endurance cutter in commission for 56 years. Commissioned in 1968, Steadfast was home ported in St. Petersburg, Florida for her first 24 years of service...
    -----
    HIBAH KAPAL 1980 = KM Perwira, one of the two Bay class patrol boats donated to MMEA by Australia. It is likely that the Bay class was the design proposed for the tri-nation VLPV project in the late 80s.
    -----
    PERBAIKAN DIBIAYAI JEPANG = Kapal patroli kedua yang disumbangkan oleh Jepang Coast Guard (JCG) untuk APMM/MMEA akan berlayar ke pulang pada akhir Mei, saat ini kapal dengan nama KM Arau ini sedang dalam tahap perbaikan akhir yang dilakukan di Jepang.
    -----
    HIBAH KAPAL 1989 DAN 1991 = Jepang menghibahkan dua kapal kelas 90m masing-masing PL-01 Ojima dan PL-02 Erimo, kedua kapal ini masuk dinas di JCG pada tahun 1989 dan 1991.
    -----
    HIBAH KAPAL1990–1991 = KM Pekan is an Ojika-class offshore patrol vessel operated by the Malonn Coast Guard. This ship, together with KM Arau and KM Marlin was transferred from the Japan Coast Guard to Malon in order to strengthen the relations between the two countries. The ship was built as the Ojika for the Japanese Coast Guard in 1990–1991
    -----
    HIBAH KAPAL 1989 = KM Arau is an offshore patrol vessel operated by the Malonn Coast Guard. She was the second ship transferred from the Japan Coast Guard together with KM Pekan and KM Marlin. KM Arau was formerly kNOwn as Oki (PL-01) in the Japan Coast Guard.
    -----
    KAPAL BUATAN 1960 =
    BEKAS MARINE POLICE BEKAS MMEA = RMN informed us that they are getting a new boat – albeit a third hand one – courtesy of the MMEA. MMEA received from the Marine police back in 2011.
    -----
    KAPAL BEKAS BEKAS MMEA = RMN has taken delivery of ex-Sundang on October 23 after the patrol craft completed its refit. She is the first of two ex-MMEA PC
    -----
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ===================
    KEYWORS
    LCS WITHOUT AMMO = DESTROYER WITH AMMO

    BalasHapus
  69. Coba beruk kasih link kalau PPA yg dibeli TNI hanya gun boat 😁😁😁😁😁

    BalasHapus
    Balasan
    1. Itukan hanya khayalan si gembul Rusli 😁😁😁😁😁

      Hapus
  70. 2011 PENGADAAN LCS = Pengadaan enam LCS pada 2011 itu juga dilakukan tanpa tender terbuka. Kapal-kapal itu akan dibangun di Galangan Kapal Boustead dan unit pertama sedianya dikirim pada 2019.
    ---------------------
    2019 LCS DIJANGKA = KD Maharaja Lela setelah ditugaskan, diluncurkan secara seremonial pada Agustus 2017. Seharusnya telah dikirim ke RMN pada April 2019
    ---------------------
    2022 LCS DIJANGKA = menurut jadual asal, setakat Ogos 2022 sepatutnya lima buah kapal LCS harus disiap dan diserahkan kepada TLDM.
    ---------------------
    2023 LCS DIJANGKA = Seharusnya telah dikirim ke RMN pada April 2019, dengan kapal terakhir dijadwalkan untuk serah terima pada Juni 2023. Namun, progres kapal pertama baru sekitar 60% selesai
    ---------------------
    2025 LCS DIJANGKA = Kapal pertama Littoral Combat Ship (LCS) TLDM itu dijangka hanya akan siap pada tahun 2025, iaitu 12 tahun selepas projek itu bermula pada Oktober 2013 dan kerajaan telah membayar RM6 bilion kepada kontraktor utama projek itu.
    ---------------------
    2026 LCS DIJANGKA = Lima kapal LCS akan diserahkan kepada TLDM secara berperingkat dengan kapal pertama dijangka diserahkan pada penghujung 2026
    ---------------------
    2029 LCS DIJANGKA = TLDM hanya akan dapat memperoleh kelima-lima LCS pada 2029 berbanding kontrak asal di mana 5 kapal LCS itu sepatutnya diserahkan pada 2022..
    ---------------------
    17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
    ---------------------
    LOST = RM14.82 MILLION
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
    ---------------------
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
    ---------------------
    RM 12.4 BILLION NOT YET DELIVERED
    LCS 2024-2011 = 15 YEARS
    15 YEARS STALLED
    15 YEARS STALLED
    The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt
    ---------------------
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    LCS WITHOUT AMMO = DESTROYER WITH AMMO
    • LCS USD 4,74 BILLION/5 UNIT = USD 948 JUTA/UNIT.
    • USD 948 JUTA (WITHOUT AMMO) = FFBNW
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -OPV PPA USD 1,3 BILLION/2 UNIT = USD 650/UNIT
    ===================
    KEYWORS
    LCS WITHOUT AMMO = DESTROYER WITH AMMO

    BalasHapus
  71. 2 KAPAL PERANG BUATAN ITALIA SIAP PERKUAT TNI ANGKATAN LAUT

    Jalesveva Jayamahe--

    Jakarta, 30 Januari 2025--Sebanyak dua kapal perang buatan Italia akan memperkuat jajaran TNI Angkatan Laut. Kepala Staf Angkatan Laut (Kasal) Laksamana TNI Dr. Muhammad Ali didampingi Ketua Umum Jalasenastri Ny. Fera Muhammad Ali memimpin upacara pemberian nama secara simbolis (Shipnaming) KRI Brawijaya-320 dan KRI Prabu Siliwangi-321 di galangan kapal Fincantieri Muggiano, Italia. Rabu (29/1).

    Kedua kapal tersebut merupakan jenis Offshore Patrol Vessels / Pattugliatore Polivalente d’Altura (PPA), dimana kehadiran kapal-kapal ini nantinya tidak hanya menjadi bagian dari armada Angkatan Laut Indonesia, tetapi juga tonggak penting dalam modernisasi alutsista untuk menjaga kedaulatan dan keamanan negara.

    Kedua kapal perang ini merupakan bagian dari kerja sama strategis antara Kementerian Pertahanan Republik Indonesia dengan Fincantieri, salah satu perusahaan galangan kapal terkemuka di dunia.

    Kapal ini memiliki panjang 143 m, lebar 16,5 m, draft 5,2 m, max speed 32 knots dengan pendorongan combine diesel, electric dan gas turbin. Selain itu senjata yang dimiliki yaitu SAM : 16 VL Sistem, SSM : 8 Teseo Mk-2E, Meriam 127 mm, Meriam 76 mm dan torpedo.

    Dalam sambutan Menteri Pertahanan RI Sjafrie Sjamsoeddin yang dibacakan oleh Kasal. Menhan RI menyampaikan bahwa ini merupakan komitmen nyata pemerintah dalam memperkuat pertahanan negara, khususnya Angkatan Laut Indonesia.

    Lebih jauh, kerja sama ini menunjukkan bahwa kemitraan strategis antara Indonesia dengan mitra internasional dapat menghasilkan alutsista yang modern dan berdaya saing tinggi.

    "Kita baru saja menyaksikan upacara pemberian nama dua Kapal Patroli Lepas Pantai, KRI Brawijaya dengan nomor lambung 320 dan KRI Prabu Siliwangi dengan nomor lambung 321. Seperti kita ketahui pemberian nama kapal bukan sekadar formalitas, tetapi merupakan langkah strategis dalam membangun identitas kapal. Nama-nama yang dipilih tersebut merupakan simbol harapan, doa, dan tekad untuk menegakkan kedaulatan dan kehormatan bangsa di seluruh lautan dunia," ungkapnya.

    Nama KRI Brawijaya dan KRI Prabu Siliwangi terinspirasi dari raja-raja Nusantara yang dipilih dengan harapan agar kapal-kapal ini kelak menjadi legenda baru yang berkontribusi besar bagi kejayaan bangsa. Dimana kapal-kapal tersebut dilengkapi dengan teknologi terkini dan sistem persenjataan modern, saya yakin kapal-kapal ini akan berhasil menyelesaikan setiap misi yang diberikan kepada mereka.

    Kerja sama ini mencerminkan keseriusan Kementerian Pertahanan dalam meningkatkan kemampuan tempur Angkatan Laut Indonesia. Dengan demikian, mereka akan mampu menghadapi tantangan di perairan nasional dan regional dengan lebih efektif.

    Turut hadir dalam kegiatan tersebut, Dirjen Kuathan Kemhan, Marsda TNI H. Haris Haryanto, Aslog Kasal Laksda TNI Eko Sunarjanto, Kadisadal Laksma TNI Ifa Djaya Sakti. Sedangkan dari pihak Italian Navy dihadiri oleh Deputy Chief of the Italian Navy, Vice Admiral Giuseppe Berutti Bergotto, CEO Fincantieri Mr. Dario Deste, DCM KBRI di Roma Tika Wihanasari, Athan RI di Roma Kolonel Laut (P) Andre M. Dotulung serta Dansatgas Yekda PPA Laksma TNI Sumarji Bimoaji.

    Demikian berita Dinas Penerangan Angkatan Laut.

    BalasHapus
    Balasan
    1. Demikian berita Dinas Penerangan Angkatan Laut.

      Hapus
  72. Lagi betul OMPONG tuu KD Mangkrakjelelah, sudah rename 2x masih MANGKRAK

    🤣🤣🤣😂😂😂😂

    BalasHapus
  73. Versi INDIANESIA ADALAH LIGHT +ya guys....GUN BOAT.... 🤣🤣🤣

    https://cdn-legacy.defence24.pl/defence24.com/upload/2021-03-12/qpula8_qppbcyKonfiguracjePPA.jpg

    BalasHapus
    Balasan
    1. LCS 2025-2011 = STALLED 15 YEARS
      LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
      USD 948 JUTA (WITHOUT AMMO) = FFBNW = MANGKRAK DELAYED
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3
      --------------
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      --------------
      LITTORAL COMBAT SHIP (LCS) PROGRAM HAS BEEN INVOLVED IN A SCANDAL THAT INCLUDES:
      • Construction delays
      The Public Accounts Committee found that the construction of the six LCS ships was delayed and had discrepancies.
      • Cost overruns
      The cost of building the ships increased by 22% to RM11.14 billion, which could result in losses of RM890.22 million for Boustead Heavy Industries Corp Bhd.
      • Power abuse
      Several high-profile people were accused of abusing their power and siphoning money in the purchase of the ships.
      • Launch before completion
      The RMN's first LCS, LCS 1 Maharaja Lela, was launched in 2017 before it was fully completed.
      • Radar choice
      The RMN reportedly requested the Thales Herakles radar, but BHIC chose the SMART-S radar instead.
      The original program plan called for the delivery of LCS 1 Maharaja Lela to the RMN in 2019, with all six ships delivered by 2023.
      The LCS is a class of Small Surface Combatants designed to provide joint force access in the littorals
      --------------
      HIBAH KAPAL 1967 = The post stated that among his achievements in the MMEA were that he was the team leader for a suitability study on absorbing the US Coast Guard cutter – USCG Decisive. Checks on the US Coast Guard website showed that Decisive– a Reliance class cutter – was laid in 1967 and commissioned in 1968
      -----
      HIBAH KAPAL 1968 = USCGC Steadfast (WMEC-623) was a United States Coast Guard medium endurance cutter in commission for 56 years. Commissioned in 1968, Steadfast was home ported in St. Petersburg, Florida for her first 24 years of service...
      -----
      HIBAH KAPAL 1980 = KM Perwira, one of the two Bay class patrol boats donated to MMEA by Australia. It is likely that the Bay class was the design proposed for the tri-nation VLPV project in the late 80s.
      -----
      PERBAIKAN DIBIAYAI JEPANG = Kapal patroli kedua yang disumbangkan oleh Jepang Coast Guard (JCG) untuk APMM/MMEA akan berlayar ke pulang pada akhir Mei, saat ini kapal dengan nama KM Arau ini sedang dalam tahap perbaikan akhir yang dilakukan di Jepang.
      -----
      HIBAH KAPAL 1989 DAN 1991 = Jepang menghibahkan dua kapal kelas 90m masing-masing PL-01 Ojima dan PL-02 Erimo, kedua kapal ini masuk dinas di JCG pada tahun 1989 dan 1991.
      -----
      HIBAH KAPAL1990–1991 = KM Pekan is an Ojika-class offshore patrol vessel operated by the Malonn Coast Guard. This ship, together with KM Arau and KM Marlin was transferred from the Japan Coast Guard to Malon in order to strengthen the relations between the two countries. The ship was built as the Ojika for the Japanese Coast Guard in 1990–1991
      -----
      HIBAH KAPAL 1989 = KM Arau is an offshore patrol vessel operated by the Malonn Coast Guard. She was the second ship transferred from the Japan Coast Guard together with KM Pekan and KM Marlin. KM Arau was formerly kNOwn as Oki (PL-01) in the Japan Coast Guard.
      -----
      KAPAL BUATAN 1960 =
      BEKAS MARINE POLICE BEKAS MMEA = RMN informed us that they are getting a new boat – albeit a third hand one – courtesy of the MMEA. MMEA received from the Marine police back in 2011.
      -----
      KAPAL BEKAS BEKAS MMEA = RMN has taken delivery of ex-Sundang on October 23 after the patrol craft completed its refit. She is the first of two ex-MMEA PC

      Hapus
    2. 2025 $1.3 BILLION MINDEF =
      MAINTENANCE
      REPAIRS
      ASSETS.
      (LEASE, LEASE AND LEASE)
      -------------
      Military spending
      In 2025, Malonn Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
      This budget included $1.3 billion for maintenance, repairs, and new military assets..
      =========
      RELATED DEBT WITH BUDGET MILITARY
      RELATED DEBT WITH BUDGET MILITARY
      RELATED DEBT WITH BUDGET MILITARY
      Public debt and defense spending in Malonn are related, and the relationship between the two is important to consider for fiscal dynamics.
      Military spending and external debt
      Military spending can have security and economic consequences, especially for developing economies. Rapid expansion in military spending can lead to rising fiscal deficits.
      Public debt and defense spending in Malonn
      Research has been conducted to study the relationship between public debt and defense spending in Malonn. This research has used data from the World Bank to analyze the dynamic relationship between the two variables.
      Policy implications
      Policymakers need to balance the benefits and costs of incurring higher government debt. They need to consider the trade-off between the benefits of growth and the costs of slowing down growth due to additional debt.
      =========
      1. HUTANG 84.2% DARI GDP
      1. HUTANG 84.2% DARI GDP
      2. HUTANG NEGARA RM 1.5 TRLLIUN
      3. HUTANG 1MDB RM 18.2 BILLION
      4. TUNGGAKAN SEWA SABAH USD 15 BILLION
      5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
      6. SEWA SIMULATOR MKM
      7. PESAWAT MIG GROUNDED
      8. SEWA MOTOR POLIS
      9. PESAWAT MB339CM GROUNDED
      10. NURI GROUNDED SEWA BLACKHAWK
      11. FIVE PROCUREMENT CANCELLED
      12. 48 PESAWAT SKYHAWK HILANG
      13. MESIN JET 2 BUAH HILANG
      14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
      15. NO LST
      16. NO LPD – NGEMIS LPD USA
      17. NO TANKER
      18. NO KCR
      19. MONUMEN MIG29M UNTUK JIMAT KOS
      20. NO SPH
      21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
      22. NO HELLFIRE
      23. NO MPA ATR72 DELAYED
      24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
      25. NO HELI HEAVY ATTACK NGEMIS AH1Z
      26. NO M3 AMPHIBIUS RIG
      27. LCS MANGKRAK KARATAN
      28. OPV MANGKRAK
      29. TANK MOGOK STOP SPARE PARTS
      30. CN 235 MSA VERSI MSI USA
      31. SEWA MOTOR MILITARY POLICE
      32. RADAR GIFTED PAID USA
      33. 84% NO SAVING EVERY MONTH
      34. SEWA VSHORAD
      35. SEWA TRUK 3 TON
      36. 4X4 SEWA 6X6 CANCELLED
      37. C130H DIGANTI 2045
      38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
      39. NO DRONE UCAV – ANKA ISR OMPONG
      40. SEWA BLACKHAWK SEWA AW159
      41. NO TRACKED SPH
      42. SEWA SIMULATOR HELI
      43. SPH CANCELLED
      44. SCORPION V150 CONDOR SIMBAS RETIRED
      45. NO PESAWAT COIN
      46. PILATUS MK II KARATAN
      47. PENCEROBOHAN 43X BTA 316 HARI
      48. SEWA AW139 SEWA COLIBRI
      49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
      50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
      51. LYNX GROUNDED
      52. MRCA CANCELLED SEWA PESAWAT ITTC
      53. MICA CANCELLED NSM CANCELLED
      54. NO LRAD NO MRAD JUST SHORAD
      55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
      56. 4X NGEMIS F18 KUWAIT
      57. MENUNGGU 2050 KAPAL SELAM
      58. NO TANK AMPHIBI AV8 MOGOK BERASAP
      59. 84% NO SAVING EVERY MONTH
      60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
      61. TUDM SEWA 12 AW149
      62. TUDM SEWA 4 AW139
      63. TUDM SEWA 5 EC120B
      64. TLDM SEWA 2 AW159
      65. TDM SEWA 4 UH-60A
      67. TDM SEWA 12 AW149
      68. BOMBA SEWA 4 AW139
      69. MMEA SEWA 2 AW159
      70. POLIS SEWA 7 BELL429

      Hapus
    3. 2025 $1.3 BILLION MINDEF =
      MAINTENANCE
      REPAIRS
      ASSETS.
      (LEASE, LEASE AND LEASE)
      -------------
      Military spending
      In 2025, Malonn Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
      This budget included $1.3 billion for maintenance, repairs, and new military assets..
      =========
      RELATED DEBT WITH BUDGET MILITARY
      RELATED DEBT WITH BUDGET MILITARY
      RELATED DEBT WITH BUDGET MILITARY
      Public debt and defense spending in Malonn are related, and the relationship between the two is important to consider for fiscal dynamics.
      Military spending and external debt
      Military spending can have security and economic consequences, especially for developing economies. Rapid expansion in military spending can lead to rising fiscal deficits.
      Public debt and defense spending in Malonn
      Research has been conducted to study the relationship between public debt and defense spending in Malonn. This research has used data from the World Bank to analyze the dynamic relationship between the two variables.
      Policy implications
      Policymakers need to balance the benefits and costs of incurring higher government debt. They need to consider the trade-off between the benefits of growth and the costs of slowing down growth due to additional debt.
      =========
      1. HUTANG 84.2% DARI GDP
      1. HUTANG 84.2% DARI GDP
      2. HUTANG NEGARA RM 1.5 TRLLIUN
      3. HUTANG 1MDB RM 18.2 BILLION
      4. TUNGGAKAN SEWA SABAH USD 15 BILLION
      5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
      6. SEWA SIMULATOR MKM
      7. PESAWAT MIG GROUNDED
      8. SEWA MOTOR POLIS
      9. PESAWAT MB339CM GROUNDED
      10. NURI GROUNDED SEWA BLACKHAWK
      11. FIVE PROCUREMENT CANCELLED
      12. 48 PESAWAT SKYHAWK HILANG
      13. MESIN JET 2 BUAH HILANG
      14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
      15. NO LST
      16. NO LPD – NGEMIS LPD USA
      17. NO TANKER
      18. NO KCR
      19. MONUMEN MIG29M UNTUK JIMAT KOS
      20. NO SPH
      21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
      22. NO HELLFIRE
      23. NO MPA ATR72 DELAYED
      24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
      25. NO HELI HEAVY ATTACK NGEMIS AH1Z
      26. NO M3 AMPHIBIUS RIG
      27. LCS MANGKRAK KARATAN
      28. OPV MANGKRAK
      29. TANK MOGOK STOP SPARE PARTS
      30. CN 235 MSA VERSI MSI USA
      31. SEWA MOTOR MILITARY POLICE
      32. RADAR GIFTED PAID USA
      33. 84% NO SAVING EVERY MONTH
      34. SEWA VSHORAD
      35. SEWA TRUK 3 TON
      36. 4X4 SEWA 6X6 CANCELLED
      37. C130H DIGANTI 2045
      38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
      39. NO DRONE UCAV – ANKA ISR OMPONG
      40. SEWA BLACKHAWK SEWA AW159
      41. NO TRACKED SPH
      42. SEWA SIMULATOR HELI
      43. SPH CANCELLED
      44. SCORPION V150 CONDOR SIMBAS RETIRED
      45. NO PESAWAT COIN
      46. PILATUS MK II KARATAN
      47. PENCEROBOHAN 43X BTA 316 HARI
      48. SEWA AW139 SEWA COLIBRI
      49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
      50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
      51. LYNX GROUNDED
      52. MRCA CANCELLED SEWA PESAWAT ITTC
      53. MICA CANCELLED NSM CANCELLED
      54. NO LRAD NO MRAD JUST SHORAD
      55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
      56. 4X NGEMIS F18 KUWAIT
      57. MENUNGGU 2050 KAPAL SELAM
      58. NO TANK AMPHIBI AV8 MOGOK BERASAP
      59. 84% NO SAVING EVERY MONTH
      60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
      61. TUDM SEWA 12 AW149
      62. TUDM SEWA 4 AW139
      63. TUDM SEWA 5 EC120B
      64. TLDM SEWA 2 AW159
      65. TDM SEWA 4 UH-60A
      67. TDM SEWA 12 AW149
      68. BOMBA SEWA 4 AW139
      69. MMEA SEWA 2 AW159
      70. POLIS SEWA 7 BELL429

      Hapus
  74. Jom. Kita lihat kapal PPA VERSI DOWNGRADE OMPONG...Hanya versi LIGHT PLUS guys....GUN BOAT... 🤣🤣🤣
    1. MERIAM 127MM ✅
    2. MERIAM 76MM ✅
    3. MISIL ANTI KAPAL ❌
    4. MISIL SAM ❌
    5. TORPEDO ❌
    6. SONAR ❌
    7. PELANCAR DECOY ❌

    BalasHapus
    Balasan
    1. LCS 2025-2011 = STALLED 15 YEARS
      LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
      USD 948 JUTA (WITHOUT AMMO) = FFBNW = MANGKRAK DELAYED
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3
      --------------
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      --------------
      LITTORAL COMBAT SHIP (LCS) PROGRAM HAS BEEN INVOLVED IN A SCANDAL THAT INCLUDES:
      • Construction delays
      The Public Accounts Committee found that the construction of the six LCS ships was delayed and had discrepancies.
      • Cost overruns
      The cost of building the ships increased by 22% to RM11.14 billion, which could result in losses of RM890.22 million for Boustead Heavy Industries Corp Bhd.
      • Power abuse
      Several high-profile people were accused of abusing their power and siphoning money in the purchase of the ships.
      • Launch before completion
      The RMN's first LCS, LCS 1 Maharaja Lela, was launched in 2017 before it was fully completed.
      • Radar choice
      The RMN reportedly requested the Thales Herakles radar, but BHIC chose the SMART-S radar instead.
      The original program plan called for the delivery of LCS 1 Maharaja Lela to the RMN in 2019, with all six ships delivered by 2023.
      The LCS is a class of Small Surface Combatants designed to provide joint force access in the littorals
      --------------
      HIBAH KAPAL 1967 = The post stated that among his achievements in the MMEA were that he was the team leader for a suitability study on absorbing the US Coast Guard cutter – USCG Decisive. Checks on the US Coast Guard website showed that Decisive– a Reliance class cutter – was laid in 1967 and commissioned in 1968
      -----
      HIBAH KAPAL 1968 = USCGC Steadfast (WMEC-623) was a United States Coast Guard medium endurance cutter in commission for 56 years. Commissioned in 1968, Steadfast was home ported in St. Petersburg, Florida for her first 24 years of service...
      -----
      HIBAH KAPAL 1980 = KM Perwira, one of the two Bay class patrol boats donated to MMEA by Australia. It is likely that the Bay class was the design proposed for the tri-nation VLPV project in the late 80s.
      -----
      PERBAIKAN DIBIAYAI JEPANG = Kapal patroli kedua yang disumbangkan oleh Jepang Coast Guard (JCG) untuk APMM/MMEA akan berlayar ke pulang pada akhir Mei, saat ini kapal dengan nama KM Arau ini sedang dalam tahap perbaikan akhir yang dilakukan di Jepang.
      -----
      HIBAH KAPAL 1989 DAN 1991 = Jepang menghibahkan dua kapal kelas 90m masing-masing PL-01 Ojima dan PL-02 Erimo, kedua kapal ini masuk dinas di JCG pada tahun 1989 dan 1991.
      -----
      HIBAH KAPAL1990–1991 = KM Pekan is an Ojika-class offshore patrol vessel operated by the Malonn Coast Guard. This ship, together with KM Arau and KM Marlin was transferred from the Japan Coast Guard to Malon in order to strengthen the relations between the two countries. The ship was built as the Ojika for the Japanese Coast Guard in 1990–1991
      -----
      HIBAH KAPAL 1989 = KM Arau is an offshore patrol vessel operated by the Malonn Coast Guard. She was the second ship transferred from the Japan Coast Guard together with KM Pekan and KM Marlin. KM Arau was formerly kNOwn as Oki (PL-01) in the Japan Coast Guard.
      -----
      KAPAL BUATAN 1960 =
      BEKAS MARINE POLICE BEKAS MMEA = RMN informed us that they are getting a new boat – albeit a third hand one – courtesy of the MMEA. MMEA received from the Marine police back in 2011.
      -----
      KAPAL BEKAS BEKAS MMEA = RMN has taken delivery of ex-Sundang on October 23 after the patrol craft completed its refit. She is the first of two ex-MMEA PC

      Hapus
    2. • LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
      • USD 948 JUTA (WITHOUT AMMO) = FFBNW = MANGKRAK DELAYED
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -OPV PPA USD 1,3 BILLION/2 UNIT = USD 650/UNIT
      ===================
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
      High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
      The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
      --------------------
      SEWA FAST INTERCEPTOR BOAT
      SEWA UTILITY BOAT
      SEWA RIGID HULL FENDER BOAT
      SEWA ROVER FIBER GLASS
      SEWA EC120B
      SEWA FLIGHT SIMULATION TRAINING DEVICE
      Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
      Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover)..
      -----
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      Tentera Laut Diraja Malon (TLDM) hari ini menerima kapal MV Aishah Aims 4 (Aishah Aims 4) yang berkeupayaan dalam melaksanakan liputan data pengukuran hidrografi yang meluas dan komprehensif.
      Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak sewaan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
      --------------------
      LITTORAL COMBAT SHIP (LCS) PROGRAM HAS BEEN INVOLVED IN A SCANDAL THAT INCLUDES:
      • Construction delays
      The Public Accounts Committee found that the construction of the six LCS ships was delayed and had discrepancies.
      • Cost overruns
      The cost of building the ships increased by 22% to RM11.14 billion, which could result in losses of RM890.22 million for Boustead Heavy Industries Corp Bhd.
      • Power abuse
      Several high-profile people were accused of abusing their power and siphoning money in the purchase of the ships.
      • Launch before completion
      The RMN's first LCS, LCS 1 Maharaja Lela, was launched in 2017 before it was fully completed.
      • Radar choice
      The RMN reportedly requested the Thales Herakles radar, but BHIC chose the SMART-S radar instead.
      The original program plan called for the delivery of LCS 1 Maharaja Lela to the RMN in 2019, with all six ships delivered by 2023.
      The LCS is a class of Small Surface Combatants designed to provide joint force access in the littorals.
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
    3. SEWA UTILITY BOAT
      SEWA RIGID HULL FENDER BOAT
      SEWA ROVER FIBER GLASS
      SEWA EC120B
      SEWA FLIGHT SIMULATION TRAINING DEVICE
      Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
      Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover)..
      -----
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      Tentera Laut Diraja Malon (TLDM) hari ini menerima kapal MV Aishah Aims 4 (Aishah Aims 4) yang berkeupayaan dalam melaksanakan liputan data pengukuran hidrografi yang meluas dan komprehensif.
      Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak sewaan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
      =========
      LCS 2025-2011 = 15 TAHUN OMPONG
      NO MERIAM
      NO RADAR
      NO MACHINE
      NO MISSILE
      LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      -----
      LCS BAYAR HUTANG NGPVs = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd....
      ---
      PAY RM 12.4 BILLION = 6 TO 5 OMPONG
      PAY RM 12.4 BILLION = 6 TO 5 OMPONG
      PAY RM 12.4 BILLION = 6 TO 5 OMPONG
      The number of Littoral Combat Ships (LCS) in Malon was reduced from six to five due to the LCS 6 not starting construction and the equipment being used on the other LCS. The construction of the five LCSs is expected to be completed in 2029, which is a significant delay from the original contract where LCS 5 was supposed to be delivered in 2022.
      -----
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      -----
      The Malonnn army has several weaknesses, including:
      • Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
      • Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
      • Corruption: The Malonnn military has been plagued by corruption.
      • Political interference: Political leaders have interfered in procurement.
      • Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
      • Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
      Other challenges include:
      • The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
      • The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
  75. 4 UNIT WITH EXO B2 RANGE 70 KM
    LEKIU CLASS 2 UNIT = EXO B2 RANGE 70 KM
    KASTURI CLASS 2 UNIT = EXO B2 RANGE 70 KM
    -----------------------------------
    READINESS 58.6% X 55 Unit = 32 UNIT
    READINESS 58.6% X 55 Unit = 32 UNIT
    READINESS 58.6% X 55 Unit = 32 UNIT
    This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
    ------------------------------------
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    ------------------------------------
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ===================
    THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
    • Logistics
    A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
    • Budgeting
    Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    • Personnel
    The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
    • Procurement
    The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
    • Political interference
    Political interference and corruption are undermining combat readiness.
    • Territorial disputes
    Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
    • Transboundary haze
    Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
    • Fleet sustainment
    The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
    • Technological obsolescence
    Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
    • Modernization
    The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

    BalasHapus
  76. Kasihan para beruk..... Makin stresss 😁😁😁😁😁 maklum semua kapal usang dan hanya jadi gun boat

    BalasHapus
  77. LIGHT PLUS OMPONG Ya guys.. YANG LENGKAP SENJATA tu PPA versi FULL.. 🤣🤣🤣

    Untuk kontrak yang ditandatangani dengan Indonesia, PPA yang akan dipasok awalnya ditujukan untuk Angkatan Laut Italia dalam konfigurasi ‘light plus’.

    Dalam konfigurasi ini, kedua kapal akan dilengkapi untuk operasi anti-air warfare (AAW) selain misi perang permukaan.

    Fincantieri kini mengalihkan kapal-kapal ini untuk kebutuhan Angkatan Laut Indonesia, tetapi kedua kapal akan mempertahankan konfigurasi 'light plus' mereka.

    BalasHapus
  78. Lagi betul OMPONG tuu KD Mangkrakjelelah, sudah rename 2x masih MANGKRAK
    1. MERIAM ❌
    2. JANGKAR ❌
    3. MISIL ANTI KAPAL ❌
    4. MISIL SAM ❌
    5. TORPEDO ❌
    6. SONAR ❌
    7. PELANCAR DECOY ❌

    🤣🤣🤣😂😂😂😂

    BalasHapus
  79. 2 KAPAL PERANG BUATAN ITALIA SIAP PERKUAT TNI ANGKATAN LAUT

    Jalesveva Jayamahe--

    Jakarta, 30 Januari 2025--Sebanyak dua kapal perang buatan Italia akan memperkuat jajaran TNI Angkatan Laut. Kepala Staf Angkatan Laut (Kasal) Laksamana TNI Dr. Muhammad Ali didampingi Ketua Umum Jalasenastri Ny. Fera Muhammad Ali memimpin upacara pemberian nama secara simbolis (Shipnaming) KRI Brawijaya-320 dan KRI Prabu Siliwangi-321 di galangan kapal Fincantieri Muggiano, Italia. Rabu (29/1).

    Kedua kapal tersebut merupakan jenis Offshore Patrol Vessels / Pattugliatore Polivalente d’Altura (PPA), dimana kehadiran kapal-kapal ini nantinya tidak hanya menjadi bagian dari armada Angkatan Laut Indonesia, tetapi juga tonggak penting dalam modernisasi alutsista untuk menjaga kedaulatan dan keamanan negara.

    Kedua kapal perang ini merupakan bagian dari kerja sama strategis antara Kementerian Pertahanan Republik Indonesia dengan Fincantieri, salah satu perusahaan galangan kapal terkemuka di dunia.

    Kapal ini memiliki panjang 143 m, lebar 16,5 m, draft 5,2 m, max speed 32 knots dengan pendorongan combine diesel, electric dan gas turbin. Selain itu senjata yang dimiliki yaitu SAM : 16 VL Sistem, SSM : 8 Teseo Mk-2E, Meriam 127 mm, Meriam 76 mm dan torpedo.

    Dalam sambutan Menteri Pertahanan RI Sjafrie Sjamsoeddin yang dibacakan oleh Kasal. Menhan RI menyampaikan bahwa ini merupakan komitmen nyata pemerintah dalam memperkuat pertahanan negara, khususnya Angkatan Laut Indonesia.

    Lebih jauh, kerja sama ini menunjukkan bahwa kemitraan strategis antara Indonesia dengan mitra internasional dapat menghasilkan alutsista yang modern dan berdaya saing tinggi.

    "Kita baru saja menyaksikan upacara pemberian nama dua Kapal Patroli Lepas Pantai, KRI Brawijaya dengan nomor lambung 320 dan KRI Prabu Siliwangi dengan nomor lambung 321. Seperti kita ketahui pemberian nama kapal bukan sekadar formalitas, tetapi merupakan langkah strategis dalam membangun identitas kapal. Nama-nama yang dipilih tersebut merupakan simbol harapan, doa, dan tekad untuk menegakkan kedaulatan dan kehormatan bangsa di seluruh lautan dunia," ungkapnya.

    Nama KRI Brawijaya dan KRI Prabu Siliwangi terinspirasi dari raja-raja Nusantara yang dipilih dengan harapan agar kapal-kapal ini kelak menjadi legenda baru yang berkontribusi besar bagi kejayaan bangsa. Dimana kapal-kapal tersebut dilengkapi dengan teknologi terkini dan sistem persenjataan modern, saya yakin kapal-kapal ini akan berhasil menyelesaikan setiap misi yang diberikan kepada mereka.

    Kerja sama ini mencerminkan keseriusan Kementerian Pertahanan dalam meningkatkan kemampuan tempur Angkatan Laut Indonesia. Dengan demikian, mereka akan mampu menghadapi tantangan di perairan nasional dan regional dengan lebih efektif.

    Turut hadir dalam kegiatan tersebut, Dirjen Kuathan Kemhan, Marsda TNI H. Haris Haryanto, Aslog Kasal Laksda TNI Eko Sunarjanto, Kadisadal Laksma TNI Ifa Djaya Sakti. Sedangkan dari pihak Italian Navy dihadiri oleh Deputy Chief of the Italian Navy, Vice Admiral Giuseppe Berutti Bergotto, CEO Fincantieri Mr. Dario Deste, DCM KBRI di Roma Tika Wihanasari, Athan RI di Roma Kolonel Laut (P) Andre M. Dotulung serta Dansatgas Yekda PPA Laksma TNI Sumarji Bimoaji.

    Demikian berita Dinas Penerangan Angkatan Laut.

    BalasHapus
  80. LIGHT PLUS OMPONG Ya guys.. YANG LENGKAP SENJATA tu PPA versi FULL.. 🤣🤣🤣

    Untuk kontrak yang ditandatangani dengan Indonesia, PPA yang akan dipasok awalnya ditujukan untuk Angkatan Laut Italia dalam konfigurasi ‘light plus’.

    Dalam konfigurasi ini, kedua kapal akan dilengkapi untuk operasi anti-air warfare (AAW) selain misi perang permukaan.

    Fincantieri kini mengalihkan kapal-kapal ini untuk kebutuhan Angkatan Laut Indonesia, tetapi kedua kapal akan mempertahankan konfigurasi 'light plus' mereka.

    BalasHapus
  81. LIGHT PLUS OMPONG Ya guys.. YANG LENGKAP SENJATA tu PPA versi FULL.. 🤣🤣🤣

    Untuk kontrak yang ditandatangani dengan Indonesia, PPA yang akan dipasok awalnya ditujukan untuk Angkatan Laut Italia dalam konfigurasi ‘light plus’.

    Dalam konfigurasi ini, kedua kapal akan dilengkapi untuk operasi anti-air warfare (AAW) selain misi perang permukaan.

    Fincantieri kini mengalihkan kapal-kapal ini untuk kebutuhan Angkatan Laut Indonesia, tetapi kedua kapal akan mempertahankan konfigurasi 'light plus' mereka.

    BalasHapus
    Balasan
    1. 2025 $1.3 BILLION MINDEF =
      MAINTENANCE
      REPAIRS
      ASSETS.
      (LEASE, LEASE AND LEASE)
      -------------
      Military spending
      In 2025, Malonn Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
      This budget included $1.3 billion for maintenance, repairs, and new military assets..
      =========
      RELATED DEBT WITH BUDGET MILITARY
      RELATED DEBT WITH BUDGET MILITARY
      RELATED DEBT WITH BUDGET MILITARY
      Public debt and defense spending in Malonn are related, and the relationship between the two is important to consider for fiscal dynamics.
      Military spending and external debt
      Military spending can have security and economic consequences, especially for developing economies. Rapid expansion in military spending can lead to rising fiscal deficits.
      Public debt and defense spending in Malonn
      Research has been conducted to study the relationship between public debt and defense spending in Malonn. This research has used data from the World Bank to analyze the dynamic relationship between the two variables.
      Policy implications
      Policymakers need to balance the benefits and costs of incurring higher government debt. They need to consider the trade-off between the benefits of growth and the costs of slowing down growth due to additional debt.
      =========
      1. HUTANG 84.2% DARI GDP
      1. HUTANG 84.2% DARI GDP
      2. HUTANG NEGARA RM 1.5 TRLLIUN
      3. HUTANG 1MDB RM 18.2 BILLION
      4. TUNGGAKAN SEWA SABAH USD 15 BILLION
      5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
      6. SEWA SIMULATOR MKM
      7. PESAWAT MIG GROUNDED
      8. SEWA MOTOR POLIS
      9. PESAWAT MB339CM GROUNDED
      10. NURI GROUNDED SEWA BLACKHAWK
      11. FIVE PROCUREMENT CANCELLED
      12. 48 PESAWAT SKYHAWK HILANG
      13. MESIN JET 2 BUAH HILANG
      14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
      15. NO LST
      16. NO LPD – NGEMIS LPD USA
      17. NO TANKER
      18. NO KCR
      19. MONUMEN MIG29M UNTUK JIMAT KOS
      20. NO SPH
      21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
      22. NO HELLFIRE
      23. NO MPA ATR72 DELAYED
      24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
      25. NO HELI HEAVY ATTACK NGEMIS AH1Z
      26. NO M3 AMPHIBIUS RIG
      27. LCS MANGKRAK KARATAN
      28. OPV MANGKRAK
      29. TANK MOGOK STOP SPARE PARTS
      30. CN 235 MSA VERSI MSI USA
      31. SEWA MOTOR MILITARY POLICE
      32. RADAR GIFTED PAID USA
      33. 84% NO SAVING EVERY MONTH
      34. SEWA VSHORAD
      35. SEWA TRUK 3 TON
      36. 4X4 SEWA 6X6 CANCELLED
      37. C130H DIGANTI 2045
      38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
      39. NO DRONE UCAV – ANKA ISR OMPONG
      40. SEWA BLACKHAWK SEWA AW159
      41. NO TRACKED SPH
      42. SEWA SIMULATOR HELI
      43. SPH CANCELLED
      44. SCORPION V150 CONDOR SIMBAS RETIRED
      45. NO PESAWAT COIN
      46. PILATUS MK II KARATAN
      47. PENCEROBOHAN 43X BTA 316 HARI
      48. SEWA AW139 SEWA COLIBRI
      49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
      50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
      51. LYNX GROUNDED
      52. MRCA CANCELLED SEWA PESAWAT ITTC
      53. MICA CANCELLED NSM CANCELLED
      54. NO LRAD NO MRAD JUST SHORAD
      55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
      56. 4X NGEMIS F18 KUWAIT
      57. MENUNGGU 2050 KAPAL SELAM
      58. NO TANK AMPHIBI AV8 MOGOK BERASAP
      59. 84% NO SAVING EVERY MONTH
      60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
      61. TUDM SEWA 12 AW149
      62. TUDM SEWA 4 AW139
      63. TUDM SEWA 5 EC120B
      64. TLDM SEWA 2 AW159
      65. TDM SEWA 4 UH-60A
      67. TDM SEWA 12 AW149
      68. BOMBA SEWA 4 AW139
      69. MMEA SEWA 2 AW159
      70. POLIS SEWA 7 BELL429

      Hapus
    2. 4 UNIT WITH EXO B2 RANGE 70 KM
      LEKIU CLASS 2 UNIT = EXO B2 RANGE 70 KM
      KASTURI CLASS 2 UNIT = EXO B2 RANGE 70 KM
      -----------------------------------
      READINESS 58.6% X 55 Unit = 32 UNIT
      READINESS 58.6% X 55 Unit = 32 UNIT
      READINESS 58.6% X 55 Unit = 32 UNIT
      This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
      ------------------------------------
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      ------------------------------------
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
    3. 165 KRI
      136 KAL PATKAMLA
      113 PESAWAT UDARA
      388 KENDARAAN TEMPUR
      Dengan demikian, kekuatan armada tempur TNI AL saat ini mencakup 165 kapal perang (KRI), 136 KAL, kapal-kapal patroli keamanan laut (patkamla), 113 pesawat udara, dan 388 kendaraan tempur.
      ---------------------
      18 COMBAT BOAT - ARMOUR PROTECTION = Patkamla Jefman memiliki beberapa keunggulan yaitu memiliki Armour Protection Standard STANAG Level 2, mampu beroperasi di medan pesisir laut, alur sungai dan daerah rawa. Saat ini TNI AL telah memiliki 18 Combat Boat Standard, dimana untuk Koarmada III saat ini membutuhkan 9 Unit Special Mission Combat Boat lagi yang akan ditempatkan jajaran dibawahnya baik di Lantamal, Lanal, dan Fasharkan Manokwari.
      ----
      Combat Boat Milik TNI AL ....
      1.Patkamla Mamburungan
      2.Patkamla Pulau Bakau
      3.Patkamla Pulau Numfor
      4.Patkamla Bali
      5.Patkamla Pulau Salando
      6.Patkamla Busalangga
      7.Patkamla Lamaru
      8.Patkamla Coebang
      9.Patkamla Pelambong
      10.Patkamla Pulau Sebesi
      11.Patkamla Karimun
      12.Patkamla Gebang
      13.Patkamla Pulau Pagerungan
      14.Patkamla Pulau Semau
      15.Patkamla Pulau Yapen
      16.Patkamla Pulau Langkai
      17.Patkamla Kastela
      18.Patkamla Santiago
      19.Patkamla Binanga
      20.Patkamla Balaroa
      21.Patkamla Gorar
      22.Patkamla Wasur
      23.Patkamla Posa
      CMB spesial kopaska
      24.KAL Kilat
      25.KAL Guruh
      26.KAL Tornado
      ===========
      ===========
      4 UNIT PLAT TIPIS G2000 Mk II memiliki lambung aluminium dan berbobot sekitar 26 ton pada beban standarnya.
      ---------------------
      SEWA FAST INTERCEPTOR BOAT
      SEWA UTILITY BOAT
      SEWA RIGID HULL FENDER BOAT
      SEWA ROVER FIBER GLASS
      SEWA EC120B
      SEWA FLIGHT SIMULATION TRAINING DEVICE
      Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
      Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
      Melalui kaedah sewaan ini, tempoh masa untuk melaksanakan proses perolehan termasuk berkaitan tender serta pembinaan aset dapat dikurangkan.
      ---------------------
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak sewaan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
      ---------------------
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      ---------------------
      READINESS 58.6% X 55 Unit = 32 UNIT
      READINESS 58.6% X 55 Unit = 32 UNIT
      READINESS 58.6% X 55 Unit = 32 UNIT
      This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.

      Hapus
  82. 2025 $1.3 BILLION MINDEF =
    MAINTENANCE
    REPAIRS
    ASSETS.
    (LEASE, LEASE AND LEASE)
    -------------
    Military spending
    In 2025, Malonn Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
    This budget included $1.3 billion for maintenance, repairs, and new military assets..
    =========
    RELATED DEBT WITH BUDGET MILITARY
    RELATED DEBT WITH BUDGET MILITARY
    RELATED DEBT WITH BUDGET MILITARY
    Public debt and defense spending in Malonn are related, and the relationship between the two is important to consider for fiscal dynamics.
    Military spending and external debt
    Military spending can have security and economic consequences, especially for developing economies. Rapid expansion in military spending can lead to rising fiscal deficits.
    Public debt and defense spending in Malonn
    Research has been conducted to study the relationship between public debt and defense spending in Malonn. This research has used data from the World Bank to analyze the dynamic relationship between the two variables.
    Policy implications
    Policymakers need to balance the benefits and costs of incurring higher government debt. They need to consider the trade-off between the benefits of growth and the costs of slowing down growth due to additional debt.
    =========
    1. HUTANG 84.2% DARI GDP
    1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN SEWA SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. SEWA SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. SEWA MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED SEWA BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. SEWA MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. SEWA VSHORAD
    35. SEWA TRUK 3 TON
    36. 4X4 SEWA 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. SEWA BLACKHAWK SEWA AW159
    41. NO TRACKED SPH
    42. SEWA SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. SEWA AW139 SEWA COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED SEWA PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM SEWA 12 AW149
    62. TUDM SEWA 4 AW139
    63. TUDM SEWA 5 EC120B
    64. TLDM SEWA 2 AW159
    65. TDM SEWA 4 UH-60A
    67. TDM SEWA 12 AW149
    68. BOMBA SEWA 4 AW139
    69. MMEA SEWA 2 AW159
    70. POLIS SEWA 7 BELL429

    BalasHapus
  83. 2 KAPAL PERANG BUATAN ITALIA SIAP PERKUAT TNI ANGKATAN LAUT

    Jalesveva Jayamahe--

    Jakarta, 30 Januari 2025--Sebanyak dua kapal perang buatan Italia akan memperkuat jajaran TNI Angkatan Laut. Kepala Staf Angkatan Laut (Kasal) Laksamana TNI Dr. Muhammad Ali didampingi Ketua Umum Jalasenastri Ny. Fera Muhammad Ali memimpin upacara pemberian nama secara simbolis (Shipnaming) KRI Brawijaya-320 dan KRI Prabu Siliwangi-321 di galangan kapal Fincantieri Muggiano, Italia. Rabu (29/1).

    Kedua kapal tersebut merupakan jenis Offshore Patrol Vessels / Pattugliatore Polivalente d’Altura (PPA), dimana kehadiran kapal-kapal ini nantinya tidak hanya menjadi bagian dari armada Angkatan Laut Indonesia, tetapi juga tonggak penting dalam modernisasi alutsista untuk menjaga kedaulatan dan keamanan negara.

    Kedua kapal perang ini merupakan bagian dari kerja sama strategis antara Kementerian Pertahanan Republik Indonesia dengan Fincantieri, salah satu perusahaan galangan kapal terkemuka di dunia.

    Kapal ini memiliki panjang 143 m, lebar 16,5 m, draft 5,2 m, max speed 32 knots dengan pendorongan combine diesel, electric dan gas turbin. Selain itu senjata yang dimiliki yaitu SAM : 16 VL Sistem, SSM : 8 Teseo Mk-2E, Meriam 127 mm, Meriam 76 mm dan torpedo.

    Dalam sambutan Menteri Pertahanan RI Sjafrie Sjamsoeddin yang dibacakan oleh Kasal. Menhan RI menyampaikan bahwa ini merupakan komitmen nyata pemerintah dalam memperkuat pertahanan negara, khususnya Angkatan Laut Indonesia.

    Lebih jauh, kerja sama ini menunjukkan bahwa kemitraan strategis antara Indonesia dengan mitra internasional dapat menghasilkan alutsista yang modern dan berdaya saing tinggi.

    "Kita baru saja menyaksikan upacara pemberian nama dua Kapal Patroli Lepas Pantai, KRI Brawijaya dengan nomor lambung 320 dan KRI Prabu Siliwangi dengan nomor lambung 321. Seperti kita ketahui pemberian nama kapal bukan sekadar formalitas, tetapi merupakan langkah strategis dalam membangun identitas kapal. Nama-nama yang dipilih tersebut merupakan simbol harapan, doa, dan tekad untuk menegakkan kedaulatan dan kehormatan bangsa di seluruh lautan dunia," ungkapnya.

    Nama KRI Brawijaya dan KRI Prabu Siliwangi terinspirasi dari raja-raja Nusantara yang dipilih dengan harapan agar kapal-kapal ini kelak menjadi legenda baru yang berkontribusi besar bagi kejayaan bangsa. Dimana kapal-kapal tersebut dilengkapi dengan teknologi terkini dan sistem persenjataan modern, saya yakin kapal-kapal ini akan berhasil menyelesaikan setiap misi yang diberikan kepada mereka.

    Kerja sama ini mencerminkan keseriusan Kementerian Pertahanan dalam meningkatkan kemampuan tempur Angkatan Laut Indonesia. Dengan demikian, mereka akan mampu menghadapi tantangan di perairan nasional dan regional dengan lebih efektif.

    Turut hadir dalam kegiatan tersebut, Dirjen Kuathan Kemhan, Marsda TNI H. Haris Haryanto, Aslog Kasal Laksda TNI Eko Sunarjanto, Kadisadal Laksma TNI Ifa Djaya Sakti. Sedangkan dari pihak Italian Navy dihadiri oleh Deputy Chief of the Italian Navy, Vice Admiral Giuseppe Berutti Bergotto, CEO Fincantieri Mr. Dario Deste, DCM KBRI di Roma Tika Wihanasari, Athan RI di Roma Kolonel Laut (P) Andre M. Dotulung serta Dansatgas Yekda PPA Laksma TNI Sumarji Bimoaji.

    Demikian berita Dinas Penerangan Angkatan Laut.

    BalasHapus
    Balasan
    1. Sumber dinas penerangan TNI AL 😁😁😁😁 beruk panas tuhhh

      Hapus
  84. 4 UNIT WITH EXO B2 RANGE 70 KM
    LEKIU CLASS 2 UNIT = EXO B2 RANGE 70 KM
    KASTURI CLASS 2 UNIT = EXO B2 RANGE 70 KM
    -----------------------------------
    READINESS 58.6% X 55 Unit = 32 UNIT
    READINESS 58.6% X 55 Unit = 32 UNIT
    READINESS 58.6% X 55 Unit = 32 UNIT
    This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
    ------------------------------------
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    ------------------------------------
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ===================
    THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
    • Logistics
    A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
    • Budgeting
    Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    • Personnel
    The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
    • Procurement
    The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
    • Political interference
    Political interference and corruption are undermining combat readiness.
    • Territorial disputes
    Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
    • Transboundary haze
    Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
    • Fleet sustainment
    The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
    • Technological obsolescence
    Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
    • Modernization
    The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

    BalasHapus
  85. Jom. Kita lihat kapal PPA VERSI DOWNGRADE OMPONG...Hanya versi LIGHT PLUS guys....GUN BOAT... 🤣🤣🤣
    1. MERIAM 127MM ✅
    2. MERIAM 76MM ✅
    3. MISIL ANTI KAPAL ❌
    4. MISIL SAM ❌
    5. TORPEDO ❌
    6. SONAR ❌
    7. PELANCAR DECOY ❌

    BalasHapus
    Balasan
    1. 17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
    2. 4 UNIT WITH EXO B2 RANGE 70 KM
      LEKIU CLASS 2 UNIT = EXO B2 RANGE 70 KM
      KASTURI CLASS 2 UNIT = EXO B2 RANGE 70 KM
      -----------------------------------
      READINESS 58.6% X 55 Unit = 32 UNIT
      READINESS 58.6% X 55 Unit = 32 UNIT
      READINESS 58.6% X 55 Unit = 32 UNIT
      This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
      ------------------------------------
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      ------------------------------------
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
  86. 165 KRI
    136 KAL PATKAMLA
    113 PESAWAT UDARA
    388 KENDARAAN TEMPUR
    Dengan demikian, kekuatan armada tempur TNI AL saat ini mencakup 165 kapal perang (KRI), 136 KAL, kapal-kapal patroli keamanan laut (patkamla), 113 pesawat udara, dan 388 kendaraan tempur.
    ---------------------
    18 COMBAT BOAT - ARMOUR PROTECTION = Patkamla Jefman memiliki beberapa keunggulan yaitu memiliki Armour Protection Standard STANAG Level 2, mampu beroperasi di medan pesisir laut, alur sungai dan daerah rawa. Saat ini TNI AL telah memiliki 18 Combat Boat Standard, dimana untuk Koarmada III saat ini membutuhkan 9 Unit Special Mission Combat Boat lagi yang akan ditempatkan jajaran dibawahnya baik di Lantamal, Lanal, dan Fasharkan Manokwari.
    ----
    Combat Boat Milik TNI AL ....
    1.Patkamla Mamburungan
    2.Patkamla Pulau Bakau
    3.Patkamla Pulau Numfor
    4.Patkamla Bali
    5.Patkamla Pulau Salando
    6.Patkamla Busalangga
    7.Patkamla Lamaru
    8.Patkamla Coebang
    9.Patkamla Pelambong
    10.Patkamla Pulau Sebesi
    11.Patkamla Karimun
    12.Patkamla Gebang
    13.Patkamla Pulau Pagerungan
    14.Patkamla Pulau Semau
    15.Patkamla Pulau Yapen
    16.Patkamla Pulau Langkai
    17.Patkamla Kastela
    18.Patkamla Santiago
    19.Patkamla Binanga
    20.Patkamla Balaroa
    21.Patkamla Gorar
    22.Patkamla Wasur
    23.Patkamla Posa
    CMB spesial kopaska
    24.KAL Kilat
    25.KAL Guruh
    26.KAL Tornado
    ===========
    ===========
    4 UNIT PLAT TIPIS G2000 Mk II memiliki lambung aluminium dan berbobot sekitar 26 ton pada beban standarnya.
    ---------------------
    SEWA FAST INTERCEPTOR BOAT
    SEWA UTILITY BOAT
    SEWA RIGID HULL FENDER BOAT
    SEWA ROVER FIBER GLASS
    SEWA EC120B
    SEWA FLIGHT SIMULATION TRAINING DEVICE
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
    Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    Melalui kaedah sewaan ini, tempoh masa untuk melaksanakan proses perolehan termasuk berkaitan tender serta pembinaan aset dapat dikurangkan.
    ---------------------
    SEWA KAPAL HIDROLOGI
    SEWA KAPAL HIDROLOGI
    SEWA KAPAL HIDROLOGI
    Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak sewaan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
    ---------------------
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    ---------------------
    READINESS 58.6% X 55 Unit = 32 UNIT
    READINESS 58.6% X 55 Unit = 32 UNIT
    READINESS 58.6% X 55 Unit = 32 UNIT
    This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.

    BalasHapus
  87. Jom. Kita lihat kapal PPA VERSI DOWNGRADE OMPONG...Hanya versi LIGHT PLUS guys....GUN BOAT... 🤣🤣🤣
    1. MERIAM 127MM ✅
    2. MERIAM 76MM ✅
    3. MISIL ANTI KAPAL ❌
    4. MISIL SAM ❌
    5. TORPEDO ❌
    6. SONAR ❌
    7. PELANCAR DECOY ❌

    BalasHapus
    Balasan
    1. 17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
  88. Jom. Kita lihat kapal PPA VERSI DOWNGRADE OMPONG...Hanya versi LIGHT PLUS guys....GUN BOAT... 🤣🤣🤣
    1. MERIAM 127MM ✅
    2. MERIAM 76MM ✅
    3. MISIL ANTI KAPAL ❌
    4. MISIL SAM ❌
    5. TORPEDO ❌
    6. SONAR ❌
    7. PELANCAR DECOY ❌

    BalasHapus
    Balasan
    1. • LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
      • USD 948 JUTA (WITHOUT AMMO) = FFBNW = MANGKRAK DELAYED
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -OPV PPA USD 1,3 BILLION/2 UNIT = USD 650/UNIT
      ===================
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      -------------
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
    2. 4 UNIT WITH EXO B2 RANGE 70 KM
      LEKIU CLASS 2 UNIT = EXO B2 RANGE 70 KM
      KASTURI CLASS 2 UNIT = EXO B2 RANGE 70 KM
      -----------------------------------
      READINESS 58.6% X 55 Unit = 32 UNIT
      READINESS 58.6% X 55 Unit = 32 UNIT
      READINESS 58.6% X 55 Unit = 32 UNIT
      This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
      ------------------------------------
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      ------------------------------------
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
  89. Beruk panas tuhhh ha ha ha ha..... Selamat menggunakan kapal bekas karam 😁😁😁😁😁
    Minggir lu miskin parahhhh

    BalasHapus
  90. Kapal PPA versi NGUTANG tiada efek gentar.... Hanya sebatas GUN BOAT.. 🤣🤣🤣

    BalasHapus
    Balasan
    1. 4 UNIT WITH EXO B2 RANGE 70 KM
      LEKIU CLASS 2 UNIT = EXO B2 RANGE 70 KM
      KASTURI CLASS 2 UNIT = EXO B2 RANGE 70 KM
      -----------------------------------
      READINESS 58.6% X 55 Unit = 32 UNIT
      READINESS 58.6% X 55 Unit = 32 UNIT
      READINESS 58.6% X 55 Unit = 32 UNIT
      This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
      ------------------------------------
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      ------------------------------------
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
    2. 17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
      • Logistics
      A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
      • Budgeting
      Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
      • Personnel
      The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
      • Procurement
      The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
      • Political interference
      Political interference and corruption are undermining combat readiness.
      • Territorial disputes
      Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
      • Transboundary haze
      Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
      • Fleet sustainment
      The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
      • Technological obsolescence
      Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
      • Modernization
      The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

      Hapus
  91. Kapal tak ada mesin maharajatipu apa kabar 😁😁😁😁😁

    BalasHapus
    Balasan
    1. Kapal kosongan seperti otak para beruk 😁😁😁😁😁

      Hapus
  92. 4 UNIT WITH EXO B2 RANGE 70 KM
    LEKIU CLASS 2 UNIT = EXO B2 RANGE 70 KM
    KASTURI CLASS 2 UNIT = EXO B2 RANGE 70 KM
    -----------------------------------
    READINESS 58.6% X 55 Unit = 32 UNIT
    READINESS 58.6% X 55 Unit = 32 UNIT
    READINESS 58.6% X 55 Unit = 32 UNIT
    This was stated during his New Year Message 2024 and One-Year Leadership Message. Currently, the RMN readiness stands at 58.6%, whereas the expected goal is 75%.
    ------------------------------------
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    ------------------------------------
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ===================
    THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
    • Logistics
    A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
    • Budgeting
    Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    • Personnel
    The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
    • Procurement
    The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
    • Political interference
    Political interference and corruption are undermining combat readiness.
    • Territorial disputes
    Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
    • Transboundary haze
    Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
    • Fleet sustainment
    The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
    • Technological obsolescence
    Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
    • Modernization
    The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

    BalasHapus
  93. DUA Kapal yang Dibeli Indonesia Menjadi Sorotan, Harga Kapal PPA Setara dengan Kapal Fregat FREMM

    https://medan.tribunnews.com/2024/04/20/dua-kapal-yang-dibeli-indonesia-menjadi-sorotan-harga-kapal-ppa-setara-dengan-kapal-fregat-fremm?page=4

    BalasHapus
    Balasan
    1. • LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
      • USD 948 JUTA (WITHOUT AMMO) = FFBNW = MANGKRAK DELAYED
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -OPV PPA USD 1,3 BILLION/2 UNIT = USD 650/UNIT
      ===================
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      -------------
      17 CREDITOR LCS
      17 CREDITOR LCS
      17 CREDITOR LCS
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
  94. • LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
    • USD 948 JUTA (WITHOUT AMMO) = FFBNW = MANGKRAK DELAYED
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -OPV PPA USD 1,3 BILLION/2 UNIT = USD 650/UNIT
    ===================
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    ===================
    THE MALONNN ARMED FORCES (MAF) FACES A NUMBER OF CHALLENGES, INCLUDING:
    • Logistics
    A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
    • Budgeting
    Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    • Personnel
    The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
    • Procurement
    The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
    • Political interference
    Political interference and corruption are undermining combat readiness.
    • Territorial disputes
    Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
    • Transboundary haze
    Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
    • Fleet sustainment
    The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
    • Technological obsolescence
    Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
    • Modernization
    The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
    =========
    THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ===================
    KEYWORS
    LCS WITHOUT AMMO = DESTROYER WITH AMMO

    BalasHapus
  95. Jom. Kita lihat kapal PPA VERSI DOWNGRADE OMPONG...Hanya versi LIGHT PLUS guys....GUN BOAT... 🤣🤣🤣
    1. MERIAM 127MM ✅
    2. MERIAM 76MM ✅
    3. MISIL ANTI KAPAL ❌
    4. MISIL SAM ❌
    5. TORPEDO ❌
    6. SONAR ❌
    7. PELANCAR DECOY ❌

    BalasHapus
    Balasan
    1. • LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
      • USD 948 JUTA (WITHOUT AMMO) = FFBNW = MANGKRAK DELAYED
      -NO NSM.
      -NO VL MICA.
      -NO TORPEDO RINGAN.
      -NO SECONDARY GUNS.
      -NO BOFORS MK3.
      https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
      -------------
      DESTROYER DAN FREGAT =
      -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
      -TYPE 052D CLASS USD 500-600 JUTA.
      -TYPE 055 CLASS USD 920 JUTA.
      -OPV PPA USD 1,3 BILLION/2 UNIT = USD 650/UNIT
      ===================
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
      High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
      The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
      --------------------
      SEWA FAST INTERCEPTOR BOAT
      SEWA UTILITY BOAT
      SEWA RIGID HULL FENDER BOAT
      SEWA ROVER FIBER GLASS
      SEWA EC120B
      SEWA FLIGHT SIMULATION TRAINING DEVICE
      Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
      Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover)..
      -----
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      SEWA KAPAL HIDROLOGI
      Tentera Laut Diraja Malon (TLDM) hari ini menerima kapal MV Aishah Aims 4 (Aishah Aims 4) yang berkeupayaan dalam melaksanakan liputan data pengukuran hidrografi yang meluas dan komprehensif.
      Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak sewaan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
      --------------------
      LITTORAL COMBAT SHIP (LCS) PROGRAM HAS BEEN INVOLVED IN A SCANDAL THAT INCLUDES:
      • Construction delays
      The Public Accounts Committee found that the construction of the six LCS ships was delayed and had discrepancies.
      • Cost overruns
      The cost of building the ships increased by 22% to RM11.14 billion, which could result in losses of RM890.22 million for Boustead Heavy Industries Corp Bhd.
      • Power abuse
      Several high-profile people were accused of abusing their power and siphoning money in the purchase of the ships.
      • Launch before completion
      The RMN's first LCS, LCS 1 Maharaja Lela, was launched in 2017 before it was fully completed.
      • Radar choice
      The RMN reportedly requested the Thales Herakles radar, but BHIC chose the SMART-S radar instead.
      The original program plan called for the delivery of LCS 1 Maharaja Lela to the RMN in 2019, with all six ships delivered by 2023.
      The LCS is a class of Small Surface Combatants designed to provide joint force access in the littorals.
      ===================
      KEYWORS
      LCS WITHOUT AMMO = DESTROYER WITH AMMO

      Hapus
  96. Beruk masih pakai kapal bekas karam ha ha ha

    BalasHapus
  97. • LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
    • USD 948 JUTA (WITHOUT AMMO) = FFBNW = MANGKRAK DELAYED
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    https://en.wikipedia.org/wiki/Maharaja_Lela-class_frigate
    -------------
    DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -OPV PPA USD 1,3 BILLION/2 UNIT = USD 650/UNIT
    ===================
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
    High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
    The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
    --------------------
    SEWA FAST INTERCEPTOR BOAT
    SEWA UTILITY BOAT
    SEWA RIGID HULL FENDER BOAT
    SEWA ROVER FIBER GLASS
    SEWA EC120B
    SEWA FLIGHT SIMULATION TRAINING DEVICE
    Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
    Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover)..
    -----
    SEWA KAPAL HIDROLOGI
    SEWA KAPAL HIDROLOGI
    SEWA KAPAL HIDROLOGI
    Tentera Laut Diraja Malon (TLDM) hari ini menerima kapal MV Aishah Aims 4 (Aishah Aims 4) yang berkeupayaan dalam melaksanakan liputan data pengukuran hidrografi yang meluas dan komprehensif.
    Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak sewaan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
    --------------------
    LITTORAL COMBAT SHIP (LCS) PROGRAM HAS BEEN INVOLVED IN A SCANDAL THAT INCLUDES:
    • Construction delays
    The Public Accounts Committee found that the construction of the six LCS ships was delayed and had discrepancies.
    • Cost overruns
    The cost of building the ships increased by 22% to RM11.14 billion, which could result in losses of RM890.22 million for Boustead Heavy Industries Corp Bhd.
    • Power abuse
    Several high-profile people were accused of abusing their power and siphoning money in the purchase of the ships.
    • Launch before completion
    The RMN's first LCS, LCS 1 Maharaja Lela, was launched in 2017 before it was fully completed.
    • Radar choice
    The RMN reportedly requested the Thales Herakles radar, but BHIC chose the SMART-S radar instead.
    The original program plan called for the delivery of LCS 1 Maharaja Lela to the RMN in 2019, with all six ships delivered by 2023.
    The LCS is a class of Small Surface Combatants designed to provide joint force access in the littorals.
    ===================
    KEYWORS
    LCS WITHOUT AMMO = DESTROYER WITH AMMO

    BalasHapus
  98. Jom. Kita lihat kapal PPA VERSI DOWNGRADE OMPONG...Hanya versi LIGHT PLUS guys....GUN BOAT... 🤣🤣🤣
    1. MERIAM 127MM ✅
    2. MERIAM 76MM ✅
    3. MISIL ANTI KAPAL ❌
    4. MISIL SAM ❌
    5. TORPEDO ❌
    6. SONAR ❌
    7. PELANCAR DECOY ❌

    BalasHapus
  99. 2 KAPAL PERANG BUATAN ITALIA SIAP PERKUAT TNI ANGKATAN LAUT

    Jalesveva Jayamahe--

    Jakarta, 30 Januari 2025--Sebanyak dua kapal perang buatan Italia akan memperkuat jajaran TNI Angkatan Laut. Kepala Staf Angkatan Laut (Kasal) Laksamana TNI Dr. Muhammad Ali didampingi Ketua Umum Jalasenastri Ny. Fera Muhammad Ali memimpin upacara pemberian nama secara simbolis (Shipnaming) KRI Brawijaya-320 dan KRI Prabu Siliwangi-321 di galangan kapal Fincantieri Muggiano, Italia. Rabu (29/1).

    Kedua kapal tersebut merupakan jenis Offshore Patrol Vessels / Pattugliatore Polivalente d’Altura (PPA), dimana kehadiran kapal-kapal ini nantinya tidak hanya menjadi bagian dari armada Angkatan Laut Indonesia, tetapi juga tonggak penting dalam modernisasi alutsista untuk menjaga kedaulatan dan keamanan negara.

    Kedua kapal perang ini merupakan bagian dari kerja sama strategis antara Kementerian Pertahanan Republik Indonesia dengan Fincantieri, salah satu perusahaan galangan kapal terkemuka di dunia.

    Kapal ini memiliki panjang 143 m, lebar 16,5 m, draft 5,2 m, max speed 32 knots dengan pendorongan combine diesel, electric dan gas turbin. Selain itu senjata yang dimiliki yaitu SAM : 16 VL Sistem, SSM : 8 Teseo Mk-2E, Meriam 127 mm, Meriam 76 mm dan torpedo.

    Dalam sambutan Menteri Pertahanan RI Sjafrie Sjamsoeddin yang dibacakan oleh Kasal. Menhan RI menyampaikan bahwa ini merupakan komitmen nyata pemerintah dalam memperkuat pertahanan negara, khususnya Angkatan Laut Indonesia.

    Lebih jauh, kerja sama ini menunjukkan bahwa kemitraan strategis antara Indonesia dengan mitra internasional dapat menghasilkan alutsista yang modern dan berdaya saing tinggi.

    "Kita baru saja menyaksikan upacara pemberian nama dua Kapal Patroli Lepas Pantai, KRI Brawijaya dengan nomor lambung 320 dan KRI Prabu Siliwangi dengan nomor lambung 321. Seperti kita ketahui pemberian nama kapal bukan sekadar formalitas, tetapi merupakan langkah strategis dalam membangun identitas kapal. Nama-nama yang dipilih tersebut merupakan simbol harapan, doa, dan tekad untuk menegakkan kedaulatan dan kehormatan bangsa di seluruh lautan dunia," ungkapnya.

    Nama KRI Brawijaya dan KRI Prabu Siliwangi terinspirasi dari raja-raja Nusantara yang dipilih dengan harapan agar kapal-kapal ini kelak menjadi legenda baru yang berkontribusi besar bagi kejayaan bangsa. Dimana kapal-kapal tersebut dilengkapi dengan teknologi terkini dan sistem persenjataan modern, saya yakin kapal-kapal ini akan berhasil menyelesaikan setiap misi yang diberikan kepada mereka.

    Kerja sama ini mencerminkan keseriusan Kementerian Pertahanan dalam meningkatkan kemampuan tempur Angkatan Laut Indonesia. Dengan demikian, mereka akan mampu menghadapi tantangan di perairan nasional dan regional dengan lebih efektif.

    Turut hadir dalam kegiatan tersebut, Dirjen Kuathan Kemhan, Marsda TNI H. Haris Haryanto, Aslog Kasal Laksda TNI Eko Sunarjanto, Kadisadal Laksma TNI Ifa Djaya Sakti. Sedangkan dari pihak Italian Navy dihadiri oleh Deputy Chief of the Italian Navy, Vice Admiral Giuseppe Berutti Bergotto, CEO Fincantieri Mr. Dario Deste, DCM KBRI di Roma Tika Wihanasari, Athan RI di Roma Kolonel Laut (P) Andre M. Dotulung serta Dansatgas Yekda PPA Laksma TNI Sumarji Bimoaji.

    Demikian berita Dinas Penerangan Angkatan Laut.

    BalasHapus
  100. LCS 2025-2011 = STALLED 15 YEARS
    LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
    USD 948 JUTA (WITHOUT AMMO) = FFBNW = MANGKRAK DELAYED
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3
    --------------
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    --------------
    LITTORAL COMBAT SHIP (LCS) PROGRAM HAS BEEN INVOLVED IN A SCANDAL THAT INCLUDES:
    • Construction delays
    The Public Accounts Committee found that the construction of the six LCS ships was delayed and had discrepancies.
    • Cost overruns
    The cost of building the ships increased by 22% to RM11.14 billion, which could result in losses of RM890.22 million for Boustead Heavy Industries Corp Bhd.
    • Power abuse
    Several high-profile people were accused of abusing their power and siphoning money in the purchase of the ships.
    • Launch before completion
    The RMN's first LCS, LCS 1 Maharaja Lela, was launched in 2017 before it was fully completed.
    • Radar choice
    The RMN reportedly requested the Thales Herakles radar, but BHIC chose the SMART-S radar instead.
    The original program plan called for the delivery of LCS 1 Maharaja Lela to the RMN in 2019, with all six ships delivered by 2023.
    The LCS is a class of Small Surface Combatants designed to provide joint force access in the littorals
    --------------
    HIBAH KAPAL 1967 = The post stated that among his achievements in the MMEA were that he was the team leader for a suitability study on absorbing the US Coast Guard cutter – USCG Decisive. Checks on the US Coast Guard website showed that Decisive– a Reliance class cutter – was laid in 1967 and commissioned in 1968
    -----
    HIBAH KAPAL 1968 = USCGC Steadfast (WMEC-623) was a United States Coast Guard medium endurance cutter in commission for 56 years. Commissioned in 1968, Steadfast was home ported in St. Petersburg, Florida for her first 24 years of service...
    -----
    HIBAH KAPAL 1980 = KM Perwira, one of the two Bay class patrol boats donated to MMEA by Australia. It is likely that the Bay class was the design proposed for the tri-nation VLPV project in the late 80s.
    -----
    PERBAIKAN DIBIAYAI JEPANG = Kapal patroli kedua yang disumbangkan oleh Jepang Coast Guard (JCG) untuk APMM/MMEA akan berlayar ke pulang pada akhir Mei, saat ini kapal dengan nama KM Arau ini sedang dalam tahap perbaikan akhir yang dilakukan di Jepang.
    -----
    HIBAH KAPAL 1989 DAN 1991 = Jepang menghibahkan dua kapal kelas 90m masing-masing PL-01 Ojima dan PL-02 Erimo, kedua kapal ini masuk dinas di JCG pada tahun 1989 dan 1991.
    -----
    HIBAH KAPAL1990–1991 = KM Pekan is an Ojika-class offshore patrol vessel operated by the Malonn Coast Guard. This ship, together with KM Arau and KM Marlin was transferred from the Japan Coast Guard to Malon in order to strengthen the relations between the two countries. The ship was built as the Ojika for the Japanese Coast Guard in 1990–1991
    -----
    HIBAH KAPAL 1989 = KM Arau is an offshore patrol vessel operated by the Malonn Coast Guard. She was the second ship transferred from the Japan Coast Guard together with KM Pekan and KM Marlin. KM Arau was formerly kNOwn as Oki (PL-01) in the Japan Coast Guard.
    -----
    KAPAL BUATAN 1960 =
    BEKAS MARINE POLICE BEKAS MMEA = RMN informed us that they are getting a new boat – albeit a third hand one – courtesy of the MMEA. MMEA received from the Marine police back in 2011.
    -----
    KAPAL BEKAS BEKAS MMEA = RMN has taken delivery of ex-Sundang on October 23 after the patrol craft completed its refit. She is the first of two ex-MMEA PC

    BalasHapus
  101. 2 KAPAL PERANG BUATAN ITALIA SIAP PERKUAT TNI ANGKATAN LAUT

    Jalesveva Jayamahe--

    Jakarta, 30 Januari 2025--Sebanyak dua kapal perang buatan Italia akan memperkuat jajaran TNI Angkatan Laut. Kepala Staf Angkatan Laut (Kasal) Laksamana TNI Dr. Muhammad Ali didampingi Ketua Umum Jalasenastri Ny. Fera Muhammad Ali memimpin upacara pemberian nama secara simbolis (Shipnaming) KRI Brawijaya-320 dan KRI Prabu Siliwangi-321 di galangan kapal Fincantieri Muggiano, Italia. Rabu (29/1).

    Kedua kapal tersebut merupakan jenis Offshore Patrol Vessels / Pattugliatore Polivalente d’Altura (PPA), dimana kehadiran kapal-kapal ini nantinya tidak hanya menjadi bagian dari armada Angkatan Laut Indonesia, tetapi juga tonggak penting dalam modernisasi alutsista untuk menjaga kedaulatan dan keamanan negara.

    Kedua kapal perang ini merupakan bagian dari kerja sama strategis antara Kementerian Pertahanan Republik Indonesia dengan Fincantieri, salah satu perusahaan galangan kapal terkemuka di dunia.

    Kapal ini memiliki panjang 143 m, lebar 16,5 m, draft 5,2 m, max speed 32 knots dengan pendorongan combine diesel, electric dan gas turbin. Selain itu senjata yang dimiliki yaitu SAM : 16 VL Sistem, SSM : 8 Teseo Mk-2E, Meriam 127 mm, Meriam 76 mm dan torpedo.

    Dalam sambutan Menteri Pertahanan RI Sjafrie Sjamsoeddin yang dibacakan oleh Kasal. Menhan RI menyampaikan bahwa ini merupakan komitmen nyata pemerintah dalam memperkuat pertahanan negara, khususnya Angkatan Laut Indonesia.

    Lebih jauh, kerja sama ini menunjukkan bahwa kemitraan strategis antara Indonesia dengan mitra internasional dapat menghasilkan alutsista yang modern dan berdaya saing tinggi.

    "Kita baru saja menyaksikan upacara pemberian nama dua Kapal Patroli Lepas Pantai, KRI Brawijaya dengan nomor lambung 320 dan KRI Prabu Siliwangi dengan nomor lambung 321. Seperti kita ketahui pemberian nama kapal bukan sekadar formalitas, tetapi merupakan langkah strategis dalam membangun identitas kapal. Nama-nama yang dipilih tersebut merupakan simbol harapan, doa, dan tekad untuk menegakkan kedaulatan dan kehormatan bangsa di seluruh lautan dunia," ungkapnya.

    Nama KRI Brawijaya dan KRI Prabu Siliwangi terinspirasi dari raja-raja Nusantara yang dipilih dengan harapan agar kapal-kapal ini kelak menjadi legenda baru yang berkontribusi besar bagi kejayaan bangsa. Dimana kapal-kapal tersebut dilengkapi dengan teknologi terkini dan sistem persenjataan modern, saya yakin kapal-kapal ini akan berhasil menyelesaikan setiap misi yang diberikan kepada mereka.

    Kerja sama ini mencerminkan keseriusan Kementerian Pertahanan dalam meningkatkan kemampuan tempur Angkatan Laut Indonesia. Dengan demikian, mereka akan mampu menghadapi tantangan di perairan nasional dan regional dengan lebih efektif.

    Turut hadir dalam kegiatan tersebut, Dirjen Kuathan Kemhan, Marsda TNI H. Haris Haryanto, Aslog Kasal Laksda TNI Eko Sunarjanto, Kadisadal Laksma TNI Ifa Djaya Sakti. Sedangkan dari pihak Italian Navy dihadiri oleh Deputy Chief of the Italian Navy, Vice Admiral Giuseppe Berutti Bergotto, CEO Fincantieri Mr. Dario Deste, DCM KBRI di Roma Tika Wihanasari, Athan RI di Roma Kolonel Laut (P) Andre M. Dotulung serta Dansatgas Yekda PPA Laksma TNI Sumarji Bimoaji.

    Demikian berita Dinas Penerangan Angkatan Laut.

    BalasHapus
  102. 2025 $1.3 BILLION MINDEF =
    MAINTENANCE
    REPAIRS
    ASSETS.
    (LEASE, LEASE AND LEASE)
    -------------
    Military spending
    In 2025, Malonn Ministry of Defense (MINDEF) was allocated $4.8 billion to protect the country's sovereignty.
    This budget included $1.3 billion for maintenance, repairs, and new military assets..
    =========
    RELATED DEBT WITH BUDGET MILITARY
    RELATED DEBT WITH BUDGET MILITARY
    RELATED DEBT WITH BUDGET MILITARY
    Public debt and defense spending in Malonn are related, and the relationship between the two is important to consider for fiscal dynamics.
    Military spending and external debt
    Military spending can have security and economic consequences, especially for developing economies. Rapid expansion in military spending can lead to rising fiscal deficits.
    Public debt and defense spending in Malonn
    Research has been conducted to study the relationship between public debt and defense spending in Malonn. This research has used data from the World Bank to analyze the dynamic relationship between the two variables.
    Policy implications
    Policymakers need to balance the benefits and costs of incurring higher government debt. They need to consider the trade-off between the benefits of growth and the costs of slowing down growth due to additional debt.
    =========
    1. HUTANG 84.2% DARI GDP
    1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN SEWA SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. SEWA SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. SEWA MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED SEWA BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. SEWA MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. SEWA VSHORAD
    35. SEWA TRUK 3 TON
    36. 4X4 SEWA 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. SEWA BLACKHAWK SEWA AW159
    41. NO TRACKED SPH
    42. SEWA SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. SEWA AW139 SEWA COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED SEWA PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM SEWA 12 AW149
    62. TUDM SEWA 4 AW139
    63. TUDM SEWA 5 EC120B
    64. TLDM SEWA 2 AW159
    65. TDM SEWA 4 UH-60A
    67. TDM SEWA 12 AW149
    68. BOMBA SEWA 4 AW139
    69. MMEA SEWA 2 AW159
    70. POLIS SEWA 7 BELL429


    BalasHapus