11 Maret 2025

RTAF Considers Purchasing MRTT to Replace A340 AIrcraft

11 Maret 2025

Air-to-air refueling A330 MRTT with JAS-39 Gripen (photo: NATO)

Airbus' A330 MRTT is a high possibility for the Air Force's Tanker-capable Transport program. The only other option in the same class is Boeing's KC-46A Pegasus. However, the KC-46 is facing structural cracks and has been ordered to ground its entire fleet. This is not to mention other problems that have occurred before, including the KC-46's foundation, which is derived from the Boeing 767, which is rarely used in Thailand. The budget of 12 billion baht is sufficient to get new ones, so there is no need to purchase second-hand aircraft to improve them.

In addition, the Air Force Commander stated during an academic seminar at the Air Force's 88th Anniversary that there is a plan to purchase aerial refueling aircraft to increase the operational range and flight time (Endurance) of the air force. However, if you look at the procurement plan in the white paper, there is no plan to directly purchase a Tanker. The closest thing is to purchase an aircraft to replace the A340 with a budget of 12 billion baht. The illustration used during the Air Force Commander's speech clearly indicates that it is a VIP transport aircraft with the ability to refuel in the air (Tanker-capable Transport).

Airbus A340-541 HS-TYV VIP transport of the Royal Thai Air Force will be proposed to be replaced with MRTT under fiscal year 2025-2028 (photo: Reddit)

Looking back at the origin of the A340 replacement aircraft procurement project, it can be seen that there was an attempt to do so several years ago, with a budget proposal of 8.7 billion baht to procure a replacement passenger aircraft, but it was rejected. Then last year, the Prime Minister's Office proposed the budget again, increasing it to 12 billion baht, and the budget passed the House of Representatives and was finally included in the 2025 fiscal year.

(TAF)

138 komentar:

  1. mrtt kita jgk dink, calon haha!🤩🤩🤩

    BalasHapus
  2. Exo B 3 = 80 UNIT
    MALON NAVY = 55 VESSELS
    80-55 = 25 UNIT
    HAAAAAA.......KASIANNNNN
    ----------
    The Malonnn Armed Forces (MAF) has faced a number of challenges, including corruption, outdated equipment, and a lack of funding. These issues have contributed to the MAF's capabilities falling behind those of neighboring countries.
    Challenges
    • Corruption: The MAF has been involved in multiple corruption scandals.
    • Outdated equipment: The MAF's equipment is outdated and unable to keep up with modern threats.
    • Lack of funding: The MAF's budget has been de-prioritized by successive governments.
    • Short service scheme: The MAF's 15-year service scheme means that many people are reluctant to join.
    • Political interference: Some say that politicians have made decisions about the military's procurement and capacity building EXCLUDING consulting the service chiefs.
    Impact
    • The MAF's challenges have left it vulnerable to internal and external threats.
    • The MAF's capabilities are unable to deter other regional states from attempting to intimidate Malonn.
    • Some veterans of the MAF fall below the poverty line upon retirement.
    ==========
    1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN LEASE SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. LEASE SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. LEASE MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED LEASE BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI LEASE KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. LEASE MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. LEASE VSHORAD
    35. LEASE TRUK 3 TON
    36. 4X4 LEASE 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. LEASE BLACKHAWK LEASE AW159
    41. NO TRACKED SPH
    42. LEASE SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. LEASE AW139 LEASE COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 LEASE BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED LEASE PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM LEASE 12 AW149
    62. TUDM LEASE 4 AW139
    63. TUDM LEASE 5 EC120B
    64. TLDM LEASE 2 AW159
    65. TDM LEASE 4 UH-60A
    67. TDM LEASE 12 AW149
    68. BOMBA LEASE 4 AW139
    69. MMEA LEASE 2 AW159
    70. POLIS LEASE 7 BELL429

    BalasHapus
  3. HEHEHEHEHEHEHEEEEE...... KAYAKNYA ADA YANG HABIS DAPAT PESANGON PANGKAT LETKOL YA.......😁🤭🤫

    BalasHapus
  4. Exo B 3 = 80 UNIT
    MALON NAVY = 55 VESSELS
    80-55 = 25 UNIT
    HAAAAAA.......KASIANNNNN
    ----------
    The Malonnn Armed Forces (MAF) has faced a number of challenges, including corruption, outdated equipment, and a lack of funding. These issues have contributed to the MAF's capabilities falling behind those of neighboring countries.
    Challenges
    • Corruption: The MAF has been involved in multiple corruption scandals.
    • Outdated equipment: The MAF's equipment is outdated and unable to keep up with modern threats.
    • Lack of funding: The MAF's budget has been de-prioritized by successive governments.
    • Short service scheme: The MAF's 15-year service scheme means that many people are reluctant to join.
    • Political interference: Some say that politicians have made decisions about the military's procurement and capacity building EXCLUDING consulting the service chiefs.
    Impact
    • The MAF's challenges have left it vulnerable to internal and external threats.
    • The MAF's capabilities are unable to deter other regional states from attempting to intimidate Malonn.
    • Some veterans of the MAF fall below the poverty line upon retirement.
    ==========
    1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN LEASE SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. LEASE SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. LEASE MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED LEASE BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI LEASE KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. LEASE MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. LEASE VSHORAD
    35. LEASE TRUK 3 TON
    36. 4X4 LEASE 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. LEASE BLACKHAWK LEASE AW159
    41. NO TRACKED SPH
    42. LEASE SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. LEASE AW139 LEASE COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 LEASE BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED LEASE PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM LEASE 12 AW149
    62. TUDM LEASE 4 AW139
    63. TUDM LEASE 5 EC120B
    64. TLDM LEASE 2 AW159
    65. TDM LEASE 4 UH-60A
    67. TDM LEASE 12 AW149
    68. BOMBA LEASE 4 AW139
    69. MMEA LEASE 2 AW159
    70. POLIS LEASE 7 BELL429

    BalasHapus
  5. CHANGE SKIN = CHANGE NAME = STALLED DELATED 15 YEARS .....
    PSC = 1995 = TRAWLERS
    PSC > BNS = 2005 = NGPVs (PAY 27 UNIT REAL 6 UNIT)
    BNS > LUNAS = 2024 = LCS PAY 6 UNIT DELAYED 15 YEARS
    PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malonnn government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malonn in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
    ===================
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
    Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
    ===================
    LCS 2024-2011 = 13 TAHUN
    13 TAHUN MANGKRAK
    13 TAHUN MANGKRAK
    LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    -----
    NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
    -----
    17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
    ===================
    Malonn's armed forces procurement faces several weaknesses, including:
    1. Corruption
    The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
    2. Political influence
    Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
    Weak parliamentary oversight
    Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
    3. Limited financial scrutiny
    Financial scrutiny is limited by excessive secrecy.
    4. Violation of procedures
    Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  6. 1 UNIT PINJAM PAKAI 5 TAHUN
    Bot ini adalah pinjaman tanpa kos bagi tempoh lima tahun bermula 1 Mac 2025 dan akan dimanfaatkan sepenuhnya untuk mempertingkat keupayaan rondaan serta operasi penguatkuasaan Maritim Malaysia,” katanya melalui kenyataan rasmi yang dikeluarkan oleh Maritim Negeri Pahang.
    --------
    SALE MIG29N FOR SPAREPART MKM
    SALE MIG29N FOR SPAREPART MKM
    SALE MIG29N FOR SPAREPART MKM
    Datuk Seri Ikhmal Hisham Abdul Aziz mencadangkan agar 18 buah pesawat MiG-29N milik Tentera Udara Diraja Malaysia (TUDM) yang telah lama digantung penggunaannya dilupuskan dan dijual kepada negara-negara yang berminat seperti India dan Sudan.
    Bekas Timbalan Menteri Pertahanan itu berkata, cadangan berkenaan bertujuan untuk menangani isu kekurangan alat ganti bagi pesawat Sukhoi Su-30MKM milik TUDM yang terkesan akibat perang Ukraine-Rusia.
    --------
    SALE = F 5 TIGERS
    SALE = F 5 TIGERS
    SALE = F 5 TIGERS
    This announcement was in response to posts, photos, and videos circulating on certain local social media platforms that purportedly depict an F-5 fighter jet allegedly belonging to Malon at one of the country’s ports.
    --------
    NGEMIS F18 SEJAK 2017 = 9 TAHUN
    NGEMIS F18 SEJAK 2017 = 9 TAHUN
    NGEMIS F18 SEJAK 2017 = 9 TAHUN
    Malonn has reportedly sought the Kuwaiti jets since at least 2017. The legacy Hornet is thought to “increase the level of preparedness and capability of the RMAF in safeguarding the country’s airspace”. While the acquisition of the secondhand Hornets would help to complement the RMAF’s fleet of Hornets, they come with their own set of challenges.
    The Malonnn Ministry of Defence had submitted no less than three letters to the Kuwaiti government over the past few years in a bid to acquire the fighters. However, the discussions were stymied by political imbroglios in the Kuwaiti goverment.
    --------
    ADA YANG WARAS LAGI....
    NO PLANS BUY NEW RIFLES = 1 LCS
    Malonnn Defence was told that there are no plans to buy a new standard assault rifles for the Armed Forces soon. The money is better used for other things, I was told. How much does it cost to change the standard assault rifle for MAF? A single LCS.
    --------
    MASIH ADA YANG WARAS ......
    Romeo says:
    16 FEBRUARY 2025 AT 10:35 AM
    I would say “DENGAR BOLEH PERCAYA JANGAN”
    1. Politicians are not good at keeping their plan. Policy is changed depend on who is sitting on driver seat.
    2. The gov is struggling to meet 36 units of FA-50. No fund will available in 2030.
    3. RMAF is not ready to operate 5th gen fighters. Operating 5th gen is about networked environment not platform.
    4. 5th gen fighter is costly in operating and maintaining which need significant increment in annual military budget.
    5. Other branches and MMEA are under equipt that need attention.
    6. Many homework should be done first such as LCS, OPV, SPH, used hornet etc.
    In short, it is all about LIMA. This is just old gimmick because LIMA has less attractive and the EO has run of option to make LIMA great again.

    BalasHapus
  7. A340 ganti A330 sebenarnya masuk akal. Perbedaannya, praktis hanya jumlah mesin. Kalau ambil MRTT standar, sayapnya malah persis sama. Posisi drogue ada di posisi mesin terluar pada A340.

    BalasHapus
    Balasan
    1. pegasus knp bemasalah mulu yak om irs, pdhl tanker idaman tuch haha!🤗🤗🤗

      Hapus
  8. KAHSIYAN seblah duluan daptar ingin jadi anggota BRICS, tapi kita yang terakhir malah diterima duluan haha!🤭🤭🤭

    #anggotaG20 sangat berkuasa haha!🦾🦾🦾
    persiyapan SHOPPING tanker ama awacs hore haha!🤑🤑🤑

    BalasHapus
  9. Apa ..... LCS MALON DELAY TERUS???
    🤣🤣🤣🤣🤣🤣

    BalasHapus
  10. Balasan
    1. KEYWORDS 1 UNIT RAFALE = 4 UNIT FA50M
      -
      1. RAFALE INDONESIA 42 UNIT HARGA USD 8.1 MILLIAR = USD 192.8 JUTA/UNIT
      -
      2. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      ------
      HARGA 1 PPA = HARGA 3 LMS B2
      -
      PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
      -
      LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -----
      HIBAH KAPAL 1967 = The post stated that among his achievements in the MMEA were that he was the team leader for a suitability study on absorbing the US Coast Guard cutter – USCG Decisive. Checks on the US Coast Guard website showed that Decisive– a Reliance class cutter – was laid in 1967 and commissioned in 1968
      -----
      HIBAH KAPAL 1968 = USCGC Steadfast (WMEC-623) was a United States Coast Guard medium endurance cutter in commission for 56 years. Commissioned in 1968, Steadfast was home ported in St. Petersburg, Florida for her first 24 years of service...
      -----
      HIBAH KAPAL 1980 = KM Perwira, one of the two Bay class patrol boats donated to MMEA by Australia. It is likely that the Bay class was the design proposed for the tri-nation VLPV project in the late 80s.
      -----
      PERBAIKAN DIBIAYAI JEPANG = Kapal patroli kedua yang disumbangkan oleh Jepang Coast Guard (JCG) untuk APMM/MMEA akan berlayar ke pulang pada akhir Mei, saat ini kapal dengan nama KM Arau ini sedang dalam tahap perbaikan akhir yang dilakukan di Jepang.
      -----
      HIBAH KAPAL 1989 DAN 1991 = Jepang menghibahkan dua kapal kelas 90m masing-masing PL-01 Ojima dan PL-02 Erimo, kedua kapal ini masuk dinas di JCG pada tahun 1989 dan 1991.
      -----
      HIBAH KAPAL1990–1991 = KM Pekan is an Ojika-class offshore patrol vessel operated by the Malonn Coast Guard. This ship, together with KM Arau and KM Marlin was transferred from the Japan Coast Guard to Malon in order to strengthen the relations between the two countries. The ship was built as the Ojika for the Japanese Coast Guard in 1990–1991
      -----
      HIBAH KAPAL 1989 = KM Arau is an offshore patrol vessel operated by the Malonn Coast Guard. She was the second ship transferred from the Japan Coast Guard together with KM Pekan and KM Marlin. KM Arau was formerly kNOwn as Oki (PL-01) in the Japan Coast Guard.
      -----
      KAPAL BUATAN 1960 =
      BEKAS MARINE POLICE BEKAS MMEA = RMN informed us that they are getting a new boat – albeit a third hand one – courtesy of the MMEA. MMEA received from the Marine police back in 2011.
      -----
      KAPAL BEKAS BEKAS MMEA = RMN has taken delivery of ex-Sundang on October 23 after the patrol craft completed its refit. She is the first of two ex-MMEA PC
      -----
      READINESS 58.6%
      READINESS 58.6%
      READINESS 58.6%
      Perkara tersebut dinyatakan oleh beliau semasa menyampaikan Perutusan Tahun Baharu 2024 dan Setahun Pemerintahan Panglima Tentera Laut di Wisma Pertahanan.
      “Kesiagaan TLDM masih berada di bawah sasaran iaitu 58.6% berbanding sasaran 75%,
      -----
      ASSETS EXCEEDING 30 YEARS =
      108 TDM
      29 TUDM
      34 TLDM
      "The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
      ----
      SOME WEAKNESSES OF THE MALONNN SHIPBUILDING INDUSTRY INCLUDE:
      1. Delays
      Consistent delays in delivering ships to customers has reduced profitability and financial results.
      2. Small tonnage
      Malonnn shipbuilding industry is relatively weak compared to other countries in the region, as the tonnage of ships manufactured is relatively small.
      3. Supply chain disruptions
      Disruptions caused by COVID-19 and the Russia-Ukraine conflict have led to supply chain disruptions and shortages of skilled personnel.
      ----
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE
      ==============
      KEYWORDS =
      1. LEASE BOAT
      2. READINESS 58.6%
      3. ASSETS EXCEEDING 30 YEARS

      Hapus
  11. LCS DISUNTIK DANA US$430 JUTA = MANGKRAK
    LCS 6 UNIT JADI 5 UNIT
    Kementerian Pertahanan Malonn mengumumkan langkah strategis terebut saat ajang LIMA 2023 minggu lalu. Kontrak terbaru ini akan memompa anggaran tambahan bagi Malonn hingga US$430 juta untuk kapal-kapal tersebut. Malonn juga akan mengurangi jumlah kapal yang akan diterima berdasarkan kontrak yang direvisi dari enam menjadi lima, dan menerima penundaan tambahan untuk pengiriman kapal.
    -----------
    OPV DISUNTIK DANA RM152,6 JUTA = TAMAT
    THHE OPV 2 DAN 3 = TAMAT
    Menteri Dalam Negeri, Datuk Seri Saifuddin Nasution Ismail berkata, OPV kedua pula dijangka dapat disiapkan pada Oktober tahun ini.
    Beliau berkata, pembinaan dua kapal marititm itu mampu disiapkan selepas kerajaan bersetuju meluluskan suntikan dana berjumlah RM152.6 juta
    -----------
    2029-2020 : INCREASE DEBT
    2029-2020 : INCREASE DEBT
    2029 = 438,09 BILLION USD
    2028 = 412,2 BILLION USD
    2027 = 386,51 BILLION USD
    2026 = 362,19 BILLION USD
    2025 = 338,75 BILLION USD
    2024 = 316,15 BILLION USD
    2023 = 293,83 BILLION USD
    2022 = 271,49 BILLION USD
    2021 = 247,49 BILLION USD
    2020 = 221,49 BILLION USD
    ------------------
    2029-2020 : DEBT PAY DEBT
    2029-2020 : OVERLIMIT DEBT
    2029 = 69,54% DEBT RATIO TO GDP
    2028 = 69,34% DEBT RATIO TO GDP
    2027 = 68,8% DEBT RATIO TO GDP
    2026 = 68,17% DEBT RATIO TO GDP
    2025 = 68,07% DEBT RATIO TO GDP
    2024 = 68,38% DEBT RATIO TO GDP
    2023 = 69,76% DEBT RATIO TO GDP
    2022 = 65,5% DEBT RATIO TO GDP
    2021 = 69,16% DEBT RATIO TO GDP
    2020 = 67,69% DEBT RATIO TO GDP
    ==========
    1. HUTANG 84.2% DARI GDP
    1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN LEASE SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. LEASE SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. LEASE MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED LEASE BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI LEASE KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. LEASE MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. LEASE VSHORAD
    35. LEASE TRUK 3 TON
    36. 4X4 LEASE 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. LEASE BLACKHAWK LEASE AW159
    41. NO TRACKED SPH
    42. LEASE SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. LEASE AW139 LEASE COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 LEASE BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED LEASE PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM LEASE 12 AW149
    62. TUDM LEASE 4 AW139
    63. TUDM LEASE 5 EC120B
    64. TLDM LEASE 2 AW159
    65. TDM LEASE 4 UH-60A
    67. TDM LEASE 12 AW149
    68. BOMBA LEASE 4 AW139
    69. MMEA LEASE 2 AW159
    70. POLIS LEASE 7 BELL429
    😝 😝 😝 😝 😝 😝 😝

    BalasHapus
  12. LCS DISUNTIK DANA US$430 JUTA = MANGKRAK
    LCS 6 UNIT JADI 5 UNIT
    Kementerian Pertahanan Malonn mengumumkan langkah strategis terebut saat ajang LIMA 2023 minggu lalu. Kontrak terbaru ini akan memompa anggaran tambahan bagi Malonn hingga US$430 juta untuk kapal-kapal tersebut. Malonn juga akan mengurangi jumlah kapal yang akan diterima berdasarkan kontrak yang direvisi dari enam menjadi lima, dan menerima penundaan tambahan untuk pengiriman kapal.
    -----------
    OPV DISUNTIK DANA RM152,6 JUTA = TAMAT
    THHE OPV 2 DAN 3 = TAMAT
    Menteri Dalam Negeri, Datuk Seri Saifuddin Nasution Ismail berkata, OPV kedua pula dijangka dapat disiapkan pada Oktober tahun ini.
    Beliau berkata, pembinaan dua kapal marititm itu mampu disiapkan selepas kerajaan bersetuju meluluskan suntikan dana berjumlah RM152.6 juta
    -----------
    LMS B2 = DOWNGRADE MILGEM VARIANT
    LMS B2 = DOWNGRADE MILGEM VARIANT
    LMS B2 = DOWNGRADE MILGEM VARIANT
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    ==============
    FA50 CHEAPEST VARIANT
    FA50 CHEAPEST VARIANT
    FA50 CHEAPEST VARIANT
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    ==============
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness.
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus

  13. LCS DISUNTIK DANA US$430 JUTA = MANGKRAK
    LCS 6 UNIT JADI 5 UNIT
    Kementerian Pertahanan Malonn mengumumkan langkah strategis terebut saat ajang LIMA 2023 minggu lalu. Kontrak terbaru ini akan memompa anggaran tambahan bagi Malonn hingga US$430 juta untuk kapal-kapal tersebut. Malonn juga akan mengurangi jumlah kapal yang akan diterima berdasarkan kontrak yang direvisi dari enam menjadi lima, dan menerima penundaan tambahan untuk pengiriman kapal.
    -----------
    OPV DISUNTIK DANA RM152,6 JUTA = TAMAT
    THHE OPV 2 DAN 3 = TAMAT
    Menteri Dalam Negeri, Datuk Seri Saifuddin Nasution Ismail berkata, OPV kedua pula dijangka dapat disiapkan pada Oktober tahun ini.
    Beliau berkata, pembinaan dua kapal marititm itu mampu disiapkan selepas kerajaan bersetuju meluluskan suntikan dana berjumlah RM152.6 juta
    -----------
    171 ASET USANG 30 TAHUN =
    108 TDM
    29 TUDM
    34 TLDM
    "The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister.
    ===================
    DESEMBER 2024 OPV TAMAT
    DESEMBER 2024 OPV TAMAT
    DESEMBER 2024 OPV TAMAT
    “Kementerian Dalam Negeri dibenarkan menamatkan kontrak projek tersebut setelah mendapat pandangan daripada Jabatan Peguam Negara. Sehubungan itu, kerajaan menandatangani perjanjian penamatan bersama pihak syarikat pada 31 Disember 2024,” katanya dalam jawapan bertulis yang dimuat naik dalam laman web Parlimen pada Khamis malam...
    -----
    LEASE FAST INTERCEPTOR BOAT
    LEASE UTILITY BOAT
    LEASE RIGID HULL FENDER BOAT
    LEASE ROVER FIBER GLASS
    LEASE EC120B
    LEASE FLIGHT SIMULATION TRAINING DEVICE
    Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
    Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    -----
    LEASE KAPAL HIDROLOGI
    LEASE KAPAL HIDROLOGI
    LEASE KAPAL HIDROLOGI
    Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak LEASEan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus

  14. LCS DISUNTIK DANA US$430 JUTA = MANGKRAK
    LCS 6 UNIT JADI 5 UNIT
    Kementerian Pertahanan Malonn mengumumkan langkah strategis terebut saat ajang LIMA 2023 minggu lalu. Kontrak terbaru ini akan memompa anggaran tambahan bagi Malonn hingga US$430 juta untuk kapal-kapal tersebut. Malonn juga akan mengurangi jumlah kapal yang akan diterima berdasarkan kontrak yang direvisi dari enam menjadi lima, dan menerima penundaan tambahan untuk pengiriman kapal.
    -----------
    OPV DISUNTIK DANA RM152,6 JUTA = TAMAT
    THHE OPV 2 DAN 3 = TAMAT
    Menteri Dalam Negeri, Datuk Seri Saifuddin Nasution Ismail berkata, OPV kedua pula dijangka dapat disiapkan pada Oktober tahun ini.
    Beliau berkata, pembinaan dua kapal marititm itu mampu disiapkan selepas kerajaan bersetuju meluluskan suntikan dana berjumlah RM152.6 juta
    -----------
    171 ASET USANG 30 TAHUN =
    108 TDM
    29 TUDM
    34 TLDM
    "The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister.
    ===================
    DESEMBER 2024 OPV TAMAT
    DESEMBER 2024 OPV TAMAT
    DESEMBER 2024 OPV TAMAT
    “Kementerian Dalam Negeri dibenarkan menamatkan kontrak projek tersebut setelah mendapat pandangan daripada Jabatan Peguam Negara. Sehubungan itu, kerajaan menandatangani perjanjian penamatan bersama pihak syarikat pada 31 Disember 2024,” katanya dalam jawapan bertulis yang dimuat naik dalam laman web Parlimen pada Khamis malam...
    -----
    LEASE FAST INTERCEPTOR BOAT
    LEASE UTILITY BOAT
    LEASE RIGID HULL FENDER BOAT
    LEASE ROVER FIBER GLASS
    LEASE EC120B
    LEASE FLIGHT SIMULATION TRAINING DEVICE
    Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
    Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    -----
    LEASE KAPAL HIDROLOGI
    LEASE KAPAL HIDROLOGI
    LEASE KAPAL HIDROLOGI
    Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak LEASEan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  15. LCS DISUNTIK DANA US$430 JUTA = MANGKRAK
    LCS 6 UNIT JADI 5 UNIT
    Kementerian Pertahanan Malonn mengumumkan langkah strategis terebut saat ajang LIMA 2023 minggu lalu. Kontrak terbaru ini akan memompa anggaran tambahan bagi Malonn hingga US$430 juta untuk kapal-kapal tersebut. Malonn juga akan mengurangi jumlah kapal yang akan diterima berdasarkan kontrak yang direvisi dari enam menjadi lima, dan menerima penundaan tambahan untuk pengiriman kapal.
    -----------
    OPV DISUNTIK DANA RM152,6 JUTA = TAMAT
    THHE OPV 2 DAN 3 = TAMAT
    Menteri Dalam Negeri, Datuk Seri Saifuddin Nasution Ismail berkata, OPV kedua pula dijangka dapat disiapkan pada Oktober tahun ini.
    Beliau berkata, pembinaan dua kapal marititm itu mampu disiapkan selepas kerajaan bersetuju meluluskan suntikan dana berjumlah RM152.6 juta
    -----------
    DELAYED LCS ...........
    PROGRESS 70.1% (2025-2011 = 15 YEARS)
    PROGRESS 70.1% (2025-2011 = 15 YEARS)
    PROGRESS 70.1% (2025-2011 = 15 YEARS)
    Deputy Defence Minister Adly Zahari said on Thursday that the overall progress of the long-delayed littoral combat ships (LCS) project had reached 70.1% as of Oct 25 this year.
    =============
    SLOWLY...........
    70.1% : 15 YEARS = 4.6% PER YEARS
    70.1% : 15 YEARS = 4.6% PER YEARS
    70.1% : 15 YEARS = 4.6% PER YEARS
    The progress — which includes design, construction, equipping, and testing — is slightly behind schedule by 0.59%, as the planned progress was 70.69%, according to the contract’s timeline.
    On the first LCS (LCS 1), the construction is in its final phase and is expected to be completed by the end of this year, Adly noted.
    ===================
    NGPVs 2024-1996 = 28 TAHUN
    28 TAHUN MANGKRAK
    28 TAHUN MANGKRAK
    NGPVs DIBAYAR 27 JADI 6 = The Kedah-class offshore patrol vessels of the Royal Malonnn Navy (RMN) are six ships based on the MEKO 100 design by Blohm + Voss. Originally, a total of 27 ships were planned, but due to programme delays and overruns, only six were eventually ordered. Their construction began in the early 2000s, and by 2009, all six were in active service.
    -----
    NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
    -----
    17 KREDITUR LCS
    17 KREDITUR LCS
    17 KREDITUR LCS
    Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malonn Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malonn Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malonn Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malonn Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (Malonn) Bhd
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  16. LCS DISUNTIK DANA US$430 JUTA = MANGKRAK
    LCS 6 UNIT JADI 5 UNIT
    Kementerian Pertahanan Malonn mengumumkan langkah strategis terebut saat ajang LIMA 2023 minggu lalu. Kontrak terbaru ini akan memompa anggaran tambahan bagi Malonn hingga US$430 juta untuk kapal-kapal tersebut. Malonn juga akan mengurangi jumlah kapal yang akan diterima berdasarkan kontrak yang direvisi dari enam menjadi lima, dan menerima penundaan tambahan untuk pengiriman kapal.
    -----------
    OPV DISUNTIK DANA RM152,6 JUTA = TAMAT
    THHE OPV 2 DAN 3 = TAMAT
    Menteri Dalam Negeri, Datuk Seri Saifuddin Nasution Ismail berkata, OPV kedua pula dijangka dapat disiapkan pada Oktober tahun ini.
    Beliau berkata, pembinaan dua kapal marititm itu mampu disiapkan selepas kerajaan bersetuju meluluskan suntikan dana berjumlah RM152.6 juta
    -----------
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    Three weeks ago, the Madani government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd. The estimated cost for the deal is RM10.7 billion and it will be covered in installments over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals.
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE SIMULATOR MKM TAHUN
    Five-year contract for Sukhoi’s simulators. Publicly listed HeiTech Padu Bhd has announced that it had been awarded a RM67 million, five-year contract to operate and maintain the Su-30MKM flight simulators at the RMAF airbase in Gong Kedak
    LEASE HELI LEASE SIMULATOR
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE 4x4
    Pejabat perusahaan mengatakan kepada Janes di pameran bahwa Angkatan Bersenjata Malon sedang mencari untuk menyewa Tarantula
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  17. LCS DISUNTIK DANA US$430 JUTA = MANGKRAK
    LCS 6 UNIT JADI 5 UNIT
    Kementerian Pertahanan Malonn mengumumkan langkah strategis terebut saat ajang LIMA 2023 minggu lalu. Kontrak terbaru ini akan memompa anggaran tambahan bagi Malonn hingga US$430 juta untuk kapal-kapal tersebut. Malonn juga akan mengurangi jumlah kapal yang akan diterima berdasarkan kontrak yang direvisi dari enam menjadi lima, dan menerima penundaan tambahan untuk pengiriman kapal.
    -----------
    OPV DISUNTIK DANA RM152,6 JUTA = TAMAT
    THHE OPV 2 DAN 3 = TAMAT
    Menteri Dalam Negeri, Datuk Seri Saifuddin Nasution Ismail berkata, OPV kedua pula dijangka dapat disiapkan pada Oktober tahun ini.
    Beliau berkata, pembinaan dua kapal marititm itu mampu disiapkan selepas kerajaan bersetuju meluluskan suntikan dana berjumlah RM152.6 juta
    -----------
    2011 PENGADAAN LCS = Pengadaan enam LCS pada 2011 itu juga dilakukan tanpa tender terbuka. Kapal-kapal itu akan dibangun di Galangan Kapal Boustead dan unit pertama sedianya dikirim pada 2019.
    -----
    2019 LCS DIJANGKA = KD Maharaja Lela setelah ditugaskan, diluncurkan secara seremonial pada Agustus 2017. Seharusnya telah dikirim ke RMN pada April 2019
    ------
    2022 LCS DIJANGKA = menurut jadual asal, setakat Ogos 2022 sepatutnya lima buah kapal LCS harus disiap dan diserahkan kepada TLDM.
    -----
    2023 LCS DIJANGKA = Seharusnya telah dikirim ke RMN pada April 2019, dengan kapal terakhir dijadwalkan untuk serah terima pada Juni 2023. Namun, progres kapal pertama baru sekitar 60% selesai
    -----
    2025 LCS DIJANGKA = Kapal pertama Littoral Combat Ship (LCS) TLDM itu dijangka hanya akan siap pada tahun 2025, iaitu 12 tahun selepas projek itu bermula pada Oktober 2013 dan kerajaan telah membayar RM6 bilion kepada kontraktor utama projek itu.
    -----
    2026 LCS DIJANGKA = Lima kapal LCS akan diserahkan kepada TLDM secara berperingkat dengan kapal pertama dijangka diserahkan pada penghujung 2026
    -----
    2029 LCS DIJANGKA = TLDM hanya akan dapat memperoleh kelima-lima LCS pada 2029 berbanding kontrak asal di mana 5 kapal LCS itu sepatutnya diserahkan pada 2022..
    -----
    17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  18. LCS DISUNTIK DANA US$430 JUTA = MANGKRAK
    LCS 6 UNIT JADI 5 UNIT
    Kementerian Pertahanan Malonn mengumumkan langkah strategis terebut saat ajang LIMA 2023 minggu lalu. Kontrak terbaru ini akan memompa anggaran tambahan bagi Malonn hingga US$430 juta untuk kapal-kapal tersebut. Malonn juga akan mengurangi jumlah kapal yang akan diterima berdasarkan kontrak yang direvisi dari enam menjadi lima, dan menerima penundaan tambahan untuk pengiriman kapal.
    -----------
    OPV DISUNTIK DANA RM152,6 JUTA = TAMAT
    THHE OPV 2 DAN 3 = TAMAT
    Menteri Dalam Negeri, Datuk Seri Saifuddin Nasution Ismail berkata, OPV kedua pula dijangka dapat disiapkan pada Oktober tahun ini.
    Beliau berkata, pembinaan dua kapal marititm itu mampu disiapkan selepas kerajaan bersetuju meluluskan suntikan dana berjumlah RM152.6 juta
    -----------
    LMS B2 = FFBNW DOWNGRADE HISAR OPV NO ASW
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -------------
    LCS = FFBNW STALLED 15 YEARS
    LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT ]
    • USD 948 JUTA (EXCLUDING AMMO) = FFBNW = DELAYED
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    -----------
    PRICE DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -------------
    KEDAH = FFBNW NO MISSILE SINCE 2025=2009 : 17 YAERS GUNBOAT
    In June 2006, after a total of 18 months of delays, the Royal Malonnn Navy commissioned KD Kedah, followed by a second hull, KD Pahang in August of the same year, and a third hull, KD Perak on 12 November 2007. By July 2009, six vessels had been launched.
    -------------
    LMS B1 = GUNBOAT NO MISSILE
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    ===================
    2029-2020 : INCREASE DEBT
    2029-2020 : INCREASE DEBT
    2029 = 438,09 BILLION USD
    2028 = 412,2 BILLION USD
    2027 = 386,51 BILLION USD
    2026 = 362,19 BILLION USD
    2025 = 338,75 BILLION USD
    2024 = 316,15 BILLION USD
    2023 = 293,83 BILLION USD
    2022 = 271,49 BILLION USD
    2021 = 247,49 BILLION USD
    2020 = 221,49 BILLION USD
    ------------------
    2029-2020 : DEBT PAY DEBT
    2029-2020 : OVERLIMIT DEBT
    2029 = 69,54% DEBT RATIO TO GDP
    2028 = 69,34% DEBT RATIO TO GDP
    2027 = 68,8% DEBT RATIO TO GDP
    2026 = 68,17% DEBT RATIO TO GDP
    2025 = 68,07% DEBT RATIO TO GDP
    2024 = 68,38% DEBT RATIO TO GDP
    2023 = 69,76% DEBT RATIO TO GDP
    2022 = 65,5% DEBT RATIO TO GDP
    2021 = 69,16% DEBT RATIO TO GDP
    2020 = 67,69% DEBT RATIO TO GDP
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things......
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  19. LCS DISUNTIK DANA US$430 JUTA = MANGKRAK
    LCS 6 UNIT JADI 5 UNIT
    Kementerian Pertahanan Malonn mengumumkan langkah strategis terebut saat ajang LIMA 2023 minggu lalu. Kontrak terbaru ini akan memompa anggaran tambahan bagi Malonn hingga US$430 juta untuk kapal-kapal tersebut. Malonn juga akan mengurangi jumlah kapal yang akan diterima berdasarkan kontrak yang direvisi dari enam menjadi lima, dan menerima penundaan tambahan untuk pengiriman kapal.
    -----------
    OPV DISUNTIK DANA RM152,6 JUTA = TAMAT
    THHE OPV 2 DAN 3 = TAMAT
    Menteri Dalam Negeri, Datuk Seri Saifuddin Nasution Ismail berkata, OPV kedua pula dijangka dapat disiapkan pada Oktober tahun ini.
    Beliau berkata, pembinaan dua kapal marititm itu mampu disiapkan selepas kerajaan bersetuju meluluskan suntikan dana berjumlah RM152.6 juta
    -----------
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
    Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
    ===================
    ===================
    LMS B2 = FFBNW DOWNGRADE HISAR OPV NO ASW
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -------------
    LCS = FFBNW STALLED 15 YEARS
    LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT ]
    • USD 948 JUTA (EXCLUDING AMMO) = FFBNW = DELAYED
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    -----------
    PRICE DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    ===================
    READINESS AIR FORCE = 43%
    READINESS AIR FORCE = 43%
    READINESS AIR FORCE = 43%
    On readiness levels, Azalina cited a 2017 Universiti Teknologi Malonn study titled Aircraft Acquisition Conceptual Framework, which found that the Royal Malonnn Air Force's (RMAF) aircraft readiness was at just 43 per cent between 2011 and 2015 compared to the minimum 70 per cent mark.
    ---------------
    READINESS NAVY = 58,6%
    READINESS NAVY = 58,6%
    READINESS NAVY = 58,6%
    Panglima Tentera Laut, Laksamana Tan Sri Abdul Rahman Ayob hari ini menyatakan tahap kesiagaan armada Tentera Laut Diraja Malon (TLDM) adalah di bawah sasaran.
    Perkara tersebut dinyatakan oleh beliau semasa menyampaikan Perutusan Tahun Baharu 2024 dan Setahun Pemerintahan Panglima Tentera Laut di Wisma Pertahanan.
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  20. LCS DISUNTIK DANA US$430 JUTA = MANGKRAK
    LCS 6 UNIT JADI 5 UNIT
    Kementerian Pertahanan Malonn mengumumkan langkah strategis terebut saat ajang LIMA 2023 minggu lalu. Kontrak terbaru ini akan memompa anggaran tambahan bagi Malonn hingga US$430 juta untuk kapal-kapal tersebut. Malonn juga akan mengurangi jumlah kapal yang akan diterima berdasarkan kontrak yang direvisi dari enam menjadi lima, dan menerima penundaan tambahan untuk pengiriman kapal.
    -----------
    OPV DISUNTIK DANA RM152,6 JUTA = TAMAT
    THHE OPV 2 DAN 3 = TAMAT
    Menteri Dalam Negeri, Datuk Seri Saifuddin Nasution Ismail berkata, OPV kedua pula dijangka dapat disiapkan pada Oktober tahun ini.
    Beliau berkata, pembinaan dua kapal marititm itu mampu disiapkan selepas kerajaan bersetuju meluluskan suntikan dana berjumlah RM152.6 juta
    -----------
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
    Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
    Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
    ===================
    ===================
    LMS B2 = FFBNW DOWNGRADE HISAR OPV NO ASW
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -------------
    LCS = FFBNW STALLED 15 YEARS
    LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT ]
    • USD 948 JUTA (EXCLUDING AMMO) = FFBNW = DELAYED
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    -----------
    PRICE DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    ===================
    READINESS AIR FORCE = 43%
    READINESS AIR FORCE = 43%
    READINESS AIR FORCE = 43%
    On readiness levels, Azalina cited a 2017 Universiti Teknologi Malonn study titled Aircraft Acquisition Conceptual Framework, which found that the Royal Malonnn Air Force's (RMAF) aircraft readiness was at just 43 per cent between 2011 and 2015 compared to the minimum 70 per cent mark.
    ---------------
    READINESS NAVY = 58,6%
    READINESS NAVY = 58,6%
    READINESS NAVY = 58,6%
    Panglima Tentera Laut, Laksamana Tan Sri Abdul Rahman Ayob hari ini menyatakan tahap kesiagaan armada Tentera Laut Diraja Malon (TLDM) adalah di bawah sasaran.
    Perkara tersebut dinyatakan oleh beliau semasa menyampaikan Perutusan Tahun Baharu 2024 dan Setahun Pemerintahan Panglima Tentera Laut di Wisma Pertahanan.
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus

  21. LCS DISUNTIK DANA US$430 JUTA = MANGKRAK
    LCS 6 UNIT JADI 5 UNIT
    Kementerian Pertahanan Malonn mengumumkan langkah strategis terebut saat ajang LIMA 2023 minggu lalu. Kontrak terbaru ini akan memompa anggaran tambahan bagi Malonn hingga US$430 juta untuk kapal-kapal tersebut. Malonn juga akan mengurangi jumlah kapal yang akan diterima berdasarkan kontrak yang direvisi dari enam menjadi lima, dan menerima penundaan tambahan untuk pengiriman kapal.
    -----------
    OPV DISUNTIK DANA RM152,6 JUTA = TAMAT
    THHE OPV 2 DAN 3 = TAMAT
    Menteri Dalam Negeri, Datuk Seri Saifuddin Nasution Ismail berkata, OPV kedua pula dijangka dapat disiapkan pada Oktober tahun ini.
    Beliau berkata, pembinaan dua kapal marititm itu mampu disiapkan selepas kerajaan bersetuju meluluskan suntikan dana berjumlah RM152.6 juta
    -----------
    EXCLUDING AMMO = ZONK
    EXCLUDING AMMO = ZONK
    EXCLUDING AMMO = ZONK
    REVISED (FINAL): RM11.2B FOR 5 SHIPS
    (final agreed-upon contract price dealing with cost overruns)
    RM 2.24 billion (2023) per unit + ToT (ceiling) [or $948M (2023 inflation) or ~$700M (2011 forex) or ~$490M (2023 forex) (excluding ammo)
    Inflation adjustment roughly equivalent to $948 million in 2023 US dollars (excluding ammo)
    -------------
    REVISED (INITIAL): RM 9.128B FOR 5 SHIPS
    (initial figures using the original contract price in dealing with cost overruns)
    RM 1.8 billion (2011) per unit + ToT (ceiling) or $560 million per ship (excluding ammo)
    Inflation adjustment roughly equivalent to $758 million in 2023 US dollars (excluding ammo)
    -------------
    ORIGINAL: RM 9B FOR 6 SHIPS
    RM 1.5 billion (2011) per unit + ToT (ceiling) or $466 million per ship (excluding cost overruns and ammo)
    Inflation adjustment roughly equivalent to $631 million in 2023 US dollars (excluding cost overruns and ammo)
    ===================
    2029-2020 : INCREASE DEBT
    2029-2020 : INCREASE DEBT
    2029 = 438,09 BILLION USD
    2028 = 412,2 BILLION USD
    2027 = 386,51 BILLION USD
    2026 = 362,19 BILLION USD
    2025 = 338,75 BILLION USD
    2024 = 316,15 BILLION USD
    2023 = 293,83 BILLION USD
    2022 = 271,49 BILLION USD
    2021 = 247,49 BILLION USD
    2020 = 221,49 BILLION USD
    ------------------
    2029-2020 : DEBT PAY DEBT
    2029-2020 : OVERLIMIT DEBT
    2029 = 69,54% DEBT RATIO TO GDP
    2028 = 69,34% DEBT RATIO TO GDP
    2027 = 68,8% DEBT RATIO TO GDP
    2026 = 68,17% DEBT RATIO TO GDP
    2025 = 68,07% DEBT RATIO TO GDP
    2024 = 68,38% DEBT RATIO TO GDP
    2023 = 69,76% DEBT RATIO TO GDP
    2022 = 65,5% DEBT RATIO TO GDP
    2021 = 69,16% DEBT RATIO TO GDP
    2020 = 67,69% DEBT RATIO TO GDP
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things......
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  22. FACT ..........
    BLASTING = MENGHILANGKAN KARAT LCS
    PAINTING = MENUTUP BEKAS KARAT LCS
    ----------------------------------
    • Blasting
    Proses pembersihan material pada kapal dengan cara menyemprotkan pasir steel grit atau pasir silika dengan tekanan tinggi. Tujuannya untuk menghilangkan kontaminan seperti karat, cat, garam, dan oli.
    • Painting
    Proses pelapisan material pada kapal menggunakan cat dengan metode roll, spray, dan kuas. Tujuannya untuk merawat dan melindungi lambung kapal dari kerusakan akibat korosi dan fouling.
    ----
    Littoral Combat Ship (LCS) 2 has successfully completed the blasting and first level of painting process, marking a significant milestone in its construction journey. It will later transition to further surface preparation and coating applications to ensure all critical areas meet the required standards.
    ===================
    The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ===================
    FACT LCS 2025 - 2011 = 15 YEARS
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ===================
    FACT NOT YET DELIVERED :
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ===================
    SOME WEAKNESSES OF THE MALONNN SHIPBUILDING INDUSTRY INCLUDE:
    1. Delays
    Consistent delays in delivering ships to customers has reduced profitability and financial results.
    2. Small tonnage
    Malonnn shipbuilding industry is relatively weak compared to other countries in the region, as the tonnage of ships manufactured is relatively small.
    3. Supply chain disruptions
    Disruptions caused by COVID-19 and the Russia-Ukraine conflict have led to supply chain disruptions and shortages of skilled personnel.

    BalasHapus
  23. FACT ..........
    BLASTING = MENGHILANGKAN KARAT LCS
    PAINTING = MENUTUP BEKAS KARAT LCS
    ----------------------------------
    • Blasting
    Proses pembersihan material pada kapal dengan cara menyemprotkan pasir steel grit atau pasir silika dengan tekanan tinggi. Tujuannya untuk menghilangkan kontaminan seperti karat, cat, garam, dan oli.
    • Painting
    Proses pelapisan material pada kapal menggunakan cat dengan metode roll, spray, dan kuas. Tujuannya untuk merawat dan melindungi lambung kapal dari kerusakan akibat korosi dan fouling.
    ----
    Littoral Combat Ship (LCS) 2 has successfully completed the blasting and first level of painting process, marking a significant milestone in its construction journey. It will later transition to further surface preparation and coating applications to ensure all critical areas meet the required standards.
    ===================
    The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ===================
    FACT LCS 2025 - 2011 = 15 YEARS
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ===================
    FACT NOT YET DELIVERED :
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ===================
    SOME WEAKNESSES OF THE MALONNN SHIPBUILDING INDUSTRY INCLUDE:
    1. Delays
    Consistent delays in delivering ships to customers has reduced profitability and financial results.
    2. Small tonnage
    Malonnn shipbuilding industry is relatively weak compared to other countries in the region, as the tonnage of ships manufactured is relatively small.
    3. Supply chain disruptions
    Disruptions caused by COVID-19 and the Russia-Ukraine conflict have led to supply chain disruptions and shortages of skilled personnel.

    BalasHapus
  24. FACT LCS 2025 - 2011 = 15 YEARS
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ===================
    FACT NOT YET DELIVERED :
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ===================
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    2017 LAUNCHING – 2025 NOT YET DELIVERED
    The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
    ===================
    SOME WEAKNESSES OF THE MALONNN SHIPBUILDING INDUSTRY INCLUDE:
    1. Delays
    Consistent delays in delivering ships to customers has reduced profitability and financial results.
    2. Small tonnage
    Malonnn shipbuilding industry is relatively weak compared to other countries in the region, as the tonnage of ships manufactured is relatively small.
    3. Supply chain disruptions
    Disruptions caused by COVID-19 and the Russia-Ukraine conflict have led to supply chain disruptions and shortages of skilled personnel.
    ===================
    The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    • Corruption
    A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
    • Aging fleet
    The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
    ===================
    SIPRI LCS = DELIVERED : 0 (KONTRAK KOSONG) ......
    SAK 70 MK 3 - DELIVERED = 0
    MICA - DELIVERED = 0
    SHIP ENGINE - DELIVERED = 0
    FIRE CONTROL RADAR - DELIVERED = 0
    AIR CONTROL RADAR - DELIVERED = 0

    BalasHapus
  25. LEASE 28 HELI = 119 HELI BARU :
    LEASE 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL LEASE DARIPADA BELI BARU =
    LEASE 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    LEASEan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
    ----
    CHEAPEST VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    ------
    CHEAPEST VARIANT HISAR OPV
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    ------
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    ------
    ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
    ==========
    1. HUTANG 84.2% DARI GDP
    1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN LEASE SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. LEASE SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. LEASE MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED LEASE BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI LEASE KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. LEASE MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. LEASE VSHORAD
    35. LEASE TRUK 3 TON
    36. 4X4 LEASE 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. LEASE BLACKHAWK LEASE AW159
    41. NO TRACKED SPH
    42. LEASE SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. LEASE AW139 LEASE COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 LEASE BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED LEASE PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM LEASE 12 AW149
    62. TUDM LEASE 4 AW139
    63. TUDM LEASE 5 EC120B
    64. TLDM LEASE 2 AW159
    65. TDM LEASE 4 UH-60A
    67. TDM LEASE 12 AW149
    68. BOMBA LEASE 4 AW139
    69. MMEA LEASE 2 AW159
    70. POLIS LEASE 7 BELL429
    ==============
    KEY WORDS =
    1. DOWNGRADE
    2. CHEAPEST VARIANT
    3. LEASE

    BalasHapus
  26. 171 ASET USANG 30 TAHUN =
    108 TDM
    29 TUDM
    34 TLDM
    "The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
    ==============
    LEASE 28 HELI = 119 HELI BARU :
    LEASE 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL LEASE DARIPADA BELI BARU =
    LEASE 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    LEASEan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
    ==============
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    ==============
    CHEAPEST VARIANT HISAR OPV
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    ==============
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    ===============
    VERSI TERMURAH FA50
    VERSI TERMURAH FA50
    VERSI TERMURAH FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    ==============
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance.
    ==============
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness

    BalasHapus
  27. Some weaknesses in Malonnn public procurement include:
    • Transparency: The principle of transparency is not well adhered to. Interference from authorities, such as local politicians, can lead to corruption, scandal, and the abuse of public resources.
    • Inefficient processes: Procurement processes can be inefficient and ineffective. Tenders may be prepared hastily, carelessly, and EXCLUDING proper consideration.
    • Poor documentation: Documentation may be poor.
    • Low quality: The quality of products, services, and work may be low.
    • Non-compliance: There may be non-compliance with the scope, specifications, and terms of contracts.
    • Delayed completion: Projects may be delayed or not completed.
    • Inadequate infrastructure: There may not be adequate infrastructure to support procurement.
    • Vendor development programs: Vendor development programs (VDPs) may be non-existent or ineffective.
    • Cronyism: There may be interference from outside parties and cronyism, which affects the awarding of contracts.
    Malpractice: Procurement officers may be involved in malpractice and not comply with the policies and procedures of the procurement system
    =========================
    LEASE 28 HELI = 119 HELI BARU :
    LEASE 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL LEASE DARIPADA BELI BARU =
    LEASE 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    LEASEan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.

    =========================
    KEY WORDS = CHEAPEST AND DOWNGRADE

    BalasHapus
  28. LEASE 28 HELI = 119 HELI BARU :
    LEASE 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL LEASE DARIPADA BELI BARU =
    LEASE 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    LEASEan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
    -------------------------------------
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness

    =========================
    KEY WORDS = CHEAPEST AND DOWNGRADE

    BalasHapus
  29. PUBLIC DEBT = DEFENCE SPENDING
    PUBLIC DEBT = DEFENCE SPENDING
    PUBLIC DEBT = DEFENCE SPENDING
    The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
    ============
    LEASE 28 HELI = 119 HELI BARU :
    LEASE 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL LEASE DARIPADA BELI BARU =
    LEASE 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    LEASEan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.


    BalasHapus
  30. The Malonnn army has several weaknesses, including:
    • Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
    • Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
    • Corruption: The Malonnn military has been plagued by corruption.
    • Political interference: Political leaders have interfered in procurement.
    • Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
    • Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
    Other challenges include:
    • The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
    • The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
    ==============
    LEASE 28 HELI = 119 HELI BARU :
    LEASE 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL LEASE DARIPADA BELI BARU =
    LEASE 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    LEASEan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.


    BalasHapus
  31. manakala INDIANESIA semakin jauh ditinggalkan sama MALAYSIA...HAHAHAH

    BalasHapus
    Balasan
    1. Malonn has faced several crises, including political, financial, and economic crises:
      • Political crisis
      From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
      • Financial crisis
      Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
      • Economic crisis
      Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
      • Household debt crisis
      As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
      • Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....
      ==============
      LEASE 28 HELI = 119 HELI BARU :
      LEASE 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL LEASE DARIPADA BELI BARU =
      LEASE 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      LEASEan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
      -------------------------------------
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      -------------------------------------
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      CHEAPEST VARIANT LMS
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
      -------------------------------------
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      -
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
      -------------------------------------
      ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance
      While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.

      Hapus
    2. PROBLEMS MALON SHIPYARD
      Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA
      ===================
      LEASE 28 HELI = 119 HELI BARU :
      LEASE 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL LEASE DARIPADA BELI BARU =
      LEASE 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      LEASEan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
      -------------------------------------
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      -------------------------------------
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      CHEAPEST VARIANT LMS
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
      -------------------------------------
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      -
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
      -------------------------------------
      ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance
      While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.


      Hapus
    3. The Malonnn Armed Forces (MAF) has faced a number of challenges, including corruption, outdated equipment, and a lack of funding. These issues have contributed to the MAF's capabilities falling behind those of neighboring countries.
      Challenges
      • Corruption: The MAF has been involved in multiple corruption scandals.
      • Outdated equipment: The MAF's equipment is outdated and unable to keep up with modern threats.
      • Lack of funding: The MAF's budget has been de-prioritized by successive governments.
      • Short service scheme: The MAF's 15-year service scheme means that many people are reluctant to join.
      • Political interference: Some say that politicians have made decisions about the military's procurement and capacity building EXCLUDING consulting the service chiefs.
      Impact
      • The MAF's challenges have left it vulnerable to internal and external threats.
      • The MAF's capabilities are unable to deter other regional states from attempting to intimidate Malonn.
      • Some veterans of the MAF fall below the poverty line upon retirement.
      ==========
      1. HUTANG 84.2% DARI GDP
      2. HUTANG NEGARA RM 1.5 TRLLIUN
      3. HUTANG 1MDB RM 18.2 BILLION
      4. TUNGGAKAN LEASE SABAH USD 15 BILLION
      5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
      6. LEASE SIMULATOR MKM
      7. PESAWAT MIG GROUNDED
      8. LEASE MOTOR POLIS
      9. PESAWAT MB339CM GROUNDED
      10. NURI GROUNDED LEASE BLACKHAWK
      11. FIVE PROCUREMENT CANCELLED
      12. 48 PESAWAT SKYHAWK HILANG
      13. MESIN JET 2 BUAH HILANG
      14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
      15. NO LST
      16. NO LPD – NGEMIS LPD USA
      17. NO TANKER
      18. NO KCR
      19. MONUMEN MIG29M UNTUK JIMAT KOS
      20. NO SPH
      21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
      22. NO HELLFIRE
      23. NO MPA ATR72 DELAYED
      24. NO HIDRO-OSEANOGRAFI LEASE KAPAL HIDRO
      25. NO HELI HEAVY ATTACK NGEMIS AH1Z
      26. NO M3 AMPHIBIUS RIG
      27. LCS MANGKRAK KARATAN
      28. OPV MANGKRAK
      29. TANK MOGOK STOP SPARE PARTS
      30. CN 235 MSA VERSI MSI USA
      31. LEASE MOTOR MILITARY POLICE
      32. RADAR GIFTED PAID USA
      33. 84% NO SAVING EVERY MONTH
      34. LEASE VSHORAD
      35. LEASE TRUK 3 TON
      36. 4X4 LEASE 6X6 CANCELLED
      37. C130H DIGANTI 2045
      38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
      39. NO DRONE UCAV – ANKA ISR OMPONG
      40. LEASE BLACKHAWK LEASE AW159
      41. NO TRACKED SPH
      42. LEASE SIMULATOR HELI
      43. SPH CANCELLED
      44. SCORPION V150 CONDOR SIMBAS RETIRED
      45. NO PESAWAT COIN
      46. PILATUS MK II KARATAN
      47. PENCEROBOHAN 43X BTA 316 HARI
      48. LEASE AW139 LEASE COLIBRI
      49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
      50. OPV DIBAYAR 3 JADI 1 LEASE BOAT
      51. LYNX GROUNDED
      52. MRCA CANCELLED LEASE PESAWAT ITTC
      53. MICA CANCELLED NSM CANCELLED
      54. NO LRAD NO MRAD JUST SHORAD
      55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
      56. 4X NGEMIS F18 KUWAIT
      57. MENUNGGU 2050 KAPAL SELAM
      58. NO TANK AMPHIBI AV8 MOGOK BERASAP
      59. 84% NO SAVING EVERY MONTH
      60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
      61. TUDM LEASE 12 AW149
      62. TUDM LEASE 4 AW139
      63. TUDM LEASE 5 EC120B
      64. TLDM LEASE 2 AW159
      65. TDM LEASE 4 UH-60A
      67. TDM LEASE 12 AW149
      68. BOMBA LEASE 4 AW139
      69. MMEA LEASE 2 AW159
      70. POLIS LEASE 7 BELL429

      Hapus
  32. LCS 2025-2011 = 15 TAHUN
    15 TAHUN MANGKRAK
    15 TAHUN MANGKRAK
    LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    -----
    OPV 2024-2017 = 8 TAHUN
    8 TAHUN MANGKRAK
    8 TAHUN MANGKRAK
    OPV DIBAYAR 3 JADI 1 = THHE BANGKRUT : Offshore fabricator and shipbuilder TH Heavy Engineering Bhd (THHE) is undertaking a voluntary winding-up, a year after it was delisted from Bursa Malonn. The company resolved to undertake voluntary winding-up as it is unable to continue its operations due to liabilities, it said in a winding-up NOtice dated Sept 13.
    -----
    NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
    -----
    17 KREDITUR LCS
    17 KREDITUR LCS
    17 KREDITUR LCS
    Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malonn Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malonn Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malonn Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malonn Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (Malonn) Bhd.
    ===================
    LEASE 28 HELI = 119 HELI BARU :
    LEASE 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL LEASE DARIPADA BELI BARU =
    LEASE 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    LEASEan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.

    BalasHapus
  33. The Malonnn Armed Forces (MAF) has faced several challenges, including poor service conditions, low interest from non-Bumiputera communities, and corruption.
    Poor service conditions
    • Low pay: Some say that low pay and irregular working hours are factors that contribute to low interest in joining the MAF.
    • Poor living conditions: Some say that the conditions of military living quarters are poor.
    • Poor veteran welfare: According to the Veterans' Association of Malonnn Armed Forces (PVATM), nearly 60% of army veterans live below the poverty line.
    Low interest from non-Bumiputera communities
    • Some say that the lack of interest from non-Bumiputera communities is due to a lack of understanding of the scope of work for security personnel.
    Corruption
    • Some say that the Malonnn military is riddled with corruption, poor planning, and interference by political leaders in procurement.
    Other challenges
    • Some say that the MAF has difficulty recruiting and retaining sufficient high-caliber personnel.
    • Some say that the MAF has logistic management problems.
    ==========
    1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN LEASE SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. LEASE SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. LEASE MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED LEASE BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI LEASE KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. LEASE MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. LEASE VSHORAD
    35. LEASE TRUK 3 TON
    36. 4X4 LEASE 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. LEASE BLACKHAWK LEASE AW159
    41. NO TRACKED SPH
    42. LEASE SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. LEASE AW139 LEASE COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 LEASE BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED LEASE PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM LEASE 12 AW149
    62. TUDM LEASE 4 AW139
    63. TUDM LEASE 5 EC120B
    64. TLDM LEASE 2 AW159
    65. TDM LEASE 4 UH-60A
    67. TDM LEASE 12 AW149
    68. BOMBA LEASE 4 AW139
    69. MMEA LEASE 2 AW159
    70. POLIS LEASE 7 BELL429

    BalasHapus
  34. The Royal Malonnn Air Force (RMAF) has faced limitations in acquiring air-to-surface missiles due to US restrictions on new technology, political interference, and corruption.
    US restrictions
    • The US has restricted the RMAF from acquiring certain new technologies, including the AIM-120 AMRAAM air-to-air missile.
    Political interference
    • Political interference has undermined the combat readiness of the Malonnn Armed Forces (MAF).
    Corruption
    • Corruption has plagued the MAF, undermining its combat readiness.
    Logistic management
    • Logistic management problems for soldiers have contributed to Malonn's military falling behind.
    The RMAF has considered purchasing air-to-surface missiles from Russia and other non-traditional sources.
    ==========
    The Royal Malonnn Navy (RMN) has experienced issues with the age and condition of its fleet. The RMN has also faced challenges in replacing its aging fleet.
    KD Pendekar
    • The KD Pendekar was a 260-ton fast attack craft that sank in August 2024 after grounding on Stork Reef.
    • The RMN's investigation found that the ship strayed from its planned route and hit the reef.
    • The RMN also cited the ship's age as a factor in its inability to stop the flooding.
    RMN fleet
    • A government audit found that over half of the RMN's fleet is past its prime.
    • The RMN has 10 to 15 ships that are over 40 years old.
    ==========
    1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN LEASE SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. LEASE SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. LEASE MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED LEASE BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI LEASE KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. LEASE MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. LEASE VSHORAD
    35. LEASE TRUK 3 TON
    36. 4X4 LEASE 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. LEASE BLACKHAWK LEASE AW159
    41. NO TRACKED SPH
    42. LEASE SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. LEASE AW139 LEASE COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 LEASE BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED LEASE PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM LEASE 12 AW149
    62. TUDM LEASE 4 AW139
    63. TUDM LEASE 5 EC120B
    64. TLDM LEASE 2 AW159
    65. TDM LEASE 4 UH-60A
    67. TDM LEASE 12 AW149
    68. BOMBA LEASE 4 AW139
    69. MMEA LEASE 2 AW159
    70. POLIS LEASE 7 BELL429

    BalasHapus
  35. The Royal Malonnn Air Force (RMAF) has faced challenges due to budgetary constraints, corruption, and mismanagement.
    Budgetary constraints
    • The RMAF operates on a shoestring budget.
    • The government's budget is limited by slow economic growth and falling oil revenues.
    • Low allocations, mismanagement, and neglect have "systematically hollowed out" the RMAF.
    Corruption
    • Malonn's military has been plagued by corruption.
    • Investigations have revealed that allocated funds have been hijacked by politicians and their cronies.
    Poor air defense capabilities
    • In 2014, the disappearance of Malonn Airlines Flight 370 highlighted the RMAF's poor air defense capabilities.
    • The RMAF lacked secondary radar and a flight identification system.
    Challenges maintaining aircraft
    • The RMAF faces challenges maintaining its Su-30MKMs due to the war in Ukraine.
    • The 1997 Asian financial crisis limited the funds available for military procurement
    • Currently, Malonn spends 1.4% of its GDP on the military
    Logistic management problems
    • Logistic management issues for soldiers have contributed to Malonn's military weakness
    Inadequate funding
    • Inadequate funding can impact the combat readiness of the Malonnn Armed Forces
    • This can undermine the country's strategic deterrence capability
    ==========
    1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN LEASE SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. LEASE SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. LEASE MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED LEASE BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI LEASE KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. LEASE MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. LEASE VSHORAD
    35. LEASE TRUK 3 TON
    36. 4X4 LEASE 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. LEASE BLACKHAWK LEASE AW159
    41. NO TRACKED SPH
    42. LEASE SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. LEASE AW139 LEASE COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 LEASE BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED LEASE PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM LEASE 12 AW149
    62. TUDM LEASE 4 AW139
    63. TUDM LEASE 5 EC120B
    64. TLDM LEASE 2 AW159
    65. TDM LEASE 4 UH-60A
    67. TDM LEASE 12 AW149
    68. BOMBA LEASE 4 AW139
    69. MMEA LEASE 2 AW159
    70. POLIS LEASE 7 BELL429

    BalasHapus
  36. Malonn's military faces many problems, including corruption, poor planning, and outdated equipment. These issues have made the Malonnn military vulnerable to threats from within and outside the country.
    Corruption
    • The defense sector is vulnerable to corruption from foreign and domestic interests.
    • There is a lack of parliamentary oversight and financial scrutiny.
    Poor planning
    • There are issues with procurement, including interference from political leaders.
    • The Malonnn procurement system needs reform.
    Outdated equipment
    • Most of the equipment in the Malonnn military was purchased between the 1970s and 1990s.
    • The military lacks modern and latest military assets.
    • The military has an aging fleet of trainer and light-combat aircraft.
    ============
    Malonn's military has been criticized for its outdated equipment and lack of modern assets. Some say that the military's preparedness is not aligned with the country's economic growth and geopolitical situation.
    Outdated equipment
    • Ships: The government's auditor-general found that half of the navy's ships were operating beyond their serviceable lifespan.
    • Helicopters: Many of the helicopters were commissioned in the 1960s.
    • Submarines: The KD Rahman submarine experienced technical issues in 2010, preventing it from submerging.
    Lack of modern assets
    • The government has been unable to provide the military with modern defense assets.
    • The military's procurement system has been criticized for being susceptible to external interference.
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme...

    BalasHapus
  37. The Royal Malonnn Navy (RMN) has faced several weaknesses, including aging ships, a lack of modern assets, and personnel issues.
    Aging ships
    • The RMN's fleet includes ships that are operating past their serviceable lifespan.
    • A 45-year-old vessel sank during a patrol due to its age and a navigational error.
    • The KD Rahman submarine was unable to submerge in 2010 due to technical problems.
    Lack of modern assets
    • The RMN has struggled to acquire new ships.
    • The RMN has a lack of modern military assets.
    Personnel issues
    • Military personnel have struggled with thinking skills, decision-making, and problem-solving during operations.
    Management issues
    • The RMN has faced management failures, such as the delay in the acquisition of the New Generation Patrol Vessels (NGPVs).
    • The RMN has faced corruption scandals, such as the hijacking of allocated funds.
    ============
    The Malonnn Armed Forces (MAF) has faced challenges in modernizing its missile capabilities due to budgetary constraints, political interference, and a lack of modern assets.
    Budgetary constraints
    • The 1997 Asian financial crisis limited the MAF's ability to procure new weapons.
    • Malonn's defense budget is limited, which can affect the pace of acquisitions and upgrades.
    Political interference
    • Political leaders have been accused of interfering in procurement.
    Lack of modern assets
    • The MAF has aging military assets, including most of the navy's fleet and helicopters commissioned in the 1960s.
    • The MAF has experienced issues with the maintenance and spare parts for its aircraft.
    Other challenges the MAF has faced include: Poor planning, Personnel issues, and Critical problems with the PT-91M main battle tank.
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme

    BalasHapus
  38. budgeting. However, the RMAF is working to modernize its air capabilities to address current and future threats.
    Challenges
    • Fleet sustainment
    The RMAF has a large fleet of aging aircraft that are difficult to maintain.
    • Readiness
    The RMAF may not have the minimum supply and service needed to start a combat operation.
    • Budgeting
    The government's defense budget is limited, and the country has faced frequent government changes since 2018.
    ==========
    The Royal Malonnn Air Force (RMAF) has faced several problems, including:
    • Aging aircraft: The RMAF's fleet of aircraft is aging, making it difficult to maintain.
    • Non-conventional threats: The RMAF needs to be able to address both conventional and non-conventional threats.
    • Limited defense budget: The government's defense budget is limited, making it difficult to modernize the air force.
    • Technological obsolescence: Some aircraft are becoming technologically obsolete.
    • Regional strategic environment: The RMAF needs to consider the regional strategic environment when developing its strategy.
    Some of the RMAF's challenges include:
    • Fleet sustainment: The RMAF has serious fleet sustainment problems.
    • Readiness: The RMAF's readiness has eroded over time.
    • Non-aligned position: Malonn's non-aligned position in the regional security architecture has led to a decline in its defense networks.
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme...

    BalasHapus
  39. The Royal Malonnn Air Force (RMAF) has faced maintenance and operational issues with its fighter planes. These issues include a lack of spares, serviceability problems, and the need to extend the service life of its aging fleet.
    Maintenance and operational issues
    • Sukhoi Su-30MKM fleet
    In 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were flyable due to maintenance issues and a lack of spares.
    • Logistical constraints
    The RMAF has faced logistical constraints that have affected the serviceability of its Sukhoi Su-30MKM fleet.
    Aging fleet
    • Service life extension: The RMAF has completed a service life extension program (SLEP) for its Sukhoi Su-30MKMs, which will extend the service life of the Russian type for at least another decade.
    ============
    The Kuwaiti Air Force's (KAF) F/A-18 Hornet fighter jets may have compatibility issues with spare parts and software integration if acquired by another country. The jets are also older than the Hornets currently used by other countries, which could make them more difficult to maintain.
    Compatibility issues
    • The Kuwaiti Hornets are from an earlier production block than the Hornets used by other countries.
    • The Kuwaiti Hornets may have received different upgrades than other Hornets.
    Maintenance and servicing issues
    • The older aircraft may require more maintenance and servicing.
    • The older aircraft may have aging technology that is difficult to keep relevant.
    Operational budget issues
    • Expanding the fleet with older aircraft may impact operational budgets.
    Acquisition approval
    • The acquisition of the Kuwaiti Hornets is contingent on approval from the United States, the original supplier of the F/A-18 jets
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme...

    BalasHapus
  40. The Kuwaiti Air Force's (KAF) F/A-18 Hornet fighter jets may have compatibility issues with spare parts and software integration if acquired by another country. The jets are also older than the Hornets currently used by other countries, which could make them more difficult to maintain.
    Compatibility issues
    • The Kuwaiti Hornets are from an earlier production block than the Hornets used by other countries.
    • The Kuwaiti Hornets may have received different upgrades than other Hornets.
    Maintenance and servicing issues
    • The older aircraft may require more maintenance and servicing.
    • The older aircraft may have aging technology that is difficult to keep relevant.
    Operational budget issues
    • Expanding the fleet with older aircraft may impact operational budgets.
    Acquisition approval
    • The acquisition of the Kuwaiti Hornets is contingent on approval from the United States, the original supplier of the F/A-18 jets.
    ============
    The Royal Malonnn Air Force (RMAF) has faced budget constraints and fleet sustainment problems. The government's limited defense budget and the need to cut spending on other priorities have made it difficult for the RMAF to modernize its air capabilities.
    Budget constraints
    • Frequent government changes: Since 2018, Malonn has had four Prime Ministers and governments, which has hindered defense development
    • Fiscal cost of the COVID-19 pandemic: The government is still dealing with the fiscal cost of the pandemic
    • Need to reduce the national deficit: The government needs to cut spending and reduce the national deficit
    Fleet sustainment problems
    • Aging aircraft: The RMAF has aging aircraft like the BAE Hawk 108 and MiG-29N
    • Fleet sustainment: Maintaining a large fleet of aging aircraft can be expensive
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme...

    BalasHapus
  41. Malonn armed forces face a number of challenges with maintenance costs, including a lack of funding, outdated equipment, and corruption.
    Funding
    Limited budget: Malonn defense budget has been limited due to fiscal constraints.
    Unwillingness to cut spending: Successive governments have been unwilling to cut spending elsewhere to fund defense.
    Corruption: There have been allegations of kickbacks in tenders for military equipment.
    Outdated equipment
    Aging aircraft: The Royal Malonn Air Force (RMAF) has a fleet of aging aircraft that are difficult to maintain.
    Incompatible spare parts: The navy has spare parts that are no longer compatible with its fleet.
    Failure to modernize: The navy has failed to modernize its fleet to meet current and future challenges.
    Other challenges
    Political machinations: The military faces significant risks from political machinations.
    Bureaucratic corruption: The military faces significant risks from bureaucratic corruption.
    Lack of clear anti-corruption strategy: The National Defence Policy lacks a clear anti-corruption strategy.
    ==============
    Malonn armed forces face challenges with limited funding, which has led to a lack of progress in defense. These challenges include:
    • Limited budget
    The government has been unwilling to reduce spending in other areas or cut the size of the military.
    • Aging aircraft
    The military has a large fleet of aging aircraft that are difficult to maintain.
    • Outdated inventory
    The military's logistics equipment is outdated, which can put the country's security at risk.
    • Secrecy
    There is a lack of transparency around the military's pension fund and how it is managed.
    • Corruption
    There have been allegations of mismanagement and misuse of funds by the military's pension fund
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme...

    BalasHapus
  42. Military spending can contribute to a country's national debt, including Malonn.
    Explanation
    Military spending and public debt
    A study found a positive correlation between public debt and defense spending in Malonn.
    Military spending and fiscal deficits
    Military spending can increase fiscal deficits in developing economies, which can lead to economic consequences.
    Military spending and national debt
    Military spending can increase foreign debt, which can constrain government spending.
    Military spending in Malonn
    In 2022, Malonn military expenditure was 0.95753% of its GDP.
    Military expenditures in Malonn include personnel, operation and maintenance, procurement, research and development, and military aid.
    National debt in Malonn
    In September 2024, Malonn national government debt was around 300.7 billion USD.
    ==============
    Malonn armed forces have faced challenges due to limited funding, which has hindered their ability to modernize and respond to threats.
    Factors
    Fiscal constraints: The government has been unwilling to cut spending elsewhere to fund defense.
    Maintenance and repair: A significant portion of the defense budget goes toward maintenance and repair, leaving little for new assets.
    Political uncertainty: Political uncertainty has limited defense spending.
    Aging aircraft: The air force has a large fleet of aging aircraft that are expensive to maintain.
    Diversified acquisitions: The country has acquired advanced weapon systems from different countries, which can lead to technical and logistical problems.
    Poor governance: Poor governance has undermined the effectiveness of outsourcing programs.
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme...

    BalasHapus
  43. The Malonn Armed Forces (MAF) has faced a number of weaknesses, including corruption, outdated equipment, and a lack of training.
    Corruption
    Corruption is a problem in the MAF, including in supply chain management.
    Corruption can undermine the MAF's ability to function effectively.
    Commanders are not trained to address corruption risks in the areas where they are deployed.
    Outdated equipment
    Much of the MAF's equipment was purchased between the 1970s and 1990s.
    The MAF has a lack of modern military assets.
    The MAF's defense assets are outdated and cannot function well.
    ==============
    Military spending can increase a country's national debt. This is because military spending is a cost that a country incurs, which can lead to a larger debt.
    Explanation
    Military spending
    Military spending includes the money spent on a country's armed forces, including defense operations and peacekeeping.
    National debt
    National debt is the total amount of money a country owes. This includes all liabilities that the country needs to pay back, plus any interest or principal that needs to be paid.
    Impact on the economy
    When a country spends more on its military, it can have a significant impact on its balance sheet. This can lead to higher interest rates and borrowing costs, which can eventually slow economic growth and increase taxes.
    Example
    In 2025, Malonn allocated $4.8 billion to its Ministry of Defense (MINDEF). This included $1.3 billion for maintenance, repairs, and new military assets
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme...

    BalasHapus
  44. The Malonn Armed Forces (MAF) faces many challenges with its equipment and capabilities, including a lack of budget, an aging equipment inventory, and a lack of modern assets.
    Budget
    The MAF has faced budget constraints for decades, which have limited its ability to purchase new equipment and upgrade existing assets
    The government has been unwilling to cut spending elsewhere to fund defense
    Aging equipment
    The MAF's equipment is aging, and some assets are over 50 years old
    The MAF's air force lost its MiG-29 Fulcrum fighter aircraft in 2017, and is struggling to keep its Su-30MKM Flanker fighter aircraft operational
    Lack of modern assets
    The MAF lacks modern military assets, which exposes it to internal and external threats
    The MAF has had issues with the serviceability of its assets due to a lack of budget
    Outsourcing
    The MAF has outsourced the maintenance of its assets, but this has led to challenges such as undertraining of staff and underperforming contractors
    Procurement
    The procurement process can be lengthy, which can lead to outdated pricing
    The MAF has acquired advanced weapon systems from different countries, which can lead to technical and logistical problems
    Maintenance: Maintaining a large fleet of aging aircraft can be costly and burdensome.
    Operational capabilities: Aging assets can limit the operational capabilities of the MAF.
    Budget constraints: The MAF may not have enough budget to replace aging assets.
    Procurement system: The MAF's procurement system may need to be restructured to avoid political interference and excessive commissions.
    Scandals: The MAF has been involved in scandals involving fighter jets, submarines, and other equipment.
    Logistics: The MAF may have issues with delivering spares to soldiers in time.
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme...

    BalasHapus
  45. The Malonn Armed Forces (MAF) faces problems with fleet sustainment, including the maintenance of an aging aircraft fleet. The MAF may also face economic constraints when prioritizing and provisioning for its military.
    Fleet sustainment
    • Aging aircraft: The MAF's fleet of aircraft may be too old to maintain effectively.
    • Limited defense budget: The MAF's defense modernization budget may be limited, making it difficult to expand or accelerate programs to upgrade its aircraft.
    Economic constraints
    • Limited power resources
    The MAF may have limited power resources, such as labor, tools, and money, to support its operations.
    • Prioritizing and provisioning
    The MAF may need to consider economic constraints when prioritizing and provisioning for its operations.
    ========
    The Malonn Armed Forces (MAF) has had issues with the serviceability of its assets due to a limited budget. The MAF has outsourced maintenance of its assets since the 1970s, but this program has faced challenges.
    Explanation
    The MAF's budget is limited, which affects the serviceability of its assets.
    The MAF outsources maintenance of its assets through competitive tenders.
    However, the outsourcing program has faced challenges such as undertrained staff and underperforming contractors.
    Over-reliance on outsourcing can compromise national security if policies are not attentively implemented.
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme...

    BalasHapus
  46. The Malonn Armed Forces (MAF) faces challenges in its defense industry, including a lack of indigenous capabilities, budget constraints, and a lack of government guidance.
    Lack of indigenous capabilities
    • Malonn imports most of its major defense assets from overseas.
    • Local companies lack the ability to design, manufacture, and develop technologically advanced defense systems.
    • Local companies lack the ability to innovate and commercialize products or processes.
    Budget constraints
    • The government lacks strategic patience and vision to groom and guide the industry.
    Other challenges
    • A lack of sufficient human talents, especially STEM specialists.
    • A lack of local industry engagement at the outset of capability and procurement planning.
    • Poor program management and oversight.
    • Reluctance of Original Equipment Manufacturers (OEMs) to share their technology
    • Lack of training: Commanders don't receive training on corruption issues before deployments.
    High levels of corruption in politics: There is a high level of corruption in Malonn politics and royalty, which can lead to corruption in the military.
    • Lack of a military doctrine: Malonn doesn't have a military doctrine that recognizes corruption.
    Effects
    • Outdated inventory: Outdated inventory can make it difficult to deliver supplies to soldiers in a timely manner.
    Counterfeit parts: Counterfeit parts can be supplied to military bases, which can make it difficult to ensure that all assets are functioning properly.
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme...

    BalasHapus
  47. The Royal Malonn Air Force (RMAF) has faced a number of weaknesses, including an aging fleet, a lack of funds, and political interference.
    Aging fleet
    • The RMAF has an aging fleet of aircraft, including the Sikorsky S-61A4 Nuri helicopter, the Mikoyan MiG-29, and the Hawk trainer and light combat aircraft.
    • The RMAF has had a number of accidents involving its aircraft, including crashes and engine failures.
    • The RMAF's fleet sustainment problems are made worse by the fact that the aircraft are rapidly becoming technologically obsolete.
    Lack of funds
    • The RMAF's defense modernization budget is limited.
    • The RMAF's limited defense budget has made it difficult to replace its aging aircraft with more advanced assets.
    Political interference
    • Political interference and corruption have undermined the RMAF's combat readiness.
    • The RMAF has been involved in a number of corruption scandals.
    Other challenges
    • Economic conditions
    The value of the Malonn Ringgit (MYR) has been low compared to the US Dollar (USD) and other currencies used by major weapon exporting nations.
    • Political interference
    There has been politicization of defense spending, which has led to acquisitions being delayed or canceled.
    Equipment
    • Outdated equipment
    Much of the MAF's equipment is outdated and out of date compared to neighboring countries.
    • Technical and logistical problems
    The MAF faces technical and logistical problems with the advanced weapon systems they have acquired.
    Other problems
    • Domestic critics: Domestic critics have pointed to the need for more modern equipment and stronger capabilities
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme...

    BalasHapus
  48. The capabilities of the Malonn Armed Forces (MAF) are outdated. The MAF has faced challenges in modernizing its fleet and equipment to meet current and future threats.
    Outdated equipment
    • Ships
    Some ships in the Royal Malonn Navy (RMN) are over 40 years old and have exceeded their intended service life.
    • Submarines
    The KD Rahman submarine experienced technical problems in 2010 and was unable to submerge.
    • Gunboats
    The Perdana-class gunboat and the KD Sri Perlis and KD SRI Johor gunboats are at least 40 years old.
    • Corvettes
    The Kasturi-class Corvette entered service in 1984, and the Laksamana Corvette class was built in the early 1980s.
    Underfunding
    Budget
    The MAF has faced budget constraints for decades, which have limited its ability to purchase new equipment and upgrade existing assets
    The government has been unwilling to cut spending elsewhere to fund defense
    Aging equipment
    The MAF's equipment is aging, and some assets are over 50 years old
    The MAF's air force lost its MiG-29 Fulcrum fighter aircraft in 2017, and is struggling to keep its Su-30MKM Flanker fighter aircraft operational
    Lack of modern assets
    The MAF lacks modern military assets, which exposes it to internal and external threats
    The MAF has had issues with the serviceability of its assets due to a lack of budget
    Outsourcing
    The MAF has outsourced the maintenance of its assets, but this has led to challenges such as undertraining of staff and underperforming contractors
    Procurement
    The procurement process can be lengthy, which can lead to outdated pricing
    The MAF has acquired advanced weapon systems from different countries, which can lead to technical and logistical problem.
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme....

    BalasHapus
  49. The Royal Malonn Navy (RMN) faces a number of issues, including funding shortages, the need for new equipment, and the need to modernize its aging fleet.
    Funding
    • Malonn's military has historically faced funding shortages.
    • The RMN needs to purchase more submarines, littoral mission ships, and multi-role support ships.
    • The RMN also needs to upgrade its aging fleet with the latest technologies.
    Modernization
    • The RMN needs to modernize its aging fleet with the latest technologies.
    • The RMN needs to implement a Service Life Extension Program (SLEP) to keep its ships modern.
    ==========
    The Malonnn Armed Forces (MAF) faces a number of challenges, including:
    • Logistics
    A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
    • Budgeting
    Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces. .
    • Procurement
    The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
    • Political interference
    Political interference and corruption are undermining combat readiness.
    • Fleet sustainment
    The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
    • Technological obsolescence
    Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme....

    BalasHapus
  50. The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
    Malonn military budget faces challenges such as a need for more funding, aging assets, and competing national priorities.
    Funding
    Budget constraints
    Malonn defense spending is low compared to other countries in the region.
    Aging assets
    Outdated aircraft
    The Malonn air force has been facing a shortage of funding to buy new assets.
    Ageing equipment
    The military's equipment is aging, which can make it difficult to maintain.
    Competing priorities
    Other national priorities
    The government has other national priorities, such as revitalizing the economy and reducing the national deficit.
    Local defense industry
    Malonn is looking to develop its local defense industry, but it faces challenges such as high import costs.
    Corruption
    Corruption in defense procurement: Corruption has been a problem in Malonn defense procurement system
    ==============
    The Royal Malonn Navy (RMN) faces a number of challenges, including underfunding, a lack of coordination, and outdated assets. These issues can make it difficult for the RMN to protect Malonn's maritime domain and respond to threats.
    Underfunding
    • The RMN's defense budget is small, and is often used for maintenance and repairs
    • The RMN's defense budget is less than 1% of Malonn's GDP
    • The RMN's defense budget is not enough to modernize the navy
    Lack of coordination
    • The RMN has outdated assets, such as the KD Rahman submarine, which could not submerge in 2010
    • The RMN's assets are not modern enough to meet the country's security needs
    Other challenges
    • Political interference and corruption can undermine the RMN's combat readiness
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme.....

    BalasHapus
  51. The Malonn military has faced several problems with procurement, including cost, political influence, and a lack of transparency.
    Cost
    Fiscal limitations
    The Malonn government has been unwilling to cut spending elsewhere to fund defense.
    Political influence
    Vendor-driven decisions: Decisions are sometimes made in favor of vendors rather than strategic interests.
    Political influence on suppliers: For example, Malonn has sometimes exchanged hardware for palm oil.
    Weak external oversight: Political influence can be used to bypass established protocols.
    Lack of transparency
    Tension between the public and the military: The public has a right to know, but the military has a need to know.
    Unethical conduct: Issues include corruption, cronyism, and interference from outside parties.
    =====================
    Military spending can increase a country's national debt. This is because military spending is a cost that a country incurs, which can lead to a larger debt.
    Explanation
    Military spending
    Military spending includes the money spent on a country's armed forces, including defense operations and peacekeeping.
    National debt
    National debt is the total amount of money a country owes. This includes all liabilities that the country needs to pay back, plus any interest or principal that needs to be paid.
    Impact on the economy
    When a country spends more on its military, it can have a significant impact on its balance sheet. This can lead to higher interest rates and borrowing costs, which can eventually slow economic growth and increase taxes.
    Example
    In 2025, Malonn allocated $4.8 billion to its Ministry of Defense (MINDEF). This included $1.3 billion for maintenance, repairs, and new military assets
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme.....

    BalasHapus
  52. The Malonn Armed Forces (MAF) faces challenges in its defense industry, including a lack of indigenous capabilities, budget constraints, and a lack of government guidance.
    Lack of indigenous capabilities
    • Malonn imports most of its major defense assets from overseas.
    • Local companies lack the ability to design, manufacture, and develop technologically advanced defense systems.
    • Local companies lack the ability to innovate and commercialize products or processes.
    Budget constraints
    • The government lacks clear guidance for the future strategic direction of the industry.
    • The government lacks strategic patience and vision to groom and guide the industry.
    Other challenges
    =================
    The Malonnn Armed Forces (MAF) has a lack of modern military assets due to a small defense budget and aging equipment. This has left the MAF vulnerable to internal and external threats.
    Causes
    • Small defense budget: The MAF has had small procurement budgets for the past quarter-century.
    • Aging equipment: Most of the MAF's equipment was purchased between the 1970s and 1990s.
    • Foreign dependence: The MAF relies on foreign Original Equipment Manufacturers (OEMs) for its military hardware and software.
    Effects
    • Vulnerability to threats
    The MAF is vulnerable to internal and external threats due to its lack of modern military assets.
    • Challenges with air force
    The MAF's air force has been challenged by the withdrawal of its MiG-29 Fulcrum fighter aircraft in 2017.
    • Challenges with naval assets
    The MAF's naval assets are aging, as evidenced by the KD Rahman submarine issue in 2010.
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme.....

    BalasHapus
  53. Malonn defense budget has been increasing in recent years, but it is still relatively low compared to its neighbors. The budget is allocated to the Ministry of Defense (MINDEF).
    2025 defense budget
    • The 2025 defense budget was $4.8 billion, a 7.08% increase from 2024
    • The budget included $1.3 billion for maintenance and repair, and the procurement of new military assets
    • The budget also included an increase in maritime assets, such as patrol vessels and multi-purpose mission ships
    2024 defense budget
    • The 2024 defense budget was $4.3 billion
    • The budget included $1.7 billion for salaries and allowances, and $1.2 billion for procurement
    Factors affecting defense budget
    • Malonn defense spending is lower than many regional powers, such as Singapore, Vietnam and Indonesia
    ===========
    The Malonn Armed Forces (MAF) face many challenges, including:
    Personnel: The MAF has difficulty recruiting and retaining high-quality personnel, partly due to poor service conditions.
    Equipment: The MAF needs to modernize its equipment, including replacing its fleet of Nuri helicopters.
    Infrastructure: The MAF needs to improve its defense infrastructure, including living quarters.
    Ethnic composition: The MAF needs to rebalance the ethnic composition of its forces.
    Logistic management: The MAF needs to improve its logistic management, including planning, operation implementation, and supply pre-budgeting.
    Non-traditional security challenges: The MAF needs to increase its authority to tackle non-traditional security challenges.
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme.....

    BalasHapus
  54. The Malonnn Armed Forces (MAF) faces a number of challenges, including:
    • Logistics
    A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
    • Budgeting
    Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    • Procurement
    The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
    • Political interference
    Political interference and corruption are undermining combat readiness.
    • Fleet sustainment
    The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
    • Technological obsolescence
    Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
    • Modernization
    The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
    =========
    Public debt in Malonn has a positive association with defense spending. This means that as public debt increases, so does defense spending.
    Explanation
    Military spending can contribute to a country's national debt.
    Developing countries with weak economies may have a problem with external debt created by military spending.
    When a country borrows overseas to maintain financial balance, the debt rescheduling can increase fiscal deficits and create a debt overhang..
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme.....

    BalasHapus
  55. The Malonnn Armed Forces (MAF) has faced challenges with the readiness of its equipment, including outdated assets, logistical issues, and a lack of operational compatibility.
    Outdated assets
    • Much of the MAF's equipment was purchased between the 1970s and 1990s, and is now outdated.
    • For example, the MiG-29N fighter jets were decommissioned in 2017 due to high maintenance costs.
    Logistical issues
    • The MAF has faced logistical problems due to the acquisition of unsuitable equipment and weapons.
    • These weapons and equipment may not be compatible with the MAF's conventional force development needs.
    Lack of operational compatibility
    ==========
    Malonn military budget faces challenges such as a need for more funding, aging assets, and competing national priorities.
    Funding
    Budget constraints
    Malonn defense spending is low compared to other countries in the region.
    Maintenance and repair
    The budget for maintenance and repair is limited, which can make it difficult to acquire new assets.
    Economic limitations
    The government has faced delays and cancellations of military modernization projects due to economic limitations.
    Other priorities
    The government has other priorities, such as revitalizing the economy and reducing the national deficit.
    Aging assets
    Outdated aircraft
    The Malonn air force has been facing a shortage of funding to buy new assets.
    Ageing equipment
    The military's equipment is aging, which can make it difficult to maintain.
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW

    BalasHapus
  56. Factors that influence Malon's military budget include:
    • Fiscal limitations
    Malonn governments have been unwilling to fund defense by cutting government spending or reducing the size of the armed forces.
    • Public debt
    A study found a positive association between public debt and defense spending in Malon.
    • Exchange rate
    The depreciation of the ringgit can impact the real gain in procurement funding.
    • Military imports
    The size of military imports is closely linked to variations in expenditure.
    • Military aid
    The availability of military aid plays a central role in military expenditure.
    • Non-conventional security issues
    These issues are beginning to shape and influence the nature of threats to national defense and security.
    • Corruption
    Corruption risks are critical in terms of military operations.
    ===========
    Political uncertainty is a challenge for Malonn armed forces (MAF). This is due to the country's history of political instability and the lack of well-established civilian control over the military.
    Political instability
    • 2020–2022 political crisis
    This crisis led to the resignation of two Prime Ministers and the collapse of two coalition governments.
    • Fragmented political landscape
    The 2022 general election resulted in a fragmented political landscape with five main camps.
    Lack of civilian control
    • Internal production of defense documents
    The Ministry of Defence (MINDEF) produces key defense documents internally, with little room for debate in parliament.
    • Limited parliamentary authority
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme......

    BalasHapus
  57. The Malonnn Armed Forces (MAF) has faced a number of weaknesses, including a lack of direction, outdated equipment, and logistical issues. These weaknesses have made the MAF vulnerable to internal and external threats.
    Weaknesses
    • Outdated equipment: The MAF has been unable to obtain modern military assets, which has left it exposed to threats.
    • Logistical issues: The MAF has experienced logistical and maintenance problems, including delays in logistical systems.
    • Lack of direction: The MAF's structure has been influenced by the security situation, which has led to a lack of direction in development.
    • Corruption: Some say that the military hierarchy has been compromised by corruption.
    • Political interference: Some say that political interference has impacted military procurement.
    ================
    The Malonn Armed Forces (MAF) face a number of equipment challenges, including:
    Aging aircraft
    The RMAF's main fighter fleet includes the Su-30MKMs and Boeing F/A-18 Hornets, which are becoming technologically obsolete. Maintaining a large fleet of aging aircraft can be expensive.
    Limited defense budget
    The government's defense modernization budget is limited, making it difficult to afford new equipment.
    Local companies may not have the necessary capabilities to produce the equipment the MAF needs.
    OEM reluctance
    Original equipment manufacturers (OEMs) may be reluctant to share their technology for fear of competition.
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme......

    BalasHapus
  58. RELATED DEBT WITH BUDGET MILITARY
    RELATED DEBT WITH BUDGET MILITARY
    RELATED DEBT WITH BUDGET MILITARY
    Public debt and defense spending in Malonn are related, and the relationship between the two is important to consider for fiscal dynamics.
    Explanation
    Debt and economic growth
    The relationship between government debt and economic growth is a key policy question. Some research suggests that there is a non-linear relationship between the two variables.
    Military spending and external debt
    Military spending can have security and economic consequences, especially for developing economies. Rapid expansion in military spending can lead to rising fiscal deficits.
    Public debt and defense spending in Malonn
    Research has been conducted to study the relationship between public debt and defense spending in Malonn. This research has used data from the World Bank to analyze the dynamic relationship between the two variables.
    ===========
    The Malonnn Armed Forces (MAF) face several problems that affect their readiness, including a lack of funding, outdated assets, and personnel issues.
    Funding
    • Insufficient funding: The MAF's combat readiness depends on funding for training, technology, and morale. EXCLUDING adequate funding, these areas are affected, which can undermine the country's strategic deterrence.
    • Cost overruns: The cost of projects like the LCS has exceeded the initial budget.
    Outdated assets
    • Lack of modern military assets
    The MAF lacks modern military assets, which can expose it to internal and external threats.
    • Personnel knowledge, skills, and abilities: Issues with personnel knowledge, skills, and abilities can affect their performance in complex military operations.
    Other issues
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme......

    BalasHapus
  59. RELATED DEBT WITH BUDGET MILITARY
    RELATED DEBT WITH BUDGET MILITARY
    RELATED DEBT WITH BUDGET MILITARY
    Public debt and defense spending in Malonn are related, and the relationship between the two is important to consider for fiscal dynamics.
    Explanation
    Debt and economic growth
    The relationship between government debt and economic growth is a key policy question. Some research suggests that there is a non-linear relationship between the two variables.
    Military spending and external debt
    Military spending can have security and economic consequences, especially for developing economies. Rapid expansion in military spending can lead to rising fiscal deficits.
    Public debt and defense spending in Malonn
    Research has been conducted to study the relationship between public debt and defense spending in Malonn. This research has used data from the World Bank to analyze the dynamic relationship between the two variables.
    ===========
    The Malonnn Armed Forces (MAF) face several problems that affect their readiness, including a lack of funding, outdated assets, and personnel issues.
    Funding
    • Insufficient funding: The MAF's combat readiness depends on funding for training, technology, and morale. EXCLUDING adequate funding, these areas are affected, which can undermine the country's strategic deterrence.
    • Cost overruns: The cost of projects like the LCS has exceeded the initial budget.
    Outdated assets
    • Lack of modern military assets
    The MAF lacks modern military assets, which can expose it to internal and external threats.
    • Personnel knowledge, skills, and abilities: Issues with personnel knowledge, skills, and abilities can affect their performance in complex military operations.
    Other issues
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme......

    BalasHapus
  60. Malonn military budget faces challenges such as a need for more funding, aging assets, and competing national priorities.
    Funding
    Budget constraints
    Malonn defense spending is low compared to other countries in the region.
    Maintenance and repair
    The budget for maintenance and repair is limited, which can make it difficult to acquire new assets.
    Economic limitations
    The government has faced delays and cancellations of military modernization projects due to economic limitations.
    Aging assets
    Outdated aircraft
    The Malonn air force has been facing a shortage of funding to buy new assets.
    Ageing equipment
    The military's equipment is aging, which can make it difficult to maintain.
    Corruption
    Corruption in defense procurement: Corruption has been a problem in Malonn defense procurement system
    ===============
    The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
    Funding
    • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
    • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    Aging equipment
    • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
    • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
    • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
    Other challenges
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme......

    BalasHapus
  61. THE MALONN LITTORAL COMBAT SHIP (LCS) PROGRAM HAS FACED A NUMBER OF ISSUES, INCLUDING:
    • Delayed delivery
    The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
    • Design issues
    The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
    • Financial issues
    Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
    ============
    Malon's combat equipment has several weaknesses, including:
    Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness.
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme......

    BalasHapus
  62. The Malonnn Army's readiness is affected by a number of factors, including corruption, poor planning, and inadequate funding.
    Factors affecting readiness
    • Corruption: The Malonnn military has been affected by corruption.
    • Poor planning: The Malonnn military has been affected by poor planning.
    • Political interference: Political leaders have interfered in the procurement process.
    • Inadequate funding: The Malonnn military has not received adequate funding.
    • Unsuitable equipment: The Malonnn military has been affected by unsuitable equipment and weapons.
    • Logistical problems: The Malonnn military has been affected by logistical problems.
    ==============
    Malonn's armed forces procurement faces several weaknesses, including:
    1. Corruption
    The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
    2. Political influence
    Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
    Weak parliamentary oversight
    Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
    3. Limited financial scrutiny
    Financial scrutiny is limited by excessive secrecy.
    4. Violation of procedures
    Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme......

    BalasHapus
  63. The Malonnn Army's readiness is affected by a number of factors, including corruption, poor planning, and inadequate funding.
    Factors affecting readiness
    • Corruption: The Malonnn military has been affected by corruption.
    • Poor planning: The Malonnn military has been affected by poor planning.
    • Political interference: Political leaders have interfered in the procurement process.
    • Inadequate funding: The Malonnn military has not received adequate funding.
    • Unsuitable equipment: The Malonnn military has been affected by unsuitable equipment and weapons.
    • Logistical problems: The Malonnn military has been affected by logistical problems.
    ==============
    Malonn's armed forces procurement faces several weaknesses, including:
    1. Corruption
    The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
    2. Political influence
    Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
    Weak parliamentary oversight
    Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
    3. Limited financial scrutiny
    Financial scrutiny is limited by excessive secrecy.
    4. Violation of procedures
    Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme......

    BalasHapus
  64. SOME WEAKNESSES OF THE MALONNN SHIPBUILDING INDUSTRY INCLUDE:
    1. Delays
    Consistent delays in delivering ships to customers has reduced profitability and financial results.
    2. Small tonnage
    Malonnn shipbuilding industry is relatively weak compared to other countries in the region, as the tonnage of ships manufactured is relatively small.
    3. Supply chain disruptions
    Disruptions caused by COVID-19 and the Russia-Ukraine conflict have led to supply chain disruptions and shortages of skilled personnel.
    ==============
    Malonn military procurement faces challenges due to budget constraints, outdated equipment, and political influence.
    Budget constraints
    • The Malonn government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    • The government has had small procurement budgets over the last quarter-century.
    • The government has had to deal with the economic impact of COVID-19.
    Outdated equipment
    • Most of the Malonn military's equipment was purchased between the 1970s and 1990s.
    • The air force's MiG-29 Fulcrum fighter aircraft were withdrawn from service in 2017.
    • The KD Rahman submarine had technical problems and could not submerge in 2010.
    Political influence
    • The procurement process is subject to political influence from suppliers.
    • The procurement process is sometimes vendor-driven and against strategic interests.
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme......

    BalasHapus
  65. The Malonn Armed Forces (MAF) has faced challenges with its equipment due to a lack of resources, outdated equipment, and corruption.
    Lack of resources
    • The government's defense budget is limited, making it difficult to afford modern equipment
    • The government has not provided clear guidance for the future of the defense industry
    • The government has not been able to increase the local content of equipment
    Outdated equipment
    • The RMAF's main fighter fleet includes the Su-30MKMs and Boeing F/A-18 Hornets, which are considered technologically obsolete
    • The RMN has many old ships, including the Kasturi-class Corvette and the Laksamana Corvette class, which were built in the 1980s
    • The KD Rahman submarine had technical problems that prevented it from submerging
    Corruption
    • The MAF has been involved in many corruption scandals
    Other challenges
    ================
    PUBLIC DEBT = DEFENSE SPENDING
    Public debt has a positive correlation with defense spending in Malonn, meaning that as public debt increases, so does defense spending. This is because the government allocates funds from the national budget to debt repayments and defense.
    Explanation
    Debt and budget
    The Malonn government's budget includes allocations for debt repayments and defense. The government's income is often not enough to cover all expenditures, so it borrows money to finance the difference.
    Debt-to-GDP ratio
    Malonn debt-to-GDP ratio has been increasing over the years. In 2023, the debt-to-GDP ratio was 65.6%.
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme.......

    BalasHapus
  66. Malonn's military procurement has several weaknesses, including:
    • Corruption: The defense sector is vulnerable to corruption, and there is a high risk of corruption.
    • Weak parliamentary oversight: Parliamentary oversight is weak, and financial scrutiny is limited by excessive secrecy.
    • External influences: Decisions are often influenced by vendors and are against strategic interests. For example, Malonn sometimes procures hardware in exchange for palm oil.
    • Mixing and matching equipment: The Malonnn military sources weapons systems and platforms from a large variety of foreign suppliers. This makes it difficult to find personnel to manage the equipment.
    • Budgetary uncertainty: There is budgetary uncertainty in defense procurement.
    • Opaque decision making: Decision making in defense procurement is opaque.
    • Shifting priorities: Priorities in defense procurement shift.
    =================
    The Malonnn Armed Forces (MAF) face a number of challenges, including limited funding, aging equipment, and a lack of modern assets.
    Funding
    • Small procurement budgets: The MAF has had small procurement budgets over the past 25 years.
    • Fiscal limitations: The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    Aging equipment
    • Outdated assets: The MAF's equipment is aging, and the government has been unable to provide modern assets.
    • Withdrawal of MiG-29 Fulcrum fighter aircraft: The MAF withdrew its MiG-29 Fulcrum fighter aircraft from service in 2017.
    • Su-30MKM Flanker fighter aircraft: The MAF is struggling to keep its Su-30MKM Flanker fighter ground-attack aircraft operational.
    Other challenges
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme.......

    BalasHapus
  67. The Malonn Armed Forces (MAF) face several problems with their combat ships, including funding, delays, and corruption.
    Funding
    • The MAF has been underfunded for years, especially for buying new assets.
    • The government has allocated more money to maintenance and repairs than to new naval assets.
    • The government has been unwilling to reduce government spending.
    Delays
    • The Littoral Combat Ship (LCS) program has been delayed due to technical difficulties, cost overruns, and corruption.
    • The first LCS was originally scheduled for delivery in 2019, but has not yet been delivered.
    Corruption
    • The Malonn Anti-Corruption Commission (MACC) arrested two senior executives involved in the LCS project.
    ======================
    Malonn's armed forces procurement faces several weaknesses, including:
    1. Corruption
    The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
    2. Political influence
    Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
    Weak parliamentary oversight
    Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
    3. Limited financial scrutiny
    Financial scrutiny is limited by excessive secrecy.
    4. Violation of procedures
    Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme.......

    BalasHapus
  68. The Royal Malonn Air Force (RMAF) faces several challenges that have contributed to its aircraft fleet weakness, including budget constraints, technological obsolescence, and frequent government changes.
    Budget constraints
    • The Malonn government's military budget fluctuates with the economy. The 1997 Asian financial crisis and the COVID-19 pandemic have both held back defense spending.
    • The government has limited defense modernization funds.
    Technological obsolescence
    • The RMAF's fleet of legacy Hornets are rapidly becoming technologically obsolete.
    • Maintaining a large fleet of aging aircraft can be expensive and burdensome.
    Frequent government changes
    • Since 2018, Malonn has had four Prime Ministers and governments.
    • The government is focused on other priorities, such as revitalizing the economy and reducing the national deficit.
    ================
    Some say that Malonn's military has outdated aircraft, but the country has also been modernizing its military with new equipment and programs.
    Outdated aircraft
    • Some say that Malonn's aircraft are becoming technologically obsolete.
    • A larger fleet of older aircraft could be difficult to maintain.
    Modernization programs
    • The Malonnn Army has a program called the Future Soldier System (FSS) to equip soldiers with personal protection equipment.
    • The Malonnn government has allocated funds for maintenance, repairs, and new military assets.
    Defense budget
    • Malonn's defense budget is $4 billion, which supports a modest ground force and an improving air force.
    • The government has allocated funds for maintenance, repairs, and new military assets
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme,

    BalasHapus
  69. The Malonn Armed Forces (MAF) has faced a number of weaknesses, including outdated equipment, financial constraints, and corruption.
    Outdated equipment
    • Most of the MAF's equipment was purchased between the 1970s and 1990s.
    • Some of the navy's fleet and helicopters were commissioned in the 1960s.
    • The government auditor-general found that half of the navy's ships were beyond their serviceable lifespan.
    • The KD Rahman submarine had technical problems that prevented it from submerging.
    Financial constraints
    • The government's financial ability may limit the MAF's ability to develop and equip modern assets.
    • The government's budget allocation may need to be spent prudently.
    Corruption
    • The MAF has been involved in several corruption scandals
    ======================
    Malonn's military has faced a number of challenges in maintaining its equipment, including:
    • Budgetary limitations
    Successive governments have been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    • Corruption
    Defence procurement has been characterized by corruption, budgetary uncertainty, and opaque decision making.
    • Outdated equipment
    The Royal Malonnn Air Force (RMAF) has a large fleet of aging aircraft that are difficult to maintain.
    • Political interference
    Political interference has undermined combat readiness.
    • Logistics weaknesses
    There are issues with the quality of logistics equipment and the delivery of spares to soldiers .
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme,

    BalasHapus
  70. The Malonn Armed Forces (MAF) has faced a number of problems with its assets, including outdated equipment, limited procurement budgets, and political interference.
    Outdated equipment
    • Many of the MAF's assets are outdated, with most of the equipment purchased between the 1970s and 1990s.
    • The Royal Malonn Navy (RMN) has many vessels that are past their intended service life.
    • The Royal Malonn Air Force (RMAF) needs to replace its Nuri helicopters, which were first commissioned in 1968.
    Limited procurement budgets
    • The MAF has had limited procurement budgets for the past quarter-century.
    • The global financial crisis caused the MAF to postpone large purchases.
    • The MAF has struggled to acquire modern military assets.
    Political interference
    • Political interference and corruption have undermined the MAF's combat readiness.
    • The MAF has faced challenges in engaging with non-traditional security challenges.
    =============
    Malonn military budget is allocated to protect the country's sovereignty and security. The budget includes the cost of military personnel, maintenance, procurement, research and development, and military aid.
    • Budget constraints
    Historical budget constraints and competing national priorities can limit the military budget.
    • Economic limitations
    Economic limitations can delay or cancel military modernization initiatives.
    • Regional security challenges
    The country's awareness of regional security challenges can impact the military budget.
    What is the military budget for 2025?
    • Malonn 2025 defense allocation was RM21.2 billion ($4.5 billion), a 7.08% increase from the previous year.
    • The budget included $1.3 billion for maintenance and repair work and the procurement of new military assets.
    ==========
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE HELI
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT superbikes today. The MPs had also taken delivery of Honda Civics under a leasing programme,

    BalasHapus
  71. ADA YANG WARAS LMS 2
    VERSI TERMURAH MILGEM
    VERSI TERMURAH MILGEM
    VERSI TERMURAH MILGEM
    VERSI TERMURAH MILGEM
    Qamarul says:
    5 DECEMBER 2024 AT 10:15 PM
    Joe-Can anyone explain, in layman terms, why the ship sides is seen to be bubbling/caving/not smooth?
    It is sheet metal welded together multi layered with hull metal be it aluminium alloy or high strength steel. Usually they were cut in squares( ERAWA) on the pendekar. There’s calculations behind that and it is a trade secret.
    Until now it’s still unclear what kind of radar will be used on the LMSB2 Cenk Aesa or Cenk 3D also the anti submarine weapon. Will it be rockets or light torps.
    -
    Haiqal says:
    5 DECEMBER 2024 AT 10:23 PM
    @Joe
    “where to cut down cost”
    I think the answer is our LMSB2 will not have ASW capability
    -
    Luqman says:
    6 DECEMBER 2024 AT 9:16 AM
    @joe
    “it will really be the most cheapest of variant”
    just my speculation, it could be combination of few factors which are
    – Use of certain structure designs from Hisar OPV, which itself is based on original Ada but faster to built and cheaper
    – Use of locally design main radar which ‘could’ be cheaper than Smart-S Mk2
    – No Yakamos sonar for ASW missions
    – Discounts……
    =========
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    =========

    PMX LEASE 15 YEARS
    PMX LEASE 15 YEARS
    PMX LEASE 15 YEARS
    RMAF
    RMN
    MMEA
    POLICE
    FIRE
    RESCUE DEPARTEMENT
    PM DEPARTEMENT
    PMX has defended the decision to lease the helicopters for the military and other government agencies – RM16.5 billion for 15 years – during the Parliament session on Thursday. Among others he said the government adopted the leasing model to reduce maintenance costs and at the same time improved the operational readiness of the fleet.
    DS Anwar Ibrahim did not address the fact that the government will be paying some RM1 billion a year for 15 years for the helicopters. He also said the helicopters selected were based on the specifications and requirements of the agencies themselves.
    He also confirmed that the Army will also be part of the leasing programme apart from RMAF,RMN, MMEA, police, Fire and Rescue Department, and the Prime Minister Department. Apart from RMAF 12 and police’s seven helicopters, he did not give the breakdown for the other services and agencies.
    =========
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness

    BalasHapus
  72. ADA YANG WARAS LMS 2
    VERSI TERMURAH MILGEM
    VERSI TERMURAH MILGEM
    VERSI TERMURAH MILGEM
    VERSI TERMURAH MILGEM
    Qamarul says:
    5 DECEMBER 2024 AT 10:15 PM
    Joe-Can anyone explain, in layman terms, why the ship sides is seen to be bubbling/caving/not smooth?
    It is sheet metal welded together multi layered with hull metal be it aluminium alloy or high strength steel. Usually they were cut in squares( ERAWA) on the pendekar. There’s calculations behind that and it is a trade secret.
    Until now it’s still unclear what kind of radar will be used on the LMSB2 Cenk Aesa or Cenk 3D also the anti submarine weapon. Will it be rockets or light torps.
    -
    Haiqal says:
    5 DECEMBER 2024 AT 10:23 PM
    @Joe
    “where to cut down cost”
    I think the answer is our LMSB2 will not have ASW capability
    -
    Luqman says:
    6 DECEMBER 2024 AT 9:16 AM
    @joe
    “it will really be the most cheapest of variant”
    just my speculation, it could be combination of few factors which are
    – Use of certain structure designs from Hisar OPV, which itself is based on original Ada but faster to built and cheaper
    – Use of locally design main radar which ‘could’ be cheaper than Smart-S Mk2
    – No Yakamos sonar for ASW missions
    – Discounts……
    =========
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    =========

    PMX LEASE 15 YEARS
    PMX LEASE 15 YEARS
    PMX LEASE 15 YEARS
    RMAF
    RMN
    MMEA
    POLICE
    FIRE
    RESCUE DEPARTEMENT
    PM DEPARTEMENT
    PMX has defended the decision to lease the helicopters for the military and other government agencies – RM16.5 billion for 15 years – during the Parliament session on Thursday. Among others he said the government adopted the leasing model to reduce maintenance costs and at the same time improved the operational readiness of the fleet.
    DS Anwar Ibrahim did not address the fact that the government will be paying some RM1 billion a year for 15 years for the helicopters. He also said the helicopters selected were based on the specifications and requirements of the agencies themselves.
    He also confirmed that the Army will also be part of the leasing programme apart from RMAF,RMN, MMEA, police, Fire and Rescue Department, and the Prime Minister Department. Apart from RMAF 12 and police’s seven helicopters, he did not give the breakdown for the other services and agencies.
    =========
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness

    BalasHapus
  73. ADA YANG WARAS LMS 2
    VERSI TERMURAH MILGEM
    VERSI TERMURAH MILGEM
    VERSI TERMURAH MILGEM
    VERSI TERMURAH MILGEM
    Qamarul says:
    5 DECEMBER 2024 AT 10:15 PM
    Joe-Can anyone explain, in layman terms, why the ship sides is seen to be bubbling/caving/not smooth?
    It is sheet metal welded together multi layered with hull metal be it aluminium alloy or high strength steel. Usually they were cut in squares( ERAWA) on the pendekar. There’s calculations behind that and it is a trade secret.
    Until now it’s still unclear what kind of radar will be used on the LMSB2 Cenk Aesa or Cenk 3D also the anti submarine weapon. Will it be rockets or light torps.
    -
    Haiqal says:
    5 DECEMBER 2024 AT 10:23 PM
    @Joe
    “where to cut down cost”
    I think the answer is our LMSB2 will not have ASW capability
    -
    Luqman says:
    6 DECEMBER 2024 AT 9:16 AM
    @joe
    “it will really be the most cheapest of variant”
    just my speculation, it could be combination of few factors which are
    – Use of certain structure designs from Hisar OPV, which itself is based on original Ada but faster to built and cheaper
    – Use of locally design main radar which ‘could’ be cheaper than Smart-S Mk2
    – No Yakamos sonar for ASW missions
    – Discounts……
    =========
    VERSI DOWNGRADE MILGEM
    VERSI DOWNGRADE MILGEM
    VERSI DOWNGRADE MILGEM
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    =========
    =========
    VERSI TERMURAH FA50
    VERSI TERMURAH FA50
    VERSI TERMURAH FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    =========

    Malonn's armed forces procurement faces several weaknesses, including:
    1. Corruption
    The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
    2. Political influence
    Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
    Weak parliamentary oversight
    Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
    3. Limited financial scrutiny
    Financial scrutiny is limited by excessive secrecy.
    4. Violation of procedures
    Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures.
    ==============
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE

    BalasHapus
  74. BUDGET LIMITED
    BUDGET LIMITED
    BUDGET LIMITED
    The Royal Malonnn Air Force (RMAF) has faced budget constraints and fleet sustainment problems. The RMAF's budget is limited, and the government has other priorities, such as revitalizing the economy and reducing the national deficit.
    Budget constraints
    • Limited budget
    The government's defense budget is limited, and the government has other priorities.
    • Frequent government changes
    The frequent change of governments since 2018 has hindered defense development.
    • Fiscal cost of COVID-19
    The government is still dealing with the fiscal cost of the COVID-19 pandemic.
    Fleet sustainment problems
    • Aging aircraft: The RMAF has a fleet of aging aircraft, such as the BAE Hawk 108 and MiG-29N.
    • Maintenance costs: Maintaining a large fleet of aging aircraft can be expensive.
    ==========
    Poor planning of the Malonnn Armed Forces (MAF) is due to a number of factors, including limited funding, an aging equipment inventory, and a lack of focus on defense.
    Limited funding
    • Successive governments have been unwilling to cut government spending elsewhere or reduce the size of the armed forces
    • The government has not allocated enough funds for procurement of new military assets and maintenance and repair work
    Aging equipment
    • The MAF has an aging equipment inventory due to small procurement budgets over the last quarter-century
    • The air force has been short on aircraft since the withdrawal of the MiG-29 Fulcrum fighter aircraft in 2017
    Lack of focus on defense
    • Economic and development concerns take priority over the needs of the military
    • The Development Division of the Ministry of Defence (MOD) follows guidelines given by the EPU in the Prime Minister's office
    Impact of poor planning
    • The MAF's combat readiness is affected, which depends on state-of-the-art technology, training, and morale
    • The country's planned strategic deterrence capability is undermined
    • The post-service career prospects for MAF veterans are affected
    ==========
    UNREADY ARMED FORCES
    UNREADY ARMED FORCES
    UNREADY ARMED FORCES
    the Malonnn military is today the region’s weakest. It is riddled with corruption, poor planning, and interference by political leaders in procurement, no longer a potent force even in managing low-level intensity conflict at a time when tensions in the South China Sea are higher than they have been since the days of the Vietnam War.
    A 2019 White Paper on Defense – nearly four years ago – called for more funds and punch as well as an overhaul of the procurement system to allow professionals to decide on what weapon systems they need. Instead, PM Anwar Ibrahim’s proposal to increase the defense budget by 10 percent to fund procurement will be delayed because of budgetary considerations related to the flagging economy, expected by the World Bank to grow at a mediocre 3.9 percent in 2023, down from an earlier estimate of 4.3 percent in April
    ==========
    2029-2020 : INCREASE DEBT
    2029-2020 : INCREASE DEBT
    2029 = 438,09 BILLION USD
    2028 = 412,2 BILLION USD
    2027 = 386,51 BILLION USD
    2026 = 362,19 BILLION USD
    2025 = 338,75 BILLION USD
    2024 = 316,15 BILLION USD
    2023 = 293,83 BILLION USD
    2022 = 271,49 BILLION USD
    2021 = 247,49 BILLION USD
    2020 = 221,49 BILLION USD
    ------------------
    2029-2020 : DEBT PAY DEBT
    2029-2020 : OVERLIMIT DEBT
    2029 = 69,54% DEBT RATIO TO GDP
    2028 = 69,34% DEBT RATIO TO GDP
    2027 = 68,8% DEBT RATIO TO GDP
    2026 = 68,17% DEBT RATIO TO GDP
    2025 = 68,07% DEBT RATIO TO GDP
    2024 = 68,38% DEBT RATIO TO GDP
    2023 = 69,76% DEBT RATIO TO GDP
    2022 = 65,5% DEBT RATIO TO GDP
    2021 = 69,16% DEBT RATIO TO GDP
    2020 = 67,69% DEBT RATIO TO GDP
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things.
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  75. The Malonnn Armed Forces (MAF) has faced a number of weaknesses, including corruption, outdated equipment, and a lack of authority.
    Corruption
    • The MAF has been plagued by corruption, which has undermined its combat readiness.
    • The MAF's Integrity Plan addresses corruption, but it's not a strategic document and doesn't provide comprehensive guidelines.
    • Commanders don't receive training on corruption issues before deployments.
    Outdated equipment
    • Most of the MAF's equipment was purchased between the 1970s and the 1990s.
    • The MAF's equipment is outdated and behind that of neighboring countries.
    • The government has been unable to provide the MAF with modern defense assets.
    Lack of authority
    • The MAF has limited authority, especially when it comes to non-traditional security challenges.
    • The MAF's role is generally to assist other authorities, such as the police.
    Other weaknesses
    • Political interference has undermined the MAF's combat readiness.
    • The MAF has faced budgetary constraints.
    =========
    The Malonnn Armed Forces (MAF) has faced a number of weaknesses, including outdated equipment, corruption, and political interference.
    Outdated equipment
    • The MAF's equipment is outdated and lacks modern military assets.
    • The MAF's equipment was purchased between the 1970s and 1990s.
    • The MAF's KD Rahman submarine was unable to submerge due to technical problems in 2010.
    Corruption
    • Political interference and corruption have undermined the MAF's combat readiness.
    • The MAF has been plagued by corruption.
    Budgetary constraints
    • The MAF's procurement has been held back by budgetary constraints.
    • The MAF's budget is limited to 1.4% of Malonn's GDP.
    Non-traditional security threats
    • The MAF faces non-traditional security threats, such as territory disputes with neighboring countries.
    • The MAF faces non-conventional threats, such as those that are transboundary in nature.
    Regional strategic environment
    • The MAF needs to consider the regional strategic environment when developing its strategic perspective.
    =========
    The Malonnn Armed Forces (MAF) faces a number of challenges, including:
    • Logistics
    A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
    • Budgeting
    Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    • Personnel
    The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
    • Procurement
    The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
    • Political interference
    Political interference and corruption are undermining combat readiness.
    • Territorial disputes
    Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
    • Transboundary haze
    Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
    • Fleet sustainment
    The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
    • Technological obsolescence
    Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
    • Modernization
    The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited

    BalasHapus
  76. The Malonnn Armed Forces (MAF) has faced a number of technical issues, including fleet sustainment problems, a lack of research and development, and a reliance on imported equipment.
    Fleet sustainment problems
    The MAF has a large fleet of aging aircraft that can be expensive to maintain.
    The government's defense modernization budget is limited, which can make it difficult to sustain the fleet.
    Lack of research and development
    The MAF has limited research and development (R&D) activities.
    The government has not provided clear guidance on the future strategic direction of the defense industry.
    Reliance on imported equipment
    Most of the MAF's equipment is imported from outside the country.
    The Asian Financial Crisis caused a downturn in Malonn's economy, which made imported goods more expensive.
    Other technical issues
    The MAF has faced logistic management problems.
    The MAF has faced challenges in developing its capabilities due to tight budgets and uncertain timelines.
    =============
    The Malonnn army has several weaknesses, including:
    • Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
    • Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
    • Corruption: The Malonnn military has been plagued by corruption.
    • Political interference: Political leaders have interfered in procurement.
    • Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
    • Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
    Other challenges include:
    • The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
    • The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
    =============
    Malonn has faced several crises, including political, financial, and economic crises:
    • Political crisis
    From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
    • Financial crisis
    Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
    • Economic crisis
    Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
    • Household debt crisis
    As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
    Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior

    BalasHapus
  77. The Royal Malonnn Air Force (RMAF) faces several problems with its aircraft, including an aging fleet, limited funding, and a lack of responsiveness in its logistics system.
    Aging fleet
    • The RMAF has a large fleet of aging aircraft that are difficult to maintain.
    • The RMAF's aircraft include the Mikoyan MiG-29, Boeing F/A-18 Hornet, and BAE Hawk.
    Limited funding
    • The government's defense modernization budget is limited. .
    • The government has many other priorities, including revitalizing the economy and reducing the national deficit.
    Logistics system
    • The RMAF's logistics system has problems with readiness and responsiveness.
    • Readiness is the ability to provide the minimum supply and service needed to start a combat operation.
    • Responsiveness is the ability to provide accurate support at the right time and place.
    Government change
    ==========
    Malonn armed forces have faced challenges due to limited funding, which has hindered their ability to modernize and respond to threats.
    Factors
    Fiscal constraints: The government has been unwilling to cut spending elsewhere to fund defense.
    Maintenance and repair: A significant portion of the defense budget goes toward maintenance and repair, leaving little for new assets.
    Political uncertainty: Political uncertainty has limited defense spending.
    Aging aircraft: The air force has a large fleet of aging aircraft that are expensive to maintain.
    Diversified acquisitions: The country has acquired advanced weapon systems from different countries, which can lead to technical and logistical problems.
    Poor governance: Poor governance has undermined the effectiveness of outsourcing programs.
    ==========
    1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN LEASE SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. LEASE SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. LEASE MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED LEASE BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI LEASE KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. LEASE MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. LEASE VSHORAD
    35. LEASE TRUK 3 TON
    36. 4X4 LEASE 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. LEASE BLACKHAWK LEASE AW159
    41. NO TRACKED SPH
    42. LEASE SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. LEASE AW139 LEASE COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 LEASE BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED LEASE PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM LEASE 12 AW149
    62. TUDM LEASE 4 AW139
    63. TUDM LEASE 5 EC120B
    64. TLDM LEASE 2 AW159
    65. TDM LEASE 4 UH-60A
    67. TDM LEASE 12 AW149
    68. BOMBA LEASE 4 AW139
    69. MMEA LEASE 2 AW159
    70. POLIS LEASE 7 BELL429

    BalasHapus
  78. The FA-50 fighter jet has faced issues with equipping, maintenance, and integration. These issues have delayed deliveries and raised doubts about the contract's completion.
    Equipment issues
    • Weapons
    Poland has had trouble securing U.S. approval for integrating certain weapons, like the AIM-120 AMRAAM missiles.
    • Integration
    The FA-50GFs in service cannot use newly ordered weapons systems, like the AIM-9X Sidewinder, due to a lack of integration.
    Maintenance issues
    • Availability: Poland has expressed dissatisfaction with the availability of the FA-50.
    • Scheduled maintenance: Some FA-50s have been on mandatory scheduled maintenance.
    Integration challenges
    • Cost: Cost concerns have raised doubts about the contract's completion.
    • Infrastructure: Poland has lacked infrastructure investments.
    • Political football: The future of the FA-50 platform has become a political football.
    ===============
    Malonn's combat readiness may be low due to a number of factors, including poor planning, corruption, and political interference.
    Factors
    • Logistic management: There are problems with managing logistics for soldiers.
    • Political interference: Political leaders have interfered with procurement.
    • Corruption: The military is riddled with corruption.
    Combat readiness
    • Combat readiness is the condition of the armed forces to perform during combat military operations.
    It includes the condition of warships, aircraft, weapon systems, and other military technology and equipment.
    ==========
    1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN LEASE SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. LEASE SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. LEASE MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED LEASE BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI LEASE KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. LEASE MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. LEASE VSHORAD
    35. LEASE TRUK 3 TON
    36. 4X4 LEASE 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. LEASE BLACKHAWK LEASE AW159
    41. NO TRACKED SPH
    42. LEASE SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. LEASE AW139 LEASE COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 LEASE BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED LEASE PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM LEASE 12 AW149
    62. TUDM LEASE 4 AW139
    63. TUDM LEASE 5 EC120B
    64. TLDM LEASE 2 AW159
    65. TDM LEASE 4 UH-60A
    67. TDM LEASE 12 AW149
    68. BOMBA LEASE 4 AW139
    69. MMEA LEASE 2 AW159
    70. POLIS LEASE 7 BELL429

    BalasHapus
  79. The Su-30MKM fighter jet has been grounded in the past, primarily due to issues with engine problems and a lack of readily available spare parts, particularly affecting the Malonnn Air Force (RMAF) which operates this variant; in 2018, Malonn grounded a significant portion of its Su-30MKM fleet due to these concerns, prompting them to invest in upgrades and local maintenance solutions to address the problem and restore operational readiness.
    Key points about the grounding:
    • Spare parts shortage:
    One of the main reasons for grounding was the difficulty in obtaining necessary spare parts for the aircraft, creating maintenance challenges.
    • Engine issues:
    The Su-30MKM's engines were also cited as a major concern, contributing to the grounding.
    -------------------
    The Malonnn Armed Forces (MAF) face several challenges that affect their combat readiness, including outdated equipment, corruption, and political interference.
    Outdated equipment
    • Most of the MAF's equipment was purchased between the 1970s and 1990s.
    • The MAF lacks modern military assets.
    • The KD Rahman submarine, which was purchased in 2010, had technical problems that prevented it from submerging.
    Corruption and political interference The MAF is plagued by corruption and Political leaders interfere with procurement.
    Other challenges
    • The MAF is unable to manage low-level conflicts.
    • The government is unable to provide the MAF with modern defense assets.
    Combat readiness
    • Combat readiness is the ability of the armed forces to perform military operations.
    • It is measured by the readiness of personnel, equipment, and training.
    ==========
    1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN LEASE SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. LEASE SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. LEASE MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED LEASE BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI LEASE KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. LEASE MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. LEASE VSHORAD
    35. LEASE TRUK 3 TON
    36. 4X4 LEASE 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. LEASE BLACKHAWK LEASE AW159
    41. NO TRACKED SPH
    42. LEASE SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. LEASE AW139 LEASE COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 LEASE BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED LEASE PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM LEASE 12 AW149
    62. TUDM LEASE 4 AW139
    63. TUDM LEASE 5 EC120B
    64. TLDM LEASE 2 AW159
    65. TDM LEASE 4 UH-60A
    67. TDM LEASE 12 AW149
    68. BOMBA LEASE 4 AW139
    69. MMEA LEASE 2 AW159
    70. POLIS LEASE 7 BELL429

    BalasHapus
  80. 1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN LEASE SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. LEASE SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. LEASE MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED LEASE BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI LEASE KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. LEASE MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. LEASE VSHORAD
    35. LEASE TRUK 3 TON
    36. 4X4 LEASE 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. LEASE BLACKHAWK LEASE AW159
    41. NO TRACKED SPH
    42. LEASE SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. LEASE AW139 LEASE COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 LEASE BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED LEASE PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM LEASE 12 AW149
    62. TUDM LEASE 4 AW139
    63. TUDM LEASE 5 EC120B
    64. TLDM LEASE 2 AW159
    65. TDM LEASE 4 UH-60A
    67. TDM LEASE 12 AW149
    68. BOMBA LEASE 4 AW139
    69. MMEA LEASE 2 AW159
    70. POLIS LEASE 7 BELL429
    ==========
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    Three weeks ago, the Madani government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd. The estimated cost for the deal is RM10.7 billion and it will be covered in installments over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals.
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE SIMULATOR MKM TAHUN
    Five-year contract for Sukhoi’s simulators. Publicly listed HeiTech Padu Bhd has announced that it had been awarded a RM67 million, five-year contract to operate and maintain the Su-30MKM flight simulators at the RMAF airbase in Gong Kedak
    LEASE HELI LEASE SIMULATOR
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)

    BalasHapus
  81. FAILED AND BANKRUPT COUNTRY =
    2029-2020 : DEBT PAY DEBT
    2029-2020 : OVERLIMIT DEBT
    2029-2020 : INCREASE DEBT
    HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN
    DEBT PROBLEMS SINCE 2000
    300.000 LOST JOBS
    ==========
    300.000 LOST JOBS
    300.000 LOST JOBS
    300.000 LOST JOBS
    Almost 300,000 lost their jobs in the last 4 years, Dewan Rakyat told Deputy human resources minister Abdul Rahman Mohamad says various programmes have been introduced to tackle underemployment. total of 293,639 workers lost their jobs between 2020 and Sept 26, with the manufacturing sector recording the highest number of layoffs at 75,615
    --------------
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    Malonn's state energy firm Petronas will reduce its workforce to ensure its long-term survival amid increasing challenges in the global operating environment
    --------------
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    The Malonnn government’s decision to terminate 30,000 contract staff without a school-leaving certification has drawn backlash from the country’s public service union, which said the sudden end to long careers working for the state lacks compassion.
    ------------------
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things. Using aggregated data from BNM's Central Credit Reference Information System (CCRIS), this dashboard gives you insight into key trends on household debt. For now, it displays data on the flow of borrowing activity on a monthly basis, broken down by purpose. In due time, it will be deepened with granular data showing the state of indebtedness of Malonn
    ==========
    DEFICIT
    Malonn recorded a Government Budget deficit equal to 4.10 percent of the country's Gross Domestic Product in 2024. Government Budget in Malonn averaged -3.33 percent of GDP from 1988 until 2024, reaching an all time high of 2.40 percent of GDP in 1997 and a record low of -6.70 percent of GDP in 2009.
    ==========
    2029-2020 : INCREASE DEBT
    2029-2020 : INCREASE DEBT
    2029 = 438,09 BILLION USD
    2028 = 412,2 BILLION USD
    2027 = 386,51 BILLION USD
    2026 = 362,19 BILLION USD
    2025 = 338,75 BILLION USD
    2024 = 316,15 BILLION USD
    2023 = 293,83 BILLION USD
    2022 = 271,49 BILLION USD
    2021 = 247,49 BILLION USD
    2020 = 221,49 BILLION USD
    ------------------
    2029-2020 : DEBT PAY DEBT
    2029-2020 : OVERLIMIT DEBT
    2029 = 69,54% DEBT RATIO TO GDP
    2028 = 69,34% DEBT RATIO TO GDP
    2027 = 68,8% DEBT RATIO TO GDP
    2026 = 68,17% DEBT RATIO TO GDP
    2025 = 68,07% DEBT RATIO TO GDP
    2024 = 68,38% DEBT RATIO TO GDP
    2023 = 69,76% DEBT RATIO TO GDP
    2022 = 65,5% DEBT RATIO TO GDP
    2021 = 69,16% DEBT RATIO TO GDP
    2020 = 67,69% DEBT RATIO TO GDP
    ==========
    Malonn's armed forces budget has been affected by economic downturns and political uncertainty. The country's defense spending has also been limited by leakage of funds.
    Economic downturns
    • The 1997 Asian financial crisis halted many of Malonn's defense procurements.
    • The pandemic also limited defense spending.
    Political uncertainty Political uncertainty has limited defense spending.
    Budget allocation
    • In 2025, Malonn allocated $4.8 billion to the Ministry of Defense (MINDEF).
    • Of this, $1.3 billion was allocated for maintenance and repair work and the procurement of new military assets
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  82. FAILED AND BANKRUPT COUNTRY =
    2029-2020 : DEBT PAY DEBT
    2029-2020 : OVERLIMIT DEBT
    2029-2020 : INCREASE DEBT
    HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN
    DEBT PROBLEMS SINCE 2000
    =========
    US DEPARTEMENT OF JUSTICE =
    1. ONE OF THE WORLD'S GREATEST FINANCIAL SCANDALS
    2. LARGEST KLEPTOCRACY CASE TO DATE
    Although it began in Malon, the scandal's global scope implicated institutions and individuals in politics, banking, and entertainment, and led to criminal investigations in a number of nations. The 1MDB scandal has been described as "one of the world's greatest financial scandals" and declared by the United States Department of Justice as the "largest kleptocracy case to date
    ------------------
    DEFICIT
    Malonn recorded a Government Budget deficit equal to 4.10 percent of the country's Gross Domestic Product in 2024. Government Budget in Malonn averaged -3.33 percent of GDP from 1988 until 2024, reaching an all time high of 2.40 percent of GDP in 1997 and a record low of -6.70 percent of GDP in 2009.
    Deficit by year
    • 2024 -4,10% of GDP
    • 2023 -4.55% of GDP
    • 2022 -4.81% of GDP
    • 2021 -6.03% of GDP
    • 2020 -4.90% of GDP
    • 2019 -3.4% of GDP
    -----------------
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things. Using aggregated data from BNM's Central Credit Reference Information System (CCRIS), this dashboard gives you insight into key trends on household debt. For now, it displays data on the flow of borrowing activity on a monthly basis, broken down by purpose. In due time, it will be deepened with granular data showing the state of indebtedness of Malonn
    ------------------
    2029-2020 : INCREASE DEBT
    2029-2020 : INCREASE DEBT
    2029 = 438,09 BILLION USD
    2028 = 412,2 BILLION USD
    2027 = 386,51 BILLION USD
    2026 = 362,19 BILLION USD
    2025 = 338,75 BILLION USD
    2024 = 316,15 BILLION USD
    2023 = 293,83 BILLION USD
    2022 = 271,49 BILLION USD
    2021 = 247,49 BILLION USD
    2020 = 221,49 BILLION USD
    ------------------
    2029-2020 : DEBT PAY DEBT
    2029-2020 : OVERLIMIT DEBT
    2029 = 69,54% DEBT RATIO TO GDP
    2028 = 69,34% DEBT RATIO TO GDP
    2027 = 68,8% DEBT RATIO TO GDP
    2026 = 68,17% DEBT RATIO TO GDP
    2025 = 68,07% DEBT RATIO TO GDP
    2024 = 68,38% DEBT RATIO TO GDP
    2023 = 69,76% DEBT RATIO TO GDP
    2022 = 65,5% DEBT RATIO TO GDP
    2021 = 69,16% DEBT RATIO TO GDP
    2020 = 67,69% DEBT RATIO TO GDP
    ==========
    HUTANG 2024 = RM 1,57 TRILLION
    HUTANG 2023 = RM 1,53 TRILLION
    HUTANG 2022 = RM 1,45 TRILLION
    HUTANG 2021 = RM 1,38 TRILLION
    HUTANG 2020 = RM 1,32 TRILLION
    HUTANG 2019 = RM 1,25 TRILLION
    HUTANG 2018 = RM 1,19 TRILLION
    The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023. In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018). “The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  83. FAILED AND BANKRUPT COUNTRY =
    2029-2020 : DEBT PAY DEBT
    2029-2020 : OVERLIMIT DEBT
    2029-2020 : INCREASE DEBT
    HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN
    DEFICIT
    RICE CRISES = 1972-73, 1999, 2008, 2020-21,2023 AND 2025
    =========
    RICE CRISES = 1972-73, 1999, 2008, 2020-21,2023 AND 2025
    Malonn has experienced several rice crises, including in 1972-73, 1999, 2008, 2020-21, and 2023. These crises are often caused by imbalances in supply and demand, and are made worse by market speculation.
    Causes
    • Weather: Rice is sensitive to temperature and flooding, and a 1–2°C increase in temperature can cut harvests in half.
    • Protectionist policies: Policies that create a non-competitive market can lead to low production and high prices.
    • Subsidies: Subsidies can be poorly targeted, and may not reach farmers in need.
    • Import restrictions: When other exporters restrict shipments, demand for local rice increases.
    Effects
    • Food insecurity: Shortages can lead to higher prices and food insecurity.
    • Low yields: Low yields can be caused by a number of factors, including weather, subsidies, and policies.
    Poverty: Low yields and high prices can lead to poverty among farmers.
    -----------------
    DEFICIT
    Malonn recorded a Government Budget deficit equal to 4.10 percent of the country's Gross Domestic Product in 2024. Government Budget in Malonn averaged -3.33 percent of GDP from 1988 until 2024, reaching an all time high of 2.40 percent of GDP in 1997 and a record low of -6.70 percent of GDP in 2009.
    Deficit by year
    • 2024 -4,10% of GDP
    • 2023 -4.55% of GDP
    • 2022 -4.81% of GDP
    • 2021 -6.03% of GDP
    • 2020 -4.90% of GDP
    • 2019 -3.4% of GDP
    -----------------
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things.
    ------------------
    2029-2020 : INCREASE DEBT
    2029-2020 : INCREASE DEBT
    2029 = 438,09 BILLION USD
    2028 = 412,2 BILLION USD
    2027 = 386,51 BILLION USD
    2026 = 362,19 BILLION USD
    2025 = 338,75 BILLION USD
    2024 = 316,15 BILLION USD
    2023 = 293,83 BILLION USD
    2022 = 271,49 BILLION USD
    2021 = 247,49 BILLION USD
    2020 = 221,49 BILLION USD
    ------------------
    2029-2020 : DEBT PAY DEBT
    2029-2020 : OVERLIMIT DEBT
    2029 = 69,54% DEBT RATIO TO GDP
    2028 = 69,34% DEBT RATIO TO GDP
    2027 = 68,8% DEBT RATIO TO GDP
    2026 = 68,17% DEBT RATIO TO GDP
    2025 = 68,07% DEBT RATIO TO GDP
    2024 = 68,38% DEBT RATIO TO GDP
    2023 = 69,76% DEBT RATIO TO GDP
    2022 = 65,5% DEBT RATIO TO GDP
    2021 = 69,16% DEBT RATIO TO GDP
    2020 = 67,69% DEBT RATIO TO GDP
    ==========
    HUTANG 2024 = RM 1,57 TRILLION
    HUTANG 2023 = RM 1,53 TRILLION
    HUTANG 2022 = RM 1,45 TRILLION
    HUTANG 2021 = RM 1,38 TRILLION
    HUTANG 2020 = RM 1,32 TRILLION
    HUTANG 2019 = RM 1,25 TRILLION
    HUTANG 2018 = RM 1,19 TRILLION
    “The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  84. RICE CRISES = 1972-73, 1999, 2008, 2020-21,2023 AND 2025
    Malonn has experienced several rice crises, including in 1972-73, 1999, 2008, 2020-21, and 2023. These crises are often caused by imbalances in supply and demand, and are made worse by market speculation.
    Causes
    • Weather: Rice is sensitive to temperature and flooding, and a 1–2°C increase in temperature can cut harvests in half.
    • Protectionist policies: Policies that create a non-competitive market can lead to low production and high prices.
    • Subsidies: Subsidies can be poorly targeted, and may not reach farmers in need.
    • Import restrictions: When other exporters restrict shipments, demand for local rice increases.
    Effects
    • Food insecurity: Shortages can lead to higher prices and food insecurity.
    • Low yields: Low yields can be caused by a number of factors, including weather, subsidies, and policies.
    • Poverty: Low yields and high prices can lead to poverty among farmers.
    =========
    RICE CRISES =
    JAPAN
    MALONN
    PHILIPPINES,
    In Japan, the government was forced to release 210,000 tons of rice from its one-million-ton emergency reserve, a historical first, due to an extreme price hike of up to 82%.
    In Malonn, a shortage of local rice has triggered public panic. Shrinking supplies have led to soaring prices, while imported rice has also become more expensive.
    Meanwhile, in the Philippines, the government declared a food security emergency in early February 2025 after rice inflation surged to 24.4%, marking the highest increase in 15 years.
    =========
    2029-2020 : INCREASE DEBT
    2029-2020 : INCREASE DEBT
    2029 = 438,09 BILLION USD
    2028 = 412,2 BILLION USD
    2027 = 386,51 BILLION USD
    2026 = 362,19 BILLION USD
    2025 = 338,75 BILLION USD
    2024 = 316,15 BILLION USD
    2023 = 293,83 BILLION USD
    2022 = 271,49 BILLION USD
    2021 = 247,49 BILLION USD
    2020 = 221,49 BILLION USD
    ------------------
    2029-2020 : DEBT PAY DEBT
    2029-2020 : OVERLIMIT DEBT
    2029 = 69,54% DEBT RATIO TO GDP
    2028 = 69,34% DEBT RATIO TO GDP
    2027 = 68,8% DEBT RATIO TO GDP
    2026 = 68,17% DEBT RATIO TO GDP
    2025 = 68,07% DEBT RATIO TO GDP
    2024 = 68,38% DEBT RATIO TO GDP
    2023 = 69,76% DEBT RATIO TO GDP
    2022 = 65,5% DEBT RATIO TO GDP
    2021 = 69,16% DEBT RATIO TO GDP
    2020 = 67,69% DEBT RATIO TO GDP
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn.............
    ==========
    The Malonnn Armed Forces (MAF) face several problems, including limited budgets, aging equipment, and logistical issues. These issues impact the country's defense policy and readiness to face threats.
    Budget
    • The MAF's budget is small and has been low for decades.
    • The MAF's budget has never exceeded 1.5% of GDP in the past 20 years.
    • The government has been focused on other priorities, such as the national debt and the COVID-19 pandemic.
    Equipment
    • The MAF's equipment is aging.
    • The MAF's air force lacks air superiority due to the withdrawal of its MiG-29 Fulcrum fighter aircraft in 2017.
    • The MAF's naval assets are old, including the Kasturi-class Corvette, which entered service in 1984.
    Logistics
    • The MAF's logistics management has problems that impact the country's defense policy.
    • The MAF's logistic unit has difficulty freeing itself from the logistic function burden of the combat unit.
    Other issues
    • The government's lack of clear guidance for the future strategic direction of the defense industry.
    • The government's reluctance to support locally produced products.
    • The frequent change of governments since 2018.
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  85. RICE CRISES = 1972-73, 1999, 2008, 2020-21,2023 AND 2025
    Malonn has experienced several rice crises, including in 1972-73, 1999, 2008, 2020-21, and 2023. These crises are often caused by imbalances in supply and demand, and are made worse by market speculation.
    Causes
    • Weather: Rice is sensitive to temperature and flooding, and a 1–2°C increase in temperature can cut harvests in half.
    • Protectionist policies: Policies that create a non-competitive market can lead to low production and high prices.
    • Subsidies: Subsidies can be poorly targeted, and may not reach farmers in need.
    • Import restrictions: When other exporters restrict shipments, demand for local rice increases.
    Effects
    • Food insecurity: Shortages can lead to higher prices and food insecurity.
    • Low yields: Low yields can be caused by a number of factors, including weather, subsidies, and policies.
    • Poverty: Low yields and high prices can lead to poverty among farmers.
    =========
    RICE CRISES =
    JAPAN
    MALONN
    PHILIPPINES,
    In Japan, the government was forced to release 210,000 tons of rice from its one-million-ton emergency reserve, a historical first, due to an extreme price hike of up to 82%.
    In Malonn, a shortage of local rice has triggered public panic. Shrinking supplies have led to soaring prices, while imported rice has also become more expensive.
    Meanwhile, in the Philippines, the government declared a food security emergency in early February 2025 after rice inflation surged to 24.4%, marking the highest increase in 15 years.
    =========
    2029-2020 : INCREASE DEBT
    2029-2020 : INCREASE DEBT
    2029 = 438,09 BILLION USD
    2028 = 412,2 BILLION USD
    2027 = 386,51 BILLION USD
    2026 = 362,19 BILLION USD
    2025 = 338,75 BILLION USD
    2024 = 316,15 BILLION USD
    2023 = 293,83 BILLION USD
    2022 = 271,49 BILLION USD
    2021 = 247,49 BILLION USD
    2020 = 221,49 BILLION USD
    ------------------
    2029-2020 : DEBT PAY DEBT
    2029-2020 : OVERLIMIT DEBT
    2029 = 69,54% DEBT RATIO TO GDP
    2028 = 69,34% DEBT RATIO TO GDP
    2027 = 68,8% DEBT RATIO TO GDP
    2026 = 68,17% DEBT RATIO TO GDP
    2025 = 68,07% DEBT RATIO TO GDP
    2024 = 68,38% DEBT RATIO TO GDP
    2023 = 69,76% DEBT RATIO TO GDP
    2022 = 65,5% DEBT RATIO TO GDP
    2021 = 69,16% DEBT RATIO TO GDP
    2020 = 67,69% DEBT RATIO TO GDP
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn.............
    ==========
    The Malonnn Armed Forces (MAF) face several problems, including limited budgets, aging equipment, and logistical issues. These issues impact the country's defense policy and readiness to face threats.
    Budget
    • The MAF's budget is small and has been low for decades.
    • The MAF's budget has never exceeded 1.5% of GDP in the past 20 years.
    • The government has been focused on other priorities, such as the national debt and the COVID-19 pandemic.
    Equipment
    • The MAF's equipment is aging.
    • The MAF's air force lacks air superiority due to the withdrawal of its MiG-29 Fulcrum fighter aircraft in 2017.
    • The MAF's naval assets are old, including the Kasturi-class Corvette, which entered service in 1984.
    Logistics
    • The MAF's logistics management has problems that impact the country's defense policy.
    • The MAF's logistic unit has difficulty freeing itself from the logistic function burden of the combat unit.
    Other issues
    • The government's lack of clear guidance for the future strategic direction of the defense industry.
    • The government's reluctance to support locally produced products.
    • The frequent change of governments since 2018.
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  86. KU LI = MALON MONKEY
    KU LI = MALON MONKEY
    MALONN had never enjoyed the status of being an “Asian Tiger” economy, instead it was more of “a monkey”, said former finance minister Tengku Razaleigh Hamzah.
    Tengku Razaleigh, better known as Ku Li, dismissed the label which was claimed by many, including former prime minister Dr Mahathir Mohamad.
    --------
    ADA YANG LEBIH WARAS....
    Hulubalang says:
    21 February 2025 at 5:42 PM
    USD400 million
    a) buy 1x gowind to have more frigates in TLDM fleet
    b) buy CAR816 replacing existing still usable and functional M4
    which spending will actually upgrade and increase the overall capability of our defence??
    Which one is just a waste of valuable budget?
    --------
    ADA YANG WARAS LAGI....
    NO PLANS BUY NEW RIFLES = 1 LCS
    Malonnn Defence was told that there are no plans to buy a new standard assault rifles for the Armed Forces soon. The money is better used for other things, I was told. How much does it cost to change the standard assault rifle for MAF? A single LCS.
    --------
    MASIH ADA YANG WARAS ......
    Romeo says:
    16 FEBRUARY 2025 AT 10:35 AM
    I would say “DENGAR BOLEH PERCAYA JANGAN”
    1. Politicians are not good at keeping their plan. Policy is changed depend on who is sitting on driver seat.
    2. The gov is struggling to meet 36 units of FA-50. No fund will available in 2030.
    3. RMAF is not ready to operate 5th gen fighters. Operating 5th gen is about networked environment not platform.
    4. 5th gen fighter is costly in operating and maintaining which need significant increment in annual military budget.
    5. Other branches and MMEA are under equipt that need attention.
    6. Many homework should be done first such as LCS, OPV, SPH, used hornet etc.
    In short, it is all about LIMA. This is just old gimmick because LIMA has less attractive and the EO has run of option to make LIMA great again.
    ==============
    ==============
    DEBT PROBLEMS SINCE 2000
    DEBT PROBLEMS SINCE 2000
    DEBT PROBLEMS SINCE 2000
    Malonn has experienced a number of debt problems since 2000, including high public debt, household debt, and a fiscal deficit.
    Public debt
    • Fiscal deficit: The fiscal deficit was high during the pandemic, exceeding 6% of GDP.
    • Public debt to GDP ratio: In 2023, public debt was almost 70% of GDP, which is higher than the average of 55% in the 2010s.
    • Statutory debt limit: The statutory debt limit has been revised several times over the last three decades.
    Household debt
    • Household debt to GDP ratio: In 2007, the household debt to GDP ratio was 67%, up from 47% in 2000.
    • Debt to income ratio: The ratio of debt to income for Malonnn households has been increasing since 2000.
    • Household debt crisis: In 2023, household debt reached RM1.53 trillion, with a household debt-to-GDP ratio of 84.2%.
    Other factors
    • External debt: Malonn's external debt is also a concern.
    Export vulnerability: Malonn's manufacturing sector is vulnerable to drops in external demand
    ==========
    2029-2020 : INCREASE DEBT
    2029-2020 : INCREASE DEBT
    2029 = 438,09 BILLION USD
    2028 = 412,2 BILLION USD
    2027 = 386,51 BILLION USD
    2026 = 362,19 BILLION USD
    2025 = 338,75 BILLION USD
    2024 = 316,15 BILLION USD
    2023 = 293,83 BILLION USD
    2022 = 271,49 BILLION USD
    2021 = 247,49 BILLION USD
    2020 = 221,49 BILLION USD
    ------------------
    2029-2020 : DEBT PAY DEBT
    2029-2020 : OVERLIMIT DEBT
    2029 = 69,54% DEBT RATIO TO GDP
    2028 = 69,34% DEBT RATIO TO GDP
    2027 = 68,8% DEBT RATIO TO GDP
    2026 = 68,17% DEBT RATIO TO GDP
    2025 = 68,07% DEBT RATIO TO GDP
    2024 = 68,38% DEBT RATIO TO GDP
    2023 = 69,76% DEBT RATIO TO GDP
    2022 = 65,5% DEBT RATIO TO GDP
    2021 = 69,16% DEBT RATIO TO GDP
    2020 = 67,69% DEBT RATIO TO GDP
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn,
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  87. UTANG kita jadi Aset
    Seblah NGUTANG LCS jadi Musium Darat Paling terkenal sejagat haha!😂😂😂

    BalasHapus
  88. KU LI = MALON MONKEY
    KU LI = MALON MONKEY
    MALONN had never enjoyed the status of being an “Asian Tiger” economy, instead it was more of “a monkey”, said former finance minister Tengku Razaleigh Hamzah.
    Tengku Razaleigh, better known as Ku Li, dismissed the label which was claimed by many, including former prime minister Dr Mahathir Mohamad.
    --------
    ADA YANG LEBIH WARAS....
    Hulubalang says:
    21 February 2025 at 5:42 PM
    USD400 million
    a) buy 1x gowind to have more frigates in TLDM fleet
    b) buy CAR816 replacing existing still usable and functional M4
    which spending will actually upgrade and increase the overall capability of our defence??
    Which one is just a waste of valuable budget?
    --------
    ADA YANG WARAS LAGI....
    NO PLANS BUY NEW RIFLES = 1 LCS
    Malonnn Defence was told that there are no plans to buy a new standard assault rifles for the Armed Forces soon. The money is better used for other things, I was told. How much does it cost to change the standard assault rifle for MAF? A single LCS.
    --------
    MASIH ADA YANG WARAS ......
    Romeo says:
    16 FEBRUARY 2025 AT 10:35 AM
    I would say “DENGAR BOLEH PERCAYA JANGAN”
    1. Politicians are not good at keeping their plan. Policy is changed depend on who is sitting on driver seat.
    2. The gov is struggling to meet 36 units of FA-50. No fund will available in 2030.
    3. RMAF is not ready to operate 5th gen fighters. Operating 5th gen is about networked environment not platform.
    4. 5th gen fighter is costly in operating and maintaining which need significant increment in annual military budget.
    5. Other branches and MMEA are under equipt that need attention.
    6. Many homework should be done first such as LCS, OPV, SPH, used hornet etc.
    In short, it is all about LIMA. This is just old gimmick because LIMA has less attractive and the EO has run of option to make LIMA great again.
    ==============
    ==============
    US DEPARTEMENT OF JUSTICE =
    1. ONE OF THE WORLD'S GREATEST FINANCIAL SCANDALS
    2. LARGEST KLEPTOCRACY CASE TO DATE
    Although it began in Malon, the scandal's global scope implicated institutions and individuals in politics, banking, and entertainment, and led to criminal investigations in a number of nations. The 1MDB scandal has been described as "one of the world's greatest financial scandals" and declared by the United States Department of Justice as the "largest kleptocracy case to date
    ------------------
    2029-2020 : INCREASE DEBT
    2029-2020 : INCREASE DEBT
    2029 = 438,09 BILLION USD
    2028 = 412,2 BILLION USD
    2027 = 386,51 BILLION USD
    2026 = 362,19 BILLION USD
    2025 = 338,75 BILLION USD
    2024 = 316,15 BILLION USD
    2023 = 293,83 BILLION USD
    2022 = 271,49 BILLION USD
    2021 = 247,49 BILLION USD
    2020 = 221,49 BILLION USD
    ------------------
    2029-2020 : DEBT PAY DEBT
    2029-2020 : OVERLIMIT DEBT
    2029 = 69,54% DEBT RATIO TO GDP
    2028 = 69,34% DEBT RATIO TO GDP
    2027 = 68,8% DEBT RATIO TO GDP
    2026 = 68,17% DEBT RATIO TO GDP
    2025 = 68,07% DEBT RATIO TO GDP
    2024 = 68,38% DEBT RATIO TO GDP
    2023 = 69,76% DEBT RATIO TO GDP
    2022 = 65,5% DEBT RATIO TO GDP
    2021 = 69,16% DEBT RATIO TO GDP
    2020 = 67,69% DEBT RATIO TO GDP
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn,
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  89. KU LI = MALON MONKEY
    KU LI = MALON MONKEY
    MALONN had never enjoyed the status of being an “Asian Tiger” economy, instead it was more of “a monkey”, said former finance minister Tengku Razaleigh Hamzah.
    Tengku Razaleigh, better known as Ku Li, dismissed the label which was claimed by many, including former prime minister Dr Mahathir Mohamad.
    --------
    ADA YANG LEBIH WARAS....
    Hulubalang says:
    21 February 2025 at 5:42 PM
    USD400 million
    a) buy 1x gowind to have more frigates in TLDM fleet
    b) buy CAR816 replacing existing still usable and functional M4
    which spending will actually upgrade and increase the overall capability of our defence??
    Which one is just a waste of valuable budget?
    --------
    ADA YANG WARAS LAGI....
    NO PLANS BUY NEW RIFLES = 1 LCS
    Malonnn Defence was told that there are no plans to buy a new standard assault rifles for the Armed Forces soon. The money is better used for other things, I was told. How much does it cost to change the standard assault rifle for MAF? A single LCS.
    --------
    MASIH ADA YANG WARAS ......
    Romeo says:
    16 FEBRUARY 2025 AT 10:35 AM
    I would say “DENGAR BOLEH PERCAYA JANGAN”
    1. Politicians are not good at keeping their plan. Policy is changed depend on who is sitting on driver seat.
    2. The gov is struggling to meet 36 units of FA-50. No fund will available in 2030.
    3. RMAF is not ready to operate 5th gen fighters. Operating 5th gen is about networked environment not platform.
    4. 5th gen fighter is costly in operating and maintaining which need significant increment in annual military budget.
    5. Other branches and MMEA are under equipt that need attention.
    6. Many homework should be done first such as LCS, OPV, SPH, used hornet etc.
    In short, it is all about LIMA. This is just old gimmick because LIMA has less attractive and the EO has run of option to make LIMA great again.
    ==============
    1. HUTANG 84.2% DARI GDP
    1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN LEASE SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. LEASE SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. LEASE MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED LEASE BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI LEASE KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. LEASE MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. LEASE VSHORAD
    35. LEASE TRUK 3 TON
    36. 4X4 LEASE 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. LEASE BLACKHAWK LEASE AW159
    41. NO TRACKED SPH
    42. LEASE SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. LEASE AW139 LEASE COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 LEASE BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED LEASE PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM LEASE 12 AW149
    62. TUDM LEASE 4 AW139
    63. TUDM LEASE 5 EC120B
    64. TLDM LEASE 2 AW159
    65. TDM LEASE 4 UH-60A
    67. TDM LEASE 12 AW149
    68. BOMBA LEASE 4 AW139
    69. MMEA LEASE 2 AW159
    70. POLIS LEASE 7 BELL429

    BalasHapus
  90. KU LI = MALON MONKEY
    KU LI = MALON MONKEY
    MALONN had never enjoyed the status of being an “Asian Tiger” economy, instead it was more of “a monkey”, said former finance minister Tengku Razaleigh Hamzah.
    Tengku Razaleigh, better known as Ku Li, dismissed the label which was claimed by many, including former prime minister Dr Mahathir Mohamad.
    --------
    ADA YANG LEBIH WARAS....
    Hulubalang says:
    21 February 2025 at 5:42 PM
    USD400 million
    a) buy 1x gowind to have more frigates in TLDM fleet
    b) buy CAR816 replacing existing still usable and functional M4
    which spending will actually upgrade and increase the overall capability of our defence??
    Which one is just a waste of valuable budget?
    --------
    ADA YANG WARAS LAGI....
    NO PLANS BUY NEW RIFLES = 1 LCS
    Malonnn Defence was told that there are no plans to buy a new standard assault rifles for the Armed Forces soon. The money is better used for other things, I was told. How much does it cost to change the standard assault rifle for MAF? A single LCS.
    --------
    MASIH ADA YANG WARAS ......
    Romeo says:
    16 FEBRUARY 2025 AT 10:35 AM
    I would say “DENGAR BOLEH PERCAYA JANGAN”
    1. Politicians are not good at keeping their plan. Policy is changed depend on who is sitting on driver seat.
    2. The gov is struggling to meet 36 units of FA-50. No fund will available in 2030.
    3. RMAF is not ready to operate 5th gen fighters. Operating 5th gen is about networked environment not platform.
    4. 5th gen fighter is costly in operating and maintaining which need significant increment in annual military budget.
    5. Other branches and MMEA are under equipt that need attention.
    6. Many homework should be done first such as LCS, OPV, SPH, used hornet etc.
    In short, it is all about LIMA. This is just old gimmick because LIMA has less attractive and the EO has run of option to make LIMA great again.
    ==============
    ==============
    35 MILLION/4 PEOPLE = 8.750.000 DEPRESION
    35 MILLION/10 PEOPLE = 3.500.000 ATTEMPTED SUICIDE
    the 2022 National Health Morbidity Survey (NHMS) in Malonn found that one in four adolescents had depression and one in ten had attempted suicide. The survey also found that suicidal thoughts and attempted suicide rates were higher among girls than boys.
    Key findings
    • 1 in 4 adolescents had depression
    • 1 in 10 adolescents had attempted suicide
    • 18.5% of girls had suicidal thoughts, compared to 13.4% of boys who had attempted suicide
    Implications
    These findings highlight the need for targeted mental health interventions.
    ---------------
    SEPERTIGA (1/3) = MENTAL DISORDER = GANGGUAN JIWA ....
    1 IN 3 PEOPLE = HAVE A MENTAL DISORDER
    35 MILLION / 3 PEOPLE = 11 MILLION PEOPLE MENTAL DISORDER
    According to Prudential, one in three people in Malonn have a mental disorder, but half of them haven't been diagnosed. This is a serious issue that requires targeted interventions.
    Prevalence of mental illness in Malonn
    • The 2022 National Health Morbidity Survey found that one in four adolescents have depression, and one in ten have attempted suicide.
    • The prevalence of mental health problems is highest among people aged 16–19 and those from low-income families.
    • Mental health problems can affect people throughout their lives.
    Impact of untreated mental illness
    • People who don't get mental health treatment may develop serious complications and even be hospitalized.
    • Mental illness stigma is still widespread in many cultures and nations.

    BalasHapus
  91. 300.000 LOST JOBS
    300.000 LOST JOBS
    300.000 LOST JOBS
    Almost 300,000 lost their jobs in the last 4 years, Dewan Rakyat told Deputy human resources minister Abdul Rahman Mohamad says various programmes have been introduced to tackle underemployment. total of 293,639 workers lost their jobs between 2020 and Sept 26, with the manufacturing sector recording the highest number of layoffs at 75,615
    --------------
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    Malonn's state energy firm Petronas will reduce its workforce to ensure its long-term survival amid increasing challenges in the global operating environment .
    --------------
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    The Malonnn government’s decision to terminate 30,000 contract staff without a school-leaving certification has drawn backlash from the country’s public service union, which said the sudden end to long careers working for the state lacks compassion.
    --------------
    KU LI = MALON MONKEY
    KU LI = MALON MONKEY
    MALONN had never enjoyed the status of being an “Asian Tiger” economy, instead it was more of “a monkey”, said former finance minister Tengku Razaleigh Hamzah.
    Tengku Razaleigh, better known as Ku Li, dismissed the label which was claimed by many, including former prime minister Dr Mahathir Mohamad.
    --------
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    Three weeks ago, the Madani government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd. The estimated cost for the deal is RM10.7 billion and it will be covered in installments over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals.
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE SIMULATOR MKM TAHUN
    Five-year contract for Sukhoi’s simulators. Publicly listed HeiTech Padu Bhd has announced that it had been awarded a RM67 million, five-year contract to operate and maintain the Su-30MKM flight simulators at the RMAF airbase in Gong Kedak
    LEASE HELI LEASE SIMULATOR
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE 4x4
    Pejabat perusahaan mengatakan kepada Janes di pameran bahwa Angkatan Bersenjata Malon sedang mencari untuk menyewa Tarantula
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    =========
    😝“DENGAR BOLEH PERCAYA JANGAN”😝

    BalasHapus
  92. 300.000 LOST JOBS
    300.000 LOST JOBS
    300.000 LOST JOBS
    Almost 300,000 lost their jobs in the last 4 years, Dewan Rakyat told Deputy human resources minister Abdul Rahman Mohamad says various programmes have been introduced to tackle underemployment. total of 293,639 workers lost their jobs between 2020 and Sept 26, with the manufacturing sector recording the highest number of layoffs at 75,615
    --------------
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    Malonn's state energy firm Petronas will reduce its workforce to ensure its long-term survival amid increasing challenges in the global operating environment .
    --------------
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    The Malonnn government’s decision to terminate 30,000 contract staff without a school-leaving certification has drawn backlash from the country’s public service union, which said the sudden end to long careers working for the state lacks compassion.
    --------------
    MASIH ADA YANG WARAS ......
    Romeo says:
    16 FEBRUARY 2025 AT 10:35 AM
    I would say “DENGAR BOLEH PERCAYA JANGAN”
    1. Politicians are not good at keeping their plan. Policy is changed depend on who is sitting on driver seat.
    2. The gov is struggling to meet 36 units of FA-50. No fund will available in 2030.
    3. RMAF is not ready to operate 5th gen fighters. Operating 5th gen is about networked environment not platform.
    4. 5th gen fighter is costly in operating and maintaining which need significant increment in annual military budget.
    5. Other branches and MMEA are under equipt that need attention.
    6. Many homework should be done first such as LCS, OPV, SPH, used hornet etc.
    In short, it is all about LIMA. This is just old gimmick because LIMA has less attractive and the EO has run of option to make LIMA great again.
    ==========
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT super bikes today. The superbikes are under lease from Syarikat Ammo Defence Sdn Bhd under a RM13.7 million Letter of Award.The tender for the superbikes was published in June, this year. Interestingly the release by Tentera Darat said the leasing period was for five years, but the tender notice said it was for a four-year period only. That said the leasing period could have been extended for another year during the negotiation process.
    As for leasing vehicles, this has been common practise by government departments for the decade or so as it is supposed to be cheaper overall. The MPs had also taken delivery of Honda Civics under a leasing programme,
    -----
    LEASE FAST INTERCEPTOR BOAT
    LEASE UTILITY BOAT
    LEASE RIGID HULL FENDER BOAT
    LEASE ROVER FIBER GLASS
    LEASE EC120B
    LEASE FLIGHT SIMULATION TRAINING DEVICE
    Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
    Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    -----
    LEASE KAPAL HIDROLOGI
    LEASE KAPAL HIDROLOGI
    LEASE KAPAL HIDROLOGI
    Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak Sewaan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
    ------
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things
    😝“DENGAR BOLEH PERCAYA JANGAN”😝

    BalasHapus
  93. Hutang kita jadi aset.... klaim si GORILLA.....HAHAHAHAH

    maksud kamu seperti beberapa Aset HUTANG contohnya APACHE yang helinya sudah GROUNDED tapi HUTANGnya masih dibayar oleh rakyat INDIANESIA...??? HAHAHAHA

    BalasHapus
  94. 300.000 LOST JOBS
    300.000 LOST JOBS
    300.000 LOST JOBS
    Almost 300,000 lost their jobs in the last 4 years, Dewan Rakyat told Deputy human resources minister Abdul Rahman Mohamad says various programmes have been introduced to tackle underemployment. total of 293,639 workers lost their jobs between 2020 and Sept 26, with the manufacturing sector recording the highest number of layoffs at 75,615
    --------------
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    Malonn's state energy firm Petronas will reduce its workforce to ensure its long-term survival amid increasing challenges in the global operating environment .
    --------------
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    The Malonnn government’s decision to terminate 30,000 contract staff without a school-leaving certification has drawn backlash from the country’s public service union, which said the sudden end to long careers working for the state lacks compassion.
    --------------
    KU LI = MALON MONKEY
    KU LI = MALON MONKEY
    MALONN had never enjoyed the status of being an “Asian Tiger” economy, instead it was more of “a monkey”, said former finance minister Tengku Razaleigh Hamzah.
    Tengku Razaleigh, better known as Ku Li, dismissed the label which was claimed by many, including former prime minister Dr Mahathir Mohamad.
    --------
    BUDGET LIMITED
    BUDGET LIMITED
    BUDGET LIMITED
    The Royal Malonnn Air Force (RMAF) has faced budget constraints and fleet sustainment problems. The RMAF's budget is limited, and the government has other priorities, such as revitalizing the economy and reducing the national deficit.
    Budget constraints
    • Limited budget
    The government's defense budget is limited, and the government has other priorities.
    • Frequent government changes
    The frequent change of governments since 2018 has hindered defense development.
    • Fiscal cost of COVID-19
    The government is still dealing with the fiscal cost of the COVID-19 pandemic.
    Fleet sustainment problems
    • Aging aircraft: The RMAF has a fleet of aging aircraft, such as the BAE Hawk 108 and MiG-29N.
    • Maintenance costs: Maintaining a large fleet of aging aircraft can be expensive.
    ==============
    The Malonnn Armed Forces (MAF) has faced a number of technical issues, including fleet sustainment problems, a lack of research and development, and a reliance on imported equipment.
    Fleet sustainment problems
    The MAF has a large fleet of aging aircraft that can be expensive to maintain.
    The government's defense modernization budget is limited, which can make it difficult to sustain the fleet.
    Lack of research and development
    The MAF has limited research and development (R&D) activities.
    The government has not provided clear guidance on the future strategic direction of the defense industry.
    Reliance on imported equipment
    Most of the MAF's equipment is imported from outside the country.
    The Asian Financial Crisis caused a downturn in Malonn's economy, which made imported goods more expensive.
    Other technical issues
    The MAF has faced logistic management problems.
    The MAF has faced challenges in developing its capabilities due to tight budgets and uncertain timelines.
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things
    😝“DENGAR BOLEH PERCAYA JANGAN”😝

    BalasHapus
  95. 300.000 LOST JOBS
    300.000 LOST JOBS
    300.000 LOST JOBS
    Almost 300,000 lost their jobs in the last 4 years, Dewan Rakyat told Deputy human resources minister Abdul Rahman Mohamad says various programmes have been introduced to tackle underemployment. total of 293,639 workers lost their jobs between 2020 and Sept 26, with the manufacturing sector recording the highest number of layoffs at 75,615
    --------------
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    Malonn's state energy firm Petronas will reduce its workforce to ensure its long-term survival amid increasing challenges in the global operating environment .
    --------------
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    The Malonnn government’s decision to terminate 30,000 contract staff without a school-leaving certification has drawn backlash from the country’s public service union, which said the sudden end to long careers working for the state lacks compassion.
    --------------
    The Royal Malonnn Air Force (RMAF) has faced some challenges, including outdated equipment and a need to modernize.
    Outdated equipment :
    • 1. The RMAF's fleet of Beechcraft Super King Air aircraft were aging.
    • 2. The RMAF's F/A-18D Hornets are aging and need to be replaced.
    Need for modernization :
    • 1. The RMAF needs to modernize its air capabilities to address current and future threats.
    • 2. The RMAF needs to replace its aging fleet of aircraft.
    Other challenges :
    • 1.The RMAF has faced challenges in logistics, including the delivery of spares to soldiers on the ground.
    3. The RMAF has faced challenges in coping with non-traditional security threats.
    ==========
    DIRAJA ONE = BEKAS MAS
    Jika Perdana Menteri menaiki pesawat tersebut maka pesawat itu dipanggil "Perdana One". Sementara itu, jika Raja yang menggunakannya, maka disebut "DiRaja One". Boeing Business Jet dibeli pada tahun 2003 dari maskapai penerbangan Malon Airlines......
    ----
    ROSAK PESAWAT PM
    Perdana Menteri, Datuk Seri Anwar Ibrahim memohon maaf atas kelewatannya tiba ke program Temu Anwar di Universiti Sains Malon (USM) pada Ahad.
    Jelas Anwar, kelewatan hampir satu jam itu akibat kerosakan pesawat rasminya.
    ----
    HELI RESMI PM = LEASE
    Meanwhile, the Royal Malonnn Police (PDRM) will receive seven helicopters, the Malonnn Maritime Enforcement Agency (APMM) will receive four, the Fire and Rescue Department will receive two, and the Prime Minister’s Department will receive one helicopter.
    ----
    A400M PEMBAYARAN = BERPERINGKAT (HUTANG)
    Malon membeli pesawat Airbus A400M secara ansuran dan bukan secara tunai. Pembelian pesawat A400M dilakukan melalui kontrak yang melibatkan pembayaran berperingkat.
    ----
    FA50M SAWIT
    On the other hand, South Korea aims to sell another 18 FA-50s to Malon in the future. Malon announced that at least half of the payment would be made in palm oil
    ----
    SCORPENE SAWIT
    Under the deal, France would buy RM819 million’s (€230 million) worth of Malonn palm oil, RM327 million (€92 million) of other commodities, and invest RM491 million (€138 million) for training and technology transfer to local firms here.
    ----
    PT91 SAWIT KARET
    Payment for the purchase includes 30 percent of direct off-set in the form of training and technology transfer and 30 percent of indirect off-set in commodities like palm oil and rubber.
    ----
    ANKA = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things
    😝“DENGAR BOLEH PERCAYA JANGAN”😝

    BalasHapus
  96. 300.000 LOST JOBS
    300.000 LOST JOBS
    300.000 LOST JOBS
    Almost 300,000 lost their jobs in the last 4 years, Dewan Rakyat told Deputy human resources minister Abdul Rahman Mohamad says various programmes have been introduced to tackle underemployment. total of 293,639 workers lost their jobs between 2020 and Sept 26, with the manufacturing sector recording the highest number of layoffs at 75,615
    --------------
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    Malonn's state energy firm Petronas will reduce its workforce to ensure its long-term survival amid increasing challenges in the global operating environment .
    --------------
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    The Malonnn government’s decision to terminate 30,000 contract staff without a school-leaving certification has drawn backlash from the country’s public service union, which said the sudden end to long careers working for the state lacks compassion.
    --------------
    MASIH ADA YANG WARAS ......
    Romeo says:
    16 FEBRUARY 2025 AT 10:35 AM
    I would say “DENGAR BOLEH PERCAYA JANGAN”
    1. Politicians are not good at keeping their plan. Policy is changed depend on who is sitting on driver seat.
    2. The gov is struggling to meet 36 units of FA-50. No fund will available in 2030.
    3. RMAF is not ready to operate 5th gen fighters. Operating 5th gen is about networked environment not platform.
    4. 5th gen fighter is costly in operating and maintaining which need significant increment in annual military budget.
    5. Other branches and MMEA are under equipt that need attention.
    6. Many homework should be done first such as LCS, OPV, SPH, used hornet etc.
    In short, it is all about LIMA. This is just old gimmick because LIMA has less attractive and the EO has run of option to make LIMA great again.
    ==========
    LEASE 28 HELI = 119 HELI BARU :
    LEASE 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL LEASE DARIPADA BELI BARU =
    LEASE 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    LEASEan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    ===================
    • LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
    • USD 948 JUTA (EXCLUDING AMMO) = FFBNW = MANGKRAK DELAYED
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    -------------
    PRICE DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -OPV PPA USD 1,3 BILLION/2 UNIT = USD 650/UNIT
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things.
    😝“DENGAR BOLEH PERCAYA JANGAN”😝

    BalasHapus
  97. KU LI = MALON MONKEY
    KU LI = MALON MONKEY
    MALONN had never enjoyed the status of being an “Asian Tiger” economy, instead it was more of “a monkey”, said former finance minister Tengku Razaleigh Hamzah.
    Tengku Razaleigh, better known as Ku Li, dismissed the label which was claimed by many, including former prime minister Dr Mahathir Mohamad.
    --------
    MASIH ADA YANG WARAS ......
    Romeo says:
    16 FEBRUARY 2025 AT 10:35 AM
    I would say “DENGAR BOLEH PERCAYA JANGAN”
    1. Politicians are not good at keeping their plan. Policy is changed depend on who is sitting on driver seat.
    2. The gov is struggling to meet 36 units of FA-50. No fund will available in 2030.
    3. RMAF is not ready to operate 5th gen fighters. Operating 5th gen is about networked environment not platform.
    4. 5th gen fighter is costly in operating and maintaining which need significant increment in annual military budget.
    5. Other branches and MMEA are under equipt that need attention.
    6. Many homework should be done first such as LCS, OPV, SPH, used hornet etc.
    In short, it is all about LIMA. This is just old gimmick because LIMA has less attractive and the EO has run of option to make LIMA great again.
    ==========
    MENUNGGU 2041-2045 C130J :
    Diterangkan Utusan Malonn, mereka baru bisa mendapatkan C-130 J Super Hercules paling tidak di tahun 2041 hingga 2045.
    MENUNGGU 2055 HAWK :
    Kerajaan merancang secara sistematik penggantian pesawat Hawk 108 dan Hawk 208 seperti yang digariskan dalam Pembangunan Keupayaan Tentera Udara Diraja Malonn (TUDM) 2055
    MENUNGGU 2053 HUTANG = OVER LIMIT DEBT:
    The Federal Government is expected to be able to settle its debts by 2053 by taking into account the number of new loans made for deficit financing purposes and refinancing maturing debts from 2024 onwards, said the Ministry of Finance (MoF)
    =========
    MENUNGGU 2050 = KAPAL SELAM
    MENUNGGU 2050 = MRSS
    MENUNGGU 2050 = LCS
    MENUNGGU 2050 = PV
    MENUNGGU 2050 = LMS
    “Mengikut Pelan Transformasi 15 ke 5 TLDM, ia dijangka akan memiliki 12 buah kapal Littoral Combat Ship (LCS), tiga buah kapal Multi Role Support Ship (MRSS), 18 buah kapal Littoral Mission Ship (LMS), 18 buah kapal Patrol Vessel (PV) dan empat buah kapal selam menjelang tahun 2050,” kata beliau dalam temuramah itu.
    Nampak gaya,impian untuk melihat TLDM menambah bilangan kapal selam dimilikinya daripada dua buah kepada empat buah akan hanya direalisasikan menjelang tahun 2050.
    =========
    UAV = MENUNGGU 2030
    LMS B2 = MENUNGGU 2030
    MRSS = MENUNGGU 2030
    HELI = MENUNGGU 2030
    RMKe-13 merangkumi tempoh tahun 2026-2030.
    “Perolehan bagi baki 3 buah LMS lagi akan dimasukkan di bawah RMKe-13,” ujar beliau.
    Selain LMS, TLDM turut merancang perolehan 2 buah kapal Multi Role Support Ship (MRSS), 3 buah kapal Littoral Mission Ship Batch 3, 4 buah helikopter anti kapal selam dan 6 buah Unmanned Aerial Vehicle (UAV).
    “Proses perolehan bagi aset-aset baharu ini dijangka berlangsung sehingga 2030. Kesemua perolehan aset TLDM ini dianggarkan
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things
    😝“DENGAR BOLEH PERCAYA JANGAN”😝

    BalasHapus
  98. KU LI = MALON MONKEY
    KU LI = MALON MONKEY
    MALONN had never enjoyed the status of being an “Asian Tiger” economy, instead it was more of “a monkey”, said former finance minister Tengku Razaleigh Hamzah.
    Tengku Razaleigh, better known as Ku Li, dismissed the label which was claimed by many, including former prime minister Dr Mahathir Mohamad.
    --------
    MASIH ADA YANG WARAS ......
    Romeo says:
    16 FEBRUARY 2025 AT 10:35 AM
    I would say “DENGAR BOLEH PERCAYA JANGAN”
    1. Politicians are not good at keeping their plan. Policy is changed depend on who is sitting on driver seat.
    2. The gov is struggling to meet 36 units of FA-50. No fund will available in 2030.
    3. RMAF is not ready to operate 5th gen fighters. Operating 5th gen is about networked environment not platform.
    4. 5th gen fighter is costly in operating and maintaining which need significant increment in annual military budget.
    5. Other branches and MMEA are under equipt that need attention.
    6. Many homework should be done first such as LCS, OPV, SPH, used hornet etc.
    In short, it is all about LIMA. This is just old gimmick because LIMA has less attractive and the EO has run of option to make LIMA great again.
    ==========
    DATA SIPRI LCS (FFBNW) =
    ENIGINE GERMAN = NOL DELIVERED = NO ENGINE
    MICA FRANCE = NOL DELIVERED = NO MICA
    FCS TNX ITALY = NOL DELIVERED = NO FCS
    SMART NETHERLANDS = NOL DELIVERED = NO SMART
    ==========
    LCS = FFBNW
    LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT ]
    • USD 948 JUTA (EXCLUDING AMMO) = FFBNW = MANGKRAK DELAYED
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    -----------
    PRICE DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    ==========
    EXCLUDING AMMO = ZONK
    EXCLUDING AMMO = ZONK
    EXCLUDING AMMO = ZONK
    REVISED (FINAL): RM11.2B FOR 5 SHIPS
    (final agreed-upon contract price dealing with cost overruns)
    RM 2.24 billion (2023) per unit + ToT (ceiling) [or $948M (2023 inflation) or ~$700M (2011 forex) or ~$490M (2023 forex) (excluding ammo)
    Inflation adjustment roughly equivalent to $948 million in 2023 US dollars (excluding ammo)
    -------------
    REVISED (INITIAL): RM 9.128B FOR 5 SHIPS
    (initial figures using the original contract price in dealing with cost overruns)
    RM 1.8 billion (2011) per unit + ToT (ceiling) or $560 million per ship (excluding ammo)
    Inflation adjustment roughly equivalent to $758 million in 2023 US dollars (excluding ammo)
    -------------
    ORIGINAL: RM 9B FOR 6 SHIPS
    RM 1.5 billion (2011) per unit + ToT (ceiling) or $466 million per ship (excluding cost overruns and ammo)
    Inflation adjustment roughly equivalent to $631 million in 2023 US dollars (excluding cost overruns and ammo
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things
    😝“DENGAR BOLEH PERCAYA JANGAN”😝

    BalasHapus
  99. KU LI = MALON MONKEY
    KU LI = MALON MONKEY
    MALONN had never enjoyed the status of being an “Asian Tiger” economy, instead it was more of “a monkey”, said former finance minister Tengku Razaleigh Hamzah.
    Tengku Razaleigh, better known as Ku Li, dismissed the label which was claimed by many, including former prime minister Dr Mahathir Mohamad.
    --------
    MASIH ADA YANG WARAS ......
    Romeo says:
    16 FEBRUARY 2025 AT 10:35 AM
    I would say “DENGAR BOLEH PERCAYA JANGAN”
    1. Politicians are not good at keeping their plan. Policy is changed depend on who is sitting on driver seat.
    2. The gov is struggling to meet 36 units of FA-50. No fund will available in 2030.
    3. RMAF is not ready to operate 5th gen fighters. Operating 5th gen is about networked environment not platform.
    4. 5th gen fighter is costly in operating and maintaining which need significant increment in annual military budget.
    5. Other branches and MMEA are under equipt that need attention.
    6. Many homework should be done first such as LCS, OPV, SPH, used hornet etc.
    In short, it is all about LIMA. This is just old gimmick because LIMA has less attractive and the EO has run of option to make LIMA great again.
    ==========
    The Malonnn Armed Forces (MAF) faces a number of challenges, including:
    • Logistics
    A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
    • Budgeting
    Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
    • Personnel
    The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
    • Procurement
    The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
    • Political interference
    Political interference and corruption are undermining combat readiness.
    • Territorial disputes
    Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
    • Transboundary haze
    Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
    • Fleet sustainment
    The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
    • Technological obsolescence
    Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
    • Modernization
    The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things
    😝“DENGAR BOLEH PERCAYA JANGAN”😝

    BalasHapus
  100. KU LI = MALON MONKEY
    KU LI = MALON MONKEY
    MALONN had never enjoyed the status of being an “Asian Tiger” economy, instead it was more of “a monkey”, said former finance minister Tengku Razaleigh Hamzah.
    Tengku Razaleigh, better known as Ku Li, dismissed the label which was claimed by many, including former prime minister Dr Mahathir Mohamad.
    --------
    MASIH ADA YANG WARAS ......
    Romeo says:
    16 FEBRUARY 2025 AT 10:35 AM
    I would say “DENGAR BOLEH PERCAYA JANGAN”
    1. Politicians are not good at keeping their plan. Policy is changed depend on who is sitting on driver seat.
    2. The gov is struggling to meet 36 units of FA-50. No fund will available in 2030.
    3. RMAF is not ready to operate 5th gen fighters. Operating 5th gen is about networked environment not platform.
    4. 5th gen fighter is costly in operating and maintaining which need significant increment in annual military budget.
    5. Other branches and MMEA are under equipt that need attention.
    6. Many homework should be done first such as LCS, OPV, SPH, used hornet etc.
    In short, it is all about LIMA. This is just old gimmick because LIMA has less attractive and the EO has run of option to make LIMA great again.
    ==========
    FACT GOVERNMENT ........
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
    RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. BUT AGAIN, MAF HAS BEEN LET DOWN BY THE GOVERNMENT WHICH HAS NOT SAY WHY IT HAS NOT APPROVE THE BUDGET REQUESTS. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
    Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
    Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
    ==============
    BUDGET 2025 FOR ......
    SALARIES AND OTHER STUFF
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    NOT ASSETS = NO SHOPPING
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things
    😝“DENGAR BOLEH PERCAYA JANGAN”😝

    BalasHapus
  101. KU LI = MALON MONKEY
    KU LI = MALON MONKEY
    MALONN had never enjoyed the status of being an “Asian Tiger” economy, instead it was more of “a monkey”, said former finance minister Tengku Razaleigh Hamzah.
    Tengku Razaleigh, better known as Ku Li, dismissed the label which was claimed by many, including former prime minister Dr Mahathir Mohamad.
    --------
    MASIH ADA YANG WARAS ......
    Romeo says:
    16 FEBRUARY 2025 AT 10:35 AM
    I would say “DENGAR BOLEH PERCAYA JANGAN”
    1. Politicians are not good at keeping their plan. Policy is changed depend on who is sitting on driver seat.
    2. The gov is struggling to meet 36 units of FA-50. No fund will available in 2030.
    3. RMAF is not ready to operate 5th gen fighters. Operating 5th gen is about networked environment not platform.
    4. 5th gen fighter is costly in operating and maintaining which need significant increment in annual military budget.
    5. Other branches and MMEA are under equipt that need attention.
    6. Many homework should be done first such as LCS, OPV, SPH, used hornet etc.
    In short, it is all about LIMA. This is just old gimmick because LIMA has less attractive and the EO has run of option to make LIMA great again.
    ==========
    FOOD CRISIS
    RICE CRISIS
    Meanwhile, the minister noted that in Malonn, rice scarcity has triggered panic among members of the public as dwindling stocks led to price increases, while the cost of imported rice has placed an additional burden on the people.
    The conditions in Malonn showed that disruption in food stocks can cause social unrest. Food is not merely a basic need for the people but also a key factor in national stability,” he stressed.
    -----------
    300.000 LOST JOBS
    300.000 LOST JOBS
    300.000 LOST JOBS
    Almost 300,000 lost their jobs in the last 4 years, Dewan Rakyat told Deputy human resources minister Abdul Rahman Mohamad says various programmes have been introduced to tackle underemployment. total of 293,639 workers lost their jobs between 2020 and Sept 26, with the manufacturing sector recording the highest number of layoffs at 75,615
    --------------
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    Malonn's state energy firm Petronas will reduce its workforce to ensure its long-term survival amid increasing challenges in the global operating environment
    --------------
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    The Malonnn government’s decision to terminate 30,000 contract staff without a school-leaving certification has drawn backlash from the country’s public service union, which said the sudden end to long careers working for the state lacks compassion.
    ===================
    2029-2020 : INCREASE DEBT
    2029-2020 : INCREASE DEBT
    2029 = 438,09 BILLION USD
    2028 = 412,2 BILLION USD
    2027 = 386,51 BILLION USD
    2026 = 362,19 BILLION USD
    2025 = 338,75 BILLION USD
    2024 = 316,15 BILLION USD
    2023 = 293,83 BILLION USD
    2022 = 271,49 BILLION USD
    2021 = 247,49 BILLION USD
    2020 = 221,49 BILLION USD
    ------------------
    2029-2020 : DEBT PAY DEBT
    2029-2020 : OVERLIMIT DEBT
    2029 = 69,54% DEBT RATIO TO GDP
    2028 = 69,34% DEBT RATIO TO GDP
    2027 = 68,8% DEBT RATIO TO GDP
    2026 = 68,17% DEBT RATIO TO GDP
    2025 = 68,07% DEBT RATIO TO GDP
    2024 = 68,38% DEBT RATIO TO GDP
    2023 = 69,76% DEBT RATIO TO GDP
    2022 = 65,5% DEBT RATIO TO GDP
    2021 = 69,16% DEBT RATIO TO GDP
    2020 = 67,69% DEBT RATIO TO GDP
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things
    😝“DENGAR BOLEH PERCAYA JANGAN”😝

    BalasHapus
  102. Si GORILLA mau samakan pengangguran di MALAYSIA dengan INDIANESIA...

    Di MALAYSIA rakyat pilih kerja kerana terlalu banyak peluang pekerjaan...manakala di INDIANESIA sudahlah cari kerjanya susah...Krisis PHK lagi....HAHAHAHA

    BalasHapus
    Balasan
    1. 300.000 LOST JOBS
      300.000 LOST JOBS
      300.000 LOST JOBS
      Almost 300,000 lost their jobs in the last 4 years, Dewan Rakyat told Deputy human resources minister Abdul Rahman Mohamad says various programmes have been introduced to tackle underemployment. total of 293,639 workers lost their jobs between 2020 and Sept 26, with the manufacturing sector recording the highest number of layoffs at 75,615
      --------------
      30.000 JOBS CUT PETRONAS
      30.000 JOBS CUT PETRONAS
      30.000 JOBS CUT PETRONAS
      Malonn's state energy firm Petronas will reduce its workforce to ensure its long-term survival amid increasing challenges in the global operating environment .
      --------------
      30.000 JOBS CUT GOVERMENTS
      30.000 JOBS CUT GOVERMENTS
      30.000 JOBS CUT GOVERMENTS
      The Malonnn government’s decision to terminate 30,000 contract staff without a school-leaving certification has drawn backlash from the country’s public service union, which said the sudden end to long careers working for the state lacks compassion.
      --------------
      KU LI = MALON MONKEY
      KU LI = MALON MONKEY
      MALONN had never enjoyed the status of being an “Asian Tiger” economy, instead it was more of “a monkey”, said former finance minister Tengku Razaleigh Hamzah.
      Tengku Razaleigh, better known as Ku Li, dismissed the label which was claimed by many, including former prime minister Dr Mahathir Mohamad.
      --------
      BUDGET LIMITED
      BUDGET LIMITED
      BUDGET LIMITED
      The Royal Malonnn Air Force (RMAF) has faced budget constraints and fleet sustainment problems. The RMAF's budget is limited, and the government has other priorities, such as revitalizing the economy and reducing the national deficit.
      Budget constraints
      • Limited budget
      The government's defense budget is limited, and the government has other priorities.
      • Frequent government changes
      The frequent change of governments since 2018 has hindered defense development.
      • Fiscal cost of COVID-19
      The government is still dealing with the fiscal cost of the COVID-19 pandemic.
      Fleet sustainment problems
      • Aging aircraft: The RMAF has a fleet of aging aircraft, such as the BAE Hawk 108 and MiG-29N.
      • Maintenance costs: Maintaining a large fleet of aging aircraft can be expensive.
      ==============
      The Malonnn Armed Forces (MAF) has faced a number of technical issues, including fleet sustainment problems, a lack of research and development, and a reliance on imported equipment.
      Fleet sustainment problems
      The MAF has a large fleet of aging aircraft that can be expensive to maintain.
      The government's defense modernization budget is limited, which can make it difficult to sustain the fleet.
      Lack of research and development
      The MAF has limited research and development (R&D) activities.
      The government has not provided clear guidance on the future strategic direction of the defense industry.
      Reliance on imported equipment
      Most of the MAF's equipment is imported from outside the country.
      The Asian Financial Crisis caused a downturn in Malonn's economy, which made imported goods more expensive.
      Other technical issues
      The MAF has faced logistic management problems.
      The MAF has faced challenges in developing its capabilities due to tight budgets and uncertain timelines.
      ==========
      BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
      Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things
      😝“DENGAR BOLEH PERCAYA JANGAN”😝

      Hapus
  103. 300.000 LOST JOBS
    300.000 LOST JOBS
    300.000 LOST JOBS
    Almost 300,000 lost their jobs in the last 4 years, Dewan Rakyat told Deputy human resources minister Abdul Rahman Mohamad says various programmes have been introduced to tackle underemployment. total of 293,639 workers lost their jobs between 2020 and Sept 26, with the manufacturing sector recording the highest number of layoffs at 75,615
    --------------
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    Malonn's state energy firm Petronas will reduce its workforce to ensure its long-term survival amid increasing challenges in the global operating environment .
    --------------
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    The Malonnn government’s decision to terminate 30,000 contract staff without a school-leaving certification has drawn backlash from the country’s public service union, which said the sudden end to long careers working for the state lacks compassion.
    --------------
    MASIH ADA YANG WARAS ......
    Romeo says:
    16 FEBRUARY 2025 AT 10:35 AM
    I would say “DENGAR BOLEH PERCAYA JANGAN”
    1. Politicians are not good at keeping their plan. Policy is changed depend on who is sitting on driver seat.
    2. The gov is struggling to meet 36 units of FA-50. No fund will available in 2030.
    3. RMAF is not ready to operate 5th gen fighters. Operating 5th gen is about networked environment not platform.
    4. 5th gen fighter is costly in operating and maintaining which need significant increment in annual military budget.
    5. Other branches and MMEA are under equipt that need attention.
    6. Many homework should be done first such as LCS, OPV, SPH, used hornet etc.
    In short, it is all about LIMA. This is just old gimmick because LIMA has less attractive and the EO has run of option to make LIMA great again.
    ==========
    LEASE 28 HELI = 119 HELI BARU :
    LEASE 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL LEASE DARIPADA BELI BARU =
    LEASE 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    LEASEan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    ===================
    • LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT.
    • USD 948 JUTA (EXCLUDING AMMO) = FFBNW = MANGKRAK DELAYED
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    -------------
    PRICE DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    -OPV PPA USD 1,3 BILLION/2 UNIT = USD 650/UNIT
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things.
    😝“DENGAR BOLEH PERCAYA JANGAN”😝

    BalasHapus
  104. 300.000 LOST JOBS
    300.000 LOST JOBS
    300.000 LOST JOBS
    Almost 300,000 lost their jobs in the last 4 years, Dewan Rakyat told Deputy human resources minister Abdul Rahman Mohamad says various programmes have been introduced to tackle underemployment. total of 293,639 workers lost their jobs between 2020 and Sept 26, with the manufacturing sector recording the highest number of layoffs at 75,615
    --------------
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    Malonn's state energy firm Petronas will reduce its workforce to ensure its long-term survival amid increasing challenges in the global operating environment .
    --------------
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    The Malonnn government’s decision to terminate 30,000 contract staff without a school-leaving certification has drawn backlash from the country’s public service union, which said the sudden end to long careers working for the state lacks compassion.
    --------------
    MASIH ADA YANG WARAS ......
    Romeo says:
    16 FEBRUARY 2025 AT 10:35 AM
    I would say “DENGAR BOLEH PERCAYA JANGAN”
    1. Politicians are not good at keeping their plan. Policy is changed depend on who is sitting on driver seat.
    2. The gov is struggling to meet 36 units of FA-50. No fund will available in 2030.
    3. RMAF is not ready to operate 5th gen fighters. Operating 5th gen is about networked environment not platform.
    4. 5th gen fighter is costly in operating and maintaining which need significant increment in annual military budget.
    5. Other branches and MMEA are under equipt that need attention.
    6. Many homework should be done first such as LCS, OPV, SPH, used hornet etc.
    In short, it is all about LIMA. This is just old gimmick because LIMA has less attractive and the EO has run of option to make LIMA great again.
    ==========
    LEASE HONDA CIVIC
    LEASE 40 BMW SUPERBIKES
    Leased BMW superbikes for military police. The Army’s military police – Kor Polis Tentera Di Raja – took delivery of 40 BMW R1250RT super bikes today. The superbikes are under lease from Syarikat Ammo Defence Sdn Bhd under a RM13.7 million Letter of Award.The tender for the superbikes was published in June, this year. Interestingly the release by Tentera Darat said the leasing period was for five years, but the tender notice said it was for a four-year period only. That said the leasing period could have been extended for another year during the negotiation process.
    As for leasing vehicles, this has been common practise by government departments for the decade or so as it is supposed to be cheaper overall. The MPs had also taken delivery of Honda Civics under a leasing programme,
    -----
    LEASE FAST INTERCEPTOR BOAT
    LEASE UTILITY BOAT
    LEASE RIGID HULL FENDER BOAT
    LEASE ROVER FIBER GLASS
    LEASE EC120B
    LEASE FLIGHT SIMULATION TRAINING DEVICE
    Mungkin ada yang tertanya-tanya, namun kaedah penyewaan ini bukanlah kali pertama dilakukan. Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM.
    Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator dan LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    -----
    LEASE KAPAL HIDROLOGI
    LEASE KAPAL HIDROLOGI
    LEASE KAPAL HIDROLOGI
    Panglima TLDM Laksamana Tan Sri Ahmad Kamarulzaman Ahmad Badaruddin berkata Aishah Aims 4 diperoleh melalui kontrak Sewaan bagi menggantikan dua kapal hidrografi sedia ada milik TLDM iaitu KD Mutiara dan KD Perantau yang akan melalui proses lucut tauliah secara berperingkat.
    ------
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things
    😝“DENGAR BOLEH PERCAYA JANGAN”😝

    BalasHapus
  105. 300.000 LOST JOBS
    300.000 LOST JOBS
    300.000 LOST JOBS
    Almost 300,000 lost their jobs in the last 4 years, Dewan Rakyat told Deputy human resources minister Abdul Rahman Mohamad says various programmes have been introduced to tackle underemployment. total of 293,639 workers lost their jobs between 2020 and Sept 26, with the manufacturing sector recording the highest number of layoffs at 75,615
    --------------
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    Malonn's state energy firm Petronas will reduce its workforce to ensure its long-term survival amid increasing challenges in the global operating environment .
    --------------
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    The Malonnn government’s decision to terminate 30,000 contract staff without a school-leaving certification has drawn backlash from the country’s public service union, which said the sudden end to long careers working for the state lacks compassion.
    --------------
    KU LI = MALON MONKEY
    KU LI = MALON MONKEY
    MALONN had never enjoyed the status of being an “Asian Tiger” economy, instead it was more of “a monkey”, said former finance minister Tengku Razaleigh Hamzah.
    Tengku Razaleigh, better known as Ku Li, dismissed the label which was claimed by many, including former prime minister Dr Mahathir Mohamad.
    --------
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    Three weeks ago, the Madani government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd. The estimated cost for the deal is RM10.7 billion and it will be covered in installments over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals.
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE SIMULATOR MKM TAHUN
    Five-year contract for Sukhoi’s simulators. Publicly listed HeiTech Padu Bhd has announced that it had been awarded a RM67 million, five-year contract to operate and maintain the Su-30MKM flight simulators at the RMAF airbase in Gong Kedak
    LEASE HELI LEASE SIMULATOR
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    LEASE 4x4
    Pejabat perusahaan mengatakan kepada Janes di pameran bahwa Angkatan Bersenjata Malon sedang mencari untuk menyewa Tarantula
    LEASE MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    LEASE PATROL BOATS : LEASE OUTBOARD MOTORS : LEASE TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    LEASE 28 HELI
    The government signed an agreement with Weststar Aviation Sdn Bhd to lease 28 helicopters for use by ministries and other government agencies
    =========
    😝“DENGAR BOLEH PERCAYA JANGAN”😝

    BalasHapus
  106. Hutang kita jadi aset.... klaim si GORILLA.....HAHAHAHAH

    maksud kamu seperti beberapa Aset HUTANG contohnya APACHE dan Mi-35 yang helinya sudah GROUNDED tapi HUTANGnya masih dibayar oleh rakyat INDIANESIA...??? HAHAHAHA

    BalasHapus
  107. US DEPARTEMENT OF JUSTICE =
    1. ONE OF THE WORLD'S GREATEST FINANCIAL SCANDALS
    2. LARGEST KLEPTOCRACY CASE TO DATE
    Although it began in Malon, the scandal's global scope implicated institutions and individuals in politics, banking, and entertainment, and led to criminal investigations in a number of nations. The 1MDB scandal has been described as "one of the world's greatest financial scandals" and declared by the United States Department of Justice as the "largest kleptocracy case to date
    ------------------
    DEBT PROBLEMS SINCE 2000
    DEBT PROBLEMS SINCE 2000
    DEBT PROBLEMS SINCE 2000
    Malonn has experienced a number of debt problems since 2000, including high public debt, household debt, and a fiscal deficit.
    Public debt
    • Fiscal deficit: The fiscal deficit was high during the pandemic, exceeding 6% of GDP.
    • Public debt to GDP ratio: In 2023, public debt was almost 70% of GDP, which is higher than the average of 55% in the 2010s.
    • Statutory debt limit: The statutory debt limit has been revised several times over the last three decades.
    Household debt
    • Household debt to GDP ratio: In 2007, the household debt to GDP ratio was 67%, up from 47% in 2000.
    • Debt to income ratio: The ratio of debt to income for Malonnn households has been increasing since 2000.
    • Household debt crisis: In 2023, household debt reached RM1.53 trillion, with a household debt-to-GDP ratio of 84.2%.
    Other factors
    • External debt: Malonn's external debt is also a concern.
    Export vulnerability: Malonn's manufacturing sector is vulnerable to drops in external demand
    ==========
    NATIONAL DEBT = $300.7 BILLION
    EXTERNAL DEBT = $306.3 BILLION
    As of September 2024, Malonn national government debt was $300.7 billion. The country's external debt was $306.3 billion.
    Explanation
    External debt: This is the total debt owed to creditors outside of Malonn.
    Fiscal deficit: The government's goal is to reduce the fiscal deficit from 4.3% of GDP in 2024 to around 3% by 2026.
    Subsidies: The government plans to rationalize subsidies, especially for fuel.
    Sales and Service Tax (SST): The government plans to expand the SST in May 2025.
    =========
    The Malonnn Armed Forces (MAF) has faced issues with spare parts for its assets, including a lack of budget, underperforming contractors, and outdated pricing.
    Budget
    • The MAF has faced budget constraints that affect the serviceability of its assets.
    • The government's revenue has been affected by reduced commodity prices, which has reduced the funds available for defense procurement.
    Outsourcing
    • The MAF has outsourced the supply of spare parts and maintenance of its assets, but this has led to issues.
    • Underperforming contractors and a lack of enforcement of contract terms have impacted the effectiveness of outsourcing.
    • The process of awarding contracts can be lengthy, which can lead to outdated pricing.
    Spare parts for specific assets
    • The MAF's PT-91M tanks have faced issues with spare parts, as the supplier of some components is no longer in production.
    • The MAF has also faced issues with Russian-produced fighter aircraft, including problems with the supply of spare parts.
    Other issues
    The MAF has also faced issues with undertraining of staff, and the lack of clear guidance for the future strategic direction of the defense industry
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn,
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  108. US DEPARTEMENT OF JUSTICE =
    1. ONE OF THE WORLD'S GREATEST FINANCIAL SCANDALS
    2. LARGEST KLEPTOCRACY CASE TO DATE
    Although it began in Malon, the scandal's global scope implicated institutions and individuals in politics, banking, and entertainment, and led to criminal investigations in a number of nations. The 1MDB scandal has been described as "one of the world's greatest financial scandals" and declared by the United States Department of Justice as the "largest kleptocracy case to date
    ------------------
    DEBT PROBLEMS SINCE 2000
    DEBT PROBLEMS SINCE 2000
    DEBT PROBLEMS SINCE 2000
    Malonn has experienced a number of debt problems since 2000, including high public debt, household debt, and a fiscal deficit.
    Public debt
    • Fiscal deficit: The fiscal deficit was high during the pandemic, exceeding 6% of GDP.
    • Public debt to GDP ratio: In 2023, public debt was almost 70% of GDP, which is higher than the average of 55% in the 2010s.
    • Statutory debt limit: The statutory debt limit has been revised several times over the last three decades.
    Household debt
    • Household debt to GDP ratio: In 2007, the household debt to GDP ratio was 67%, up from 47% in 2000.
    • Debt to income ratio: The ratio of debt to income for Malonnn households has been increasing since 2000.
    • Household debt crisis: In 2023, household debt reached RM1.53 trillion, with a household debt-to-GDP ratio of 84.2%.
    Other factors
    • External debt: Malonn's external debt is also a concern.
    Export vulnerability: Malonn's manufacturing sector is vulnerable to drops in external demand
    ==========
    2029-2020 : INCREASE DEBT
    2029-2020 : INCREASE DEBT
    2029 = 438,09 BILLION USD
    2028 = 412,2 BILLION USD
    2027 = 386,51 BILLION USD
    2026 = 362,19 BILLION USD
    2025 = 338,75 BILLION USD
    2024 = 316,15 BILLION USD
    2023 = 293,83 BILLION USD
    2022 = 271,49 BILLION USD
    2021 = 247,49 BILLION USD
    2020 = 221,49 BILLION USD
    ------------------
    2029-2020 : DEBT PAY DEBT
    2029-2020 : OVERLIMIT DEBT
    2029 = 69,54% DEBT RATIO TO GDP
    2028 = 69,34% DEBT RATIO TO GDP
    2027 = 68,8% DEBT RATIO TO GDP
    2026 = 68,17% DEBT RATIO TO GDP
    2025 = 68,07% DEBT RATIO TO GDP
    2024 = 68,38% DEBT RATIO TO GDP
    2023 = 69,76% DEBT RATIO TO GDP
    2022 = 65,5% DEBT RATIO TO GDP
    2021 = 69,16% DEBT RATIO TO GDP
    2020 = 67,69% DEBT RATIO TO GDP
    ==========
    IMF 2024-2029 = DEBT MALON $ 121,9 BILLION
    IMF 2024-2029 = DEBT MALON $ 121,9 BILLION
    The national debt in Malonn was forecast to continuously increase between 2024 and 2029 by in total 121.9 billion U.S. dollars (+38.56 percent). After the tenth consecutive increasing year, the national debt is estimated to reach 438.09 billion U.S. dollars and therefore a new peak in 2029. Notably, the national debt was continuously increasing over the past years.
    As defined by the International Monetary Fund, the general government gross debt consists of all liabilities that require payment or payments of interest and/or principal by the debtor to the creditor at a date or dates in the future.
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn,
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  109. KU LI = MALON MONKEY
    KU LI = MALON MONKEY
    MALONN had never enjoyed the status of being an “Asian Tiger” economy, instead it was more of “a monkey”, said former finance minister Tengku Razaleigh Hamzah.
    Tengku Razaleigh, better known as Ku Li, dismissed the label which was claimed by many, including former prime minister Dr Mahathir Mohamad.
    --------
    ADA YANG LEBIH WARAS....
    Hulubalang says:
    21 February 2025 at 5:42 PM
    USD400 million
    a) buy 1x gowind to have more frigates in TLDM fleet
    b) buy CAR816 replacing existing still usable and functional M4
    which spending will actually upgrade and increase the overall capability of our defence??
    Which one is just a waste of valuable budget?
    --------
    ADA YANG WARAS LAGI....
    NO PLANS BUY NEW RIFLES = 1 LCS
    Malonnn Defence was told that there are no plans to buy a new standard assault rifles for the Armed Forces soon. The money is better used for other things, I was told. How much does it cost to change the standard assault rifle for MAF? A single LCS.
    --------
    MASIH ADA YANG WARAS ......
    Romeo says:
    16 FEBRUARY 2025 AT 10:35 AM
    I would say “DENGAR BOLEH PERCAYA JANGAN”
    1. Politicians are not good at keeping their plan. Policy is changed depend on who is sitting on driver seat.
    2. The gov is struggling to meet 36 units of FA-50. No fund will available in 2030.
    3. RMAF is not ready to operate 5th gen fighters. Operating 5th gen is about networked environment not platform.
    4. 5th gen fighter is costly in operating and maintaining which need significant increment in annual military budget.
    5. Other branches and MMEA are under equipt that need attention.
    6. Many homework should be done first such as LCS, OPV, SPH, used hornet etc.
    In short, it is all about LIMA. This is just old gimmick because LIMA has less attractive and the EO has run of option to make LIMA great again.
    ==============
    ==============
    35 MILLION/4 PEOPLE = 8.750.000 DEPRESION
    35 MILLION/10 PEOPLE = 3.500.000 ATTEMPTED SUICIDE
    the 2022 National Health Morbidity Survey (NHMS) in Malonn found that one in four adolescents had depression and one in ten had attempted suicide. The survey also found that suicidal thoughts and attempted suicide rates were higher among girls than boys.
    Key findings
    • 1 in 4 adolescents had depression
    • 1 in 10 adolescents had attempted suicide
    • 18.5% of girls had suicidal thoughts, compared to 13.4% of boys who had attempted suicide
    Implications
    These findings highlight the need for targeted mental health interventions.
    ---------------
    SEPERTIGA (1/3) = MENTAL DISORDER = GANGGUAN JIWA ....
    1 IN 3 PEOPLE = HAVE A MENTAL DISORDER
    35 MILLION / 3 PEOPLE = 11 MILLION PEOPLE MENTAL DISORDER
    According to Prudential, one in three people in Malonn have a mental disorder, but half of them haven't been diagnosed. This is a serious issue that requires targeted interventions.
    Prevalence of mental illness in Malonn
    • The 2022 National Health Morbidity Survey found that one in four adolescents have depression, and one in ten have attempted suicide.
    • The prevalence of mental health problems is highest among people aged 16–19 and those from low-income families.
    • Mental health problems can affect people throughout their lives.
    Impact of untreated mental illness
    • People who don't get mental health treatment may develop serious complications and even be hospitalized.
    • Mental illness stigma is still widespread in many cultures and nations.

    BalasHapus
  110. KU LI = MALON MONKEY
    KU LI = MALON MONKEY
    MALONN had never enjoyed the status of being an “Asian Tiger” economy, instead it was more of “a monkey”, said former finance minister Tengku Razaleigh Hamzah.
    Tengku Razaleigh, better known as Ku Li, dismissed the label which was claimed by many, including former prime minister Dr Mahathir Mohamad.
    --------
    ADA YANG LEBIH WARAS....
    Hulubalang says:
    21 February 2025 at 5:42 PM
    USD400 million
    a) buy 1x gowind to have more frigates in TLDM fleet
    b) buy CAR816 replacing existing still usable and functional M4
    which spending will actually upgrade and increase the overall capability of our defence??
    Which one is just a waste of valuable budget?
    --------
    ADA YANG WARAS LAGI....
    NO PLANS BUY NEW RIFLES = 1 LCS
    Malonnn Defence was told that there are no plans to buy a new standard assault rifles for the Armed Forces soon. The money is better used for other things, I was told. How much does it cost to change the standard assault rifle for MAF? A single LCS.
    --------
    MASIH ADA YANG WARAS ......
    Romeo says:
    16 FEBRUARY 2025 AT 10:35 AM
    I would say “DENGAR BOLEH PERCAYA JANGAN”
    1. Politicians are not good at keeping their plan. Policy is changed depend on who is sitting on driver seat.
    2. The gov is struggling to meet 36 units of FA-50. No fund will available in 2030.
    3. RMAF is not ready to operate 5th gen fighters. Operating 5th gen is about networked environment not platform.
    4. 5th gen fighter is costly in operating and maintaining which need significant increment in annual military budget.
    5. Other branches and MMEA are under equipt that need attention.
    6. Many homework should be done first such as LCS, OPV, SPH, used hornet etc.
    In short, it is all about LIMA. This is just old gimmick because LIMA has less attractive and the EO has run of option to make LIMA great again.
    ==============
    1. HUTANG 84.2% DARI GDP
    1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN LEASE SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. LEASE SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. LEASE MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED LEASE BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI LEASE KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. LEASE MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. LEASE VSHORAD
    35. LEASE TRUK 3 TON
    36. 4X4 LEASE 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. LEASE BLACKHAWK LEASE AW159
    41. NO TRACKED SPH
    42. LEASE SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. LEASE AW139 LEASE COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 LEASE BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED LEASE PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM LEASE 12 AW149
    62. TUDM LEASE 4 AW139
    63. TUDM LEASE 5 EC120B
    64. TLDM LEASE 2 AW159
    65. TDM LEASE 4 UH-60A
    67. TDM LEASE 12 AW149
    68. BOMBA LEASE 4 AW139
    69. MMEA LEASE 2 AW159
    70. POLIS LEASE 7 BELL429

    BalasHapus
  111. KU LI = MALON MONKEY
    KU LI = MALON MONKEY
    MALONN had never enjoyed the status of being an “Asian Tiger” economy, instead it was more of “a monkey”, said former finance minister Tengku Razaleigh Hamzah.
    Tengku Razaleigh, better known as Ku Li, dismissed the label which was claimed by many, including former prime minister Dr Mahathir Mohamad.
    --------
    ADA YANG LEBIH WARAS....
    Hulubalang says:
    21 February 2025 at 5:42 PM
    USD400 million
    a) buy 1x gowind to have more frigates in TLDM fleet
    b) buy CAR816 replacing existing still usable and functional M4
    which spending will actually upgrade and increase the overall capability of our defence??
    Which one is just a waste of valuable budget?
    --------
    ADA YANG WARAS LAGI....
    NO PLANS BUY NEW RIFLES = 1 LCS
    Malonnn Defence was told that there are no plans to buy a new standard assault rifles for the Armed Forces soon. The money is better used for other things, I was told. How much does it cost to change the standard assault rifle for MAF? A single LCS.
    --------
    MASIH ADA YANG WARAS ......
    Romeo says:
    16 FEBRUARY 2025 AT 10:35 AM
    I would say “DENGAR BOLEH PERCAYA JANGAN”
    1. Politicians are not good at keeping their plan. Policy is changed depend on who is sitting on driver seat.
    2. The gov is struggling to meet 36 units of FA-50. No fund will available in 2030.
    3. RMAF is not ready to operate 5th gen fighters. Operating 5th gen is about networked environment not platform.
    4. 5th gen fighter is costly in operating and maintaining which need significant increment in annual military budget.
    5. Other branches and MMEA are under equipt that need attention.
    6. Many homework should be done first such as LCS, OPV, SPH, used hornet etc.
    In short, it is all about LIMA. This is just old gimmick because LIMA has less attractive and the EO has run of option to make LIMA great again.
    ==============
    ==============
    DEBT PROBLEMS SINCE 2000
    DEBT PROBLEMS SINCE 2000
    DEBT PROBLEMS SINCE 2000
    Malonn has experienced a number of debt problems since 2000, including high public debt, household debt, and a fiscal deficit.
    Public debt
    • Fiscal deficit: The fiscal deficit was high during the pandemic, exceeding 6% of GDP.
    • Public debt to GDP ratio: In 2023, public debt was almost 70% of GDP, which is higher than the average of 55% in the 2010s.
    • Statutory debt limit: The statutory debt limit has been revised several times over the last three decades.
    Household debt
    • Household debt to GDP ratio: In 2007, the household debt to GDP ratio was 67%, up from 47% in 2000.
    • Debt to income ratio: The ratio of debt to income for Malonnn households has been increasing since 2000.
    • Household debt crisis: In 2023, household debt reached RM1.53 trillion, with a household debt-to-GDP ratio of 84.2%.
    Other factors
    • External debt: Malonn's external debt is also a concern.
    Export vulnerability: Malonn's manufacturing sector is vulnerable to drops in external demand
    ==========
    2029-2020 : INCREASE DEBT
    2029-2020 : INCREASE DEBT
    2029 = 438,09 BILLION USD
    2028 = 412,2 BILLION USD
    2027 = 386,51 BILLION USD
    2026 = 362,19 BILLION USD
    2025 = 338,75 BILLION USD
    2024 = 316,15 BILLION USD
    2023 = 293,83 BILLION USD
    2022 = 271,49 BILLION USD
    2021 = 247,49 BILLION USD
    2020 = 221,49 BILLION USD
    ------------------
    2029-2020 : DEBT PAY DEBT
    2029-2020 : OVERLIMIT DEBT
    2029 = 69,54% DEBT RATIO TO GDP
    2028 = 69,34% DEBT RATIO TO GDP
    2027 = 68,8% DEBT RATIO TO GDP
    2026 = 68,17% DEBT RATIO TO GDP
    2025 = 68,07% DEBT RATIO TO GDP
    2024 = 68,38% DEBT RATIO TO GDP
    2023 = 69,76% DEBT RATIO TO GDP
    2022 = 65,5% DEBT RATIO TO GDP
    2021 = 69,16% DEBT RATIO TO GDP
    2020 = 67,69% DEBT RATIO TO GDP
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn,
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  112. CHINESE ARMY BERJAYA = SALAM 1MDB!!!
    BUKTI POSTER 3 TENTARA CHINESE
    BUKTI POSTER 3 TENTARA CHINESE
    BUKTI POSTER 3 TENTARA CHINESE
    The scrapbook competition poster for the secondary school in mainland Penang which went viral on social media and received widespread criticism had displayed images of three members of the Chinese army which was purportedly a propaganda material.
    ------
    TIDAK BAYAR HUTANG
    1MDB = BTA DICAPLOK CHINA
    1MDB = BTA DICAPLOK CHINA
    316 HARI = Kapal China Meronda Di Beting Patinggi Ali Selama 316 Hari Tahun Lepas Menurut Asia Maritime Transparency Initiative (AMTI) yang berpengkalan di Washington, kapal-kapal pengawal pantai China didapati melakukan rondaan di beberapa ciri maritim di Laut China Selatan termasuk Beting Patinggi Ali (Luconia Shoals) hampir setiap hari sepanjang tahun lepas.
    ------
    TIDAK BAYAR HUTANG
    1MDB = UDARA DICAPLOK CHINA
    1MDB = UDARA DICAPLOK CHINA
    43 KASUS = 43 Kes Pencerobohan Ruang Udara Negara Sepanjang Jan-Mei 2023 — MINDEF “Jumlah keseluruhan pesawat asing yang dikesan dan direkodkan menceroboh ruang udara negara dari bulan Januari 2023 sehingga Mei 2023 ialah berjumlah 43 kes pencerobohan.” -- Kementerian Pertahanan memberitahu Dewan Negara pada 20 Jun 2023.
    ------
    One Belt One Road (OBOR) atau Belt and Road Initiative (BRI)
    1.ECRL $ 20 bn dolar
    2. Forest city $ 100bn dolar
    3.China-Malon Qinzhou Industrial Park (CMQIP) $ 4,2 bn dolar
    4.Malon-China Kuantan Industrial Park (MCKIP) $ 3,77 bn dolar
    5.China Railway Rolling Stock Corp’s Rolling Stock Center - $ 131 juta dolar
    6. 1 MDB = The 1Malon Development Berhad scandal, often referred to as the 1MDB scandal or just 1MDB, is an ongoing corruption, bribery and money laundering conspiracy in which the Malonn sovereign wealth fund 1Malon Development Berhad (1MDB) was systematically embezzled, with assets diverted globally by the perpetrators of the scheme
    ------
    2029-2020 : INCREASE DEBT
    2029 = 438,09 BILLION USD
    2028 = 412,2 BILLION USD
    2027 = 386,51 BILLION USD
    2026 = 362,19 BILLION USD
    2025 = 338,75 BILLION USD
    2024 = 316,15 BILLION USD
    2023 = 293,83 BILLION USD
    2022 = 271,49 BILLION USD
    2021 = 247,49 BILLION USD
    2020 = 221,49 BILLION USD
    ------------------
    2029-2020 : DEBT PAY DEBT
    2029-2020 : OVERLIMIT DEBT
    2029 = 69,54% DEBT RATIO TO GDP
    2028 = 69,34% DEBT RATIO TO GDP
    2027 = 68,8% DEBT RATIO TO GDP
    2026 = 68,17% DEBT RATIO TO GDP
    2025 = 68,07% DEBT RATIO TO GDP
    2024 = 68,38% DEBT RATIO TO GDP
    2023 = 69,76% DEBT RATIO TO GDP
    2022 = 65,5% DEBT RATIO TO GDP
    2021 = 69,16% DEBT RATIO TO GDP
    2020 = 67,69% DEBT RATIO TO GDP
    ==========
    HUTANG 2024 = RM 1,57 TRILLION
    HUTANG 2023 = RM 1,53 TRILLION
    HUTANG 2022 = RM 1,45 TRILLION
    HUTANG 2021 = RM 1,38 TRILLION
    HUTANG 2020 = RM 1,32 TRILLION
    HUTANG 2019 = RM 1,25 TRILLION
    HUTANG 2018 = RM 1,19 TRILLION
    “The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things. Using aggregated data from BNM's Central Credit Reference Information System (CCRIS), this dashboard gives you insight into key trends on household debt. For now, it displays data on the flow of borrowing activity on a monthly basis, broken down by purpose. In due time, it will be deepened with granular data showing the state of indebtedness of Malonn
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  113. RICE CRISES = 1972-73, 1999, 2008, 2020-21,2023 AND 2025
    Malonn has experienced several rice crises, including in 1972-73, 1999, 2008, 2020-21, and 2023. These crises are often caused by imbalances in supply and demand, and are made worse by market speculation.
    Causes
    • Weather: Rice is sensitive to temperature and flooding, and a 1–2°C increase in temperature can cut harvests in half.
    • Protectionist policies: Policies that create a non-competitive market can lead to low production and high prices.
    • Subsidies: Subsidies can be poorly targeted, and may not reach farmers in need.
    • Import restrictions: When other exporters restrict shipments, demand for local rice increases.
    Effects
    • Food insecurity: Shortages can lead to higher prices and food insecurity.
    • Low yields: Low yields can be caused by a number of factors, including weather, subsidies, and policies.
    • Poverty: Low yields and high prices can lead to poverty among farmers.
    =========
    RICE CRISES =
    JAPAN
    MALONN
    PHILIPPINES,
    In Japan, the government was forced to release 210,000 tons of rice from its one-million-ton emergency reserve, a historical first, due to an extreme price hike of up to 82%.
    In Malonn, a shortage of local rice has triggered public panic. Shrinking supplies have led to soaring prices, while imported rice has also become more expensive.
    Meanwhile, in the Philippines, the government declared a food security emergency in early February 2025 after rice inflation surged to 24.4%, marking the highest increase in 15 years.
    =========
    300.000 LOST JOBS
    300.000 LOST JOBS
    300.000 LOST JOBS
    Almost 300,000 lost their jobs in the last 4 years, Dewan Rakyat told Deputy human resources minister Abdul Rahman Mohamad says various programmes have been introduced to tackle underemployment. total of 293,639 workers lost their jobs between 2020 and Sept 26, with the manufacturing sector recording the highest number of layoffs at 75,615
    --------------
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    Malonn's state energy firm Petronas will reduce its workforce to ensure its long-term survival amid increasing challenges in the global operating environment
    --------------
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    The Malonnn government’s decision to terminate 30,000 contract staff without a school-leaving certification has drawn backlash from the country’s public service union, which said the sudden end to long careers working for the state lacks compassion.
    ==========
    2029-2020 : INCREASE DEBT
    2029-2020 : INCREASE DEBT
    2029 = 438,09 BILLION USD
    2028 = 412,2 BILLION USD
    2027 = 386,51 BILLION USD
    2026 = 362,19 BILLION USD
    2025 = 338,75 BILLION USD
    2024 = 316,15 BILLION USD
    2023 = 293,83 BILLION USD
    2022 = 271,49 BILLION USD
    2021 = 247,49 BILLION USD
    2020 = 221,49 BILLION USD
    ------------------
    2029-2020 : DEBT PAY DEBT
    2029-2020 : OVERLIMIT DEBT
    2029 = 69,54% DEBT RATIO TO GDP
    2028 = 69,34% DEBT RATIO TO GDP
    2027 = 68,8% DEBT RATIO TO GDP
    2026 = 68,17% DEBT RATIO TO GDP
    2025 = 68,07% DEBT RATIO TO GDP
    2024 = 68,38% DEBT RATIO TO GDP
    2023 = 69,76% DEBT RATIO TO GDP
    2022 = 65,5% DEBT RATIO TO GDP
    2021 = 69,16% DEBT RATIO TO GDP
    2020 = 67,69% DEBT RATIO TO GDP
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things......
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  114. US DEPARTEMENT OF JUSTICE =
    1. ONE OF THE WORLD'S GREATEST FINANCIAL SCANDALS
    2. LARGEST KLEPTOCRACY CASE TO DATE
    Although it began in Malon, the scandal's global scope implicated institutions and individuals in politics, banking, and entertainment, and led to criminal investigations in a number of nations. The 1MDB scandal has been described as "one of the world's greatest financial scandals" and declared by the United States Department of Justice as the "largest kleptocracy case to date
    ------------------
    2029-2020 : INCREASE DEBT
    2029-2020 : INCREASE DEBT
    2029 = 438,09 BILLION USD
    2028 = 412,2 BILLION USD
    2027 = 386,51 BILLION USD
    2026 = 362,19 BILLION USD
    2025 = 338,75 BILLION USD
    2024 = 316,15 BILLION USD
    2023 = 293,83 BILLION USD
    2022 = 271,49 BILLION USD
    2021 = 247,49 BILLION USD
    2020 = 221,49 BILLION USD
    ------------------
    2029-2020 : DEBT PAY DEBT
    2029-2020 : OVERLIMIT DEBT
    2029 = 69,54% DEBT RATIO TO GDP
    2028 = 69,34% DEBT RATIO TO GDP
    2027 = 68,8% DEBT RATIO TO GDP
    2026 = 68,17% DEBT RATIO TO GDP
    2025 = 68,07% DEBT RATIO TO GDP
    2024 = 68,38% DEBT RATIO TO GDP
    2023 = 69,76% DEBT RATIO TO GDP
    2022 = 65,5% DEBT RATIO TO GDP
    2021 = 69,16% DEBT RATIO TO GDP
    2020 = 67,69% DEBT RATIO TO GDP
    ==========
    DEFICIT
    Malonn recorded a Government Budget deficit equal to 4.10 percent of the country's Gross Domestic Product in 2024. Government Budget in Malonn averaged -3.33 percent of GDP from 1988 until 2024, reaching an all time high of 2.40 percent of GDP in 1997 and a record low of -6.70 percent of GDP in 2009.
    Deficit by year
    • 2024 -4,10% of GDP
    • 2023 -4.55% of GDP
    • 2022 -4.81% of GDP
    • 2021 -6.03% of GDP
    • 2020 -4.90% of GDP
    • 2019 -3.4% of GDP
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things. Using aggregated data from BNM's Central Credit Reference Information System (CCRIS), this dashboard gives you insight into key trends on household debt. For now, it displays data on the flow of borrowing activity on a monthly basis, broken down by purpose. In due time, it will be deepened with granular data showing the state of indebtedness of Malonn
    ==========
    The Malonnn Armed Forces (MAF) face several problems, including limited budgets, aging equipment, and logistical issues. These issues impact the country's defense policy and readiness to face threats.
    Budget
    • The MAF's budget is small and has been low for decades.
    • The MAF's budget has never exceeded 1.5% of GDP in the past 20 years.
    • The government has been focused on other priorities, such as the national debt and the COVID-19 pandemic.
    Equipment
    • The MAF's equipment is aging.
    • The MAF's air force lacks air superiority due to the withdrawal of its MiG-29 Fulcrum fighter aircraft in 2017.
    • The MAF's naval assets are old, including the Kasturi-class Corvette, which entered service in 1984.
    Logistics
    • The MAF's logistics management has problems that impact the country's defense policy.
    • The MAF's logistic unit has difficulty freeing itself from the logistic function burden of the combat unit.
    Other issues
    • The government's lack of clear guidance for the future strategic direction of the defense industry.
    • The government's reluctance to support locally produced products.
    • The frequent change of governments since 2018.
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
    Balasan
    1. FACT LCS 2025 - 2011 = 15 YEARS
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      15 YEARS = LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
      ===================
      FACT GOVERNMENT ........
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      BUDGET 2025 = NOT APPROVE THE BUDGET REQUEST
      RM11 billion annually also sounds reasonable if we look at the current US dollar exchange rate – US$2.5 billion – and the challenges ahead. But again, MAF has been let down by the government which has not say why it has not approve the budget requests. To me at least give us the reason why it has not try to meet the challenges faced by MAF. MAF acknowledges the conundrum which resulted in it coming out with the CAP 55 and 15 to 5 transformation plans. Despite this, the government has yet to stick to the plan and instead goes out of the way not to stick to it.
      Yes, in the three terms he has been in power, PMX has given the highest DE budget for the last three decades. In 2023 he allocated RM6.041 billion, RM7.053 bilion and the latest RM7.492 billion. But it is still not enough to recover from the Covid years and the under-investment for the last three decades. Not when the MAF is still operating some 171 assets which are three decades old. Could he have given more to meet the defence budget? I have no idea, really as I am not purview to the government finances.
      Unfortunately, recent events does not augur well for MAF. Can MAF recover in the next RMK? Only time will tell and if the world does not goes berserk first.
      ==============
      BUDGET 2025 FOR ......
      SALARIES AND OTHER STUFF
      NOT ASSETS
      NOT ASSETS
      NOT ASSETS
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonnn GDP. That said most of the allocation is FOR SALARIES AND OTHER STUFF AND NOT ASSETS.
      ==============
      BUDGET 2025 ......
      ASSET PROCUREMENT DOWN
      ASSET PROCUREMENT DOWN
      ASSET PROCUREMENT DOWN
      Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR

      Hapus
    2. The Malonn Littoral Combat Ship (LCS) program has faced a number of issues, including:
      • Delayed delivery
      The original plan was to deliver the first ship, the LCS 1 Maharaja Lela, in 2019, and all six ships by 2023. However, the program was stalled in 2019 due to financial issues at Boustead Naval Shipbuilding. The program was restarted in 2023, with the first ship scheduled for delivery in 2026 and the remaining four by 2029.
      • Design issues
      The Royal Malonn Navy (RMN) did not get to choose the design of the ship, and the detailed design was not completed until after 66.64% of the budget had been paid.
      • Financial issues
      Boustead Naval Shipbuilding was in a critical financial state, and a middleman increased the project cost by up to four times.
      • Corruption
      A declassified audit report highlighted irregularities in the execution of the program, including the abuse of power and the involvement of a Zainab Mohd Salleh.
      • Aging fleet
      The RMN's current fleet is outdated, with two-thirds of the ships dating back over 30 years
      ===================
      FACT LCS 2025 - 2011 = 15 YEARS
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      LAUGHING STOCK TO THE WORLD
      Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
      ===================
      FACT NOT YET DELIVERED :
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
      The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ===================
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      2017 LAUNCHING – 2025 NOT YET DELIVERED
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malonn’s former Navy chief said today.
      ===================
      Malon's combat equipment has several weaknesses, including:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness

      Hapus
    3. HUTANG 17 CREDITOR LCS =
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ===================
      1. HUTANG 84.2% DARI GDP
      1. HUTANG 84.2% DARI GDP
      2. HUTANG NEGARA RM 1.5 TRLLIUN
      3. HUTANG 1MDB RM 18.2 BILLION
      4. TUNGGAKAN LEASE SABAH USD 15 BILLION
      5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
      6. LEASE SIMULATOR MKM
      7. PESAWAT MIG GROUNDED
      8. LEASE MOTOR POLIS
      9. PESAWAT MB339CM GROUNDED
      10. NURI GROUNDED LEASE BLACKHAWK
      11. FIVE PROCUREMENT CANCELLED
      12. 48 PESAWAT SKYHAWK HILANG
      13. MESIN JET 2 BUAH HILANG
      14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
      15. NO LST
      16. NO LPD – NGEMIS LPD USA
      17. NO TANKER
      18. NO KCR
      19. MONUMEN MIG29M UNTUK JIMAT KOS
      20. NO SPH
      21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
      22. NO HELLFIRE
      23. NO MPA ATR72 DELAYED
      24. NO HIDRO-OSEANOGRAFI LEASE KAPAL HIDRO
      25. NO HELI HEAVY ATTACK NGEMIS AH1Z
      26. NO M3 AMPHIBIUS RIG
      27. LCS MANGKRAK KARATAN
      28. OPV MANGKRAK
      29. TANK MOGOK STOP SPARE PARTS
      30. CN 235 MSA VERSI MSI USA
      31. LEASE MOTOR MILITARY POLICE
      32. RADAR GIFTED PAID USA
      33. 84% NO SAVING EVERY MONTH
      34. LEASE VSHORAD
      35. LEASE TRUK 3 TON
      36. 4X4 LEASE 6X6 CANCELLED
      37. C130H DIGANTI 2045
      38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
      39. NO DRONE UCAV – ANKA ISR OMPONG
      40. LEASE BLACKHAWK LEASE AW159
      41. NO TRACKED SPH
      42. LEASE SIMULATOR HELI
      43. SPH CANCELLED
      44. SCORPION V150 CONDOR SIMBAS RETIRED
      45. NO PESAWAT COIN
      46. PILATUS MK II KARATAN
      47. PENCEROBOHAN 43X BTA 316 HARI
      48. LEASE AW139 LEASE COLIBRI
      49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
      50. OPV DIBAYAR 3 JADI 1 LEASE BOAT
      51. LYNX GROUNDED
      52. MRCA CANCELLED LEASE PESAWAT ITTC
      53. MICA CANCELLED NSM CANCELLED
      54. NO LRAD NO MRAD JUST SHORAD
      55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
      56. 4X NGEMIS F18 KUWAIT
      57. MENUNGGU 2050 KAPAL SELAM
      58. NO TANK AMPHIBI AV8 MOGOK BERASAP
      59. 84% NO SAVING EVERY MONTH
      60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
      61. TUDM LEASE 12 AW149
      62. TUDM LEASE 4 AW139
      63. TUDM LEASE 5 EC120B
      64. TLDM LEASE 2 AW159
      65. TDM LEASE 4 UH-60A
      67. TDM LEASE 12 AW149
      68. BOMBA LEASE 4 AW139
      69. MMEA LEASE 2 AW159
      70. POLIS LEASE 7 BELL429
      ===================
      LEASE 28 HELI = 119 HELI BARU :
      LEASE 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit generally around $30,000 to $33,000. It has a range of up to 1,000 meters and can destroy a tank in a single shot.
      ----
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      ------
      CHEAPEST VARIANT HISAR OPV
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      ------
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      ------
      ANKA = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.

      Hapus
    4. CARA MENIPU SULTAN - PSIM FAKE
      Jika pada peluncurannya tahun 2017 lalu kapal ini terlihat telah dilengkapi dengan modul PSIM, maka itu adalah modul PSIM palsu/fake yang dipasang untuk upacara peluncuran sebagaimana disampaikan dalam sidang PAC (Public Account Committe). Modul PSIM palsu ini kemudian dilepas saat kapal ini dipasangi hanggar.
      ==============
      HUTANG 17 CREDITOR LCS =
      1. MTU Services Ingat Kawan (M) Sdn Bhd
      2. include Contraves Sdn Bhd
      3. Axima Concept SA
      4. Contraves Advanced Devices Sdn Bhd
      5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
      6. Security & Services Malon Sdn Bhd,
      7. iXblue SAS
      8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
      9. Bank Pembangunan Malon Bhd
      10. AmBank Islamic Bhd
      11. AmBank (M) Bhd
      12. Affin Hwang Investment Bank Bhd
      13. Bank Muamalat Malon Bhd
      14. Affin Bank Bhd
      15. Bank Kerjasama Rakyat Malon Bhd
      16. Malayan Banking Bhd (Maybank)
      17. KUWAIT FINANCE HOUSE (MALON) BHD.
      ==========
      LEASE 28 HELI = 119 HELI BARU :
      LEASE 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL LEASE DARIPADA BELI BARU =
      LEASE 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      LEASEan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
      ----
      KEYWORDS
      1 UNIT JAVELIN = 3 UNIT NLAW
      4.5 KM JAVELIN = 1 KM NLAW
      ---
      Javelin: Costs about US$80,000 per missile and has a maximum effective range of up to 4.5 kilometers
      The cost of an NLAW (Next-generation Light Anti-tank Weapon) unit generally around $30,000 to $33,000. It has a range of up to 1,000 meters and can destroy a tank in a single shot.
      ----
      KEYWORDS 1 UNIT APACHE = 13 UNIT MD530G
      -
      1. APACHE INDONESIA 8 UNIT HARGA USD 1.42 BILLION = USD 177.5 MILLION/UNIT
      -
      2. MD530G 6 UNIT HARGA USD 77.4 MILLION = USD 12,9 MILLION/UNIT
      -
      USD 177.5 MILLION/ USD 12,9 MILLION = 13 UNIT MD630G
      ------
      CHEAPEST VARIANT HISAR OPV
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      ------
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      ------
      ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance, and will NOt be equipped with any weaponry.
      ==============
      FACT :
      1. 1 UNIT APACHE = 13 UNIT MD530G
      2. 1 UNIT RAFALE = 4 UNIT FA50M
      3. 1 UNIT PPA = 3 UNIT LMS B2
      4. 1 UNIT SCORPENE IDN = 2 UNIT SCORPENE MALONN
      5. CN 235 US$ 27,50 JUTA = ATR 72 US$24.7 JUTA
      6. LEASE 28 HELI = 119 HELI BARU
      7. 4.5 KM JAVELIN = 1 KM NLAW
      8. ANKA ISR NOT ARMED

      Hapus
  115. Some weaknesses in Malonnn public procurement include:
    • Transparency: The principle of transparency is not well adhered to. Interference from authorities, such as local politicians, can lead to corruption, scandal, and the abuse of public resources.
    • Inefficient processes: Procurement processes can be inefficient and ineffective. Tenders may be prepared hastily, carelessly, and EXCLUDING proper consideration.
    • Poor documentation: Documentation may be poor.
    • Low quality: The quality of products, services, and work may be low.
    • Non-compliance: There may be non-compliance with the scope, specifications, and terms of contracts.
    • Delayed completion: Projects may be delayed or not completed.
    • Inadequate infrastructure: There may not be adequate infrastructure to support procurement.
    • Vendor development programs: Vendor development programs (VDPs) may be non-existent or ineffective.
    • Cronyism: There may be interference from outside parties and cronyism, which affects the awarding of contracts.
    Malpractice: Procurement officers may be involved in malpractice and not comply with the policies and procedures of the procurement system
    =========================
    LEASE 28 HELI = 119 HELI BARU :
    LEASE 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL LEASE DARIPADA BELI BARU =
    LEASE 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    LEASEan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.

    =========================
    KEY WORDS = CHEAPEST AND DOWNGRADE

    BalasHapus
  116. 171 ASET USANG 30 TAHUN =
    108 TDM
    29 TUDM
    34 TLDM
    "The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
    ==============
    LEASE 28 HELI = 119 HELI BARU :
    LEASE 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL LEASE DARIPADA BELI BARU =
    LEASE 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    LEASEan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
    ==============
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    ==============
    CHEAPEST VARIANT HISAR OPV
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    ==============
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    ===============
    VERSI TERMURAH FA50
    VERSI TERMURAH FA50
    VERSI TERMURAH FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    ==============
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance.
    ==============
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness

    BalasHapus
  117. HUTANG 17 CREDITOR LCS =
    1. MTU Services Ingat Kawan (M) Sdn Bhd
    2. include Contraves Sdn Bhd
    3. Axima Concept SA
    4. Contraves Advanced Devices Sdn Bhd
    5. Contraves Electrodynamics Sdn Bhd and Tyco Fire
    6. Security & Services Malon Sdn Bhd,
    7. iXblue SAS
    8. iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd
    9. Bank Pembangunan Malon Bhd
    10. AmBank Islamic Bhd
    11. AmBank (M) Bhd
    12. Affin Hwang Investment Bank Bhd
    13. Bank Muamalat Malon Bhd
    14. Affin Bank Bhd
    15. Bank Kerjasama Rakyat Malon Bhd
    16. Malayan Banking Bhd (Maybank)
    17. KUWAIT FINANCE HOUSE (MALON) BHD.
    ===================
    1. HUTANG 84.2% DARI GDP
    1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN LEASE SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. LEASE SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. LEASE MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED LEASE BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI LEASE KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. LEASE MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. LEASE VSHORAD
    35. LEASE TRUK 3 TON
    36. 4X4 LEASE 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. LEASE BLACKHAWK LEASE AW159
    41. NO TRACKED SPH
    42. LEASE SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. LEASE AW139 LEASE COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 LEASE BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED LEASE PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM LEASE 12 AW149
    62. TUDM LEASE 4 AW139
    63. TUDM LEASE 5 EC120B
    64. TLDM LEASE 2 AW159
    65. TDM LEASE 4 UH-60A
    67. TDM LEASE 12 AW149
    68. BOMBA LEASE 4 AW139
    69. MMEA LEASE 2 AW159
    70. POLIS LEASE 7 BELL429
    ===================
    2024 RASIO HUTANG 84,2% DARI GDP
    The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023.
    In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018).
    “The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
    ===================
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness

    BalasHapus
  118. GARA-GARA LCS = KFH BANGKRUT
    --------------
    KUWAIT FINANCE HOUSE = EXIT BANKRUPT
    KUWAIT FINANCE HOUSE = EXIT BANKRUPT
    KUWAIT FINANCE HOUSE = EXIT BANKRUPT
    Malon's first foreign Islamic bank Kuwait Finance House (Malon) Bhd (KFH Malon) is exiting Malon after 19 years of operation.
    --------------
    FOOD CRISIS
    RICE CRISIS
    Meanwhile, the minister noted that in Malonn, rice scarcity has triggered panic among members of the public as dwindling stocks led to price increases, while the cost of imported rice has placed an additional burden on the people.
    The conditions in Malonn showed that disruption in food stocks can cause social unrest. Food is not merely a basic need for the people but also a key factor in national stability,” he stressed.
    -----------
    300.000 LOST JOBS
    300.000 LOST JOBS
    300.000 LOST JOBS
    Almost 300,000 lost their jobs in the last 4 years, Dewan Rakyat told Deputy human resources minister Abdul Rahman Mohamad says various programmes have been introduced to tackle underemployment. total of 293,639 workers lost their jobs between 2020 and Sept 26, with the manufacturing sector recording the highest number of layoffs at 75,615
    --------------
    PETRONAS BAYAR PGN
    PETRONAS BAYAR PGN
    PETRONAS BAYAR PGN
    Afiliasi Pertamina Gas Negara alias PGN (PGAS) menang gugatan atas Petronas Carigali Muriah Limited (PCML), dan PLN. Itu setelah ICC International Court of Arbitration, Hong Kong, menghukum Petronas. Oleh karena itu, Petronas harus membayar kepada Kalimantan Jawa Gas (KJG).
    --------------
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    30.000 JOBS CUT PETRONAS
    Malonn's state energy firm Petronas will reduce its workforce to ensure its long-term survival amid increasing challenges in the global operating environment
    --------------
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    30.000 JOBS CUT GOVERMENTS
    The Malonnn government’s decision to terminate 30,000 contract staff without a school-leaving certification has drawn backlash from the country’s public service union, which said the sudden end to long careers working for the state lacks compassion.
    ===================
    2029-2020 : INCREASE DEBT
    2029-2020 : INCREASE DEBT
    2029 = 438,09 BILLION USD
    2028 = 412,2 BILLION USD
    2027 = 386,51 BILLION USD
    2026 = 362,19 BILLION USD
    2025 = 338,75 BILLION USD
    2024 = 316,15 BILLION USD
    2023 = 293,83 BILLION USD
    2022 = 271,49 BILLION USD
    2021 = 247,49 BILLION USD
    2020 = 221,49 BILLION USD
    ------------------
    2029-2020 : DEBT PAY DEBT
    2029-2020 : OVERLIMIT DEBT
    2029 = 69,54% DEBT RATIO TO GDP
    2028 = 69,34% DEBT RATIO TO GDP
    2027 = 68,8% DEBT RATIO TO GDP
    2026 = 68,17% DEBT RATIO TO GDP
    2025 = 68,07% DEBT RATIO TO GDP
    2024 = 68,38% DEBT RATIO TO GDP
    2023 = 69,76% DEBT RATIO TO GDP
    2022 = 65,5% DEBT RATIO TO GDP
    2021 = 69,16% DEBT RATIO TO GDP
    2020 = 67,69% DEBT RATIO TO GDP
    ==========
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN ......
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things......
    😝😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  119. DATA SIPRI LCS (FFBNW) =
    ENIGINE GERMAN = NOL DELIVERED = NO ENGINE
    MICA FRANCE = NOL DELIVERED = NO MICA
    FCS TNX ITALY = NOL DELIVERED = NO FCS
    SMART NETHERLANDS = NOL DELIVERED = NO SMART
    ==========
    LCS = FFBNW
    LCS USD 4,74 BILLION/5 UNIT = USD 948 MILLION/UNIT ]
    • USD 948 JUTA (EXCLUDING AMMO) = FFBNW = MANGKRAK DELAYED
    -NO NSM.
    -NO VL MICA.
    -NO TORPEDO RINGAN.
    -NO SECONDARY GUNS.
    -NO BOFORS MK3.
    -----------
    PRICE DESTROYER DAN FREGAT =
    -KDX 3 CLASS/SEJONG USD 900 JUTA/UNIT
    -TYPE 052D CLASS USD 500-600 JUTA.
    -TYPE 055 CLASS USD 920 JUTA.
    ==========
    EXCLUDING AMMO = ZONK
    EXCLUDING AMMO = ZONK
    EXCLUDING AMMO = ZONK
    REVISED (FINAL): RM11.2B FOR 5 SHIPS
    (final agreed-upon contract price dealing with cost overruns)
    RM 2.24 billion (2023) per unit + ToT (ceiling) [or $948M (2023 inflation) or ~$700M (2011 forex) or ~$490M (2023 forex) (excluding ammo)
    Inflation adjustment roughly equivalent to $948 million in 2023 US dollars (excluding ammo)
    -------------
    REVISED (INITIAL): RM 9.128B FOR 5 SHIPS
    (initial figures using the original contract price in dealing with cost overruns)
    RM 1.8 billion (2011) per unit + ToT (ceiling) or $560 million per ship (excluding ammo)
    Inflation adjustment roughly equivalent to $758 million in 2023 US dollars (excluding ammo)
    -------------
    ORIGINAL: RM 9B FOR 6 SHIPS
    RM 1.5 billion (2011) per unit + ToT (ceiling) or $466 million per ship (excluding cost overruns and ammo)
    Inflation adjustment roughly equivalent to $631 million in 2023 US dollars (excluding cost overruns and ammo
    ==========
    PROBLEMS SHIPYARD = LCS OPV NGPVs FAILED
    PROBLEMS SHIPYARD = LCS OPV NGPVs FAILED
    PROBLEMS SHIPYARD = LCS OPV NGPVs FAILED
    Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.
    😝😝😝😝😝😝😝😝😝😝😝

    BalasHapus
  120. FACT LCS 2025 - 2011 = 15 YEARS
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    LAUGHING STOCK TO THE WORLD
    Defence Minister DSU Mohamad Hasan - By building five ships, each vessel will cost around RM2.2 billion to RM2.4 billion, he said adding that he has no idea the amount needed to build the other three. “If we were to build only two ships, it will cost around RM4.5 billion each, making it the world’s most expensive ship for its class and make us a laughing-stock to the world”
    ===================
    FACT NOT YET DELIVERED :
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    LCS RM12.4 BILLION /5 UNIT = RM2,48 PER UNIT
    The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ===================
    2024 RASIO HUTANG 84,2% DARI GDP
    HUTANG 2023 = RM 1.53 TRILLION
    HUTANG 2022 = RM 1.45 TRILLION
    HUTANG 2021 = RM 1.38 TRILLION
    HUTANG 2020 = RM 1.32 TRILLION
    HUTANG 2019 = RM 1.25 TRILLION
    HUTANG 2018 = RM 1.19 TRILLION
    The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023.
    In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018).
    “The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
    ===================
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness

    BalasHapus
  121. SDH 14 tahun baru keliatan..wkwkwk🤣🤣🤣 itu jg belum tentu jadi..🫢😂🤣

    BalasHapus
  122. just info,completed discharged 350 Medium tank harimau Family di pelabuhan tanjung priok,konfirmasi dari keponakan yang bekerja di pelabuhan IKT tanjung priok..hebat diam diam tau tau udah sampe..

    BalasHapus
  123. Hutang juga jadi barang ya malon ngemis2 tudak ada yang ngasih kasian no shiping miskin tudak dpercaya lender lonlonlon

    BalasHapus
  124. Pandangan si purwira otak kosong manusia bodoh itu dengki ngaca malon bisanya ngemis miskin tidak ada uang shoping tudak dipercaya negsra lain malonmalon malingsial

    BalasHapus
  125. 1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN LEASE SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. LEASE SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. LEASE MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED LEASE BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI LEASE KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. LEASE MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. LEASE VSHORAD
    35. LEASE TRUK 3 TON
    36. 4X4 LEASE 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. LEASE BLACKHAWK LEASE AW159
    41. NO TRACKED SPH
    42. LEASE SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. LEASE AW139 LEASE COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 LEASE BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED LEASE PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM LEASE 12 AW149
    62. TUDM LEASE 4 AW139
    63. TUDM LEASE 5 EC120B
    64. TLDM LEASE 2 AW159
    65. TDM LEASE 4 UH-60A
    67. TDM LEASE 12 AW149
    68. BOMBA LEASE 4 AW139
    69. MMEA LEASE 2 AW159
    70. POLIS LEASE 7 BELL429
    ==========
    LEASE VSHORAD
    LEASE TRUK CINA 3 TON
    Three weeks ago, the Madani government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd. The estimated cost for the deal is RM10.7 billion and it will be covered in installments over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals.
    LEASE PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    LEASE SIMULATOR MKM TAHUN
    Five-year contract for Sukhoi’s simulators. Publicly listed HeiTech Padu Bhd has announced that it had been awarded a RM67 million, five-year contract to operate and maintain the Su-30MKM flight simulators at the RMAF airbase in Gong Kedak
    LEASE HELI LEASE SIMULATOR
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    LEASE HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara LEASEan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    LEASE BOAT
    LEASEan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    LEASE HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak LEASEan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)

    BalasHapus
  126. 2024 EXTERNAL DEBT REACHED AN ALL-TIME
    2024 EXTERNAL DEBT REACHED AN ALL-TIME
    2024 EXTERNAL DEBT REACHED AN ALL-TIME
    Malonn external debt reached an all-time high of MYR 1,345,400 million in the fourth quarter of 2024. This was an increase from MYR 1,262,300 million in the third quarter of 2024.
    Additional information
    The average external debt for Malaysia from 1990 to 2024 was MYR 393,996.07 million.
    The record low for Malonn external debt was MYR 9,063 million in the second quarter of 1997.
    Malaysia faced external pressures in 2023, including capital outflows, a negative interest rate differential, and ringgit depreciation.
    Gross international reserves (GIR) declined from US$114.7 billion at the end of 2022 to US$113.5 billion at the end of 2023.
    However, as of mid-January 2024, reserves had increased to US$115.1 billion.
    The Bank Negara Malaysia (BNM) Quarterly Bulletin provides a quarterly review of Malonn economic, monetary, and financial developments.
    ---------------
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things. Using aggregated data from BNM's Central Credit Reference Information System (CCRIS), this dashboard gives you insight into key trends on household debt. For now, it displays data on the flow of borrowing activity on a monthly basis, broken down by purpose. In due time, it will be deepened with granular data showing the state of indebtedness of Malonn
    ---------------
    DEBT PROBLEMS SINCE 2000
    DEBT PROBLEMS SINCE 2000
    DEBT PROBLEMS SINCE 2000
    Malonn has experienced a number of debt problems since 2000, including high public debt, household debt, and a fiscal deficit.
    Public debt
    • Fiscal deficit: The fiscal deficit was high during the pandemic, exceeding 6% of GDP.
    • Public debt to GDP ratio: In 2023, public debt was almost 70% of GDP, which is higher than the average of 55% in the 2010s.
    • Statutory debt limit: The statutory debt limit has been revised several times over the last three decades.
    Household debt
    • Household debt to GDP ratio: In 2007, the household debt to GDP ratio was 67%, up from 47% in 2000.
    • Debt to income ratio: The ratio of debt to income for Malonnn households has been increasing since 2000.
    • Household debt crisis: In 2023, household debt reached RM1.53 trillion, with a household debt-to-GDP ratio of 84.2%.
    Other factors
    • External debt: Malonn's external debt is also a concern.
    Export vulnerability: Malonn's manufacturing sector is vulnerable to drops in external demand
    ---------------
    Malonn debt has been increasing, including household debt, external debt, and total debt. This debt can have a negative impact on the economy and may lead to a crisis.
    Household debt
    • As of 2024, Malonn household debt was RM1.63 trillion, which is 84.2% of the country's GDP.
    • This is a sharp increase in debt that could lead to a crisis.
    External debt
    • Malonn external debt has increased since the global financial crisis (GFC).
    • In 2018, Malonn external debt was RM924.9 billion, which is 64.7% of the country's GDP.
    • The increase in external debt is due to higher holdings of domestic debt securities, interbank borrowings, and more.
    Total debt
    • As of 2023, Malonn total debt was RM1.5 trillion, which is 65.6% of the country's GDP.
    • The total debt has been steadily increasing over the years.
    Government debt
    • The government has temporarily increased debt to help businesses and citizens.
    • The government will implement fiscal discipline and consolidation once the economy recovers.

    BalasHapus
  127. 2024 EXTERNAL DEBT REACHED AN ALL-TIME
    2024 EXTERNAL DEBT REACHED AN ALL-TIME
    2024 EXTERNAL DEBT REACHED AN ALL-TIME
    Malonn external debt reached an all-time high of MYR 1,345,400 million in the fourth quarter of 2024. This was an increase from MYR 1,262,300 million in the third quarter of 2024.
    Additional information
    The average external debt for Malaysia from 1990 to 2024 was MYR 393,996.07 million.
    The record low for Malonn external debt was MYR 9,063 million in the second quarter of 1997.
    Malaysia faced external pressures in 2023, including capital outflows, a negative interest rate differential, and ringgit depreciation.
    Gross international reserves (GIR) declined from US$114.7 billion at the end of 2022 to US$113.5 billion at the end of 2023.
    However, as of mid-January 2024, reserves had increased to US$115.1 billion.
    The Bank Negara Malaysia (BNM) Quarterly Bulletin provides a quarterly review of Malonn economic, monetary, and financial developments.
    ---------------
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN
    BNM = HOUSEHOLD DEBT IS ONE OF THE HIGHEST IN THE ASEAN
    Malonn household debt is one of the highest in the ASEAN region. Against this backdrop, Bank Negara Malonn (BNM) safeguards financial stability by monitoring and regulating the lending activity of all financial institutions in Malonn, among other things. Using aggregated data from BNM's Central Credit Reference Information System (CCRIS), this dashboard gives you insight into key trends on household debt. For now, it displays data on the flow of borrowing activity on a monthly basis, broken down by purpose. In due time, it will be deepened with granular data showing the state of indebtedness of Malonn
    ---------------
    1. HUTANG 84.2% DARI GDP
    2. HUTANG NEGARA RM 1.5 TRLLIUN
    3. HUTANG 1MDB RM 18.2 BILLION
    4. TUNGGAKAN LEASE SABAH USD 15 BILLION
    5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
    6. LEASE SIMULATOR MKM
    7. PESAWAT MIG GROUNDED
    8. LEASE MOTOR POLIS
    9. PESAWAT MB339CM GROUNDED
    10. NURI GROUNDED LEASE BLACKHAWK
    11. FIVE PROCUREMENT CANCELLED
    12. 48 PESAWAT SKYHAWK HILANG
    13. MESIN JET 2 BUAH HILANG
    14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
    15. NO LST
    16. NO LPD – NGEMIS LPD USA
    17. NO TANKER
    18. NO KCR
    19. MONUMEN MIG29M UNTUK JIMAT KOS
    20. NO SPH
    21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
    22. NO HELLFIRE
    23. NO MPA ATR72 DELAYED
    24. NO HIDRO-OSEANOGRAFI LEASE KAPAL HIDRO
    25. NO HELI HEAVY ATTACK NGEMIS AH1Z
    26. NO M3 AMPHIBIUS RIG
    27. LCS MANGKRAK KARATAN
    28. OPV MANGKRAK
    29. TANK MOGOK STOP SPARE PARTS
    30. CN 235 MSA VERSI MSI USA
    31. LEASE MOTOR MILITARY POLICE
    32. RADAR GIFTED PAID USA
    33. 84% NO SAVING EVERY MONTH
    34. LEASE VSHORAD
    35. LEASE TRUK 3 TON
    36. 4X4 LEASE 6X6 CANCELLED
    37. C130H DIGANTI 2045
    38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
    39. NO DRONE UCAV – ANKA ISR OMPONG
    40. LEASE BLACKHAWK LEASE AW159
    41. NO TRACKED SPH
    42. LEASE SIMULATOR HELI
    43. SPH CANCELLED
    44. SCORPION V150 CONDOR SIMBAS RETIRED
    45. NO PESAWAT COIN
    46. PILATUS MK II KARATAN
    47. PENCEROBOHAN 43X BTA 316 HARI
    48. LEASE AW139 LEASE COLIBRI
    49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
    50. OPV DIBAYAR 3 JADI 1 LEASE BOAT
    51. LYNX GROUNDED
    52. MRCA CANCELLED LEASE PESAWAT ITTC
    53. MICA CANCELLED NSM CANCELLED
    54. NO LRAD NO MRAD JUST SHORAD
    55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
    56. 4X NGEMIS F18 KUWAIT
    57. MENUNGGU 2050 KAPAL SELAM
    58. NO TANK AMPHIBI AV8 MOGOK BERASAP
    59. 84% NO SAVING EVERY MONTH
    60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
    61. TUDM LEASE 12 AW149
    62. TUDM LEASE 4 AW139
    63. TUDM LEASE 5 EC120B
    64. TLDM LEASE 2 AW159
    65. TDM LEASE 4 UH-60A
    67. TDM LEASE 12 AW149
    68. BOMBA LEASE 4 AW139
    69. MMEA LEASE 2 AW159
    70. POLIS LEASE 7 BELL429

    BalasHapus