Latihan Pasukan Khusus TNI Angkatan Laut (Latpassusla) di Pantai Todak, Dabo Singkep, Kepulauan Riau (photos: Korps Marinir)
Dispen Kormar, TNI Angkatan Laut. (Dabosingkep). Di Daerah Latihan Dabosingkep, Komandan Korps Marinir (Dankormar) Mayor Jenderal TNI (Mar) Endi Supardi, S.E., M.M., M.Tr.Opsla., CHRMP., CRMP. mendampingi Kepala Staf Angkatan Laut (Kasal) Laksamana TNI Dr. Muhammad Ali, S.E., M.M., M.Tr.Opsla. meninjau Latihan Pasukan Khusus TNI Angkatan Laut (Latpassusla) bertempat di Pantai Todak, Dabo Singkep, Kepulauan Riau, Sabtu (14/12/2024).
Dalam kegiatan melibatkan pasukan Khusus TNI AL yang terdiri dari Detasemen Jalamangkara (Denjaka), Batalyon Intai Amfibi (Yontaifib) Korps Marinir dan Komando Pasukan Katak (Kopaska) dengan tujuan meningkatkan kemampuan, profesionalisme, serta naluri tempur Prajurit Pasukan Khusus.
Dalam kesempatan ini Kepala Staf Angkatan Laut didampingi Komandan Korps Marinir meninjau sekaligus menyaksikan langsung pelaksanaan latihan dengan didampingi para pejabat tinggi TNI AL. Sejumlah materi latihan dilaksanakan oleh para prajurit satuan elit TNI AL ini diantaranya Pendaratan Khusus, Beach Clearing & Demolisi, Terjun Tempur, Rubber Duck, serta Fast Roping/Stabo.
Usai pelaksanaan latihan, Dankormar mengikuti kegiatan Bakti Sosial dengan membagikan paket bantuan sembako kepada 300 masyarakat pesisir, Bakti Kesehatan berupa pengobatan gratis dan khitan kepada 200 masyarakat, serta Makan Sehat Bergizi bersama dengan 500 siswa-siswi di wilayah Dabo Singkep.
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
BalasHapus•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
----
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
----
SEWA HELI 28 = KONGSI 5
SEWA HELI 28 = KONGSI 5
SEWA HELI 28 = KONGSI 5
Dengan termeterainya kontrak tersebut, sebanyak 12 buah akan digunakan Tentera Udara Diraja Malon (TUDM); Polis Diraja Malon (PDRM) (7); Tentera Laut Diraja Malon (TLDM) (2); Jabatan Bomba dan Penyelamat (JPBM) (2) dan Agensi Penguatkuasaan Maritim Malon (Maritim Malon) (4).
----
LIGHT TWIN HELO = GAGAL
LIGHT TWIN HELO = GAGAL
LIGHT TWIN HELO = GAGAL
The Procurement division of the Home Ministry issued two separate tenders for the supply and delivery of seven twin-engine utility and transport aircraft and five light twin engine helicopters for the police’s Air Wing. the tender for the five twin-engine helicopters has been canceled. Checks on the Eperolehan website today confirmed the cancelation
----
SEWA BEKAS = 15 TAHUN
15 TAHUN = BELI RONGSOK
Semua dikendalikan oleh syarikat yang melakukan pajakan ini dan pajakan ini adalah pajakan To-Own bermakna selepas 15 tahun, kerajaan diberikan pilihan untuk membeli kesemua 28 helikopter itu pada harga nominal RM1 sahaja.
----
BLACKHAWK = GAGAL
BLACKHAWK = GAGAL
BLACKHAWK = GAGAL
Menteri Pertahanan, Datuk Seri Mohamed Khaled Nordin berkata, ia susulan pelanjutan kontrak oleh syarikat itu pada Oktober lalu selepas gagal mematuhi kontrak penyerahannya.
"Oktober sudah berakhir. Tiada apa-apa (Black Hawks), tiada apa-apa.
---
SEWA 53 HELI BEKAS
SEWA 53 HELI BEKAS
SEWA 53 HELI BEKAS
TUDM SEWA =
12 AW149
4 AW139
5 EC120B
TLDM SEWA =
2 AW159
TDM SEWA =
4 UH-60A
12 AW149
BOMBA SEWA =
4 AW139
POLIS SEWA =
7 BELL429
MMEA SEWA =
2 AW159
JABATAN PM SEWA =
1 AW189
https://www.facebook.com/share/p/gnmpDnsCCTn8tx6b/
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
KEY WORDS =
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
TERSINGKIR PIALA CIKI-CIKI
BalasHapusTERSINGKIR PIALA CIKI-CIKI
TERSINGKIR PIALA CIKI-CIKI
Timnas Malon tersingkir dari Piala AFF 2024 atau ASEAN Championship usai ditahan Singapura 0-0 di Stadion Bukit Jalil, Jumat (20/12). Malon gagal ke semifinal Piala AFF 2024 usai menempati peringkat ketiga klasemen Grup A.
==============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
==============
Malonn's economy has faced a number of challenges, including:
• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
WESTSTAR GETTING MONEY = MALON GETTING JUNK
BalasHapusWESTSTAR GETTING MONEY = MALON GETTING JUNK
WESTSTAR GETTING MONEY = MALON GETTING JUNK
“Kaedah ini juga dianggap inovatif kerana berpotensi untuk menjimatkan kos jangka panjang tanpa menjejaskan kualiti mahupun fungsi aset yang diperoleh.”
As of now, many publicly available evidence shows that the above is not true until is proven. We are just wasting more money long term. We need an audit to compare the total leasing cost and overall cost of outright buying and operating for 15 years
So Weststar is getting richer and richer……
==========
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==========
1. HUTANG 84.2% DARI GDP
1. HUTANG 84.2% DARI GDP
2. HUTANG NEGARA RM 1.5 TRLLIUN
3. HUTANG 1MDB RM 18.2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST SHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. TUDM SEWA 12 AW149
62. TUDM SEWA 4 AW139
63. TUDM SEWA 5 EC120B
64. TLDM SEWA 2 AW159
65. TDM SEWA 4 UH-60A
67. TDM SEWA 12 AW149
68. BOMBA SEWA 4 AW139
69. MMEA SEWA 2 AW159
70. POLIS SEWA 7 BELL429
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
Sudah MEMBUAL akan lolos tau tau tersingkir... HAHAHAHAHA😂😂😂
BalasHapusJumat (20/12/2024) malam menjadi malam yang berat bagi Timnas MALAYDESH. KUCING KUNING dipastikan tersingkir di Piala AFF 2024...HAHAHAHAHA
MALON Di permalukan bekas jajahannya.....Di kandang sendiri... HAHAHAHA😂😂😂😂😂😂
WARNA KUNING.. SIH..
HapusPANTESAN KUNING KAYAK TAIK..
😁😁😁😁
Sudah MEMBUAL akan lolos tau tau tersingkir... HAHAHAHAHA😂😂😂
BalasHapusJumat (20/12/2024) malam menjadi malam yang berat bagi Timnas MALAYDESH. KUCING KUNING dipastikan tersingkir di Piala AFF 2024...HAHAHAHAHA
MALON Di permalukan bekas jajahannya.....Di kandang sendiri... HAHAHAHA😂😂😂😂😂😂
BUKAN HARIMAU TAPI KUCING PASAR SAYUR.. MALAYA..
Hapus😁😁😁😁
Sudah MEMBUAL akan lolos tau tau tersingkir... HAHAHAHAHA😂😂😂
BalasHapusJumat (20/12/2024) malam menjadi malam yang berat bagi Timnas MALAYDESH. KUCING KUNING dipastikan tersingkir di Piala AFF 2024...HAHAHAHAHA
MALON Di permalukan bekas jajahannya.....Di kandang sendiri... HAHAHAHA😂😂😂😂😂😂
KUCING DIKEJAR SINGA.. 😁😁😁
HapusSudah MEMBUAL akan lolos tau tau tersingkir... HAHAHAHAHA😂😂😂
BalasHapusJumat (20/12/2024) malam menjadi malam yang berat bagi Timnas MALAYDESH. KUCING KUNING dipastikan tersingkir di Piala AFF 2024...HAHAHAHAHA
MALON Di permalukan bekas jajahannya.....Di kandang sendiri... HAHAHAHA😂😂😂😂😂😂
LARI KEJALAN RAYA KUCINGNYA
HapusMATI.. 😁😁😁
MASUK HOTNEWS
https://youtu.be/MTuG6g2mttQ?si=eKT3hKGpU_jWkj6J
AWANI..
😁😁😁😁😁
Sudah MEMBUAL akan lolos tau tau tersingkir... HAHAHAHAHA😂😂😂
BalasHapusJumat (20/12/2024) malam menjadi malam yang berat bagi Timnas MALAYDESH. KUCING KUNING dipastikan tersingkir di Piala AFF 2024...HAHAHAHAHA
MALON Di permalukan bekas jajahannya.....Di kandang sendiri... HAHAHAHA😂😂😂😂😂😂
TEWAAAAS KUCINGNYA.. 😁😁😁
HapusMALAYDESH KOMEN DIKIT ..
BalasHapusGANJAAANG AE....
TUNGGU APALAGI..
KERAJAAN BANGKRUT..
MENUJU BUBAR..
DAN KEPUNAHAN..
RAKYATNYA SUDAH JADI BURUH RENDAHAN CEPAT ATAU LAMBAT MEREKA AKAN BEKERJA DI KITA..
😁😁😁😁😁😁😁😁
Skor 0-0 sudah kaya telor AYAM SAYUR..
BalasHapusTelor tuh mungkin sudah si lapisi dengan lapisi baja tank... Oleh timnas singapur... Wkwkwkwkw
Wah Dabo singkep latihan persiapan serbu seblah haha!👍👍👍
BalasHapusGANJAAAAANG....
HapusSEUMUR HIDUPKU NUNGGU WAKTU GANJAAAANG NEKOLIM..
💪🇲🇨⚓🔥🔥🔥🔥🔥🔥🔥⚔️
sabarrr om
Hapusmulai dengan timfuk fisank dolo 🍌haha!🤣🤣🤣
Eittt kita Latihan dengan heli Panther milik sendiri bukan SEWA sperti sebelah haha!🤭🤭🤭
BalasHapushttps://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEhuVxgD1YpRyZMvtN8qyBGIXgfV98V3h1zoG1NOcq1m-QT2scCuiV1uCQ2VWMKWFHPTzA7-6N1LvIM5IE0X0UfZ1qczHveoGgVHtIYRKvkmh88nn4fddQo8xL3WBBPPFKUE4DsvFNPUij235rWjVu-HecKvLzP4fZDrRMKpqMr5v-FklwseT_KTz49kJv3Q/s1440/470504588_122205245438211399_5565654438153949462_n.jpg
NATURALISASI = TERSINGKIR PIALA CIKI-CIKI
BalasHapusNATURALISASI = TERSINGKIR PIALA CIKI-CIKI
NATURALISASI = TERSINGKIR PIALA CIKI-CIKI
Timnas Malon tersingkir dari Piala AFF 2024 atau ASEAN Championship usai ditahan Singapura 0-0 di Stadion Bukit Jalil, Jumat (20/12). Malon gagal ke semifinal Piala AFF 2024 usai menempati peringkat ketiga klasemen Grup A.
==============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
==============
Malonn's economy has faced a number of challenges, including:
• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
Bikin gelak..😂🤣🤣
BalasHapushttps://www.bolatimes.com/bolaindonesia/2024/12/17/204412/peter-cklamovski-jadi-pelatih-baru-timnas-malaysia-target-100-besar-dunia
Kasian jannya heli Panther dipake buat heli serbu.....tingkat proteksi nya kalah lawan NBell-412 🤔
HapusMoga-moga marinir lekas diberikan heli angkut kelas berat, sekelas Caracal yg mumpuni👇.....tapi soal goncangan rotor Blades nya jangan ditanya 😆😆😆
https://youtu.be/S3ltZTYAAiY?si=OEEtKdPHEtCp2vTz
LAWAK... 🤣🤣🤣
BalasHapusNATURALISASI = TERSINGKIR PIALA CIKI-CIKI
HapusNATURALISASI = TERSINGKIR PIALA CIKI-CIKI
NATURALISASI = TERSINGKIR PIALA CIKI-CIKI
Timnas Malon tersingkir dari Piala AFF 2024 atau ASEAN Championship usai ditahan Singapura 0-0 di Stadion Bukit Jalil, Jumat (20/12). Malon gagal ke semifinal Piala AFF 2024 usai menempati peringkat ketiga klasemen Grup A.
==============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
==============
Malonn's economy has faced a number of challenges, including:
• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
CHEAPEST PLATFORM VARIANT :
Hapus-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malaysia to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malaysian service, and will NOt be equipped with any weaponry.
------
1. BARTER SAWIT 10 LCA 8 FLIT DOWNGRADE
2. P-72M CHEAPEST AIRCRAFT
3. ANKA DOWNGRADE NO WEAPONARY
4. LMS B2 Ada-Class DOWNGRADE HISAR OPV
6. Dibayar PBB/UN = 4x4 Ejder Yalçin
7. LCS dibayar 6 jadi NOL DELAYED
8, OPV dibayar 3 jadi 1 DELAYED
===================
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
===================
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
HapusWEAKEST MILITARY
WEAKEST MILITARY
WEAKEST MILITARY
the Malaysian military is today the region’s weakest. It is riddled with corruption, poor planning, and interference by political leaders in procurement, no longer a potent force even in managing low-level intensity conflict at a time when tensions in the South China Sea are higher than they have been since the days of the Vietnam War.
During the royal address to Parliament in July 2018, the defense minister revealed that only four of Malaysia’s 28 Russian jet fighters could fly. The 42-year-old MiG-29N – two of which crashed in 1998 and 2005, respectively –was decommissioned in 2017 owing to high maintenance costs of RM262 million a year. The Russian jets were bought via an offset program in which palm oil was bartered for fighter jets. In 2003, Malaysia purchased 18 Flankers, introduced in 1985, from Russia for US$900 million (RM3.67 billion), also involving palm oil trade. The offset deal with Russia led to the country’s first space program, with Malaysia’s first astronaut to the International Space Station in 2007. By contrast, Singapore has purchased at least 12 F35B stealth jets from the US, with 100-mile over-the-horizon shoot-down capability. The People’s Liberation Army Air Force is flying the J-20 twin-jet all-weather stealth fighter aircraft developed by the Chengdu Aerospace Corporation. Both would reduce Malaysia’s aging jets to scrap metal in seconds.
In 2006, Malaysia acquired the Jernas system from the UK, including nine missile launchers (later increased to 15), three radars, Rapier Mk2 missiles, training, and support. According to a reliable source, this purchase was made against the recommendation of the RMAF which wanted a more versatile anti-aircraft system from Russia and France.
Admiral Reza Sany, the previous Navy Chief, before retiring earlier this year, openly complained of “dismal annual defense expenditure,” taking the government to task for the Navy’s dismal budget.
Due to low and erratic allocations, the RMN is saddled with old ships, with 58 percent of ships in service much older than the Royal Thai Navy’s HTMS Sukhothai, which sank on December 18, 2022. That includes, according to one source, the Kasturi-class Corvette that entered service in 1984 and the Laksamana Corvette class built in the early 1980s, the Perdana-class gunboat and the Handalan and Jerung class commissioned in the 1970s – at least 40 years ago. The KD Sri Perlis and KD SRI Johor gunboats commissioned in the late 1960s – even older – are still in service.
Admiral Reza made no mention of the scandalous fate of the littoral combat ships (LCS) which have not been delivered although the government has paid billions for them. During investigations into the scandal, it was revealed by Admiral Aziz Jaafar, a former Chief of the Navy, that he personally wrote letters complaining over the delay and cost overruns. Aziz’s observations and advice from other military professionals have been ignored. The scandal is a case in point where allocated funds have been hijacked.
The military likely had no idea they were being used by politicians and their cronies to purchase equipment, especially those that do not meet their technical and operational specifications. Whether some of these officers were also greased along the way by the politicians is something else. It is strange that no one in the military learned the lessons of the Scorpene submarine scandal that preceded the CLS debacle by a decade. Malaysia bought two Scorpene-class submarines from France in 2002 when Najib Razak was defense minister and later PM. A two-ringgit Malaysian company owned by a Najib’s crony received a €114 million “commission” for the purchase. The rest is history.
Ini lagi berat guys... MALAYSIA VIRAL DI INDIANESIA... 🤣🤣🤣
BalasHapusImbas PPN 12 Persen, Poster Ajakan Berobat ke Malaysia Viral Lagi
https://m.youtube.com/watch?v=FVFIDSU1CZw
CHEAPEST PLATFORM VARIANT :
Hapus-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malaysia to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malaysian service, and will NOt be equipped with any weaponry.
------
1. BARTER SAWIT 10 LCA 8 FLIT DOWNGRADE
2. P-72M CHEAPEST AIRCRAFT
3. ANKA DOWNGRADE NO WEAPONARY
4. LMS B2 Ada-Class DOWNGRADE HISAR OPV
6. Dibayar PBB/UN = 4x4 Ejder Yalçin
7. LCS dibayar 6 jadi NOL DELAYED
8, OPV dibayar 3 jadi 1 DELAYED
===================
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
===================
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
CHEAPEST PLATFORM VARIANT :
Hapus-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malaysia to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malaysian service, and will NOt be equipped with any weaponry.
------
1. BARTER SAWIT 10 LCA 8 FLIT DOWNGRADE
2. P-72M CHEAPEST AIRCRAFT
3. ANKA DOWNGRADE NO WEAPONARY
4. LMS B2 Ada-Class DOWNGRADE HISAR OPV
6. Dibayar PBB/UN = 4x4 Ejder Yalçin
7. LCS dibayar 6 jadi NOL DELAYED
8, OPV dibayar 3 jadi 1 DELAYED
==========
1. HUTANG 84.2% DARI GDP
1. HUTANG 84.2% DARI GDP
2. HUTANG NEGARA RM 1.5 TRLLIUN
3. HUTANG 1MDB RM 18.2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST SHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. TUDM SEWA 12 AW149
62. TUDM SEWA 4 AW139
63. TUDM SEWA 5 EC120B
64. TLDM SEWA 2 AW159
65. TDM SEWA 4 UH-60A
67. TDM SEWA 12 AW149
68. BOMBA SEWA 4 AW139
69. MMEA SEWA 2 AW159
70. POLIS SEWA 7 BELL429
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
Malonn's armed forces procurement faces several weaknesses, including:
Hapus1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
------
1. BARTER SAWIT 10 LCA 8 FLIT DOWNGRADE
2. P-72M CHEAPEST AIRCRAFT
3. ANKA DOWNGRADE NO WEAPONARY
4. LMS B2 Ada-Class DOWNGRADE HISAR OPV
6. Dibayar PBB/UN = 4x4 Ejder Yalçin
7. LCS dibayar 6 jadi NOL DELAYED
8, OPV dibayar 3 jadi 1 DELAYED
==================
==================
1. real contract and delivery five units C130J Hercules
2. real contract and delivery two unit Frankethal class Countermine vessels (Pulau Fani class)
3. real contract and delivery four units KCR 60 Fast missiles boats PT PAL
4. real contract and delivery 9 units Bell 412 EPI
5. real contract and delivery 8 additional H225 M
6. real contract and delivery 2 units Bell 429 Global Ranger
7. real contract and delivery 18 Medium weight tank Harimau
8. real contract and delivery 22 Pandur II IFV
9. real contract and delivery two unit Hospital Ships
10. real contract and delivery one unit Command and control variant C295
11. real contract and delivery one unit CN235 MPA
12. real contract and delivery 7 Badak FSV, 26 ANOa apc and 10 additional Komodo recce vehicles in 2022
13. real contract and delivery 4 AS 550 Fennec and 8 AS565 MBE, in 2024
14. real contract and delivery five NC212i in 2023
15. real contract and delivery one Leonardo RAT 31 DL/M
16. real contract and delivery five C130H ordered from Australia in 2013 (finished in 2020) after received Grant of 4 C130H
17. real contract and delivery 9 Teluk Bintuni class LST
18. real contract and delivery six CH4B UCAV ordered in 2019
19. real contract t and process building of Abeking & Rasmussen design ocean Hydrography ship
20. real contract and process building two AH140 AAW Frigate
21. real contract and process building two OPV 90 ASW patrol vessels
22. real contract and process building 42 Dassault Rafale F4 fighter
23. real contract and process building two A400M heavy cargo aircraft
24. real contract and delivery M3 Amphibious bridging system
25. real contract and delivery 3 KT1 Wong Bee ordered in 2018 along with radar and spares for T/A50
26. real contract and process building 13 GM 403 GCI radar from Thales
27. real contract and process building 12 ANKA S UCAV
28. real contract and process building additional CH4B UCAV
29. real contract and delivery Slingshot Satcom system
30. real contract and delivery Falcon 8X aircraft
31. real contract and process Thales Alenia earth observation satelite
32. real contract and process 22 S70M Blackhawk
33. real contract and process 6 N219 aircraft
34. real contract and process 3 CN235 for Army
35. real contract and process 2 PPA patrol Frigate
36. real contract and process 2 Scorpene Subs
37. real contract and process Khan Short Range ballistic missiles from Turki
38. real contract and process Trisula Air defense system
39. real contract and process 6 T50i aircraft
40. real contract and delivery Oiler and replenishment ship
41. real contract and delivery several Tug Harbor ships
42. real contract and process Submarine rescue vessels and system
43. real contract and delivery two Large LCU for army
44. real contract and process 45 Atmaca
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
Ini lagi berat guys... MALAYSIA VIRAL DI INDIANESIA... 🤣🤣🤣
BalasHapusImbas PPN 12 Persen, Poster Ajakan Berobat ke Malaysia Viral Lagi
https://m.youtube.com/watch?v=FVFIDSU1CZw
HapusWEAKEST MILITARY
WEAKEST MILITARY
WEAKEST MILITARY
the Malaysian military is today the region’s weakest. It is riddled with corruption, poor planning, and interference by political leaders in procurement, no longer a potent force even in managing low-level intensity conflict at a time when tensions in the South China Sea are higher than they have been since the days of the Vietnam War.
During the royal address to Parliament in July 2018, the defense minister revealed that only four of Malaysia’s 28 Russian jet fighters could fly. The 42-year-old MiG-29N – two of which crashed in 1998 and 2005, respectively –was decommissioned in 2017 owing to high maintenance costs of RM262 million a year. The Russian jets were bought via an offset program in which palm oil was bartered for fighter jets. In 2003, Malaysia purchased 18 Flankers, introduced in 1985, from Russia for US$900 million (RM3.67 billion), also involving palm oil trade. The offset deal with Russia led to the country’s first space program, with Malaysia’s first astronaut to the International Space Station in 2007. By contrast, Singapore has purchased at least 12 F35B stealth jets from the US, with 100-mile over-the-horizon shoot-down capability. The People’s Liberation Army Air Force is flying the J-20 twin-jet all-weather stealth fighter aircraft developed by the Chengdu Aerospace Corporation. Both would reduce Malaysia’s aging jets to scrap metal in seconds.
In 2006, Malaysia acquired the Jernas system from the UK, including nine missile launchers (later increased to 15), three radars, Rapier Mk2 missiles, training, and support. According to a reliable source, this purchase was made against the recommendation of the RMAF which wanted a more versatile anti-aircraft system from Russia and France.
Admiral Reza Sany, the previous Navy Chief, before retiring earlier this year, openly complained of “dismal annual defense expenditure,” taking the government to task for the Navy’s dismal budget.
Due to low and erratic allocations, the RMN is saddled with old ships, with 58 percent of ships in service much older than the Royal Thai Navy’s HTMS Sukhothai, which sank on December 18, 2022. That includes, according to one source, the Kasturi-class Corvette that entered service in 1984 and the Laksamana Corvette class built in the early 1980s, the Perdana-class gunboat and the Handalan and Jerung class commissioned in the 1970s – at least 40 years ago. The KD Sri Perlis and KD SRI Johor gunboats commissioned in the late 1960s – even older – are still in service.
Admiral Reza made no mention of the scandalous fate of the littoral combat ships (LCS) which have not been delivered although the government has paid billions for them. During investigations into the scandal, it was revealed by Admiral Aziz Jaafar, a former Chief of the Navy, that he personally wrote letters complaining over the delay and cost overruns. Aziz’s observations and advice from other military professionals have been ignored. The scandal is a case in point where allocated funds have been hijacked.
The military likely had no idea they were being used by politicians and their cronies to purchase equipment, especially those that do not meet their technical and operational specifications. Whether some of these officers were also greased along the way by the politicians is something else. It is strange that no one in the military learned the lessons of the Scorpene submarine scandal that preceded the CLS debacle by a decade. Malaysia bought two Scorpene-class submarines from France in 2002 when Najib Razak was defense minister and later PM. A two-ringgit Malaysian company owned by a Najib’s crony received a €114 million “commission” for the purchase. The rest is history.
Malonn's armed forces procurement faces several weaknesses, including:
Hapus1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
------
1. BARTER SAWIT 10 LCA 8 FLIT DOWNGRADE
2. P-72M CHEAPEST AIRCRAFT
3. ANKA DOWNGRADE NO WEAPONARY
4. LMS B2 Ada-Class DOWNGRADE HISAR OPV
6. Dibayar PBB/UN = 4x4 Ejder Yalçin
7. LCS dibayar 6 jadi NOL DELAYED
8, OPV dibayar 3 jadi 1 DELAYED
==================
==================
1. real contract and delivery five units C130J Hercules
2. real contract and delivery two unit Frankethal class Countermine vessels (Pulau Fani class)
3. real contract and delivery four units KCR 60 Fast missiles boats PT PAL
4. real contract and delivery 9 units Bell 412 EPI
5. real contract and delivery 8 additional H225 M
6. real contract and delivery 2 units Bell 429 Global Ranger
7. real contract and delivery 18 Medium weight tank Harimau
8. real contract and delivery 22 Pandur II IFV
9. real contract and delivery two unit Hospital Ships
10. real contract and delivery one unit Command and control variant C295
11. real contract and delivery one unit CN235 MPA
12. real contract and delivery 7 Badak FSV, 26 ANOa apc and 10 additional Komodo recce vehicles in 2022
13. real contract and delivery 4 AS 550 Fennec and 8 AS565 MBE, in 2024
14. real contract and delivery five NC212i in 2023
15. real contract and delivery one Leonardo RAT 31 DL/M
16. real contract and delivery five C130H ordered from Australia in 2013 (finished in 2020) after received Grant of 4 C130H
17. real contract and delivery 9 Teluk Bintuni class LST
18. real contract and delivery six CH4B UCAV ordered in 2019
19. real contract t and process building of Abeking & Rasmussen design ocean Hydrography ship
20. real contract and process building two AH140 AAW Frigate
21. real contract and process building two OPV 90 ASW patrol vessels
22. real contract and process building 42 Dassault Rafale F4 fighter
23. real contract and process building two A400M heavy cargo aircraft
24. real contract and delivery M3 Amphibious bridging system
25. real contract and delivery 3 KT1 Wong Bee ordered in 2018 along with radar and spares for T/A50
26. real contract and process building 13 GM 403 GCI radar from Thales
27. real contract and process building 12 ANKA S UCAV
28. real contract and process building additional CH4B UCAV
29. real contract and delivery Slingshot Satcom system
30. real contract and delivery Falcon 8X aircraft
31. real contract and process Thales Alenia earth observation satelite
32. real contract and process 22 S70M Blackhawk
33. real contract and process 6 N219 aircraft
34. real contract and process 3 CN235 for Army
35. real contract and process 2 PPA patrol Frigate
36. real contract and process 2 Scorpene Subs
37. real contract and process Khan Short Range ballistic missiles from Turki
38. real contract and process Trisula Air defense system
39. real contract and process 6 T50i aircraft
40. real contract and delivery Oiler and replenishment ship
41. real contract and delivery several Tug Harbor ships
42. real contract and process Submarine rescue vessels and system
43. real contract and delivery two Large LCU for army
44. real contract and process 45 Atmaca
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
CHEAPEST PLATFORM VARIANT :
Hapus-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malaysia.
=========
VERSI TERMURAH FA50
VERSI TERMURAH FA50
VERSI TERMURAH FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
=========
DOWNGRADE ANKA
DOWNGRADE ANKA
2023 ANKA OMPONG = WILL NOT ARMED
Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malaysia will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
-----
DOWNGRADE ANKA
DOWNGRADE ANKA
2024 ANKA OMPONG = SURVEILLANCE CAPABILITIES
Former Defense Minister, Datuk Seri Mohamad Hasan emphasized the importance of equipping the country with comprehensive surveillance capabilities and the need to have “eyes to see and ears to hear” everything happening in the country’s waters, especially in the South China Sea.
-----
DOWNGRADE ANKA
DOWNGRADE ANKA
2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malaysia to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malaysian service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malaysian Ankas will have modified wings to improve their endurance.
=========
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
KEY WORDS =
1. LMS B2 = DOWNGRADE MILGEM VARIANT
2. MPA = CHEAPEST VARIANT
3. FA 50 = CHEAPEST VARIANT
4. DOWNGRADE ANKA NO WEAPONARY
BERUBAT SAJA KE MALAYSIA LEBIH MURAH DAN MAMPU UNTUK DIBAYAR.... 🔥🔥🤣🤣🤣
BalasHapusMalonn's armed forces procurement faces several weaknesses, including:
Hapus1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
------
1. BARTER SAWIT 10 LCA 8 FLIT DOWNGRADE
2. P-72M CHEAPEST AIRCRAFT
3. ANKA DOWNGRADE NO WEAPONARY
4. LMS B2 Ada-Class DOWNGRADE HISAR OPV
6. Dibayar PBB/UN = 4x4 Ejder Yalçin
7. LCS dibayar 6 jadi NOL DELAYED
8, OPV dibayar 3 jadi 1 DELAYED
==================
==================
1. real contract and delivery five units C130J Hercules
2. real contract and delivery two unit Frankethal class Countermine vessels (Pulau Fani class)
3. real contract and delivery four units KCR 60 Fast missiles boats PT PAL
4. real contract and delivery 9 units Bell 412 EPI
5. real contract and delivery 8 additional H225 M
6. real contract and delivery 2 units Bell 429 Global Ranger
7. real contract and delivery 18 Medium weight tank Harimau
8. real contract and delivery 22 Pandur II IFV
9. real contract and delivery two unit Hospital Ships
10. real contract and delivery one unit Command and control variant C295
11. real contract and delivery one unit CN235 MPA
12. real contract and delivery 7 Badak FSV, 26 ANOa apc and 10 additional Komodo recce vehicles in 2022
13. real contract and delivery 4 AS 550 Fennec and 8 AS565 MBE, in 2024
14. real contract and delivery five NC212i in 2023
15. real contract and delivery one Leonardo RAT 31 DL/M
16. real contract and delivery five C130H ordered from Australia in 2013 (finished in 2020) after received Grant of 4 C130H
17. real contract and delivery 9 Teluk Bintuni class LST
18. real contract and delivery six CH4B UCAV ordered in 2019
19. real contract t and process building of Abeking & Rasmussen design ocean Hydrography ship
20. real contract and process building two AH140 AAW Frigate
21. real contract and process building two OPV 90 ASW patrol vessels
22. real contract and process building 42 Dassault Rafale F4 fighter
23. real contract and process building two A400M heavy cargo aircraft
24. real contract and delivery M3 Amphibious bridging system
25. real contract and delivery 3 KT1 Wong Bee ordered in 2018 along with radar and spares for T/A50
26. real contract and process building 13 GM 403 GCI radar from Thales
27. real contract and process building 12 ANKA S UCAV
28. real contract and process building additional CH4B UCAV
29. real contract and delivery Slingshot Satcom system
30. real contract and delivery Falcon 8X aircraft
31. real contract and process Thales Alenia earth observation satelite
32. real contract and process 22 S70M Blackhawk
33. real contract and process 6 N219 aircraft
34. real contract and process 3 CN235 for Army
35. real contract and process 2 PPA patrol Frigate
36. real contract and process 2 Scorpene Subs
37. real contract and process Khan Short Range ballistic missiles from Turki
38. real contract and process Trisula Air defense system
39. real contract and process 6 T50i aircraft
40. real contract and delivery Oiler and replenishment ship
41. real contract and delivery several Tug Harbor ships
42. real contract and process Submarine rescue vessels and system
43. real contract and delivery two Large LCU for army
44. real contract and process 45 Atmaca
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
CHEAPEST VARIANT
Hapus-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
==============
HARGA 1 PPA = HARGA 3 LMS B2
-
PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
-
LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
==============
3 CN235 MSA VERSI MSI USA = The program to convert the CN-235 transport aircraft to MSA variants was financed by the US Government under its Indo-Pacific Maritime Security Initiative (MSI) Program, which aims to improve the maritime surveillance capabilities of partner nations.PTDI worked in cooperation with the US company Integrated Surveillance and Defence Inc. (ISD), which supplied and integrated the Mission Management System (MMS) for the three aircraft.
==============
3 B200T MSA RETIRED = RMAF is to retire its three remaining Beechcraft Super King B200T maritime air surveillance (MSA) in the immediate future, its chief Gen Ackbal Abdul Samad said in his speech on the 63rd anniversary of the service.
==============
LMS B2 = DOWNGRADE MILGEM VARIANT
LMS B2 = DOWNGRADE MILGEM VARIANT
LMS B2 = DOWNGRADE MILGEM VARIANT
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malaysia.
==============
FA50 CHEAPEST VARIANT
FA50 CHEAPEST VARIANT
FA50 CHEAPEST VARIANT
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
==============
KEY WORDS =
1. LMS B2 = DOWNGRADE MILGEM VARIANT
2. MPA = CHEAPEST VARIANT
3. FA 50 = CHEAPEST VARIANT
Malonn's economy has faced a number of challenges, including:
Hapus• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
===================
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
===================
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
RENAME = COPY PASTE = SAME .....
HapusPSC = 1995
PSC > BNS = 2005
BNC > LUNAS = 2024
PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malaysian government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malaysia in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
===================
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malaysian Navy in 2004 and complete the delivery in 2007.
Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
===================
PROBLEMS SHIPYARD
PROBLEMS SHIPYARD
PROBLEMS SHIPYARD
Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.
HapusHARGA 1 PPA = HARGA 3 LMS B2
-
PPA USD 1,3 MILYAR/2 = USD 650 JUTA PER UNIT
-
LMS B2 (DOWNGRADE HISAR OPV) USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-------------------
RUGGERO DI LAURIA = BRAWIJAYA 320
MARCANTONIO COLONNA = SILIWANGI 321
Sono stati recentemente assegnati i nomi e i distintivi ottici ai 2 Pattugliatori Polivalenti d’Altura/Multipurpose Combat Ships (PPA/MCS) originariamente destinati alla Marina Militare e che Fincantieri ha ceduto alla Marina Indonesiana.
Si tratta del BRAWIJAYA 320 (già RUGGERO DI LAURIA, PPA Light Plus) e del PRABU SILIWANGI 321 (già MARCANTONIO COLONNA, PPA Light Plus).
===================
===================
VERSI DOWNGRADE MILGEM
VERSI DOWNGRADE MILGEM
VERSI DOWNGRADE MILGEM
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malaysia
---------------------
LCS 2024-2011 = 13 TAHUN
13 TAHUN MANGKRAK
13 TAHUN MANGKRAK
LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
---------------------
NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
----------------------
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedure
==============
DOWNGRADE ANKA
DOWNGRADE ANKA
2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malaysia to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malaysian service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malaysian Ankas will have modified wings to improve their endurance
==============
CHEAPEST VARIANT
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
==============
KEY WORDS =
1. LMS B2 = DOWNGRADE MILGEM VARIANT
2. MPA = CHEAPEST VARIANT
3. FA 50 = CHEAPEST VARIANT
4. DOWNGRADE ANKA NO WEAPONARY
CHANGE SKIN = CHANGE NAME = SAME .....
HapusPSC = 1995
PSC > BNS = 2005
BNC > LUNAS = 2024
PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malaysian government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malaysia in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
===================
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malaysian Navy in 2004 and complete the delivery in 2007.
Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
===================
LCS 2024-2011 = 13 TAHUN
13 TAHUN MANGKRAK
13 TAHUN MANGKRAK
LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
-----
NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
-----
17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
===================
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
PPN 12% & Dolar AS Rp16.300, Siap-siap Hidup Warga RI Makin Sulit!
BalasHapushttps://www.cnbcindonesia.com/news/20241220075321-4-597525/ppn-12-dolar-as-rp16300-siap-siap-hidup-warga-ri-makin-sulit
Malonn's economy has faced a number of challenges, including:
Hapus• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
===================
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
===================
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
TOTAL 171 ASSETS = 30 YEARS
HapusARMY 108 UNITS
AIR FORCE 29 UNITS
NAVY 34 UNITS
28 VESSELS = 40 YEARS
A total of 171 assets from all three branches of the Malaysian Armed Forces (ATM) have exceeded 30 years of service, underscoring the challenges posed by aging military equipment.
The issue was raised by Defence Minister Datuk Seri Mohamed Khaled Nordin in response to a question from Lim Lip Eng (DAP-Kepong) during today’s parliamentary session.
“The number of ATM assets exceeding 30 years in service includes 108 units for the Malaysian Army, 29 units for the Royal Malaysian Air Force (RMAF), and 34 units for the Royal Malaysian Navy (RMN),” he stated.
He added, “The operational lifespan of military assets varies according to their respective functions.”
However, the minister did not provide specific details on the types of assets beyond the 30-year threshold.
In recent years, military leaders have openly acknowledged the burden of outdated assets.
Earlier this month, Malaysia Armed Forces (MAF) chief General Tan Sri Mohammad Ab Rahman disclosed to local media that 34 RMN vessels have surpassed their intended service life, with 28 of them over 40 years old.
“The RMN currently operates 53 ships across various classes to meet operational and patrol needs within Malaysia’s maritime zones.
==============
AGE LIMITS
35 YEARS = SUBMARINE
30 YEARS = FRIGATES CORVETTES
24 YEARS = TUGBOAT PATROL BOATS
“However, many of these vessels have exceeded their optimal lifespan in terms of capability, technology, and maintenance costs,” he said during a press conference after the 91st ATM Anniversary celebration at Camp Segenting earlier this month.
According to General Mohammad, the age limit for RMN vessels is 35 years for submarines and 30 years for frigates, corvettes, logistics ships, next-generation patrol vessels, and hydrographic vessels.
Smaller vessels, such as fast patrol boats, mine warfare ships, sailing vessels, and tugboats, have an age limit of 24 years.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
KEY WORDS = OVER LIMITS AGE
PUBLIC DEBT = DEFENCE SPENDING
HapusPUBLIC DEBT = DEFENCE SPENDING
PUBLIC DEBT = DEFENCE SPENDING
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
==============
2024 RASIO HUTANG 84,2% DARI GDP
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
==============
2024 HUTANG JATUH TEMPO = The federal government's debt is expected to be fully settled in 2053 if no new loans were to be taken to finance the deficit and to refinance maturing debts from 2024 onwards, said the Finance Ministry (MoF)
----
2023 TIDAK BAYAR HUTANG = “Ini bermakna bayaran khidmat hutang banyak…hanya membayar faedah bukan bayar hutang tertunggak,” kata Anwar lagi
----
2022 HUTANG BAYAR HUTANG 52,4% = Kah Woh menjelaskan pada tahun lalu, kerajaan ada membuat pinjaman yang meningkat sebanyak 11.6 peratus daripada RM194.5 bilion pada tahun sebelumnya. Daripada jumlah itu, beliau berkata 52.4 peratus atau RM113.7 bilion digunakan untuk membayar prinsipal pinjaman matang.
----
2021 HUTANG BAYAR HUTANG 50,4% = Sejumlah RM98.058 bilion atau 50.4 peratus daripada pinjaman baharu berjumlah RM194.555 bilion yang dibuat kerajaan pada tahun lalu digunakan untuk bayaran balik prinsipal pinjaman yang matang.
----
2020 HUTANG BAYAR HUTANG 60% = Jabatan Audit Negara (JAN) bimbang dengan tindakan kerajaan menggunakan hampir 60 peratus pinjaman baharu untuk membayar hutang .
----
2019 HUTANG BAYAR HUTANG 59% = Laporan Ketua Audit Negara mengenai Penyata Kewangan Kerajaan Persekutuan 2018 mendapati sejumlah 59 peratus pinjaman baharu kerajaan dibuat untuk membayar hutang kerajaan terdahulu
----
2018 RASIO HUTANG 80% DARI GDP : OPEN DONASI = Kementerian Keuangan Malon pada hari Rabu membuka rekening donasi supaya masyarakat dapat menyumbang untuk membantu negara membayar utang yang mencapai 1 triliun ringgit (US$ 250,8 miliar) atau 80 persen dari PDB.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
171 ASET USANG 30 TAHUN =
108 TDM
29 TUDM
34 TLDM
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
==============
KEY WORDS =
1. PUBLIC DEBT = DEFENCE SPENDING
2. RATIO DEBT 84,2% TO GDP
3. DEBT TO PAY DEBT
4. 171 COMBAT EQUIPMENT 30 YEARS
HapusBUDGET 2025 = SALARIES AND ALLOWANCES
BUDGET 2025 = NOT ASSETS
BUDGET 2025 = NOT ASSETS
BUDGET 2025 = NOT ASSETS
PMX DS Anwar Ibrahim today announce an allocation of RM40.6 billion for the national security sector from the RM461 billion 2025 national budget. This is an increase of RM2 billion for the sector which includes Home and Defence ministries, from the 2024 budget of RM38.7 billion.
Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
==============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
==============
Malonn's economy has faced a number of challenges, including:
• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
=========
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
=========
KEY WORDS =
1. THE MOST CHEAPEST OF VARIANT
2. GUNBOAT NAVY
3. DOWNGRADE VERSION
PPN 12% & Dolar AS Rp16.300, Siap-siap Hidup Warga RI Makin Sulit!
BalasHapushttps://www.cnbcindonesia.com/news/20241220075321-4-597525/ppn-12-dolar-as-rp16300-siap-siap-hidup-warga-ri-makin-sulit
NO AMPHIBIOUS NAVAL PLATFORM
HapusSERANGAN AMFIBI = SAMPAN
SERANGAN AMFIBI = SAMPAN
SERANGAN AMFIBI = SAMPAN
MELAKA: 10 Briged (Para) telah melaksanakan latihan serangan amfibi bagi mempamerkan keupayaan melaksanakan operasi tersebut kepada Tim Naziran JPA Semakan Bayaran Insentif Pasukan Aturgerak Cepat, Angkatan Tentera Malon (BIPAC-ATM) ke 10 Bgd (Para) pada 30 Julai 2024
-----
NO MARINIR = LACK AN AMPHIBIOUS NAVAL PLATFORM
DISCUSS LPD BUATAN 1963
DISCUSS AH-1Z
Initially, the Malonn marine corps will lack an amphibious naval platform as the RMN’s only amphibious ship, It is currently in discussions with both France and South Korea over acquiring a landing platform deck (LPD). The U.S. has also offered Malon the LPD USS Denver after it decommissions it in 2014. U.S.-based defense companies are also discussing selling Malon the AH-1Z
------
171 ASSETS = 30 YEARS
108 ARMY
29 AIR FORCE
34 NAVY
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
baharu.
==============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
HapusPROBLEMS SHIPYARD
PROBLEMS SHIPYARD
PROBLEMS SHIPYARD
Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.
===================
Some problems Malonn shipyards face in making warships include:
• Supply chain disruptions
In 2022, COVID-19 and the Russia-Ukraine conflict disrupted supply chains and led to shortages of skilled personnel.
• Low-quality products
Workers may use sketches, photos, and previous experience instead of following good engineering practices, which can lead to low-quality products, reworks, higher costs, and late deliveries.
• Traditional shipbuilding
Traditional shipbuilding is a slow, expensive, and laborious process. It involves a systems approach, where each system has its own drawings, and work crews may compete for work space.
• Resource shortage
The shipbuilding industry is facing a shortage of resources due to an aging workforce and a lack of young people willing to enter the trade.
===================
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
==============
KEY WORDS = PROBLEMS SHIPYARD
Malon's combat equipment has several weaknesses, including:
Hapus• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
==============
MENUNGGU 2050 = PV
MENUNGGU 2050 = KAPAL SELAM
MENUNGGU 2050 = MRSS
MENUNGGU 2050 = LCS
MENUNGGU 2050 = LMS
Panglima TLDM Laksamana Tan Sri Mohd Reza Mohd Sany berkata, bilangan kapal itu mungkin akan berubah bergantung kepada keadaan geo-strategik rantau itu yang dinamik.
Dalam temuramah dengan majalah pertahanan berbahasa Inggeris tempatan, Asian Defence Journal (ADJ) keluaran May-Jun tahun ini, beliau juga memaklumkan bilangan jenis-jenis kapal perang yang dirancang dimiliki oleh TLDM dibawah pelan transformasi itu.
“Mengikut Pelan Transformasi 15 ke 5 TLDM, ia dijangka akan memiliki 12 buah kapal Littoral Combat Ship (LCS), tiga buah kapal Multi Role Support Ship (MRSS), 18 buah kapal Littoral Mission Ship (LMS), 18 buah kapal Patrol Vessel (PV) dan empat buah kapal selam menjelang tahun 2050,” kata beliau dalam temuramah itu.
Nampak gaya,impian untuk melihat TLDM menambah bilangan kapal selam dimilikinya daripada dua buah kepada empat buah akan hanya direalisasikan menjelang tahun 2050.
==============
MENUNGGU 2030 = UAV
MENUNGGU 2030 = LMS B2
MENUNGGU 2030 = HELI
MENUNGGU 2030 = MRSS
Perolehan 3 buah LMSB2 itu dilakukan melalui kaedah Government to Government (G2G) dengan negara Turkiye.
RMKe-13 merangkumi tempoh tahun 2026-2030.
“Perolehan bagi baki 3 buah LMS lagi akan dimasukkan di bawah RMKe-13,” ujar beliau.
Selain LMS, TLDM turut merancang perolehan 2 buah kapal Multi Role Support Ship (MRSS), 3 buah kapal Littoral Mission Ship Batch 3, 4 buah helikopter anti kapal selam dan 6 buah Unmanned Aerial Vehicle (UAV).
“Proses perolehan bagi aset-aset baharu ini dijangka berlangsung sehingga 2030. Kesemua perolehan aset TLDM ini dianggarkan
==============
MENUNGGU 2041-2045 = C130J
Diterangkan Utusan Malon, mereka baru bisa mendapatkan C-130 J Super Hercules paling tidak di tahun 2041 hingga 2045.
MENUNGGU 2055 = HAWK :
Kerajaan merancang secara sistematik penggantian pesawat Hawk 108 dan Hawk 208 seperti yang digariskan dalam Pembangunan Keupayaan Tentera Udara Diraja Malon (TUDM) 2055
=========
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
=========
KEY WORDS =
1. THE MOST CHEAPEST OF VARIANT
2. GUNBOAT NAVY
3. DOWNGRADE VERSION
Kesian rakyat INDIANESIA..... Makin di PERAS
BalasHapusMalon's combat equipment has several weaknesses, including:
Hapus• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
==============
MENUNGGU 2050 = PV
MENUNGGU 2050 = KAPAL SELAM
MENUNGGU 2050 = MRSS
MENUNGGU 2050 = LCS
MENUNGGU 2050 = LMS
Panglima TLDM Laksamana Tan Sri Mohd Reza Mohd Sany berkata, bilangan kapal itu mungkin akan berubah bergantung kepada keadaan geo-strategik rantau itu yang dinamik.
Dalam temuramah dengan majalah pertahanan berbahasa Inggeris tempatan, Asian Defence Journal (ADJ) keluaran May-Jun tahun ini, beliau juga memaklumkan bilangan jenis-jenis kapal perang yang dirancang dimiliki oleh TLDM dibawah pelan transformasi itu.
“Mengikut Pelan Transformasi 15 ke 5 TLDM, ia dijangka akan memiliki 12 buah kapal Littoral Combat Ship (LCS), tiga buah kapal Multi Role Support Ship (MRSS), 18 buah kapal Littoral Mission Ship (LMS), 18 buah kapal Patrol Vessel (PV) dan empat buah kapal selam menjelang tahun 2050,” kata beliau dalam temuramah itu.
Nampak gaya,impian untuk melihat TLDM menambah bilangan kapal selam dimilikinya daripada dua buah kepada empat buah akan hanya direalisasikan menjelang tahun 2050.
==============
MENUNGGU 2030 = UAV
MENUNGGU 2030 = LMS B2
MENUNGGU 2030 = HELI
MENUNGGU 2030 = MRSS
Perolehan 3 buah LMSB2 itu dilakukan melalui kaedah Government to Government (G2G) dengan negara Turkiye.
RMKe-13 merangkumi tempoh tahun 2026-2030.
“Perolehan bagi baki 3 buah LMS lagi akan dimasukkan di bawah RMKe-13,” ujar beliau.
Selain LMS, TLDM turut merancang perolehan 2 buah kapal Multi Role Support Ship (MRSS), 3 buah kapal Littoral Mission Ship Batch 3, 4 buah helikopter anti kapal selam dan 6 buah Unmanned Aerial Vehicle (UAV).
“Proses perolehan bagi aset-aset baharu ini dijangka berlangsung sehingga 2030. Kesemua perolehan aset TLDM ini dianggarkan
==============
MENUNGGU 2041-2045 = C130J
Diterangkan Utusan Malon, mereka baru bisa mendapatkan C-130 J Super Hercules paling tidak di tahun 2041 hingga 2045.
MENUNGGU 2055 = HAWK :
Kerajaan merancang secara sistematik penggantian pesawat Hawk 108 dan Hawk 208 seperti yang digariskan dalam Pembangunan Keupayaan Tentera Udara Diraja Malon (TUDM) 2055
=========
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
=========
KEY WORDS =
1. THE MOST CHEAPEST OF VARIANT
2. GUNBOAT NAVY
3. DOWNGRADE VERSION
HapusBUDGET 2025 = ASSET PROCUREMENT DOWN
Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
============
The Royal Malonnn Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Technological obsolescence
Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited.
============-
The Royal Malonn Navy (RMN) faces several challenges, including:
• Aging fleet: More than half of the RMN's fleet is past its prime, and the country has only received four of the 18 new vessels it planned to acquire. The last time the RMN acquired a combat ship was in 1997.
• Delayed replacements: The RMN's plans to replace its aging fleet have been stalled due to mismanagement.
• Insufficient defense budget: Malon's defense budget is less than one percent of its GDP, while neighboring Singapore spends six percent.
• Lack of coordination: There is a lack of coordination among agencies.
• Outdated assets: The RMN's ships and assets are outdated.
• Combat system issues: The RMN has observed deficiencies with the combat system of its LMS type vessels.
• Low endurance: The LCS's endurance was too low to stay with a carrier strike group or amphibious ready group without significant refueling.
• Lack of air and surface warfare capabilities: The LCS lacked significant air and surface warfare capabilities
============
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
============
Malonn's economy has faced a number of challenges, including:
• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
==============
KEY WORDS = ASSET PROCUREMENT DOWN
GOOD QUALITY WARSHIPS
HapusGOOD QUALITY WARSHIPS
GOOD QUALITY WARSHIPS
Indonesia's warships are considered to be of good quality, and the country's navy is ranked fourth in the world. The quality of a navy is assessed based on a variety of factors, including the number and quality of warships and submarines, the mix of inventory, and the country's shipbuilding capabilities.
Indonesia's navy, also known as the Tentara Nasional Indonesia-Angkatan Laut (TNI-AL), has 209 units in its fleet, four submarines, and 30 amphibious assault units. The TNI-AL's ships are named with the prefix KRI, which stands for Kapal Republik Indonesia or Naval Vessel of the Republic of Indonesia.
The Indonesian government has ordered the construction of a 140-meter-long frigate, the largest warship the country has ever built, which will be made entirely by local engineers. The government has also ordered two frigates from PT PAL, which is leading the modernization project for 41 warships.
----------
Indonesian-made LPD warships have been praised for their quality and versatility:
• BRP Tarlac (LD-601) and BRP Davao del Sur (LD-602)
The first two LPDs delivered to the Philippines were commissioned in 2016 and 2017, respectively. They have participated in many exercises and humanitarian missions, and have been deployed to the South China Sea. A Philippine official praised the ships, noting their sophisticated maneuvers, including the "landing craft utility" (LCU).
• Indonesian Navy
The Indonesian Navy is considered one of the world's four strongest navies. The Navy's fleet includes aircraft, helicopters, submarines, frigates, corvettes, ASW corvettes, missile boats, patrol crafts, minesweepers, tank landing ships, and amphibious transport docks.
Some challenges for Indonesia's warship industry include the need to develop local production of ship parts and materials, and to secure government support for large-scale projects.
----------
Pesawat-pesawat buatan Indonesia diakui dunia karena kualitasnya, di antaranya:
• CN235-220 MPA
Pesawat ini merupakan karya anak bangsa yang mampu terbang selama 11 jam. Pesawat ini pernah diekspor ke Senegal.
• CN295
Pesawat multiguna yang dapat membawa 50 penumpang dan terbang ke daerah terpencil. Pesawat ini dibuat oleh PT Dirgantara Indonesia bekerja sama dengan Airbus Defense & Space.
• NC212 Family
Pesawat ini memiliki beberapa seri, yaitu NC212-200, NC212-400, NC212i, dan NC212i MSC. Pesawat ini mampu terbang selama 6–8 jam.
• N219 Nurtanio
Pesawat terbaru buatan PT Dirgantara Indonesia yang menggunakan teknologi canggih pada sistem avionik.
PT Dirgantara Indonesia (Persero) merupakan perusahaan kedirgantaraan nasional yang memproduksi pesawat terbang untuk kebutuhan maskapai penerbangan sipil, operator militer, dan misi khusus. PT Dirgantara Indonesia juga memegang lisensi untuk modifikasi, pemeliharaan, distribusi, dan penjualan pesawat.
----------
Indonesia memiliki beberapa tank dengan berbagai kemampuan, di antaranya:
• Medium Tank Harimau
Tank kelas medium ini diproduksi oleh PT Pindad (Persero) bekerja sama dengan FNSS Turkiye. Tank ini memiliki bobot 30–35 ton, kecepatan 70 km/jam, dan dilengkapi dengan meriam 105 mm, smoke grenade, dan senapan mesin 7,62 mm.
• Tank Leopard 2
Tank lapis baja buatan Jerman yang dimiliki oleh TNI Angkatan Darat (AD).
• BMP-3F
Tank jenis IFV (infantry fighting vehicle) yang dikhususkan untuk Korps Marinir TNI AL. Tank ini memiliki komputerisasi balistik dengan sistem digital, dan mampu beroperasi di laut selama tujuh jam.
• Panser Badak 6x6
Tank yang dilengkapi dengan kanon 90 mm dan senapan mesin 7,62 mm. Tank ini memiliki top speed 80 km/h dan daya jelajah sejauh 600 kilometer.
• Tank Boat Antasena
Tank atas laut buatan Indonesia yang merupakan bagian dari program Kementerian Pertahanan Indonesia.
Selain itu, Indonesia juga memiliki kendaraan lapis baja ringan seperti SSE P1 PAKCI dan kendaraan serang ringan seperti SSE P6 ATAV dan ILSV.
==============
KEY WORDS = GOOD QUALITY WARSHIPS
10 FOREIGN SUPPLIERS MILITARY EQUIPMENT MALON =
Hapus1. AMERIKA SERIKAT
2. RUSIA
3. TIONGKOK (CINA)
4. TURKI
5. UNI EROPA
6. PERANCIS
7. INGGRIS
8. JERMAN
9. INDONESIA
10. POLANDIA
-----
SATU-SATUNYA DI ASEAN
RELAX EKSPOR MRSS UEA The United Arab Emirates (UAE) anNOunced it had awarded the Indonesian shipyard PT PAL an AED1.5 billion (USD408.32 million) contract to supply a “multimission vessel” during the IDEX 2023 show being held in Abu Dhabi from 20 to 24 February.
-----
SATU-SATUNYA DI ASEAN
RELAX EKSPOR B2 SSV FILIPINA Dipercayakannya PT PAL Indonesia dalam pengadaan 2 (dua) unit kapal perang jenis Landing Dock oleh Angkatan Laut Filipina, karena kepuasan Pemerintah Filipina dan Angkatan Laut Filipina atas pengoperasian 2 unit Landing Dock atau Strategic Sealift Vessel (SSV) yang telah diserahterimakan oleh PAL beberapa tahun lalu.
-----
SATU-SATUNYA DI ASEAN
RELAX BUILD FRIGAT On August 25, the keel laying ceremony for the first of two Red White frigates was held at Indonesian state-owned shipbuilder PT PAL Indonesia’s facility in Surabaya City, East Java. Based on Babcock's Arrowhead 140 design, it is said that with a 140-metre length and a displacement of 5,996 tons, the Red White frigate will be the largest and most advanced surface combatant ever constructed in Indonesia.
-----
SATU_SATUNYA DI ASEAN
INDUSTRI PENERBANGAN
PT Dirgantara Indonesia (atau biasa disingkat menjadi PTDI) adalah produsen pesawat terbang pertama dan satu-satunya di Indonesia dan di wilayah Asia Tenggara. Dirgantara Indonesia tidak hanya memproduksi berbagai jenis pesawat terbang.
-----
SATU-SATUNYA DI ASEAN
PRODUKSI TANK MEDIUM
Indonesia currently is the only country in Southeast Asia that produces its own combat tanks. This tank was made Pindad, an Indonesian state- owned military equipment manufacturing company.
===========
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
Indonesia's warships are considered to be of good quality, and the country's navy is ranked fourth in the world. The quality of a navy is assessed based on a variety of factors, including the number and quality of warships and submarines, the mix of inventory, and the country's shipbuilding capabilities.
----------
Indonesian-made LPD warships have been praised for their quality and versatility:
• BRP Tarlac (LD-601) and BRP Davao del Sur (LD-602)
The first two LPDs delivered to the Philippines were commissioned in 2016 and 2017, respectively. They have participated in many exercises and humanitarian missions, and have been deployed to the South China Sea. A Philippine official praised the ships, noting their sophisticated maneuvers, including the "landing craft utility" (LCU).
• Indonesian Navy
The Indonesian Navy is considered one of the world's four strongest navies. The Navy's fleet includes aircraft, helicopters, submarines, frigates, corvettes, ASW corvettes, missile boats, patrol crafts, minesweepers, tank landing ships, and amphibious transport docks.
Some challenges for Indonesia's warship industry include the need to develop local production of ship parts and materials, and to secure government support for large-scale projects.
----------
Pesawat-pesawat buatan Indonesia diakui dunia karena kualitasnya, di antaranya:
• CN235-220 MPA
Pesawat ini merupakan karya anak bangsa yang mampu terbang selama 11 jam. Pesawat ini pernah diekspor ke Senegal.
• CN295
Pesawat multiguna yang dapat membawa 50 penumpang dan terbang ke daerah terpencil. Pesawat ini dibuat oleh PT Dirgantara Indonesia bekerja sama dengan Airbus Defense & Space.
• NC212 Family
Pesawat ini memiliki beberapa seri, yaitu NC212-200, NC212-400, NC212i, dan NC212i MSC. Pesawat ini mampu terbang selama 6–8 jam.
• N219 Nurtanio
Pesawat terbaru buatan PT Dirgantara Indonesia yang menggunakan teknologi canggih pada sistem avionik.
==============
KEY WORDS = FOREIGN SUPPLIERS MILITARY EQUIPMENT MALON
Pemerintah nekat naikkan PPN 12 persen, ketika rakyat menjerit di tengah ekonomi sulit
BalasHapushttps://www.brilio.net/serius/pemerintah-nekat-naikkan-ppn-12-persen-ketika-rakyat-menjerit-di-tengah-ekonomi-sulit-241119s.html
GOOD QUALITY WARSHIPS
HapusGOOD QUALITY WARSHIPS
GOOD QUALITY WARSHIPS
Indonesia's warships are considered to be of good quality, and the country's navy is ranked fourth in the world. The quality of a navy is assessed based on a variety of factors, including the number and quality of warships and submarines, the mix of inventory, and the country's shipbuilding capabilities.
Indonesia's navy, also known as the Tentara Nasional Indonesia-Angkatan Laut (TNI-AL), has 209 units in its fleet, four submarines, and 30 amphibious assault units. The TNI-AL's ships are named with the prefix KRI, which stands for Kapal Republik Indonesia or Naval Vessel of the Republic of Indonesia.
The Indonesian government has ordered the construction of a 140-meter-long frigate, the largest warship the country has ever built, which will be made entirely by local engineers. The government has also ordered two frigates from PT PAL, which is leading the modernization project for 41 warships.
----------
Indonesian-made LPD warships have been praised for their quality and versatility:
• BRP Tarlac (LD-601) and BRP Davao del Sur (LD-602)
The first two LPDs delivered to the Philippines were commissioned in 2016 and 2017, respectively. They have participated in many exercises and humanitarian missions, and have been deployed to the South China Sea. A Philippine official praised the ships, noting their sophisticated maneuvers, including the "landing craft utility" (LCU).
• Indonesian Navy
The Indonesian Navy is considered one of the world's four strongest navies. The Navy's fleet includes aircraft, helicopters, submarines, frigates, corvettes, ASW corvettes, missile boats, patrol crafts, minesweepers, tank landing ships, and amphibious transport docks.
Some challenges for Indonesia's warship industry include the need to develop local production of ship parts and materials, and to secure government support for large-scale projects.
----------
Pesawat-pesawat buatan Indonesia diakui dunia karena kualitasnya, di antaranya:
• CN235-220 MPA
Pesawat ini merupakan karya anak bangsa yang mampu terbang selama 11 jam. Pesawat ini pernah diekspor ke Senegal.
• CN295
Pesawat multiguna yang dapat membawa 50 penumpang dan terbang ke daerah terpencil. Pesawat ini dibuat oleh PT Dirgantara Indonesia bekerja sama dengan Airbus Defense & Space.
• NC212 Family
Pesawat ini memiliki beberapa seri, yaitu NC212-200, NC212-400, NC212i, dan NC212i MSC. Pesawat ini mampu terbang selama 6–8 jam.
• N219 Nurtanio
Pesawat terbaru buatan PT Dirgantara Indonesia yang menggunakan teknologi canggih pada sistem avionik.
PT Dirgantara Indonesia (Persero) merupakan perusahaan kedirgantaraan nasional yang memproduksi pesawat terbang untuk kebutuhan maskapai penerbangan sipil, operator militer, dan misi khusus. PT Dirgantara Indonesia juga memegang lisensi untuk modifikasi, pemeliharaan, distribusi, dan penjualan pesawat.
----------
Indonesia memiliki beberapa tank dengan berbagai kemampuan, di antaranya:
• Medium Tank Harimau
Tank kelas medium ini diproduksi oleh PT Pindad (Persero) bekerja sama dengan FNSS Turkiye. Tank ini memiliki bobot 30–35 ton, kecepatan 70 km/jam, dan dilengkapi dengan meriam 105 mm, smoke grenade, dan senapan mesin 7,62 mm.
• Tank Leopard 2
Tank lapis baja buatan Jerman yang dimiliki oleh TNI Angkatan Darat (AD).
• BMP-3F
Tank jenis IFV (infantry fighting vehicle) yang dikhususkan untuk Korps Marinir TNI AL. Tank ini memiliki komputerisasi balistik dengan sistem digital, dan mampu beroperasi di laut selama tujuh jam.
• Panser Badak 6x6
Tank yang dilengkapi dengan kanon 90 mm dan senapan mesin 7,62 mm. Tank ini memiliki top speed 80 km/h dan daya jelajah sejauh 600 kilometer.
• Tank Boat Antasena
Tank atas laut buatan Indonesia yang merupakan bagian dari program Kementerian Pertahanan Indonesia.
Selain itu, Indonesia juga memiliki kendaraan lapis baja ringan seperti SSE P1 PAKCI dan kendaraan serang ringan seperti SSE P6 ATAV dan ILSV.
==============
KEY WORDS = GOOD QUALITY WARSHIPS
LMS B2 = HISAR OPV = THE MOST CHEAPEST OF VARIANT.....
HapusQamarul says:
5 DECEMBER 2024 AT 10:15 PM
Joe-Can anyone explain, in layman terms, why the ship sides is seen to be bubbling/caving/not smooth?
It is sheet metal welded together multi layered with hull metal be it aluminium alloy or high strength steel. Usually they were cut in squares( ERAWA) on the pendekar. There’s calculations behind that and it is a trade secret.
Until now it’s still unclear what kind of radar will be used on the LMSB2 Cenk Aesa or Cenk 3D also the anti submarine weapon. Will it be rockets or light torps.
-
Haiqal says:
5 DECEMBER 2024 AT 10:23 PM
@Joe
“where to cut down cost”
I think the answer is our LMSB2 will not have ASW capability
-
Far de Man says:
DECEMBER 2024 AT 9:08 AM
Any included with torpedoes?
-
Luqman says:
6 DECEMBER 2024 AT 9:16 AM
@joe
“it will really be the most cheapest of variant”
just my speculation, it could be combination of few factors which are
– Use of certain structure designs from Hisar OPV, which itself is based on original Ada but faster to built and cheaper
– Use of locally design main radar which ‘could’ be cheaper than Smart-S Mk2
– No Yakamos sonar for ASW missions
– Discounts……
=========
DOWNGRADE NO SONAR = NO ASW
DOWNGRADE NO SONAR = NO ASW
DOWNGRADE NO SONAR = NO ASW
STM, in its role as main contractor, will turn to the Turkish defence sector for such equipment as the Combat Management System; the Gun Fire Control System, to be supplied by HAVELSAN; and the 3D Search Radar, Fire Control Radar, IFF, 30mm Gun, ESM and Chaff Decoy System, as well as other electronic sensors, to be supplied by ASELSAN. ROKETSAN will be supplying its ATMACA Surface-to-Surface G/M System.
=========
LMS B2 = HISAR OPV
LMS B2 = HISAR OPV
LMS B2 = HISAR OPV
RMN chief Admiral Zulhelmy Ithnain officiated the steel cutting ceremony for the service’s Littoral Mission Ship Batch 2 (LMS Batch 2) at the Istanbul Shipayard in Turkiye, on November 4. The RMN in a press statement stated that the steel cutting ceremony was a symbolic event to mark the start of the ship building process
============
HISAR OPV = ADKG = LMS B2
HISAR OPV = ADKG = LMS B2
HISAR OPV = ADKG = LMS B2
The Hisar-class offshore patrol vessel (ADKG) is a versatile and modern platform designed for a variety of naval missions. Built at the Istanbul Shipyard Command under the General Directorate of Shipyards and with ASFAT as the main contractor, the vessel features a length of 99.56 meters, a draft of 3.77 meters, and a displacement of 2,300 tons. It boasts a maximum speed of 24 knots and an operational range of 12 knots for extended patrols, accommodating a crew of 104 personnel.
Equipped with state-of-the-art sensors, including a 3D search radar, fire control radar, TACAN navigation aid, hull-mounted sonar system, and electronic support systems, the vessel ensures superior situational awareness. The ADKG also features the Turkish-developed ADVENT combat management system and a hydrodynamic design optimized for performance and efficiency.
=========
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
VERSI DOWNGRADE MILGEM
HapusVERSI DOWNGRADE MILGEM
VERSI DOWNGRADE MILGEM
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
===========
VERSI TERMURAH FA50
VERSI TERMURAH FA50
VERSI TERMURAH FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
============
BUDGET 2025 = SALARIES AND ALLOWANCES
BUDGET 2025 = NOT ASSETS
BUDGET 2025 = NOT ASSETS
BUDGET 2025 = NOT ASSETS
PMX DS Anwar Ibrahim today announce an allocation of RM40.6 billion for the national security sector from the RM461 billion 2025 national budget. This is an increase of RM2 billion for the sector which includes Home and Defence ministries, from the 2024 budget of RM38.7 billion.
Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
=========
Malonn has a number of weaknesses, including:
• Economic
Malonn's budget income is highly dependent on the oil and gas sector, and fiscal revenues are low. The country also has high levels of household and corporate debt, and a high dependency on food imports.
• Political
Malonn has a divided political landscape, and the country has experienced political instability since 2018. The 2022 election resulted in a hung parliament, the first time this has happened since Malonn's independence.
• Environmental
Malonn ranks 147 out of 210 economies on the Environmental Sustainability Index, due to challenges with climate change vulnerability, recycling rate, and renewable electricity output.
• Public procurement
Some weaknesses in public procurement in Malonn include non-compliance with contract terms, delayed project completion, poor documentation, and low quality of products and services.
• Property market
In the second half of 2023, sales volumes in the property market declined, and prices rose by only 0.1% year-on-year.
• Currency
The Malonnn ringgit (MYR) could potentially go down in value further. A weaker currency can have negative economic impacts, particularly for businesses that rely on imports.
============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
😝VERSI DOWNGRADE = VERSI TERMURAH😝
Pemerintah nekat naikkan PPN 12 persen, ketika rakyat menjerit di tengah ekonomi sulit
BalasHapushttps://www.brilio.net/serius/pemerintah-nekat-naikkan-ppn-12-persen-ketika-rakyat-menjerit-di-tengah-ekonomi-sulit-241119s.html
10 FOREIGN SUPPLIERS MILITARY EQUIPMENT MALON =
Hapus1. AMERIKA SERIKAT
2. RUSIA
3. TIONGKOK (CINA)
4. TURKI
5. UNI EROPA
6. PERANCIS
7. INGGRIS
8. JERMAN
9. INDONESIA
10. POLANDIA
-----
SATU-SATUNYA DI ASEAN
RELAX EKSPOR MRSS UEA The United Arab Emirates (UAE) anNOunced it had awarded the Indonesian shipyard PT PAL an AED1.5 billion (USD408.32 million) contract to supply a “multimission vessel” during the IDEX 2023 show being held in Abu Dhabi from 20 to 24 February.
-----
SATU-SATUNYA DI ASEAN
RELAX EKSPOR B2 SSV FILIPINA Dipercayakannya PT PAL Indonesia dalam pengadaan 2 (dua) unit kapal perang jenis Landing Dock oleh Angkatan Laut Filipina, karena kepuasan Pemerintah Filipina dan Angkatan Laut Filipina atas pengoperasian 2 unit Landing Dock atau Strategic Sealift Vessel (SSV) yang telah diserahterimakan oleh PAL beberapa tahun lalu.
-----
SATU-SATUNYA DI ASEAN
RELAX BUILD FRIGAT On August 25, the keel laying ceremony for the first of two Red White frigates was held at Indonesian state-owned shipbuilder PT PAL Indonesia’s facility in Surabaya City, East Java. Based on Babcock's Arrowhead 140 design, it is said that with a 140-metre length and a displacement of 5,996 tons, the Red White frigate will be the largest and most advanced surface combatant ever constructed in Indonesia.
-----
SATU_SATUNYA DI ASEAN
INDUSTRI PENERBANGAN
PT Dirgantara Indonesia (atau biasa disingkat menjadi PTDI) adalah produsen pesawat terbang pertama dan satu-satunya di Indonesia dan di wilayah Asia Tenggara. Dirgantara Indonesia tidak hanya memproduksi berbagai jenis pesawat terbang.
-----
SATU-SATUNYA DI ASEAN
PRODUKSI TANK MEDIUM
Indonesia currently is the only country in Southeast Asia that produces its own combat tanks. This tank was made Pindad, an Indonesian state- owned military equipment manufacturing company.
===========
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
Indonesia's warships are considered to be of good quality, and the country's navy is ranked fourth in the world. The quality of a navy is assessed based on a variety of factors, including the number and quality of warships and submarines, the mix of inventory, and the country's shipbuilding capabilities.
----------
Indonesian-made LPD warships have been praised for their quality and versatility:
• BRP Tarlac (LD-601) and BRP Davao del Sur (LD-602)
The first two LPDs delivered to the Philippines were commissioned in 2016 and 2017, respectively. They have participated in many exercises and humanitarian missions, and have been deployed to the South China Sea. A Philippine official praised the ships, noting their sophisticated maneuvers, including the "landing craft utility" (LCU).
• Indonesian Navy
The Indonesian Navy is considered one of the world's four strongest navies. The Navy's fleet includes aircraft, helicopters, submarines, frigates, corvettes, ASW corvettes, missile boats, patrol crafts, minesweepers, tank landing ships, and amphibious transport docks.
Some challenges for Indonesia's warship industry include the need to develop local production of ship parts and materials, and to secure government support for large-scale projects.
----------
Pesawat-pesawat buatan Indonesia diakui dunia karena kualitasnya, di antaranya:
• CN235-220 MPA
Pesawat ini merupakan karya anak bangsa yang mampu terbang selama 11 jam. Pesawat ini pernah diekspor ke Senegal.
• CN295
Pesawat multiguna yang dapat membawa 50 penumpang dan terbang ke daerah terpencil. Pesawat ini dibuat oleh PT Dirgantara Indonesia bekerja sama dengan Airbus Defense & Space.
• NC212 Family
Pesawat ini memiliki beberapa seri, yaitu NC212-200, NC212-400, NC212i, dan NC212i MSC. Pesawat ini mampu terbang selama 6–8 jam.
• N219 Nurtanio
Pesawat terbaru buatan PT Dirgantara Indonesia yang menggunakan teknologi canggih pada sistem avionik.
==============
KEY WORDS = FOREIGN SUPPLIERS MILITARY EQUIPMENT MALON
VERSI DOWNGRADE MILGEM
HapusVERSI DOWNGRADE MILGEM
VERSI DOWNGRADE MILGEM
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malaysia.
=========
=========
VERSI TERMURAH FA50
VERSI TERMURAH FA50
VERSI TERMURAH FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
=========
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
=========
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures.
==============
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
=========
KEY WORDS =
1. THE MOST CHEAPEST OF VARIANT
2. GUNBOAT NAVY
3. DOWNGRADE VERSION
VERSI DOWNGRADE MILGEM
HapusVERSI DOWNGRADE MILGEM
VERSI DOWNGRADE MILGEM
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
===========
VERSI TERMURAH FA50
VERSI TERMURAH FA50
VERSI TERMURAH FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
============
BUDGET 2025 = SALARIES AND ALLOWANCES
BUDGET 2025 = NOT ASSETS
BUDGET 2025 = NOT ASSETS
BUDGET 2025 = NOT ASSETS
PMX DS Anwar Ibrahim today announce an allocation of RM40.6 billion for the national security sector from the RM461 billion 2025 national budget. This is an increase of RM2 billion for the sector which includes Home and Defence ministries, from the 2024 budget of RM38.7 billion.
Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
=========
Malonn has a number of weaknesses, including:
• Economic
Malonn's budget income is highly dependent on the oil and gas sector, and fiscal revenues are low. The country also has high levels of household and corporate debt, and a high dependency on food imports.
• Political
Malonn has a divided political landscape, and the country has experienced political instability since 2018. The 2022 election resulted in a hung parliament, the first time this has happened since Malonn's independence.
• Environmental
Malonn ranks 147 out of 210 economies on the Environmental Sustainability Index, due to challenges with climate change vulnerability, recycling rate, and renewable electricity output.
• Public procurement
Some weaknesses in public procurement in Malonn include non-compliance with contract terms, delayed project completion, poor documentation, and low quality of products and services.
• Property market
In the second half of 2023, sales volumes in the property market declined, and prices rose by only 0.1% year-on-year.
• Currency
The Malonnn ringgit (MYR) could potentially go down in value further. A weaker currency can have negative economic impacts, particularly for businesses that rely on imports.
============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
😝VERSI DOWNGRADE = VERSI TERMURAH😝
VERSI DOWNGRADE MILGEM
HapusVERSI DOWNGRADE MILGEM
VERSI DOWNGRADE MILGEM
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malaysia.
=========
=========
VERSI TERMURAH FA50
VERSI TERMURAH FA50
VERSI TERMURAH FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
=========
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
=========
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures.
==============
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
=========
KEY WORDS =
1. THE MOST CHEAPEST OF VARIANT
2. GUNBOAT NAVY
3. DOWNGRADE VERSION
Kucing naturalisasi...mmiauuw
BalasHapus😂😂🤣🤣😛🤪
Ekonomi merudum.... Mata wang jatuh... Di Pajak lagi 12 Persen..... Parah...
BalasHapusVERSI DOWNGRADE MILGEM
HapusVERSI DOWNGRADE MILGEM
VERSI DOWNGRADE MILGEM
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malaysia.
=========
=========
VERSI TERMURAH FA50
VERSI TERMURAH FA50
VERSI TERMURAH FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
=========
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
=========
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures.
==============
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
=========
KEY WORDS =
1. THE MOST CHEAPEST OF VARIANT
2. GUNBOAT NAVY
3. DOWNGRADE VERSION
VERSI DOWNGRADE MILGEM
HapusVERSI DOWNGRADE MILGEM
VERSI DOWNGRADE MILGEM
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malaysia.
=========
=========
VERSI TERMURAH FA50
VERSI TERMURAH FA50
VERSI TERMURAH FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
=========
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
=========
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures.
==============
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
=========
KEY WORDS =
1. THE MOST CHEAPEST OF VARIANT
2. GUNBOAT NAVY
3. DOWNGRADE VERSION
HISAR OPV = LMS B2 = NO ASW
HapusHISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malaysia.
=========
DOWNGRADE BUKAN ADA CLASS .....
Qamarul says:
5 DECEMBER 2024 AT 10:15 PM
Joe-Can anyone explain, in layman terms, why the ship sides is seen to be bubbling/caving/not smooth?
It is sheet metal welded together multi layered with hull metal be it aluminium alloy or high strength steel. Usually they were cut in squares( ERAWA) on the pendekar. There’s calculations behind that and it is a trade secret.
Until now it’s still unclear what kind of radar will be used on the LMSB2 Cenk Aesa or Cenk 3D also the anti submarine weapon. Will it be rockets or light torps.
-
Haiqal says:
5 DECEMBER 2024 AT 10:23 PM
@Joe
“where to cut down cost”
I think the answer is our LMSB2 will not have ASW capability
-
Luqman says:
6 DECEMBER 2024 AT 9:16 AM
@joe
“it will really be the most cheapest of variant”
just my speculation, it could be combination of few factors which are
– Use of certain structure designs from Hisar OPV, which itself is based on original Ada but faster to built and cheaper
– Use of locally design main radar which ‘could’ be cheaper than Smart-S Mk2
– No Yakamos sonar for ASW missions
– Discounts……
=========
PMX LEASE 15 YEARS
PMX LEASE 15 YEARS
PMX LEASE 15 YEARS
RMAF
RMN
MMEA
POLICE
FIRE
RESCUE DEPARTEMENT
PM DEPARTEMENT
PMX has defended the decision to lease the helicopters for the military and other government agencies – RM16.5 billion for 15 years – during the Parliament session on Thursday. Among others he said the government adopted the leasing model to reduce maintenance costs and at the same time improved the operational readiness of the fleet.
DS Anwar Ibrahim did not address the fact that the government will be paying some RM1 billion a year for 15 years for the helicopters. He also said the helicopters selected were based on the specifications and requirements of the agencies themselves.
He also confirmed that the Army will also be part of the leasing programme apart from RMAF,RMN, MMEA, police, Fire and Rescue Department, and the Prime Minister Department. Apart from RMAF 12 and police’s seven helicopters, he did not give the breakdown for the other services and agencies.
=========
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
HISAR OPV = LMS B2 = NO ASW
HapusHISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malaysia.
https://www.airtimes.my/tag/kapal-kelas-hisar/
=========
@joe
“it will really be the most cheapest of variant” just my speculation, it could be combination of few factors which are
– Use of certain structure designs from Hisar OPV, which itself is based on original Ada but faster to built and cheaper
– Use of locally design main radar which ‘could’ be cheaper than Smart-S Mk2
– No Yakamos sonar for ASW missions
– Discounts……
=========
BUKAN ADA CLASS
LMS B2 = HISAR OPV
LMS B2 = HISAR OPV
LMS B2 = HISAR OPV
RMN chief Admiral Zulhelmy Ithnain officiated the steel cutting ceremony for the service’s Littoral Mission Ship Batch 2 (LMS Batch 2) at the Istanbul Shipayard in Turkiye, on November 4. The RMN in a press statement stated that the steel cutting ceremony was a symbolic event to mark the start of the ship building process
============
HISAR OPV = ADKG = LMS B2
HISAR OPV = ADKG = LMS B2
HISAR OPV = ADKG = LMS B2
The Hisar-class offshore patrol vessel (ADKG) is a versatile and modern platform designed for a variety of naval missions. Built at the Istanbul Shipyard Command under the General Directorate of Shipyards and with ASFAT as the main contractor, the vessel features a length of 99.56 meters, a draft of 3.77 meters, and a displacement of 2,300 tons. It boasts a maximum speed of 24 knots and an operational range of 12 knots for extended patrols, accommodating a crew of 104 personnel.
Equipped with state-of-the-art sensors, including a 3D search radar, fire control radar, TACAN navigation aid, hull-mounted sonar system, and electronic support systems, the vessel ensures superior situational awareness. The ADKG also features the Turkish-developed ADVENT combat management system and a hydrodynamic design optimized for performance and efficiency.
============
The Royal Malonn Navy (RMN) faces several challenges, including:
• Aging fleet: More than half of the RMN's fleet is past its prime, and the country has only received four of the 18 new vessels it planned to acquire. The last time the RMN acquired a combat ship was in 1997.
• Delayed replacements: The RMN's plans to replace its aging fleet have been stalled due to mismanagement.
• Insufficient defense budget: Malon's defense budget is less than one percent of its GDP, while neighboring Singapore spends six percent.
• Lack of coordination: There is a lack of coordination among agencies.
• Outdated assets: The RMN's ships and assets are outdated.
• Combat system issues: The RMN has observed deficiencies with the combat system of its LMS type vessels.
• Low endurance: The LCS's endurance was too low to stay with a carrier strike group or amphibious ready group without significant refueling.
• Lack of air and surface warfare capabilities: The LCS lacked significant air and surface warfare capabilities
HISAR OPV = LMS B2 = NO ASW
HapusHISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malaysia.
https://www.airtimes.my/tag/kapal-kelas-hisar/
============
@joe
“it will really be the most cheapest of variant” just my speculation, it could be combination of few factors which are
– Use of certain structure designs from Hisar OPV, which itself is based on original Ada but faster to built and cheaper
– Use of locally design main radar which ‘could’ be cheaper than Smart-S Mk2
– No Yakamos sonar for ASW missions
– Discounts……
============
HISAR OPV = ADKG = LMS B2
HISAR OPV = ADKG = LMS B2
HISAR OPV = ADKG = LMS B2
The Hisar-class offshore patrol vessel (ADKG) is a versatile and modern platform designed for a variety of naval missions. Built at the Istanbul Shipyard Command under the General Directorate of Shipyards and with ASFAT as the main contractor, the vessel features a length of 99.56 meters, a draft of 3.77 meters, and a displacement of 2,300 tons. It boasts a maximum speed of 24 knots and an operational range of 12 knots for extended patrols, accommodating a crew of 104 personnel.
Equipped with state-of-the-art sensors, including a 3D search radar, fire control radar, TACAN navigation aid, hull-mounted sonar system, and electronic support systems, the vessel ensures superior situational awareness. The ADKG also features the Turkish-developed ADVENT combat management system and a hydrodynamic design optimized for performance and efficiency.
Its weapons systems include a 76mm main gun, two 12.7mm guns, and the capability to deploy Atmaca anti-ship missiles. Additionally, the vessel supports aerial operations with a helicopter platform capable of handling 10-ton class helicopters and UAVs, certified to Level-1 Class 2 standards. Two Rigid Hull Inflatable Boats (RHIBs) facilitate personnel transport and special operations missions, further enhancing its versatility.
============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
============
LCS 2024-2011 = 13 TAHUN OMPONG
LCS 2024-2011 = RM 12.4 BILLION
NO MERIAM
NO RADAR
NO MACHINE
NO MISSILE
LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
============
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
============
KEY WORDS = GUNBOAT NAVY
HISAR OPV = LMS B2 = NO ASW
HapusHISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malaysia.
=========
DOWNGRADE = THE MOST CHEAPEST OF VARIANT
Qamarul says:
5 DECEMBER 2024 AT 10:15 PM
Joe-Can anyone explain, in layman terms, why the ship sides is seen to be bubbling/caving/not smooth?
It is sheet metal welded together multi layered with hull metal be it aluminium alloy or high strength steel. Usually they were cut in squares( ERAWA) on the pendekar. There’s calculations behind that and it is a trade secret.
Until now it’s still unclear what kind of radar will be used on the LMSB2 Cenk Aesa or Cenk 3D also the anti submarine weapon. Will it be rockets or light torps.
-
Haiqal says:
5 DECEMBER 2024 AT 10:23 PM
@Joe
“where to cut down cost”
I think the answer is our LMSB2 will not have ASW capability
-
Luqman says:
6 DECEMBER 2024 AT 9:16 AM
@joe
“it will really be the most cheapest of variant”
just my speculation, it could be combination of few factors which are
– Use of certain structure designs from Hisar OPV, which itself is based on original Ada but faster to built and cheaper
– Use of locally design main radar which ‘could’ be cheaper than Smart-S Mk2
– No Yakamos sonar for ASW missions
– Discounts……
==============
LMS B2 = HISAR OPV
LMS B2 = HISAR OPV
LMS B2 = HISAR OPV
RMN chief Admiral Zulhelmy Ithnain officiated the steel cutting ceremony for the service’s Littoral Mission Ship Batch 2 (LMS Batch 2) at the Istanbul Shipayard in Turkiye, on November 4. The RMN in a press statement stated that the steel cutting ceremony was a symbolic event to mark the start of the ship building process
============
HISAR OPV = ADKG = LMS B2
HISAR OPV = ADKG = LMS B2
HISAR OPV = ADKG = LMS B2
The Hisar-class offshore patrol vessel (ADKG) is a versatile and modern platform designed for a variety of naval missions. Built at the Istanbul Shipyard Command under the General Directorate of Shipyards and with ASFAT as the main contractor, the vessel features a length of 99.56 meters, a draft of 3.77 meters, and a displacement of 2,300 tons. It boasts a maximum speed of 24 knots and an operational range of 12 knots for extended patrols, accommodating a crew of 104 personnel.
Equipped with state-of-the-art sensors, including a 3D search radar, fire control radar, TACAN navigation aid, hull-mounted sonar system, and electronic support systems, the vessel ensures superior situational awareness. The ADKG also features the Turkish-developed ADVENT combat management system and a hydrodynamic design optimized for performance and efficiency.
============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
Pemerintah nekat naikkan PPN 12 persen, ketika rakyat menjerit di tengah ekonomi sulit
BalasHapushttps://www.brilio.net/serius/pemerintah-nekat-naikkan-ppn-12-persen-ketika-rakyat-menjerit-di-tengah-ekonomi-sulit-241119s.html
HASIL STUDI ........
HapusBELANJA PERTAHANAN = TERGANTUNG HUTANG
BELANJA PERTAHANAN = TERGANTUNG HUTANG
BELANJA PERTAHANAN = TERGANTUNG HUTANG
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
=============
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
The Malonnn Armed Forces (MAF) faces a number of challenges, including:
• Logistics
A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
• Budgeting
Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
• Personnel
The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
• Procurement
The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
• Political interference
Political interference and corruption are undermining combat readiness.
• Territorial disputes
Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
• Transboundary haze
Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Technological obsolescence
Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
The Malonnn army has several weaknesses, including:
Hapus• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....
==============
HASIL STUDI ........
BELANJA PERTAHANAN = TERGANTUNG HUTANG
BELANJA PERTAHANAN = TERGANTUNG HUTANG
BELANJA PERTAHANAN = TERGANTUNG HUTANG
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
CHEAPEST VARIANT :
Hapus-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malaysia to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malaysian service, and will NOt be equipped with any weaponry.
------
1. BARTER SAWIT 10 LCA 8 FLIT DOWNGRADE
2. P-72M CHEAPEST AIRCRAFT
3. ANKA DOWNGRADE NO WEAPONARY
4. LMS B2 Ada-Class DOWNGRADE HISAR OPV
6. Dibayar PBB/UN = 4x4 Ejder Yalçin
7. LCS dibayar 6 jadi NOL DELAYED
8, OPV dibayar 3 jadi 1 DELAYED
===================
Malonn's defense budget is considered not in accordance with its objectives. Some of the things to consider are:
• The allocation of salaries and allowances for 2024 reaches 40% of the total defense budget.
• The allocation for procurement has increased slightly from 2023, but there may be no real benefit due to the depreciation of the ringgit.
• The Ministry of Finance assesses the availability of funds for programs and procurement requirements in private.
• Hundreds of Malonnn military assets have exceeded the 30-year service limit.
==========
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
Malonn's defense budget is considered not in accordance with its objectives. Some of the things to consider are:
Hapus• The allocation of salaries and allowances for 2024 reaches 40% of the total defense budget.
• The allocation for procurement has increased slightly from 2023, but there may be no real benefit due to the depreciation of the ringgit.
• The Ministry of Finance assesses the availability of funds for programs and procurement requirements in private.
• Hundreds of Malonnn military assets have exceeded the 30-year service limit.
==========
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
==========
Malonn has several issues related to assault rifles, including:
• Smuggling
Malonn's long and porous borders make it difficult to stop the smuggling of firearms and ammunition into the country. The border between Malonn and Thailand is particularly vulnerable to gun smuggling.
• Outdated inventory
The Malonnn Armed Forces (MAF) has outdated inventory stock, which can be a stumbling block for ongoing operations.
• Wary of Russian-made weapons
Malonn is becoming wary of its Russian-made weapons
==========
Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
• Krisis politik
Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
3. Dampak politik pandemi COVID-19
4. Proklamasi Darurat 2021
5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
• Krisis beras
Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
• Krisis mata uang
Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
1. Kinerja ekspor yang buruk
2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
3. Kekhawatiran geopolitik
4. Ketidakpastian mengenai prospek ekonomi China
Pemerintah nekat naikkan PPN 12 persen, ketika rakyat menjerit di tengah ekonomi sulit
BalasHapushttps://www.brilio.net/serius/pemerintah-nekat-naikkan-ppn-12-persen-ketika-rakyat-menjerit-di-tengah-ekonomi-sulit-241119s.html
HASIL STUDI ........
HapusBELANJA PERTAHANAN = TERGANTUNG HUTANG
BELANJA PERTAHANAN = TERGANTUNG HUTANG
BELANJA PERTAHANAN = TERGANTUNG HUTANG
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
=============
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
The Malonnn Armed Forces (MAF) faces a number of challenges, including:
• Logistics
A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
• Budgeting
Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
• Personnel
The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
• Procurement
The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
• Political interference
Political interference and corruption are undermining combat readiness.
• Territorial disputes
Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
• Transboundary haze
Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Technological obsolescence
Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
Malon's combat equipment has several weaknesses, including:
Hapus• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
==============
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....
Malon's combat equipment has several weaknesses, including:
Hapus• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
==============
The Malonnn Armed Forces (MAF) faces a number of challenges, including:
• Logistics
A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
• Budgeting
Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
• Personnel
The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
• Procurement
The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
• Political interference
Political interference and corruption are undermining combat readiness.
• Territorial disputes
Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
• Transboundary haze
Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Technological obsolescence
Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
==============
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
Malonn's defense budget is considered not in accordance with its objectives. Some of the things to consider are:
Hapus• The allocation of salaries and allowances for 2024 reaches 40% of the total defense budget.
• The allocation for procurement has increased slightly from 2023, but there may be no real benefit due to the depreciation of the ringgit.
• The Ministry of Finance assesses the availability of funds for programs and procurement requirements in private.
• Hundreds of Malonnn military assets have exceeded the 30-year service limit.
==========
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
==========
Malonn has several issues related to assault rifles, including:
• Smuggling
Malonn's long and porous borders make it difficult to stop the smuggling of firearms and ammunition into the country. The border between Malonn and Thailand is particularly vulnerable to gun smuggling.
• Outdated inventory
The Malonnn Armed Forces (MAF) has outdated inventory stock, which can be a stumbling block for ongoing operations.
• Wary of Russian-made weapons
Malonn is becoming wary of its Russian-made weapons
==========
Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
• Krisis politik
Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
3. Dampak politik pandemi COVID-19
4. Proklamasi Darurat 2021
5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
• Krisis beras
Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
• Krisis mata uang
Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
1. Kinerja ekspor yang buruk
2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
3. Kekhawatiran geopolitik
4. Ketidakpastian mengenai prospek ekonomi China
CHEAPEST VARIANT :
Hapus-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malaysia to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malaysian service, and will NOt be equipped with any weaponry.
------
1. BARTER SAWIT 10 LCA 8 FLIT DOWNGRADE
2. P-72M CHEAPEST AIRCRAFT
3. ANKA DOWNGRADE NO WEAPONARY
4. LMS B2 Ada-Class DOWNGRADE HISAR OPV
6. Dibayar PBB/UN = 4x4 Ejder Yalçin
7. LCS dibayar 6 jadi NOL DELAYED
8, OPV dibayar 3 jadi 1 DELAYED
===================
Malonn's defense budget is considered not in accordance with its objectives. Some of the things to consider are:
• The allocation of salaries and allowances for 2024 reaches 40% of the total defense budget.
• The allocation for procurement has increased slightly from 2023, but there may be no real benefit due to the depreciation of the ringgit.
• The Ministry of Finance assesses the availability of funds for programs and procurement requirements in private.
• Hundreds of Malonnn military assets have exceeded the 30-year service limit.
==========
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
Ekonomi Malon merudum.... Mata wang jatuh... Di Pajak lagi 12 Persen..... Kucing pun kalah di kandang...mmiauuuww...Parah...
BalasHapus🤣🤣😂🤪😛
Rakyat INDIANESIA ngamuk kenapa di MALAYSIA lebih murah.... 🔥🔥😂😂
BalasHapusImbas PPN 12 Persen, Poster Ajakan Berobat ke Malaysia Viral Lagi
https://m.youtube.com/watch?v=FVFIDSU1CZw
The Malonnn Armed Forces (MAF) faces a number of challenges, including:
Hapus• Logistics
A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
• Budgeting
Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
• Personnel
The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
• Procurement
The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
• Political interference
Political interference and corruption are undermining combat readiness.
• Territorial disputes
Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
• Transboundary haze
Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Technological obsolescence
Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
-----
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
-----
NO CONTRACT ATMACA
While the Malaysian Navy continues to work on the choice of the anti-ship missile system of LMS, Naval News has learned that the Atmaca missile, developed by Roketsan, has emerged as a leading contender.
-----
PRANK KS-1A CHINA
PRANK KS-1A CHINA
PRANK KS-1A CHINA
Malonn has agreed in principle to purchase medium-range missiles from China, which in return will transfer technology on very short-range air defence to the country, Deputy Prime Minister Najib Razak said Tuesday.
The procurement of the surface-to-air missiles was part of the armed forces modernisation program and would be made under the Ninth Malonn Plan from 2006-2009, he was quoted as saying by Bernama news agency.
CNPMIEC president Wang Bingyan said China had also offered to conclude the KS-1A transaction on flexible payment terms, including counter-trade, barter and deferred payments.
------
VSHORAD = LEASE
VSHORAD = LEASE
VSHORAD = LEASE
The procurement division of the Defence Ministry has issued a tender for the supply, delivery, and commissioning for eight Very Short-Range Air Defence (VSHORAD) ground-based air defence system for the Army. The VSHORAD system is listed as the Army’s main asset and equipment for 2024.
The 23-day tender published on November 20 closes on December 19. As usual the public specifications for the tender are limited.
The Malonnn army has several weaknesses, including:
Hapus• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
Factors that influence Malon's military budget include:
• Fiscal limitations
Malonn governments have been unwilling to fund defense by cutting government spending or reducing the size of the armed forces.
• Public debt
A study found a positive association between public debt and defense spending in Malon.
• Exchange rate
The depreciation of the ringgit can impact the real gain in procurement funding.
• Military imports
The size of military imports is closely linked to variations in expenditure.
• Military aid
The availability of military aid plays a central role in military expenditure.
• Non-conventional security issues
These issues are beginning to shape and influence the nature of threats to national defense and security.
• Corruption
Corruption risks are critical in terms of military operations.
• Competition between the U.S.A. and China
The increasing competition between the U.S.A. and China has triggered an increase in military expenditure in the region.
• Conflicts and potential conflicts
Conflicts and potential conflicts between countries in the Southeast Asian region are permanent causes
==============
The Malonnn Armed Forces (MAF) faces a number of challenges, including:
• Logistics
A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
• Budgeting
Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
• Personnel
The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
• Procurement
The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
• Political interference
Political interference and corruption are undermining combat readiness.
• Territorial disputes
Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
• Transboundary haze
Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Technological obsolescence
Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
The Malonnn army has several weaknesses, including:
Hapus• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
Factors that influence Malon's military budget include:
• Fiscal limitations
Malonn governments have been unwilling to fund defense by cutting government spending or reducing the size of the armed forces.
• Public debt
A study found a positive association between public debt and defense spending in Malon.
• Exchange rate
The depreciation of the ringgit can impact the real gain in procurement funding.
• Military imports
The size of military imports is closely linked to variations in expenditure.
• Military aid
The availability of military aid plays a central role in military expenditure.
• Non-conventional security issues
These issues are beginning to shape and influence the nature of threats to national defense and security.
• Corruption
Corruption risks are critical in terms of military operations.
• Competition between the U.S.A. and China
The increasing competition between the U.S.A. and China has triggered an increase in military expenditure in the region.
• Conflicts and potential conflicts
Conflicts and potential conflicts between countries in the Southeast Asian region are permanent causes
==============
The Malonnn Armed Forces (MAF) faces a number of challenges, including:
• Logistics
A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
• Budgeting
Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
• Personnel
The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
• Procurement
The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
• Political interference
Political interference and corruption are undermining combat readiness.
• Territorial disputes
Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
• Transboundary haze
Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Technological obsolescence
Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
Hapus171 ASET USANG 30 TAHUN =
108 TDM
29 TUDM
34 TLDM
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister.
----
BUDGET 2025
RM 5,8 BILION : USD 1,34 MILYAR
USD 1,34 MILYAR / 3 ANGKATAN = USD 440 JUTA PER ANGKATAN
USD 440 JUTA = LAUT
USD 440 JUTA = UDARA
USD 440 JUTA = DARAT
Perdana Menteri, Datuk Seri Anwar Ibrahim berkata, kerajaan akan terus memastikan kesiagaan penuh Angkatan Tentera Malon (ATM) dengan RM5.8 bilion dikhususkan untuk kerja-kerja senggara dan pembaikan serta perolehan aset-aset ketenteraan baharu.
------
2024 MILITARY STRENGTH RANKING
GLOBAL FIRE POWER – GFP
13. Indonesia US$ 25 Billion = SHOPPING
22. Vietnam US$ 7,9 Billion = SHOPPING
25. Thailand US$ 7,7 Billion = SHOPPING
30. Singapura US$ 13,493 Billion = SHOPPING
42. Malon US$ 4,370 Billion = LEASE
------
1. BARTER SAWIT 10 LCA 8 FLIT DOWNGRADE
2. akan 2 Leonardo P-72M DELAYED
3. akan 3 anka ISR OMPONG
4. LOA LMS B2 Ada-Class DOWNGRADE
6. Dibayar PBB/UN = 4x4 Ejder Yalçin
7. LCS dibayar 6 jadi NOL DELAYED
8, OPV dibayar 3 jadi 1 DELAYED
==================
Factors that influence Malon's military budget include:
• Fiscal limitations
Malonn governments have been unwilling to fund defense by cutting government spending or reducing the size of the armed forces.
• Public debt
A study found a positive association between public debt and defense spending in Malon.
• Exchange rate
The depreciation of the ringgit can impact the real gain in procurement funding.
• Military imports
The size of military imports is closely linked to variations in expenditure.
• Military aid
The availability of military aid plays a central role in military expenditure.
• Non-conventional security issues
These issues are beginning to shape and influence the nature of threats to national defense and security.
• Corruption
Corruption risks are critical in terms of military operations.
• Competition between the U.S.A. and China
The increasing competition between the U.S.A. and China has triggered an increase in military expenditure in the region.
• Conflicts and potential conflicts
Conflicts and potential conflicts between countries in the Southeast Asian region are permanent causes.
=========
The Malonn Armed Forces (MAF) faces a number of challenges, including:
• Outdated equipment
Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern assets. For example, the KD Rahman submarine was unable to submerge due to technical issues in 2010.
• Misappropriation of funds
There have been multiple instances of public funds being misappropriated under the guise of meeting defense needs.
• Army-centric mindset
Malon has an army-centric mindset, even though the country is surrounded by water.
• Double budgetary allocation
The army receives more of the budget than the other services.
• Lack of standard operating procedures
There are issues with standard operating procedures, from the e-procurement process to inventory receipts.
• Tension between public and military
There is tension between the public's right to know and the military's "need-to-know" policies
CHEAPEST VARIANT :
Hapus-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malaysia to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malaysian service, and will NOt be equipped with any weaponry.
------
1. BARTER SAWIT 10 LCA 8 FLIT DOWNGRADE
2. P-72M CHEAPEST AIRCRAFT
3. ANKA DOWNGRADE NO WEAPONARY
4. LMS B2 Ada-Class DOWNGRADE HISAR OPV
6. Dibayar PBB/UN = 4x4 Ejder Yalçin
7. LCS dibayar 6 jadi NOL DELAYED
8, OPV dibayar 3 jadi 1 DELAYED
===================
Malonn's defense budget is considered not in accordance with its objectives. Some of the things to consider are:
• The allocation of salaries and allowances for 2024 reaches 40% of the total defense budget.
• The allocation for procurement has increased slightly from 2023, but there may be no real benefit due to the depreciation of the ringgit.
• The Ministry of Finance assesses the availability of funds for programs and procurement requirements in private.
• Hundreds of Malonnn military assets have exceeded the 30-year service limit.
==========
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
Hapus•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
----
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
----
SEWA 53 HELI BEKAS
SEWA 53 HELI BEKAS
SEWA 53 HELI BEKAS
TUDM SEWA =
12 AW149
4 AW139
5 EC120B
TLDM SEWA =
2 AW159
TDM SEWA =
4 UH-60A
12 AW149
BOMBA SEWA =
4 AW139
POLIS SEWA =
7 BELL429
MMEA SEWA =
2 AW159
JABATAN PM SEWA =
1 AW189
==========
Malonn has several issues related to assault rifles, including:
• Smuggling
Malonn's long and porous borders make it difficult to stop the smuggling of firearms and ammunition into the country. The border between Malonn and Thailand is particularly vulnerable to gun smuggling.
• Outdated inventory
The Malonnn Armed Forces (MAF) has outdated inventory stock, which can be a stumbling block for ongoing operations.
• Wary of Russian-made weapons
Malonn is becoming wary of its Russian-made weapons
==========
Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
• Krisis politik
Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
3. Dampak politik pandemi COVID-19
4. Proklamasi Darurat 2021
5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
• Krisis beras
Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
• Krisis mata uang
Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
1. Kinerja ekspor yang buruk
2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
3. Kekhawatiran geopolitik
4. Ketidakpastian mengenai prospek ekonomi China
Itu saya belum masuk hal PENGANGURAN...... 🤣🤣🤣🤣
BalasHapusMalon's combat equipment has several weaknesses, including:
Hapus• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
==============
The Malonnn Armed Forces (MAF) faces a number of challenges, including:
• Logistics
A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
• Budgeting
Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
• Personnel
The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
• Procurement
The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
• Political interference
Political interference and corruption are undermining combat readiness.
• Territorial disputes
Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
• Transboundary haze
Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Technological obsolescence
Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
==============
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
Hapus•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
----
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
----
SEWA 53 HELI BEKAS
SEWA 53 HELI BEKAS
SEWA 53 HELI BEKAS
TUDM SEWA =
12 AW149
4 AW139
5 EC120B
TLDM SEWA =
2 AW159
TDM SEWA =
4 UH-60A
12 AW149
BOMBA SEWA =
4 AW139
POLIS SEWA =
7 BELL429
MMEA SEWA =
2 AW159
JABATAN PM SEWA =
1 AW189
==========
Malonn has several issues related to assault rifles, including:
• Smuggling
Malonn's long and porous borders make it difficult to stop the smuggling of firearms and ammunition into the country. The border between Malonn and Thailand is particularly vulnerable to gun smuggling.
• Outdated inventory
The Malonnn Armed Forces (MAF) has outdated inventory stock, which can be a stumbling block for ongoing operations.
• Wary of Russian-made weapons
Malonn is becoming wary of its Russian-made weapons
==========
Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
• Krisis politik
Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
3. Dampak politik pandemi COVID-19
4. Proklamasi Darurat 2021
5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
• Krisis beras
Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
• Krisis mata uang
Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
1. Kinerja ekspor yang buruk
2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
3. Kekhawatiran geopolitik
4. Ketidakpastian mengenai prospek ekonomi China
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
Hapus•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
==============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
==============
Malonn's economy has faced a number of challenges, including:
• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
==============
KEY WORDS =
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
Hapus•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
----
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
----
SEWA HELI 28 = KONGSI 5
SEWA HELI 28 = KONGSI 5
SEWA HELI 28 = KONGSI 5
Dengan termeterainya kontrak tersebut, sebanyak 12 buah akan digunakan Tentera Udara Diraja Malon (TUDM); Polis Diraja Malon (PDRM) (7); Tentera Laut Diraja Malon (TLDM) (2); Jabatan Bomba dan Penyelamat (JPBM) (2) dan Agensi Penguatkuasaan Maritim Malon (Maritim Malon) (4).
----
LIGHT TWIN HELO = GAGAL
LIGHT TWIN HELO = GAGAL
LIGHT TWIN HELO = GAGAL
The Procurement division of the Home Ministry issued two separate tenders for the supply and delivery of seven twin-engine utility and transport aircraft and five light twin engine helicopters for the police’s Air Wing. the tender for the five twin-engine helicopters has been canceled. Checks on the Eperolehan website today confirmed the cancelation
----
SEWA BEKAS = 15 TAHUN
15 TAHUN = BELI RONGSOK
Semua dikendalikan oleh syarikat yang melakukan pajakan ini dan pajakan ini adalah pajakan To-Own bermakna selepas 15 tahun, kerajaan diberikan pilihan untuk membeli kesemua 28 helikopter itu pada harga nominal RM1 sahaja.
----
BLACKHAWK = GAGAL
BLACKHAWK = GAGAL
BLACKHAWK = GAGAL
Menteri Pertahanan, Datuk Seri Mohamed Khaled Nordin berkata, ia susulan pelanjutan kontrak oleh syarikat itu pada Oktober lalu selepas gagal mematuhi kontrak penyerahannya.
"Oktober sudah berakhir. Tiada apa-apa (Black Hawks), tiada apa-apa.
---
SEWA 53 HELI BEKAS
SEWA 53 HELI BEKAS
SEWA 53 HELI BEKAS
TUDM SEWA =
12 AW149
4 AW139
5 EC120B
TLDM SEWA =
2 AW159
TDM SEWA =
4 UH-60A
12 AW149
BOMBA SEWA =
4 AW139
POLIS SEWA =
7 BELL429
MMEA SEWA =
2 AW159
JABATAN PM SEWA =
1 AW189
https://www.facebook.com/share/p/gnmpDnsCCTn8tx6b/
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
KEY WORDS =
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
PPN 12% & Dolar AS Rp16.300, Siap-siap Hidup Warga RI Makin Sulit!
BalasHapushttps://www.cnbcindonesia.com/news/20241220075321-4-597525/ppn-12-dolar-as-rp16300-siap-siap-hidup-warga-ri-makin-sulit
Hapus171 ASET USANG 30 TAHUN =
108 TDM
29 TUDM
34 TLDM
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister.
----
BUDGET 2025
RM 5,8 BILION : USD 1,34 MILYAR
USD 1,34 MILYAR / 3 ANGKATAN = USD 440 JUTA PER ANGKATAN
USD 440 JUTA = LAUT
USD 440 JUTA = UDARA
USD 440 JUTA = DARAT
Perdana Menteri, Datuk Seri Anwar Ibrahim berkata, kerajaan akan terus memastikan kesiagaan penuh Angkatan Tentera Malon (ATM) dengan RM5.8 bilion dikhususkan untuk kerja-kerja senggara dan pembaikan serta perolehan aset-aset ketenteraan baharu.
------
2024 MILITARY STRENGTH RANKING
GLOBAL FIRE POWER – GFP
13. Indonesia US$ 25 Billion = SHOPPING
22. Vietnam US$ 7,9 Billion = SHOPPING
25. Thailand US$ 7,7 Billion = SHOPPING
30. Singapura US$ 13,493 Billion = SHOPPING
42. Malon US$ 4,370 Billion = LEASE
------
1. BARTER SAWIT 10 LCA 8 FLIT DOWNGRADE
2. akan 2 Leonardo P-72M DELAYED
3. akan 3 anka ISR OMPONG
4. LOA LMS B2 Ada-Class DOWNGRADE
6. Dibayar PBB/UN = 4x4 Ejder Yalçin
7. LCS dibayar 6 jadi NOL DELAYED
8, OPV dibayar 3 jadi 1 DELAYED
==================
Factors that influence Malon's military budget include:
• Fiscal limitations
Malonn governments have been unwilling to fund defense by cutting government spending or reducing the size of the armed forces.
• Public debt
A study found a positive association between public debt and defense spending in Malon.
• Exchange rate
The depreciation of the ringgit can impact the real gain in procurement funding.
• Military imports
The size of military imports is closely linked to variations in expenditure.
• Military aid
The availability of military aid plays a central role in military expenditure.
• Non-conventional security issues
These issues are beginning to shape and influence the nature of threats to national defense and security.
• Corruption
Corruption risks are critical in terms of military operations.
• Competition between the U.S.A. and China
The increasing competition between the U.S.A. and China has triggered an increase in military expenditure in the region.
• Conflicts and potential conflicts
Conflicts and potential conflicts between countries in the Southeast Asian region are permanent causes.
=========
The Malonn Armed Forces (MAF) faces a number of challenges, including:
• Outdated equipment
Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern assets. For example, the KD Rahman submarine was unable to submerge due to technical issues in 2010.
• Misappropriation of funds
There have been multiple instances of public funds being misappropriated under the guise of meeting defense needs.
• Army-centric mindset
Malon has an army-centric mindset, even though the country is surrounded by water.
• Double budgetary allocation
The army receives more of the budget than the other services.
• Lack of standard operating procedures
There are issues with standard operating procedures, from the e-procurement process to inventory receipts.
• Tension between public and military
There is tension between the public's right to know and the military's "need-to-know" policies
The Malonnn army has several weaknesses, including:
Hapus• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
-----
The Royal Malonnn Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Technological obsolescence
Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited.
-----
BARTER = MINTA (NGEMIS) DIPERCEPAT
BARTER = MINTA (NGEMIS) DIPERCEPAT
BARTER = MINTA (NGEMIS) DIPERCEPAT
50% PAYMENT = BARTER PALM OIL
50% PAYMENT = BARTER PALM OIL
50% PAYMENT = BARTER PALM OIL
A $919 million contract was signed between KAI and the Malonnn Ministry of Defense for the supply of the FA-50 light combat aircraft. According to the contract, deliveries of the aircraft should begin in 2026.
On the other hand, South Korea aims to sell another 18 FA-50s to Malonn in the future. Malonn announced that at least half of the payment would be made in palm
============
FA 50PL NO BARTER = 2028
FA 50PL NO BARTER = 2028
FA 50PL NO BARTER = 2028
For the 32 FA-50PL, fully multi-role combat aircrafts that will replace the aging Su-22 and MiG-29 fleets, Poland requested the integration of systems such as Raytheon’s PhantomStrike radar, in-flight refueling capability, helmets with integrated HMD display, GBU laser-guided bombs, and compatibility with AIM-120 AMRAAM and AIM-9X Sidewinder missiles. The complexity of these modifications has extended the development timeline, and now it’s expected that the aircrafts won’t be fully operational until after 2028, as originally planned
============
The Royal Malonn Navy (RMN) faces several challenges, including:
• Aging fleet: More than half of the RMN's fleet is past its prime, and the country has only received four of the 18 new vessels it planned to acquire. The last time the RMN acquired a combat ship was in 1997.
• Delayed replacements: The RMN's plans to replace its aging fleet have been stalled due to mismanagement.
• Insufficient defense budget: Malon's defense budget is less than one percent of its GDP, while neighboring Singapore spends six percent.
• Lack of coordination: There is a lack of coordination among agencies.
• Outdated assets: The RMN's ships and assets are outdated.
• Combat system issues: The RMN has observed deficiencies with the combat system of its LMS type vessels.
• Low endurance: The LCS's endurance was too low to stay with a carrier strike group or amphibious ready group without significant refueling.
• Lack of air and surface warfare capabilities: The LCS lacked significant air and surface warfare capabilities
Malon's household debt-to-GDP ratio
HapusDecember 2023 = 84.2%
December 2020 = 93.1% (all-time high)
December 2008 = 60.4% (record low)
Some factors that have contributed to the growth in household debt include:
• Government and private sector home ownership incentives
• Sales and service tax (SST) incentives for the purchase of motor vehicles between 2020 and 2022
=========
2023 : SETTLED IN 2053 = IF NO NEW LOANS
2023 : SETTLED IN 2053 = IF NO NEW LOANS
2023 : SETTLED IN 2053 = IF NO NEW LOANS
The federal government's debt is expected to be fully settled in 2053 if no new loans were to be taken to finance the deficit and to refinance maturing debts from 2024 onwards, said the Finance Ministry (MoF).
=========
2024 DEBT TO GDP 84,2% DARI GDP = NEW LOANS
2023 DEBT RM 1.53 TRILLION = NEW LOANS
2022 DEBT RM 1.45 TRILLION = NEW LOANS
2021 DEBT RM 1.38 TRILLION = NEW LOANS
2020 DEBT RM 1.32 TRILLION = NEW LOANS
2019 DEBT RM 1.25 TRILLION = NEW LOANS
The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023. In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018). “The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
=========
2024 OVER LIMIT DEBT 65,6%
Malon Government debt accounted for 65.6 % of the country's Nominal GDP in Mar 2024, compared with the ratio of 64.3 % in the previous quarter. Malon government debt to GDP ratio data is updated quarterly, available from Dec 2010 to Mar 2024.
=========
2024 HUTANG JATUH TEMPO = The federal government's debt is expected to be fully settled in 2053 if no new loans were to be taken to finance the deficit and to refinance maturing debts from 2024 onwards, said the Finance Ministry (MoF)
----
2023 TIDAK BAYAR HUTANG = “Ini bermakna bayaran khidmat hutang banyak…hanya membayar faedah bukan bayar hutang tertunggak,” kata Anwar lagi
----
2022 HUTANG BAYAR HUTANG 52,4% = Kah Woh menjelaskan pada tahun lalu, kerajaan ada membuat pinjaman yang meningkat sebanyak 11.6 peratus daripada RM194.5 bilion pada tahun sebelumnya. Daripada jumlah itu, beliau berkata 52.4 peratus atau RM113.7 bilion digunakan untuk membayar prinsipal pinjaman matang.
----
2021 HUTANG BAYAR HUTANG 50,4% = Sejumlah RM98.058 bilion atau 50.4 peratus daripada pinjaman baharu berjumlah RM194.555 bilion yang dibuat kerajaan pada tahun lalu digunakan untuk bayaran balik prinsipal pinjaman yang matang.
----
2020 HUTANG BAYAR HUTANG 60% = Jabatan Audit Negara (JAN) bimbang dengan tindakan kerajaan menggunakan hampir 60 peratus pinjaman baharu untuk membayar hutang .
----
2019 HUTANG BAYAR HUTANG 59% = Laporan Ketua Audit Negara mengenai Penyata Kewangan Kerajaan Persekutuan 2018 mendapati sejumlah 59 peratus pinjaman baharu kerajaan dibuat untuk membayar hutang kerajaan terdahulu
----
2018 RASIO HUTANG 80% DARI GDP : OPEN DONASI = Kementerian Keuangan Malon pada hari Rabu membuka rekening donasi supaya masyarakat dapat menyumbang untuk membantu negara membayar utang yang mencapai 1 triliun ringgit (US$ 250,8 miliar) atau 80 persen dari PDB.
==============
SCANDALS = Now and then, by exception, scandals spill out into the public domain, like Bumiputera Malon Finance 1982, Bank Negara’s FX losses in the 1980s and 1990s, the Scorpene submarines of 2002, the National Feedlot scandal – “cowgate” – of 2012, 1MDB, and the latest LCS naval procurement. But these are just the tip of the iceberg of systematic pilferage. It has become the institutional norm
Rupiah Makin Merana, Dolar AS Rawan Menguji Rp16.400!
BalasHapushttps://www.cnbcindonesia.com/market/20241220083245-17-597537/rupiah-makin-merana-dolar-as-rawan-menguji-rp16400
HapusWESTSTAR GETTING MONEY = MALON GETTING JUNK
WESTSTAR GETTING MONEY = MALON GETTING JUNK
WESTSTAR GETTING MONEY = MALON GETTING JUNK
“Kaedah ini juga dianggap inovatif kerana berpotensi untuk menjimatkan kos jangka panjang tanpa menjejaskan kualiti mahupun fungsi aset yang diperoleh.”
As of now, many publicly available evidence shows that the above is not true until is proven. We are just wasting more money long term. We need an audit to compare the total leasing cost and overall cost of outright buying and operating for 15 years
So Weststar is getting richer and richer……
==========
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==========
1. HUTANG 84.2% DARI GDP
1. HUTANG 84.2% DARI GDP
2. HUTANG NEGARA RM 1.5 TRLLIUN
3. HUTANG 1MDB RM 18.2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST SHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. TUDM SEWA 12 AW149
62. TUDM SEWA 4 AW139
63. TUDM SEWA 5 EC120B
64. TLDM SEWA 2 AW159
65. TDM SEWA 4 UH-60A
67. TDM SEWA 12 AW149
68. BOMBA SEWA 4 AW139
69. MMEA SEWA 2 AW159
70. POLIS SEWA 7 BELL429
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
HapusWESTSTAR RICH = MALON POOR
WESTSTAR RICH = MALON POOR
WESTSTAR RICH = MALON POOR
“Kaedah ini juga dianggap inovatif kerana berpotensi untuk menjimatkan kos jangka panjang tanpa menjejaskan kualiti mahupun fungsi aset yang diperoleh.”
As of now, many publicly available evidence shows that the above is not true until is proven. We are just wasting more money long term. We need an audit to compare the total leasing cost and overall cost of outright buying and operating for 15 years
So Weststar is getting richer and richer……
=========
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
The government on December 19 signed the leasing deal for helicopters with Weststar Aviation Sdn Bhd for use of ministries and agencies. Not many details have been issued so far but RMAF posted on Facebook today on the signing ceremony at Putrajaya.
RMAF release on the leasing arrangement.
Chief Secretary to Government TS Shamsul Azri Abu Bakar had this to say on the leasing deal
=========
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
=========
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
WESTSTAR GETTING RICH = MALON GETTING POOR
HapusWESTSTAR GETTING RICH = MALON GETTING POOR
WESTSTAR GETTING RICH = MALON GETTING POOR
“Kaedah ini juga dianggap inovatif kerana berpotensi untuk menjimatkan kos jangka panjang tanpa menjejaskan kualiti mahupun fungsi aset yang diperoleh.”
As of now, many publicly available evidence shows that the above is not true until is proven. We are just wasting more money long term. We need an audit to compare the total leasing cost and overall cost of outright buying and operating for 15 years
So Weststar is getting richer and richer……
=========
COMMISSION FOR THE PURCHASE
COMMISSION FOR THE PURCHASE
COMMISSION FOR THE PURCHASE
The military likely had no idea they were being used by politicians and their cronies to purchase equipment, especially those that do not meet their technical and operational specifications. Whether some of these officers were also greased along the way by the politicians is something else. It is strange that no one in the military learned the lessons of the Scorpene submarine scandal that preceded the CLS debacle by a decade. Malaysia bought two Scorpene-class submarines from France in 2002 when Najib Razak was defense minister and later PM. A two-ringgit Malaysian company owned by a Najib’s crony received a €114 million “commission” for the purchase. The rest is history.
=========
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
The government on December 19 signed the leasing deal for helicopters with Weststar Aviation Sdn Bhd for use of ministries and agencies. Not many details have been issued so far but RMAF posted on Facebook today on the signing ceremony at Putrajaya.
RMAF release on the leasing arrangement.
Chief Secretary to Government TS Shamsul Azri Abu Bakar had this to say on the leasing deal
=========
PMX LEASE 15 YEARS
PMX LEASE 15 YEARS
PMX LEASE 15 YEARS
RMAF
RMN
MMEA
POLICE
FIRE
RESCUE DEPARTEMENT
PM DEPARTEMENT
PMX has defended the decision to lease the helicopters for the military and other government agencies – RM16.5 billion for 15 years – during the Parliament session on Thursday. Among others he said the government adopted the leasing model to reduce maintenance costs and at the same time improved the operational readiness of the fleet.
DS Anwar Ibrahim did not address the fact that the government will be paying some RM1 billion a year for 15 years for the helicopters. He also said the helicopters selected were based on the specifications and requirements of the agencies themselves.
He also confirmed that the Army will also be part of the leasing programme apart from RMAF,RMN, MMEA, police, Fire and Rescue Department, and the Prime Minister Department. Apart from RMAF 12 and police’s seven helicopters, he did not give the breakdown for the other services and agencies.
=========
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
RUPIAH terus menerus JATUH guys.....
BalasHapus
HapusWESTSTAR GETTING MONEY = MALON GETTING JUNK
WESTSTAR GETTING MONEY = MALON GETTING JUNK
WESTSTAR GETTING MONEY = MALON GETTING JUNK
“Kaedah ini juga dianggap inovatif kerana berpotensi untuk menjimatkan kos jangka panjang tanpa menjejaskan kualiti mahupun fungsi aset yang diperoleh.”
As of now, many publicly available evidence shows that the above is not true until is proven. We are just wasting more money long term. We need an audit to compare the total leasing cost and overall cost of outright buying and operating for 15 years
So Weststar is getting richer and richer……
==========
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==========
1. HUTANG 84.2% DARI GDP
1. HUTANG 84.2% DARI GDP
2. HUTANG NEGARA RM 1.5 TRLLIUN
3. HUTANG 1MDB RM 18.2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST SHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. TUDM SEWA 12 AW149
62. TUDM SEWA 4 AW139
63. TUDM SEWA 5 EC120B
64. TLDM SEWA 2 AW159
65. TDM SEWA 4 UH-60A
67. TDM SEWA 12 AW149
68. BOMBA SEWA 4 AW139
69. MMEA SEWA 2 AW159
70. POLIS SEWA 7 BELL429
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
HapusWESTSTAR RICH = MALON POOR
WESTSTAR RICH = MALON POOR
WESTSTAR RICH = MALON POOR
“Kaedah ini juga dianggap inovatif kerana berpotensi untuk menjimatkan kos jangka panjang tanpa menjejaskan kualiti mahupun fungsi aset yang diperoleh.”
As of now, many publicly available evidence shows that the above is not true until is proven. We are just wasting more money long term. We need an audit to compare the total leasing cost and overall cost of outright buying and operating for 15 years
So Weststar is getting richer and richer……
=========
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
The government on December 19 signed the leasing deal for helicopters with Weststar Aviation Sdn Bhd for use of ministries and agencies. Not many details have been issued so far but RMAF posted on Facebook today on the signing ceremony at Putrajaya.
RMAF release on the leasing arrangement.
Chief Secretary to Government TS Shamsul Azri Abu Bakar had this to say on the leasing deal
=========
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
=========
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
ALL LEASE = LEASE ALL
HapusALL LEASE = LEASE ALL
ALL LEASE = LEASE ALL
sewa aset kerajaan akan memperoleh 28 helikopter AW-149 untuk tempo selama 15 tahun, dengan perincian jumlah: 1 untuk PM, 12 untuk TUDM, 2 untuk TLDM, 7 untuk Polis DM, 4 untuk APMM, 2 untuk Bomba dan Penyelamat
=========
WESTSTAR = GETTING RICHER AND RICHER
WESTSTAR = GETTING RICHER AND RICHER
WESTSTAR = GETTING RICHER AND RICHER
“Kaedah ini juga dianggap inovatif kerana berpotensi untuk menjimatkan kos jangka panjang tanpa menjejaskan kualiti mahupun fungsi aset yang diperoleh.”
As of now, many publicly available evidence shows that the above is not true until is proven. We are just wasting more money long term. We need an audit to compare the total leasing cost and overall cost of outright buying and operating for 15 years
So Weststar is getting richer and richer……
=========
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
The government on December 19 signed the leasing deal for helicopters with Weststar Aviation Sdn Bhd for use of ministries and agencies. Not many details have been issued so far but RMAF posted on Facebook today on the signing ceremony at Putrajaya.
RMAF release on the leasing arrangement.
Chief Secretary to Government TS Shamsul Azri Abu Bakar had this to say on the leasing deal
=========
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
=========
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
=========
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
=========
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
=========
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
Rupiah Makin Merana, Dolar AS Rawan Menguji Rp16.400!
BalasHapushttps://www.cnbcindonesia.com/market/20241220083245-17-597537/rupiah-makin-merana-dolar-as-rawan-menguji-rp16400
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
Hapus•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
==============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
==============
Malonn's economy has faced a number of challenges, including:
• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
==============
KEY WORDS =
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
Hapus•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
----
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
----
SEWA HELI 28 = KONGSI 5
SEWA HELI 28 = KONGSI 5
SEWA HELI 28 = KONGSI 5
Dengan termeterainya kontrak tersebut, sebanyak 12 buah akan digunakan Tentera Udara Diraja Malon (TUDM); Polis Diraja Malon (PDRM) (7); Tentera Laut Diraja Malon (TLDM) (2); Jabatan Bomba dan Penyelamat (JPBM) (2) dan Agensi Penguatkuasaan Maritim Malon (Maritim Malon) (4).
----
LIGHT TWIN HELO = GAGAL
LIGHT TWIN HELO = GAGAL
LIGHT TWIN HELO = GAGAL
The Procurement division of the Home Ministry issued two separate tenders for the supply and delivery of seven twin-engine utility and transport aircraft and five light twin engine helicopters for the police’s Air Wing. the tender for the five twin-engine helicopters has been canceled. Checks on the Eperolehan website today confirmed the cancelation
----
SEWA BEKAS = 15 TAHUN
15 TAHUN = BELI RONGSOK
Semua dikendalikan oleh syarikat yang melakukan pajakan ini dan pajakan ini adalah pajakan To-Own bermakna selepas 15 tahun, kerajaan diberikan pilihan untuk membeli kesemua 28 helikopter itu pada harga nominal RM1 sahaja.
----
BLACKHAWK = GAGAL
BLACKHAWK = GAGAL
BLACKHAWK = GAGAL
Menteri Pertahanan, Datuk Seri Mohamed Khaled Nordin berkata, ia susulan pelanjutan kontrak oleh syarikat itu pada Oktober lalu selepas gagal mematuhi kontrak penyerahannya.
"Oktober sudah berakhir. Tiada apa-apa (Black Hawks), tiada apa-apa.
---
SEWA 53 HELI BEKAS
SEWA 53 HELI BEKAS
SEWA 53 HELI BEKAS
TUDM SEWA =
12 AW149
4 AW139
5 EC120B
TLDM SEWA =
2 AW159
TDM SEWA =
4 UH-60A
12 AW149
BOMBA SEWA =
4 AW139
POLIS SEWA =
7 BELL429
MMEA SEWA =
2 AW159
JABATAN PM SEWA =
1 AW189
https://www.facebook.com/share/p/gnmpDnsCCTn8tx6b/
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
KEY WORDS =
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
HapusWESTSTAR GETTING MONEY = MALON GETTING JUNK
WESTSTAR GETTING MONEY = MALON GETTING JUNK
WESTSTAR GETTING MONEY = MALON GETTING JUNK
“Kaedah ini juga dianggap inovatif kerana berpotensi untuk menjimatkan kos jangka panjang tanpa menjejaskan kualiti mahupun fungsi aset yang diperoleh.”
As of now, many publicly available evidence shows that the above is not true until is proven. We are just wasting more money long term. We need an audit to compare the total leasing cost and overall cost of outright buying and operating for 15 years
So Weststar is getting richer and richer……
==========
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==========
1. HUTANG 84.2% DARI GDP
1. HUTANG 84.2% DARI GDP
2. HUTANG NEGARA RM 1.5 TRLLIUN
3. HUTANG 1MDB RM 18.2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST SHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. TUDM SEWA 12 AW149
62. TUDM SEWA 4 AW139
63. TUDM SEWA 5 EC120B
64. TLDM SEWA 2 AW159
65. TDM SEWA 4 UH-60A
67. TDM SEWA 12 AW149
68. BOMBA SEWA 4 AW139
69. MMEA SEWA 2 AW159
70. POLIS SEWA 7 BELL429
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
BABI TOLOL 21 Desember 2024 pukul 07.56
BalasHapusManakala negara 200 Juta lebih penduduk tanpa Pemain Belanda mereka bukan siapa siapa... 🤣🤣🤣_______________________
TUNJUKKAN BUKTI INDONESIA PAKAI PEMAIN BELANDA...??
-VIRGIL VAN DIJK.
-GAKPO.
-TIJANI REJINDERS
DLL
BABI TOLOL... KLU INDONESIA PAKAI PEMAIN BELANDA, PASTI INDONESIA SUDAH DI BANNED N SANKSI OLEH FIFA
BABI TOLOL 21 Desember 2024 pukul 07.56
BalasHapusManakala negara 200 Juta lebih penduduk tanpa Pemain Belanda mereka bukan siapa siapa... 🤣🤣🤣_______________________
TUNJUKKAN BUKTI INDONESIA PAKAI PEMAIN BELANDA...??
-VIRGIL VAN DIJK.
-GAKPO.
-TIJANI REJINDERS
DLL
BABI TOLOL... KLU INDONESIA PAKAI PEMAIN BELANDA, PASTI INDONESIA SUDAH DI BANNED N SANKSI OLEH FIFA
BABI TOLOL 21 Desember 2024 pukul 07.56
BalasHapusManakala negara 200 Juta lebih penduduk tanpa Pemain Belanda mereka bukan siapa siapa... 🤣🤣🤣
_______________________
TUNJUKKAN BUKTI INDONESIA PAKAI PEMAIN BELANDA...??
-VIRGIL VAN DIJK.
-GAKPO.
-TIJANI REJINDERS
DLL
BABI TOLOL... KLU INDONESIA PAKAI PEMAIN BELANDA, PASTI INDONESIA SUDAH DI BANNED N SANKSI OLEH FIFA
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
BalasHapus•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
==============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
==============
Malonn's economy has faced a number of challenges, including:
• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
==============
KEY WORDS =
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
WESTSTAR GETTING RICH = MALON GETTING POOR
BalasHapusWESTSTAR GETTING RICH = MALON GETTING POOR
WESTSTAR GETTING RICH = MALON GETTING POOR
“Kaedah ini juga dianggap inovatif kerana berpotensi untuk menjimatkan kos jangka panjang tanpa menjejaskan kualiti mahupun fungsi aset yang diperoleh.”
As of now, many publicly available evidence shows that the above is not true until is proven. We are just wasting more money long term. We need an audit to compare the total leasing cost and overall cost of outright buying and operating for 15 years
So Weststar is getting richer and richer……
=========
COMMISSION FOR THE PURCHASE
COMMISSION FOR THE PURCHASE
COMMISSION FOR THE PURCHASE
The military likely had no idea they were being used by politicians and their cronies to purchase equipment, especially those that do not meet their technical and operational specifications. Whether some of these officers were also greased along the way by the politicians is something else. It is strange that no one in the military learned the lessons of the Scorpene submarine scandal that preceded the CLS debacle by a decade. Malaysia bought two Scorpene-class submarines from France in 2002 when Najib Razak was defense minister and later PM. A two-ringgit Malaysian company owned by a Najib’s crony received a €114 million “commission” for the purchase. The rest is history.
=========
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
The government on December 19 signed the leasing deal for helicopters with Weststar Aviation Sdn Bhd for use of ministries and agencies. Not many details have been issued so far but RMAF posted on Facebook today on the signing ceremony at Putrajaya.
RMAF release on the leasing arrangement.
Chief Secretary to Government TS Shamsul Azri Abu Bakar had this to say on the leasing deal
=========
PMX LEASE 15 YEARS
PMX LEASE 15 YEARS
PMX LEASE 15 YEARS
RMAF
RMN
MMEA
POLICE
FIRE
RESCUE DEPARTEMENT
PM DEPARTEMENT
PMX has defended the decision to lease the helicopters for the military and other government agencies – RM16.5 billion for 15 years – during the Parliament session on Thursday. Among others he said the government adopted the leasing model to reduce maintenance costs and at the same time improved the operational readiness of the fleet.
DS Anwar Ibrahim did not address the fact that the government will be paying some RM1 billion a year for 15 years for the helicopters. He also said the helicopters selected were based on the specifications and requirements of the agencies themselves.
He also confirmed that the Army will also be part of the leasing programme apart from RMAF,RMN, MMEA, police, Fire and Rescue Department, and the Prime Minister Department. Apart from RMAF 12 and police’s seven helicopters, he did not give the breakdown for the other services and agencies.
=========
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
BABI TOLOL 21 Desember 2024 pukul 07.56
BalasHapusManakala negara 200 Juta lebih penduduk tanpa Pemain Belanda mereka bukan siapa siapa... 🤣🤣🤣
BABI TOLOL 21 Desember 2024 pukul 08.01
Tanpa Pemain Belanda INDIANESIA bukan siapa siapa.... Pssstttt... 200 Juta penduduk woiiii...masa harap Pemain BELANDA... 🤣🤣🤣
____________________
TANPA PEMAIN KETURUNAN INDONESIA BISA MENEWASKAN MALAYSEWA🇲🇾 4-1
😂😂😂😂😂😂😂😂😂😂😂😂..
LUS KASIH BUKTI INDONESIA PAKAI PEMAIN BELANDA seperti :
-VIRGIL VAN DIJK.
-MATTHIJS DE LIGHT.
-RYAN GRAVENBERCH.
-TIJANI REJINDERS.
-CODY GAKPO.
OH YA TOLOL.. INDONESIA PAKAI PEMAIN BELANDA PASTI DI BAN & SANGSI FIFA
Malonn's economy has faced a number of challenges, including:
BalasHapus• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
===================
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
===================
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
NO AMPHIBIOUS NAVAL PLATFORM
BalasHapusSERANGAN AMFIBI = SAMPAN
SERANGAN AMFIBI = SAMPAN
SERANGAN AMFIBI = SAMPAN
MELAKA: 10 Briged (Para) telah melaksanakan latihan serangan amfibi bagi mempamerkan keupayaan melaksanakan operasi tersebut kepada Tim Naziran JPA Semakan Bayaran Insentif Pasukan Aturgerak Cepat, Angkatan Tentera Malon (BIPAC-ATM) ke 10 Bgd (Para) pada 30 Julai 2024
-----
NO MARINIR = LACK AN AMPHIBIOUS NAVAL PLATFORM
DISCUSS LPD BUATAN 1963
DISCUSS AH-1Z
Initially, the Malonn marine corps will lack an amphibious naval platform as the RMN’s only amphibious ship, It is currently in discussions with both France and South Korea over acquiring a landing platform deck (LPD). The U.S. has also offered Malon the LPD USS Denver after it decommissions it in 2014. U.S.-based defense companies are also discussing selling Malon the AH-1Z
------
171 ASSETS = 30 YEARS
108 ARMY
29 AIR FORCE
34 NAVY
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
baharu.
==============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
PUBLIC DEBT = DEFENCE SPENDING
BalasHapusPUBLIC DEBT = DEFENCE SPENDING
PUBLIC DEBT = DEFENCE SPENDING
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
==============
2024 RASIO HUTANG 84,2% DARI GDP
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
==============
2024 HUTANG JATUH TEMPO = The federal government's debt is expected to be fully settled in 2053 if no new loans were to be taken to finance the deficit and to refinance maturing debts from 2024 onwards, said the Finance Ministry (MoF)
----
2023 TIDAK BAYAR HUTANG = “Ini bermakna bayaran khidmat hutang banyak…hanya membayar faedah bukan bayar hutang tertunggak,” kata Anwar lagi
----
2022 HUTANG BAYAR HUTANG 52,4% = Kah Woh menjelaskan pada tahun lalu, kerajaan ada membuat pinjaman yang meningkat sebanyak 11.6 peratus daripada RM194.5 bilion pada tahun sebelumnya. Daripada jumlah itu, beliau berkata 52.4 peratus atau RM113.7 bilion digunakan untuk membayar prinsipal pinjaman matang.
----
2021 HUTANG BAYAR HUTANG 50,4% = Sejumlah RM98.058 bilion atau 50.4 peratus daripada pinjaman baharu berjumlah RM194.555 bilion yang dibuat kerajaan pada tahun lalu digunakan untuk bayaran balik prinsipal pinjaman yang matang.
----
2020 HUTANG BAYAR HUTANG 60% = Jabatan Audit Negara (JAN) bimbang dengan tindakan kerajaan menggunakan hampir 60 peratus pinjaman baharu untuk membayar hutang .
----
2019 HUTANG BAYAR HUTANG 59% = Laporan Ketua Audit Negara mengenai Penyata Kewangan Kerajaan Persekutuan 2018 mendapati sejumlah 59 peratus pinjaman baharu kerajaan dibuat untuk membayar hutang kerajaan terdahulu
----
2018 RASIO HUTANG 80% DARI GDP : OPEN DONASI = Kementerian Keuangan Malon pada hari Rabu membuka rekening donasi supaya masyarakat dapat menyumbang untuk membantu negara membayar utang yang mencapai 1 triliun ringgit (US$ 250,8 miliar) atau 80 persen dari PDB.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
171 ASET USANG 30 TAHUN =
108 TDM
29 TUDM
34 TLDM
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
==============
KEY WORDS =
1. PUBLIC DEBT = DEFENCE SPENDING
2. RATIO DEBT 84,2% TO GDP
3. DEBT TO PAY DEBT
4. 171 COMBAT EQUIPMENT 30 YEARS
Malon's combat equipment has several weaknesses, including:
BalasHapus• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
==============
MENUNGGU 2050 = PV
MENUNGGU 2050 = KAPAL SELAM
MENUNGGU 2050 = MRSS
MENUNGGU 2050 = LCS
MENUNGGU 2050 = LMS
Panglima TLDM Laksamana Tan Sri Mohd Reza Mohd Sany berkata, bilangan kapal itu mungkin akan berubah bergantung kepada keadaan geo-strategik rantau itu yang dinamik.
Dalam temuramah dengan majalah pertahanan berbahasa Inggeris tempatan, Asian Defence Journal (ADJ) keluaran May-Jun tahun ini, beliau juga memaklumkan bilangan jenis-jenis kapal perang yang dirancang dimiliki oleh TLDM dibawah pelan transformasi itu.
“Mengikut Pelan Transformasi 15 ke 5 TLDM, ia dijangka akan memiliki 12 buah kapal Littoral Combat Ship (LCS), tiga buah kapal Multi Role Support Ship (MRSS), 18 buah kapal Littoral Mission Ship (LMS), 18 buah kapal Patrol Vessel (PV) dan empat buah kapal selam menjelang tahun 2050,” kata beliau dalam temuramah itu.
Nampak gaya,impian untuk melihat TLDM menambah bilangan kapal selam dimilikinya daripada dua buah kepada empat buah akan hanya direalisasikan menjelang tahun 2050.
==============
MENUNGGU 2030 = UAV
MENUNGGU 2030 = LMS B2
MENUNGGU 2030 = HELI
MENUNGGU 2030 = MRSS
Perolehan 3 buah LMSB2 itu dilakukan melalui kaedah Government to Government (G2G) dengan negara Turkiye.
RMKe-13 merangkumi tempoh tahun 2026-2030.
“Perolehan bagi baki 3 buah LMS lagi akan dimasukkan di bawah RMKe-13,” ujar beliau.
Selain LMS, TLDM turut merancang perolehan 2 buah kapal Multi Role Support Ship (MRSS), 3 buah kapal Littoral Mission Ship Batch 3, 4 buah helikopter anti kapal selam dan 6 buah Unmanned Aerial Vehicle (UAV).
“Proses perolehan bagi aset-aset baharu ini dijangka berlangsung sehingga 2030. Kesemua perolehan aset TLDM ini dianggarkan
==============
MENUNGGU 2041-2045 = C130J
Diterangkan Utusan Malon, mereka baru bisa mendapatkan C-130 J Super Hercules paling tidak di tahun 2041 hingga 2045.
MENUNGGU 2055 = HAWK :
Kerajaan merancang secara sistematik penggantian pesawat Hawk 108 dan Hawk 208 seperti yang digariskan dalam Pembangunan Keupayaan Tentera Udara Diraja Malon (TUDM) 2055
=========
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
=========
KEY WORDS =
1. THE MOST CHEAPEST OF VARIANT
2. GUNBOAT NAVY
3. DOWNGRADE VERSION
BABI TOLOL 21 Desember 2024 pukul 07.56
BalasHapusManakala negara 200 Juta lebih penduduk tanpa Pemain Belanda mereka bukan siapa siapa... 🤣🤣🤣
BABI TOLOL 21 Desember 2024 pukul 08.01
Tanpa Pemain Belanda INDIANESIA bukan siapa siapa.... Pssstttt... 200 Juta penduduk woiiii...masa harap Pemain BELANDA... 🤣🤣🤣
____________________
TERUS MALAYSEWA🇲🇾 NIH APE...
TIM PBB/UN YA 😏😄👍 PBB TIM
-DECLAN LAMBERT (🇬🇧).
-DANIEL TINGGI (🇬🇧).
-DOMINIC TAN (🇸🇬/🇨🇳).
-STUART WILKIN (🇬🇧).
-ENDRICK DOS SANTOS (🇧🇷).
-SYAMER KUTTY ABBA (🇧🇩).
-EZEQUIEL AGUERO (🇦🇷).
-PAOLO JOSUE (🇧🇷).
-DARREN LOK (🇨🇳/🇬🇧).
-DARYLAL SHAM (🇵🇭).
-FERGUS TIERNEY (🏴).
TIMNAS PBB GUYS... DAN ITUPUN HANCUR DI PIALA CIKI AFF
SALAM INDONESIA (TANPA PEMAIN KETURUNAN) 4-1 VS TIMNAS PBB N BANGLA MALAYSEWA🇲🇾
BABI TOLOL 21 Desember 2024 pukul 07.56
BalasHapusManakala negara 200 Juta lebih penduduk tanpa Pemain Belanda mereka bukan siapa siapa... 🤣🤣🤣
BABI TOLOL 21 Desember 2024 pukul 08.01
Tanpa Pemain Belanda INDIANESIA bukan siapa siapa.... Pssstttt... 200 Juta penduduk woiiii...masa harap Pemain BELANDA... 🤣🤣🤣
____________________
TERUS MALAYSEWA🇲🇾 NIH APE...
TIM PBB/UN YA 😏😄👍 PBB TIM
-DECLAN LAMBERT (🇬🇧).
-DANIEL TINGGI (🇬🇧).
-DOMINIC TAN (🇸🇬/🇨🇳).
-STUART WILKIN (🇬🇧).
-ENDRICK DOS SANTOS (🇧🇷).
-SYAMER KUTTY ABBA (🇧🇩).
-EZEQUIEL AGUERO (🇦🇷).
-PAOLO JOSUE (🇧🇷).
-DARREN LOK (🇨🇳/🇬🇧).
-DARYLAL SHAM (🇵🇭).
-FERGUS TIERNEY (🏴).
TIMNAS PBB GUYS... DAN ITUPUN HANCUR DI PIALA CIKI AFF
SALAM INDONESIA (TANPA PEMAIN KETURUNAN) 4-1 VS TIMNAS PBB N BANGLA MALAYSEWA🇲🇾
Alhamdulilah semakin hampir.... Horeyyy
BalasHapusKapal LCS 1 Milik TLDM “Maharaja Lela” Semakin Hampiri Harbour Acceptance Test (HAT)
https://defencesecurityasia.com/kapal-lcs-1-milik-tldm-maharaja-lela-semakin-hampiri-harbour-acceptance-test-hat/
Malon's combat equipment has several weaknesses, including:
Hapus• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
==============
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....
LCS 2024-2011 = 13 TAHUN OMPONG
HapusLCS 2024-2011 = RM 12.4 BILLION
NO MERIAM
NO RADAR
NO MACHINE
NO MISSILE
LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
-----
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
-----
HIGH COURT =
CRIMINAL BREACH LCS RM 21 MILLION
CRIMINAL BREACH LCS RM 21 MILLION
CRIMINAL BREACH LCS RM 21 MILLION
Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
=========
PMX LEASE 15 YEARS
PMX LEASE 15 YEARS
PMX LEASE 15 YEARS
RMAF
RMN
MMEA
POLICE
FIRE
RESCUE DEPARTEMENT
PM DEPARTEMENT
PMX has defended the decision to lease the helicopters for the military and other government agencies – RM16.5 billion for 15 years – during the Parliament session on Thursday. Among others he said the government adopted the leasing model to reduce maintenance costs and at the same time improved the operational readiness of the fleet.
DS Anwar Ibrahim did not address the fact that the government will be paying some RM1 billion a year for 15 years for the helicopters. He also said the helicopters selected were based on the specifications and requirements of the agencies themselves.
He also confirmed that the Army will also be part of the leasing programme apart from RMAF,RMN, MMEA, police, Fire and Rescue Department, and the Prime Minister Department. Apart from RMAF 12 and police’s seven helicopters, he did not give the breakdown for the other services and agencies.
=========
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
LCS 2024-2011 = 13 TAHUN OMPONG
HapusLCS 2024-2011 = RM 12.4 BILLION
NO MERIAM
NO RADAR
NO MACHINE
NO MISSILE
LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
-----
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
-----
HIGH COURT =
CRIMINAL BREACH LCS RM 21 MILLION
CRIMINAL BREACH LCS RM 21 MILLION
CRIMINAL BREACH LCS RM 21 MILLION
Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
=========
PMX LEASE 15 YEARS
PMX LEASE 15 YEARS
PMX LEASE 15 YEARS
RMAF
RMN
MMEA
POLICE
FIRE
RESCUE DEPARTEMENT
PM DEPARTEMENT
PMX has defended the decision to lease the helicopters for the military and other government agencies – RM16.5 billion for 15 years – during the Parliament session on Thursday. Among others he said the government adopted the leasing model to reduce maintenance costs and at the same time improved the operational readiness of the fleet.
DS Anwar Ibrahim did not address the fact that the government will be paying some RM1 billion a year for 15 years for the helicopters. He also said the helicopters selected were based on the specifications and requirements of the agencies themselves.
He also confirmed that the Army will also be part of the leasing programme apart from RMAF,RMN, MMEA, police, Fire and Rescue Department, and the Prime Minister Department. Apart from RMAF 12 and police’s seven helicopters, he did not give the breakdown for the other services and agencies.
=========
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
TERUS MALAYSEWA🇲🇾 NIH APE...
HapusTIM PBB/UN YA 😏😄👍 PBB TIM
-DECLAN LAMBERT (🇬🇧).
-DANIEL TING (🇬🇧).
-DOMINIC TAN (🇸🇬/🇨🇳).
-STUART WILKIN (🇬🇧).
-ENDRICK DOS SANTOS (🇧🇷).
-SYAMER KUTTY ABBA (🇧🇩).
-EZEQUIEL AGUERO (🇦🇷).
-PAOLO JOSUE (🇧🇷).
-DARREN LOK (🇨🇳/🇬🇧).
-DARYLAL SHAM (🇵🇭).
-FERGUS TIERNEY (🏴).
TIMNAS PBB GUYS... DAN ITUPUN HANCUR DI PIALA CIKI AFF
SALAM INDONESIA (TANPA PEMAIN KETURUNAN) 4-1 VS TIMNAS PBB N BANGLA MALAYSEWA🇲🇾
PRANK TURKI = PRANK YAVUZ
HapusPRANK TURKI = PRANK YAVUZ
PRANK TURKI = PRANK YAVUZ
PRANK MKE : The Malaysian Ministry of Defence has reportedly reviewing its planned acquisition of Yavuz 155mm
-
PRANK FRANCE - PRANK NEXTER : LoI is signed during day three of DSA 2016. 20 units are to be supplied, which include the supporting vehicles, and will boost the Malaysian Army's firepower inventory
-
PRANK INDONESIA - PRANK PT PAL : "The contract with Malaysia’s Navy will be inked next August. There is a possibility that they will order more than one MRSS.
-
PRANK FRANCE - PRANK DASSAULT : Malaysia, which wants to buy up to 18 combat planes in a deal potentially worth more than $2 billion, is now talking to only one supplier, France's Dassault Aviation, about its Rafale jets,
-
PRANK SLOVAKIA - PRANK KDS : Malaysia is expected to conclude a deal with Slovakia for the supply of EVA 155mm
===
PT91 DISCONTINUING THE PRODUCTION According to Hisham, this decision raises questions because the Polish original equipment manufacturer Bumar Laberdy has stopped producing spare parts for Twardy.discontinuing the production of some main MBT components.
2025 F18 STOP PRODUCTION stop production of the F/A-18 Super Hornet in late 2025 after delivering the last of the fighter jets,.
LCS DETAIL DESIGN NOT COMPLETED = Defence Minister secretary-general DS Khaled Nordin told Parliament on March 12 as the detail design has not been completed.
===
SEWA HELI 4 buah Helikopter Leonardo AW 139 yang diperolehi secara sewaan ini adalah untuk kegunaan Tentera Udara Diraja Malaysia (TUDM)
SEWA HELI = Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
SEWA MOTOR The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
SEWA BOAT sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
SEWA HIDROGRAFI tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak sewaan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
SEWA PESAWAT ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malaysian Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39
SEWA 4x4 Pejabat perusahaan mengatakan kepada Janes di pameran bahwa Angkatan Bersenjata Malaysia sedang mencari untuk menyewa Tarantula.
===
RETIRED MIG29 Malaysia recently retired the MiG-29 Fulcrum due to its inability to maintain them.
RETIRED MB339CM the Aermacchi MB-339CM trainer jets that are currently grounded
RETIRED SCORPION Scorpions to be retired. The Army has recommended that it’s fleet of Scorpion light tanks be retired due to the high cost of maintenance and obsolescence issues.
RETIRED CONDOR Condor armoured 4X4 and Sibmas armoured recovery vehicle as retired from service as off January 1, 2023.
RETIRED SIBMAS = Condor armoured 4X4 and Sibmas armoured recovery vehicle as retired from service as off January 1, 2023.
RETIRED V150 = . It was used by the Malaysian Army in Second Malayan Emergency (now retired)
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
HapusLCS = STALLED 13 YEARS
LMS B1 = OMPONG
LMS B2 = GHOIB
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = OMPONG
KEDAH = OMPONG
PERDANA = OMPONG
HANDALAN = OMPONG
JERUNG = OMPONG
-----
DOWNGRADE NO SONAR = NO ASW
DOWNGRADE NO SONAR = NO ASW
DOWNGRADE NO SONAR = NO ASW
STM, in its role as main contractor, will turn to the Turkish defence sector for such equipment as the Combat Management System; the Gun Fire Control System, to be supplied by HAVELSAN; and the 3D Search Radar, Fire Control Radar, IFF, 30mm Gun, ESM and Chaff Decoy System, as well as other electronic sensors, to be supplied by ASELSAN. ROKETSAN will be supplying its ATMACA Surface-to-Surface G/M System.
-----
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
-----
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....
BABI TOLOL 21 Desember 2024 pukul 07.56
BalasHapusManakala negara 200 Juta lebih penduduk tanpa Pemain Belanda mereka bukan siapa siapa... 🤣🤣🤣
BABI TOLOL 21 Desember 2024 pukul 08.01
Tanpa Pemain Belanda INDIANESIA bukan siapa siapa.... Pssstttt... 200 Juta penduduk woiiii...masa harap Pemain BELANDA... 🤣🤣🤣
____________________
TERUS MALAYSEWA🇲🇾 NIH APE...
TIM PBB/UN YA 😏😄👍 PBB TIM
-DECLAN LAMBERT (🇬🇧).
-DANIEL TING (🇬🇧).
-DOMINIC TAN (🇸🇬/🇨🇳).
-STUART WILKIN (🇬🇧).
-ENDRICK DOS SANTOS (🇧🇷).
-SYAMER KUTTY ABBA (🇧🇩).
-EZEQUIEL AGUERO (🇦🇷).
-PAOLO JOSUE (🇧🇷).
-DARREN LOK (🇨🇳/🇬🇧).
-DARYLAL SHAM (🇵🇭).
-FERGUS TIERNEY (🏴).
TIMNAS PBB GUYS... DAN ITUPUN HANCUR DI PIALA CIKI AFF
SALAM INDONESIA (TANPA PEMAIN KETURUNAN) 4-1 VS TIMNAS PBB N BANGLA MALAYSEWA🇲🇾
BABI TOLOL 21 Desember 2024 pukul 07.56
BalasHapusManakala negara 200 Juta lebih penduduk tanpa Pemain Belanda mereka bukan siapa siapa... 🤣🤣🤣
BABI TOLOL 21 Desember 2024 pukul 08.01
Tanpa Pemain Belanda INDIANESIA bukan siapa siapa.... Pssstttt... 200 Juta penduduk woiiii...masa harap Pemain BELANDA... 🤣🤣🤣
____________________
TERUS MALAYSEWA🇲🇾 NIH APE...
TIM PBB/UN YA 😏😄👍 PBB TIM
-DECLAN LAMBERT (🇬🇧).
-DANIEL TING (🇬🇧).
-DOMINIC TAN (🇸🇬/🇨🇳).
-STUART WILKIN (🇬🇧).
-ENDRICK DOS SANTOS (🇧🇷).
-SYAMER KUTTY ABBA (🇧🇩).
-EZEQUIEL AGUERO (🇦🇷).
-PAOLO JOSUE (🇧🇷).
-DARREN LOK (🇨🇳/🇬🇧).
-DARYLAL SHAM (🇵🇭).
-FERGUS TIERNEY (🏴).
TIMNAS PBB GUYS... DAN ITUPUN HANCUR DI PIALA CIKI AFF
SALAM INDONESIA (TANPA PEMAIN KETURUNAN) 4-1 VS TIMNAS PBB N BANGLA MALAYSEWA🇲🇾
LCS 2024-2011 = 13 TAHUN OMPONG
BalasHapusLCS 2024-2011 = RM 12.4 BILLION
NO MERIAM
NO RADAR
NO MACHINE
NO MISSILE
LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
-----
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
-----
HIGH COURT =
CRIMINAL BREACH LCS RM 21 MILLION
CRIMINAL BREACH LCS RM 21 MILLION
CRIMINAL BREACH LCS RM 21 MILLION
Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
=========
PMX LEASE 15 YEARS
PMX LEASE 15 YEARS
PMX LEASE 15 YEARS
RMAF
RMN
MMEA
POLICE
FIRE
RESCUE DEPARTEMENT
PM DEPARTEMENT
PMX has defended the decision to lease the helicopters for the military and other government agencies – RM16.5 billion for 15 years – during the Parliament session on Thursday. Among others he said the government adopted the leasing model to reduce maintenance costs and at the same time improved the operational readiness of the fleet.
DS Anwar Ibrahim did not address the fact that the government will be paying some RM1 billion a year for 15 years for the helicopters. He also said the helicopters selected were based on the specifications and requirements of the agencies themselves.
He also confirmed that the Army will also be part of the leasing programme apart from RMAF,RMN, MMEA, police, Fire and Rescue Department, and the Prime Minister Department. Apart from RMAF 12 and police’s seven helicopters, he did not give the breakdown for the other services and agencies.
=========
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
BABI TOLOL 21 Desember 2024 pukul 07.56
BalasHapusManakala negara 200 Juta lebih penduduk tanpa Pemain Belanda mereka bukan siapa siapa... 🤣🤣🤣
BABI TOLOL 21 Desember 2024 pukul 08.01
Tanpa Pemain Belanda INDIANESIA bukan siapa siapa.... Pssstttt... 200 Juta penduduk woiiii...masa harap Pemain BELANDA... 🤣🤣🤣
____________________
TERUS MALAYSEWA🇲🇾 NIH APE...
TIM PBB/UN YA 😏😄👍 PBB TIM
-DECLAN LAMBERT (🇬🇧).
-DANIEL TING (🇬🇧).
-DOMINIC TAN (🇸🇬/🇨🇳).
-STUART WILKIN (🇬🇧).
-ENDRICK DOS SANTOS (🇧🇷).
-SYAMER KUTTY ABBA (🇧🇩).
-EZEQUIEL AGUERO (🇦🇷).
-PAOLO JOSUE (🇧🇷).
-DARREN LOK (🇨🇳/🇬🇧).
-DARYLAL SHAM (🇵🇭).
-FERGUS TIERNEY (🏴).
TIMNAS PBB GUYS... DAN ITUPUN HANCUR DI PIALA CIKI AFF
SALAM INDONESIA (TANPA PEMAIN KETURUNAN) 4-1 VS TIMNAS PBB N BANGLA MALAYSEWA🇲🇾
NO TUG BOAT = Abdul Aziz also said he wanted the navy’s ships to use tug boats whenever they leave or enter ports to ensure that the grazing incidents involving KD Kelantan and KD Mahawangsa at the Lumut Naval Base not be repeated.....
BalasHapus-
PRANK TURKI - PRANK MKE : The Malaysian Ministry of Defence has reportedly reviewing its planned acquisition of Yavuz 155mm
-
PRANK FRANCE - PRANK NEXTER : LoI is signed during day three of DSA 2016. 20 units are to be supplied, which include the supporting vehicles, and will boost the Malaysian Army's firepower inventory
-
PRANK INDONESIA - PRANK PT PAL : "The contract with Malaysia’s Navy will be inked next August. There is a possibility that they will order more than one MRSS.
-
PRANK FRANCE - PRANK DASSAULT : Malaysia, which wants to buy up to 18 combat planes in a deal potentially worth more than $2 billion, is now talking to only one supplier, France's Dassault Aviation, about its Rafale jets,
-
PRANK SLOVAKIA - PRANK KDS : Malaysia is expected to conclude a deal with Slovakia for the supply of EVA 155mm
===
PT91 DISCONTINUING THE PRODUCTION According to Hisham, this decision raises questions because the Polish original equipment manufacturer Bumar Laberdy has stopped producing spare parts for Twardy.discontinuing the production of some main MBT components.
2025 F18 STOP PRODUCTION stop production of the F/A-18 Super Hornet in late 2025 after delivering the last of the fighter jets,.
LCS DETAIL DESIGN NOT COMPLETED = Defence Minister secretary-general DS Khaled Nordin told Parliament on March 12 as the detail design has not been completed.
===
SEWA HELI 4 buah Helikopter Leonardo AW 139 yang diperolehi secara sewaan ini adalah untuk kegunaan Tentera Udara Diraja Malaysia (TUDM)
SEWA HELI = Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
SEWA MOTOR The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
SEWA BOAT sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
SEWA HIDROGRAFI tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak sewaan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
SEWA PESAWAT ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malaysian Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39
SEWA 4x4 Pejabat perusahaan mengatakan kepada Janes di pameran bahwa Angkatan Bersenjata Malaysia sedang mencari untuk menyewa Tarantula.
===
RETIRED MIG29 Malaysia recently retired the MiG-29 Fulcrum due to its inability to maintain them.
RETIRED MB339CM the Aermacchi MB-339CM trainer jets that are currently grounded
RETIRED SCORPION Scorpions to be retired. The Army has recommended that it’s fleet of Scorpion light tanks be retired due to the high cost of maintenance and obsolescence issues.
RETIRED CONDOR Condor armoured 4X4 and Sibmas armoured recovery vehicle as retired from service as off January 1, 2023.
RETIRED SIBMAS = Condor armoured 4X4 and Sibmas armoured recovery vehicle as retired from service as off January 1, 2023.
RETIRED V150 = . It was used by the Malaysian Army in Second Malayan Emergency (now retired)
Alhamdulilah semakin hampir.... Horeyyy
BalasHapusKapal LCS 1 Milik TLDM “Maharaja Lela” Semakin Hampiri Harbour Acceptance Test (HAT)
https://defencesecurityasia.com/kapal-lcs-1-milik-tldm-maharaja-lela-semakin-hampiri-harbour-acceptance-test-hat/
10 PEMASOK ALAT MILITER MALON =
Hapus1. AMERIKA SERIKAT
2. RUSIA
3. TIONGKOK (CINA)
4. TURKI
5. UNI EROPA
6. PERANCIS
7. INGGRIS
8. JERMAN
9. INDONESIA
10. POLANDIA
-----
SATU-SATUNYA DI ASEAN
RELAX EKSPOR MRSS UEA The United Arab Emirates (UAE) anNOunced it had awarded the Indonesian shipyard PT PAL an AED1.5 billion (USD408.32 million) contract to supply a “multimission vessel” during the IDEX 2023 show being held in Abu Dhabi from 20 to 24 February.
-----
SATU-SATUNYA DI ASEAN
RELAX EKSPOR B2 SSV FILIPINA Dipercayakannya PT PAL Indonesia dalam pengadaan 2 (dua) unit kapal perang jenis Landing Dock oleh Angkatan Laut Filipina, karena kepuasan Pemerintah Filipina dan Angkatan Laut Filipina atas pengoperasian 2 unit Landing Dock atau Strategic Sealift Vessel (SSV) yang telah diserahterimakan oleh PAL beberapa tahun lalu.
-----
SATU-SATUNYA DI ASEAN
RELAX BUILD FRIGAT On August 25, the keel laying ceremony for the first of two Red White frigates was held at Indonesian state-owned shipbuilder PT PAL Indonesia’s facility in Surabaya City, East Java. Based on Babcock's Arrowhead 140 design, it is said that with a 140-metre length and a displacement of 5,996 tons, the Red White frigate will be the largest and most advanced surface combatant ever constructed in Indonesia.
-----
SATU_SATUNYA DI ASEAN
INDUSTRI PENERBANGAN
PT Dirgantara Indonesia (atau biasa disingkat menjadi PTDI) adalah produsen pesawat terbang pertama dan satu-satunya di Indonesia dan di wilayah Asia Tenggara. Dirgantara Indonesia tidak hanya memproduksi berbagai jenis pesawat terbang.
-----
SATU-SATUNYA DI ASEAN
PRODUKSI TANK MEDIUM
Indonesia currently is the only country in Southeast Asia that produces its own combat tanks. This tank was made Pindad, an Indonesian state- owned military equipment manufacturing company.
===========
===========
LCS 2024-2011 = 13 TAHUN OMPONG
LCS 2024-2011 = RM 12.4 BILLION
NO MERIAM
NO RADAR
NO MACHINE
NO MISSILE
LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
-----
PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
LCS = STALLED 13 YEARS
LMS B1 = GUNBOAT NO MISSILE
LMS B2 = DOWNGRADE HISAR OPV
LEKIU = EXO B2 EXPIRED
KASTURI = EXO B2 EXPIRED
LAKSAMANA = GUNBOAT NO MISSILE
KEDAH = GUNBOAT NO MISSILE
PERDANA = GUNBOAT NO MISSILE
HANDALAN = GUNBOAT NO MISSILE
JERUNG = GUNBOAT NO MISSILE
-----
2024 BARTER = MINTA (NGEMIS) DIPERCEPAT
2024 BARTER = MINTA (NGEMIS) DIPERCEPAT
2024 BARTER = MINTA (NGEMIS) DIPERCEPAT
50% PAYMENT = BARTER PALM OIL
50% PAYMENT = BARTER PALM OIL
50% PAYMENT = BARTER PALM OIL
A $919 million contract was signed between KAI and the Malonnn Ministry of Defense for the supply of the FA-50 light combat aircraft. According to the contract, deliveries of the aircraft should begin in 2026.
On the other hand, South Korea aims to sell another 18 FA-50s to Malonn in the future. Malonn announced that at least half of the payment would be made in palm
-----
2024 NGEMIS 4x F18 BEKAS.....
2024 NGEMIS 4x F18 BEKAS.....
2024 NGEMIS 4x F18 BEKAS.....
Malon masih lagi menunggu keputusan daripada kerajaan Kuwait tentang hasratnya untuk memperolehi pesawat-pesawat pejuang F/A-18C/D HORNET MALONN milik tentera udara negara Timur Tengah itu
NO CONTRACT ATMACA
HapusWhile the Malaysian Navy continues to work on the choice of the anti-ship missile system of LMS, Naval News has learned that the Atmaca missile, developed by Roketsan, has emerged as a leading contender.
-----
PRANK KS-1A CHINA
PRANK KS-1A CHINA
PRANK KS-1A CHINA
Malonn has agreed in principle to purchase medium-range missiles from China, which in return will transfer technology on very short-range air defence to the country, Deputy Prime Minister Najib Razak said Tuesday.
The procurement of the surface-to-air missiles was part of the armed forces modernisation program and would be made under the Ninth Malonn Plan from 2006-2009, he was quoted as saying by Bernama news agency.
CNPMIEC president Wang Bingyan said China had also offered to conclude the KS-1A transaction on flexible payment terms, including counter-trade, barter and deferred payments.
------
VSHORAD = LEASE
VSHORAD = LEASE
VSHORAD = LEASE
The procurement division of the Defence Ministry has issued a tender for the supply, delivery, and commissioning for eight Very Short-Range Air Defence (VSHORAD) ground-based air defence system for the Army. The VSHORAD system is listed as the Army’s main asset and equipment for 2024.
The 23-day tender published on November 20 closes on December 19. As usual the public specifications for the tender are limited.
------
DOWNGRADE NO SONAR = NO ASW
DOWNGRADE NO SONAR = NO ASW
DOWNGRADE NO SONAR = NO ASW
STM, in its role as main contractor, will turn to the Turkish defence sector for such equipment as the Combat Management System; the Gun Fire Control System, to be supplied by HAVELSAN; and the 3D Search Radar, Fire Control Radar, IFF, 30mm Gun, ESM and Chaff Decoy System, as well as other electronic sensors, to be supplied by ASELSAN. ROKETSAN will be supplying its ATMACA Surface-to-Surface G/M System.
------
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
------
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
Malon's combat equipment has several weaknesses, including:
Hapus• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
==============
The Malonnn Armed Forces (MAF) faces a number of challenges, including:
• Logistics
A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
• Budgeting
Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
• Personnel
The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
• Procurement
The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
• Political interference
Political interference and corruption are undermining combat readiness.
• Territorial disputes
Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
• Transboundary haze
Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Technological obsolescence
Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
==============
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
Malon's household debt-to-GDP ratio
HapusDecember 2023 = 84.2%
December 2020 = 93.1% (all-time high)
December 2008 = 60.4% (record low)
Some factors that have contributed to the growth in household debt include:
• Government and private sector home ownership incentives
• Sales and service tax (SST) incentives for the purchase of motor vehicles between 2020 and 2022
=========
2023 : SETTLED IN 2053 = IF NO NEW LOANS
2023 : SETTLED IN 2053 = IF NO NEW LOANS
2023 : SETTLED IN 2053 = IF NO NEW LOANS
The federal government's debt is expected to be fully settled in 2053 if no new loans were to be taken to finance the deficit and to refinance maturing debts from 2024 onwards, said the Finance Ministry (MoF).
=========
2024 DEBT TO GDP 84,2% DARI GDP = NEW LOANS
2023 DEBT RM 1.53 TRILLION = NEW LOANS
2022 DEBT RM 1.45 TRILLION = NEW LOANS
2021 DEBT RM 1.38 TRILLION = NEW LOANS
2020 DEBT RM 1.32 TRILLION = NEW LOANS
2019 DEBT RM 1.25 TRILLION = NEW LOANS
The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023. In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018). “The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
=========
2024 OVER LIMIT DEBT 65,6%
Malon Government debt accounted for 65.6 % of the country's Nominal GDP in Mar 2024, compared with the ratio of 64.3 % in the previous quarter. Malon government debt to GDP ratio data is updated quarterly, available from Dec 2010 to Mar 2024.
=========
2024 HUTANG JATUH TEMPO = The federal government's debt is expected to be fully settled in 2053 if no new loans were to be taken to finance the deficit and to refinance maturing debts from 2024 onwards, said the Finance Ministry (MoF)
----
2023 TIDAK BAYAR HUTANG = “Ini bermakna bayaran khidmat hutang banyak…hanya membayar faedah bukan bayar hutang tertunggak,” kata Anwar lagi
----
2022 HUTANG BAYAR HUTANG 52,4% = Kah Woh menjelaskan pada tahun lalu, kerajaan ada membuat pinjaman yang meningkat sebanyak 11.6 peratus daripada RM194.5 bilion pada tahun sebelumnya. Daripada jumlah itu, beliau berkata 52.4 peratus atau RM113.7 bilion digunakan untuk membayar prinsipal pinjaman matang.
----
2021 HUTANG BAYAR HUTANG 50,4% = Sejumlah RM98.058 bilion atau 50.4 peratus daripada pinjaman baharu berjumlah RM194.555 bilion yang dibuat kerajaan pada tahun lalu digunakan untuk bayaran balik prinsipal pinjaman yang matang.
----
2020 HUTANG BAYAR HUTANG 60% = Jabatan Audit Negara (JAN) bimbang dengan tindakan kerajaan menggunakan hampir 60 peratus pinjaman baharu untuk membayar hutang .
----
2019 HUTANG BAYAR HUTANG 59% = Laporan Ketua Audit Negara mengenai Penyata Kewangan Kerajaan Persekutuan 2018 mendapati sejumlah 59 peratus pinjaman baharu kerajaan dibuat untuk membayar hutang kerajaan terdahulu
----
2018 RASIO HUTANG 80% DARI GDP : OPEN DONASI = Kementerian Keuangan Malon pada hari Rabu membuka rekening donasi supaya masyarakat dapat menyumbang untuk membantu negara membayar utang yang mencapai 1 triliun ringgit (US$ 250,8 miliar) atau 80 persen dari PDB.
==============
SCANDALS = Now and then, by exception, scandals spill out into the public domain, like Bumiputera Malon Finance 1982, Bank Negara’s FX losses in the 1980s and 1990s, the Scorpene submarines of 2002, the National Feedlot scandal – “cowgate” – of 2012, 1MDB, and the latest LCS naval procurement. But these are just the tip of the iceberg of systematic pilferage. It has become the institutional norm
Malonn's defense budget is considered not in accordance with its objectives. Some of the things to consider are:
Hapus• The allocation of salaries and allowances for 2024 reaches 40% of the total defense budget.
• The allocation for procurement has increased slightly from 2023, but there may be no real benefit due to the depreciation of the ringgit.
• The Ministry of Finance assesses the availability of funds for programs and procurement requirements in private.
• Hundreds of Malonnn military assets have exceeded the 30-year service limit.
==========
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
==========
Malonn has several issues related to assault rifles, including:
• Smuggling
Malonn's long and porous borders make it difficult to stop the smuggling of firearms and ammunition into the country. The border between Malonn and Thailand is particularly vulnerable to gun smuggling.
• Outdated inventory
The Malonnn Armed Forces (MAF) has outdated inventory stock, which can be a stumbling block for ongoing operations.
• Wary of Russian-made weapons
Malonn is becoming wary of its Russian-made weapons
==========
Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
• Krisis politik
Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
3. Dampak politik pandemi COVID-19
4. Proklamasi Darurat 2021
5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
• Krisis beras
Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
• Krisis mata uang
Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
1. Kinerja ekspor yang buruk
2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
3. Kekhawatiran geopolitik
4. Ketidakpastian mengenai prospek ekonomi China
Malon's combat equipment has several weaknesses, including:
BalasHapus• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
==============
The Malonnn Armed Forces (MAF) faces a number of challenges, including:
• Logistics
A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
• Budgeting
Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
• Personnel
The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
• Procurement
The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
• Political interference
Political interference and corruption are undermining combat readiness.
• Territorial disputes
Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
• Transboundary haze
Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Technological obsolescence
Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
==============
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
LCS 1...Persiapan untuk fasa Harbour Acceptance Test (HAT)...MANTAP...
BalasHapushttps://www.youtube.com/watch?v=VssVxTlXQ_w
HapusWESTSTAR GETTING MONEY = MALON GETTING JUNK
WESTSTAR GETTING MONEY = MALON GETTING JUNK
WESTSTAR GETTING MONEY = MALON GETTING JUNK
“Kaedah ini juga dianggap inovatif kerana berpotensi untuk menjimatkan kos jangka panjang tanpa menjejaskan kualiti mahupun fungsi aset yang diperoleh.”
As of now, many publicly available evidence shows that the above is not true until is proven. We are just wasting more money long term. We need an audit to compare the total leasing cost and overall cost of outright buying and operating for 15 years
So Weststar is getting richer and richer……
==========
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==========
1. HUTANG 84.2% DARI GDP
1. HUTANG 84.2% DARI GDP
2. HUTANG NEGARA RM 1.5 TRLLIUN
3. HUTANG 1MDB RM 18.2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST SHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. TUDM SEWA 12 AW149
62. TUDM SEWA 4 AW139
63. TUDM SEWA 5 EC120B
64. TLDM SEWA 2 AW159
65. TDM SEWA 4 UH-60A
67. TDM SEWA 12 AW149
68. BOMBA SEWA 4 AW139
69. MMEA SEWA 2 AW159
70. POLIS SEWA 7 BELL429
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
NATURALISASI = TERSINGKIR PIALA CIKI-CIKI
HapusNATURALISASI = TERSINGKIR PIALA CIKI-CIKI
NATURALISASI = TERSINGKIR PIALA CIKI-CIKI
Timnas Malon tersingkir dari Piala AFF 2024 atau ASEAN Championship usai ditahan Singapura 0-0 di Stadion Bukit Jalil, Jumat (20/12). Malon gagal ke semifinal Piala AFF 2024 usai menempati peringkat ketiga klasemen Grup A.
==============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
==============
Malonn's economy has faced a number of challenges, including:
• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
CHEAPEST PLATFORM VARIANT :
Hapus-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malaysia to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malaysian service, and will NOt be equipped with any weaponry.
------
1. BARTER SAWIT 10 LCA 8 FLIT DOWNGRADE
2. P-72M CHEAPEST AIRCRAFT
3. ANKA DOWNGRADE NO WEAPONARY
4. LMS B2 Ada-Class DOWNGRADE HISAR OPV
6. Dibayar PBB/UN = 4x4 Ejder Yalçin
7. LCS dibayar 6 jadi NOL DELAYED
8, OPV dibayar 3 jadi 1 DELAYED
===================
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
===================
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
WEAKEST MILITARY
HapusWEAKEST MILITARY
WEAKEST MILITARY
the Malaysian military is today the region’s weakest. It is riddled with corruption, poor planning, and interference by political leaders in procurement, no longer a potent force even in managing low-level intensity conflict at a time when tensions in the South China Sea are higher than they have been since the days of the Vietnam War.
During the royal address to Parliament in July 2018, the defense minister revealed that only four of Malaysia’s 28 Russian jet fighters could fly. The 42-year-old MiG-29N – two of which crashed in 1998 and 2005, respectively –was decommissioned in 2017 owing to high maintenance costs of RM262 million a year. The Russian jets were bought via an offset program in which palm oil was bartered for fighter jets. In 2003, Malaysia purchased 18 Flankers, introduced in 1985, from Russia for US$900 million (RM3.67 billion), also involving palm oil trade. The offset deal with Russia led to the country’s first space program, with Malaysia’s first astronaut to the International Space Station in 2007. By contrast, Singapore has purchased at least 12 F35B stealth jets from the US, with 100-mile over-the-horizon shoot-down capability. The People’s Liberation Army Air Force is flying the J-20 twin-jet all-weather stealth fighter aircraft developed by the Chengdu Aerospace Corporation. Both would reduce Malaysia’s aging jets to scrap metal in seconds.
In 2006, Malaysia acquired the Jernas system from the UK, including nine missile launchers (later increased to 15), three radars, Rapier Mk2 missiles, training, and support. According to a reliable source, this purchase was made against the recommendation of the RMAF which wanted a more versatile anti-aircraft system from Russia and France.
Admiral Reza Sany, the previous Navy Chief, before retiring earlier this year, openly complained of “dismal annual defense expenditure,” taking the government to task for the Navy’s dismal budget.
Due to low and erratic allocations, the RMN is saddled with old ships, with 58 percent of ships in service much older than the Royal Thai Navy’s HTMS Sukhothai, which sank on December 18, 2022. That includes, according to one source, the Kasturi-class Corvette that entered service in 1984 and the Laksamana Corvette class built in the early 1980s, the Perdana-class gunboat and the Handalan and Jerung class commissioned in the 1970s – at least 40 years ago. The KD Sri Perlis and KD SRI Johor gunboats commissioned in the late 1960s – even older – are still in service.
Admiral Reza made no mention of the scandalous fate of the littoral combat ships (LCS) which have not been delivered although the government has paid billions for them. During investigations into the scandal, it was revealed by Admiral Aziz Jaafar, a former Chief of the Navy, that he personally wrote letters complaining over the delay and cost overruns. Aziz’s observations and advice from other military professionals have been ignored. The scandal is a case in point where allocated funds have been hijacked.
The military likely had no idea they were being used by politicians and their cronies to purchase equipment, especially those that do not meet their technical and operational specifications. Whether some of these officers were also greased along the way by the politicians is something else. It is strange that no one in the military learned the lessons of the Scorpene submarine scandal that preceded the CLS debacle by a decade. Malaysia bought two Scorpene-class submarines from France in 2002 when Najib Razak was defense minister and later PM. A two-ringgit Malaysian company owned by a Najib’s crony received a €114 million “commission” for the purchase. The rest is history.
Malonn's armed forces procurement faces several weaknesses, including:
Hapus1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
------
1. BARTER SAWIT 10 LCA 8 FLIT DOWNGRADE
2. P-72M CHEAPEST AIRCRAFT
3. ANKA DOWNGRADE NO WEAPONARY
4. LMS B2 Ada-Class DOWNGRADE HISAR OPV
6. Dibayar PBB/UN = 4x4 Ejder Yalçin
7. LCS dibayar 6 jadi NOL DELAYED
8, OPV dibayar 3 jadi 1 DELAYED
==================
==================
1. real contract and delivery five units C130J Hercules
2. real contract and delivery two unit Frankethal class Countermine vessels (Pulau Fani class)
3. real contract and delivery four units KCR 60 Fast missiles boats PT PAL
4. real contract and delivery 9 units Bell 412 EPI
5. real contract and delivery 8 additional H225 M
6. real contract and delivery 2 units Bell 429 Global Ranger
7. real contract and delivery 18 Medium weight tank Harimau
8. real contract and delivery 22 Pandur II IFV
9. real contract and delivery two unit Hospital Ships
10. real contract and delivery one unit Command and control variant C295
11. real contract and delivery one unit CN235 MPA
12. real contract and delivery 7 Badak FSV, 26 ANOa apc and 10 additional Komodo recce vehicles in 2022
13. real contract and delivery 4 AS 550 Fennec and 8 AS565 MBE, in 2024
14. real contract and delivery five NC212i in 2023
15. real contract and delivery one Leonardo RAT 31 DL/M
16. real contract and delivery five C130H ordered from Australia in 2013 (finished in 2020) after received Grant of 4 C130H
17. real contract and delivery 9 Teluk Bintuni class LST
18. real contract and delivery six CH4B UCAV ordered in 2019
19. real contract t and process building of Abeking & Rasmussen design ocean Hydrography ship
20. real contract and process building two AH140 AAW Frigate
21. real contract and process building two OPV 90 ASW patrol vessels
22. real contract and process building 42 Dassault Rafale F4 fighter
23. real contract and process building two A400M heavy cargo aircraft
24. real contract and delivery M3 Amphibious bridging system
25. real contract and delivery 3 KT1 Wong Bee ordered in 2018 along with radar and spares for T/A50
26. real contract and process building 13 GM 403 GCI radar from Thales
27. real contract and process building 12 ANKA S UCAV
28. real contract and process building additional CH4B UCAV
29. real contract and delivery Slingshot Satcom system
30. real contract and delivery Falcon 8X aircraft
31. real contract and process Thales Alenia earth observation satelite
32. real contract and process 22 S70M Blackhawk
33. real contract and process 6 N219 aircraft
34. real contract and process 3 CN235 for Army
35. real contract and process 2 PPA patrol Frigate
36. real contract and process 2 Scorpene Subs
37. real contract and process Khan Short Range ballistic missiles from Turki
38. real contract and process Trisula Air defense system
39. real contract and process 6 T50i aircraft
40. real contract and delivery Oiler and replenishment ship
41. real contract and delivery several Tug Harbor ships
42. real contract and process Submarine rescue vessels and system
43. real contract and delivery two Large LCU for army
44. real contract and process 45 Atmaca
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
Malonn's armed forces procurement faces several weaknesses, including:
Hapus1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==========
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
==========
Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
• Krisis politik
Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
3. Dampak politik pandemi COVID-19
4. Proklamasi Darurat 2021
5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
• Krisis beras
Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
• Krisis mata uang
Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
1. Kinerja ekspor yang buruk
2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
3. Kekhawatiran geopolitik
4. Ketidakpastian mengenai prospek ekonomi China
Sudah MEMBUAL akan lolos tau tau tersingkir... HAHAHAHAHA😂😂😂
BalasHapusJumat (20/12/2024) malam menjadi malam yang berat bagi Timnas MALAYDESH. KUCING KUNING dipastikan tersingkir di Piala AFF 2024...HAHAHAHAHA
MALON Di permalukan bekas jajahannya.....Di kandang sendiri... HAHAHAHA😂😂😂😂😂😂
Sudah MEMBUAL akan lolos tau tau tersingkir... HAHAHAHAHA😂😂😂
BalasHapusJumat (20/12/2024) malam menjadi malam yang berat bagi Timnas MALAYDESH. KUCING KUNING dipastikan tersingkir di Piala AFF 2024...HAHAHAHAHA
MALON Di permalukan bekas jajahannya.....Di kandang sendiri... HAHAHAHA😂😂😂😂😂😂
9 naturalisasi pun tak dapat buat timnas MALAYDESH menang tau tau malah TERSINGKIR... HAHAHAHAHA😂😂😂
BalasHapusJumat (20/12/2024) malam menjadi malam yang berat bagi Timnas MALAYDESH. KUCING KUNING dipastikan tersingkir di Piala AFF 2024...HAHAHAHAHA
MALON Di permalukan bekas jajahannya.....Di kandang sendiri... HAHAHAHA😂😂😂😂😂😂
NATURALISASI = TERSINGKIR PIALA CIKI-CIKI
BalasHapusNATURALISASI = TERSINGKIR PIALA CIKI-CIKI
NATURALISASI = TERSINGKIR PIALA CIKI-CIKI
Timnas Malon tersingkir dari Piala AFF 2024 atau ASEAN Championship usai ditahan Singapura 0-0 di Stadion Bukit Jalil, Jumat (20/12). Malon gagal ke semifinal Piala AFF 2024 usai menempati peringkat ketiga klasemen Grup A.
==============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
==============
Malonn's economy has faced a number of challenges, including:
• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
4 buah BOT TEMPUR BARU lagi guys....HOREYYYY
BalasHapushttps://www.facebook.com/photo?fbid=895852822740262&set=pcb.895858192739725
Malonn's armed forces procurement faces several weaknesses, including:
Hapus1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==========
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
==========
Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
• Krisis politik
Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
3. Dampak politik pandemi COVID-19
4. Proklamasi Darurat 2021
5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
• Krisis beras
Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
• Krisis mata uang
Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
1. Kinerja ekspor yang buruk
2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
3. Kekhawatiran geopolitik
4. Ketidakpastian mengenai prospek ekonomi China
4 buah BOT TEMPUR BARU lagi guys....HOREYYYY
BalasHapushttps://www.facebook.com/photo?fbid=895852822740262&set=pcb.895858192739725
Buat angkut KELAPA SAWIT dan pemain timnas malaydesh tuh kan.. Wkwkwkwkw
HapusMalonn's armed forces procurement faces several weaknesses, including:
Hapus1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==========
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
==========
Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
• Krisis politik
Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
3. Dampak politik pandemi COVID-19
4. Proklamasi Darurat 2021
5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
• Krisis beras
Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
• Krisis mata uang
Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
1. Kinerja ekspor yang buruk
2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
3. Kekhawatiran geopolitik
4. Ketidakpastian mengenai prospek ekonomi China
Timnas MALAYDESH tersingkir eh fansnya NGAMUK-NGAMUK... HAHAHAHAHA😭😭😭😭
BalasHapusHarimaunya jadi KUCING... Meong.. Meong.. Meong.. Meong... Wkwkwkwkwjwj🐈🐈🐈🐈
https://www.viva.co.id/berita/politik/1636078-prabowo-sifat-bangsa-indonesia-kadang-suka-bohong-dan-nipu
BalasHapusPrabowo lantas melanjutkan dengan menilai sifat bangsa Indonesia kadang suka melakukan penipuan hingga berbohong. Menurutnya, bangsa Indonesia kerap merasa senang jika aksi penipuan itu berhasil dilakukan.
"Maaf, sifat bangsa Indonesia ini memang kadang-kadang suka bohong, suka nipu. Kalau berhasil nipu, senang," ungkapnya.
Salut Bapak Presiden kerana jujur tentang sifat bangsa KONOHA.
😂😂😂😂😂😂😂😂😂😂😂😂
Malonn's defense budget is considered not in accordance with its objectives. Some of the things to consider are:
Hapus• The allocation of salaries and allowances for 2024 reaches 40% of the total defense budget.
• The allocation for procurement has increased slightly from 2023, but there may be no real benefit due to the depreciation of the ringgit.
• The Ministry of Finance assesses the availability of funds for programs and procurement requirements in private.
• Hundreds of Malonnn military assets have exceeded the 30-year service limit.
==========
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
==========
Malonn has several issues related to assault rifles, including:
• Smuggling
Malonn's long and porous borders make it difficult to stop the smuggling of firearms and ammunition into the country. The border between Malonn and Thailand is particularly vulnerable to gun smuggling.
• Outdated inventory
The Malonnn Armed Forces (MAF) has outdated inventory stock, which can be a stumbling block for ongoing operations.
• Wary of Russian-made weapons
Malonn is becoming wary of its Russian-made weapons
==========
Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
• Krisis politik
Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
3. Dampak politik pandemi COVID-19
4. Proklamasi Darurat 2021
5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
• Krisis beras
Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
• Krisis mata uang
Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
1. Kinerja ekspor yang buruk
2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
3. Kekhawatiran geopolitik
4. Ketidakpastian mengenai prospek ekonomi China
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
Hapus•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
==============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
==============
Malonn's economy has faced a number of challenges, including:
• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
==============
KEY WORDS =
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
Hapus•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
----
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
----
SEWA HELI 28 = KONGSI 5
SEWA HELI 28 = KONGSI 5
SEWA HELI 28 = KONGSI 5
Dengan termeterainya kontrak tersebut, sebanyak 12 buah akan digunakan Tentera Udara Diraja Malon (TUDM); Polis Diraja Malon (PDRM) (7); Tentera Laut Diraja Malon (TLDM) (2); Jabatan Bomba dan Penyelamat (JPBM) (2) dan Agensi Penguatkuasaan Maritim Malon (Maritim Malon) (4).
----
LIGHT TWIN HELO = GAGAL
LIGHT TWIN HELO = GAGAL
LIGHT TWIN HELO = GAGAL
The Procurement division of the Home Ministry issued two separate tenders for the supply and delivery of seven twin-engine utility and transport aircraft and five light twin engine helicopters for the police’s Air Wing. the tender for the five twin-engine helicopters has been canceled. Checks on the Eperolehan website today confirmed the cancelation
----
SEWA BEKAS = 15 TAHUN
15 TAHUN = BELI RONGSOK
Semua dikendalikan oleh syarikat yang melakukan pajakan ini dan pajakan ini adalah pajakan To-Own bermakna selepas 15 tahun, kerajaan diberikan pilihan untuk membeli kesemua 28 helikopter itu pada harga nominal RM1 sahaja.
----
BLACKHAWK = GAGAL
BLACKHAWK = GAGAL
BLACKHAWK = GAGAL
Menteri Pertahanan, Datuk Seri Mohamed Khaled Nordin berkata, ia susulan pelanjutan kontrak oleh syarikat itu pada Oktober lalu selepas gagal mematuhi kontrak penyerahannya.
"Oktober sudah berakhir. Tiada apa-apa (Black Hawks), tiada apa-apa.
---
SEWA 53 HELI BEKAS
SEWA 53 HELI BEKAS
SEWA 53 HELI BEKAS
TUDM SEWA =
12 AW149
4 AW139
5 EC120B
TLDM SEWA =
2 AW159
TDM SEWA =
4 UH-60A
12 AW149
BOMBA SEWA =
4 AW139
POLIS SEWA =
7 BELL429
MMEA SEWA =
2 AW159
JABATAN PM SEWA =
1 AW189
https://www.facebook.com/share/p/gnmpDnsCCTn8tx6b/
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
KEY WORDS =
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
WESTSTAR GETTING RICH = MALON GETTING POOR
HapusWESTSTAR GETTING RICH = MALON GETTING POOR
WESTSTAR GETTING RICH = MALON GETTING POOR
“Kaedah ini juga dianggap inovatif kerana berpotensi untuk menjimatkan kos jangka panjang tanpa menjejaskan kualiti mahupun fungsi aset yang diperoleh.”
As of now, many publicly available evidence shows that the above is not true until is proven. We are just wasting more money long term. We need an audit to compare the total leasing cost and overall cost of outright buying and operating for 15 years
So Weststar is getting richer and richer……
=========
COMMISSION FOR THE PURCHASE
COMMISSION FOR THE PURCHASE
COMMISSION FOR THE PURCHASE
The military likely had no idea they were being used by politicians and their cronies to purchase equipment, especially those that do not meet their technical and operational specifications. Whether some of these officers were also greased along the way by the politicians is something else. It is strange that no one in the military learned the lessons of the Scorpene submarine scandal that preceded the CLS debacle by a decade. Malaysia bought two Scorpene-class submarines from France in 2002 when Najib Razak was defense minister and later PM. A two-ringgit Malaysian company owned by a Najib’s crony received a €114 million “commission” for the purchase. The rest is history.
=========
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
The government on December 19 signed the leasing deal for helicopters with Weststar Aviation Sdn Bhd for use of ministries and agencies. Not many details have been issued so far but RMAF posted on Facebook today on the signing ceremony at Putrajaya.
RMAF release on the leasing arrangement.
Chief Secretary to Government TS Shamsul Azri Abu Bakar had this to say on the leasing deal
=========
PMX LEASE 15 YEARS
PMX LEASE 15 YEARS
PMX LEASE 15 YEARS
RMAF
RMN
MMEA
POLICE
FIRE
RESCUE DEPARTEMENT
PM DEPARTEMENT
PMX has defended the decision to lease the helicopters for the military and other government agencies – RM16.5 billion for 15 years – during the Parliament session on Thursday. Among others he said the government adopted the leasing model to reduce maintenance costs and at the same time improved the operational readiness of the fleet.
DS Anwar Ibrahim did not address the fact that the government will be paying some RM1 billion a year for 15 years for the helicopters. He also said the helicopters selected were based on the specifications and requirements of the agencies themselves.
He also confirmed that the Army will also be part of the leasing programme apart from RMAF,RMN, MMEA, police, Fire and Rescue Department, and the Prime Minister Department. Apart from RMAF 12 and police’s seven helicopters, he did not give the breakdown for the other services and agencies.
=========
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
9 naturalisasi pun tak dapat buat timnas MALAYDESH menang tau tau malah TERSINGKIR... HAHAHAHAHA😂😂😂
BalasHapusJumat (20/12/2024) malam menjadi malam yang berat bagi Timnas MALAYDESH. KUCING KUNING dipastikan tersingkir di Piala AFF 2024...HAHAHAHAHA
MALON Di permalukan bekas jajahannya.....Di kandang sendiri... HAHAHAHA😂😂😂😂😂😂
CHEAPEST VARIANT :
BalasHapus-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malaysia to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malaysian service, and will NOt be equipped with any weaponry.
------
1. BARTER SAWIT 10 LCA 8 FLIT DOWNGRADE
2. P-72M CHEAPEST AIRCRAFT
3. ANKA DOWNGRADE NO WEAPONARY
4. LMS B2 Ada-Class DOWNGRADE HISAR OPV
6. Dibayar PBB/UN = 4x4 Ejder Yalçin
7. LCS dibayar 6 jadi NOL DELAYED
8, OPV dibayar 3 jadi 1 DELAYED
===================
Malonn's defense budget is considered not in accordance with its objectives. Some of the things to consider are:
• The allocation of salaries and allowances for 2024 reaches 40% of the total defense budget.
• The allocation for procurement has increased slightly from 2023, but there may be no real benefit due to the depreciation of the ringgit.
• The Ministry of Finance assesses the availability of funds for programs and procurement requirements in private.
• Hundreds of Malonnn military assets have exceeded the 30-year service limit.
==========
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
Pemerintah nekat naikkan PPN 12 persen, ketika rakyat menjerit di tengah ekonomi sulit..
BalasHapushttps://www.brilio.net/serius/pemerintah-nekat-naikkan-ppn-12-persen-ketika-rakyat-menjerit-di-tengah-ekonomi-sulit-241119s.html
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
Hapus•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
----
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
----
SEWA HELI 28 = KONGSI 5
SEWA HELI 28 = KONGSI 5
SEWA HELI 28 = KONGSI 5
Dengan termeterainya kontrak tersebut, sebanyak 12 buah akan digunakan Tentera Udara Diraja Malon (TUDM); Polis Diraja Malon (PDRM) (7); Tentera Laut Diraja Malon (TLDM) (2); Jabatan Bomba dan Penyelamat (JPBM) (2) dan Agensi Penguatkuasaan Maritim Malon (Maritim Malon) (4).
----
LIGHT TWIN HELO = GAGAL
LIGHT TWIN HELO = GAGAL
LIGHT TWIN HELO = GAGAL
The Procurement division of the Home Ministry issued two separate tenders for the supply and delivery of seven twin-engine utility and transport aircraft and five light twin engine helicopters for the police’s Air Wing. the tender for the five twin-engine helicopters has been canceled. Checks on the Eperolehan website today confirmed the cancelation
----
SEWA BEKAS = 15 TAHUN
15 TAHUN = BELI RONGSOK
Semua dikendalikan oleh syarikat yang melakukan pajakan ini dan pajakan ini adalah pajakan To-Own bermakna selepas 15 tahun, kerajaan diberikan pilihan untuk membeli kesemua 28 helikopter itu pada harga nominal RM1 sahaja.
----
BLACKHAWK = GAGAL
BLACKHAWK = GAGAL
BLACKHAWK = GAGAL
Menteri Pertahanan, Datuk Seri Mohamed Khaled Nordin berkata, ia susulan pelanjutan kontrak oleh syarikat itu pada Oktober lalu selepas gagal mematuhi kontrak penyerahannya.
"Oktober sudah berakhir. Tiada apa-apa (Black Hawks), tiada apa-apa.
---
SEWA 53 HELI BEKAS
SEWA 53 HELI BEKAS
SEWA 53 HELI BEKAS
TUDM SEWA =
12 AW149
4 AW139
5 EC120B
TLDM SEWA =
2 AW159
TDM SEWA =
4 UH-60A
12 AW149
BOMBA SEWA =
4 AW139
POLIS SEWA =
7 BELL429
MMEA SEWA =
2 AW159
JABATAN PM SEWA =
1 AW189
https://www.facebook.com/share/p/gnmpDnsCCTn8tx6b/
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
KEY WORDS =
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
Hapus•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
==============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
==============
Malonn's economy has faced a number of challenges, including:
• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
==============
KEY WORDS =
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
Malonn's defense budget is considered not in accordance with its objectives. Some of the things to consider are:
Hapus• The allocation of salaries and allowances for 2024 reaches 40% of the total defense budget.
• The allocation for procurement has increased slightly from 2023, but there may be no real benefit due to the depreciation of the ringgit.
• The Ministry of Finance assesses the availability of funds for programs and procurement requirements in private.
• Hundreds of Malonnn military assets have exceeded the 30-year service limit.
==========
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
==========
Malonn has several issues related to assault rifles, including:
• Smuggling
Malonn's long and porous borders make it difficult to stop the smuggling of firearms and ammunition into the country. The border between Malonn and Thailand is particularly vulnerable to gun smuggling.
• Outdated inventory
The Malonnn Armed Forces (MAF) has outdated inventory stock, which can be a stumbling block for ongoing operations.
• Wary of Russian-made weapons
Malonn is becoming wary of its Russian-made weapons
==========
Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
• Krisis politik
Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
3. Dampak politik pandemi COVID-19
4. Proklamasi Darurat 2021
5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
• Krisis beras
Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
• Krisis mata uang
Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
1. Kinerja ekspor yang buruk
2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
3. Kekhawatiran geopolitik
4. Ketidakpastian mengenai prospek ekonomi China
Geng MALON mulai NGAMUK-NGAMUK tak dapat terima kalah dari singapura... Hahahahahaha
BalasHapusMALU woooiiiii... Hahahahahah 😂😂😂😂
CHEAPEST VARIANT :
BalasHapus-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malaysia to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malaysian service, and will NOt be equipped with any weaponry.
------
1. BARTER SAWIT 10 LCA 8 FLIT DOWNGRADE
2. P-72M CHEAPEST AIRCRAFT
3. ANKA DOWNGRADE NO WEAPONARY
4. LMS B2 Ada-Class DOWNGRADE HISAR OPV
6. Dibayar PBB/UN = 4x4 Ejder Yalçin
7. LCS dibayar 6 jadi NOL DELAYED
8, OPV dibayar 3 jadi 1 DELAYED
===================
Malonn's defense budget is considered not in accordance with its objectives. Some of the things to consider are:
• The allocation of salaries and allowances for 2024 reaches 40% of the total defense budget.
• The allocation for procurement has increased slightly from 2023, but there may be no real benefit due to the depreciation of the ringgit.
• The Ministry of Finance assesses the availability of funds for programs and procurement requirements in private.
• Hundreds of Malonnn military assets have exceeded the 30-year service limit.
==========
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
kesian rakyat...hanya bola mampu buat mereka lupa kesengsaraan hidup mereka.....HAHAHAHAH
BalasHapusYa.. Ampunn.. Jangan NGAMUK lah... Hahahaha
Hapus
HapusWESTSTAR GETTING MONEY = MALON GETTING JUNK
WESTSTAR GETTING MONEY = MALON GETTING JUNK
WESTSTAR GETTING MONEY = MALON GETTING JUNK
“Kaedah ini juga dianggap inovatif kerana berpotensi untuk menjimatkan kos jangka panjang tanpa menjejaskan kualiti mahupun fungsi aset yang diperoleh.”
As of now, many publicly available evidence shows that the above is not true until is proven. We are just wasting more money long term. We need an audit to compare the total leasing cost and overall cost of outright buying and operating for 15 years
So Weststar is getting richer and richer……
==========
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==========
1. HUTANG 84.2% DARI GDP
1. HUTANG 84.2% DARI GDP
2. HUTANG NEGARA RM 1.5 TRLLIUN
3. HUTANG 1MDB RM 18.2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST SHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. TUDM SEWA 12 AW149
62. TUDM SEWA 4 AW139
63. TUDM SEWA 5 EC120B
64. TLDM SEWA 2 AW159
65. TDM SEWA 4 UH-60A
67. TDM SEWA 12 AW149
68. BOMBA SEWA 4 AW139
69. MMEA SEWA 2 AW159
70. POLIS SEWA 7 BELL429
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
WESTSTAR RICH = MALON POOR
HapusWESTSTAR RICH = MALON POOR
WESTSTAR RICH = MALON POOR
“Kaedah ini juga dianggap inovatif kerana berpotensi untuk menjimatkan kos jangka panjang tanpa menjejaskan kualiti mahupun fungsi aset yang diperoleh.”
As of now, many publicly available evidence shows that the above is not true until is proven. We are just wasting more money long term. We need an audit to compare the total leasing cost and overall cost of outright buying and operating for 15 years
So Weststar is getting richer and richer……
=========
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
The government on December 19 signed the leasing deal for helicopters with Weststar Aviation Sdn Bhd for use of ministries and agencies. Not many details have been issued so far but RMAF posted on Facebook today on the signing ceremony at Putrajaya.
RMAF release on the leasing arrangement.
Chief Secretary to Government TS Shamsul Azri Abu Bakar had this to say on the leasing deal
=========
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
=========
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
WESTSTAR GETTING RICH = MALON GETTING POOR
HapusWESTSTAR GETTING RICH = MALON GETTING POOR
WESTSTAR GETTING RICH = MALON GETTING POOR
“Kaedah ini juga dianggap inovatif kerana berpotensi untuk menjimatkan kos jangka panjang tanpa menjejaskan kualiti mahupun fungsi aset yang diperoleh.”
As of now, many publicly available evidence shows that the above is not true until is proven. We are just wasting more money long term. We need an audit to compare the total leasing cost and overall cost of outright buying and operating for 15 years
So Weststar is getting richer and richer……
=========
COMMISSION FOR THE PURCHASE
COMMISSION FOR THE PURCHASE
COMMISSION FOR THE PURCHASE
The military likely had no idea they were being used by politicians and their cronies to purchase equipment, especially those that do not meet their technical and operational specifications. Whether some of these officers were also greased along the way by the politicians is something else. It is strange that no one in the military learned the lessons of the Scorpene submarine scandal that preceded the CLS debacle by a decade. Malaysia bought two Scorpene-class submarines from France in 2002 when Najib Razak was defense minister and later PM. A two-ringgit Malaysian company owned by a Najib’s crony received a €114 million “commission” for the purchase. The rest is history.
=========
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
The government on December 19 signed the leasing deal for helicopters with Weststar Aviation Sdn Bhd for use of ministries and agencies. Not many details have been issued so far but RMAF posted on Facebook today on the signing ceremony at Putrajaya.
RMAF release on the leasing arrangement.
Chief Secretary to Government TS Shamsul Azri Abu Bakar had this to say on the leasing deal
=========
PMX LEASE 15 YEARS
PMX LEASE 15 YEARS
PMX LEASE 15 YEARS
RMAF
RMN
MMEA
POLICE
FIRE
RESCUE DEPARTEMENT
PM DEPARTEMENT
PMX has defended the decision to lease the helicopters for the military and other government agencies – RM16.5 billion for 15 years – during the Parliament session on Thursday. Among others he said the government adopted the leasing model to reduce maintenance costs and at the same time improved the operational readiness of the fleet.
DS Anwar Ibrahim did not address the fact that the government will be paying some RM1 billion a year for 15 years for the helicopters. He also said the helicopters selected were based on the specifications and requirements of the agencies themselves.
He also confirmed that the Army will also be part of the leasing programme apart from RMAF,RMN, MMEA, police, Fire and Rescue Department, and the Prime Minister Department. Apart from RMAF 12 and police’s seven helicopters, he did not give the breakdown for the other services and agencies.
=========
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
ALL LEASE = LEASE ALL
HapusALL LEASE = LEASE ALL
ALL LEASE = LEASE ALL
sewa aset kerajaan akan memperoleh 28 helikopter AW-149 untuk tempo selama 15 tahun, dengan perincian jumlah: 1 untuk PM, 12 untuk TUDM, 2 untuk TLDM, 7 untuk Polis DM, 4 untuk APMM, 2 untuk Bomba dan Penyelamat
=========
WESTSTAR = GETTING RICHER AND RICHER
WESTSTAR = GETTING RICHER AND RICHER
WESTSTAR = GETTING RICHER AND RICHER
“Kaedah ini juga dianggap inovatif kerana berpotensi untuk menjimatkan kos jangka panjang tanpa menjejaskan kualiti mahupun fungsi aset yang diperoleh.”
As of now, many publicly available evidence shows that the above is not true until is proven. We are just wasting more money long term. We need an audit to compare the total leasing cost and overall cost of outright buying and operating for 15 years
So Weststar is getting richer and richer……
=========
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
The government on December 19 signed the leasing deal for helicopters with Weststar Aviation Sdn Bhd for use of ministries and agencies. Not many details have been issued so far but RMAF posted on Facebook today on the signing ceremony at Putrajaya.
RMAF release on the leasing arrangement.
Chief Secretary to Government TS Shamsul Azri Abu Bakar had this to say on the leasing deal
=========
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
=========
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
=========
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
=========
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
=========
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
Sudah pakai 9 naturalisasi pun timnas MlON malah TERSINGKIR... Hahahaha
BalasHapusJumat (20/12/2024) malam menjadi malam yang berat bagi Timnas MALAYDESH. KUCING KUNING dipastikan tersingkir di Piala AFF 2024...HAHAHAHAHA
MALON Di permalukan bekas jajahannya.....Di kandang sendiri... HAHAHAHA😂😂😂😂😂😂
MANTAP MALAYSIA....HAHAHA
BalasHapusImbas PPN 12 Persen, Poster Ajakan Berobat ke Malaysia Viral Lagi
https://m.youtube.com/watch?v=FVFIDSU1CZw
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
Hapus•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
----
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
----
SEWA 53 HELI BEKAS
SEWA 53 HELI BEKAS
SEWA 53 HELI BEKAS
TUDM SEWA =
12 AW149
4 AW139
5 EC120B
TLDM SEWA =
2 AW159
TDM SEWA =
4 UH-60A
12 AW149
BOMBA SEWA =
4 AW139
POLIS SEWA =
7 BELL429
MMEA SEWA =
2 AW159
JABATAN PM SEWA =
1 AW189
==========
Malonn has several issues related to assault rifles, including:
• Smuggling
Malonn's long and porous borders make it difficult to stop the smuggling of firearms and ammunition into the country. The border between Malonn and Thailand is particularly vulnerable to gun smuggling.
• Outdated inventory
The Malonnn Armed Forces (MAF) has outdated inventory stock, which can be a stumbling block for ongoing operations.
• Wary of Russian-made weapons
Malonn is becoming wary of its Russian-made weapons
==========
Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
• Krisis politik
Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
3. Dampak politik pandemi COVID-19
4. Proklamasi Darurat 2021
5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
• Krisis beras
Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
• Krisis mata uang
Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
1. Kinerja ekspor yang buruk
2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
3. Kekhawatiran geopolitik
4. Ketidakpastian mengenai prospek ekonomi China
Malonn's armed forces procurement faces several weaknesses, including:
Hapus1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==========
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
==========
Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
• Krisis politik
Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
3. Dampak politik pandemi COVID-19
4. Proklamasi Darurat 2021
5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
• Krisis beras
Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
• Krisis mata uang
Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
1. Kinerja ekspor yang buruk
2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
3. Kekhawatiran geopolitik
4. Ketidakpastian mengenai prospek ekonomi China
CHEAPEST VARIANT :
Hapus-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malaysia to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malaysian service, and will NOt be equipped with any weaponry.
------
1. BARTER SAWIT 10 LCA 8 FLIT DOWNGRADE
2. P-72M CHEAPEST AIRCRAFT
3. ANKA DOWNGRADE NO WEAPONARY
4. LMS B2 Ada-Class DOWNGRADE HISAR OPV
6. Dibayar PBB/UN = 4x4 Ejder Yalçin
7. LCS dibayar 6 jadi NOL DELAYED
8, OPV dibayar 3 jadi 1 DELAYED
===================
Malonn's defense budget is considered not in accordance with its objectives. Some of the things to consider are:
• The allocation of salaries and allowances for 2024 reaches 40% of the total defense budget.
• The allocation for procurement has increased slightly from 2023, but there may be no real benefit due to the depreciation of the ringgit.
• The Ministry of Finance assesses the availability of funds for programs and procurement requirements in private.
• Hundreds of Malonnn military assets have exceeded the 30-year service limit.
==========
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
CHEAPEST VARIANT :
BalasHapus-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malaysia to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malaysian service, and will NOt be equipped with any weaponry.
------
1. BARTER SAWIT 10 LCA 8 FLIT DOWNGRADE
2. P-72M CHEAPEST AIRCRAFT
3. ANKA DOWNGRADE NO WEAPONARY
4. LMS B2 Ada-Class DOWNGRADE HISAR OPV
6. Dibayar PBB/UN = 4x4 Ejder Yalçin
7. LCS dibayar 6 jadi NOL DELAYED
8, OPV dibayar 3 jadi 1 DELAYED
===================
Malonn's defense budget is considered not in accordance with its objectives. Some of the things to consider are:
• The allocation of salaries and allowances for 2024 reaches 40% of the total defense budget.
• The allocation for procurement has increased slightly from 2023, but there may be no real benefit due to the depreciation of the ringgit.
• The Ministry of Finance assesses the availability of funds for programs and procurement requirements in private.
• Hundreds of Malonnn military assets have exceeded the 30-year service limit.
==========
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
Geng MALAYDESH mulai KEPANASAN timnas bolanya tak LOLOS...
BalasHapusGAGAL TOTAL.... Hahahahaha
Meong... Meong.. Meong... Hahahaha
Hidup di INDIANESIA makin KERAS....
BalasHapusPPN 12% & Dolar AS Rp16.300, Siap-siap Hidup Warga RI Makin Sulit!
https://www.cnbcindonesia.com/news/20241220075321-4-597525/ppn-12-dolar-as-rp16300-siap-siap-hidup-warga-ri-makin-sulit
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
Hapus•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
==============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
==============
Malonn's economy has faced a number of challenges, including:
• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
==============
KEY WORDS =
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
Hapus•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
----
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
----
SEWA HELI 28 = KONGSI 5
SEWA HELI 28 = KONGSI 5
SEWA HELI 28 = KONGSI 5
Dengan termeterainya kontrak tersebut, sebanyak 12 buah akan digunakan Tentera Udara Diraja Malon (TUDM); Polis Diraja Malon (PDRM) (7); Tentera Laut Diraja Malon (TLDM) (2); Jabatan Bomba dan Penyelamat (JPBM) (2) dan Agensi Penguatkuasaan Maritim Malon (Maritim Malon) (4).
----
LIGHT TWIN HELO = GAGAL
LIGHT TWIN HELO = GAGAL
LIGHT TWIN HELO = GAGAL
The Procurement division of the Home Ministry issued two separate tenders for the supply and delivery of seven twin-engine utility and transport aircraft and five light twin engine helicopters for the police’s Air Wing. the tender for the five twin-engine helicopters has been canceled. Checks on the Eperolehan website today confirmed the cancelation
----
SEWA BEKAS = 15 TAHUN
15 TAHUN = BELI RONGSOK
Semua dikendalikan oleh syarikat yang melakukan pajakan ini dan pajakan ini adalah pajakan To-Own bermakna selepas 15 tahun, kerajaan diberikan pilihan untuk membeli kesemua 28 helikopter itu pada harga nominal RM1 sahaja.
----
BLACKHAWK = GAGAL
BLACKHAWK = GAGAL
BLACKHAWK = GAGAL
Menteri Pertahanan, Datuk Seri Mohamed Khaled Nordin berkata, ia susulan pelanjutan kontrak oleh syarikat itu pada Oktober lalu selepas gagal mematuhi kontrak penyerahannya.
"Oktober sudah berakhir. Tiada apa-apa (Black Hawks), tiada apa-apa.
---
SEWA 53 HELI BEKAS
SEWA 53 HELI BEKAS
SEWA 53 HELI BEKAS
TUDM SEWA =
12 AW149
4 AW139
5 EC120B
TLDM SEWA =
2 AW159
TDM SEWA =
4 UH-60A
12 AW149
BOMBA SEWA =
4 AW139
POLIS SEWA =
7 BELL429
MMEA SEWA =
2 AW159
JABATAN PM SEWA =
1 AW189
https://www.facebook.com/share/p/gnmpDnsCCTn8tx6b/
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
KEY WORDS =
4x LEBIH MAHAL SEWA DARIPADA BELI BARU
HapusWESTSTAR GETTING MONEY = MALON GETTING JUNK
WESTSTAR GETTING MONEY = MALON GETTING JUNK
WESTSTAR GETTING MONEY = MALON GETTING JUNK
“Kaedah ini juga dianggap inovatif kerana berpotensi untuk menjimatkan kos jangka panjang tanpa menjejaskan kualiti mahupun fungsi aset yang diperoleh.”
As of now, many publicly available evidence shows that the above is not true until is proven. We are just wasting more money long term. We need an audit to compare the total leasing cost and overall cost of outright buying and operating for 15 years
So Weststar is getting richer and richer……
==========
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==========
1. HUTANG 84.2% DARI GDP
1. HUTANG 84.2% DARI GDP
2. HUTANG NEGARA RM 1.5 TRLLIUN
3. HUTANG 1MDB RM 18.2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST SHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. TUDM SEWA 12 AW149
62. TUDM SEWA 4 AW139
63. TUDM SEWA 5 EC120B
64. TLDM SEWA 2 AW159
65. TDM SEWA 4 UH-60A
67. TDM SEWA 12 AW149
68. BOMBA SEWA 4 AW139
69. MMEA SEWA 2 AW159
70. POLIS SEWA 7 BELL429
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
Sudah TERSINGKIR pelatih pun di PECAT... Tragis sepak bola MALAYDESH nih... 😂😂😂 😂😂😂
BalasHapusJumat (20/12/2024) malam menjadi malam yang berat bagi Timnas MALAYDESH. KUCING KUNING dipastikan tersingkir di Piala AFF 2024...HAHAHAHAHA
MALON Di permalukan bekas jajahannya.....Di kandang sendiri... HAHAHAHA😂😂😂😂😂😂
BalasHapusWESTSTAR GETTING MONEY = MALON GETTING JUNK
WESTSTAR GETTING MONEY = MALON GETTING JUNK
WESTSTAR GETTING MONEY = MALON GETTING JUNK
“Kaedah ini juga dianggap inovatif kerana berpotensi untuk menjimatkan kos jangka panjang tanpa menjejaskan kualiti mahupun fungsi aset yang diperoleh.”
As of now, many publicly available evidence shows that the above is not true until is proven. We are just wasting more money long term. We need an audit to compare the total leasing cost and overall cost of outright buying and operating for 15 years
So Weststar is getting richer and richer……
==========
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==========
1. HUTANG 84.2% DARI GDP
1. HUTANG 84.2% DARI GDP
2. HUTANG NEGARA RM 1.5 TRLLIUN
3. HUTANG 1MDB RM 18.2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST SHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. TUDM SEWA 12 AW149
62. TUDM SEWA 4 AW139
63. TUDM SEWA 5 EC120B
64. TLDM SEWA 2 AW159
65. TDM SEWA 4 UH-60A
67. TDM SEWA 12 AW149
68. BOMBA SEWA 4 AW139
69. MMEA SEWA 2 AW159
70. POLIS SEWA 7 BELL429
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
Sudah TERSINGKIR pelatih pun di PECAT... Tragis sepak bola MALAYDESH nih... 😂😂😂 😂😂😂
BalasHapusJumat (20/12/2024) malam menjadi malam yang berat bagi Timnas MALAYDESH. KUCING KUNING dipastikan tersingkir di Piala AFF 2024...HAHAHAHAHA
MALON Di permalukan bekas jajahannya.....Di kandang sendiri... HAHAHAHA😂😂😂😂😂😂
Hidup di INDIANESIA makin KERAS....
BalasHapusPPN 12% & Dolar AS Rp16.300, Siap-siap Hidup Warga RI Makin Sulit!
https://www.cnbcindonesia.com/news/20241220075321-4-597525/ppn-12-dolar-as-rp16300-siap-siap-hidup-warga-ri-makin-sulit
ALL LEASE = LEASE ALL
BalasHapusALL LEASE = LEASE ALL
ALL LEASE = LEASE ALL
sewa aset kerajaan akan memperoleh 28 helikopter AW-149 untuk tempo selama 15 tahun, dengan perincian jumlah: 1 untuk PM, 12 untuk TUDM, 2 untuk TLDM, 7 untuk Polis DM, 4 untuk APMM, 2 untuk Bomba dan Penyelamat
=========
WESTSTAR = GETTING RICHER AND RICHER
WESTSTAR = GETTING RICHER AND RICHER
WESTSTAR = GETTING RICHER AND RICHER
“Kaedah ini juga dianggap inovatif kerana berpotensi untuk menjimatkan kos jangka panjang tanpa menjejaskan kualiti mahupun fungsi aset yang diperoleh.”
As of now, many publicly available evidence shows that the above is not true until is proven. We are just wasting more money long term. We need an audit to compare the total leasing cost and overall cost of outright buying and operating for 15 years
So Weststar is getting richer and richer……
=========
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
The government on December 19 signed the leasing deal for helicopters with Weststar Aviation Sdn Bhd for use of ministries and agencies. Not many details have been issued so far but RMAF posted on Facebook today on the signing ceremony at Putrajaya.
RMAF release on the leasing arrangement.
Chief Secretary to Government TS Shamsul Azri Abu Bakar had this to say on the leasing deal
=========
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
=========
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
=========
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
=========
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
=========
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
NATURALISASI = TERSINGKIR PIALA CIKI-CIKI
BalasHapusNATURALISASI = TERSINGKIR PIALA CIKI-CIKI
NATURALISASI = TERSINGKIR PIALA CIKI-CIKI
Timnas Malon tersingkir dari Piala AFF 2024 atau ASEAN Championship usai ditahan Singapura 0-0 di Stadion Bukit Jalil, Jumat (20/12). Malon gagal ke semifinal Piala AFF 2024 usai menempati peringkat ketiga klasemen Grup A.
==============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
==============
Malonn's economy has faced a number of challenges, including:
• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
WESTSTAR GETTING RICH = MALON GETTING POOR
BalasHapusWESTSTAR GETTING RICH = MALON GETTING POOR
WESTSTAR GETTING RICH = MALON GETTING POOR
“Kaedah ini juga dianggap inovatif kerana berpotensi untuk menjimatkan kos jangka panjang tanpa menjejaskan kualiti mahupun fungsi aset yang diperoleh.”
As of now, many publicly available evidence shows that the above is not true until is proven. We are just wasting more money long term. We need an audit to compare the total leasing cost and overall cost of outright buying and operating for 15 years
So Weststar is getting richer and richer……
=========
COMMISSION FOR THE PURCHASE
COMMISSION FOR THE PURCHASE
COMMISSION FOR THE PURCHASE
The military likely had no idea they were being used by politicians and their cronies to purchase equipment, especially those that do not meet their technical and operational specifications. Whether some of these officers were also greased along the way by the politicians is something else. It is strange that no one in the military learned the lessons of the Scorpene submarine scandal that preceded the CLS debacle by a decade. Malaysia bought two Scorpene-class submarines from France in 2002 when Najib Razak was defense minister and later PM. A two-ringgit Malaysian company owned by a Najib’s crony received a €114 million “commission” for the purchase. The rest is history.
=========
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
The government on December 19 signed the leasing deal for helicopters with Weststar Aviation Sdn Bhd for use of ministries and agencies. Not many details have been issued so far but RMAF posted on Facebook today on the signing ceremony at Putrajaya.
RMAF release on the leasing arrangement.
Chief Secretary to Government TS Shamsul Azri Abu Bakar had this to say on the leasing deal
=========
PMX LEASE 15 YEARS
PMX LEASE 15 YEARS
PMX LEASE 15 YEARS
RMAF
RMN
MMEA
POLICE
FIRE
RESCUE DEPARTEMENT
PM DEPARTEMENT
PMX has defended the decision to lease the helicopters for the military and other government agencies – RM16.5 billion for 15 years – during the Parliament session on Thursday. Among others he said the government adopted the leasing model to reduce maintenance costs and at the same time improved the operational readiness of the fleet.
DS Anwar Ibrahim did not address the fact that the government will be paying some RM1 billion a year for 15 years for the helicopters. He also said the helicopters selected were based on the specifications and requirements of the agencies themselves.
He also confirmed that the Army will also be part of the leasing programme apart from RMAF,RMN, MMEA, police, Fire and Rescue Department, and the Prime Minister Department. Apart from RMAF 12 and police’s seven helicopters, he did not give the breakdown for the other services and agencies.
=========
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
WESTSTAR RICH = MALON POOR
BalasHapusWESTSTAR RICH = MALON POOR
WESTSTAR RICH = MALON POOR
“Kaedah ini juga dianggap inovatif kerana berpotensi untuk menjimatkan kos jangka panjang tanpa menjejaskan kualiti mahupun fungsi aset yang diperoleh.”
As of now, many publicly available evidence shows that the above is not true until is proven. We are just wasting more money long term. We need an audit to compare the total leasing cost and overall cost of outright buying and operating for 15 years
So Weststar is getting richer and richer……
=========
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
DEAL = LEASE HELICOPTERS
The government on December 19 signed the leasing deal for helicopters with Weststar Aviation Sdn Bhd for use of ministries and agencies. Not many details have been issued so far but RMAF posted on Facebook today on the signing ceremony at Putrajaya.
RMAF release on the leasing arrangement.
Chief Secretary to Government TS Shamsul Azri Abu Bakar had this to say on the leasing deal
=========
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
=========
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
Miris! IQ Anak Indonesia Terendah di ASEAN
BalasHapushttps://www.cnbcindonesia.com/news/20240925102000-4-574396/miris-iq-anak-indonesia-terendah-di-asean
WESTSTAR GETTING MONEY = MALON GETTING JUNK
BalasHapusWESTSTAR GETTING MONEY = MALON GETTING JUNK
WESTSTAR GETTING MONEY = MALON GETTING JUNK
“Kaedah ini juga dianggap inovatif kerana berpotensi untuk menjimatkan kos jangka panjang tanpa menjejaskan kualiti mahupun fungsi aset yang diperoleh.”
As of now, many publicly available evidence shows that the above is not true until is proven. We are just wasting more money long term. We need an audit to compare the total leasing cost and overall cost of outright buying and operating for 15 years
So Weststar is getting richer and richer……
==========
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==========
1. HUTANG 84.2% DARI GDP
1. HUTANG 84.2% DARI GDP
2. HUTANG NEGARA RM 1.5 TRLLIUN
3. HUTANG 1MDB RM 18.2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST SHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. TUDM SEWA 12 AW149
62. TUDM SEWA 4 AW139
63. TUDM SEWA 5 EC120B
64. TLDM SEWA 2 AW159
65. TDM SEWA 4 UH-60A
67. TDM SEWA 12 AW149
68. BOMBA SEWA 4 AW139
69. MMEA SEWA 2 AW159
70. POLIS SEWA 7 BELL429
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE