The Embassy witnessed the signing ceremony of the contract between the Ministry of Defence of Oman and Marsun Public Company Limited
Marsun shipyard is experienced in building Landing Craft Vessel for the Royal Thai Navy (image: Marsun)
After the ceremony, the delegation including representatives of the Ministry of Defense of Thailand and the Royal Thai Navy met with HE Ms. Warunee Pan-krajang, Ambassador-Designate, to provide information on the company's business operations and Thailand's potential for the defense industry.
On 10 December 2024, Mr. Ek-att Thitaram, Minister Counsellor, represented the Royal Thai Embassy in Muscat as a witness in the signing ceremony of the contract between the Ministry of Defense of the Sultanate of Oman and Marsun Public Company Limited on Design, Build, and Supply of Landing Craft Vessel for the Royal Navy of Oman.
Some weaknesses in Malonnn public procurement include:
BalasHapus• Transparency: The principle of transparency is not well adhered to. Interference from authorities, such as local politicians, can lead to corruption, scandal, and the abuse of public resources.
• Inefficient processes: Procurement processes can be inefficient and ineffective. Tenders may be prepared hastily, carelessly, and without proper consideration.
• Poor documentation: Documentation may be poor.
• Low quality: The quality of products, services, and work may be low.
• Non-compliance: There may be non-compliance with the scope, specifications, and terms of contracts.
• Delayed completion: Projects may be delayed or not completed.
• Inadequate infrastructure: There may not be adequate infrastructure to support procurement.
• Vendor development programs: Vendor development programs (VDPs) may be non-existent or ineffective.
• Cronyism: There may be interference from outside parties and cronyism, which affects the awarding of contracts.
Malpractice: Procurement officers may be involved in malpractice and not comply with the policies and procedures of the procurement system
=========================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
=========================
KEY WORDS = CHEAPEST AND DOWNGRADE
SEWA 28 HELI = 119 HELI BARU :
BalasHapusSEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
==============
BUDGET 2025 = SALARIES AND ALLOWANCES
BUDGET 2025 = NOT ASSETS
BUDGET 2025 = NOT ASSETS
BUDGET 2025 = NOT ASSETS
PMX DS Anwar Ibrahim today announce an allocation of RM40.6 billion for the national security sector from the RM461 billion 2025 national budget. This is an increase of RM2 billion for the sector which includes Home and Defence ministries, from the 2024 budget of RM38.7 billion.
Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
==============
BUDGET 2025 = ASSET PROCUREMENT DOWN
BUDGET 2025 = ASSET PROCUREMENT DOWN
BUDGET 2025 = ASSET PROCUREMENT DOWN
Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
==============
Some weaknesses in Malonnn public procurement include:
• Transparency: The principle of transparency is not well adhered to. Interference from authorities, such as local politicians, can lead to corruption, scandal, and the abuse of public resources.
• Inefficient processes: Procurement processes can be inefficient and ineffective. Tenders may be prepared hastily, carelessly, and without proper consideration.
• Poor documentation: Documentation may be poor.
• Low quality: The quality of products, services, and work may be low.
• Non-compliance: There may be non-compliance with the scope, specifications, and terms of contracts.
• Delayed completion: Projects may be delayed or not completed.
• Inadequate infrastructure: There may not be adequate infrastructure to support procurement.
• Vendor development programs: Vendor development programs (VDPs) may be non-existent or ineffective.
• Cronyism: There may be interference from outside parties and cronyism, which affects the awarding of contracts.
Malpractice: Procurement officers may be involved in malpractice and not comply with the policies and procedures of the procurement system
Bicara galangan kapal, jadi ingat kerajaan sebelah nan sombong, GAGAL 4X bikin kapal. Selalu DELAY, mangkrak, disuntik dana, bangkrut
BalasHapus🤣🤣🤣🤣🤣🤣
Gak ada yg mau pesan ke LUNAS 😁😁😁😁😁😁😁
BalasHapusIndonesia punya galangan buat bikin kapal ✅
BalasHapusSingapore punya galangan buat bikin kapal ✅
Thailand punya galangan buat bikin kapal ✅
Malon punya galangan buat bikin monumen kebodohan 😂🤭 ✅
Pork ditunggu bualannya buat bahan lawak dan bikin gelak.
BalasHapusManakala MALAYSIA terlibat bina kapal Frigat INDIANESIA dan membina kapal perang NIGERIA NAVY... 😎😎😎😎
BalasHapus10 FOREIGN SUPPLIERS MILITARY EQUIPMENT MALON =
Hapus1. AMERIKA SERIKAT
2. RUSIA
3. TIONGKOK (CINA)
4. TURKI
5. UNI EROPA
6. PERANCIS
7. INGGRIS
8. JERMAN
9. INDONESIA
10. POLANDIA
-----
SATU-SATUNYA DI ASEAN
RELAX EKSPOR MRSS UEA The United Arab Emirates (UAE) anNOunced it had awarded the Indonesian shipyard PT PAL an AED1.5 billion (USD408.32 million) contract to supply a “multimission vessel” during the IDEX 2023 show being held in Abu Dhabi from 20 to 24 February.
-----
SATU-SATUNYA DI ASEAN
RELAX EKSPOR B2 SSV FILIPINA Dipercayakannya PT PAL Indonesia dalam pengadaan 2 (dua) unit kapal perang jenis Landing Dock oleh Angkatan Laut Filipina, karena kepuasan Pemerintah Filipina dan Angkatan Laut Filipina atas pengoperasian 2 unit Landing Dock atau Strategic Sealift Vessel (SSV) yang telah diserahterimakan oleh PAL beberapa tahun lalu.
-----
SATU-SATUNYA DI ASEAN
RELAX BUILD FRIGAT On August 25, the keel laying ceremony for the first of two Red White frigates was held at Indonesian state-owned shipbuilder PT PAL Indonesia’s facility in Surabaya City, East Java. Based on Babcock's Arrowhead 140 design, it is said that with a 140-metre length and a displacement of 5,996 tons, the Red White frigate will be the largest and most advanced surface combatant ever constructed in Indonesia.
-----
SATU_SATUNYA DI ASEAN
INDUSTRI PENERBANGAN
PT Dirgantara Indonesia (atau biasa disingkat menjadi PTDI) adalah produsen pesawat terbang pertama dan satu-satunya di Indonesia dan di wilayah Asia Tenggara. Dirgantara Indonesia tidak hanya memproduksi berbagai jenis pesawat terbang.
-----
SATU-SATUNYA DI ASEAN
PRODUKSI TANK MEDIUM
Indonesia currently is the only country in Southeast Asia that produces its own combat tanks. This tank was made Pindad, an Indonesian state- owned military equipment manufacturing company.
===========
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
Indonesia's warships are considered to be of good quality, and the country's navy is ranked fourth in the world. The quality of a navy is assessed based on a variety of factors, including the number and quality of warships and submarines, the mix of inventory, and the country's shipbuilding capabilities.
----------
Indonesian-made LPD warships have been praised for their quality and versatility:
• BRP Tarlac (LD-601) and BRP Davao del Sur (LD-602)
The first two LPDs delivered to the Philippines were commissioned in 2016 and 2017, respectively. They have participated in many exercises and humanitarian missions, and have been deployed to the South China Sea. A Philippine official praised the ships, noting their sophisticated maneuvers, including the "landing craft utility" (LCU).
• Indonesian Navy
The Indonesian Navy is considered one of the world's four strongest navies. The Navy's fleet includes aircraft, helicopters, submarines, frigates, corvettes, ASW corvettes, missile boats, patrol crafts, minesweepers, tank landing ships, and amphibious transport docks.
Some challenges for Indonesia's warship industry include the need to develop local production of ship parts and materials, and to secure government support for large-scale projects.
----------
Pesawat-pesawat buatan Indonesia diakui dunia karena kualitasnya, di antaranya:
• CN235-220 MPA
Pesawat ini merupakan karya anak bangsa yang mampu terbang selama 11 jam. Pesawat ini pernah diekspor ke Senegal.
• CN295
Pesawat multiguna yang dapat membawa 50 penumpang dan terbang ke daerah terpencil. Pesawat ini dibuat oleh PT Dirgantara Indonesia bekerja sama dengan Airbus Defense & Space.
• NC212 Family
Pesawat ini memiliki beberapa seri, yaitu NC212-200, NC212-400, NC212i, dan NC212i MSC. Pesawat ini mampu terbang selama 6–8 jam.
• N219 Nurtanio
Pesawat terbaru buatan PT Dirgantara Indonesia yang menggunakan teknologi canggih pada sistem avionik.
==============
KEY WORDS = FOREIGN SUPPLIERS MILITARY EQUIPMENT MALON
The Malonnn army has several weaknesses, including:
Hapus• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....
=========================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
HASIL STUDI ........
HapusBELANJA PERTAHANAN = TERGANTUNG HUTANG
BELANJA PERTAHANAN = TERGANTUNG HUTANG
BELANJA PERTAHANAN = TERGANTUNG HUTANG
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
==============
2024 RASIO HUTANG 84,2% DARI GDP
The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023.
In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018).
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
==============
2024 HUTANG JATUH TEMPO = The federal government's debt is expected to be fully settled in 2053 if no new loans were to be taken to finance the deficit and to refinance maturing debts from 2024 onwards, said the Finance Ministry (MoF)
----
2023 TIDAK BAYAR HUTANG = “Ini bermakna bayaran khidmat hutang banyak…hanya membayar faedah bukan bayar hutang tertunggak,” kata Anwar lagi
----
2022 HUTANG BAYAR HUTANG 52,4% = Kah Woh menjelaskan pada tahun lalu, kerajaan ada membuat pinjaman yang meningkat sebanyak 11.6 peratus daripada RM194.5 bilion pada tahun sebelumnya. Daripada jumlah itu, beliau berkata 52.4 peratus atau RM113.7 bilion digunakan untuk membayar prinsipal pinjaman matang.
----
2021 HUTANG BAYAR HUTANG 50,4% = Sejumlah RM98.058 bilion atau 50.4 peratus daripada pinjaman baharu berjumlah RM194.555 bilion yang dibuat kerajaan pada tahun lalu digunakan untuk bayaran balik prinsipal pinjaman yang matang.
----
2020 HUTANG BAYAR HUTANG 60% = Jabatan Audit Negara (JAN) bimbang dengan tindakan kerajaan menggunakan hampir 60 peratus pinjaman baharu untuk membayar hutang .
----
2019 HUTANG BAYAR HUTANG 59% = Laporan Ketua Audit Negara mengenai Penyata Kewangan Kerajaan Persekutuan 2018 mendapati sejumlah 59 peratus pinjaman baharu kerajaan dibuat untuk membayar hutang kerajaan terdahulu
----
2018 RASIO HUTANG 80% DARI GDP : OPEN DONASI = Kementerian Keuangan Malon pada hari Rabu membuka rekening donasi supaya masyarakat dapat menyumbang untuk membantu negara membayar utang yang mencapai 1 triliun ringgit (US$ 250,8 miliar) atau 80 persen dari PDB.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
COMMISSION
HapusCOMMISSION
COMMISSION
The military likely had no idea they were being used by politicians and their cronies to purchase equipment, especially those that do not meet their technical and operational specifications. Whether some of these officers were also greased along the way by the politicians is something else. It is strange that no one in the military learned the lessons of the Scorpene submarine scandal that preceded the CLS debacle by a decade. Malonn bought two Scorpene-class submarines from France in 2002 when Najib Razak was defense minister and later PM. A two-ringgit Malonnn company owned by a Najib’s crony received a €114 million “commission” for the purchase
=========================
Some weaknesses in Malonnn public procurement include:
• Transparency: The principle of transparency is not well adhered to. Interference from authorities, such as local politicians, can lead to corruption, scandal, and the abuse of public resources.
• Inefficient processes: Procurement processes can be inefficient and ineffective. Tenders may be prepared hastily, carelessly, and without proper consideration.
• Poor documentation: Documentation may be poor.
• Low quality: The quality of products, services, and work may be low.
• Non-compliance: There may be non-compliance with the scope, specifications, and terms of contracts.
• Delayed completion: Projects may be delayed or not completed.
• Inadequate infrastructure: There may not be adequate infrastructure to support procurement.
• Vendor development programs: Vendor development programs (VDPs) may be non-existent or ineffective.
• Cronyism: There may be interference from outside parties and cronyism, which affects the awarding of contracts.
Malpractice: Procurement officers may be involved in malpractice and not comply with the policies and procedures of the procurement system
=========================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
----
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
=========
VERSI TERMURAH FA50
VERSI TERMURAH FA50
VERSI TERMURAH FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
=========
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
=========================
KEY WORDS = COMMISSION, COMMISSION AND COMMISSION
Some weaknesses in Malonnn public procurement include:
Hapus• Transparency: The principle of transparency is not well adhered to. Interference from authorities, such as local politicians, can lead to corruption, scandal, and the abuse of public resources.
• Inefficient processes: Procurement processes can be inefficient and ineffective. Tenders may be prepared hastily, carelessly, and without proper consideration.
• Poor documentation: Documentation may be poor.
• Low quality: The quality of products, services, and work may be low.
• Non-compliance: There may be non-compliance with the scope, specifications, and terms of contracts.
• Delayed completion: Projects may be delayed or not completed.
• Inadequate infrastructure: There may not be adequate infrastructure to support procurement.
• Vendor development programs: Vendor development programs (VDPs) may be non-existent or ineffective.
• Cronyism: There may be interference from outside parties and cronyism, which affects the awarding of contracts.
Malpractice: Procurement officers may be involved in malpractice and not comply with the policies and procedures of the procurement system
=========================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
=========================
KEY WORDS = CHEAPEST AND DOWNGRADE
Manakala MALAYSIA terlibat bina kapal Frigat INDIANESIA dan membina kapal perang NIGERIA NAVY... 😎😎😎😎
BalasHapus10 FOREIGN SUPPLIERS MILITARY EQUIPMENT MALON =
Hapus1. AMERIKA SERIKAT
2. RUSIA
3. TIONGKOK (CINA)
4. TURKI
5. UNI EROPA
6. PERANCIS
7. INGGRIS
8. JERMAN
9. INDONESIA
10. POLANDIA
-----
SATU-SATUNYA DI ASEAN
RELAX EKSPOR MRSS UEA The United Arab Emirates (UAE) anNOunced it had awarded the Indonesian shipyard PT PAL an AED1.5 billion (USD408.32 million) contract to supply a “multimission vessel” during the IDEX 2023 show being held in Abu Dhabi from 20 to 24 February.
-----
SATU-SATUNYA DI ASEAN
RELAX EKSPOR B2 SSV FILIPINA Dipercayakannya PT PAL Indonesia dalam pengadaan 2 (dua) unit kapal perang jenis Landing Dock oleh Angkatan Laut Filipina, karena kepuasan Pemerintah Filipina dan Angkatan Laut Filipina atas pengoperasian 2 unit Landing Dock atau Strategic Sealift Vessel (SSV) yang telah diserahterimakan oleh PAL beberapa tahun lalu.
-----
SATU-SATUNYA DI ASEAN
RELAX BUILD FRIGAT On August 25, the keel laying ceremony for the first of two Red White frigates was held at Indonesian state-owned shipbuilder PT PAL Indonesia’s facility in Surabaya City, East Java. Based on Babcock's Arrowhead 140 design, it is said that with a 140-metre length and a displacement of 5,996 tons, the Red White frigate will be the largest and most advanced surface combatant ever constructed in Indonesia.
-----
SATU_SATUNYA DI ASEAN
INDUSTRI PENERBANGAN
PT Dirgantara Indonesia (atau biasa disingkat menjadi PTDI) adalah produsen pesawat terbang pertama dan satu-satunya di Indonesia dan di wilayah Asia Tenggara. Dirgantara Indonesia tidak hanya memproduksi berbagai jenis pesawat terbang.
-----
SATU-SATUNYA DI ASEAN
PRODUKSI TANK MEDIUM
Indonesia currently is the only country in Southeast Asia that produces its own combat tanks. This tank was made Pindad, an Indonesian state- owned military equipment manufacturing company.
===========
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
Indonesia's warships are considered to be of good quality, and the country's navy is ranked fourth in the world. The quality of a navy is assessed based on a variety of factors, including the number and quality of warships and submarines, the mix of inventory, and the country's shipbuilding capabilities.
----------
Indonesian-made LPD warships have been praised for their quality and versatility:
• BRP Tarlac (LD-601) and BRP Davao del Sur (LD-602)
The first two LPDs delivered to the Philippines were commissioned in 2016 and 2017, respectively. They have participated in many exercises and humanitarian missions, and have been deployed to the South China Sea. A Philippine official praised the ships, noting their sophisticated maneuvers, including the "landing craft utility" (LCU).
• Indonesian Navy
The Indonesian Navy is considered one of the world's four strongest navies. The Navy's fleet includes aircraft, helicopters, submarines, frigates, corvettes, ASW corvettes, missile boats, patrol crafts, minesweepers, tank landing ships, and amphibious transport docks.
Some challenges for Indonesia's warship industry include the need to develop local production of ship parts and materials, and to secure government support for large-scale projects.
----------
Pesawat-pesawat buatan Indonesia diakui dunia karena kualitasnya, di antaranya:
• CN235-220 MPA
Pesawat ini merupakan karya anak bangsa yang mampu terbang selama 11 jam. Pesawat ini pernah diekspor ke Senegal.
• CN295
Pesawat multiguna yang dapat membawa 50 penumpang dan terbang ke daerah terpencil. Pesawat ini dibuat oleh PT Dirgantara Indonesia bekerja sama dengan Airbus Defense & Space.
• NC212 Family
Pesawat ini memiliki beberapa seri, yaitu NC212-200, NC212-400, NC212i, dan NC212i MSC. Pesawat ini mampu terbang selama 6–8 jam.
• N219 Nurtanio
Pesawat terbaru buatan PT Dirgantara Indonesia yang menggunakan teknologi canggih pada sistem avionik.
==============
KEY WORDS = FOREIGN SUPPLIERS MILITARY EQUIPMENT MALON
The Malonnn army has several weaknesses, including:
Hapus• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....
=========================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
Some weaknesses in Malonnn public procurement include:
Hapus• Transparency: The principle of transparency is not well adhered to. Interference from authorities, such as local politicians, can lead to corruption, scandal, and the abuse of public resources.
• Inefficient processes: Procurement processes can be inefficient and ineffective. Tenders may be prepared hastily, carelessly, and without proper consideration.
• Poor documentation: Documentation may be poor.
• Low quality: The quality of products, services, and work may be low.
• Non-compliance: There may be non-compliance with the scope, specifications, and terms of contracts.
• Delayed completion: Projects may be delayed or not completed.
• Inadequate infrastructure: There may not be adequate infrastructure to support procurement.
• Vendor development programs: Vendor development programs (VDPs) may be non-existent or ineffective.
• Cronyism: There may be interference from outside parties and cronyism, which affects the awarding of contracts.
Malpractice: Procurement officers may be involved in malpractice and not comply with the policies and procedures of the procurement system
=========================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
=========================
KEY WORDS = CHEAPEST AND DOWNGRADE
SEWA 28 HELI = 119 HELI BARU :
HapusSEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
-------------------------------------
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
=========================
KEY WORDS = CHEAPEST AND DOWNGRADE
Paling lawak TURKI TOLAK ToT kapal BOT KECIL TAIS 70M... 🤣🤣🤣
BalasHapus10 FOREIGN SUPPLIERS MILITARY EQUIPMENT MALON =
Hapus1. AMERIKA SERIKAT
2. RUSIA
3. TIONGKOK (CINA)
4. TURKI
5. UNI EROPA
6. PERANCIS
7. INGGRIS
8. JERMAN
9. INDONESIA
10. POLANDIA
-----
SATU-SATUNYA DI ASEAN
RELAX EKSPOR MRSS UEA The United Arab Emirates (UAE) anNOunced it had awarded the Indonesian shipyard PT PAL an AED1.5 billion (USD408.32 million) contract to supply a “multimission vessel” during the IDEX 2023 show being held in Abu Dhabi from 20 to 24 February.
-----
SATU-SATUNYA DI ASEAN
RELAX EKSPOR B2 SSV FILIPINA Dipercayakannya PT PAL Indonesia dalam pengadaan 2 (dua) unit kapal perang jenis Landing Dock oleh Angkatan Laut Filipina, karena kepuasan Pemerintah Filipina dan Angkatan Laut Filipina atas pengoperasian 2 unit Landing Dock atau Strategic Sealift Vessel (SSV) yang telah diserahterimakan oleh PAL beberapa tahun lalu.
-----
SATU-SATUNYA DI ASEAN
RELAX BUILD FRIGAT On August 25, the keel laying ceremony for the first of two Red White frigates was held at Indonesian state-owned shipbuilder PT PAL Indonesia’s facility in Surabaya City, East Java. Based on Babcock's Arrowhead 140 design, it is said that with a 140-metre length and a displacement of 5,996 tons, the Red White frigate will be the largest and most advanced surface combatant ever constructed in Indonesia.
-----
SATU_SATUNYA DI ASEAN
INDUSTRI PENERBANGAN
PT Dirgantara Indonesia (atau biasa disingkat menjadi PTDI) adalah produsen pesawat terbang pertama dan satu-satunya di Indonesia dan di wilayah Asia Tenggara. Dirgantara Indonesia tidak hanya memproduksi berbagai jenis pesawat terbang.
-----
SATU-SATUNYA DI ASEAN
PRODUKSI TANK MEDIUM
Indonesia currently is the only country in Southeast Asia that produces its own combat tanks. This tank was made Pindad, an Indonesian state- owned military equipment manufacturing company.
===========
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
Indonesia's warships are considered to be of good quality, and the country's navy is ranked fourth in the world. The quality of a navy is assessed based on a variety of factors, including the number and quality of warships and submarines, the mix of inventory, and the country's shipbuilding capabilities.
----------
Indonesian-made LPD warships have been praised for their quality and versatility:
• BRP Tarlac (LD-601) and BRP Davao del Sur (LD-602)
The first two LPDs delivered to the Philippines were commissioned in 2016 and 2017, respectively. They have participated in many exercises and humanitarian missions, and have been deployed to the South China Sea. A Philippine official praised the ships, noting their sophisticated maneuvers, including the "landing craft utility" (LCU).
• Indonesian Navy
The Indonesian Navy is considered one of the world's four strongest navies. The Navy's fleet includes aircraft, helicopters, submarines, frigates, corvettes, ASW corvettes, missile boats, patrol crafts, minesweepers, tank landing ships, and amphibious transport docks.
Some challenges for Indonesia's warship industry include the need to develop local production of ship parts and materials, and to secure government support for large-scale projects.
----------
Pesawat-pesawat buatan Indonesia diakui dunia karena kualitasnya, di antaranya:
• CN235-220 MPA
Pesawat ini merupakan karya anak bangsa yang mampu terbang selama 11 jam. Pesawat ini pernah diekspor ke Senegal.
• CN295
Pesawat multiguna yang dapat membawa 50 penumpang dan terbang ke daerah terpencil. Pesawat ini dibuat oleh PT Dirgantara Indonesia bekerja sama dengan Airbus Defense & Space.
• NC212 Family
Pesawat ini memiliki beberapa seri, yaitu NC212-200, NC212-400, NC212i, dan NC212i MSC. Pesawat ini mampu terbang selama 6–8 jam.
• N219 Nurtanio
Pesawat terbaru buatan PT Dirgantara Indonesia yang menggunakan teknologi canggih pada sistem avionik.
==============
KEY WORDS = FOREIGN SUPPLIERS MILITARY EQUIPMENT MALON
SEWA 28 HELI = 119 HELI BARU :
HapusSEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
-------------------------------------
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
=========================
KEY WORDS = CHEAPEST AND DOWNGRADE
Some weaknesses in Malonnn public procurement include:
Hapus• Transparency: The principle of transparency is not well adhered to. Interference from authorities, such as local politicians, can lead to corruption, scandal, and the abuse of public resources.
• Inefficient processes: Procurement processes can be inefficient and ineffective. Tenders may be prepared hastily, carelessly, and without proper consideration.
• Poor documentation: Documentation may be poor.
• Low quality: The quality of products, services, and work may be low.
• Non-compliance: There may be non-compliance with the scope, specifications, and terms of contracts.
• Delayed completion: Projects may be delayed or not completed.
• Inadequate infrastructure: There may not be adequate infrastructure to support procurement.
• Vendor development programs: Vendor development programs (VDPs) may be non-existent or ineffective.
• Cronyism: There may be interference from outside parties and cronyism, which affects the awarding of contracts.
Malpractice: Procurement officers may be involved in malpractice and not comply with the policies and procedures of the procurement system
=========================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
=========================
KEY WORDS = CHEAPEST AND DOWNGRADE
TIMNAS MACAN OMPONG =
HapusNATURALISASI = FAILED QWC ASIAN CUP PIALA CIKI-CIKI
NATURALISASI = FAILED QWC ASIAN CUP PIALA CIKI-CIKI
NATURALISASI = FAILED QWC ASIAN CUP PIALA CIKI-CIKI
Razali Alias - Singapore
Syed Adney - England
Matthew Davies - Australia
Brendan Gan - Australia
Darren Lok - England
Kiko Insa - Spain
Natxo Insa - Spain
Mohamadou Sumareh - Gambia
La'Vere Corbin-Ong - England
Dominic Tan - Singapore
Liridon Krasniqi - Yugoslavia
Guilherme de Paula - Brazil
Quentin Cheng - Australia
Ezequiel Agüero - Argentina
Lee Tuck - England
David Rowley - Australia
Stuart Wilkin - England
Endrick - Brazil
Paulo Josué - Brazil
Nooa Laine - Finland
Daniel Ting - England
Romel Morales - Colombia
Fergus Tierney - Scotland
-------------------
HIGHEST NATURALIZED PLAYERS = FAILED
HIGHEST NATURALIZED PLAYERS = FAILED
HIGHEST NATURALIZED PLAYERS = FAILED
Malaysia had 14 naturalized players, tying with Hong Kong for the joint-highest number of naturalized players. Malaysia has been actively recruiting foreign-born players since 2013 to increase their talent pool. Players with local heritage don't have to meet the five-year residency rule to switch nationalities, which gives them a longer time in the national team...
-
KUALIFIKASI PIALA DUNIA = TEWAS FAILED
-
PIALA ASIA = TEWAS FAILED
-
PIALA CIKI-CIKI (NON CALENDER FIFA) = TEWAS FAILED
-
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
Timnas Malon tersingkir dari Piala AFF 2024 atau ASEAN Championship usai ditahan Singapura 0-0 di Stadion Bukit Jalil, Jumat (20/12). Malon gagal ke semifinal Piala AFF 2024 usai menempati peringkat ketiga klasemen Grup A.
-------------------
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
171 ASET USANG 30 TAHUN =
Hapus108 TDM
29 TUDM
34 TLDM
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
==============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
==============
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
==============
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
==============
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
===============
VERSI TERMURAH FA50
VERSI TERMURAH FA50
VERSI TERMURAH FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
==============
DOWNGRADE ANKA
DOWNGRADE ANKA
2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
PUBLIC DEBT = DEFENCE SPENDING
HapusPUBLIC DEBT = DEFENCE SPENDING
PUBLIC DEBT = DEFENCE SPENDING
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
==============
2024 RASIO HUTANG 84,2% DARI GDP
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
==============
2024 HUTANG JATUH TEMPO = The federal government's debt is expected to be fully settled in 2053 if no new loans were to be taken to finance the deficit and to refinance maturing debts from 2024 onwards, said the Finance Ministry (MoF)
----
2023 TIDAK BAYAR HUTANG = “Ini bermakna bayaran khidmat hutang banyak…hanya membayar faedah bukan bayar hutang tertunggak,” kata Anwar lagi
----
2022 HUTANG BAYAR HUTANG 52,4% = Kah Woh menjelaskan pada tahun lalu, kerajaan ada membuat pinjaman yang meningkat sebanyak 11.6 peratus daripada RM194.5 bilion pada tahun sebelumnya. Daripada jumlah itu, beliau berkata 52.4 peratus atau RM113.7 bilion digunakan untuk membayar prinsipal pinjaman matang.
----
2021 HUTANG BAYAR HUTANG 50,4% = Sejumlah RM98.058 bilion atau 50.4 peratus daripada pinjaman baharu berjumlah RM194.555 bilion yang dibuat kerajaan pada tahun lalu digunakan untuk bayaran balik prinsipal pinjaman yang matang.
----
2020 HUTANG BAYAR HUTANG 60% = Jabatan Audit Negara (JAN) bimbang dengan tindakan kerajaan menggunakan hampir 60 peratus pinjaman baharu untuk membayar hutang .
----
2019 HUTANG BAYAR HUTANG 59% = Laporan Ketua Audit Negara mengenai Penyata Kewangan Kerajaan Persekutuan 2018 mendapati sejumlah 59 peratus pinjaman baharu kerajaan dibuat untuk membayar hutang kerajaan terdahulu
----
2018 RASIO HUTANG 80% DARI GDP : OPEN DONASI = Kementerian Keuangan Malon pada hari Rabu membuka rekening donasi supaya masyarakat dapat menyumbang untuk membantu negara membayar utang yang mencapai 1 triliun ringgit (US$ 250,8 miliar) atau 80 persen dari PDB.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
171 ASET USANG 30 TAHUN =
108 TDM
29 TUDM
34 TLDM
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
==============
KEY WORDS =
1. PUBLIC DEBT = DEFENCE SPENDING
2. RATIO DEBT 84,2% TO GDP
3. DEBT TO PAY DEBT
4. 171 COMBAT EQUIPMENT 30 YEARS
SYARIKAT MALAYSIA TERLIBAT DALAM PROJEK KAPAL INDONESIA
BalasHapusSyarikat pertahanan Malaysia, Protank Group ketika ini dilaporkan turut terlibat dalam Projek Frigate Merah Putih Indonesia
Mereka terlibat membekalkan tangki penerima udara dan sistem pengisian minyak untuk 2 kapal Frigate Indonesia berkenaan. Protank Group merupakan antara syarikat yang mahir dalam pembekalan sistem bahan api dua perkara berkenaan dan telah banyak membekalkan sistem itu kepada tentera laut di seluruh dunia
Protank Group juga turut terlibat dalam pembekalan sistem sama untuk LCS TLDM
10 FOREIGN SUPPLIERS MILITARY EQUIPMENT MALON =
Hapus1. AMERIKA SERIKAT
2. RUSIA
3. TIONGKOK (CINA)
4. TURKI
5. UNI EROPA
6. PERANCIS
7. INGGRIS
8. JERMAN
9. INDONESIA
10. POLANDIA
-----
SATU-SATUNYA DI ASEAN
RELAX EKSPOR MRSS UEA The United Arab Emirates (UAE) anNOunced it had awarded the Indonesian shipyard PT PAL an AED1.5 billion (USD408.32 million) contract to supply a “multimission vessel” during the IDEX 2023 show being held in Abu Dhabi from 20 to 24 February.
-----
SATU-SATUNYA DI ASEAN
RELAX EKSPOR B2 SSV FILIPINA Dipercayakannya PT PAL Indonesia dalam pengadaan 2 (dua) unit kapal perang jenis Landing Dock oleh Angkatan Laut Filipina, karena kepuasan Pemerintah Filipina dan Angkatan Laut Filipina atas pengoperasian 2 unit Landing Dock atau Strategic Sealift Vessel (SSV) yang telah diserahterimakan oleh PAL beberapa tahun lalu.
-----
SATU-SATUNYA DI ASEAN
RELAX BUILD FRIGAT On August 25, the keel laying ceremony for the first of two Red White frigates was held at Indonesian state-owned shipbuilder PT PAL Indonesia’s facility in Surabaya City, East Java. Based on Babcock's Arrowhead 140 design, it is said that with a 140-metre length and a displacement of 5,996 tons, the Red White frigate will be the largest and most advanced surface combatant ever constructed in Indonesia.
-----
SATU_SATUNYA DI ASEAN
INDUSTRI PENERBANGAN
PT Dirgantara Indonesia (atau biasa disingkat menjadi PTDI) adalah produsen pesawat terbang pertama dan satu-satunya di Indonesia dan di wilayah Asia Tenggara. Dirgantara Indonesia tidak hanya memproduksi berbagai jenis pesawat terbang.
-----
SATU-SATUNYA DI ASEAN
PRODUKSI TANK MEDIUM
Indonesia currently is the only country in Southeast Asia that produces its own combat tanks. This tank was made Pindad, an Indonesian state- owned military equipment manufacturing company.
===========
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
Indonesia's warships are considered to be of good quality, and the country's navy is ranked fourth in the world. The quality of a navy is assessed based on a variety of factors, including the number and quality of warships and submarines, the mix of inventory, and the country's shipbuilding capabilities.
----------
Indonesian-made LPD warships have been praised for their quality and versatility:
• BRP Tarlac (LD-601) and BRP Davao del Sur (LD-602)
The first two LPDs delivered to the Philippines were commissioned in 2016 and 2017, respectively. They have participated in many exercises and humanitarian missions, and have been deployed to the South China Sea. A Philippine official praised the ships, noting their sophisticated maneuvers, including the "landing craft utility" (LCU).
• Indonesian Navy
The Indonesian Navy is considered one of the world's four strongest navies. The Navy's fleet includes aircraft, helicopters, submarines, frigates, corvettes, ASW corvettes, missile boats, patrol crafts, minesweepers, tank landing ships, and amphibious transport docks.
Some challenges for Indonesia's warship industry include the need to develop local production of ship parts and materials, and to secure government support for large-scale projects.
----------
Pesawat-pesawat buatan Indonesia diakui dunia karena kualitasnya, di antaranya:
• CN235-220 MPA
Pesawat ini merupakan karya anak bangsa yang mampu terbang selama 11 jam. Pesawat ini pernah diekspor ke Senegal.
• CN295
Pesawat multiguna yang dapat membawa 50 penumpang dan terbang ke daerah terpencil. Pesawat ini dibuat oleh PT Dirgantara Indonesia bekerja sama dengan Airbus Defense & Space.
• NC212 Family
Pesawat ini memiliki beberapa seri, yaitu NC212-200, NC212-400, NC212i, dan NC212i MSC. Pesawat ini mampu terbang selama 6–8 jam.
• N219 Nurtanio
Pesawat terbaru buatan PT Dirgantara Indonesia yang menggunakan teknologi canggih pada sistem avionik.
==============
KEY WORDS = FOREIGN SUPPLIERS MILITARY EQUIPMENT MALON
TIMNAS MACAN OMPONG =
HapusNATURALISASI = FAILED QWC ASIAN CUP PIALA CIKI-CIKI
NATURALISASI = FAILED QWC ASIAN CUP PIALA CIKI-CIKI
NATURALISASI = FAILED QWC ASIAN CUP PIALA CIKI-CIKI
Razali Alias - Singapore
Syed Adney - England
Matthew Davies - Australia
Brendan Gan - Australia
Darren Lok - England
Kiko Insa - Spain
Natxo Insa - Spain
Mohamadou Sumareh - Gambia
La'Vere Corbin-Ong - England
Dominic Tan - Singapore
Liridon Krasniqi - Yugoslavia
Guilherme de Paula - Brazil
Quentin Cheng - Australia
Ezequiel Agüero - Argentina
Lee Tuck - England
David Rowley - Australia
Stuart Wilkin - England
Endrick - Brazil
Paulo Josué - Brazil
Nooa Laine - Finland
Daniel Ting - England
Romel Morales - Colombia
Fergus Tierney - Scotland
-------------------
HIGHEST NATURALIZED PLAYERS = FAILED
HIGHEST NATURALIZED PLAYERS = FAILED
HIGHEST NATURALIZED PLAYERS = FAILED
Malaysia had 14 naturalized players, tying with Hong Kong for the joint-highest number of naturalized players. Malaysia has been actively recruiting foreign-born players since 2013 to increase their talent pool. Players with local heritage don't have to meet the five-year residency rule to switch nationalities, which gives them a longer time in the national team...
-
KUALIFIKASI PIALA DUNIA = TEWAS FAILED
-
PIALA ASIA = TEWAS FAILED
-
PIALA CIKI-CIKI (NON CALENDER FIFA) = TEWAS FAILED
-
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
Timnas Malon tersingkir dari Piala AFF 2024 atau ASEAN Championship usai ditahan Singapura 0-0 di Stadion Bukit Jalil, Jumat (20/12). Malon gagal ke semifinal Piala AFF 2024 usai menempati peringkat ketiga klasemen Grup A.
-------------------
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
PUBLIC DEBT = DEFENCE SPENDING
HapusPUBLIC DEBT = DEFENCE SPENDING
PUBLIC DEBT = DEFENCE SPENDING
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
==============
2024 RASIO HUTANG 84,2% DARI GDP
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
==============
2024 HUTANG JATUH TEMPO = The federal government's debt is expected to be fully settled in 2053 if no new loans were to be taken to finance the deficit and to refinance maturing debts from 2024 onwards, said the Finance Ministry (MoF)
----
2023 TIDAK BAYAR HUTANG = “Ini bermakna bayaran khidmat hutang banyak…hanya membayar faedah bukan bayar hutang tertunggak,” kata Anwar lagi
----
2022 HUTANG BAYAR HUTANG 52,4% = Kah Woh menjelaskan pada tahun lalu, kerajaan ada membuat pinjaman yang meningkat sebanyak 11.6 peratus daripada RM194.5 bilion pada tahun sebelumnya. Daripada jumlah itu, beliau berkata 52.4 peratus atau RM113.7 bilion digunakan untuk membayar prinsipal pinjaman matang.
----
2021 HUTANG BAYAR HUTANG 50,4% = Sejumlah RM98.058 bilion atau 50.4 peratus daripada pinjaman baharu berjumlah RM194.555 bilion yang dibuat kerajaan pada tahun lalu digunakan untuk bayaran balik prinsipal pinjaman yang matang.
----
2020 HUTANG BAYAR HUTANG 60% = Jabatan Audit Negara (JAN) bimbang dengan tindakan kerajaan menggunakan hampir 60 peratus pinjaman baharu untuk membayar hutang .
----
2019 HUTANG BAYAR HUTANG 59% = Laporan Ketua Audit Negara mengenai Penyata Kewangan Kerajaan Persekutuan 2018 mendapati sejumlah 59 peratus pinjaman baharu kerajaan dibuat untuk membayar hutang kerajaan terdahulu
----
2018 RASIO HUTANG 80% DARI GDP : OPEN DONASI = Kementerian Keuangan Malon pada hari Rabu membuka rekening donasi supaya masyarakat dapat menyumbang untuk membantu negara membayar utang yang mencapai 1 triliun ringgit (US$ 250,8 miliar) atau 80 persen dari PDB.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
171 ASET USANG 30 TAHUN =
108 TDM
29 TUDM
34 TLDM
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
==============
KEY WORDS =
1. PUBLIC DEBT = DEFENCE SPENDING
2. RATIO DEBT 84,2% TO GDP
3. DEBT TO PAY DEBT
4. 171 COMBAT EQUIPMENT 30 YEARS
HASIL STUDI ........
HapusBELANJA PERTAHANAN = TERGANTUNG HUTANG
BELANJA PERTAHANAN = TERGANTUNG HUTANG
BELANJA PERTAHANAN = TERGANTUNG HUTANG
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
=============
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
The Malonnn Armed Forces (MAF) faces a number of challenges, including:
• Logistics
A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
• Budgeting
Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
• Personnel
The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
• Procurement
The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
• Political interference
Political interference and corruption are undermining combat readiness.
• Territorial disputes
Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
• Transboundary haze
Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Technological obsolescence
Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
The Malonnn army has several weaknesses, including:
Hapus• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
=========
the Malonn Armed Forces (MAF) faces several challenges with maintaining its equipment, including:
• Budget
The MAF has a limited budget, which affects the serviceability of its assets.
• Outsourcing
The MAF has outsourced maintenance of its assets since the 1970s, but the outsourcing program has faced challenges such as undertrained staff, underperforming contractors, and lack of contract enforcement.
• Old inventory
The Royal Malonn Navy (RMN) has a number of old ships in service, including the Kasturi-class Corvette, the Laksamana Corvette class, the Perdana-class gunboat, and the Handalan and Jerung class.
• Spare parts
There are issues with delivering spare parts to soldiers on the ground at the right time.
----------
Malon's military equipment is old due to a number of factors, including:
• Outdated equipment
The majority of the Malonn Armed Forces' (MAF) equipment was purchased between the 1970s and 1990s.
• Low and erratic allocations
The Royal Malonn Navy (RMN) has many ships that are older than the HTMS Sukhothai, which sank in 2022.
• Government's inability to provide modern equipment
The government is unable to provide the MAF with modern defense assets.
• Defense industry issues
The defense industry is controlled by the government, but some say it lacks accountability and determination. Some issues include the import of critical components, local companies acting as intermediaries for foreign companies, and a lack of research and development.
=========
BUDGET 2025 = ASSET PROCUREMENT DOWN
Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
============
The Royal Malonnn Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Technological obsolescence
Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
Some weaknesses in Malonnn public procurement include:
Hapus• Transparency: The principle of transparency is not well adhered to. Interference from authorities, such as local politicians, can lead to corruption, scandal, and the abuse of public resources.
• Inefficient processes: Procurement processes can be inefficient and ineffective. Tenders may be prepared hastily, carelessly, and without proper consideration.
• Poor documentation: Documentation may be poor.
• Low quality: The quality of products, services, and work may be low.
• Non-compliance: There may be non-compliance with the scope, specifications, and terms of contracts.
• Delayed completion: Projects may be delayed or not completed.
• Inadequate infrastructure: There may not be adequate infrastructure to support procurement.
• Vendor development programs: Vendor development programs (VDPs) may be non-existent or ineffective.
• Cronyism: There may be interference from outside parties and cronyism, which affects the awarding of contracts.
Malpractice: Procurement officers may be involved in malpractice and not comply with the policies and procedures of the procurement system
===================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
----
CHEAPEST VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a
SYARIKAT MALAYSIA TERLIBAT DALAM PROJEK KAPAL INDONESIA
BalasHapusSyarikat pertahanan Malaysia, Protank Group ketika ini dilaporkan turut terlibat dalam Projek Frigate Merah Putih Indonesia
Mereka terlibat membekalkan tangki penerima udara dan sistem pengisian minyak untuk 2 kapal Frigate Indonesia berkenaan. Protank Group merupakan antara syarikat yang mahir dalam pembekalan sistem bahan api dua perkara berkenaan dan telah banyak membekalkan sistem itu kepada tentera laut di seluruh dunia
Protank Group juga turut terlibat dalam pembekalan sistem sama untuk LCS TLDM
10 FOREIGN SUPPLIERS MILITARY EQUIPMENT MALON =
Hapus1. AMERIKA SERIKAT
2. RUSIA
3. TIONGKOK (CINA)
4. TURKI
5. UNI EROPA
6. PERANCIS
7. INGGRIS
8. JERMAN
9. INDONESIA
10. POLANDIA
-----
SATU-SATUNYA DI ASEAN
RELAX EKSPOR MRSS UEA The United Arab Emirates (UAE) anNOunced it had awarded the Indonesian shipyard PT PAL an AED1.5 billion (USD408.32 million) contract to supply a “multimission vessel” during the IDEX 2023 show being held in Abu Dhabi from 20 to 24 February.
-----
SATU-SATUNYA DI ASEAN
RELAX EKSPOR B2 SSV FILIPINA Dipercayakannya PT PAL Indonesia dalam pengadaan 2 (dua) unit kapal perang jenis Landing Dock oleh Angkatan Laut Filipina, karena kepuasan Pemerintah Filipina dan Angkatan Laut Filipina atas pengoperasian 2 unit Landing Dock atau Strategic Sealift Vessel (SSV) yang telah diserahterimakan oleh PAL beberapa tahun lalu.
-----
SATU-SATUNYA DI ASEAN
RELAX BUILD FRIGAT On August 25, the keel laying ceremony for the first of two Red White frigates was held at Indonesian state-owned shipbuilder PT PAL Indonesia’s facility in Surabaya City, East Java. Based on Babcock's Arrowhead 140 design, it is said that with a 140-metre length and a displacement of 5,996 tons, the Red White frigate will be the largest and most advanced surface combatant ever constructed in Indonesia.
-----
SATU_SATUNYA DI ASEAN
INDUSTRI PENERBANGAN
PT Dirgantara Indonesia (atau biasa disingkat menjadi PTDI) adalah produsen pesawat terbang pertama dan satu-satunya di Indonesia dan di wilayah Asia Tenggara. Dirgantara Indonesia tidak hanya memproduksi berbagai jenis pesawat terbang.
-----
SATU-SATUNYA DI ASEAN
PRODUKSI TANK MEDIUM
Indonesia currently is the only country in Southeast Asia that produces its own combat tanks. This tank was made Pindad, an Indonesian state- owned military equipment manufacturing company.
===========
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
Indonesia's warships are considered to be of good quality, and the country's navy is ranked fourth in the world. The quality of a navy is assessed based on a variety of factors, including the number and quality of warships and submarines, the mix of inventory, and the country's shipbuilding capabilities.
----------
Indonesian-made LPD warships have been praised for their quality and versatility:
• BRP Tarlac (LD-601) and BRP Davao del Sur (LD-602)
The first two LPDs delivered to the Philippines were commissioned in 2016 and 2017, respectively. They have participated in many exercises and humanitarian missions, and have been deployed to the South China Sea. A Philippine official praised the ships, noting their sophisticated maneuvers, including the "landing craft utility" (LCU).
• Indonesian Navy
The Indonesian Navy is considered one of the world's four strongest navies. The Navy's fleet includes aircraft, helicopters, submarines, frigates, corvettes, ASW corvettes, missile boats, patrol crafts, minesweepers, tank landing ships, and amphibious transport docks.
Some challenges for Indonesia's warship industry include the need to develop local production of ship parts and materials, and to secure government support for large-scale projects.
----------
Pesawat-pesawat buatan Indonesia diakui dunia karena kualitasnya, di antaranya:
• CN235-220 MPA
Pesawat ini merupakan karya anak bangsa yang mampu terbang selama 11 jam. Pesawat ini pernah diekspor ke Senegal.
• CN295
Pesawat multiguna yang dapat membawa 50 penumpang dan terbang ke daerah terpencil. Pesawat ini dibuat oleh PT Dirgantara Indonesia bekerja sama dengan Airbus Defense & Space.
• NC212 Family
Pesawat ini memiliki beberapa seri, yaitu NC212-200, NC212-400, NC212i, dan NC212i MSC. Pesawat ini mampu terbang selama 6–8 jam.
• N219 Nurtanio
Pesawat terbaru buatan PT Dirgantara Indonesia yang menggunakan teknologi canggih pada sistem avionik.
==============
KEY WORDS = FOREIGN SUPPLIERS MILITARY EQUIPMENT MALON
TIMNAS MACAN OMPONG
Hapus14 NATURALISASI = TEWAS FAILED
14 NATURALISASI = TEWAS FAILED
14 NATURALISASI = TEWAS FAILED
Malaysia had 14 naturalized players, tying with Hong Kong for the joint-highest number of naturalized players. Malaysia has been actively recruiting foreign-born players since 2013 to increase their talent pool. Players with local heritage don't have to meet the five-year residency rule to switch nationalities, which gives them a longer time in the national team...
-
KUALIFIKASI PIALA DUNIA = TEWAS FAILED
-
PIALA ASIA = TEWAS FAILED
-
PIALA CIKI-CIKI (NON CALENDER FIFA) = TEWAS FAILED
-
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
Timnas Malon tersingkir dari Piala AFF 2024 atau ASEAN Championship usai ditahan Singapura 0-0 di Stadion Bukit Jalil, Jumat (20/12). Malon gagal ke semifinal Piala AFF 2024 usai menempati peringkat ketiga klasemen Grup A.
-------------------
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
-------------------
Malonn's economy has faced a number of challenges, including:
• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
==============
==============
TIMNAS GARUDA
KUALIFIKASI PIALA DUNIA ROUND 3 = SENIOR
-
PIALA ASIA = SENIOR, U23, U20
-
PIALA CIKI-CIKI (NON CALENDER FIFA) = U20
=========================
KEY WORDS = 14 NATURALISASI : TEWAS FAILED QWC ASIAN CUP
HASIL STUDI ........
HapusBELANJA PERTAHANAN = TERGANTUNG HUTANG
BELANJA PERTAHANAN = TERGANTUNG HUTANG
BELANJA PERTAHANAN = TERGANTUNG HUTANG
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
==============
2024 RASIO HUTANG 84,2% DARI GDP
The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023.
In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018).
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
==============
2024 HUTANG JATUH TEMPO = The federal government's debt is expected to be fully settled in 2053 if no new loans were to be taken to finance the deficit and to refinance maturing debts from 2024 onwards, said the Finance Ministry (MoF)
----
2023 TIDAK BAYAR HUTANG = “Ini bermakna bayaran khidmat hutang banyak…hanya membayar faedah bukan bayar hutang tertunggak,” kata Anwar lagi
----
2022 HUTANG BAYAR HUTANG 52,4% = Kah Woh menjelaskan pada tahun lalu, kerajaan ada membuat pinjaman yang meningkat sebanyak 11.6 peratus daripada RM194.5 bilion pada tahun sebelumnya. Daripada jumlah itu, beliau berkata 52.4 peratus atau RM113.7 bilion digunakan untuk membayar prinsipal pinjaman matang.
----
2021 HUTANG BAYAR HUTANG 50,4% = Sejumlah RM98.058 bilion atau 50.4 peratus daripada pinjaman baharu berjumlah RM194.555 bilion yang dibuat kerajaan pada tahun lalu digunakan untuk bayaran balik prinsipal pinjaman yang matang.
----
2020 HUTANG BAYAR HUTANG 60% = Jabatan Audit Negara (JAN) bimbang dengan tindakan kerajaan menggunakan hampir 60 peratus pinjaman baharu untuk membayar hutang .
----
2019 HUTANG BAYAR HUTANG 59% = Laporan Ketua Audit Negara mengenai Penyata Kewangan Kerajaan Persekutuan 2018 mendapati sejumlah 59 peratus pinjaman baharu kerajaan dibuat untuk membayar hutang kerajaan terdahulu
----
2018 RASIO HUTANG 80% DARI GDP : OPEN DONASI = Kementerian Keuangan Malon pada hari Rabu membuka rekening donasi supaya masyarakat dapat menyumbang untuk membantu negara membayar utang yang mencapai 1 triliun ringgit (US$ 250,8 miliar) atau 80 persen dari PDB.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
BUDGET 2025 = SALARIES AND ALLOWANCES
HapusBUDGET 2025 = NOT ASSETS
BUDGET 2025 = NOT ASSETS
BUDGET 2025 = NOT ASSETS
PMX DS Anwar Ibrahim today announce an allocation of RM40.6 billion for the national security sector from the RM461 billion 2025 national budget. This is an increase of RM2 billion for the sector which includes Home and Defence ministries, from the 2024 budget of RM38.7 billion.
Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
==============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
Mantap MALAYSIA.. 😎😎🇲🇾🇲🇾
BalasHapus10 FOREIGN SUPPLIERS MILITARY EQUIPMENT MALON =
Hapus1. AMERIKA SERIKAT
2. RUSIA
3. TIONGKOK (CINA)
4. TURKI
5. UNI EROPA
6. PERANCIS
7. INGGRIS
8. JERMAN
9. INDONESIA
10. POLANDIA
-----
SATU-SATUNYA DI ASEAN
RELAX EKSPOR MRSS UEA The United Arab Emirates (UAE) anNOunced it had awarded the Indonesian shipyard PT PAL an AED1.5 billion (USD408.32 million) contract to supply a “multimission vessel” during the IDEX 2023 show being held in Abu Dhabi from 20 to 24 February.
-----
SATU-SATUNYA DI ASEAN
RELAX EKSPOR B2 SSV FILIPINA Dipercayakannya PT PAL Indonesia dalam pengadaan 2 (dua) unit kapal perang jenis Landing Dock oleh Angkatan Laut Filipina, karena kepuasan Pemerintah Filipina dan Angkatan Laut Filipina atas pengoperasian 2 unit Landing Dock atau Strategic Sealift Vessel (SSV) yang telah diserahterimakan oleh PAL beberapa tahun lalu.
-----
SATU-SATUNYA DI ASEAN
RELAX BUILD FRIGAT On August 25, the keel laying ceremony for the first of two Red White frigates was held at Indonesian state-owned shipbuilder PT PAL Indonesia’s facility in Surabaya City, East Java. Based on Babcock's Arrowhead 140 design, it is said that with a 140-metre length and a displacement of 5,996 tons, the Red White frigate will be the largest and most advanced surface combatant ever constructed in Indonesia.
-----
SATU_SATUNYA DI ASEAN
INDUSTRI PENERBANGAN
PT Dirgantara Indonesia (atau biasa disingkat menjadi PTDI) adalah produsen pesawat terbang pertama dan satu-satunya di Indonesia dan di wilayah Asia Tenggara. Dirgantara Indonesia tidak hanya memproduksi berbagai jenis pesawat terbang.
-----
SATU-SATUNYA DI ASEAN
PRODUKSI TANK MEDIUM
Indonesia currently is the only country in Southeast Asia that produces its own combat tanks. This tank was made Pindad, an Indonesian state- owned military equipment manufacturing company.
===========
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
GOOD QUALITY WARSHIPS = RANK 4 IN THE WORLD
Indonesia's warships are considered to be of good quality, and the country's navy is ranked fourth in the world. The quality of a navy is assessed based on a variety of factors, including the number and quality of warships and submarines, the mix of inventory, and the country's shipbuilding capabilities.
----------
Indonesian-made LPD warships have been praised for their quality and versatility:
• BRP Tarlac (LD-601) and BRP Davao del Sur (LD-602)
The first two LPDs delivered to the Philippines were commissioned in 2016 and 2017, respectively. They have participated in many exercises and humanitarian missions, and have been deployed to the South China Sea. A Philippine official praised the ships, noting their sophisticated maneuvers, including the "landing craft utility" (LCU).
• Indonesian Navy
The Indonesian Navy is considered one of the world's four strongest navies. The Navy's fleet includes aircraft, helicopters, submarines, frigates, corvettes, ASW corvettes, missile boats, patrol crafts, minesweepers, tank landing ships, and amphibious transport docks.
Some challenges for Indonesia's warship industry include the need to develop local production of ship parts and materials, and to secure government support for large-scale projects.
----------
Pesawat-pesawat buatan Indonesia diakui dunia karena kualitasnya, di antaranya:
• CN235-220 MPA
Pesawat ini merupakan karya anak bangsa yang mampu terbang selama 11 jam. Pesawat ini pernah diekspor ke Senegal.
• CN295
Pesawat multiguna yang dapat membawa 50 penumpang dan terbang ke daerah terpencil. Pesawat ini dibuat oleh PT Dirgantara Indonesia bekerja sama dengan Airbus Defense & Space.
• NC212 Family
Pesawat ini memiliki beberapa seri, yaitu NC212-200, NC212-400, NC212i, dan NC212i MSC. Pesawat ini mampu terbang selama 6–8 jam.
• N219 Nurtanio
Pesawat terbaru buatan PT Dirgantara Indonesia yang menggunakan teknologi canggih pada sistem avionik.
==============
KEY WORDS = FOREIGN SUPPLIERS MILITARY EQUIPMENT MALON
PUBLIC DEBT = DEFENCE SPENDING
HapusPUBLIC DEBT = DEFENCE SPENDING
PUBLIC DEBT = DEFENCE SPENDING
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
==============
2024 RASIO HUTANG 84,2% DARI GDP
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
==============
2024 HUTANG JATUH TEMPO = The federal government's debt is expected to be fully settled in 2053 if no new loans were to be taken to finance the deficit and to refinance maturing debts from 2024 onwards, said the Finance Ministry (MoF)
----
2023 TIDAK BAYAR HUTANG = “Ini bermakna bayaran khidmat hutang banyak…hanya membayar faedah bukan bayar hutang tertunggak,” kata Anwar lagi
----
2022 HUTANG BAYAR HUTANG 52,4% = Kah Woh menjelaskan pada tahun lalu, kerajaan ada membuat pinjaman yang meningkat sebanyak 11.6 peratus daripada RM194.5 bilion pada tahun sebelumnya. Daripada jumlah itu, beliau berkata 52.4 peratus atau RM113.7 bilion digunakan untuk membayar prinsipal pinjaman matang.
----
2021 HUTANG BAYAR HUTANG 50,4% = Sejumlah RM98.058 bilion atau 50.4 peratus daripada pinjaman baharu berjumlah RM194.555 bilion yang dibuat kerajaan pada tahun lalu digunakan untuk bayaran balik prinsipal pinjaman yang matang.
----
2020 HUTANG BAYAR HUTANG 60% = Jabatan Audit Negara (JAN) bimbang dengan tindakan kerajaan menggunakan hampir 60 peratus pinjaman baharu untuk membayar hutang .
----
2019 HUTANG BAYAR HUTANG 59% = Laporan Ketua Audit Negara mengenai Penyata Kewangan Kerajaan Persekutuan 2018 mendapati sejumlah 59 peratus pinjaman baharu kerajaan dibuat untuk membayar hutang kerajaan terdahulu
----
2018 RASIO HUTANG 80% DARI GDP : OPEN DONASI = Kementerian Keuangan Malon pada hari Rabu membuka rekening donasi supaya masyarakat dapat menyumbang untuk membantu negara membayar utang yang mencapai 1 triliun ringgit (US$ 250,8 miliar) atau 80 persen dari PDB.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
171 ASET USANG 30 TAHUN =
108 TDM
29 TUDM
34 TLDM
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
==============
KEY WORDS =
1. PUBLIC DEBT = DEFENCE SPENDING
2. RATIO DEBT 84,2% TO GDP
3. DEBT TO PAY DEBT
4. 171 COMBAT EQUIPMENT 30 YEARS
SEWA 28 HELI = 119 HELI BARU :
HapusSEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
----
CHEAPEST VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
==========
1. HUTANG 84.2% DARI GDP
1. HUTANG 84.2% DARI GDP
2. HUTANG NEGARA RM 1.5 TRLLIUN
3. HUTANG 1MDB RM 18.2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST SHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. TUDM SEWA 12 AW149
62. TUDM SEWA 4 AW139
63. TUDM SEWA 5 EC120B
64. TLDM SEWA 2 AW159
65. TDM SEWA 4 UH-60A
67. TDM SEWA 12 AW149
68. BOMBA SEWA 4 AW139
69. MMEA SEWA 2 AW159
70. POLIS SEWA 7 BELL429
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
TIMNAS MACAN OMPONG
Hapus14 NATURALISASI = TEWAS FAILED
14 NATURALISASI = TEWAS FAILED
14 NATURALISASI = TEWAS FAILED
Malaysia had 14 naturalized players, tying with Hong Kong for the joint-highest number of naturalized players. Malaysia has been actively recruiting foreign-born players since 2013 to increase their talent pool. Players with local heritage don't have to meet the five-year residency rule to switch nationalities, which gives them a longer time in the national team...
-
KUALIFIKASI PIALA DUNIA = TEWAS FAILED
-
PIALA ASIA = TEWAS FAILED
-
PIALA CIKI-CIKI (NON CALENDER FIFA) = TEWAS FAILED
-
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
Timnas Malon tersingkir dari Piala AFF 2024 atau ASEAN Championship usai ditahan Singapura 0-0 di Stadion Bukit Jalil, Jumat (20/12). Malon gagal ke semifinal Piala AFF 2024 usai menempati peringkat ketiga klasemen Grup A.
-------------------
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
-------------------
Malonn's economy has faced a number of challenges, including:
• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
==============
==============
TIMNAS GARUDA
KUALIFIKASI PIALA DUNIA ROUND 3 = SENIOR
-
PIALA ASIA = SENIOR, U23, U20
-
PIALA CIKI-CIKI (NON CALENDER FIFA) = U20
=========================
KEY WORDS = 14 NATURALISASI : TEWAS FAILED QWC ASIAN CUP
The Malonnn army has several weaknesses, including:
Hapus• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....
=========================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
COMMISSION
HapusCOMMISSION
COMMISSION
The military likely had no idea they were being used by politicians and their cronies to purchase equipment, especially those that do not meet their technical and operational specifications. Whether some of these officers were also greased along the way by the politicians is something else. It is strange that no one in the military learned the lessons of the Scorpene submarine scandal that preceded the CLS debacle by a decade. Malonn bought two Scorpene-class submarines from France in 2002 when Najib Razak was defense minister and later PM. A two-ringgit Malonnn company owned by a Najib’s crony received a €114 million “commission” for the purchase
=========================
Some weaknesses in Malonnn public procurement include:
• Transparency: The principle of transparency is not well adhered to. Interference from authorities, such as local politicians, can lead to corruption, scandal, and the abuse of public resources.
• Inefficient processes: Procurement processes can be inefficient and ineffective. Tenders may be prepared hastily, carelessly, and without proper consideration.
• Poor documentation: Documentation may be poor.
• Low quality: The quality of products, services, and work may be low.
• Non-compliance: There may be non-compliance with the scope, specifications, and terms of contracts.
• Delayed completion: Projects may be delayed or not completed.
• Inadequate infrastructure: There may not be adequate infrastructure to support procurement.
• Vendor development programs: Vendor development programs (VDPs) may be non-existent or ineffective.
• Cronyism: There may be interference from outside parties and cronyism, which affects the awarding of contracts.
Malpractice: Procurement officers may be involved in malpractice and not comply with the policies and procedures of the procurement system
=========================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
----
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
=========
VERSI TERMURAH FA50
VERSI TERMURAH FA50
VERSI TERMURAH FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
=========
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
=========================
KEY WORDS = COMMISSION, COMMISSION AND COMMISSION
LEASE 30 YEARS = VSHORAD AND VSHORAD CHINA
HapusLEASE 30 YEARS = VSHORAD AND VSHORAD CHINA
LEASE 30 YEARS = VSHORAD AND VSHORAD CHINA
the Madani government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd. The estimated cost for the deal is RM10.7 billion and it will be covered in installments over a 30-year lease period.
How does this relate to the military, then? Not much really, but I was told recently that there are proposals for the leasing of one hundred three-tonne GS Cargo trucks and un-known number of VSHORAD systems for the Army. And just maybe, the approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals. There is also the massive leasing deals for helicopters for all the services to think about.
==============
LEASE 15 YEARS
LEASE 15 YEARS
LEASE 15 YEARS
PMX has defended the decision to lease the helicopters for the military and other government agencies – RM16.5 billion for 15 years – during the Parliament session on Thursday. Among others he said the government adopted the leasing model to reduce maintenance costs and at the same time improved the operational readiness of the fleet.
DS Anwar Ibrahim did not address the fact that the government will be paying some RM1 billion a year for 15 years for the helicopters. He also said the helicopters selected were based on the specifications and requirements of the agencies themselves.
He also confirmed that the Army will also be part of the leasing programme apart from RMAF,RMN, MMEA, police, Fire and Rescue Department, and the Prime Minister Department. Apart from RMAF 12 and police’s seven helicopters, he did not give the breakdown for the other services and agencies.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
CHEAPEST VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
----
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
BUDGET 2025 = SALARIES AND ALLOWANCES
HapusBUDGET 2025 = NOT ASSETS
BUDGET 2025 = NOT ASSETS
BUDGET 2025 = NOT ASSETS
PMX DS Anwar Ibrahim today announce an allocation of RM40.6 billion for the national security sector from the RM461 billion 2025 national budget. This is an increase of RM2 billion for the sector which includes Home and Defence ministries, from the 2024 budget of RM38.7 billion.
Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
==============
BUDGET 2025 = ASSET PROCUREMENT DOWN
BUDGET 2025 = ASSET PROCUREMENT DOWN
BUDGET 2025 = ASSET PROCUREMENT DOWN
Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
==============
Some weaknesses in Malonnn public procurement include:
• Transparency: The principle of transparency is not well adhered to. Interference from authorities, such as local politicians, can lead to corruption, scandal, and the abuse of public resources.
• Inefficient processes: Procurement processes can be inefficient and ineffective. Tenders may be prepared hastily, carelessly, and without proper consideration.
• Poor documentation: Documentation may be poor.
• Low quality: The quality of products, services, and work may be low.
• Non-compliance: There may be non-compliance with the scope, specifications, and terms of contracts.
• Delayed completion: Projects may be delayed or not completed.
• Inadequate infrastructure: There may not be adequate infrastructure to support procurement.
• Vendor development programs: Vendor development programs (VDPs) may be non-existent or ineffective.
• Cronyism: There may be interference from outside parties and cronyism, which affects the awarding of contracts.
Malpractice: Procurement officers may be involved in malpractice and not comply with the policies and procedures of the procurement system
==============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
----
CHEAPEST VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
SEWA 28 HELI = 119 HELI BARU :
HapusSEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
==============
BUDGET 2025 = SALARIES AND ALLOWANCES
BUDGET 2025 = NOT ASSETS
BUDGET 2025 = NOT ASSETS
BUDGET 2025 = NOT ASSETS
PMX DS Anwar Ibrahim today announce an allocation of RM40.6 billion for the national security sector from the RM461 billion 2025 national budget. This is an increase of RM2 billion for the sector which includes Home and Defence ministries, from the 2024 budget of RM38.7 billion.
Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
==============
BUDGET 2025 = ASSET PROCUREMENT DOWN
BUDGET 2025 = ASSET PROCUREMENT DOWN
BUDGET 2025 = ASSET PROCUREMENT DOWN
Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
==============
Some weaknesses in Malonnn public procurement include:
• Transparency: The principle of transparency is not well adhered to. Interference from authorities, such as local politicians, can lead to corruption, scandal, and the abuse of public resources.
• Inefficient processes: Procurement processes can be inefficient and ineffective. Tenders may be prepared hastily, carelessly, and without proper consideration.
• Poor documentation: Documentation may be poor.
• Low quality: The quality of products, services, and work may be low.
• Non-compliance: There may be non-compliance with the scope, specifications, and terms of contracts.
• Delayed completion: Projects may be delayed or not completed.
• Inadequate infrastructure: There may not be adequate infrastructure to support procurement.
• Vendor development programs: Vendor development programs (VDPs) may be non-existent or ineffective.
• Cronyism: There may be interference from outside parties and cronyism, which affects the awarding of contracts.
Malpractice: Procurement officers may be involved in malpractice and not comply with the policies and procedures of the procurement system
HASIL STUDI ........
HapusBELANJA PERTAHANAN = TERGANTUNG HUTANG
BELANJA PERTAHANAN = TERGANTUNG HUTANG
BELANJA PERTAHANAN = TERGANTUNG HUTANG
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
=============
The Malonnn army has several weaknesses, including:
• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
The Malonnn Armed Forces (MAF) faces a number of challenges, including:
• Logistics
A study noted that the MAF's rapid development has raised questions about its readiness to face threats.
• Budgeting
Malonn's defense budget and spending has been limited by fiscal constraints. The government has been unwilling to cut spending elsewhere or reduce the size of the armed forces.
• Personnel
The MA has identified that military personnel struggle with thinking skills, decision-making, and problem-solving during military operations.
• Procurement
The Malonnn procurement system needs reform. The LCS program has been delayed and reduced in scope.
• Political interference
Political interference and corruption are undermining combat readiness.
• Territorial disputes
Malonn faces territorial disputes and intrusions in its Exclusive Economic Zone (EEZ).
• Transboundary haze
Transboundary haze has had a grave impact on economic and social activities in MalonnThe Royal Malonnn Air Force (RMAF) faces several problems, including:
• Fleet sustainment
The RMAF has faced challenges maintaining its fleet of aircraft. For example, in 2018, only four of the RMAF's 18 Sukhoi Su-30MKM aircraft were able to fly due to maintenance issues and a lack of spare parts.
• Technological obsolescence
Some aircraft in the RMAF's fleet are reaching technological obsolescence. For example, the Kuwaiti HORNET MALONNs are an earlier block of the HORNET MALONN, which may cause compatibility issues with spare parts.
• Modernization
The RMAF has ambitious plans to modernize its air capabilities to address current and future threats. However, the government's defense modernization budget is limited
BUDGET 2025 = ASSET PROCUREMENT DOWN
HapusOperational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
Kenapa geng GORILLA marah marah ni... Saya tahu la di MALU kan di kandang sendiri 1-0.... 🤣🤣🤣
BalasHapusTIMNAS MACAN OMPONG
HapusNATURALISASI = FAILED QWC ASIAN CUP PIALA CIKI-CIKI
NATURALISASI = FAILED QWC ASIAN CUP PIALA CIKI-CIKI
NATURALISASI = FAILED QWC ASIAN CUP PIALA CIKI-CIKI
Razali Alias - Singapore
Syed Adney - England
Matthew Davies - Australia
Brendan Gan - Australia
Darren Lok - England
Kiko Insa - Spain
Natxo Insa - Spain
Mohamadou Sumareh - Gambia
La'Vere Corbin-Ong - England
Dominic Tan - Singapore
Liridon Krasniqi - Yugoslavia
Guilherme de Paula - Brazil
Quentin Cheng - Australia
Ezequiel Agüero - Argentina
Lee Tuck - England
David Rowley - Australia
Stuart Wilkin - England
Endrick - Brazil
Paulo Josué - Brazil
Nooa Laine - Finland
Daniel Ting - England
Romel Morales - Colombia
Fergus Tierney - Scotland
-------------------
HIGHEST NATURALIZED PLAYERS = FAILED
HIGHEST NATURALIZED PLAYERS = FAILED
HIGHEST NATURALIZED PLAYERS = FAILED
Malaysia had 14 naturalized players, tying with Hong Kong for the joint-highest number of naturalized players. Malaysia has been actively recruiting foreign-born players since 2013 to increase their talent pool. Players with local heritage don't have to meet the five-year residency rule to switch nationalities, which gives them a longer time in the national team...
-
KUALIFIKASI PIALA DUNIA = TEWAS FAILED
-
PIALA ASIA = TEWAS FAILED
-
PIALA CIKI-CIKI (NON CALENDER FIFA) = TEWAS FAILED
-
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
Timnas Malon tersingkir dari Piala AFF 2024 atau ASEAN Championship usai ditahan Singapura 0-0 di Stadion Bukit Jalil, Jumat (20/12). Malon gagal ke semifinal Piala AFF 2024 usai menempati peringkat ketiga klasemen Grup A.
-------------------
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
171 ASET USANG 30 TAHUN =
Hapus108 TDM
29 TUDM
34 TLDM
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
==============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
==============
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
==============
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
==============
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
===============
VERSI TERMURAH FA50
VERSI TERMURAH FA50
VERSI TERMURAH FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
==============
DOWNGRADE ANKA
DOWNGRADE ANKA
2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
PUBLIC DEBT = DEFENCE SPENDING
HapusPUBLIC DEBT = DEFENCE SPENDING
PUBLIC DEBT = DEFENCE SPENDING
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
==============
2024 RASIO HUTANG 84,2% DARI GDP
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
==============
2024 HUTANG JATUH TEMPO = The federal government's debt is expected to be fully settled in 2053 if no new loans were to be taken to finance the deficit and to refinance maturing debts from 2024 onwards, said the Finance Ministry (MoF)
----
2023 TIDAK BAYAR HUTANG = “Ini bermakna bayaran khidmat hutang banyak…hanya membayar faedah bukan bayar hutang tertunggak,” kata Anwar lagi
----
2022 HUTANG BAYAR HUTANG 52,4% = Kah Woh menjelaskan pada tahun lalu, kerajaan ada membuat pinjaman yang meningkat sebanyak 11.6 peratus daripada RM194.5 bilion pada tahun sebelumnya. Daripada jumlah itu, beliau berkata 52.4 peratus atau RM113.7 bilion digunakan untuk membayar prinsipal pinjaman matang.
----
2021 HUTANG BAYAR HUTANG 50,4% = Sejumlah RM98.058 bilion atau 50.4 peratus daripada pinjaman baharu berjumlah RM194.555 bilion yang dibuat kerajaan pada tahun lalu digunakan untuk bayaran balik prinsipal pinjaman yang matang.
----
2020 HUTANG BAYAR HUTANG 60% = Jabatan Audit Negara (JAN) bimbang dengan tindakan kerajaan menggunakan hampir 60 peratus pinjaman baharu untuk membayar hutang .
----
2019 HUTANG BAYAR HUTANG 59% = Laporan Ketua Audit Negara mengenai Penyata Kewangan Kerajaan Persekutuan 2018 mendapati sejumlah 59 peratus pinjaman baharu kerajaan dibuat untuk membayar hutang kerajaan terdahulu
----
2018 RASIO HUTANG 80% DARI GDP : OPEN DONASI = Kementerian Keuangan Malon pada hari Rabu membuka rekening donasi supaya masyarakat dapat menyumbang untuk membantu negara membayar utang yang mencapai 1 triliun ringgit (US$ 250,8 miliar) atau 80 persen dari PDB.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
171 ASET USANG 30 TAHUN =
108 TDM
29 TUDM
34 TLDM
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
==============
KEY WORDS =
1. PUBLIC DEBT = DEFENCE SPENDING
2. RATIO DEBT 84,2% TO GDP
3. DEBT TO PAY DEBT
4. 171 COMBAT EQUIPMENT 30 YEARS
SEWA 28 HELI = 119 HELI BARU :
HapusSEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
----
CHEAPEST VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
==========
1. HUTANG 84.2% DARI GDP
1. HUTANG 84.2% DARI GDP
2. HUTANG NEGARA RM 1.5 TRLLIUN
3. HUTANG 1MDB RM 18.2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST SHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. TUDM SEWA 12 AW149
62. TUDM SEWA 4 AW139
63. TUDM SEWA 5 EC120B
64. TLDM SEWA 2 AW159
65. TDM SEWA 4 UH-60A
67. TDM SEWA 12 AW149
68. BOMBA SEWA 4 AW139
69. MMEA SEWA 2 AW159
70. POLIS SEWA 7 BELL429
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
TIMNAS MACAN OMPONG
Hapus14 NATURALISASI = TEWAS FAILED
14 NATURALISASI = TEWAS FAILED
14 NATURALISASI = TEWAS FAILED
Malaysia had 14 naturalized players, tying with Hong Kong for the joint-highest number of naturalized players. Malaysia has been actively recruiting foreign-born players since 2013 to increase their talent pool. Players with local heritage don't have to meet the five-year residency rule to switch nationalities, which gives them a longer time in the national team...
-
KUALIFIKASI PIALA DUNIA = TEWAS FAILED
-
PIALA ASIA = TEWAS FAILED
-
PIALA CIKI-CIKI (NON CALENDER FIFA) = TEWAS FAILED
-
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
Timnas Malon tersingkir dari Piala AFF 2024 atau ASEAN Championship usai ditahan Singapura 0-0 di Stadion Bukit Jalil, Jumat (20/12). Malon gagal ke semifinal Piala AFF 2024 usai menempati peringkat ketiga klasemen Grup A.
-------------------
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
-------------------
Malonn's economy has faced a number of challenges, including:
• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
==============
==============
TIMNAS GARUDA
KUALIFIKASI PIALA DUNIA ROUND 3 = SENIOR
-
PIALA ASIA = SENIOR, U23, U20
-
PIALA CIKI-CIKI (NON CALENDER FIFA) = U20
=========================
KEY WORDS = 14 NATURALISASI : TEWAS FAILED QWC ASIAN CUP
HASIL STUDI ........
HapusBELANJA PERTAHANAN = TERGANTUNG HUTANG
BELANJA PERTAHANAN = TERGANTUNG HUTANG
BELANJA PERTAHANAN = TERGANTUNG HUTANG
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
==============
2024 RASIO HUTANG 84,2% DARI GDP
The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023.
In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018).
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
==============
2024 HUTANG JATUH TEMPO = The federal government's debt is expected to be fully settled in 2053 if no new loans were to be taken to finance the deficit and to refinance maturing debts from 2024 onwards, said the Finance Ministry (MoF)
----
2023 TIDAK BAYAR HUTANG = “Ini bermakna bayaran khidmat hutang banyak…hanya membayar faedah bukan bayar hutang tertunggak,” kata Anwar lagi
----
2022 HUTANG BAYAR HUTANG 52,4% = Kah Woh menjelaskan pada tahun lalu, kerajaan ada membuat pinjaman yang meningkat sebanyak 11.6 peratus daripada RM194.5 bilion pada tahun sebelumnya. Daripada jumlah itu, beliau berkata 52.4 peratus atau RM113.7 bilion digunakan untuk membayar prinsipal pinjaman matang.
----
2021 HUTANG BAYAR HUTANG 50,4% = Sejumlah RM98.058 bilion atau 50.4 peratus daripada pinjaman baharu berjumlah RM194.555 bilion yang dibuat kerajaan pada tahun lalu digunakan untuk bayaran balik prinsipal pinjaman yang matang.
----
2020 HUTANG BAYAR HUTANG 60% = Jabatan Audit Negara (JAN) bimbang dengan tindakan kerajaan menggunakan hampir 60 peratus pinjaman baharu untuk membayar hutang .
----
2019 HUTANG BAYAR HUTANG 59% = Laporan Ketua Audit Negara mengenai Penyata Kewangan Kerajaan Persekutuan 2018 mendapati sejumlah 59 peratus pinjaman baharu kerajaan dibuat untuk membayar hutang kerajaan terdahulu
----
2018 RASIO HUTANG 80% DARI GDP : OPEN DONASI = Kementerian Keuangan Malon pada hari Rabu membuka rekening donasi supaya masyarakat dapat menyumbang untuk membantu negara membayar utang yang mencapai 1 triliun ringgit (US$ 250,8 miliar) atau 80 persen dari PDB.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
BUDGET 2025 = ASSET PROCUREMENT DOWN
HapusOperational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
Manakala malon ni nampak sangat TOLOL karena tak bisa baca..
BalasHapusPantaslah bikin 1 kapal makan masa 14 tahun
😂😂🤣🤣🤣😛😛🤪
Kenapa geng MALON marah marah ni.
BalasHapus🤪😛😛🤣😂😂😂
https://www.ntvnews.id/news/0128473/tersingkir-di-piala-aff-suporter-malaysia-ngamuk-hingga-rusak-stasiun-lrt
Sudahlah pakai 14 orang SENIOR dari 6 negara luar, masih saja GAGAL..
BalasHapus🤣🤣😛😛🤪😂😂😂
https://www.ntvnews.id/news/0128473/tersingkir-di-piala-aff-suporter-malaysia-ngamuk-hingga-rusak-stasiun-lrt
TIMNAS MACAN OMPONG
BalasHapusNATURALISASI = FAILED QWC ASIAN CUP PIALA CIKI-CIKI
NATURALISASI = FAILED QWC ASIAN CUP PIALA CIKI-CIKI
NATURALISASI = FAILED QWC ASIAN CUP PIALA CIKI-CIKI
Razali Alias - Singapore
Syed Adney - England
Matthew Davies - Australia
Brendan Gan - Australia
Darren Lok - England
Kiko Insa - Spain
Natxo Insa - Spain
Mohamadou Sumareh - Gambia
La'Vere Corbin-Ong - England
Dominic Tan - Singapore
Liridon Krasniqi - Yugoslavia
Guilherme de Paula - Brazil
Quentin Cheng - Australia
Ezequiel Agüero - Argentina
Lee Tuck - England
David Rowley - Australia
Stuart Wilkin - England
Endrick - Brazil
Paulo Josué - Brazil
Nooa Laine - Finland
Daniel Ting - England
Romel Morales - Colombia
Fergus Tierney - Scotland
-------------------
HIGHEST NATURALIZED PLAYERS = FAILED
HIGHEST NATURALIZED PLAYERS = FAILED
HIGHEST NATURALIZED PLAYERS = FAILED
Malaysia had 14 naturalized players, tying with Hong Kong for the joint-highest number of naturalized players. Malaysia has been actively recruiting foreign-born players since 2013 to increase their talent pool. Players with local heritage don't have to meet the five-year residency rule to switch nationalities, which gives them a longer time in the national team...
-
KUALIFIKASI PIALA DUNIA = TEWAS FAILED
-
PIALA ASIA = TEWAS FAILED
-
PIALA CIKI-CIKI (NON CALENDER FIFA) = TEWAS FAILED
-
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
Timnas Malon tersingkir dari Piala AFF 2024 atau ASEAN Championship usai ditahan Singapura 0-0 di Stadion Bukit Jalil, Jumat (20/12). Malon gagal ke semifinal Piala AFF 2024 usai menempati peringkat ketiga klasemen Grup A.
-------------------
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
SALAM 1-0....KAH...KAH...KAH....
BalasHapusHELP ME BELANDA...... HELP ME..... HAHAHAH
TIMNAS MACAN OMPONG =
HapusNATURALISASI = FAILED QWC ASIAN CUP PIALA CIKI-CIKI
NATURALISASI = FAILED QWC ASIAN CUP PIALA CIKI-CIKI
NATURALISASI = FAILED QWC ASIAN CUP PIALA CIKI-CIKI
Razali Alias - Singapore
Syed Adney - England
Matthew Davies - Australia
Brendan Gan - Australia
Darren Lok - England
Kiko Insa - Spain
Natxo Insa - Spain
Mohamadou Sumareh - Gambia
La'Vere Corbin-Ong - England
Dominic Tan - Singapore
Liridon Krasniqi - Yugoslavia
Guilherme de Paula - Brazil
Quentin Cheng - Australia
Ezequiel Agüero - Argentina
Lee Tuck - England
David Rowley - Australia
Stuart Wilkin - England
Endrick - Brazil
Paulo Josué - Brazil
Nooa Laine - Finland
Daniel Ting - England
Romel Morales - Colombia
Fergus Tierney - Scotland
-------------------
HIGHEST NATURALIZED PLAYERS = FAILED
HIGHEST NATURALIZED PLAYERS = FAILED
HIGHEST NATURALIZED PLAYERS = FAILED
Malaysia had 14 naturalized players, tying with Hong Kong for the joint-highest number of naturalized players. Malaysia has been actively recruiting foreign-born players since 2013 to increase their talent pool. Players with local heritage don't have to meet the five-year residency rule to switch nationalities, which gives them a longer time in the national team...
-
KUALIFIKASI PIALA DUNIA = TEWAS FAILED
-
PIALA ASIA = TEWAS FAILED
-
PIALA CIKI-CIKI (NON CALENDER FIFA) = TEWAS FAILED
-
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
Timnas Malon tersingkir dari Piala AFF 2024 atau ASEAN Championship usai ditahan Singapura 0-0 di Stadion Bukit Jalil, Jumat (20/12). Malon gagal ke semifinal Piala AFF 2024 usai menempati peringkat ketiga klasemen Grup A.
-------------------
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
TIMNAS MACAN OMPONG
Hapus14 NATURALISASI = TEWAS FAILED
14 NATURALISASI = TEWAS FAILED
14 NATURALISASI = TEWAS FAILED
Malaysia had 14 naturalized players, tying with Hong Kong for the joint-highest number of naturalized players. Malaysia has been actively recruiting foreign-born players since 2013 to increase their talent pool. Players with local heritage don't have to meet the five-year residency rule to switch nationalities, which gives them a longer time in the national team...
-
KUALIFIKASI PIALA DUNIA = TEWAS FAILED
-
PIALA ASIA = TEWAS FAILED
-
PIALA CIKI-CIKI (NON CALENDER FIFA) = TEWAS FAILED
-
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
14 NATURALISASI = PIALA CIKI-CIKI TEWAS FAILED
Timnas Malon tersingkir dari Piala AFF 2024 atau ASEAN Championship usai ditahan Singapura 0-0 di Stadion Bukit Jalil, Jumat (20/12). Malon gagal ke semifinal Piala AFF 2024 usai menempati peringkat ketiga klasemen Grup A.
-------------------
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
-------------------
Malonn's economy has faced a number of challenges, including:
• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
==============
==============
TIMNAS GARUDA
KUALIFIKASI PIALA DUNIA ROUND 3 = SENIOR
-
PIALA ASIA = SENIOR, U23, U20
-
PIALA CIKI-CIKI (NON CALENDER FIFA) = U20
=========================
KEY WORDS = 14 NATURALISASI : TEWAS FAILED QWC ASIAN CUP
PUBLIC DEBT = DEFENCE SPENDING
HapusPUBLIC DEBT = DEFENCE SPENDING
PUBLIC DEBT = DEFENCE SPENDING
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
SEWA 28 HELI = 119 HELI BARU :
HapusSEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
-------------------------------------
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
=========================
KEY WORDS = CHEAPEST AND DOWNGRADE
Some weaknesses in Malonnn public procurement include:
Hapus• Transparency: The principle of transparency is not well adhered to. Interference from authorities, such as local politicians, can lead to corruption, scandal, and the abuse of public resources.
• Inefficient processes: Procurement processes can be inefficient and ineffective. Tenders may be prepared hastily, carelessly, and without proper consideration.
• Poor documentation: Documentation may be poor.
• Low quality: The quality of products, services, and work may be low.
• Non-compliance: There may be non-compliance with the scope, specifications, and terms of contracts.
• Delayed completion: Projects may be delayed or not completed.
• Inadequate infrastructure: There may not be adequate infrastructure to support procurement.
• Vendor development programs: Vendor development programs (VDPs) may be non-existent or ineffective.
• Cronyism: There may be interference from outside parties and cronyism, which affects the awarding of contracts.
Malpractice: Procurement officers may be involved in malpractice and not comply with the policies and procedures of the procurement system
=========================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
=========================
KEY WORDS = CHEAPEST AND DOWNGRADE
171 ASET USANG 30 TAHUN =
Hapus108 TDM
29 TUDM
34 TLDM
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
==============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
==============
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
==============
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
==============
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
===============
VERSI TERMURAH FA50
VERSI TERMURAH FA50
VERSI TERMURAH FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
==============
DOWNGRADE ANKA
DOWNGRADE ANKA
2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
PUBLIC DEBT = DEFENCE SPENDING
HapusPUBLIC DEBT = DEFENCE SPENDING
PUBLIC DEBT = DEFENCE SPENDING
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
==============
2024 RASIO HUTANG 84,2% DARI GDP
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
==============
2024 HUTANG JATUH TEMPO = The federal government's debt is expected to be fully settled in 2053 if no new loans were to be taken to finance the deficit and to refinance maturing debts from 2024 onwards, said the Finance Ministry (MoF)
----
2023 TIDAK BAYAR HUTANG = “Ini bermakna bayaran khidmat hutang banyak…hanya membayar faedah bukan bayar hutang tertunggak,” kata Anwar lagi
----
2022 HUTANG BAYAR HUTANG 52,4% = Kah Woh menjelaskan pada tahun lalu, kerajaan ada membuat pinjaman yang meningkat sebanyak 11.6 peratus daripada RM194.5 bilion pada tahun sebelumnya. Daripada jumlah itu, beliau berkata 52.4 peratus atau RM113.7 bilion digunakan untuk membayar prinsipal pinjaman matang.
----
2021 HUTANG BAYAR HUTANG 50,4% = Sejumlah RM98.058 bilion atau 50.4 peratus daripada pinjaman baharu berjumlah RM194.555 bilion yang dibuat kerajaan pada tahun lalu digunakan untuk bayaran balik prinsipal pinjaman yang matang.
----
2020 HUTANG BAYAR HUTANG 60% = Jabatan Audit Negara (JAN) bimbang dengan tindakan kerajaan menggunakan hampir 60 peratus pinjaman baharu untuk membayar hutang .
----
2019 HUTANG BAYAR HUTANG 59% = Laporan Ketua Audit Negara mengenai Penyata Kewangan Kerajaan Persekutuan 2018 mendapati sejumlah 59 peratus pinjaman baharu kerajaan dibuat untuk membayar hutang kerajaan terdahulu
----
2018 RASIO HUTANG 80% DARI GDP : OPEN DONASI = Kementerian Keuangan Malon pada hari Rabu membuka rekening donasi supaya masyarakat dapat menyumbang untuk membantu negara membayar utang yang mencapai 1 triliun ringgit (US$ 250,8 miliar) atau 80 persen dari PDB.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
171 ASET USANG 30 TAHUN =
108 TDM
29 TUDM
34 TLDM
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
==============
KEY WORDS =
1. PUBLIC DEBT = DEFENCE SPENDING
2. RATIO DEBT 84,2% TO GDP
3. DEBT TO PAY DEBT
4. 171 COMBAT EQUIPMENT 30 YEARS
SEWA 28 HELI = 119 HELI BARU :
HapusSEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
----
CHEAPEST VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
==========
1. HUTANG 84.2% DARI GDP
1. HUTANG 84.2% DARI GDP
2. HUTANG NEGARA RM 1.5 TRLLIUN
3. HUTANG 1MDB RM 18.2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST SHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. TUDM SEWA 12 AW149
62. TUDM SEWA 4 AW139
63. TUDM SEWA 5 EC120B
64. TLDM SEWA 2 AW159
65. TDM SEWA 4 UH-60A
67. TDM SEWA 12 AW149
68. BOMBA SEWA 4 AW139
69. MMEA SEWA 2 AW159
70. POLIS SEWA 7 BELL429
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
The Malonnn army has several weaknesses, including:
Hapus• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....
=========================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
Malonn has faced several crises, including political, financial, and economic crises:
Hapus• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....
==============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
The Malonnn army has several weaknesses, including:
Hapus• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
PUBLIC DEBT = DEFENCE SPENDING
HapusPUBLIC DEBT = DEFENCE SPENDING
PUBLIC DEBT = DEFENCE SPENDING
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
==============
2024 RASIO HUTANG 84,2% DARI GDP
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
==============
2024 HUTANG JATUH TEMPO = The federal government's debt is expected to be fully settled in 2053 if no new loans were to be taken to finance the deficit and to refinance maturing debts from 2024 onwards, said the Finance Ministry (MoF)
----
2023 TIDAK BAYAR HUTANG = “Ini bermakna bayaran khidmat hutang banyak…hanya membayar faedah bukan bayar hutang tertunggak,” kata Anwar lagi
----
2022 HUTANG BAYAR HUTANG 52,4% = Kah Woh menjelaskan pada tahun lalu, kerajaan ada membuat pinjaman yang meningkat sebanyak 11.6 peratus daripada RM194.5 bilion pada tahun sebelumnya. Daripada jumlah itu, beliau berkata 52.4 peratus atau RM113.7 bilion digunakan untuk membayar prinsipal pinjaman matang.
----
2021 HUTANG BAYAR HUTANG 50,4% = Sejumlah RM98.058 bilion atau 50.4 peratus daripada pinjaman baharu berjumlah RM194.555 bilion yang dibuat kerajaan pada tahun lalu digunakan untuk bayaran balik prinsipal pinjaman yang matang.
----
2020 HUTANG BAYAR HUTANG 60% = Jabatan Audit Negara (JAN) bimbang dengan tindakan kerajaan menggunakan hampir 60 peratus pinjaman baharu untuk membayar hutang .
----
2019 HUTANG BAYAR HUTANG 59% = Laporan Ketua Audit Negara mengenai Penyata Kewangan Kerajaan Persekutuan 2018 mendapati sejumlah 59 peratus pinjaman baharu kerajaan dibuat untuk membayar hutang kerajaan terdahulu
----
2018 RASIO HUTANG 80% DARI GDP : OPEN DONASI = Kementerian Keuangan Malon pada hari Rabu membuka rekening donasi supaya masyarakat dapat menyumbang untuk membantu negara membayar utang yang mencapai 1 triliun ringgit (US$ 250,8 miliar) atau 80 persen dari PDB.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
171 ASET USANG 30 TAHUN =
108 TDM
29 TUDM
34 TLDM
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
==============
KEY WORDS =
1. PUBLIC DEBT = DEFENCE SPENDING
2. RATIO DEBT 84,2% TO GDP
3. DEBT TO PAY DEBT
4. 171 COMBAT EQUIPMENT 30 YEAR
Negara mana tuh yg katanya jaguh tapi bikin kapal 13 tahun belum beroperasi
BalasHapus🤣🤣🤣😭
Minggu depan masuk masa 14 tahun bro
Hapus😂😂🤣😛🤪🤪
Lebih lama dibanding masa membuat CV
🤣😂😂😂
Sudah pakai skuad bule senior malon tsk bise ape2 wkwkkwkw
BalasHapusLawan timor leste kelabakan
Supoerter ngamuk rosak fasilitas kereta api
IQ Rendah
Dominasi dolar AS pun berdampak pada mata uang Asia. Hanya dua mata uang Asia yang mampu melawan dolar AS sepanjang tahun ini yakni ringgit Malaysia dan baht Thailand.
BalasHapushttps://www.cnbcindonesia.com/research/20241222093222-128-597924/dolar-naik-gila-gilaan-begini-nasib-mata-uang-asia-sepanjang-2024
Malonn has faced several crises, including political, financial, and economic crises:
Hapus• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....
==============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
The Malonnn army has several weaknesses, including:
Hapus• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
SEWA 28 HELI = 119 HELI BARU :
HapusSEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
-------------------------------------
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
=========================
KEY WORDS = CHEAPEST AND DOWNGRADE
Some weaknesses in Malonnn public procurement include:
Hapus• Transparency: The principle of transparency is not well adhered to. Interference from authorities, such as local politicians, can lead to corruption, scandal, and the abuse of public resources.
• Inefficient processes: Procurement processes can be inefficient and ineffective. Tenders may be prepared hastily, carelessly, and without proper consideration.
• Poor documentation: Documentation may be poor.
• Low quality: The quality of products, services, and work may be low.
• Non-compliance: There may be non-compliance with the scope, specifications, and terms of contracts.
• Delayed completion: Projects may be delayed or not completed.
• Inadequate infrastructure: There may not be adequate infrastructure to support procurement.
• Vendor development programs: Vendor development programs (VDPs) may be non-existent or ineffective.
• Cronyism: There may be interference from outside parties and cronyism, which affects the awarding of contracts.
Malpractice: Procurement officers may be involved in malpractice and not comply with the policies and procedures of the procurement system
=========================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
=========================
KEY WORDS = CHEAPEST AND DOWNGRADE
Dominasi dolar AS pun berdampak pada mata uang Asia. Hanya dua mata uang Asia yang mampu melawan dolar AS sepanjang tahun ini yakni ringgit Malaysia dan baht Thailand.
BalasHapushttps://www.cnbcindonesia.com/research/20241222093222-128-597924/dolar-naik-gila-gilaan-begini-nasib-mata-uang-asia-sepanjang-2024
PUBLIC DEBT = DEFENCE SPENDING
HapusPUBLIC DEBT = DEFENCE SPENDING
PUBLIC DEBT = DEFENCE SPENDING
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
Lalu kenapa habis masa 14 tahun tak selesai 1 pun?
BalasHapus🤪🤪😛🤣😂😂😂😂
Aduh MALU guys tak dianggap....AHAHHAHA
BalasHapusKronologi Sejumlah Delegasi Walk Out saat Prabowo Pidato di KTT D-8
https://kabar24.bisnis.com/read/20241222/15/1826204/kronologi-sejumlah-delegasi-walk-out-saat-prabowo-pidato-di-ktt-d-8
Some weaknesses in Malonnn public procurement include:
Hapus• Transparency: The principle of transparency is not well adhered to. Interference from authorities, such as local politicians, can lead to corruption, scandal, and the abuse of public resources.
• Inefficient processes: Procurement processes can be inefficient and ineffective. Tenders may be prepared hastily, carelessly, and without proper consideration.
• Poor documentation: Documentation may be poor.
• Low quality: The quality of products, services, and work may be low.
• Non-compliance: There may be non-compliance with the scope, specifications, and terms of contracts.
• Delayed completion: Projects may be delayed or not completed.
• Inadequate infrastructure: There may not be adequate infrastructure to support procurement.
• Vendor development programs: Vendor development programs (VDPs) may be non-existent or ineffective.
• Cronyism: There may be interference from outside parties and cronyism, which affects the awarding of contracts.
Malpractice: Procurement officers may be involved in malpractice and not comply with the policies and procedures of the procurement system
=========================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
=========================
KEY WORDS = CHEAPEST AND DOWNGRADE
171 ASET USANG 30 TAHUN =
Hapus108 TDM
29 TUDM
34 TLDM
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
==============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
==============
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
==============
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
==============
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
===============
VERSI TERMURAH FA50
VERSI TERMURAH FA50
VERSI TERMURAH FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
==============
DOWNGRADE ANKA
DOWNGRADE ANKA
2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
PUBLIC DEBT = DEFENCE SPENDING
HapusPUBLIC DEBT = DEFENCE SPENDING
PUBLIC DEBT = DEFENCE SPENDING
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
==============
2024 RASIO HUTANG 84,2% DARI GDP
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
==============
2024 HUTANG JATUH TEMPO = The federal government's debt is expected to be fully settled in 2053 if no new loans were to be taken to finance the deficit and to refinance maturing debts from 2024 onwards, said the Finance Ministry (MoF)
----
2023 TIDAK BAYAR HUTANG = “Ini bermakna bayaran khidmat hutang banyak…hanya membayar faedah bukan bayar hutang tertunggak,” kata Anwar lagi
----
2022 HUTANG BAYAR HUTANG 52,4% = Kah Woh menjelaskan pada tahun lalu, kerajaan ada membuat pinjaman yang meningkat sebanyak 11.6 peratus daripada RM194.5 bilion pada tahun sebelumnya. Daripada jumlah itu, beliau berkata 52.4 peratus atau RM113.7 bilion digunakan untuk membayar prinsipal pinjaman matang.
----
2021 HUTANG BAYAR HUTANG 50,4% = Sejumlah RM98.058 bilion atau 50.4 peratus daripada pinjaman baharu berjumlah RM194.555 bilion yang dibuat kerajaan pada tahun lalu digunakan untuk bayaran balik prinsipal pinjaman yang matang.
----
2020 HUTANG BAYAR HUTANG 60% = Jabatan Audit Negara (JAN) bimbang dengan tindakan kerajaan menggunakan hampir 60 peratus pinjaman baharu untuk membayar hutang .
----
2019 HUTANG BAYAR HUTANG 59% = Laporan Ketua Audit Negara mengenai Penyata Kewangan Kerajaan Persekutuan 2018 mendapati sejumlah 59 peratus pinjaman baharu kerajaan dibuat untuk membayar hutang kerajaan terdahulu
----
2018 RASIO HUTANG 80% DARI GDP : OPEN DONASI = Kementerian Keuangan Malon pada hari Rabu membuka rekening donasi supaya masyarakat dapat menyumbang untuk membantu negara membayar utang yang mencapai 1 triliun ringgit (US$ 250,8 miliar) atau 80 persen dari PDB.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
171 ASET USANG 30 TAHUN =
108 TDM
29 TUDM
34 TLDM
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
==============
KEY WORDS =
1. PUBLIC DEBT = DEFENCE SPENDING
2. RATIO DEBT 84,2% TO GDP
3. DEBT TO PAY DEBT
4. 171 COMBAT EQUIPMENT 30 YEARS
Lalu kenapa sudsh pakai 14 orang SENIOR TUA dari 6 negara plus Bangla masih gagal lon..?
BalasHapus😂😂🤣🤣😛🤪
Aduh MALU guys tak dianggap....AHAHHAHA
BalasHapusKronologi Sejumlah Delegasi Walk Out saat Prabowo Pidato di KTT D-8
https://kabar24.bisnis.com/read/20241222/15/1826204/kronologi-sejumlah-delegasi-walk-out-saat-prabowo-pidato-di-ktt-d-8
Malonn has faced several crises, including political, financial, and economic crises:
Hapus• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....
==============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
Kronologi Viral Erdogan Disebut Walk Out saat Prabowo Pidato di D-8
BalasHapushttps://www.cnnindonesia.com/internasional/20241223065446-106-1180113/kronologi-viral-erdogan-disebut-walk-out-saat-prabowo-pidato-di-d-8
PUBLIC DEBT = DEFENCE SPENDING
HapusPUBLIC DEBT = DEFENCE SPENDING
PUBLIC DEBT = DEFENCE SPENDING
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
==============
2024 RASIO HUTANG 84,2% DARI GDP
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
==============
2024 HUTANG JATUH TEMPO = The federal government's debt is expected to be fully settled in 2053 if no new loans were to be taken to finance the deficit and to refinance maturing debts from 2024 onwards, said the Finance Ministry (MoF)
----
2023 TIDAK BAYAR HUTANG = “Ini bermakna bayaran khidmat hutang banyak…hanya membayar faedah bukan bayar hutang tertunggak,” kata Anwar lagi
----
2022 HUTANG BAYAR HUTANG 52,4% = Kah Woh menjelaskan pada tahun lalu, kerajaan ada membuat pinjaman yang meningkat sebanyak 11.6 peratus daripada RM194.5 bilion pada tahun sebelumnya. Daripada jumlah itu, beliau berkata 52.4 peratus atau RM113.7 bilion digunakan untuk membayar prinsipal pinjaman matang.
----
2021 HUTANG BAYAR HUTANG 50,4% = Sejumlah RM98.058 bilion atau 50.4 peratus daripada pinjaman baharu berjumlah RM194.555 bilion yang dibuat kerajaan pada tahun lalu digunakan untuk bayaran balik prinsipal pinjaman yang matang.
----
2020 HUTANG BAYAR HUTANG 60% = Jabatan Audit Negara (JAN) bimbang dengan tindakan kerajaan menggunakan hampir 60 peratus pinjaman baharu untuk membayar hutang .
----
2019 HUTANG BAYAR HUTANG 59% = Laporan Ketua Audit Negara mengenai Penyata Kewangan Kerajaan Persekutuan 2018 mendapati sejumlah 59 peratus pinjaman baharu kerajaan dibuat untuk membayar hutang kerajaan terdahulu
----
2018 RASIO HUTANG 80% DARI GDP : OPEN DONASI = Kementerian Keuangan Malon pada hari Rabu membuka rekening donasi supaya masyarakat dapat menyumbang untuk membantu negara membayar utang yang mencapai 1 triliun ringgit (US$ 250,8 miliar) atau 80 persen dari PDB.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
==============
171 ASET USANG 30 TAHUN =
108 TDM
29 TUDM
34 TLDM
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
==============
KEY WORDS =
1. PUBLIC DEBT = DEFENCE SPENDING
2. RATIO DEBT 84,2% TO GDP
3. DEBT TO PAY DEBT
4. 171 COMBAT EQUIPMENT 30 YEARS
SEWA 28 HELI = 119 HELI BARU :
HapusSEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
----
CHEAPEST VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
==========
1. HUTANG 84.2% DARI GDP
1. HUTANG 84.2% DARI GDP
2. HUTANG NEGARA RM 1.5 TRLLIUN
3. HUTANG 1MDB RM 18.2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST SHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. TUDM SEWA 12 AW149
62. TUDM SEWA 4 AW139
63. TUDM SEWA 5 EC120B
64. TLDM SEWA 2 AW159
65. TDM SEWA 4 UH-60A
67. TDM SEWA 12 AW149
68. BOMBA SEWA 4 AW139
69. MMEA SEWA 2 AW159
70. POLIS SEWA 7 BELL429
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
The Malonnn army has several weaknesses, including:
Hapus• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....
=========================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
HASIL STUDI ........
HapusBELANJA PERTAHANAN = TERGANTUNG HUTANG
BELANJA PERTAHANAN = TERGANTUNG HUTANG
BELANJA PERTAHANAN = TERGANTUNG HUTANG
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
==============
2024 RASIO HUTANG 84,2% DARI GDP
The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023.
In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018).
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
==============
2024 HUTANG JATUH TEMPO = The federal government's debt is expected to be fully settled in 2053 if no new loans were to be taken to finance the deficit and to refinance maturing debts from 2024 onwards, said the Finance Ministry (MoF)
----
2023 TIDAK BAYAR HUTANG = “Ini bermakna bayaran khidmat hutang banyak…hanya membayar faedah bukan bayar hutang tertunggak,” kata Anwar lagi
----
2022 HUTANG BAYAR HUTANG 52,4% = Kah Woh menjelaskan pada tahun lalu, kerajaan ada membuat pinjaman yang meningkat sebanyak 11.6 peratus daripada RM194.5 bilion pada tahun sebelumnya. Daripada jumlah itu, beliau berkata 52.4 peratus atau RM113.7 bilion digunakan untuk membayar prinsipal pinjaman matang.
----
2021 HUTANG BAYAR HUTANG 50,4% = Sejumlah RM98.058 bilion atau 50.4 peratus daripada pinjaman baharu berjumlah RM194.555 bilion yang dibuat kerajaan pada tahun lalu digunakan untuk bayaran balik prinsipal pinjaman yang matang.
----
2020 HUTANG BAYAR HUTANG 60% = Jabatan Audit Negara (JAN) bimbang dengan tindakan kerajaan menggunakan hampir 60 peratus pinjaman baharu untuk membayar hutang .
----
2019 HUTANG BAYAR HUTANG 59% = Laporan Ketua Audit Negara mengenai Penyata Kewangan Kerajaan Persekutuan 2018 mendapati sejumlah 59 peratus pinjaman baharu kerajaan dibuat untuk membayar hutang kerajaan terdahulu
----
2018 RASIO HUTANG 80% DARI GDP : OPEN DONASI = Kementerian Keuangan Malon pada hari Rabu membuka rekening donasi supaya masyarakat dapat menyumbang untuk membantu negara membayar utang yang mencapai 1 triliun ringgit (US$ 250,8 miliar) atau 80 persen dari PDB.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
Dukung tapi tak berani LANTANG, singkat kata LEMAH
BalasHapus🤣😂😂😂😂🤪😛
===
PM Malaysia Anwar Ibrahim Dukung Amarah Prabowo di Depan Erdogan Cs
pgr, CNBC Indonesia
Jakarta, CNBC Indonesia - Perdana Menteri (PM) Malaysia Anwar Ibrahim memberikan dukungan terhadap Presiden RI Prabowo Subianto terkait pernyataan kerasnya di Konferensi Tingkat Tinggi (KTT) Ke-11 Developing Eight (D-8) di Istana Kepresidenan New Administrative Capital, Kairo, Mesir, yang berlangsung Kamis (19/12/2024).
Pantaslah pernah dipenjara 2x..
BalasHapusKarena Lemah
😂😂🤣🤣🤣😛🤪
Aduhhhh masa diperlakukan begitu...HAHAHA
BalasHapusErdogan Walkout saat Prabowo Pidato Bela Gaza di KTT D-8, Presiden Turki Sampai Senggol Kursi RI 1
https://www.youtube.com/watch?v=ZYIq_6pW9fE
CHANGE SKIN = CHANGE NAME = SAME .....
HapusPSC = 1995
PSC > BNS = 2005
BNC > LUNAS = 2024
PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malonnn government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malonn in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
===================
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
===================
LCS 2024-2011 = 13 TAHUN
13 TAHUN MANGKRAK
13 TAHUN MANGKRAK
LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
-----
NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
-----
17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
===================
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
NO AMPHIBIOUS NAVAL PLATFORM
HapusSERANGAN AMFIBI = SAMPAN
SERANGAN AMFIBI = SAMPAN
SERANGAN AMFIBI = SAMPAN
MELAKA: 10 Briged (Para) telah melaksanakan latihan serangan amfibi bagi mempamerkan keupayaan melaksanakan operasi tersebut kepada Tim Naziran JPA Semakan Bayaran Insentif Pasukan Aturgerak Cepat, Angkatan Tentera Malon (BIPAC-ATM) ke 10 Bgd (Para) pada 30 Julai 2024
-----
NO MARINIR = LACK AN AMPHIBIOUS NAVAL PLATFORM
DISCUSS LPD BUATAN 1963
DISCUSS AH-1Z
Initially, the Malonn marine corps will lack an amphibious naval platform as the RMN’s only amphibious ship, It is currently in discussions with both France and South Korea over acquiring a landing platform deck (LPD). The U.S. has also offered Malon the LPD USS Denver after it decommissions it in 2014. U.S.-based defense companies are also discussing selling Malon the AH-1Z
------
171 ASSETS = 30 YEARS
108 ARMY
29 AIR FORCE
34 NAVY
"The total number of Malonn Armed Forces (ATM) assets exceeding 30 years in service comprises 108 units for the Army, 29 units for the Royal Malonn Air Force (RMAF), and 34 units for the Royal Malonn Navy (RMN)," the Malonn Defence Minister
baharu.
==============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
==============
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
Malonn's economy has faced a number of challenges, including:
Hapus• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
===================
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
===================
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
PROBLEMS SHIPYARD
HapusPROBLEMS SHIPYARD
PROBLEMS SHIPYARD
Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.
===================
Some problems Malonn shipyards face in making warships include:
• Supply chain disruptions
In 2022, COVID-19 and the Russia-Ukraine conflict disrupted supply chains and led to shortages of skilled personnel.
• Low-quality products
Workers may use sketches, photos, and previous experience instead of following good engineering practices, which can lead to low-quality products, reworks, higher costs, and late deliveries.
• Traditional shipbuilding
Traditional shipbuilding is a slow, expensive, and laborious process. It involves a systems approach, where each system has its own drawings, and work crews may compete for work space.
• Resource shortage
The shipbuilding industry is facing a shortage of resources due to an aging workforce and a lack of young people willing to enter the trade.
===================
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
==============
KEY WORDS = PROBLEMS SHIPYARD
LCS 2024-2011 = 13 TAHUN
Hapus13 TAHUN MANGKRAK
13 TAHUN MANGKRAK
LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
-----
NGPVs 2024-1996 = 28 TAHUN
28 TAHUN MANGKRAK
28 TAHUN MANGKRAK
NGPVs DIBAYAR 27 JADI 6 = The Kedah-class offshore patrol vessels of the Royal Malonnn Navy (RMN) are six ships based on the MEKO 100 design by Blohm + Voss. Originally, a total of 27 ships were planned, but due to programme delays and overruns, only six were eventually ordered. Their construction began in the early 2000s, and by 2009, all six were in active service.
-----
OPV 2024-2017 = 8 TAHUN
8 TAHUN MANGKRAK
8 TAHUN MANGKRAK
OPV DIBAYAR 3 JADI 1 = THHE BANGKRUT : Offshore fabricator and shipbuilder TH Heavy Engineering Bhd (THHE) is undertaking a voluntary winding-up, a year after it was delisted from Bursa Malonn. The company resolved to undertake voluntary winding-up as it is unable to continue its operations due to liabilities, it said in a winding-up NOtice dated Sept 13.
-----
NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
-----
17 KREDITUR LCS
17 KREDITUR LCS
17 KREDITUR LCS
Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malonn Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malonn Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malonn Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malonn Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (Malonn) Bhd.
===================
PROBLEMS MALON SHIPYARD
Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA
Aduhhhh masa diperlakukan begitu...HAHAHA
BalasHapusErdogan Walkout saat Prabowo Pidato Bela Gaza di KTT D-8, Presiden Turki Sampai Senggol Kursi RI 1
https://www.youtube.com/watch?v=ZYIq_6pW9fE
The Malonnn army has several weaknesses, including:
Hapus• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....
=========================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
HASIL STUDI ........
HapusBELANJA PERTAHANAN = TERGANTUNG HUTANG
BELANJA PERTAHANAN = TERGANTUNG HUTANG
BELANJA PERTAHANAN = TERGANTUNG HUTANG
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
==============
2024 RASIO HUTANG 84,2% DARI GDP
The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023.
In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018).
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
==============
2024 HUTANG JATUH TEMPO = The federal government's debt is expected to be fully settled in 2053 if no new loans were to be taken to finance the deficit and to refinance maturing debts from 2024 onwards, said the Finance Ministry (MoF)
----
2023 TIDAK BAYAR HUTANG = “Ini bermakna bayaran khidmat hutang banyak…hanya membayar faedah bukan bayar hutang tertunggak,” kata Anwar lagi
----
2022 HUTANG BAYAR HUTANG 52,4% = Kah Woh menjelaskan pada tahun lalu, kerajaan ada membuat pinjaman yang meningkat sebanyak 11.6 peratus daripada RM194.5 bilion pada tahun sebelumnya. Daripada jumlah itu, beliau berkata 52.4 peratus atau RM113.7 bilion digunakan untuk membayar prinsipal pinjaman matang.
----
2021 HUTANG BAYAR HUTANG 50,4% = Sejumlah RM98.058 bilion atau 50.4 peratus daripada pinjaman baharu berjumlah RM194.555 bilion yang dibuat kerajaan pada tahun lalu digunakan untuk bayaran balik prinsipal pinjaman yang matang.
----
2020 HUTANG BAYAR HUTANG 60% = Jabatan Audit Negara (JAN) bimbang dengan tindakan kerajaan menggunakan hampir 60 peratus pinjaman baharu untuk membayar hutang .
----
2019 HUTANG BAYAR HUTANG 59% = Laporan Ketua Audit Negara mengenai Penyata Kewangan Kerajaan Persekutuan 2018 mendapati sejumlah 59 peratus pinjaman baharu kerajaan dibuat untuk membayar hutang kerajaan terdahulu
----
2018 RASIO HUTANG 80% DARI GDP : OPEN DONASI = Kementerian Keuangan Malon pada hari Rabu membuka rekening donasi supaya masyarakat dapat menyumbang untuk membantu negara membayar utang yang mencapai 1 triliun ringgit (US$ 250,8 miliar) atau 80 persen dari PDB.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
masa bila Anwar dukung INDIANESIA di KTT D8 sedangkan MALAYSIA hanya hantar wakil...HAHAHAHA....
BalasHapusSEWA 28 HELI = 119 HELI BARU :
HapusSEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
----
CHEAPEST VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
------
CHEAPEST VARIANT HISAR OPV
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
------
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
==========
1. HUTANG 84.2% DARI GDP
1. HUTANG 84.2% DARI GDP
2. HUTANG NEGARA RM 1.5 TRLLIUN
3. HUTANG 1MDB RM 18.2 BILLION
4. TUNGGAKAN SEWA SABAH USD 15 BILLION
5. HUTANG KERAJAAN PERSEKUTUAN 60.4%
6. SEWA SIMULATOR MKM
7. PESAWAT MIG GROUNDED
8. SEWA MOTOR POLIS
9. PESAWAT MB339CM GROUNDED
10. NURI GROUNDED SEWA BLACKHAWK
11. FIVE PROCUREMENT CANCELLED
12. 48 PESAWAT SKYHAWK HILANG
13. MESIN JET 2 BUAH HILANG
14. NO MARINIR NO AMPHIBIOUS NAVAL PLATFORM
15. NO LST
16. NO LPD – NGEMIS LPD USA
17. NO TANKER
18. NO KCR
19. MONUMEN MIG29M UNTUK JIMAT KOS
20. NO SPH
21. SUBMARINE DEFACT MEMBUNUH WANITA HAMIL
22. NO HELLFIRE
23. NO MPA ATR72 DELAYED
24. NO HIDRO-OSEANOGRAFI SEWA KAPAL HIDRO
25. NO HELI HEAVY ATTACK NGEMIS AH1Z
26. NO M3 AMPHIBIUS RIG
27. LCS MANGKRAK KARATAN
28. OPV MANGKRAK
29. TANK MOGOK STOP SPARE PARTS
30. CN 235 MSA VERSI MSI USA
31. SEWA MOTOR MILITARY POLICE
32. RADAR GIFTED PAID USA
33. 84% NO SAVING EVERY MONTH
34. SEWA VSHORAD
35. SEWA TRUK 3 TON
36. 4X4 SEWA 6X6 CANCELLED
37. C130H DIGANTI 2045
38. TEMBAK GRANAT BOM PASUKAN SEMDIRI
39. NO DRONE UCAV – ANKA ISR OMPONG
40. SEWA BLACKHAWK SEWA AW159
41. NO TRACKED SPH
42. SEWA SIMULATOR HELI
43. SPH CANCELLED
44. SCORPION V150 CONDOR SIMBAS RETIRED
45. NO PESAWAT COIN
46. PILATUS MK II KARATAN
47. PENCEROBOHAN 43X BTA 316 HARI
48. SEWA AW139 SEWA COLIBRI
49. MRSS LMS B2 UAV ANKA HELI MENUNGGU 2026-2030
50. OPV DIBAYAR 3 JADI 1 SEWA BOAT
51. LYNX GROUNDED
52. MRCA CANCELLED SEWA PESAWAT ITTC
53. MICA CANCELLED NSM CANCELLED
54. NO LRAD NO MRAD JUST SHORAD
55. PRANK UN PRANK TURKEY PRANK PERANCIS PRANK SLOVAKIA
56. 4X NGEMIS F18 KUWAIT
57. MENUNGGU 2050 KAPAL SELAM
58. NO TANK AMPHIBI AV8 MOGOK BERASAP
59. 84% NO SAVING EVERY MONTH
60. OVER LIMIT DEBT 65,6% (LIMIT DEBT 65%)
61. TUDM SEWA 12 AW149
62. TUDM SEWA 4 AW139
63. TUDM SEWA 5 EC120B
64. TLDM SEWA 2 AW159
65. TDM SEWA 4 UH-60A
67. TDM SEWA 12 AW149
68. BOMBA SEWA 4 AW139
69. MMEA SEWA 2 AW159
70. POLIS SEWA 7 BELL429
==============
KEY WORDS =
1. DOWNGRADE
2. CHEAPEST VARIANT
3. LEASE
The Malonnn army has several weaknesses, including:
Hapus• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
Malonn has faced several crises, including political, financial, and economic crises:
• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....
=========================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
HASIL STUDI ........
HapusBELANJA PERTAHANAN = TERGANTUNG HUTANG
BELANJA PERTAHANAN = TERGANTUNG HUTANG
BELANJA PERTAHANAN = TERGANTUNG HUTANG
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
==============
2024 RASIO HUTANG 84,2% DARI GDP
The Finance Ministry stated that the aggregate national household debt stood at RM1.53 trillion between 2018 and 2023.
In aggregate, it said the household debt for 2022 was RM1.45 trillion, followed by RM1.38 trillion (2021,) RM1.32 trillion (2020), RM1.25 trillion (2019) and RM1.19 trillion (2018).
“The ratio of household debt to gross domestic product (GDP) at the end of 2023 also slightly increased to 84.2% compared with 82% in 2018,” it said.
==============
2024 HUTANG JATUH TEMPO = The federal government's debt is expected to be fully settled in 2053 if no new loans were to be taken to finance the deficit and to refinance maturing debts from 2024 onwards, said the Finance Ministry (MoF)
----
2023 TIDAK BAYAR HUTANG = “Ini bermakna bayaran khidmat hutang banyak…hanya membayar faedah bukan bayar hutang tertunggak,” kata Anwar lagi
----
2022 HUTANG BAYAR HUTANG 52,4% = Kah Woh menjelaskan pada tahun lalu, kerajaan ada membuat pinjaman yang meningkat sebanyak 11.6 peratus daripada RM194.5 bilion pada tahun sebelumnya. Daripada jumlah itu, beliau berkata 52.4 peratus atau RM113.7 bilion digunakan untuk membayar prinsipal pinjaman matang.
----
2021 HUTANG BAYAR HUTANG 50,4% = Sejumlah RM98.058 bilion atau 50.4 peratus daripada pinjaman baharu berjumlah RM194.555 bilion yang dibuat kerajaan pada tahun lalu digunakan untuk bayaran balik prinsipal pinjaman yang matang.
----
2020 HUTANG BAYAR HUTANG 60% = Jabatan Audit Negara (JAN) bimbang dengan tindakan kerajaan menggunakan hampir 60 peratus pinjaman baharu untuk membayar hutang .
----
2019 HUTANG BAYAR HUTANG 59% = Laporan Ketua Audit Negara mengenai Penyata Kewangan Kerajaan Persekutuan 2018 mendapati sejumlah 59 peratus pinjaman baharu kerajaan dibuat untuk membayar hutang kerajaan terdahulu
----
2018 RASIO HUTANG 80% DARI GDP : OPEN DONASI = Kementerian Keuangan Malon pada hari Rabu membuka rekening donasi supaya masyarakat dapat menyumbang untuk membantu negara membayar utang yang mencapai 1 triliun ringgit (US$ 250,8 miliar) atau 80 persen dari PDB.
==============
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
Kalau yg bikin lunas..... Dijamin tuh kapal selesai setelah perang dunia ke 3
BalasHapusAduhhhh masa diperlakukan begitu...HAHAHA
BalasHapusErdogan Walkout saat Prabowo Pidato Bela Gaza di KTT D-8, Presiden Turki Sampai Senggol Kursi RI 1
https://www.youtube.com/watch?v=ZYIq_6pW9fE
RENAME = COPY PASTE = SAME .....
HapusPSC = 1995
PSC > BNS = 2005
BNC > LUNAS = 2024
PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malonnn government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malonn in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
===================
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
===================
PROBLEMS SHIPYARD
PROBLEMS SHIPYARD
PROBLEMS SHIPYARD
Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.
Malonn's economy has faced a number of challenges, including:
Hapus• Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
• Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
• Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
• High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
• High dependency on food imports: Malonn imports 60% of the food it consumes.
• Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
===================
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
===================
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
CHANGE SKIN = CHANGE NAME = SAME .....
HapusPSC = 1995
PSC > BNS = 2005
BNC > LUNAS = 2024
PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malonnn government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malonn in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
===================
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
===================
LCS 2024-2011 = 13 TAHUN
13 TAHUN MANGKRAK
13 TAHUN MANGKRAK
LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
-----
NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
-----
17 KREDITUR = Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malon Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malon Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malon Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malon Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (MALON) BHD.
===================
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
RENAME = COPY PASTE = SAME .....
BalasHapusPSC = 1995
PSC > BNS = 2005
BNC > LUNAS = 2024
PSC-Naval Dockyard founded 1995. In 2005, Public Accounts Committee (PAC) unveiled serious corruption in the PCS-ND and caused solemn concern from the public. Under pressure of the public, Malonnn government enforced a reorganize result the PCS-ND to be taken over by Boustead Heavy Industries Corporation and renamed as Boustead Naval Shipyard Sdn Bhd. Boustead Heavy Industries Corporation (BHIC) was listed on Bursa Malonn in 2007 and the parent company is Boustead Holdings. BHIC was known for its subsidiary Boustead Naval Shipyard (BNS) which is specialised in naval shipbuilding and ship repair.[5] BNS now had taken over by Government and renamed as Lumut Naval Shipyard (LUNAS) 2024
===================
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
NEVER BUILT ANYTHING BUT = TRAWLERS OR POLICE BOATS
Despite the auditor-general stating that PSC-Naval Dockyard had never built anything but trawlers or police boats before being given the contract, the company was contracted to deliver six patrol boats for the Malonnn Navy in 2004 and complete the delivery in 2007.
Those were supposed to be the first of 27 offshore vessels ultimately cost RM24 billion plus the right to maintain and repair all of the country’s naval craft.
===================
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness.
===================
PROBLEMS SHIPYARD
PROBLEMS SHIPYARD
PROBLEMS SHIPYARD
Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.
Detik-detik Aksi Arogan Erdogan Dorong Kursi Prabowo Subianto di KTT D-8
BalasHapushttps://www.youtube.com/watch?v=94w1MnhEPUw
Malonn has faced several crises, including political, financial, and economic crises:
Hapus• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....
==============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
The Malonnn army has several weaknesses, including:
Hapus• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
Duh. Framing beruk gagal lagi dong
BalasHapushttps://nasional.kompas.com/read/2024/12/22/21203001/penjelasan-kemenlu-soal-erdogan-keluar-ruangan-saat-prabowo-pidato-di-ktt-d
kalau sudah keluar tak mahu dengar pidato tu beerti TAK DIANGGAP la waoiii...HAHAHAH
BalasHapusLCS 2024-2011 = 13 TAHUN
Hapus13 TAHUN MANGKRAK
13 TAHUN MANGKRAK
LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
-----
NGPVs 2024-1996 = 28 TAHUN
28 TAHUN MANGKRAK
28 TAHUN MANGKRAK
NGPVs DIBAYAR 27 JADI 6 = The Kedah-class offshore patrol vessels of the Royal Malonnn Navy (RMN) are six ships based on the MEKO 100 design by Blohm + Voss. Originally, a total of 27 ships were planned, but due to programme delays and overruns, only six were eventually ordered. Their construction began in the early 2000s, and by 2009, all six were in active service.
-----
OPV 2024-2017 = 8 TAHUN
8 TAHUN MANGKRAK
8 TAHUN MANGKRAK
OPV DIBAYAR 3 JADI 1 = THHE BANGKRUT : Offshore fabricator and shipbuilder TH Heavy Engineering Bhd (THHE) is undertaking a voluntary winding-up, a year after it was delisted from Bursa Malonn. The company resolved to undertake voluntary winding-up as it is unable to continue its operations due to liabilities, it said in a winding-up NOtice dated Sept 13.
-----
NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
-----
17 KREDITUR LCS
17 KREDITUR LCS
17 KREDITUR LCS
Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malonn Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malonn Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malonn Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malonn Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (Malonn) Bhd.
===================
PROBLEMS MALON SHIPYARD
Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA
PUBLIC DEBT = DEFENCE SPENDING
HapusPUBLIC DEBT = DEFENCE SPENDING
PUBLIC DEBT = DEFENCE SPENDING
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
LCS 2024-2011 = 13 TAHUN
Hapus13 TAHUN MANGKRAK
13 TAHUN MANGKRAK
LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
-----
OPV 2024-2017 = 8 TAHUN
8 TAHUN MANGKRAK
8 TAHUN MANGKRAK
OPV DIBAYAR 3 JADI 1 = THHE BANGKRUT : Offshore fabricator and shipbuilder TH Heavy Engineering Bhd (THHE) is undertaking a voluntary winding-up, a year after it was delisted from Bursa Malonn. The company resolved to undertake voluntary winding-up as it is unable to continue its operations due to liabilities, it said in a winding-up NOtice dated Sept 13.
-----
NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
-----
17 KREDITUR LCS
17 KREDITUR LCS
17 KREDITUR LCS
Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malonn Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malonn Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malonn Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malonn Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (Malonn) Bhd.
===================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
DITOLAK ARAB SAUDI =
HapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
kesian.....HAHAHAH
BalasHapus1. WALK OUT masa INDIANESIA pidato
2. Kerusi di senggol oleh Turki
PUBLIC DEBT = DEFENCE SPENDING
HapusPUBLIC DEBT = DEFENCE SPENDING
PUBLIC DEBT = DEFENCE SPENDING
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
LCS 2024-2011 = 13 TAHUN
Hapus13 TAHUN MANGKRAK
13 TAHUN MANGKRAK
LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
-----
NGPVs 2024-1996 = 28 TAHUN
28 TAHUN MANGKRAK
28 TAHUN MANGKRAK
NGPVs DIBAYAR 27 JADI 6 = The Kedah-class offshore patrol vessels of the Royal Malonnn Navy (RMN) are six ships based on the MEKO 100 design by Blohm + Voss. Originally, a total of 27 ships were planned, but due to programme delays and overruns, only six were eventually ordered. Their construction began in the early 2000s, and by 2009, all six were in active service.
-----
OPV 2024-2017 = 8 TAHUN
8 TAHUN MANGKRAK
8 TAHUN MANGKRAK
OPV DIBAYAR 3 JADI 1 = THHE BANGKRUT : Offshore fabricator and shipbuilder TH Heavy Engineering Bhd (THHE) is undertaking a voluntary winding-up, a year after it was delisted from Bursa Malonn. The company resolved to undertake voluntary winding-up as it is unable to continue its operations due to liabilities, it said in a winding-up NOtice dated Sept 13.
-----
NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
-----
17 KREDITUR LCS
17 KREDITUR LCS
17 KREDITUR LCS
Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malonn Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malonn Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malonn Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malonn Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (Malonn) Bhd.
===================
PROBLEMS MALON SHIPYARD
Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big
PROBLEMS MALON SHIPYARD
HapusLocal shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA
===================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
LCS 2024-2011 = 13 TAHUN
Hapus13 TAHUN MANGKRAK
13 TAHUN MANGKRAK
LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
-----
OPV 2024-2017 = 8 TAHUN
8 TAHUN MANGKRAK
8 TAHUN MANGKRAK
OPV DIBAYAR 3 JADI 1 = THHE BANGKRUT : Offshore fabricator and shipbuilder TH Heavy Engineering Bhd (THHE) is undertaking a voluntary winding-up, a year after it was delisted from Bursa Malonn. The company resolved to undertake voluntary winding-up as it is unable to continue its operations due to liabilities, it said in a winding-up NOtice dated Sept 13.
-----
NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
-----
17 KREDITUR LCS
17 KREDITUR LCS
17 KREDITUR LCS
Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malonn Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malonn Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malonn Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malonn Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (Malonn) Bhd.
===================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
>>> ya ampuuun.....malon di forum DS itu LOW IQ nya ABADI pantas aja kapasitas volume malon itu 1 cc
BalasHapusPERTANYAA SEDERHANA :
1. Pemimpin Negara Manakah yang melakukan WALK OUT saat Sidang D-8 ?
2. Posisi Presiden INDONESIA apakah melakukan WALK OUT saat Sidang D-8 ?
KONKLUSI :
PRESIDEN INDONESIA TETAP HADIR MENGIKUTI SIDANG D-8 sampai selesai .
artinya :
PRESIDEN INDONESIA ITU KUAT POSISINYA DAN BERPENGARUH DALAM SIDANG D-8.
Detik-detik Aksi Arogan Erdogan Dorong Kursi Prabowo Subianto di KTT D-8.
BalasHapushttps://www.youtube.com/watch?v=94w1MnhEPUw
DITOLAK ARAB SAUDI =
HapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
DITOLAK ARAB SAUDI =
HapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
DITOLAK ARAB SAUDI =
HapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
Malonn has faced several crises, including political, financial, and economic crises:
Hapus• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....
==============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
The Malonnn army has several weaknesses, including:
Hapus• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
PUBLIC DEBT = DEFENCE SPENDING
HapusPUBLIC DEBT = DEFENCE SPENDING
PUBLIC DEBT = DEFENCE SPENDING
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
Masa diperlakukan begitu masa pidato delegasi negara lain WALK OUT siap SENGGOL KERUSI....HAHAHHHA
BalasHapusDITOLAK ARAB SAUDI =
HapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
DITOLAK ARAB SAUDI =
HapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
DITOLAK ARAB SAUDI =
HapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
LCS 2024-2011 = 13 TAHUN
Hapus13 TAHUN MANGKRAK
13 TAHUN MANGKRAK
LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
-----
OPV 2024-2017 = 8 TAHUN
8 TAHUN MANGKRAK
8 TAHUN MANGKRAK
OPV DIBAYAR 3 JADI 1 = THHE BANGKRUT : Offshore fabricator and shipbuilder TH Heavy Engineering Bhd (THHE) is undertaking a voluntary winding-up, a year after it was delisted from Bursa Malonn. The company resolved to undertake voluntary winding-up as it is unable to continue its operations due to liabilities, it said in a winding-up NOtice dated Sept 13.
-----
NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
-----
17 KREDITUR LCS
17 KREDITUR LCS
17 KREDITUR LCS
Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malonn Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malonn Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malonn Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malonn Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (Malonn) Bhd.
===================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
Masa diperlakukan begitu masa pidato delegasi negara lain WALK OUT siap SENGGOL KERUSI....HAHAHHHA
BalasHapusDITOLAK ARAB SAUDI =
HapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
DITOLAK ARAB SAUDI =
HapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
DITOLAK ARAB SAUDI =
HapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
PROBLEMS MALON SHIPYARD
HapusLocal shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA
===================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
PUBLIC DEBT = DEFENCE SPENDING
HapusPUBLIC DEBT = DEFENCE SPENDING
PUBLIC DEBT = DEFENCE SPENDING
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
PRESIDEN INDONESIA BERANI DAN KUAT membela Perjuangan Kemerdekaan PALESTINA saat Sidang D-8 di Kairo, Mesir
BalasHapuspaham kan kenapa ada anggota D-8 yang Walk Out ...
https://www.youtube.com/watch?v=g1FlkV7MTa8
perdana menteri malon yang homoseksual MANA BERANI BELA PALESTINA ?
BalasHapusmalon LEMAH , right ?
WKWKWKWKWKWKWKWKWK....
>>> ya ampuuun.....malon di forum DS itu LOW IQ nya ABADI pantas aja kapasitas volume malon itu 1 cc
BalasHapusPERTANYAA SEDERHANA :
1. Pemimpin Negara Manakah yang melakukan WALK OUT saat Sidang D-8 ?
2. Posisi Presiden INDONESIA apakah melakukan WALK OUT saat Sidang D-8 ?
KONKLUSI :
PRESIDEN INDONESIA TETAP HADIR MENGIKUTI SIDANG D-8 sampai selesai .
artinya :
PRESIDEN INDONESIA ITU KUAT POSISINYA DAN BERPENGARUH DALAM SIDANG D-8.
DITOLAK ARAB SAUDI =
BalasHapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
DITOLAK ARAB SAUDI =
BalasHapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
PRESIDEN INDONESIA BERANI DAN KUAT membela Perjuangan Kemerdekaan PALESTINA saat Sidang D-8 di Kairo, Mesir
BalasHapuspaham kan kenapa ada anggota D-8 yang Walk Out ...
https://www.youtube.com/watch?v=g1FlkV7MTa8
Cuba lihat masa Erdogan pidato di Sidang kemuncak D8... tiada negara WALK OUT kerana apa...?? kerana mereka negara yang penting...buka linknya.....HAHAHA
BalasHapus..
https://www.youtube.com/watch?v=DspBaXDHEY8
DITOLAK ARAB SAUDI =
HapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
DITOLAK ARAB SAUDI =
HapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
LCS 2024-2011 = 13 TAHUN
Hapus13 TAHUN MANGKRAK
13 TAHUN MANGKRAK
LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
-----
OPV 2024-2017 = 8 TAHUN
8 TAHUN MANGKRAK
8 TAHUN MANGKRAK
OPV DIBAYAR 3 JADI 1 = THHE BANGKRUT : Offshore fabricator and shipbuilder TH Heavy Engineering Bhd (THHE) is undertaking a voluntary winding-up, a year after it was delisted from Bursa Malonn. The company resolved to undertake voluntary winding-up as it is unable to continue its operations due to liabilities, it said in a winding-up NOtice dated Sept 13.
-----
NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
-----
17 KREDITUR LCS
17 KREDITUR LCS
17 KREDITUR LCS
Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malonn Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malonn Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malonn Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malonn Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (Malonn) Bhd.
===================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
Malonn has faced several crises, including political, financial, and economic crises:
Hapus• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....
==============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
>>> ya ampuuun.....malon di forum DS itu LOW IQ nya ABADI pantas aja kapasitas volume OTAK malon itu 1 cc
BalasHapusPERTANYAAN SEDERHANA :
1. Pemimpin Negara Manakah yang melakukan WALK OUT saat Sidang D-8 ?
2. Posisi Presiden INDONESIA apakah melakukan WALK OUT saat Sidang D-8 ?
KONKLUSI :
PRESIDEN INDONESIA TETAP HADIR MENGIKUTI SIDANG D-8 sampai selesai .
artinya :
PRESIDEN INDONESIA ITU KUAT POSISINYA DAN BERPENGARUH DALAM SIDANG D-8 mendukung Perjuangan Kemerdekaan PALESTINA.
link:
https://www.youtube.com/watch?v=g1FlkV7MTa8
Masa bicara berani lantang berbanding PM yang kena penjara pasal sodomi DUA kali...
BalasHapus🤣🤣😂😂😂😂
Masa pihak iran pidato di D8 juga sama tiada negara yang walk out....HAHAHAH
BalasHapushttps://www.youtube.com/watch?v=xWocoM3qdEc
DITOLAK ARAB SAUDI =
HapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
DITOLAK ARAB SAUDI =
HapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
PROBLEMS MALON SHIPYARD
HapusLocal shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA
===================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
Malonn has faced several crises, including political, financial, and economic crises:
Hapus• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....
==============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
PUBLIC DEBT = DEFENCE SPENDING
HapusPUBLIC DEBT = DEFENCE SPENDING
PUBLIC DEBT = DEFENCE SPENDING
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
DITOLAK ARAB SAUDI =
BalasHapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
>>> ya ampuuun.....malon di forum DS itu LOW IQ nya ABADI pantas aja kapasitas volume OTAK malon itu 1 cc
BalasHapusPERTANYAAN SEDERHANA :
1. Pemimpin Negara Manakah yang melakukan WALK OUT saat Sidang D-8 ?
2. Posisi Presiden INDONESIA apakah melakukan WALK OUT saat Sidang D-8 ?
KONKLUSI :
PRESIDEN INDONESIA TETAP HADIR MENGIKUTI SIDANG D-8 sampai selesai .
artinya :
PRESIDEN INDONESIA ITU KUAT POSISINYA DAN BERPENGARUH DALAM SIDANG D-8 mendukung Perjuangan Kemerdekaan PALESTINA.
link:
https://www.youtube.com/watch?v=g1FlkV7MTa8
Sekarang saya paham kenapa dia hanya dukung tapi TAK BERANI bicara lantang
BalasHapus😂🤣🤣😛😛😛
https://www.detik.com/sulsel/berita/d-6426261/profil-anwar-ibrahim-pm-malaysia-ke-10-pernah-dipenjara-kasus-korupsi-sodomi
>>>> kenapa lon malon...elo KEPANASAN LONCAT LONCAT karena GUE GAGALIN NEGATIVE FRAMING di Forum DS atas POSISI PRESIDEN INDONESIA DAN RAKYAT INDONESIA ATAS SIDANG D-8 DI KAIRO MESIR
BalasHapus>>>> GAGAL LAGI nich yeeeeeeee.......WKWKWWK
Nah ini jelas berbeza bila INDIANESIA mula pidato D8 beberapa negara mulai WALK OUT siap SENGGOL KERUSI...HAHAHA
BalasHapushttps://www.youtube.com/watch?v=D9dhaKtFNyE
DITOLAK ARAB SAUDI =
HapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
BANTUAN PALESTINA DIKORUPSI =
The Malonn Anti-Corruption Commission (MACC) has frozen 41 bank accounts belonging to Aman Palestin and several other companies in its investigation into the alleged misappropriation of RM70 million by the NGO.
MACC said the 41 bank accounts had a combined total of RM15.8 million.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
DITOLAK ARAB SAUDI =
HapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
BANTUAN PALESTINA DIKORUPSI =
The Malonn Anti-Corruption Commission (MACC) has frozen 41 bank accounts belonging to Aman Palestin and several other companies in its investigation into the alleged misappropriation of RM70 million by the NGO.
MACC said the 41 bank accounts had a combined total of RM15.8 million.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
PROBLEMS MALON SHIPYARD
HapusLocal shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA
===================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
DITOLAK ARAB SAUDI =
BalasHapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
BANTUAN PALESTINA DIKORUPSI =
The Malonn Anti-Corruption Commission (MACC) has frozen 41 bank accounts belonging to Aman Palestin and several other companies in its investigation into the alleged misappropriation of RM70 million by the NGO.
MACC said the 41 bank accounts had a combined total of RM15.8 million.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
Nah ini jelas berbeza bila INDIANESIA mula pidato D8 beberapa negara mulai WALK OUT siap SENGGOL KERUSI...HAHAHA
BalasHapushttps://www.youtube.com/watch?v=D9dhaKtFNyE
DITOLAK ARAB SAUDI =
HapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
BANTUAN PALESTINA DIKORUPSI =
The Malonn Anti-Corruption Commission (MACC) has frozen 41 bank accounts belonging to Aman Palestin and several other companies in its investigation into the alleged misappropriation of RM70 million by the NGO.
MACC said the 41 bank accounts had a combined total of RM15.8 million.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
DITOLAK ARAB SAUDI =
HapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
BANTUAN PALESTINA DIKORUPSI =
The Malonn Anti-Corruption Commission (MACC) has frozen 41 bank accounts belonging to Aman Palestin and several other companies in its investigation into the alleged misappropriation of RM70 million by the NGO.
MACC said the 41 bank accounts had a combined total of RM15.8 million.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
Malonn has faced several crises, including political, financial, and economic crises:
Hapus• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....
==============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
The Malonnn army has several weaknesses, including:
Hapus• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
DITOLAK ARAB SAUDI =
HapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
BANTUAN PALESTINA DIKORUPSI =
The Malonn Anti-Corruption Commission (MACC) has frozen 41 bank accounts belonging to Aman Palestin and several other companies in its investigation into the alleged misappropriation of RM70 million by the NGO.
MACC said the 41 bank accounts had a combined total of RM15.8 million.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
HapusSEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
-------------------------------------
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
=========================
KEY WORDS = CHEAPEST AND DOWNGRADE
Some weaknesses in Malonnn public procurement include:
Hapus• Transparency: The principle of transparency is not well adhered to. Interference from authorities, such as local politicians, can lead to corruption, scandal, and the abuse of public resources.
• Inefficient processes: Procurement processes can be inefficient and ineffective. Tenders may be prepared hastily, carelessly, and without proper consideration.
• Poor documentation: Documentation may be poor.
• Low quality: The quality of products, services, and work may be low.
• Non-compliance: There may be non-compliance with the scope, specifications, and terms of contracts.
• Delayed completion: Projects may be delayed or not completed.
• Inadequate infrastructure: There may not be adequate infrastructure to support procurement.
• Vendor development programs: Vendor development programs (VDPs) may be non-existent or ineffective.
• Cronyism: There may be interference from outside parties and cronyism, which affects the awarding of contracts.
Malpractice: Procurement officers may be involved in malpractice and not comply with the policies and procedures of the procurement system
=========================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
=========================
KEY WORDS = CHEAPEST AND DOWNGRADE
Kenapa tidak di Malaydesh?
BalasHapusKarena merekanTAK BERANI...🤣🤣😂😂
===
https://www.antaranews.com/berita/4540906/ktt-d-8-dukung-perluasan-keanggotaan-dan-ri-jadi-tuan-rumah-2025
DITOLAK ARAB SAUDI =
BalasHapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
BANTUAN PALESTINA DIKORUPSI =
The Malonn Anti-Corruption Commission (MACC) has frozen 41 bank accounts belonging to Aman Palestin and several other companies in its investigation into the alleged misappropriation of RM70 million by the NGO.
MACC said the 41 bank accounts had a combined total of RM15.8 million.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
Cuba lihat masa Erdogan pidato di Sidang kemuncak D8... tiada negara WALK OUT.
BalasHapus..
https://www.youtube.com/watch?v=DspBaXDHEY8
DITOLAK ARAB SAUDI =
HapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
BANTUAN PALESTINA DIKORUPSI =
The Malonn Anti-Corruption Commission (MACC) has frozen 41 bank accounts belonging to Aman Palestin and several other companies in its investigation into the alleged misappropriation of RM70 million by the NGO.
MACC said the 41 bank accounts had a combined total of RM15.8 million.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
DITOLAK ARAB SAUDI =
HapusKegagalan Anwar untuk bertemu putera mahkota Mohammed bukanlah kegagalan diplomatik pertama yang dialami oleh seorang pemimpin Malon sejak beberapa tahun kebelakangan ini.
-
BANTUAN PALESTINA DIKORUPSI =
The Malonn Anti-Corruption Commission (MACC) has frozen 41 bank accounts belonging to Aman Palestin and several other companies in its investigation into the alleged misappropriation of RM70 million by the NGO.
MACC said the 41 bank accounts had a combined total of RM15.8 million.
-
DITOLAK KUWAIT =
NGEMIS 4x F18 BEKAS.....
Antara perkara yang dibincangkan adalah berkenaan hasrat negara untuk memperoleh jet-jet pejuang F/A-18 Legacy HORNET MALONN milik Tentera Udara Kuwait (KAF) setelah KAF menerima Super HORNET MALONN baharunya.
-
DITOLAK EU =
EU PALM OIL CURBS - NO RAFALE
Malon says EU palm oil curbs may undermine France's fighter jet bid.......
on Thursday the European Union's decision to curb imports of the commodity could undermine France's hopes of winning one of Asia's biggest fighter plane deals.
-
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
DITOLAK WARGA LEBANON
BUKTI DISERANG WARGA LEBANON
BUKTI DILEMPARI BATU WARGA LEBANON
https://www.youtube.com/watch?v=d0h0NrZ1NwQ
============
SAHABATNYA
During the early days of his administration, Tunku Abdul Rahman was open to fostering ties with Israel as the latter had expressed support for Malaya’s independence. In 1956, Tunku, then Chief Minister, welcomed the Israeli Prime Minister, Moshe Sharett, to the county....
-
TEMAN DAGANGNYA
Official data published by the Israeli Central Bureau of Statistics (CBS) tells of a booming, but very discreet, trade relationship that is blossoming between the two countries, despite a hawkish prime minister in Jerusalem and Razak’s Islamist and proudly pro-Palestinian government in Kuala Lumpur.
============
Malonn's armed forces procurement faces several weaknesses, including:
1. Corruption
The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
2. Political influence
Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
Weak parliamentary oversight
Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
3. Limited financial scrutiny
Financial scrutiny is limited by excessive secrecy.
4. Violation of procedures
Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
-------------------
Some factors that contribute to the Malonn Army's perceived weakness include:
• Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
• Corruption: The MAF has been plagued by corruption.
• Poor planning: The MAF has been criticized for poor planning.
• Political interference: Political leaders have interfered in the MAF's procurement process.
• Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
PROBLEMS MALON SHIPYARD
HapusLocal shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA
===================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
LCS 2024-2011 = 13 TAHUN
Hapus13 TAHUN MANGKRAK
13 TAHUN MANGKRAK
LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
-----
OPV 2024-2017 = 8 TAHUN
8 TAHUN MANGKRAK
8 TAHUN MANGKRAK
OPV DIBAYAR 3 JADI 1 = THHE BANGKRUT : Offshore fabricator and shipbuilder TH Heavy Engineering Bhd (THHE) is undertaking a voluntary winding-up, a year after it was delisted from Bursa Malonn. The company resolved to undertake voluntary winding-up as it is unable to continue its operations due to liabilities, it said in a winding-up NOtice dated Sept 13.
-----
NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
-----
17 KREDITUR LCS
17 KREDITUR LCS
17 KREDITUR LCS
Besides MTU Services, others include Contraves Sdn Bhd, Axima Concept SA, Contraves Advanced Devices Sdn Bhd, Contraves Electrodynamics Sdn Bhd and Tyco Fire, Security & Services Malonn Sdn Bhd, as well as iXblue SAS, iXblue Sdn Bhd and Protank Mission Systems Sdn Bhd. Also included are Bank Pembangunan Malonn Bhd, AmBank Islamic Bhd, AmBank (M) Bhd, MTU Services, Affin Hwang Investment Bank Bhd, Bank Muamalat Malonn Bhd, Affin Bank Bhd, Bank Kerjasama Rakyat Malonn Bhd, Malayan Banking Bhd (Maybank) and KUWAIT FINANCE HOUSE (Malonn) Bhd.
===================
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
>>> ya ampuuuun.....perdana menteri malon aja HOMO SEKSUAL.....pantas aja LEMAH MEMBELA PALESTINA....
BalasHapusFAKTA : BICARA lewat APLIKASI X atau Twitter
netizen INDONESIA TERTAWA LEPAS...WKWKWK
link:
https://www.youtube.com/watch?v=mpM4Zoz6_U0&pp=ygUjYW53YXIgaWJyYWhpbSBkdWt1bmcgcHJhYm93byBkaSBELTg%3D
https://www.detik.com/sulsel/berita/d-6426261/profil-anwar-ibrahim-pm-malaysia-ke-10-pernah-dipenjara-kasus-korupsi-sodomi
Nah ini jelas berbeza bila INDIANESIA mula pidato D8 beberapa negara mulai WALK OUT siap SENGGOL KERUSI...HAHAHA
BalasHapushttps://www.youtube.com/watch?v=D9dhaKtFNyE
The Malonnn army has several weaknesses, including:
Hapus• Limited defense budgeting: The Malonnn government has been unwilling to fund defense by cutting other government spending or reducing the size of the armed forces.
• Outdated equipment: Most of the Malonnn Army's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern equipment.
• Corruption: The Malonnn military has been plagued by corruption.
• Political interference: Political leaders have interfered in procurement.
• Lack of authority: The armed forces are generally given authority to assist relevant authorities, such as the police, in dealing with non-traditional security challenges.
• Low ranking in military capability: According to the Lowy Institute Asia Power Index, Malonn ranks 16th in military capability in Southeast Asia.
Other challenges include:
• The need to replace the Nuri helicopter fleet, which has seen 14 crashes with many fatalities
• The need for the Navy and Maritime Enforcement Agency to patrol the country's maritime expanse to combat piracy, human trafficking, and smuggling
==============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
PUBLIC DEBT = DEFENCE SPENDING
HapusPUBLIC DEBT = DEFENCE SPENDING
PUBLIC DEBT = DEFENCE SPENDING
The results reveal a robust positive association between Public Debt and Defence Spending, substantiated by the significant coefficient of 0.7601 (p < 0.01). This suggests that an increase in Public Debt corresponds to a substantial rise in Defence Spending. Additionally, the study underscores the influence of Gross Domestic Saving and Exchange Rate on Defence Spending, with coefficients of 1.5996 (p < 0.01) and 0.4703 (p < 0.05), respectively. These findings contribute valuable insights into the fiscal dynamics of Malon's defence budget, shedding light on the interplay between Public Debt and strategic resource allocation. The incorporation of control variables enhances the robustness of the analysis, providing a nuanced understanding of the factors shaping defence spending in the Malonn context.
============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
SEWA 28 HELI = 119 HELI BARU :
HapusSEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
-------------------------------------
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
=========================
KEY WORDS = CHEAPEST AND DOWNGRADE
Malonn has faced several crises, including political, financial, and economic crises:
BalasHapus• Political crisis
From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
• Financial crisis
Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
• Economic crisis
Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
• Household debt crisis
As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
• Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior....
==============
SEWA 28 HELI = 119 HELI BARU :
SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
SEWA 28 HELI = 119 HELI BARU :
BalasHapusSEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
•HARGA HELI AW149 = USD 31 JUTA
•28 UNITK X $ 31 JT= USD 857 JUTA
•$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
----
4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
SEWA 15 TAHUN = RM16.8 BILION
BELI BARU = RM3.954 BILION
sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
-------------------------------------
CHEAPEST PLATFORM VARIANT :
-
HARGA CN 235 = US$ 27,50 Juta
-
HARGA ATR 72 = US$24.7 Juta
-------------------------------------
DOWNGRADE HISAR
DOWNGRADE HISAR
DOWNGRADE HISAR
CHEAPEST VARIANT LMS
-
1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
-
2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
-
3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
-
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
HISAR OPV = LMS B2 = NO ASW
TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
-------------------------------------
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
CHEAPEST VARIANT FA50
-
1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
-
2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
-
3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
-
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
FA50 = UNSUITABLE FOR MILITARY OPERATIONS
South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
-------------------------------------
ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
Malonn to use Anka-S for Maritime Surveillance
While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry.
-------------------------------------
Malon's combat equipment has several weaknesses, including:
• Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
• Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
• Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
• Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
• Procurement system: The Malonn procurement system needs reform.
Political interference and corruption: Political interference and corruption are undermining combat readiness
=========================
KEY WORDS = CHEAPEST AND DOWNGRADE