27 Desember 2024

Tatmadaw (Air) Marks 77th Anniversary with Aircraft and Helicopter Commissioning Ceremony

27 Desember 2024

Commissioning ceremony of fighter aircraft Su-30SME, JF-17, transport aircraft Y-8, helicopter Mi-17 and trainer aircraft MTX-1A, MTX-1B (photos: CINCDS) 

Chairman of State Administration Council Commander-in-Chief of Defence Services Senior General Min Aung Hlaing attends 77th Founding Anniversary of Tatmadaw (Air) and commissioning ceremony of aircraft

The commissioning ceremony of air planes and helicopters to increase the air  power of Tatmadaw and the nation marking the 77th  Founding Anniversary of Tatmadaw (Air) of the Republic of Union of Myanmar was held at Aviation Training School in Meiktila Station this morning, graced by Chairman of State  Administration Council Commanderin-Chief of Defence Services Senior General Min Aung Hlaing.

Also present were Daw Kyu Kyu Hla, wife of the Senior General, Chief of General  Staff (Army, Navy and Air) General Maung Maung Aye and wife, retired commanders-in-chief (Air) and wives, Commanderin- Chief (Navy) Vice-Admiral Htain Win and wife, Commanderin-Chief (Air) General Tun Aung and wife, union level officials and wives, union ministers and wives, the Mandalay Region Chief Minister and wife, senior military officers from the Office of the Commander-in- Chief and wives, the Central Command commander, air base commanders, war veterans, students and honoured guests.

In his address, the Senior General said today marks the 77th Founding  Anniversary of Tatmadaw (Air). On such auspicious days, air planes and helicopters were commissioned into service to enhance air power in  shouldering the national defence duties. Hence, it is an honourable day for the nation, Tatmadaw and Airforce.


The Air Force has already held aircraft commissioning ceremonies for 14 times. Today, the commissioned aircraft will be transferred to the Airforce. The reinforcement of new aircraft enhances the performance of the Air Force, the essential part of its military campaigns and aerial missions, as well as its fighting ability and combat power.

A study of the modern-day battles and armed conflicts all over the world indicates the pivotal role of aerospace power for battle victory. It is visible that air superiority can control and crush the enemy and raise the morale and  fighting capacity of their own troops.

In this regard Tatmadaw (Air) must always keep in touch with the latest developments and adapt to the changes. Members of the Air Force are required to be well trained to fully utilize the power of aircraft and weapon systems. As a single training session is not adequate for handling the ever-advancing technology, Air Force members must follow the process of constant studying, training and compliance.


Today, rivalry between powers is increasing, followed by the attempts to interfere in the multiple sectors of small countries, and the occurrence of territorial disputes, terrorist attacks, and internal instability all over the world.

In reflecting on the history of the Tatmadaw (Air), it is evident that, despite  numerous challenges, they persevered  their efforts to achieve their objectives with the aircraft and weapons at their disposal, motivated by a deep love for their country, patriotism, and unwavering determination.

It is important to emphasize the value of preserving and upholding these noble  and honorable traditions, ensuring that they are passed down to future generations. The Tatmadaw (Air) must continue to play an active role in the national defense, nationbuilding, and development efforts undertaken by the Tatmadaw. It is crucial to value and maintain the aircraft including helicopters currently commissioned into service, thereby enhancing the honor of the Tatmadaw. Furthermore, he urged the Tatmadaw to work diligently in building a modern air force that is capable of effectively safeguarding the nation.


Following this, Commanderin-Chief (Air) General Tun Aung expressed his  gratitude for the aircraft commissioned into service. Chief of Staff (Air) Lt-Gen Zaw Win Myint then officially declared the aircraft and helicopters  commissioned into service.

Afterward, General Tun Aung presented miniature models of aircraft and  helicopters to the Senior General. Subsequently, airplanes and helicopters conducted a demonstration flight salute and aerobatic display. As part of the synchronized flight salute program, two transport helicopters hoisted the national flag and the military flag, while two light transport helicopters flew in formation to salute the Senior General.

Four light transport helicopters flew in a composite box formation of different types; Two reconnaissance aircraft and one trainer aircraft, developed and tested by the Tatmadaw (Air), flew in a composite trail formation of different types; One transport aircraft and two medium transport aircraft flew in a composite arrowhead formation of different types; Three jet fighters flew in the composite trail formation, emitting yellow, white, and blue smoke representing the Tatmadaw (Air); Two interceptor aircraft and two multirole fighter jets flew in a composite box formation of different types; Three fighter jets flew in a composite arrowhead formation, flying straight ahead in a split-winged pattern; One trainer aircraft, one multirole fighter jet, and one post-4th generation multirole heavy fighter jet, representing three types of aircraft in different sizes and flight speeds, flew in a composite arrowhead formation and saluted the Senior General.



Then, a fighter jet conducted a high speed flight at 900 kilometre per hour and the zoom climb maneuver featuring an upward vertical flight while a 4th generation multi-role heavy fighter SU-30 SME performed the oblique loop maneuver, dodging possible enemy air defence weapon fires by turning left or right and reappearing at the back of enemy aircraft, the multi-roll flight to deceive enemy aircraft and the high AOA loop, which cannot be performed by an ordinary fighter jet, and reappearing from the backward before firing rockets.

Then, birds were released for life saving donations to mark the 77th Anniversary  of the air force and the Senior General and party released 77 birds before sprinkling scented water on newly commissioned aircraft.

Afterwards, the Senior General and party inspected the aircraft and posed for  documentary photographs. Afterward, the Senior General greeted the pilots, who participated in the fleet demonstration, and presented cash rewards to them.


The MTX-1A and MTX-1B, which participated in the commissioning ceremony today, were reconnaissance aircraft developed by officers and other ranks of the air force. They were produced on a trial basis with the aim of gaining  experience in production of aircraft by using the reverse engineering techniques. The designs for the cockpit flight system and the communication  and navigation system of the MTX-1A were produced and the system integration was carried out before test flights were conducted successfully on 25 March, 2021.

Based on experience gained from production of MTX-1A, officers and other ranks of the air force produced MTX-1B by upgrading the cockpit display system, the communication system and the fuselage.

The aircraft were produced by de-signing the fuselage, electric and engine parts, the navigation system, the communication system and the control system. During the production process, functional and operational tests were conducted at every stage and MTX-1B with turboprop engines and the glass cockpit system were produced. Test flights for the aircraft were successfully conducted in March, 2024.


In the evening of 14 March, the Senior General and party observed the exhibition commemorating the 77th Anniversary of the air force and the commissioning ceremony. The exhibition displayed the history of the air force, uniforms used by the air force in successive eras, photographs depicting the history of the air force, documentary photographs of commanders-in-chief of the air force, historic aircraft and battles they fought, avionics equipment used in aircraft, miniatures of new generation aircraft and equipment used by pilots, weapons and ammunition used by the air force, photographs of air force personnel who won medals for the their capabilities, photographs of commissioning ceremonies of aircraft, documentary photographs of training for officers, other ranks and substitutes of air force, photographs depicting the international relations and development of the air force, photographs of prize  presentation ceremonies for pilots by commanders-in-chief and aviation electronic equipment produced by the air force.

Then, the Senior General and wife and party signed the commemorative book of the 77th Anniversary of the air force and inspected shops selling souvenirs, traditional food, books and consumer products manufactured by respective air force bases before cordially greeting officers, other ranks and families.

121 komentar:

  1. KATA KUNCI =
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    Tomczyk revealed that while Poland initially pursued the acquisition of the FA-50s from South Korea with the expectation of receiving operational aircraft, it subsequently emerged that the armaments intended for these aircraft had been discontinued. As a result, the Polish Ministry of Defence has received 12 aircraft that are no longer capable of fulfilling combat roles.....
    ----
    KATA KUNCI =
    FA50 = TRAINING AIRCRAFT
    FA50 = TRAINING AIRCRAFT
    So far, Poland has received 12 of the jets in the GF (Gap Filler) version, but Blaszczak failed to secure weapons for them, Cezary Tomczyk, a deputy defence minister, told parliament on Thursday.
    According to him, the delivery of the 36 remaining jets in the PL version custom-made for Poland "is largely at risk" and delays in their deliveries may reach nine months.
    While praising the role the FA-50s are playing in the Polish Air Force, Tomczyk said that they can only be used as training aircraft.
    ------
    KATA KUNCI =
    HELI MD530G = HELI TRAINING
    HELI MD530G = HELI TRAINING
    A notable attraction at this year’s Langkawi International Maritime and Aerospace (LIMA) exhibition are six new MD530Gs, which were delivered to Malon’s army in 2022. The type is appearing on static, and also participated in the show’s opening ceremony.
    The six rotorcraft – delivery of which was delayed for several years – are primarily used for training.....
    ------
    KATA KUNCI =
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    ------
    KATA KUNCI =
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    ------
    KATA KUNCI =
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    ==============
    ==============
    BUDGET 2025 = SALARIES AND ALLOWANCES
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
    ==============
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR

    BalasHapus
    Balasan
    1. MALONN DIBAWAH KAKI =
      RAFALE : BANGLADESH MYANMAR
      RAFALE : BANGLADESH MYANMAR
      For the first batch, Bangladesh, which shares borders with Myanmar and India, plans to procure four Rafale F3-R variants, consisting of three two-seat fighters and one single-seat aircraft currently operated by the French Air Force.
      ==================
      MALONN DIBAWAH KAKI =
      MYANMAR : FRIGATE 135M
      MYANMAR : FRIGATE 135M
      SAC Chairman Commander-in-Chief of Defence Services Senior General Min Aung Hlaing joins the auspicious ceremony to name and commission 135-metre Frigate built by Tatmadaw (Navy)
      ==================
      MALONN DIBAWAH KAKI =
      SPH : LAOS, VIETNAM, MYANMAR, BANGLADESH, KENYA
      -
      The ‘CAESAR CLUB’ aims to bring together its different user countries and share feedback. Around the manufacturer, KNDS, the officialization in Canjuers gathered countries using the self-propelled howitzer: France (76), Thailand (6), Saudi Arabia (132), Indonesia (55), Czech Republic (62), Belgium (9 GN ordered) and Lithuania (18). And Ukraine for several months.
      -
      SPH MYANMAR : That is the main reason why Myanmar bought large number of SH 1 howitzers in early 2010s. Currently there are as many as 72 SH 1 howitzers in Myanmar inventory and they are used extensively in many counter insurgency operations.
      -
      SPH LAOS : At the end of 2017, a unit of the Lao People's Army Artillery Division surprised the regional military observers with the publicity of CS/SH1's self-evident training image.
      -
      SPH FILIPINA : Philippine Army operates two batteries of ATMOS 155 self-propelled guns which consist of 6 mobile firing units each (12 total) has been delivered by Elbit Systems.
      -
      SPH THAILAND : THailand mengakuisisi sistem meriam swagerak (self-propelled gun-howitzer) kaliber 155 mm untuk melindungi wilayah perbatasan timur Negara Gajah Putih dengan Kamboja.
      -
      SPH VIETNAM : Over the past decade the People's Army of Vietnam developed homebuilt self-propelled howitzers using leftover M101 self-propelled guns combined with the chassis of Ural trucks & M548 tracked cargo carriers
      -
      NORA B-52 = CYPRUS, ALGERIA, KENYA, AZERBAIJAN, BANGLADESH AND MYANMAR
      This artillery system, beyond the domestic market, has seen a fair amount of success in international sales to Cyprus, Algeria, Kenya, Azerbaijan, Bangladesh and Myanmar.
      ==============
      Malon's combat equipment has several weaknesses, including:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness.
      ==================
      KEY WORDS = DIBAWAH KAKI LAOS, VIETNAM, MYANMAR, BANGLADESH, KENYA

      Hapus
  2. POLAND BUDGET USD 38 BILLION = CASH PREMIUM
    FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA = USD 58,75 JUTA/UNIT
    FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA = USD 63,89 JUTA/UNIT
    ------
    BUDGET USD 4,3 BILLION = BARTER PALM OIL
    DOWNGRADE CHEAPEST FA 50
    FA 50M 18 UNIT HARGA USD 920 JUTA = USD 51,1 JUTA/UNIT
    ==============
    KATA KUNCI =
    BUDGET USD 38 BILLION = GROUNDED
    BUDGET USD 4,3 BILLION = PASTI LEBIH GROUNDED!!!
    At Monday’s press conference in the south-eastern city of Rzeszow, Wladyslaw Kosiniak-Kamysz addressed the report, saying that while the Law and Justice (PiS) cabinet, whose administration ended last December, in fact made several deals for military equipment purchases, they did not arrange for appropriate changes that would prepare the armed forces for its implementation. In his view, after the army received the purchased FA-50 planes, they were not ready for take-off or to be used right away.
    ----
    KATA KUNCI =
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    Tomczyk revealed that while Poland initially pursued the acquisition of the FA-50s from South Korea with the expectation of receiving operational aircraft, it subsequently emerged that the armaments intended for these aircraft had been discontinued. As a result, the Polish Ministry of Defence has received 12 aircraft that are no longer capable of fulfilling combat roles.....
    ----
    KATA KUNCI =
    FA50 = TRAINING AIRCRAFT
    FA50 = TRAINING AIRCRAFT
    So far, Poland has received 12 of the jets in the GF (Gap Filler) version, but Blaszczak failed to secure weapons for them, Cezary Tomczyk, a deputy defence minister, told parliament on Thursday.
    According to him, the delivery of the 36 remaining jets in the PL version custom-made for Poland "is largely at risk" and delays in their deliveries may reach nine months.
    While praising the role the FA-50s are playing in the Polish Air Force, Tomczyk said that they can only be used as training aircraft.
    ------
    KATA KUNCI =
    HELI MD530G = HELI TRAINING
    HELI MD530G = HELI TRAINING
    A notable attraction at this year’s Langkawi International Maritime and Aerospace (LIMA) exhibition are six new MD530Gs, which were delivered to Malon’s army in 2022. The type is appearing on static, and also participated in the show’s opening ceremony.
    The six rotorcraft – delivery of which was delayed for several years – are primarily used for training.....
    ------
    KATA KUNCI =
    DOWNGRADE LMS B2 NO SONAR
    DOWNGRADE LMS B2 NO SONAR
    STM, in its role as main contractor, will turn to the Turkish defence sector for such equipment as the Combat Management System; the Gun Fire Control System, to be supplied by HAVELSAN; and the 3D Search Radar, Fire Control Radar, IFF, 30mm Gun, ESM and Chaff Decoy System, as well as other electronic sensors, to be supplied by ASELSAN. ROKETSAN will be supplying its ATMACA Surface-to-Surface G/M System.
    ==============
    Military equipment in Malon has broken down for a variety of reasons, including:
    • Engine problems
    In August 2022, a Malonn Army PT-91M Pendekar tank broke down on a highway near Parliament due to engine problems. The tank was being used for rehearsals for the country's Independence Day parade.
    • Aging aircraft
    Malon's Royal Malonn Air Force (RMAF) has a fleet of legacy Hornets that are becoming technologically obsolete. The RMAF has faced fleet sustainment problems, and some say that the government's defense modernization budget should be used to expand the LCA program or accelerate the MRCA program.
    • Limited defense budget
    Malon's defense progress has been limited since 2018 due to fiscal limitations. Malonn governments have been unwilling to cut government spending elsewhere or reduce the size of the armed forces.
    • Russian-made weapons
    • Malon has become wary of its Russian-made weapons, and is looking to buy elsewhere. The West's sanctions against Russia have prevented Malon from buying the Su-30 directly from the Kremlin

    BalasHapus
    Balasan
    1. MYANMAR =
      BUILT 2017 - COMMISSIONED 2024
      BUILT 2017 - COMMISSIONED 2024
      BUILT 2017 - COMMISSIONED 2024
      The Senior General and party viewed launching the newlycommissioned 135-metre Frigate from the ship lift platform. The 135-metre Frigate King Thalun was built at the Naval Dockyard Command Headquarters in March 2017 under the guidance of the Senior General.
      ==============
      ==============
      LCS MALONN =
      LAUNCHING 2017 - MANGKRAK 2024
      LAUNCHING 2017 - MANGKRAK 2024
      LAUNCHING 2017 - MANGKRAK 2024
      LAUNCHING 2017 - MANGKRAK 2024
      LAUNCHING 2017 - MANGKRAK 2024
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malaysia’s former Navy chief said today.
      ---------------------
      LCS 2024-2011 = 13 TAHUN
      13 TAHUN MANGKRAK
      13 TAHUN MANGKRAK
      LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ---------------------
      NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
      ----------------------
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn
      ---------------------
      Malonn's armed forces procurement faces several weaknesses, including:
      1. Corruption
      The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
      2. Political influence
      Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
      Weak parliamentary oversight
      Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
      3. Limited financial scrutiny
      Financial scrutiny is limited by excessive secrecy.
      4. Violation of procedures
      Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedure
      ==============
      KEY WORDS = LAUNCHING 2017 - MANGKRAK 2024

      Hapus
  3. Harga abun mandi bakal naek .....ente besok mo coli pake apaan tong 🐒

    BalasHapus
    Balasan
    1. Jangan panik dulu mas'e...
      tetep fokus ke tujuan.....🤪😁

      Hapus
  4. INI BARU PENGADAAN & PENGUATAN MENGINGATKAN RI PRA 2014 PENGADAANNYA BISA SEGALA TERBELI BARU DENGAN HARGA RASIONAL , BENAR & UNIT² MODERN TANPA OMDO & BANYAK TINGKAH ATUR² UNTUK DAPAT BAGIAN DARI MARK UP , TOTNYA KEREN JELAS SERTA BISA DIRASAKAN SAMPAI SEKARANG.

    BalasHapus
    Balasan
    1. Hoax.....
      Komentar kelas TAIK dari otak 0.000000001cc

      Hapus
  5. Mantab.. Myanmar...

    Lagi lagi geng MALAYDESH di buat IRI HATI sama myanmar.... Hahahahahaha
    😂😂😂😂

    BalasHapus
  6. Kalau di negara MALAYDESH heli yang ada pun boleh BERTABRAKAN di udara... HAHAHAHAHAHA


    TAMING TAI buat ketar ketir.. Wkwkwkwkwk

    BalasHapus
  7. Kasihan malon..
    Se kelas Myanmar mampu mengayam ayamkan malon..
    Kemarin kena Fregat 135m
    Sekarang kena Heli & fighter

    Good job Myanmar

    😛😛😂🤣🤣😂🤣

    BalasHapus
  8. Selepas myanmar PERMALUKAN 5 kapal LCS MAHA MANGKRAJ geng MALAYDESH dengan kapal KING THALUN 3.500 ton...

    Myanmar coba kembali PERMALUKAN geng MALAYDESH dengan heli beli bukan versi GAGAL SEWA dengan KONTRAK KOSONG tuh... HAHAHAHAHA 😭😭😭😭

    BalasHapus
  9. Selepas myanmar PERMALUKAN 5 kapal LCS MAHA MANGKRAK geng MALAYDESH dengan kapal KING THALUN 3.500 ton...

    Myanmar coba kembali PERMALUKAN geng MALAYDESH dengan heli beli bukan versi GAGAL SEWA dengan KONTRAK KOSONG tuh... HAHAHAHAHA 🤣 🤣 🤣 🤣 🤣 🤣

    BalasHapus
  10. Su-30SME, JF-17
    ----------------

    MYANMAR anggota TIM ELIT SHOPPING SOPING Sukses dapat ASET Baruw haha!🤗🤗🤗
    ✅️MRCA & LCA Baruw
    ✅️MIG 29 hasil apgred masi berjaya..

    sementara tetangga selatannya, negeri semenanjung🎰kasino genting,
    ❌️MIG TAMAT
    ❌️F5 TAMAT
    ❌️MRCA PRENK
    ❌️LCA PRENK
    ❌️JET LATIH PRENK
    semua tanpa ganti KAHSIYAN haha!😝😝😝

    BalasHapus
  11. Paling LAWAK GORILLA.. mereka tunjuk foto RAFAKE dibina dan klaim konon itu milik INDIANESIA...

    Tapi bila saya tanya apa bukti itu RAFAKE INDIANESIA..? mereka diam tak mampu tunjuk bukti kan itu milik mereka Selain klaim je.. 🤣🤣

    BalasHapus
    Balasan
    1. Malonn has faced several crises, including political, financial, and economic crises:
      • Political crisis
      From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
      • Financial crisis
      Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
      • Economic crisis
      Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
      • Household debt crisis
      As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
      Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
      ==========
      The Royal Malonn Air Force (RMAF) has faced several challenges, including:
      • Aircraft maintenance
      The RMAF has had issues with maintenance and spare parts for its aircraft, including the Sukhoi Su-30MKM and the Kuwaiti HORNET MALONN. For example, in 2018, only four of the RMAF's Sukhoi Su-30MKM aircraft were flyable due to maintenance issues. The Kuwaiti HORNET MALONNs are an earlier model than the Malonn fighters, which may cause compatibility issues.
      • Budget constraints
      Malon's defense budget is limited, which can affect the pace of acquisitions and upgrades. The government must balance defense spending with other national priorities.
      • Regional competition
      Neighboring countries like Indonesia and Singapore are also increasing their air force capabilities, which puts pressure on Malon to keep pace.
      • Corruption
      Malon's military has been involved in multiple corruption scandals
      =========
      The Royal Malonn Navy (RMN) faces several challenges, including:
      • Aging fleet: More than half of the RMN's fleet is past its prime, and the country has only received four of the 18 new vessels it planned to acquire. The last time the RMN acquired a combat ship was in 1997.
      • Delayed replacements: The RMN's plans to replace its aging fleet have been stalled due to mismanagement.
      • Insufficient defense budget: Malon's defense budget is less than one percent of its GDP, while neighboring Singapore spends six percent.
      • Lack of coordination: There is a lack of coordination among agencies.
      • Outdated assets: The RMN's ships and assets are outdated.
      • Combat system issues: The RMN has observed deficiencies with the combat system of its LMS type vessels.
      • Low endurance: The LCS's endurance was too low to stay with a carrier strike group or amphibious ready group without significant refueling.
      • Lack of air and surface warfare capabilities: The LCS lacked significant air and surface warfare capabilities
      =========
      BUDGET 2025 = SALARIES AND ALLOWANCES
      BUDGET 2025 = NOT ASSETS
      BUDGET 2025 = NOT ASSETS
      BUDGET 2025 = NOT ASSETS
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
      ==============
      KEY WORDS CRISES=
      1. POLITICAL
      2. FINANCIAL
      3. ECONOMIC
      4. DEBT

      Hapus
    2. Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
      • Krisis politik
      Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
      1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
      2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
      3. Dampak politik pandemi COVID-19
      4. Proklamasi Darurat 2021
      5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
      • Krisis beras
      Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
      • Krisis mata uang
      Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
      1. Kinerja ekspor yang buruk
      2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
      3. Kekhawatiran geopolitik
      4. Ketidakpastian mengenai prospek ekonomi China
      ==========
      Malonn has faced several crises, including political, financial, and economic crises:
      • Political crisis
      From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
      • Financial crisis
      Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
      • Economic crisis
      Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
      • Household debt crisis
      As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
      • Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
      ==========
      BUDGET 2025 = SALARIES AND ALLOWANCES
      BUDGET 2025 = NOT ASSETS
      BUDGET 2025 = NOT ASSETS
      BUDGET 2025 = NOT ASSETS
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
      ==============
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR

      Hapus
    3. PRANK KS-1A
      PRANK KS-1A
      PRANK KS-1A
      Malonn has agreed in principle to purchase medium-range missiles from China, which in return will transfer technology on very short-range air defence to the country, Deputy Prime Minister Najib Razak said Tuesday.
      ------
      VSHORAD = LEASE 30 YEARS
      VSHORAD = LEASE 30 YEARS
      VSHORAD = LEASE 30 YEARS
      The procurement division of the Defence Ministry has issued a tender for the supply, delivery, and commissioning for eight Very Short-Range Air Defence (VSHORAD) ground-based air defence system for the Army. The VSHORAD system is listed as the Army’s main asset and equipment for 2024.
      The 23-day tender published on November 20 closes on December 19. As usual the public specifications for the tender are limited.
      The indicative cost for the eight VSHORAD system is RM150 million. It is therefore unclear whether the VSHORAD system is meant for the four Starstreak carrier vehicles or Kenderaan Pembawa Misil Starstreak (KPMS) which tender was published last August.
      It may well be that the Starstreak LML NG VSHORAD SAM being sought are for the KPMS. And if it’s meant to be for the KPMS it may well be the setting up of a GBAD unit for 1 Division which is based in Kuching, Sarawak. The Fifth Division based in Kota Kinabalu, Sabah has a single GBAD unit, 35 RAD (Ad-hoc) which got its Starstreak KPMS, missiles, and launchers from the disbanded RMN GBAD unit.
      The other Starstreak unit is 32 RAD which is based at the Terendak camp in Malacca. It is also interesting to note that the 361 Battery of RAD – the GBAD unit- with 10th Para Brigade are still equipped with the Anza Mk2 VSHORAD system procured some 20 years ago. The Thales Starstreak missiles, launchers, vehicles, and a single radar system were procured in 2015.
      ------
      The Malonnn air defense system faces some challenges, including:
      • Budget constraints
      The government's defense budget is limited and must be balanced with other national priorities.
      • Regional competition
      Neighboring countries like Indonesia and Singapore are also increasing their air force capabilities, which Malonn must keep pace with.
      • Depreciation of the ringgit
      Malonn sources much of its equipment from overseas, and domestic manufacture is also dependent on foreign OEMs
      ------
      Malonn has a number of weaknesses, including:
      • Economic
      Malonn's budget income is highly dependent on the oil and gas sector, and fiscal revenues are low. The country also has high levels of household and corporate debt, and a high dependency on food imports.
      • Political
      Malonn has a divided political landscape, and the country has experienced political instability since 2018. The 2022 election resulted in a hung parliament, the first time this has happened since Malonn's independence.
      • Environmental
      Malonn ranks 147 out of 210 economies on the Environmental Sustainability Index, due to challenges with climate change vulnerability, recycling rate, and renewable electricity output.
      • Public procurement
      Some weaknesses in public procurement in Malonn include non-compliance with contract terms, delayed project completion, poor documentation, and low quality of products and services.
      • Property market
      In the second half of 2023, sales volumes in the property market declined, and prices rose by only 0.1% year-on-year.
      • Currency
      The Malonnn ringgit (MYR) could potentially go down in value further. A weaker currency can have negative economic impacts, particularly for businesses that rely on imports.
      =============
      =============
      REAL KS-1A KAMBOJA
      REAL KS-1A KAMBOJA
      REAL KS-1A KAMBOJA
      Royal Cambodian Army telah menerima KS-1 buatan China, SAM yang masuk dalam kategori medium and long-range air defense system
      😝DIBAWAH KAKI KAMBOJA = PRANK KS-1A😝

      Hapus
    4. BUDGET 2025 = SALARIES AND ALLOWANCES
      BUDGET 2025 = NOT ASSETS
      BUDGET 2025 = NOT ASSETS
      BUDGET 2025 = NOT ASSETS
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
      ==============
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
      ==============
      Malonn has faced several crises, including political, financial, and economic crises:
      • Political crisis
      From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
      • Financial crisis
      Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
      • Economic crisis
      Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
      • Household debt crisis
      As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
      Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
      =========
      Malonn has a number of weaknesses, including:
      • Economic
      Malonn's budget income is highly dependent on the oil and gas sector, and fiscal revenues are low. The country also has high levels of household and corporate debt, and a high dependency on food imports.
      • Political
      Malonn has a divided political landscape, and the country has experienced political instability since 2018. The 2022 election resulted in a hung parliament, the first time this has happened since Malonn's independence.
      • Environmental
      Malonn ranks 147 out of 210 economies on the Environmental Sustainability Index, due to challenges with climate change vulnerability, recycling rate, and renewable electricity output.
      • Public procurement
      Some weaknesses in public procurement in Malonn include non-compliance with contract terms, delayed project completion, poor documentation, and low quality of products and services.
      • Property market
      In the second half of 2023, sales volumes in the property market declined, and prices rose by only 0.1% year-on-year.
      • Currency
      The Malonnn ringgit (MYR) could potentially go down in value further. A weaker currency can have negative economic impacts, particularly for businesses that rely on imports.

      Hapus
    5. The Royal Malonn Air Force (RMAF) has faced several challenges, including:
      • Aircraft maintenance
      The RMAF has had issues with maintenance and spare parts for its aircraft, including the Sukhoi Su-30MKM and the Kuwaiti HORNET MALONN. For example, in 2018, only four of the RMAF's Sukhoi Su-30MKM aircraft were flyable due to maintenance issues. The Kuwaiti HORNET MALONNs are an earlier model than the Malonn fighters, which may cause compatibility issues.
      • Budget constraints
      Malon's defense budget is limited, which can affect the pace of acquisitions and upgrades. The government must balance defense spending with other national priorities.
      • Regional competition
      Neighboring countries like Indonesia and Singapore are also increasing their air force capabilities, which puts pressure on Malon to keep pace.
      • Corruption
      Malon's military has been involved in multiple corruption scandals
      ==================
      LARGE GAPS MILITARY CAPABILITY
      LARGE GAPS MILITARY CAPABILITY
      LARGE GAPS MILITARY CAPABILITY
      Large gaps in Malon’s military capability remain, however. These are largely the result of the small procurement budgets of the last quarter-century and ageing equipment inventory. Equipment-modernisation challenges are not Malon’s only defence woes. The Malonn Armed Forces have difficulty recruiting and retaining sufficient high-calibre personnel, partly because of poor conditions of service. In June, Anwar remarked that he was ‘appalled’ by the condition of some military living quarters. But beyond immediate remedial measures, fixing defence infrastructure will probably not happen until 2024 at the earliest, as the government is currently prioritising the repair of dilapidated school buildings.
      Many in Malon’s defence community have tentatively welcomed the Anwar government’s early efforts to respond to some of the country’s military shortcomings and particularly the alleged wastage of defence funds through corrupt practices. However, given the wide-ranging nature of the demands on the government’s resources and attention, and in the absence of clear-cut threats, Anwar may find it difficult to continue treading the fine line between neglecting and over-indulging the defence sector.
      ==================
      Malon's military budget is driven by a number of factors, including:
      • Security threats: Malon needs to protect its sovereignty and address security threats like piracy and terrorism.
      • Regional security landscape: Malon faces challenges in the regional security landscape, including strategic, geopolitical, security, and economic challenges.
      • Military capability: In 2021, Malon was ranked 16th out of 26 for military capability.
      • Military modernization: Malon's defense budget is expected to grow to $6.2 billion by 2028 to support military modernization efforts.
      • Disaster response: The budget will support disaster response capabilities.
      • International commitments: The budget will support international commitments.
      • Economic interests: The budget will contribute to the country's economic interests
      ==============
      HIGH COURT =
      CRIMINAL BREACH LCS RM 21 MILLION
      CRIMINAL BREACH LCS RM 21 MILLION
      CRIMINAL BREACH LCS RM 21 MILLION
      Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
      High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
      The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.

      Hapus

    6. The Royal Malonn Air Force (RMAF) has faced several challenges, including:
      • Aircraft maintenance
      The RMAF has had issues with maintenance and spare parts for its aircraft, including the Sukhoi Su-30MKM and the Kuwaiti HORNET MALONN. For example, in 2018, only four of the RMAF's Sukhoi Su-30MKM aircraft were flyable due to maintenance issues. The Kuwaiti HORNET MALONNs are an earlier model than the Malonn fighters, which may cause compatibility issues.
      • Budget constraints
      Malon's defense budget is limited, which can affect the pace of acquisitions and upgrades. The government must balance defense spending with other national priorities.
      • Regional competition
      Neighboring countries like Indonesia and Singapore are also increasing their air force capabilities, which puts pressure on Malon to keep pace.
      • Corruption
      Malon's military has been involved in multiple corruption scandals
      =========
      The Royal Malonn Navy (RMN) faces several challenges, including:
      • Aging fleet: More than half of the RMN's fleet is past its prime, and the country has only received four of the 18 new vessels it planned to acquire. The last time the RMN acquired a combat ship was in 1997.
      • Delayed replacements: The RMN's plans to replace its aging fleet have been stalled due to mismanagement.
      • Insufficient defense budget: Malon's defense budget is less than one percent of its GDP, while neighboring Singapore spends six percent.
      • Lack of coordination: There is a lack of coordination among agencies.
      • Outdated assets: The RMN's ships and assets are outdated.
      • Combat system issues: The RMN has observed deficiencies with the combat system of its LMS type vessels.
      • Low endurance: The LCS's endurance was too low to stay with a carrier strike group or amphibious ready group without significant refueling.
      • Lack of air and surface warfare capabilities: The LCS lacked significant air and surface warfare capabilities
      =========
      BUDGET 2025 = SALARIES AND ALLOWANCES
      BUDGET 2025 = NOT ASSETS
      BUDGET 2025 = NOT ASSETS
      BUDGET 2025 = NOT ASSETS
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
      ==============
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
      =========
      Malon's combat equipment has several weaknesses, including:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness

      Hapus
  12. Zirah.... Mau tanya INDIANESIA dibantai 1-0 Kan sama Pinoy..? ... 🔥🔥🤣🤣🤣

    AYAM.... 🔥🔥🤣🤣

    BalasHapus
    Balasan
    1. Yang 9 naturalisasi tuh maksut mu.. Hahaha

      Hapus
    2. BUDGET 2025 = SALARIES AND ALLOWANCES
      BUDGET 2025 = NOT ASSETS
      BUDGET 2025 = NOT ASSETS
      BUDGET 2025 = NOT ASSETS
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
      ==============
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
      ==============
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      -
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
      -------------------------------------
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
      -------------------------------------
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      -------------------------------------
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      CHEAPEST VARIANT LMS
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
      -------------------------------------
      DOWNGRADE ANKA
      DOWNGRADE ANKA
      2023 ANKA OMPONG = WILL NOT ARMED
      Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
      -------------------------------------
      DOWNGRADE ANKA
      DOWNGRADE ANKA
      2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance
      While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance

      Hapus
    3. Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
      • Krisis politik
      Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
      1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
      2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
      3. Dampak politik pandemi COVID-19
      4. Proklamasi Darurat 2021
      5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
      • Krisis beras
      Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
      • Krisis mata uang
      Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
      1. Kinerja ekspor yang buruk
      2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
      3. Kekhawatiran geopolitik
      4. Ketidakpastian mengenai prospek ekonomi China
      ==========
      Malonn has faced several crises, including political, financial, and economic crises:
      • Political crisis
      From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
      • Financial crisis
      Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
      • Economic crisis
      Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
      • Household debt crisis
      As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
      • Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
      ==========
      BUDGET 2025 = SALARIES AND ALLOWANCES
      BUDGET 2025 = NOT ASSETS
      BUDGET 2025 = NOT ASSETS
      BUDGET 2025 = NOT ASSETS
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
      ==============
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR

      Hapus
  13. SALAM 1-0....KALAH PALING MEMALUKAN DAN MENYAKITKAN... 🤣🤣🤣

    BalasHapus
    Balasan
    1. Malonn's defense budget is considered not in accordance with its objectives. Some of the things to consider are:
      • The allocation of salaries and allowances for 2024 reaches 40% of the total defense budget.
      • The allocation for procurement has increased slightly from 2023, but there may be no real benefit due to the depreciation of the ringgit.
      • The Ministry of Finance assesses the availability of funds for programs and procurement requirements in private.
      • Hundreds of Malonnn military assets have exceeded the 30-year service limit.
      ==========
      Malonn has faced several crises, including political, financial, and economic crises:
      • Political crisis
      From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
      • Financial crisis
      Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
      • Economic crisis
      Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
      • Household debt crisis
      As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
      • Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
      ==========
      Malonn has several issues related to assault rifles, including:
      • Smuggling
      Malonn's long and porous borders make it difficult to stop the smuggling of firearms and ammunition into the country. The border between Malonn and Thailand is particularly vulnerable to gun smuggling.
      • Outdated inventory
      The Malonnn Armed Forces (MAF) has outdated inventory stock, which can be a stumbling block for ongoing operations.
      • Wary of Russian-made weapons
      Malonn is becoming wary of its Russian-made weapons
      ==========
      Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
      • Krisis politik
      Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
      1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
      2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
      3. Dampak politik pandemi COVID-19
      4. Proklamasi Darurat 2021
      5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
      • Krisis beras
      Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
      • Krisis mata uang
      Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
      1. Kinerja ekspor yang buruk
      2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
      3. Kekhawatiran geopolitik
      4. Ketidakpastian mengenai prospek ekonomi China

      Hapus
    2. The Royal Malonn Air Force (RMAF) has faced several challenges, including:
      • Aircraft maintenance
      The RMAF has had issues with maintenance and spare parts for its aircraft, including the Sukhoi Su-30MKM and the Kuwaiti HORNET MALONN. For example, in 2018, only four of the RMAF's Sukhoi Su-30MKM aircraft were flyable due to maintenance issues. The Kuwaiti HORNET MALONNs are an earlier model than the Malonn fighters, which may cause compatibility issues.
      • Budget constraints
      Malon's defense budget is limited, which can affect the pace of acquisitions and upgrades. The government must balance defense spending with other national priorities.
      • Regional competition
      Neighboring countries like Indonesia and Singapore are also increasing their air force capabilities, which puts pressure on Malon to keep pace.
      • Corruption
      Malon's military has been involved in multiple corruption scandals
      ==================
      LARGE GAPS MILITARY CAPABILITY
      LARGE GAPS MILITARY CAPABILITY
      LARGE GAPS MILITARY CAPABILITY
      Large gaps in Malon’s military capability remain, however. These are largely the result of the small procurement budgets of the last quarter-century and ageing equipment inventory. Equipment-modernisation challenges are not Malon’s only defence woes. The Malonn Armed Forces have difficulty recruiting and retaining sufficient high-calibre personnel, partly because of poor conditions of service. In June, Anwar remarked that he was ‘appalled’ by the condition of some military living quarters. But beyond immediate remedial measures, fixing defence infrastructure will probably not happen until 2024 at the earliest, as the government is currently prioritising the repair of dilapidated school buildings.
      Many in Malon’s defence community have tentatively welcomed the Anwar government’s early efforts to respond to some of the country’s military shortcomings and particularly the alleged wastage of defence funds through corrupt practices. However, given the wide-ranging nature of the demands on the government’s resources and attention, and in the absence of clear-cut threats, Anwar may find it difficult to continue treading the fine line between neglecting and over-indulging the defence sector.
      ==================
      Malon's military budget is driven by a number of factors, including:
      • Security threats: Malon needs to protect its sovereignty and address security threats like piracy and terrorism.
      • Regional security landscape: Malon faces challenges in the regional security landscape, including strategic, geopolitical, security, and economic challenges.
      • Military capability: In 2021, Malon was ranked 16th out of 26 for military capability.
      • Military modernization: Malon's defense budget is expected to grow to $6.2 billion by 2028 to support military modernization efforts.
      • Disaster response: The budget will support disaster response capabilities.
      • International commitments: The budget will support international commitments.
      • Economic interests: The budget will contribute to the country's economic interests
      ==============
      HIGH COURT =
      CRIMINAL BREACH LCS RM 21 MILLION
      CRIMINAL BREACH LCS RM 21 MILLION
      CRIMINAL BREACH LCS RM 21 MILLION
      Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
      High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
      The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.

      Hapus
    3. The Royal Malonn Air Force (RMAF) has faced several challenges, including:
      • Aircraft maintenance
      The RMAF has had issues with maintenance and spare parts for its aircraft, including the Sukhoi Su-30MKM and the Kuwaiti HORNET MALONN. For example, in 2018, only four of the RMAF's Sukhoi Su-30MKM aircraft were flyable due to maintenance issues. The Kuwaiti HORNET MALONNs are an earlier model than the Malonn fighters, which may cause compatibility issues.
      • Budget constraints
      Malon's defense budget is limited, which can affect the pace of acquisitions and upgrades. The government must balance defense spending with other national priorities.
      • Regional competition
      Neighboring countries like Indonesia and Singapore are also increasing their air force capabilities, which puts pressure on Malon to keep pace.
      • Corruption
      Malon's military has been involved in multiple corruption scandals
      =========
      The Royal Malonn Navy (RMN) faces several challenges, including:
      • Aging fleet: More than half of the RMN's fleet is past its prime, and the country has only received four of the 18 new vessels it planned to acquire. The last time the RMN acquired a combat ship was in 1997.
      • Delayed replacements: The RMN's plans to replace its aging fleet have been stalled due to mismanagement.
      • Insufficient defense budget: Malon's defense budget is less than one percent of its GDP, while neighboring Singapore spends six percent.
      • Lack of coordination: There is a lack of coordination among agencies.
      • Outdated assets: The RMN's ships and assets are outdated.
      • Combat system issues: The RMN has observed deficiencies with the combat system of its LMS type vessels.
      • Low endurance: The LCS's endurance was too low to stay with a carrier strike group or amphibious ready group without significant refueling.
      • Lack of air and surface warfare capabilities: The LCS lacked significant air and surface warfare capabilities
      =========
      BUDGET 2025 = SALARIES AND ALLOWANCES
      BUDGET 2025 = NOT ASSETS
      BUDGET 2025 = NOT ASSETS
      BUDGET 2025 = NOT ASSETS
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
      ==============
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
      =========
      Malon's combat equipment has several weaknesses, including:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness

      Hapus
    4. Some problems Malonn shipyards face in making warships include:
      • Supply chain disruptions
      In 2022, COVID-19 and the Russia-Ukraine conflict disrupted supply chains and led to shortages of skilled personnel.
      • Low-quality products
      Workers may use sketches, photos, and previous experience instead of following good engineering practices, which can lead to low-quality products, reworks, higher costs, and late deliveries.
      • Traditional shipbuilding
      Traditional shipbuilding is a slow, expensive, and laborious process. It involves a systems approach, where each system has its own drawings, and work crews may compete for work space.
      • Resource shortage
      The shipbuilding industry is facing a shortage of resources due to an aging workforce and a lack of young people willing to enter the trade.
      ----------
      The Royal Malonn Navy (RMN) has faced challenges with its readiness rate, including a lack of modern assets, aging vessels, and budget limitations:
      • Lack of modern assets
      The RMN has faced challenges in obtaining modern military assets, which can expose it to internal and external threats.
      • Aging vessels
      Many of the RMN's assets are over 20 years old, and the budget to replace them is limited.
      • Political interference and corruption
      Some say that political interference and corruption are undermining the RMN's combat readiness.
      ===========
      ===========
      Indonesia's warship industry has several advantages, including:
      • Strategic location: Indonesia's location in Southeast Asia, with a coastline that stretches across the Indian and Pacific Oceans, makes it a hub for maritime trade. Two of the world's most important maritime trade routes pass through its waters.
      • Natural resources: Indonesia is rich in natural resources.
      • Large archipelago: Indonesia is the world's largest archipelagic country, with over 17,000 islands. Ships are important for connecting the islands and transporting goods and passengers.
      • National defense: Ships are vital to the national defense system.
      • Shipbuilding company: PT PAL Indonesia is Indonesia's largest shipbuilding company, with capabilities in warship and commercial ship construction and design.
      • Maritime technology: Maritime technology can strengthen the sovereignty and defense of the Indonesian marine, improve the welfare of fishermen and ship owners, and create a sustainable technology education system.
      ----------
      Warships made by PT PAL Indonesia have many advantages, including:
      • Quality
      PT PAL has a strong commitment to quality, which is reflected in their products and services. They have a good quality assurance system that ensures their products are high quality and meet the needs of their users.
      • Design capability
      PT PAL has a strong design capability that has been recognized internationally.
      • Modern technology
      PT PAL uses advanced technology in their production, including modern management systems and professional and experienced human resources.
      • Maintenance and repair
      PT PAL can also perform maintenance and repair on warships, submarines, and commercial vessels.
      • Domestic production
      PT PAL is capable of producing, repairing, and modernizing defense equipment domestically.
      • Global reach
      PT PAL's products have sailed in waters all over the world.
      • Auxiliary vessels
      PT PAL can also build and manufacture auxiliary vessels, such as Landing Platform Docks (LPD).
      • Combat assistance
      PT PAL's vessels can carry out combat assistance, as well as non-war military operations like humanitarian missions and disaster relie

      Hapus
  14. Kesian INDIANESIA.... Hanya jadi BEBAN ASEAN... 🤣🤣🤣

    BalasHapus
    Balasan
    1. TERGANTUNG KEADAAN EKONOMI =
      LMS B2 MENUNGGU 2030
      UAV ANKA MENUNGGU 2030
      MRSS MENUNGGU 2030
      HELI MENUNGGU 2030
      KUALA LUMPUR – Rancangan perolehan aset baharu Tentera Laut Diraja Malon (TLDM) dijangka akan menelan belanja sekurang-kurangnya RM10 bilion untuk tempoh Rancangan Malon Ke-13 (RMKe-13).
      Perkara tersebut dinyatakan oleh Timbalan Menteri Pertahanan, Adly Zahari semasa Perbahasan Penggulungan Laporan Ketua Audit Negara (LKAN) di Dewan Rakyat, hari ini.
      Menurut beliau, perolehan Kapal Misi Pesisir (Littoral Mission Ship) Batch Kedua (LMSB2) yang dilakukan oleh kerajaan pada Jun lalu merupakan sebahagian daripada usaha untuk memperkasakan armada TLDM.
      “Di bawah RMKe-13 pula, usaha memperkasakan armada TLDM diteruskan dengan termeterainya perjanjian perolehan bagi tiga buah kapal Littoral Mission Ship Batch 2 dengan negara Turkiye baru-baru ini,” katanya di Dewan Rakyat.
      Perolehan 3 buah LMSB2 itu dilakukan melalui kaedah Government to Government (G2G) dengan negara Turkiye.
      RMKe-13 merangkumi tempoh tahun 2026-2030.
      “Perolehan bagi baki 3 buah LMS lagi akan dimasukkan di bawah RMKe-13,” ujar beliau.
      Selain LMS, TLDM turut merancang perolehan 2 buah kapal Multi Role Support Ship (MRSS), 3 buah kapal Littoral Mission Ship Batch 3, 4 buah helikopter anti kapal selam dan 6 buah Unmanned Aerial Vehicle (UAV).
      “Proses perolehan bagi aset-aset baharu ini dijangka berlangsung sehingga 2030. Kesemua perolehan aset TLDM ini dianggarkan berjumlah RM10 – RM11 bilion bergantung kepada keadaan ekonomi semasa kerajaan,” katanya.
      ===========================
      MENUNGGU 2041-2045 = C130J
      Diterangkan Utusan Malon, mereka baru bisa mendapatkan C-130 J Super Hercules paling tidak di tahun 2041 hingga 2045.
      MENUNGGU 2055 = HAWK :
      Kerajaan merancang secara sistematik penggantian pesawat Hawk 108 dan Hawk 208 seperti yang digariskan dalam Pembangunan Keupayaan Tentera Udara Diraja Malon (TUDM) 2055
      ===========================
      Some problems Malonn shipyards face in making warships include:
      • Supply chain disruptions
      In 2022, COVID-19 and the Russia-Ukraine conflict disrupted supply chains and led to shortages of skilled personnel.
      • Low-quality products
      Workers may use sketches, photos, and previous experience instead of following good engineering practices, which can lead to low-quality products, reworks, higher costs, and late deliveries.
      • Traditional shipbuilding
      Traditional shipbuilding is a slow, expensive, and laborious process. It involves a systems approach, where each system has its own drawings, and work crews may compete for work space.
      • Resource shortage
      The shipbuilding industry is facing a shortage of resources due to an aging workforce and a lack of young people willing to enter the trade.
      ===================
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE NO SONAR NO ASW = HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE

      Hapus
  15. Woiii.. Ada team di BANTAI 1-0 di kandang sendiri woiiii... 🔥🔥🤣🤣

    BalasHapus
  16. Kapal king thalun myanmar 2017 di bina 2024 sudah selesai... Bobot 3.500 ton hanya dalam waktu 8 tahun..

    KING LCS MANGKRAK geng MALAYDESH di bina 2012 hingga sekara masih GHOIB.. bobot hanya 3.100 ton ,13 tahun masih GHOIB...

    Paling memalukan SALAH POTONG pula... Hahahahahaha 🤣 🤣 🤣 🤣 🤣 🤣

    BalasHapus
  17. Hahahaha... Sudah pakai pemain 9 naturalisasi pun geng MALAYDESH masih NGAMUK NGAMUK... Hahahahaha


    KING HAWIMAU... Hahahaha

    BalasHapus
  18. Ceremony penyerahan fa50 malon yg dipercepat guys
    Yelah....yelah kita mengakui

    https://youtube.com/shorts/c4GksPeHW9Q?si=WLzwin32HOFH1uVO

    BalasHapus
  19. Lebih memalukan BUDAYA SARAPAN jadi warisan unesco... Hahahahahaha


    Kebodohan macam apa ini... BUDAYA SARAPAN masih di klaim ..

    Orang orang nama makananya malah budayanya... Hahahaha

    BalasHapus
  20. Logika IQ MALAYDESH...

    Kapal bobot 3.100 ton KING MANGKRAK lebih sulit...13 masih GHOIB


    Logika myanmar..

    Kapal bobot 3.500 ton KING THALUN sudah buat 5 kapal LCS geng MALAYDESH terhinakan... Hahaha

    BalasHapus
  21. LOST = RM14.82 MILLION
    LOST = RM14.82 MILLION
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
    BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
    ---------------------
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
    High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
    The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
    ---------------------
    LCS MALONN =
    LAUNCHING 2017 - MANGKRAK 2024
    LAUNCHING 2017 - MANGKRAK 2024
    LAUNCHING 2017 - MANGKRAK 2024
    LAUNCHING 2017 - MANGKRAK 2024
    LAUNCHING 2017 - MANGKRAK 2024
    The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malaysia’s former Navy chief said today.
    ---------------------
    LCS 2024-2011 = 13 TAHUN
    13 TAHUN MANGKRAK
    13 TAHUN MANGKRAK
    LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ---------------------
    NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
    ----------------------
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness.
    ==============
    ==============
    MYANMAR =
    BUILT 2017 - COMMISSIONED 2024
    BUILT 2017 - COMMISSIONED 2024
    BUILT 2017 - COMMISSIONED 2024
    The Senior General and party viewed launching the newlycommissioned 135-metre Frigate from the ship lift platform. The 135-metre Frigate King Thalun was built at the Naval Dockyard Command Headquarters in March 2017 under the guidance of the Senior General.
    ==============
    KEY WORDS =
    1. LAUNCHING 2017 - MANGKRAK 2024
    2. LOST RM14.82 MILLION - SELL 51% CAD TO RHEINMETALL AG

    BalasHapus
  22. CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2023 ANKA OMPONG = WILL NOT ARMED
    Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance
    -------------------------------------
    MALONN DIBAWAH KAKI =
    RAFALE : BANGLADESH MYANMAR
    RAFALE : BANGLADESH MYANMAR
    For the first batch, Bangladesh, which shares borders with Myanmar and India, plans to procure four Rafale F3-R variants, consisting of three two-seat fighters and one single-seat aircraft currently operated by the French Air Force.
    ==================
    MALONN DIBAWAH KAKI =
    MYANMAR : FRIGATE 135M
    MYANMAR : FRIGATE 135M
    SAC Chairman Commander-in-Chief of Defence Services Senior General Min Aung Hlaing joins the auspicious ceremony to name and commission 135-metre Frigate built by Tatmadaw (Navy)
    ==================
    MALONN DIBAWAH KAKI =
    SPH : LAOS, VIETNAM, MYANMAR, BANGLADESH, KENYA
    NORA B-52 = CYPRUS, ALGERIA, KENYA, AZERBAIJAN, BANGLADESH AND MYANMAR
    This artillery system, beyond the domestic market, has seen a fair amount of success in international sales to Cyprus, Algeria, Kenya, Azerbaijan, Bangladesh and Myanmar.

    BalasHapus

  23. CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2023 ANKA OMPONG = WILL NOT ARMED
    Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance
    -------------------------------------
    The Malonnn air defense system faces some challenges, including:
    • Budget constraints
    The government's defense budget is limited and must be balanced with other national priorities.
    • Regional competition
    Neighboring countries like Indonesia and Singapore are also increasing their air force capabilities, which Malonn must keep pace with.
    • Depreciation of the ringgit
    Malonn sources much of its equipment from overseas, and domestic manufacture is also dependent on foreign OEMs

    BalasHapus
  24. LEASE 30 YEARS = VSHORAD AND VSHORAD CHINA
    LEASE 30 YEARS = VSHORAD AND VSHORAD CHINA
    LEASE 30 YEARS = VSHORAD AND VSHORAD CHINA
    the Madani government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd. The estimated cost for the deal is RM10.7 billion and it will be covered in installments over a 30-year lease period.
    ==============
    LMS B1 MADE IN CHINA
    LMS B1 = OMPONG SEJAK 2010
    LMS B1 = OMPONG SEJAK 2010
    Littoral Mission Ship built in China by China Shipbuilding and Offshore International Co. Ltd,. The first ship was to be delivered to the Royal Malonnn Navy by 2019, the second and third by 2020 and the fourth by 2021
    ==============
    LEASE 15 YEARS
    LEASE 15 YEARS
    LEASE 15 YEARS
    PMX has defended the decision to lease the helicopters for the military and other government agencies – RM16.5 billion for 15 years – during the Parliament session on Thursday. Among others he said the government adopted the leasing model to reduce maintenance costs and at the same time improved the operational readiness of the fleet..
    ==============
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2023 ANKA OMPONG = WILL NOT ARMED
    Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance


    BalasHapus
  25. LEASE 30 YEARS = VSHORAD AND VSHORAD CHINA
    LEASE 30 YEARS = VSHORAD AND VSHORAD CHINA
    LEASE 30 YEARS = VSHORAD AND VSHORAD CHINA
    the Madani government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd. The estimated cost for the deal is RM10.7 billion and it will be covered in installments over a 30-year lease period.
    ==============
    LMS B1 MADE IN CHINA
    LMS B1 = OMPONG SEJAK 2010
    LMS B1 = OMPONG SEJAK 2010
    Littoral Mission Ship built in China by China Shipbuilding and Offshore International Co. Ltd,. The first ship was to be delivered to the Royal Malonnn Navy by 2019, the second and third by 2020 and the fourth by 2021
    ==============
    LEASE 15 YEARS
    LEASE 15 YEARS
    LEASE 15 YEARS
    PMX has defended the decision to lease the helicopters for the military and other government agencies – RM16.5 billion for 15 years – during the Parliament session on Thursday. Among others he said the government adopted the leasing model to reduce maintenance costs and at the same time improved the operational readiness of the fleet.
    DS Anwar Ibrahim did not address the fact that the government will be paying some RM1 billion a year for 15 years for the helicopters. He also said the helicopters selected were based on the specifications and requirements of the agencies themselves.
    He also confirmed that the Army will also be part of the leasing programme apart from RMAF,RMN, MMEA, police, Fire and Rescue Department, and the Prime Minister Department. Apart from RMAF 12 and police’s seven helicopters, he did not give the breakdown for the other services and agencies.
    ==============
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness
    =========
    Malonn's armed forces procurement faces several weaknesses, including:
    1. Corruption
    The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
    2. Political influence
    Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
    Weak parliamentary oversight
    Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
    3. Limited financial scrutiny
    Financial scrutiny is limited by excessive secrecy.
    4. Violation of procedures
    Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures

    BalasHapus
  26. Kapal KING MANGKRAK di permalukan myanmar... Hahahahaha


    Yavuz sudah tiba kah MALON..?? 😂😂😂

    BalasHapus
  27. MYANMAR =
    BUILT 2017 - COMMISSIONED 2024
    BUILT 2017 - COMMISSIONED 2024
    BUILT 2017 - COMMISSIONED 2024
    The Senior General and party viewed launching the newlycommissioned 135-metre Frigate from the ship lift platform. The 135-metre Frigate King Thalun was built at the Naval Dockyard Command Headquarters in March 2017 under the guidance of the Senior General.
    ==============
    ==============
    LCS MALONN =
    LAUNCHING 2017 - MANGKRAK 2024
    LAUNCHING 2017 - MANGKRAK 2024
    LAUNCHING 2017 - MANGKRAK 2024
    LAUNCHING 2017 - MANGKRAK 2024
    LAUNCHING 2017 - MANGKRAK 2024
    The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malaysia’s former Navy chief said today.
    ---------------------
    LCS 2024-2011 = 13 TAHUN
    13 TAHUN MANGKRAK
    13 TAHUN MANGKRAK
    LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ---------------------
    NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
    ----------------------
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn
    ---------------------
    Malonn's armed forces procurement faces several weaknesses, including:
    1. Corruption
    The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
    2. Political influence
    Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
    Weak parliamentary oversight
    Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
    3. Limited financial scrutiny
    Financial scrutiny is limited by excessive secrecy.
    4. Violation of procedures
    Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedure
    ==============
    KEY WORDS = LAUNCHING 2017 - MANGKRAK 2024



    BalasHapus
  28. KATA KUNCI =
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    Tomczyk revealed that while Poland initially pursued the acquisition of the FA-50s from South Korea with the expectation of receiving operational aircraft, it subsequently emerged that the armaments intended for these aircraft had been discontinued. As a result, the Polish Ministry of Defence has received 12 aircraft that are no longer capable of fulfilling combat roles.....
    ----
    KATA KUNCI =
    FA50 = TRAINING AIRCRAFT
    FA50 = TRAINING AIRCRAFT
    So far, Poland has received 12 of the jets in the GF (Gap Filler) version, but Blaszczak failed to secure weapons for them, Cezary Tomczyk, a deputy defence minister, told parliament on Thursday.
    According to him, the delivery of the 36 remaining jets in the PL version custom-made for Poland "is largely at risk" and delays in their deliveries may reach nine months.
    While praising the role the FA-50s are playing in the Polish Air Force, Tomczyk said that they can only be used as training aircraft.
    ------
    KATA KUNCI =
    HELI MD530G = HELI TRAINING
    HELI MD530G = HELI TRAINING
    A notable attraction at this year’s Langkawi International Maritime and Aerospace (LIMA) exhibition are six new MD530Gs, which were delivered to Malon’s army in 2022. The type is appearing on static, and also participated in the show’s opening ceremony.
    The six rotorcraft – delivery of which was delayed for several years – are primarily used for training.....
    ------
    KATA KUNCI =
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    ------
    KATA KUNCI =
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    ------
    KATA KUNCI =
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    ==============
    ==============
    BUDGET 2025 = SALARIES AND ALLOWANCES
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
    ==============
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR

    BalasHapus
  29. LOST = RM14.82 MILLION
    LOST = RM14.82 MILLION
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
    BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
    ---------------------
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
    High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
    The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
    ---------------------
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance

    BalasHapus
  30. KALAH LAWAN PHINOY


    95% SUPORTER TIMNAS INDONESIA N REAL PUNDIT SEPAK BOLA INDONESIA RELAKS PURRR.


    INDONESIA U21 VS PHINOY SENIOR FULL TEAM..

    SANTAI... YG SAKIT TUH MALAYSEWA🇲🇾

    -GAGAL ROUND 3 WORLD CUP QUALIFIER.
    -GAGAL KE PIALA ASIA U17.
    -GAGAL KE PIALA ASIA U19.
    -GAGAL AFEFEK 2024 , PADAHAL BAWA 9 PEMAIN ASENG ALIAS PBB TEAM.

    BalasHapus
  31. Malonn has faced several crises, including political, financial, and economic crises:
    • Political crisis
    From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
    • Financial crisis
    Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
    • Economic crisis
    Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
    • Household debt crisis
    As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
    Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
    =========
    Malonn has a number of weaknesses, including:
    • Economic
    Malonn's budget income is highly dependent on the oil and gas sector, and fiscal revenues are low. The country also has high levels of household and corporate debt, and a high dependency on food imports.
    • Political
    Malonn has a divided political landscape, and the country has experienced political instability since 2018. The 2022 election resulted in a hung parliament, the first time this has happened since Malonn's independence.
    • Environmental
    Malonn ranks 147 out of 210 economies on the Environmental Sustainability Index, due to challenges with climate change vulnerability, recycling rate, and renewable electricity output.
    • Public procurement
    Some weaknesses in public procurement in Malonn include non-compliance with contract terms, delayed project completion, poor documentation, and low quality of products and services.
    • Property market
    In the second half of 2023, sales volumes in the property market declined, and prices rose by only 0.1% year-on-year.
    • Currency
    The Malonnn ringgit (MYR) could potentially go down in value further. A weaker currency can have negative economic impacts, particularly for businesses that rely on imports.
    =========
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness

    BalasHapus
  32. Malonn has faced several crises, including political, financial, and economic crises:
    • Political crisis
    From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
    • Financial crisis
    Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
    • Economic crisis
    Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
    • Household debt crisis
    As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
    Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
    =========
    Malonn has a number of weaknesses, including:
    • Economic
    Malonn's budget income is highly dependent on the oil and gas sector, and fiscal revenues are low. The country also has high levels of household and corporate debt, and a high dependency on food imports.
    • Political
    Malonn has a divided political landscape, and the country has experienced political instability since 2018. The 2022 election resulted in a hung parliament, the first time this has happened since Malonn's independence.
    • Environmental
    Malonn ranks 147 out of 210 economies on the Environmental Sustainability Index, due to challenges with climate change vulnerability, recycling rate, and renewable electricity output.
    • Public procurement
    Some weaknesses in public procurement in Malonn include non-compliance with contract terms, delayed project completion, poor documentation, and low quality of products and services.
    • Property market
    In the second half of 2023, sales volumes in the property market declined, and prices rose by only 0.1% year-on-year.
    • Currency
    The Malonnn ringgit (MYR) could potentially go down in value further. A weaker currency can have negative economic impacts, particularly for businesses that rely on imports.
    =========
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness

    BalasHapus
  33. Factors that influence Malon's military budget include:
    • Fiscal limitations
    Malonn governments have been unwilling to fund defense by cutting government spending or reducing the size of the armed forces.
    • Public debt
    A study found a positive association between public debt and defense spending in Malon.
    • Exchange rate
    The depreciation of the ringgit can impact the real gain in procurement funding.
    • Military imports
    The size of military imports is closely linked to variations in expenditure.
    • Military aid
    The availability of military aid plays a central role in military expenditure.
    • Non-conventional security issues
    These issues are beginning to shape and influence the nature of threats to national defense and security.
    • Corruption
    Corruption risks are critical in terms of military operations.
    • Competition between the U.S.A. and China
    The increasing competition between the U.S.A. and China has triggered an increase in military expenditure in the region.
    • Conflicts and potential conflicts
    Conflicts and potential conflicts between countries in the Southeast Asian region are permanent causes
    ==============
    Some weaknesses in Malonnn public procurement include:
    • Transparency: The principle of transparency is not well adhered to. Interference from authorities, such as local politicians, can lead to corruption, scandal, and the abuse of public resources.
    • Inefficient processes: Procurement processes can be inefficient and ineffective. Tenders may be prepared hastily, carelessly, and without proper consideration.
    • Poor documentation: Documentation may be poor.
    • Low quality: The quality of products, services, and work may be low.
    • Non-compliance: There may be non-compliance with the scope, specifications, and terms of contracts.
    • Delayed completion: Projects may be delayed or not completed.
    • Inadequate infrastructure: There may not be adequate infrastructure to support procurement.
    • Vendor development programs: Vendor development programs (VDPs) may be non-existent or ineffective.
    • Cronyism: There may be interference from outside parties and cronyism, which affects the awarding of contracts.
    Malpractice: Procurement officers may be involved in malpractice and not comply with the policies and procedures of the procurement system
    ----------
    Indonesia's amphibious assault capabilities include:
    • Amphibious assault vehicles (MAVs)
    These vehicles have a self-righting hull design, two rear water jets, and a 500 hp diesel engine. They can reach speeds of 13 kmph (7 nmph) and can be launched from amphibious landing ships while underway. MAVs can be armed with a remote weapon station that includes a .50 machinegun and 40mm automatic grenade launcher.
    • Marine amphibious reconnaissance battalions (Yontaifib)
    This elite recon unit of the Indonesian Marine Corps is tasked with conducting amphibious and special reconnaissance. Yontaifib was formed in 1961 in response to Operation Trikora.
    • Amphibious warfare vessels
    The Indonesian Navy has several amphibious warfare vessels, including the KRI Teluk Amboina, KRI Teluk Banten, KRI Teluk Berau, and more.
    • Joint exercises
    Indonesia has participated in joint amphibious exercises with other countries, including Australia. For example, in November 2024, Indonesia and Australia conducted Exercise Keris Woomera, which involved an amphibious landing at Banongan Beach. The exercise included tanks, ships, fighter aircraft, landing craft, attack helicopters, and approximately 2,000 personnel from both militaries.
    ----------
    Indonesia has marines to perform a variety of missions, including:
    • Coastal defense: The Indonesian Marine Corps (Pasukan Marinir, or Pasmar) defends strategic islands
    • Amphibious force: Pasmar is the Navy's amphibious force, projecting power to land by sea
    • Combat operations: Pasmar conducts other combat operations in accordance with the policy of the Navy Chief of Staff, Marine Corps Commandant, and Commander of the Indonesian National Armed Forces
    The Indonesian Marine Corps has three Marine Corps Bases, located in Jakarta, Surabaya, and Sorong

    BalasHapus
  34. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
    ==============
    Malonn's armed forces procurement faces several weaknesses, including:
    1. Corruption
    The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
    2. Political influence
    Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
    Weak parliamentary oversight
    Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
    3. Limited financial scrutiny
    Financial scrutiny is limited by excessive secrecy.
    4. Violation of procedures
    Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
    ==============
    Some factors that contribute to the Malonn Army's perceived weakness include:
    • Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
    • Corruption: The MAF has been plagued by corruption.
    • Poor planning: The MAF has been criticized for poor planning.
    • Political interference: Political leaders have interfered in the MAF's procurement process.
    • Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
    Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
    ==============
    Malonn's economy has faced a number of challenges, including:
    • Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
    • Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
    • Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
    • High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
    • High dependency on food imports: Malonn imports 60% of the food it consumes.
    • Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
    Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
    ==============
    KEY WORDS =
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU

    BalasHapus
  35. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
    ==============
    Malonn's armed forces procurement faces several weaknesses, including:
    1. Corruption
    The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
    2. Political influence
    Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
    Weak parliamentary oversight
    Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
    3. Limited financial scrutiny
    Financial scrutiny is limited by excessive secrecy.
    4. Violation of procedures
    Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
    ==============
    Some factors that contribute to the Malonn Army's perceived weakness include:
    • Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
    • Corruption: The MAF has been plagued by corruption.
    • Poor planning: The MAF has been criticized for poor planning.
    • Political interference: Political leaders have interfered in the MAF's procurement process.
    • Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
    Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
    ==============
    Malonn's economy has faced a number of challenges, including:
    • Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
    • Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
    • Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
    • High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
    • High dependency on food imports: Malonn imports 60% of the food it consumes.
    • Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
    Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
    ==============
    KEY WORDS =
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU

    BalasHapus
  36. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
    ==============
    Malonn's armed forces procurement faces several weaknesses, including:
    1. Corruption
    The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
    2. Political influence
    Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
    Weak parliamentary oversight
    Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
    3. Limited financial scrutiny
    Financial scrutiny is limited by excessive secrecy.
    4. Violation of procedures
    Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
    ==============
    Some factors that contribute to the Malonn Army's perceived weakness include:
    • Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
    • Corruption: The MAF has been plagued by corruption.
    • Poor planning: The MAF has been criticized for poor planning.
    • Political interference: Political leaders have interfered in the MAF's procurement process.
    • Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
    Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
    ==============
    BUDGET 2025 = SALARIES AND ALLOWANCES
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
    ==============
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
    ==============
    KEY WORDS =
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU

    BalasHapus
  37. Malonn has faced several crises, including political, financial, and economic crises:
    • Political crisis
    From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
    • Financial crisis
    Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
    • Economic crisis
    Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
    • Household debt crisis
    As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
    Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
    ==========
    The Royal Malonn Air Force (RMAF) has faced several challenges, including:
    • Aircraft maintenance
    The RMAF has had issues with maintenance and spare parts for its aircraft, including the Sukhoi Su-30MKM and the Kuwaiti HORNET MALONN. For example, in 2018, only four of the RMAF's Sukhoi Su-30MKM aircraft were flyable due to maintenance issues. The Kuwaiti HORNET MALONNs are an earlier model than the Malonn fighters, which may cause compatibility issues.
    • Budget constraints
    Malon's defense budget is limited, which can affect the pace of acquisitions and upgrades. The government must balance defense spending with other national priorities.
    • Regional competition
    Neighboring countries like Indonesia and Singapore are also increasing their air force capabilities, which puts pressure on Malon to keep pace.
    • Corruption
    Malon's military has been involved in multiple corruption scandals
    =========
    The Royal Malonn Navy (RMN) faces several challenges, including:
    • Aging fleet: More than half of the RMN's fleet is past its prime, and the country has only received four of the 18 new vessels it planned to acquire. The last time the RMN acquired a combat ship was in 1997.
    • Delayed replacements: The RMN's plans to replace its aging fleet have been stalled due to mismanagement.
    • Insufficient defense budget: Malon's defense budget is less than one percent of its GDP, while neighboring Singapore spends six percent.
    • Lack of coordination: There is a lack of coordination among agencies.
    • Outdated assets: The RMN's ships and assets are outdated.
    • Combat system issues: The RMN has observed deficiencies with the combat system of its LMS type vessels.
    • Low endurance: The LCS's endurance was too low to stay with a carrier strike group or amphibious ready group without significant refueling.
    • Lack of air and surface warfare capabilities: The LCS lacked significant air and surface warfare capabilities
    =========
    BUDGET 2025 = SALARIES AND ALLOWANCES
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
    ==============
    KEY WORDS CRISES=
    1. POLITICAL
    2. FINANCIAL
    3. ECONOMIC
    4. DEBT

    BalasHapus
  38. Hawimauw...
    Hawimauw...
    Hawimauw....
    Mweeuuuuwwww....
    😅😂🤣😂😅🤣

    BalasHapus
  39. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
    ==============
    Malonn's armed forces procurement faces several weaknesses, including:
    1. Corruption
    The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
    2. Political influence
    Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
    Weak parliamentary oversight
    Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
    3. Limited financial scrutiny
    Financial scrutiny is limited by excessive secrecy.
    4. Violation of procedures
    Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
    ==============
    Some factors that contribute to the Malonn Army's perceived weakness include:
    • Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
    • Corruption: The MAF has been plagued by corruption.
    • Poor planning: The MAF has been criticized for poor planning.
    • Political interference: Political leaders have interfered in the MAF's procurement process.
    • Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
    Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
    ==============
    BUDGET 2025 = SALARIES AND ALLOWANCES
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
    ==============
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
    ==============
    KEY WORDS =
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU

    BalasHapus
  40. KATA KUNCI =
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    Tomczyk revealed that while Poland initially pursued the acquisition of the FA-50s from South Korea with the expectation of receiving operational aircraft, it subsequently emerged that the armaments intended for these aircraft had been discontinued. As a result, the Polish Ministry of Defence has received 12 aircraft that are no longer capable of fulfilling combat roles.....
    ----
    KATA KUNCI =
    FA50 = TRAINING AIRCRAFT
    FA50 = TRAINING AIRCRAFT
    So far, Poland has received 12 of the jets in the GF (Gap Filler) version, but Blaszczak failed to secure weapons for them, Cezary Tomczyk, a deputy defence minister, told parliament on Thursday.
    According to him, the delivery of the 36 remaining jets in the PL version custom-made for Poland "is largely at risk" and delays in their deliveries may reach nine months.
    While praising the role the FA-50s are playing in the Polish Air Force, Tomczyk said that they can only be used as training aircraft.
    ------
    KATA KUNCI =
    HELI MD530G = HELI TRAINING
    HELI MD530G = HELI TRAINING
    A notable attraction at this year’s Langkawi International Maritime and Aerospace (LIMA) exhibition are six new MD530Gs, which were delivered to Malon’s army in 2022. The type is appearing on static, and also participated in the show’s opening ceremony.
    The six rotorcraft – delivery of which was delayed for several years – are primarily used for training.....
    ------
    KATA KUNCI =
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    ------
    KATA KUNCI =
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    ------
    KATA KUNCI =
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    ==============
    ==============
    BUDGET 2025 = SALARIES AND ALLOWANCES
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
    ==============
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR

    BalasHapus
  41. POLAND BUDGET USD 38 BILLION = CASH PREMIUM
    FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA = USD 58,75 JUTA/UNIT
    FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA = USD 63,89 JUTA/UNIT
    ------
    BUDGET USD 4,3 BILLION = BARTER PALM OIL
    DOWNGRADE CHEAPEST FA 50
    FA 50M 18 UNIT HARGA USD 920 JUTA = USD 51,1 JUTA/UNIT
    ==============
    KATA KUNCI =
    BUDGET USD 38 BILLION = GROUNDED
    BUDGET USD 4,3 BILLION = PASTI LEBIH GROUNDED!!!
    At Monday’s press conference in the south-eastern city of Rzeszow, Wladyslaw Kosiniak-Kamysz addressed the report, saying that while the Law and Justice (PiS) cabinet, whose administration ended last December, in fact made several deals for military equipment purchases, they did not arrange for appropriate changes that would prepare the armed forces for its implementation. In his view, after the army received the purchased FA-50 planes, they were not ready for take-off or to be used right away.
    ----
    KATA KUNCI =
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    Tomczyk revealed that while Poland initially pursued the acquisition of the FA-50s from South Korea with the expectation of receiving operational aircraft, it subsequently emerged that the armaments intended for these aircraft had been discontinued. As a result, the Polish Ministry of Defence has received 12 aircraft that are no longer capable of fulfilling combat roles.....
    ----
    KATA KUNCI =
    FA50 = TRAINING AIRCRAFT
    FA50 = TRAINING AIRCRAFT
    So far, Poland has received 12 of the jets in the GF (Gap Filler) version, but Blaszczak failed to secure weapons for them, Cezary Tomczyk, a deputy defence minister, told parliament on Thursday.
    According to him, the delivery of the 36 remaining jets in the PL version custom-made for Poland "is largely at risk" and delays in their deliveries may reach nine months.
    While praising the role the FA-50s are playing in the Polish Air Force, Tomczyk said that they can only be used as training aircraft.
    ------
    KATA KUNCI =
    HELI MD530G = HELI TRAINING
    HELI MD530G = HELI TRAINING
    A notable attraction at this year’s Langkawi International Maritime and Aerospace (LIMA) exhibition are six new MD530Gs, which were delivered to Malon’s army in 2022. The type is appearing on static, and also participated in the show’s opening ceremony.
    The six rotorcraft – delivery of which was delayed for several years – are primarily used for training.....
    ------
    KATA KUNCI =
    DOWNGRADE LMS B2 NO SONAR
    DOWNGRADE LMS B2 NO SONAR
    STM, in its role as main contractor, will turn to the Turkish defence sector for such equipment as the Combat Management System; the Gun Fire Control System, to be supplied by HAVELSAN; and the 3D Search Radar, Fire Control Radar, IFF, 30mm Gun, ESM and Chaff Decoy System, as well as other electronic sensors, to be supplied by ASELSAN. ROKETSAN will be supplying its ATMACA Surface-to-Surface G/M System.
    ==============
    Military equipment in Malon has broken down for a variety of reasons, including:
    • Engine problems
    In August 2022, a Malonn Army PT-91M Pendekar tank broke down on a highway near Parliament due to engine problems. The tank was being used for rehearsals for the country's Independence Day parade.
    • Aging aircraft
    Malon's Royal Malonn Air Force (RMAF) has a fleet of legacy Hornets that are becoming technologically obsolete. The RMAF has faced fleet sustainment problems, and some say that the government's defense modernization budget should be used to expand the LCA program or accelerate the MRCA program.
    • Limited defense budget
    Malon's defense progress has been limited since 2018 due to fiscal limitations. Malonn governments have been unwilling to cut government spending elsewhere or reduce the size of the armed forces.
    • Russian-made weapons
    • Malon has become wary of its Russian-made weapons, and is looking to buy elsewhere. The West's sanctions against Russia have prevented Malon from buying the Su-30 directly from the Kremlin

    BalasHapus
  42. Malonn's defense budget is considered not in accordance with its objectives. Some of the things to consider are:
    • The allocation of salaries and allowances for 2024 reaches 40% of the total defense budget.
    • The allocation for procurement has increased slightly from 2023, but there may be no real benefit due to the depreciation of the ringgit.
    • The Ministry of Finance assesses the availability of funds for programs and procurement requirements in private.
    • Hundreds of Malonnn military assets have exceeded the 30-year service limit.
    ==========
    Malonn has faced several crises, including political, financial, and economic crises:
    • Political crisis
    From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
    • Financial crisis
    Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
    • Economic crisis
    Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
    • Household debt crisis
    As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
    • Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
    ==========
    Malonn has several issues related to assault rifles, including:
    • Smuggling
    Malonn's long and porous borders make it difficult to stop the smuggling of firearms and ammunition into the country. The border between Malonn and Thailand is particularly vulnerable to gun smuggling.
    • Outdated inventory
    The Malonnn Armed Forces (MAF) has outdated inventory stock, which can be a stumbling block for ongoing operations.
    • Wary of Russian-made weapons
    Malonn is becoming wary of its Russian-made weapons
    ==========
    Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
    • Krisis politik
    Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
    1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
    2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
    3. Dampak politik pandemi COVID-19
    4. Proklamasi Darurat 2021
    5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
    • Krisis beras
    Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
    • Krisis mata uang
    Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
    1. Kinerja ekspor yang buruk
    2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
    3. Kekhawatiran geopolitik
    4. Ketidakpastian mengenai prospek ekonomi China

    BalasHapus
  43. Malonn has faced several crises, including political, financial, and economic crises:
    • Political crisis
    From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
    • Financial crisis
    Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
    • Economic crisis
    Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
    • Household debt crisis
    As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
    Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
    =========
    Malonn has a number of weaknesses, including:
    • Economic
    Malonn's budget income is highly dependent on the oil and gas sector, and fiscal revenues are low. The country also has high levels of household and corporate debt, and a high dependency on food imports.
    • Political
    Malonn has a divided political landscape, and the country has experienced political instability since 2018. The 2022 election resulted in a hung parliament, the first time this has happened since Malonn's independence.
    • Environmental
    Malonn ranks 147 out of 210 economies on the Environmental Sustainability Index, due to challenges with climate change vulnerability, recycling rate, and renewable electricity output.
    • Public procurement
    Some weaknesses in public procurement in Malonn include non-compliance with contract terms, delayed project completion, poor documentation, and low quality of products and services.
    • Property market
    In the second half of 2023, sales volumes in the property market declined, and prices rose by only 0.1% year-on-year.
    • Currency
    The Malonnn ringgit (MYR) could potentially go down in value further. A weaker currency can have negative economic impacts, particularly for businesses that rely on imports.
    =========
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness

    BalasHapus
  44. Some problems Malonn shipyards face in making warships include:
    • Supply chain disruptions
    In 2022, COVID-19 and the Russia-Ukraine conflict disrupted supply chains and led to shortages of skilled personnel.
    • Low-quality products
    Workers may use sketches, photos, and previous experience instead of following good engineering practices, which can lead to low-quality products, reworks, higher costs, and late deliveries.
    • Traditional shipbuilding
    Traditional shipbuilding is a slow, expensive, and laborious process. It involves a systems approach, where each system has its own drawings, and work crews may compete for work space.
    • Resource shortage
    The shipbuilding industry is facing a shortage of resources due to an aging workforce and a lack of young people willing to enter the trade.
    ----------
    The Royal Malonn Navy (RMN) has faced challenges with its readiness rate, including a lack of modern assets, aging vessels, and budget limitations:
    • Lack of modern assets
    The RMN has faced challenges in obtaining modern military assets, which can expose it to internal and external threats.
    • Aging vessels
    Many of the RMN's assets are over 20 years old, and the budget to replace them is limited.
    • Political interference and corruption
    Some say that political interference and corruption are undermining the RMN's combat readiness.
    ===========
    ===========
    Indonesia's warship industry has several advantages, including:
    • Strategic location: Indonesia's location in Southeast Asia, with a coastline that stretches across the Indian and Pacific Oceans, makes it a hub for maritime trade. Two of the world's most important maritime trade routes pass through its waters.
    • Natural resources: Indonesia is rich in natural resources.
    • Large archipelago: Indonesia is the world's largest archipelagic country, with over 17,000 islands. Ships are important for connecting the islands and transporting goods and passengers.
    • National defense: Ships are vital to the national defense system.
    • Shipbuilding company: PT PAL Indonesia is Indonesia's largest shipbuilding company, with capabilities in warship and commercial ship construction and design.
    • Maritime technology: Maritime technology can strengthen the sovereignty and defense of the Indonesian marine, improve the welfare of fishermen and ship owners, and create a sustainable technology education system.
    ----------
    Warships made by PT PAL Indonesia have many advantages, including:
    • Quality
    PT PAL has a strong commitment to quality, which is reflected in their products and services. They have a good quality assurance system that ensures their products are high quality and meet the needs of their users.
    • Design capability
    PT PAL has a strong design capability that has been recognized internationally.
    • Modern technology
    PT PAL uses advanced technology in their production, including modern management systems and professional and experienced human resources.
    • Maintenance and repair
    PT PAL can also perform maintenance and repair on warships, submarines, and commercial vessels.
    • Domestic production
    PT PAL is capable of producing, repairing, and modernizing defense equipment domestically.
    • Global reach
    PT PAL's products have sailed in waters all over the world.
    • Auxiliary vessels
    PT PAL can also build and manufacture auxiliary vessels, such as Landing Platform Docks (LPD).
    • Combat assistance
    PT PAL's vessels can carry out combat assistance, as well as non-war military operations like humanitarian missions and disaster relie

    BalasHapus
  45. INDONESIA RAFALE F4 SEDANG DIBINA

    https://www.facebook.com/share/p/1EaEGCesYM/

    MEDIA MILITERNYA MALON NIH

    BalasHapus

  46. Some factors that contribute to the Malonn Army's perceived weakness include:
    • Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
    • Corruption: The MAF has been plagued by corruption.
    • Poor planning: The MAF has been criticized for poor planning.
    • Political interference: Political leaders have interfered in the MAF's procurement process.
    • Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
    Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
    ===================
    PROBLEMS MALON SHIPYARD
    Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.
    ===================
    LOST = RM14.82 MILLION
    LOST = RM14.82 MILLION
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
    BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
    ===================
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
    High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
    The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
    ===================
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE

    BalasHapus
  47. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
    ==============
    Malonn's armed forces procurement faces several weaknesses, including:
    1. Corruption
    The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
    2. Political influence
    Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
    Weak parliamentary oversight
    Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
    3. Limited financial scrutiny
    Financial scrutiny is limited by excessive secrecy.
    4. Violation of procedures
    Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
    ==============
    Some factors that contribute to the Malonn Army's perceived weakness include:
    • Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
    • Corruption: The MAF has been plagued by corruption.
    • Poor planning: The MAF has been criticized for poor planning.
    • Political interference: Political leaders have interfered in the MAF's procurement process.
    • Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
    Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
    ==============
    BUDGET 2025 = SALARIES AND ALLOWANCES
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
    ==============
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
    ==============
    KEY WORDS =
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU

    BalasHapus
  48. Malonn has faced several crises, including political, financial, and economic crises:
    • Political crisis
    From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
    • Financial crisis
    Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
    • Economic crisis
    Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
    • Household debt crisis
    As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
    Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
    ==========
    The Royal Malonn Air Force (RMAF) has faced several challenges, including:
    • Aircraft maintenance
    The RMAF has had issues with maintenance and spare parts for its aircraft, including the Sukhoi Su-30MKM and the Kuwaiti HORNET MALONN. For example, in 2018, only four of the RMAF's Sukhoi Su-30MKM aircraft were flyable due to maintenance issues. The Kuwaiti HORNET MALONNs are an earlier model than the Malonn fighters, which may cause compatibility issues.
    • Budget constraints
    Malon's defense budget is limited, which can affect the pace of acquisitions and upgrades. The government must balance defense spending with other national priorities.
    • Regional competition
    Neighboring countries like Indonesia and Singapore are also increasing their air force capabilities, which puts pressure on Malon to keep pace.
    • Corruption
    Malon's military has been involved in multiple corruption scandals
    =========
    The Royal Malonn Navy (RMN) faces several challenges, including:
    • Aging fleet: More than half of the RMN's fleet is past its prime, and the country has only received four of the 18 new vessels it planned to acquire. The last time the RMN acquired a combat ship was in 1997.
    • Delayed replacements: The RMN's plans to replace its aging fleet have been stalled due to mismanagement.
    • Insufficient defense budget: Malon's defense budget is less than one percent of its GDP, while neighboring Singapore spends six percent.
    • Lack of coordination: There is a lack of coordination among agencies.
    • Outdated assets: The RMN's ships and assets are outdated.
    • Combat system issues: The RMN has observed deficiencies with the combat system of its LMS type vessels.
    • Low endurance: The LCS's endurance was too low to stay with a carrier strike group or amphibious ready group without significant refueling.
    • Lack of air and surface warfare capabilities: The LCS lacked significant air and surface warfare capabilities
    =========
    BUDGET 2025 = SALARIES AND ALLOWANCES
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
    ==============
    KEY WORDS CRISES=
    1. POLITICAL
    2. FINANCIAL
    3. ECONOMIC
    4. DEBT


    BalasHapus
  49. Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
    • Krisis politik
    Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
    1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
    2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
    3. Dampak politik pandemi COVID-19
    4. Proklamasi Darurat 2021
    5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
    • Krisis beras
    Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
    • Krisis mata uang
    Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
    1. Kinerja ekspor yang buruk
    2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
    3. Kekhawatiran geopolitik
    4. Ketidakpastian mengenai prospek ekonomi China
    ==========
    Malonn has faced several crises, including political, financial, and economic crises:
    • Political crisis
    From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
    • Financial crisis
    Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
    • Economic crisis
    Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
    • Household debt crisis
    As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
    • Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
    ==========
    BUDGET 2025 = SALARIES AND ALLOWANCES
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
    ==============
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR

    BalasHapus

  50. PRANK KS-1A
    PRANK KS-1A
    PRANK KS-1A
    Malonn has agreed in principle to purchase medium-range missiles from China, which in return will transfer technology on very short-range air defence to the country, Deputy Prime Minister Najib Razak said Tuesday.
    ------
    VSHORAD = LEASE 30 YEARS
    VSHORAD = LEASE 30 YEARS
    VSHORAD = LEASE 30 YEARS
    The procurement division of the Defence Ministry has issued a tender for the supply, delivery, and commissioning for eight Very Short-Range Air Defence (VSHORAD) ground-based air defence system for the Army. The VSHORAD system is listed as the Army’s main asset and equipment for 2024.
    The 23-day tender published on November 20 closes on December 19. As usual the public specifications for the tender are limited.
    The indicative cost for the eight VSHORAD system is RM150 million. It is therefore unclear whether the VSHORAD system is meant for the four Starstreak carrier vehicles or Kenderaan Pembawa Misil Starstreak (KPMS) which tender was published last August.
    It may well be that the Starstreak LML NG VSHORAD SAM being sought are for the KPMS. And if it’s meant to be for the KPMS it may well be the setting up of a GBAD unit for 1 Division which is based in Kuching, Sarawak. The Fifth Division based in Kota Kinabalu, Sabah has a single GBAD unit, 35 RAD (Ad-hoc) which got its Starstreak KPMS, missiles, and launchers from the disbanded RMN GBAD unit.
    The other Starstreak unit is 32 RAD which is based at the Terendak camp in Malacca. It is also interesting to note that the 361 Battery of RAD – the GBAD unit- with 10th Para Brigade are still equipped with the Anza Mk2 VSHORAD system procured some 20 years ago. The Thales Starstreak missiles, launchers, vehicles, and a single radar system were procured in 2015.
    ------
    The Malonnn air defense system faces some challenges, including:
    • Budget constraints
    The government's defense budget is limited and must be balanced with other national priorities.
    • Regional competition
    Neighboring countries like Indonesia and Singapore are also increasing their air force capabilities, which Malonn must keep pace with.
    • Depreciation of the ringgit
    Malonn sources much of its equipment from overseas, and domestic manufacture is also dependent on foreign OEMs
    ------
    Malonn has a number of weaknesses, including:
    • Economic
    Malonn's budget income is highly dependent on the oil and gas sector, and fiscal revenues are low. The country also has high levels of household and corporate debt, and a high dependency on food imports.
    • Political
    Malonn has a divided political landscape, and the country has experienced political instability since 2018. The 2022 election resulted in a hung parliament, the first time this has happened since Malonn's independence.
    • Environmental
    Malonn ranks 147 out of 210 economies on the Environmental Sustainability Index, due to challenges with climate change vulnerability, recycling rate, and renewable electricity output.
    • Public procurement
    Some weaknesses in public procurement in Malonn include non-compliance with contract terms, delayed project completion, poor documentation, and low quality of products and services.
    • Property market
    In the second half of 2023, sales volumes in the property market declined, and prices rose by only 0.1% year-on-year.
    • Currency
    The Malonnn ringgit (MYR) could potentially go down in value further. A weaker currency can have negative economic impacts, particularly for businesses that rely on imports.
    =============
    =============
    REAL KS-1A KAMBOJA
    REAL KS-1A KAMBOJA
    REAL KS-1A KAMBOJA
    Royal Cambodian Army telah menerima KS-1 buatan China, SAM yang masuk dalam kategori medium and long-range air defense system
    😝DIBAWAH KAKI KAMBOJA = PRANK KS-1A😝

    BalasHapus
  51. BUDGET 2025 = SALARIES AND ALLOWANCES
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
    ==============
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
    ==============
    Malonn has faced several crises, including political, financial, and economic crises:
    • Political crisis
    From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
    • Financial crisis
    Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
    • Economic crisis
    Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
    • Household debt crisis
    As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
    Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
    =========
    Malonn has a number of weaknesses, including:
    • Economic
    Malonn's budget income is highly dependent on the oil and gas sector, and fiscal revenues are low. The country also has high levels of household and corporate debt, and a high dependency on food imports.
    • Political
    Malonn has a divided political landscape, and the country has experienced political instability since 2018. The 2022 election resulted in a hung parliament, the first time this has happened since Malonn's independence.
    • Environmental
    Malonn ranks 147 out of 210 economies on the Environmental Sustainability Index, due to challenges with climate change vulnerability, recycling rate, and renewable electricity output.
    • Public procurement
    Some weaknesses in public procurement in Malonn include non-compliance with contract terms, delayed project completion, poor documentation, and low quality of products and services.
    • Property market
    In the second half of 2023, sales volumes in the property market declined, and prices rose by only 0.1% year-on-year.
    • Currency
    The Malonnn ringgit (MYR) could potentially go down in value further. A weaker currency can have negative economic impacts, particularly for businesses that rely on imports.

    BalasHapus
  52. KATA KUNCI =
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    Tomczyk revealed that while Poland initially pursued the acquisition of the FA-50s from South Korea with the expectation of receiving operational aircraft, it subsequently emerged that the armaments intended for these aircraft had been discontinued. As a result, the Polish Ministry of Defence has received 12 aircraft that are no longer capable of fulfilling combat roles.....
    ----
    KATA KUNCI =
    FA50 = TRAINING AIRCRAFT
    FA50 = TRAINING AIRCRAFT
    So far, Poland has received 12 of the jets in the GF (Gap Filler) version, but Blaszczak failed to secure weapons for them, Cezary Tomczyk, a deputy defence minister, told parliament on Thursday.
    According to him, the delivery of the 36 remaining jets in the PL version custom-made for Poland "is largely at risk" and delays in their deliveries may reach nine months.
    While praising the role the FA-50s are playing in the Polish Air Force, Tomczyk said that they can only be used as training aircraft.
    ------
    KATA KUNCI =
    HELI MD530G = HELI TRAINING
    HELI MD530G = HELI TRAINING
    A notable attraction at this year’s Langkawi International Maritime and Aerospace (LIMA) exhibition are six new MD530Gs, which were delivered to Malon’s army in 2022. The type is appearing on static, and also participated in the show’s opening ceremony.
    The six rotorcraft – delivery of which was delayed for several years – are primarily used for training.....
    ------
    KATA KUNCI =
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    ------
    KATA KUNCI =
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    ------
    KATA KUNCI =
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    ==============
    ==============
    BUDGET 2025 = SALARIES AND ALLOWANCES
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
    ==============
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR

    BalasHapus
  53. LOST = RM14.82 MILLION
    LOST = RM14.82 MILLION
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
    BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
    ---------------------
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
    High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
    The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
    ---------------------
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance

    BalasHapus
  54. BUDGET 2025 = SALARIES AND ALLOWANCES
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
    ==============
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
    ==============
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2023 ANKA OMPONG = WILL NOT ARMED
    Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance

    BalasHapus
  55. KATA KUNCI =
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    Tomczyk revealed that while Poland initially pursued the acquisition of the FA-50s from South Korea with the expectation of receiving operational aircraft, it subsequently emerged that the armaments intended for these aircraft had been discontinued. As a result, the Polish Ministry of Defence has received 12 aircraft that are no longer capable of fulfilling combat roles.....
    ----
    KATA KUNCI =
    FA50 = TRAINING AIRCRAFT
    FA50 = TRAINING AIRCRAFT
    So far, Poland has received 12 of the jets in the GF (Gap Filler) version, but Blaszczak failed to secure weapons for them, Cezary Tomczyk, a deputy defence minister, told parliament on Thursday.
    According to him, the delivery of the 36 remaining jets in the PL version custom-made for Poland "is largely at risk" and delays in their deliveries may reach nine months.
    While praising the role the FA-50s are playing in the Polish Air Force, Tomczyk said that they can only be used as training aircraft.
    ------
    KATA KUNCI =
    HELI MD530G = HELI TRAINING
    HELI MD530G = HELI TRAINING
    A notable attraction at this year’s Langkawi International Maritime and Aerospace (LIMA) exhibition are six new MD530Gs, which were delivered to Malon’s army in 2022. The type is appearing on static, and also participated in the show’s opening ceremony.
    The six rotorcraft – delivery of which was delayed for several years – are primarily used for training.....
    ------
    KATA KUNCI =
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    ------
    KATA KUNCI =
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    ------
    KATA KUNCI =
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    ------
    KATA KUNCI =
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    ------
    KATA KUNCI =
    CHEAPEST VARIANT LMS
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    ------
    KATA KUNCI =
    DOWNGRADE ANKA
    ANKA OMPONG = WILL NOT ARMED
    Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.

    BalasHapus
  56. The Malonn army has faced some challenges, including corruption and issues with military personnel:
    • Corruption
    Malon's military has been involved in corruption, and the country's military doctrine doesn't recognize it as a threat. The Integrity Plan addresses corruption, but it's not a strategic document, and commanders don't receive training on corruption issues before deployments.
    • Military personnel
    Some say that military personnel have struggles with thinking skills, decision-making, and problem-solving.
    • Logistics
    Some say that Malon has had problems ensuring the readiness of the Malonn Armed Forces (MAF) in the face of threats
    -------------------------------------
    Malonn Armed Forces (MAF) faces several challenges with maintaining its equipment, including:
    • Budget
    The MAF has a limited budget, which affects the serviceability of its assets.
    • Outsourcing
    The MAF has outsourced maintenance of its assets since the 1970s, but the outsourcing program has faced challenges such as undertrained staff, underperforming contractors, and lack of contract enforcement.
    • Old inventory
    The Royal Malonn Navy (RMN) has a number of old ships in service, including the Kasturi-class Corvette, the Laksamana Corvette class, the Perdana-class gunboat, and the Handalan and Jerung class.
    • Spare parts
    There are issues with delivering spare parts to soldiers on the ground at the right time
    -------------------------------------
    Malon's military equipment is old due to a number of factors, including:
    • Outdated equipment
    The majority of the Malonn Armed Forces' (MAF) equipment was purchased between the 1970s and 1990s.
    • Low and erratic allocations
    The Royal Malonn Navy (RMN) has many ships that are older than the HTMS Sukhothai, which sank in 2022.
    • Government's inability to provide modern equipment
    The government is unable to provide the MAF with modern defense assets.
    • Defense industry issues
    The defense industry is controlled by the government, but some say it lacks accountability and determination. Some issues include the import of critical components, local companies acting as intermediaries for foreign companies, and a lack of research and development.
    -------------------------------------
    Military equipment in Malon has broken down for a variety of reasons, including:
    • Engine problems
    In August 2022, a Malonn Army PT-91M Pendekar tank broke down on a highway near Parliament due to engine problems. The tank was being used for rehearsals for the country's Independence Day parade.
    • Aging aircraft
    Malon's Royal Malonn Air Force (RMAF) has a fleet of legacy Hornets that are becoming technologically obsolete. The RMAF has faced fleet sustainment problems, and some say that the government's defense modernization budget should be used to expand the LCA program or accelerate the MRCA program.
    • Limited defense budget
    Malon's defense progress has been limited since 2018 due to fiscal limitations. Malonn governments have been unwilling to cut government spending elsewhere or reduce the size of the armed forces.
    • Russian-made weapons
    Malon has become wary of its Russian-made weapons, and is looking to buy elsewhere. The West's sanctions against Russia have prevented Malon from buying the Su-30 directly from the Kremlin.

    BalasHapus
  57. CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2023 ANKA OMPONG = WILL NOT ARMED
    Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance
    -------------------------------------
    The Malonnn air defense system faces some challenges, including:
    • Budget constraints
    The government's defense budget is limited and must be balanced with other national priorities.
    • Regional competition
    Neighboring countries like Indonesia and Singapore are also increasing their air force capabilities, which Malonn must keep pace with.
    • Depreciation of the ringgit
    Malonn sources much of its equipment from overseas, and domestic manufacture is also dependent on foreign OEMs

    BalasHapus
  58. pssstttt...serius.... masa berita dari MALAYSIA dijadikan sandaran bukti itu Foto RAFAKE INDIANESIA....Media MALAYSIA hanya ikut klaim dari geng GORILLA ya...HAHAHAHAH

    BalasHapus
    Balasan
    1. MYANMAR =
      BUILT 2017 - COMMISSIONED 2024
      BUILT 2017 - COMMISSIONED 2024
      BUILT 2017 - COMMISSIONED 2024
      The Senior General and party viewed launching the newlycommissioned 135-metre Frigate from the ship lift platform. The 135-metre Frigate King Thalun was built at the Naval Dockyard Command Headquarters in March 2017 under the guidance of the Senior General.
      ==============
      ==============
      LCS MALONN =
      LAUNCHING 2017 - MANGKRAK 2024
      LAUNCHING 2017 - MANGKRAK 2024
      LAUNCHING 2017 - MANGKRAK 2024
      LAUNCHING 2017 - MANGKRAK 2024
      LAUNCHING 2017 - MANGKRAK 2024
      The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malaysia’s former Navy chief said today.
      ---------------------
      LCS 2024-2011 = 13 TAHUN
      13 TAHUN MANGKRAK
      13 TAHUN MANGKRAK
      LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
      ---------------------
      NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
      ----------------------
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn
      ---------------------
      Malonn's armed forces procurement faces several weaknesses, including:
      1. Corruption
      The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
      2. Political influence
      Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
      Weak parliamentary oversight
      Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
      3. Limited financial scrutiny
      Financial scrutiny is limited by excessive secrecy.
      4. Violation of procedures
      Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedure
      ==============
      KEY WORDS = LAUNCHING 2017 - MANGKRAK 2024

      Hapus
    2. LEASE 30 YEARS = VSHORAD AND VSHORAD CHINA
      LEASE 30 YEARS = VSHORAD AND VSHORAD CHINA
      LEASE 30 YEARS = VSHORAD AND VSHORAD CHINA
      the Madani government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd. The estimated cost for the deal is RM10.7 billion and it will be covered in installments over a 30-year lease period.
      ==============
      LMS B1 MADE IN CHINA
      LMS B1 = OMPONG SEJAK 2010
      LMS B1 = OMPONG SEJAK 2010
      Littoral Mission Ship built in China by China Shipbuilding and Offshore International Co. Ltd,. The first ship was to be delivered to the Royal Malonnn Navy by 2019, the second and third by 2020 and the fourth by 2021
      ==============
      LEASE 15 YEARS
      LEASE 15 YEARS
      LEASE 15 YEARS
      PMX has defended the decision to lease the helicopters for the military and other government agencies – RM16.5 billion for 15 years – during the Parliament session on Thursday. Among others he said the government adopted the leasing model to reduce maintenance costs and at the same time improved the operational readiness of the fleet.
      DS Anwar Ibrahim did not address the fact that the government will be paying some RM1 billion a year for 15 years for the helicopters. He also said the helicopters selected were based on the specifications and requirements of the agencies themselves.
      He also confirmed that the Army will also be part of the leasing programme apart from RMAF,RMN, MMEA, police, Fire and Rescue Department, and the Prime Minister Department. Apart from RMAF 12 and police’s seven helicopters, he did not give the breakdown for the other services and agencies.
      ==============
      Malon's combat equipment has several weaknesses, including:
      • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
      • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
      • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
      • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
      • Procurement system: The Malonn procurement system needs reform.
      Political interference and corruption: Political interference and corruption are undermining combat readiness
      =========
      Malonn's armed forces procurement faces several weaknesses, including:
      1. Corruption
      The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
      2. Political influence
      Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
      Weak parliamentary oversight
      Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
      3. Limited financial scrutiny
      Financial scrutiny is limited by excessive secrecy.
      4. Violation of procedures
      Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures



      Hapus
    3. LEASE 30 YEARS = VSHORAD AND VSHORAD CHINA
      LEASE 30 YEARS = VSHORAD AND VSHORAD CHINA
      LEASE 30 YEARS = VSHORAD AND VSHORAD CHINA
      the Madani government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd. The estimated cost for the deal is RM10.7 billion and it will be covered in installments over a 30-year lease period.
      ==============
      LMS B1 MADE IN CHINA
      LMS B1 = OMPONG SEJAK 2010
      LMS B1 = OMPONG SEJAK 2010
      Littoral Mission Ship built in China by China Shipbuilding and Offshore International Co. Ltd,. The first ship was to be delivered to the Royal Malonnn Navy by 2019, the second and third by 2020 and the fourth by 2021
      ==============
      LEASE 15 YEARS
      LEASE 15 YEARS
      LEASE 15 YEARS
      PMX has defended the decision to lease the helicopters for the military and other government agencies – RM16.5 billion for 15 years – during the Parliament session on Thursday. Among others he said the government adopted the leasing model to reduce maintenance costs and at the same time improved the operational readiness of the fleet..
      ==============
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      -
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
      -------------------------------------
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
      -------------------------------------
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      -------------------------------------
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      CHEAPEST VARIANT LMS
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
      -------------------------------------
      DOWNGRADE ANKA
      DOWNGRADE ANKA
      2023 ANKA OMPONG = WILL NOT ARMED
      Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
      -------------------------------------
      DOWNGRADE ANKA
      DOWNGRADE ANKA
      2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance
      While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance



      Hapus
  59. CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2023 ANKA OMPONG = WILL NOT ARMED
    Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance
    -------------------------------------
    The Malonnn air defense system faces some challenges, including:
    • Budget constraints
    The government's defense budget is limited and must be balanced with other national priorities.
    • Regional competition
    Neighboring countries like Indonesia and Singapore are also increasing their air force capabilities, which Malonn must keep pace with.
    • Depreciation of the ringgit
    Malonn sources much of its equipment from overseas, and domestic manufacture is also dependent on foreign OEMs

    BalasHapus

  60. LOST = RM14.82 MILLION
    LOST = RM14.82 MILLION
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
    BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
    ---------------------
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
    High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
    The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
    ---------------------
    LCS MALONN =
    LAUNCHING 2017 - MANGKRAK 2024
    LAUNCHING 2017 - MANGKRAK 2024
    LAUNCHING 2017 - MANGKRAK 2024
    LAUNCHING 2017 - MANGKRAK 2024
    LAUNCHING 2017 - MANGKRAK 2024
    The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malaysia’s former Navy chief said today.
    ---------------------
    LCS 2024-2011 = 13 TAHUN
    13 TAHUN MANGKRAK
    13 TAHUN MANGKRAK
    LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ---------------------
    NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
    ----------------------
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness.
    ==============
    ==============
    MYANMAR =
    BUILT 2017 - COMMISSIONED 2024
    BUILT 2017 - COMMISSIONED 2024
    BUILT 2017 - COMMISSIONED 2024
    The Senior General and party viewed launching the newlycommissioned 135-metre Frigate from the ship lift platform. The 135-metre Frigate King Thalun was built at the Naval Dockyard Command Headquarters in March 2017 under the guidance of the Senior General.
    ==============
    KEY WORDS =
    1. LAUNCHING 2017 - MANGKRAK 2024
    2. LOST RM14.82 MILLION - SELL 51% CAD TO RHEINMETALL AG

    BalasHapus
  61. SEWA TRUK CINA 3 TON = 30 YEARS
    SEWA TRUK CINA 3 TON = 30 YEARS
    SEWA VSHORAD CINA = 30 YEARS
    SEWA VSHORAD CINA = 30 YEARS
    The Madani government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd. The estimated cost for the deal is RM10.7 billion and it will be covered in installments over a 30-year lease period. The approved leasing deal for KTMB may tip the scale in favour of the truck and VSHORAD proposals. There is also the massive leasing deals for helicopters for all the services to think about.
    SEWA PESAWAT
    ITTC is currently providing Fighter Lead-In Training (FLIT) to the Royal Malonn Air Force in London, Ontario. ITTC operates a fleet of Aero Vodochody L-39 featuring upgraded avionics for the FLIT programme
    SEWA SIMULATOR MKM TAHUN
    Five-year contract for Sukhoi’s simulators. Publicly listed HeiTech Padu Bhd has announced that it had been awarded a RM67 million, five-year contract to operate and maintain the Su-30MKM flight simulators at the RMAF airbase in Gong Kedak
    SEWA HELI SEWA SIMULATOR
    Kerajaan sebelum ini pernah menyewa Helikopter Latihan Airbus EC120B dan Flight Simulation Training Device (FSTD) Untuk Kegunaan Kursus Asas Juruterbang Helikopter TUDM. Selain itu, kerajaan turut pernah menyewa 5 unit Helikopter EC120B; 1 unit Sistem Simulator
    SEWA HELI
    Kementerian Pertahanan Malon pada 27 Mei 2023 lalu telah menandatangani perjanjian sewa dengan penyedia layanan penerbangan lokal, Aerotree, untuk menyediakan empat helikopter bekas Sikorsky UH-60A+ Black Hawk.
    SEWA HELI
    4 buah Helikopter Leonardo AW 139 yang diperolehi secara sewaan ini adalah untuk kegunaan Tentera Udara Diraja Malon (TUDM) yang akan ditempatkan di NO.3 Skuadron, Pangkalan Udara Butterworth
    SEWA BOAT
    sewaan Bot Op Pasir merangkumi 10 unit Fast Interceptor Boat (FIB); 10 unit Utility Boat; 10 unit Rigid Hull Fender Boat (RHFB); 10 unit Rover Fiber Glass (Rover).
    SEWA HIDROGRAFI
    tugas pemetaan data batimetri bagi kawasan perairan negara akan dilakukan oleh sebuah kapal hidrografi moden, MV Aishah AIM 4, yang diperoleh menerusi kontrak sewaan dari syarikat Breitlink Engineering Services Sdn Bhd (BESSB)
    SEWA 4x4
    Pejabat perusahaan mengatakan kepada Janes di pameran bahwa Angkatan Bersenjata Malon sedang mencari untuk menyewa Tarantula
    SEWA MOTOR
    The Royal Military Police Corp (KPTD) celebrated the lease of 40 brand-new BMW R1250RT Superbikes for the Enforcement Motorcycle Squad on December 22nd, 2022
    SEWA PATROL BOATS : SEWA OUTBOARD MOTORS : SEWA TRAILERS
    Meanwhile, the division also published a tender for eleven glass reinforced plastic patrol boats together outboard motors, trailers and associated equipment. The tender was published on February 28 and closes on March 29. The estimated cost of the tender is RM4.6 million..
    =========
    Some factors that contribute to the Malonn Army's perceived weakness include:
    • Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
    • Corruption: The MAF has been plagued by corruption.
    • Poor planning: The MAF has been criticized for poor planning.
    • Political interference: Political leaders have interfered in the MAF's procurement process.
    • Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
    Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations




    BalasHapus

  62. MALONN DIBAWAH KAKI =
    RAFALE : BANGLADESH MYANMAR
    RAFALE : BANGLADESH MYANMAR
    For the first batch, Bangladesh, which shares borders with Myanmar and India, plans to procure four Rafale F3-R variants, consisting of three two-seat fighters and one single-seat aircraft currently operated by the French Air Force.
    ==================
    MALONN DIBAWAH KAKI =
    MYANMAR : FRIGATE 135M
    MYANMAR : FRIGATE 135M
    SAC Chairman Commander-in-Chief of Defence Services Senior General Min Aung Hlaing joins the auspicious ceremony to name and commission 135-metre Frigate built by Tatmadaw (Navy)
    ==================
    MALONN DIBAWAH KAKI =
    SPH : LAOS, VIETNAM, MYANMAR, BANGLADESH, KENYA
    -
    The ‘CAESAR CLUB’ aims to bring together its different user countries and share feedback. Around the manufacturer, KNDS, the officialization in Canjuers gathered countries using the self-propelled howitzer: France (76), Thailand (6), Saudi Arabia (132), Indonesia (55), Czech Republic (62), Belgium (9 GN ordered) and Lithuania (18). And Ukraine for several months.
    -
    SPH MYANMAR : That is the main reason why Myanmar bought large number of SH 1 howitzers in early 2010s. Currently there are as many as 72 SH 1 howitzers in Myanmar inventory and they are used extensively in many counter insurgency operations.
    -
    SPH LAOS : At the end of 2017, a unit of the Lao People's Army Artillery Division surprised the regional military observers with the publicity of CS/SH1's self-evident training image.
    -
    SPH FILIPINA : Philippine Army operates two batteries of ATMOS 155 self-propelled guns which consist of 6 mobile firing units each (12 total) has been delivered by Elbit Systems.
    -
    SPH THAILAND : THailand mengakuisisi sistem meriam swagerak (self-propelled gun-howitzer) kaliber 155 mm untuk melindungi wilayah perbatasan timur Negara Gajah Putih dengan Kamboja.
    -
    SPH VIETNAM : Over the past decade the People's Army of Vietnam developed homebuilt self-propelled howitzers using leftover M101 self-propelled guns combined with the chassis of Ural trucks & M548 tracked cargo carriers
    -
    NORA B-52 = CYPRUS, ALGERIA, KENYA, AZERBAIJAN, BANGLADESH AND MYANMAR
    This artillery system, beyond the domestic market, has seen a fair amount of success in international sales to Cyprus, Algeria, Kenya, Azerbaijan, Bangladesh and Myanmar.
    ==============
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness.
    ==================
    KEY WORDS = DIBAWAH KAKI LAOS, VIETNAM, MYANMAR, BANGLADESH, KENYA


    BalasHapus


  63. kalau dilihat di FOTO RAFAKE tu tiada satu pun tanda itu milik INDIANESIA...HAHAHAHA

    BalasHapus
    Balasan
    1. LEASE 30 YEARS = VSHORAD AND VSHORAD CHINA
      LEASE 30 YEARS = VSHORAD AND VSHORAD CHINA
      LEASE 30 YEARS = VSHORAD AND VSHORAD CHINA
      the Madani government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd. The estimated cost for the deal is RM10.7 billion and it will be covered in installments over a 30-year lease period.
      ==============
      LMS B1 MADE IN CHINA
      LMS B1 = OMPONG SEJAK 2010
      LMS B1 = OMPONG SEJAK 2010
      Littoral Mission Ship built in China by China Shipbuilding and Offshore International Co. Ltd,. The first ship was to be delivered to the Royal Malonnn Navy by 2019, the second and third by 2020 and the fourth by 2021
      ==============
      LEASE 15 YEARS
      LEASE 15 YEARS
      LEASE 15 YEARS
      PMX has defended the decision to lease the helicopters for the military and other government agencies – RM16.5 billion for 15 years – during the Parliament session on Thursday. Among others he said the government adopted the leasing model to reduce maintenance costs and at the same time improved the operational readiness of the fleet..
      ==============
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      -
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
      -------------------------------------
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
      -------------------------------------
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      -------------------------------------
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      CHEAPEST VARIANT LMS
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
      -------------------------------------
      DOWNGRADE ANKA
      DOWNGRADE ANKA
      2023 ANKA OMPONG = WILL NOT ARMED
      Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
      -------------------------------------
      DOWNGRADE ANKA
      DOWNGRADE ANKA
      2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance
      While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance

      Hapus

  64. LOST = RM14.82 MILLION
    LOST = RM14.82 MILLION
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
    BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
    ---------------------
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
    High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
    The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
    ---------------------
    LCS MALONN =
    LAUNCHING 2017 - MANGKRAK 2024
    LAUNCHING 2017 - MANGKRAK 2024
    LAUNCHING 2017 - MANGKRAK 2024
    LAUNCHING 2017 - MANGKRAK 2024
    LAUNCHING 2017 - MANGKRAK 2024
    The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malaysia’s former Navy chief said today.
    ---------------------
    LCS 2024-2011 = 13 TAHUN
    13 TAHUN MANGKRAK
    13 TAHUN MANGKRAK
    LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ---------------------
    NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
    ----------------------
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness.
    ==============
    ==============
    MYANMAR =
    BUILT 2017 - COMMISSIONED 2024
    BUILT 2017 - COMMISSIONED 2024
    BUILT 2017 - COMMISSIONED 2024
    The Senior General and party viewed launching the newlycommissioned 135-metre Frigate from the ship lift platform. The 135-metre Frigate King Thalun was built at the Naval Dockyard Command Headquarters in March 2017 under the guidance of the Senior General.
    ==============
    KEY WORDS =
    1. LAUNCHING 2017 - MANGKRAK 2024
    2. LOST RM14.82 MILLION - SELL 51% CAD TO RHEINMETALL AG

    BalasHapus
  65. CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2023 ANKA OMPONG = WILL NOT ARMED
    Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance
    -------------------------------------
    The Malonnn air defense system faces some challenges, including:
    • Budget constraints
    The government's defense budget is limited and must be balanced with other national priorities.
    • Regional competition
    Neighboring countries like Indonesia and Singapore are also increasing their air force capabilities, which Malonn must keep pace with.
    • Depreciation of the ringgit
    Malonn sources much of its equipment from overseas, and domestic manufacture is also dependent on foreign OEMs

    BalasHapus
  66. KATA KUNCI =
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    Tomczyk revealed that while Poland initially pursued the acquisition of the FA-50s from South Korea with the expectation of receiving operational aircraft, it subsequently emerged that the armaments intended for these aircraft had been discontinued. As a result, the Polish Ministry of Defence has received 12 aircraft that are no longer capable of fulfilling combat roles.....
    ----
    KATA KUNCI =
    FA50 = TRAINING AIRCRAFT
    FA50 = TRAINING AIRCRAFT
    So far, Poland has received 12 of the jets in the GF (Gap Filler) version, but Blaszczak failed to secure weapons for them, Cezary Tomczyk, a deputy defence minister, told parliament on Thursday.
    According to him, the delivery of the 36 remaining jets in the PL version custom-made for Poland "is largely at risk" and delays in their deliveries may reach nine months.
    While praising the role the FA-50s are playing in the Polish Air Force, Tomczyk said that they can only be used as training aircraft.
    ------
    KATA KUNCI =
    HELI MD530G = HELI TRAINING
    HELI MD530G = HELI TRAINING
    A notable attraction at this year’s Langkawi International Maritime and Aerospace (LIMA) exhibition are six new MD530Gs, which were delivered to Malon’s army in 2022. The type is appearing on static, and also participated in the show’s opening ceremony.
    The six rotorcraft – delivery of which was delayed for several years – are primarily used for training.....
    ------
    KATA KUNCI =
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    ------
    KATA KUNCI =
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    ------
    KATA KUNCI =
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    ------
    KATA KUNCI =
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    ------
    KATA KUNCI =
    CHEAPEST VARIANT LMS
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    ------
    KATA KUNCI =
    DOWNGRADE ANKA
    ANKA OMPONG = WILL NOT ARMED
    Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.

    BalasHapus
  67. KATA KUNCI =
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    Tomczyk revealed that while Poland initially pursued the acquisition of the FA-50s from South Korea with the expectation of receiving operational aircraft, it subsequently emerged that the armaments intended for these aircraft had been discontinued. As a result, the Polish Ministry of Defence has received 12 aircraft that are no longer capable of fulfilling combat roles.....
    ----
    KATA KUNCI =
    FA50 = TRAINING AIRCRAFT
    FA50 = TRAINING AIRCRAFT
    So far, Poland has received 12 of the jets in the GF (Gap Filler) version, but Blaszczak failed to secure weapons for them, Cezary Tomczyk, a deputy defence minister, told parliament on Thursday.
    According to him, the delivery of the 36 remaining jets in the PL version custom-made for Poland "is largely at risk" and delays in their deliveries may reach nine months.
    While praising the role the FA-50s are playing in the Polish Air Force, Tomczyk said that they can only be used as training aircraft.
    ------
    KATA KUNCI =
    HELI MD530G = HELI TRAINING
    HELI MD530G = HELI TRAINING
    A notable attraction at this year’s Langkawi International Maritime and Aerospace (LIMA) exhibition are six new MD530Gs, which were delivered to Malon’s army in 2022. The type is appearing on static, and also participated in the show’s opening ceremony.
    The six rotorcraft – delivery of which was delayed for several years – are primarily used for training.....
    ------
    KATA KUNCI =
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    ------
    KATA KUNCI =
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    ------
    KATA KUNCI =
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    ------
    KATA KUNCI =
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    ------
    KATA KUNCI =
    CHEAPEST VARIANT LMS
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    ------
    KATA KUNCI =
    DOWNGRADE ANKA
    ANKA OMPONG = WILL NOT ARMED
    Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.

    BalasHapus

  68. CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2023 ANKA OMPONG = WILL NOT ARMED
    Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance
    -------------------------------------
    The Malonnn air defense system faces some challenges, including:
    • Budget constraints
    The government's defense budget is limited and must be balanced with other national priorities.
    • Regional competition
    Neighboring countries like Indonesia and Singapore are also increasing their air force capabilities, which Malonn must keep pace with.
    • Depreciation of the ringgit
    Malonn sources much of its equipment from overseas, and domestic manufacture is also dependent on foreign OEMs


    BalasHapus
  69. CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2023 ANKA OMPONG = WILL NOT ARMED
    Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance
    -------------------------------------
    MALONN DIBAWAH KAKI =
    RAFALE : BANGLADESH MYANMAR
    RAFALE : BANGLADESH MYANMAR
    For the first batch, Bangladesh, which shares borders with Myanmar and India, plans to procure four Rafale F3-R variants, consisting of three two-seat fighters and one single-seat aircraft currently operated by the French Air Force.
    ==================
    MALONN DIBAWAH KAKI =
    MYANMAR : FRIGATE 135M
    MYANMAR : FRIGATE 135M
    SAC Chairman Commander-in-Chief of Defence Services Senior General Min Aung Hlaing joins the auspicious ceremony to name and commission 135-metre Frigate built by Tatmadaw (Navy)
    ==================
    MALONN DIBAWAH KAKI =
    SPH : LAOS, VIETNAM, MYANMAR, BANGLADESH, KENYA
    NORA B-52 = CYPRUS, ALGERIA, KENYA, AZERBAIJAN, BANGLADESH AND MYANMAR
    This artillery system, beyond the domestic market, has seen a fair amount of success in international sales to Cyprus, Algeria, Kenya, Azerbaijan, Bangladesh and Myanmar.

    BalasHapus

  70. LOST = RM14.82 MILLION
    LOST = RM14.82 MILLION
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
    BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
    ---------------------
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
    High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
    The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
    ---------------------
    LCS MALONN =
    LAUNCHING 2017 - MANGKRAK 2024
    LAUNCHING 2017 - MANGKRAK 2024
    LAUNCHING 2017 - MANGKRAK 2024
    LAUNCHING 2017 - MANGKRAK 2024
    LAUNCHING 2017 - MANGKRAK 2024
    The littoral combat ship (LCS), which was launched in Lumut, Perak in 2017, was not a mock-up or dummy, but the actual vessel that had yet to be completed, Malaysia’s former Navy chief said today.
    ---------------------
    LCS 2024-2011 = 13 TAHUN
    13 TAHUN MANGKRAK
    13 TAHUN MANGKRAK
    LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ---------------------
    NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
    ----------------------
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness.
    ==============
    ==============
    MYANMAR =
    BUILT 2017 - COMMISSIONED 2024
    BUILT 2017 - COMMISSIONED 2024
    BUILT 2017 - COMMISSIONED 2024
    The Senior General and party viewed launching the newlycommissioned 135-metre Frigate from the ship lift platform. The 135-metre Frigate King Thalun was built at the Naval Dockyard Command Headquarters in March 2017 under the guidance of the Senior General.
    ==============
    KEY WORDS =
    1. LAUNCHING 2017 - MANGKRAK 2024
    2. LOST RM14.82 MILLION - SELL 51% CAD TO RHEINMETALL AG


    BalasHapus

  71. MALONN DIBAWAH KAKI =
    RAFALE : BANGLADESH MYANMAR
    RAFALE : BANGLADESH MYANMAR
    For the first batch, Bangladesh, which shares borders with Myanmar and India, plans to procure four Rafale F3-R variants, consisting of three two-seat fighters and one single-seat aircraft currently operated by the French Air Force.
    ==================
    MALONN DIBAWAH KAKI =
    MYANMAR : FRIGATE 135M
    MYANMAR : FRIGATE 135M
    SAC Chairman Commander-in-Chief of Defence Services Senior General Min Aung Hlaing joins the auspicious ceremony to name and commission 135-metre Frigate built by Tatmadaw (Navy)
    ==================
    MALONN DIBAWAH KAKI =
    SPH : LAOS, VIETNAM, MYANMAR, BANGLADESH, KENYA
    -
    The ‘CAESAR CLUB’ aims to bring together its different user countries and share feedback. Around the manufacturer, KNDS, the officialization in Canjuers gathered countries using the self-propelled howitzer: France (76), Thailand (6), Saudi Arabia (132), Indonesia (55), Czech Republic (62), Belgium (9 GN ordered) and Lithuania (18). And Ukraine for several months.
    -
    SPH MYANMAR : That is the main reason why Myanmar bought large number of SH 1 howitzers in early 2010s. Currently there are as many as 72 SH 1 howitzers in Myanmar inventory and they are used extensively in many counter insurgency operations.
    -
    SPH LAOS : At the end of 2017, a unit of the Lao People's Army Artillery Division surprised the regional military observers with the publicity of CS/SH1's self-evident training image.
    -
    SPH FILIPINA : Philippine Army operates two batteries of ATMOS 155 self-propelled guns which consist of 6 mobile firing units each (12 total) has been delivered by Elbit Systems.
    -
    SPH THAILAND : THailand mengakuisisi sistem meriam swagerak (self-propelled gun-howitzer) kaliber 155 mm untuk melindungi wilayah perbatasan timur Negara Gajah Putih dengan Kamboja.
    -
    SPH VIETNAM : Over the past decade the People's Army of Vietnam developed homebuilt self-propelled howitzers using leftover M101 self-propelled guns combined with the chassis of Ural trucks & M548 tracked cargo carriers
    -
    NORA B-52 = CYPRUS, ALGERIA, KENYA, AZERBAIJAN, BANGLADESH AND MYANMAR
    This artillery system, beyond the domestic market, has seen a fair amount of success in international sales to Cyprus, Algeria, Kenya, Azerbaijan, Bangladesh and Myanmar.
    ==============
    Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    Political interference and corruption: Political interference and corruption are undermining combat readiness.
    ==================
    KEY WORDS = DIBAWAH KAKI LAOS, VIETNAM, MYANMAR, BANGLADESH, KENYA

    BalasHapus
  72. LEASE 30 YEARS = VSHORAD AND VSHORAD CHINA
    LEASE 30 YEARS = VSHORAD AND VSHORAD CHINA
    LEASE 30 YEARS = VSHORAD AND VSHORAD CHINA
    the Madani government announced that it had struck a deal with China to lease 62 new train sets for KTM Bhd. The estimated cost for the deal is RM10.7 billion and it will be covered in installments over a 30-year lease period.
    ==============
    LMS B1 MADE IN CHINA
    LMS B1 = OMPONG SEJAK 2010
    LMS B1 = OMPONG SEJAK 2010
    Littoral Mission Ship built in China by China Shipbuilding and Offshore International Co. Ltd,. The first ship was to be delivered to the Royal Malonnn Navy by 2019, the second and third by 2020 and the fourth by 2021
    ==============
    LEASE 15 YEARS
    LEASE 15 YEARS
    LEASE 15 YEARS
    PMX has defended the decision to lease the helicopters for the military and other government agencies – RM16.5 billion for 15 years – during the Parliament session on Thursday. Among others he said the government adopted the leasing model to reduce maintenance costs and at the same time improved the operational readiness of the fleet..
    ==============
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2023 ANKA OMPONG = WILL NOT ARMED
    Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance



    BalasHapus
  73. Some factors that contribute to the Malonn Army's perceived weakness include:
    • Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
    • Corruption: The MAF has been plagued by corruption.
    • Poor planning: The MAF has been criticized for poor planning.
    • Political interference: Political leaders have interfered in the MAF's procurement process.
    • Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
    Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
    ===================
    PROBLEMS MALON SHIPYARD
    Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.
    ===================
    LOST = RM14.82 MILLION
    LOST = RM14.82 MILLION
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    SELL 51% CAD TO RHEINMETALL AG
    Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
    BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
    ===================
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
    Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
    High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
    The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
    ===================
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE

    BalasHapus
  74. Balasan
    1. Some factors that contribute to the Malonn Army's perceived weakness include:
      • Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
      • Corruption: The MAF has been plagued by corruption.
      • Poor planning: The MAF has been criticized for poor planning.
      • Political interference: Political leaders have interfered in the MAF's procurement process.
      • Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
      Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
      ===================
      PROBLEMS MALON SHIPYARD
      Local shipyards have poor record building big ships. LCS is one, Kedah is the first. The MMEA OPV is the other one. No need to be a cheerleader about it and trying to play it safe. It’s bad then it’s bad. Can blame the system, blame the politicians, blame the lack of controls, blame the people, the fact remains the local shipyards failed to deliver, and it has cost RMN. Less we forget, BNS (from the days of PSC-ND) had more than 20+ years to learn building complex ships. Also, the shipbuilding pipeline is too limited to support a local industry, meaning there is no learning possible – BNS (and its predecessor PSC-ND) only had contract to build 12 warships in its existence. In fact, come 2030, after 30 years, if we’re lucky the shipyard would still only have built 11 ships. In contrast ST Engineering had more than 40 ships over 28 years and have confirmed 6 new ships out to 2030. Learning is one thing, tolerating “still learning” after 20 plus years is not good enough. Not recognising learning is not possible because of limited pipeline is another. Local shipyards have proven capable of building certain type of ships because of good pipeline, so good for them that they win those contract – they can learn over time to build bigger ships. But for now, no need to be a cheerleader for local shipyards pitching to win big ships for RMN and MMEA.
      ===================
      LOST = RM14.82 MILLION
      LOST = RM14.82 MILLION
      SELL 51% CAD TO RHEINMETALL AG
      SELL 51% CAD TO RHEINMETALL AG
      SELL 51% CAD TO RHEINMETALL AG
      Boustead Heavy Industries Corporation Bhd (BHIC) lost some RM14.82 million by selling its 51 per cent equity stake in Contraves Advanced Devices Sdn Bhd (CAD) to Rheinmetall AG, a German automotive and arms manufacturer. CAD was the company which was given the most contracts for the LCS project. Rheinmetall owns a 49% stake in CAD.
      BHIC’s wholly owned subsidiary, BHIC Defence Technologies Sdn Bhd, which holds the stake in the CAD, reached an agreement with Rheinmetall following negotiations that began in December 2023.
      ===================
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      HIGH COURT = CRIMINAL BREACH LCS RM 21 MILLION
      Former Royal Malonnn Navy (RMN) chief Tan Sri Ahmad Ramli Mohd Nor failed to quash his three counts of criminal breach of trust totalling RM21 million over the Littoral Combat Ship (LCS) project scandal.
      High Court judge Datuk Azhar Abdul Hamid made the decision today on grounds that the issue of the 80-year-old accused's mental fitness to stand trial should be investigated by the trial judge.
      The High Court also ordered the case to be remitted back to the Sessions Court before judge Suzana Hussain.
      ===================
      PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
      LCS = STALLED 13 YEARS
      LMS B1 = GUNBOAT NO MISSILE
      LMS B2 = DOWNGRADE HISAR OPV
      LEKIU = EXO B2 EXPIRED
      KASTURI = EXO B2 EXPIRED
      LAKSAMANA = GUNBOAT NO MISSILE
      KEDAH = GUNBOAT NO MISSILE
      PERDANA = GUNBOAT NO MISSILE
      HANDALAN = GUNBOAT NO MISSILE
      JERUNG = GUNBOAT NO MISSILE

      Hapus

    2. SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
      ==============
      Malonn's armed forces procurement faces several weaknesses, including:
      1. Corruption
      The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
      2. Political influence
      Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
      Weak parliamentary oversight
      Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
      3. Limited financial scrutiny
      Financial scrutiny is limited by excessive secrecy.
      4. Violation of procedures
      Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
      ==============
      Some factors that contribute to the Malonn Army's perceived weakness include:
      • Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
      • Corruption: The MAF has been plagued by corruption.
      • Poor planning: The MAF has been criticized for poor planning.
      • Political interference: Political leaders have interfered in the MAF's procurement process.
      • Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
      Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
      ==============
      BUDGET 2025 = SALARIES AND ALLOWANCES
      BUDGET 2025 = NOT ASSETS
      BUDGET 2025 = NOT ASSETS
      BUDGET 2025 = NOT ASSETS
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
      ==============
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      BUDGET 2025 = ASSET PROCUREMENT DOWN
      Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
      ==============
      KEY WORDS =
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU

      Hapus
    3. Malonn has faced several crises, including political, financial, and economic crises:
      • Political crisis
      From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
      • Financial crisis
      Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
      • Economic crisis
      Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
      • Household debt crisis
      As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
      Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
      ==========
      The Royal Malonn Air Force (RMAF) has faced several challenges, including:
      • Aircraft maintenance
      The RMAF has had issues with maintenance and spare parts for its aircraft, including the Sukhoi Su-30MKM and the Kuwaiti HORNET MALONN. For example, in 2018, only four of the RMAF's Sukhoi Su-30MKM aircraft were flyable due to maintenance issues. The Kuwaiti HORNET MALONNs are an earlier model than the Malonn fighters, which may cause compatibility issues.
      • Budget constraints
      Malon's defense budget is limited, which can affect the pace of acquisitions and upgrades. The government must balance defense spending with other national priorities.
      • Regional competition
      Neighboring countries like Indonesia and Singapore are also increasing their air force capabilities, which puts pressure on Malon to keep pace.
      • Corruption
      Malon's military has been involved in multiple corruption scandals
      =========
      The Royal Malonn Navy (RMN) faces several challenges, including:
      • Aging fleet: More than half of the RMN's fleet is past its prime, and the country has only received four of the 18 new vessels it planned to acquire. The last time the RMN acquired a combat ship was in 1997.
      • Delayed replacements: The RMN's plans to replace its aging fleet have been stalled due to mismanagement.
      • Insufficient defense budget: Malon's defense budget is less than one percent of its GDP, while neighboring Singapore spends six percent.
      • Lack of coordination: There is a lack of coordination among agencies.
      • Outdated assets: The RMN's ships and assets are outdated.
      • Combat system issues: The RMN has observed deficiencies with the combat system of its LMS type vessels.
      • Low endurance: The LCS's endurance was too low to stay with a carrier strike group or amphibious ready group without significant refueling.
      • Lack of air and surface warfare capabilities: The LCS lacked significant air and surface warfare capabilities
      =========
      BUDGET 2025 = SALARIES AND ALLOWANCES
      BUDGET 2025 = NOT ASSETS
      BUDGET 2025 = NOT ASSETS
      BUDGET 2025 = NOT ASSETS
      Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
      ==============
      KEY WORDS CRISES=
      1. POLITICAL
      2. FINANCIAL
      3. ECONOMIC
      4. DEBT


      Hapus
    4. SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
      ==============
      ---------------------
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      CHEAPEST VARIANT FA50
      -
      1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
      -
      2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
      -
      3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
      -
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      FA50 = UNSUITABLE FOR MILITARY OPERATIONS
      South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
      -------------------------------------
      SEWA 28 HELI = 119 HELI BARU :
      SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
      •HARGA HELI AW149 = USD 31 JUTA
      •28 UNITK X $ 31 JT= USD 857 JUTA
      •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
      ----
      4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
      SEWA 15 TAHUN = RM16.8 BILION
      BELI BARU = RM3.954 BILION
      sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
      -------------------------------------
      CHEAPEST PLATFORM VARIANT :
      -
      HARGA CN 235 = US$ 27,50 Juta
      -
      HARGA ATR 72 = US$24.7 Juta
      -------------------------------------
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      DOWNGRADE HISAR
      CHEAPEST VARIANT LMS
      -
      1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
      -
      2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
      -
      3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
      -
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      HISAR OPV = LMS B2 = NO ASW
      TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
      Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
      -------------------------------------
      DOWNGRADE ANKA
      DOWNGRADE ANKA
      2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
      Malonn to use Anka-S for Maritime Surveillance
      While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance
      ==============
      Malonn's economy has faced a number of challenges, including:
      • Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
      • Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
      • Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
      • High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
      • High dependency on food imports: Malonn imports 60% of the food it consumes.
      • Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
      Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn

      Hapus
  75. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
    ==============
    ---------------------
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance
    ==============
    Malonn's economy has faced a number of challenges, including:
    • Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
    • Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
    • Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
    • High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
    • High dependency on food imports: Malonn imports 60% of the food it consumes.
    • Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
    Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn

    BalasHapus
  76. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
    -------------------------------------
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance
    ==============
    Malonn's economy has faced a number of challenges, including:
    • Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
    • Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
    • Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
    • High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
    • High dependency on food imports: Malonn imports 60% of the food it consumes.
    • Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
    Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn

    BalasHapus
  77. KATA KUNCI =
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    Tomczyk revealed that while Poland initially pursued the acquisition of the FA-50s from South Korea with the expectation of receiving operational aircraft, it subsequently emerged that the armaments intended for these aircraft had been discontinued. As a result, the Polish Ministry of Defence has received 12 aircraft that are no longer capable of fulfilling combat roles.....
    ----
    KATA KUNCI =
    FA50 = TRAINING AIRCRAFT
    FA50 = TRAINING AIRCRAFT
    So far, Poland has received 12 of the jets in the GF (Gap Filler) version, but Blaszczak failed to secure weapons for them, Cezary Tomczyk, a deputy defence minister, told parliament on Thursday.
    According to him, the delivery of the 36 remaining jets in the PL version custom-made for Poland "is largely at risk" and delays in their deliveries may reach nine months.
    While praising the role the FA-50s are playing in the Polish Air Force, Tomczyk said that they can only be used as training aircraft.
    ------
    KATA KUNCI =
    HELI MD530G = HELI TRAINING
    HELI MD530G = HELI TRAINING
    A notable attraction at this year’s Langkawi International Maritime and Aerospace (LIMA) exhibition are six new MD530Gs, which were delivered to Malon’s army in 2022. The type is appearing on static, and also participated in the show’s opening ceremony.
    The six rotorcraft – delivery of which was delayed for several years – are primarily used for training.....
    ------
    KATA KUNCI =
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    ------
    KATA KUNCI =
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    ------
    KATA KUNCI =
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    ------
    KATA KUNCI =
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    ------
    KATA KUNCI =
    CHEAPEST VARIANT LMS
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    ------
    KATA KUNCI =
    DOWNGRADE ANKA
    ANKA OMPONG = WILL NOT ARMED
    Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor

    BalasHapus
  78. KATA KUNCI =
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    Tomczyk revealed that while Poland initially pursued the acquisition of the FA-50s from South Korea with the expectation of receiving operational aircraft, it subsequently emerged that the armaments intended for these aircraft had been discontinued. As a result, the Polish Ministry of Defence has received 12 aircraft that are no longer capable of fulfilling combat roles.....
    ----
    KATA KUNCI =
    FA50 = TRAINING AIRCRAFT
    FA50 = TRAINING AIRCRAFT
    So far, Poland has received 12 of the jets in the GF (Gap Filler) version, but Blaszczak failed to secure weapons for them, Cezary Tomczyk, a deputy defence minister, told parliament on Thursday.
    According to him, the delivery of the 36 remaining jets in the PL version custom-made for Poland "is largely at risk" and delays in their deliveries may reach nine months.
    While praising the role the FA-50s are playing in the Polish Air Force, Tomczyk said that they can only be used as training aircraft.
    ------
    KATA KUNCI =
    HELI MD530G = HELI TRAINING
    HELI MD530G = HELI TRAINING
    A notable attraction at this year’s Langkawi International Maritime and Aerospace (LIMA) exhibition are six new MD530Gs, which were delivered to Malon’s army in 2022. The type is appearing on static, and also participated in the show’s opening ceremony.
    The six rotorcraft – delivery of which was delayed for several years – are primarily used for training.....
    ------
    KATA KUNCI =
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    ------
    KATA KUNCI =
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    ------
    KATA KUNCI =
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    ------
    KATA KUNCI =
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    ------
    KATA KUNCI =
    CHEAPEST VARIANT LMS
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    ------
    KATA KUNCI =
    DOWNGRADE ANKA
    ANKA OMPONG = WILL NOT ARMED
    Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor

    BalasHapus
  79. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
    ==============
    Malonn's armed forces procurement faces several weaknesses, including:
    1. Corruption
    The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
    2. Political influence
    Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
    Weak parliamentary oversight
    Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
    3. Limited financial scrutiny
    Financial scrutiny is limited by excessive secrecy.
    4. Violation of procedures
    Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
    ==============
    Some factors that contribute to the Malonn Army's perceived weakness include:
    • Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
    • Corruption: The MAF has been plagued by corruption.
    • Poor planning: The MAF has been criticized for poor planning.
    • Political interference: Political leaders have interfered in the MAF's procurement process.
    • Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
    Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
    ==============
    BUDGET 2025 = SALARIES AND ALLOWANCES
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
    ==============
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
    ==============
    KEY WORDS =
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU

    BalasHapus
  80. Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
    • Krisis politik
    Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
    1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
    2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
    3. Dampak politik pandemi COVID-19
    4. Proklamasi Darurat 2021
    5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
    • Krisis beras
    Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
    • Krisis mata uang
    Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
    1. Kinerja ekspor yang buruk
    2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
    3. Kekhawatiran geopolitik
    4. Ketidakpastian mengenai prospek ekonomi China
    ==========
    Malonn has faced several crises, including political, financial, and economic crises:
    • Political crisis
    From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
    • Financial crisis
    Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
    • Economic crisis
    Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
    • Household debt crisis
    As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
    • Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
    ==========
    BUDGET 2025 = SALARIES AND ALLOWANCES
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
    ==============
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR

    BalasHapus
  81. KATA KUNCI =
    FA50 = TRAINING AIRCRAFT
    FA50 = TRAINING AIRCRAFT
    So far, Poland has received 12 of the jets in the GF (Gap Filler) version, but Blaszczak failed to secure weapons for them, Cezary Tomczyk, a deputy defence minister, told parliament on Thursday.
    According to him, the delivery of the 36 remaining jets in the PL version custom-made for Poland "is largely at risk" and delays in their deliveries may reach nine months.
    While praising the role the FA-50s are playing in the Polish Air Force, Tomczyk said that they can only be used as training aircraft.
    ------
    KATA KUNCI =
    HELI MD530G = HELI TRAINING
    HELI MD530G = HELI TRAINING
    A notable attraction at this year’s Langkawi International Maritime and Aerospace (LIMA) exhibition are six new MD530Gs, which were delivered to Malon’s army in 2022. The type is appearing on static, and also participated in the show’s opening ceremony.
    The six rotorcraft – delivery of which was delayed for several years – are primarily used for training.....
    ------
    KATA KUNCI =
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    ------
    KATA KUNCI =
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    ------
    KATA KUNCI =
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    ------
    KATA KUNCI =
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    ------
    KATA KUNCI =
    CHEAPEST VARIANT LMS
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    ------
    KATA KUNCI =
    DOWNGRADE ANKA
    ANKA OMPONG = WILL NOT ARMED
    Erol Oguz, unmanned aerial systems programme manager at Turkish Aerospace, told ESD at LIMA that the UAV type being supplied to Malonn will be a new version of the Anka-S with modified wings. Oguz also confirmed that the Ankas will NOt be armed, but will carry a maritime intelligence, surveillance and reconnaissance (ISR) payload that includes a synthetic aperture radar and an electro-optical/infra-red sensor.
    ==============
    Some factors that contribute to the Malonn Army's perceived weakness include:
    • Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
    • Corruption: The MAF has been plagued by corruption.
    • Poor planning: The MAF has been criticized for poor planning.
    • Political interference: Political leaders have interfered in the MAF's procurement process.
    • Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
    Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations

    BalasHapus
  82. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
    -------------------------------------
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance
    ==============
    Malonn's economy has faced a number of challenges, including:
    • Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
    • Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
    • Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
    • High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
    • High dependency on food imports: Malonn imports 60% of the food it consumes.
    • Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
    Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn

    BalasHapus
  83. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
    -------------------------------------
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    CHEAPEST VARIANT FA50
    -
    1. FA 50 GF (TA 50 BLOK II) 12 UNIT HARGA USD 705 JUTA ALIAS USD 58,75 JUTA/UNIT
    -
    2. FA 50 PL (BLOK 20) 36 UNIT HARGA USD 2300 JUTA ALIAS USD 63,89 JUTA/UNIT
    -
    3. FA 50M 18 UNIT HARGA USD 920 JUTA ALIAS USD 51,1 JUTA/UNIT
    -
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    FA50 = UNSUITABLE FOR MILITARY OPERATIONS
    South Korea has delivered FA-50 combat trainer aircraft to Poland that are reportedly unsuitable for military operations, Polish Deputy Defence Minister Cezary Tomczyk said.
    -------------------------------------
    SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM)
    -------------------------------------
    CHEAPEST PLATFORM VARIANT :
    -
    HARGA CN 235 = US$ 27,50 Juta
    -
    HARGA ATR 72 = US$24.7 Juta
    -------------------------------------
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    DOWNGRADE HISAR
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    DOWNGRADE ANKA
    DOWNGRADE ANKA
    2024 ANKA OMPONG = WILL NOT BE EQUIPPED WITH ANY WEAPONRY
    Malonn to use Anka-S for Maritime Surveillance
    While the specific equipment configuration of the Ankas is NOt currently kNOwn, they will be operated solely as a maritime surveillance platform in Malonnn service, and will NOt be equipped with any weaponry. According to European Security & Defence reporting from LIMA 2023, the Malonnn Ankas will have modified wings to improve their endurance
    ==============
    Malonn's economy has faced a number of challenges, including:
    • Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
    • Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
    • Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
    • High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
    • High dependency on food imports: Malonn imports 60% of the food it consumes.
    • Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
    Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn

    BalasHapus
  84. Malonn telah mengalami beberapa krisis, termasuk krisis politik, krisis beras, dan krisis mata uang:
    • Krisis politik
    Malonn mengalami krisis politik berkepanjangan sejak 2020 hingga 2022. Beberapa penyebabnya adalah:
    1. Pertikaian dalam Pakatan Harapan dan Perikatan Nasional
    2. Penolakan Perdana Menteri Mahathir Mohamad untuk menentukan tanggal peralihan kekuasaan
    3. Dampak politik pandemi COVID-19
    4. Proklamasi Darurat 2021
    5. Pengunduran diri Perdana Menteri Muhyiddin Yassin
    • Krisis beras
    Malonn mengalami krisis beras ketika harga beras impor naik sebesar 36% pada September 2023. Hal ini menyebabkan konsumen beralih ke beras lokal yang lebih murah.
    • Krisis mata uang
    Ringgit Malonn mengalami penurunan nilai yang signifikan pada tahun 2024. Beberapa penyebabnya adalah:
    1. Kinerja ekspor yang buruk
    2. Kenaikan suku bunga bank sentral Amerika Serikat (Federal Reserve)
    3. Kekhawatiran geopolitik
    4. Ketidakpastian mengenai prospek ekonomi China
    ==========
    Malonn has faced several crises, including political, financial, and economic crises:
    • Political crisis
    From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
    • Financial crisis
    Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
    • Economic crisis
    Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
    • Household debt crisis
    As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
    • Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
    ==========
    BUDGET 2025 = SALARIES AND ALLOWANCES
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
    ==============
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR

    BalasHapus
  85. BUDGET 2025 = SALARIES AND ALLOWANCES
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    BUDGET 2025 = NOT ASSETS
    Defence got RM21.1 billion allocation, an increase of RM1.4 billion from last year, while Home will get RM19.5 billion, an increase of some RM500 million. Others have made the calculations that the Defence’s stake of the budget is 1.2 per cent of the Malonn GDP. That said most of the allocation is for salaries and other stuff and not assets.
    ==============
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
    ==============
    Malonn has faced several crises, including political, financial, and economic crises:
    • Political crisis
    From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
    • Financial crisis
    Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
    • Economic crisis
    Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
    • Household debt crisis
    As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
    Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
    =========
    Malonn has a number of weaknesses, including:
    • Economic
    Malonn's budget income is highly dependent on the oil and gas sector, and fiscal revenues are low. The country also has high levels of household and corporate debt, and a high dependency on food imports.
    • Political
    Malonn has a divided political landscape, and the country has experienced political instability since 2018. The 2022 election resulted in a hung parliament, the first time this has happened since Malonn's independence.
    • Environmental
    Malonn ranks 147 out of 210 economies on the Environmental Sustainability Index, due to challenges with climate change vulnerability, recycling rate, and renewable electricity output.
    • Public procurement
    Some weaknesses in public procurement in Malonn include non-compliance with contract terms, delayed project completion, poor documentation, and low quality of products and services.
    • Property market
    In the second half of 2023, sales volumes in the property market declined, and prices rose by only 0.1% year-on-year.
    • Currency
    The Malonnn ringgit (MYR) could potentially go down in value further. A weaker currency can have negative economic impacts, particularly for businesses that rely on imports.

    BalasHapus
  86. The Malonn army has faced some challenges, including corruption and issues with military personnel:
    • Corruption
    Malon's military has been involved in corruption, and the country's military doctrine doesn't recognize it as a threat. The Integrity Plan addresses corruption, but it's not a strategic document, and commanders don't receive training on corruption issues before deployments.
    • Military personnel
    Some say that military personnel have struggles with thinking skills, decision-making, and problem-solving.
    • Logistics
    Some say that Malon has had problems ensuring the readiness of the Malonn Armed Forces (MAF) in the face of threats
    -------------------------------------
    Malonn has faced several crises, including political, financial, and economic crises:
    • Political crisis
    From 2020–2022, Malonn experienced a political crisis that led to the resignation of two Prime Ministers and the collapse of two coalition governments. The crisis was caused by political infighting, party switching, and the refusal of Prime Minister Mahathir Mohamad to transition power to Anwar Ibrahim. The crisis ended in 2022 with a snap general election and the formation of a coalition government.
    • Financial crisis
    Malonn experienced a financial crisis when the country's economic fundamentals appeared strong, but the crisis came suddenly. The government's initial response was to increase interest rates and tighten fiscal policy, but this was not enough to correct the external imbalances.
    • Economic crisis
    Malonn's economy has faced challenges due to weak global demand and a dependence on exports. In 2020, Malonn's economy shrank by the most since the Asian crisis. In 2023, weak global demand for electronics and a decline in energy prices weighed on the economy.
    • Household debt crisis
    As of the end of 2023, Malonn's household debt-to-GDP ratio was 84.2%, with household debt reaching RM1.53 trillion
    Malonn has faced several rice crises in the past, including in 1973–1975, the 1980s, 1997–1998, 2008, and 2023. These crises are often caused by price hikes, which are driven by supply and demand, as well as market player behavior
    -------------------------------------
    Malonn's defense budget is considered not in accordance with its objectives. Some of the things to consider are:
    • The allocation of salaries and allowances for 2024 reaches 40% of the total defense budget.
    • The allocation for procurement has increased slightly from 2023, but there may be no real benefit due to the depreciation of the ringgit.
    • The Ministry of Finance assesses the availability of funds for programs and procurement requirements in private.
    • Hundreds of Malonnn military assets have exceeded the 30-year service limit.
    ------------------------------------
    The Malonn Armed Forces (MAF) faces a number of challenges, including:
    • Outdated equipment
    Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government is unable to provide modern assets. For example, the KD Rahman submarine was unable to submerge due to technical issues in 2010.
    • Misappropriation of funds
    There have been multiple instances of public funds being misappropriated under the guise of meeting defense needs.
    • Army-centric mindset
    Malon has an army-centric mindset, even though the country is surrounded by water.
    • Double budgetary allocation
    The army receives more of the budget than the other services.
    • Lack of standard operating procedures
    There are issues with standard operating procedures, from the e-procurement process to inventory receipts.
    • Tension between public and military
    There is tension between the public's right to know and the military's "need-to-know" policies

    BalasHapus
  87. BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    BUDGET 2025 = ASSET PROCUREMENT DOWN
    Operational Expenditure for Defence in 2025 is RM13.363 billion while Development Expenditure is RM7.492 billion. The OE allocation is an increase of some RM1 billion while the increase in DE is around RM450 million. The highest increase in OE is for the emolument (salaries and allowances) which amounted to RM8.773 billion. It is interesting to note that the increase in DE is for services and supply (RM1.906 billion) WHILE ASSET PROCUREMENT IS DOWN TO RM5.585 BILLION, DOWN BY SOME RM250 MILLION FROM LAST YEAR
    -------------------------------------
    The Malonn army has faced some challenges, including corruption and issues with military personnel:
    • Corruption
    Malon's military has been involved in corruption, and the country's military doctrine doesn't recognize it as a threat. The Integrity Plan addresses corruption, but it's not a strategic document, and commanders don't receive training on corruption issues before deployments.
    • Military personnel
    Some say that military personnel have struggles with thinking skills, decision-making, and problem-solving.
    • Logistics
    Some say that Malon has had problems ensuring the readiness of the Malonn Armed Forces (MAF) in the face of threats
    -------------------------------------
    The Royal Malonnn Navy (RMN) has a few weaknesses, including:
    • Lack of modernization: The RMN's fleet is not up to date with current and future challenges. This makes it harder for Malonn to respond to disputes with other countries.
    • Funding shortages: The RMN has a history of funding shortages.
    • Location: The RMN is located between major powers, which could make its waters a frontier in the event of a naval conflict. This could threaten Malonn's sovereignty and maritime interests
    -------------------------------------
    The Royal Malonn Air Force (RMAF) has faced several challenges, including:
    • Aircraft maintenance
    The RMAF has had issues with maintenance and spare parts for its aircraft, including the Sukhoi Su-30MKM and the Kuwaiti HORNET MALONN. For example, in 2018, only four of the RMAF's Sukhoi Su-30MKM aircraft were flyable due to maintenance issues. The Kuwaiti HORNET MALONNs are an earlier model than the Malonn fighters, which may cause compatibility issues.
    • Budget constraints
    Malon's defense budget is limited, which can affect the pace of acquisitions and upgrades. The government must balance defense spending with other national priorities.
    • Regional competition
    Neighboring countries like Indonesia and Singapore are also increasing their air force capabilities, which puts pressure on Malon to keep pace.
    • Corruption
    Malon's military has been involved in multiple corruption scandals

    BalasHapus
  88. Malon's combat equipment has several weaknesses, including:
    • Ageing equipment: The Malonn military's equipment is aging due to small procurement budgets over the past 25 years.
    • Lack of modern assets: The Malonn Armed Forces (MAF) lacks modern military assets, which puts them at risk from both internal and external threats.
    • Russian-made weapons: Malon has been struggling to keep its Russian-made Su-30MKM ground-attack aircraft operational. The country is also wary of Russian-made weapons due to sanctions imposed on Russia after its invasion of Ukraine.
    • Local production: The MAF is reluctant to use locally produced products. Local companies have produced prototypes of pistols and rifles, but none have materialized.
    • Procurement system: The Malonn procurement system needs reform.
    • Political interference and corruption: Political interference and corruption are undermining combat readiness.
    =========
    Malonn's military budget faces a number of problems, including:
    • Fiscal limitations
    Malonnn governments have been unwilling to cut government spending to fund defense.
    • Defense spending as a percentage of GDP
    Malonn's defense spending is 1.2% of its GDP, which is lower than many other regional powers.
    • Necessity of military upgrades
    Some say that military upgrades, such as the purchase of Hornets, are not necessary because the aircraft are becoming technologically obsolete.
    • Fleet sustainment problems
    The Royal Malonnn Air Force (RMAF) faces fleet sustainment problems, and a larger fleet of aging aircraft would make maintenance more difficult.
    The 2025 defense budget for Malonn is RM21.13 billion, which is a 7.08% increase from 2024. RM5.8 billion of that budget is earmarked for maintenance, repair, and the acquisition of new military assets
    =========
    Some factors that contribute to the Malonn Army's perceived weakness include:
    • Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
    • Corruption: The MAF has been plagued by corruption.
    • Poor planning: The MAF has been criticized for poor planning.
    • Political interference: Political leaders have interfered in the MAF's procurement process.
    • Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
    Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
    ============
    The Malonn Army has faced issues with its tanks, including breakdowns and operational problems:
    • August 2022 breakdowns
    A PT-91M Pendekar tank broke down on a highway in Kuala Lumpur on Friday, August 26, 2022, while returning to the Sungai Besi camp after rehearsals for the 65th Independence Day parade. The tank was towed to the National Museum for repairs. The next day, a prime mover also broke down on Jalan Damansara in front of the National Museum. The Malonn Army apologized for the incidents and promised to dispatch a standby recovery team to prevent future breakdowns.
    • Operational issues
    The Malonn Army is addressing operational issues with its PT-91M Pendekar tanks. The issues include problems with the Renk France ESM 350M hydrokinetic transmissions, the electronic components of the GLRF laser rangefinder, and the Sagem Savan-15 fire control system.
    • Spare parts
    The Original Equipment Manufacturer (OEM) for the Pendekar PT-90M, Bumar Labedy from Poland, has stopped producing spare parts for the tanks.
    • Life Extension Program (LEP)
    The Malonn Army plans to implement an LEP for the Pendekar PT-90M Main Battle Tank. The LEP is expected to be included in the 12th Malon Plan (12MP) or 13th Malon Plan (13MP).

    BalasHapus
  89. SEWA 28 HELI = 119 HELI BARU :
    SEWA 28 HELI RM 16.8BN = USD 3.7BN/USD 3.700 JT DOLAR
    •HARGA HELI AW149 = USD 31 JUTA
    •28 UNITK X $ 31 JT= USD 857 JUTA
    •$ 3.700JT ÷ $ 31 JT = 119 HELI BARU
    ----
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU =
    SEWA 15 TAHUN = RM16.8 BILION
    BELI BARU = RM3.954 BILION
    sewaan selama 15 tahun dianggarkan mencecah RM16.8 bilion, jauh lebih tinggi berbanding kos pembelian helikopter serupa yang dianggarkan sekitar RM3.954 bilion.Malon (ATM).
    ==============
    Malonn's armed forces procurement faces several weaknesses, including:
    1. Corruption
    The defense sector is at high risk of corruption, and procurement is vulnerable to powerful interests. The Malonn Anti-Corruption Commission (MACC) received the highest number of corruption complaints for procurement activities in 2013 and 2018.
    2. Political influence
    Decisions are often driven by vendors and against strategic interests. For example, Malonn has sometimes exchanged hardware for palm oil, which exposes the procurement process to political influence.
    Weak parliamentary oversight
    Parliamentary oversight is weak, and audit bodies can only provide ex-post scrutiny.
    3. Limited financial scrutiny
    Financial scrutiny is limited by excessive secrecy.
    4. Violation of procedures
    Procedures are regularly circumvented through political influence. For example, the purchase of military helicopters in 2015 violated the Ministry of Finance's procedures
    ==============
    Some factors that contribute to the Malonn Army's perceived weakness include:
    • Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
    • Corruption: The MAF has been plagued by corruption.
    • Poor planning: The MAF has been criticized for poor planning.
    • Political interference: Political leaders have interfered in the MAF's procurement process.
    • Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
    Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
    ==============
    Malonn's economy has faced a number of challenges, including:
    • Global slowdown: Slower global trade, geopolitical tensions, and tighter monetary policies have contributed to Malonn's economic decline.
    • Weakening global demand: A decline in demand from developed countries, such as the US, EU, and Japan, has negatively impacted Malonn's exports.
    • Slowdown in China: A slowdown in Malonn's main trading partner, China, has also contributed to the economic downturn.
    • High government debt: Malonn has high levels of household and corporate debt, as well as insufficient tax revenue.
    • High dependency on food imports: Malonn imports 60% of the food it consumes.
    • Erosion of price competitiveness: Increasing labor costs have eroded Malonn's price competitiveness.
    Inflation concerns: The war in Ukraine has affected food prices, which are a significant import for Malonn
    ==============
    KEY WORDS =
    4x LEBIH MAHAL SEWA DARIPADA BELI BARU

    BalasHapus
  90. Kesian.....😭😭😭
    Elak topik demi sedapkan hati...😁😁😁

    BalasHapus
  91. WELCOME LIGHT+
    ASTER 30 NT
    ASTER 30 NT
    ASTER 30 NT
    Fincantieri kini mengalihkan kapal-kapal ini untuk kebutuhan Angkatan Laut Indonesia, tetapi kedua kapal akan mempertahankan konfigurasi 'light plus' mereka.
    -------------------------------------
    The Light+ (C band radar 4FF) and Full (complete DBR radar) options also mount Aster anti-aircraft missiles, including the new 30 NT, which is capable of intercepting MRBMs.
    All configurations have the option to mount TESEO "EVO" MK2/E anti-ship missile launchers. According to RID, the Italian Navy ordered the new MBDA TESEO MK/2E heavy-duty missile (TESEO "EVO"), a long-range anti-ship missile with also land attack capability.

    =========
    =========
    DOWNGRADE HISAR = NO ASW
    DOWNGRADE HISAR = NO ASW
    DOWNGRADE HISAR = NO ASW
    CHEAPEST VARIANT LMS
    -
    1. ADA CLASS PAKISTAN USD 1 MILYAR/4 = USD 250 JUTA PER UNIT
    -
    2. ADA CLASS UKRAINE USD 1 MILYAR/2 = USD 250 JUTA PER UNIT + UCAV SENILAI USD 500 JUTA
    -
    3. HISAR OPV CLASS (LMS B2) MALON USD 530 JUTA /3 = USD 176,7 JUTA PER UNIT
    -
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    HISAR OPV = LMS B2 = NO ASW
    TCG AKHISAR dan TCG KOÇHISAR merupakan kapal kelas HISAR yang dibangunkan dalam skop projek MILGEM.
    Kapal ini dibangunkan dari model kovet kelas ADA, yang merupakan antara calon-calon yang disebut akan memenuhi program Littoral Mission Ship Batch 2 Tentera Laut Diraja Malonn.
    -------------------------------------
    ---------------------
    LCS 2024-2011 = 13 TAHUN
    13 TAHUN MANGKRAK
    13 TAHUN MANGKRAK
    LCS DIBAYAR 6 RM 12.4 BILLION NOT YET DELIVERED = The cost of the project is now RM12.4 billion. This is because Ocean Sunshine Bhd (OSB) – the government owned company set up to take over BNS will be paying the BHIC and LTAT (the previous owner of BNS) some RM1.2 billion in liabilities and debt.
    ---------------------
    NGPVs BAYAR HUTANG LCS = seperti didedahkan Jawatankuasa Kira-kira Wang Negara (PAC) dan CEO LTAT, syarikat BNS menggunakan RM400 juta daripada bayaran pendahuluan bagi projek LCS untuk menjelaskan hutang lapuk bagi projek NGPV," syarikat PSC-Naval Dockyard pada Disember 2005 sebelum dijenamakan semula menjadi syarikat Boustead Naval Dockyard Sdn Bhd
    -------------------------------------
    Some factors that contribute to the Malonn Army's perceived weakness include:
    • Political instability: Frequent government changes since 2018 have made it difficult for the Malonn Armed Forces (MAF) to receive the support it needs.
    • Corruption: The MAF has been plagued by corruption.
    • Poor planning: The MAF has been criticized for poor planning.
    • Political interference: Political leaders have interfered in the MAF's procurement process.
    • Outdated equipment: Much of the MAF's equipment was purchased between the 1970s and 1990s, and the government has been unable to provide modern equipment.
    Lack of military knowledge: Military personnel have struggled with decision-making and problem-solving during military operations
    ----------------------
    PERDANA MENTERI = DEFACT KILL PREGNANT WOMEN
    LCS = STALLED 13 YEARS
    LMS B1 = GUNBOAT NO MISSILE
    LMS B2 = DOWNGRADE HISAR OPV
    LEKIU = EXO B2 EXPIRED
    KASTURI = EXO B2 EXPIRED
    LAKSAMANA = GUNBOAT NO MISSILE
    KEDAH = GUNBOAT NO MISSILE
    PERDANA = GUNBOAT NO MISSILE
    HANDALAN = GUNBOAT NO MISSILE
    JERUNG = GUNBOAT NO MISSILE
    ==============
    KEYWORDS =
    DOWNGRADE GUNBOAT NO MISSILE

    BalasHapus